98 Manor Way, Beckenham, Kent BR3 3LR

Size: px
Start display at page:

Download "98 Manor Way, Beckenham, Kent BR3 3LR"

Transcription

1 98 Manor Way, Beckenham, Kent BR3 3LR RECOMMENDATIONS FOR HS2, CROSSRAIL AND OLD OAK COMMON INTERCHANGE DECEMBER

2 1. High Speed London Birmingham BIRMINGHAM LONDON 2. HS2 London - Birmingham BIRMINGHAM To The North LONDON 2

3 3. Key HS2 design parameters Opportunities for HS2 to be brought closer to more people through more stations better connections Needs to be adequately engineered with:- Adequate spacing between running tracks; Frequent crossovers; Bi-directional signaling All the above to be provided throughout to allow single-line working on both lines during periods of disruption All HS2 infrastructure, including tunnels, over- under-bridges, should be able to accommodate Double-Decker passenger Continental gauge freight trains, even though the latter may not form a large part of HS2 s daylight market Double-Decker trains could be shorter than single-decker trains, needing less ltake for structures, stations, depots, loops sidings 4. Suggested HS2 Parkway Stations N BIRMINGHAM To The North Birmingham International for NEC Airport North Warwickshire Parkway Three Counties Parkway or Claydon (for interchange with East-West Railway) Chilterns Parkway LONDON Each HS2 train cycle would have one Birmingham International non-stop, with each of the rest also stopping at a different Parkway station. 3

4 5. Options for platform arrangements for HS2 Parkway stations Passive provision for the three Parkway stations should be made now with passing loops installed from the outset to allow for construction of their future platforms Options 1 3 above offer greater capacity to meet operational dem 4

5 6. Populations served Birmingham 2,086,000 London 8,294,000 Total 10,380,000 Main centres within 15 minutes drive time of an HS2 Intermediate station Solihull 207,000 Coventry 316,900 Rugby 95,700* Kenilworth 23,200 Royal Leamington Spa 49,500 Warwick 30,100 Stratford- upon-avon 25,500 Daventry 25,000* Northampton 212,100 Banbury 43,100* Brackley 14,500* Buckingham 12,000 Bletchley 15,300 Milton Keynes 189,300 Bicester 28,700 Original Total 10,380, % Oxford 145,000 Areas Above 1,318,300 13% Aylesbury 74,700 Revised Total 11,698, % Many of the most prosperous areas outside London, but some pockets of deprivation areas of low economic activity Strong commuter dem for London Birmingham Swifter access to airports by rail Opportunities to ease road networks Opportunities for sensitive development Opportunities for local decisions on stations with guidance from Government These benefits to counterbalance perceived adverse environmental impacts Bringing the benefits of High Speed rail closer to those who will be paying for it 5

6 7. Crossrail excluding All stations to Slough West London Ealing Broadway West Ealing Hanwell Southall Bond Street Tottenham Court Road Farringdon Liverpool Street All stations to Stratford Ilford Romford Shenfield Hayes & Harlington Paddington Whitechapel Custom House (for ExCeL LCA) Woolwich Arsenal 8. Crossrail including All stations to Slough West London Ealing Broadway West Ealing Hanwell Southall OLD OAK COMMON for HS2 WLL NLL GWML WCML Chiltern Bakerloo Central Lines Bond Street Tottenham Court Road Farringdon Liverpool Street All stations to Stratford Ilford Romford Shenfield Hayes & Harlington Paddington Whitechapel Custom House (for ExCeL LCA) Woolwich Arsenal 9. Present Plans for HS2 Crossrail at Paddington To 6

7 10. Connecting HS2 Crossrail at Paddington To 11. Crossrail extended to Watford Junction Watford Junction Paddington To 7

8 12. Crossrail extended to Denham Parkway Denham Parkway Paddington To 13. Main centres within possible 20 minutes drive time of Denham Parkway Aylesbury Tring Wendover Berkhamsted Princes Risborough Great Missenden Hemel Hempstead Chesham Bovingdon Kings Langley Abbots Langley Amersham Chorleywood Watford Hazlemere The Chalfonts Rickmansworth Northwood High Wycombe Beaconsfield Denham Parkway Ruislip Gerrards Cross Uxbridge Slough 8

9 14. Crossrail extended to Watford Junction Denham Parkway To Watford Junction Denham Parkway To Paddington 15. Crossrail, HS2 Great Western Main Line To Watford Junction Denham Parkway GWML to the West South Wales To Paddington 9

10 16. Crosssrail, HS2, GWML North London Line To Watford Junction NORTH LONDON LINE to Stratford Willesden Junction Denham Parkway GWML to the West South Wales Acton Central To Paddington NORTH LONDON LINE to Gunnersbury Kew Gardens Richmond (for SWT) 10

11 17. Crosssrail, HS2, GWML, NLL West London Line WCML to Milton Keynes Wembley Central Watford Junction NLL to Stratford Willesden Junction Denham Parkway GWML to the West South Wales Acton Central To Paddington WEST LONDON LINE to Westway Circus (for White City OA (North)) Shepherd s Bush (for White City OA (South)) Kensington Olympia (for Olympia) NLL to Gunnersbury Kew Gardens Richmond (for SWT) West Brompton (for Earl s Court OA) Imperial Wharf (for Crossrail 2) Clapham Junction (for SWT Southern) all stations to East Croydon (for Tramlink) 11

