Rail Travel Summary for Week 13: 25 June-1 July

Size: px
Start display at page:

Download "Rail Travel Summary for Week 13: 25 June-1 July"

Transcription

1 Rail Travel Summary for Week 13: 25 June-1 July Updated on: 17 June Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items are translated in the Train Operating Company Codes section. The areas covered by each sub-heading are detailed in the Geographical Scope section. Table of Contents Introduction 2 Long-Term Service Alterations 2 Saturday and Sunday 3 Cross-London Connections 3 Essex & Anglia 4 North & West of London 5 South & South East 6 East & North East 8 Midlands, North Wales & North West 9 Cotswolds, South Wales & West Country 10 Scotland 11 Monday to Friday 12 Cross-London Connections 12 Essex & Anglia 13 North & West of London 14 South & South East 15 East & North East 16 Midlands, North Wales & North West 17 Cotswolds, South Wales & West Country 18 Scotland 19 Train Operating Company Codes 20 Geographical Scope 21

2 Introduction This summary shows the main routes on which journeys are disrupted or amended for the dates shown above. Alterations may affect other areas and passengers are advised to check journey times with National Rail Enquiries before travelling, via or Replacement buses are unable to carry bicycles or non-folding prams, and may depart early to maintain connections. For further information regarding Cross-London Connections go to Long-Term Service Alterations Long-term emergency repairs affect two routes: Folkestone-Dover (damage to sea wall): until December Leeds-Carlisle (land slip): until Spring Passengers must check journey times before travelling, either with National Rail Enquiries or the individual train operators.

3 Saturday and Sunday Cross-London Connections All Weekend Paddington-Marylebone/Charing Cross/Waterloo connections may take longer as Bakerloo Line services do not stop at Paddington. (LT)

4 Essex & Anglia Sunday to 0830 Liverpool Street-Shenfield local services replaced by buses between Ilford- Shenfield. (XR) Sunday to 0800 East Anglia-Liverpool Street services replaced by buses between Colchester- Liverpool Street. (LE) Sunday from 2100 Liverpool Street-Ipswich/Norwich services reduced in frequency north of Colchester. Change of train or bus connections required for some journeys. (LE) Sunday to 0820 Buses replace trains between Marks Tey-Sudbury. (LE) Sunday to 0910 Liverpool Street-Hertford East/Stansted Airport/Cambridge services replaced by buses between Cheshunt-Hertford East/Bishops Stortford. Additional fast buses run between Liverpool-Stansted Airport. (LE)

5 North & West of London Sunday to 1000 Kings Cross-Stevenage/Cambridge/Peterborough services via Welwyn Garden City and via Hertford North replaced by buses for part of the journey, with delays up to 45 minutes. (GN) Sunday to 0930 Moorgate-Drayton Park inclusive are closed. Underground and local bus connections available. (GN) 2300 Saturday-1100 Sunday Bedford-Three Bridges/Brighton services replaced by buses between Bedford-Luton. (TL) Sunday to 0730 Euston-Milton Keynes/Northampton services replaced by buses for whole or part of the journey. (LM) All Weekend Gospel Oak-Barking services cancelled, with stations served by bus connections and/or Underground. (LO) All Weekend Highbury & Islington/Dalston Junction-South London services replaced by buses between Dalston Kingsland/Dalston Junction-Shadwell. Some stations served by Underground connections. (LO) All Weekend Willesden Junction-Clapham Junction services replaced by local buses between Willesden Junction-Shepherds Bush. (LO) All Weekend Milton Keynes/Watford Junction-Clapham Junction/East Croydon services cancelled. Tickets valid via Central London. (SN) All Weekend Marylebone-Oxford services replaced by buses between Oxford Parkway- Oxford. (CH) Sunday to 0620 Paddington-Heathrow Airport services cancelled. (HX/HC) 2341 Saturday Oxford-Banbury replaced by bus. (GW) 2330 Saturday-2359 Sunday Paddington/Reading-Oxford services replaced by buses between Reading/Didcot-Oxford. (GW) Sunday Paddington-Reading local services replaced by buses between Twyford- Reading. (GW) All Sunday Slough-Windsor & Eton Central services replaced by buses running to/from Windsor & Eton Riverside. (GW) 2220 Saturday-1030 Sunday Pangbourne served by buses from/to Tilehurst. (GW) 0945 & 1854 Sunday Bedwyn-Paddington depart early. (GW)

6 South & South East Sunday to 0830 Reading-Basingstoke services replaced by buses, departing early. (GW) Sunday to 1540 Reading-Gatwick Airport services replaced by buses betw3een Guildford- Shalford, with delays. Trains depart up to 35 minutes early from Reading. (GW) 0819 Sunday Romsey-Brighton replaced by bus, departing early, between Romsey- Southampton. (GW) Sunday from 1500 Some Waterloo-Salisbury/Yeovil services extended to/from Castle Cary for the Glastonbury festival. Buses run between Castle Cary and the Festival site. (SW) Saturday & Sunday Buses run between Wool and Bovington for the Tank Fest. (SW) All Weekend Waterloo-Alton services replaced by buses between Farnborough-Alton. (SW) All Weekend Ascot-Guildford services replaced by buses. (SW) All Sunday Waterloo-Portsmouth services via Guildford replaced by buses between Guildford- Petersfield, with delays. Alternative through trains run via Winchester. (SW) All Sunday Waterloo-Shepperton services replaced by buses between Teddington- Shepperton. (SW) 2350 Saturday-0800 Sunday Buses replace trains between Bournemouth-Poole. (SW) 2300 Saturday-0900 Sunday Eastleigh/Southampton-Romsey-Salisbury services replaced by buses for whole or part of the journey. (SW) All Weekend New Cross-Dalston Junction services cancelled. New Cross passengers should use New Cross Gate or Surrey Quays. (LO) All Weekend Willesden Junction-Clapham Junction services replaced by local buses between Willesden Junction-Shepherds Bush. (LO) All Weekend Milton Keynes/Watford Junction-Clapham Junction/East Croydon services cancelled. Tickets valid via Central London. (SN) All Sunday Luton-Sutton services diverted with delays in South London. Many stations served by buses. (TL) All Sunday London Bridge-Horsham services start from/terminate at Victoria and London Bridge-Tonbridge services only run between Redhill-Tonbridge. (SN) All Sunday London Bridge-Crystal Palace/East Croydon/West Croydon/Tattenham Corner services replaced by buses for whole or part of the journey. (SN) All Sunday Victoria-Sutton/Dorking/Epsom services replaced by buses between West Croydon-Sutton or between Streatham Common-Sutton/Epsom. (SN)

