1 Thameslink: Bedford to Gatwick Airport and Brighton Q1 What do you think about these proposals noting that it is not possible to serve both London Bridge and London Blackfriars stations from Preston Park, Hassocks and Wivelsfield until 2018 when the Thameslink works are completed? In this response, all references to fast trains are to be read as referring to trains that run nonstop between Gatwick and East Croydon; the stopping pattern north of St Pancras is irrelevant. We disagree with the proposal as it stands. The timetable as set out seriously disadvantages: Travellers from north of London as regards GTR, both Thameslink travellers and Great Northern travellers, and also those changing to GTR from East Midlands Trains, East Coast, Hull Trains and Great Central. Travellers to/from Gatwick Airport requiring Central London stations in the City of London, Farringdon and St Pancras areas. Travellers from south London wishing to travel onward from Luton Airport and from St Pancras. In all cases this is because there is an effective reduction in the service frequency from 4 trains per hour to 2 trains per hour. This arises because services that are routed via Redhill (and stopping at intermediate stations) are around 15 minutes slower than those routed non-stop via the Quarry lines. For example: 12:34 departure from East Croydon: arrives Gatwick Airport 13:01; 12:49 departure: arrives at 13:04 11:40 departure from Gatwick Airport: arrives East Croydon 11:54; 11:39 departure (one minute earlier) arrives 12:06 We believe that the service to Blackfriars and stations north thereof on the Midland Main Line should depart from (arrive at) Gatwick Airport at approximately 15 minute intervals. We believe that significant passenger flows that are already disadvantaged by the slower journey time between Blackfriars and East Croydon are at risk if the service frequency is effectively reduced. In our submissions regarding the December 2014 timetable we observed that a 15 minute service frequency is very important for airport passengers as it provides comfort that a cancelled (or missed) train will not result in a delay of more than 15 minute and therefore should not result in a missed flight. This observation remains as valid now as before indeed even more valid, given current service performance. Even though it is reasonable to expect that GTR can make improvements between now and December, and the new timetable is itself designed to improve performance, it is unlikely that there will have been a sufficiently long sustained improvement for passengers to feel comfortable with a de-facto 30 minute interval service something that will encourage intending passengers to switch to alternate options such as the car and coach or to airports not on the GTR network such as Heathrow. 28 January 2015 P a g e 1 of 5
2 We note from discussions that the service pattern being developed is designed as part of the transition to the full Thameslink service pattern to operate from 2018 when there will be eight trains per hour from St Pancras to/from Gatwick Airport south of the Thames there being four fast and four semi-fast. The 2015 pattern envisages that Bedford will be served by two fast and two semi-fast services; services destined for the Great Northern (from 2018) will run only between London Bridge and their southern destinations Brighton (fast, ultimately from Cambridge) and Horsham (slow, ultimately from Peterborough). We believe that from 2018, the City of London and north thereof market would be best served by 6 fast trains (2 * Cambridge and 4 * Bedford) and 2 slower trains (2 * Peterborough). This will provide an approximately 10 minute fast interval service to London Bridge and stations to St Pancras, including Kent and South East London at London Bridge, Crossrail at Farringdon and East Coast, Midland Main Line and Kent High Speed at Pancras. With one additional change, Euston, Paddington and Liverpool Street can all be easily reached. Most London underground lines can also be connected with directly including destinations such as Canary Wharf of considerable importance to Gatwick. We therefore believe that this will be a very busy route and the above will offer a better service. In preparation for this, the December 2015 timetable should provide four fast services per hour. To achieve this, we believe 2 services per hour for Purley, Coulsdon South and Merstham should be transferred to the Reigate and Tonbridge hourly services. We note comments elsewhere about speeding up services from the South coast by omitting a Redhill stop, and whilst we believe it would be for the best if all 6 Thameslink services per hour ran fast, we can see how a stop for 2 per hour at Redhill would balance the total service package better. Q2 Do you support the new journey opportunities between Brighton, Gatwick Airport, Central London, Stevenage, Letchworth and Cambridge? See our response to Q1. We welcome the introduction of new journey opportunities from 2018, but believe the December timetable results in a considerable reduction in service from the current pattern (this itself being a reduction on the 2014 service pattern). (Overnight Thameslink services north of London) Q3 Do you support faster journey times on overnight services for passengers travelling from stations between Bedford, Luton and London? We support the improvement in journey time. Q4 In order to achieve this, the existing calling pattern of overnight services will have to change and Radlett, Elstree & Borehamwood, Mill Hill Broadway, Hendon and Cricklewood will be served by a new Luton to London overnight service. Do you support this? We believe that the additional fast services overnight should also call at Elstree & Borehamwood. This station has a substantial traveller count and stopping here (in a similar 28 January 2015 P a g e 2 of 5
