1 REPORT - APPENDICES 27 th March 2010 REPORT - APPENDICES Edition of 200

2 REPORT - APPENDICES Appendix A Table of Changes to IP 1 steps This table lists the proposed changes to 74 steps of the initial set of 96 steps composing and the rationale for these changes. s Identifier AO-0102 s title Proposed Changes Rationale Automated Alerting of Controller in Case of Runway Incursion or Intrusion into Restricted Areas Comments change: completed with: in case the cooperative surveillance is provided by ADS-B out the will move to 2012 date change :curent 2008 new: 2010 list updated SCG/10 recommended that immature steps should be deferred to. The SCG Workshop of Nov 2009 provided feedback/clarification on further steps. Using these SCG inputs, the SESAR WG on the 1st Master Plan Update has analysed the supporting enablers for those s proposed to be moved to and has also considered which steps required the same enablers.this has led the to recommend updates to the date, comments and to the list of enablers linked to Automated Alerting of Controller in Case of Runway Incursion or Intrusion into Restricted Areas. AO-0103 Improved Runway-Taxiway Lay-out, Signage and Markings to Prevent Runway Incursions date change: current: 2009; new: 2012 Alignment between the dates of steps and those of their s has been carried out. This has led the SESAR WG on the 1st Master Plan update to recommend an update of the date linked to Improved Runway- Taxiway Lay-out, Signage and Markings to Prevent Runway Incursions. 58 of 200

3 REPORT - APPENDICES s Identifier AO-0201 AO-0202 s title Proposed Changes Rationale Enhanced Ground Controller Situational Awareness in all Weather Conditions Detection of FOD (Foreign Object Debris) on the Airport Surface date change: current: 2007; new: 2012 list updated Proposed to be kept in IP 1 list updated SCG/10 recommended that immature steps should be deferred to. The SCG Workshop of Nov 2009 provided feedback/clarification on further steps. Using these SCG inputs, the SESAR WG on the 1st Master Plan Update has analysed the supporting enablers for those s proposed to be moved to and has also considered which steps required the same enablers.this has led the to recommend updates to the date, comments and to the list of enablers linked to Enhanced Ground Controller Situational Awareness in all Weather Conditions. There was a low maturity assessment in Summer 2008 as there was still R&D and standardisation activities required before a harmonised start of deployment of this step could be envisaged. SCG/10 therefore recommended to defer this step to. However, it appears now (Jan 2010) that standardisation works from EUROCAE are well underway and it was noted at the ECAC-FOD-WG of Dec 2009 that London operates one FOD system on both runways since September This has led the SESAR WG on the 1st Master Plan update to recommend maintaining Detection of FOD on the Airport Surface within timeframe and to update the list of supporting enablers. 59 of 200

4 REPORT - APPENDICES s Identifier AO-0203 AO-0301 s title Proposed Changes Rationale Guidance Assistance to Airport Vehicle Driver Crosswind Reduced Separations for Departures and Arrivals date change: current: 2009; new: 2012 list updated Proposed to be kept in date change: current 2009, new: 2010 list updated SCG/10 recommended that immature steps should be deferred to. The SCG Workshop of Nov 2009 provided feedback/clarification on further steps. Using these SCG inputs, the SESAR WG on the 1st Master Plan Update has analysed the supporting enablers for those s proposed to be moved to and has also considered which steps required the same enablers.this has led the to recommend updates, both to the date and to the list of s linked to Guidance Assistance to Airport Vehicle Driver. SCG/10 recommended that immature steps should be deferred to. The SCG Workshop of Nov 2009 provided feedback/clarification on further steps. Using these SCG inputs, the SESAR WG on the 1st Master Plan Update has analysed the supporting enablers for those s proposed to be moved to and has also considered which steps required the same enablers.this confirmed that Enhanced AMAN is not required for this step. This has led the to recommend updates, both to the date and to the list of enablers linked to Crosswind Reduced Separations for Departures and Arrivals. 60 of 200

5 REPORT - APPENDICES s Identifier AO-0302 s title Proposed Changes Rationale Time Based Separation for Arrivals Proposed to be kept in Title changed : "Basic Time Based Separations for Final Approach" Rationale is completed with: The intent is to mitigate the effect of wind on final approach sequencing so as to achieve accurate and more consistent final approach spacing, and recover most of the capacity lost under strong headwind with simple controller tool evolution. Comments is completed with (initially empty) This Step is managed as a Eurocontrol Project ( blic/standard_page/apt_time_ba sed.html ) and is fully supported by AOT. list updated Clarification of the step description and supporting enablers showed that Time Based Separation in the timeframe does not require AMAN. Good progress for the step development was made following the initial low maturity assessment of Summer This step is procedural/systematic and is expected to be implementable within the next 18 months (e.g. at London Heathrow) after completion of the safety case.this has led the to recommend updates to the step title, rationale, comments and to the list of enablers linked to Time Based Separation for Arrivals. AO-0303 Fixed Reduced Separations based on Wake Vortex Prediction Proposed to move to IP 2 list updated There was a low maturity assessment in Summer SCG/10 therefore recommended to defer this step to. The SESAR WG on the 1st Master Plan update analysed the supporting enablers and did not identify reasons to modify SCG/10 recommendation. Further, it recommends updates to the list of supporting enablers linked to Fixed Reduced Separations based on Wake Vortex Prediction. AO-0402 Interlaced Take- Off and Landing date change: current: 2007; new: 2008 list updated SCG/10 recommended that immature steps should be deferred to. The SCG Workshop of Nov 2009 provided feedback/clarification on further steps. Using these SCG inputs, the SESAR WG on the 1st Master Plan Update has analysed the supporting enablers for those s proposed to be moved to and has also considered which steps required the same enablers.this has led the to recommend updates, both to the date and to the list of enablers linked to Interlaced Take-Off and Landing. 61 of 200

6 REPORT - APPENDICES s Identifier AO-0403 s title Proposed Changes Rationale Optimised Dependent Parallel Operations list updated SCG/10 recommended that immature steps should be deferred to. The SCG Workshop of Nov 2009 provided feedback/clarification on further steps. Using these SCG inputs, the SESAR WG on the 1st Master Plan Update has analysed the supporting enablers for those s proposed to be moved to and has also considered which steps required the same enablers.this has led the SESAR WG on the 1st Master Plan update to recommend updates to the list of enablers linked to Optimised Dependent Parallel Operations. 62 of 200

7 REPORT - APPENDICES s Identifier AO-0504 s title Proposed Changes Rationale Improved Low Visibility Runway Operations Using MLS Title change: suppress «Using MLS» to read Improved Low Visibility Runway Operations date change: current: 2010 new: 2008 Description change: to be revised as follows Use of MLS and/or interim application of GLS (GPS only) instead of ILS for precision approaches. Rationale change: to be completed at the end with: "Improvement in the capacity of the airport in Low Visibility condition is vital for future ATM. The critical and sensitive areas for ILS are a barrier to capacity; they are reduced by ILS, MLS and GLS but the applications Obstacle Free Zones (OFZ) have to be amended. Comments change: completed with (initially empty): MLS Cat III is already in operation in Heathrow and it can bring capacity improvement at Cat II/III level where there is ILS or it can extend capacity when ILS Cat II/III is not available. MLS could be seen as an interim of availability of GLS Cat II/III. Initial GLS is becoming operational using GPS alone with potential to achieving Cat II/III in limited subset of OFZ. R&D needs have to be reduced to: Studies into ways of maximizing benefits of MLS and GLS. list updated Clarification of the step description and list of supporting enablers was consolidated from input received both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates to the date, title, description, rationale, comments and to the list of enablers linked to Improved Low Visibility Runway Operations Using MLS. 63 of 200