7 Sunday to 0900 and from 2330 Victoria/Brighton-Chichester/Portsmouth/Southampton services replaced by buses between Barnham-Chichester/Portsmouth/Fratton. (SN) Sunday from 2145 Victoria-Bognor Regis services replaced by buses between Horsham- Bognor Regis. (SN) All Weekend Services to/from/via London Bridge are affected by station reconstruction. Some journeys require bus or Underground connections. Passengers must check alternative arrangements before travelling. (TL/SN/SE) All Weekend Kent Coast services via Folkestone diverted, or replaced by buses between Folkestone West/Folkestone Central-Dover due to storm damage. Buses also replace trains between Dover-Deal. (SE) All Weekend Charing Cross and Waterloo East are closed, with services starting from/ terminating at Cannon Street, Victoria or London Bridge. Services via Orpington further diverted, or replaced by buses between Grove Park-Orpington. Passengers must check journey times before travelling. (SE) Sunday to 0900 St Pancras/Victoria-Kent Coast services replaced by buses for part of the journey. Early departure required for some services. (SE) All Sunday Dartford/Gravesend/Gillingham services via Woolwich diverted, or replaced by buses between Plumstead-Dartford. (SE) All Sunday Sittingbourne-Sheerness services replaced by buses. Early departure may be required to maintain connections. (SE)

8 East & North East All Weekend Leeds-Carlisle services replaced by buses between Appleby-Carlisle, with delays up to 60 minutes. (NT) Saturday Kings Cross-Leeds replaced by bus between Doncaster-Leeds. (GR) Sunday to 1200 Kings Cross/Doncaster-Leeds/York/Newcastle/Edinburgh services reduced in frequency. Change of train required for some journeys. (GR) Sunday to 1245 Kings Cross-Bradford Interchange services subject to delays up to 45 minutes. (GC) Saturday from 2200 Birmingham-North East services do not call at Doncaster. Bus connections arranged. (XC) All Sunday North East-Manchester/Liverpool services reduced in frequency and diverted with delays. Huddersfield served by buses for many journeys. Passengers should check journey times before travelling. (TP) All Sunday Sheffield-Lincoln services replaced by buses between Worksop-Lincoln. (NT) 0900 Sunday Kings Cross-Edinburgh and 0903 Sunday Kings Cross-Leeds depart up to 5 minutes early from Kings Cross. (GR) All Saturday Additional trains run to/from Cleethorpes for the Armed Forces Day event. (TP/NT/EM)

9 Midlands, North Wales & North West All Saturday Norton Bridge, Barlaston and Wedgwood served by buses. (LM) All Sunday Birmingham-Reading/Bournemouth services replaced by buses between Oxford- Didcot. (XC) All Weekend Hunts Cross/Liverpool-Ormskirk/Kirkby/Southport northbound services do not call at Moorfields. Passengers should use Liverpool Central. (ME) 2200 Saturday-0900 Sunday Manchester-Chester services via Warrington diverted, or replaced by buses. (AW) Sunday from 2330 Buses replace trains between Preston-Blackpool North. (NT) Saturday from 2300 Buses replace trains between Blackburn-Colne. (NT) 2315 Sunday Blackburn-Manchester Victoria replaced by bus. (NT) 2120 Saturday-1130 Sunday Buses replace trains between Oxenholme-Windermere. (NT) All Sunday Liverpool/Manchester-North East services reduced in frequency and diverted with delays. Huddersfield served by buses for many journeys. Passengers should check journey times before travelling. (TP) All Weekend North Wales/Manchester-South Wales services via Hereford replaced by buses between Shrewsbury-Newport, with delays. Shrewsbury-Swansea services via Llandrindod replaced by buses between Shrewsbury-Broome. (AW) Saturday from 2330 Buses replace trains between Llandudno Junction-Holyhead. (AW) 0818 Sunday Derby-Nottingham replaced by bus. (EM) 0914 Sunday Derby-Nottingham departs at (EM) Saturday from 2120 St Pancras-East Midlands services subject to delays between St Pancras-Bedford. (EM) All Sunday Buses replace trains between Kettering-Corby. (EM)

10 Cotswolds, South Wales & West Country 0150 Sunday Fishguard Harbour-Cardiff replaced by bus between Carmarthen-Swansea/ Cardiff. (AW) All Weekend South Wales-North Wales/Manchester services via Hereford replaced by buses between Newport-Shrewsbury, with delays. Swansea-Shrewsbury services via Llandrindod replaced by buses between Broome-Shrewsbury. (AW) Saturday Some Bristol Temple Meads-Severn Beach services replaced by buses between Avonmouth-Severn Beach. (GW) All Weekend Birmingham-Worcester/Great Malvern/Hereford services reduced in frequency and do not call at Worcester Shrub Hill. Passengers should use Worcester Foregate Street. Hereford services also replaced by buses between Great Malvern-Hereford. (LM) All Weekend Paddington/Cheltenham-Great Malvern/Hereford services require a change of train at Worcester Shrub Hill. Buses also replace trains between Great Malvern-Hereford, with delays up to 35 minutes. Buses from Hereford depart early. Passengers should check journey times before travelling. (GW) All Sunday Paddington-Worcester/Great Malvern/Hereford services replaced by buses between Didcot-Oxford, with delays. From 1600 some through services run via an alternative route. (GW) Sunday to 0815 Some trains depart early from Paddington. (GW) All Weekend Paddington-Bristol Temple Meads services diverted with delays. Didcot, Swindon, Chippenham and Bath served by rail/road connections for some or all journeys. Passengers must check journey times before travelling. (GW) All Weekend Swindon-Westbury services reduced in frequency, and replaced by buses between Swindon-Chippenham. (GW) All Weekend Additional trains call at Castle Cary for passengers travelling to the Glastonbury Festival. Buses run between Castle Cary and the Festival site. (GW/SW)

11 Scotland All Weekend Glasgow Queen Street High Level platforms are closed, with services diverted to use the Low Level Platforms or Glasgow Central. Delays up to 40 minutes. Additional change of train may be required for some journeys. Passengers must check journey times before travelling. (SR) All Sunday Glasgow-Dumfries/Carlisle services replaced by buses between Kilmarnock- Dumfries, with delays. Early departure required for some journeys. (SR)