3 manner to the fast service pattern during previous Core blockades) would be useful. For the avoidance of doubt, we believe these services should also call at West Hampstead Thameslink. The all stations south-bound service should be scheduled to arrive at St Pancras with a relatively short wait for the service to Gatwick. This is an important mitigation for existing travellers from stations south of St Albans who already use these services to reach destinations south of Blackfriars. We suspect that there will be limited demand from Luton Airport at this time. Likewise, the northbound all stations service should depart relatively soon after the fast service. Q5 Do you support the integration of the Gatwick Express into the wider Brighton mainline? Yes, we believe that these steps are sensible as evening out the service gaps and making best use of capacity between East Croydon and Gatwick is of benefit to all users of the line, including Thameslink passengers. Brighton Main Line Q6 Do you support the above proposals? See our response to Q1. Mainline West Q7 Do you support our plans to reduce the journey time between London, Horsham, Chichester, Portsmouth Harbour, Southampton Central and Bognor Regis by omitting to call at Redhill? As set out in our response to Q1, whilst we believe that, in isolation, Thameslink services should not call at Redhill, in the interests of overall balance, we can accept that this might be necessary for 2 trains per hour. Q8 Do you support our plans to reduce the journey time between London, Hove, Worthing and Littlehampton by omitting to call at Preston Park and placing the calls at Portslade and Lancing into one train? Mainline East Q9 Do you support our plans to reduce the journey time between London, Lewes, Eastbourne and Hastings by placing the calls at Wivelsfield and Plumpton into one train? 28 January 2015 P a g e 3 of 5
4 Redhill Q10 (Do you support) the reduction of journey time between London, Reigate and Tonbridge and the change of London terminal from London Bridge to London Victoria? As set out in our response to Q1, we believe these services should call at Redhill, Merstham, Coulsdon South and Purley. Q11 (Do you support) the introduction of new off peak Thameslink services between Redhill, Merstham, Coulsdon South, Purley and London Blackfriars, City Thameslink, Farringdon and St Pancras International earlier than planned We disagree with this proposal for the reasons set out in in our response to Q1. Q12 (Do you support) removing the Redhill stop from London Victoria to Portsmouth Harbour, Southampton Central & Bognor Regis via Horsham services. As set out in our response to Q1, whilst we believe that, in isolation, Thameslink services should not call at Redhill, in the interests of overall balance, we can accept that this might be necessary for 2 trains per hour. Q13 What do you think of more trains calling additionally at Southease during the week noting that there will be a slight increase (2 minutes) in journey times to/from Seaford to accommodate the call? Q14 What do you think of Sunday trains calling at Three Oaks and Winchelsea alternately every two hours on Sundays noting that there will be a slight increase (2 minutes) in journey times to/from Ashford International to accommodate the calls? Q15 Do you support the new journey opportunities between Brighton, Gatwick Airport, Central London, Stevenage, Letchworth and Cambridge? Please refer to our answer to Q2. Further comments Q16 Do you have any further comments not covered in this consultation which you would like to raise for possible future consideration? Sevenoaks services We note that weekend services from Sevenoaks are to be extended to Kentish Town. We welcome this and believe that further journey opportunities could be created by extending 28 January 2015 P a g e 4 of 5
5 these services to Cricklewood in particular this would offer options for interchange at West Hampstead with the Jubilee line (and Metropolitan line with a second easy change) and with London Overground. On the same basis, Monday to Friday services should also be extended to West Hampstead and Cricklewood. Operating hours of the full off peak service As part of the introduction of this new timetable, we believe it is appropriate to consider extensions to the operating hours of the full off-peak service on Thameslink North, in particular as follows: The Monday to Saturday 15 minute interval service northbound both fast and slow after 22:00 from St Pancras. These services are often as crowded as at rush hour and any service perturbation can lead to significant over-crowding. Passengers in excess of seating is a regular occurrence. The Monday to Friday 15 minute interval southbound service for Mill Hill Broadway, Hendon, Cricklewood and Kentish Town. After the 18:26 departure from St Albans the intervals increase to around 30 minutes and this is a particularly early time to reduce service frequency with people travelling for evenings out, evening shift work and late office finishes. Consideration should be given to adding stops to some of the services at that time which stop at Radlett, Elstree and West Hampstead. 28 January 2015 P a g e 5 of 5
GTR December 2015 timetable consultation
GTR December 2015 timetable consultation Date issued: 14 November 2014 December 2015 timetable consultation Introduction GTR stands for Govia Thameslink Railway. By July 2015, we ll be the largest train
More informationGTR 2018 Timetable Consultation Results (phase one) Date issued: Monday 26 June 2017
GTR 2018 Timetable Consultation Results (phase one) Date issued: Monday 26 June 2017 Our consultation setting new industry standards An industry first Two phased approach Consulted the consultation process
More informationGTR 2018 timetable proposals
GTR 2018 timetable proposals Wednesday 16 November 2016 Phil Hutchinson - Head of Strategic Planning and team Thameslink Programme and GTR The GTR franchise was created to deliver the Thameslink Programme.
