Anglia Winter Key Route Strategy (KRS) 2017/18

Size: px
Start display at page:

Download "Anglia Winter Key Route Strategy (KRS) 2017/18"

Transcription

1 Anglia Winter Key Route Strategy (KRS) 2017/18 This is an overview of the train service plan should Key Route Strategy be declared. The principle of the KRS is to ensure we can run a service during conditions in which even with point heaters on point work would still be overwhelmed this could be due to forecasted heavy snowfall within a short period of time or the cumulating effect after multiple days of snowfall. It is possible that the KRS could be implemented on some lines of route but not others due to the geographical spread of the route. This will be communicated out as necessary before implementation of the KRS. *When KRS is implemented the route availability will be from 0600 to 2200 in line with staffing availability of Snow men. Respective SPOC s and deputies for Anglia Route KRS: TOC SPOC Deputy Greater Anglia Gold On-call C2C GTR Gold On Call ARL Control Shift Manager TFL Rail Greater Anglia Once units are marshalled for the day s service, there are no planned split/attach moves within the plan. This does lead to additional ECS moves to and from depots, but makes the overall plan more robust. Longer distance services have longer turn rounds at destinations. All trains have been given extra running time and dwell time at stations, to allow for the conditions. Classes 317 and 321, limited to 60mph, and as such times have been adjusted to reflect this. West Anglia: Sub lines only, platforms 1-7, at Bethnal Green, services towards Seven Sisters Sub line to Hackney Downs, all other services via the Fast Lines Mainline: Main lines only to Shenfield and platform 8-14 The below is a summary of service for each of the three areas, on a route by route basis.

2 North Area: Norwich to Cambridge Saturday service, longer turnarounds at Norwich. Ipswich to Cambridge Saturday service with slightly longer journey times and longer turnarounds at Cambridge. Ipswich to Peterborough Saturday service with minor re-timings. Norwich to Lowestoft Saturday service with minor-retimings. All other Routes All other North area routes are not included in the plan, due to Network Rail not guaranteeing the point work being available en route. Services to be run as appropriate under control arrangements, based on available resources. South East Area: London to Southend Victoria 2 TPH all day increasing to 4 TPH in the peaks. All trains 12 coaches Wickford to Southminster 1 Shuttle Train in service 90min frequency if points at Wickford and Fambridge allow. London to Colchester / Ipswich 2 TPH calling all stations, all trains 12 coaches. 1 TPH London Colchester. Class 321s. 1 TPH London Ipswich. Class 360s. Additional peak services will operate to/from Colchester to London. London to Norwich 1 TPH all day plus 3 extra services in the peaks. Witham to Braintree 1 TPH, 60min frequency with Witham connections with mainline services. Colchester to Clacton 1 TPH shuttle service, all stations except Colchester Town. All trains 8 coaches Additional peak services will operate to/from Clacton to London (12 coaches). Thorpe LS to Walton on the Naze 1 TPH 60min frequency connecting at Thorpe LS with Clacton services. If local conditions allow (i.e. points at Thorpe le Soken and Kirby Cross. Manningtree to Harwich Town 1 TPH 60min frequency connecting at Manningtree with mainline services if local conditions allow (i.e. points at Manningtree and Harwich International).

3 West Area: London to Bishop s Stortford 1 TPH calling Tottenham Hale, then all stations from Ponders End to Bishop s Stortford with 1 TPH calling Northumberland Park. No service to Stratford from West Anglia. All trains 8 coaches. London to Stansted Airport 2 TPH calling Tottenham Hale, Harlow Town and Bishop s Stortford with 1 TPH calling Stansted Montfichet. All class 379 and 8 coaches. London to Cambridge 2 TPH, Saturday timetable with revised timings and stopping patterns. All class 379 and 8 coaches. Broxbourne to Hertford East 1 TPH 60min frequency using one train connecting at Broxbourne with mainline services. If local conditions allow (i.e. points at Broxbourne, Broxbourne Junction, Ware and Hertford East). These trains are shown as Q paths in the bid, and will have crew allocated to them. Control to liven up trains in systems if able to operate. Cambridge to King s Lynn GTR will operate an hourly shuttle from Cambridge to King s Lynn. No GA services. TFL Rail London to Shenfield (Metro) Services to run every 10 mins, but run fast from Ilford to Stratford in the peak direction during the peaks. Supplementary Gidea Park / Chadwell Heath services may be introduced to serve Manor Park, Forest Gate and Maryland. All TfL Rail services between Liverpool Street and Shenfield will have an additional 5 minute journey time during snow level 2 & 3. London to Brentwood Saturday timetable, 10 minute frequency, with VSTP enhancements. All trains 8 coaches. Potential for additional services during peak hours. All TfL Rail services between Liverpool Street and Brentwood will have an additional 5 minute journey time during snow level 2 & 3. Arriva Rail London Romford to Upminster Point work to get unit on branch not covered by Network Rail staff, significant risk to disruption of mainline services if points fail when accessing branch. However, a service may run on Romford - Upminster if there is already a

