Are There Realistic Expectations About Building Hangars in California?

Size: px
Start display at page:

Download "Are There Realistic Expectations About Building Hangars in California?"

Transcription

1 Are There Realistic Expectations About Building Hangars in California? 2006 FALL CONFERENCE Moderator: Mike Shutt, P.E., Mead & Hunt, Inc. Panel Members: Ken Keatts, Regional Sales Manager, Erect-a-Tube, Inc. Carl Honaker, Director of Airports, Santa Clara County Dave Hoover, President, HYT Corporation (Fire Protection & Code Specialists)

2

3

4

5 Nested vs. Stacked Hangars Cost Comparison Building footprint nested hangars require 1,500 s.f. of additional area, but it is rentable space no cost FAA taxiways are 11,000 s.f. greater in stacked configuration Hangar apron pavements are 20,250 s.f. greater in stacked configuration Ø $88,000 $162,000 Construction cost increase $250,000 The stacked hangar complex requires 30,000 s.f. of additional land, which is either forgiven or adds cost depending on value of land.

6

7 Overview of Santa Clara County System Over 1,300 based aircraft, nearly 500,000 ops/year Palo Alto Airport - PAO County - 0 hangars, 360 tie-downs FBO - 69 hangar spaces, 95 tie-downs Reid-Hillview Airport - RHV County hangars, 52 shelter spaces, 175 tie-downs FBO 47 hangar spaces, 255 tie-downs South County/San Martin Airport - E16 County hangars, 90 tie-downs FBO 55 hangars, 28 tie-downs

8 Hangar Issues at Reid-Hillview and Palo Alto Airports PAO County gets 6% of rent for some FBO hangars RHV Hangar Development FBO storage hangars various box hangars, no T s no rent % County construction identical T-Hangars w/concrete found. and basic electricity No sprinkler system, no bathrooms Developer construction Ground Lease 1984 Off-the-shelf Nunno Box Hangars and Portaport T-Hangars Anchored to asphalt on existing grade ramp No electricity, bathrooms, or sprinkler system Poor oversight by County, bad management by lessee County bought out leases due to conflicts/rent prices, and loss of tenancy during threat of airport closure

9 Recent Experience at South County Airport Single FBO had only hangars until 06 County Hangar Project 100 hangars 5 sizes Based on previous 82 Master Plan build when demand grew 120,000 sq/ft total, 103,000 billable space 9 Box and 91 T-Hangars, fit within existing taxilanes from mid-90s Concrete foundations, electricity, box hangars w/elect. doors, 4 bathrooms, parking AND Fire Marshal mandated sprinklers Insufficient water flow from fire main requirement for 500,000 gallon tank and pump system to supplement fire flow ($1.2M) Waiting list established by lottery started with 100, grew to 130 Currently 56 hangars rented (only 42 from waiting list 35%)

10

11 Financing the South County Airport Hangars Cost was estimated at $4.5 M for Hangars, $1.2 M for Tank/Pump ABAG Loan for entire amount plus payoff of G.F. loans at RHV Only available to ABAG Counties/Municipalities No Strings Attached (State has since changed requirements) 30 Year payback, pymts started before we broke ground on project Took almost 2 years longer than original estimate to complete Extra $1M for in-house Overhead/Contract Mgmt. came out of AEF Total cost/sq ft = $55, or average of $66,000 per hangar Barely breaking even on debt service now Added 2 staff to airport to help manage hangars (~$130K/yr)

12 Private vs. Public Bottom Line Expensive for municipalities to build their own, versus lease with Private Developer Bureaucracy increases cost/time Expensive rents required to pay debt/costs Cannot sell hangars or customize for tenant needs Cannot depreciate asset/amortize loan Must pay prevailing wage Private Developer Lease easier and lower risk Make sure you use Minimum Standards Get % of rent in addition to land lease BUT, if airport can swing it, you will eventually make more money by building them (if you can keep them occupied).

13

14 A Code Dilemma A combination of three model and consensus Codes and Standards identify the minimum requirements for the design and construction of aircraft hangars Uniform Building Code (UBC), California Building Code (CBC) International Building Code (IBC) National Fire Protection Association (NFPA) 409, Standard on Aircraft Hangars

15 Comparison of Occupancy Classifications UBC/CBC S5 Occupancy; Work is limited to exchange of parts and maintenance activities no open flame or welding permitted H5 Occupancy; Hangars not classified as S5 Occupancies IBC S1 Occupancy; Moderate hazard storage H2 Occupancy; Paint hangars NFPA 409 Group I Hangars; Have at least one of the following: Aircraft access door height over 28 ft. or provision for housing aircraft with tail height over 28 ft. A single fire area in excess of 40,000 ft 2 Group II Hangars; Have both of the following: Door height of 28 feet or less, and a single fire for specific types of construction. Group III Hangars; Have both of the following: Door height of 28 feet or less, and a single fire not exceeding the maximum permitted based upon construction type. Group IV Hangars; Membrane-covered rigid steel frame Paint Hangars