8 REPORT - APPENDICES s Identifier AO-0601 s title Proposed Changes Rationale Improved Turn- Round Process through Collaborative Decision Making date change: current:2007; new: 2010 list updated SCG/10 recommended that immature steps should be deferred to. The SCG Workshop of Nov 2009 provided feedback/clarification on further steps. Using these SCG inputs, the SESAR WG on the 1st Master Plan Update has analysed the supporting enablers for those s proposed to be moved to and has also considered which steps required the same enablers.this has led the to recommend updates, both to the date and to the list of enablers linked to Improved Turn-Round Process through Collaborative Decision Making. AO-0602 Collaborative Predeparture Sequencing date change: current:2007; new: 2010 list updated Alignment between the dates of steps and those of their s has been carried out. This has led the Working Group to recommend updates, both to the date and to the list of enablers linked to Collaborative Pre-departure Sequencing. AO-0603 Improved De-icing Operation through Collaborative Decision Making date change: current:2007; new: 2010 list updated Alignment between the dates of steps and those of their s has been carried out. This has led the Working Group to recommend updates, both to the date and to the list of enablers linked to Improved De-icing Operation through Collaborative Decision Making. 64 of 200

9 REPORT - APPENDICES s Identifier AO-0703 AO-0704 s title Proposed Changes Rationale Aircraft Noise Management and Mitigation at and around Airports Aircraft Fuel Use and Emissions Management at and around Airports date change: current 2007; new: 2008 Comments change: add: More information on Aircraft Noise Management is provided on ment/public/standard_page/noise. html list updated date change: current: 2007; new: 2008 Comments change add: More information on airport air quality related emissions management is provided on ment/public/standard_page/air_qu ality.html list updated Clarification of the step description and list of supporting enablers was consolidated from input received both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec 2009.The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates to the date, comments and to the list of supporting enablers linked to Aircraft Noise Management and Mitigation at and around Airports. Clarification of the step description and list of supporting enablers was consolidated from input received both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec 2009.The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates to the date, comments and to the list of supporting enablers linked to Aircraft Fuel Use and Emissions Management at and around Airports. 65 of 200

10 REPORT - APPENDICES s Identifier AOM-0201 s title Proposed Changes Rationale Moving Airspace Management Into Day of Operation Comments change: add: This step is covered by DMEAN Work Programme. Status of deployment is reported in DMEAN/FEP Action Plan & Progress Report. This Step is covered by the ASM improvement initiative; the OCG already initiated work to investigate the provision, processing and notification of real time airspace status as part of the deployment of the ASM improvement initiative. Further systems and tools are available or planned for deployment (within timeframe) to support this (e.g. ADR, DDR, CIAM, LARA...). Most of the enablers required are expected to be gradually deployed over this period. Clarification of the step description and list of supporting enablers was consolidated from input received both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec 2009.The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates to the comments linked to Moving Airspace Management Into Day of Operation AOM-0203 Cross-Border Operations Facilitated through Collaborative Airspace Planning with Neighbours date change: current:2007; new: 2009 Alignment between the dates of steps and those of their s has been carried out. This has led the SESAR WG on the 1st Master Plan update to recommend an update of the date linked to Cross-Border Operations Facilitated through Collaborative Airspace Planning with Neighbours. 66 of 200

11 REPORT - APPENDICES s Identifier AOM-0205 # AOM-0302 s title Proposed Changes Rationale Modular Temporary Airspace Structures and Reserved Areas Harmonised OAT Flight Planning Description change: enhanced with: The design of Modular Temporary Airspace Structure and reserved areas is a common principle used in the European airspace design; it is part of the Advanced Airspace Scheme (AAS) operational concept and the DMEAN operational concept. Comments change: completed with: This step is covered by DMEAN Work Programme, Flexible Military Airspace structures. Status of deployment is reported in DMEAN/FEP Action Plan & Progress Report'. It started to be implemented in various countries in Europe. Further systems and tools are available or planned for deployment (between 2010/ ) to support this (e.g. ADR, DDR, CIAM, LARA...). Most of the enablers required are expected to be gradually deployed over this period. list updated date change: current: 2010; new: 2011 Clarification of the step description and list of supporting enablers was consolidated from input received both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates to step description, comments and to the list of supporting enablers linked to Modular Temporary Airspace Structures and Reserved Areas. Alignment between the dates of steps and those of their s has been carried out. This led the SESAR WG on the 1st Master Plan update to recommend an update of the date linked to Harmonised OAT Flight Planning. # relates to SESAR Quick Win Functional Use of Military Airspace (FUA) and Use of Conditional Route (CDR) 67 of 200

12 REPORT - APPENDICES s Identifier AOM-0303 s title Proposed Changes Rationale Pan-European OAT Transit System date change: current: 2010; new: 2012 Title change: Change title to: "Pan-European OAT Transit Service" Comments change: add "EUR OAT may facilitate the delivery of OATTS" list updated Clarification of the step description and list of supporting enablers was consolidated from input received both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates to the date, title, comments and to the list of supporting enablers linked to Pan-European OAT Transit System. 68 of 200

13 REPORT - APPENDICES s Identifier AOM-0504 s title Proposed Changes Rationale Optimum Trajectories in Defined Airspaces at Particular Times Description change: revised description to: Operations along optimum trajectories are possible in defined airspace volumes at particular times. It refers to the initial implementation by various states of free routes operation in their FIR, above a certain FL, for 24 hours or during limited periods of time. These initiatives are left to local implementation decisions. Rationale is completed with: In 2009, Eurocontrol OCG agreed on an harmonized approach for the deployment of free route operations in the short /medium term to enable the availability of all network procedures and systems required to support the implementation of various local/sub-regional/fab free route operation initiatives. It is covered in the Eurocontrol Flight efficiency plan ( /public/standard_page/flight_effic iency_plan.html ). Comments change: complement with: Free route airspace operations are already implemented for 24 hours and the full FIR above FL 245 in Portugal and Ireland. Sweden implemented free route operations in some portions of their FIR and will continue with implementation in various steps till Finland will implement free route operations during night and during part of the day times at week end in early 2010.Other ANSPs and FAB initiatives have concrete plans to gradually implement free route operations between 2010 and 2013/15. All necessary central and local systems and procedures are known and planned; deployment as part of ARN v7. This is considered as a necessary step towards trajectory-based operations. Clarification of the step description was consolidated from feedback/clarification both at the SCG Workshop of Nov 2009 and clarification meeting of Dec The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates to the step description and comments linked to Optimum Trajectories in Defined Airspaces at Particular Times. 69 of 200

14 REPORT - APPENDICES s Identifier s title Proposed Changes Rationale AOM-0602 Enhanced Terminal Airspace with Curved/Segmente d Approaches, Steep Approaches and RNAV Approaches Where Suitable date change: current: 2010; new: 2011 list updated SCG/10 recommended that immature steps should be deferred to. The SCG Workshop of Nov 2009 provided feedback/clarification on further steps. Using these SCG inputs, the SESAR WG on the 1st Master Plan Update has analysed the supporting enablers for those s proposed to be moved to and has also considered which steps required the same enablers.this has led the to recommend updates, both to the date and to the list of enablers linked to Enhanced Terminal Airspace with Curved/Segmented Approaches, Steep Approaches and RNAV Approaches Where Suitable. Clarification of the step description and list of supporting enablers was consolidated from input received both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates to the step comments and to the list of enablers linked to Continuous Climb Departure. AOM-0703 # Continuous Climb Departure Comments change: change to: Just procedural and implementation on going (ex: Copenhagen); Totally coupled to CDA due to Airspace reorganisation; Need for European Harmonisation (to avoid Interoperability problems like for CDA) list updated # relates to SESAR Quick Win Continuous Descent Approach (CDA)/Continuous Climb Departure (CCD) 70 of 200

15 REPORT - APPENDICES s Identifier AOM-0801 s title Proposed Changes Rationale Flexible Sectorisation Management date change: current: 2007; new: 2010 Comments change: change to : In it refers only to practice of composing and recomposing sectors but with large number of combinations and advanced environmental exchange (between ACCs); current airspace design practices enable modular sectorisation and the possibility to ensure a large number of sector configurations based on collapsing/decollapsing elementary sectors. Rationale change: complement with: Improved agreements with the ATCOs, better working practices and planning tools lead in some cases to a reduction of delays of more 50% without any additional investments. Best practices need to be expanded at European network level in order to make available the latent capacity that still exists in some parts of Europe by using today's systems and best practices of collapsing/decollapsing sectors. list updated Clarification of the step description and list of supporting enablers was consolidated from input received both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates to date, rationale, comments and to the list of enablers linked to Flexible Sectorisation Management. 71 of 200