4 unit on the branch when the KRS is implemented. London to Chingford Saturday timetable, 15 minute frequency. All trains 8 coaches. Chingfords to run on the fast lines London to Cheshunt No services. London to Enfield Town Saturday timetable, 15 minute frequency during peak hours and 30 minute service off peak. All trains 8 coaches. All service to run on the sub lines. North London Line / West London Line 3 TPH will be running in each direction between Clapham Jn and Stratford. There will be no service between Willesden Jn and Richmond. ARL is doing this in order to minimize the use of points at Willesden Jn. The Willesden-Clapham service is much busier (with fewer alternatives) than the Willesden Richmond service. Although NR Sussex have stated that they cannot man the WLL as part of their KRS, it has been indicated by Sussex and LNW Routes that routes at Latchmere and Mitre Bridge Junctions respectively will be secured in ARL s favour, using P17 at Clapham Jn. DC Line Not Anglia route but no service will run. Gospel Oak Barking Line 3 TPH all day. East London Line 3 TPH Highbury West Croydon 4 TPH Dalston Jn New Cross. No service to Crystal Palace. Points to note are that we will need Kensal Green Jn, Camden Rd West Jn, and Gospel Oak Jn available and be able to get units to/from East Ham to get ARL ECSs in the right place. Away from the Anglia Route ARL will need the New Lines to be fully accessible from Willesden Jn and be able to turn ECS moves at Queen s Park. - C2C There are two timetable options; Snow Plan and Snow Plan Lite The core service pattern will be: London Fenchurch Street to Shoeburyness via Laindon London Fenchurch Street to Pitsea via Rainham Upminster Grays via Ockendon Mainline:

5 Up Road: 4 TPH until 0935 then 2tph to 1405, then 4tph until 1905 then 2tph. Services will call at all stations via Laindon. Down Road: 4 TPH until 0930hrs, 2 TPH until 1430hrs, 4 TPH until 2030hrs then 2 TPH until end of service. Platform 2 at Laindon and Leigh on Sea are expected to be unavailable, as are Platforms 1 & 4 at Southend Central. Train Length: Services will operate in 8-car fixed formation with coupler bags fitted on each leading end. Rainham / Tilbury: Down Road: 2 TPH all day Fenchurch Street to Pitsea via the Down Tilbury Line, Platform 7 Barking, Platform 2 at Grays and Platform 3 at Pitsea. Up Road: 2 TPH all day to Fenchurch Street via the Up Tilbury Line Platform 1 at Grays, Platform 8 at Barking and the Up Main Line calling at all intermediate stations. Platform 4 at Pitsea is to be used until 0620 hours. Train Length: Services will operate in 8-car fixed formation with coupler bags on each leading end. Ockendon: Single Train Working. Service every 45 minutes starting from Upminster Platform 1A and Grays Platform 3. Services will use Platform 1 at Ockendon and the Reversible Line (3rd Line) at West Thurrock Junction to Platform 3 at Grays. Ockendon passing loop unavailable. Require access to single line to lock-in and extract the unit from the branch. The unit will run with coupler bags on each leading end. Train Length: Services will operate in 4-car formation owing to Platform 1A at Upminster being inadequate (7-cars). Govia Thameslink Railway Great Northern Severe Weather Timetable 2 TPH Kings Cross Cambridge (semi fast) 1 TPH Cambridge Kings Lynn 1 TPH Cambridge Royston Class 321 EMUs will be used. All Outer services timed as Class 317s. Graduated SRTs to avoid inflated time at the end of journey 60mph running assumed. Great Northern Resource Deficient Timetable 1 TPH Kings Cross Cambridge (semi fast). Cambridge Ely / Kings Lynn booked service over Fens. 1 TPH Cambridge Royston.

6 Cross Country Trains Run a normal hourly timetable EMT Run a normal hourly timetable. FOC Both corridors out of Felixstowe, crosscountry and London. North Walsham to Harwich.

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE Correct at time of publication 2018 Sat 22 December Sun 23 December Mon 24 December (Christmas Eve) Tues 25 December (Christmas Day) Weds 26 December (Boxing Day)

More information

Penalty Fares Scheme. Comments by Transport Focus. Abellio East Anglia Ltd. 16 October Abellio East Anglia Operating Route October 2016

Penalty Fares Scheme. Comments by Transport Focus. Abellio East Anglia Ltd. 16 October Abellio East Anglia Operating Route October 2016 Penalty Fares Scheme Comments by Transport Focus Abellio East Anglia Ltd 16 October 2016 Abellio East Anglia Operating Route October 2016 1 Introduction 1.1 We, Abellio East Anglia Ltd, give notice, under

More information

c2c s timetable consultation Passenger Focus report

c2c s timetable consultation Passenger Focus report c2c s timetable consultation Passenger Focus report August 2006 c2c s timetable consultation 16 March 2006 14 April 2006 Introduction Passengers were recently consulted on c2c s plans to make changes to

More information

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c. Abellio ScotRail Arriva Rail London Alliance Rail Arriva Trains Wales c2c Chiltern Railways Colas Rail CrossCountry DB Cargo (UK) Limited Devon & Cornwall Railway Direct Rail Services East Midlands Trains

More information

GTR 2018 timetable proposals

GTR 2018 timetable proposals GTR 2018 timetable proposals Wednesday 16 November 2016 Phil Hutchinson - Head of Strategic Planning and team Thameslink Programme and GTR The GTR franchise was created to deliver the Thameslink Programme.