12 18. Interchange (Chiltern, Bakerloo Central Lines omitted) WCML to Milton Keynes Wembley Central Watford Junction NLL to Stratford Willesden Junction Denham Parkway GWML to the West South Wales Acton Central To Paddington WEST LONDON LINE to Westway Circus (for White City OA (North)) Shepherd s Bush (for White City OA (South)) Kensington Olympia (for Olympia) NLL to Gunnersbury Kew Gardens Richmond (for SWT) West Brompton (for Earl s Court OA) Imperial Wharf (for Crossrail 2) Clapham Junction (for SWT Southern) all stations to East Croydon (for Tramlink) 12

13 19. HS2 HS1 Link via the West London Line Merstham Parkway, the North West, the North East Scotl St Pancras International To South Wales the West WEST LONDON LINE CORRIDOR (Westway Circus - Imperial Wharf) New alignment over the Thames Victoria To Paddington HS1 via Stratford Ebbsfleet Waterloo Clapham Junction HS2-HS1 station (above Clapham Yard) Clapham Junction SWT network to SW London Southern Engl East Croydon Merstham Parkway for Gatwick Airport M23/M25 Interchange Redhill HS2-HS1 link via stilts above or tunnel below Brighton Main Line to deal with BML dem Tonbridge Gatwick Airport Brighton Ashford International 13 HS1 to the Continent

14 Summary of Recommendations HS2 should proceed, but become more positively relevant for potential users both along its length for those wishing to connect with it. HS2 needs to be adequately engineered with:- o Sufficient spacing between running tracks; o Frequent crossovers; o Bi-directional signaling All the above must be provided throughout to allow single-line working on both lines during periods of disruption. All HS2 infrastructure, including tunnels, over- under-bridges, should be able to accommodate Double-Decker passenger Continental gauge freight trains, even though the latter may not form a large part of HS2 s daylight market. Double-Decker trains could be shorter than single-decker trains, needing fewer vehicles less ltake for structures, stations, depots, loops sidings. As well as Birmingham International, three area Parkway stations are recommended. Each HS2 train cycle would have one Birmingham International non-stop, with each of the rest also stopping at a different Parkway station. Passive provision for the three Parkway stations should be made now with passing loops installed from the outset to allow for future construction of their platforms All three Parkway stations would bring HS2 to another 13% of potential users above the combined populations of London Birmingham. Many of these are in the most prosperous areas outside London, although some of these areas have pockets of deprivation low economic activity. From within these areas there would be:- o Strong commuter dem for London Birmingham o Swifter access to airports by rail o Opportunities to ease road networks o Opportunities for sensitive development o Opportunities for local decisions on stations with guidance from Government o Benefits to counterbalance perceived adverse environmental impacts upon those who will be paying for HS2 14

15 HS2 needs to have interchange at with Crossrail other rail tube lines An HS2/Crossrail station at with interlaced platforms for crossplatform interchange between the two networks may obviate the need cost of HS2 reaching A Crossrail Parkway station on the HS2 axis at Denham would provide fast direct services from a large Herts/Bucks catchment to Dockls relief on WCML GWML tube connections. would become a true transport hub when good connections are provided between all of HS2, Crossrail, GWML, North London Line. West London Line (with its 2 Opportunity Areas links to Clapham Junction), Bakerloo Central Lines to their cumulative mutual benefit Direct trains should run from HS2 to HS1 via the West London Line, Clapham Junction, the Brighton Main Line corridor (via stilts above or tunnel below the BML to deal with its capacity problems), Merstham Parkway (for Gatwick M23/M25 junction) Tonbridge. This would provide an alternative through HS2 HS1 link that would: o deal with service disruption; o bring more areas of the UK (primarily SW London southern Engl) within easier reach of both the international domestic High Speed networks. MLB 11 December

WEST LONDON LINE GROUP 98 Manor Way, Beckenham, Kent BR3 3LR

WEST LONDON LINE GROUP 98 Manor Way, Beckenham, Kent BR3 3LR WEST LONDON LINE GROUP 98 Manor Way, Beckenham, Kent BR3 3LR 020 8650 0667 29 July 2011 Consultation Manager High Speed Rail Consultation Department for Transport PO Box 59628 London SE21 9AX Dear Sir

More information

WEST LONDON LINE GROUP CALLS FOR NEW STATION

WEST LONDON LINE GROUP CALLS FOR NEW STATION 98 Manor Way, Beckenham, Kent BR3 3LR 020 8650 0667 www.westlondonlinegroup.org.uk WEST LONDON LINE GROUP CALLS FOR NEW STATION The West London Line Group is calling for Westway Circus, a new West London

More information

THE WEST LONDON LINE GROUP ENTRY TO THE RAILWAY FORUM / MODERN RAILWAYS RAILWAY INDUSTRY INNOVATION AWARDS 2007

THE WEST LONDON LINE GROUP ENTRY TO THE RAILWAY FORUM / MODERN RAILWAYS RAILWAY INDUSTRY INNOVATION AWARDS 2007 THE WEST LONDON LINE GROUP ENTRY TO THE RAILWAY FORUM / MODERN RAILWAYS RAILWAY INDUSTRY INNOVATION AWARDS 2007 A proposal for a new innovative overground rail service between Heathrow Airport and Ebbsfleet

More information

CROSSRAIL INFORMATION PAPER A1 DEVELOPMENT OF THE CROSSRAIL ROUTE

CROSSRAIL INFORMATION PAPER A1 DEVELOPMENT OF THE CROSSRAIL ROUTE CROSSRAIL INFORMATION PAPER DEVELOPMENT OF THE CROSSRAIL ROUTE This paper explains how the Crossrail route set out in the Crossrail Bill was developed. It will be of particular relevance to those interested

More information

Profile west. Impressive modern office environment. Excellent national and international access.

