1 Wind Power Plant Podveležje Public Information Meeting Mostar,
2 Topics 1. PROJECT BACKGROUND AND OBJECTIVES 2. PROJECT DESCRIPTION 3. PERMITTING STATUS 4. DESCRIPTION OF THE ENVIRONMENTAL CONDITIONS Physical Environment Biological Environment Human Environment National Monuments 5. ENVIRONMENTAL AND SOCIAL IMPACTS AND MITIGATION MEASURES Impacts during construction Impacts during operation 2
3 PROJECT BACKGROUND AND OBJECTIVES Project data q 15 Wind Turbines q Total capacity up to 48 MW q Financed by KfW and JP Elektroprivreda Bosne i Hercegovine d.d. Sarajevo in a ratio appr. 80%/20%, respectively q Operated by EP BiH q Construction contractors: Lot 1: Wind turbines - TBD Lot 2: Substation and MV cabling and FO network ABB d.o.o. Zagreb Lot 3: Access roads - consortium: HP INVESTING / AMITEA / IZGRADNJA TOJAGA 3
4 PROJECT DESCRIPTION (1) q 15 wind turbines with a capacity of 3.0 MW to 3.2 MW each q Line of series of operational plateaus including: design procurement manufacture transport storage installation test runs commissioning q Commissioning planned in the second half of
5 PROJECT DESCRIPTION (2) The works have been divided into 3 components/lots: Lot 1: Engineering, procurement, supply and construction of the 15 (fifteen) Wind Energy Converters of the 3MW platform, with the same rated unit power (in range 3,0 MW 3,2 MW), including their foundations and all relevant civil works, electrical works, and WEC control system, including a 5 to 15 year maintenance contract from the start of commercial operation. Lot 2: Engineering, procurement, supply and construction of a 30/110 kv substation, the 30kV cabling and fiber optical network and earthing network between WECs and Substation, including all relevant civil works, electrical works and Substation control system. Lot 3: Construction of the wind farm internal roads and crane platforms. 5
6 PROJECT DESCRIPTION (3) Roads q The existing access roads to the Podveležje plateau will be used for the transport of the major equipment, construction materials and the machinery, also for the purposes of installation and maintenance of the wind turbines during operation phase. The reconstruction of the existing local road up to the entrance to the project area is foreseen in order to enable undisturbed transport of the main equipment (WEC). q Wind Turbine T13 will not be built, since the Investor gave up its construction and consequently part of internal access road between WT T12 and WT T15 will not be constructed. 6
7 PROJECT DESCRIPTION (4) q Bosnia and Herzegovina Mine Action Centre (BH MAC) issued letter in June 2014 with confirmation that the Project site, in accordance with Employer s request, is outside of any defined suspicious areas and that risk of mines is not expected. q Ministry of Communication and Transport, Directorate of Civil Aviation has granted a Permission in July 2014 to construct the Podveležje wind power plant. 7
8 PROJECT DESCRIPTION (5) Podveležje Ploče Metković Source: Transport Study WPP Podveležje, ICTL Belgium,
9 PROJECT DESCRIPTION (6) Podveležje area Source: Dokumentacija uz zahtjev za okolinsku dozvolu za vjetroelektranu Podveležje 1, JP Elektroprivreda Bosne i Hercegovine,
10 PROJECT DESCRIPTION (7) Optimized location of the Wind Turbines Note: Wind Turbine T13 will not be built Source: Fichtner,
11 Internal roads and crane platforms Source: Detailed design for roads and platforms,
12 PERMITTING STATUS The following relevant consents and permits have been issued by authorities up to date: Final Urban planning consent issued by the Ministry of Construction and Physical Planning of Herzegovina-Neretva Canton; General building permit: approval for construction of complex structure for wind farm Podveležje issued by the Ministry of Construction and Physical Planning of Herzegovina-Neretva Canton; Final Environmental permit issued by the Federal ministry of environment and tourism; Building Permit for internal access roads and crane platforms issued by the Ministry of Construction and Physical Planning of Herzegovina-Neretva Canton; Building Permit for Substation 30/110 kv issued by the Ministry of Construction and Physical Planning of Herzegovina-Neretva Canton. Energy Permit for Podveležje Wind Farm issued by the Federal Ministry for Energy, Mining and Industry. 12