More information

Suffolk Chamber Transport Board Greater Anglia. 16 January 2018

Suffolk Chamber Transport Board Greater Anglia. 16 January 2018 Suffolk Chamber Transport Board Greater Anglia 16 January 2018 Greater Anglia update GEML Taskforce NRPS Spring 2017 results Fleet reliability and refresh initiatives Timetable improvements New trains

More information

Pritlewell Station - Mobile Catering Opportunity

Pritlewell Station - Mobile Catering Opportunity Pritlewell Station - Mobile Catering Opportunity Town/city: Essex Newmarket Station - Mobile Catering Opportunity Town/city: Suffolk Lingwood Crossing Cottage - Residential Opportunity Type: residential

More information

Connecting local communities

Connecting local communities Route Plans 2009 Route 7 Great Eastern Connecting local communities Network Rail helps bring Britain together. We own, operate and maintain the rail network, delivering improved standards of safety, reliability

More information

National Rail Passenger Survey: User Guidance Report

National Rail Passenger Survey: User Guidance Report National Rail Passenger Survey: User Guidance Report Spring 2015 (Wave 32) Rebecca Joyner Director Tel: 020 7490 9148 rebecca.joyner@bdrc continental.com Contents Page No. 1. Background... 1 2. Summary

More information

HS11/HS12 Mk2 Route Loadings

HS11/HS12 Mk2 Route Loadings HS11/HS12 Mk2 Route Loadings Introduction Deriving the route loadings for a given service plan can be a difficult and tedious matter, and very prone to error. Furthermore, understanding what a given loading

More information

Michèle Dix Managing Director 17 January 2018

Michèle Dix Managing Director 17 January 2018 Crossrail 2 Michèle Dix Managing Director 17 January 2018 1.Introduction 2.Hertfordshire s challenges 3.What Crossrail 2 would achieve 4.Next steps 3 Crossrail 2 A proposed new railway serving London and

More information

Making rail accessible: helping older and disabled customers

Making rail accessible: helping older and disabled customers London Overground Making rail accessible: helping older and disabled customers November 2016 1 Contents Our commitment to you page 3 Policy summary page 4 Assistance for customers page 5 Alternative accessible

More information

PROPOSALS FOR MEDIUM AND LONG TERM DEVELOPMENT

PROPOSALS FOR MEDIUM AND LONG TERM DEVELOPMENT MICHAEL SCHABAS FIRST CLASS PARTNERSHIPS 28 GRAND AVENUE, LONDON UNITED KINGDOM N10 3BB WWW.FCPWORLD.NET 13 July 2013 Airports Commission By email to airport.proposals@airports.gsi.gov.uk PROPOSALS FOR

More information

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) 1. The Forest Hill Society represents residents in and around the Forest Hill and Honor Oak Park

More information

Elizabeth line Services

Elizabeth line Services Elizabeth line Services Steve Murphy Managing Director MTR Crossrail 17 th April 2018 London TravelWatch Timescales Stage 0-1: Shenfield / Liverpool Street Stage 0 (May 2015) marked the commencement of

More information

Making rail accessible: Helping older and disabled customers. October 2018

Making rail accessible: Helping older and disabled customers. October 2018 Making rail accessible: Helping older and disabled customers October 2018 Contents Our commitment to you... page 3 Policy summary... page 5 Assistance for customers... page 6 Alternative accessible transport...

More information

NETWORK RAIL Anglia Route AR 9

NETWORK RAIL Anglia Route AR 9 PRIVATE AND NOT FOR PUBLICATION NETWORK RAIL Anglia Route Week No. AR 9 WEEKLY OPERATING NOTICE Containing SAFETY NOTICES TEMPORARY SPEED RESTRICTIONS ENGINEERING ARRANGEMENTS SIGNALLING AND PERMANENT

More information

Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX

Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX National Rail Passenger Survey TOC Report 16 (Wave 34) Due to a technical query sector scores may need to be revised slightly at a future date - as such current scores should be treated as provisional

More information

National Rail Passenger Survey: User Guidance Report. Spring 2014 (wave 30)

National Rail Passenger Survey: User Guidance Report. Spring 2014 (wave 30) National Rail Passenger Survey: User Guidance Report Spring 2014 (wave 30) Rebecca Joyner Director Tel: 020 7490 9148 rebecca.joyner@bdrc continental.com Contents Page No. 1. Background... 1 2. Summary

More information

National Rail Passenger Survey: User Guidance Report

National Rail Passenger Survey: User Guidance Report National Rail Passenger Survey: User Guidance Report Autumn 2015 (Wave 33) Rebecca Joyner Director Tel: 020 7490 9148 rebecca.joyner@bdrc-continental.com Contents Page No. 1. Background... 1 2. Summary

More information

National Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29)

National Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29) National Rail Passenger Survey: User Guidance Report Autumn 2013 (wave 29) Rebecca Joyner Research Director Tel: 020 7490 9148 rebecca.joyner@bdrc continental.com Contents Page No. 1. Background... 1 2.