16 Comparison of Fire Protection Requirements UBC/CBC Through adoption, refers to the appropriate NFPA Standard IBC Requires protection of hangars in accordance with NFPA 409 Exception: Group II hangars storing private aircraft without major maintenance or overhaul are exempt from foam suppression requirements NFPA 409 Group I Hangars; Provide one of the following: Foam-water deluge system Fire sprinklers + low level / low expansion foam system Fire sprinklers + low level / high expansion foam system Fire sprinklers (unfueled aircraft, only) Group II Hangars; Provide as for Group I Hangars, or: A closed-head foam-water sprinkler system Group III Hangars; with hazardous operations including fuel transfer, welding or other hot work, doping, and/or spray painting must be protected as a Group II Hangar

17 Fire Protection Water Supply and Distribution Systems Can present difficulty in airport and hangar design due to: Potential high volumes of required water at high pressures Location and distribution of fire hydrants Fire department access

18 QUESTIONS

Public Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California

Public Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California Public Review Draft South County Airport Master Plan Report County of Santa Clara San Martin, California July 2005 County of Santa Clara Board of Supervisors Donald F. Gage Blanca Alvarado Peter A. McHugh

More information

Business Plan INTRODUCTION AIRPORT ENTERPRISE FUND OVERVIEW. Master Plan Guiding Principles

Business Plan INTRODUCTION AIRPORT ENTERPRISE FUND OVERVIEW. Master Plan Guiding Principles 5 Business Plan INTRODUCTION Just as previous chapters have outlined plans for the airport s physical development, this chapter outlines a plan for the airport s financial development. More specifically,

More information

Draft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005

Draft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005 Draft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005 County of Santa Clara Board of Supervisors Donald F. Gage Blanca Alvarado Peter A. McHugh James T. Beall, Jr. Liz

More information

Appendix B. February 26, Robert Lee FAA ADO Office 1000 Marina Blvd., Suite 220 Brisbane, CA Sent via . Dear Mr.

Appendix B. February 26, Robert Lee FAA ADO Office 1000 Marina Blvd., Suite 220 Brisbane, CA Sent via  . Dear Mr. Appendix B February 26, 2015 Robert Lee FAA ADO Office 1000 Marina Blvd., Suite 220 Brisbane, CA 94005-1853 Sent via e-mail Dear Mr. Lee: The County of Santa Clara is the owner and sponsor for Reid-Hillview

More information

City of Redding Airports

City of Redding Airports City of Redding Airports Benton Airpark Redding Municipal Airport DEVELOPMENT AND USE GUIDELINES FOR GENERAL AVIATION HANGARS April 7, 2009 PREFACE The City of Redding, as owner of federally obligated

More information

SUBJECT: Business Plan Update for Reid Hillview and San Martin Airports

SUBJECT: Business Plan Update for Reid Hillview and San Martin Airports County of Santa Clara Roads and Airports Department 89143 B DATE: December 5, 2017 TO: FROM: Board of Supervisors Harry Freitas, Director, Roads and Airports SUBJECT: Business Plan Update for Reid Hillview

More information

Chapter 5 Airport Development Alternatives

Chapter 5 Airport Development Alternatives Chapter 5 Airport Development Alternatives Introduction CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-1 Evaluation Process No-Action Alternative CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-2

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

BOARD OF AIRPORT COMMISSIONERS -

BOARD OF AIRPORT COMMISSIONERS - 0 OF1 Los Angeks World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS - Meeting Date: O'IAA.A.)1.Alk-Tort/uQA212J`s-- Approved by: Samantha Bricker - Deputy Executive Director 11/16/2017 11-Pleviewed

More information

[Type text] AIRPORT MASTER PLAN UPDATE EMAS PROJECT WRAPPING UP A TEMPORARY HOME FOR A BBJ

[Type text] AIRPORT MASTER PLAN UPDATE EMAS PROJECT WRAPPING UP A TEMPORARY HOME FOR A BBJ [Type text] EMAS PROJECT WRAPPING UP AIRPORT MASTER PLAN UPDATE A TEMPORARY HOME FOR A BBJ AUGUST 2014 417,713 REVENUE IN DOLLARS 8,778 TOTAL AIRCRAFT OPERATIONS 530,282 TOTAL FUEL FLOWAGE IN GALLONS 43

