1 RUNWAY 7-25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION Contract No ADDENDUM NUMBER THREE This Addendum Number Three supersedes and/or supplements all portions of the Contract Documents with which it conflicts. Bidders must acknowledge receipt of this addendum on page 27 of the Bid Forms. Johnson, Keith - DIA Keith Johnson Project Manager Development Infrastructure Digitally signed by Johnson, Keith - DIA DN: dc=com, dc=flydenver, dc=ad, ou=domain Users, ou=employees, ou=engineering, cn=johnson, Keith - DIA, =keith.johnson@flydenver.com Date: :48:46-07'00' * * * * * * * * * * * * End of Addendum Number Three

2 Addendum No. 3 December 14, 2017 To: Bid Forms, Project Requirements, Technical Specifications and Plans Runway 7-25 Complex Lighting and Pavement Rehabilitation DEN Contract No Dated: November 20, 2017 ADDENDUM NO. 3 TO PLANS FOR IMPROVEMENTS TO DENVER INTERNATIONAL AIRPORT DENVER, COLORADO RUNWAY 7-25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION DEN CONTRACT NO Bidders are informed that the above referenced Plans are modified as follows as of December 14, BID FORMS Delete Bid Forms and replace with attached Bid Forms. Item L-132d Furnish Passive Pavement Sensors was added Item L-132e Install Passive Pavement Sensor was added 2. PART I GENERAL REQUIREMENTS No changes 3. PART II TECHNICAL SPECIFICATIONS Division 2 Technical Specifications Specification L-132 Runway Surface Condition Sensor System Replace specification L-132 in its entirety with the attached specification L-132. Section was modified Section was modified Section c was added Page 1 of 4

3 Addendum No. 3 December 14, 2017 To: Bid Forms, Project Requirements, Technical Specifications and Plans Runway 7-25 Complex Lighting and Pavement Rehabilitation DEN Contract No Dated: November 20, 2017 Section d was added Section e was added Section f was added Section g was added Section h was modified Section was modified Section was modified Section was modified Section was added Section was added Two additional bid items were added to the Basis of Payment section. 4. PLANS Sheet G-003 Replace sheet G-003 with the attached sheet G-003. Modified index of drawings (table) to show new sheets. Sheet G-004 Replace sheet G-004 with the attached sheet G-004. Modified summary of approximate quantities (table). Sheet EL001 Deleted sheet EL101 and replaced with attached sheet EL101. Summary: Revised Legend Sheet EL102 Deleted sheet EL102 and replaced with attached sheet EL102. Summary: Modified key notes and Runway Surface Sensor symbol. Page 2 of 4

4 Addendum No. 3 December 14, 2017 To: Bid Forms, Project Requirements, Technical Specifications and Plans Runway 7-25 Complex Lighting and Pavement Rehabilitation DEN Contract No Dated: November 20, 2017 Sheet EL104 Deleted sheet EL104 and replaced with attached sheet EL104. Summary: Modified key notes and Runway Surface Sensor symbol. Sheet EL107 Deleted sheet EL107 and replaced with attached sheet EL107. Summary: Modified key notes and Runway Surface Sensor symbol. Sheet EL110 Deleted sheet EL110 and replaced with attached sheet EL110. Summary: Modified key notes and Runway Surface Sensor symbol. Sheet EL112 Deleted sheet EL112 and replaced with attached sheet EL112. Summary: Modified key notes and Runway Surface Sensor symbol. Sheet EL115 Deleted sheet EL115 and replaced with attached sheet EL115. Summary: Modified key notes and Runway Surface Sensor symbol. Sheet EL122 Deleted sheet EL122 and replaced with attached sheet EL122. Summary: Modified key notes and Runway Surface Sensor symbol. Sheet EL136 Deleted sheet EL136 and replaced with attached sheet EL136. Summary: Modified key notes and Runway Surface Sensor symbol. Sheet EL511 New Sheet Page 3 of 4

5 Addendum No. 3 December 14, 2017 To: Bid Forms, Project Requirements, Technical Specifications and Plans Runway 7-25 Complex Lighting and Pavement Rehabilitation DEN Contract No Dated: November 20, 2017 The total number of pages (Including cover sheet) contained in this Addendum Number Three is thirty four (34) pages. ** END OF ADDENDUM NO. 3 ** Page 4 of 4

6 BID PROPOSAL SUMMARY RUNWAY 7-25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION DEN CONTRACT NO Bidder Name: Schedule 1 Total Schedule 2 Total Schedule 3 Total Schedule 4 Total Total Bid $ $ $ $ $ ADDENDUM #3 12/14/2017 1

7 Runway 7-25 Complex Lighting and Pavement Rehabiliation - Schedule 1 Item No. Description Units Est. Qty Unit Price Total a a a b c d L-107a Construction Asbuilt Survey (BIM) Mobilization Flagger Gate Guard Gate Guard Shack Traffic Control New L-806 Windcone on New Foundation cents. HR 2,160 $ $ cents. HR 2,160 $ $ L-108a L-108b 1-1/C #8 L-824 AFL Cable 1-1/C #6 L-824 AFL Cable cents. LF 851,025 $ $ cents. LF 40,000 $ $ L-110a L-110b L-110c L-110d 1W-2"C in Non- Paved Earth - Concrete Encased 2W-2"C in Non- Paved Earth - Concrete Encased 1W-2"C in Existing Concrete - Concrete Encased 1W-2"C in Existing Asphalt Shoulder - Concrete Encased cents. LF 1,250 $ $ cents. LF 50 $ $ cents. LF 175 $ $ cents. LF 225 $ $ L-110e 4W-4"C Ductbank - Concrete Encased cents. LF 300 $ $ ADDENDUM #3 12/14/ Schedule 1

8 Runway 7-25 Complex Lighting and Pavement Rehabiliation - Schedule 1 Item No. Description Units Est. Qty Unit Price Total L-110f L-115a 1W-4"C Ductbank - Concrete Encased 4' by 4' by 4' Handhole - Aircraft Rated cents. LF 325 $ $ cents. EA 4 $ $ L-122Ca L-122Cb L-125a L-125b L-125c Install 30 KW CCR Install 20 KW CCR L-804 LED Elevated Runway Guard Light L-862S LED Elevated Stop Bar Light L-852G/S Runway Inpavement Guard/Stop Bar cents. EA 4 $ $ cents. EA 6 $ $ cents. EA 16 $ $ cents. EA 16 $ $ cents. EA 99 $ $ L-125d L-850A LED Runway Centerline (Any Color) cents. EA 238 $ $ L-125e L-125f L-125g L-125h L-125i L-125j L-850B LED Touchdown Zone Light L-850C Runway Inpavement Edge light L-850D Runway Inpavement End/Threshold Light L-862 Runway Edge Light Elevated L-852D LED Taxiway Bidirectional Centerline Light L-852C LED Taxiway Bidirectional Centerline Light cents. EA 180 $ $ cents. EA 17 $ $ cents. EA 16 $ $ cents. EA 103 $ $ cents. EA 79 $ $ cents. EA 189 $ $ ADDENDUM #3 12/14/ Schedule 1

9 Runway 7-25 Complex Lighting and Pavement Rehabiliation - Schedule 1 Item No. Description Units Est. Qty Unit Price Total L-125k L-125l L-125m L-852D LED Taxiway Unidirectional Centerline Light L-852C LED Taxiway Unidirectional Centerline Light Remove and Reinstall Taxiway Centerline Light cents. EA 109 $ $ cents. EA 31 $ $ cents. EA 370 $ $ L-125n L-125o L-125p L-125q L-125r L-861T QUARTZ Taxiway Edge Light L-852T QUARTZ Inpavement Taxiway Edge Light L-868B Cover Plate L-852K LED Taxiway Bidirectional Centerline Light (SINGLE CIRCUIT) L-852K LED Taxiway Bidirectional Centerline Light (DOUBLE CIRCUIT) cents. EA 552 $ $ cents. EA 3 $ $ cents. EA 316 $ $ cents. EA 64 $ $ cents. EA 18 $ $ L-125s L-125t L-125u L-852K LED Taxiway Unidirectional Centerline Light New L-868B Base Can LED Module and Lens for Existing LED Light Fixtures cents. EA 55 $ $ cents. EA 72 $ $ cents. EA 185 $ $ L-128a Removal of Electrical Items and Miscellaneous Electrical Work L-132b Installation of RPU Equipment ADDENDUM #3 12/14/ Schedule 1

10 Runway 7-25 Complex Lighting and Pavement Rehabiliation - Schedule 1 Item No. Description Units Est. Qty Unit Price Total L-132c L-132e L-135a Surface Scan Sensor Cable - Type V Install Passive Pavement Sensor 24 Strand Single Mode Fiber cents. LF 11,500 $ $ cents. EA 8 $ $ cents. LS 2,500 $ $ L-137a CCTV Camera Pole and Foundation L-140a L-858a L-858b L-858c L-858d L-858e Photometric Testing L-858 Led Guidance Sign - 1 Mod L-858 Led Guidance Sign - 2 Mod L-858 Led Guidance Sign - 3 Mod L-858 Led Guidance Sign - 4 Mod LED Runway Distance Marker Sign cents. EA 3 $ $ cents. EA 16 $ $ cents. EA 21 $ $ cents. EA 11 $ $ cents. EA 11 $ $ L-858f New Guidance Sign Foundation (any Size) cents. EA 21 $ $ 13410Ca ALCS Modification & Miscellaneous Vault Work Total Schedule 1 $ ADDENDUM #3 12/14/ Schedule 1