More information

Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013

Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013 Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013 Compiled by Paul Murphy August 2013 Correct as of Friday 23 rd August 2013 CONTENTS Road Closures & Map Changes

More information

ASLEF s Response to the East Anglia Rail Franchise Consultation

ASLEF s Response to the East Anglia Rail Franchise Consultation ASLEF s Response to the East Anglia Rail Franchise Consultation 1. The Associated Society of Locomotive Engineers and Firemen (ASLEF) is the UK s largest train driver s union representing approximately

More information

Bus Passenger News April 2016

Bus Passenger News April 2016 Bus Passenger News April 2016 This newsletter provides information on forthcoming changes to local bus services in Essex. There are a significant number of changes occurring to bus services on 10 April

More information

Bus Passenger News September/October 2016

Bus Passenger News September/October 2016 Bus Passenger News September/October 2016 This newsletter provides information on forthcoming changes to local bus services in Essex. A summary of each change is provided as it is not possible to publish

More information

National Rail Passenger Survey Main Report Spring 2018

National Rail Passenger Survey Main Report Spring 2018 National Rail Passenger Survey Main Report Spring 2018 Transport Focus is the independent transport user watchdog Our mission is to get the best deal for passengers and road users. With a strong emphasis

More information

National Rail Passenger Survey Virgin Trains East Coast TOC Report Spring 2018 (Wave 38)

National Rail Passenger Survey Virgin Trains East Coast TOC Report Spring 2018 (Wave 38) National Rail Passenger Survey TOC Report 18 (Wave 38) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk

More information

Putting Havering on the map

Putting Havering on the map Putting Havering on the map Click on this page to go to the Havering map and from there, each development s information Cambridge M1 M11 Ipswich Felixstowe London Luton London Stansted Harwich M40 London

More information

Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX

Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX National Rail Passenger Survey TOC Report 16 (Wave 4) scores are the subject of technical query and may need to be revised at a future date - as such the current scores should be treated as provisional.

More information

GTR December 2015 timetable consultation

GTR December 2015 timetable consultation GTR December 2015 timetable consultation Date issued: 14 November 2014 December 2015 timetable consultation Introduction GTR stands for Govia Thameslink Railway. By July 2015, we ll be the largest train

More information

National Rail Passenger Survey Heathrow Connect TOC Report Spring 2017 (Wave 36)

National Rail Passenger Survey Heathrow Connect TOC Report Spring 2017 (Wave 36) National Rail Passenger Survey TOC Report 17 (Wave 36) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk

More information

National Rail Passenger Survey East Midlands Trains TOC Report Spring 2016 (Wave 34)

National Rail Passenger Survey East Midlands Trains TOC Report Spring 2016 (Wave 34) National Rail Passenger Survey TOC Report 16 (Wave 34) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk

More information

National Rail Passenger Survey Heathrow Connect TOC Report Autumn 2017 (Wave 37)

National Rail Passenger Survey Heathrow Connect TOC Report Autumn 2017 (Wave 37) National Rail Passenger Survey TOC Report (Wave 37) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk Pam

More information

Summary of questions and discussion

Summary of questions and discussion London and South East Route Utilisation Strategy - Rail User Group Meeting Saturday 11 July 2009 Chair- Ashwin Kumar, Passenger Director, Passenger Focus Summary of questions and discussion A - Comments,

More information

Railfuture East Anglia Autumn 2018 Public Meeting

Railfuture East Anglia Autumn 2018 Public Meeting Railfuture Autumn 2018 Public Meeting Update about Railfuture activities and progress of rail schemes Friends Meeting House Upper Goat Lane, Norwich 29 th September 2018 1 Making Travel Easier Including

More information

National Rail Passenger Survey Autumn 2015 Main Report

National Rail Passenger Survey Autumn 2015 Main Report National Rail Passenger Survey Autumn 2015 Main Report Transport Focus is the independent transport user watchdog Our mission is to get the best deal for passengers and road users. With a strong emphasis

More information

45,000 SQ FT HEADQUARTERS BUILDING AVAILABLE TO PRE-LET

45,000 SQ FT HEADQUARTERS BUILDING AVAILABLE TO PRE-LET 45,000 SQ FT HEADQUARTERS BUILDING AVAILABLE TO PRE-LET ARE YOU CM2? CM2 IS A 44,736 SQ FT LANDMARK HEADQUARTERS BUILDING LOCATED JUST TWO MILES FROM THE HEART OF CHELMSFORD CITY CENTRE. CM2 Anderson Group

More information

45,000 sq ft headquarters building available to pre-let

45,000 sq ft headquarters building available to pre-let 45,000 sq ft headquarters building available to pre-let are you cm2? CM2 is a 44,736 sq ft landmark headquarters building located just two miles from the heart of Chelmsford city centre. CM2 Anderson Group

More information

London and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009

London and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009 London and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009 Appendix 1 Flip chart notes from Breakout Groups Groups were asked to consider what gaps and issues

More information

Stakeholder News. // 4m service. Welcome from MD, Jamie Burles. improvements. Issue 11 September 2015

Stakeholder News. // 4m service. Welcome from MD, Jamie Burles. improvements. Issue 11 September 2015 Stakeholder News Issue 11 September 2015 Welcome from MD, Jamie Burles Welcome to the latest edition of Stakeholder News. It contains updates on key developments and progress over the last couple of months,

More information

YOUR SPACE COLCHESTER

YOUR SPACE COLCHESTER YOUR SPACE COLCHESTER Evolve is a unique new concept in flexible, affordable, self-contained workspace. Designed for both start-up and investment. Consider the facts: I can own my own freehold commercial

