APPENDIX 15 EXPECTED ENVIRONMENTAL IMPACTS OF THE MASTER PLAN

Size: px
Start display at page:

Download "APPENDIX 15 EXPECTED ENVIRONMENTAL IMPACTS OF THE MASTER PLAN"

Transcription

1 APPENDIX 15 EXPECTED ENVIRONMENTAL IMPACTS OF THE MASTER PLAN Page 15.1 PHOTOGRAPHS OF THE MISSING LINKS A ENVIRONMENTAL IMPACTS OF MISSING LINK CONSTRUCTION WORKS, INTERSECTION IMPROVEMENT, ROAD IMPROVEMENT AND NON-MOTORIZED TRANSPORTATION TRAFFIC CORRIDORS A IEE FOR THE PROPOSED PROJECTS OF ALTERNATIVE 3 A MAJOR ENVIRONMENTAL IMPACTS OF HIGH PRIORITY PROJECTS A CONTENTS OF RESETTLEMENT ACTION PLAN A15-43

2 15.1 PHOTOGRAPHS OF THE MISSING LINKS Missing Link No.1: At Ngara Road to Nairobi River, the road reserves are occupied by a large number kiosks. Missing Link No.1: At River Road, the road reserves are occupied for cars and garages. A15-1 Appendix

3 Missing Link No.1: At mid point, it goes across heavily occupied Nairobi River side. Missing Link No.1: At mid point, road reserve is heavily occupied. A15-2 Appendix

4 Missing Link No.2: Gardening area the local residence, including Bangladesh's Chancellery, occupy the road reserve. Missing Link No.2: At the exit, local residents cultivate maize in the road reserve. A15-3 Appendix

5 Missing Link No.3: At the bottom the road where a few temporary garages occupy the road reserve. Missing Link No.3: A few kiosks occupy the area near Westland. A15-4 Appendix

6 Missing Link No.4: At the northern end Mpaka Road, a few kiosks occupy the road reserve. Missing Link No.4: At the southern end Mpaka Road, a school occupy the road reserve. Outside the school kiosks also occupy the road. A15-5 Appendix

7 Missing Link No.5: Near Juja Road, a lot kiosks occupy the road reserve. Mission Link No.5: From north to south, large part the road reserve is occupied by kiosks. A15-6 Appendix

8 Missing Link No.6: At Mandera Road, road reserve is not occupied. Missing Link No.6: At the mid point road reserve is not occupied. A15-7 Appendix

9 Missing Link No.7: View from Olenguruone Ave. to Gatundu Road. A few gardening areas occupy the road reserve. Missing Link No.7: From Mwingi Road to Denis Pritt Road - More than 70 units temporary structures are in the road reserve in this section. A15-8 Appendix

10 Missing Link No.7: A few temporary structures occupy at this section Gatundu Road. Missing Link No.7: A few trees have been planted within the road reserve at Lenana Road entrance. A15-9 Appendix

11 Missing Link No.8: At Nyerere Street, road reserve is used as parking area. Slum area developed in the area is not on the road reserve. Missing Link No.8: At the Statehouse Road, road reserve is not occupied. A15-10 Appendix

12 Missing Link No.9: At Denis Prit Road, gardening occupy the road reserve. Missing Link No.9: At mid point, large trees and temporary housing and kiosks occupy the road reserve. A15-11 Appendix

13 Missing Link No.10: A few temporary structures occupy at Enterprise Road entrace. Missing Link No.10: At mid point, a few temporary structures began occupying the road reserve. A15-12 Appendix

14 Missing Link No.11: A large number temporary structures occupy the road reserve. Missing Link No.11: A large number temporary structures occupy the road reserve. A15-13 Appendix

15 Missing Link No.12: At the intersection Southern Bypass, in South Lands Estate, the road reserve ends. The road goes through Kibera's Makina Estate. Missing Link No.12: At the section near Ngong Road, a largenumber kiosks and venders occupy the road reserve. A15-14 Appendix

16 Missing Link No.13: Both sides the road are occupied by kioskes and venders. Missing Link No.13: Northern end the road goes through farming area but road reserve is not occupied. A15-15 Appendix

17 Missing Link 14: No encroachment people in the road reserve. Missing Link 14: No encroachment people in the road reserve (viewed from. the other end). A15-16 Appendix

18 MUTRANS Missing Link No.15: No occupation the road reserve at mid point. Missing Link No.15: Occupation the road reserve with farming during the rainy season at mid point. A15-17 Appendix

19 Missing Link No.15: Occupation the road reserve with gardening and temporary housing units or kiosk. Missing Link No.15: Occupation the road reserve with gardening and temporary kiosk at Peponi Road entrance. A15-18 Appendix

20 Railway Reserve 30 m Missing Link No.15: Encroachment the local residents into the railway reserve near Mbagathi Way. A15-19 Appendix

21 15.2 ENVIRONMENTAL IMPACTS OF MISSING LINK CONSTRUCTION WORKS, INTERSECTION IMPROVEMENT, ROAD IMPROVEMENT AND ON-MOTORIZED TRANSPORTATION TRAFFIC CORRIDORS TABLE (1/2) ENVIRONMENTAL IMPACTS OF MISSING LINK CONSTRUCTION WORKS Type Code Name Road/Junction Agencie Road Length [km] Type Cross Section Type Work Anticipated s - Social Environment Anticipated s - Natural Environment M-1 Missing Link No.1 MoLG 0.65 Single Including grade separation at A There are 250 kiosk/slum units appears to be occupying the road D No significant natural environment is affected other than a few A Kirinyaga Rd. and a bridge across reserve. acacia trees grown in the side the road reserve. (River Rd. to Ngara Rd.) / NCC Nairobi River. M-2 Missing Link No.2 (Ole Odume Rd.-Part) MoLG 0.65 Single Including box culvert at Kirichwa B There are a few gardens constructed in front the gate the D There are 20 tall trees approximately 20 m high in the middle A Kubwa River. residential plots fronting the road reserve. There are also farming road reserve that are no significant part the natural (Muringa Rd. to Argwings Kodhek Rd.) / NCC area on the road reserve. environment. M-3 Missing Link No.3 MoLG 1.00 Single B There are 18 kiosk/slum units including 2 units temporary D There are 17 trees grown in the road reserve. A garages subject to removal. (Riverside Drive to Ring Road Westland / NCC M-4 Missing Link No.4 (Mpaka Rd.) MoLG 0.65 Single Including box culvert across B There are 33 units kiosk/slum units occupying the road reserve D There are 4 trees grown within the sidewalk the road reserve. A canalized stream. from the mid point to the north end. At the south end, school There is no other significant natural environment affected by (Mpaka to First Parkland Av.) / NCC buildings occupy the road reserve. the road construction works. M-5 Missing Link No.5 (Muratina St) MoLG 2.50 Single B There are 130 units kiosk/slum units occupying the road reserve. D There is no significant natural environment affected by the road A construction works. (General Waruingi St to Juja Rd.) / NCC M-6 Missing Link No.6 MoLG 3.00 Single B D A (Oloitoktok Rd. to Ring Road Kileleshwa) / NCC No occupation temporary housing unit is observed. However, a number farming areas occupy the road reserve. At the southern end, there are several residential units and apartment buildings extend their garden onto the road reserve. There are 26 tall trees, 5 12 m high such as Gravilla robusta, Terminalia Mentalis, Acrocarpus fraxinifolius and Acacia sp. There is no significant natural environment affected by the project. M-7 Missing Link No.7 MoLG 3.50 Double Including two bridges across B D A Kirichwa Kubwa River & Kirichwa (Argwings Kodhek Rd. to James Gichuru Rd.) / NCC Dogo River. M-8 Missing Link No.8 (Processional Way) MoLG 1.30 Single (State House Rd. to Keyatta Av.) / NCC Including grade separated junction at Nyerere Rd. & Kenyatta Av. is a possibility There are 95 kiosk/slum units occupying the road reserve throughout the route. Some them are simple fencing for car repairing shops. Others are kiosk and residential purposes. At the mid point to the entrance at James Gichuru Road, gardening area, farming area, and un-occupied grassland occupy the road reserve. Missing Link No.7 crosses with the Missing Link No.6 in the mid point and then goes across Kirichwa Rubwa River. There is an old tree Schinus Molle at the intersection with No.6. There is no significant natural environment is affected. B There are a few farming areas occupying the road reserve. Some D There is no significant natural environment affected the project. A forty five units temporary housing appear to be occupying in the area next to road reserve. M-9 Missing Link No.9 (Milimani Rd.) MoLG 0.65 Single Including improvement storm B There are 36 kiosk/slum units occupying the road reserve. D There are 28 fully grown trees in the road reserve. At the A (Ralph Bunche Rd. to Denis Pritt Rd.) / NCC water drain. eastern end, which is the mid point Milimani Street, 30 m wide and 150 m long forest area is affected by the project. Design completed under KUTIP Double B There are 45 kiosk/slum units occupying the road reserve. D No significant natural environment is affected by the project. A M-10 Missing Link No.10 (Likoni Rd. Extension) MoLG 2.50 Project. (Enterprise Rd. to Mombasa Rd. ) / NCC Includeing grade separation at A Depending on the route the road joining to Langata Road, D There is no significant natural environment affected by the A M-11 Missing Link No.11 (Paw Paw Rd. Extension) MoLG 2.50 Single Langata Rd. and Mbagathi Way Jct. project. (Muhoho Av. to Langata Rd.) are the possibility. the following is noted: * There are 3 permanent houses and a parking lot belonging to an fice building occupying the road reserve if the route takes to north for joining to Langata Road; * If the road takes to west for joining to Langata Road, there / NCC are 4 large fice buildings subject to relocation. * Entering from Paw Paw Road, there are 205 units kiosk/slum units and fenced area for car repairing shops occupying the road reserve M-12 Missing Link No.12 MoLG 4.20 Double Including special junction at Ngong A There are approximately three sections which social D There is no significant natural environment affected by the A (Kung'u Karumba Rd. to Ngong Rd.) / NCC Rd. is a possibility. Crossing over impacts are noted as follows: project. railway & Kibera slum is a * Northern portion the road reserve, at Ngong Road possibility. is usually occupied by street vendors. A few kiosks have been built and they will increase over years; * In the southern portion the Southland Estate, road reserve is occupied partly by gardening the residential buildings and apartment house fronting it. There are also a few patches farming areas; and * It appears that there is no road reserve set out within Kibera slum. It is estimated that there are approximately 380 units kiosk/slum units occupying would-be road area. Anticipated s - Pollution Air pollution and noise will increase due to increased traffic. s Missing Links (Including Public & Non-Motorized Transport Facilities) A15-20 Appendix