16 REPORT - APPENDICES s Identifier AOM-0802 s title Proposed Changes Rationale Modular Sectorisation Adapted to Variations in Traffic Flows Comments change: complement with (add additional text " into account ) The optimisation of the sectorisation is achieved not only by collapsing/de-collapsing control sectors, but by modification of the number and types of modules building a control sector. This approach to sector configuration management provides an optimised resources management and should contribute to deliver the capacity needed to meet variations and increases in traffic demand, as well as early accommodation of user preferred routing. In refers only to practice of composing and recomposing sectors but with large number of combinations and advanced environmental exchange (between ACCs); current airspace design practices enable modular sectorisation and the possibility to ensure a large number of sector configurations based on collasping/decollaspsing elementary sectors. Current capacity management practices call at local and network level for the utilisation of sector configurations adapted to traffic demand. Preparation of capacity plans and of capacity management solutions fully take that into account. NIMS-10 can help in complex environment. list updated Clarification of the step description and list of supporting enablers was consolidated from input received both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates to the step comments and to the list of enablers linked to Modular Sectorisation Adapted to Variations in Traffic Flows. 72 of 200

17 REPORT - APPENDICES s Identifier AUO-0101 AUO-0103 s title Proposed Changes Rationale ATFM Slot Swapping Manual User Driven Prioritisation Process (UDPP) list updated Proposed to move to IP 2 SCG/10 recommended that immature steps should be deferred to. The SCG Workshop of Nov 2009 provided feedback/clarification on further steps. Using these SCG inputs, the SESAR WG on the 1st Master Plan Update has analysed the supporting enablers for those s proposed to be moved to and has also considered which steps required the same enablers.this has led the SESAR WG on the 1st Master Plan update to recommend updates to the list of enablers linked to ATFM Slot Swapping. There was a low maturity assessment in Summer 2008 for Manual User Driven Prioritisation Process (UDPP). SCG/10 therefore recommended to defer this step to. The SESAR WG on the 1st Master Plan update analysed the supporting enablers (none are described). Therefore, the SESAR WG on the 1st Master Plan update did not identify reasons to modify SCG/10 recommendation. AUO-0304 Initiating Optimal Trajectories through Cruise- Climb Techniques Proposed to move to IP 2 list updated There was a low maturity assessment in Summer SCG/10 therefore recommended to defer this step to. The SESAR WG on the 1st Master Plan update analysed the supporting enablers and did not identify reasons to modify SCG/10 recommendation.further, it recommends to update the list of supporting enablers linked for Initiating Optimal Trajectories through Cruise-Climb Techniques. 73 of 200

18 REPORT - APPENDICES s Identifier s title Proposed Changes Rationale AUO-0401 Air Traffic Situational Awareness (ATSAW) on the Airport Surface date change: current: 2010; new: 2012 list updated SCG/10 recommended that immature steps should be deferred to. The SCG Workshop of Nov 2009 provided feedback/clarification on further steps. Using these SCG inputs, the SESAR WG on the 1st Master Plan Update has analysed the supporting enablers for those s proposed to be moved to and has also considered which steps required the same enablers. This has led the to recommend updates, both to the date and to the list of s linked to Air Traffic Situational Awareness (ATSAW) on the Airport Surface. SCG/10 recommended that immature steps should be deferred to. The SCG Workshop of Nov 2009 provided feedback/clarification on further steps. Using these SCG inputs, the SESAR WG on the 1st Master Plan Update has analysed the supporting enablers for those s proposed to be moved to and has also considered which steps required the same enablers.this has led the to recommend updates to this step title adding (AIRB) to refer to Airborne application and to its date and list of enablers linked to Air Traffic Situational Awareness (ATSAW) during Flight Operations. AUO-0402 Air Traffic Situational Awareness (ATSAW) during Flight Operations date change: current: 2010; new: 2012 Title change: add: "(AIRB)" at the end of title list updated 74 of 200

19 REPORT - APPENDICES s Identifier AUO-0501 AUO-0502 s title Proposed Changes Rationale Visual Contact Approaches When Appropriate Visual Conditions Prevail Enhanced Visual Separation on Approach (ATSA- VSA) Proposed to be kept in IP 1 list updated date change: current: 2010; new: 2012 There was a low maturity assessment in Summer SCG/10 therefore recommended to defer this step to. The SESAR WG on the 1st Master Plan update analysed supporting enablers and confirmed related ICAO PANS availability. The need is for some States to enshrine use of this procedure in their legislation. This has led the to recommend maintaining this step within timeframe. Further, it recommends updates to the list of enablers linked to Visual Contact Approaches When Appropriate Visual Conditions Prevail. SCG/10 recommended that immature steps should be deferred to. The SCG Workshop of Nov 2009 provided feedback/clarification on further steps. Using these SCG inputs, the SESAR WG on the 1st Master Plan Update has analysed the supporting enablers for those s proposed to be moved to and has also considered which steps required the same enablers.this has led the to recommend an update to the date linked to Enhanced Visual Separation on Approach (ATSA-VSA). AUO-0503 In-trail Procedure in Oceanic Airspace (ATSA- ITP) date change: current: 2009; new: 2012 Alignment between the dates of steps and those of their s has been carried out. This led the SESAR WG on the 1st Master Plan update to recommend an update of the date linked to In-trail Procedure in Oceanic Airspace (ATSA-ITP). 75 of 200

20 REPORT - APPENDICES s Identifier s title Proposed Changes Rationale AUO-0602 Guidance Assistance to Aircraft on the Airport Surface Proposed to move to IP 2 list updated There was a low maturity assessment in Summer SCG/10 therefore recommended to defer this step to. The SESAR WG on the 1st Master Plan update analysed the supporting enablers and did not identify reasons to modify SCG/10 recommendation.further, it recommends updates to the list of enablers linked to Guidance Assistance to Aircraft on the Airport Surface. AUO-0603 Enhanced Guidance Assistance to Aircraft on the Airport Surface Combined with Routing Proposed to move to IP 2 list updated There was a low maturity assessment in Summer SCG/10 therefore recommended to defer this step to. The SESAR WG on the 1st Master Plan update analysed the supporting enablers and did not identify reasons to modify SCG/10 recommendation.further, it recommends updates to the list of enablers linked to Enhanced Guidance Assistance to Aircraft on the Airport Surface Combined with Routing. AUO-0702 Brake to Vacate (BTV) Procedure Proposed to move to IP 2 list updated Feedback/clarification gathered both at the SCG Workshop of Nov 2009 and at the WG-expert meeting in Dec 2009 showed the aim of this operational improvement is to use the runways to their full potential. The aim of current BTV systems (which are not linked with ground systems) is primary to save on maintenance costs of brakes and tires. Due to the immaturity of BTV (airport and cockpit) procedures, the SESAR WG proposes to move this step in.further, it recommends updates to the list of enablers linked to Brake to Vacate (BTV) Procedure. 76 of 200

21 REPORT - APPENDICES s Identifier s title Proposed Changes Rationale AUO-0801 Environmental Restrictions Accommodated in the Earliest Phase of Flight Planning Proposed to move to IP 2 list updated There was a low maturity assessment in Summer SCG/10 therefore recommended to defer this step to. The SESAR WG on the 1st Master Plan update analysed the supporting enablers and did not identify reasons to modify SCG/10 recommendation. Further, it recommends updates to the list of enablers linked to Environmental Restrictions Accommodated in the Earliest Phase of Flight Planning. CM-0102 Automated Support for Dynamic Sectorisation and Dynamic Constraint Management Proposed to move to IP 2 list updated There was a low maturity assessment in Summer SCG/10 therefore recommended to defer this step to. The SESAR WG on the 1st Master Plan update analysed the supporting enablers and did not identify reasons to modify SCG/10 recommendation. Further, it recommends updates to the list of enablers linked to Automated Support for Dynamic Sectorisation and Dynamic Constraint Management. CM-0201 Automated Assistance to Controller for Seamless Coordination, Transfer and Dialogue Comments change: complemented with (add additional text :"FASTI use now ): delete [DSNA - implementation planned in Coflight as 2011 support.] FASTI Concept of Operations (cf. SYSCO subconcept) is available at Few messages within scope concept implemented between Sweden and Finland (pioneer implementation) + project with SWISS, Maastricht/Denmark, Adriatic project (Italy/Slovenia and Croatia). Many ANSPs already have this capability which needs to be brought into operational use now. list updated Clarification of the step description and list of supporting enablers was consolidated from input received both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates to the step comments and to the list of enablers linked to Automated Assistance to Controller for Seamless Coordination, Transfer and Dialogue 77 of 200