More information

JWN Runway Safety Area Project Summer 2015 Closure

JWN Runway Safety Area Project Summer 2015 Closure JWN Runway Safety Area Project Summer 2015 Closure March 2015 Welcome and Overview Doug Kreulen, Chief Operating Officer Robert Ramsey, P. E., A.A.E. Chief Engineer Overview Purpose of Closure Concurrent

More information

VIRGIN ISLANDS PORT AUTHORITY (VIPA) 2016 PUBLIC HEARING ON PROPOSED TARIFF INCREASE. ! July

VIRGIN ISLANDS PORT AUTHORITY (VIPA) 2016 PUBLIC HEARING ON PROPOSED TARIFF INCREASE. ! July VIRGIN ISLANDS PORT! July AUTHORITY (VIPA) 2016 2016 PUBLIC HEARING ON PROPOSED TARIFF INCREASE FINANCIAL OPERATIONS VIPA AVIATION DIVISION VIRGIN ISLANDS PORT AUTHORITY 2 5-YEAR INCOME STATEMENT SNAPSHOT-

More information

SAN MARTIN BUSINESS PLAN COMMUNITY MEETING

SAN MARTIN BUSINESS PLAN COMMUNITY MEETING SAN MARTIN BUSINESS PLAN COMMUNITY MEETING Summary of Community Meeting Wednesday May 23, 2018 Santa Clara County Roads and Airports Department hosted a community meeting on Wednesday May 23 nd, 2018 from

More information

TABLE 4-1 REGIONAL ECONOMIC AIRPORT IMPACT. Jobs Supported

TABLE 4-1 REGIONAL ECONOMIC AIRPORT IMPACT. Jobs Supported Financial Analysis 4.0 Overview The 2011 State of Texas Airport System Economic Impact Study calculated that H.H. Coffield Regional Airport has annual local economic impact of $187,293. This value places

More information

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO Wyoming Valley Airport Proposed Improvements Presented June 26, 2012 By The WBW Airport Advisory Board & FBO Contents Purpose of meeting Airport overview Background of proposed improvements SWOT analysis

More information

A New Guidebook for Managing Small Airports and What to Consider With Corporate Aircraft Operations

A New Guidebook for Managing Small Airports and What to Consider With Corporate Aircraft Operations A New Guidebook for Managing Small Airports and What to Consider With Corporate Aircraft Operations So Someone Wants to Build a Corporate Aircraft Hangar at Your Airport What You Need to Know Purdue Road

More information

PAO Business Plan INTRODUCTION

PAO Business Plan INTRODUCTION PAO Business Plan INTRODUCTION The Palo Alto Airport (PAO) Master Plan is part of an update to the 1982 Master Plan for the three general aviation airports in the County of Santa Clara. However, unlike

More information

MILLION AIR WHITE PLAINS. Westchester County Airport 136 Tower Road, Hangar M White Plains, NY 10604

MILLION AIR WHITE PLAINS. Westchester County Airport 136 Tower Road, Hangar M White Plains, NY 10604 MILLION AIR WHITE PLAINS Westchester County Airport 136 Tower Road, Hangar M White Plains, NY 10604 The Million Air name has been synonymous with award-winning, upscale FBO aviation services for over 30

More information

BELFAST MUNICIPAL AIRPORT OVERVIEW

BELFAST MUNICIPAL AIRPORT OVERVIEW BELFAST MUNICIPAL AIRPORT OVERVIEW LOCATION AND HISTORY Belfast Municipal Airport (Federal Aviation Administration (FAA) airport code BST, International Civil Aviation Organization airport code KBST, FAA

More information

MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM

MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, 2011 8:30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM Pledge of Allegiance ACTION ITEMS APPROVAL OF MINUTES of the Regular Meeting of

More information

Exhibit A. Excerpt from the New Jersey Forest Fire Service s Andover- Aeroflex Airport Facility Operations Manual January 2009

Exhibit A. Excerpt from the New Jersey Forest Fire Service s Andover- Aeroflex Airport Facility Operations Manual January 2009 Exhibit A Excerpt from the New Jersey Forest Fire Service s Andover- Aeroflex Airport Facility Operations Manual January 2009 Minimum Standards for Aeronautical Activities AEROFLEX ANDOVER AIRPORT FACILITY

More information

Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163

Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163 Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163 INTRODUCTION The City of Hutchinson is issuing a Request For Proposal (RFP) for the private or commercial use of the Hangar

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

RFP No C001 Fixed Base Operator, Dulles Airport. May 3, 2017

RFP No C001 Fixed Base Operator, Dulles Airport. May 3, 2017 RFP No. 6-17-C001 Fixed Base Operator, Dulles Airport May 3, 2017 Questions and Answers Notice: Questions may have been edited for clarity and relevance. 1. Question: RFP Section I.I. Is Jet Aviation Dulles,

More information

TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017

TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017 TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017 Please find attached for your review prior to the PAC Meeting #4,

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington

More information

Appendix A - Definitions

Appendix A - Definitions Appendix A - Definitions Aeronautical Activity Any activity conducted at airports which involves, makes possible, or is required for the operation of aircraft, or which contributes to or is required for

More information

Why are the underground fuel tanks being removed and replaced with above ground tanks?