More informationAppendix A Hosted Station These stations are all in the London TravelWatch area
Appendix A Hosted Station These stations are all in the London TravelWatch area The stations listed below will have a Host on duty for times significantly in excess of the current ticket office hours.
More informationGTR 2018 Timetable Consultation Phase 3 weekends & late night trains ( )
GTR 2018 Timetable Consultation Phase 3 weekends & late night trains (2330 0500) Thank you for taking the time to read and respond to our Consultation. We ve finished phase one and two which concentrated
More informationPeterborough. Bedford. Stevenage. Luton. St Albans. Finsbury Park. Kentish Town. St Pancras International. Farringdon. London Blackfriars
The big picture King s Lynn Key Today In order to improve train services to and through London, we are investing 5.5bn in new and longer trains (new rolling stock), new track and new stations. This scheme,
More informationTo provide the best possible service during the Thameslink construction work at London Bridge;
Dear stakeholder Re: Southeastern December 2014 timetable The 6 billion government-funded Thameslink Programme has entered the final construction phase. This involves a complete rebuild of London Bridge
More informationOriginally published 27 January 2019, updated 2 February 2019 as the Thameslink Stakeholder meeting is now 11 February 2019
Dear Friend We, together with other stakeholders for Thameslink services on the Midland Mainline have just re have just received an analysis from Thameslink that: 1. Provides information about current
More information22 nd February Proposed changes to Govia Thameslink Railway Ticket Offices and introduction of Station Hosts
Tim Bellenger Director, Policy and Investigations London TravelWatch 169 Union Street London SE1 0LL Keith Jipps Passenger Service Director (GN) Govia Thameslink Railway Ltd East Side Offices King s Cross
More informationResponse from West Sussex Rail Users Association to the DfT consultation on Thameslink franchise.
Response from West Sussex Rail Users Association to the DfT consultation on Thameslink franchise. Q.1 What improvements do stakeholders believe could be made on the combined franchise through partnership
More informationBRENT CROSS THAMESLINK
INTRODUCTION The 4.5 billion Brent Cross Cricklewood development is Barnet Council s most significant growth and regeneration programme. It will create a new sustainable mixed use town centre for Barnet
More informationLondon Bridge station opens upgrade works
On board wi-fi rollout Dorking station highly commended at cycle awards Govia Railway Stakeholder Newsletter Period 9-10 February 2017-182016 Our stakeholder newsletter features business updates, news
More informationForest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)
Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) 1. The Forest Hill Society represents residents in and around the Forest Hill and Honor Oak Park
More informationThe Brighton mainline Route Utilisation Strategy. Making it work for passengers. A paper by London TravelWatch and Passenger Focus
The Brighton mainline Route Utilisation Strategy Making it work for passengers A paper by London TravelWatch and Passenger Focus 1 Executive summary This paper is issued by London TravelWatch and Passenger
More informationDear Member. Treasurer s Note Subscriptions
Dear Member FCC meeting Our FCC meeting is booked for 7:30pm Wednesday 24 June. We expect to have both Jim Morgan, Interim Managing Director at FCC and Larry Heyman there and are hopeful that Tom Joyner,
More informationJUNE 2015 NEWSLETTER
BEDFORD COMMUTERS ASSOCIATION The Rail User Group for Bedford and Flitwick JUNE 2015 NEWSLETTER 1. BLOCKADE FROM 23:15 ON FRIDAY 19 JUNE UNTIL 04:00 ON MONDAY 22 JUNE - GTR INFORMATION Network Rail will
More informationKent Route Utilisation Strategy consultation by Network Rail. A response from London TravelWatch
Kent Route Utilisation Strategy consultation by Network Rail A response from London TravelWatch Published by London TravelWatch 6 Middle Street London EC1A 7JA Phone : 020 7505 9000 Fax : 020 7505 9003
More informationJULY 2017 NEWSLETTER
BEDFORD COMMUTERS ASSOCIATION The Rail User Group for Bedford and Flitwick JULY 2017 NEWSLETTER 1. EMT Franchise The DfT published the East Midlands Franchise Public Consultation document on July 20 th,
More informationImprovements to East Coastway train services from May 2018
Improvements to East Coastway train services from May 2018 Phil Hutchinson Head of Strategic Planning James Harris Service Development Manager Jane Cobb Timetable Consultation Project Manager What we will
More informationFirst Thameslink trains arrive on Great Northern
Major Christmas engineering works Southern passengers in line for better loos and new waiting room at Eastbourne station Govia Thameslink Railway Stakeholder Newsletter Period February 7 2017-182016 Our
More informationArriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.
