1 [Type text] EMAS PROJECT WRAPPING UP AIRPORT MASTER PLAN UPDATE A TEMPORARY HOME FOR A BBJ AUGUST 2014
2 417,713 REVENUE IN DOLLARS 8,778 TOTAL AIRCRAFT OPERATIONS 530,282 TOTAL FUEL FLOWAGE IN GALLONS 43 INTERNATIONAL FLIGHTS 4% 3% 2% 79% 16% 4% 15% 0% The Beechcraft Model 2000A Starship was originally conceived as a replacement for the venerable (and hugely successful) King Air series twin-engine turbo-prop. The Starship featured an all-composite fuselage and an advanced design, but it was not a commercial success, with only 53 aircraft produced between 1983 and FAA records show that only 5 Beech Starships remain in the active fleet but those 5 do not include N903SC (pictured above). While N903SC is clearly an operating Beech Starship, it has an Experimental FAA registration with the model listed as Enterprise and the manufacturer serial number given as NCC-1701 (the actual manufacturer serial numbers run from NC-1 through NC-53). Evidently the owner has a sense of humor. This Starship and one other are based here at ADS. 2
3 REVENUE FY14 year-to-date revenue ($4,385,135) has already exceeded the FY14 full-year budget projection ($4,364,830), mainly from higher-than-expected commercial property income stemming from recent airport property acquisitions (most notably the Addison Jet Center located on Taxilane Uniform). August 2014 revenue (at $417,713) was very strong, exceeding budget by over $60,000. FUEL Fuel flowage typically shows a seasonal drop in July-August; such a drop did not occur in 2014, with the result that August fuel flowage (530,282 gallons) was up 15% from August FY14 year-to-date (11 months) fuel flowage totals 5,917,512 gallons, which is 7.8% ahead of projections. FY14 will finish as the best year since FY08. OPERATIONS Aircraft operations totaled a very respectable 8,778 for the month of August; of that total 2,863 were IFR (instrument) operations. Customs clearances (international operations) rebounded some from last month s unusually low level, but were still a little lower than normal. For FY14 to date, operations total 85,382. Of that total, 95.1% is itinerant and 38.5% is IFR itinerant. Local traffic operations in the traffic pattern and remaining within sight of the airport is at a historically low level both in absolute and proportional terms, with only 4,172 local operations recorded 11 months through FY14. 3
4 Above: the nearly completed EMAS project as viewed from the south end of the runway. EMAS PROJECT WRAPPING UP After 4½ months of construction, the EMAS is nearly complete. As of the end of August, all that remains is a bit of site clean-up and some punch-list items. A series of construction photos is presented on pages 5-6 of this report. The project will be completed and closed out in September. Below: a view from on the EMAS showing temporary irrigation for the newly replaced sod. AIRPORT MASTER PLAN UPDATE The Airport Master Plan project has reached the point where various ideas and options for future (re)development are being presented, discussed, and evaluated. Options for several different areas of the airport were presented to the Project Steering Committee in a meeting on August 20. The next Project Steering Committee meeting is scheduled for September 30. Above: a development option for a helicopter landing area on a parcel of airport land fronting Midway Road. Below: Another development option for a parcel of land on the west side of the airport, just north of the Addison Toll Tunnel. Above: with the supporting piers already in place, erection of the steel frame and roof of this extra-large patio hangar required less than three weeks. A TEMPORARY HOME FOR A BBJ An airport tenant recently completed construction of a temporary shelter for the tenant s Boeing Business Jet (BBJ). This temporary structure (pictured above) is located just south of Taxilane Victor, on the north side of the Addison JetPort. It will remain in place for months pending construction of a permanent hangar facility south of Taxilane Sierra and just north of Taxiway Echo, after which it will be dismantled and removed. The BBJ is one of the largest aircraft currently using Addison Airport, so any hangar built to accommodate it will also be among the largest on the airport. Above: resident BBJ parked in its interim home. 4