12 Monday to Friday Cross-London Connections Monday-Friday Paddington-Marylebone/Charing Cross/Waterloo connections may take longer as Bakerloo Line services do not stop at Paddington. (LT)

13 Essex & Anglia Monday-Wednesday each night Liverpool Street-Colchester/Ipswich/Norwich services subject to delays, with some replaced by buses for part of the journey. Passengers should check journey times before travelling, especially those with connections at Ipswich or Norwich. (LE) Monday-Thursday 2214 & 2314 Kings Cross-Kings Lynn replaced by buses between Ely- Kings Lynn. (GN)

14 North & West of London Monday-Friday Gospel Oak-Barking services run between Gospel Oak-South Tottenham. Blackhorse Road-Barking inclusive served by buses or Underground. (LO) Monday-Friday Marylebone-Oxford services replaced by buses between Oxford Parkway- Oxford. (CH) Monday-Thursday each night Paddington-Newbury/Bedwyn services replaced by buses for part of the journey west of Reading. (GW) Monday-Thursday each night, also Friday from 2345 Pangbourne served by buses from/to Tilehurst. (GW) Wednesday-Friday from 0840 each day Additional services run between Twyford-Henley on Thames for the Regatta. Trains do not call at Wargrave, bus connections arranged. (GW)

15 South & South East Monday to 1430 Some Yeovil/Salisbury-Waterloo services extended to start from Castle Cary for passengers returning from the Glastonbury festival. Buses run between the Festival site and Castle Cary. (SW) Monday-Friday Wimbledon will be busy for the Tennis Championships, with some additional trains calling. (SW) Friday Additional services call at Esher for the Sandown Park race meeting. (SW) Monday-Friday Ascot-Guildford services subject to delays in the Aldershot area. Some trains depart early. (SW) Monday-Thursday each night Portsmouth served by buses from/to Fratton. Buses from Portsmouth may depart early. (SW) Tuesday-Friday 0105 Waterloo-Southampton diverted. Wimbledon and Surbiton served by bus. (SW) Tuesday-Friday 0042 Waterloo-Strawberry Hill replaced by bus between Teddington- Strawberry Hill. (SW) Monday-Thursday from 2230 each night West Croydon-Highbury & Islington services replaced by buses between West Croydon-New Cross Gate. (LO) Monday-Thursday each night Victoria/London Bridge-Oxted/Uckfield/East Grinstead services replaced by buses for part of the journey. (SN) Tuesday-Friday to 0200 each morning Buses replace trains between Crystal Palace-London Bridge. (SN) Monday-Thursday each night Victoria-South Coast services via Horsham diverted, or replaced by buses for part of the journey. (SN) Friday Chichester will be busy for the Goodwood Festival of Speed. (SN) Monday-Friday Services to/from/via London Bridge are affected by station reconstruction. Some journeys require bus or Underground connections. Passengers must check alternative arrangements before travelling. (TL/SN/SE) Monday-Friday Kent Coast services via Folkestone diverted, or replaced by buses between Folkestone West/Folkestone Central-Dover due to storm damage. (SE) Monday-Thursday each night Victoria-Ashford services replaced by buses between Maidstone East-Ashford. (SE)

16 East & North East Monday-Friday Leeds-Carlisle services replaced by buses between Appleby-Carlisle, with delays up to 60 minutes. (NT)

17 Midlands, North Wales & North West Monday-Friday Norton Bridge, Barlaston and Wedgwood served by buses. (LM) Monday, Wednesday & Thursday 2245 Wolverhampton-Euston diverted. Long Buckby and Northampton served by bus. (VT) Monday, Wednesday & Thursday 2254 Birmingham-Northampton terminates at Coventry. Rugby, Long Buckby and Northampton served by rail/road connections. (LM) Tuesday, Thursday & Friday 0516 Rugby-Euston replaced by bus, departing early, between Rugby-Northampton. (LM) Monday-Friday Hunts Cross/Liverpool-Ormskirk/Kirkby/Southport northbound services do not call at Moorfields. Passengers should use Liverpool Central. (ME) Monday-Thursday each night Services to/from Manchester via Stockport diverted, or replaced by buses for part of the journey. (VT/NT/EM) Monday-Thursday 2306 Huddersfield-Manchester Victoria replaced by bus between Stalybridge-Manchester Victoria. (NT) Monday-Thursday from 2230 each night Blackburn-Manchester Victoria services via Todmorden replaced by buses between Blackburn-Rochdale. (NT) Monday-Thursday from 2300 each night Blackburn-Manchester Victoria services via Bolton replaced by buses. (NT) Monday-Thursday each night Manchester-Preston/Blackpool services diverted. Bolton served by buses. (TP/NT) Monday-Friday to 0500 each morning Buses replace trains between Blackpool North- Preston. Early departure required for some journeys. (NT/VT) Monday-Friday 0519 Blackpool South-Colne diverted to start from Blackpool North. Blackpool South-Moss Side inclusive served by bus, departing early. (NT) Monday-Thursday each night Blackpool/Preston-Colne services replaced by buses for whole or part of the journey. (NT) Monday-Thursday 2242 Preston-Liverpool replaced by bus. (NT) Monday-Thursday 2309 Manchester Victoria departs at 2235 and runs early throughout. An additional bus departs at 2309, calling at all stations. (NT) Monday-Thursday from 1900 each night Manchester/Preston-Barrow in Furness services require a change of train at Lancaster. (NT) Monday-Thursday each night Manchester-Chester services via Warrington diverted or replaced by buses for part of the journey. (AW)

18 Cotswolds, South Wales & West Country Thursday from 1600 Cardiff Central will be busy for the Beyonce concert. Station access after the event may be controlled to prevent overcrowding. (AW/GW/XC) Monday-Thursday from 2130 each night Cardiff-Ebbw Vale services replaced by buses. (AW) Monday Some Paddington-Cardiff services cancelled. (GW) Monday Additional trains call at Castle Cary for passengers returning from the Glastonbury Festival. Buses run between the Festival site and Castle Cary. (GW/SW) Monday 0450 Hereford-Paddington replaced by bus, departing early, between Hereford-Great Malvern. (GW)

19 Scotland Monday-Friday Glasgow Queen Street High Level platforms are closed, with services diverted to use the Low Level Platforms or Glasgow Central. Delays up to 40 minutes. Additional change of train may be required for some journeys. Passengers must check journey times before travelling. (SR)

