Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.
|
|
- Alicia Henry
- 5 years ago
- Views:
Transcription
1 Abellio ScotRail Arriva Rail London Alliance Rail Arriva Trains Wales c2c Chiltern Railways Colas Rail CrossCountry DB Cargo (UK) Limited Devon & Cornwall Railway Direct Rail Services East Midlands Trains Eurostar (UK) First East Coast GTR GTR Southern Great Western Railway Hull Trains Freightliner Group GB Railfreight Grand Central Greater Anglia Heathrow Connect Heathrow Express Island Line Locomotive Services Limited London Underground MTR Crossrail Merseyrail North Yorkshire Moors Railway Northern Rail Operations Group Serco Caledonian Sleeper Sheffield Supertram South Western Railway Southeastern TransPennine Express Tyne & Wear Metro Virgin Trains East Coast Virgin Trains West Coast West Coast Railway Co. West Midlands Trains Anglia London North Eastern & East Midlands London North Western Scotland South East Wales Wessex Western TIMETABLE PARTICIPANTS NETWORK RAIL Calendar of Events Expected Event Type of Event ESG ESG No. May 2019 change to reflect reduced platforms at Euston / Infrastructure West Coast 2 December 2019 May 2020 Great Western Route Modernisation Configuration State C: Crossrail Full Service West - including services to Reading Full Crossrail Service East, including services to Shenfield, Liverpool Street & Abbey Wood. Greater Anglia timetable recast and the introduction of new rolling North of England - TransPennine Express and Northern franchise commitments. New rolling and TransPennine Express services on the East Coast Main Line also introduction of Northern Connect services Thameslink Programme Key Output 2 - up to 24 trains per hour between Blackfriars & St Pancras International and reconstructed London Bridge and Redhill capacity enhancement Enhanced Infrastructure Western & South Wales 5 Enhanced Infrastructure, & Rolling / Infrastructure Anglia 11 North of England 4 Enhanced Infrastructure Thameslink 9 Southampton - West Midlands Freight train lengthening Enhanced Infrastructure Southampton - West Midlands 6 December 2020 Introduction of 6th hourly Long Distance High Speed train service on the Midland Main Line. Electric trains between London and Kettering / Corby. Capacity schemes Bedford to Kettering & Corby / Infrastructure East Midlands 12 May 2021 New East Coast Main Line timetable / Infrastructure East Coast 3 s from Draft May 2019 version are shown in red Participants included are indicative
2 s which are not Events Expected Type of End Reason for not being an Event May 2019 Rolling Programme of Electrification: Midcalder to Holytown (Shotts) route Enhanced Infrastructure May-19 Not expected to drive significant timetable change East Midlands franchise New franchise Aug-19 Extent and timing of timetable change(s) not currently known East Anglia Franchise. TS2 of East Anglia ITT including 2tph shuttle between Angel Road and May-19 changes expected - insufficient to qualify as an Event Stratford, journey time improvements on GEML and increased off peak service between Ipswich and Norwich. Rolling Programme of Electrification (Shotts) Enhanced infrastructure May-19 changes expected - insufficient to qualify as an Event Highland Mainline Enhanced infrastructure May-19 changes expected - insufficient to qualify as an Event Stirling, Dunblane Alloa: Rolling Programme of Electrification: Enhanced infrastructure May-19 changes expected - insufficient to qualify as an Event Phase B: Larbert to Stirling North Phase C: Stirling North to Dunblane Phase D: Stirling to Alloa West Coast Partnership Franchise Apr-19 Extent and timing of timetable change(s) not currently known Elizabeth Line operating between Paddington Low Level & Shenfield May-19 changes expected - insufficient to qualify as an Event Additional services operated by GTR through the Thameslink core May-19 changes expected - insufficient to qualify as an Event December 2019 A2I, Aberdeen to Inverurie ½ hourly service introduced Enhanced service from Dec-19 changes expected - insufficient to qualify as an Event infrastructure introduced Sept '19 Leeds Station Capacity Improvements Enhanced Infrastructure Dec-19 changes expected - insufficient to qualify as an Event New Rolling & TT s New Dunbar down platform Enhanced infrastructure Dec-19 changes expected - insufficient to qualify as an Event EGIP Key Output 4 - Completion of Glasgow Queen Street work to enable 8 car trains Enhanced infrastructure Dec-19 changes expected - insufficient to qualify as an Event Cross Country franchise New franchise Dec-19 Extent and timing of timetable change(s) not currently known Felixstowe Branch enhancement Enhanced Infrastructure Dec-19 changes expected - insufficient to qualify as an Event Gatwick Airport Station Upgrade - Platform 7 and Down Platform Loop out of use Restricted Infrastructure Dec-19 change expected - insufficient to qualify as an Event May 2020 South Western Railway new rolling and timetable change & Rolling May-20 changes expected - insufficient to qualify as an