PROGRESS REPORT No.7 (up to )

Size: px
Start display at page:

Download "PROGRESS REPORT No.7 (up to )"

Transcription

1 BOSNIA AND HERZEGOVINA FEDERATION OF BOSNIA AND HERZEGOVINA PUBLIC COMPANY MOTORWAYS IN FEDERATION OF BOSNIA AND HERZEGOVINA LTD. MOSTAR PROJECT: MOTORWAY ON CORRIDOR 5c IN FEDERATION OF BiH PROGRESS REPORT No.7 (up to ) Mostar, January 2012.

2 Contents: 1. INTRODUCTION About us Project description LOAN AGREEMENTS PROCUREMENT PLAN MAIN DESIGN LAND ACQUISITION CONSTRUCTION PERMITS PREPARATION ACTIVITIES FOR CONSTRUCTION PROJECTS PROJECT CONSTRUCTION FINANCIAL POSITION Payment from EIB loan Payment from EBRD loan Summary ENVIRONMENTAL IMPACT Appendix Physical Progress of the construction permits up to Condition of approval required for construction permit for subsection Vlakovo - Lepenica up to Condition of approval required for construction permit for subsection Lepenica Tarčin up to (31.12.) Condition of approval required for construction permit for subsection Svilaj Vukosavlje up to (31.12.) Appendix Physical Progress of the Construction Project up to Lot 1: Kakanj Bilješevo Physical Progress of the Project (Lot 1) (31.12.) Lot 2: Bilješevo Gorica (tunnel Vijenac 2964 m) Lot 3: Gorica Drivuša Lot 7: Kravice Bijača

3 1. INTRODUCTION Public company Motorways in 1.1. About us Public company Motorways in Federation of Bosnia and Herzegovina, ltd Mostar, is registered in a court in Mostar on in accordance with the Law on roads (''Official Gazette FBiH'', No. 12/10 and 16/10), the Law of Management company ('' Official Gazette FBiH'', No.23/99,45/00,2/02,6/02,29/03,68/05,91/07,84/08,88/08 and 7/09) and the Decision of status issues of Public company Motorways in Federation of Bosnia and Herzegovina ltd Mostar adopted by the Government Federation of Bosnia and Herzegovina (Decision V No.593/10 from ) at its 149 session held on 1.July in Sarajevo. Activities of Public company Motorways in FBiH are defined by statute of Public company as jobs and tasks on motorways and express roads in FBiH and: - Preparation long-term, medium term and annual plans and development programs, maintenance, protection, reconstruction, construction, reconstruction of roads and structures on the roads as well as reports on implementation of these plans and programs; - Perform of maintenance and protection; -Investor transactions for studies and projects, renovation, construction, reconstruction and maintenance on roads and buildings; - Proposing financial plans and improve ways of raising funds intended for the road; -Keeping database of roads, buildings, traffic signs and equipment on roads and road cadastre land belt; - Assignment of work on reconstruction, construction, rehabilitation and maintenance of roads; - Preparing and monitoring the implementation of measures and activities to promote safety traffic on roads managed by; - Prepare the basis for granting concessions and ensuring professional and technical supervision; - Organization of toll collection system - Gathering data and informing the public about the condition of roads and method of traffic flow; - Taking the necessary measures to preserve and protect the environment - Organizing and providing services to users of motorways and express roads, etc.. The Government of the Federation of Bosnia and Herzegovina at its meeting held , on the proposal of Federal Ministry of Transport and Communications, made the decision to appoint a proxy Assembly representing the Company in accordance with the Regulation on the exercise of powers authority Federation of Bosnia and Herzegovina in 3

4 companies with state capital and The decision to appoint a temporary supervisory board of Public company FBiH (''Official Gazzette FBiH'' No.88/10). On a session of the Assembly Public company Motorways FBiH was held in the presence of a notary where the Statute of Public company Motorways FBiH has been adopted. At the same day there was also a meeting of the Supervisory Board of Public company Motorways FBiH at which approval was given and adopted Rules of Procedure of Public company Motorways FBiH and Regulations on internal organization affairs Public company Motorways FBiH. In this way they acquire all conditions to stop work Federal Authority for the construction, operation and maintenance of motorways on day and to start with work of Public company Motorways of the Federation of Bosnia and Herzegovina. In accordance with provisions of the Law of the roads of the Federation of BiH, Public company Motorways in FBiH take all equipment, emloyees and records of the Federal directorate for construction, operation and maintenance motorways or Public company motorways in FBiH is the legal successor of the Federal directorate for construction, management and maintenance Project description At Conferences held in Crete and Helsinki in 1994 and 1997, ten trans-european transport corridors were identified as routes in Central and Eastern Europe that require priority investments. Corridor V (Five), linking Kiev in Ukraine to the Adriatic Sea via Lvov and Budapest(Hungary) was one of them. Consisting of three branches, the Vc branch follows Europian route E73 from Budapest to Ploče (Croatia) via Osijek (Croatia) and Sarajevo. Bosnia and Herzegovina contains the longest section of the Vc branch. With a total length of approximately 340 km, the driving force behind construction of the Corridor Vc motorway is to improve connectivity of BiH with its neighbouring countries and to enhance its potential for economic development. The project has strong support from the government and is expected to enable BiH to integrate better with the European economic and social structure. Corridor Vc motorway in BiH includes four main sections (known in Government documents as Lots ), as follows: Lot 1: Svilaj on The Sava River (connection to Corridor X) - Doboj South; Lot 2: Doboj South - Sarajevo South (Tarčin); Lot 3: Sarajevo South (Tarčin) - Mostar North; Lot 4: Mostar North Bijača on the southern border with Croatia. 4

5 Implementation of the construction is on entities level. The Government of Federation of B&H has already completed construction of 37 km long section of motorway in Lot 2 north of Sarajevo on the section between Sarajevo (Jošanica) and Kakanj. Part of the Corridor Vc, in lenght 8 km (Sarajevo bypass) is under construction and expected date of completion is end of 2014 year. Project is financed by the loans of EIB, EBRD, OPEC and WB. The EIB and EBRD are financing four new sections within the four above mentioned Lots which are marked as high priority sections by Government of Federation B&H. These sections are as follows: Section 1: Drivuša to Kakanj, section within Lot 2 (15,2 km); Section 2: Vlakovo to Tarčin, section within Lot 2 (20 km); Section 3: Pocitelj to Bijača (southern Border with Croatia) within Lot 4 (20 km); Section 4: Odzak to Svilaj (northern border with Croatia) Lot 1 (10 km). Section 1 is entirely located in one Canton (Zeničko-Dobojski), traversing through the southern half of the Municipality of Zenica and a south-western section of the Municipality of Kakanj. With a right of way of approximately metres, the Corridor in section 1 follows the narrow Bosna river valley, wich is characterized by undulating hillsides and minimal forest coverage. Corridor Vc in Section 1 largely follows existing infrastructure including main road M17 and, in certain sections, the railway Vrpolje to Sarajevo. Section 2 is located in two cantons ( 90% in Canton Sarajevo and 10% in Middle Bosnia canton), traversing through the western and than southern part of the capital Sarajevo passing through urban and industrial area (Vlakovo and Rakovica) of Canton Sarajevo. The Corridor, in this part, starts its way through mountain area of Federation of BiH. Thus, this section will already have over 6 km of tunnels. In this direction except the highway will be the existing main road M17. Section 3 is entirely located in two cantons (The Herzegovina-Neretva Canton and West Herzegovina Canton) traversing roughly the northern and western part of Municipality Čapljina and Ljubuški. According to the plans this part of the Corridor Vc will also be a part of Adriatic Ion motorway. It will improve connection between B&H and Croatia on the south and the Adriatic sea. 5

6 Public company Motorways in Section 4 is entirely located in one Canton (Posavina Canton) connecting northern part of BiH with Croatia and Corridor X. In addition it is also a continuation of the completed section of Corridor Vc coming from Hungary and Croatia. This area is mostly flat, there is no important structures on the motorway beside 660 m long bridge over the river Sava and border crosing. It is planned to complete all these four sections up the end of 2014 when total constructed length of Corridor Vc in Federation BiH will be 125 km. Part of the construction is also the Zenica baypass (section from Drivuša to Donja Gračanica, 8 km long section whitin Lot 2). This section will be finaced partly by Kuwait Investment Fund. The loan agreement has been signed in 2009 in amount of 30 million Euro. Picture 1: Network of motorways, expressways and trunk roads in Federation of Bosnia and Herzegovina 6

7 2. LOAN AGREEMENTS In a purpose to create stabile financing structure Public company Motorways in Federation of Bosnia and Herzegowina contact international financing institutions for support of these project through loan agreements. First requests have been made in May 2007 and up to date two loan agreements have been signed. First loan agreement was signed in October 2008 with EBRD in amount of 180 millions Euro for: Section Kakanj Drivuša Section Vlakovo Tačin Sections Počitelj Bijača and Svilaj Odžak 60 million Euro 60 million Euro 60 million Euro Second loan agreement was signed in December 2008 with EIB in amount of 75 millions Euro for: Section Kakanj Drivuša 75 million Euro Third loan agreement is going to be signed with EIB in amount of 166 millions Euro for: Section Vlakovo Tarčin and Section Svilaj Odžak Financial proposal for this amount has been submitted to Federation of BiH end of November Financial negotiation are expected to be in July. Signing this Loan agreement is expected in September. The fourth Loan agreement is planned to be signed with EIB in amount of 60 millions Euro for section Počitelj - Bijača after confirmation of final location for the bridge Počitelj by the Parliament. 7