More information

Archived News & Gen Week commencing 18/03/12

Archived News & Gen Week commencing 18/03/12 Archived News & Gen Week commencing 18/03/12 18/03/12 Virgin Trains Planned engineering work took place at various locations between London and Norwich today. All services that did run were worked by units;

More information

HIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK

HIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK HIGH SPEED UK..connecting in London Colin Elliff BSc CEng MICE Civil Engineering Principal, Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, www.highspeeduk.co.uk HS2+3 GL EH GL

More information

98 Manor Way, Beckenham, Kent BR3 3LR

98 Manor Way, Beckenham, Kent BR3 3LR 98 Manor Way, Beckenham, Kent BR3 3LR 020 8650 0667 www.westlondonlinegroup.org.uk RECOMMENDATIONS FOR HS2, CROSSRAIL AND OLD OAK COMMON INTERCHANGE DECEMBER 2013 1 1. High Speed London Birmingham BIRMINGHAM

More information

GTR 2018 Timetable Consultation Results (phase one) Date issued: Monday 26 June 2017

GTR 2018 Timetable Consultation Results (phase one) Date issued: Monday 26 June 2017 GTR 2018 Timetable Consultation Results (phase one) Date issued: Monday 26 June 2017 Our consultation setting new industry standards An industry first Two phased approach Consulted the consultation process

More information

The case for a local rail station. At Great Blakenham, Suffolk.

The case for a local rail station. At Great Blakenham, Suffolk. The case for a local rail station At Great Blakenham, Suffolk. The London to Norwich (Great Eastern) main rail line passes through Great Blakenham in Suffolk, a village which adjoins Claydon and Barham.

More information

Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017

Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017 Crossrail transforming travel across the capital - Railtex conference Jeremy Long, MTR Corporation, CEO European Business 9 May 2017 Page 1 The Crossrail Journey Construction May 2015 Dec 2018 Page 2 Crossrail

More information

Making rail accessible. Helping older and disabled passengers

Making rail accessible. Helping older and disabled passengers Making rail accessible Helping older and disabled passengers Valid from October 2016 Contents GREAT TO HAVE YOU ON BOARD We recognise the unique needs of older and disabled customers when using the public

More information

Crossrail transforming travel across London - Infrarail

Crossrail transforming travel across London - Infrarail Crossrail transforming travel across London - Infrarail Jeremy Long, MTR Corporation, CEO European Business 2 May 2018 Page 1 The Crossrail Journey Construction May 2015 Dec 2018 Page 2 Crossrail the 15bn

More information

SCIENTIFIC RESEARCH AND DEVELOPMENT

SCIENTIFIC RESEARCH AND DEVELOPMENT M11.J7 / HARLOW / CM19 5AW SCIENTIFIC RESEARCH AND DEVELOPMENT 241,000 SQ FT AVAILABLE JANUARY 2019 SCIENCE CO ECTED Introducing the former GlaxoSmithKline facility used for research, development and manufacturing

More information

The Brighton mainline Route Utilisation Strategy. Making it work for passengers. A paper by London TravelWatch and Passenger Focus

The Brighton mainline Route Utilisation Strategy. Making it work for passengers. A paper by London TravelWatch and Passenger Focus The Brighton mainline Route Utilisation Strategy Making it work for passengers A paper by London TravelWatch and Passenger Focus 1 Executive summary This paper is issued by London TravelWatch and Passenger

More information

Central Section Conditional Outputs Statement

Central Section Conditional Outputs Statement Railfuture Oxford to Cambridge (East West Rail) campaign Briefing note on the East West Rail route Central Section conditional outputs statement and benefits to Cambridgeshire Central Section Conditional

More information

Network Rail 2014 Customer Survey Report

Network Rail 2014 Customer Survey Report GfK 2014 GfK Business Network Rail Customer Report 2014 Network Rail 2014 Customer Survey Report Route Report: Anglia Prepared by: January 2015 14-Jan-15 / 1 GfK 2014 GfK Business Network Rail Customer

More information

EAST WEST RAIL EASTERN SECTION. prospectus for growth

EAST WEST RAIL EASTERN SECTION. prospectus for growth EAST WEST RAIL EASTERN SECTION prospectus for growth September 2018 executive summary The East West Rail Consortium, a partnership of local authorities, rail operators and Network Rail, continues to promote

More information

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Chapter 4 Route Window NE3 Manor Park station. Transport for London Chapter 4 Route Window NE3 Manor Park station MANOR PARK STATION 4 Route Window NE3 Manor Park station 4.7 Highway access to Manor Park station is very good. A117 Station Road connects with A116 to the

More information

NR is also currently conducting two other studies, those for the Cambridgeshire Corridor and for Ely Area Capacity Enhancements.