22 TABLE (2/2) ENVIRONMENTAL IMPACTS OF MISSING LINK CONSTRUCTION WORKS M-13 Missing Link No.13 MoLG 1.50 Single Including a bridge across Nairobi A There are approximately three sections which the social D There is no significant natural environment is affected by the A (Muthiora Rd. to Hinga Rd.) / NCC River & a box culvert across a impacts are noted as follows: project. seasonal stream. * In the southern half, there are 115 kiosk/slum units occupying the road reserve. * In the mid point, the road reserve appears to go through agricultural area although it is not explicitly demarcated; and * There are 65 permanent households subject to resettlement and 35 kiosk/slum units. M-14 Missing Link No.14 (Convent Drive MoLG 0.50 Single Including a bridge across Nairobi B This is a short section road in the middle residential area D This is a short section road in the middle residential A Extension) River. and there is no temporary housing unit occupy the road reserve. area and there is no temporary housing unit occupy the road (Convent Dr to Kabarsiran Av.) / NCC reserve. M-15a Missing Link No.15a (Ring Rd. Parkland) MoLG 2.30 Double Planned in 1960 Cadastral Plan. A There are 11 kiosk occupy the road reserve. D It passes through Mathare River's right bank, which is A Including special junction at forested for the entire section. (Ring Rd. Parkland to Limuru Rd.) / NCC Limuru Rd. Widening present Ring Road Parklands & Sixth Parklands Av. M-15b M-15c M-15d Missing Link No.15b (Ring Rd. Parkland MoLG 1.60 Double Extension) (Limuru Rd. to Thika Rd.) / NCC Missing Link No.15c (Ring Rd. Parkland Extension) (Ring Rd. Parkland to Limuru Rd. thru Karura Forest) B D A MoLG 1.60 Double A There is no significant social impact on the Missing Link No.15c. A A / NCC Missing Link No.15d (Ring Rd. Parkland MoLG 1.30 Single Extension) (Ring Rd. Parkland to Peponi Rd.) / NCC Agencie Type Code Name Road/Junction Type Work Anticipated s - Social Environment Anticipated s - Natural Environment s Road Length [km] Type Cross Section It appears planned in 1960 Cadastral Plan including special junction at Thika Rd. Proposed by Muthaiga Residents Association including two bridges across small streams. Missing Links (Including Public & Non-Motorized Transport Facilities) Proposed by Nairobi City Convention in 1993 including a bridge or a box culvert across Mathare River. The households holding farming areas on the road reserve loose means food supply to some extent. There are also 16 kiosk/slum units subject to removal. There is 1 temporary housing unit occupying road reserve. Further to the east Peponi Garden Street, there are gardening areas the residential buildings fronting the road reserve subject to demolition. Depending on the design as to which side the existing road reserve should be incorporated into new road design, there are several permanent households subject to demolition. It passes through the existing Ring Roads Parklands and some gardening and fully grown trees are subject to removal. A part it also passes through road reserve being used for farming and gardening the residential buildings fronting the road reserve. It passes through Karura Forest, which is a gazetted forest Kenya. Length the road inside the gazetted Karura Forest is approximately 750m and 400m in the degazetted forest. It passes through a portion forest area, used to be a part Karura Forest but degazetted area at present, joining from Peponi Gardens to Ring Road Parkland is forest area. Approximately 30 m wide road goes through 580 m forest area. B B A M-16 Missing Link No.16 (Quarry Rd. Extension) MoLG 0.85 Double (Landhies Rd. to Quarry Rd.) / NCC Proposed by Nairobi City Convention in Including a bridge across Nairobi River & widening a section present Q Rd NoteA - Significant impact expected; B - Some impact expected; C - unknown; D - Little or no impact (not subject to IEE or EIA) The portion joining from Landhies Rd. to Quarry Rd. involves more than 280 kiosk/slum units and 3 large permanent shelters local market selling hand crafted households goods. A A D The portion joining from Landhies Rd. to Quarry Rd. is on the river bank area, which is now occupied by street vendors and heavily littered. Anticipated s - Pollution Air pollution and noise will increase due to increased traffic A15-21 Appendix

23 TABLE ENVIRONMENTAL IMPACTS OF INTERSECTION IMPROVEMENT Type Code Name Road/Junction Agencies Type Work Anticipated s - Social Environment Anticipated s - Natural Environment JC-1 Waiyaki Way Junction MRPW Grade B Traffic congestion during the construction period should increase. D No significant natural environment is affected. A (Uhuru Highway Corridor-1) / NCC Separation Smooth flow traffic is realized upon completion. JC-2 Museum Hill Junction MRPW Grade C Traffic congestion during the construction period should increase. D Trees in a limited area on both sides the road A (Uhuru Highway Corridor-2) / NCC Separation Smooth flow traffic is realized upon completion. would have to be cut down. JC-3 University Way Junction MRPW Grade C D No significant natural environment is affected. A (Uhuru Highway Corridor-3) / NCC Separation JC-4 Kenyatta Avenue Junction MRPW Grade C D A (Uhuru Highway Corridor-4) / NCC Separation JC-5 Haile Selassie Avenue Junction MRPW Grade C D A (Uhuru Highway Corridor-5) / NCC Separation JC-6 Bunyala Road Junction MRPW Grade C D A (Uhuru Highway Corridor-6) / NCC Separation JC-7 Langata/Lusaka Road Junction MRPW Grade C D A (Uhuru Highway Corridor-7) / NCC Separation Impac Anticipated s - Pollution Air pollution and noise will increase due to increased traffic. Note: JC-8 Likoni Road Extension Junction MRPW Grade C D A (Uhuru Highway Corridor-8) / NCC Separation JC-9 Enterprise Road Junction MRPW C D A (Uhuru Highway Corridor-9) / NCC JC-10 Airport North Road Junction MRPW Grade C D A (Uhuru Highway Corridor-10) / NCC Separation JC-11 Elgeyo Marakwet Junction MRPW C D A (Ngong Road Corridor-1) / NCC JC-12 Ring Road Kilimani Junction MRPW C D A (Ngong Road Corridor-2) / NCC JC-13 Valley Road Junction MRPW Grade C D A (Ngong Road Corridor-3) / NCC Separation JC-14 Kenyatta Avenue Junction MRPW Grade C D A (Ngong Road Corridor-4) / NCC Separation JC-15 Ring Rd Kilimani / Argwings MoLG C Traffic congestion during the construction period should increase. D A Kohdek Rd Junction / NCC In reference to Missing Link No.12, encroachment to the road reserve has to be dealt with stakeholders meeting. Smooth flow traffic is realized upon completion. Major Junctions that Require Attention JC-16 James Gichuru Rd / Gitanga MoLG C Traffic congestion during the construction period should increase. D To a limited extent, road side trees would have A Rd Junction / NCC Smooth flow traffic is realized upon completion. to be felled. JC-17 Riverside Drive / Ring Rd MoLG Grade C D A Kileleshwa Junction / NCC Separation JC-18 Limuru Rd / Forest Rd Junction MRPW Grade C D A No significant natural environment is affected. / NCC Separation JC-19 Muranga Rd / Forest Rd Junction MRPW C D A / NCC JC-20 Thika Rd / Muranga Rd Junction MRPW Grade C D A / NCC Separation JC-21 Thika Rd / Outer Ring Rd Junction MRPW Grade C D A / NCC Separation JC-22 Outer Ring Rd / Juja Rd Junction MRPW C D A / NCC A - Significant impact expected; B - Some impact expected; C - unknown; D - Little or no impact (not subject to IEE or EIA) A15-22 Appendix

24 TABLE (1/3) ENVIRONMENTAL IMPACTS OF ROAD IMPROVEMENT a. Radial Arterials Type Code Name Road/Junction R-1 R-2a R-2b R-3a R-3b R-4 R-5a R-5b R-5c Agencies Road Length [km] Type Cross Section Mombasa Rd MRPW Triple Includes grade separation at B Traffic congestion during the construction period D A No significant natural environment is specific junctions, and separation should increase. Smooth flow traffic is (Fly-Over at JKIA to Lusaka Rd) / NCC affected. transit and local traffic realized upon completion. Langata Rd MRPW 2.00 Double B D A (KWS HQ to Bomas Kenya) / NCC Langata Rd MRPW 7.40 Single B D A (Bomas Kenya to Ngong Rd) / NCC Ngong Rd MRPW 6.60 Double Includes dualling, mass transit B D A route, and separation transit and (Kenyatta Av to Naivasha Rd) / NCC local traffic Ngong Rd MRPW 6.70 Double B D A (Naivasha Rd to Karen Rd) / NCC Uhuru Highway / Chiromo Rd MRPW 5.35 Quadruple Includes grade separated B D A junctions, and separation transit (Lusaka Rd to Waiyaki Way) / NCC and local traffic Forest Rd MRPW 0.90 Double Includes grade separation at Limuru B D A (Museum Hill Rd to Limuru Rd) / NCC Rd junctions. Limuru Rd MRPW Double A D A (Muranga Rd to City Boundary) / NCC Limuru Rd MRPW 1.00 Double A A number estates along the road are affected. D A Smooth flow traffic is realized upon (City Boundary to Kikuyu Rd) completion. Muranga Rd Slip Rd MRPW 0.30 Single B Traffic congestion during the construction period D A should increase. Smooth flow traffic is (Moi Av to Muranga Rd) / NCC realized upon completion. Muranga Rd MRPW 2.70 Double Includes 4 No. Bridges (across B D A Canalized Stream, Mathare River, (Limuru Rd to Thika Rd) / NCC Gitathuru River, and Karura Thika Rd MRPW Triple B D A (Muranga Rd to Kenyatta University) / NCC Park Rd MRPW 1.00 Double B D A (Ngara Rd to Muranga Rd) / NCC Juja Rd MRPW 5.40 Double B D A (Muranga Rd to Outer Ring Rd) / NCC Juja Rd Extension MRPW 4.20 Double B D A (Outer Ring Rd to Komarock Rd) / NCC Jogoo Rd Extension MRPW 6.60 Double B D A (Outer Ring Rd to Komarock Rd) / NCC R-10 Ring Road Ngara MRPW - - Widening /Public and NMT B D A (Racecourse Rd to Thika Road) / NCC A - Significant impact expected; B - Some impact expected; C - unknown; D - Little or no impact (not subject to IEE or EIA) Anticipated s - Pollution Air pollution and noise will increase due to increased traffic. Road that Require Improvements (Widening and/or grade separation incorporating Public & Non-Motorized Transport Facilities) Radial Arterials R-6a R-6b R-6d R-7a R-7b R-7c R-8b Type Work Anticipated s - Social Environment Anticipated s - Natural Environment Note: A15-23 Appendix

25 TABLE (2/3) ENVIRONMENTAL IMPACTS OF ROAD IMPROVEMENT b. Circumferential Arterials Type Note: Code Name Road/Junction C-2a C-2b C-2c C-2d C-2e C-2f C-2g C-2h C-3a C-3b C-4a C-4b C-4c C-4d C-4e C-4f C-4g C-4h C-5 Agencies Road Length [km] Type Cross Section Type Work Museum Hill Rd MRPW 0.40 Double B Traffic congestion during the construction period No significant natural environment is A (Uhuru Highway to Forest Rd) / NCC should increase. Smooth flow traffic is affected. Ngara Rd MRPW 1.90 Double B D A (Forest Rd to Park Rd) / NCC Quarry Rd MRPW 1.20 Double B D A (Park Rd to Pumwani Rd) / NCC Quarry Rd Extension MRPW 0.80 Double B D A (Pumwani Rd to Landhies Rd) / NCC Lusaka Rd MRPW 1.30 Double B D A (Enterprise Rd to Mombasa Rd) / NCC Woodlands Rd Extension MRPW 0.70 Double B D A (Mbagathi Rd to Argwings Kodhek Rd) / NCC Woodlands Rd MRPW 1.00 Double B D A (Argwings Kodhek Rd to Denis Pritt Rd) / NCC Woodlands Rd / Museum Hill Rd Link MRPW 2.20 Double B D A (Denis Pritt Rd to Uhuru Highway) / NCC Ring Road Parkland Extension MRPW 1.15 Double B D A (Thika Rd to First Av Eastleigh) / NCC First Av Eastleigh & Likoni Rd Link MRPW 0.80 Double B D A (First Av Eastleigh to Likoni Rd) / NCC Outer Ring Rd MRPW 2.20 Double B D A (Airport South Rd to Airport North Rd) / NCC Outer Ring Rd MRPW Double Includes grade separation at Jogoo B D A (Airport North Rd to Thika Rd) / NCC Rd junctions, and separation Outer Ring Rd Extension MRPW 3.35 Double B D A (Thika Rd to Kiambu Rd) / NCC Ruaka Rd MRPW 5.00 Double B D A (Kiambu Rd to Limuru Rd) / NCC Ruaka Rd Extension MRPW 1.70 Double B D A (Limuru Rd to Red Hill Rd) / NCC Bypass Link Rd MRPW 4.30 Double B D A (Red Hill Rd to Wiayaki Way) / NCC James Gichuru Rd MRPW 4.20 Double B D A (Waiyaki Way to Gitanga Rd) / NCC Kingara Rd MRPW 1.00 Double B D A (Gitanga Rd to Ngong Rd) / NCC Kamiti Rd MRPW 8.00 Single B D A (Thika Rd to Koma Rock Rd) / NCC A - Significant impact expected; B - Some impact expected; C - unknown; D - Little or no impact (not subject to IEE or EIA) Anticipated s - Social Environment Anticipated s - Natural Environment Anticipated s - Pollution Air pollution and noise will increase due to increased traffic. Roads that Require Improvements Roads that Require Improvements Circum ferential Arterials Circum ferential Arterials A15-24 Appendix