8 3. PROCUREMENT PLAN Public company Motorways in Federation of Bosnia and Herzegowina prepared estimated procurement plan. The estimated values are planned but real values will be determined after completion of the main project and tender procedure. Amount in Thousands EUR No. Description Estimated Contract Value Financing by EBRD and EIB Financing by others Contract Contract Procurement Tender Contract Contract Financier Amount Type method Invitation mmm/yy Award mmm/yy Completion mmm/yy 1 Drivuša-Kakanj Motorway Design 3,200 a Bilješevo - Kakanj 1,600 FBHMD Consultancy Jan-07 Oct-07 Nov-08 2 b Drivuša - Gorica - Bilješevo 1,600 FBHMD Consultancy Jan-07 Oct-07 Nov-08 Drivuša-Kakanj Construction Supervision 6,500 a Bilješevo - Kakanj 1,800 EIB 1,103 Consultancy Competitive May-09 April-10 May-12 b Gorica - Bilješevo 3,000 EBRD 1,984 Consultancy Competitive May-09 June-10 April-14 3 c Drivuša - Gorica 1,700 EIB 1,189 Consultancy Competitive May-09 Oct-10 Dec-12 Drivuša-Kakanj Motorway Construction 128,500 a Bilješevo - Kakanj 41,000 EIB 36,926 Works Open Feb-09 April-10 May-12 b Gorica - Bilješevo 57,000 EBRD 53,061 Works Open May-09 April-11 Jan-14 c Drivuša - Gorica 30,500 EIB 20,510 Works Open Sep-09 Sep-10 Sep-12 Table 1a. Procurement plan 8

9 No. Description Estimated Financing by Contract Value EBRD and EIB Financing by others Contract Contract Procurement Tender Contract Contract Financier Amount Type method Invitation mmm/yy Award mmm/yy Completion mmm/yy 4 Vlakovo-Tarčin Motorway Design 3,390 a Vlakovo - Lepenica 1,560 FBHMD Consultancy Competitive Jan-08 Jun-08 June-10 b Lepenica - Tarčin 1,830 FBHMD Consultancy Competitive Jan-08 Jun-08 June-10 5 Vlakovo-Tarčin Construction Supervision 7,500 a Vlakovo - Lepenica 3,000 EIB Consultancy Competitive Sep-11 April-12 Oct-14 b Lepenica - Suhodol 1,500 EIB Consultancy Competitive Sep-11 May-12 May-14 6 c Suhodol - Tarčin 3,000 EBRD Consultancy Competitive March-11 Jan-12 Jan-15 Vlakovo-Tarčin Motorway Construction 172,500 a Vlakovo - Lepenica 74,000 EIB Works Open Aug-11 April-12 April-14 b Lepenica - Suhodol 41,500 EIB Works Open Sep-11 May-12 May c Suhodol - Tarčin 57,000 EBRD Works Open Nov-10 Jan-12 July-14 Počitelj-Southern Border with Croatia Motorway Design 2,500 MOCT Consultancy Competitive Aug-07 Feb-08 April-11 Počitelj-Zvirovići Motorway Design_new 2,000 EIB-grant Consultancy Competitive Jan-12 April-12 Oct-13 Table 1b. Procurement plan 9

10 No. Description 9 Estimated Contract Value Počitelj-Southern Border with Croatia Construction Supervision 4,500 Financing by EBRD and EIB Financing by others Contract Contract Procurement Tender Contract Contract Financier Amount Type method Invitation mmm/yy Award mmm/yy Completion mmm/yy a Počitelj - Zvirovići without bridge Počitelj 1,200 EIB Consultancy Competitive Oct-12 Oct-13 Dec b Bridge Počitelj 1,500 EIB Consultancy Competitive Oct-12 Oct-13 Oct-15 c Zvirovići - Bijača 1,800 EBRD Consultancy Competitive Sept-10 Aug-11 Dec-13 Počitelj-Southern Border with Croatia Motorway Construction 115,500 a Počitelj - Zvirovići without bridge Počitelj 38,000 EIB Works Open Oct-12 Oct-13 Dec-14 b Bridge Počitelj 19,300 EIB Works Open Jan-12 Oct-13 Oct-15 c.i Zvirovići - Kravice 43,200 EBRD Works Open Sep-10 Dec-11 Dec-13 c.ii Kravice - Bijača 15,000 EBRD Works Open July-10 Aug-11 June-12 Odžak-Northern Border with Croatia Motorway 11 Design 1,500 MOCT Consultancy Competitive Aug-07 Feb-08 Aug-11 Odžak-Northern Border with Croatia 12 Construction Supervision 2,000 EIB Consultancy Competitive Nov-11 Sep-12 Sep-13 Odžak-Northern Border with Croatia 13 Construction Supervision 58,000 EIB Works Open Nov-11 Sep-12 Sep Land Acquisition 22,498 PCMFBH 15 VAT (17%) 71,923 PCMFBH TOTALS 105,011 PCMFBH MOCT TOTALS 495,000 EIB, EBRD Table 1c. Procurement plan Legend: MOCT - Ministry of Transport and Communications BH PCMFBH - Public company Motorways in Federation of Bosnia and Herzegovina 10

11 4. MAIN DESIGN Execution of the main design is divided into three parts. The reason of this is the that the main design was started to be prepared before Public company Motorways in Federation of Bosnia and Herzegowina was fully established and completed delivery of all works related to the Corridor 5c. Status of Main design preparation is as following: No. Section Client Status Remark 1. Vlakovo Lepenica PCMFBH Finished Revised 2. Lepenica Tarčin PCMFBH Finished Revised Dionica Kakanj Drivuša, PCMFBH Finished 3. poddionica Gorica Drivuša i Bilješevo Gorica In construction Dionica Kakanj Drivuša, PCMFBH Finished 4. poddionica Kakanj Bilješevo In construction 5. Dionica Svilaj - Odžak MOCT Finished Revision of main design is in progress. It is projected interchange Odžak. 6. Dionica Zviroviči - Bijača MOCT Finished Revided 7. Dionica Tarčin Konjic Poddionica Tarčin Zukići Poddionica Zukići Konjic Sarajevo bypass Lot3A and Lot 3B Mostar north Mostar south PCMFBH PCMFBH PCMFBH PCMFBH MOCT 10. Mostar south Počitelj MOCT In progress In progress In progress Main project finished Main project finished This section is divided on two subsections: Tarcin- Zukici and Zukici- Konjic Projecting in progress L=10 km Projecting in progress L=11 km Taking documentation between FRD and PCMFBH in progress Taking documentation between MOCT and PCMFBH is in progress. Possible redesign in dependence of adopted spatial plan for Corridor Vc. Taking documentation between MOCT and PCMFBH is in progress. Possible redesign in dependence of adopted spatial plan for Corridor Vc.. Table 2. Progress of the main designes Legend: MOCT - Ministry of Transport and Communications BH FRD - Federal Road Directorate PCMFBH - Public company Motorways in Federation of Bosnia and Herzegovina 11

12 5. LAND ACQUISITION Activities on this item started on five sections. Section Kakanj - Drivuša is completed, and sections Vlakovo - Tarčin and Bijača - Počitelj subsection Bijača Zvirovići are in progress. Land aquisition for sections Donja Gračanica Drivuša and Svilaj Odžak started in September. The following table 3 shows the activities on land acquisition and progress on it. Section Municipality Submitted request to start land acquisition Started work on the field Parcels include in Elaborate of expropriation Issued decisions of land acquisition Number of agreements Complet ed (%) 1. Kakanj Drivuša Kakanj Zenica %* 2. Vlakovo Tarčin Ilidža % Kiseljak % Hadžići % Bijača Počitelj Donja Gračanica Drivuša Čapljina % Ljubuški % Zenica % 5. Svilaj Odžak Odžak % Table 3. Physical progress of land acquisition * Remaining subjects are in process of agreement 12

13 6. CONSTRUCTION PERMITS In accordance with Law of land planning and land use in Federation of B&H it defined a procedure of issuing preliminary construction permit and final construction permit. For issuing of preliminary construction permit it is necessery to collect 17 approvals, while for final construction permit requires preliminary construction permit, completed land acquisition and completed and revised main design. It has obtained a final construction permit for section Kakanj Drivuša. For subsection Kakanj Binješevo in April 2010 and for subsection Bilješevo Gorica and Gorica Drivuša in Jun The tables in Appendix 1. shows physical progress for obtaining urban approval and construction permit per section. 7. PREPARATION ACTIVITIES FOR CONSTRUCTION PROJECTS In the following paragraphs are presented preparatory activities for construction projects devided into sections and subsections. Section Počitelj Bijača is devided into four Lots: Lot 1 Subsection Bijača Kravice Urban planning permit is expected in early July. Land acquisition is finished Opening of financial bids were on 10th May The contract was signed Contractors were introduced into the possession and works begin in late September Preliminary values of works is ,00 Euro (with VAT) The deadline for the work is 10 months 13