Abellio ScotRail Arriva Rail London Alliance Rail Arriva Trains Wales c2c Chiltern Railways Colas Rail CrossCountry DB Cargo (UK) Limited Devon & Cornwall Railway Direct Rail Services East Midlands Trains
More informationLONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication
LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE Correct at time of publication 2018 Sat 22 December Sun 23 December Mon 24 December (Christmas Eve) Tues 25 December (Christmas Day) Weds 26 December (Boxing Day)
More informationCrossrail / Elizabeth Line An Update
Crossrail / Elizabeth Line An Update Howard Smith Operations Director, Crossrail Railfuture Autumn 2018 Conference 10 th November 2018 Novotel Reading (uploaded to the www.railfuture.org.uk website with
More informationRAIL HUB FOR HEATHROW?
Heathrow Hub F_P.indd 1 08/12/2014 11:08 On borrowed time: Heathrow Connect Class 360 No 360203 approaches the Southall stop on 10 May 2012, forming the 13.57 service from Terminals 1, 2 & 3 to Paddington.
More informationNotting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013
Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013 Compiled by Paul Murphy August 2013 Correct as of Friday 23 rd August 2013 CONTENTS Road Closures & Map Changes
More informationMARCH 2017 NEWSLETTER
BEDFORD COMMUTERS ASSOCIATION The Rail User Group for Bedford and Flitwick MARCH 2017 NEWSLETTER 1. EMT Franchise The consultation document for the franchise should have been published at the beginning
More informationLondon and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009
London and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009 Appendix 1 Flip chart notes from Breakout Groups Groups were asked to consider what gaps and issues
More informationAppendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes
Appendix 9 Impacts on Great Western Main Line Prepared by Christopher Stokes 9 IMPACTS ON GREAT WESTERN MAIN LINE Prepared by Christopher Stokes Introduction 9.1 This appendix evaluates the impact of
More informationPROPOSALS FOR MEDIUM AND LONG TERM DEVELOPMENT
MICHAEL SCHABAS FIRST CLASS PARTNERSHIPS 28 GRAND AVENUE, LONDON UNITED KINGDOM N10 3BB WWW.FCPWORLD.NET 13 July 2013 Airports Commission By email to airport.proposals@airports.gsi.gov.uk PROPOSALS FOR
More informationModern air-conditioned trains take over King s Lynn route as Great Northern services are doubled at Ely
Ramping up accessibility at Hadley Wood Phase two 2018 timetable consultation launches Govia Thameslink Railway Stakeholder Newsletter Period February 2 2017-182016 Our stakeholder newsletter features
More informationSummary of questions and discussion
London and South East Route Utilisation Strategy - Rail User Group Meeting Saturday 11 July 2009 Chair- Ashwin Kumar, Passenger Director, Passenger Focus Summary of questions and discussion A - Comments,
More informationAssociation of Public Transport Users
Association of Public Transport Users Pre-submitted questions for AGM on 31 May 12 General 1 Why do trains sometime dawdle in the countryside or even in the core; something is not right with a system supposed
More informationCross-London Inter-Regional Connections
Cross-London Inter-Regional Connections This article refers to and should be read in conjunction with the article Towards a High Speed Network. That article sought to make the case for developing a network
More informationCAPELLA COURT. you ve arrived. Peer Group PLC SOUTH CROYDON
CAPELLA SOUTH Peer Group PLC you ve arrived CAPELLA SOUTH CAPELLA OFFERS A UNIQUE HEADQUARTERS OPPORTUNITY TO OCCUPY A PRESTIGIOUS BUILDING. UPON ARRIVAL GREETED BY A SPECTACULAR ATRIUM ENTRANCE TO PANORAMIC
More informationEarly May Bank Holiday Travel Summary 2012
Early May Bank Holiday Travel Summary 2012 Photo Attribution: Pete Ashton on Flickr Train service and engineering work information from National Rail Enquiries for customers travelling over the Early May
More informationSussex Route Utilisation Strategy consultation by Network Rail. A response from London TravelWatch
Sussex Route Utilisation Strategy consultation by Network Rail A response from London TravelWatch Published by London TravelWatch 6 Middle Street London EC1A 7JA Phone : 020 7505 9000 Fax : 020 7505 9003
More informationTimetable Change Research. Re-contact survey key findings
Timetable Change Research Re-contact survey key findings Key project objectives Measure the impact of the timetable changes on customers, what actions have they taken as a result Gauge how have the timetable
More informationSummary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys
Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period
More informationHIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK
HIGH SPEED UK..connecting in London Colin Elliff BSc CEng MICE Civil Engineering Principal, Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, www.highspeeduk.co.uk HS2+3 GL EH GL
More informationcampaigning by the Railway Development Society Limited
London & South East The Combined Franchise Replacement Sponsor Department for Transport Zone 3/15, Great Minster House, 33 Horseferry Road, London SW1P 4DR campaigning by the Railway Development Society
More informationOur stakeholder newsletter features business updates, news from our local communities and performance analysis.