26 TABLE (3/3) ENVIRONMENTAL IMPACTS OF ROAD IMPROVEMENT c. Minor Arterials Type Code Name Road/Junction Agencies Enterprise Rd MRPW 0.60 Double B Traffic congestion during the construction period D No significant natural environment is A (Commercial St to Lusaka Rd) / NCC should increase. Smooth flow traffic is affected. Enterprise Rd MRPW 4.50 Double B D A (Isiolo Rd to Mombasa Rd) / NCC Magadi Rd MRPW Single B D A (Bomas Kenya to Ngong Circular Rd East) Naivasha Rd MRPW 6.90 Double B D A (Ngong Rd to Waiyaki Way) / NCC Lower Kabete Rd MRPW Single B D A (Ring Rd Westlands to Kikuyu Rd) / NCC Kiambu Rd MRPW 5.60 Single B D A (Thika Rd to City Boundary) / NCC Kiambu Rd MRPW 5.00 Single B D A (City Boundary to Kiamu Town) Kamiti Rd MRPW 5.30 Single B D A (Thika Rd to City Boundary) / NCC Kamiti Rd MRPW 2.60 Single B D A (City Boundary to Kiu Valley Rd) Racecouse Rd / Gen Waruingi St MRPW 2.20 Double B D A (Ring Rd Ngara to Eastleigh Second Av) / NCC Nairobi River Rd (Dandora Rd Extension) MRPW 5.70 Double B D A (Racecourse Rd to Outer Ring Rd) / NCC Dandora Rd MRPW 5.20 Double B D A (Outer Ring Rd to Koma Rock Rd) / NCC A - Significant impact expected; B - Some impact expected; C - unknown; D - Little or no impact (not subject to IEE or EIA) M inor Arterials R oads tha t R equire Im p r ovem e nts Note: S-1a S-1b S-2 S-3 S-4 S-5a S-5b S-6a S-6b S-7 S-8a S-8b Road Length [km] Type Cross Section Type Work Anticipated s - Social Environment Anticipated s - Natural Environment Anticipated s - Pollution Air pollution and noise will increase due to increased traffic. A15-25 Appendix

27 15.3 IEE FOR THE PROPOSED PROJECTS OF ALTERNATIVE 3 TABLE 15.3 (1/6) IEE FOR THE PROPOSED PROJECTS OF ALTERNATIVE 3 Type Code 1. Bypass and Link Roads Description(Road / Junction Name and Section) Rd.Length [km] Type Cross Section Type Work 1.1 Bypass Roads (B) B-1 Southern Bypass (on-going) lane 4-lane Construction with NMT A A A Social Environment Description The detailed design works are on-going including EIA study subject to implementation within the package contract. Natural Environment Pollution Description The detailed design works are on-going including EIA study. Fauna and Flora may be impacted by projects. Description The detailed design works are on-going including EIA study. Air pollution and noise will increase due to increased traffic. B-2 Northern Bypass lane 4-lane Construction with NMT A A A It goes through tea and other types agricultural estates that would involve a number resettlement. The detailed design works are on-going including EIA study. Fauna and Flora may be impacted by projects. B-3 Eastern Bypass lane 4-lane Construction with NMT B C B Most road reserve, which goes through cattle rearing area, has been largely obtained. Specific natural impacts are subject to further study. Natural forests remaining among agricultural estates are affected. Specific natural impacts are subject to further study. 1.2 Link Roads (LR) L-1a Bypass Link Road lane 4-lane Construction with NMT Portions the road are subject to land acquisition and the local farming C B A Specific natural impacts are subject to further study. Air pollution and noise will increase due to increased traffic. (Northern Bypass to Waiyaki Way) 4- Bridge Construction areas are affected. L-1b Bypass Link Road lane Widening with NMT (2 to 4 lanes) Several portions the road required land acquisition as the road C B B (James Gichuru: Wiayki Way to Ngong Rd) widening works are carried out. L-2a Outer Ring Road lane Widening with NMT (2 to 4 lanes) Traffic congestion during the construction period should increase. Smooth C A B (Airport South Rd to Airport North Rd) flow traffic is realized upon completion. L-2b Outer Ring Road lane Widening with NMT (2 to 4 lanes) C A A (Airport North Rd to Thika Rd) 1.3 Link Road Extensions (LE) L-1c Bypass Link Road Extension lane 4-lane Construction with NMT Land acquisition on various portions the road would involved C A A (Ngong Rd to Langata Rd) A Bridge Construction resettlement. L-2c Bypass Link Road Extension lane 4-lane Construction with NMT Land acquisition on various portions the road would involved C A A (Outer Ring Rd to Northern Bypass) A Bridge Construction resettlement. 2. Missing Links (Including Public & Non-Motorized Transport Facilities) 2.1 Arterial Roads (MA) M-1 Missing Link No lane 2-lane Construction with NMT A D A There are 250 kiosk/slum units appears to be occupying the road reserve. No significant natural environment is affected. (River Rd to Ngara Rd) M-3 Missing Link No lane 2-lane Construction with NMT There are 18 kiosk/slum units including 2 units temporary garages D A B (River Side Drive to Ring Rd Westlands) subject to removal. M-6 Missing Link No lane 4-lane Construction with NMT D A B There are a number farming and gardening areas subject to removal. (Oloitokitok Rd to Ring Rd Kileleshwa) M-7 Missing Link No lane 4-lane Construction with NMT D A (Argwings Kodhek Rd to James Gichuru Rd) M-10 Missing Link No.10 (Likoni Rd Extension) lane 4-lane Construction with NMT D A (Kung'u Karumba Rd to Ngong Rd) M-15a Missing Link No.15a (Ring Rd Parkland) lane 4-lane Construction with NMT D A (Landhies Rd to Quarry Rd) A Bridge Construction 2.2 Collector Roads (MC) M-5 Missing Link No.5 (Muratina St) lane 2-lane Construction with NMT D A (Ralph Bunche Rd to Denis Pritt Rd) M-14 Missing Link No.14 (Convent Drive Extension) lane 2-lane Construction with NMT D A (Convent Dr to Kabarsiran Av) M-15d Missing Link No.15d (Ring Rd Parkland Ext.) lane 2-lane Construction with NMT B A (Ring Rd Parkland to Peponi Rd) A Bridge Construction 3. Roads that Require Improvements (Widening and/or Grade Separation incorporating Public & Non-Motorized Transport Facilities) Approximately 30 m wide road goes through 580 m forest area. 3.1 Radial Arterials 1) Radial Arterials Inside C3 (RC) R-1a Uhuru Highway lane Widening with NMT (6 to 8 lanes) B Traffic congestion during the construction period should increase.smooth D A No significant natural environment is affected. (Haile Selassie Av to Lusaka / Langata Rd) Included in Uhuru Highway Widening flow traffic is realized upon completion. B B There are 45 kiosk/slum units occupying the road reserve. (Enterprise Rd to Mombasa Rd ) M-12 Missing Link No lane 4-lane Construction with NMT D A A A There are 11 kiosk occupy the road reserve. (Ring Rd Westlands to Limuru Rd) M-15b Missing Link No.15b (Ring Rd Parkland Ext.) lane 4-lane Construction with NMT D A B There are 16 kiosk/slum units and farming areas subject to removal. (Limuru Rd to Thika Rd) M-16 Missing Link No.16 (Quarry Rd Extension) lane 4-lane Construction with NMT D A A B There are 130 units kiosk/slum units occupying the road reserve. (General Waruingi St to Juja Rd) M-11 Missing Link No.11 (Paw Paw Rd Extension) lane 2-lane Construction with NMT There are 205 kiosk/slum units, 6 permanent houses, and 3 ficeblocks D A A (Muhoho Av to Langata Rd) subject to resettlement. M-13 Missing Link No lane 2-lane Construction with NMT There are 150 kiosks/slum units and 65 permanent houses subject to D A A (Muthiora Rd to Hinga Rd) resettlement. M-15c Missing Link No.15c (Ring Rd Parkland Ext.) lane 2-lane Construction with NMT There is no significant social impact on the Missing Link No.15c while A It passes through Karura Forest, which is a gazetted forest A B (Ring Rd Parkland to Limuru Rd thru Karura Forest) 400m Continuous Bridge Construction stakeholder meeting should be held. Kenya. 2.3 Local Roads (ML) M-2 Missing Link No.2 (Ole Odume Rd-Part) lane 2-lane Construction with NMT There are a few gardens constructed in front the gate the residential D A A No significant natural environment is affected. (Muringa Rd to Argwings Kodhek Rd) plots fronting the road reserve. M-4 Missing Link No.4 (Mpaka Rd) lane 2-lane Construction with NMT Traffic congestion during the construction period should increase. Smooth D A B (Mpaka to First Parkland Av) flow traffic is realized upon completion. M-8 Missing Link No.8 (Processional Way) lane 2-lane Construction with NMT D A B (State House Rd to Kenyatta Av) M-9 Missing Link No.9 (Milimani Rd) lane 2-lane Construction with NMT D A B B B A number factory and fice buildings as well as local houses would become subject to resttlement. There are 95 kiosk/slum units occupying the road reserve. There are also a number gardening and farming areas. There area 380 kiosk/slum units occupying the planned alignment the road. There area more than 280 kiosk/slum units and 3 large permanent shelters local market subject to resettlement. Air pollution and noise will increase due to increased traffic. R-1b Mombasa Rd lane Widening with NMT (4 to 6 lanes) B D A ( Lusaka / Langata Rd to Likoni Rd Ext.:C3) R-2a Langata Rd lane Widening with NMT ( to 6 lanes) B D A (Mbagati Rd to C3) R-3a Ngong Rd lane Widening with NMT (2 to 4 lanes) B D A (Kenyatta Av to C3) A15-26 Appendix