NR is also currently conducting two other studies, those for the Cambridgeshire Corridor and for Ely Area Capacity Enhancements. Joint Response to draft East Coast Main Line Route Study 8 March 2018 For and on behalf of the Borough Council of King s Lynn & West Norfolk, Fen Line Users Association, King s Lynn BID Ltd and Norfolk

More information

Crossrail: Socio-Economic Technical Report

Crossrail: Socio-Economic Technical Report Crossrail: Socio-Economic Technical Report Cross London Rail Links Ltd Feb 2005 Crossrail: Socio-Economic Technical Report - Project No: 72711 Feb 2005 Prepared by: Approved by: John Siraut, Paul Buchanan,

More information

campaigning by the Railway Development Society Limited

campaigning by the Railway Development Society Limited London & South East The Combined Franchise Replacement Sponsor Department for Transport Zone 3/15, Great Minster House, 33 Horseferry Road, London SW1P 4DR campaigning by the Railway Development Society

More information

Improving stations: improving passenger satisfaction. October 2016

Improving stations: improving passenger satisfaction. October 2016 Improving stations: improving passenger satisfaction October 2016 1 Contents Introduction... 3 Summary of overall satisfaction... 5 Trends over time... 7 Station-specific examples... 9 Reading station...

More information

Current Contents of Website, and Version History V5.17

Current Contents of Website, and Version History V5.17 Current Contents of Website, and Version History V5.17 The current contents of the website are: Articles on High Speed Rail Towards a High Speed Network v14.3 Towards a High Speed Network the Maps v2.0

More information

Cabinet. South Western Railway Timetable Consultation Response. Date of Meeting 6 December 2017

Cabinet. South Western Railway Timetable Consultation Response. Date of Meeting 6 December 2017 Cabinet Date of Meeting 6 December 2017 Cabinet Member Cllr Daryl Turner Cabinet Member for Natural and Built Environment Lead Director Mike Harries Corporate Director for Environment and Economy Subject

More information

News & Gen Report for week commencing 4 th July 2010

News & Gen Report for week commencing 4 th July 2010 News & Gen Report for week commencing 4 th July 2010 4 th July Firstscotrail Sleeper Diversions: Up Services The Glasgow portion of 1m11 left Glasgow at 21:39 where it travelled to Edinburgh to join the

More information

BUILD TO SUIT INDUSTRIAL / LOGISTICS DEVELOPMENT

BUILD TO SUIT INDUSTRIAL / LOGISTICS DEVELOPMENT M11.J7 / HARLOW / M19 5AW BUILD TO SUIT INDUSTRIAL / LOGISTIS DEVELOPMENT 50,000-200,000 SQ FT FREEHOLD / LEASEHOLD LOGISTIS O ETED Introducing a new industrial / logistics opportunity with a blank canvas

More information

THE IMPACT OF STANSTED EXPANSION UPON SURFACE ACCESS NETWORKS

THE IMPACT OF STANSTED EXPANSION UPON SURFACE ACCESS NETWORKS THE IMPACT OF STANSTED EXPANSION UPON SURFACE ACCESS NETWORKS Report to Stop Stansted Expansion Berkeley Hanover Consulting Suite 23 Coleridge House 4/5 Coleridge Gardens London NW6 3QH Tel: 020 7372 2600

More information

Cross-London Inter-Regional Connections

Cross-London Inter-Regional Connections Cross-London Inter-Regional Connections This article refers to and should be read in conjunction with the article Towards a High Speed Network. That article sought to make the case for developing a network

More information

Govia Thameslink Railway consultation on December 2015 timetable - APTU response

Govia Thameslink Railway consultation on December 2015 timetable - APTU response Thameslink: Bedford to Gatwick Airport and Brighton Q1 What do you think about these proposals noting that it is not possible to serve both London Bridge and London Blackfriars stations from Preston Park,

More information

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London Chapter 8 Route Window NE7 Chadwell Heath station Transport CHADWELL HEATH STATION 8 Route Window NE7 Chadwell Heath station Baseline conditions 8.6 This route window lies within the London Boroughs of

More information

National Rail Performance Report - Quarter /16 (January-March 2016)

National Rail Performance Report - Quarter /16 (January-March 2016) National Rail Performance Report - Quarter 4 2015/16 (January-March 2016) May 2016 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling public. Our role

More information

Cycle Tendring. Great Bicycle rides around the Clacton and Great Bentley area

Cycle Tendring. Great Bicycle rides around the Clacton and Great Bentley area 5 Cycle Tendring Great Bicycle rides around the Clacton and Great Bentley area Cycle Tendring Why not discover and explore the beauty of the Tendring Peninsula by bike? There s nothing like following

More information

railse no. 111 March 2011

railse no. 111 March 2011 railse no. 111 March 2011 Railfuture in London and the South East quarterly branch newsletter Campaigning by the Railway Development Society in London and the Home Counties - Kent, Surrey, Sussex, south

More information

London TravelWatch Response to the West Coast Main Line Route Utilisation Strategy Draft for Consultation

London TravelWatch Response to the West Coast Main Line Route Utilisation Strategy Draft for Consultation London TravelWatch Response to the West Coast Main Line Route Utilisation Strategy Draft for Consultation March 2011 London TravelWatch is the official body set up by Parliament to provide a voice for

More information

Discussion Paper. Peterborough. Corby. Kettering. Northampton. Cambridge. Bedford Sandy. Milton Keynes. Bletchley. Hitchin. Stevenage.