Profile west. Impressive modern office environment. Excellent national and international access. Profile west Impressive modern office environment. Excellent national and international access. At 52,990 sq ft (4,923 sq m ) Profile West is a landmark building which provides an impressive modern office

More information

The Evergreen 3 Project

The Evergreen 3 Project The Evergreen 3 Project Railway Civil Engineers Association 26 th January 2012 Allan Dare Strategic Development Manager Chiltern Railways Chiltern Railways Birmingham Solihull Warwick Parkway Virgin West

More information

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE Correct at time of publication 2018 Sat 22 December Sun 23 December Mon 24 December (Christmas Eve) Tues 25 December (Christmas Day) Weds 26 December (Boxing Day)

More information

QUALITY OFFICES SET WITHIN A TRANQUIL BUSINESS PARK TO LET.

QUALITY OFFICES SET WITHIN A TRANQUIL BUSINESS PARK TO LET. QUALITY OFFICES SET WITHIN A TRANQUIL BUSINESS PARK TO LET www.pavilions-twyford.co.uk CONNECTED FROM 2019 Set in a unique and environmentally inspiring business park, The Pavilions offers year round natural

More information

Crossrail: Socio-Economic Technical Report

Crossrail: Socio-Economic Technical Report Crossrail: Socio-Economic Technical Report Cross London Rail Links Ltd Feb 2005 Crossrail: Socio-Economic Technical Report - Project No: 72711 Feb 2005 Prepared by: Approved by: John Siraut, Paul Buchanan,

More information

London and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009

London and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009 London and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009 Appendix 1 Flip chart notes from Breakout Groups Groups were asked to consider what gaps and issues

More information

Connecting People, Connecting Business

Connecting People, Connecting Business Connecting People, Connecting Business Connecting People, Connecting Business 1 East West Rail is a scheme to re-establish a rail link between Cambridge and Oxford to improve rail services between East

More information

ravengreen THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential

ravengreen THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential 64 66 THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential ravengreen CHARTERED SURVEYORS Gunnersbury Park Ealing Green College Walpole

More information

Jubilee and Metropolitan Lines. Jubilee: Waterloo to Stanmore. Metropolitan: Aldgate to Harrow-on-the-Hill

Jubilee and Metropolitan Lines. Jubilee: Waterloo to Stanmore. Metropolitan: Aldgate to Harrow-on-the-Hill Jubilee and Metropolitan Lines Jubilee: Waterloo to Stanmore Metropolitan: Aldgate to Harrow-on-the-Hill Saturday 16 th to Sunday 17 th January 2016 Headlines Jubilee: West Hampstead to Stanmore Metropolitan:

More information

TRS018 Annex A. Development of Train Services for Chiltern Routes

TRS018 Annex A. Development of Train Services for Chiltern Routes TRS018 Annex A Development of Train Services for Chiltern Routes October 2011 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling public. Our role is

More information

A STUNNING SELECTION OF STUDIO SUITES, 1, 2 & 3 BEDROOM LUXURY APARTMENTS FACT SHEET

A STUNNING SELECTION OF STUDIO SUITES, 1, 2 & 3 BEDROOM LUXURY APARTMENTS FACT SHEET A STUNNING SELECTION OF STUDIO SUITES, 1, 2 & 3 BEDROOM LUXURY APARTMENTS FACT SHEET PRESENTED BY DEVELOPMENT BY GREENVIEW COURT West London s newest destination for luxury living THE DEVELOPMENT Three

More information

Elizabeth line Services

Elizabeth line Services Elizabeth line Services Steve Murphy Managing Director MTR Crossrail 17 th April 2018 London TravelWatch Timescales Stage 0-1: Shenfield / Liverpool Street Stage 0 (May 2015) marked the commencement of

More information

CROSSRAIL Moving London Forward

CROSSRAIL Moving London Forward CROSSRAIL Moving London Forward XX Crossrail: Header here The Project max 30 characters Cost 14.8bn Net benefit 42bn Length 118km Stations 40 (10 new) Jobs supported 55,000 Business opportunities Trains

More information

London TravelWatch Response to the West Coast Main Line Route Utilisation Strategy Draft for Consultation

London TravelWatch Response to the West Coast Main Line Route Utilisation Strategy Draft for Consultation London TravelWatch Response to the West Coast Main Line Route Utilisation Strategy Draft for Consultation March 2011 London TravelWatch is the official body set up by Parliament to provide a voice for

More information

Newly refurbished Grade A offices

Newly refurbished Grade A offices Newly refurbished Grade A offices OUTSTANDING QUALITY Newly refurbished Grade A offices 4,000-52,176 sq ft To Let Building One Building Two & Three GRADE A IN EVERY ASPECT Concorde Park has recently undergone