22 REPORT - APPENDICES s Identifier CM-0203 CM-0301 CM-0801 s title Proposed Changes Rationale Automated Flight Conformance Monitoring Sector Team Operations Adapted to New Roles for Tactical and Planning Controllers Ground Based Safety Nets (TMA, En Route) date change: current: 2007; new: 2008 list updated Proposed to move to IP 2 date change: current: 2007; new: 2008 list updated SCG/10 recommended that immature steps should be deferred to. The SCG Workshop of Nov 2009 provided feedback/clarification on further steps. Using these SCG inputs, the SESAR WG on the 1st Master Plan Update has analysed the supporting enablers for those s proposed to be moved to and has also considered which steps required the same enablers. This has led the to recommend updates, both to the date and to the list of s linked to Automated Flight Conformance Monitoring. Feedback/clarification gathered on Sector Team Operations Adapted to New Roles for Tactical and Planning Controllers both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec 2009 showed a low maturity. The SESAR WG on the 1st Master Plan update analysed the supporting enablers and recommend to defer this step to. SCG/10 recommended that immature steps should be deferred to. The SCG Workshop of Nov 2009 provided feedback/clarification on further steps. Using these SCG inputs, the SESAR WG on the 1st Master Plan Update has analysed the supporting enablers for those s proposed to be moved to and has also considered which steps required the same enablers.this has led the to recommend updates, both to the date and to the list of s linked to Ground Based Safety Nets (TMA, En Route). 78 of 200

23 REPORT - APPENDICES s Identifier CM-0803 DCB-0102 s title Proposed Changes Rationale Enhanced ACAS through Use of Autopilot or Flight Director Interactive Rolling NOP Title change to: Enhanced TCAS compliant with change 7.1 Description change: complement with: The first steps of the interactive Rolling NOP were already implemented through the deployment of the NOP portal. Further systems and tools are available or planned for deployment (between 2010/ ) to support the Interactive approach to the NOP (e.g. NEVAC, ADR, DDR, CIAM, LARA...); most of the enablers required are expected to be gradually deployed over this period. Comments change: revised with: This step is covered by DMEAN Work Programme - Status of deployment is reported in DMEAN/FEP Action Plan & Progress Report. list updated Clarification of the step description and list of supporting enablers was consolidated from input received both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec 2009.The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Therefore, it recommends to change the step title to "ACAS through use of Autopilot or Flight Director", as it is an Airbus patented solution. Clarification of the step description and list of supporting enablers was consolidated from input received both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates to the step description, comments and to the list of enablers linked to Interactive Rolling NOP. 79 of 200

24 REPORT - APPENDICES s Identifier DCB-0201 s title Proposed Changes Rationale Interactive Network Capacity Planning Rationale change: complement with: This Step is already implemented and is run through the capacity planning and airspace design processes supported by appropriate data and tools (NEVAC, SAAM, DDR). Further developments of a more interactive process are foreseen through the evolution of the existing tools; this evolution is closely coordinated with all ANSPs through the CAPLAN group. Comments change: revised with: This step is covered by DMEAN Work Programme. Status of deployment is reported in 'DMEAN/FEP Action Plan & Progress Report' list updated Clarification of the step description and list of supporting enablers was consolidated from input received both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates to the step rationale, comments and to the list of enablers linked to Interactive Network Capacity Planning. DCB-0203 Enhanced ASM/ATFCM Coordinated Process date change: current: 2009; new: 2010 Comments change: revised with: This step is covered by DMEAN Work Programme. Status of deployment is reported in 'DMEAN/FEP Action Plan & Progress Report. This Step is covered by the ASM improvement initiative; the PC and the OCG already approved this initiative to support enhanced ASM/ATFCM coordinated process. Further systems and tools are available or planned for deployment (between 2010/ ) to support this (e.g. ADR, DDR, CIAM, LARA...). Most of the enablers required are expected to be gradually deployed over this period. list updated Clarification of the step description and list of supporting enablers was consolidated from input received both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates to the date, comments and to the list of enablers linked to Enhanced ASM/ATFCM Coordinated Process. DCB-0204 ATFCM Scenarios date change: current: 2007; new: 2008 Alignment between the dates of steps and those of their s has been carried out. This led the SESAR WG on the 1st Master Plan update to recommend an update of the date linked to ATFCM Scenarios. 80 of 200

25 REPORT - APPENDICES s Identifier DCB-0205 DCB-0206 s title Proposed Changes Rationale Short Term ATFCM Measures Coordinated Network Management Operations Extended Within Day of Operation date: current: 2010; new: 2011 Description change: complement with additional text "with direct.traffic In order to close the gap between ATC and ATFCM, operational procedures are developed requiring dynamic coordination between more than one ACC, the AOs and the CFMU. The aim is to maximise the efficiency of the system using flow management techniques close to the real time operations with direct impact on tactical capacity management, occupancy counts and tactical action on traffic. Comment change: complement with: Tactical Capacity Management already in use with number of ANSPs (Maastricht). list updated Description change: complemented as follows: After analysis of anticipated capacity shortfalls at local, regional or network wide levels, responses are selected from predefined scenarios and adjusted to the planned situation until day of operation. This relies on improved working relationship and processes between CFMU/FMPs/ATC supervisor especially during the anticipating and reacting phases to optimise capacity throughput in sector groups based upon current improvement of ATFM activities. list updated Clarification of the step description and list of supporting enablers was consolidated from feedback/clarification gathered on Short Term ATFCM Measures both at the SCG Workshop of Nov 2009 and clarification meeting of Dec The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates to the date, description, comments and to the list of enablers linked to Short Term ATFCM Measures. Clarification of the step description and list of supporting enablers was consolidated from input received both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec 2009.The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates, both to the step description and to the list of enablers linked to Coordinated Network Management Operations Extended Within Day of Operation. 81 of 200

26 REPORT - APPENDICES s Identifier DCB-0207 DCB-0301 DCB-0302 s title Proposed Changes Rationale Management of Critical Events Improved Consistency between Airport Slots, Flight Plans and ATFM Slots Collaborative Management of Flight Updates Proposed to be kept in IP 1 date change: current: 2007; new: 2010 Description change: reduce to (suppression of last part of the description): Convergence is ensured between airport slots, ATFM slots together with airport slot monitoring processes in order to improve consistency on a daily basis. [and to reduce delays] deleted. Comments change: replace with: This step is covered by DMEAN Work Programme (Demand Data Repository phase II). Status of deployment is reported in DMEAN/FEP Action Plan & Progress Report. list updated Current date: 2007, proposed date: 2010 Comments change: complement with: This step is covered by DMEAN Work Programme. Status of deployment is reported in DMEAN/FEP Action Plan & Progress Report. Data flows and interfaces are implemented from CFMU perspectives; progress on going at airport level (A-CDM) - [FUM DPI message] list updated There was a low maturity assessment in Summer SCG/10 therefore recommended to defer this step to. However, the SESAR WG on the 1st Master Plan update analysed the supporting enablers (Procedures and Community Specification) and it appears now (Jan 2010) that they are all developed and being implemented. This led the SESAR WG on the 1st Master Plan update to recommend maintaining Management of Critical Events within timeframe and updating its date. Clarification of the step description and list of supporting enablers was consolidated from input received both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec 2009.The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates to the step description, comments and to the list of enablers linked to Improved Consistency between Airport Slots, Flight Plans and ATFM Slots. Clarification of the step description and list of supporting enablers was consolidated from input received both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec 2009.The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates to the date, comments and to the list of s linked to Collaborative Management of Flight Updates. 82 of 200