Why are the underground fuel tanks being removed and replaced with above ground tanks? AIRPORT/CITIZEN FAQ This list of Frequently Asked Questions (FAQs) with responses are provided to share information related to airport topics with the Citizens of Georgetown. The questions / responses

More information

CHAPTER 61 SHEBOYGAN COUNTY MEMORIAL AIRPORT

CHAPTER 61 SHEBOYGAN COUNTY MEMORIAL AIRPORT 61.01 OPERATION OF AIRPORT 61.02 DEFINITION OF WORDS AND PHRASES 61.03 AIRPORT OPERATION POLICIES 61.04 UTILITIES 61.05 ENTRANCES 61.06 SPECIAL VARIANCE 61.07 ENFORCEMENT 61.08 PENALTY 61.09 MULTIPLE OWNERSHIP

More information

Airport Master Plan Open House Front Range Airport February 23, 2017

Airport Master Plan Open House Front Range Airport February 23, 2017 Airport Master Plan Open House Front Range Airport February 23, 2017 MASTER PLAN PROCESS AND OVERVIEW MASTER PLAN ELEMENTS The Master Plan is a 20-year plan to understand the needs of current and future

More information

Rates & Charges Analysis

Rates & Charges Analysis Aeronautics Division Rates & Charges Analysis Executive Summary Executive Summary In This Report: Airlines Rates and Charges Other Building Rental Rates Landing Fees Parking Rates Tie-Downs Special Use

More information

Chapter 4 Airport Facility Requirements

Chapter 4 Airport Facility Requirements Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT

More information

GILLESPIE COUNTY AIRPORT

GILLESPIE COUNTY AIRPORT GILLESPIE COUNTY AIRPORT MINIMUM OPERATING STANDARDS 8/14/2017 These minimum operating standards allow for the non-discriminatory and safe development and operation of the Gillespie County airport under

More information

Squint s Ranch and Airport

Squint s Ranch and Airport Squint s Ranch and Airport Lake Arrowhead, CA Airport Project Summary The Lake Arrowhead Airport at The Lost Ranch is a valuable asset to the surrounding communities. Not only does it provide residents

More information

EXPERIENCE. MILLION AIR. MILLION AIR HOUSTON HOUSTON HOBBY AIRPORT 7555 IPSWICH HOUSTON, TEXAS NEW HANGAR DEVELOPMENT 2018

EXPERIENCE. MILLION AIR. MILLION AIR HOUSTON HOUSTON HOBBY AIRPORT 7555 IPSWICH HOUSTON, TEXAS NEW HANGAR DEVELOPMENT 2018 EXPERIENCE. MILLION AIR. MILLION AIR HOUSTON HOUSTON HOBBY AIRPORT 7555 IPSWICH HOUSTON, TEXAS 77061 NEW HANGAR DEVELOPMENT 2018 The Million Air name has been synonymous with award-winning, upscale aviation

More information

RULES AND REGULATIONS DRAFT December 3

RULES AND REGULATIONS DRAFT December 3 RULES AND REGULATIONS DRAFT December 3 INTRODUCTION The Logan Cache Airport is a class IV commercial and general Aviation facility that serves the air transportation needs of the citizens of Cache County,

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 INDIANAPOLIS AIRPORT AUTHORITY 2017 APPROPRIATION BUDGET ORDINANCE NO. 2-2016 BOARD APPROVED AUGUST 19, 2016 2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 1 Appropriation Summary

More information

EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008

EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008 EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008 SECTION 1 - PURPOSE AND SCOPE 1.1 Purpose This document is designed to serve as a guide for private and commercial hangar construction

More information

STUDY WORK GROUP MEETING No. 3. November 29, 2016

STUDY WORK GROUP MEETING No. 3. November 29, 2016 STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity

More information

GENERAL AVIATION AIRPORT AGREEMENTS

GENERAL AVIATION AIRPORT AGREEMENTS 33 rd Annual Basics of Airport Law Workshop and 2017 Legal Update Session #17 GENERAL AVIATION AIRPORT AGREEMENTS W. Eric Pilsk Kaplan Kirsch & Rockwell Corinne C. Nystrom, A.A.E., Airport Director Mesa-Falcon