11 Runway 7-25 Complex Lighting and Pavement Rehabiliation - Schedule 2 Item No. Description Units Est. Qty Unit Price Total a a P-150a P-150b Mobilization Temporary Erosion Control Remove Portland Cement Concrete Pavement (Non- Reinforced, 17") Remove Portland Cement Concrete Pavement (Reinforced, 17") cents. SY 9,485 $ $ cents. SY 201 $ $ P-150c Full Depth Asphalt Pavement Removal cents. SY 238 $ $ P-150d P-152a P-159a Grind Concrete Treated Base Course (0" to 1") Unclassified Excavation Concrete Crushing cents. SY 500 $ $ cents. CY 940 $ $ cents. CY 4,574 $ $ P-161a Bondbreaker Fabric cents. SY 9,686 $ $ P-161b Geotextile Fabric cents. SY 238 $ $ P-403a Bituminous Surface Course cents. TON 40 $ $ P-403b Bituminous Base Course cents. TON 94 $ $ P-404a P-501a Asphalt Treated Permeable Base 7" Portland Cement Conrete Pavement (Non-Reinforced, 17") cents. SY 238 $ $ cents. SY 9,485 $ $ ADDENDUM #3 12/14/ Schedule 2

12 Runway 7-25 Complex Lighting and Pavement Rehabiliation - Schedule 2 Item No. Description Units Est. Qty Unit Price Total P-501b P-610a Portland Cement Conrete Pavement (Reinforced, 17") Cement Treated Base Repair cents. SY 201 $ $ cents. SY 150 $ $ P-620a P-621a D-705a D-705b D-710a Airfield Pavement Markings - Permanent Saw Cut Grooves Install 4" Underdrain (Non- Perforated PVC) Install 4" Underdrain Headwall Grouted Type "M" Riprap cents. SF 372,443 $ $ cents. SY 6,333 $ $ cents. LF 1,233 $ $ cents. EA 1 $ $ cents. CY 2.0 $ $ D-751a Tie-in to Existing Concrete Structure cents. EA 7 $ $ D-751b D-751c T-901a T-905a Install Sanitary Vent Cover Adjust Electrical Manhole Seeding (Seed Mix Design 2) Topsoiling cents. EA 6 $ $ cents. EA 7 $ $ cents. AC 2 $ $ cents. CY 340 $ $ T-908a Hydraulic Mulching cents. AC 2 $ $ Total Schedule 2 $ ADDENDUM #3 12/14/ Schedule 2

13 Runway 7-25 Complex Lighting and Pavement Rehabiliation - Schedule 3 Item No. Description Units Est. Qty Unit Price Total a L-122Aa L-122Ab L-132a Mobilization Furnish 30 KW CCR w/internal ACE Furnish 20 KW CCR w/internal ACE Furnishing and Commissioning of RPU Equipment cents. EA 4 $ $ cents. EA 6 $ $ L-132d Furnish Passive Pavement Sensors 13410Aa 13410Ab 13410Ac Airfield Lighting Control System (ALCS) Modifications Furnish BRITEMASTER Furnish BRITE Remotes for L- 852G/S cents. EA 99 $ $ 13410Ad Furnish BRITE Remotes for L- 862S cents. EA 16 $ $ Total Schedule 3 $ ADDENDUM #3 12/14/ Schedule 3

14 Runway 7-25 Complex Lighting and Pavement Rehabiliation - Schedule 4 Item No. Description Units Est. Qty Unit Price Total a P-501c Mobilization Pavement Spall Repair cents. SY 200 $ $ P-605a Joint Seal Repair cents. LF 110,000 $ $ Total Schedule 4 $ ADDENDUM #3 12/14/ Schedule 4

15 TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT DIVISION 2 AIRFIELD STANDARDS RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION ITEM L-132 RUNWAY SURFACE CONDITION SENSOR SYSTEM CONTRACT NO ITEM L-132 RUNWAY SURFACE CONDITION SENSOR SYSTEM DESCRIPTION GENERAL. This item shall consist of furnishing and installing new material and components for two of the airport surface condition sensor as supplied by Vaisala Inc. and in accordance with these Specifications and in accordance with the dimensions, design and details shown in the Drawings as well as the recommendations of the equipment manufacturer. This item shall include the furnishing of all equipment, materials, services and incidentals necessary to place the system in operation as completed units to the satisfaction of the DEN Project Manager. Conduits, duct banks, trenching, and cabling to complete the system operation will be included as part of this specification. Contact for furnishing the equipment is Vaisala, Inc., 194 South Taylor Ave, Louisvillle, CO Tel (303) Mobile (314) SUBMITTALS. Shop drawings of each pavement sensor system component shall be submitted to the DEN Project Manager for review and approval and be approved prior to ordering any materials for this item. This submittal shall include the proposed method of installation for all components. The submittal shall include data on all component parts of the item or system. The data submitted shall be sufficient, in the opinion of the DEN Project Manager, to determine compliance with the Contract Documents. The Contractor's submittals shall be in accordance with Item L QUALIFICATIONS. The DEN Project Manager reserves the right to reject any and all equipment, materials or procedures which, in the DEN Project Manager s opinion, does not meet the system design and the standards and codes specified herein GENERAL. EQUIPMENT AND MATERIALS a. All equipment and materials covered by other referenced specifications shall be subject to acceptance through manufacturer s certification of compliance with the applicable specification when requested by the DEN Project Manager. b. All items not specified in these specifications or shown on the construction plans, but recognized to be required and involved in carrying out the system installation shall ADDENDUM #3 ENGINEERING REVISION NO. 0 12/14/2017 L-132-1

16 TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT DIVISION 2 AIRFIELD STANDARDS RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION ITEM L-132 RUNWAY SURFACE CONDITION SENSOR SYSTEM CONTRACT NO be included and performed as though they were specifically delineated, described and mentioned GUARANTEES. All equipment and materials furnished and installed under this section shall be guaranteed against defects in materials and workmanship for a period of 24 months or the manufacturer's standard guarantee period whichever is greater, from final acceptance by DEN. The defective materials and/or equipment shall be replaced with no additional cost to DEN CONDUIT. Conduit shall conform to Item L-110 Airport Underground Electrical Duct CONCRETE. Concrete and steel reinforcement shall conform to Item P-610 Structural Portland Cement Concrete WIRE. Power wire and cable shall be in accordance with Item L-108 Installation of Underground Cable for Airports unless otherwise required by the manufacturer for proper operation of the system MULTI-PAIR CONTROL CABLE. Multi-pair control cable shall conform to DIN VDE 0812, Equipment Wires and Stranded Equipment Wires for Telecommunications Systems and Data Processing Systems, and DIN VDE 0814, Cords for Telecommunication Systems and Information Processing Systems, color coded to DIN 47100, International Electrotechnical Commission (IEC) Class 5, Conductors of Insulated Cables. The cable shall be 3-twisted pairs, No. 16 (30/30) AWG bare copper with tinned copper wire shield, PVC core insulation and PVC outer jacket, 250V minimum working voltage. Also referenced as LiYCY TP. Type V surface sensor control cable shall conform to USDA, Rural Electrification Administration (REA) Bulleting , PE-39, Specification for Fully Color-Coded, Polyethylene Insulated, Double Polyethylene- Jacketed Filled Telephone Cables for Direct Burial. The cable shall be multiple conductor #19 AWG solid copper with either inch copper or inch thick aluminum shield CONTROL CABLE SPLICES. Control cable splices shall consist of a pressure cast splice, employing a plastic mold and using epoxy resin equal to that manufactured by Minnesota Mining and Manufacturing (3M) Company, Scotchcast electrical insulating resin No. 4 for potting the splice is approved. Connections of cable and connectors shall be made using crimp connectors utilizing a crimping tool designed to make a complete crimp before the tool can be removed. No. 16 AWG telecommunications control wires may be connected by means of wrapped and soldered splice, 3M Company Moisture Proof UR type connector, or equal, or by a method approved by the DEN Project Manager. This means of splicing is the only type approved for telecommunications control cable BASE CAN. Base cans shall be in accordance with Item L-125 Airport Lighting Systems. ADDENDUM #3 ENGINEERING REVISION NO. 0 12/14/2017 L-132-2

17 TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT DIVISION 2 AIRFIELD STANDARDS RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION ITEM L-132 RUNWAY SURFACE CONDITION SENSOR SYSTEM CONTRACT NO SURGE ARRESTER. At each Remote Processing Unit (RPU) site a surge arrester designed for 120/240 volts, 60Hz, 1 phase, 3 wire plus ground, all mode protection shall be supplied. All components shall be installed in a NEMA 4 with a hinged cover. Indicator lights shall be installed in the front cover to show when power is normal and when a device has failed. The surge suppressor shall be U.L. Listed under Standard No or be approved by the Federal Aviation Administration. Written verification of approval shall be submitted. Breakdown Voltage: (Turn On Threshold): 120V + 10% maximum operating (clamping) voltage. Operating Time: Less than 1 nanosecond. a. Maximum Surge Current (8 x 20 microsecond): 80 KA per mode, minimum. Fuses: Each surge suppression device shall be fused and there shall be no series devices in the power line. Field Replacement: Terminals: All fuses and surge suppression devices shall be field replaceable. Terminals shall securely hold #8 AWG copper wire OBSTRUCTION LIGHT. The obstruction lights shall conform to the requirements of AC 150/ , Specification for Obstruction Lighting Equipment. The steady-burning obstruction light shall be type L-810, steady burning, LED, single unit, operating from a 120V circuit. The obstruction lights shall be controlled by a photoelectric cell, with turn-on at 35fc and turn-off at 58fc RECEPTACLE. The Contractor shall provide a specification grade, 15A duplex GFCI receptacle. The receptacle shall meet the requirements of Federal Specification WC596. The receptacle shall include red LED trip indicator light and 10kA short circuit rating. Mount the receptacle in a cast box with an in-use metal cover RUNWAY PAVEMENT SURFACE CONDITION SYSTEM EQUIPMENT TO BE FURNISHED BY MANUFACTURER a. Remote Processing Unit (RPU). The contractor shall supply and install a rack mounted RPU electronics package with enclosure on a concrete foundation as noted on the Plans. The electronic cabinet shall be The RPU shall be enclosed inside a NEMA 4 lockable enclosure that is resistant to damage by weather. It shall be mounted on a freestanding, non-climbable, corrosion resistant, rack. The RPU hardware and software supplied for the project shall meet the following technical specifications. Each RPU shall collect data from sensor arrays that are shown on the drawings. There will be a total of eight sensor arrays for the complex. ADDENDUM #3 ENGINEERING REVISION NO. 0 12/14/2017 L-132-3