13 DESCRIPTION OF THE ENVIRONMENTAL CONDITIONS (1) Physical Environment Biological Environment Human Environment Located in the center of the Herzegovina-Neretva Canton of FBiH, ca. 10 km east from Mostar town Podveležje plateau, is characterized by carbonate composition Paleocene and karst sediments, as well as fragmentary Neocene sediments and quaternary creations Typically karst terrains No streams which carry water during the whole year Biggest water wells - Jelovčev well and Vrbovica Continetal climate Nature park Hutovo blato - 30 km south from the Podveležje plateau Scarce vegetation Snakes (Vipera berus), lizards, rabbits (Leporidae), wildfowls (Gallus gallus), mountain partridges (Alectoris graeca), quails (Phasianidae) 85 species of birds were recorded in WF area Most of recorded species have the threat status of least concern (LC) in Bosnia-Herzegovina (BiH). 15 raptors species and 14 bat species recorded Ethnographic complex: Dobrč, Gornje Gnojnice, Podvelež, Banjdol, Kružanj and Kokorina Estimated population people who are located in 13 villages. The main occupation of the residents is agriculture, apropos livestock, done in the traditional way. Six villages next to the Wind Farm: Dobrč, Usamljena kuća - Okolište, Gnojnice Gornje, Gornje Opine, Okolište and Šipovac. 13
14 DESCRIPTION OF THE ENVIRONMENTAL CONDITIONS (2) Physical Environment Located in the center of the Herzegovina-Neretva Canton of FBiH, Ca. 10 km east from Mostar town Podveležje plateau, is characterized by carbonate composition Paleocene and karst sediments, as well as fragmentary Neocene sediments and quaternary creations Typically karst terrains No streams which carry water during the whole year Biggest water wells - Jelovčev well and Vrbovica Continetal climate 14
15 DESCRIPTION OF THE ENVIRONMENTAL CONDITIONS (3) Biological Environment Nature park Hutovo blato - 30 km south from the Podveležje plateau Scarce vegetation Snakes (Vipera berus), lizards, rabbits (Leporidae), wildfowls (Gallus gallus), mountain par-tridges (Alectoris graeca), quails (Phasianidae) 85 species of birds were recorded in WF area Most of recorded species have the threat status of least concern (LC) in Bosnia-Herzegovina (BiH). 15 raptors species and 14 bat species recorded 15
16 DESCRIPTION OF THE ENVIRONMENTAL CONDITIONS (4) Human Environment Ethnographic complex: Dobrč, Gornje Gnojnice, Podvelež, Banjdol, Kružanj and Kokorina Estimated population people who are located in 13 villages. The main occupation of the residents is agriculture, apropos livestock, done in the traditional way. Seven villages next to the Wind Farm: Gornje Opine, Kričani, Gnojnice Gornje, Usamljena kuća - Okolište, Dobrč, Okolište and Šipovac. 16
17 DESCRIPTION OF THE ENVIRONMENTAL CONDITIONS (5) Distance between the Wind Park and the local villages Village Gornje Opine Kričani Gnojnice Gornje Usamljena kuća - Okolište Dobrč Okolište Šipovac Distance to the Wind Park 814 m 779 m m 587 m 670 m 869 m m Within the area of the Wind Park a few fortifications exist but no further information with respect to their status is currently available. It is known that they have a certain cultural value. 17
18 DESCRIPTION OF THE ENVIRONMENTAL CONDITIONS (6) Photo of the site showing the type of land cover Source: Fichtner,
19 Environmental Impact Assessment Baseline Collecting of information on environmental conditions in the project area. Prediction & Evaluation Identification and quantification of significant direct or indirect environmental and social effects of the project during construction and operation Relevant aspects of the biological, physical and social environment Mitigation Avoid, minimize, mitigate and offset any adverse impacts Monitor their implementation 19
20 E&S IMPACTS AND MITIGATION MEASURES Construction Phase short-term employment opportunity potential market for the local agricultural producers and other small businesses like local shops Stockpiled topsoil - spread over the disturbed areas and rehabilitated with indigenous vegetation. Operation Phase Noise - exceedance of national and international limits not expected Shadow flickering - exceedance of national and international limits not expected Birds and bats - mitigation and monitoring measures defined ESMP - mitigation and management measures incl. schedule 20
21 THANK YOU FOR YOUR ATTENTION 21
Elektroprivreda BiH. 6th South East Europe Energy Dialogue (6th SEEED) Redefining SE Europe s Energy Map
Power Sector Projects And Investment Opportunities Elektroprivreda BiH 6th South East Europe Energy Dialogue (6th SEEED) Redefining SE Europe s Energy Map MAY 2012 Bosnia and Herzegovina ELECTRIC SECTOR
More informationINTRODUCTION. Energy Efficiency Potential in Bosnia and Herzegovina
INTRODUCTION Energy Efficiency Potential in Bosnia and Herzegovina ENERGY EFFICIENCY POTENTIAL RENEWABLE ENERGY ACTION PLAN OF BOSNIA AND HERZEGOVINA ENERGY EFFICIENCY ACTION PLAN OF BOSNIA AND HERZEGOVINA
More informationWATER RESOURCES IN BOSNIA AND HERZEGOVINA
Bosna i Hercegovina Agencija za statistiku Bosne i Hercegovine Bosnia and Herzegovina Agency for Statistics of Bosnia and Herzegovina WATER RESOURCES IN BOSNIA AND HERZEGOVINA Water resources in BiH Climate:
More informationIvan Lovrić. Telephone Mobile phone Fax
PERSONAL INFORMATION Surname and first name Ivan Lovrić Address Work: Faculty of Civil Engineering, University of Mostar, Matice hrvatske bb, 88000 Mostar, Bosnia and Herzegovina Telephone +387 36 355
More informationFACTORY CONSTRUCTION FOR THE PRODUCTION OF FERROSILICIUM IN GORNJI VAKUF - USKOPLJE MINISTRY OF ECONOMY, CENTRAL BOSNIAN CANTON
FACTORY CONSTRUCTION FOR THE PRODUCTION OF FERROSILICIUM IN GORNJI VAKUF - USKOPLJE MINISTRY OF ECONOMY, CENTRAL BOSNIAN CANTON Travnik, september 2013 Ministry of economy, Central Bosnian Canton Construction
More informationReport on BACID Activity. Capacity Building for Investment Attraction in the Canton Sarajevo
Report on BACID Activity Capacity Building for Investment Attraction in the Canton Sarajevo SA Consulting GmbH in cooperation with the Ministry of Ecenomy, the Chamber of Economy of Sarajevo Canton and
More informationINVITATION FOR TENDERS BOSNIA AND HERZEGOVINA. CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI
INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI No: JPAC 841-B80-17 This Invitation for Tenders is published
More informationENVIRONMENTAL SECTOR IN BOSNIA AND HERZEGOVINA -Institutions, Legislation, UNECE TEIA-
Foreign Trade and Economic Relations of Bosnia and Herzegovina ENVIRONMENTAL SECTOR IN BOSNIA AND HERZEGOVINA -Institutions, Legislation, UNECE TEIA- Senad Oprašić, PhD. Head of Environmetal Protection
More informationReport from fact-finding mission on Corridor Vc motorway, Bosnia and Herzegovina, February 2010
18 July 2010 Introduction Report from fact-finding mission on Corridor Vc motorway, Bosnia and Herzegovina, 23-25 February 2010 On 23-25 February 2010 Bankwatch s Balkan and EBRD Co-ordinators together
More informationMAPs sector in Bosnia and Herzegovina
MAPs sector in Bosnia and Herzegovina CEDDEM Decembre 2016 Bosnia & Herzegovina Official Name: Bosnia and Herzegovina (BH) Political system: Parliamentary democracy with a bicameral parliament; BH is composed
More information112 SYSTEM IN BOSNIA AND HERZEGOVINA
Ministry of Security of Bosnia and Herzegovina 112 SYSTEM IN BOSNIA AND HERZEGOVINA Mirnesa Softic Operational Communication Center BH - 112 Ministry of Security of Bosnia and Herzegovina Zagreb, 16 November
More informationPublic Seminar 30 October 2018, Lisbon. Water sector in B&H
Public Seminar 30 October 2018, Lisbon Water sector in B&H Ministry of Foreign Trade and Economic Relations www.mvteo.gov.ba Boško Kenjić, Head of Department Tel: +387 33 262 155 E-mail: bosko.kenjic@mvteo.gov.ba
More informationPumped storage hydroelectric power plants: Issues and applications BIH Case Study
Pumped storage hydroelectric power plants: Issues and applications BIH Case Study Sasa Scekic, Head of Licensing and Technical Affairs Dpt., SERC BIH www. erranet.org Power System of Bosnia and Herzegovina
More informationBosnia and Herzegovina
Bosnia and Herzegovina Country Report by Damir Mrđen PC for Water Management for Adriatic Sea RBD in FBIH, by Damir Mrđen 1 Geographic, Social and Economic Context - Total surface area 51,197 km 2, - Population
More information1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS. 2. SECTOR Energy
1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS 2. SECTOR Energy 3. LOCATION The term Upper Horizons means the undeveloped part of the hydropower system Trebišnjica, which is located above the
More informationFRAMEWORK LAW ON THE PROTECTION AND RESCUE OF PEOPLE AND PROPERTY IN THE EVENT OF NATURAL OR OTHER DISASTERS IN BOSNIA AND HERZEGOVINA
Pursuant to Article IV4.a) of the Constitution of Bosnia and Herzegovina, at the 28 th session of the House of Representatives held on 29 April 2008, and at the 17 th session of the House of Peoples held
More informationPCN Annex: GEF Data Sheet
PCN Annex: GEF Data Sheet PROJECT IDENTIFICATION Project Title: West Balkans Drina River Basin Management Country(ies): Bosnia-Herzegovina, Serbia, GEF Project ID: 7 Montenegro GEF (ies): World Bank GEF
More informationYEARS OF THE WORLD BANK IN BOSNIA AND HERZEGOVINA
15 YEARS OF THE WORLD BANK IN BOSNIA AND HERZEGOVINA 15 YEARS OF THE WORLD BANK IN BOSNIA AND HERZEGOVINA Dear reader, Join us in celebrating 15 years of successful partnership between Bosnia and Herzegovina
More informationHelichrysum-Hercegovina d.o.o Čitluk
Helichrysum-Hercegovina d.o.o Čitluk Helichrysum-Hercegovina d.o.o Gospodarska zona, Tromeđa II 88260 Čitluk, BiH Tel.: +38763043165 Fax.: +38736446097 e: immortelle@helichrysum-herzegovina.com Company
More informationINVESTMENT PROJECT Preparation and management for professional automatic greenhouses
INVESTMENT PROJECT Preparation and management for 10-100 professional automatic greenhouses Ministry of Economy of the Central Bosnia Canton Travnik, 2015. Ministry of Economy of the Central Bosnia Canton