More information

Horton Road Industrial Estate

Horton Road Industrial Estate Horton Road Industrial Estate West Drayton Middlesex UB7 8JL Multi-Let Industrial Investment Opportunity Central London Hayes & Harlington Station London Heathrow Airport Stockley Park West Stockley Park

More information

High Speed Rail London to the West Midlands and Beyond. A Report to Government by High Speed Two Limited. PART 4 of 11

High Speed Rail London to the West Midlands and Beyond. A Report to Government by High Speed Two Limited. PART 4 of 11 High Speed Rail London to the West Midlands and Beyond A Report to Government by High Speed Two Limited PART 4 of 11 While High Speed Two (HS2) Limited has made every effort to ensure the information in

More information

The Chiltern Railways Company Limited Penalty Fares Scheme

The Chiltern Railways Company Limited Penalty Fares Scheme The Chiltern Railways Company Limited Penalty Fares Scheme December 2015 1. Penalty Fares Trains 1.1. For the purposes of this scheme, all the trains operated by the company (Chiltern Railway Company Limited)

More information

Consultation Round 2: Results and Crossrail s Response

Consultation Round 2: Results and Crossrail s Response Consultation Round 2: Results and Crossrail s Response February 2005 Crossing the Capital Connecting the UK Contents 01 Introduction 2 02 Why did we consult? 3 03 Who did we consult? 3 04 When did we consult?

More information

symmetry park Aston Clinton / A41 PHASE 1 M25 / J20 UNDER CONSTRUCTION READY Q NEW INDUSTRIAL / WAREHOUSE BUILDINGS

symmetry park Aston Clinton / A41 PHASE 1 M25 / J20 UNDER CONSTRUCTION READY Q NEW INDUSTRIAL / WAREHOUSE BUILDINGS PHASE 1 UNDER CONSTRUCTION READY Q2 2019 / J20 NEW INDUSTRIAL / WAREHOUSE BUILDINGS PHASE 1 CURRENTLY UNDER CONSTRUCTION Units of 55,000, 83,000 & 110,000 sq ft (5,110, 7,711, 10,219 sq m) PHASE 2 AVAILABLE

More information

Cross-London Inter-Regional Connections

Cross-London Inter-Regional Connections Cross-London Inter-Regional Connections This article refers to and should be read in conjunction with the article Towards a High Speed Network. That article sought to make the case for developing a network

More information

LTW 372 Annex B. Development of Train Services for Chiltern Routes. Draft for consultation

LTW 372 Annex B. Development of Train Services for Chiltern Routes. Draft for consultation LTW 372 Annex B Development of Train Services for Chiltern Routes Draft for consultation February 2011 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling

More information

Contents. Executive Summary Introduction A regular interval timetable for the West Coast Main Line (south) 8. 3.

Contents. Executive Summary Introduction A regular interval timetable for the West Coast Main Line (south) 8. 3. February 2011 Contents Executive Summary 2 1. Introduction 6 2. A regular interval timetable for the West Coast Main Line (south) 8 3. Freight 15 4. Wider service network developments 17 5. Future phases

More information

National Passenger Survey TOC Report for Chiltern Railways Autumn 2011

National Passenger Survey TOC Report for Chiltern Railways Autumn 2011 National Passenger Survey TOC Report for Contacts: David Greeno Passenger Focus 1 Drummond Gate London, SW1V QY Tel: 13 837 Email: david.greeno@passengerfocus.org.uk David Chilvers BDRC Continental Kingsbourne

More information

Current Contents of Website, and Version History V5.17

Current Contents of Website, and Version History V5.17 Current Contents of Website, and Version History V5.17 The current contents of the website are: Articles on High Speed Rail Towards a High Speed Network v14.3 Towards a High Speed Network the Maps v2.0

More information

Maidenhead Bridge. Proposed Work

Maidenhead Bridge. Proposed Work W1.1 Maidenhead Bridge Proposed Work The Maidenhead Bridge over the River Thames at Maidenhead is a Grade II* listed structure. Installation of overhead electrification on top of the structure would be

More information

High Speed Rail London to the West Midlands and Beyond Supplementary Report. A report to Government by High Speed Two Limited

High Speed Rail London to the West Midlands and Beyond Supplementary Report. A report to Government by High Speed Two Limited High Speed Rail London to the West Midlands and Beyond Supplementary Report A report to Government by High Speed Two Limited September 2010 1 2 Contents Page Executive Summary Introduction 9 Chapter 1

More information

SPORTS DIRECT & DREAMS

SPORTS DIRECT & DREAMS SPORTS DIRECT & DREAMS 383 389 BATH ROAD, SLOUGH SL1 5QA PRIME RETAIL WAREHOUSE INVESTMENT OPPORTUNITY WITH A WAULT OF 9.6 YEARS TERMS CERTAIN INVESTMENT CONSIDERATIONS n Slough is a south east commercial