14 Lot 2 Subsection Kravice Zvirovići Prequalification documents are opened in October 2010 Urban planning consent was released Acquisition of land is finished. Opening of financial bids was in Mostar Arithymetic error control of offered price have been made. Evaluation of tehnical and financial part of the bid is pending Start of construction is scheduled for March 2012 Preliminary values of works is 45 millions Euro (without VAT) The deadline for the work is 24 months Tender procedure for Supervision for Lot 1 and Lot 2 are finished. Contract was signed The same contractor signed a contract for both lots. For Lot 3 Počitelj - Zvirovići and Lot 4 Bridge Počitelj the procedures for selecting contractors have not started yet. The reason is that it has not adopted a spatial plan and the route of the motorway in this area. Section Vlakovo Tarčin is devided into three Lots: Lot 1 Subsection Tarčin Suhodol Land acquisition and collection of documetation for urban development approval and construction permit is in progress Oppening of finnancial bids was held in Mostar on Procedures of land acquisition and collecting of urban pllaning permit and construction permit is in progress Arithymetic error control of offered prices and evalutation of technical and financial parts of the tender is scheduled for January 2012 Start of construction is scheduled for March 2012 Preliminary values of works is 57 millions Euro (without VAT) The deadline for the work is 36 months Tender procedure for Supervision for this section is still in progress. Technical and financial bids are received Evaluation of technical offers is ongoing until After that follows opening of financial bids and start of the negotiations with the best bidder. Signing the contract is scheduled for March

15 Lot 2 Subsection Lepenica Suhodol Prequalification documents received and opened Evaluation of received documentation is finished, Director of motorways received report (we need his approval before sending report to EIB) Sending PQ report for EIB is scheduled for Call for submission of financial bids for subsection Lepenica Suhodol is scheduled for March 2012 Collecting urban planning permits and construction permits Land acquisition in municipalities Hadžići, Kiseljak, i Ilidža Construction works on subsection Lepenica - Suhodol are scheduled for September 2012 Preliminary values of works is 41,5 millions Euro (without VAT) The deadline for the work is 20 months Lot 3 Subsection Vlakovo - Lepenica Prequalification documents received and opened Evaluation of received documentation is finished, Director of motorways received report (we need his approval before sending report to EIB) Sending PQ report for EIB is scheduled for Call for submission of financial bids for subsection Lepenica Suhodol is scheduled for March 2012 Collecting urban planning permit and construction permits Land expropriation in municipalities Hadžići, Kiseljak, and Ilidža Construction works on subsection Vlakovo Lepenica are scheduled for September 2012 Preliminary values of works is 74 millions Euro (without VAT) The deadline for the work is 24 months 15

16 Section Svilaj Odžak Land acquisition has started in September Redesigning are ongoing Call for prequalification is planned for April 2012 Construction works are scheduled for March 2013 Preliminary values of works is 58 millions Euro (without VAT) The deadline for the works is 12 months 8. PROJECT CONSTRUCTION It is currently under construction Section Kakanj Drivuša which is devided in three lots: Lot 1 Kakanj Bilješevo Contract value 43,2 million Euro Contractor Joint Venture Vijadukt (Croatia) and Hering (Bosnia and Herzegovina) Deadline 18 months Start of construction Lot 2 Bilješevo Gorica (tunnel Vijenac 2964 m) Contract value ,52 Euro Contractor PRIMORJE d.d. (Slovenia) Deadline 33 months Start of construction Lot 3 Gorica Drivuša Contract value 24 mil Euro Contractor Joint Venture BH Joint Venture (Bosnia and Herzegovina) Deadline 24 months Contract signed

17 Lot 1 Construction works on the subsection Bijača Kravice Contract value ,00 EURO Contractor BH Konzorcij (Bosnia and Herzegovina) Deadline 10 months Contract signed Details of completion of contracted works and project status is given in Appendix FINANCIAL POSITION 9.1. Payment from EIB loan Lot 1 Kakanj Bilješevo Constructor: JV Viadukt d.d. Hering d.d. No. Description Period Net amount exc. VAT EUR Date of payment VAT Date of payment Total amount EURO 1 Advance July , , ,87 2. First September , , ,88 3. Second October , ,417, ,64 4. Third November , , ,77 5. Fourth February , , ,62 6. Fifth March , , ,41 17

18 7. Sixth April , , ,94 8. Seventh May , , ,72 9. Eight certificate June , , , Ninth interim certificate July , , , Tenth September , , , Eleventh October , , , Twelfth November , , ,80 Total: , , ,19 Table 4a. Payment from EIB loan to Constructor Note: Net payments were done from EIB loan and VAT from Government FBH fund. Supervision: INOCSA Ingenieria S.L. No. Description Period Net amount exc. VAT EUR Date of payment VAT Date of payment Total amount EURO First Second Third July , ,45 August 2010 September , , , , , ,29 18

19 4. Fourth October , , ,69 5. Fifth November , , ,84 6. Sixth December , , ,75 7. Seventh January , , ,12 8. Eighth February , , ,93 9. Ninth March , , , Tenth April , , , Eleventh May , , , Twelfth June , , , Thirteenth July , , , Fourteenth August , , , Fifteenth September , , , Sixteenth October , , ,69 Total: , ,05 Table 4b. Payment from EIB loan to Supervision 19

20 Lot 3 Gorica Drivuša Constructor: BH Joint Venture Public company Motorways in No. Description 1 Advance First Second Third Fourth Fifth Sixth Period October 2010 March April Net amount exc. VAT EUR Date of payment VAT , , , ,79 Date of payment Total amount EURO , , , , ,56 June , ,70 July , , ,78 September November , , , , ,60 Total: , , ,50 Table 5a. Payment from EIB loan to Constructor Note: Net payments were done from EBRD loan and VAT from Government FBH fund. Supervision: INOCSA INGENIERIA S.L. No. Description Period Net amount exc. VAT EUR Date of payment VAT Date of payment Total amount EURO 1. First November , , ,95 2. Second December , , ,25 3. Third January , , ,62 4. Fourth February , , ,09 5. Fifth March , , ,12 20

21 6. Sixth April , , ,18 7. Seventh May , , ,69 8. Eight June , , ,68 9. Ninth July , , , Tenth August , , , Eleventh September , , Twelfth October , , ,54 Total: , , ,23 Table 5b. Payment from EIB loan to Supervision 9.2. Payment from EBRD loan Lot 2 Bilješevo Gorica (tunnel Vijenac 2964 m) Constructor: PRIMORJE d.d. No. Description Period Net amount exc. VAT EUR Date of payment VAT Date of payment Total amount EURO 1 Advance June , , ,95 2. First September , , ,50 21

22 3. Second October , ,32 Total: , , ,77 Table 6a. Payment from EBRD loan to Constructor Note: The amount of 5,306, Euro will be partially paid from loan funds EBRD (639, Euro) while the second part of the amount of 4,666, Euro paid from funds that were charged protest advance bank guarantee issued of NLB dd Ljubljana for SCT d.d. Ljubljana. These advance previously paid to SCT in the loan funds. Supervision: IGH d.d. Description 1. Advance First Second Period October 2010 October 2010 November 2010 Net amount exc. VAT EUR Date of payment VAT Date of payment Total amount EURO , , , , , , , , ,50 4. Third December , , ,00 5. Fourth February , , ,00 6. Fifth March , , ,50 7. Sixth April 8.786, , ,74 8. Seventh May 8.900, , , Eight Ninth June , ,00 July , , ,23 22

23 11. Tenth August , , Eleventh August , , Thirteen September , , ,86 Total: , , ,81 Table 6b. Payment from EBRD loan to Supervision BH Joint Venture Euroasfalt (Bijača Kravice) No. Description Period Net amount exc. VAT EUR Date of payment VAT Date of payment Total amount EURO 1. Advance September , , ,48 Total: , , ,48 Table 7a. Payment from EBRD loan to Constructor 23

24 9.3.Summary Loan EIB Remark Withdrawn No ,00 ( ) No. Withdrawn No ,00 ( ) LOT 1 Withdrawn No ,00 ( ) JV VIADUKT d.d. - HERING d.d. Total: ,00 ( ) ,99 ( ) Details in Table 4a. INOCSA INGENIERIA S.L ,08 ( ) Details in Table 4b. 3 BH Konzorcij ,66 ( ) Details in Table 5a. 4 LOT 3 INOCSA INGENIERIA S.L ,19 ( ) Details in Table 5b. The remaining sum: ,08 ( ) Tabela 7. Summary report of EIB Loan No. EBRD Loan Total Withdrawn: ,00 ( ) 1 PRIMORJE d.d ,56 ( ) Remark: Section Drivuša- Kakanj, part 1 of main contract Details in table 6a. 2 IGH d.d ,80 ( ) Details in table 6b. BH Konzorcij ,54 ( ) The remaing sum: ,02 ( ) Počitelj- Southern border with Croatia, part 3 of main contract Details in table 7a. Table 8. Summary Report about EBRD Loan 24

25 10. ENVIRONMENTAL IMPACT Until the end of June, the Federal ministry of Environment and Tourism issued three environmental permits. The first was issued in February 2009 for sections Kakanj Drivuša and Vlakovo Tarčin, while the second was issued in September 2010 for section from Svilaj (including part of the bridge which belongs to the Bosnia and Herzegovina) to Doboj South (Karuše). Environmental permit for section Mostar North Southern border, subsection Bijača Zvirovići was issued in December During the normal cycle of maintenance (September- December) we performed cleaning of the closed drainage system drains and drainage separators on the motorway route Kakanj Jošanica. During this action we have cleaned 76 separators 22 concrete, 11 steel and 43 polyetylene separators. In same period, we performed activities in tendering and signing of contract to provide services on monitorning air, soil and water quality. We tested water quality at 76 outlets in the environment in accordance with enivronmental permit. This activities continued troughout December. This material is very large and we will include it in Progress report No 8 with complete testing results containing conclusions and measures to eliminate any possible irregularities and deficiencies. When we talking about air and soil quality, it is important to mention that we took 10 samples of air and 6 samples of soil. Analisys are in progress. In the section Bijača Kravice we performed preventive archeological reserching during period September December. We found two archeological sites on this route. Also, we made relocation and protection of this sites and artifacts during December. On the same section we made management plan for construction plan same as plan for monitoring of air and soil quality during construction stage. It's performed inital examination and first results will be known in January