27 REPORT - APPENDICES s Identifier DCB-0303 s title Proposed Changes Rationale Improved Operations at Airport in Adverse Conditions Using ATFCM Techniques date change: current: 2008; new: 2010 Rationale change: add: Better manage the traffic considering local situation and reduce the ATFM delays (precoordinated measures with airports). [procedure Tower-FMP- CFMU]. Comments change: replace "No further plans" with "Trials also planned with Charles-de-Gaulle airport". list updated Clarification of the step description and list of supporting enablers was consolidated from input received both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates to the date, rationale, comments and to the list of s linked to Improved Operations at Airport in Adverse Conditions Using ATFCM Techniques. DCB-0304 Airport CDM extended to Regional Airports Proposed to move to IP 2 list updated There was a low maturity assessment in Summer 2008 for this step. SCG/10 therefore recommended to defer this step to. The SESAR WG on the 1st Master Plan update analysed the supporting enablers and did not identify reasons to modify the SCG/10 recommendation. Further, it recommends updates to the list of supporting enablers linked to Airport CDM extended to Regional Airports. IS-0101 Improved Flight Plan Consistency Pre-Departure list updated SCG/10 recommended that immature steps should be deferred to. The SCG Workshop of Nov 2009 provided feedback/clarification on further steps. Using these SCG inputs, the SESAR WG on the 1st Master Plan Update has analysed the supporting enablers for those s proposed to be moved to and has also considered which steps required the same enablers.this has led the to recommend updates to the list of enablers linked to Improved Flight Plan Consistency Pre-Departure. 83 of 200

28 REPORT - APPENDICES s Identifier IS-0102 IS-0201 IS-0202 s title Proposed Changes Rationale Improved Management of Flight Plan After Departure Integrated Pre- Flight Briefing Improved Supply Chain for Aeronautical Data through Common Quality Measures Rationale change: add to existing text "It.ATFM regulation The process will provide an effective interface between ATC, ATFCM, and Airport with regard to deviations from the current flight plan. It will be implemented by stakeholders through FCM03 and it shall be in line with the to be released ATFM regulation. Comments change to: Is part of DMEAN planning but behind schedule, with only 15% ANSPs providing flight plan change (AFP) messages. list updated list updated list updated Clarification of the step description and list of supporting enablers was consolidated from input received both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec 2009.The SESAR WG on the 1st Master Plan update analysed this step and the supporting enablers information and did not identify reasons to modify the earlier SCG recommendations. Further, it recommends updates to the step rationale, comments and to the list of enablers linked to Improved Management of Flight Plan After Departure. SCG/10 recommended that immature steps should be deferred to. The SCG Workshop of Nov 2009 provided feedback/clarification on further steps. Using these SCG inputs, the SESAR WG on the 1st Master Plan Update has analysed the supporting enablers for those s proposed to be moved to and has also considered which steps required the same enablers.this has led the SESAR WG on the 1st Master Plan update to recommend updates to the list of enablers linked to Integrated Pre-Flight Briefing. SCG/10 recommended that immature steps should be deferred to. The SCG Workshop of Nov 2009 provided feedback/clarification on further steps. Using these SCG inputs, the SESAR WG on the 1st Master Plan Update has analysed the supporting enablers for those s proposed to be moved to and has also considered which steps required the same enablers.this has led the SESAR WG on the 1st Master Plan update to recommend updates to the list of enablers linked to Improved Supply Chain for Aeronautical Data through Common Quality Measures. 84 of 200

29 REPORT - APPENDICES s Identifier IS-0203 IS-0204 s title Proposed Changes Rationale Harmonised Aeronautical Information through Common Data Model Facilitated Aeronautical Data Exchanges through Digitalised Information list updated list updated SCG/10 recommended that immature steps should be deferred to. The SCG Workshop of Nov 2009 provided feedback/clarification on further steps. Using these SCG inputs, the SESAR WG on the 1st Master Plan Update has analysed the supporting enablers for those s proposed to be moved to and has also considered which steps required the same enablers.this has led the SESAR WG on the 1st Master Plan update to recommend updates to the list of enablers linked to Harmonised Aeronautical Information through Common Data Model. SCG/10 recommended that immature steps should be deferred to. The SCG Workshop of Nov 2009 provided feedback/clarification on further steps. Using these SCG inputs, the SESAR WG on the 1st Master Plan Update has analysed the supporting enablers for those s proposed to be moved to and has also considered which steps required the same enablers.this has led the SESAR WG on the 1st Master Plan update to recommend updates to the list of enablers linked to Facilitated Aeronautical Data Exchanges through Digitalised Information IS-0301 Interoperability between AOC and ATM Systems (FDPS) Proposed to move to IP 2 date change: current: 2010; new: 2013 list updated There was a low maturity assessment in Summer SCG/10 therefore recommended to defer this step to. The SESAR WG on the 1st Master Plan update analysed the supporting enablers and did not identify reasons to modify SCG/10 recommendation. Further, it recommends updates, both to the date and to the list of enablers linked to Interoperability between AOC and ATM Systems (FDPS). 85 of 200

30 REPORT - APPENDICES s Identifier s title Proposed Changes Rationale IS-0402 Extended Operational Terminal Information Service Provision Using Datalink Proposed to move to IP 2 date change: current: 2011; new: 2015 list updated There was a low maturity assessment gathered both at the SCG Workshop of Nov 2009 and at a further WG-expert meeting in Dec The SESAR WG on the 1st Master Plan update analysed the supporting enablers and recommend to defer this step to. Further, it recommends updates, both to the date and to the list of enablers linked to Extended Operational Terminal Information Service Provision Using Datalink. IS-0701 SWIM - baseline an initial common information model based on existing and consistent standards Proposed to move to IP 2 list updated There was a low maturity assessment in Summer SCG/10 therefore recommended to defer this step to. The SESAR WG on the 1st Master Plan update analysed the supporting enablers and did not identify reasons to modify the SCG/10 recommendation. Further, it recommends updates to the list of enablers linked to SWIM - baseline an initial common information model based on existing and consistent standards. 86 of 200

ART Workshop Airport Capacity

ART Workshop Airport Capacity ART Workshop Airport Capacity Airport Research Bob Graham Head of Airport Research 21 st September 2016 Madrid Expectations The issues and opportunities for future research New solutions / directions for

More information

SESAR Solutions. Display Options

SESAR Solutions. Display Options SESAR Solutions Outputs from the SESAR Programme R&I activities which relate to an Operational Improvement (OI) step or a small group of OI steps and its/their associated enablers, which have been designed,

More information

REG ASP MIL APO USE INT IND NM

REG ASP MIL APO USE INT IND NM ECAC REG ASP MIL APO USE INT IND NM Subject matter and scope This objective is linked to ATM Functionality 3 of Commission Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project,

More information

The SESAR Airport Concept

The SESAR Airport Concept Peter Eriksen The SESAR Airport Concept Peter Eriksen EUROCONTROL 1 The Future Airport Operations Concept 1.1 Airports The aim of the future airport concept is to facilitate the safe and efficient movement

More information

NEFAB Project Feasibility Study Report Operational Concept

NEFAB Project Feasibility Study Report Operational Concept NEFAB Project Feasibility Study Report Operational Concept Page 1 of 16 TABLE OF CONTENTS 1. INTRODUCTION... 4 2. AIRSPACE DESIGN... 6 2.1 ATS Routes and Free Routes 6 2.2 Sectorisation 6 2.3 Airspace

More information

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES RAAC/15-WP/28 International Civil Aviation Organization 04/12/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,

More information

Cooperative traffic management

Cooperative traffic management 3/17/2017 Cooperative traffic management Moderated by Peter Alty, SESAR JU #SESAR 2 Cooperative Traffic Management The Airport view 8 th March 2017 Alison Bates Head of Service Transformation and Ops Efficiency

More information

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE Vineet Gulati GM(ATM-IPG), AAI AIR TRAFFIC FLOW MANAGEMENT ATFM is a service provided with the objective to enhance the efficiency of the ATM system by,

More information

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales 1 Single European Sky ATM Research (SESAR) - Objectives Enabling EU skies to handle 3 times