18 TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT DIVISION 2 AIRFIELD STANDARDS RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION ITEM L-132 RUNWAY SURFACE CONDITION SENSOR SYSTEM CONTRACT NO RPU communication will be via wireless cell modem service to the supplier s Online Web site and shall utilize the most current published Federal Standard NTCIP-ESS protocol, with some manufacturer specific objects. The web site will poll the RPU via the IP addressable modem. The RPU shall incorporate watch-dog circuitry and monitor its own operation and reset itself if the RPU software enters an indeterminate state. The RPU shall also have the capability to be reset by a user administrator from the server. b. User Interface. The Contractor shall provide an Internet Hosted Web Site, RSCSS Online Navigator and provide access to RSCSS data using a widely available Internet browser (Internet Explorer). Access and display of current and historical RSCSS sensor data, and forecast data resident on hosted Web site shall be available. c. Passive Pavement Sensor-DRS511. The Contractor shall supply and install passive pavement sensor(s) as shown on the Drawings. The sensor shall be constructed of materials that have thermal characteristics similar to common pavement materials. The top of the sensor shall approximate the runway pavement color and texture. It shall be installed using manufacturer supplied epoxy sealer so the top is 1mm to 3mm (0.04 to 0.12 ) below the surrounding pavement surface. The sensor shall be thermally passive, providing stable operation over a temperature range from - 40⁰C to 60⁰C (-40 F to 140 F). Weather conditions, aircraft wheel loading, or deicing chemicals shall not degrade its performance. Sensor observation range is from 0.0mm to 7.0mm (0 to 0.3 ) with an accuracy of 0.1mm± (0.004 ) in a range of 0mm to 1.0mm (0 to 0.04 ). The reported surface states shall be dry, moist, wet, snow, icy, frosty, moist and chemical, and wet and chemical. d. Present Weather Detector and Visibility Sensor-PWD22. The Contractor shall supply and install a present weather/visibility sensor approximately 8 feet above ground on the RPU tower structure. This sensor shall function as a precipitation classifier, a precipitation rate meter, and a close range visibility sensor. The sensor shall be able to differentiate between rain, snow, mixed rain/snow, and drizzle as well as to measure actual precipitation rates as water equivalent. Sensor visibility range shall extend from 10 to 20,000m (32 to 65,600 feet). Sensor housing shall be all weather and ice-proof with optional heated optics to prevent ice, dew or frost buildup. Normal operating temperature range shall be from -40 C to 60 C (-40 F to 140 F). e. Air Temperature/Relative Humidity Sensor-HMP155. The Air Temperature/Relative Humidity Sensor shall have an air temperature-sensing element that operates over a temperature range of -80 C to 60 C (-112 F to 140 F). The relative humidity sensing element shall be the HUMICAP 180R(C) type and have a measuring range of 0 to 100% RH. ADDENDUM #3 ENGINEERING REVISION NO. 0 12/14/2017 L-132-4

19 TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT DIVISION 2 AIRFIELD STANDARDS RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION ITEM L-132 RUNWAY SURFACE CONDITION SENSOR SYSTEM CONTRACT NO System dew point temperature shall be calculated by the RPU from the air temperature and relative humidity. Both atmospheric sensing elements shall be mounted on the RPU tower at the standard meteorological height of approximately 2m (6 ft) above ground level in a solar/wind-radiation shield. The radiation shield shall be a model DTR503A. The shield shall be supplied so that it can be mounted to the RPU mounting pole. f. Ultrasonic Wind Speed/Direction Sensor-WMT700. The contractor shall supply and install an ultrasonic wind sensor at the standard meteorological height of approximately 8 ft above ground level at the top of the RPU rack. The sensor has no moving parts and is available with analog or digital outputs. The sensor shall have an operating range of 0 to 65 m/s (0 to 145 mph). Wind speed accuracy shall be ±0.1 m/sec or 2%, with a resolution of 0.01 m/sec. The operating azimuth shall be 0 to 360 degrees with a wind direction accuracy of ±2 degrees, and resolution of 0.01 degrees. The temperature operating range shall be -40 C to 60 C (- 40 F to 140 F) with external heater option installed. g. Barometric Pressure Sensor-PTB110. The Contractor shall supply and install a solid-state barometric pressure sensor inside the RPU enclosure. The sensor shall have no moving parts, and have NIST-traceable calibration. The sensor shall have an operating range of hPa up to hPa depending upon installation elevation above sea level and supplier recommendations. Sensor accuracy shall be ±01.5hPa at a temperature operating range of -40 C to 60 C (-40⁰F to 140⁰F). h. The manufacturer of the surface scan sensor shall furnish the following materials: i. RPU #1 RPU ) PWD22 - Precipitation/Visibility Sensor 2) WMT700 Ultrasonic WS/WD Sensor 3) HMP155 Air Temperature / Relative Humidity Sensor 4) Mounting frame for installation into an aluminum RPU Cabinet 5) NEMA 4 RPU 6) Dual Obstruction LED Lights 7) Existing one can be reused if it s in good condition 8) PTB110 Barometric Pressure Sensor ii. RWS200 RPU RPU ) HMP155 Air Temperature / Relative Humidity Sensor 2) DRD11A Y/N Precipitation Sensor 3) Mounting frame for installation into an aluminum RPU Cabinet 4) NEMA 4 RPU 5) Airport Mounting Structure ADDENDUM #3 ENGINEERING REVISION NO. 0 12/14/2017 L-132-5

20 TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT DIVISION 2 AIRFIELD STANDARDS RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION ITEM L-132 RUNWAY SURFACE CONDITION SENSOR SYSTEM CONTRACT NO iii. 6) Dual Obstruction LED Lights DRS511 Passive Pavement Sensor 1) 8 sensors total installed by contractor at locations indicated on drawings All other equipment including, foundation, mounting poles, unistruts, and all other materials and appurtenances shall be furnished and installed by the contractor RUNWAY PAVEMENT SURFACE CONDITION SYSTEM EQUIPMENT TO BE FURNISHED BY CONTRACTOR a. Contractor shall supply foundation, unitstrut, mounting pole, transformers, disconnect switches, and all other appurtenances required to complete the work but not provided for by the manufacturer. Refer to specification L-135 for details associated with the electrical equipment for the equipment rack. Note; the contractor shall also be responsible for hiring the manufacturer of the surface scan sensor to commission and calibrate the equipment as well as escorting the manufacturer on/off jobsite. Contractor shall contact the manufacturer prior to the bid to obtain, in writing, escort and management requirements as well as shop drawings of equipment. CONSTRUCTION METHODS GENERAL. Prior to start of any construction, a coordination meeting between the Airport, DEN Project Manager, Contractor, and Manufacturer should be scheduled. The meeting should as a minimum discuss phasing of work, responsibilities of each party, sensor and cable installation requirements, and scheduling of work. The Contractor shall furnish and install surface condition sensors as shown on the Plans. Installation of the sensors, cabling between sensors and RPU, and installation of the RPU itself shall be in accordance with the Plans, recommendations of the manufacturer and all federal, state and local codes. Each sensor shall have its own individual cable. The sensor cables shall be continuous between the RPU and each sensor and shall have no cable connector kits installed except for the passive pavement sensors COMMISSIONING. After completion of the surface scan sensor system equipment installation, the system vendor shall provide an on-site field engineer to start-up and test the entire system. The vendor s field engineer will make all final sensor connections to the RPU, perform all final system checks, sensor alignments, software setup, and software configuration to provide a fully operational system. A four-hour on-site training course of the system shall take place after the system is operational and tested GROUND CONNECTION AND GROUND ROD. The Contractor shall furnish and install ground rods, grounding cable, and exothermic welds for grounding the ADDENDUM #3 ENGINEERING REVISION NO. 0 12/14/2017 L-132-6