Event Great Western Franchise New franchise May-20 Extent and timing of timetable change(s) not currently known Kings Cross area S&C / re-modelling Enhanced Infrastructure May-20 Not expected to drive significant timetable change Gatwick Airport Station Upgrade - Platforms 5 & 6, Down Fast and Reversible Loop out of use for 12 months Restricted Infrastructure Dec-21 change expected - insufficient to qualify as an Event December 2020 Extension of Gospel Oak Barking services to Barking Riverside Enhanced infrastructure Dec-20 Extent and timing of timetable change(s) not currently known Watford Junction-Croxley Link. Improved connectivity between LU Metropolitan line and main New Line Dec-20 changes expected - insufficient to qualify as an Event line services
3 Expected s which are not Events Type of End Reason for not being an Event Brighton Main Line Upgrade - Commencement of Disruptive Access Restricted infrastructure Dec-28 Extent and timing of timetable change(s) not currently known Intercity East Coast Partnership New franchise Dec-20 Extent and timing of timetable change(s) not currently known c2c timetable recast and Beam Park station opening Dec-20 Extent and timing of timetable change(s) not currently known South Western Railway new rolling & Rolling Dec-20 Extent and timing of timetable change(s) not currently known The introduction of 1tph between Avonmouth and Bristol TM and 1tph between Severn Beach and Bath Spa as part of MetroWest Enhanced infrastructure Dec-20 Extent and timing of timetable change(s) not currently known May 2021 Thameslink, Southern & Great Northern Franchise New franchise Sep-21 Extent and timing of timetable change(s) not currently known West Midlands franchise increased service level including Sundays May-21 Extent and timing of timetable change(s) not currently known The introduction of 1tph between Portishead and Bristol TM, 1tph Yate to Bristol TM and 1tph Henbury to Weston-Super-Mare (this replaces the current Weston-Super-Mare to Bristol Parkway service) as part of MetroWest Enhanced infrastructure, New Line, rolling and & TT changes May-21 Extent and timing of timetable change(s) not currently known December 2021 Chiltern Franchise New franchise Dec-21 Extent and timing of timetable change(s) not currently known East London Line enhanced frequency to Crystal Palace, Enhanced infrastructure & Rolling Dec-21 Extent and timing of timetable change(s) not currently known May 2022 December 2022 Transpennine Route Upgrade Enhanced infrastructure Dec-22 Extent and timing of timetable change(s) not currently known and Rolling Stock s East West Rail, Bicester Village Bedford operation New and enhanced Dec-22 Extent and timing of timetable change(s) not currently known infrastructure South Eastern Franchise - new timetable Dec-22 Extent and timing of timetable change(s) not currently known East London Line enhanced frequency to Clapham Junction, Enhanced Dec-22 Extent and timing of timetable change(s) not currently known infrastructure & Rolling Transpennine Express Franchise New franchise Apr-23 Extent and timing of timetable change(s) not currently known May 2023 December 2023 Western Rail Link to Heathrow New infrastructure Dec-23 Extent and timing of timetable change(s) not currently known s from Draft May 2019 version are shown in red
4 Completed Event Steering Groups No ESG Completion date 1 Chat Moss 2012 December 2013 / May West Coast May East Coast May North of England December 2017 / December Western & South Wales May 2017 to December Southampton - West Midlands December not used 8 not used 9 Thameslink May 18 / December not used 11 Anglia December East Midlands December 2020
5 MINUTES OF EVENT SUBMISSION REVIEW GROUP MEETINGS (Groups purpose is to review changes to the Calendar of Events and supporting information prior to the publication of each Draft and Final version) Final May 2019 version Attendees: David Fletcher (CrossCountry, Mike Hoptroff (Virgin Trains West Coast), Ian Kapur (GBRf), Chris Hanks (Alliance Rail) and Andrew Relf (Network Rail). Apologies: David Smith (Abellio ScotRail) Events sheet Agreed to add Tyne & Wear Metro as a participant to the December 2019 North of England Event, as requested in response to the Draft Calendar of Events Reviewed other participants given the above prompt and updated d name of NR Route to South East Proposed combining the two Anglia ESG entries into one for December made post meeting Andrew to ask NYMR whether they wish to be shown as a participant in the East Coast or North of England ESG s s sheet Added 2 changes to May 2019 for Crossrail and GTR ESG s completed sheet Agreed with changes proposed to aid reading of entries Misc Ian asked to if the anyone had a copy of the Terms of Reference for the Group Chris Hanks agreed to look This will answer if the group is quorate Agree to publish agreed minutes of group going forward, as extra tab to sheets Next version is Draft December 2019, published by D64 on 21 September. Next ESRG meeting to be held prior to this date, in mid August.