Industrial relations update Alliance board prioritise key infrastructure reliability works Govia Thameslink Railway Stakeholder Newsletter Period February 9 2016-2017 Our stakeholder newsletter features
More informationPolicy committee Item: 11 Ref: PC086. National Rail Performance Report - Quarter (Oct-Dec 2015)
Policy committee 23.02.16 Item: 11 Ref: PC086 National Rail Performance Report - Quarter 3 2015-16 (Oct-Dec 2015) February 2016 London TravelWatch is the official body set up by Parliament to provide a
More informationElizabeth line Services
Elizabeth line Services Steve Murphy Managing Director MTR Crossrail 17 th April 2018 London TravelWatch Timescales Stage 0-1: Shenfield / Liverpool Street Stage 0 (May 2015) marked the commencement of
More informationRoad Traffic Implications of a second runway at Gatwick Airport. Gatwick in perspective I. Prepared by a Senior Highway Engineer NUMBER 8
Gatwick in perspective I NUMBER 8 Road Traffic Implications of a second runway at Gatwick Airport Prepared by a Senior Highway Engineer A series of research papers on a second Gatwick runway Road Traffic
More informationOut of Station Interchanges (October 2010)
Station NLC Exit station Operator Station NLC Entry station Operator Maximum Permitted Interchange Time 502 Aldgate LU 7490 Fenchurch Street NR 40 508 Archway LU 1524 Upper Holloway NR 20 511 Baker Street
More information98 Manor Way, Beckenham, Kent BR3 3LR
98 Manor Way, Beckenham, Kent BR3 3LR 020 8650 0667 www.westlondonlinegroup.org.uk RECOMMENDATIONS FOR HS2, CROSSRAIL AND OLD OAK COMMON INTERCHANGE DECEMBER 2013 1 1. High Speed London Birmingham BIRMINGHAM
More informationTransport Focus Informed Traveller monitoring initial findings, 9 March April- 13 April
Appendix A Transport Focus Informed Traveller monitoring initial findings, 9 March 2018 1. Is the timetable correct six weeks ahead? In the first two weeks of our monitoring at T-6 Transport Focus has
More informationGB Railways Group Plc
New Railways for London Michael Schabas, Director, GB Railways Group Plc In the last few years, four major rail schemes have been completed in London. The Jubilee Extension, Heathrow Express, Docklands
More informationChapter 21 Route window W6 West Ealing station. Transport for London
Chapter 21 Route window W6 West Ealing station WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is
More informationDear Parent(s) TRANSPORT TO THE SCHOOL SITE
July 2017 TO PARENTS OF YEAR 7 AND NEW SIXTH FORM STUDENTS ATTENDING JFS FROM SEPTEMBER 2017 Dear Parent(s) TRANSPORT TO THE SCHOOL SITE I write with details of transport arrangements to the School, effective
More informationUpdate on the Thameslink programme
A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts
More informationAppendix 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes
Appendix 8 Capacity and Service Disbenefits Prepared by Christopher Stokes 8 CAPACITY AND SERVICE DISBENEFITS Prepared by Christopher Stokes Introduction 8.1 This appendix considers the following major
More informationMay 2019 Timetable. Highlights and Response to Feedback
May 2019 Timetable Highlights and Response to Feedback Contents 1. Foreword 2 2. Overview 3 3. Highlights in the May 2019 timetable changes 4 4. Feedback from passengers & stakeholders 6 5. Feedback to
More informationNational Rail Performance Report - Quarter /16 (January-March 2016)
National Rail Performance Report - Quarter 4 2015/16 (January-March 2016) May 2016 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling public. Our role
More informationSpending round 2013: The case for investment in transport. Mayor s Office, May 2013