26 11. MISCELLANEOUS Section Zvirovici Bijaca is a part of the corridor Vc motorway. The aligment is located south of Mostar, on the southern border of Bosnia and Herzegovina with the Republic of Croatia. Construction works are divided into two contracts as following: Contract Section Type of road Length (km) Construction period 1 Kravice - Bijača Motorway 4,06 10 months 2 Zvirovići - Kravice Motorway 5,00 20 months After land acquisition process have been finished in the territory of municipalities of Čapljina and Ljubuški works on the construction have been started contract 1 Kravice Bijača. Construction works will be paid from EBRD loan. This contract was awarded to BH Joint Venture and supervision to Roughton international Ltd. Construction period for this contract is 10 calendar months. Contract 1 consists of the construction of the subsection of motorway between Kravice and Bijača which starts on the rest area at Kravice and finishes on the south border with Croatia in village Bijača, beyond the new border crossing facility, which is to be constructed as part of separated contract. Subsection Kravice Bijača is 4,06 km long excluding border crossing facility. Construction on this section includes: The main alignment with new double carriageway motorway over 4,06 km The overpasses, one in Podine,72 m long and a second one, 90 m long at Zvirići Interchange Three underpasses : Dol, Sulet and Galići One interchange Zvirici Frontal toll station A center for maintenance and traffic control During the period November December earthworks as excavation and embankment on the whole section, bulk in the plateau zone COKP Zvirići and excavation at position underpassing Sulet and Galici. Control drilling were carried out at locations of underpasses foundation. Also, underlying concrete has been set for the fundamental lanes. Beside this the preparations for making external drainage system and relocation of existing water and electrical installations. During December the Contractor has stressed the earthworks activities on 5 fronts whilst culvert construction progressing is much better since their design changed. 26

27 12. Appendix 1. Physical Progress of the construction permits up to

28 12.1. Condition of approval required for construction permit for subsection Vlakovo - Lepenica up to No. Institutions Handed Condition Previous Policies 1 Federal Ministry of Culture and Sports - Institute for the Protection of Monuments Issued Agency for Water Area river Sava (Previous water consent) Issued Documentation have been made 3 BH Telecom d.o.o Issued Ministry of Physical Planning for Canton Sarajevo and Canton Srednjebosanski Municipality Kiseljak (expert opinion - permit) Željeznice Federacije BiH d.o.o. (Railway of Federation BiH) Issued Issued Issued BH Gas Issued Elektrodistribucija Sarajevo Issued 9 Elektroprenos Sarajevo Issued Documentation have been made Documentation have been made 10 Ministry of Agriculture for Canton Sarajevo and Canton Srednjebosanski (consent for deforestation - forest consent) Issued Ministry of Agriculture for Canton Sarajevo and Canton Srednjebosanski (consent for conversion agricurtural land - agricultural agreement) handed Vodovod (water supply) Ilidža Issued Ministry of Defence Issued Ministry of Health Canton Sarajevo and Canton Srednjebosanski (sanitary permit) Municipality of Ilidža ( expert opinion - consent) issued Issued Elektro Kiseljak issued Vodovod (water supply) Kiseljak Issued Federal Ministry of Environment and Tourism (environmental permit) Federal Ministry of Physical Planning Issued --- Urban planning approval obtained (January 2012) - construction permit submitted in January

29 12.2. Condition of approval required for construction permit for subsection Lepenica Tarčin up to (31.12.) No. Institutions Handed Condition Previous Policies 1 2 Federal Ministry of Culture and Sports - Institute for the Protection of Monuments Agency for Water Area river Sava (Previous water consent) --- issued issued Documentation finished 3 BH Telecom d.o.o Issued Ministry of Physical Planning for Canton Sarajevo and Canton Srednjebosanski Municipality Kiseljak (expert opinion - permit) Željeznice Federacije BiH d.o.o. (Railway of Federation BiH) --- issued Issued issued BH Gas Issued Elektrodistribucija Sarajevo Issued Documentation finished 9 Elektroprenos Sarajevo Issued Documentation finished Ministry of Agriculture for Canton Sarajevo and Canton Srednjebosanski (consent for deforestation - forest consent) Ministry of Agriculture for Canton Sarajevo and Canton Srednjebosanski (consent for conversion agricurtural land - agricultural agreement) --- issued Issued 12 Vodovod (water supply) Hadžići Issued Ministry of Defence Issued Ministry of Health Canton Sarajevo and Canton Srednjebosanski (sanitary permit) --- issued Municipality of Hadžići ( expert opinion - consent) --- issued Elektrodistribucija Kiseljak --- issued Vodovod (water supply) Kiseljak Issued Federal Ministry of Environment and Tourism (environmental permit) Issued Federal Ministry of Physical Planning Urban planning permit has been issued in July, application for construction permit has submitted in January

30 12.3. Condition of approval required for construction permit for subsection Svilaj Vukosavlje up to (31.12.) No. Institutions Handed Condition Previous Policies 1 2 Federal Ministry of Culture and Sports - Institute for the Protection of Monuments Agency for Water Area river Sava (Previous water consent) issued Issued (without bridge) Documentation finished 3 JP HT Mostar d.d. --- issued Ministry of Physical Planning for Canton Posavski Municipality Odžak (expert opinion - permit) Obtained only for to km (the rest up to area Federation, is not in accordance with the adopted spatial plan) --- Not necessary Željeznice Federacije BiH d.o.o. (Railway of Federation BiH) issued BH Gas --- issued Elektrodistribucija Odžak issued Elektroprenos Tuzla --- issued Necessary prepare documentation 10 Ministry of Agriculture for Canton Posavski (consent for deforestation - forest consent) --- Issued (required payments) Ministry of Agriculture for Canton Posavski(consent for conversion agricurtural land - agricultural agreement) --- Issued (required payments) Vodovod (water supply) Odžak --- issued Ministry of Defence --- issued Ministry of Health Canton Posavski(sanitary permit) JP Ceste FBiH (relocation of the main road) Federal Ministry of Environment and Tourism ( environmental permit) Federal Ministry of Physical Planning --- issued issued issued --- Applying for urban planning permit by February 2012, and construction permit by June

31 13. Appendix 2. Physical Progress of the Construction Project up to

32 13.1. Lot 1: Kakanj Bilješevo Physical Progress of the Project (Lot 1) (31.12.) No. ID Task Name Duration Start Deadline 1 1. HIGHWAY ALIGNMENT % of Completion New Alignment ,5% Reconstructed alignment % 4 2. INTERCHANGE LUČANI Construction of toll station Lučani % Underpassages Lučani % 7 3. DRAINAGE 69% 8 4. ENGINEER`S CONSTRUCTIONS AND STRUCTURES Passages % Project of recovery sliding area Tičići % BRIDGES Construction of new bridge % Reconstruction of existing bridges % Table 9a. Physical progress of Lot 1 Type of Works under construction 32

33 No. ID Task Name Duration Start Deadline REGIONAL ROAD R445 % of Completion Alignment % Engineer`s constructions and structures % Bridges % Passage 36% LOCAL ROADS % TRAFFIC TECHNICAL EQUIPMENT Traffic tehnical equipment for highway 0% 22 Traffic tehnical equipment for regional 8.2. road 23 Traffic tehnical equipment for local 8.3. road TRAFFIC OPERATION DURING CONSTRUCTION WORKS ON INSTALATIONS Gas instalations 100% Electro distributive lines - collisions 80% Electro energy supply 0% Optic cables and TC lines 5% Traffic information system 0% Other works 20% 21% 0% 55% Table 9b. Physical progress of Lot 1 Type of Works under construction 33

34 13.2 Lot 2: Bilješevo Gorica (tunnel Vijenac 2964 m) Physical Progress of the Project (Lot 2) (31.12.) No. ID Task Name Duration Start Deadline % of Completion 1 1. EARTH WORKS ON PORTALS AND CUTTINGS % 2 2. PROTECTION AND SUPPORT WORKS ON PORTALS % 3 3. DRAINAGE WORKS ON PORTALS AND CUTTINGS EXCAVATION IN TUNNELS AND CROSSCONNECTION ,5% 5 5. SUPPORT WORKS IN TUNNELS ,5% 6 6. SUPPORT WORKS IN CROSS CONNECTIONS TUNNELS WATERPROOFING AND DRAINAGE DRAINAGE TUNNELS "VIJENAC" PORTALS CANOPIES % CONCRETE WORKS IN TUNNELS AND CROSS CONNECTION REINFORCEMENT REINFORCED CONCRETE OF CARRIAGEWAY GEOTEHNICAL MONITORING % EARTHING HORTICULTURE VENTILATION IN TUNNELS A. ELECTROMATERIAL AND ELECTROWORKS FOR TUNNEL VENTILATION: APROACH TEMPORARY ROADS % RADIO SYSTEM TUNNELS "VIJENAC" SYSTEM OF SOUNDING Table 10a. Physical progress of Lot 2 Type of Works under construction 34