28 TABLE 15.3 (2/6) IEE FOR THE PROPOSED PROJECTS OF ALTERNATIVE 3 Type Code Description(Road / Junction Name and Section) R-4a Uhuru Highway lane Widening with NMT (6 to 8lanes) B D A (University Way:C1 to Museum Hill Rd:C2) R-4b Chiromo Road lane Widening with NMT (6 to 8lanes) B D A (Museum Hill Rd:C2 to Ring Rd Westlands:C3) Bridge Widening (6 to 8 lanes) R-6a Muranga Rd w/ Slip Rd lane 2-lane Construction B D A (Moi Av:C1 to Ngara Rd:C2) A Bridge Construction R-6b Muranga Rd lane Widening with NMT (2 to 4 lanes) B D A (Ngara Rd:C2 to Forest Rd) R-6c Muranga Rd lane Widening with NMT (4 to 6 lanes) B D A (Forest Rd to Muthaiga Rd) R-7a Park Rd lane Widening with NMT (2 to 4 lanes) B D A (Ngara Rd to Muranga Rd) R-7b Juja Rd lane Widening with NMT (2 to 4 lanes) B D A (Muranga Rd to Muratina Rd:C3) R-8a Jogoo Rd West Extension lane Widening with NMT (2 to 4 lanes) B D A (Enterprise Rd to Lusaka Rd) 2) Radial Arterials Outside C3-South & West (RS) R-1c Mombasa Rd lane Widening with NMT (4 to 6 lanes) B D A (Likoni Rd Ext.:C3 to Fly-Over at JKIA) R-2b Langata Rd lane Widening with NMT (2 to 4 lanes) B D A (C3 to Magadi Rd) R-2c Langata Rd lane Widening with NMT (2 to 4 lanes) B D A (Magadi Rd to Ngong Rd) R-2d Dagorettie Rd lane Widening with NMT (2 to 4 lanes) B D A (Ngong Rd to Kikuyu Rd) R-3b Ngong Rd lane Widening with NMT (2 to 4 lanes) B D A (C3 to Naivahsa Rd) R-3c Ngong Rd lane Widening with NMT (2 to 4 lanes) B D A (Naivasha Rd to Langata / Dagorettie Rd) R-3d Ngong Rd lane Widening with NMT (2 to 4 lanes) B D A (Langata / Dagorettie Rd to Ngong Town) R-4b Wiayaki Way lane Widening with NMT (4 to 6lanes) B D A (Ring Rd Westlands:C3 to James Gichuru Rd:L1) R-4c Wiayaki Way lane Widening with NMT (4 to 6lanes) B D A (James Gichuru Rd:L1 to Naivasha Rd) R-5a Forest Rd lane Widening with NMT (4 to 6 lanes) B D A (Museum Hill Rd to Limuru Rd) R-5b Limuru Rd lane Widening with NMT (2 to 4 lanes) B A A (Muranga Rd to City Boundary) R-5c Limuru Rd lane Widening with NMT (2 to 4 lanes) B D A (City Boundary to Kikuyu Rd:C63) Rd.Length [km] Type Cross Section Type Work R-6c Thika Rd lane Widening with NMT (4 to 6 lanes) B D A (Muranga Rd to Kenyatta University) R-7c Juja Rd lane Widening with NMT (2 to 4 lanes) B D A (Muratina Rd:C3 to Outer Ring Rd) R-7d Komarock Rd lane Widening with NMT (2 to 4 lanes) B D A (Outer Ring Rd to Dandora Estate) R-7e Komarock Rd lane New Construction (4-lane) B D A (Dandora Estate to Dandora Rd) R-7f Komarock Rd lane Widening with NMT (2 to 4 lanes) B D A (Dandora Rd to Eastern Bypass) R-8b Jogoo Rd Extension lane New Construction (4-lane) B D A (Jogoo Rd to Umoja Estate) R-8c Jogoo Rd Extension lane Widening with NMT (2 to 4 lanes) B D A (Umoja Estate to Komarock Rd) 4) Proposed New Radial Roads (RP) S-8a Nairobi River Road lane New Construction (4-lane) A A large number kiosk/slum units are subject to relocation. D A (Museum Hill Rd to Muranga Rd) S-8b Nairobi River Road lane New Construction (4-lane) A D A (Muranga Rd to Ring Rd Pumwani Rd) S-8c Nairobi River Road lane New Construction (4-lane) A D A (Ring Rd Pumwani to Dandora Rd) S-1a Enterprise Rd Extension lane New Construction (2-lane) B D A (Nairobi Station to Commercial St) 0.6 Bridge Railway Over Bridge (2-lanes) 3.2 Circumferential Arterials Social Environment Natural Environment Pollution Description Significant number permanent houses and kiosk/slum units are subject to resettlement or relocation. Traffic congestion during the construction period should increase. Smooth flow traffic is realized upon completion. 1) Circumferential Arterials C1 & C2 (C2) C-1a Uhuru Highway lane Widening with NMT (6 to 8lanes) B D A (University Way to Haile Selassie Av) Included in Uhuru Highway Widening C-2a Museum Hill Rd lane Widening with NMT (2 to 4 lanes) B D A (Uhuru Highway to Forest Rd) C-2b Ngara Rd lane Widening with NMT (2 to 4 lanes) B D A (Forest Rd to Park Rd) C-2c Quarry Rd lane Widening with NMT (2 to 4 lanes) B D A (Park Rd to Pumwani Rd) C-2e Lusaka Rd lane Widening with NMT (2 to 4 lanes) B D A (Enterprise Rd to Mombasa Rd) Description A portion Karura Forest is affected. No significant natural environment is affected. No significant natural environment is affected. Description Air pollution and noise will increase due to increased traffic. A15-27 Appendix

29 TABLE 15.3 (3/6) IEE FOR THE PROPOSED PROJECTS OF ALTERNATIVE 3 Type Code Description(Road / Junction Name and Section) C-2f Woodlands Rd Extension lane Widening with NMT (2 to 4 lanes) B D A (Mbagathi Rd to Argwings Kodhek Rd) C-2g Woodlands Rd lane Widening with NMT (2 to 4 lanes) B D A (Argwings Kodhek Rd to Denis Pritt Rd) C-2h Woodlands Rd / Museum Hill Rd Link lane Widening with NMT (2 to 4 lanes) B D A (Denis Pritt Rd to Uhuru Highway) lane Construction with NMT 2) Circumferential Arterials C3 (C3) C-3a Ring Road Westlands lane Widening with NMT (2 to 4 lanes) B D A (Ring Rd Kileleshwa to Ring Rd Parklands) C-3b Ring Road Parkland Extension lane 4-lane Construction with NMT B D A (Thika Rd to Juja Rd) A Bridge Construction C-3c Muratina Street lane Widening with NMT (2 to 4 lanes) B D A (Juja Rd to General Waruingi St) C-3d Muinami Street & Extension lane 4-lane Construction with NMT B D A (General Waruingi St to Likoni Rd) A Bridge Construction 3.3 Secondary Arterial Roads 1) South-West (S-S) S-1b Enterprise Rd lane Widening with NMT (2 to 4 lanes) B D A (Commercial St to Lusaka Rd) S-1c Enterprise Rd lane Widening with NMT (2 to 4 lanes) B D A (Isiolo Rd to Mombasa Rd) S-2 Magadi Rd lane Widening with NMT (2 to 4 lanes) B D A (Langata Rd to Ngong Circular Rd East) S-3 Naivasha Rd lane Widening with NMT (2 to 4 lanes) B D A (Ngong Rd to Waiyaki Way) S-4 Lower Kabete Rd lane Widening with NMT (2 to 4 lanes) B D A (Ring Rd Westlands to Kikuyu Rd) 2) North-East (SAN) S-5a Kiambu Rd lane Widening with NMT (2 to 4 lanes) B C A Specific natural impacts are subject to further study. (Thika Rd to City Boundary) S-5b Kiambu Rd lane Widening with NMT (2 to 4 lanes) B C A (City Boundary to Kiambu Town) S-6a Kamiti Rd lane Widening with NMT (2 to 4 lanes) B C A (Thika Rd to City Boundary) S-6b Kamiti Rd lane Widening with NMT (2 to 4 lanes) B C A (City Boundary to Kiu Valley Rd) S-7 Racecourse Rd / Gen Waruingi St lane Widening with NMT (2 to 4 lanes) B C A (Ring Rd Ngara to Eastleigh Second Av) S-8d Dandora Rd lane Widening with NMT (2 to 4 lanes) B C A (Outer Ring Rd to Koma Rock Rd) 4. Signalisation for Intersection Improvement (SG) Rd.Length [km] Type Cross Section Type Work Social Environment Natural Environment Pollution 4.1 A102/A104 SG-1 Likoni Road Extension (Southern Bypass) (0.5) Grade Separation (On-going) B D C No significant natural environment is affected. (Uhuru Highway Corridor-8) Northern Corridor Transport Project SG-2 Enterprise Road Junction (0.25) Improvement (On-going) B D C (Uhuru Highway Corridor-9) Northern Corridor Transport Project SG-3 Airport North Road (Eastern Bypass) Junction (0.5) Grade Separation (On-going) B D C (Uhuru Highway Corridor-10) Northern Corridor Transport Project SG-4 James Gichuru Road Junction (0.25) Improvement B D C (Uhuru Highway Corridor-11) 4.2 Forest Road/Thika Road SG-5 Forest Rd / Ngara Rd Junction (0.1) Improvement B D C (Thika Road Corridor-1) SG-6 Forest Rd / Limuru Rd Junction (0.1) Improvement B D C (Thika Road Corridor-2) SG-7 Forest Rd / Muranga Rd Junction (0.1) Improvement B D C (Thika Road Corridor-3) SG-8 Muranga Rd / Thika Rd Junction (0.1) Improvement B D C (Thika Road Corridor-4) SG-9 Thika Rd / Outer Ring Rd Junction (0.1) Improvement B D C (Thika Road Corridor-5) 4.3 Ngong Road/Valley Road SG-10 Kenyatta Avenue Junction (0.1) Improvement B D C (Ngong Rd / Valley Rd Corridor-1) SG-11 Haile Selassie Avenue Junction (0.1) Improvement B D C (Ngong Rd / Valley Rd Corridor-2) SG-12 Valley Road Junction (0.1) Improvement B D C (Ngong Rd / Valley Rd Corridor-3) SG-13 Ring Road Kilimani Junction (0.1) Improvement B D C (Ngong Rd / Valley Rd Corridor-4) SG-14 Elgeyo Marakwet Road Junction (0.1) Improvement B D C (Ngong Rd / Valley Rd Corridor-5) SG-15 Dagorettie Corner Junction (0.1) Improvement B D C (Ngong Rd / Valley Rd Corridor-6) SG-16 Valley Rd / Argwings Kodhek Rd Junction (0.1) Improvement B D C (Ngong Rd / Valley Rd Corridor-7) Description Traffic congestion during the construction period should increase. Smooth flow traffic is realized upon completion. Description Description Air pollution and noise discharge are subject to futher study. A15-28 Appendix