More information

Cuyahoga County Airport Master Plan Update Draft Final Report APPENDIX E AIRPORT SURVEY RESULTS

Cuyahoga County Airport Master Plan Update Draft Final Report APPENDIX E AIRPORT SURVEY RESULTS Cuyahoga County Airport Master Plan Update Draft Final Report APPENDIX E AIRPORT SURVEY RESULTS We are asking for your assistance with ideas to make Cuyahoga County Airport a better facility. An important

More information

AIRPORT COMMITTEE MEETING AGENDA September 06, :00 PM Moorhead Municipal Airport

AIRPORT COMMITTEE MEETING AGENDA September 06, :00 PM Moorhead Municipal Airport AIRPORT COMMITTEE MEETING AGENDA September 06, 2017-4:00 PM Moorhead Municipal Airport 1. Call to Order 2. Agenda Amendments 3. Approval of Minutes A June 14, 2017 4. Citizens to be Heard 5. Airport Capital

More information

Tent Policy & Procedures for Washington University in St. Louis

Tent Policy & Procedures for Washington University in St. Louis Tent Policy & Procedures for Washington University in St. Louis Table of Contents Tent Policy & Procedures for Washington University in St. Louis... 1 Notice... 2 Policy/Purpose... 2 General Information...

More information

MILLION AIR AUSTIN HANGAR SPACE FOR LEASE. Austin Bergstrom International Airport Emma Browning Ave Austin, Texas

MILLION AIR AUSTIN HANGAR SPACE FOR LEASE. Austin Bergstrom International Airport Emma Browning Ave Austin, Texas MILLION AIR AUSTIN HANGAR SPACE FOR LEASE Austin Bergstrom International Airport Emma Browning Ave Austin, Texas Million Air Austin is pleased to respond to the high demand for top quality corporate aircraft

More information

CHAPTER 5: Landside Facility Requirements and Development Concepts

CHAPTER 5: Landside Facility Requirements and Development Concepts CHAPTER 5: Landside Facility Requirements and Development Concepts Overview Implementation of the preferred intermediate-term (10-year) and long-term (20-year) airside alternatives will have a significant

More information

Tent /Membrane Structure Permit Application

Tent /Membrane Structure Permit Application TOWN OF BRIGHTON Office of the Fire Marshal 2300 Elmwood Avenue Rochester, New York 14618 (585) 784-5220 Office (585) 784-5207 Fax Tent /Membrane Structure Permit Application In accordance with the Code

More information

San Bernardino International Airport Authority Hangar Policies and Procedures

San Bernardino International Airport Authority Hangar Policies and Procedures San Bernardino International Airport Authority Hangar Policies and Procedures April 1, 2015 I. GENERAL A. Hangar Eligibility Approved entities (LESSEEs) may enter into a hangar rental agreement (Hangar

More information

The following attendees signed in and gave contact info to be put on a project mailing list:

The following attendees signed in and gave contact info to be put on a project mailing list: Notes from Scoping Meeting Report VISTA FIELD ALTERNATIVES STUDY Date: October 4, 2012 Location: TriCities Visitor and Convention Bureau, Bechtel Conference Room Present: Duany Plater-Zyberk and Company

More information

Santa Clara County Airport Business Plan Updates

Santa Clara County Airport Business Plan Updates Santa Clara County Airport Business Plan Updates Prepared for Eric Peterson, Airports Director Santa Clara County Roads and Airports Prepared by Aries Consultants Ltd. April 2018 TABLE OF CONTENTS Section

More information

6 MONTHS 1/2 RENT ON 3 YEAR DEALS! SIERRA VISTA BUSINESS PARK Chaparral Court, Anaheim, California FEATURES

6 MONTHS 1/2 RENT ON 3 YEAR DEALS! SIERRA VISTA BUSINESS PARK Chaparral Court, Anaheim, California FEATURES 6 MONTHS 1/2 RENT ON 3 YEAR DEALS! 100-140 Chaparral Court, Anaheim, California FEATURES High Tech Concrete Aggregate Architecture Ground Floor and 2nd Story Space Available Parking Ratio ±4:1 Fully Fire

More information

TAIT FY 2019 BUDGET Summary

TAIT FY 2019 BUDGET Summary TAIT FY 2019 BUDGET Summary Prior FY Budget V Current FY Budget PY 2018 Budget FY 2019 Budget Net % Net $ Beginning Cash (Revenue Fund) $ 2,823,010.00 $ 3,000,000.00 6.27% $ 176,990.00 PFC's & CFC's for

More information

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906 Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement

More information

FIRST QUARTER RESULTS 2017

FIRST QUARTER RESULTS 2017 FIRST QUARTER RESULTS 2017 KEY RESULTS In the 1Q17 Interjet total revenues added $4,421.5 million pesos that represented an increase of 14.8% over the income generated in the 1Q16. In the 1Q17, operating

More information

Huronia/Midland Airport, CYEE

Huronia/Midland Airport, CYEE Huronia/Midland Airport, CYEE HURONIA MUNICIPAL AIRPORT- 2016 TO 2020 1. INTRODUCTION In 2010, The Huronia Municipal Airport Commission (HMAC) developed a five-year business plan to increase activity levels

More information

AIRPORT ADVISORY COMMITTEE AGENDA REGULAR MEETING 401 CALIFORNIA AVENUE, BOULDER CITY NV JULY 17, :00 PM

AIRPORT ADVISORY COMMITTEE AGENDA REGULAR MEETING 401 CALIFORNIA AVENUE, BOULDER CITY NV JULY 17, :00 PM AIRPORT ADVISORY COMMITTEE AGENDA REGULAR MEETING 401 CALIFORNIA AVENUE, BOULDER CITY NV 89005 JULY 17, 2018-6:00 PM ITEMS LISTED ON THE AGENDA MAY BE TAKEN OUT OF ORDER; TWO OR MORE AGENDA ITEMS FOR CONSIDERATION

More information

CARSON CITY AIRPORT HANGAR INSPECTION POLICY

CARSON CITY AIRPORT HANGAR INSPECTION POLICY CARSON CITY AIRPORT HANGAR INSPECTION POLICY The Carson City Airport has never had a hangar inspection and as such, should ensure compliance of CCMC Title 19 by conducting inspections of airport hangars.

More information

SECOND QUARTER RESULTS 2018

SECOND QUARTER RESULTS 2018 SECOND QUARTER RESULTS 2018 KEY RESULTS In the 2Q18 Interjet total revenues added $ 5,781.9 million pesos that represented an increase of 9.6% over the revenue generated in the 2Q17. In the 2Q18, operating

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the

More information

The Corporation of the City of Kawartha Lakes Council Report

The Corporation of the City of Kawartha Lakes Council Report The Corporation of the City of Kawartha Lakes Council Report Report Number ENG2017-008 Date: September 12, 2017 Time: 2:00 p.m. Place: Council Chambers Ward Community Identifier: All Subject: Author Name

More information

South County Airport Master Plan Report. County of Santa Clara San Martin, California

South County Airport Master Plan Report. County of Santa Clara San Martin, California South County Airport Master Plan Report County of Santa Clara San Martin, California July 2006 County of Santa Clara Board of Supervisors Donald F. Gage Blanca Alvarado Peter A. McHugh James T. Beall,

More information

VIRGI ISLA DS PORT AUTHORITY

VIRGI ISLA DS PORT AUTHORITY VIRGI ISLA DS PORT AUTHORITY AVIATIO DIVISIO RATES Effective 10/01/05-1 - AVIATIO RATE SCHEDULE By virtue of authority granted under Title 29, Section 543 (12) of the Virgin Islands Code, the Virgin Islands

More information

COUNTY OF MILWAUKEE ADDENDUM NO. 1 DEPARTMENT OF TRANSPORTATION September 9, 2013 AIRPORT DIVISION

COUNTY OF MILWAUKEE ADDENDUM NO. 1 DEPARTMENT OF TRANSPORTATION September 9, 2013 AIRPORT DIVISION COUNTY OF MILWAUKEE ADDENDUM NO. 1 DEPARTMENT OF TRANSPORTATION September 9, 2013 AIRPORT DIVISION INVITATION TO SUBMIT PROPOSAL FOR THE OPERATION OF A FIXED BASE OPERATOR FACILITY AT GENERAL MITCHELL

More information

AVIATION. MichiganReportCard.com 5

AVIATION. MichiganReportCard.com 5 MichiganReportCard.com 5 GRADE C AVIATION OVERVIEW Michigan s 200+ airports bring $4.3 billion into the economy each year. The state s Tier 1 and Tier 2 airports were evaluated based on six key infrastructure

More information

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline

More information

COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday August 20, 2015

COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday August 20, 2015 COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday August 20, 2015 Minutes of the regular monthly meeting of the Board of Commissioners of the Coos County Airport District held on Thursday, August

More information

ACTION TRANSMITTAL

ACTION TRANSMITTAL Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2018-16 DATE: February 9, 2018 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED

More information

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4 MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #4 December 14, 2017 Today s Agenda o Welcome o Introductions o Progress update o Alternatives analysis