Discussion Paper. Peterborough. Corby. Kettering. Northampton. Cambridge. Bedford Sandy. Milton Keynes. Bletchley. Hitchin. Stevenage. EAST WEST RAIL Central Section - Operating Case Discussion Paper February 2009 Peterborough Corby Kettering Northampton Cambridge Bedford Sandy Milton Keynes Bletchley Hitchin Luton Bicester Aylesbury

More information

Our new Great Western Franchise. Tarka Rail Association AGM June 2015

Our new Great Western Franchise. Tarka Rail Association AGM June 2015 Our new Great Western Franchise Tarka Rail Association AGM June 2015 To cover New Franchise - recap Implications for the line Taking forward the strategy 3 Second Great Western Direct Award Overview Brand

More information

RAILFUTURE LONDON AND SOUTH EAST BRANCH

RAILFUTURE LONDON AND SOUTH EAST BRANCH RAILFUTURE LONDON AND SOUTH EAST BRANCH https://www.railfuture.org.uk/london+and+south+east Minutes of Annual General Meeting held in the Kwanglim Room, Wesley s Chapel, London EC1Y 1AU on Saturday, 28

More information

Crossrail / Elizabeth Line An Update

Crossrail / Elizabeth Line An Update Crossrail / Elizabeth Line An Update Howard Smith Operations Director, Crossrail Railfuture Autumn 2018 Conference 10 th November 2018 Novotel Reading (uploaded to the www.railfuture.org.uk website with

More information

GETTING AROUND LONDON THE RENAISCANCE OF LONDON ORBITAL RAIL SERVICES A 21ST CENTURY SURPRISE?

GETTING AROUND LONDON THE RENAISCANCE OF LONDON ORBITAL RAIL SERVICES A 21ST CENTURY SURPRISE? GETTING AROUND LONDON THE RENAISCANCE OF LONDON ORBITAL RAIL SERVICES A 21ST CENTURY SURPRISE? by Eric Stuart Readers may recall a couple of recent articles, essentially recording the history of rail services

More information

May 2019 Timetable. Highlights and Response to Feedback

May 2019 Timetable. Highlights and Response to Feedback May 2019 Timetable Highlights and Response to Feedback Contents 1. Foreword 2 2. Overview 3 3. Highlights in the May 2019 timetable changes 4 4. Feedback from passengers & stakeholders 6 5. Feedback to

More information

RAILFUTURE. campaigning by the Railway Development Society. A I R P O R T L I N K S

RAILFUTURE. campaigning by the Railway Development Society.   A I R P O R T L I N K S RAILFUTURE campaigning by the Railway Development Society www.railfuture.org.uk A I R P O R T L I N K S INTRODUCTION This report aims to stimulate debate on public transport links to and from UK airports.

More information

London Stansted Noise Complaints Analysis Report 2014

London Stansted Noise Complaints Analysis Report 2014 London Stansted Noise Complaints Analysis Report 214 Introduction The purpose of this report is to provide statistics relating to noise complaints received by London Stansted Airport for the period January

More information

commercial office retail WITHAM ESSEX CM8 1FR

commercial office retail  WITHAM ESSEX CM8 1FR commercial office retail www.gershwinpark.com WITHAM ESSEX CM8 1FR Master Plan Gershwin Park, Witham, is a multi-use development combining a new residential neighbourhood with a range of retail, office

More information

CROSSRAIL INFORMATION PAPER A1 DEVELOPMENT OF THE CROSSRAIL ROUTE

CROSSRAIL INFORMATION PAPER A1 DEVELOPMENT OF THE CROSSRAIL ROUTE CROSSRAIL INFORMATION PAPER DEVELOPMENT OF THE CROSSRAIL ROUTE This paper explains how the Crossrail route set out in the Crossrail Bill was developed. It will be of particular relevance to those interested

More information

The New Northern Franchise

The New Northern Franchise The New Northern Franchise The? Shape of things to come This document is produced by Noel Henry for the Friends of Reddish South and Denton stations campaign group (FORSADS), to highlight the benefits

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Leader and Cabinet 8 May 2008 AUTHOR/S: Executive Director / Senior Planning Policy Officer SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL S RESPONSE TO UTTLESFORD

More information

Initial Road Link Capacity Assessment Land East of Elsenham, Essex The Fairfield Partnership. 31 st July 2006

Initial Road Link Capacity Assessment Land East of Elsenham, Essex The Fairfield Partnership. 31 st July 2006 Initial Road Link Capacity Assessment Land East of Elsenham, Essex The Fairfield Partnership 31 st July 2006 Addendum 26 th September 2007 This addendum to the preliminary Link Capacity Appraisal has been

More information

IPSWICH MEANS BUSINESS

IPSWICH MEANS BUSINESS IPSWICH MEANS BUSINESS Ipswich is the oldest English town that boasts a new waterfront, a university and a cultural centre that attracts visitors from all over the world. Its location makes connection

More information

Highland Mainline Journey Time Improvements Phase 2

Highland Mainline Journey Time Improvements Phase 2 Highland Mainline Journey Time Improvements Phase 2 1 Specified Outputs The objective for the second phase of the HML Improvements project was established in the Scottish Ministers Scotland High Level

More information

Policy committee Item: 11 Ref: PC086. National Rail Performance Report - Quarter (Oct-Dec 2015)

Policy committee Item: 11 Ref: PC086. National Rail Performance Report - Quarter (Oct-Dec 2015) Policy committee 23.02.16 Item: 11 Ref: PC086 National Rail Performance Report - Quarter 3 2015-16 (Oct-Dec 2015) February 2016 London TravelWatch is the official body set up by Parliament to provide a