21 TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT DIVISION 2 AIRFIELD STANDARDS RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION ITEM L-132 RUNWAY SURFACE CONDITION SENSOR SYSTEM CONTRACT NO frame of the assembly near the base. The ground rods shall be 3/4-inch diameter by 10 feet long and shall be copper or copper-clad steel MAINTENANCE MANUALS. The Contractor shall provide data for all equipment, material and components supplied or furnished under this section in the Operation and Maintenance Manuals. This data shall include cut sheets from the manufacturer and the manufacturer's installation, operation and maintenance manuals, recommended spare parts lists, any required test results, and other data. Final payment for any contract amounts shall not be processed without proper submittal of these manuals and review and approval by the DEN Project Manager. METHOD OF MEASUREMENT Furnishing and Commissioning of RPU Equipment (By Manufacturer). This bid item shall be measured by a lump sum cost furnished and shipped to the contractor s site at the airport. The equipment shall be furnished by the manufacturer (Vaisala) and shall include all equipment detailed in paragraph , paragraph h, parts i and ii. This bid item shall also include the cost of commissioning to be furnished by the manufacturer. Bid item includes all taxes, overhead, and cost from the manufacturer Installation of RPU Equipment (Work by Contractor). The RPU surface sensor installation and testing shall be measured by a lump sum cost, complete in place, ready for operation, and accepted as satisfactory by the Engineer. The RPU surface sensor installation and testing work shall include, but is not limited to: testing, securing, and coordination of manufacturer for their services to commission the system, coordination with DEN, furnishing and installing all hardware, foundation, conduit and cable to within 5 of foundation, grounding, enclosure, transformer(s), disconnect switch, strut, solar panels, batteries, and all the material, equipment, labor and coordination necessary to complete the work shown in the construction drawings and described herein, complete in place and to the full satisfaction to the Engineer. This bid item does not include furnishing the equipment detailed in paragraph but does include installation of the material per manufacturer recommendations. Note; this bid item does not include surface scan Type V cable which shall be bid in paragraph Contractor shall contact manufacturer prior to the bid to obtain all requirements, details, installation notes, and scheduling requirements. This bid item includes the cost of both sets of RPU as shown on the construction drawings. This bid item covers both RPU foundation rack and equipment for both RPUS to be installed: RPU and This bid item covers the removal and demolition of the existing RPUs Surface Scan Sensor Cable Type II V. The surface scan cable shall be measured by linear foot, complete in place, ready for operation, and accepted as satisfactory by the Engineer. The cost of the cable shall include removal of existing cable, mandrel of conduit, furnishing and installation of new cable and any splice connections required. Contractor shall contact the manufacturer of the surface scan sensory equipment to ascertain pulling tensions prior to the bid. ADDENDUM #3 ENGINEERING REVISION NO. 0 12/14/2017 L-132-7

22 TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT DIVISION 2 AIRFIELD STANDARDS RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION ITEM L-132 RUNWAY SURFACE CONDITION SENSOR SYSTEM CONTRACT NO Furnish Passive Pavement Sensors. This bid item shall be measured by a lump sum cost furnished and shipped to the contractor s site at the airport. The equipment shall be furnished by the manufacturer (Vaisala) and shall include all equipment detailed in paragraph , paragraph h, part iii. This bid item shall also include the cost of commissioning to be furnished by the manufacturer. Bid item includes all taxes, overhead, and cost from the manufacturer Install Passive Pavement Sensor. The quantity of equipment installed as completed units in place, accepted by the DEN Project Manager and ready for operation will be measured per each. This item shall include all work required to install new passive pavement sensors as described in this specification and detailed in the plans. Also included shall be the installation of sensor cable from the sensor to the nearest junction box, removal of existing sensor, pavement cutting, epoxy, and all tools, supplies, and incidentals. BASIS OF PAYMENT Payment shall be made in accordance with the following items: L-132a Furnishing and Commissioning of RPU Equipment LS L-132b Installation of RPU Equipment LS L-132c Surface Scan Sensor Cable - Type V. LF L-132d Furnish Passive Pavement Sensors LS L-132e Install Passive Pavement Sensor EA END OF ITEM L-132 ADDENDUM #3 ENGINEERING REVISION NO. 0 12/14/2017 L-132-8

23 CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT CITY AND U CO N SE TY AL OF DENVER RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION 5 ISSUE RECORD NO. BY PURPOSE DATE CKD 1 BRG IFR 60% 31AU17 2 BRG IFR 90% 29SE17 3 BRG IFR 100% 03NO17 4 BRG IFB 20NO17 5 BRG ADD#3 14DE17 5 SCALE NO SCALE DATE AUGUST 31, 2017 DRAWN BY: A.P.A. CHECKED BY: C.L.G. FAA AIP NO: WORK BREAKDOWN NO. DESIGN CONTRACT NO TASK 8 CONST. CONTRACT NO. VOLUME NO. SHEET TITLE INDEX TO DRAWINGS (2 OF 2) SHEET NO. CADD FILE NO. G OF 295 _ T8-B1GIND-002-R725 1

24 CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT 6 CITY AND U CO N SE TY AL OF DENVER RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION ISSUE RECORD NO. BY PURPOSE DATE CKD 1 BRG IFR 60% 31AU17 2 BRG IFR 90% 29SE17 3 BRG IFR 100% 03NO17 4 BRG IFB 20NO17 5 BRG ADD#2 13DE17 6 BRG ADD#3 14DE SCALE NO SCALE DATE AUGUST 31, 2017 DRAWN BY: A.P.A. CHECKED BY: C.L.G. FAA AIP NO: WORK BREAKDOWN NO. 6 DESIGN CONTRACT NO TASK 8 CONST. CONTRACT NO VOLUME NO. SHEET TITLE SUMMARY OF APPROXIMATE QUANTITIES SHEET NO. CADD FILE NO. G OF 295 _ T8-B1GQTY-004-R725 1

25 UNION CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT CITY AND CO UN SE TY AL OF DENVER RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION AND STATE OF COLORADO CONSTITUTION NIL 1 SINE NUMINE ISSUE RECORD NO. BY PURPOSE DATE CKD 1 BRG IFR 60% 31AUG17 2 BRG IFR 90% 29SE17 3 BRG IFR 100% 03NO17 4 BRG IFB 20NO17 SCALE NTS DATE AUGUST 31, 2017 DRAWN BY: CHECKED BY: FAA AIP NO: WORK BREAKDOWN NO. DESIGN CONTRACT NO TASK 8 CONST. CONTRACT NO. VOLUME NO. SHEET TITLE NEW ELECTRICAL SYMBOLS SHEET NO. CADD FILE NO. EL OF 295 _ T8-B1EELP-EL001-R725 1

26 UNION RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA KEY PLAN TW B RW 7/25 B4 TW 40 TW G CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT CITY AND CO UN SE TY AL OF DENVER RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION AND STATE OF COLORADO CONSTITUTION NIL SINE NUMINE ISSUE RECORD NO. BY PURPOSE DATE CKD 1 BRG IFR 60% 31AUG17 2 BRG IFR 90% 29SE17 3 BRG IFR 100% 03NO17 4 BRG IFB 20NO17 SCALE 1"=60' DATE AUGUST 31, 2017 DRAWN BY: CHECKED BY: FAA AIP NO: WORK BREAKDOWN NO. RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA DESIGN CONTRACT NO TASK 8 CONST. CONTRACT NO. VOLUME NO. SHEET TITLE NEW ELECTRICAL PLAN 2 SHEET NO. CADD FILE NO. EL OF 295 _ T8-B1EELP-EL102-R725 1

27 UNION A RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA KEY PLAN TW B RW 7/25 B4 TW 40 TW G CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT CITY AND CO UN SE TY AL OF DENVER RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION AND STATE OF COLORADO CONSTITUTION NIL SINE NUMINE ISSUE RECORD NO. BY PURPOSE DATE CKD 1 BRG IFR 60% 31AUG17 2 BRG IFR 90% 29SE17 3 BRG IFR 100% 03NO17 4 BRG IFB 20NO17 SCALE 1"=60' DATE AUGUST 31, 2017 DRAWN BY: CHECKED BY: FAA AIP NO: WORK BREAKDOWN NO. A RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA DESIGN CONTRACT NO TASK 8 CONST. CONTRACT NO. VOLUME NO. SHEET TITLE NEW ELECTRICAL PLAN 4 SHEET NO. CADD FILE NO. EL OF 295 _ T8-B1EELP-EL102-R725 1

28 UNION RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA KEY PLAN TW B RW 7/25 B4 TW 40 TW G CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT CITY AND CO UN SE TY AL OF DENVER STATE OF COLORADO CONSTITUTION NIL SINE NUMINE RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION AND ISSUE RECORD NO. BY PURPOSE DATE CKD 1 BRG IFR 60% 31AUG17 2 BRG IFR 90% 29SE17 3 BRG IFR 100% 03NO17 4 BRG IFB 20NO17 SCALE 1"=60' DATE AUGUST 31, 2017 DRAWN BY: CHECKED BY: FAA AIP NO: WORK BREAKDOWN NO. RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA DESIGN CONTRACT NO TASK 8 CONST. CONTRACT NO. VOLUME NO. SHEET TITLE NEW ELECTRICAL PLAN 7 SHEET NO. CADD FILE NO. EL OF 295 _ T8-B1EELP-EL102-R725 1

29 UNION RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA KEY PLAN TW B RW 7/25 B4 TW 40 TW G CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT CITY AND CO UN SE TY AL OF DENVER RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION AND STATE OF COLORADO CONSTITUTION NIL SINE NUMINE ISSUE RECORD NO. BY PURPOSE DATE CKD 1 BRG IFR 60% 31AUG17 2 BRG IFR 90% 29SE17 3 BRG IFR 100% 03NO17 4 BRG IFB 20NO17 SCALE 1"=60' DATE AUGUST 31, 2017 DRAWN BY: CHECKED BY: FAA AIP NO: WORK BREAKDOWN NO. RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA DESIGN CONTRACT NO TASK 8 CONST. CONTRACT NO. VOLUME NO. SHEET TITLE NEW ELECTRICAL PLAN 10 SHEET NO. CADD FILE NO. EL OF 295 _ T8-B1EELP-EL102-R725 1