5 EMAS CONSTRUCTION NEARING COMPLETION concrete anchor beam light can for runway end light concrete anchor beam concrete anchor beam jet blast deflector Above Left: in preparation for constructing the EMAS bed, the area beyond the south end of the runway was excavated to a depth of four feet and the removed material was replaced with select fill. A significant feature of the EMAS is the massive concrete anchor beam (red arrows) which measures approximately 112 feet across and 2 feet front-to-back, and extends to a depth of 4 feet below grade. Above: shoulder strength asphalt supports the EMAS bed. The asphalt is flush with the anchor beam on the leading edge (runway side) but three inches below the beam on the trailing edge. This is a design feature that allows the wheels of an aircraft entering the EMAS to set into the blocks, initiating block crushing in controlled, predictable manner. Left: a jet blast deflector is bolted to the anchor beam at the leading edge of the EMAS. Below Left: at the end of the first day of EMAS block placement, the contractors had placed six rows of 28 blocks each (168 blocks). The finished EMAS bed has 87 rows of 28 blocks each (2,436 total). Trailers containing more blocks are visible in the background. Below: before the EMAS blocks were set in place, the supporting pavement was surveyed and laid out in a grid to ensure accurate placement of the blocks. 5
6 EMAS block placement procedures are illustrated on this page. Top Row: blocks are unloaded and positioned with forklifts. Second Row: a hot asphalt compound is used to glue blocks in place. Third Row: a block is set in place; spacers are used to ensure proper alignment. Bottom Row: joints and edges are sealed with adhesive and a special vinyl tape. 6
Addendum - Airport Development Alternatives (Chapter 6)
Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary
More informationFACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW
FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.
More informationTable of Contents. Overview Objectives Key Issues Process...1-3
Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5
More informationDallas Executive Airport Town Hall Meeting April 3, 2014
Dallas Executive Airport Town Hall Meeting April 3, 2014 Background 1,040 acre general aviation facility owned and operated by the City of Dallas 150 based aircraft including business jets and helicopters,
More informationCity of Redding Airports
City of Redding Airports Benton Airpark Redding Municipal Airport DEVELOPMENT AND USE GUIDELINES FOR GENERAL AVIATION HANGARS April 7, 2009 PREFACE The City of Redding, as owner of federally obligated
More informationCHAPTER 61 SHEBOYGAN COUNTY MEMORIAL AIRPORT
61.01 OPERATION OF AIRPORT 61.02 DEFINITION OF WORDS AND PHRASES 61.03 AIRPORT OPERATION POLICIES 61.04 UTILITIES 61.05 ENTRANCES 61.06 SPECIAL VARIANCE 61.07 ENFORCEMENT 61.08 PENALTY 61.09 MULTIPLE OWNERSHIP
More informationCHICO MUNICIPAL AIRPORT NON-MOVEMENT AREA DRIVER TRAINING PROGRAM
CHICO MUNICIPAL AIRPORT NON-MOVEMENT AREA DRIVER TRAINING PROGRAM Introduction In an effort to provide the safest and most efficient operating environment for tenants and users of the Chico Municipal Airport
More informationChapter 4 Airport Facility Requirements
Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT
More informationJWN Runway Safety Area Project Summer 2015 Closure
JWN Runway Safety Area Project Summer 2015 Closure March 2015 Welcome and Overview Doug Kreulen, Chief Operating Officer Robert Ramsey, P. E., A.A.E. Chief Engineer Overview Purpose of Closure Concurrent
More informationLOGAN - CACHE AIRPORT AUTHORITY BOARD MEETING DECEMBER 2, 2015 MINUTES
LOGAN - CACHE AIRPORT AUTHORITY BOARD MEETING DECEMBER 2, 2015 MINUTES The Logan-Cache Airport Authority Board convened in a regular session on December 2, 2015 at 7:30 a.m. in the Cache County Historic
More informationMilton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.
Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet
More informationChapter 5 Center of Gravity Change After Repair or Alteration
Chapter 5 Center of Gravity Change After Repair or Alteration The largest weight changes that occur during the lifetime of an aircraft are those caused by alterations and repairs. It is the responsibility
More informationPreliminary Findings of Proposed Alternative
Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be
More informationBremerton National Airport Airport Master Plan Project Update February 12, 2013
Bremerton National Airport Airport Master Plan Project Update February 12, 2013 Project Team Century West Engineering Northwest firm founded in 1969 500+ airport projects completed throughout the Pacific
More informationNational Transportation Safety Board Aviation Accident Final Report
National Transportation Safety Board Aviation Accident Final Report Location: MISSOULA, MT Accident Number: Date & Time: 09/22/2000, 0220 MDT Registration: N99TH Aircraft: Beech B99 Aircraft Damage: Substantial
More informationGeneral Aviation Master Plan Update
Peter O. Knight Airport Public Meeting #2 Peter O. Knight Airport Agenda Welcome and Introductions HCAA System of Airports Purpose of Public Meetings Master Plan Status Update Next Steps Q & A 2 Our System
More informationBusiness Plan INTRODUCTION AIRPORT ENTERPRISE FUND OVERVIEW. Master Plan Guiding Principles
5 Business Plan INTRODUCTION Just as previous chapters have outlined plans for the airport s physical development, this chapter outlines a plan for the airport s financial development. More specifically,
More informationNational Transportation Safety Board Aviation Accident Final Report
National Transportation Safety Board Aviation Accident Final Report Location: Dexter, MO Accident Number: Date & Time: 05/10/2016, 1730 CDT Registration: N86TR Aircraft: BEECH B100 Aircraft Damage: Substantial
More informationPunta Gorda Airport Master Plan Update
Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,
More informationRegular Board Meeting August 4, 2015
Regular Board Meeting August 4, 2015 1616 Airport Circle Hailey, ID 83333 208.788.4956 PUBLIC COMMENT FY 16 Rates & Charges FY 16 Budget Approval Rates & Charges will provide the Board the ability to operate
More informationRunway Incursions 3 Markings
Session Visual Aids Runway Incursions 3 Markings 3.12.2 A runway-holding position shall be established: a) on the taxiway, at the intersection of a taxiway and a runway; and b) at an intersection of a
More informationRECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1
PHASING PLAN - PHASE 1 2 Weeks PHASE 1 SCOPE OF WORK Phase 1 consists of the reconstruction of a portion of Taxiway 'A' and the crack seal and seal coat of the North Apron. The portion of Taxiway 'A' to
More informationNational Transportation Safety Board Aviation Accident Final Report
National Transportation Safety Board Aviation Accident Final Report Location: MORRISTOWN, NJ Accident Number: Date & Time: 07/26/1988, 0740 EDT Registration: N442NE Aircraft: LEARJET 35A Aircraft Damage:
More informationAre There Realistic Expectations About Building Hangars in California?
Are There Realistic Expectations About Building Hangars in California? 2006 FALL CONFERENCE Moderator: Mike Shutt, P.E., Mead & Hunt, Inc. Panel Members: Ken Keatts, Regional Sales Manager, Erect-a-Tube,
More informationFORECASTING FUTURE ACTIVITY
EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver
More informationPLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #4 MASTER PLAN ADVISORY COMMITTEE (MPAC) - MEETING #4
MASTER PLAN ADVISORY COMMITTEE (MPAC) - MEETING #4 MASTER PLAN ADVISORY COMMITTEE (MPAC) MEETING #4 AGENDA & ACTION ITEMS Date/Time: Location: Monday, March 19, 2018 from 1:30-3:30 p.m. Thun Field Airport
More informationTABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved
TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING
More informationNational Transportation Safety Board Aviation Accident Final Report
National Transportation Safety Board Aviation Accident Final Report Location: DALLAS, TX Accident Number: Date & Time: 03/24/1987, 2045 CST Registration: N73107 Aircraft: CONVAIR CV-580 Aircraft Damage:
More informationAIRPORT FUND. Description. Summary
Description In March 1941 construction started for the airport at its present site. After Pearl Harbor, the airport, known as Pinellas Army Airfield, was used as a military flight-training base. After
More informationTime-series methodologies Market share methodologies Socioeconomic methodologies
This Chapter features aviation activity forecasts for the Asheville Regional Airport (Airport) over a next 20- year planning horizon. Aviation demand forecasts are an important step in the master planning