Investing in our local rail network June 2014
Investing in our local rail network June 2014 Bath & North East Somerset, Bristol, North Somerset and South Gloucestershire councils working together to improve your local transport MetroWest: Investing
More informationSummary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys
Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period
More informationIntroduction Government 6
CONTENTS Introduction 5 1. Government 6 The McNulty Report 6 Rail Delivery Group 6 Scotland and Wales 7 Regulation 8 Passenger Transport Executives 10 Community Rail Partnerships 11 Rail Decentralisation
More informationNational Rail Passenger Survey: User Guidance Report. Spring 2014 (wave 30)
National Rail Passenger Survey: User Guidance Report Spring 2014 (wave 30) Rebecca Joyner Director Tel: 020 7490 9148 rebecca.joyner@bdrc continental.com Contents Page No. 1. Background... 1 2. Summary
More informationNational Rail Passenger Survey: User Guidance Report
National Rail Passenger Survey: User Guidance Report Spring 2015 (Wave 32) Rebecca Joyner Director Tel: 020 7490 9148 rebecca.joyner@bdrc continental.com Contents Page No. 1. Background... 1 2. Summary
More informationNational Rail Passenger Survey: User Guidance Report
National Rail Passenger Survey: User Guidance Report Autumn 2015 (Wave 33) Rebecca Joyner Director Tel: 020 7490 9148 rebecca.joyner@bdrc-continental.com Contents Page No. 1. Background... 1 2. Summary
More informationNational Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29)
National Rail Passenger Survey: User Guidance Report Autumn 2013 (wave 29) Rebecca Joyner Research Director Tel: 020 7490 9148 rebecca.joyner@bdrc continental.com Contents Page No. 1. Background... 1 2.
More informationAnglia Winter Key Route Strategy (KRS) 2017/18
Anglia Winter Key Route Strategy (KRS) 2017/18 This is an overview of the train service plan should Key Route Strategy be declared. The principle of the KRS is to ensure we can run a service during conditions
More informationThe West of England Partnership is the sub-regional partnership formed by the four councils working together with partners
Great Western Route Utilisation Strategy Evidence Submission June 2008 Wilder House Wilder Street Bristol BS2 8PH 0117 903 6868 www.westofengland.org 1 The West of England Partnership is the sub-regional
More informationLONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication
LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE Correct at time of publication 2018 Sat 22 December Sun 23 December Mon 24 December (Christmas Eve) Tues 25 December (Christmas Day) Weds 26 December (Boxing Day)
More informationElizabeth line Services
Elizabeth line Services Steve Murphy Managing Director MTR Crossrail 17 th April 2018 London TravelWatch Timescales Stage 0-1: Shenfield / Liverpool Street Stage 0 (May 2015) marked the commencement of
More informationNational Rail Passenger Survey Main Report Spring 2018
National Rail Passenger Survey Main Report Spring 2018 Transport Focus is the independent transport user watchdog Our mission is to get the best deal for passengers and road users. With a strong emphasis
More informationTransport Focus Informed Traveller monitoring initial findings, 9 March April- 13 April
Appendix A Transport Focus Informed Traveller monitoring initial findings, 9 March 2018 1. Is the timetable correct six weeks ahead? In the first two weeks of our monitoring at T-6 Transport Focus has
More informationQuarterly Progress Report
Quarterly Progress Report Team: Passenger Link Quarter: 3 Agenda Item: 6.2.4 Sponsor Ashwin Kumar Author(s): Lee Paddock 1. Highlights The paper attached provides an update on passenger facing work during
More informationGTR 2018 timetable proposals
GTR 2018 timetable proposals Wednesday 16 November 2016 Phil Hutchinson - Head of Strategic Planning and team Thameslink Programme and GTR The GTR franchise was created to deliver the Thameslink Programme.