30 UNION RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA KEY PLAN TW B RW 7/25 B4 TW 40 TW G CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT CITY AND CO UN SE TY AL OF DENVER RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION AND STATE OF COLORADO CONSTITUTION NIL SINE NUMINE ISSUE RECORD NO. BY PURPOSE DATE CKD 1 BRG IFR 60% 31AUG17 2 BRG IFR 90% 29SE17 3 BRG IFR 100% 03NO17 4 BRG IFB 20NO17 SCALE 1"=60' DATE AUGUST 31, 2017 DRAWN BY: CHECKED BY: FAA AIP NO: WORK BREAKDOWN NO. RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA DESIGN CONTRACT NO TASK 8 CONST. CONTRACT NO. VOLUME NO. SHEET TITLE NEW ELECTRICAL PLAN 12 SHEET NO. CADD FILE NO. EL OF 295 _ T8-B1EELP-EL102-R725 1

31 UNION RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA KEY PLAN TW B RW 7/25 B4 TW 40 TW G CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT CITY AND CO UN SE TY AL OF DENVER RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION AND STATE OF COLORADO CONSTITUTION NIL SINE NUMINE ISSUE RECORD NO. BY PURPOSE DATE CKD 1 BRG IFR 60% 31AUG17 2 BRG IFR 90% 29SE17 3 BRG IFR 100% 03NO17 4 BRG IFB 20NO17 SCALE 1"=60' DATE AUGUST 31, 2017 DRAWN BY: CHECKED BY: FAA AIP NO: WORK BREAKDOWN NO. RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA DESIGN CONTRACT NO TASK 8 CONST. CONTRACT NO. VOLUME NO. SHEET TITLE NEW ELECTRICAL PLAN 15 SHEET NO. CADD FILE NO. EL OF 295 _ T8-B1EELP-EL102-R725 1

32 TOFA UNION TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA KEY PLAN TW B RW 7/25 B4 TW 40 TW G CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT CITY AND CO UN SE TY AL OF DENVER RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION AND STATE OF COLORADO CONSTITUTION NIL SINE NUMINE TOFA TOFA TOFA TOFA TOFA TOFA ISSUE RECORD NO. BY PURPOSE DATE CKD 1 BRG IFR 60% 31AUG17 2 BRG IFR 90% 29SE17 3 BRG IFR 100% 03NO17 4 BRG IFB 20NO17 FA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA SCALE 1"=60' DATE AUGUST 31, 2017 DRAWN BY: CHECKED BY: FAA AIP NO: WORK BREAKDOWN NO. DESIGN CONTRACT NO TASK 8 CONST. CONTRACT NO. VOLUME NO. SHEET TITLE NEW ELECTRICAL PLAN 22 SHEET NO. CADD FILE NO. EL OF 295 _ T8-B1EELP-EL102-R725 1

33 UNION CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT CITY AND CO UN SE TY AL OF DENVER OFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION AND KEY PLAN TW B RW 7/25 TW B4 40 TW G STATE OF COLORADO CONSTITUTION NIL SINE NUMINE ISSUE RECORD NO. BY PURPOSE DATE CKD 1 BRG IFR 60% 31AUG17 2 BRG IFR 90% 29SE17 3 BRG IFR 100% 03NO17 4 BRG IFB 20NO17 TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA SCALE 1"=60' DATE AUGUST 31, 2017 DRAWN BY: CHECKED BY: FAA AIP NO: WORK BREAKDOWN NO. DESIGN CONTRACT NO TASK 8 CONST. CONTRACT NO. VOLUME NO. SHEET TITLE NEW ELECTRICAL PLAN 36 SHEET NO. CADD FILE NO. EL OF 295 _ T8-B1EELP-EL102-R725 1

34 UNION CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT CITY AND CO UN SE TY AL OF DENVER RUNWAY 7/25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION AND STATE OF COLORADO CONSTITUTION NIL SINE NUMINE ISSUE RECORD NO. BY PURPOSE DATE CKD 1 BRG IFR 60% 31AUG17 2 BRG IFR 90% 29SE17 3 BRG IFR 100% 03NO17 4 BRG IFB 20NO17 SCALE NTS DATE AUGUST 31, 2017 DRAWN BY: CHECKED BY: FAA AIP NO: WORK BREAKDOWN NO. DESIGN CONTRACT NO TASK 8 CONST. CONTRACT NO. VOLUME NO. SHEET TITLE PAVEMENT SENSOR DETAILS 1 SHEET NO. EL A OF 295 CADD FILE NO. _ T8-B1EELP-510-R725

ADDENDUM NO. TWO AB

ADDENDUM NO. TWO AB ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County

More information

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

BID FORM. Bid by: Name of Bidder. Address:  Address: To the Texas Department of Transportation hereinafter called the Agent. BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway

More information

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014 CHICAGO DEPARTMENT OF AVIATION AND THE O HARE MODERNIZATION PROGRAM Current Construction Projects May 2, 2014 O HARE INTERNATIONAL AIRPORT CURRENT CONFIGURATION 2 PHASE 1 & COMPLETION PHASE 9L-27R Completed

More information

SUMMARY OF QUANTITES NO. ITEM DESCRIPTION UNIT QUANTITY DRAWING NUMBER TITLE GENERAL ELECTRICAL

SUMMARY OF QUANTITES NO. ITEM DESCRIPTION UNIT QUANTITY DRAWING NUMBER TITLE GENERAL ELECTRICAL SRQ-D-FOTS-G000 DRAWING NUMBER TITLE GENERAL 1 SRQ-D-FOTS-G000 COVER SHEET 2 SRQ-D-FOTS-G001 DRAWING INDEX AND SUMMARY OF QUANTITIES 3 SRQ-D-FOTS-G002 LEGEND AND ABBREVIATIONS 4 SRQ-D-FOTS-G101 OVERALL

More information

Technical Standard Order

Technical Standard Order Department of Transportation Federal Aviation Administration Aircraft Certification Service Washington, D.C. TSO-C124b Effective Date: 04/10/07 Subject: Technical Standard Order FLIGHT DATA RECORDER SYSTEMS

More information

Emergency Stop Devices

Emergency Stop Devices New! Selection and Application of.. 278 Emergency Stop Rope Pull Switches........... 279 New! Emergency Stop Push Buttons............... 293 Banner Engineering Corp. Minneapolis, MN U.S.A. bannerengineering.com

More information

PGFS Series 30 Amp Permanent Series (Splice-In) GFCI/ELCI

PGFS Series 30 Amp Permanent Series (Splice-In) GFCI/ELCI PGFS Series 30 Amp Permanent Series (Splice-In) GFCI/ELCI INTRODUCTION The LineGard 30 Amp Permanent Series is an industrial grade ground fault interrupter device designed and manufactured by North Shore

More information

TENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1

TENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1 TENDER NO. T-2170-2018 ADDENDUM NO. 1 SCHEDULE OF QUANTITIES AND PRICES REPLACE A revised copy of the Schedule of Quantities and Prices with changes bolded in red has been posted online (pdf attached).

More information

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB MICHIGAN AIRPORT DEVELOPMENT PROGRAM AIP CAPITAL IMPROVEMENT PLAN 20102019 FEDERAL/STATE/LOCAL Ann Arbor, MI Date of Latest ALP 2008 ACIP Airport Code A Airport Identifier ARB Prepared by: MDOTAERO Sponsor:

More information

Technical Standard Order

Technical Standard Order Department of Transportation Federal Aviation Administration Aircraft Certification Service Washington, DC TSO-C145a Effective Date: 09/19/02 Technical Standard Order Subject: AIRBORNE NAVIGATION SENSORS

More information

SERVICE BULLETIN SERIAL NUMBERS

SERVICE BULLETIN SERIAL NUMBERS TITLE ENGINE INDICATING - ENGINE TREND MONITOR CALIBRATION EFFECTIVITY MODEL SERIAL NUMBERS 560 (Citation Ultra) -0387, -0392, -0404, -0410, -0415, -0420, -0426, -0452, -0456, -0462, -0468, -0472, -0495,

More information

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON EAST RDICA AVENUE FOR THE LOCATION MAP STANDARD SYMBOLS FEATURE EISTING PROPOSED BENCHMARK BM/TBM SHEET INDE. BM/TBM TITLE SHEET CONCRETE R.O.W. MONUMENT

More information

OLD AIRPORT (PFN) RW 05/23 RW 14/32. 4,884-FEET X 150-FEET MIRL 4-BOX VASIs (5 & 23 APPROACHES) REILS

OLD AIRPORT (PFN) RW 05/23 RW 14/32. 4,884-FEET X 150-FEET MIRL 4-BOX VASIs (5 & 23 APPROACHES) REILS FAITH ADAMS AGENDA AIRPORT RELOCATION CHALLENGES AIRFIELD LIGHTING & SIGNAGE NAVAIDS AIRFIELD LIGHTING VAULT L-890 ALCMS AIR TRAFFIC CONTROL TOWER (ATCT) CONCLUSION AIRPORT RELOCATION OLD AIRPORT (PFN)

More information

203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'

More information

HEATER POWER CONTROLLER

HEATER POWER CONTROLLER HEATER POWER CONTROLLER /04 Rev 0 - - ii PROCON MODEL HPC TABLE OF CONTENTS DESCRIPTION... MANUAL REVISIONS... 5 WARRANTY... 5 SPECIFICATIONS... 6 DRAWINGS PHYSICAL DIMENSIONS 44-090095-0-00... 7 PANEL

More information

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division MIAMI-DADE AVIATION DEPARTMENT MIA Runway 8R8R-26L Pavement Pavement Rehabilitation Civil Environmental Engineering Division The Project Team Mission Statement C EXPERTISE + COMMITMENT = OWNERSHIP Project

More information

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations Section: Page 32.A General... 32-1 32.B Aircraft... 32-4 32-i THIS PAGE INTENTIONALLY LEFT BLANK 32-i SECTION 32 Airfield and Aircraft Operations

More information

2004 Spa Pre-Delivery Guide

2004 Spa Pre-Delivery Guide 2004 Spa Pre-Delivery Guide The guide to making your new Cal Spa installation easy. Duplication without written consent is strictly prohibited. This is for spas manufactured after May19, 2003 Revised July

More information

SECTION 32. Airfield and Aircraft Operations

SECTION 32. Airfield and Aircraft Operations SECTION 32 Airfield and Aircraft Operations 32.A Airfields General. 32.A.01 The following safety requirements shall be in addition to the airfield's safety requirements. When an airfield has safety requirements

More information

Blue Series Hot Melt Hose with RediFlext II Hanger System

Blue Series Hot Melt Hose with RediFlext II Hanger System Instruction Sheet P/N 1124594_01 Blue Series Hot Melt Hose with RediFlext II Hanger System Safety WARNING! Allow only personnel with appropriate training and experience to operate or service the equipment.