More informationCHAPTER 1 INTRODUCTION AND BACKGROUND
CHAPTER 1 INTRODUCTION AND BACKGROUND An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance with the National
More informationTallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016
Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand
More informationYolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California
Yolo County Airport ALP Narrative Report April 2016 Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report Prepared for the County of Yolo Mindi Nunes,
More informationNational Transportation Safety Board Aviation Accident Final Report
National Transportation Safety Board Aviation Accident Final Report Location: Mojave, CA Accident Number: Date & Time: 02/04/2009, 0852 PST Registration: N834TP Aircraft: DOUGLAS DC-3/65AR Aircraft Damage:
More informationDallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting
Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting 10.27.16 Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting Agenda Welcome / Introductions DFW
More informationAIRSIDE CAPACITY AND FACILITY REQUIREMENTS
AIRSIDE CAPACITY AND FACILITY REQUIREMENTS This Section investigates the capacity of the airport, its ability to meet current demand, and the facilities required to meet forecasted needs as established
More information2017 Accomplishments
CY2017 ANNUAL REPORT Vision The Chippewa Valley Regional Airport will provide our users with a safe, efficient and welcoming operation while striving to meet the needs of the communities we serve. 2017
More informationLogansport Cass County Aviation Authority Meeting Minutes July 9 th, 2003 Board Meeting
Logansport Cass County Aviation Authority Meeting Minutes July 9 th, 2003 Board Meeting Attendance: Board members - Guests - Bob Barr Paul Hipsher Pat McNarny Jim Steinberger Tad Wilkinson Mark Shillington;
More informationJACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007
JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 27 11242 1 of 14 Sponsor: City of Naples Airport Authority NPIAS No.: 12-53 Sponsor ID: 122 Airport ID: APF Site No.: 3379.*A 11242 Airport Project ID: 1
More informationK SIGNAGE & TRAFFIC CONTROL. Table of Contents
Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...
More informationTechnical Memorandum. Synopsis. Steve Carrillo, PE. Bryan Oscarson/Carmen Au Lindgren, PE. April 3, 2018 (Revised)
Appendix D Orange County/John Wayne Airport (JWA) General Aviation Improvement Program (GAIP) Based Aircraft Parking Capacity Analysis and General Aviation Constrained Forecasts Technical Memorandum To:
More informationRESOLUTION NO
RESOLUTION NO. 2015-15 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MARINA AUTHORIZING SUBMISSION OF A GRANT APPLICATION TO THE FEDERAL AVIATION ADMINISTRATION (FAA) FOR PARTICIPATION IN THE 2015 MILITARY
More informationSafety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013
New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts
More information2009 Muskoka Airport Economic Impact Study
2009 Muskoka Airport Economic Impact Study November 4, 2009 Prepared by The District of Muskoka Planning and Economic Development Department BACKGROUND The Muskoka Airport is situated at the north end
More informationDallas Executive Airport
648 DECLARED DISTANCE OPTION 1a DISPLACE 31 THRESHOLD BY 97 Considers RSA Limiting Factor No runway extensions 13 31 TORA 6,451 6,451 TODA 6,451 6,451 ASDA 5,958 6,451 LDA 5,958 6,354 Runway 17-35 (3,8
More informationAirport Advisory Board Meeting Minutes June 26, 2017
Board Members Present: Robert Spivey John Barber Jr Ronald Stutes James Wynne III Joshua Ebright Board Members Absent: Lindsey Birdsong Kelly Walker Others Attending: Davis Dickson, Airport Manager, COT
More informationVista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington
Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington
More informationTECHNICAL BULLETIN TRI-FUNCTIONAL BUSH INSPECTION
TECHNICAL BULLETIN TRI-FUNCTIONAL BUSH INSPECTION LIT NO: 97117-135 DATE: June 2018 REVISION: E 6 Inch Bush 3 Inch Bush The TRI-FUNCTIONAL Bush (TFB ) is a key factor in both ride quality and roll stability
More informationChapter Two FORECAST OF AVIATION DEMAND A. DESCRIPTION OF FORECAST ELEMENTS
Chapter Two FORECAST OF AVIATION DEMAND A. DESCRIPTION OF FORECAST ELEMENTS The forecast of aeronautical activity at the (GED) during the 20-year planning period (2002-2021) is a key element of the Master
More informationOctober 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION
October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.