35 No. ID Task Name Duration Start Deadline SUMMARY OF EQUIPMENT AND ASSEMBLAGE TV SYSTEM TUNNELS "VIJENAC" (ITEM ) SUMMARY EQUIPMENT (ITEM 21.1 TO 21.10) AND WORKS ASSEMBLAGE (ITEM TO ) OF REMOTE MANAGEMENT AND SUPERVISION FOR TUNNELS "VIJENAC" RETAINING WALL Z3, BETWEN VIJADUCT "GORICA" AND TUNNELS "VIJENAC" RETAINING WALLS Z1 AND Z2, BETWEN VIJADUCT "GORICA" AND TUNNELS "VIJENAC": % of Completion % % ALIGNMENT OUT OF TUNNELS VIJENAC SURFACE SLIDING "GORICA" /DELUVIUM EROSION/ % WATER SUPPLY TUNNELS "VIJENAC" DIVERSION OF VILLAGE EXISTING ROAD WATER SUPPLY TUNNEL "VIJENAC" HYDRANT NETTING IN TUNNELS "VIJENAC" INTERNAL TUNNELS DRAINAGE ELECTRICAL TUNNELS SUPPLY TRANSFORMER STATIONS AND UPS DESIGN OF LIGHTING AND LOW VOLTAGE FEEDING DISTRIBUTION CABINET TUNNEL EQUIPMENT CABLE TK TRENCHING IN FRONT OF TUNNELS: OPTICAL TELECOMMUNICATION CABLES TELEPHONE CALLING SYSTEM TPS SYSTEM OF FIRE ANNOUNCEMENT TRAFFIC SIGNALIZATION AND EQUIPMENT IN TUNNELS "VIJENAC" Table 10b. Physical progress of Lot2. Type of Works under construction 35

36 13.3. Lot 3: Gorica Drivuša Physical Progress of the Project (Lot 3) (31.12.) No. ID Task Name Duration Start Deadline % of Completion Type of Works under construction ALIGNMENT WORKS: 622 days ,00% Embankment up to the subgrade, segment ditch, soiling, culvert, Reno mattresses TOLL STATION DRIVUSA: 583 days ,00% Embankment up to the subgrade 2.a TOLL STATION DRIVUSA OBJECTS 450 days ,00% Making columns and plates for tool station COKP DRIVUŠA: 532 days ,00% Curbs, road base, segment ditch and objects 3.a COKP Drivuša objects 425 days ,00% Making foundations for all objects on the tool station OTHER ROADS AND TRAFFIC SURFACES: 583 days ,00% Embankment up to the subgrade, concreting of the wall (km 3+318) 36

37 No. ID Task Name Duration Start Deadline % of Completion Type of Works under construction INTERNAL DRAINAGE: 503 days ,00% Pipe laying and inspection chambers 5a INTERNAL DRAINAGE: (PROPUSTI) 503 days ,00% Making culvert ENGINEER'S CONSTRUCTIONS AND STRUCTURES: SUMMARY BRIDGE M days ,00% SUMMARY BRIDGE M 425 days ,00% SUMMARY BRIDGE M days ,00% SUMMARY BRIDGE M days ,00% SUMMARY UNDERBRIDGE "DRIVUŠA" 150 days ,00% Making foundations and pillars for left and right bridge, making reinforced concrete bearers Making foundations and pillars for left and right bridge, making segments of the span construction Making buoyant foundation of the underbridge SUMMARY CULVERT "DRIVUŠA" 120 days ,00% Not started yet TRAFFIC SIGNALIZATION AND EQUIPMENT: NOISE PROTECTION: 0,00% INSTALLATIONS: 5,00% 0,00 2 Substations, collection consent, light not started yet, optic not started yet, tunnel Vijenac, not started yet 16. Table 11b. Physical progress of Lot3. 37

38 12.4. Lot 7: Kravice Bijača Physical Progress of the Project (Lot 7) (31.12.) No. ID Task Name Duration Start Deadline % of Completion Type of Works under construction 1 1. ALIGNMENT WORKS New route % Embankment to the subsoil, segment ditch, culvert, road base, 3 2. Loop ZVIRIĆI Tool station Zvirici % Making columns and plates for tool station 5 3.a COKP ZVIRIĆI: objects % 6 4. ENGINEERING contructions and objects Making foundations and bearers for COKP Passages % 8 5. Bridges Bridges - construction % 10 6 Resting area Kravice - construction % Table 12c. Dinamika radova Lot7. 38

39 39

Motorways of Federation of BH Ltd Mostar

Motorways of Federation of BH Ltd Mostar BOSNIA AND HERZEGOVINA FEDERATION OF BOSNIA AND HERZEGOVINA Motorways of Federation of BH Ltd Mostar PROJECT: MOTORWAY ON CORRIDOR Vc IN FEDERATION OF BH PROGRESS REPORT No. 13 concluded on June 30, 2013

More information

Motorways of Federation of BH Ltd Mostar BOSNIA AND HERZEGOVINA FEDERATION OF BOSNIA AND HERZEGOVINA

Motorways of Federation of BH Ltd Mostar BOSNIA AND HERZEGOVINA FEDERATION OF BOSNIA AND HERZEGOVINA BOSNIA AND HERZEGOVINA FEDERATION OF BOSNIA AND HERZEGOVINA Motorways of Federation of BH Ltd Mostar PROJECT: MOTORWAY ON CORRIDOR Vc IN FEDERATION OF BH PROGRESS REPORT NO. 16 (concluded on March 31,

More information

INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA. CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI

INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA. CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI No: JPAC 841-B80-17 This Invitation for Tenders is published

More information

updated CONNECTIVITY AGENDA western balkans 6 summit, london July 2018 Co-financing of Investment Projects in the Western Balkans

updated CONNECTIVITY AGENDA western balkans 6 summit, london July 2018 Co-financing of Investment Projects in the Western Balkans updated western balkans 6 summit, london July 2018 CONNECTIVITY AGENDA Co-financing of Investment Projects in the Western Balkans 2018 CONTENTS 1 FOREWORD Johannes Hahn, European Commissioner for Neighbourhood

More information

Government of Montenegro. Ministry of Transport and Maritime Affairs. Podgorica, April 2013

Government of Montenegro. Ministry of Transport and Maritime Affairs. Podgorica, April 2013 Government of Montenegro Ministry of Transport and Maritime Affairs Podgorica, April 2013 1 I RAIL INFRUSTRUCTURE 1. Rehabilitation of railway line Bar Vrbnica, according to the study Italferr: Technical

More information

Public Seminar 30 October 2018, Lisbon. Water sector in B&H

Public Seminar 30 October 2018, Lisbon. Water sector in B&H Public Seminar 30 October 2018, Lisbon Water sector in B&H Ministry of Foreign Trade and Economic Relations www.mvteo.gov.ba Boško Kenjić, Head of Department Tel: +387 33 262 155 E-mail: bosko.kenjic@mvteo.gov.ba

More information

Trieste, 26 th September 2012

Trieste, 26 th September 2012 Experience in working with EBRD Trieste, 26 th September 2012 Sectors of Activity Roads Railways Bridges Airports Building facilities Water supply Wastewater Dams Services Design, supervision, technical

More information

Bosnia and Herzegovina Corridor VC 2 Project. Non-technical Summary

Bosnia and Herzegovina Corridor VC 2 Project. Non-technical Summary Bosnia and Herzegovina Corridor VC 2 Project Non-technical Summary Project: Report: Prepared by: Financed by: Bosnia and Herzegovina Corridor VC 2 Project Environmental and Social Assessment Non-technical

More information

LAW ON THE AGENCY FOR PRESCHOOL, PRIMARY AND SECONDARY EDUCATION

LAW ON THE AGENCY FOR PRESCHOOL, PRIMARY AND SECONDARY EDUCATION Pursuant to Article IV.4.a) of the Constitution of Bosnia and Herzegovina, at the 16th session of the House of Representatives, held on October 11th and 30th, 2007, and at the 9th session of the House

More information

Ivan Lovrić. Telephone Mobile phone Fax

Ivan Lovrić. Telephone Mobile phone Fax PERSONAL INFORMATION Surname and first name Ivan Lovrić Address Work: Faculty of Civil Engineering, University of Mostar, Matice hrvatske bb, 88000 Mostar, Bosnia and Herzegovina Telephone +387 36 355

More information

IPA National Programme 2009 part 1 Bosnia and Herzegovina Fiche 2 - "Transport Infrastructure"

IPA National Programme 2009 part 1 Bosnia and Herzegovina Fiche 2 - Transport Infrastructure IPA National Programme 2009 part 1 Bosnia and Herzegovina Fiche 2 - "Transport Infrastructure" 1. Basic information 1.1 CRIS Number: 2009/021-333 1.2 Title: Improvement of regional transport infrastructure

More information

ARTWEI ARTWEI ARTWEI

ARTWEI ARTWEI ARTWEI Protection / Management Plans for Natura 2000 areas and Maritime Spatial Plan for internal sea waters - including the Szczecin Lagoon Szczecin, 7th May 2011 Andrzej Zych Inspectorate of Coast Protection

More information

IRONTON-RUSSELL BRIDGE REPLACEMENT

IRONTON-RUSSELL BRIDGE REPLACEMENT IRONTON-RUSSELL BRIDGE REPLACEMENT 2012-2016 District 9 Ohio Department of Transportation Ironton-Russell Bridge Replacement Existing Ironton-Russell Bridge Ironton-Russell Bridge Replacement Existing

More information

TA Round 19 WBIF Steering Committee Paris, 18 June 2018

TA Round 19 WBIF Steering Committee Paris, 18 June 2018 TA Round 19 WBIF Steering Committee Paris, 18 June 2018 Round 19 eligibility criteria Restricted call: only WBIF portfolio projects; Open to all eligible sectors - national sector strategy adopted; Energy

More information

Wind Power Plant Podveležje

Wind Power Plant Podveležje Wind Power Plant Podveležje Public Information Meeting Mostar, Topics 1. PROJECT BACKGROUND AND OBJECTIVES 2. PROJECT DESCRIPTION 3. PERMITTING STATUS 4. DESCRIPTION OF THE ENVIRONMENTAL CONDITIONS Physical