20 Train Operating Company Codes AW CC CH CS EM GC GN GR GW GX HC HT HX IL LE LM LO LT ME NT SE SN SR SW TL TP TW VT XC XR Arriva Trains Wales c2c Chiltern Railways Caledonian Sleeper East Midlands Trains Grand Central Great Northern Virgin Trains East Coast First Great Western Gatwick Express Heathrow Connect Hull Trains Heathrow Express Island Line Abellio Greater Anglia London Midland London Overground London Underground Merseyrail Northern Southeastern Southern ScotRail South West Trains Thameslink TransPennine Express Tyne & Wear Metro Virgin Trains Cross Country TfL Rail

21 Geographical Scope Cross-London Connections Underground links between the Central London termini Essex & East Anglia All services from/to London Fenchurch Street/Liverpool Street, and connecting branch lines Rural services in Cambridgeshire, Suffolk and Norfolk. Stansted Airport/Norwich-Peterborough North & West of London Suburban services between London and: Stevenage/Cambridge/Peterborough St Albans/Luton/Bedford Watford Junction/Tring/Milton Keynes/Northampton Aylesbury Oxford/Banbury/Birmingham/Stratford-upon-Avon via High Wycombe Reading/Newbury/Bedwyn/Oxford East London/North London/West London Lines and Gospel Oak-Barking Associated branch lines of the above South & South East South London, Kent, Surrey, Sussex, Hampshire, Dorset Coast Waterloo-Salisbury/Yeovil/Exeter Services via Richmond/Hounslow Reading-Basingstoke/Gatwick Airport Reading-Bournemouth Westbury-Southampton Castle Cary-Weymouth Isle of Wight East & North East London-Doncaster/North East/Scotland * Lincolnshire, Yorkshire, Humberside North East England Leeds-Morecambe/Carlisle and Newcastle-Carlisle Midlands, North Wales & North West London-East Midlands/Sheffield * London-West Midlands/North West/Scotland * East & West Midlands suburban/rural services Birmingham-Reading * Birmingham-Sheffield/Peterborough Mid Wales & North Wales, Greater Manchester, Merseyside & North West England Cotswolds, South Wales & West Country London-Bristol/South Wales/Devon/Cornwall and branches * South Wales Local Service Llanelli-Shrewsbury & Newport-Shrewsbury Oxford-Worcester-Hereford Scotland All services in Scotland Euston-Scotland Sleepers * Other than the suburban services listed in the North & West of London area.

Rail Travel Summary for Week 21: August

Rail Travel Summary for Week 21: August Rail Travel Summary for Week 21: 20-26 August Updated on: 16 August Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 23: 3-9 September

Rail Travel Summary for Week 23: 3-9 September Rail Travel Summary for Week 23: 3-9 September Updated on: 30 August Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 11: June

Rail Travel Summary for Week 11: June Rail Travel Summary for Week 11: 11-17 June Updated on: 02 June Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items

More information

Rail Travel Summary for Week 35: 26 November 2 December

Rail Travel Summary for Week 35: 26 November 2 December Rail Travel Summary for Week 35: 26 November 2 December Updated on: 23 November Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the

More information

Rail Travel Summary for Week 52: March

Rail Travel Summary for Week 52: March Rail Travel Summary for Week 52: 19-24 March Updated on: 15 March Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 37: December

Rail Travel Summary for Week 37: December Rail Travel Summary for Week 37: 08-14 December Updated on: 6 December 2012 Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Rail Travel Summary for Week 23: 30 August-5 September

Rail Travel Summary for Week 23: 30 August-5 September Rail Travel Summary for Week 23: 30 August-5 September Updated on: 27 August Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the

More information

Rail Travel Summary for Week 29: October

Rail Travel Summary for Week 29: October Rail Travel Summary for Week 29: 10-16 October Updated on: 29 September Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Rail Travel Summary for Week 15: July 4-10

Rail Travel Summary for Week 15: July 4-10 Rail Travel Summary for Week 15: July 4-10 Updated on: 02 July Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items

More information

Rail Travel Summary for Week 5: 25 April-May 1

Rail Travel Summary for Week 5: 25 April-May 1 Rail Travel Summary for Week 5: 25 April-May 1 Updated on: 20 April Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 49: 27 February-4 March

Rail Travel Summary for Week 49: 27 February-4 March Rail Travel Summary for Week 49: 27 February-4 March Updated on: 25 February Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the

More information

Rail Travel Summary for Week 21: August

Rail Travel Summary for Week 21: August Rail Travel Summary for Week 21: 16-22 August Updated on: 05 August Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 52: March

Rail Travel Summary for Week 52: March Rail Travel Summary for Week 52: 21-27 March Updated on: 10 March Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 32: 5 11 November

Rail Travel Summary for Week 32: 5 11 November Rail Travel Summary for Week 32: 5 11 November Updated on: 27 October Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Rail Travel Summary for Week 31: 29 October 4 November

Rail Travel Summary for Week 31: 29 October 4 November Rail Travel Summary for Week 31: 29 October 4 November Updated on: 27 October Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the

More information

Rail Travel Summary for Week 03: April

Rail Travel Summary for Week 03: April Rail Travel Summary for Week 03: 13-19 April Updated on: 09 April Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items

More information

Rail Travel Summary for Week 05: 27 April 03 May

Rail Travel Summary for Week 05: 27 April 03 May Rail Travel Summary for Week 05: 27 April 03 May Updated on: 25 April Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 33: 8-14 November

Rail Travel Summary for Week 33: 8-14 November Rail Travel Summary for Week 33: 8-14 November Updated on: 29 October Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Rail Travel Summary for Week 49: 1-7 March

Rail Travel Summary for Week 49: 1-7 March Rail Travel Summary for Week 49: 1-7 March Updated on: 20 February Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items

More information

Rail Travel Summary for Week 6: 3-9 May

Rail Travel Summary for Week 6: 3-9 May Rail Travel Summary for Week 6: 3-9 May Updated on: 28 April Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items are

More information

Rail Travel Summary for Week 07: May

Rail Travel Summary for Week 07: May Rail Travel Summary for Week 07: 11-17 May Updated on: 08 May Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items are

More information

Rail Travel Summary for Week 34: November

Rail Travel Summary for Week 34: November Rail Travel Summary for Week 34: 15-21 November Updated on: 11 November Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Rail Travel Summary for Week 24: 7-13 September

Rail Travel Summary for Week 24: 7-13 September Rail Travel Summary for Week 24: 7-13 September Updated on: 03 September Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 3: April