More information

SUNY GENESEO ENVIRONMENTAL HEALTH AND SAFETY

SUNY GENESEO ENVIRONMENTAL HEALTH AND SAFETY Prepared by: Chuck Reyes Page 1 of 6 PURPOSE SUNY Geneseo strives to keep all students, staff and visitors safe while at our campus. To that end, we have summarized requirements for tents and canopies,

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007 JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 27 11242 1 of 14 Sponsor: City of Naples Airport Authority NPIAS No.: 12-53 Sponsor ID: 122 Airport ID: APF Site No.: 3379.*A 11242 Airport Project ID: 1

More information

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1 PHASING PLAN - PHASE 1 2 Weeks PHASE 1 SCOPE OF WORK Phase 1 consists of the reconstruction of a portion of Taxiway 'A' and the crack seal and seal coat of the North Apron. The portion of Taxiway 'A' to

More information

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report April 2016 Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report Prepared for the County of Yolo Mindi Nunes,

More information

BERMUDA DUNES AIRPORT (UDD)

BERMUDA DUNES AIRPORT (UDD) BERMUDA DUNES AIRPORT (UDD) FOR SALE: 105 Acres in Coachella Valley, Southern California More information online at: BERMUDADUNESAIRPORT.ORG AIRPORTPROPERTY.COM (480) 483-1985 John Meyer DESIGNATED BROKER

More information

::f BOA OF AIRPORT COMMISSIONERS REPORT TO THE. -A. A_ A.4k fig

::f BOA OF AIRPORT COMMISSIONERS REPORT TO THE. -A. A_ A.4k fig 3/3/208 2/26/208 Approval NY a NY Y RW JH BOA /...-_ 0...0 00:4.4 Los Angeles World Airports REPORT TO THE OF AIRPORT COMMISSIONERS -A. A_ A.4k._ra. At, Approved y: Dave Jones - Air.n:TPro:-.,. oncession

More information

AIRPORT ADVISORY COMMITTEE AGENDA REGULAR MEETING 401 CALIFORNIA AVENUE, BOULDER CITY NV OCTOBER 2, :00 PM

AIRPORT ADVISORY COMMITTEE AGENDA REGULAR MEETING 401 CALIFORNIA AVENUE, BOULDER CITY NV OCTOBER 2, :00 PM AIRPORT ADVISORY COMMITTEE AGENDA REGULAR MEETING 401 CALIFORNIA AVENUE, BOULDER CITY NV 89005 OCTOBER 2, 2018-6:00 PM ITEMS LISTED ON THE AGENDA MAY BE TAKEN OUT OF ORDER; TWO OR MORE AGENDA ITEMS FOR

More information

RESOLUTION OF THE BOARD OF SUPERVISORS OF ORANGE COUNTY, CALIFORNIA. February 14, 2017

RESOLUTION OF THE BOARD OF SUPERVISORS OF ORANGE COUNTY, CALIFORNIA. February 14, 2017 RESOLUTION OF THE BOARD OF SUPERVISORS OF ORANGE COUNTY, CALIFORNIA February 14, 2017 WHEREAS, the County of Orange ( County ), through the Board of Supervisors ( Board ), is the owner and operator of

More information

Pavement Strength Analysis Prepared by Molzen Corbin September 2016

Pavement Strength Analysis Prepared by Molzen Corbin September 2016 Pavement Strength Analysis Prepared by Molzen Corbin September 2016 The Santa Fe Municipal Airport was originally constructed in 1941. It was constructed by the military as a B-24 bomber training base.

More information

FOURTH QUARTER RESULTS 2017

FOURTH QUARTER RESULTS 2017 FOURTH QUARTER RESULTS 2017 KEY RESULTS In the 4Q17 Interjet total revenues added $5,824.8 million pesos that represented an increase of 10.8% over the revenue generated in the 4Q16. In the 4Q17, operating

More information

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016 Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand

More information

AIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI

AIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI AIRPORT MASTER PLAN FOR charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI Prepared For The City of Kansas City, Missouri By Coffman Associates, Inc. January 2004 "The contents of these documents

More information

Ordinance No Amendments to Airport Ordinance 87-8

Ordinance No Amendments to Airport Ordinance 87-8 SECTION 1. SUMMARY. This Ordinance adds various provisions to uncodified County Ordinance 87-8 ("the Airport Regulations"), amends and renumbers various provisions of the Airport Regulations, and adds

More information

Finance and Implementation

Finance and Implementation 5 Finance and Implementation IMPLEMENTATION The previous chapters have presented discussions and plans for development of the airfield, terminal, and building areas at Sonoma County Airport. This chapter

More information

Grove Field Airport Environmental Assessment

Grove Field Airport Environmental Assessment Grove Field Airport Environmental Assessment Advisory Committee Meeting #2 December 9, 2008 Port of Camas-Washougal Conference Room 6:00 7:30 PM Agenda: Welcome and Overview Dave Ripp, Director, Port of