More information

Project of E-763 Motorway Construction, Section: Belgrade Ostružnica - Požega Boljare/ Border of Montenegro

Project of E-763 Motorway Construction, Section: Belgrade Ostružnica - Požega Boljare/ Border of Montenegro Project of E-763 Motorway Construction, Section: Belgrade Ostružnica - Požega Boljare/ Border of Montenegro I Legal Framework: Preparation of design for construction of E-763 motorway, section: Belgrade

More information

REPUBLIC OF CROATIA MINISTRY OF MARITIME AFFAIRS, TRANSPORT AND INFRASTRUCTURE AGENCY FOR INLAND WATERWAYS

REPUBLIC OF CROATIA MINISTRY OF MARITIME AFFAIRS, TRANSPORT AND INFRASTRUCTURE AGENCY FOR INLAND WATERWAYS REPUBLIC OF CROATIA MINISTRY OF MARITIME AFFAIRS, TRANSPORT AND INFRASTRUCTURE AGENCY FOR INLAND WATERWAYS BRATISLAVA, MAY 3rd, 2012 Inland Waterways in Republic of Croatia Significant waterways in the

More information

Company ID. Bosnia and Herzegovina Entity: The Federation of Bosnia and Herzegovina Canton: The Herzegovina-Neretva Canton

Company ID. Bosnia and Herzegovina Entity: The Federation of Bosnia and Herzegovina Canton: The Herzegovina-Neretva Canton Company ID State: Bosnia and Herzegovina Entity: The Federation of Bosnia and Herzegovina Canton: The Herzegovina-Neretva Canton City: Mostar Address: Baćevići bb, 88000 Contact: +387 (0) 36 375 555 /

More information

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information

More information

Road Connections Affecting the Competitiveness Strengthening of the Port of Ploče

Road Connections Affecting the Competitiveness Strengthening of the Port of Ploče ISSN 0554-6397 UDK: 656.1.022.8 656.615(497.5 Ploče) Review article (PREGLEDNI RAD) Received (Primljeno): 10.03.2018. Siniša Vilke E-mail: svilke@pfri.hr Borna Debelić E-mail: debelic@pfri.hr University

More information

Yugoslav Republic of Macedonia.

Yugoslav Republic of Macedonia. Albania the former Yugoslav Republic of Macedonia Power Interconnection (I): Grid Section in Albania Partners: Transmission System Operator in Albania (OST sh.a.) The Ministry of Energy and Industry, Albania

More information

КORIDORI SRBIJE. The Danube Region Transport Days 2013 STATUS OVERVIEW. October 3, 2013 Belgrade

КORIDORI SRBIJE. The Danube Region Transport Days 2013 STATUS OVERVIEW. October 3, 2013 Belgrade КORIDORI SRBIJE The Danube Region Transport Days 2013 STATUS OVERVIEW October 3, 2013 Belgrade 1 CONTENT Introduction Company profile Basic information Importance of the project Stakeholders map Finance

More information

University of Mostar in brief. Prof.Dražena Gašpar, Ph.D. Vice-Rector for International Relations and Business

University of Mostar in brief. Prof.Dražena Gašpar, Ph.D. Vice-Rector for International Relations and Business University of Mostar in brief Prof.Dražena Gašpar, Ph.D. Vice-Rector for International Relations and Business 1 UNIVERSITY OF MOSTAR - HISTORY 1. 1895 - Origins from the Franciscan School of Theology the

More information

Notice regarding expected tender

Notice regarding expected tender 1 1 Notice regarding expected tender Section I: Contracting entity Name and address Kalaallit Airports A/S Aqqusinersuaq 48A, P.O. Box 2000 GL-3900 Nuuk Greenland Contact person: Jesper Nordskilde E-mail:

More information

LAW ON CITIZENSHIP OF REPUBLIKA SRPSKA

LAW ON CITIZENSHIP OF REPUBLIKA SRPSKA UNOFFICIAL TRANSLATION Official Gazette RS no. 35/99 of 6 December 1999 Pursuant to Article 70, Paragraph 1, Item 2 of the Constitution of Republika Srpska, and Article 116 of the Rules of Procedure of

More information

IZVJEŠTAJ O DINAMICI PROJEKTA Br. 5 (zaključno sa: godine)

IZVJEŠTAJ O DINAMICI PROJEKTA Br. 5 (zaključno sa: godine) BOSNA I HERCEGOVINA FEDERACIJA BOSNE I HERCEGOVINE JAVNO PREDUZEĆE AUTOCESTE FEDERACIJE BOSNE I HERCEGOVINE d.o.o Mostar PROJEKAT: AUTOCESTA NA KORIDORU Vc U FEDERACIJI BiH IZVJEŠTAJ O DINAMICI PROJEKTA

More information

Heritage Legislation - Bosnia-Herzegovina

Heritage Legislation - Bosnia-Herzegovina Published on HEREIN System (http://www.herein-system.eu) Home > Heritage Legislation - Bosnia-Herzegovina Heritage Legislation - Bosnia-Herzegovina Country: Bosnia-Herzegovina 7.1.A Council of Europe conventions

More information

Bosnia and Herzegovina

Bosnia and Herzegovina Bosnia and Herzegovina Country Report by Damir Mrđen PC for Water Management for Adriatic Sea RBD in FBIH, by Damir Mrđen 1 Geographic, Social and Economic Context - Total surface area 51,197 km 2, - Population

More information

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: SH 130 Project, Segments 5 & 6, Travis, Caldwell and Guadalupe counties; DFW Connector, Tarrant County; North Tarrant Express (NTE),

More information

CONNECTIVITY AGENDA Co-financing of Investment Projects in the Western Balkans 2017

CONNECTIVITY AGENDA Co-financing of Investment Projects in the Western Balkans 2017 CONNECTIVITY AGENDA Co-financing of Investment Projects in the Western Balkans 2017 CONNECTIVITY AGENDA Co-financing of Investment Projects in the Western Balkans in 2017 Johannes Hahn European Commissioner

More information

112 SYSTEM IN BOSNIA AND HERZEGOVINA

112 SYSTEM IN BOSNIA AND HERZEGOVINA Ministry of Security of Bosnia and Herzegovina 112 SYSTEM IN BOSNIA AND HERZEGOVINA Mirnesa Softic Operational Communication Center BH - 112 Ministry of Security of Bosnia and Herzegovina Zagreb, 16 November

More information

Report from fact-finding mission on Corridor Vc motorway, Bosnia and Herzegovina, February 2010

Report from fact-finding mission on Corridor Vc motorway, Bosnia and Herzegovina, February 2010 18 July 2010 Introduction Report from fact-finding mission on Corridor Vc motorway, Bosnia and Herzegovina, 23-25 February 2010 On 23-25 February 2010 Bankwatch s Balkan and EBRD Co-ordinators together

More information

3RD SEETAC ANNUAL MINISTERIAL MEETING AND SEEIF

3RD SEETAC ANNUAL MINISTERIAL MEETING AND SEEIF Government of Montenegro Ministry of Transport and Maritime Affairs 3RD SEETAC ANNUAL MINISTERIAL MEETING AND SEEIF Angelina Živković MSc ADVISOR TO MINISTER 22 MAY, 2012, ATHENS MONTENEGRO ADRIATIC-MEDITERRANEAN

More information

FRAMEWORK LAW ON THE PROTECTION AND RESCUE OF PEOPLE AND PROPERTY IN THE EVENT OF NATURAL OR OTHER DISASTERS IN BOSNIA AND HERZEGOVINA

FRAMEWORK LAW ON THE PROTECTION AND RESCUE OF PEOPLE AND PROPERTY IN THE EVENT OF NATURAL OR OTHER DISASTERS IN BOSNIA AND HERZEGOVINA Pursuant to Article IV4.a) of the Constitution of Bosnia and Herzegovina, at the 28 th session of the House of Representatives held on 29 April 2008, and at the 17 th session of the House of Peoples held

More information

Legal Briefing. Serbia: Infrastructure

Legal Briefing. Serbia: Infrastructure Legal Briefing Serbia: Infrastructure Legal Briefing Serbia: Infrastructure 01 Serbia on the Right Track THE EUROPEAN AND WORLD TRANSPORT NETWORK 02 Overview of Finalized, Ongoing, and Planned Projects

More information

Recommendation: THAT the Council of the Township of Centre Wellington award the following two tenders:

Recommendation: THAT the Council of the Township of Centre Wellington award the following two tenders: Report to Council To: Mayor Linton and Members of Council Prepared By: Wes Snarr, Managing Director of Corporate Services Report: COR-45 Date: 12 Jul RE: Recomendation for Award of Request for Tenders

More information

REGULATIONS FOR DECLARATION AND DISPOSAL OF UNCLAIMED ITEMS OF THE PIRAEUS CONTAINER TERMINAL S.A. IN THE PIRAEUS FREE ZONE

REGULATIONS FOR DECLARATION AND DISPOSAL OF UNCLAIMED ITEMS OF THE PIRAEUS CONTAINER TERMINAL S.A. IN THE PIRAEUS FREE ZONE REGULATIONS FOR DECLARATION AND DISPOSAL OF UNCLAIMED ITEMS OF THE PIRAEUS CONTAINER TERMINAL S.A. IN THE PIRAEUS FREE ZONE Article 1 Goods declared unclaimed deadlines Goods unloaded and received by the

More information

Ministry of Communications and Transport

Ministry of Communications and Transport more than 100,000 houses and other buildings in Bosnia and Herzegovina (May 2014) were no longer fit to use and that over a million people had been cut off from clean water supplies. Ministry of Communications