More informationJP ELEKTROPRIVREDA HZ HB d.d Mostar Mile Budaka 106a Mostar Bosnia and Herzegovina Tel.: Fax:
2009 ANNUAL REPORT JP ELEKTROPRIVREDA HZ HB d.d Mostar Mile Budaka 106a 88000 Mostar Bosnia and Herzegovina Tel.: +387 36 335 700 Fax: +387 36 335 777 ephzhb@ephzhb.ba www.ephzhb.ba CONTENTS GENERAL MANAGER
More informationThe Electric Power System
The Electric Power System - Bosnia and Herzegovina - Bosnia and Herzegovina Power System 1 2 Basic facts Area: 51.197 km 2 Population: 3.791.622 Number of electricity consumers: 1.505.015 Number of TSOs:
More informationETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7
ETOBICOKE CREEK NORTH TRAIL PROJECT May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 1 Purpose of Open House The purpose of today s open house is to present the design
More informationF I N A L EIA R E P O R T
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Consulting Services for Environment Impact Assessment in the Neretva and Trebišnjica
More informationSarajevo, Bosnia and Herzegovina 1 December 2011
WITH THE FINANCIAL SUPPORT OF THE EUROPEAN UNION Western Balkans Regional Competitiveness Initiative Presentation for: Steering Platform for Research for the Western Balkans Countries Sarajevo, Bosnia
More informationProject Fiche MASTER PLAN FOR DEVELOPMENT OF THE NAUTICAL TOURISM IN THE SAVA RIVER BASIN
Project Fiche MASTER PLAN FOR DEVELOPMENT OF THE NAUTICAL TOURISM IN THE SAVA RIVER BASIN 1. Basic information 1.1 Title: Master plan 1.2 Location: Sava River Basin which covers Bosnia and Herzegovina,
More informationIAC 2011 Cape Town, October th
Cape Town, October 05 05 th Project Partners External Supporters and Sponsors The Problem The Solution Overview S 2 BAS Concept of Operations Architecture Possible Applications Stakeholders Flight Phases
More informationHeritage Legislation - Bosnia-Herzegovina
Published on HEREIN System (http://www.herein-system.eu) Home > Heritage Legislation - Bosnia-Herzegovina Heritage Legislation - Bosnia-Herzegovina Country: Bosnia-Herzegovina 7.1.A Council of Europe conventions
More informationConcessions and PPPs in. Bosnia and Herzegovina
Bosnia and Herzegovina Concessions and PPPs in Bosnia and Herzegovina Milomir Amovic Commission for Concessions of BiH Bosnia and Herzegovina is a small Balkan country with 4.5 million people and it composed
More informationCompany ID. Bosnia and Herzegovina Entity: The Federation of Bosnia and Herzegovina Canton: The Herzegovina-Neretva Canton
Company ID State: Bosnia and Herzegovina Entity: The Federation of Bosnia and Herzegovina Canton: The Herzegovina-Neretva Canton City: Mostar Address: Baćevići bb, 88000 Contact: +387 (0) 36 375 555 /
More informationUniversity of Mostar in brief. Prof.Dražena Gašpar, Ph.D. Vice-Rector for International Relations and Business
University of Mostar in brief Prof.Dražena Gašpar, Ph.D. Vice-Rector for International Relations and Business 1 UNIVERSITY OF MOSTAR - HISTORY 1. 1895 - Origins from the Franciscan School of Theology the
More informationACTIVITIES OF THE INTERNATIONAL TRUST FUND FOR DEMINING AND MINE VICTIMS ASSISTANCE (ITF) IN THE REGION OF SE EUROPE
ACTIVITIES OF THE INTERNATIONAL TRUST FUND FOR DEMINING AND MINE VICTIMS ASSISTANCE (ITF) IN THE REGION OF SE EUROPE Eva Veble Head of Department for International Relations ITF ACTIVITIES 1. DEMINING
More informationDecision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation
for Salt Lake County, Utah Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 1. Background The present location of the Desolation Trail (#1159) between Mill D and Desolation Lake follows old
More informationCURRICULUM VITAE. Cairo Demographic Canter, Cairo, Egypt Date: December, 1999 April, 2001 Title/Diploma: Master of Philosophy (MPhil)
CURRICULUM VITAE 1. Surname: ABDIJEVIĆ 2. Name: Lamija 3. Date and place of birth: 08.07.1968, Novo Mesto, SLOVENIJA 4. Phone: 061 218 406 5. E-mail address: lamija.abdijevic@gmail.com 6. Education: Date:
More informationTWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)
INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda
More informationMain Features Location. 2 EUROPEAN CORRIDORS Koridor VII Danube River 22km of riverbank, road bridge, Smederevo Fortress monument of culture
Main Features Location 46km from Belgrade 2 EUROPEAN CORRIDORS Koridor VII Danube River 22km of riverbank, road bridge, Smederevo Fortress monument of culture Koridor X Highway E-75 27km of highway, with
More informationTourism and Wetlands
CONVENTION ON WETLANDS (Ramsar, Iran, 1971) 43 rd Meeting of the Standing Committee Gland, Switzerland, 31 October 4 November 2011 DOC. SC43-27 Tourism and Wetlands Action requested. The Standing Committee