Rail Travel Summary for Week 3: April Rail Travel Summary for Week 3: 11-17 April Updated on: 01 April Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 22: August

Rail Travel Summary for Week 22: August Rail Travel Summary for Week 22: 24-30 August Updated on: 22 August Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items

More information

Rail Travel Summary for Week 31: October

Rail Travel Summary for Week 31: October Rail Travel Summary for Week 31: 25-31 October Updated on: 24 October Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Rail Travel Summary for Week 46: 7-13 February

Rail Travel Summary for Week 46: 7-13 February Rail Travel Summary for Week 46: 7-13 February Updated on: 04 February Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Rail Travel Summary for Week 33: 7-13 November

Rail Travel Summary for Week 33: 7-13 November Rail Travel Summary for Week 33: 7-13 November Updated on: 27 October Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Rail Travel Summary for Week 43: January

Rail Travel Summary for Week 43: January Rail Travel Summary for Week 43: 17-23 January Updated on: 06 January Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Rail Travel Summary for Week 49: 28 February-6 March

Rail Travel Summary for Week 49: 28 February-6 March Rail Travel Summary for Week 49: 28 February-6 March Updated on: 24 February Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the

More information

Rail Travel Summary for Week 31: 26 October-1 November

Rail Travel Summary for Week 31: 26 October-1 November Rail Travel Summary for Week 31: 26 October-1 November Updated on: 16 October Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end

More information

Rail Travel Summary for Week 27: 26 September-2 October

Rail Travel Summary for Week 27: 26 September-2 October Rail Travel Summary for Week 27: 26 September-2 October Updated on: 17 September Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at

More information

Rail Travel Summary for Week 28: 4-10 October

Rail Travel Summary for Week 28: 4-10 October Rail Travel Summary for Week 28: 4-10 October Updated on: 02 October Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 50: 7-13 March

Rail Travel Summary for Week 50: 7-13 March Rail Travel Summary for Week 50: 7-13 March Updated on: 04 March Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 51: March

Rail Travel Summary for Week 51: March Rail Travel Summary for Week 51: 15-21 March Updated on: 10 March Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items

More information

Technical specification: BS 4449:2005 GRADE B500B BAR AND COIL

Technical specification: BS 4449:2005 GRADE B500B BAR AND COIL BS 4449:2005 GRADE B500B BAR AND COIL DIAMETER SIZE EXTRA* COIL EXTRA* 8 mm 40.00 15.00 10 mm 25.00 15.00 12 mm 20.00 15.00 Base price + the following extras per size and/or format (coil) 16 mm - 15.00

More information

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE Correct at time of publication 2018 Sat 22 December Sun 23 December Mon 24 December (Christmas Eve) Tues 25 December (Christmas Day) Weds 26 December (Boxing Day)

More information

Early May Bank Holiday Travel Summary 2012

Early May Bank Holiday Travel Summary 2012 Early May Bank Holiday Travel Summary 2012 Photo Attribution: Pete Ashton on Flickr Train service and engineering work information from National Rail Enquiries for customers travelling over the Early May

More information

Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013

Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013 Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013 Compiled by Paul Murphy August 2013 Correct as of Friday 23 rd August 2013 CONTENTS Road Closures & Map Changes

More information

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c. Abellio ScotRail Arriva Rail London Alliance Rail Arriva Trains Wales c2c Chiltern Railways Colas Rail CrossCountry DB Cargo (UK) Limited Devon & Cornwall Railway Direct Rail Services East Midlands Trains

More information

Easter Improvement Works. London Euston Closed Friday 19 until Monday 22 April virgintrains.com/spanner nationalrail.co.

Easter Improvement Works. London Euston Closed Friday 19 until Monday 22 April virgintrains.com/spanner nationalrail.co. Easter Improvement Works London Euston Closed Friday 19 until Monday 22 April 2019 virgintrains.com/spanner nationalrail.co.uk/westcoast @virgintrains virgintrains What's happening? We recommend that

More information

Oriel 2018 (2019intake) Hospital and Health Board Employers

Oriel 2018 (2019intake) Hospital and Health Board Employers Oriel 2018 (2019intake) Hospital and Health Board Employers Employer Name ABERTAWE BRO MORGANNWG UNIVERSITY HEALTH BOARD AINTREE UNIVERSITY HOSPITAL NHS FOUNDATION TRUST AIREDALE NHS FOUNDATION TRUST ALDER

More information

Christmas Engineering Works

Christmas Engineering Works THE GREAT NORTH RAIL PROJECT COLLEAGUE UPDATE Christmas Engineering Works 2018 until 2019 Thursday 27 December Tuesday 01 January This past year has seen significant progress in Network Rail s Great North

More information

Sixth Form University Open Days

Sixth Form University Open Days Sixth Form Open Days 2017-2018 A of Aberdeen Abertay Aberystwyth Anglia Ruskin Saturday 7 th Wednesday 8 th Saturday 11 th Aston Saturday 7 th Saturday 4 th B Bangor Sunday 15 th Bath Spa of Bedfordshire

More information

Happiness is a town called Harrogate destination named happiest place to live for THIRD year running

Happiness is a town called Harrogate destination named happiest place to live for THIRD year running Rightmove plc 3 rd & 4 th Floor 33 Soho Square London W1D 3QU Under embargo until 00.01 Thursday 6 th August Happiness is a town called Harrogate destination named happiest place to live for THIRD year

More information

Improving stations: improving passenger satisfaction. October 2016

Improving stations: improving passenger satisfaction. October 2016 Improving stations: improving passenger satisfaction October 2016 1 Contents Introduction... 3 Summary of overall satisfaction... 5 Trends over time... 7 Station-specific examples... 9 Reading station...