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

DaHar Danube Inland Harbour Development

DaHar Danube Inland Harbour Development The European Union's Southeast Europe programme supporting DaHar Danube Inland Harbour Development DaHar WP 4 A4: Local Action Plan of the Port of Novi Sad Final version: 30 th of December 2013 This project

More information

Stability Pact for SEE. Working Table II. Sava River Basin Initiative

Stability Pact for SEE. Working Table II. Sava River Basin Initiative Stability Pact for SEE Working Table II Sava River Basin Initiative Background Prior to disintegration of former Yugoslavia, the Sava was a river basin of national interest Now, it belongs to four countries:

More information

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme

More information

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of environment, mining and spatial planning Department of project

More information

CITY OF BIHAĆ BOSNIA AND HERZEGOVINA. Project: Bussines Zone Kamenica

CITY OF BIHAĆ BOSNIA AND HERZEGOVINA. Project: Bussines Zone Kamenica CITY OF BIHAĆ BOSNIA AND HERZEGOVINA Project: Bussines Zone Kamenica Sarajevo Business Forum May 4-5, 2016 About City of Bihać Location: North-West Region of Bosnia and Herzegovina Economic, educational

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA (Ljubljana, 7 to 8 March 2002) International Civil Aviation

More information

Rehabilitation and development of navigation on the Sava river

Rehabilitation and development of navigation on the Sava river Rehabilitation and development of navigation on the Sava river 3rd Joint Statement Implementation Meeting, Vienna, April 5-6, 2011 Background of the project Recognized as a priority project in the framework

More information

Concessions and PPPs in. Bosnia and Herzegovina

Concessions and PPPs in. Bosnia and Herzegovina Bosnia and Herzegovina Concessions and PPPs in Bosnia and Herzegovina Milomir Amovic Commission for Concessions of BiH Bosnia and Herzegovina is a small Balkan country with 4.5 million people and it composed

More information

CONTENT: Page. 1. Introduction Railway infrastructure investments Goals 9

CONTENT: Page. 1. Introduction Railway infrastructure investments Goals 9 INVESTMENT PLAN FOR RAILWAY INFRASTRUCTURE IN BOSNIA AND HERZEGOVINA IN THE PERIOD 2010 2014 WITH THE DEVELOPMENT PROSPECTIVE UP TO 2020 December 2009 CONTENT: Page 1. Introduction 4 2. Railway infrastructure

More information

Members of the Administrative Staff Committee. Award of Tender T Trans Canada Trail Extension

Members of the Administrative Staff Committee. Award of Tender T Trans Canada Trail Extension To: From: Members of the Administrative Staff Committee W.H. Jackson, Director of Utility Services Meeting Date: August 26, 2015 Subject: Report USEC15-021 Award of Tender T-54-15 - Trans Canada Trail

More information

Your partner in Bosnia & Herzegovina

Your partner in Bosnia & Herzegovina Your partner in Bosnia & Herzegovina for design, building, installation and servicing Your partner in Bosnia & Herzegovina 1 1.1 History of EGW Dear Sir, Madam, You have just turned over the first page

More information

PCN Annex: GEF Data Sheet

PCN Annex: GEF Data Sheet PCN Annex: GEF Data Sheet PROJECT IDENTIFICATION Project Title: West Balkans Drina River Basin Management Country(ies): Bosnia-Herzegovina, Serbia, GEF Project ID: 7 Montenegro GEF (ies): World Bank GEF

More information

NLB d.d., Ljubljana PRESENTATION

NLB d.d., Ljubljana PRESENTATION NLB d.d., Ljubljana PRESENTATION Banking Sector Perspective NLB d.d. Ljubljana 1 NLB GROUP 8,475 employees 2 million customers 55 members in 17 countries or 18 markets - 12 members and 1 branch abroad

More information

January 2018 Air Traffic Activity Summary

January 2018 Air Traffic Activity Summary January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279

More information

Bosnia and Herzegovina

Bosnia and Herzegovina UNCTAD Compendium of Investment Laws Bosnia and Herzegovina Law on the Policy of Foreign Direct Investment (1998) Unofficial translation Note The Investment Laws Navigator is based upon sources believed

More information

THE DANUBE WATER PROGRAM PHILIP WELLER, IAWD DANUBE STRATEGY PA 4,, 2015

THE DANUBE WATER PROGRAM PHILIP WELLER, IAWD DANUBE STRATEGY PA 4,, 2015 THE DANUBE WATER PROGRAM PHILIP WELLER, IAWD DANUBE STRATEGY PA 4,, 2015 STRUCTURE IAWD Representing the interests of all drinking water supply companies in the Danube catchment area for over 20 years

More information

Mr. David Peng, General Manager, Kings Aviation. Set Up an AOC and Operating Helicopters in China

Mr. David Peng, General Manager, Kings Aviation. Set Up an AOC and Operating Helicopters in China Mr. David Peng, General Manager, Kings Aviation Set Up an AOC and Operating Helicopters in China Kings Aviation Ltd. Kings Aviation is an operator primarily servicing the general aviation industry in Mainland

More information

MULTI-COUNTRY. Co-financing of Connectivity Projects in the Western Balkans INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

MULTI-COUNTRY. Co-financing of Connectivity Projects in the Western Balkans INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MULTI-COUNTRY Co-financing of Connectivity Projects in the Western Balkans 2017-2018 Action summary The European Commission is, via the Western

More information

REAL ESTATES IN BOSNIA AND HERZEGOVINA

REAL ESTATES IN BOSNIA AND HERZEGOVINA REAL ESTATES IN BOSNIA AND HERZEGOVINA BAHRAIN-BOSNIA Connect with us today YOUR GATEWAY TO A PARTNERSHIP ILIDZA RIVER APARTMENTS 1 House in Konjic City area, with beautiful view on the Jablanicko Lake

More information

Security of Natural Gas Supply in BiH

Security of Natural Gas Supply in BiH USAID Energy Investment Activity Security of Natural Gas Supply in BiH Conference on Security of Gas Supply in Bosnia and Herzegovina Dušan Gvozdenac Hotel Termag, Jahorina, July 2 3, 2018 Topics: 1. Trans-European

More information

STATUS OF PPP PROJECTS AS OF 05 OCTOBER 2011

STATUS OF PPP PROJECTS AS OF 05 OCTOBER 2011 1. Daang Hari SLEx Link Project P 1.956 B ROW P 177.3 M Publication of Invitation to Participate and Bid July 20, 27 $ 43.5 M IC P 10.635 M and August 3, 2011 New 4 kilometer, 4-lane paved toll road that

More information

N11 Arklow / Rathnew & N7 Newlands Cross PPP Contract. Kieran Kelly

N11 Arklow / Rathnew & N7 Newlands Cross PPP Contract. Kieran Kelly N11 Arklow / Rathnew & N7 Newlands Cross PPP Contract Kieran Kelly N7/N11 PPP CONTRACT - OVERVIEW Section A N11 Arklow/Rathnew Scheme Section B Upgrade Works on Existing M11 (Arklow Bypass & Arklow to

More information

Welcome. Green Line in Your Community

Welcome. Green Line in Your Community Welcome Green Line in Your Community Today s session will provide you with information on options The City is exploring for connecting the Green Line in the Beltline to the future Inglewood/Ramsay station.

More information

SOME BACKGROUND NOTES ON BOSNIA & HERZEGOVINA

SOME BACKGROUND NOTES ON BOSNIA & HERZEGOVINA SOME BACKGROUND NOTES ON BOSNIA & HERZEGOVINA The independent country of Bosnia & Herzegovina is 51,129 square kilometres and its population is estimated at 4.6 million people. The country s name is often

More information

KOSOVO REGIONAL AND LOCAL ROADS ENVIRONMENTAL AND SOCIAL ASSESSMENT

KOSOVO REGIONAL AND LOCAL ROADS ENVIRONMENTAL AND SOCIAL ASSESSMENT KOSOVO REGIONAL AND LOCAL ROADS ENVIRONMENTAL AND SOCIAL ASSESSMENT Project: Report: Prepared by: Financed by: Consultant: Kosovo Regional and Local Roads Environmental and Social Assessment Ministry of

More information

CITY OF BELGRADE BELGRADE LAND DEVELOPMENT PUBLIC AGENCY

CITY OF BELGRADE BELGRADE LAND DEVELOPMENT PUBLIC AGENCY CITY OF BELGRADE BELGRADE URBAN TRANSPORT Conference on Transportation Infrastractures in the Balkans July 2011, Madrid BELGRADE LAND DEVELOPMENT PUBLIC BELGRADE BELGRADE Belgrade is capital of Serbia.

More information

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 26 April 2016 Title Brent Cross Cricklewood Gowling Wragge Lawrence Graham (UK) LLP Report of Commissioning Director, Growth and Development Wards Child s

More information

Significant increase in accommodation activity but slightly less than in the previous month

Significant increase in accommodation activity but slightly less than in the previous month Tourism activity February 2015 15 April, 2015 Significant increase in accommodation activity but slightly less than in the previous month Hotel establishments recorded approximately 2.2 million overnight

More information

THE WELSH MINISTERS STATEMENT OF REASONS

THE WELSH MINISTERS STATEMENT OF REASONS THE WELSH MINISTERS The Welsh Ministers (The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East of Magor) Connecting

More information

Opportunities and Challenges for an Enhanced Cooperation between Regulators and Auditors

Opportunities and Challenges for an Enhanced Cooperation between Regulators and Auditors Opportunities and Challenges for an Enhanced Cooperation between Regulators and Auditors Pascal Frèrejacque, Senior Operations Officer, Centre for Financial Reporting Reform, The World Bank Vienna, 21

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

RIJEKA GATEWAY PROJECT CROATIA. M. Audigé Program Team Leader ECSIE

RIJEKA GATEWAY PROJECT CROATIA. M. Audigé Program Team Leader ECSIE RIJEKA GATEWAY PROJECT CROATIA M. Audigé Program Team Leader ECSIE Transport Forum & Learning Week - Washington DC 2006 Transport Forum & Learning Week 2006 2 Historical Reminder Initially two separated

More information

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN Doc. 1S-26-O-11-5/1-2 ACTION PLAN FOR THE PERIOD 2011-2015 concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN April 2011 Table of Contents INTRODUCTION... 5 1.