More informationSustainable Hydropower in the Dinaric Arc
UPDATE 2013 Sustainable Hydropower in the Dinaric Arc Issue 5 / July 2013 Livanjsko polje, Bosnia and Herzegovina. Andrija Vrdoljak / WWF - Canon Fresh water This newsletter provides information on the
More informationList of participants. List of Participants. Country (Bosnia and Herzegovina)
List of participants National Training in Bosnia and Herzegovina on SEA and EIA, CITES Convention and Management in protected areas 10-12 May 2016 Mostar, Bosnia and Herzegovina List of Participants Country
More informationProtected Areas Benefit Assessment (PA-BAT) in Bosnia and Herzegovina REPORT ADRIA
REPORT ADRIA 2016 Protected Areas Benefit Assessment (PA-BAT) in Bosnia and Herzegovina Protected Areas Benefit Assessment (PA-BAT) in Bosnia and Herzegovina 1 Una National Park Haris Hadžihajdarević CONTENT
More informationProtection and Sustainable Use of the Dinaric Karst Transboundary Aquifer System
Protection and Sustainable Use of the Dinaric Karst Transboundary Aquifer System What is DIKTAS? DIKTAS is a project initiated by the aquifer-sharing states and supported by GEF - Global Environment Facility.
More informationBOSNIA AND HERZEGOVINA FEDERATION OF BOSNIA AND HERZEGOVINA JP DIREKCIJA CESTA FEDERACIJE BIH ENVIRONMENTAL MANAGEMENT PLAN
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized BOSNIA AND HERZEGOVINA FEDERATION OF BOSNIA AND HERZEGOVINA JP DIREKCIJA CESTA FEDERACIJE
More informationTourism Satellite Account Calendar Year 2010
The Economic Impact of Tourism in Georgia Tourism Satellite Account Calendar Year 2010 Highlights The Georgia visitor economy rebounded in 2010, recovering 98% of the losses experienced during the recession
More informationProject References Kosovo
Project References Kosovo Name applicant: Arbeiter-Samariter-Bund, Deutschland e.v Project title Improving the Sector: 15150 Strengthening civil society (REGIONAL PROJECT) provision of Social Service Delivery
More informationThe Economic Impact of Tourism in North Carolina. Tourism Satellite Account Calendar Year 2015
The Economic Impact of Tourism in North Carolina Tourism Satellite Account Calendar Year 2015 Key results 2 Total tourism demand tallied $28.3 billion in 2015, expanding 3.6%. This marks another new high
More informationDraft LAW. ON SOME AMENDAMENTS IN THE LAW No.9587, DATED ON THE PROTECTION OF BIODIVERSITY AS AMENDED. Draft 2. Version 1.
Technical Assistance for Strengthening the Capacity of the Ministry of Environment, Forests and Water Administration in Albania for Law Drafting and Enforcement of National Environmental Legislation A
More informationInternational Sava River Basin Commission - An example of EU/non EU country cooperation in water management
International Sava River Basin Commission - An example of EU/non EU country cooperation in water management Improvement and co-operation possibilities in the water sector with non-eu countries Ulm, 29
More informationTOURISM. Bhutan s Perspective. A presentation by: Tourism Council of Bhutan
TOURISM Bhutan s Perspective A presentation by: Tourism Council of Bhutan The Vision To create a vibrant and dynamic industry making significant contribution to Gross National Happiness and be a positive
More informationJP ELEKTROPRIVREDA HZ HB d.d Mostar Mile Budaka 106a Mostar Bosnia and Herzegovina Tel.: Fax:
ANNUAL REPORT 2010 JP ELEKTROPRIVREDA HZ HB d.d Mostar Mile Budaka 106a 88000 Mostar Bosnia and Herzegovina Tel.: +387 36 335 700 Fax: +387 36 335 777 ephzhb@ephzhb.ba www.ephzhb.ba contents GENERAL
More information1 Introduction. Introduction. Environmental Context. Environmental Sensitivity. Site Location and Surroundings
Inverclyde Wind Farm Inverclyde Renewables LLP 1 Introduction Introduction 1.1 This (ES) is submitted in support of a full planning application made by Inverclyde Renewables LLP ( the Applicant ) for permission
More informationTHE CITIZEN ASSOCIATION OF THE SUBMERGED AREAS OF LISIČIĆI KONJIC
"CONSTRUCTION OF A HYDROELECTRIC POWER PLANT DAM JABLANICA: THE HUMAN RIGHTS VIOLATIONS OF THE POPULATION FROM THE SUBMERGED AREAS OF THE JABLANIČKO LAKE" ASJA BORIĆ THE CITIZEN ASSOCIATION OF THE SUBMERGED
More informationMr. David Peng, General Manager, Kings Aviation. Set Up an AOC and Operating Helicopters in China
Mr. David Peng, General Manager, Kings Aviation Set Up an AOC and Operating Helicopters in China Kings Aviation Ltd. Kings Aviation is an operator primarily servicing the general aviation industry in Mainland
More informationMountain Valley Pipeline, LLC Mountain Valley Pipeline Project Docket No. CP
16. Prior to construction, Mountain Valley shall file with the Secretary, for review and approval by the Director of OEP, a segment-specific construction and operation access plan for the area between