30 TABLE 15.3 (4/6) IEE FOR THE PROPOSED PROJECTS OF ALTERNATIVE 3 Type Code Description(Road / Junction Name and Section) Rd.Length [km] Type Cross Section Type Work Social Environment Natural Environment Pollution SG-17 Argwings Kodhek Rd / Woodlands Rd Junction (0.1) Improvement B D C (Ngong Rd / Valley Rd Corridor-8) 4.4 Muranga Road/Juja Road SG-18 Globe Cinema Junction (0.1) Improvement B D C (Muranga Rd / Juja Rd Corridor-1) SG-19 Muranga Rd / Limuru Rd Junction (0.1) Improvement B D C (Muranga Rd / Juja Rd Corridor-2) SG-20 Muranga Rd / Park Rd Junction (0.1) Improvement B D C (Muranga Rd / Juja Rd Corridor-3) SG-21 Ring Rd Ngara / Juja Rd Junction (0.1) Improvement B D C (Muranga Rd / Juja Rd Corridor-4) SG-22 Outer Ring Rd / Juja Rd Junction (0.1) Improvement B D C (Muranga Rd / Juja Rd Corridor-5) 4.5 Lusaka Road/Jogoo Road/Outer Ring Road SG-23 Lusaka Rd / Dunga Rd Junction (0.1) Improvement B D C (Lusaka Rd / Jogoo Rd Corridor-1) SG-24 Lusaka Rd / Enterprise Rd Junction (0.1) Improvement B D C (Lusaka Rd / Jogoo Rd Corridor-2) SG-25 Lusaka Rd / Jogoo Rd Junction (0.1) Improvement B D C (Lusaka Rd / Jogoo Rd Corridor-3) SG-26 Jogoo Rd / First Av Eastleigh Junction (0.1) Improvement B D C (Lusaka Rd / Jogoo Rd Corridor-4) SG-27 Jogoo Rd / Likoni Rd Junction (0.1) Improvement B D C (Lusaka Rd / Jogoo Rd Corridor-5) SG-28 Jogoo Rd / Outer Ring Rd Junction (0.1) Improvement B D C (Lusaka Rd / Jogoo Rd Corridor-6) SG-29 Outer Ring Rd / Airport North Rd Junction (0.1) Improvement B D C (Lusaka Rd / Jogoo Rd Corridor-7) 4.6 River Rd/Racecourse Rd SG-30 Haile Selassie Av / Racecourse Rd Junction (0.1) Improvement B Traffic congestion during the construction period should increase. Smooth D C No significant natural environment is affected. (River Rd / Racecourse Road Corridor-1) flow traffic is realized upon completion. SG-31 Haile Selassie Av / Landhies Rd Junction (0.1) Improvement B D C (River Rd / Racecourse Road Corridor-2) SG-32 Racecourse Rd / Ring Rd Pumwani Junction (0.1) Improvement B D C (River Rd / Racecourse Road Corridor-3) SG-33 River Rd / Tom Mboya St Junction (0.1) Improvement B D C (River Rd / Racecourse Road Corridor-4) 4.7 Kenyatta Avenue/Moi Avenue/University Way SG-34 Kenyatta Av / Koinange St Junction (0.1) Improvement B D C (CBD-1) SG-35 Kenyatta Av / Muindi Mbingu St Junction (0.1) Improvement B D C (CBD-2) SG-36 Kenyatta Av / Wabera St Junction (0.1) Improvement B D C (CBD-3) SG-37 Kenyatta Av / Kimathi St Junction (0.1) Improvement B D C (CBD-4) SG-38 Kenyatta Av / Moi Av Junction (0.1) Improvement B D C (CBD-5) SG-39 Kenyatta Av / Tom Mboya St Junction (0.1) Improvement B D C (CBD-6) SG-40 Moi Av / Accra Rd Junction (0.1) Improvement B D C (CBD-7) SG-41 Moi Av / Ronald Ngala St Junction (0.1) Improvement B D C (CBD-8) SG-42 Moi Av / Halambee Av Junction (0.1) Improvement B D C (CBD-9) SG-43 Moi Av / Haile Selassie Av Junction (0.1) Improvement B D C (CBD-10) SG-44 University Way / Koinange St Junction (0.1) Improvement B D C (CBD-11) SG-45 University Way / Muindi Mbingu St Junction (0.1) Improvement B D C (CBD-12) 4.8 Others SG-46 Riverside Dr / Ring Rd Kileleshwa Junction 0.1 Improvement B D C Description Description Description Air pollution and noise discharge are subject to futher study. SG-47 Lower Kabete Rd / Ring Rd Westlands Junction (0.1) Improvement B D C SG-48 Limuru Rd / Muthaiga Rd Junction (0.1) Improvement B D C 5. Major Non-Motorized Transport Corridors (Foot Path and Bicycle Lanes) 5.1 NMT - South & West (NMT-S) NMT-1 Ngong Rd 0.0 B D D 5-m Footpath and Bicycle Lane, Drainage No significant natural environment is affected. Traffic congestion during the construction period should increase. Smooth flow traffic is realized upon completion. Air pollution and noise will be be no change (Lenana School to Naivasha Rd) NMT-2 Kikuyu Rd m Footpath and Bicycle Lane, Drainage B D D (Waithaka Shopping Centre to Naivasha Rd) NMT-3 Naivasha Rd m Footpath and Bicycle Lane, Drainage B D D (Kawangware to Ngong Rd) A15-29 Appendix

31 TABLE 15.3 (5/6) IEE FOR THE PROPOSED PROJECTS OF ALTERNATIVE 3 Type Code Description(Road / Junction Name and Section) Rd.Length [km] Type Cross Section Type Work Social Environment Natural Environment Pollution NMT-4 Kingara Rd m Footpath and Bicycle Lane, Drainage B D D (Ngong Rd to Gitanga Rd) NMT-5 James Gichuru Rd m Footpath and Bicycle Lane, Drainage B D D (Gitanga Rd to Waiyaki Way) NMT-6 Gitanga Rd m Footpath and Bicycle Lane, Drainage B D D (Kawangare to Ole Odume Rd) NMT-7a Argwings Kodhek Rd m Footpath and Bicycle Lane, Drainage B D D (Kingara Rd to Valley Rd) NMT-7b Argwings Kodhek Rd Extension m Footpath and Bicycle Lane, Drainage B D D (Valley Rd to Ralph Bunche Rd) NMT-8 Denis Pritt Road Corridor m Footpath and Bicycle Lane, Drainage B D D (Oloitokitok Rd to Kenyatta Av) NMT-9 Mbagathi Way Corridor m Footpath and Bicycle Lane, Drainage B D D (Ngong Rd to Langata Rd) NMT-10 Valley Rd m Footpath and Bicycle Lane, Drainage B D D (Ngong Rd to Uhuru Highway) NMT-11 Waiyaki Way Corridor m Footpath and Bicycle Lane, Drainage B D D (Uthiru to Limuru Rd) 5.2 NMT - North & East (NMT-N) NMT-12 Kiambu Rd m Footpath and Bicycle Lane, Drainage B Athough traffic congestion during the construction period should increase C Specific natural impacts are subject to further study. A Air pollution and noise will increase due to increased traffic. (Thika Rd to City Boundary) smooth flow NMT is realized upon completion. NMT-13 First Avenue Eastleigh Corridor m Footpath and Bicycle Lane, Drainage B C A (Juja Rd to Industrial Area) NMT-14 Heshima Avenue Corridor m Footpath and Bicycle Lane, Drainage B C A (Outer Ring Rd to First Avenue Eastleigh) NMT-15 Mumias Road Corridor m Footpath and Bicycle Lane, Drainage B C A (Kariobangi to Industrial Area) NMT-16 Rabal Road Corridor m Footpath and Bicycle Lane, Drainage B C A (Mumias Rd Corridor to Industrial Area) NMT-17 Jogoo Rd m Footpath and Bicycle Lane, Drainage B C A (Outer Ring Rd to Lusaka Rd) NMT-18 Lusaka Road Corridor m Footpath and Bicycle Lane, Drainage B C A (Country Bus Station to Industrial Area) 6. Uhuru Highway Improvement 6.1 Widening (UW) U-1 Uhuru Highway Improvement lane Widening with NMT (8 to 12 lanes) B C A (Museum Hill Rd to Lusaka Rd) Bridge/Intersection improvement (8 to 12 lanes) 6.2 Grade Separation / Improvement (UGS) GIS-1 Ring Road Westlands Junction (0.5) Grade Separation B C A (Uhuru Highway Corridor-1) GIS-2 Museum Hill Road Junction (0.5) Grade Separation B C A (Uhuru Highway Corridor-2) GIS-3 University Way Junction (0.5) Grade Separation B C A (Uhuru Highway Corridor-3) GIS-4 Kenyatta Avenue Junction (0.5) Grade Separation B C A (Uhuru Highway Corridor-4) GIS-5 Haile Selassie Avenue Junction (0.5) Grade Separation B C A (Uhuru Highway Corridor-5) GIS-6 Bunyala Road Junction (0.5) Grade Separation B C A (Uhuru Highway Corridor-6) GIS-7 Langata / Lusaka Road Junction (0.5) Grade Separation B C A (Uhuru Highway Corridor-7) 7. Public Transport Description Description Description BI 1. Bus Incentive Policy C Specific social impacts are subject to further study. D No significant natural environment is affected. D Significant pollutants are not discharged. BP 2. Bus Priority BL 2.1 Bus Lane - - 1) Bus Lane C D D BW 2.2 Bus Way - - 2) Bus Way C D D Relocation a large number kiosks/slum units are currently PU-4 3. Upgrading Existing Rail A D D undertaken by Kenya Railways. PU-5 4. LRT C Specific social impacts are subject to further study. D D 8. Traffic Management TC 1. Traffic Circulation in City Centre C D D OP 2. Street Parking C D D EN 3. Enforcement C D D PE 4. Public Education D No significant social impact is expected. D D 9. Traffic Institutions TI-1 1. Human Resource Capacity Building D D D TI-2 2. Institute Development D D D A15-30 Appendix

32 TABLE 15.3 (6/6) IEE FOR THE PROPOSED PROJECTS OF ALTERNATIVE 3 Type Code 10. Expressway Description(Road / Junction Name and Section) Rd.Length [km] Type Cross Section E-1 Uhuru Highway 5 4-lane 4-lane flyover C Specific social impacts are subject to further study. C A Specific natural impacts are subject to further study. (Stage 1) lane Construction Air pollution and noise will increase due to increased traffic. E-2 C-2 route 12 4-lane 4-lane flyover C C A (Stage 2) lane Construction E-3 C-3 route 25 4-lane 4-lane flyover C C A (Stage 3) lane Construction Legend: A - Significant impact expected; B - Some impact expected; C - unknown; D - Little or no impact (not subject to IEE or EIA) Type Work Social Environment Natural Environment Description Description Pollution Description A15-31 Appendix

33 15.4 MAJOR ENVIRONMENTAL IMPACTS OF HIGH PRIORITY PROJECTS Chiromo Road Section 1 Road side occupied by kiosks at Section 1 Existing Road Encroachment Road Reserve (No. Units) 1) (Width: m) (Width: m) Section 1 30m - 63 units Section 2-30m Gardening and 12 units Section 3 15m - 30m - Gardening and trees (148 pcs.) Total 75 Units Note: 1) Kiosks are the major encroachment. They are temporary structures for vending groceries, daily necessities, etc. placed on the road side. Its licence is subject to renewal every year for Ks. 4,000/unit. Section 2 Riverside Road Section 3 Arboretum Drive Migori Road Mandera Road Ring Road Kileleshwa Missing Link No.6 Githunguri Road Legend Existing Road Planned Road Section 2: Gardening area encroached into road reserve FIGURE a MAJOR ENVIRONMENTAL IMPACTS OF MISSING LINK NO.3 A15-32 Appendix

34 Migori Road Mandera Road Section 1 Githunguri Road Road reserve is not heavily occupied Section 2 Kieni Road Mazeras Road Section 3 Missing Link No.7 Several kiosks put up on daily license basis Section 4 Existing Road Road Reserve Encroachment (Width: m) (Width: m) (No. Units) 1) Section 1-30m Farming and 1 Unit Section 2-30m 15 units Legend Section 3-30m Gardening Existing Road Section 4 15m - 3 units + Gardening Planned Road Total 19 Units + Gardening Note: 1) Kiosks are the major encroachment. They are temporary structures for vending groceries, daily necessities, etc. placed on the road side. Its licence is subject to renewal every year for Ks. 4,000/unit. FIGURE b MAJOR ENVIRONMENTAL IMPACTS OF MISSING LINK NO.6 A15-33 Appendix