More information

Inverness LOCH NESS CALEDONIAN LOCH OICH LOCH LOCHY WATERWAY MAP Key SCALE 0 50 kilometres Fort William Managed by British Waterways 0 10 20 30 miles Managed by British Waterways Scotland Perth Dundee

More information

75,402 sq ft. 88,866 sq ft NOTTINGHAM. panattoni park CONSTRUCTION UNDER. Two industrial/warehouse units TO LET AVAILABLE Q3 2018

75,402 sq ft. 88,866 sq ft NOTTINGHAM. panattoni park CONSTRUCTION UNDER. Two industrial/warehouse units TO LET AVAILABLE Q3 2018 panattoni park Two industrial/warehouse units 88,866 sq ft TO LET AVAILABLE Q3 2018 75,402 sq ft TO LET AVAILABLE Q4 2018 /J26 UNDER CONSTRUCTION INDICATIVE IMAGE www.pp.com panattoni park NG16 NN7 4DE

More information

TIMETABLES ETC in the collection of John Hinson

TIMETABLES ETC in the collection of John Hinson TIMETABLES ETC in the collection of John Hinson Public Timetables SR all lines Summer 1948 LMS all lines Summer 1946 LNER all lines (except London suburban) Summer 1946 (damaged) Railway and Road-way holidays

More information

#element of bullying / harassment South West 2gether NHS FT Mental Health Small

#element of bullying / harassment South West 2gether NHS FT Mental Health Small 1 South West 2gether NHS FT Mental Health Small 3 2 0 3 0 Aintree University Hospital NHS FT Yorks and Humber Airedale NHS FT Combined Acute and Community Small 28 0 8 7 1 North West Alder Hey Children's

More information

Dear Louise. I can confirm that the full list of approved sites for this study is:

Dear Louise. I can confirm that the full list of approved sites for this study is: From: TOTENHOFER, Ashley (HEALTH RESEARCH AUTHORITY) Sent: 28 June 2018 13:06 To: SAVIC, Louise (LEEDS TEACHING HOSPITALS NHS TRUST) Subject: RE: DALES 232512 Dear Louise I can confirm that the full list

More information

1.6 million sq ft TO LET/FOR SALE AVAILABLE Q4 2019

1.6 million sq ft TO LET/FOR SALE AVAILABLE Q4 2019 ON SITE NOW 1.6 illion sq ft TO LET/FOR SALE AVAILABLE Q4 019 / WEEDON ROAD NN7 4DE Build-to-suit and speculative buildings Direct access to Junction 16 Clear height up to 18 Three speculatively built

More information

PHASE 2 UNDER CONSTRUCTION

PHASE 2 UNDER CONSTRUCTION PRACTICAL COMPLETION SUMMER 2017 / J11 OX16 4XD INDICATIVE CGI PHASE 2 UNDER CONSTRUCTION BUILDING 7-95,000 SQ FT (8,826 SQ M) BUILDING 8-78,000 SQ FT (7,246 SQ M) www.central.co.uk / J11 BUILDING 7 SPECIFICATION

More information

CONSTRUCTION UNDER. Cross-docked warehouse/distribution unit 550,270 sq ft TO LET AVAILABLE Q M1/J26 PANATTONI PARK NOTTINGHAM NOTTINGHAM 550

CONSTRUCTION UNDER. Cross-docked warehouse/distribution unit 550,270 sq ft TO LET AVAILABLE Q M1/J26 PANATTONI PARK NOTTINGHAM NOTTINGHAM 550 UNDER CONSTRUCTION PANATTONI PARK NOTTINGHAM Cross-docked warehouse/distribution unit 550,270 sq ft TO LET AVAILABLE Q1 2019 /J26 INDICATIVE IMAGE NN7 NG16 4DE 3RY /J26 Panattoni Park Nottingham is a 55

More information

Census 2011: City snapshot

Census 2011: City snapshot Census Snapshot September 2012 Census 2011: snapshot Rachel Smith, September 2012 On 16 July 2012 the first outputs from the Census 2011 for England and Wales were released, followed on 19 September 2012

More information

WCML Service Plans. The Purpose, Background and Method

WCML Service Plans. The Purpose, Background and Method The Purpose, Background and Method WCML Service Plans This article refers to and should be read in conjunction with several other articles. Towards a High Speed Network is the original, and seeks to make

More information

National Rail Passenger Survey: User Guidance Report. Spring 2014 (wave 30)

National Rail Passenger Survey: User Guidance Report. Spring 2014 (wave 30) National Rail Passenger Survey: User Guidance Report Spring 2014 (wave 30) Rebecca Joyner Director Tel: 020 7490 9148 rebecca.joyner@bdrc continental.com Contents Page No. 1. Background... 1 2. Summary

More information

National Rail Passenger Survey: User Guidance Report

National Rail Passenger Survey: User Guidance Report National Rail Passenger Survey: User Guidance Report Spring 2015 (Wave 32) Rebecca Joyner Director Tel: 020 7490 9148 rebecca.joyner@bdrc continental.com Contents Page No. 1. Background... 1 2. Summary

More information

National Rail Passenger Survey: User Guidance Report

National Rail Passenger Survey: User Guidance Report National Rail Passenger Survey: User Guidance Report Autumn 2015 (Wave 33) Rebecca Joyner Director Tel: 020 7490 9148 rebecca.joyner@bdrc-continental.com Contents Page No. 1. Background... 1 2. Summary

More information

Healthwatch is the independent champion for people who use health and social care services.

Healthwatch is the independent champion for people who use health and social care services. B R I E F I N G State of Support Local Healthwatch Funding 2017/18 30 November 2017 Overview Healthwatch is the independent champion for people who use health and social care services. Across the country

More information

National Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29)

National Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29) National Rail Passenger Survey: User Guidance Report Autumn 2013 (wave 29) Rebecca Joyner Research Director Tel: 020 7490 9148 rebecca.joyner@bdrc continental.com Contents Page No. 1. Background... 1 2.

More information

S31 Grant determination for a high needs strategic planning fund in : DCLG ref 31/2916

S31 Grant determination for a high needs strategic planning fund in : DCLG ref 31/2916 S31 Grant determination for a high needs strategic planning fund in 2016-17: DCLG ref 31/2916 Purpose of the fund Local authorities can use this fund to carry out a strategic review of their high needs

More information

PHASE 3 UNDER CONSTRUCTION

PHASE 3 UNDER CONSTRUCTION UNIT 5 AVAILABLE SPRING 2019 / J11 OX16 4XD INDICATIVE CGI PHASE 3 UNDER CONSTRUCTION BUILDING 5 333,000 SQ FT (30,937 SQ M) www.central.co.uk / J11 Gas & Elec Sub. tpa th Chalker Way Chalker Way 20 No.

More information

PHASE 3 UNDER CONSTRUCTION

PHASE 3 UNDER CONSTRUCTION UNIT 5 AVAILABLE SPRING 2019 / J11 OX16 4XD INDICATIVE CGI PHASE 3 UNDER CONSTRUCTION BUILDING 5 333,000 SQ FT (30,936 SQ M) www.central.co.uk / J11 Gas & Elec Sub. tpa th Chalker Way Chalker Way 20 No.