More information

THE OLD VINYL FACTORY, BLYTH ROAD, HAYES, UB3 1HA SHIPPING BUILDING SCROLL TO DISCOVER MORE

THE OLD VINYL FACTORY, BLYTH ROAD, HAYES, UB3 1HA SHIPPING BUILDING SCROLL TO DISCOVER MORE THE OLD VINYL FACTORY, BLYTH ROAD, HAYES, UB3 1HA SHIPPING BUILDING SCROLL TO DISCOVER MORE SHIPPING BUILDING SHIPPING BUILDING The Shipping Building is a landmark art deco building designed by Wallis,

More information

EASY TO FOLLOW GUIDE TO CATCHING THE BUS FROM. West Wycombe Road

EASY TO FOLLOW GUIDE TO CATCHING THE BUS FROM. West Wycombe Road EASY TO FOLLOW GUIDE TO CATCHING THE BUS FROM West Wycombe Road You don t need a car to get places from West Wycombe Road. Did you know that there are direct buses to a number of locations? If you haven

More information

hemelone.com HIGH QUALITY OFFICE SUITES FROM 1,527 TO 11,685 SQ FT WITH A TOTAL OF 35,491 SQ FT AVAILABLE TO LET

hemelone.com HIGH QUALITY OFFICE SUITES FROM 1,527 TO 11,685 SQ FT WITH A TOTAL OF 35,491 SQ FT AVAILABLE TO LET hemelone.com BOUNDARY WAY, HEMEL HEMPSTEAD, HP2 7YU HIGH QUALITY OFFICE SUITES FROM,527 TO,685 SQ FT WITH A TOTAL OF 5,49 SQ FT AVAILABLE TO LET THEONE AN IMPRESSIVE FOUR STOREY OFFICE BUILDING WHICH HAS

More information

Crossrail / Elizabeth Line An Update

Crossrail / Elizabeth Line An Update Crossrail / Elizabeth Line An Update Howard Smith Operations Director, Crossrail Railfuture Autumn 2018 Conference 10 th November 2018 Novotel Reading (uploaded to the www.railfuture.org.uk website with

More information

Chapter 21 Route window W6 West Ealing station. Transport for London

Chapter 21 Route window W6 West Ealing station. Transport for London Chapter 21 Route window W6 West Ealing station WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is

More information

CHILTERN RAILWAYS PASSENGER BOARD ANNUAL REPORT

CHILTERN RAILWAYS PASSENGER BOARD ANNUAL REPORT CHILTERN RAILWAYS PASSENGER BOARD ANNUAL REPORT 2010-2011 Ian Rivett Chairman Reg Whittome Vice Chairman Chairman s Message: This is the ninth Annual Report of the Chiltern Railways Passenger Board and

More information

24/28 QUEEN VICTORIA STREET READING RG1 1TG

24/28 QUEEN VICTORIA STREET READING RG1 1TG 24/28 QUEEN VICTORIA STREET READING RG1 1TG INVESTMENT SUMMARY Reading is an important and affluent, regional retail centre with an extensive primary catchment population of 692,000 and total catchment

More information

Strategic Transport Forum 7 th December 2018

Strategic Transport Forum 7 th December 2018 Strategic Transport Forum 7 th December 2018 Agenda Item 7: East West Rail Recommendation: It is recommended that the Forum: a) Endorse the East West Rail Consortium s position in relation to the draft

More information

PARKVIEW BRENTFORD PARKVIEW BRENTFORD

PARKVIEW BRENTFORD PARKVIEW BRENTFORD OPPORTUNITY TO OCCUPY A HIGHLY VISIBLE LANDMARK OFFICE BUILDING OVERLOOKING THE M4 MOTORWAY IN WEST LONDON GREAT WEST ROAD TW8 9AZ 02 HIGH PROFILE One of the most prominent buildings in West London comprising

More information

Crossrail transforming travel across London - Infrarail

Crossrail transforming travel across London - Infrarail Crossrail transforming travel across London - Infrarail Jeremy Long, MTR Corporation, CEO European Business 2 May 2018 Page 1 The Crossrail Journey Construction May 2015 Dec 2018 Page 2 Crossrail the 15bn

More information

Strategic Transport Forum 21 st September 2018

Strategic Transport Forum 21 st September 2018 Strategic Transport Forum 21 st September 2018 Agenda Item 4: Heathrow Airport Expansion: Surface Access Strategy Update Recommendation: It is recommended that the Forum consider the update provided by

More information

HIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK

HIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK HIGH SPEED UK..connecting in London Colin Elliff BSc CEng MICE Civil Engineering Principal, Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, www.highspeeduk.co.uk HS2+3 GL EH GL

More information

Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014

Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014 Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014 Compiled by Paul Murphy-Kasp August 2014 CONTENTS Road Closures & Map Changes to Bus routes & Map Transport

More information

WORK WATERFRONT SUITES AVAILABLE FROM 9,100 TO 25,542 SQ FT

WORK WATERFRONT SUITES AVAILABLE FROM 9,100 TO 25,542 SQ FT WORK WATERFRONT SUITES AVAILABLE FROM 9,00 TO 25,542 SQ FT WATERFRONT WATERFRONT IS ONE OF TWO GRADE A HEADQUARTERS BUILDINGS WHICH FORM HAMMERSMITH EMBANKMENT. THROUGH ITS FULL HEIGHT GLAZING & IMPRESSIVE

More information

This paper outlines the development of the HS2 scheme since the then Government decided to set up HS2 Ltd and explore options in January 2009.