More informationNational Transportation Safety Board Aviation Accident Final Report
National Transportation Safety Board Aviation Accident Final Report Location: YPSILANTI, MI Accident Number: Date & Time: 04/23/1992, 1816 EDT Registration: N29549 Aircraft: MCDONNELL DOUGLAS DC-8F-55
More informationCATCODE ] CATCODE
Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class
More informationPavement Strength Analysis Prepared by Molzen Corbin September 2016
Pavement Strength Analysis Prepared by Molzen Corbin September 2016 The Santa Fe Municipal Airport was originally constructed in 1941. It was constructed by the military as a B-24 bomber training base.
More informationPublic Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California
Public Review Draft South County Airport Master Plan Report County of Santa Clara San Martin, California July 2005 County of Santa Clara Board of Supervisors Donald F. Gage Blanca Alvarado Peter A. McHugh
More information1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201
More informationAppendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update
Appendix D Project Newsletters Tacoma Narrows Airport Master Plan Update This appendix contains the newsletters distributed throughout the project. These newsletters provided updates and information on
More informationCHAPTER 3 AIRPORT FACILITY REQUIREMENTS
CHAPTER 3 AIRPORT FACILITY REQUIREMENTS 3.1 Introduction The existing runway and taxiway system at Skyhaven Airport provides more than adequate operational capacity to accommodate future peak hour and
More informationExecutive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport
Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche
More informationMerritt Island Airport
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory
More informationHuronia/Midland Airport, CYEE
Huronia/Midland Airport, CYEE HURONIA MUNICIPAL AIRPORT- 2016 TO 2020 1. INTRODUCTION In 2010, The Huronia Municipal Airport Commission (HMAC) developed a five-year business plan to increase activity levels
More informationAnn Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB
MICHIGAN AIRPORT DEVELOPMENT PROGRAM AIP CAPITAL IMPROVEMENT PLAN 20102019 FEDERAL/STATE/LOCAL Ann Arbor, MI Date of Latest ALP 2008 ACIP Airport Code A Airport Identifier ARB Prepared by: MDOTAERO Sponsor:
More informationFuture Economic Benefits to North Carolina from Session Law (34.19a-34.19c) Investments. Bobby Walston, Director of Aviation April 2, 2018
Future Economic Benefits to North Carolina from Session Law 2017-57 (34.19a-34.19c) Investments Bobby Walston, Director of Aviation April 2, 2018 2016 Study Results (Summary) Jobs Economic Contribution
More informationSTAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D
STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings
More informationAirport Master Plan. Brookings Regional Airport. Runway Runway 17-35
Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements
More informationMeeting Notes Public Open House
Meeting Notes Public Open House, 5:30-8:00 pm Fairbanks Pipeline Training Center, 3605 Cartwright Court, Fairbanks, Alaska= Agenda: Open House: 30 minutes Presentation: 45 minutes Question and Answers:
More informationNational Transportation Safety Board Aviation Incident Final Report
National Transportation Safety Board Aviation Incident Final Report Location: Los Angeles, CA Incident Number: Date & Time: 08/16/2007, 1257 PDT Registration: Aircraft: Boeing 737-700 Aircraft Damage:
More informationPORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM
PORT OF PORTLAND Chapter Seven CAPITAL IMPROVEMENT PROGRAM CHAPTER SEVEN PORT OF PORTLAND CAPITAL IMPROVEMENT PROGRAM The analyses conducted in the previous chapters evaluated airport development needs
More informationDEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering
DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 1.Landing direction indicator UNIT 4 TWO MARK QUESTIONS AND ANSWERS Two mark question with
More informationMANCHESTER AIRPORT AIRCRAFT PUSHBACK PROCEDURES. Effective from 27th November :01 hrs local.