35 James Gichuru Road Section 1 Section 2 Olenguruone Av. Section 3 At Section 8, road side is occupied by kiosks Section 4 Gatundu Road Existing Road (Width: m) Road Reserve (Width: m) Encroachment (No. Units) 3) Section m - - Section 2-30m Gardening only Section 3-30m Gardening only Section 4-30m 7 Section 5-30m 87 Section 6-30m 31 Section 7-30m 26 Section 8 30m 1) Vendors 2) Denis Pritt Road Total Vendors Note: 1) Existing "Ring Road Kilimani" is paved a half the width road reserve. 2) Vendors without kiosk's structure. 3) Kiosks are the major encroachment. They are temporary structures for vending groceries, daily necessities, etc. placed on the road side. Its licence Argwings Kodhek Road is subject to renewal every year for Ks. 4,000/unit. Section 7 Section 6 Section 5 Section 8 Ngong Road At Section 5, road side is occupied by kiosks Legend Existing Road Planned Road FIGURE c MAJOR ENVIRONMENTAL IMPACTS OF MISSING LINK NO.7 A15-34 Appendix

36 Chiromo Road Section A1-2 Section A1-1 Forest Road Ngara Road Existing Road (Width: m) Road Reserve (Width: m) Resettlement and Env. s Section A m - - Section A m - Section A Units 1) Section A1-0 Section A1-3 15m - 48 trees 2) Section A1-3 Section A1-4 6m 3) - 38 trees 2) Section A1-4 Section A Garden area 4) Section A State House 5) At Section A1-2, two story apartment comprex could be subject to resettlement. Section A1-5 Uhuru Highway Section A1-7 6m 6) - - Section A1-8 10m - - Section A1-9 10m - - Section A m 7) - - Total 2 Units+86 trees Section A1-6 State House Compound Section A2-1 Note: 1) Two story apartment complex are subject to demolition. 2) Relatively large size trees should be felled. 3) A road leading to a private house without paving. 4) A private house's garden is subject to acquisition. 5) State House's garden is bisected. 6) Private house's garden area is subject to acquisition as the road is widened. 7) One-third the with is paved. Denis Pritt d Section A1-7 Section A1-8 Section A2-4 Section A2-3 Section A2-2 Section A3-2 Section A3-1 Milimani Road At Section A2-3, road reserve is occupied by permanent and semi-permanent structures Existing Road (Width: m) Road Reserve (Width: m) Resettlement and Env. s Section A2-1 15m - - Section A m - - Section A units 1) Section A m - Section A Army Compound Total 24 units Note: 1) Road Reserve appears to be existing with 24 semi-permanent units and 1 permanent unit are subject to demolition. 2) The section is inside Army Compound. Section A1-9 Section A2-5 Valley Road Section A3-3 Existing Road (Width: m) Road Reserve (Width: m) Resettlement and Env. s Section A3-1 15m - - Section A3-2 15m - - Section A3-3 30m 1) - - Total - Note: 1) A half the road is paved. Section A1-10 Argwings Kodhek Road Legend Existing Road Planned Road FIGURE a MAJOR ENVIRONMENTAL IMPACTS OF C-2 RING ROAD (STATE HOUSE AREA) A15-35 Appendix

37 Woodland Road Valley Road Argwings Kodhek Road Section 1 Ngong Road A number permanent structures are subject to relocation Existing Road (Width: m) Road Reserve (Width: m) Resettlement and Env. s Section units 1) Mbagathi Way Total 27 units Note: 1) Several large apartment complex, houses and a church building is subject to relocation. Legend Existing Road Planned Road FIGURE b MAJOR ENVIRONMENTAL IMPACTS OF C-2 RING ROAD (NGONG ROAD AREA) A15-36 Appendix

38 Quarry Road Digo Road BONDENI Nairobi River Section 1 Landhies Road Kamukunji A large number kiosks and market shelters are subject to relocation Factory Street Jogoo Road Existing Road (Width: m) Road Reserve (Width: m) Resettlement and Env. s Section units 1) Total 280 units Note: 1) The portion joining from Landhies Rd. to Quarry Rd. involves more than 280 temporary housing units and 3 large permanent shelters local market selling hand crafted households goods. Legend Existing Road Planned Road APPENDIX c MAJOR ENVIRONMENTAL IMPACTS OF C-2 RING ROAD (KAMUKUNJI-BONDENI AREA) A15-37 Appendix

39 Existing Road (Width: m) Road Reserve (Width: m) Section Resettlement and Env. s 16 Slum Units + Wooded Area 1) Section Permenanet units Section 3-30m 11 Kiosk/Slum Units + Farming Section 4 15m - Gardening Areas At Section 4, road side is occupied by gardening areas At Section 3, road reserve is occupied by farming areas Total 27 Kiosk/Slum Units + Others Note: 1) Western part City Park along Mathre River 2) Farming areas appears to be significant areas the local residents. 3) Temporary units include kiosks and residential units. Section 3 Section 2 Section 4 Section 1 Limuru Road Muranga Road Gen. Mathenge Drive Section 2 goes through a portion the permenent houses and fice buildings Section 1 goes through wooded portion the City Park along Mathare River FIGURE a MAJOR ENVIRONMENTAL IMPACTS OF C-3 RING ROAD (CITY PARK AREA) A15-38 Appendix

40 Section 1 Mathare River Section 2 Muranga Road Juja Road Section 2 goes through the area on the western edge Mathare Slum Section 3 Gen. Warungi Street First Avenue Eastleigh Section 4 Section 5 Section 5 goes through a portion government housing area Section 4 goes through a portion slum housing area Jogoo Road Existing Road (Width: m) Road Reserve (Width: m) Section Permanet House + Garden Section 2-30m 113 Slum units 1) Section 3-30m 130 Kiosks Section Slum units Section Likoni Road Resettlement and Env. s 8 Permanent + 12 Slum units 363 slum units + Total 8 permanent units Note: 1) Slum units are built mainly for residential purpose but kiosks are included. FIGURE b MAJOR ENVIRONMENTAL IMPACTS OF C-3 RING ROAD (PANGANI-SHAURI MOYO AREA) A15-39 Appendix

41 Enterprise Road Likoni Road Section 1 Uhuru Highway Existing Road (Width: m) Road Reserve (Width: m) Encroachment (No. Units) Section 1-30m 45 units Total 45 units Note: 1) This is Missing Link No.10. There are a mixture kiosks and residential units. FIGURE c MAJOR ENVIRONMENTAL IMPACTS OF C-3 RING ROAD (NAIROBI SOUTH AREA) A15-40 Appendix

42 Ngong Road Section 1 Section 2 Section 3 Railway Section 3 goes through Kibera Slum Motoine River Section 4 Southern Bypass Road Existing Road (Width: m) Road Reserve (Width: m) Resettlement and Env. s Section 1-30m 8 Kiosks and a large number vendors Section 2 30m - - Section 1 goes through a road reserve occupied by kiosks and a large number vendors Section 3-30m 380 Slum Units Section 4 60m - Gardening and Farming areas Total 388 Kiosk/Slum Units and others Note: 1) Slum units are built mainly for residential purpose including kiosks. FIGURE d MAJOR ENVIRONMENTAL IMPACTS OF C-3 RING ROAD (KIBERA AREA) A15-41 Appendix

43 Existing Road (Width: m) Road Reserve (Width: m) Encroachment (No. Units) 1) Section 1 15m - - Section 2 30m - 47 units 2) Section 3 15m - - Section m - Variation 3) Section 5 45m - 25 units 4) Section 6 45m - 29 units 5) Section 7 45m - 9 units 6) Section 8 45m - 6 units 7) Total 116 units and others Note: 1) Since the road reserve on both side the road is very wide, these kiosks and vendors may not be considered as encroachment. 2) A mixture shoe-shine, clothing and food vendors as as few kiosks for lottery, etc. 3) A gardening area a petrol station, farming plots and wooded walkway occupies the road side. 4) Six kiosks, one souvenir shop and 18 street vendors occupy the road side. 5) Twelve kiosks, 11 street vendors two used car dealers and a gardening/entrance area apartment complex occupy the road side. 6) Eight plant vendors and a furniture shop occupy the the road side. 7) Six plant vendors occupy the road side. At Section 5, a number used car dealers occupy the road side At Section 6, street vendors concentrate on the road side near Elgeyo Marakwet Road Valley Road Section 2 Section 1 Section 3 Section 4 Section 5 Kingar Section 6 Haile Selassie Ave. Section 7 Section 8 Mbagathi Way Ring Road Kilimani Makindi Road Elgeyo Marakuwet Road Legend Existing Road Planned Section At Section 8, plant vendor occupies the road reserve At Section 2, farming plot occupies the road reserve FIGURE MAJOR ENVIRONMENTAL IMPACTS OF NGONG ROAD IMPROVEMENT PROJECT A15-42 Appendix

DECONGESTION OF ROADS IN NAIROBI

DECONGESTION OF ROADS IN NAIROBI DECONGESTION OF ROADS IN NAIROBI PRESENTED DURING THE REGIONAL WORKSHOP ON PROMOTING SUSTAINABLE TRANSPORT SOLUTIONS HELD ON 7 TH AUGUST, 2012 UNEP HEADQUARTERS NAIROBI By: ENG. M. M. NJONGE KENYA URBAN

More information

UPGRADING OF NAIROBI URBAN ROAD NETWORK

UPGRADING OF NAIROBI URBAN ROAD NETWORK 1 UPGRADING OF NAIROBI URBAN ROAD NETWORK Presented by: Eng. S. M. Kinoti Ag. DG -KURA Meeting at NAIROBI CLUB ON 8 TH FEBRUARY, 2017 2 OUTLINE 1.INTRODUCTION 2.NAIROBI PLANS (ROADS COMPONENT) 3.UPPERHILL

More information

KENYA S NEWEST COMMUNITY.

KENYA S NEWEST COMMUNITY. KENYA S NEWEST COMMUNITY www.tilisi.co.ke 3 Introducing Tilisi - where aspirations become reality Set within 397 acres of the beautiful sprawling greenery of Limuru, Tilisi is Kenya s newest community

More information

KRA OFFICES BUILDING ROAD POSTAL ADDRESS

KRA OFFICES BUILDING ROAD POSTAL ADDRESS ISO 9001:2008 CERTIFIED DOMESTIC TAXES DEPARTMENT (DTD) OFFICES KRA OFFICES BUILDING ROAD POSTAL ADDRESS TELEPHONE HEADQUARTERS Times Tower Haile Selassie 48240-00100 254-20-2 810 000 Building Avenue CONTACT

More information

Retail, Offices, Entertainment & Lifestyle Centre

Retail, Offices, Entertainment & Lifestyle Centre Retail, Offices, Entertainment & Lifestyle Centre Location Windsor Golf & Country Club Ruaka Town Red Hill Road Nyari Runda Estate Village Market NORTHERN BYPASS Muthaiga/ Gigiri Area UN Compound US Embassy

More information

DOMESTIC TAXES DEPARTMENT (DTD) OFFICES DIRECTORY

DOMESTIC TAXES DEPARTMENT (DTD) OFFICES DIRECTORY DOMESTIC TAXES DEPARTMENT (DTD) OFFICES DIRECTORY KRA OFFICES BUILDING ROAD POSTAL ADDRESS TELEPHONE HEADQUARTERS Times Tower Building Haile Selassie Avenue 48240-00100 +254 20 281 0000 CONTACT CENTRE

More information

PARATRANSIT OPERATIONS IN NAIROBI: Development of their Routes and Termini

PARATRANSIT OPERATIONS IN NAIROBI: Development of their Routes and Termini PARATRANSIT OPERATIONS IN NAIROBI: Development of their Routes and Termini PRESTON CHITERE, DOROTHY MCCORMICK*, RISPER ORERO**, WINNIE MITULLAH*** and MARILYN OMMEH**** Institute for Development Studies,

More information

1 ABC TOTAL SERVICE STATION TOTAL KENYA LTD 2 AHERO TOTAL SERVICE STATION TOTAL KENYA LTD 3 ARCADE TOTAL SERVICE STATION EBENANGI ENT.