This paper outlines the development of the HS2 scheme since the then Government decided to set up HS2 Ltd and explore options in January 2009. HIGH SPEED TWO INFORMATION PAPER A1: DEVELOPMENT OF THE HS2 PROPOSED SCHEME This paper outlines the development of the HS2 scheme since the then Government decided to set up HS2 Ltd and explore options

More information

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Chapter 4 Route Window NE3 Manor Park station. Transport for London Chapter 4 Route Window NE3 Manor Park station MANOR PARK STATION 4 Route Window NE3 Manor Park station 4.7 Highway access to Manor Park station is very good. A117 Station Road connects with A116 to the

More information

Chapter 4 Route window W23 Taplow station. Transport for London

Chapter 4 Route window W23 Taplow station. Transport for London Chapter 4 Route window W23 Taplow station TAPLOW STATION 4 Route window W23 Taplow station 4.6 Baseline conditions Taplow station Taplow station is located in South Buckinghamshire, 1.5 km southeast of

More information

RICHMOND-UPON-THAMES

RICHMOND-UPON-THAMES -UPON-THAMES No1 Church Road provides an outstanding opportunity to LEASE HIGH quality Grade A office accommodation situated in the heart of Richmond town centre. The Property has undergone a major reconfiguration,

More information

Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013

Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013 Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013 Compiled by Paul Murphy August 2013 Correct as of Friday 23 rd August 2013 CONTENTS Road Closures & Map Changes

More information

Round 2 Consultation Document August to October 2004

Round 2 Consultation Document August to October 2004 Developing Crossrail Round 2 Consultation Document August to October 2004 Update Crossing the Capital Connecting the UK Introduction from Crossrail s Chief Executive Crossrail wants to hear from you! That

More information

ISSUE 40 OCTOBER 2016 MOVING AHEAD CROSSRAIL PROJECT OCTOBER UPDATE. Andrew Wolstenholme CEO Crossrail Ltd

ISSUE 40 OCTOBER 2016 MOVING AHEAD CROSSRAIL PROJECT OCTOBER UPDATE. Andrew Wolstenholme CEO Crossrail Ltd ISSUE 40 OCTOBER 2016 MOVING AHEAD PROJECT OCTOBER UPDATE Andrew Wolstenholme CEO Crossrail Ltd PROGRAMME 77% 60% The project is more than 75% complete. There is a huge amount of work underway to complete

More information

Kent Route Utilisation Strategy consultation by Network Rail. A response from London TravelWatch

Kent Route Utilisation Strategy consultation by Network Rail. A response from London TravelWatch Kent Route Utilisation Strategy consultation by Network Rail A response from London TravelWatch Published by London TravelWatch 6 Middle Street London EC1A 7JA Phone : 020 7505 9000 Fax : 020 7505 9003

More information

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) 1. The Forest Hill Society represents residents in and around the Forest Hill and Honor Oak Park

More information

2 longwalk Stockley Park, Heathrow UB11 1BA

2 longwalk Stockley Park, Heathrow UB11 1BA www.2longwalk.com 2 longwalk Stockley Park, Heathrow UB11 1BA Newly refurbished 48,552 sq ft headquarter office building 2 longwalk Stockley Park, Heathrow UB11 1BA 2 Longwalk offers businesses bright,

More information

A PROMINENT GRADE A HEADQUARTERS BUILDING TOTALLING 117,263 SQ FT

A PROMINENT GRADE A HEADQUARTERS BUILDING TOTALLING 117,263 SQ FT A PROMINENT GRADE A HEADQUARTERS BUILDING TOTALLING 117,263 SQ FT VANTAGE LONDON A 12-STOREY OFFICE BUILDING CONVENIENTLY LOCATED OFF JUNCTION 1 OF THE M4 WHICH BENEFITS FROM DIRECT ACCESS INTO CENTRAL

More information

PROPOSALS FOR MEDIUM AND LONG TERM DEVELOPMENT

PROPOSALS FOR MEDIUM AND LONG TERM DEVELOPMENT MICHAEL SCHABAS FIRST CLASS PARTNERSHIPS 28 GRAND AVENUE, LONDON UNITED KINGDOM N10 3BB WWW.FCPWORLD.NET 13 July 2013 Airports Commission By email to airport.proposals@airports.gsi.gov.uk PROPOSALS FOR

More information

REFURBISHMENT NOW UNDER V159 WAREHOUSE / INDUSTRIAL UNIT 159,588 SQ FT (14,826 SQ M) M25 J21 & 22 / M1 J6.