More information

Zinc Cable & Conduit Connectors For Armored Cable, Flexible Metal Conduit & Metal Clad Cable

Zinc Cable & Conduit Connectors For Armored Cable, Flexible Metal Conduit & Metal Clad Cable Zinc Cable & Conduit Connectors For Armored Cable, Flexible Metal Conduit & Metal Clad Cable Type FC Set Screw To terminate regular wall steel or aluminum flexible conduit to a 1/2 knockout in a dry location

More information

BELFAST MUNICIPAL AIRPORT OVERVIEW

BELFAST MUNICIPAL AIRPORT OVERVIEW BELFAST MUNICIPAL AIRPORT OVERVIEW LOCATION AND HISTORY Belfast Municipal Airport (Federal Aviation Administration (FAA) airport code BST, International Civil Aviation Organization airport code KBST, FAA

More information

Therme storage water heater. Table of contents. Symbols used. Symbols used Symbol indicates a possible hazard. Installation instructions

Therme storage water heater. Table of contents. Symbols used. Symbols used Symbol indicates a possible hazard. Installation instructions Therme storage water heater Table of contents Symbols used... 8 Installation instructions Water supply... 9 Choice of location... 9 Installation of the Therme... 9 Fitting the draining and venting valve...

More information

CAUTION - NOTICE TO CONTRACTOR

CAUTION - NOTICE TO CONTRACTOR 7. WINDSOCK 7.7 CPP TOP.. 7.7 INV CPP EL..7...7.7.... 7...... CNT BOX NOEL. CNT BOX. CNT BOX NOEL. CNT BOX NOEL..7... 7. 7.......7. 7. 7..7. TOP. TOP. TOP TOP.7 7.. TOP TOP.7. TOP TOP..7 TOP. TOP.7. PVC

More information

Grounding Clamp. Pins and Ball-Socket Clamps for Temporary Grounding

Grounding Clamp. Pins and Ball-Socket Clamps for Temporary Grounding Grounding Clamp Pins and Ball-Socket Clamps for Temporary Grounding Pins and Ball-Socket Clamps have been designed to solve several temporary grounding situations, where the physical space or the contact

More information

CAUTION - NOTICE TO CONTRACTOR

CAUTION - NOTICE TO CONTRACTOR WINDSOCK 7. 7.7 CPP TOP.. 7.7 INV CPP EL..7...7.7.... 7....... CNT BOX NOEL CNT BOX.. CNT BOX NOEL CNT BOX NOEL.7 7........ 7...7.. 7..7. 7..7 TOP. TOP TOP TOP. TOP. 7.7.. TOP. TOP.7 TOP. TOP.7 TOP. PVC

More information

Model Crosspoint Matrix

Model Crosspoint Matrix Model 3000 4380 256 Crosspoint Matrix 90401270 Page 1 All technical data and specifications in this publication are subject to change without prior notice and do not represent a commitment on the part

More information

SIDERMAT combination Visible breaking and tripping fuse switches from 630 to 1800 A

SIDERMAT combination Visible breaking and tripping fuse switches from 630 to 1800 A Fuse protection The solution for > Motor load break > Protection of industrial cabinet > Electrical distribution sdmat_048_b_1_cat Strong points > Tripping upon overload > High breaking capacity > Improved

More information

FIBER OPTIC CLOSURES

FIBER OPTIC CLOSURES FIBER OPTIC CLOSURES In-line type and dome type - series CLS-I, CLS- IF2X, CLS-D, CLS-DF2X144 and CLS-DF2X240 PACIFIC INTERCONNECTIONS - connecting the world with fiber optics IN-LINE TYPE FIBER OPTIC

More information

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT Pursuant to CFR 158.24, the City and County of Denver Department of Aviation ( City ), owner and operator of the Denver International

More information

General-Use Auto-Tuning HPX-T Series

General-Use Auto-Tuning HPX-T Series General-Use Auto-Tuning HPX-T Series Built-in Hyper-tuning automatically adjusts scanning characteristics. Adjustment steps, results and scanning conditions are digitally displayed by LED. Digital display

More information

LANDING GEAR - REPLACEMENT OF NOSE LANDING GEAR RETRACT PLUNGER ASSEMBLY

LANDING GEAR - REPLACEMENT OF NOSE LANDING GEAR RETRACT PLUNGER ASSEMBLY Beechcraft TITLE: SERVICE BULLETIN LANDING GEAR - REPLACEMENT OF NOSE LANDING GEAR RETRACT PLUNGER ASSEMBLY 1. Planning Information A. Effectivity (1) Airplanes (a) Civil (i) (ii) (b) Military (i) The

More information

AVIAT AIRCRAFT INC. P.O. Box South Washington Afton, WY USA Tel: Fax:

AVIAT AIRCRAFT INC. P.O. Box South Washington Afton, WY USA Tel: Fax: DATE: 2 April 1999 REVISION: n/c AIRCRAFT: HUSKY A-1 P.O. Box 1240 672 South Washington Afton, WY 83110 USA Tel: 307-886-3151 Fax: 307-886-9674 e-mail: aviat@aviataircraft.com SUBJECT: Normal Category

More information

SERVICE BULLETIN REVISION TRANSMITTAL

SERVICE BULLETIN REVISION TRANSMITTAL REVISION TRANSMITTAL This sheet transmits Revision 1 to, which: A. Moves the CM2987-3 ID Tags from the -0 Parts Kit to the -1 Parts Kit. B. Adds EASA approval statement to the Approval section. C. Adds

More information

200-BP-CAL-KIT. Sphygmomanometer Calibration Kit INSTRUCTION MANUAL

200-BP-CAL-KIT. Sphygmomanometer Calibration Kit INSTRUCTION MANUAL 200-BP-CAL-KIT Sphygmomanometer Calibration Kit INSTRUCTION MANUAL Netech Corporation 110 Toledo Street Farmingdale N.Y. 11735 Phone: 631-531-0100 Fax: 631-531-0101 www.netechcorporation.com Sphygmomanometer

More information

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where

More information

BUILT-IN OVEN SAFETY

BUILT-IN OVEN SAFETY UILT-IN OVN SFTY Your safety and the safety of others are very important. We have provided many important safety messages in this manual and on your appliance. lways read and obey all safety messages.

More information

SUPERSEDED. [Docket No NM-148-AD; Amendment ; AD ]

SUPERSEDED. [Docket No NM-148-AD; Amendment ; AD ] [Federal Register: August 12, 2002 (Volume 67, Number 155)] [Rules and Regulations] [Page 52396-52398] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr12au02-6] DEPARTMENT

More information

FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 CHECKLIST

FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 CHECKLIST Form 291111wd (09-15) Storm Lake Municipal Airport Airport FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 SLB FAA Identifier CHECKLIST Please attach the following documents with your

More information

TENTS, CANOPIES AND TEMPORARY MEMBRANE STRUCTURES

TENTS, CANOPIES AND TEMPORARY MEMBRANE STRUCTURES INFORMATION BULLETIN TENTS, CANOPIES AND TEMPORARY MEMBRANE STRUCTURES Code Reference: Title 19 California Code of Regulations California Fire Code (CFC), 2001 Edition, Article 32 California Building Code

More information

EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008

EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008 EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008 SECTION 1 - PURPOSE AND SCOPE 1.1 Purpose This document is designed to serve as a guide for private and commercial hangar construction

More information

PROFIBUS Cordsets Technical Data

PROFIBUS Cordsets Technical Data These pre-tested molded cordsets utilize high-quality continuous flex cable and integral molded strain relief. They are designed to provide interconnection between simple devices such as sensors and actuators

More information

To add airplane serial numbers thru and 172S0001 thru 172S9974 to the Effectivity section.