1 ABC TOTAL SERVICE STATION TOTAL KENYA LTD 2 AHERO TOTAL SERVICE STATION TOTAL KENYA LTD 3 ARCADE TOTAL SERVICE STATION EBENANGI ENT. 1 ABC TOTAL SERVICE STATION TOTAL KENYA LTD 2 AHERO TOTAL SERVICE STATION TOTAL KENYA LTD 3 ARCADE TOTAL SERVICE STATION EBENANGI ENT. LTD 4 ARGWINGS TOTAL SERVICE STATION ARGWINGS TOTAL LIMITED 5 BAABAX

More information

Nairobi Hospitality Report 2017, & Cytonn Monthly November 2017

Nairobi Hospitality Report 2017, & Cytonn Monthly November 2017 Nairobi Hospitality Report 2017, & Cytonn Monthly November 2017 Focus of the Week In October 2016, we released Kenya s-hospitality-sector-report dubbed Sailing Through The Storm. According to the report,

More information

MEDICAL PROVIDERS LIST NAIROBI COUNTY

MEDICAL PROVIDERS LIST NAIROBI COUNTY MEDICAL PROVIDERS LIST NAIROBI COUNTY www.jubileeinsurance.com NAME OF PROVIDER PHYSICAL ADDRESS TELEPHONE SERVICES WORKING HOURS NAIROBI CBD Mater - Town Branch Karen Meridian Medical Centre- Nation Centre

More information

PREPARATORY SURVEY FOR INTEGRATED SOLID WASTE MANAGEMENT IN NAIROBI CITY IN THE REPUBLIC OF KENYA FINAL REPORT VOLUME 4 DATA BOOK SECTION I

PREPARATORY SURVEY FOR INTEGRATED SOLID WASTE MANAGEMENT IN NAIROBI CITY IN THE REPUBLIC OF KENYA FINAL REPORT VOLUME 4 DATA BOOK SECTION I PREPARATORY SURVEY FOR INTEGRATED SOLID WASTE MANAGEMENT IN NAIROBI CITY IN THE REPUBLIC OF KENYA FINAL REPORT VOLUME 4 DATA BOOK SECTION I HAZARDOUS WASTE MANAGEMENT TABLE OF CONTENTS 1. Medical Facilities

More information

NOTIFICATION OF COMPLETION OF PREQUALIFICATION EXERCISE

NOTIFICATION OF COMPLETION OF PREQUALIFICATION EXERCISE To all Applicants, NOTIFICATION OF COMPLETION OF PREQUALIFICATION EXERCISE TENDER REF No: ERC/PROC/4/4/11-12/190 - PREQUALIFICATION OF SUPPLIERS FOR GOODS, WORKS AND SERVICES FOR THE YEAR 2012/13 2013/14

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

5.7 Local road upgrades

5.7 Local road upgrades 5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

JICA s Activities. TICAD VI Side Event, JICA Seminar Series. Access and Location. JICA Country Offices in Africa Offices in 31 countries.

JICA s Activities. TICAD VI Side Event, JICA Seminar Series. Access and Location. JICA Country Offices in Africa Offices in 31 countries. TICAD VI Side Event, JICA Seminar Series JICA s Activities Japan International Cooperation Agency (JICA) assists and supports developing countries as the executing agency of Japanese Official Development

More information

Town Select the Dealer Region AA Pipeline rd ENLIGHT COMMUNICATION LIMITED Nairobi Balozi East Zone Distributors Nairobi Banana KAUTHUR ELECTRONICS

Town Select the Dealer Region AA Pipeline rd ENLIGHT COMMUNICATION LIMITED Nairobi Balozi East Zone Distributors Nairobi Banana KAUTHUR ELECTRONICS AA Pipeline rd ENLIGHT COMMUNICATION LIMITED Nairobi Balozi East Zone Distributors Nairobi Banana KAUTHUR ELECTRONICS LIMITED Nairobi Buruburu COMMUNICATION POINT LIMITED Nairobi Buruburu IDEAL FONE LIMITED

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

Threats to possible orbital light-rail in outer London from the current Brent Cross planning application...

Threats to possible orbital light-rail in outer London from the current Brent Cross planning application... Threats to possible orbital light-rail in outer London from the current Brent Cross planning application... (We need safeguarding in place, for better times!) Map from Transport 2025 document. Boris photo:

More information

REPUBLIC OF KENYA THE PROJECT ON DETAILED PLANNING OF INTEGRATED TRANSPORT SYSTEM AND LOOP LINE IN THE NAIROBI URBAN CORE FINAL REPORT

REPUBLIC OF KENYA THE PROJECT ON DETAILED PLANNING OF INTEGRATED TRANSPORT SYSTEM AND LOOP LINE IN THE NAIROBI URBAN CORE FINAL REPORT Republic of Kenya Nairobi City County Government REPUBLIC OF KENYA THE PROJECT ON DETAILED PLANNING OF INTEGRATED TRANSPORT SYSTEM AND LOOP LINE IN THE NAIROBI URBAN CORE FINAL REPORT MAY 2018 JAPAN INTERNATIONAL

More information

Appendix 6 Fulbourn Greenway Review

Appendix 6 Fulbourn Greenway Review Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

Vasona Light Rail Signal Design Challenges. Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority

Vasona Light Rail Signal Design Challenges. Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority Vasona Light Rail Signal Design Challenges Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority Abstract The Vasona line is the most recent extension of

More information

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017 DRAFT 11.08.17 4801 24TH AVE NE URBAN DESIGN MERIT PRESENTATION 17-002 DPD#3027312 16 NOVEMBER 2017 PROJECT BACKGROUND URBAN DESIGN ANALYSIS VACATION / NO-VACATION COMPARISON URBAN DESIGN MERIT INTRODUCTION

More information

Hospital Link Project Project Update Winter 2018

Hospital Link Project Project Update Winter 2018 Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open

More information

Main Line System Recommendations

Main Line System Recommendations (Existing) Main Line System Recommendations This system recommendation focuses mobility investment in a central main line corridor proximate to I-290. A bus rapid transit (BRT) line at each end of the

More information

PUBLIC INFORMATION SESSION #2

PUBLIC INFORMATION SESSION #2 Highway 16, Highway 779 to Kapasiwin Road, Planning Study PUBLIC INFORMATION SESSION #2 Wednesday June 20, 2012 4 to 8 pm HIGHWAY 16 Highway 779 to Kapasiwin Road Functional Planning Study Blueberry Community

More information

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how

More information

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route February 2015 Valley ine-stage 1 RT EISA Update FINA REPORT Page A1 Memorandum AECOM ConnectEd Transit Partnership 10235

More information

A number of goals were identified during the initial work on this Big Lake Transportation Plan.

A number of goals were identified during the initial work on this Big Lake Transportation Plan. C. Transportation General Background Information Big Lake s transportation system includes all the roads, paths and facilities that allow the movement of private vehicles, trains and planes, as well as

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

Alternatives Study of Alignment

Alternatives Study of Alignment Project: 4-lanning of Barhi Rajauli Section of NH-31 Sheet: 1 of 6 Alternatives Study of Alignment 1 Objectives The following objectives were kept in view while locating the alternative bypass alignments:

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than

More information

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local CHAPTER 10 TRANSPORTATION Introduction The system of public roads in East Pikeland Township is decidedly rural in character. Since the 1984, the road network has remained much the same, with the addition

More information

Site Location and Setting

Site Location and Setting Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and

More information

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS NORTH CENTRAL CAC AREA LITTLE VALLEY ROAD TO JUG HANDLE CREEK PLANNING AREA This planning area includes Cleone, Noyo,

More information

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION Abstract The vision for the East Coast Greenway is an off-road urban trail system running from Calais, Maine

More information

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1 ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City

More information

Building the transportation network we need for the future in Niagara Region

Building the transportation network we need for the future in Niagara Region Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006

More information

Appendix H: North Corridor Alternatives Through Western University - July 2017

Appendix H: North Corridor Alternatives Through Western University - July 2017 Appendix H: North Corridor Alternatives Through Western University - July 2017 1 Overview The North corridor to Masonville Place from Downtown was examined with respect to three possible routings: 1. Utilizing

More information

001 Town Centre Arterials

001 Town Centre Arterials MASTERPLAN 001 Town Centre Arterials Page 1 MASTERPLAN Town Centre Arterials Long List Options Summary Option 1: Status Quo Do Nothing Option 2: Do-Minimum Travel Demand Management Option 3: Arterial Relief

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

US 380 FEASIBILITY STUDY

US 380 FEASIBILITY STUDY US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15

More information

SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER

SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER Proposal to Eliminate Traffic Gridlock in South North York Centre Area With Southbound Yonge Street to Eastbound Highway 401 Fly-UNDER A much

More information

Transportation Supporting Dulles Airport

Transportation Supporting Dulles Airport Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements

More information

Trails, steps, & P-Patch to be south of I- 5 Colonnade

Trails, steps, & P-Patch to be south of I- 5 Colonnade UW Campus Trails, steps, & P-Patch to be south of I- 5 Colonnade Blaine and Howe Street steps REI N new lighting existing features connector trail new features or improvements overhead freeway and support

More information

MHASIBU TWINMOUNT ESTATE, NYERI. Tel: , Cell:

MHASIBU TWINMOUNT ESTATE, NYERI. Tel: , Cell: MHASIBU TWINMOUNT ESTATE, NYERI Tel: 020 3524242, 020 2228221 Cell: 0714 461 852 Email: info@micl.co.ke Website: www.micl.co.ke Introduction Mhasibu Twinmount Estate is a controlled development estate

More information

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings

More information

Appendix 8 Sawston Greenway Review

Appendix 8 Sawston Greenway Review Appendix 8 Sawston Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016 Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty

More information

Northern Rail Extension, Phase One

Northern Rail Extension, Phase One General Project and Funding 1. Where does Phase One start? The rail line for Phase One begins roughly at the northern boundary of the former Bradbury property, but also includes work along Tom Bear Trail

More information

Hospital Link Project Project Update September 2015

Hospital Link Project Project Update September 2015 Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service

More information

2.0 POLICY AND DEVELOPMENT FRAMEWORK. Introduction. Transport21. Celbridge Development Plan 2002

2.0 POLICY AND DEVELOPMENT FRAMEWORK. Introduction. Transport21. Celbridge Development Plan 2002 2.0 POLICY AND DEVELOPMENT FRAMEWORK Introduction 2.1 This section of the report highlights the key elements of both Transport21, and the Celbridge Development Plan 2002, both of which include a number

More information

EXPLANATORY STATEMENT

EXPLANATORY STATEMENT THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

PLANNING THE SUNBURY GROWTH CORRIDOR

PLANNING THE SUNBURY GROWTH CORRIDOR SUNBURY GROWTH CORRIDOR NOVEMBER 2016 PLANNING THE SUNBURY GROWTH CORRIDOR Sunbury Planning Background The Victorian Planning Authority, in consultation with Hume City Council, is undertaking a number

More information

Cammachmore. Community Action Plan Prepared by Newtonhill, Muchalls & Cammachmore Community Council

Cammachmore. Community Action Plan Prepared by Newtonhill, Muchalls & Cammachmore Community Council Cammachmore Community Action Plan 2012 Prepared by Newtonhill, Muchalls & Cammachmore Community Council Map of Cammachmore obtained from Google maps Introduction In March 2012 Newtonhill, Muchalls & Cammachmore

More information

26 APPLICATION FOR APPROVAL TO EXPROPRIATE WIDENING AND RECONSTRUCTION OF ST. JOHN'S SIDEROAD PROJECT 97100, TOWN OF AURORA

26 APPLICATION FOR APPROVAL TO EXPROPRIATE WIDENING AND RECONSTRUCTION OF ST. JOHN'S SIDEROAD PROJECT 97100, TOWN OF AURORA Clause No. 26 in Report No. 12 of the was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on June 26, 2014. 26 APPLICATION FOR APPROVAL TO EXPROPRIATE

More information

Context. Ivanhoe Estate at Macquarie Park. Ivanhoe Estate. Epping Boys High School. Macquarie University Sport & Aquatic Centre.