REFURBISHMENT NOW UNDER V159 WAREHOUSE / INDUSTRIAL UNIT 159,588 SQ FT (14,826 SQ M) M25 J21 & 22 / M1 J6. NOW UNDER REFURBISHMENT V159 WAREHOUSE / INDUSTRIAL UNIT 159,588 SQ FT (1,826 SQ M) J21 & 22 / M1 J6 www.venturapark.co.uk V159 www.venturapark.co.uk LOCATION Located off Old Parkbury Lane, V159 is located

More information

CHILTERN RAILWAYS PASSENGER BOARD ANNUAL REPORT

CHILTERN RAILWAYS PASSENGER BOARD ANNUAL REPORT CHILTERN RAILWAYS PASSENGER BOARD ANNUAL REPORT 2011-2012 Ian Rivett Chairman Reg Whittome Vice Chairman Chairman s Introduction: This is the tenth Annual Report of the Chiltern Railways Passenger Board

More information

Crossrail Business Case Update: Summary Report July 2011

Crossrail Business Case Update: Summary Report July 2011 Crossrail Business Case Update: Summary Report July 2011 This report provides an update to the July 2010 Crossrail business case, including taking into account a number of changes to the costs and revenues

More information

THEFUTUREWORKSSLOUGH.COM

THEFUTUREWORKSSLOUGH.COM BROUGHT TO YOU BY AGENTS THEFUTUREWORKSSLOUGH.COM THE FUTURE WORKS SLOUGH IS EVOLVING A three phase office development set within an entirely new commercial quarter in the Heart of Slough, providing 350,000

More information

The Brighton mainline Route Utilisation Strategy. Making it work for passengers. A paper by London TravelWatch and Passenger Focus

The Brighton mainline Route Utilisation Strategy. Making it work for passengers. A paper by London TravelWatch and Passenger Focus The Brighton mainline Route Utilisation Strategy Making it work for passengers A paper by London TravelWatch and Passenger Focus 1 Executive summary This paper is issued by London TravelWatch and Passenger

More information

ROYAL ARSENAL, LONDON SE18

ROYAL ARSENAL, LONDON SE18 ROYAL ARSENAL, LONDON SE18 - 8,000-30,000 SQ FT OF STUNNING OFFICE SPACE - EXCEPTIONAL CONVERTED WAREHOUSE - EXPOSED BRICK WALLS, PAINTED STEEL COLUMNS AND 4-6M CEILING HEIGHTS - 1 MINUTES WALK FROM CROSSRAIL

More information

Govia Thameslink Railway consultation on December 2015 timetable - APTU response

Govia Thameslink Railway consultation on December 2015 timetable - APTU response Thameslink: Bedford to Gatwick Airport and Brighton Q1 What do you think about these proposals noting that it is not possible to serve both London Bridge and London Blackfriars stations from Preston Park,

More information

WCML Service Plans. The Purpose, Background and Method

WCML Service Plans. The Purpose, Background and Method The Purpose, Background and Method WCML Service Plans This article refers to and should be read in conjunction with several other articles. Towards a High Speed Network is the original, and seeks to make

More information

Avoiding stairs Tube guide

Avoiding stairs Tube guide London Underground Avoiding stairs Tube guide Showing all Tube and DLR stations where you can use lifts, escalators or ramps between the street and the platform January 2016 MAYOR OF LONDON A B C D Heathrow

More information

CONTEMPORARY GRADE A OFFICES SUITABLE FOR ALL TYPES OF BUSINESS 3,770 41,860 SQ FT

CONTEMPORARY GRADE A OFFICES SUITABLE FOR ALL TYPES OF BUSINESS 3,770 41,860 SQ FT CONTEMPORARY GRADE A OFFICES SUITABLE FOR ALL TYPES OF BUSINESS 3,770 41,860 SQ FT A BRIGHT AND FRIENDLY WELCOME DESIGNED TO MEET THE NEEDS OF A NEW BREED OF BUSINESS Agile, flexible and collaborative,

More information

OUTSTANDING COMBINATIONS

OUTSTANDING COMBINATIONS OUTSTANDING COMBINATIONS BALANCE COSTS & AMENITIES ENJOY LOW TOTAL OCCUPATION COSTS, HIGH SPECIFICATION AND EXCITING TOWN CENTRE AMENITIES AT READING BRIDGE HOUSE With all the benefits of being in Reading

More information

THAMES VALLEY TOWN CENTRE OFFICE INVESTMENT BELL TOWER HOUSE BELL STREET, MAIDENHEAD, SL6 1BU

THAMES VALLEY TOWN CENTRE OFFICE INVESTMENT BELL TOWER HOUSE BELL STREET, MAIDENHEAD, SL6 1BU THAMES VALLEY TOWN CENTRE OFFICE INVESTMENT BELL TOWER HOUSE BELL STREET, MAIDENHEAD, SL6 1BU INVESTMENT SUMMARY Town Centre office investment in the heart of the Thames Valley Exceptionally well located

More information

Thames Valley Branch Lines Notes of Meeting

Thames Valley Branch Lines Notes of Meeting Thames Valley Branch Lines Notes of Meeting Date: Time: Venue: Attendees: 05 December 2016 10.00am 4 Marlow Road, Maidenhead Cllr Phillip Bicknell, Royal Borough of Windsor & Maidenhead Cllr Julian Brookes,

More information

101,000 SQ FT (9,400 SQ M)

101,000 SQ FT (9,400 SQ M) R+ READING WELCOME LEADING THE WAY FOR COMMUNICATIONS AND PROFILE, R+ WILL BE THE LATEST ADDITION TO READING S ESTABLISHED INTERNATIONAL BUSINESS LANDSCAPE. A HEADQUARTERS OFFICE BUILDING OF THE HIGHEST

More information

Spending round 2013: The case for investment in transport. Mayor s Office, May 2013

Spending round 2013: The case for investment in transport. Mayor s Office, May 2013 Spending round 2013: The case for investment in transport isabel.dedring@london.gov.uk Mayor s Office, May 2013 Key messages London is the productive heart of the UK economy, supporting jobs and growth