More information

European Joint Industry CDA Action Plan

European Joint Industry CDA Action Plan Foreword In September 2008, CANSO, IATA and EUROCONTROL signed up to a Flight Efficiency Plan that includes a specific target to increase European CDA performance and achievement. This was followed in

More information

ATFM/CDM ICAO s Perspective

ATFM/CDM ICAO s Perspective ATFM/CDM ICAO s Perspective Elie El Khoury ICAO Regional Officer, ATM/SAR Middle East Office, Cairo Cairo/3-4 April 2016 Outline Traffic Growth in the MID Region What is ATFM/CDM Main Objectives ICAO Guidance

More information

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework Dakar, Senegal, 18-22 September 2017 presented by Emeric Osmont The Aviation Community Indra 2 The Aviation Community

More information

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018 Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s

More information

DMT Report. Overview for Step 1. Maturity Assessment Issue date: (OFA view) 28/01/2015

DMT Report. Overview for Step 1. Maturity Assessment Issue date: (OFA view) 28/01/2015 MAT Report References: Maturity Assessment Issue date: (OFA view) Integrated roadmap 26/11/2014 Dataset 13 - Baseline 5.0 DMT Report 26/01/2015 PIRM Result 19/09/2014 Updated Assessment in 2014 (Step1)

More information

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016 ICAO ATFM SEMINAR Dubai, UAE, 14 December 2016 ICAO ATFM Seminar Session 2.2: ATFM Sub-regional and Regional Solutions Brian Flynn EUROCONTROL Network Manager Directorate 12 th December 2016 Central Flow

More information

Civil-Military Cooperation. Advanced Flexible Use of Airspace

Civil-Military Cooperation. Advanced Flexible Use of Airspace Civil-Military Cooperation Advanced Flexible Use of Airspace Need for Airspace data sharing and collaboration Network Manager Military Civil Airlines Military Operational Requirements for the Use of Airspace

More information

REG ASP MIL APO USE INT IND NM

REG ASP MIL APO USE INT IND NM ECAC REG ASP MIL APO USE INT IND NM Subject matter and scope This objective is linked to ATM Functionality 3 of Commission Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project,

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 19/3/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 (Presented by the Secretariat) EXPLANATORY NOTES ON THE AGENDA ITEMS The

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

ORGANISER HOST LEAD SPONSOR

ORGANISER HOST LEAD SPONSOR ORGANISER HOST LEAD SPONSOR Data Sharing and ATFM Moderator Francois Delille Director of Business and Product Strategy, ATM, Thales CANSO LATIN AMERICA AND CARIBBEAN CONFERENCE 2017 Challenges of the Air

More information

Advanced Flexible Use of Airspace (AFUA) Kris DELCOURTE, EUROCONTROL Davide BARDELLI, LUFTHANSA SYSTEMS

Advanced Flexible Use of Airspace (AFUA) Kris DELCOURTE, EUROCONTROL Davide BARDELLI, LUFTHANSA SYSTEMS Advanced Flexible Use of Airspace (AFUA) Kris DELCOURTE, EUROCONTROL Davide BARDELLI, LUFTHANSA SYSTEMS AFUA - the partners Initial situation Airspace reservations: TSAs/TRAs Non-optimal use of large volumes

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/8 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 3: Interoperability and data through globally

More information

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services concept Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services 2 Why do we need Centralised Services? Europe needs to be competitive again! a

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

Block 0 to Block 1 Vaughn Maiolla

Block 0 to Block 1 Vaughn Maiolla Block 0 to Block 1 Vaughn Maiolla Dakar, Senegal, September 2017 Objective To show Block 1 threads as an operational evolution from Block 0 threads. 23 September 2017 2 Flight plan - Vision - ASBUs - Evolution.

More information

Towards a Global ATFM Manual. Brian Flynn Head Network Operations

Towards a Global ATFM Manual. Brian Flynn Head Network Operations Towards a Global ATFM Manual Brian Flynn Head Network Operations ATM Structure in Europe 41 States One single ATFCM System over Europe >60 En-route centres = 1750 Sectors 1348 Aircraft Operators 450 Airports

More information

Disruptive Technologies in Air Traffic Management

Disruptive Technologies in Air Traffic Management Disruptive Technologies in Air Traffic Management OCTOBER 21, 2016 www.thalesgroup.com Advanced Air Traffic Services Main themes for Thales Enhanced arrival and departure operations (PJ01) Extended Arrival

More information

ACI EUROPE POSITION PAPER

ACI EUROPE POSITION PAPER ACI EUROPE POSITION PAPER November 2018 Cover / Photo: Stockholm Arlanda Airport (ARN) Introduction Air traffic growth in Europe has shown strong performance in recent years, but airspace capacity has

More information

EUROCONTROL SPECIFICATIONS SYNOPSIS

EUROCONTROL SPECIFICATIONS SYNOPSIS EUROCONTROL EUROCONTROL SPECIFICATIONS SYNOPSIS n EUROCONTROL Specification of Interoperability and Performance Requirements for the Flight Message Transfer Protocol (FMTP) n EUROCONTROL Specification

More information

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,

More information

A FOCUS ON TACTICAL ATFM. ICAO ATFM Workshop Beijing, 29 th -30 th October 2014

A FOCUS ON TACTICAL ATFM. ICAO ATFM Workshop Beijing, 29 th -30 th October 2014 A FOCUS ON TACTICAL ATFM ICAO ATFM Workshop Beijing, 29 th -30 th October 2014 2 / 22 Contents Thales has been involved in ATFM for over a decade Closely linked to ATM/ANSP; CAMU Milestone South Africa

More information

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning Purpose: Release 5 SESAR Solution ID #109 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution with a summary of the results stemming

More information

Operations Control Centre perspective. Future of airline operations

Operations Control Centre perspective. Future of airline operations Operations Control Centre perspective Future of airline operations This brochure was developed based on the results provided by the OCC project as part of the SESAR programme. This project was managed

More information

Future Network Manager Methods

Future Network Manager Methods Future Network Manager Methods Workshop on Emerging Technologies Sonke Mahlich Project Manager, EUROCONTROL ATC Global Beijing, 12. Sep. 2016 Network Management A global scope with regional challenges

More information

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva International Civil Aviation Organization SIP/2012/ASBU/Dakar-WP/19 FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Dakar,

More information

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT: WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT: SUPPORTING A GLOBALLY HARMONIZED AND SEAMLESS ATM SYSTEM Vince Galotti Chief/ATM ICAO 2 June 2008 Presentation Outline What is a

More information

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4 26/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4 The attached draft report on Agenda Item 4 is presented for approval by the Committee

More information

AMAN RESEARCH IN SESAR

AMAN RESEARCH IN SESAR AMAN RESEARCH IN SESAR CCA939 TAP842 AZA1480 BPA1713 Arrival MANager (AMAN) Advisories to ground in complex cross border AMAN: Time To Lose/Time To Gain (TTL/TTG) Speed Use of new avionics capabilities:

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

SESAR CONCEPT DEVELOPMENT: AN ANSP CASE STUDY. Owen DAVIES Brussels Representative Department of International Affairs, NATS

SESAR CONCEPT DEVELOPMENT: AN ANSP CASE STUDY. Owen DAVIES Brussels Representative Department of International Affairs, NATS SESAR CONCEPT DEVELOPMENT: AN ANSP CASE STUDY Owen DAVIES Brussels Representative Department of International Affairs, NATS Content of Presentation Introduction Overview of NATS involvement in SESAR Beyond

More information

ATC automation: facts and steps ahead

ATC automation: facts and steps ahead ATC automation: facts and steps ahead Objectives Context Stating the problem Current solution Steps ahead Implementation constraints ATC automation: facts and steps ahead Objectives Understand why ATC

More information

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014 Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme Cockpit Initiatives for ATM ATC Global 2014 Page 2 Cockpit Initiatives for ATM Airbus vision on ATM transformation Airbus position

More information

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport Screening Chapter 14 Single European Sky (SES) 18 December 2014 SINGLE EUROPEAN SKY OBJECTIVES: INCREASE SAFETY, EFFICIENCY, CAPACITY & PERFORMANCE Reduce fragmentation and complexity of ATM in Europe