Context. Ivanhoe Estate at Macquarie Park. Ivanhoe Estate. Epping Boys High School. Macquarie University Sport & Aquatic Centre. Context Epping Boys High School Sport & Aquatic Centre M2 Motorway Macquarie University Hospital Station Priority Precinct Macquarie Shopping Centre Train Station Ch Waterloo oad ild ca re Cottonwood Park

More information

places Mooloolaba s heart five

places Mooloolaba s heart five five places the mooloolaba heart 1 Flexible community event use of school oval 2 Enhanced streetscape District cycle route Future cross-block pedestrian link 5 Existing school buildings New signalised

More information

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013 FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144

More information

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A.

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A. Project: Cambourne to Cambridge Better Bus Journeys To: CCC Subject: Considerations for Corridor Option Plans From: Atkins Date: 1 Sep 2016 cc: 1. Introduction This note summarises considerations undertaken

More information

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging Chapter four Route selection and staging Gold Coast Rapid Transit Chapter four Route selection and staging Chapter content Route selection...73 Section one: Helensvale to Griffith University...74 Section

More information

PROPOSED ALTERATION AND EXPANSION OF THE MOUNT PEARL MUNICIPAL BOUNDARY TO INCLUDE THE AREA OF THE FORMER PEARL ESTATE LANDS & ENVIRONS

PROPOSED ALTERATION AND EXPANSION OF THE MOUNT PEARL MUNICIPAL BOUNDARY TO INCLUDE THE AREA OF THE FORMER PEARL ESTATE LANDS & ENVIRONS PROPOSED ALTERATION AND EXPANSION OF THE MOUNT PEARL MUNICIPAL BOUNDARY TO INCLUDE THE AREA OF THE FORMER PEARL ESTATE LANDS & ENVIRONS JANUARY 4, 2007 INTRODUCTION In accordance with Sections 3 to 6 inclusive

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway

More information

Public Open House. Chief Peguis Trail Project

Public Open House. Chief Peguis Trail Project Public Open House Chief Peguis Trail Project CHIEF PEGUIS TRAIL OPEN HOUSE Welcome! Please browse the display boards Project Engineers and City of Winnipeg representatives are available to address your

More information

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010 CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF

More information

Appendix 4.8 A. Agency Correspondence and Final APE Statement

Appendix 4.8 A. Agency Correspondence and Final APE Statement Appendix 4.8 A Agency Correspondence and Final APE Statement Area of Potential Effect for Cultural Resources Introduction The South Coast Rail project requires review by the Army Corps of Engineers (Corps),

More information

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London Chapter 6 Route Window NE5 Seven Kings station Transport SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated

More information

The Concept of Tourism Area Plans By Ruth, K.K. (2015)

The Concept of Tourism Area Plans By Ruth, K.K. (2015) The Concept of Tourism Area Plans By Ruth, K.K. (2015) Tourism plays a significant role in the economy In 1963,the country turned to tourism as an alternative Through government efforts and inputs from

More information

Centurion Way Chichester

Centurion Way Chichester Centurion Way Chichester Work book of plans to show details of the Centurion Way, its links, and potential developments and enhancements from linking to the South Downs National Park all the way to the

More information

M56. New Junction 11a Summary of the consultation report

M56. New Junction 11a Summary of the consultation report M56 New Junction 11a Summary of the consultation report August 2017 M56 New Junction 11a Summary of the public consultation The scheme The M56 New Junction 11a scheme is part of our continued programme

More information

Building the transportation network we need for the future in Niagara Region

Building the transportation network we need for the future in Niagara Region Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006

More information

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts MILE END PARK AND ELEANOR STREET SHAFTS 14 Route Window C12 Mile End Park and Eleanor Street shafts Introduction 14.1 Crossrail s twin

More information

Electric System Serving Pierce County Current system and future investments

Electric System Serving Pierce County Current system and future investments Electric System Serving Pierce County Current system and future investments Janet Olsen Project Manager Steve Botts Real Estate / Rights-of-Way April 13, 2011 Presentation overview Information requested

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS. Policy Session Worksheet

CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS. Policy Session Worksheet CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS Policy Session Worksheet Presentation Date: 10/10/17 Approx. Start Time: 1:30 PM Approx. Length: 60 minutes Presentation Title: An Update on the Sunrise Highway

More information

JOINT PBN AND GNSS TASK FORCE MEETING Nairobi, Kenya 8-10 September 2009 AGENDA. Adoption of the agenda and election of chairperson

JOINT PBN AND GNSS TASK FORCE MEETING Nairobi, Kenya 8-10 September 2009 AGENDA. Adoption of the agenda and election of chairperson Attachment A JOINT PBN AND GNSS TASK FORCE MEETING Nairobi, Kenya 8-10 September 2009 AGENDA Agenda Item 1: Agenda Item 2: Agenda Item 3: Agenda Item 4: Agenda Item 5: Agenda Item 6 : Agenda Item 7: Agenda

More information

PennDOT Interstate Work next week March 30-April 3:

PennDOT Interstate Work next week March 30-April 3: PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)

More information

TRANSPORT AND COMMUNICATION

TRANSPORT AND COMMUNICATION NAME SCHOOL INDEX NUMBER DATE TRANSPORT AND COMMUNICATION 1. 1993 Q 3(b-d) b) Apart from transportation, list four economic uses of rivers in Africa. c) Explain five factors that have hindered the development

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

Lawrence Loop SWOT Analysis

Lawrence Loop SWOT Analysis Alignment: D1 (Map Color: Dark Blue) Description: This alignment connects to the north end of the Burroughs Creek Trail and continues along the west side of the Railroad to 8 th Street. Strengths: - This

More information

Building the transportation network we need for the future in Niagara Region

Building the transportation network we need for the future in Niagara Region Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

CHAPTER 3.0 PROJECT DESCRIPTION

CHAPTER 3.0 PROJECT DESCRIPTION Pacific Coast Highway/Del Prado Avenue Phase I Street Improvement Project Chapter 3.0 Project Description CHAPTER 3.0 PROJECT DESCRIPTION 3.1 Project Location Regional Location The City of Dana Point is

More information

31 st ANNUAL SEMINAR DATE: 19 th - 22 nd MAY, 2015 VENUE: - SAROVA WHITESANDS BEACH RESORT AND SPA - MOMBASA THEME: Towards making Kenya a regional

31 st ANNUAL SEMINAR DATE: 19 th - 22 nd MAY, 2015 VENUE: - SAROVA WHITESANDS BEACH RESORT AND SPA - MOMBASA THEME: Towards making Kenya a regional 31 st ANNUAL SEMINAR DATE: 19 th - 22 nd MAY, 2015 VENUE: - SAROVA WHITESANDS BEACH RESORT AND SPA - MOMBASA THEME: Towards making Kenya a regional investment hub 1 WHO WE ARE Tourism Fund is a body corporate

More information

Port Everglades Master/Vision Plan Update

Port Everglades Master/Vision Plan Update Port Everglades Master/Vision Plan Update Environmental Stakeholder Meeting June 15, 2009 Discussion to Focus On: Updating the 2006 Port Everglades Master Plan Issues dealing with the Turning Notch Potential

More information

KENYA RESEARCH MARKET UPDATE - 1ST HALF 2018 HIGHLIGHTS. Sanlam Tower, Westlands, Nairobi

KENYA RESEARCH MARKET UPDATE - 1ST HALF 2018 HIGHLIGHTS. Sanlam Tower, Westlands, Nairobi RESEARCH KENYA MARKET UPDATE - 1ST HALF 2018 HIGHLIGHTS Kenya s economic outlook positive for 2018 Kenya Shilling strengthens against Sterling Pound & Euro The Treasury recommends lifting Interest Rate

More information

Co-ordinated and Orderly Growth A Suite of Infrastructure and Public Assets for the Future... 1

Co-ordinated and Orderly Growth A Suite of Infrastructure and Public Assets for the Future... 1 Co-ordinated and Orderly Growth... 1 A Suite of Infrastructure and Public Assets for the Future... 1 Funding Sources, Revenues and Prioritising Expenditure... 2 Stage 1 Short Term Growth Sunbury to 50,000...

More information

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJ/148/ W 031 E20 SNIVELLERS THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJECTION BY

More information

Contact information Longonot Gate Development Limited

Contact information Longonot Gate Development Limited LONGONOT GATE Contact information Longonot Gate Development Limited Muthaiga Road Opposite Mobil Plaza, P.O.Box 64553 00620, Nairobi. Telephone 020-2067872 Mobile 0710 129261 Email: info@longonotgate.co.ke

More information

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP). Chapter 5 The Railroad Corridor as a Trail Corridor The intent of this chapter is to identify how the rail corridor, if available for lease or purchase in all or part, could be incorporated into the core

More information

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS APPENDIX 15.1-3 LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN Purpose of the Structure Plan Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS LSP-P1 The District

More information

2. Introduction to Kurunegala Area : 2.1 Location and History : 2.2 Regional Aspects :

2. Introduction to Kurunegala Area : 2.1 Location and History : 2.2 Regional Aspects : 2. Introduction to Kurunegala Area : 2.1 Location and History : Kurunegala town is the capital of Kurunegala district as well as the capital of North Western Province (Fig 2.1). It has been administered

More information

Tallahassee-St. Marks Historic Railroad Trail

Tallahassee-St. Marks Historic Railroad Trail Revitalizing a Historic Trail Designated as a National Recreation Trail, the 16-mile Tallahassee-St. Marks Historic Railroad Trail has been enjoyed by countless bicyclists, runners, and outdoor enthusiasts

More information

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010 MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010 This is a compilation of issues and outcomes identified by the CAC. It is a work in progress,

More information

Boise Municipal Code. Chapter DEFINITIONS

Boise Municipal Code. Chapter DEFINITIONS Chapter 12-03 DEFINITIONS Sections: 12-03-01 ADMINISTRATOR 12-03-02 AIRPORT DESIGNATIONS 12-03-03 AIRPORT HAZARD 12-03-04 AIRPORT HEIGHT LIMITATIONS 12-03-05 AIRPORT REFERENCE POINT 12-03-06 AIRPORT INSTRUMENT

More information