Spending round 2013: The case for investment in transport isabel.dedring@london.gov.uk Mayor s Office, May 2013 Key messages London is the productive heart of the UK economy, supporting jobs and growth
More informationBoard meeting
Board meeting 28.11.17 Secretariat memorandum Author: Vincent Stops Agenda item: 8 Ref: LTW568 Drafted: 13.11.17 Oxford Street bus changes associated with pedestrianisation 1 Purpose of report 1.1. To
More information1 National Rail New procedure for contributing information to publish in Newsrail Express, Retail Manuals and Rail Directory for Travel Agents
N ewsrail E X P R E S S 1 National Rail New procedure for contributing information to publish in Newsrail Express, Retail Manuals and Rail Directory for Travel Agents WEEK ENDING 1 OCTOBER 2005 ITEM FOR
More informationDelivering a better railway for a better Britain Network Specification 2016 South East Route
Delivering a better railway for a better Britain Network Specification 2016 South East Route Network Specification: South East Route Network Rail Network Specification: South East Route 02 Incorporates
More informationChapter 4 Route window W23 Taplow station. Transport for London
Chapter 4 Route window W23 Taplow station TAPLOW STATION 4 Route window W23 Taplow station 4.6 Baseline conditions Taplow station Taplow station is located in South Buckinghamshire, 1.5 km southeast of
More informationNotting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014
Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014 Compiled by Paul Murphy-Kasp August 2014 CONTENTS Road Closures & Map Changes to Bus routes & Map Transport
More informationSOUTH EAST FREEHOLD OFFICE INVESTMENT LET TO EDF ENERGY PLC ATLANTIC HOUSE HAZELWICK AVENUE CRAWLEY RH10 1QQ
SOUTH EAST FREEHOLD OFFICE INVESTMENT LET TO EDF ENERGY PLC ATLANTIC HOUSE HAZELWICK AVENUE CRAWLEY RH10 1QQ INVESTMENT SUMMARY + + Modern self contained office building totalling approximately 20,382
More informationTO LET READY Q DEMOLITION COMPLETED
PLANNING GRANTED NEW SPECULATIVE INDUSTRIAL/WAREHOUSING DEVELOPMENT UNITS RANGING FROM 20,000 170,000 SQ.FT TO LET READY Q3 2019 DEMOLITION COMPLETED www.northgatwickgateway.co.uk Goya Developments North
More informationInformation Pack for representatives and visitors to the Region 9 Assembly and Convention in London, September 2018
Information Pack for representatives and visitors to the Region 9 Assembly and Convention in London, 26-30 September 2018 The following information is for: 1. Attendees participating in both the "Assembly
More informationAppendix 12. HS2/HS1 Connection. Prepared by Christopher Stokes
Appendix 12 HS2/HS1 Connection Prepared by Christopher Stokes 12 HS2/HS1 CONNECTION Prepared by Christopher Stokes Introduction 12.1 This appendix examines the business case for through services to HS1,
More informationTRS018 Annex A. Development of Train Services for Chiltern Routes
TRS018 Annex A Development of Train Services for Chiltern Routes October 2011 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling public. Our role is
More informationDecember 2018 timetable consultation outcome report. Published April 2018
December 2018 timetable consultation outcome report Published April 2018 1 The outcome of South Western Railway s timetable consultation for December 2018 Thank you to the thousands of people who took
More informationRAILFUTURE LONDON AND SOUTH EAST BRANCH
RAILFUTURE LONDON AND SOUTH EAST BRANCH https://www.railfuture.org.uk/london+and+south+east Minutes of Annual General Meeting held in the Kwanglim Room, Wesley s Chapel, London EC1Y 1AU on Saturday, 28
More informationNR is also currently conducting two other studies, those for the Cambridgeshire Corridor and for Ely Area Capacity Enhancements.