More information

School improvement monitoring and brokering grant provisional allocations for illustrative purposes

School improvement monitoring and brokering grant provisional allocations for illustrative purposes School improvement monitoring and brokering grant provisional allocations for illustrative purposes The school improvement monitoring and brokering grant was announced on 30 November 2016. This grant of

More information

EMPIRE. Bromley Clydebank Newcastle Sunderland ODEON UK & IRELAND

EMPIRE. Bromley Clydebank Newcastle Sunderland ODEON UK & IRELAND CINEWORLD ABERDEEN UNION SQUARE ALDERSHOT ASHFORD ASHTON-UNDER-LYNE BEDFORD BEXLEYHEATH BIRMINGHAM BROAD STREET BOLDON BOLTON BRADFORD BRAINTREE BRIGHTON BRISTOL BURTON-ON-TRENT CARDIFF CASTLEFORD CHELTENHAM

More information

Winners of the Exemplar Awards 2016

Winners of the Exemplar Awards 2016 Winners of the Exemplar Awards 2016 Winner of the Exemplar Award 2016 Leeds City Council Winner of the Peer Award 2016 David Lloyd, Huntingdonshire District Council Data Quality & Performance Awards 2016

More information

2016-BASED HOUSEHOLD PROJECTIONS

2016-BASED HOUSEHOLD PROJECTIONS 2016-BASED HOUSEHOLD PROJECTIONS PLANNING DESIGN ENVIRONMENT PEGASUSGROUP.CO.UK ECONOMICS 2016-BASED HOUSEHOLD PROJECTIONS The Office for National Statistics (ONS) released its 2016-household projections

More information

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere)

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere) APPNDIX L2 CONNCTIVITY IMPROVMNTS ACHIVD BY HS2 AND HIGH SPD UK FOR: LICSTR (extract from HS2 High Speed to Nowhere) Appendix L2 : Leicester Page 262 Introduction & key results Page 263 Timeline of comparative

More information

Most regions saw price falls during 2012

Most regions saw price falls during 2012 www.nationwide.co.uk/hpi Embargoed until 0700 Thurs 3 Jan 2013 Most regions saw price falls during 2012 11 out of 13 UK regions saw annual price falls during 2012 London best performing region in 2012

More information

House prices fall in most regions during the third quarter

House prices fall in most regions during the third quarter www.nationwide.co.uk/hpi Q3 2010 Embargoed until 0700 Thurs 30 Sep 2010 House prices fall in most regions during the third quarter House prices fell in nine out of thirteen UK regions in the third quarter

More information

550,270 sq ft TO LET AVAILABLE Q1 2019

550,270 sq ft TO LET AVAILABLE Q1 2019 UNDER CONSTRUCTION 10 EASTWOOD NG16 3RY CROSS-DOCKED WAREHOUSE/DISTRIBUTION UNIT,270 sq ft TO LET Q1 2019 junction 26-7 minutes Ample car & HGV parking with potential for more 50m yards on both sides 15m

More information

UNITS 4 & 5 AVAILABLE TO LET CV35 9JY TWO NEW INDUSTRIAL / WAREHOUSE OPPORTUNITIES ON AN ESTABLISHED PARK

UNITS 4 & 5 AVAILABLE TO LET CV35 9JY TWO NEW INDUSTRIAL / WAREHOUSE OPPORTUNITIES ON AN ESTABLISHED PARK IMMEDIATELY AVAILABLE TO LET UNITS 4 & 5 CV35 9JY TWO NEW INDUSTRIAL / WAREHOUSE OPPORTUNITIES ON AN ESTABLISHED PARK SAY HELLO TO THE SWEET SP T UNIT 5 66,500 SQ FT UNIT 4 51,500 SQ FT Strategic location

More information

National Rail Passenger Survey Virgin Trains East Coast TOC Report Spring 2018 (Wave 38)

National Rail Passenger Survey Virgin Trains East Coast TOC Report Spring 2018 (Wave 38) National Rail Passenger Survey TOC Report 18 (Wave 38) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk

More information

House prices in London continue to climb

House prices in London continue to climb www.nationwide.co.uk/hpi Q2 2014 Embargoed until 0700 Wed 2 Jul 2014 House prices in London continue to climb All UK regions saw annual price rises in Q2 2014 London continues to lead, with annual price

More information

Regional Spread of Inbound Tourism

Regional Spread of Inbound Tourism Regional Spread of Inbound Tourism Foresight issue 164 VisitBritain Research, January 2019 1 Contents Introduction Summary Key metrics by UK area Analysis by UK area Summary of growth by UK area Scotland

More information

Transport Focus Informed Traveller monitoring initial findings, 9 March April- 13 April

Transport Focus Informed Traveller monitoring initial findings, 9 March April- 13 April Appendix A Transport Focus Informed Traveller monitoring initial findings, 9 March 2018 1. Is the timetable correct six weeks ahead? In the first two weeks of our monitoring at T-6 Transport Focus has

More information

UK Universities Quick Dial

UK Universities Quick Dial UK Universities Quick Dial To use the abbreviated dialling codes, press *11 on your handset followed by the appropriate code below. There is no need key 9 for an outside line. University Telephone No Abbreviated

More information

Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014

Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014 Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014 Compiled by Paul Murphy-Kasp August 2014 CONTENTS Road Closures & Map Changes to Bus routes & Map Transport

More information

Govia Thameslink Railway consultation on December 2015 timetable - APTU response

Govia Thameslink Railway consultation on December 2015 timetable - APTU response Thameslink: Bedford to Gatwick Airport and Brighton Q1 What do you think about these proposals noting that it is not possible to serve both London Bridge and London Blackfriars stations from Preston Park,

More information

Planned Expenditure by Local Authorities: Services for Young People

Planned Expenditure by Local Authorities: Services for Young People Planned Expenditure by Local Authorities: Services for Young People Section 251 Under Section 251 of the Apprenticeships, Skills, Children and Learning Act 2009, local authorities are required to submit

More information

Supplementary information for Parliamentary Questions UIN : VOA Closures and UIN : VOA Staff. 15 December 2017

Supplementary information for Parliamentary Questions UIN : VOA Closures and UIN : VOA Staff. 15 December 2017 Supplementary information for Parliamentary Questions UIN 117327: VOA Closures and UIN 117328: VOA Staff 15 December 2017 Notes about this release All dates shown in the attached pack are provisional and