More information

The flow centric approach :

The flow centric approach : The flow centric approach : an innovative SESAR concept Presented at EIWAC 2017 by Patrick SOUCHU SESAR program director DSNA France Agenda What is the concept of flow centric operations? Collaborative

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION

INTERNATIONAL CIVIL AVIATION ORGANIZATION APIRG/18 IP/9 12/2/2012 INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP EIGHTEENTH MEETING (APIRG/18) Kampala, Uganda (27 30 March 2012) Agenda Item 3.4: Communication

More information

European ATM Master Plan Level 3. Implementation View Plan 2018

European ATM Master Plan Level 3. Implementation View Plan 2018 2018 European ATM Master Plan Level 3 Implementation View Plan 2018 European ATM Master Plan Level 3 Implementation View Plan 2018 7 EXECUTIVE SUMMARY What is the role of the European ATM Master Plan

More information

European ATM Master Plan Level 3. Implementation View

European ATM Master Plan Level 3. Implementation View European ATM Master Plan Level 3 Implementation View 2017 2017Plan European ATM Master Plan Level 3 Implementation View 2017 2017Plan EXECUTIVE SUMMARY What is the role of the European ATM Master Plan

More information

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA CONTENTS 1 India Civil Aviation Scenario 2 C-ATFM Concepts 3 C-ATFM Implementation 4 4 Road Value Ahead

More information

Implementation of SESAR Pilot Common Project. - expected effects

Implementation of SESAR Pilot Common Project. - expected effects Implementation of SESAR Pilot Common Project - expected effects (2014-2024) European Commission May 20, 2014 - Oslo 1 SESAR SESAR - Technological Pillar of the Single Technological pillar of the SES European

More information

The Network Manager tasks and the ASM improvement initiative

The Network Manager tasks and the ASM improvement initiative The Network Manager tasks and the ASM improvement initiative AFUAS Workshop - 24 th June 2015 Olivier MROWICKI Programme Manager ASM/ATS/ATFCM NMD/NOM/OPL/PRO Network Vision by 2020 Free Route airspace

More information

DANUBE FAB real-time simulation 7 November - 2 December 2011

DANUBE FAB real-time simulation 7 November - 2 December 2011 EUROCONTROL DANUBE FAB real-time simulation 7 November - 2 December 2011 Visitor Information DANUBE FAB in context The framework for the creation and operation of a Functional Airspace Block (FAB) is laid

More information

SRC POSITION PAPER. Edition March 2011 Released Issue

SRC POSITION PAPER. Edition March 2011 Released Issue E U R O C O N T R O L SRC POSITION PAPER Safety Assessment of Optimised Operations in Low Visibility Conditions Utilising Landing Clearance Delivery Position and/or Landing Clearance Line Concept, Edition1.5,

More information

User Forum Capacity Planning with DDR2 & NEST. Thierry Champougny / Laszlo Elbert / Stephanie Vincent

User Forum Capacity Planning with DDR2 & NEST. Thierry Champougny / Laszlo Elbert / Stephanie Vincent User Forum 2013 Capacity Planning with DDR2 & NEST Thierry Champougny / Laszlo Elbert / Stephanie Vincent Expert Operation Planning 24/01/2013 General view Capacity Planning functions, provided by NEST

More information

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM Subject matter and scope * The extension of the applicability area to non-eu ECAC States that have not signed an aviation agreement with EU, as well

More information

Workshop. SESAR 2020 Concept. A Brief View of the Business Trajectory

Workshop. SESAR 2020 Concept. A Brief View of the Business Trajectory SESAR 2020 Concept A Brief View of the Business Trajectory 1 The Presentation SESAR Concept: Capability Levels Key Themes: Paradigm change Business Trajectory Issues Conclusion 2 ATM Capability Levels

More information

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION RASG-EUR/03 Summary of Discussions L-1 APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE REGION ST1- Improvement of the accident rate in commercial air transport Safety Target: Reduce by

More information

Asia/Pacific Region A-CDM Planning

Asia/Pacific Region A-CDM Planning Asia/Pacific Region A-CDM Planning Shane Sumner Regional Officer Air Traffic Management,/Aeronautical Information Management ICAO Asia/Pacific Regional Office (Bangkok) ICAO Airport CDM Seminar Kunming,

More information

Demand capacity balancing in a dynamic fashion. Sonke Mahlich, EUROCONTROL Experimental Centre

Demand capacity balancing in a dynamic fashion. Sonke Mahlich, EUROCONTROL Experimental Centre Demand capacity balancing in a dynamic fashion Sonke Mahlich, EUROCONTROL Experimental Centre SESAR Industrial Research to overcome the shortcomings Dynamic Demand Capacity Balancing (DCB) - Short Term

More information

Seen through an IATA lens A-CDM Globally

Seen through an IATA lens A-CDM Globally Seen through an IATA lens A-CDM Globally A-CDM Basics ATM Perspective Airport CDM is a part of the broader Collaborative Decision Making Focus: managing the turnaround of the aircraft fully transparent

More information

Packaging Tomorrow s Aviation System

Packaging Tomorrow s Aviation System International Civil Aviation Organization Second Briefing on ICAO s Aviation System Block Upgrades Issued: July 2012 The 30 000 Feet View Air traffic growth expands two-fold once every 15 years Growth

More information

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA CONTENTS 1 India Civil Aviation Scenario 2 C-ATFM Concepts 3 C-ATFM Implementation 4 4 Road Value Ahead

More information

ENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES. Guido Kerkhofs Director ATM Programmes EUROCONTROL

ENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES. Guido Kerkhofs Director ATM Programmes EUROCONTROL ENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES Guido Kerkhofs Director ATM Programmes EUROCONTROL EUROCONTROL Air Traffic Emissions Estimates EU 27 States 2004-2006 Tonnes of CO 2 Drop Page

More information

Concept of Operations Workshop

Concept of Operations Workshop Concept of Operations Workshop CS#2 4DPP 4D Trajectory Calculation for Purposes Bernard Rausch CS2 Project Manager 03 September 2013 On the menu today. 1. Drivers for change 2. Objectives 3. Concept 4.

More information

European ATM Master Plan Level 3. Implementation View

European ATM Master Plan Level 3. Implementation View European ATM Master Plan Level 3 Implementation View Plan 2016 Executive summary Setting the scene This Implementation Plan constitutes the Implementation view or Level 3 of the European ATM Master Plan

More information

Aviation System Block Upgrades Module N B0-86/PIA-3

Aviation System Block Upgrades Module N B0-86/PIA-3 International Civil Aviation Organization ASBU/SIP/Mexico/2012-WP/20 E Aviation System Block Upgrades Module N B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent Procedures using

More information

ATSAW. (Airborne Traffic Situational Awareness) Presented by Laurent VIDAL - Surveillance systems manager Support to sales & programs

ATSAW. (Airborne Traffic Situational Awareness) Presented by Laurent VIDAL - Surveillance systems manager Support to sales & programs ATSAW (Airborne Traffic Situational Awareness) Presented by Laurent VIDAL - Surveillance systems manager Support to sales & programs CONTENTS 1 2 3 INTRODUCTION ATSAW COCKPIT INTERFACE ATSAW OPERATION

More information

Flight Efficiency Initiative

Flight Efficiency Initiative Network Manager nominated by the European Commission EUROCONTROL Flight Efficiency Initiative Making savings through improved flight planning Flight efficiency The Network Manager is playing a pivotal

More information

Date Planned/Implemented December Status Developing. Date Planned/Implemented Before May Status Implemented

Date Planned/Implemented December Status Developing. Date Planned/Implemented Before May Status Implemented PIA 1 Block - Module B0 - ACDM Date MAY, 2017 Module Description: To implement collaborative applications that will allow the sharing of surface operations data among the different stakeholders on the

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN International Civil Aviation Organization AIRARDTF/2 IP03 Second Meeting of the Advanced Inter-Regional ATS Route Development Task Force (AIRARDTF/02) Astana, Kazakhstan, 26-27 October 2017 Agenda Item