More informationBiosphere Reserves of India : Complete Study Notes
Biosphere Reserves of India : Complete Study Notes Author : Oliveboard Date : April 7, 2017 Biosphere reserves of India form an important topic for the UPSC CSE preparation. This blog post covers all important
More informationInternational Conference on Sustainable Hydropower in the Dinaric Arc 07 Ocober 2009 Hotel Lapad, Dubrovnik, Croatia
International Conference on Sustainable Hydropower in the Dinaric Arc 07 Ocober 2009 Hotel Lapad, Dubrovnik, Croatia 1997 WWF first projects in the region (small grants) 2009 team of 8 people (4 freshwater),
More informationPICTURE STORY. Balkan energy and the future of Bosnia December 2007
PICTURE STORY Balkan energy and the future of Bosnia December 2007 Balkan energy and the future of Bosnia The collapse of much of its industry as a result of both war and transition means that today Bosnia's
More informationRehabilitation and development of navigation on the Sava river
Rehabilitation and development of navigation on the Sava river 3rd Joint Statement Implementation Meeting, Vienna, April 5-6, 2011 Background of the project Recognized as a priority project in the framework
More informationYour partner in Bosnia & Herzegovina
Your partner in Bosnia & Herzegovina for design, building, installation and servicing Your partner in Bosnia & Herzegovina 1 1.1 History of EGW Dear Sir, Madam, You have just turned over the first page
More informationARTWEI ARTWEI ARTWEI
Protection / Management Plans for Natura 2000 areas and Maritime Spatial Plan for internal sea waters - including the Szczecin Lagoon Szczecin, 7th May 2011 Andrzej Zych Inspectorate of Coast Protection
More informationTravel Shouldn t Cost the Earth
Travel Shouldn t Cost the Earth Kym Cheatham Chief Executive Officer Ecotourism Australia Limited Driving Visitation To Australia Using Experience Themes Research travellers from 11 international markets
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name. MIDDLE EAST AND NORTH AFRICA Sector Aviation (100%) Project ID
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name EG-Second
More informationLabrador - Island Transmission Link Target Rare Plant Survey Locations
27-28- Figure: 36 of 55 29-28- Figure: 37 of 55 29- Figure: 38 of 55 #* Figure: 39 of 55 30- - east side Figure: 40 of 55 31- Figure: 41 of 55 31- Figure: 42 of 55 32- - secondary Figure: 43 of 55 32-
More informationTHE MUNICIPALITY of PROZOR-RAMA
Bosnia and Herzegovina Federation of Bosnia and Herzegovina Herzegovina-Neretva Canton THE MUNICIPALITY of PROZOR-RAMA I T S D E V E L O P M E N T S T R A T E G Y B U S I N E S S ZONES S U B S I D Y S
More informationCOLLISION AVOIDANCE FOR RPAS
COLLISION AVOIDANCE FOR RPAS Johan Pellebergs, Saab Aeronautics ICAS workshop, September 2017 This document and the information contained herein is the property of Saab AB and must not be used, disclosed
More informationWelcome to AVI AFRIQUE 2017
Welcome to AVI AFRIQUE 2017 Single African sky and Functional Airspace Blocks: Improving Air Traffic Management The global ATM operational concept is fundamental framework drive ATM operational requirements,
More informationDaisy Dean Trail 628/619 ATV Trail Construction
Background and Purpose and Need The Daisy Dean ATV Trail Construction Project is located in the Little Belt Mountains, Musselshell Ranger District, Lewis and Clark National Forest approximately 32 miles
More informationLAW ON THE AGENCY FOR PRESCHOOL, PRIMARY AND SECONDARY EDUCATION
Pursuant to Article IV.4.a) of the Constitution of Bosnia and Herzegovina, at the 16th session of the House of Representatives, held on October 11th and 30th, 2007, and at the 9th session of the House
More informationBosnia and Herzegovina Corridor VC 2 Project. Non-technical Summary
Bosnia and Herzegovina Corridor VC 2 Project Non-technical Summary Project: Report: Prepared by: Financed by: Bosnia and Herzegovina Corridor VC 2 Project Environmental and Social Assessment Non-technical
More informationUnited Nations Educational, Scientific and Cultural Organization Executive Board
ex United Nations Educational, Scientific and Cultural Organization Executive Board Hundred and fifty-fourth Session 154 EX/39 PARIS, 17 March 1998 Original: French Item 8.2 of the provisional agenda REPORT
More informationBend Municipal Airport Urban Renewal Plan. Tashman Johnson LLC Elaine Howard Consulting LLC
Bend Municipal Airport Urban Renewal Plan Tashman Johnson LLC Elaine Howard Consulting LLC Urban Renewal Background The purpose of urban renewal is to improve certain areas that are poorly developed or
More informationHow should the proposed protected area be administered and managed?