MANCHESTER AIRPORT AIRCRAFT PUSHBACK PROCEDURES Effective from 27th November 2018. 00:01 hrs local. Operational changes from previous revision; TRPs 216 and NA permanently withdrawn from use. Choice of
More informationChapter Seven COST ESTIMATES AND FUNDING A. GENERAL
Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction
More informationBUSINESS AVIATION SUPPORT SERVICES AIRCRAFT MANAGEMENT. Taking You Under Our Wing
BUSINESS AVIATION SUPPORT SERVICES AIRCRAFT MANAGEMENT ACASS provides a full range of Aircraft Management services built upon its broad experience in the business aviation industry. Our IS-BAO certified
More informationHutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163
Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163 INTRODUCTION The City of Hutchinson is issuing a Request For Proposal (RFP) for the private or commercial use of the Hangar
More informationRaleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018
Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018 Agenda» Website Update» Alternatives» Discussion» Evaluation» Schedule Agenda» Website Update» Alternatives» Discussion» Evaluation»
More informationSession Best Practices Amendments From Annex14, Volume I Annex 15. Runway Incursions Runway Excursions
Session Best Practices Amendments From Annex14, Volume I Annex 15 Runway Incursions Runway Excursions Annex 15 AIP - Member States Report: Installation of ARRESTOR SYSTEMS Location - Runway End Industry
More informationMEDIA/ANALYST PRESENTATION FY RESULTS 11 MAY 2007
MEDIA/ANALYST PRESENTATION FY2006-07 RESULTS 11 MAY 2007 SIA GROUP FY2006-07 07 RESULTS GROUP REVENUE FY2006/07 ($ million) ($ million) 15,000 14,494 14,000 13,000 12,000 11,000 10,515 12,013 13,341 Record
More informationHILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1
HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 Feb. 27, 2017 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Welcome Curtis Robinhold, Port of Portland 1 HILLSBORO
More informationSELF RE-ERECTING MARKER POSTS
ONE OF A KIND TECHNOLOGY FOR OUR TIMES MULTI APPLICATIONS SELF RE-ERECTING MARKER POSTS TEMPORARY OR PERMANENT BICYCLE LANES CROSSWALKS CHANALIZATION BRIDGES CITY US REFLECTOR WORK ZONES ALL-ROUND RUGGEDNESS
More informationNew PFC Application #13
PUBLIC CONSULTATION New PFC Application #13 Buffalo, NY December 16, 2015 Agenda PFC Program at Notice to Carriers and Consultation Meeting Class of Carrier Not Required to Collect PFC Air Carrier Requirements
More informationNational Transportation Safety Board Aviation Accident Final Report
National Transportation Safety Board Aviation Accident Final Report Location: AUSTIN, TX Accident Number: Date & Time: 11/27/1998, 1405 CST Registration: N787WB Aircraft: Lockheed L-1329 Aircraft Damage:
More informationSEPTEMBER 2015 BOARD INFORMATION PACKAGE
SEPTEMBER 2015 BOARD INFORMATION PACKAGE MEMORANDUM TO: Members of the Airport Authority FROM: Lew Bleiweis, Executive Director DATE: September 11, 2015 Financial Report (document) Informational Reports:
More informationLas Vegas McCarran International Airport. Capacity Enhancement Plan
Las Vegas McCarran International Airport Capacity Enhancement Plan Las Vegas McCarran International Airport Capacity Enhancement Plan September 1994 Prepared jointly by the U.S. Department of Transportation,
More informationPlanning & Development Group
Planning & Development Group LAX Airside Technical Committee Meeting January 9, 2018 Mark Vicelja, P.E. 1 Airside Element Projects LAX AIRSIDE ELEMENT PROJECTS CONSTRUCTION SCHEDULE (as of January 1, 2018)
More informationprint materials visit information on free live seminars, online courses, and
The AOPA Air Safety Foundation is dedicated to making flying easier and safer for general aviation pilots. For information on free live seminars, online courses, and print materials visit. ILS Critical
More informationCLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257
Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and
More informationAPRIL 2016 BOARD INFORMATION PACKAGE