To add airplane serial numbers thru and 172S0001 thru 172S9974 to the Effectivity section. Revision Transmittal February 13, 2006 TO: Cessna Distributors, Single Engine Service Stations and CPC's SUBJECT: Single Engine Service Bulletin, Floorboard Bulkhead Rivet Inspection. REASON FOR REVISION

More information

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2 Advisory Circular Subject: Part Design Approvals Issuing Office: Standards Document No.: AC 521-007 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 5612108-V33 Effective Date: 2012-03-16 1.1

More information

VFR Parallel Flow, Fan-Powered, VAV Terminals

VFR Parallel Flow, Fan-Powered, VAV Terminals VFR Parallel Flow, Fan-Powered, VAV Terminals Model VFR construction features Galvanized-steel casing withstands 125-hour, salt-spray test per ASTM B-117 All unit configurations listed with ETL for safety

More information

Installation and Maintenance Manual

Installation and Maintenance Manual Freestanding Gas Stove MODEL: PGS2005 GPEBB20R GPEBW20R Installation and Maintenance Manual Warning Maintenance products should be carried out by professional and technical personnel with relevant qualification,

More information

Data Sheet for Precision Potentiometer

Data Sheet for Precision Potentiometer AL(R)17/19 soldering lugs The AL(R)17/19 potentiometers in 22 mm housing are suitable for applications where a precise and economical multiturn potentiometer is important. Economical and precise multiturn

More information

Model Number Structure

Model Number Structure Solid State Relays Refer to Safety Precautions for All Solid State Relays. Extremely Thin Relays Integrated with Heat Sinks Downsizing achieved through optimum design of heat sink. Mounting possible via

More information

NH MULTIBLOC fuse-switchdisconnector. terminal version reference no.

NH MULTIBLOC fuse-switchdisconnector. terminal version reference no. NH fuse-switch-disconnector NH fuse-switchdisconnector ~ 690V screw fixing of disconnectors onto plates size rated current in A no. of poles terminal version art. group 00 160 1 screw M8 both sides F229292

More information

Insulated Scissors. Handles made with shock-proof plastic. Length Blade Std. Part No. Type mm shape Pk.

Insulated Scissors. Handles made with shock-proof plastic. Length Blade Std. Part No. Type mm shape Pk. Cutting Tools Cable Cutter - For copper and aluminum cables only. Extremely high cutting capacity with adjustable screw joint. for cable Length Std. Part No Type Ømm mm 2 AWG mm Pk. AP1017 N 15 50 1/0

More information

Supplementary protector S 200 MR for ring-tongue applications acc. to UL 1077

Supplementary protector S 200 MR for ring-tongue applications acc. to UL 1077 Electrical installations in buildings for ring-tongue applications acc. to UL 1077 S 200 MR is a high-performance supplementary protector with ring cable lug connections conforming to UL, CSA, and IEC

More information

SECTIONAL OVERHEAD DOORS

SECTIONAL OVERHEAD DOORS SECTIONAL OVERHEAD DOORS Why choose Insulated Sectional Overhead Doors? 25mm approx. 40mm This leaflet is offered as a guide for the Trade when presenting the arguments in favour of specification and selection

More information

Mainelli Wagner & Associates, Inc.

Mainelli Wagner & Associates, Inc. www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 September 14, 2018 The Colfax County Board of Commissioners

More information

SERVICE BULLETIN MANDATORY SB Planning Information TITLE:

SERVICE BULLETIN MANDATORY SB Planning Information TITLE: SERVICE BULLETIN TITLE: LANDING GEAR - NOSE LANDING GEAR FORWARD RETRACT PLUNGER ROD INSPECTION / REPLACEMENT 1. Planning Information A. Effectivity (1) Airplanes (a) Civil Model G36 Bonanza, Serials E-3979

More information

SafeSite. Series LED Based Signaling for Hazardous Locations

SafeSite. Series LED Based Signaling for Hazardous Locations SafeSite Series LED Based Signaling for Hazardous Locations Index 02 SafeSite L-864 Red LED Beacon 03 SafeSite LED Based L-864/L-865 Flashing Dual (White/Red) Strobe 04 SafeSite L-810 Red LED Obstruction

More information

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

K SIGNAGE & TRAFFIC CONTROL. Table of Contents Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...

More information

SERVICE BULLETIN. Citation 525B TITLE NAVIGATION - ENHANCED SURVEILLANCE TRANSPONDER UPGRADE EFFECTIVITY SERIAL NUMBERS

SERVICE BULLETIN. Citation 525B TITLE NAVIGATION - ENHANCED SURVEILLANCE TRANSPONDER UPGRADE EFFECTIVITY SERIAL NUMBERS TITLE NAVIGATION - ENHANCED SURVEILLANCE TRANSPONDER UPGRADE EFFECTIVITY MODEL 525B (CJ3) SERIAL NUMBERS -0042 and On NOTE: This service bulletin may only be accomplished at a Cessna-owned or authorized

More information

10' x 20' MAX AP CANOPY EXTENSION KIT Assembly Instructions

10' x 20' MAX AP CANOPY EXTENSION KIT Assembly Instructions 10' x 20' MAX AP CANOPY EXTENSION KIT Assembly Instructions Frame Not Included Description Model # 10' x 20' MAX AP Canopy - Extension Kit - White 35730 Recommended Tools Please read instructions COMPLETELY

More information

Ground Clamps Cable Tray

Ground Clamps Cable Tray COMMERCIAL AND INDUSTRIAL FITTINGS: GROUNDING FITTINGS AND SOLDERLESS CONNECTORS Clamps Cable Tray Terminates ground wire to cable tray. For aluminum or copper conductors. 1 4 hex wrench tightens both

More information

10' x 20' MAX AP CANOPY Assembly Instructions

10' x 20' MAX AP CANOPY Assembly Instructions 10' x 20' MAX AP CANOPY Assembly Instructions Description Model # 10' x 20' MAX AP Canopy - 8 Leg - White 30522 Recommended Tools Please read instructions COMPLETELY before assembly. This shelter MUST

More information

Permit Application Requirements For Temporary Tents, and Membrane Structures

Permit Application Requirements For Temporary Tents, and Membrane Structures CTY OF PAM DESERT Building & Safety Department Permit Application Requirements For Temporary Tents, and Membrane Structures F O R M A T O A B U E T Revised 1-30-14 73510 Fred Waring Drive Palm Desert,

More information

Data Sheet for Precision Potentiometer

Data Sheet for Precision Potentiometer The ALI(R)17/19 potentiometers in mm housing are suitable for applications where a precise multiturn potentiometer increased radial shaft loads is important. ALI(R)17/19 reinforced bearing ALI(R)17/19

More information

10 A at 100 to 240 VAC. G3NE-220T-US (20 A at 75 to 264 VAC) 5 A at 100 to 240 VAC

10 A at 100 to 240 VAC. G3NE-220T-US (20 A at 75 to 264 VAC) 5 A at 100 to 240 VAC Solid State Relays G3NE Compact, Low-cost, SSR Switching 5to20 A Wide load voltage range: 75 to 264 VAC. Dedicated, compact aluminum PCB and power elements used. Built-in varistor effectively absorbs external

More information

USE OF TENTS Guide. Frederick County Fire and Rescue Services Division. Office of the Fire Marshal

USE OF TENTS Guide. Frederick County Fire and Rescue Services Division. Office of the Fire Marshal Frederick County Fire and Rescue Services Division 5370 Public Safety Place Frederick, MD 21704 301-600-1479 USE OF TENTS Guide Office of the Fire Marshal Guidelines for the Use of Tents The following

More information

LOCAL DISCONNECT SWITCHES Manual Motor Controllers

LOCAL DISCONNECT SWITCHES Manual Motor Controllers LOCAL DISCONNECT SWITCHES Manual Motor Controllers 1 2 Ensto Manufacturer of electrical components and systems This brochure presents the economical, versatile and reliable Ensto Origin manual motor controllers

More information

SECTION TOILET ACCESSORIES

SECTION TOILET ACCESSORIES Specifier notes are shown in italics and should be deleted from the final document. Generally all of the manufacturer s products in this category are listed and the specifier must take care to delete those

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

KEY FEATURES IN SHORT

KEY FEATURES IN SHORT KA C90/B200/350 KA C90/B200/350 It is the fixed base simulator of commercial turboprop multi-crew aircraft. The simulator meets all the requirements determined for EASA CS-FSTD(A) FNPTII +MCC level. The

More information

CONNECTORS FROM THE GREAVES ADAP T ER Z O N E

CONNECTORS FROM THE GREAVES ADAP T ER Z O N E AGE 9 CONNECTORS FROM THE GRVES ADA T ER Z O N E When the cable doesn t fit, you need a solution fast What can you do when dealing with new or relocated equipment, spec changes, and/or mismatched parts

More information

Project Purpose: Project History and Status:

Project Purpose: Project History and Status: Plant Unit Substation Improvements Project Purpose: The purpose of this project is to ensure that the portions of the Nine Springs Wastewater Treatment Plant powered by Unit Substations U11, U12, and U13

More information

Product Guide LED OBSTRUCTION LIGHTS

Product Guide LED OBSTRUCTION LIGHTS Product Guide LED OBSTRUCTION LIGHTS Certified to: FAA AC NO: 150/5345-43F FAA Engineering Brief No. 67 Compliant to: ICAO Annex 14, 4th Edition, July 2004 ICAO Aerodromes Design Manual, Chapter 18 Canadian

More information

CATCODE ] CATCODE

CATCODE ] CATCODE Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class

More information

inside diameter wire part no. color length I.D. after recovery gauge red Single Wall Polyolefin 2:1 Shrink Tube - Flexible

inside diameter wire part no. color length I.D. after recovery gauge red Single Wall Polyolefin 2:1 Shrink Tube - Flexible PVC 2:1 Shrink Tube Use to insulate terminals after the terminal has been crimped to the wire. Tubing remains flexible and will shrink to approximately 50% of its original size when 160 C (320 F) heat

More information

Reiff Manufaturing. Shelter Types. Airport Landing System Equipment Shelters. Maintenance Shelters. Cellular Phone Shelters

Reiff Manufaturing. Shelter Types. Airport Landing System Equipment Shelters. Maintenance Shelters. Cellular Phone Shelters Reiff Manufaturing Phone: 509-525-1081 Fax: 509-525-0439 Email: info@reiffman.com www.reiffman.com Shelter Types Airport Landing System Equipment Shelters Maintenance Shelters Custom Shelters Equipment

More information

July 5, Re: Contract ID Plan, & Proposal July 11, 2017 Letting. The Contractor is hereby advised of modifications to the bid documents.