SPERRGEBIET CONSERVATION PLANNING Questionnaire In big words the main objectives of this questionnaire are to contribute to: 1. finding approaches and mechanism for implementing a multi-use protected area
More informationINVESTMENT BRIEF BROD MUNICIPALITY
INVESTMENT BRIEF BROD MUNICIPALITY 2 BROD MUNICIPALITY INVESTMENT BRIEF Republika Srpska Federacija Bosne i Hercegovine Republika Srpska Bosnia and Herzegovina in Europe Brod Municipality in Republika
More informationStability Pact for SEE. Working Table II. Sava River Basin Initiative
Stability Pact for SEE Working Table II Sava River Basin Initiative Background Prior to disintegration of former Yugoslavia, the Sava was a river basin of national interest Now, it belongs to four countries:
More information"ST. KLIMENT OHRIDSKI FACULTY OF GEOLOGY AND GEOGRAPHY
SOFIA UNIVERSITY "ST. KLIMENT OHRIDSKI FACULTY OF GEOLOGY AND GEOGRAPHY APPLICATION OF THE MODEL "DRIVING FORCES PRESSURE STATE - RESPONSE FOR ASSESSMENT OF FLOOD RISK RADOSTINA BORISOVA DOCHEVA Bachelor
More informationTowards Strengthened Governance of the Shared Trans-boundary Natural and Cultural Heritage of the Lake Ohrid Region
Towards Strengthened Governance of the Shared Trans-boundary Natural and Cultural Heritage of the Lake Ohrid Region Zhulieta Harasani, Albania OCTOBER 2015 THE SHARED TRANSBOUNDARY NATURAL AND CULTURAL
More informationPerformance Criteria for Assessing Airport Expansion Alternatives for the London Region
Performance Criteria for Assessing Airport Expansion Alternatives for the London Region Jagoda Egeland International Transport Forum at the OECD TRB Annual Meeting 836 - Measuring Aviation System Performance:
More informationMostar: Personification of Cultural Heritage
Mostar: Personification of Cultural Heritage MEDCITIES INTERNATIONAL SEMINAR HISTORIC CITY CENTRES: HERITAGE, INNOVATION AND SOCIAL COHESION DUBROVNIK, 10 NOVEMBER 2015 SENADA DEMIROVIĆ HABIBIJA SENIOR
More informationANGLIAN WATER GREEN BOND
ANGLIAN WATER GREEN BOND DNV GL ELIGIBILITY ASSESSMENT Scope and Objectives Anglian Water Services Financing Plc is the financing subsidiary of Anglian Water Services Limited. References in this eligibility
More informationEurope s Living Heart
Europe s Living Heart Preserving biodiversity in South Eastern Europe using EU standards June 2008 2 Project title: Europe s Living Heart. Preserving Bosnia and Herzegovina s natural heritage using EU
More informationThe Design of Nature Reserves
The Design of Nature Reserves Goals Maintenance of MVP s for targeted species Maintenance of intact communities Minimization of disease Considerations of reserve design 1. Disturbance regime Fire Insect
More informationHealth Impact Assessment on Tourism and. Recreational Water Policies III MACEDONİAN CONGRESS İ PREVENTİVE MEDİCİNE, OHRİD, 4-7 OCTOBER 2006
Health Impact Assessment on Tourism and Recreational Water Policies III MACEDONİAN CONGRESS İ PREVENTİVE MEDİCİNE, OHRİD, 4-7 OCTOBER 2006 E.Didem Evci Assist.Prof.Dr., MD.,PhD., Adnan Menderes University,
More informationCatchment and Lake Research
LARS 2007 Catchment and Lake Research Multilateral versus bilateral agreements for the establishment of river based organizations: comparison of legal, economic and social benefits in the Zambian experience.
More informationMinistry of Communications and Transport
more than 100,000 houses and other buildings in Bosnia and Herzegovina (May 2014) were no longer fit to use and that over a million people had been cut off from clean water supplies. Ministry of Communications
More informationUlica Mile Budaka 106 A, Mostar, Bosnia and Herzegovina Tel.: Fax:
2007 Annual Report Ulica Mile Budaka 106 A, 88000 Mostar, Bosnia and Herzegovina Tel.: +387 36 33 57 00 Fax: +387 36 33 57 77 E-mail: ephzhb@ephzhb.ba www.ephzhb.ba CONTENTS Introduction... 7 Employees...