Joint Response to draft East Coast Main Line Route Study 8 March 2018 For and on behalf of the Borough Council of King s Lynn & West Norfolk, Fen Line Users Association, King s Lynn BID Ltd and Norfolk
More informationTravel market demand and the HS1 HS2 link
Travel market demand and the HS1 HS2 link Greengauge 21 June 2013 1. Executive Summary Current plans for HS2 include a connection with HS1 the high-speed line from central London across Kent to the channel
More informationBusiness Register and Employment Survey 2016 Update Final March 2016
Business Register and Employment Survey 2016 Update Final March 2016 Jamie.watson@coast2capital.org.uk EXECUTIVE SUMMARY The Business Register and Employment Survey (BRES) update has shown that the Coast
More informationLondon and Crossrail 2. Chris Moores Transport for London
London and Crossrail 2 Chris Moores Transport for London 1 Contents 2 1 The region needs Crossrail 2 2 Crossrail 2 can be more than just a railway 3 Planning and Delivering Crossrail 2 Issues facing London
More informationGOVIA THAMESLINK RAILWAY PENALTY FARES SCHEME
GOVI THMESLINK RILWY PENLTY FRES SCHEME Issue 2 30 th September 2016 CONTENTS 1 INTRODUCTION 2 PENLTY FRES TRINS 3 PENLTY FRES STTIONS 4 COMPULSORY TICKETS RES 5 TICKET FCILITIES 6 PUBLICITY ND WRNING
More informationTHE RESIDENCE. 65 Maygrove Road, West Hampstead, London NW6. The key to perfect London Living.
The key to perfect London Living. Developer Regal Homes Location Local Authority London Borough of Camden Tenure 999 year leasehold Architect Hopkins Architects (designers of the London 2012 Olympic Velodrom)
More informationUNLOCKING THE BRIGHTON MAINLINE
UNLOCKING THE BRIGHTON MAINLINE The highly successful Coast to Capital region, which runs from South London to Brighton and across the coast to Chichester, needs significant long-term rail investment to
More informationSWR December 2018 Timetable Consultation Response
Campaigning for better services over a bigger rail network South Western Railway Timetable feedback For the attention of Jon Hills please reply to: Mr David Brace 48 Hatch Lane Old Basing Basingstoke RG24
More informationChapter 12. HS2/HS1 Connection. Prepared by Christopher Stokes
Chapter 12 HS2/HS1 Connection Prepared by Christopher Stokes 12 HS2/HS1 CONNECTION Prepared by Christopher Stokes 12.1 This chapter relates to the following questions listed by the Committee: 3.1 Business
More informationLTW 372 Annex B. Development of Train Services for Chiltern Routes. Draft for consultation
LTW 372 Annex B Development of Train Services for Chiltern Routes Draft for consultation February 2011 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling
More informationThreats to possible orbital light-rail in outer London from the current Brent Cross planning application...
Threats to possible orbital light-rail in outer London from the current Brent Cross planning application... (We need safeguarding in place, for better times!) Map from Transport 2025 document. Boris photo:
More informationAgenda Item 5: Rail East Midlands Rail Franchise Consultation
Strategic Transport Forum 15 th September 2017 Agenda Item 5: Rail East Midlands Rail Franchise Consultation Recommendation: It is recommended that the Forum agree (subject to any amendments agreed by
More informationThameslink response to questions asked before the St Albans Council meeting
1 Claire Singh 2 Fiona Lane a) What can Govia do to improve their service? b) What are the timelines for improvements? a) Why is the St Albans to London service more expensive than the Hatfield line? b)
More informationGOVIA THAMESLINK RAILWAY PENALTY FARES SCHEME
GOVI THMESLINK RILWY PENLTY FRES SCHEME CONTENTS 1 INTRODUCTION 2 PENLTY FRES TRINS 3 PENLTY FRES STTIONS 4 COMPULSORY TICKETS RES 5 TICKET FCILITIES 6 PUBLICITY ND WRNING NOTICES 7 SELECTION ND TRINING
More informationWEST LONDON LINE GROUP 98 Manor Way, Beckenham, Kent BR3 3LR
WEST LONDON LINE GROUP 98 Manor Way, Beckenham, Kent BR3 3LR 020 8650 0667 29 July 2011 Consultation Manager High Speed Rail Consultation Department for Transport PO Box 59628 London SE21 9AX Dear Sir
More information5,000-40,000 sq ft Landmark Offices To Let
Croydon 5,000-40,000 sq ft Landmark Offices To Let Wellesley Grove, Croydon CR0 1XG Landmark offices Southern House is a 200,000 sq ft, 17 storey office building with 146 parking spaces. It is situated
More informationDemand and Appraisal Report
Demand and Appraisal Report HS2 London - West Midlands Report for HS2 Ltd MVA Consultancy, In Association With Mott MacDonald and Atkins April 2012 Document Control Project Title: MVA Project Number: Document