More informationCONTENTS. Introduction Government 6. Scotland and Wales 6 Regulation 7 Passenger Transport Executives Main Line Railway Infrastructure 9
CONTENTS Introduction 5 1. Government 6 Scotland and Wales 6 Regulation 7 Passenger Transport Executives 7 2. Main Line Railway Infrastructure 9 Network Rail 9 Organisation 9 Route Utilisation Strategies
More informationCrossCountry Future Timetable Consultation
CrossCountry Future Timetable Consultation 1 Contents 1. Executive Summary... 3 2. Introduction... 4 3. Future Timetable Concept... 5 3.1 Introduction... 5 3.2 Passenger requirements... 5 3.3 How our timetable
More informationRailway Upgrade Plan Western 2017/18
2 Railway Upgrade Plan 2017/18 Glossary CaSL Cancelled and Significantly Late. This measures how many trains are cancelled or are more than 29 minutes late at their terminating station. Passenger satisfaction
More informationGovia Thameslink Railway consultation on December 2015 timetable - APTU response
Thameslink: Bedford to Gatwick Airport and Brighton Q1 What do you think about these proposals noting that it is not possible to serve both London Bridge and London Blackfriars stations from Preston Park,
More informationMystery shop of rail ticket retailing. Internet checks
Mystery shop of rail ticket retailing Internet checks March 2007 Mystery shop of rail ticket retailing - internet checks 1. INTRODUCTION 1.1. Background Passenger Focus undertook a mystery shopping programme
More informationNational Rail Passenger Survey Autumn 2015 Main Report
National Rail Passenger Survey Autumn 2015 Main Report Transport Focus is the independent transport user watchdog Our mission is to get the best deal for passengers and road users. With a strong emphasis
More informationCurrent Contents of Website, and Version History V5.17
Current Contents of Website, and Version History V5.17 The current contents of the website are: Articles on High Speed Rail Towards a High Speed Network v14.3 Towards a High Speed Network the Maps v2.0
More informationOPERATING REVIEW, ENGLAND AND WALES
STRATEGIC REPORT OPERATING REVIEW, ENGLAND AND WALES Network Rail operates across seven routes in England and Wales. This devolved structure promotes competition and enterprise, faster decision making
More informationNetwork Rail 2014 Customer Survey Report
GfK 2014 GfK Business Network Rail Customer Report 2014 Network Rail 2014 Customer Survey Report Route Report: Anglia Prepared by: January 2015 14-Jan-15 / 1 GfK 2014 GfK Business Network Rail Customer
More informationANYTIME OFF-PEAK ADVANCE SEASON
ANYTIME OFF-PEAK ADVANCE SEASON This guide is designed to help you choose the right ticket for your jo urney with confidence. Get 1/3 off with a Railcard There are now over 3.5 million Railcards in use,
More informationRailway performance and subsidy statistics
Railway performance and subsidy statistics Standard Note: SN/SG/2199 Last updated: 2 October 2013 Author: Matthew Keep Social and General Statistics Section This Note provides data and commentary relating
More informationCross-London Inter-Regional Connections
Cross-London Inter-Regional Connections This article refers to and should be read in conjunction with the article Towards a High Speed Network. That article sought to make the case for developing a network
More informationHIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK
HIGH SPEED UK..connecting in London Colin Elliff BSc CEng MICE Civil Engineering Principal, Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, www.highspeeduk.co.uk HS2+3 GL EH GL
More informationConnecting People, Connecting Business
Connecting People, Connecting Business Connecting People, Connecting Business 1 East West Rail is a scheme to re-establish a rail link between Cambridge and Oxford to improve rail services between East
More information1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014
West of England Joint Transport Executive Committee 13 th March 2014 Agenda Item 5 Views of Joint Scrutiny Committee Purpose 1. To inform members of the views of the West of England Joint Scrutiny Committee
More informationLondon Bridge station opens upgrade works
On board wi-fi rollout Dorking station highly commended at cycle awards Govia Railway Stakeholder Newsletter Period 9-10 February 2017-182016 Our stakeholder newsletter features business updates, news
More informationAppendix 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes
Appendix 8 Capacity and Service Disbenefits Prepared by Christopher Stokes 8 CAPACITY AND SERVICE DISBENEFITS Prepared by Christopher Stokes Introduction 8.1 This appendix considers the following major
More informationSTAFF TRAVEL RESTRICTIONS
Association of Train Operating Companies STAFF TRAVEL RESTRICTIONS SUMMER 2014 2012 Sunday 13 18 th May 2014 2012 to Saturday 13 8th December 2012 2014 INDEX 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
More informationSummary of questions and discussion