More informationCONTENTS GENERAL MANAGER S REPORT 5 HUMAN RESOURCES 9 LEGAL STATUS AND ORGANIZATION OF COMPANY 11 COMPANY PERFORMANCE 15 POWER GENERATION DIVISION 19
2008 ANNUAL REPORT CONTENTS GENERAL MANAGER S REPORT 5 HUMAN RESOURCES 9 LEGAL STATUS AND ORGANIZATION OF COMPANY 11 COMPANY PERFORMANCE 15 POWER GENERATION DIVISION 19 HPP RAMA 20 HPP MOSTAR 21 HPP PEĆ
More informationRepublic of Kosova Ministry of Economy and Finance. CAPACITY BUILDING CONFERENCE ON PUBLIC PRIVATE PARTNERSHIP (PPPs)
Republic of Kosova Ministry of Economy and Finance Presentation By: Donat Alaj Partnerships Kosovo CAPACITY BUILDING CONFERENCE ON PUBLIC PRIVATE PARTNERSHIP (PPPs) Zagreb, Croatia February, 2011 PRISHTINA
More information1. PROJECT TITLE HOTEL WITH SUPPORTING FACILITIES WITHIN KASTEL FORTRESS. 2. SECTOR Tourism and hospitality industry. 3. LOCATION Banja Luka
1. PROJECT TITLE HOTEL WITH SUPPORTING FACILITIES WITHIN KASTEL FORTRESS 2. SECTOR Tourism and hospitality industry 3. LOCATION Banja Luka 4. BRIEF PROJECT DESCRIPTION Banja Luka s Kastel Fortress, as
More informationGlobal Sustainable Tourism Destinations Criteria
Global Sustainable Tourism Destinations Criteria Draft destination level Global Sustainable Tourism Criteria as proposed after Destinations and International Standards joint working group meeting and follow-up
More informationEcosystem context in the Environmental Impact Assessment of the Dredging Operations in the Argentina s Santa Fe
Ecosystem context in the Environmental Impact Assessment of the Dredging g Operations in the Argentina s Santa Fe Confluencia Waterway (Paraná River) Authors: Claudio Daniele (Estudio de Ambiente y Desarrollo
More informationPlanning Approval Consistency Assessment Form
Integrated Management System Planning Approval Consistency Assessment Form SM ES-FT-414 Sydney Metro Integrated Management System (IMS) Applicable to: Document Owner: System Owner: Status: Sydney Metro
More informationProtection and Sustainable Use of the Dinaric Karst Transboundary Aquifer System
Protection and Sustainable Use of the Dinaric Karst Transboundary Aquifer System Second Workshop "River Basin Commissions and Other Joint Bodies for Transboundary Water Cooperation: Technical Aspects "
More informationIPA cross-border project BALMAS (Ballast water management system for Adriatic sea protection)
IPA cross-border project BALMAS (Ballast water management system for Adriatic sea protection) Gašper Zupančič, Institute for Water of the Republic of Slovenia BlueMed meeting, Piran, 22.3.2017 What s wrong
More information43. DEVELOPMENT AND DISTRIBUTION OF TOURISM
Tourism Tourism is one of the world s largest industries. In many regions it is also the greatest source of revenue and employment. Tourism demand is based on the values and needs of modern tourists, while
More informationOptimizing trajectories over the 4DWeatherCube
Optimizing trajectories over the 4DWeatherCube Detailed Proposal - SES Awards 2016 Airbus Defence and Space : dirk.schindler@airbus.com Luciad : robin.houtmeyers@luciad.com Eumetnet : kamel.rebai@meteo.fr
More information2018 US Trade Mission to Algeria Algiers, Algeria- October 21-23, 2018
The US-Algeria Business Council & The Business Council for International Understanding, with the support of The Embassy of Algeria in Washington DC Proudly presents the 2018 US Trade Mission to Algeria
More informationIEEJ: June 2010 JICA JFY 2010 Energy Policy (B) NO. J / ID Country Report: Bosnia and Herzegovina March 2010 Prepared by JICA trainee
JICA JFY 2010 Energy Policy (B) NO. J1000606 / ID. 1080149 Country Report: Bosnia and Herzegovina March 2010 Prepared by JICA trainee Mile Srdanovic Bosnia and Herzegovina basic energy related figures
More information*Latin America spans 7,000 miles, from Mexico to Tierra Del Fuego. *3 Regions: Central America, South America, and the Caribbean.
Physical Geography Latin America spans 7,000 miles, from Mexico to Tierra Del Fuego *3 Regions: Central America, South America, and the Caribbean. *Intro clip: http://www.youtube.com/watch?v=cffp6rza3
More informationSTREAMS OF INCOME AND JOBS:
STREAMS OF INCOME AND JOBS: The Economic Significance of the Neretva and Trebišnjica River Basins CONTENTS EXECUTIVE SUMMARY 3 Highlights The Value of Water for Electricity 5 Highlights The Value of Water
More information11 January Dear Public Consultations Team of the White Paper Task Force,
Public Consultations Team White Paper Task Force Department of Foreign Affairs and Trade RG Casey Building John McEwan Crescent Barton ACT 0221 Australia 11 January 2017 Dear Public Consultations Team
More informationSarajevo, Bosnia and Herzegovina, February 25-27, 2009 BALGEOS
Sarajevo, Bosnia and Herzegovina, February 25-27, 2009 BALGEOS BALkan GEodetic Observing System A SCIENTIFIC CHALLENGE FOR THE BALKAN COUNTRIES WORKSHOP in Sarajevo THE FIRST CIRCULAR BALGEOS as a contribution
More information