More informationCOUNTY OAK RETAIL PARK
COUNTY OAK Crawley, Sussex, RH11 7XN 201,595 sq ft (18,729 sq m) Prime open A1 non food COUNTY OAK SCHEME SIZE: 201,595 sq ft (18,729 sq m) CURRENT OCCUPIERS: Next, Hobbycraft, Argos, Harveys, Boots, Currys/PC
More informationEdgware Road Colindale London NW9 6TD
Edgware Road Colindale London NW9 6TD Clear cut advantages From 6,736 sq ft to 43,427 sq ft (NIA) www.333edgwareroad.com 1 333 Edgware Road The building 333 Edgware Road offers clear cut advantages. It
More informationEditorial text from Grand Union Alliance Report of First Old Oak Common & Park Royal Charette, held in Brent on 15 November 2014:
Editorial text from Grand Union Alliance Report of First Old Oak Common & Park Royal Charette, held in Brent on 15 November 2014: Morning session Theresa Magee, Wesley Estate Residents Associaton (Ealing)
More informationLondon TravelWatch Response to the West Coast Main Line Route Utilisation Strategy Draft for Consultation
London TravelWatch Response to the West Coast Main Line Route Utilisation Strategy Draft for Consultation March 2011 London TravelWatch is the official body set up by Parliament to provide a voice for
More informationThameslink 2000 Environmental Statement
Thameslink 2000 Environmental Statement Non-technical summary Prepared by Temple Environmental Consultants Ltd for Network Rail Infrastructure Limited June 2004 Contents Introduction......................................................................................................................................3
More informationWEST LONDON LINE GROUP CALLS FOR NEW STATION
98 Manor Way, Beckenham, Kent BR3 3LR 020 8650 0667 www.westlondonlinegroup.org.uk WEST LONDON LINE GROUP CALLS FOR NEW STATION The West London Line Group is calling for Westway Circus, a new West London
More informationChapter 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes
Chapter 8 Capacity and Service Disbenefits Prepared by Christopher Stokes 8 CAPACITY AND SERVICE DISBENEFITS Prepared by Christopher Stokes 8.1 This chapter relates to the following questions listed by
More information356,500 people commuted to jobs in the City of London. 40 per cent from inner London, 29 per cent from outer London, 31 per cent from outside London
CIS 2014-11 Commuting in London July 2014 The 2011 Census recorded the place of work and method of travel to work of all respondents aged 16 or over. The Special Workplace Statistics dataset provides information
More informationFLOORS 17, 18 & 19 NOW LET TO FLOORS 16 & 15 UNDER OFFER CROWN AGENTS BANK SUTTON 6,200 43,400 SQ FT OFFICES THE QUADRANT SUTTON SURREY SM2 5AS
FLOORS 17, 18 & 19 NOW LET TO CROWN AGENTS BANK FLOORS 16 & 15 UNDER OFFER 6,200 43,400 SQ FT OFFICES SUTTON THE QUADRANT SUTTON SURREY SM2 5AS QUADRANT HOUSE, HEADQUARTERS OFFICES 6,200 43,400 SQ FT Quadrant
More informationChapter 2 Route window W25 Maidenhead station. Transport for London
Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,
More informationCrossCountry Future Timetable Consultation
CrossCountry Future Timetable Consultation 1 Contents 1. Executive Summary... 3 2. Introduction... 4 3. Future Timetable Concept... 5 3.1 Introduction... 5 3.2 Passenger requirements... 5 3.3 How our timetable
More informationSoutheastern contingency timetable Issue 1
Cannon Street Metro Services Cannon Street Gillingham Gillingham Cannon Street Cannon Street Dartford Dartford Cannon Street via Greenwich via Greenwich via Bexleyheath FIRST: 0705 then 05 & 35 past every
More informationCONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere)
APPNIX H2 CONNCTIVITY IMPROVMNTS ACHIV BY HS2 AN HIGH SP UK FOR: HURSFIL (extract from HS2 High Speed to Nowhere) Appendix H2 : Page 244 Introduction & key results Page 245 Timeline of comparative journey
More informationChapter 11. Links to Heathrow. Prepared by Christopher Stokes
Chapter 11 Links to Heathrow Prepared by Christopher Stokes 11 LINKS TO HEATHROW Prepared by Christopher Stokes 11.1 This submission relates to the following questions listed by the Committee: 2.3 Implications
More informationRe: Invitation to comment on CrossCountry December 2008 Timetable Proposals
Mr G Bostock Arriva Cross Country 9th Floor, Rail House, Store Street, Manchester, M1 2RP w www.passengerfocus.org.uk t 0870 336 6095 f 0161 244 5981 e info@passengerfocus.org.uk direct Phone 07918 626115
More informationWay to go: Improving public transport access to London s airports
A London TravelWatch report The voice of London transport users Way to go: Improving public transport access to London s January 2019 London TravelWatch is the official body set up by Parliament to provide
More information