London and South East Route Utilisation Strategy - Rail User Group Meeting Saturday 11 July 2009 Chair- Ashwin Kumar, Passenger Director, Passenger Focus Summary of questions and discussion A - Comments,
More informationOur new Great Western Franchise. Tarka Rail Association AGM June 2015
Our new Great Western Franchise Tarka Rail Association AGM June 2015 To cover New Franchise - recap Implications for the line Taking forward the strategy 3 Second Great Western Direct Award Overview Brand
More informationSTAFF TRAVEL RESTRICTIONS SUMMER 2018
STAFF TRAVEL RESTRICTIONS SUMMER 2018 Sunday 20 th MAY 2018 to Saturday 8 th DECEMBER 2018 Index 2 Restrictions Information 3 Codes used in the Facilities barred & Exceptions columns and Index 4 Overview
More informationSpending round 2013: The case for investment in transport. Mayor s Office, May 2013
Spending round 2013: The case for investment in transport isabel.dedring@london.gov.uk Mayor s Office, May 2013 Key messages London is the productive heart of the UK economy, supporting jobs and growth
More informationImproving stations: improving passenger satisfaction. October 2016
Improving stations: improving passenger satisfaction October 2016 1 Contents Introduction... 3 Summary of overall satisfaction... 5 Trends over time... 7 Station-specific examples... 9 Reading station...
More informationStaff Travel Restrictions. Winter 2017/2018
Staff Travel Restrictions Winter 2017/2018 Sunday 10 December 2017 to Saturday 19 May 2018 Index 2 Restrictions Information 3 Codes used in the Facilities barred & Exceptions columns and Index 4 Overview
More informationEaster Improvement Works. London Euston Closed Friday 19 until Monday 22 April virgintrains.com/spanner nationalrail.co.
Easter Improvement Works London Euston Closed Friday 19 until Monday 22 April 2019 virgintrains.com/spanner nationalrail.co.uk/westcoast @virgintrains virgintrains What's happening? We recommend that
More informationForest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)
Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) 1. The Forest Hill Society represents residents in and around the Forest Hill and Honor Oak Park
More informationHow Network Rail is collaborating with Community Rail
How Network Rail is collaborating with Community Rail Roy Greenhalgh Customer Account Manager ACoRP Seminar for CRPs and Station Adopters Monday 5th June 2017 7-Jun-17 / 1 Context of Network Rail Network
More informationCornwall Great Western Railway. Luke Farley Assistant Regional Development Manager
Cornwall 2018 Great Western Railway Luke Farley Assistant Regional Development Manager What s on at GWR? Electrification of the route from London to Bristol and South Wales Introduction of new IETs on
More informationStrategic Transport Forum 21 st September 2018
Strategic Transport Forum 21 st September 2018 Agenda Item 4: Heathrow Airport Expansion: Surface Access Strategy Update Recommendation: It is recommended that the Forum consider the update provided by
More informationNational Rail Passenger Survey Heathrow Connect TOC Report Spring 2017 (Wave 36)
National Rail Passenger Survey TOC Report 17 (Wave 36) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk
More informationNational Rail Passenger Survey Heathrow Connect TOC Report Autumn 2017 (Wave 37)
National Rail Passenger Survey TOC Report (Wave 37) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk Pam
More informationLondon and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009
London and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009 Appendix 1 Flip chart notes from Breakout Groups Groups were asked to consider what gaps and issues
More informationSuffolk Chamber Transport Board Greater Anglia. 16 January 2018
Suffolk Chamber Transport Board Greater Anglia 16 January 2018 Greater Anglia update GEML Taskforce NRPS Spring 2017 results Fleet reliability and refresh initiatives Timetable improvements New trains
More informationHighland Mainline Journey Time Improvements Phase 2
Highland Mainline Journey Time Improvements Phase 2 1 Specified Outputs The objective for the second phase of the HML Improvements project was established in the Scottish Ministers Scotland High Level
More informationContacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX
National Rail Passenger Survey TOC Report 16 (Wave 34) Due to a technical query sector scores may need to be revised slightly at a future date - as such current scores should be treated as provisional
More informationA new approach to rail passenger services in London and the South East. Working in partnership to improve services and support growth MAYOR OF LONDON
A new approach to rail passenger services in London and the South East Working in partnership to improve services and support growth 1 MAYOR OF LONDON Contents A message from the Secretary of State for
More informationHARROGATE LINE SUPPORTERS GROUP - NEWS BULLETIN No. 13
HARROGATE LINE SUPPORTERS GROUP - NEWS BULLETIN No. 13 - PROMISES OF MORE AND MORE TRAINS TO HARROGATE! There have been many important announcements and planned developments affecting rail services to