More information

Atlantic Interoperability Initiative to Reduce Emissions AIRE

Atlantic Interoperability Initiative to Reduce Emissions AIRE ICAO Colloquium on Aviation and Climate Change ICAO ICAO Colloquium Colloquium on Aviation Aviation and and Climate Climate Change Change Atlantic Interoperability Initiative to Reduce Emissions AIRE Célia

More information

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010 Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010 INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR

More information

ECOsystem: MET-ATM integration to improve Aviation efficiency

ECOsystem: MET-ATM integration to improve Aviation efficiency ECOsystem: MET-ATM integration to improve Aviation efficiency Daniel MULLER ICAO APAC/EUR/MID Workshop on Service improvement through integration of AIM, MET and ATM Information Services Brussels, October

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations

More information

THIRTEENTH AIR NAVIGATION CONFERENCE

THIRTEENTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization WORKING PAPER 23/8/18 (Information Paper) English only THIRTEENTH AIR NAVIGATION CONFERENCE Montréal, Canada, 9 to 19 October 2018 COMMITTEE A Agenda Item 3: Enhancing

More information

CMATS The Civil Military ATM System

CMATS The Civil Military ATM System CMATS The Civil Military ATM System OneSKY Australia Program Update Michael Berechree National Manager Aviation Meteorological Services Bureau of Meteorology OneSKY Australia program By 2021, Australia

More information

EUROCONTROL. An introduction to the EUROCONTROL Network Manager Operations Centre

EUROCONTROL. An introduction to the EUROCONTROL Network Manager Operations Centre EUROCONTROL An introduction to the EUROCONTROL Network Manager Operations Centre Since it started tactical operations in 1995*, the EUROCONTROL Network Manager is a key player in improving the overall

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE

More information

SAMPLE TEMPLATE APPENDIX 3.5C-1

SAMPLE TEMPLATE APPENDIX 3.5C-1 APIRG/19 Appendix 3.5 C1-C3 SAMPLE TEMPLATE APPENDIX 3.5C-1 AIR NAVIGATION REPORT FORM (ANRF) ASBU METHODOLOGY Regional and National planning for all ASBU Modules REGIONAL/NATIONAL PERFORMANCE OBJECTIVE

More information

European ATM Development The Big Idea

European ATM Development The Big Idea European ATM Development The Big Idea Bo Redeborn Principal Director ATM EUROCONTROL CANSO Data Communications Conference Amsterdam, 6-8 th Sept 2011 The European Organisation for the Safety of Air Navigation

More information

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member SWIM: An ANSP Perspective Jan-Philipp LAUER, MSc CANSO AIMWG SC Member ICAO Interregional APAC/EUR/MID Workshop on Service improvement through integration of AIM, MET and ATM Information Services Agenda

More information

ENABLING GREENER FLIGHT TRAJECTORIES. David Bowen Chief of ATM SESAR JU

ENABLING GREENER FLIGHT TRAJECTORIES. David Bowen Chief of ATM SESAR JU ENABLING GREENER FLIGHT TRAJECTORIES David Bowen Chief of ATM SESAR JU 24 November 2016 SESAR vision SESAR life cycle To define, develop and deploy the technology that is needed to increase ATM performance

More information

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry Future of ATM Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry 1 1 Air Traffic Management (ATM) Management of aircraft and airspace

More information

(Presented by United States) EXECUTIVE SUMMARY

(Presented by United States) EXECUTIVE SUMMARY NACC/WG/5 IP/07 27/04/17 Fifth North American, Central American and Caribbean Working Group Meeting (NACC/WG/5) Port of Spain, Trinidad and Tobago, 22-26 May 2017 Agenda Item 3 Implementation on Air Navigation

More information

2.6% /14 Forward Plan. 4.1 Traffic Outlook. Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015

2.6% /14 Forward Plan. 4.1 Traffic Outlook. Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015 4 2013/14 Forward Plan 2.6% Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015 4.1 Traffic Outlook Traffic levels continue to be affected by a combination of the fragile economic situation in the

More information

Airspace User Forum 2012

Airspace User Forum 2012 Airspace User Forum 2012 Better prediction: why we need your schedules Francis DECROLY Expert Quality Operational Specifications & Requirements Section Why do we need Airlines schedules? Provide the Network

More information

Cross-border Free Route Airspace Implementation Workshop Conclusions and Recommendations

Cross-border Free Route Airspace Implementation Workshop Conclusions and Recommendations Cross-border Free Route Airspace Implementation Workshop Conclusions and Recommendations 29 30 JUN 2015 Item 1: Cross-border expansion of FRA (1) Harmonised CONOPS PMP and management structure Important

More information

The situation before the FUA

The situation before the FUA DIRECTORATE CIVIL-MILITARY ATM COORDINATION FLEXIBLE USE of AIRSPACE in EUROPE «The military perspective» Olivier Mrowicki CHISINAU 4th August 2009 1 The situation before the FUA AIRPORT 1 AREA 4 AREA

More information

Air Traffic Flow & Capacity Management Frederic Cuq

Air Traffic Flow & Capacity Management Frederic Cuq Air Traffic Flow & Capacity Management Frederic Cuq www.thalesgroup.com Why Do We Need ATFM/CDM? www.thalesgroup.com OPEN Why do we need flow management? ATM Large investments in IT infrastructure by all

More information

30 SEP - 02 OCT, 2014

30 SEP - 02 OCT, 2014 EASTERN CARIBBEAN AERONAUTICAL INFORMATION MANAGEMENT (AIM) FAMILIARIZATION WORKSHOP TRINIDAD AND TOBAGO AVIATION AUTHORITY COMPLEX PORT OF SPAIN, TRINIDAD AND TOBAGO, 30 SEPTEMBER TO 2 OCTOBER 2014 30

More information

Trajectory Based Operations (TBO)

Trajectory Based Operations (TBO) Trajectory Based Operations (TBO) David Batchelor Head of International Affairs, SESAR Joint Undertaking Emerging Technologies Workshop ATC Global, Beijing, 12 September 2016 SESAR SINGLE EUROPEAN SKY

More information

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013 International Civil Aviation Organization ATConf/6-WP/52 15/2/13 WORKING PAPER WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING Montréal, 18 to 22 March 2013 Agenda Item 2: Examination of key

More information

Boeing Air Traffic Management Overview and Status

Boeing Air Traffic Management Overview and Status Boeing Air Traffic Management Overview and Status ENRI International Workshop on ATM/CNS EIWAC 2010 November 10-15, 2010 Tokyo, Japan Matt Harris Avionics Air Traffic Management Boeing Commercial Airplanes

More information

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES Abbreviations ACI ADS ADS-B ADS-C AFTN AIDC AIP ANSP AMHS APAC APANPIRG ASBU ASIOACG ATFM ATM ATS AUSEP CHG CNL CPDLC CPL DARP DLA EOBT FAA FIR FIRBX

More information

Next Generation Airspace Developments: Key Operational Trends and Enablers

Next Generation Airspace Developments: Key Operational Trends and Enablers Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory

More information

Centralised Services 4 Advanced Flexible Use of Airspace Service

Centralised Services 4 Advanced Flexible Use of Airspace Service EUROCONTROL Centralised Services 4 Advanced Flexible Use of Airspace Service Time for the next level A COST-EFFICIENT SOLUTION A centralised service (CS) is a support service for an air navigation service

More information

The European Experience Flexible Use of Airspace (FUA)

The European Experience Flexible Use of Airspace (FUA) Ensuring a 'Flexible Use of Airspace'. The European Experience Flexible Use of Airspace (FUA) ICAO FUA Workshop Republic of Moldova Chisinau, 4 6 Aug 2009 Presented by EUROCONTROL Anders Hallgren (CND/ND/OI/PR)

More information

Introducing Free Route Airspace: Summary Paper from NEFAB Customer Consultation Days Helsinki, October 21, 2014 and Oslo, October 23, 2014

Introducing Free Route Airspace: Summary Paper from NEFAB Customer Consultation Days Helsinki, October 21, 2014 and Oslo, October 23, 2014 Introducing Free Route Airspace: Summary Paper from NEFAB Customer Consultation Days Helsinki, October 21, 2014 and Oslo, October 23, 2014 NEFAB Programme Office organised customer consultation days on

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 17/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information