July 5, Re: Contract ID Plan, & Proposal July 11, 2017 Letting. The Contractor is hereby advised of modifications to the bid documents. July 5, 2017 Dear Prospective Bidders: Re: Contract ID 2688050 Plan, & Proposal July 11, 2017 Letting The Contractor is hereby advised of modifications to the bid documents. The Proposal has been modified:

More information

Slit Loom Installation Tool. Spools and Bags. Bulk Boxes

Slit Loom Installation Tool. Spools and Bags. Bulk Boxes Looms and Tubing Polyethylene Slit Loom Slit seam construction allows for easy wire insertion and repair, yet retains wire even when bent or twisted. Maximum temperature 93 C (200 F). Ideal for protecting

More information

630 to 1800 A. Functions. Conformity to standards. General characteristics. Fuse combination switches SIDERMAT combination.

630 to 1800 A. Functions. Conformity to standards. General characteristics. Fuse combination switches SIDERMAT combination. SIDERMAT combination 630 to 1800 A sdmat_048_a_1_cat SIDERMAT combination are manually operated tri- or tetrapolar fuse disconnecting switches which can be triggered remotely. They provide breaking and

More information

SERVICE ADVISORY. NO.: 0608 Revision A. All Garmin Aviation Service Centers

SERVICE ADVISORY. NO.: 0608 Revision A. All Garmin Aviation Service Centers SERVICE ADVISORY NO.: 0608 Revision A TO: All Garmin Aviation Service Centers DATE: 9 May 2006 SUBJECT: Applicability of Service Bulletins 0530 and 0532 appropriate to TERRAIN functionality of Garmin 400

More information

Gas Conversion Kits and Instructions

Gas Conversion Kits and Instructions Gas Conversion Kits and Instructions INSTALLATION FORM RGM 432/433-GC (Version D.1) Obsoletes Form RGM 432/433-GC (Version D) APPLIES TO: Model FT and Model SFT All gas conversion must be done by a qualified

More information

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016 Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand

More information

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG)

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG) AMOFSG/8-IP/6 23/12/09 AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG) EIGHTH MEETING Melbourne, Australia, 15 to 18 February 2010 Agenda Item 5: Observing and forecasting at the

More information

Marin County Fire Department. Fire Protection Standard 119. Tents and Awnings

Marin County Fire Department. Fire Protection Standard 119. Tents and Awnings Page: 1 7 Scope: These standards shall apply to any temporary membrane structure, tent, or canopy, in accordance with the California Code Regulations (CCR) Title 19 and California Fire Code (CFC). Temporary

More information

FERRULES & TOOLS Altech Corp. 35 Royal Road Flemington, NJ Phone (908) FAX (908)

FERRULES & TOOLS Altech Corp. 35 Royal Road Flemington, NJ Phone (908) FAX (908) TerminalBlocks_072012(alt-2).QD_Blocks 10/23/12 9:05 AM Page 117 To help you do the best job possible when using Altech s terminal blocks, we put together a selection of useful tools to accomplish just

More information

105 SKY KING TAXI-WAY - SPICEWOOD, TEXAS

105 SKY KING TAXI-WAY - SPICEWOOD, TEXAS S P I C E W O O D A I R P O R T 8 8 R H A N G A R F O R L E A S E 105 SKY KING TAXI-WAY - SPICEWOOD, TEXAS Available for immediate lease 7,200 SF (90 x 80 ) Class A Aircraft Hangar W / Climate Controlled

More information

6275-S1 PNEUMATIC DRILL OPERATING MANUAL ORIGINAL INSTRUCTIONS. P/N November 2014 Revision 1

6275-S1 PNEUMATIC DRILL OPERATING MANUAL ORIGINAL INSTRUCTIONS. P/N November 2014 Revision 1 6275-S1 PNEUMATIC DRILL OPERATING MANUAL ORIGINAL INSTRUCTIONS P/N 80749 November 2014 Revision 1 2014 Climax Portable Machining and Welding Systems or its subsidiaries. All rights reserved. Except as

More information

CODE SUMMARY TENTS AND OTHER MEMBRANE STRUCTURES

CODE SUMMARY TENTS AND OTHER MEMBRANE STRUCTURES CODE SUMMARY TENTS AND OTHER MEMBRANE STRUCTURES A code summary is a compilation of code sections related to a specific topic and does not contain any interpretations or District standards. This code summary

More information

Minimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Helvetia Shop 12/19/2017

Minimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Helvetia Shop 12/19/2017 Minimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Helvetia Shop 12/19/2017 Winning Bid PERMIT FEES, FORMS, PLANS and NOTIFICATIONS Secure all necessary state and local

More information

ELITE SERIES R-410A Ready - Multi-Position

ELITE SERIES R-410A Ready - Multi-Position PRODUCT SPECIFICATIONS AIR HANDLERS CXM ELITE SERIES R-0A Ready - Multi-Position ulletin No. 0 March 0 Supersedes February 0 Nominal Capacity -. to Tons Optional Electric Heat -. to 0 kw MODEL NUMER IDENTIFICATION

More information

Tank. Part B, Section 1. This section covers the following unit configurations. Pump Piston Pump (E or G)

Tank. Part B, Section 1. This section covers the following unit configurations. Pump Piston Pump (E or G) Part B, ection Model Voltage This section covers the following unit configurations. 3400V All Pump Piston Pump (E or G) Manifold Control 4-Port (A) Vista tandard (V) Vista Pattern (PC) Vista Temperature

More information

AIRCRAFT SERVICE CHANGE

AIRCRAFT SERVICE CHANGE AIRCRAFT SERVICE CHANGE NUMBER 077 SUBJECT NAVIGATION (ATA 34) TCAS 7.1 INSTALLATION JUNE 12, 2012 PILOTS INFORMATION SHEET TCAS 7.1 INSTALLATION This service change upgrades TCAS 2000 or 3000SP systems

More information

SERVICE BULLETIN TITLE NAVIGATION - ENHANCED SURVEILLANCE TRANSPONDER STRAPPING MODIFICATION

SERVICE BULLETIN TITLE NAVIGATION - ENHANCED SURVEILLANCE TRANSPONDER STRAPPING MODIFICATION TITLE NAVIGATION - ENHANCED SURVEILLANCE TRANSPONDER STRAPPING MODIFICATION EFFECTIVITY MODEL SERIAL NUMBERS 525B (CJ3) -0001 thru -0056, -0058 thru -0262, and -0264 thru -0293 equipped with TCAS I NOTE:

More information

PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS

PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS INTRODUCTION The Zelienople Airport Authority (ZAA) has commenced engineering activities for the rehabilitation of Runway 17-35 to a

More information

RIO VISTA MUNICIPAL AIRPORT

RIO VISTA MUNICIPAL AIRPORT DRAINAGE TECHNICAL MEMORANDUM RIO VISTA MUNICIPAL AIRPORT RIO VISTA, CALIFORNIA Prepared for: City of Rio Vista 1 Main Street Rio Vista, CA 94571 (707) 374-5337 Prepared by: August 2012 Copyright 2012

More information

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS P U B L I C N O T I C E MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application 10-07-C-00-MBS INTRODUCTION: This Public Notice is issued as part of a Federal Aviation

More information

Tents & Membrane Structures Information Packet

Tents & Membrane Structures Information Packet Tents & Membrane Structures Information Packet South Metro Fire Rescue Authority Community Safety Services Division Life Safety Bureau 9195 E. Mineral Ave. Centennial, Colorado 80112 Tel: (720) 989-2230

More information

TOKISTAR. Exhibitor TOKISTAR LIGHTING

TOKISTAR. Exhibitor TOKISTAR LIGHTING TOKISTAR Exhibitor TOKISTAR LIGHTING Exhibitor TM T okistar Exhibitor Series is a wet-location festoon lighting system used in amusement parks, shopping centers, street decorations and promenades. Exhibitor

More information

XENON HELIDECK FLOODLIGHT INDUSTRY USER MANUAL

XENON HELIDECK FLOODLIGHT INDUSTRY USER MANUAL TEF 9964 XENON HELIDECK FLOODLIGHT INDUSTRY USER MANUAL IMPORTANT Read this instruction carefully before installing the product 996A106032 TUM 1024 REV. E 06.02.14 Tranberg AS P.O. Box 8033 N-4068 Stavanger

More information

L-864 L-865 / L-864 L-810 L-810. Vigilant Series LED Based Obstruction Lights

L-864 L-865 / L-864 L-810 L-810. Vigilant Series LED Based Obstruction Lights L-864 L-865 / L-864 L-810 L-810 Vigilant Series LED Based Obstruction Lights Certified to: FAA AC NO: 150/5345-43F FAA Engineering Brief No. 67 Compliant to: ICAO Annex 14, 4th Edition, July 2004 ICAO

More information

Subpart H. 2042/2003

Subpart H. 2042/2003 AIRWORTHINESS NOTICE Issue of Certificate of Airworthiness No 12 Issue 3 May 2014 1 Purpose and scope The Civil Aviation Directive CAD-AIRW/8(1)-1 incorporates the Annex Part 21 to the European Commission

More information