More informationCrossrail / Elizabeth Line An Update
Crossrail / Elizabeth Line An Update Howard Smith Operations Director, Crossrail Railfuture Autumn 2018 Conference 10 th November 2018 Novotel Reading (uploaded to the www.railfuture.org.uk website with
More informationBACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE
BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE 1 The East Coast Main Line 1.1 The East Coast Main Line (ECML) is one of two high-capacity north-south trunk routes that run between
More informationUK Universities Quick Dial
UK Universities Quick Dial To use the abbreviated dialling codes, press *11 on your handset followed by the appropriate code below. There is no need key 9 for an outside line. University Telephone No Abbreviated
More informationNational Rail Passenger Survey Virgin Trains East Coast TOC Report Spring 2018 (Wave 38)
National Rail Passenger Survey TOC Report 18 (Wave 38) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk
More informationAirport Operators Association National Needs Assessment: Call for evidence
Airport Operators Association National Needs Assessment: Call for evidence Introduction the need for aviation to grow across the UK 1. This response is submitted on behalf of the Airport Operators Association
More informationArchived News & Gen Report Week Commencing 25/12/16
Archived News & Gen Report Week Commencing 25/12/16 25/12/16 Greater Anglia No trains on the GEML today 90016 no known location 90045 no known location 90048 at Wembley for weekend 90049 at Wembley for
More informationThe Evergreen 3 Project
The Evergreen 3 Project Railway Civil Engineers Association 26 th January 2012 Allan Dare Strategic Development Manager Chiltern Railways Chiltern Railways Birmingham Solihull Warwick Parkway Virgin West
More informationNational Rail Passenger Survey East Midlands Trains TOC Report Spring 2016 (Wave 34)
National Rail Passenger Survey TOC Report 16 (Wave 34) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk
More informationWest of England response to the Great Western Specification Consultation. June (with amendments 04/07/14)
West of England response to the Great Western Specification Consultation June 2014 (with amendments 04/07/14) Summary This response was submitted by 26 June 2014 deadline and formally endorsed at the Joint
More informationMaking Rail Accessible Helping our Older and Disabled Guests
Making Rail Accessible Helping our Older and Disabled Guests Provisional from 5th January 2015 to 31st March 2015 sleeper.scot 2 CALEDONIAN SLEEPER: MAKING RAIL ACCESSIBLE Contents 1. Serco is proud to
More informationCrossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017
Crossrail transforming travel across the capital - Railtex conference Jeremy Long, MTR Corporation, CEO European Business 9 May 2017 Page 1 The Crossrail Journey Construction May 2015 Dec 2018 Page 2 Crossrail
More informationPolicy committee Item: 11 Ref: PC086. National Rail Performance Report - Quarter (Oct-Dec 2015)
Policy committee 23.02.16 Item: 11 Ref: PC086 National Rail Performance Report - Quarter 3 2015-16 (Oct-Dec 2015) February 2016 London TravelWatch is the official body set up by Parliament to provide a
More informationLondon and Crossrail 2. Chris Moores Transport for London
London and Crossrail 2 Chris Moores Transport for London 1 Contents 2 1 The region needs Crossrail 2 2 Crossrail 2 can be more than just a railway 3 Planning and Delivering Crossrail 2 Issues facing London
More informationRail passengers priorities for improvement November 2017
Rail passengers priorities for improvement November 2017 Rail passengers priorities for improvement November 2017 Foreword We asked more than 12,800 passengers across the country to rank 31 possible improvements
More informationMeeting the capacity challenge: The case for new lines
Meeting the capacity challenge: The case for new lines NewLineStudy_v7.indd 1 21/08/2009 15:02:42 Meeting the capacity challenge Our railways are getting full. At some point, in the not too distant future,
More informationThe Edinburgh Glasgow Improvement Programme. Strategic Environmental Assessment (SEA) Consultation Document. October 2013
The Edinburgh Glasgow Improvement Programme Strategic Environmental Assessment (SEA) Consultation Document October 2013 Transport Scotland Rail Directorate Table of Contents 1.0 Introduction 2.0 The Edinburgh
More informationRailfuture East Anglia Autumn 2018 Public Meeting
Railfuture Autumn 2018 Public Meeting Update about Railfuture activities and progress of rail schemes Friends Meeting House Upper Goat Lane, Norwich 29 th September 2018 1 Making Travel Easier Including
More informationSunday 9 December 2018 to Saturday 18 May 2019
STAFF TRAVEL RESTRICTIONS Winter 2018-2019 Sunday 9 December 2018 to Saturday 18 May 2019 RST Ref: 90-007-002 Contents Introduction... 3 Facilities Barred and exceptions codes... 4 Caledonian Sleeper...