More information

1 st US - Kosovo Trade Forum New York, New York

1 st US - Kosovo Trade Forum New York, New York Republic of Kosova Ministry of Economy and Finance 1 st US - Kosovo Trade Forum New York, New York Presentation By Lorik Fejzullahu Head of Public Private Partnership Unit October 27 2010 Presentation

More information

For personal use only

For personal use only Aspire Mining Limited ABN: 46 122 417 243 Suite B3, 431-435 Roberts Road Subiaco WA 6008 PO Box 1918 Subiaco WA 6904 Tel: (08) 9287 4555 Fax: (08) 9388 1980 Web: www.aspiremininglimited.com Email: info@aspiremininglimited.com

More information

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT 8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated May 27, 2010, from the Commissioner

More information

The development of a high speed road network in Northwestern Romania in the context of the Gdansk - Budapest

The development of a high speed road network in Northwestern Romania in the context of the Gdansk - Budapest OPEN DAYS 2007, NEEBOR Marinel Kovacs President Maramures County Council The development of a high speed road network in Northwestern Romania in the context of the Gdansk - Budapest Odessa - Constanta

More information

AZE: Second Road Network Development Investment Program Tranches 1 and 2

AZE: Second Road Network Development Investment Program Tranches 1 and 2 Internal Monitoring Report Project No.: 45389 August 2016 AZE: Second Road Network Development Investment Program Tranches 1 and 2 Prepared by Azerbaijan Republic Azeravtoyol OJSC for the Asian Development

More information

Egnatia Odos, a tollway from the past to the future

Egnatia Odos, a tollway from the past to the future Egnatia Odos, a tollway from the past to the future, Director of Exploitation and Growth, EGNATIA ODOS SA 1 Contents Historical reference of Egnatia Implementation and impact of Egnatia Odos Traffic figures

More information

MEGAPROJECT Case Study

MEGAPROJECT Case Study SECTION 1 - BASIC PROJECT INFORMATION MEGAPROJECT Case Study Case compiled by: Dr. Athena Romboutsos Contact details: athena@aegean.gr Basic Project Information Project Title Athens Ring Road Location

More information

Project Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title:

Project Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title: BASIC PROJECT DATA Full project title: Short project title: (acronym) Rehabilitation and Development of Transport and Navigation on the Sava River Waterway Project logo: Project website: www.savacommission.org

More information

EXPLANATORY STATEMENT

EXPLANATORY STATEMENT THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.

More information

Port MacKenzie Rail Extension

Port MacKenzie Rail Extension Port MacKenzie Rail Extension Project The Matanuska-Susitna Borough (MSB) and the Alaska Railroad Corporation (ARRC) jointly propose construction and operation of a new rail line to connect the Borough

More information

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

BID FORM. Bid by: Name of Bidder. Address:  Address: To the Texas Department of Transportation hereinafter called the Agent. BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway

More information

Fate of Fővám tér station appears headed for resolution

Fate of Fővám tér station appears headed for resolution Fate of Fővám tér station appears headed for resolution Building of platform tunnels beneath Danube begins In order to further speed up ongoing work, construction has begun of the section of platform tunnels

More information

Ministry of Social Affairs and Health, Finland N.B. Unofficial translation. Legally valid only in Finnish and Swedish

Ministry of Social Affairs and Health, Finland N.B. Unofficial translation. Legally valid only in Finnish and Swedish Ministry of Social Affairs and Health, Finland N.B. Unofficial translation. Legally valid only in Finnish and Swedish No. 395/2012 Adopted in Helsinki on 15 June 2012 Act on the Working and Living Environment

More information

THE CITIZEN ASSOCIATION OF THE SUBMERGED AREAS OF LISIČIĆI KONJIC

THE CITIZEN ASSOCIATION OF THE SUBMERGED AREAS OF LISIČIĆI KONJIC "CONSTRUCTION OF A HYDROELECTRIC POWER PLANT DAM JABLANICA: THE HUMAN RIGHTS VIOLATIONS OF THE POPULATION FROM THE SUBMERGED AREAS OF THE JABLANIČKO LAKE" ASJA BORIĆ THE CITIZEN ASSOCIATION OF THE SUBMERGED

More information

Terms of Reference (ToR) for a Short-Term assignment

Terms of Reference (ToR) for a Short-Term assignment Terms of Reference (ToR) for a Short-Term assignment Technical assistance requested Expert for climate change mitigation and adaptation Project Title Outline of the Climate Adaptation Strategy and basin-wide

More information

COMMUNICATION THE RT. HON. PERRY G. CHRISTIE PRIME MINISTER AND MEMBER OF PARLIAMENT FOR CENTREVILLE

COMMUNICATION THE RT. HON. PERRY G. CHRISTIE PRIME MINISTER AND MEMBER OF PARLIAMENT FOR CENTREVILLE COMMUNICATION BY THE RT. HON. PERRY G. CHRISTIE PRIME MINISTER AND MEMBER OF PARLIAMENT FOR CENTREVILLE ON THE GRAND BAHAMA (PORT AREA) INVESTMENT INVENTIVES (AMENDMENT) BILL, 2016 MONDAY, 7 TH NOVEMBER

More information

1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS. 2. SECTOR Energy

1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS. 2. SECTOR Energy 1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS 2. SECTOR Energy 3. LOCATION The term Upper Horizons means the undeveloped part of the hydropower system Trebišnjica, which is located above the

More information

Port MacKenzie Rail Extension

Port MacKenzie Rail Extension Port MacKenzie Rail Extension Project The Matanuska-Susitna Borough (MSB) and the Alaska Railroad Corporation (ARRC) jointly propose construction and operation of a new rail line to connect the Borough

More information

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING Clause No. 9 in Report No. 9 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on May 15, 2014. 9 CONSTRUCTION OF BATHURST

More information

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT Welcome KROSNO CREEK DIVERSION PROJECT PUBLIC INFORMATION CENTRE # 1 Tonight s Presentation Study Overview Background Existing Conditions Alternative Solutions Preliminary Preferred Solution Next Steps

More information

Related Expertise Concession Projects - PPP

Related Expertise Concession Projects - PPP Related Expertise Concession Projects - PPP IMPETUS-ISIS for Attiki Odos ISIS and Impetus developed a traffic model for the offer that Attiki Odos, SA had provided in the bidding process and won the contract

More information

Gas network development in BiH

Gas network development in BiH USAID Energy Investment Activity Gas network development in BiH Conference on Security of Gas Supply in Bosnia and Herzegovina Fahrudin Kulic Jahorina, 2 July 2018 CONTENTS Existing gas network in BiH

More information

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE

More information

Bosnia and Herzegovina Council of Ministers FOURTH REPORT

Bosnia and Herzegovina Council of Ministers FOURTH REPORT Fourth Report submitted by Bosnia and Herzegovina pursuant to Article 25, paragraph 2 of the Framework Convention for the Protection of National Minorities (Received on 22 December 2016) Bosnia and Herzegovina

More information

The Researchers Report 2012 Country Profile: Bosnia and Herzegovina

The Researchers Report 2012 Country Profile: Bosnia and Herzegovina The Researchers Report 2012 Country Profile: Bosnia and Herzegovina TABLE OF CONTENTS 1. NATIONAL STRATEGIES... 3 2. WOMEN IN THE RESEARCH PROFESSION... 4 Measures supporting women researchers in top-level

More information

OBČINA BOVEC. A3-NET project team. Colleges from Ministry of Economy of the Herzegbosnian Canton

OBČINA BOVEC. A3-NET project team. Colleges from Ministry of Economy of the Herzegbosnian Canton Newsletter Nr. 2; A3-NET Strengthening and NETworking of small Airport facilities in Adriatic Areas A3-NET, 24.4.2012, Prot.Nr. 3512-07/2009-238 http://www.a3-net.info Here is second edition of the newsletter,

More information

United Nations Educational, Scientific and Cultural Organization Executive Board

United Nations Educational, Scientific and Cultural Organization Executive Board ex United Nations Educational, Scientific and Cultural Organization Executive Board Hundred and fifty-sixth Session 156 EX/44 PARIS, 15 April 1999 Original: Spanish Item 10.3 of the provisional agenda

More information

ASSOCIATION OF CONSULTING ENGINEERS OF BOSNIA AND HERZEGOVINA DECISION ON FOUNDING OF THE ASSOCIATION

ASSOCIATION OF CONSULTING ENGINEERS OF BOSNIA AND HERZEGOVINA DECISION ON FOUNDING OF THE ASSOCIATION ASSOCIATION OF CONSULTING ENGINEERS OF BOSNIA AND HERZEGOVINA DECISION ON FOUNDING OF THE ASSOCIATION 1 ASSOCIATION OF CONSULTING ENGINEERS OF BOSNIA AND HERZEGOVINA Founding Assembly No: 01/2004 Pursuant

More information