More information

PROPOSALS FOR MEDIUM AND LONG TERM DEVELOPMENT

PROPOSALS FOR MEDIUM AND LONG TERM DEVELOPMENT MICHAEL SCHABAS FIRST CLASS PARTNERSHIPS 28 GRAND AVENUE, LONDON UNITED KINGDOM N10 3BB WWW.FCPWORLD.NET 13 July 2013 Airports Commission By email to airport.proposals@airports.gsi.gov.uk PROPOSALS FOR

More information

PQ Local Authorities with exceedances of NO 2 annual mean limit value (based on 2015

PQ Local Authorities with exceedances of NO 2 annual mean limit value (based on 2015 PQ 47949 - Local Authorities with exceedances of NO 2 annual mean limit value (based on 2015 compliance assessment) Local Authorities with exceedances of NO 2 annual mean limit value (based on 2015 compliance

More information

550,270 sq ft TO LET AVAILABLE Q1 2019

550,270 sq ft TO LET AVAILABLE Q1 2019 UNDER CONSTRUCTION 10 EASTWOOD NG16 3UA CROSS-DOCKED WAREHOUSE/DISTRIBUTION UNIT 550,270 sq ft TO LET Q1 2019 J26-7 minutes Ample car and HGV parking with potential for more 50m yards on both sides 15m

More information

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: and Merseyside conurbation. (extract from HS2 High Speed to Nowhere)

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: and Merseyside conurbation. (extract from HS2 High Speed to Nowhere) APPENDIX 3 CNNECTIVITY IMPRVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FR: IVERP and Merseyside conurbation (extract from HS2 High Speed to Nowhere) Appendix 3 : iverpool Page 268 Introduction & key results

More information

Cross-London Inter-Regional Connections

Cross-London Inter-Regional Connections Cross-London Inter-Regional Connections This article refers to and should be read in conjunction with the article Towards a High Speed Network. That article sought to make the case for developing a network

More information

98 Manor Way, Beckenham, Kent BR3 3LR

98 Manor Way, Beckenham, Kent BR3 3LR 98 Manor Way, Beckenham, Kent BR3 3LR 020 8650 0667 www.westlondonlinegroup.org.uk RECOMMENDATIONS FOR HS2, CROSSRAIL AND OLD OAK COMMON INTERCHANGE DECEMBER 2013 1 1. High Speed London Birmingham BIRMINGHAM

More information

Anglia Winter Key Route Strategy (KRS) 2017/18

Anglia Winter Key Route Strategy (KRS) 2017/18 Anglia Winter Key Route Strategy (KRS) 2017/18 This is an overview of the train service plan should Key Route Strategy be declared. The principle of the KRS is to ensure we can run a service during conditions

More information

Connecting People, Connecting Business

Connecting People, Connecting Business Connecting People, Connecting Business Connecting People, Connecting Business 1 East West Rail is a scheme to re-establish a rail link between Cambridge and Oxford to improve rail services between East

More information

City employment: An overview from the Business Register & Employment Survey (BRES)

City employment: An overview from the Business Register & Employment Survey (BRES) employment September 2012 employment: An overview from the Business Register & Employment Survey (BRES) Rachel Smith, September 2012 On 28 September, the latest employment estimates for 2011, taken from

More information

Appendix 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes

Appendix 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes Appendix 8 Capacity and Service Disbenefits Prepared by Christopher Stokes 8 CAPACITY AND SERVICE DISBENEFITS Prepared by Christopher Stokes Introduction 8.1 This appendix considers the following major

More information

Council Performance Ratings 2010

Council Performance Ratings 2010 Council Performance Ratings 2010 Tameside Metropolitan Borough Council North West 4 - Performs excellently Wandsworth Borough Council London 4 - Performs excellently City of Westminster Council London

More information

National Rail Passenger Survey Heathrow Connect TOC Report Autumn 2017 (Wave 37)

National Rail Passenger Survey Heathrow Connect TOC Report Autumn 2017 (Wave 37) National Rail Passenger Survey TOC Report (Wave 37) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk Pam

More information

Numbers achieving 3 A grades in specific A-Level combinations by school type and LEA

Numbers achieving 3 A grades in specific A-Level combinations by school type and LEA Numbers achieving 3 A grades in specific A-Level combinations by school type and LEA Statistics Report Series No. 9 Joanne L. Emery February 2009 Research Division Statistics Group Assessment, Research

More information

GTR December 2015 timetable consultation

GTR December 2015 timetable consultation GTR December 2015 timetable consultation Date issued: 14 November 2014 December 2015 timetable consultation Introduction GTR stands for Govia Thameslink Railway. By July 2015, we ll be the largest train

More information

ALDERNEY GUERNSEY 3 BARRA BENBECULA 1 BELFAST CITY (GEORGE BEST) BELFAST INTERNATIONAL 17 BELFAST INTERNATIONAL LIVERPOOL (JOHN LENNON) 1

ALDERNEY GUERNSEY 3 BARRA BENBECULA 1 BELFAST CITY (GEORGE BEST) BELFAST INTERNATIONAL 17 BELFAST INTERNATIONAL LIVERPOOL (JOHN LENNON) 1 Landings Diverted To Classified by Airport of and Table 7.1 ABERDEEN DUNDEE 2 DURHAM TEES VALLEY 1 EAST MIDLANDS INTERNATIONAL 1 EDINBURGH 8 GLASGOW 7 HUMBERSIDE 3 INVERNESS 10 PRESTWICK 1 Total ABERDEEN

More information

National Report To Postcomm and Postwatch

National Report To Postcomm and Postwatch Licence Condition 4.6 (a) and (b) Licence Condition 4.9 (a) Licence Condition 5.6 (a) and (b) National Report To Postcomm and Postwatch 2008/09 Quarter 1 Report NATIONAL QUARTER 1 REPORT 2008 / 2009 CONTENT

More information

National Rail Passenger Survey Heathrow Connect TOC Report Spring 2017 (Wave 36)

National Rail Passenger Survey Heathrow Connect TOC Report Spring 2017 (Wave 36) National Rail Passenger Survey TOC Report 17 (Wave 36) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk

More information

Annex 3: CCGs confirmed for waves 1, 2, 3 and 4 for authorisation

Annex 3: CCGs confirmed for waves 1, 2, 3 and 4 for authorisation Annex 3: s confirmed for waves 1, 2, 3 and 4 for authorisation Below is a list of the clinical commissioning groups (s) which will be put forward for authorisation in wave 1, split by Commissioning Board

More information