More informationEarly May Bank Holiday Travel Summary 2012
Early May Bank Holiday Travel Summary 2012 Photo Attribution: Pete Ashton on Flickr Train service and engineering work information from National Rail Enquiries for customers travelling over the Early May
More informationPOLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY. January
POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY January 2011 www.scdi.org.uk SCDI is an independent and inclusive economic development network which seeks to influence and inspire
More informationInvestor Report 1 July June 2014
Investor Report 1 July 2013 30 June 2014 Angel Trains Investor Report 1 July 2011 to 30 June 2012 1 1 GENERAL OVERVIEW In the 12 months ending 30 June 2014, Angel Trains (the Group ) delivered an increase
More informationAgenda Item 5: Rail East Midlands Rail Franchise Consultation
Strategic Transport Forum 15 th September 2017 Agenda Item 5: Rail East Midlands Rail Franchise Consultation Recommendation: It is recommended that the Forum agree (subject to any amendments agreed by
More informationDelivering a better railway for a better Britain Network Specification 2017 Western
Delivering a better railway for a better Britain Network Specification 2017 Western Network Specification: Western Network Rail - Network Specification: Western 02 Incorporates Strategic Routes: J: London
More informationChapter 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes
Chapter 8 Capacity and Service Disbenefits Prepared by Christopher Stokes 8 CAPACITY AND SERVICE DISBENEFITS Prepared by Christopher Stokes 8.1 This chapter relates to the following questions listed by
More informationBoard meeting
Board meeting 27.09.16 Secretariat memorandum Author : Sharon Malley Agenda item: 11 LTW535 Drafted: 19.09.16 Key activities 1 Purpose of report 1.1. To advise members of actions undertaken since last
More informationNorthern Powerhouse Rail
Northern Powerhouse Rail Our vision is of a thriving North of England where modern transport connections drive economic growth and support an excellent quality of life. About Northern Powerhouse Rail This
More informationThe Rail Network in Wales
The Rail Network in Wales The Case for Investment Summary Professor Mark Barry 12 July 2018 Mark Barry M&G Barry Consulting Ltd www.mgbarryconsulting.com Mae r ddogfen yma hefyd ar gael yn Gymraeg. This
More informationNational Passenger Survey TOC Report for East Midlands Trains Spring 2011
National Passenger Survey TOC Report for 11 Contacts: David Greeno Passenger Focus 1 Drummond Gate London, SW1V QY Tel: 13 83 Email: david.greeno@passengerfocus.org.uk David Chilvers BDRC Continental Kingsbourne
More informationLondon TravelWatch Response to the West Coast Main Line Route Utilisation Strategy Draft for Consultation
London TravelWatch Response to the West Coast Main Line Route Utilisation Strategy Draft for Consultation March 2011 London TravelWatch is the official body set up by Parliament to provide a voice for
More informationASLEF s Response to the East Anglia Rail Franchise Consultation
ASLEF s Response to the East Anglia Rail Franchise Consultation 1. The Associated Society of Locomotive Engineers and Firemen (ASLEF) is the UK s largest train driver s union representing approximately
More informationCrossrail transforming travel across London - Infrarail
Crossrail transforming travel across London - Infrarail Jeremy Long, MTR Corporation, CEO European Business 2 May 2018 Page 1 The Crossrail Journey Construction May 2015 Dec 2018 Page 2 Crossrail the 15bn
More informationProject 43. Modular HST journeys for Western Mainlines (v4) from Just Trains
Project 43 Modular HST journeys for Western Mainlines (v4) from Just Trains Build your own journey with handy bite size scenarios that reflect common FGW HST services around 2015 by driving scenarios in
More informationImprovements to East Coastway train services from May 2018
Improvements to East Coastway train services from May 2018 Phil Hutchinson Head of Strategic Planning James Harris Service Development Manager Jane Cobb Timetable Consultation Project Manager What we will