More information

Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014

Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014 Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014 Compiled by Paul Murphy-Kasp August 2014 CONTENTS Road Closures & Map Changes to Bus routes & Map Transport

More information

Surface Access. Position Statement on behalf of Stop Stansted Expansion

Surface Access. Position Statement on behalf of Stop Stansted Expansion Doc. No. SSE/37 Case Ref. 2032278 Appeal by BAA Ltd and Stansted Airport Ltd following the refusal by Uttlesford District Council of planning application UTT/0717/06/FUL Surface Access Position Statement

More information

NEW ENTERPRISE ZONE DEVELOPMENT SUFFOLK PARK BURY ST EDMUNDS IP32 7QB. HIGH QUALITY BUSINESS SPACE DESIGNED FOR YOU FROM 2,000 to 75,000 sq ft

NEW ENTERPRISE ZONE DEVELOPMENT SUFFOLK PARK BURY ST EDMUNDS IP32 7QB. HIGH QUALITY BUSINESS SPACE DESIGNED FOR YOU FROM 2,000 to 75,000 sq ft SUFFOLK PARK BURY ST EDMUNDS IP32 7QB NEW ENTERPRISE ZONE DEVELOPMENT HIGH QUALITY BUSINESS SPACE DESIGNED FOR YOU FROM 2,000 to 75,000 sq ft suffolk-park.uk SPACE TO CREATE DELIVER GROW Suffolk Park has

More information

London Stansted Noise Complaints Analysis Report 2015

London Stansted Noise Complaints Analysis Report 2015 London Stansted Noise Complaints Analysis Report 2015 Introduction The purpose of this report is to provide statistics relating to noise complaints received by London Stansted Airport for the period January

More information

January EASTERN SECTION prospectus for growth

January EASTERN SECTION prospectus for growth January 2019 EASTERN SECTION prospectus for growth Contents 2 Foreword 4 Our objectives 5 Our offer 10 Our ask 11 How rail improvements will unlock growth 16 Moving forward Front row, from left to right:

More information

Railfuture East Anglia Seamless Public Transport in East Anglia How well integrated are trains and buses?

Railfuture East Anglia Seamless Public Transport in East Anglia How well integrated are trains and buses? Railfuture East Anglia Seamless Public Transport in East Anglia How well integrated are trains and buses? Contents 1. Introduction 2. What do we have already? 3. Further opportunities 4. Obstacles to seamless

More information

LOCATION AND COMMENTS LINES AND FEATURES MILEAGE GRID. REF. UP DOWN GREATER U/BRIDGE A107 UPPER CLAPTON LONDON ROAD

LOCATION AND COMMENTS LINES AND FEATURES MILEAGE GRID. REF. UP DOWN GREATER U/BRIDGE A107 UPPER CLAPTON LONDON ROAD UP DOWN U/BRIDGE A107 UPPER CLAPTON ROAD CLAPTON STATION Situated on A107 Upper Clapton Road at Junction with Gunton Road E.5 U/BRIDGE SOUTHWOLD ROAD L165 3m 78ch 4MP 4m 03ch TQ 348 866 L164 4m 16ch MOUNT

More information

356,500 people commuted to jobs in the City of London. 40 per cent from inner London, 29 per cent from outer London, 31 per cent from outside London

356,500 people commuted to jobs in the City of London. 40 per cent from inner London, 29 per cent from outer London, 31 per cent from outside London CIS 2014-11 Commuting in London July 2014 The 2011 Census recorded the place of work and method of travel to work of all respondents aged 16 or over. The Special Workplace Statistics dataset provides information

More information

First Thameslink trains arrive on Great Northern

First Thameslink trains arrive on Great Northern Major Christmas engineering works Southern passengers in line for better loos and new waiting room at Eastbourne station Govia Thameslink Railway Stakeholder Newsletter Period February 7 2017-182016 Our

More information

London Stansted Airport Noise Complaints Analysis Report 2016

London Stansted Airport Noise Complaints Analysis Report 2016 London Stansted Airport Noise Complaints Analysis Report 2016 Introduction The purpose of this report is to provide statistics relating to noise complaints received by London Stansted Airport for the period

More information

Update on the Thameslink programme

Update on the Thameslink programme A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts

More information

Freedom of Information request Re: paragraph 3.19 and Figure 11 of the NAO s July 2005 report on Maintaining and improving Britain s railway stations

Freedom of Information request Re: paragraph 3.19 and Figure 11 of the NAO s July 2005 report on Maintaining and improving Britain s railway stations Freedom of Information request Re: paragraph 3.19 and Figure 11 of the NAO s July 2005 report on Maintaining and improving Britain s railway stations 1. Paragraph 3.19 of the NAO report points out that,

More information

SUFFOLK PARK BURY ST EDMUNDS IP32 7QB

SUFFOLK PARK BURY ST EDMUNDS IP32 7QB SUFFOLK PARK BURY ST EDMUNDS IP32 7QB NEW BUSINESS PARK WITH ENTERPRISE ZONE STATUS HIGH QUALITY BUSINESS SPACE DESIGNED FOR YOU FROM 2,000 to 75,000 sq ft suffolk-park.uk SPACE TO CREATE DELIVER GROW

More information