APRIL 2016 BOARD INFORMATION PACKAGE MEMORANDUM TO: Members of the Airport Authority FROM: Lew Bleiweis, Executive Director DATE: April 8, 2016 Financial Report (document) Informational Reports: A. February,
More information4-foot Economy Sign Post. 4-foot post is rated at 2 pounds per foot. 7-foot Economy Sign Post
Introduction: ComplianceSigns.com offers a variety of sign posts, sign mounting hardware, sign bases, mounting tape and more to mount your safety signs indoors or out. We offer three styles of sign posts,
More information5 Give the students Worksheet 4. Ask them to. 6 Ask the students to look at the second part of. 7 Give the students a copy of Worksheet 5 and ask
TEACHER S NOTES Lesson length: 60-75 minutes Aim: Students learn and practise giving thanks in a variety of situations Main aim: presentation and practice of aviation-related vocabulary Subsidiary aims:
More informationLocation, Identity, Specific Location, Intention, Location Again
I. PEDESTRIAN AND GROUND VEHICLE RULES AND INFORMATION The Sanford Seacoast Regional Airport (SFM) is a nontowered airport, meaning it has no air traffic control tower. Any vehicle authorized to operate
More informationNotice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application
July 3, 2018 Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application The City of Kansas City (City), Missouri through its Aviation Department ( the Department
More informationBELFAST MUNICIPAL AIRPORT OVERVIEW
BELFAST MUNICIPAL AIRPORT OVERVIEW LOCATION AND HISTORY Belfast Municipal Airport (Federal Aviation Administration (FAA) airport code BST, International Civil Aviation Organization airport code KBST, FAA
More informationBrunswick Executive Airport. Airport Safety Program
Brunswick Executive Airport Airport Safety Program Why Runway Incursions FY 14 FY 13 FY 12 FY 11 1 st Quarter 298 273 226 215 2 nd Quarter 258 287 267 246 3 rd Quarter 359 328 352 257 4 th Quarter 349
More informationVertiport Chicago is a private facility, open to authorized users. Prior permission and/or landing reservations are required (PPR).
Heliport Information Vertiport Chicago is a private facility, open to authorized users. Prior permission and/or landing reservations are required (PPR). Location Identifier: 43IL Lat/Long: 41 51 47.3"N
More information1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions.
ALBUQUERQUE INTERNATIONAL SUNPORT AIRCRAFT HOLD LINE LOCATION ANALYSIS WHITE PAPER JUNE 24, 2016 HOLD LINE LOCATION ISSUE The location of many of the taxiway hold lines at the Sunport do not meet current
More informationMASTER PLAN CONCEPT 1 DRAFT
The Airport Master Plan Update for Dallas Executive Airport has included the development of aviation demand forecasts, an assessment of future facility needs, and the evaluation of airport development
More informationNational Transportation Safety Board Aviation Accident Final Report
National Transportation Safety Board Aviation Accident Final Report Location: SOUTH BEND, IN Accident Number: Date & Time: 09/16/1995, 2020 CDT Registration: N169GA Aircraft: Swearingen SA-226TC Aircraft
More informationTeterboro Airport Overview
Teterboro Airport Overview Teterboro Airport consists of two intersecting runways. Runway 6-24 is 6,013 ft long and 150 ft wide, and is equipped with High Intensity Runway Edge Lights (HIRL) and Runway
More informationFORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT
D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix
More informationAirport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal
Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred
More informationAIRPORT COMMITTEE MEETING AGENDA September 06, :00 PM Moorhead Municipal Airport
AIRPORT COMMITTEE MEETING AGENDA September 06, 2017-4:00 PM Moorhead Municipal Airport 1. Call to Order 2. Agenda Amendments 3. Approval of Minutes A June 14, 2017 4. Citizens to be Heard 5. Airport Capital
More informationAirport Master Plan Open House Front Range Airport February 23, 2017
Airport Master Plan Open House Front Range Airport February 23, 2017 MASTER PLAN PROCESS AND OVERVIEW MASTER PLAN ELEMENTS The Master Plan is a 20-year plan to understand the needs of current and future