More informationNational Rail Passenger Survey Autumn 2013 Main Report
National Rail Passenger Survey Autumn 2013 Main Report What is Passenger Focus? Passenger Focus is the independent consumer watchdog for Britain s rail passengers and England s bus, coach and tram passengers
More informationChristmas Engineering Works
THE GREAT NORTH RAIL PROJECT COLLEAGUE UPDATE Christmas Engineering Works 2018 until 2019 Thursday 27 December Tuesday 01 January This past year has seen significant progress in Network Rail s Great North
More informationinsouthglos Economy .co.uk Our economy
insouthglos Economy South Gloucestershire plays an important role in the West of England Local Enterprise Partnership which is working to create 95,000 jobs across the West of England by 2030. Our economy
More informationOpen Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee
Agenda Item 9 Policy and Scrutiny Open Report on behalf of Executive Director for Environment & Economy Report to: Date: 13 June 2016 Subject: Summary: Highways and Transport Scrutiny Committee Rail Update
More informationNational Rail Passenger Survey
National Rail Passenger Survey Technical Guide Spring 2015 (Wave 32) Rebecca Joyner Director 020 7490 9148 rebecca.joyner@bdrc-continental.com Contents Page No. 1. Background... 1 2. Sample design... 2
More informationContacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX
National Rail Passenger Survey TOC Report 16 (Wave 4) scores are the subject of technical query and may need to be revised at a future date - as such the current scores should be treated as provisional.
More informationPublished by ASLEF Design & print by TU ink The train drivers union
ASLEF 77 St John Street, London EC1M 4NN Tel 020 7324 2400 Fax 020 7794 6406 Email info@aslef.org.uk www.aslef.org.uk Published by ASLEF Design & print by TU ink www.tuink.co.uk V4 July 2015 ASLEF THE
More informationAppendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes
Appendix 9 Impacts on Great Western Main Line Prepared by Christopher Stokes 9 IMPACTS ON GREAT WESTERN MAIN LINE Prepared by Christopher Stokes Introduction 9.1 This appendix evaluates the impact of
More informationDepartment for Transport
Department for Transport From the Secretary of State The Rt. Hon Patrick Mcloughlin Great Minster House 33 Horseferry Road London SW1P 4DR Tel: 0300 330 3000 Louise Ellman MP Web site: www.gov.uk/dft House
More informationStrategic Transport Forum 7 th December 2018
Strategic Transport Forum 7 th December 2018 Agenda Item 7: East West Rail Recommendation: It is recommended that the Forum: a) Endorse the East West Rail Consortium s position in relation to the draft
More informationHOUSE OF COMMONS WELSH AFFAIRS COMMITTEE RESPONSE BY RAILFUTURE ON CROSS-BORDER ROAD AND RAIL CONNECTIVITY
HOUSE OF COMMONS WELSH AFFAIRS COMMITTEE RESPONSE BY RAILFUTURE ON CROSS-BORDER ROAD AND RAIL CONNECTIVITY Railfuture is pleased to submit this consolidated national response on Cross-Border Road and Rail
More informationNational Rail Performance Report - Quarter /16 (January-March 2016)
National Rail Performance Report - Quarter 4 2015/16 (January-March 2016) May 2016 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling public. Our role
More informationRUGBY GATEWAY RG-2 290,000 SQ FT SPECULATIVE UNIT TO LET JUNCTION 1 M6 CV23 0XF OCCUPATION FROM SEPTEMBER
RUGBY GATEWAY JUNCTION 1 CV23 0XF A 1.8 MILLION SQ FT (167,225 SQ M) LOGISTICS DEVELOPMENT OCCUPATION FROM SEPTEMBER 2016 IMMEDIATELY ADJACENT TO JUNCTION 1 OF THE AT THE HEART OF THE LOGISTICS GOLDEN
More informationJULY 2017 NEWSLETTER
BEDFORD COMMUTERS ASSOCIATION The Rail User Group for Bedford and Flitwick JULY 2017 NEWSLETTER 1. EMT Franchise The DfT published the East Midlands Franchise Public Consultation document on July 20 th,
More informationRe: Invitation to comment on CrossCountry December 2008 Timetable Proposals
Mr G Bostock Arriva Cross Country 9th Floor, Rail House, Store Street, Manchester, M1 2RP w www.passengerfocus.org.uk t 0870 336 6095 f 0161 244 5981 e info@passengerfocus.org.uk direct Phone 07918 626115
More information