More information

Annual Airport Finance and Administration Conference Innovative Funding Strategies. March 4, 2013 Destin, Florida Bonnie Deger Ossege

Annual Airport Finance and Administration Conference Innovative Funding Strategies. March 4, 2013 Destin, Florida Bonnie Deger Ossege Annual Airport Finance and Administration Conference Innovative Funding Strategies March 4, 2013 Destin, Florida Bonnie Deger Ossege OVERVIEW Trends- Capital Improvement Programs Determine Your Airport

More information

COUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fees for Fiscal Year 2019 October 1, 2018 through September 30, 2019

COUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fees for Fiscal Year 2019 October 1, 2018 through September 30, 2019 COUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fees for Fiscal Year 2019 October 1, 2018 through September 30, 2019 GROUND & FACILITY LEASE RATES Ground Lease Rate Bare ground for development

More information

Marin County Fire Department. Fire Protection Standard 119. Tents and Awnings

Marin County Fire Department. Fire Protection Standard 119. Tents and Awnings Page: 1 7 Scope: These standards shall apply to any temporary membrane structure, tent, or canopy, in accordance with the California Code Regulations (CCR) Title 19 and California Fire Code (CFC). Temporary

More information

Tents & Membrane Structures Information Packet

Tents & Membrane Structures Information Packet Tents & Membrane Structures Information Packet South Metro Fire Rescue Authority Community Safety Services Division Life Safety Bureau 9195 E. Mineral Ave. Centennial, Colorado 80112 Tel: (720) 989-2230

More information

Q Fast growth continued, Comparable operating result at record high levels Pekka Vauramo

Q Fast growth continued, Comparable operating result at record high levels Pekka Vauramo 2018 Fast growth continued, Comparable operating result at record high levels 17.7.2018 Pekka Vauramo 2 A good - Comparable operating result increased to new seasonal high Revenue Comparable operating

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2015-15 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MARINA AUTHORIZING SUBMISSION OF A GRANT APPLICATION TO THE FEDERAL AVIATION ADMINISTRATION (FAA) FOR PARTICIPATION IN THE 2015 MILITARY

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application July 3, 2018 Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application The City of Kansas City (City), Missouri through its Aviation Department ( the Department

More information

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10 The 747 8 offers operators increased capacity while taking advantage of existing airport infrastructure. 14 aero quarterly qtr_03 10 Operating the 747 8 at Existing Airports Today s major airports are

More information

Page 68-1 rev (7) standards and requirements for aeronautical services and related activities at the airport.

Page 68-1 rev (7) standards and requirements for aeronautical services and related activities at the airport. 68.01 68.11(7) CHAPTER 68 AIRPORT MINIMUM STANDARDS ORDINANCE 68.01 Title. 68.02 Purpose. 68.03 Definitions. 68.04 Administration and Policy Oversight. [68.05-68.10 reserved.] 68.11 Evidence of Qualifications.

More information

A RESOLUTION OF THE BOARD OF DIRECTORS OF THE SANTA MARIA PUBLIC AIRPORT DISTRICT AMENDING RATES AND CHARGES FOR 2017/2018 FISCAL YEAR

A RESOLUTION OF THE BOARD OF DIRECTORS OF THE SANTA MARIA PUBLIC AIRPORT DISTRICT AMENDING RATES AND CHARGES FOR 2017/2018 FISCAL YEAR RESOLUTION NO. 855 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE SANTA MARIA PUBLIC AIRPORT DISTRICT AMENDING RATES AND CHARGES FOR 2017/2018 FISCAL YEAR WHEREAS, by Resolution 855, the Board of Directors

More information

Stafford Regional Airport. Rules and Regulations

Stafford Regional Airport. Rules and Regulations Stafford Regional Airport Rules and Regulations Adopted by the Stafford Regional Airport Authority (SRAA) August 8, 2018 Table of Contents CHAPTER ONE... 3 GENERAL PROVISIONS... 3 INTRODUCTION... 3 PURPOSE...

More information

SECTION 5 AERONAUTICAL ACTIVITIES

SECTION 5 AERONAUTICAL ACTIVITIES 5.01 GENERAL RULES a. COMPLIANCE WITH ORDERS SECTION 5 AERONAUTICAL ACTIVITIES All Aeronautical Activities at the Airport shall be conducted in compliance with all federal, state and local laws, current

More information

JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT

JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT Signatory Airlines Landing Fee: (Net of GAC & SAC = $2.06 / 1,000 lbs) $3.32 / 1,000 lbs. Apron Fees: Square Foot Rate Landed Weight Rate $1.91 / sq. ft. $0.41

More information