More information

Proforma Portfolio Summary Big Yellow Stores

Proforma Portfolio Summary Big Yellow Stores Strategic Report (continued) Proforma Portfolio Summary Big Yellow Stores 2016 2015 Mature (1) Established Developing Total Mature Established Developing Total Number of stores (2) 56 11 4 71 56 11 2 69

More information

500 Capability Green LUTON. 500CapabilityGreen.co.uk

500 Capability Green LUTON. 500CapabilityGreen.co.uk 500 Capability Green 500CapabilityGreen.co.uk 500 Capability Green CAPABILITY GREEN IS ONE OF THE UK S LEADING BUSINESS PARKS AND DOMINATES THE NORTH M25 OFFICE MARKET AN IMPRESSIVE SELF CONTAINED OFFICE

More information

EXCEPTIONAL DEVELOPMENT OPPORTUNITY.

EXCEPTIONAL DEVELOPMENT OPPORTUNITY. EXCEPTIONAL DEVELOPMENT OPPORTUNITY www.cavershampark.co.uk Summary Grade II listed manor house with stunning views across the Thames Valley c115,000 sq ft (GIA) including ancillary buildings Set in c93

More information

Early May Bank Holiday Travel Summary 2012

Early May Bank Holiday Travel Summary 2012 Early May Bank Holiday Travel Summary 2012 Photo Attribution: Pete Ashton on Flickr Train service and engineering work information from National Rail Enquiries for customers travelling over the Early May

More information

THE OLD VINYL FACTORY, BLYTH ROAD, HAYES, UB3 1HA RETAIL & LEISURE SCROLL TO DISCOVER MORE

THE OLD VINYL FACTORY, BLYTH ROAD, HAYES, UB3 1HA RETAIL & LEISURE SCROLL TO DISCOVER MORE THE OLD VINYL FACTORY, BLYTH ROAD, HAYES, UB3 1HA RETAIL & LEISURE SCROLL TO DISCOVER MORE CLICK THE SECTION TITLE TO NAVIGATE A GROWING PLACE FOR ALL RETAIL AND LEISURE The 0 million regeneration of The

More information

Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017

Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017 Crossrail transforming travel across the capital - Railtex conference Jeremy Long, MTR Corporation, CEO European Business 9 May 2017 Page 1 The Crossrail Journey Construction May 2015 Dec 2018 Page 2 Crossrail

More information

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c. Abellio ScotRail Arriva Rail London Alliance Rail Arriva Trains Wales c2c Chiltern Railways Colas Rail CrossCountry DB Cargo (UK) Limited Devon & Cornwall Railway Direct Rail Services East Midlands Trains

More information

East West Rail Consortium

East West Rail Consortium East West Rail Consortium EWR Wider Economic Case: Refresh 18 th November 2015 Rupert Dyer Rail Expertise Ltd Rail Expertise Ltd. Tel: 01543 493533 Email: info@railexpertise.co.uk 1 Introduction 1.1 The

More information

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes Appendix 9 Impacts on Great Western Main Line Prepared by Christopher Stokes 9 IMPACTS ON GREAT WESTERN MAIN LINE Prepared by Christopher Stokes Introduction 9.1 This appendix evaluates the impact of

More information

South East Waterway Partnership Draft Strategic Plan. Our Objectives and Aims

South East Waterway Partnership Draft Strategic Plan. Our Objectives and Aims South East Waterway Partnership Draft Strategic Plan Our Objectives and Aims 1. Build community engagement, volunteering and ownership. This means increasing the number of community based and business

More information

THE GENERAL STRIKE OF 1926

THE GENERAL STRIKE OF 1926 THE GENERAL STRIKE OF 1926 By Antony Badsey-Ellis In the 1920s labour disputes were common in Britain. The most significant of these was the General Strike, which lasted for nine days from midnight on

More information

THIRTY FIVE GREAT SUTTON ST. CLERKENWELL EC1

THIRTY FIVE GREAT SUTTON ST. CLERKENWELL EC1 Converted warehouse building, comprehensively refurbished. Office suites arranged over the 1st, 2nd and 3rd floors located in one of London s most lively locations. Newly refurbished contemporary reception

More information

CITY IN THE WEST. 210,000 homes 310,000 jobs 600,000 Londoners

CITY IN THE WEST. 210,000 homes 310,000 jobs 600,000 Londoners CITY IN THE WEST CITY IN THE WEST 210,000 homes 310,000 jobs 600,000 Londoners Barnet Enfield The purpose of maps or plans, is to tell us where we are in relation to other things and how to get from where

More information

Anglia Winter Key Route Strategy (KRS) 2017/18

Anglia Winter Key Route Strategy (KRS) 2017/18 Anglia Winter Key Route Strategy (KRS) 2017/18 This is an overview of the train service plan should Key Route Strategy be declared. The principle of the KRS is to ensure we can run a service during conditions

More information

to do better business

to do better business BUILDING / LOCATION to do better business Kennet Place is a building with presence. Its warm stone and glass atrium offers a first impression that is welcoming and uplifting, promising a sophisticated

More information

HOUSE WATERSIDE RIVERSIDE UXBRIDGE 20,996 SQ FT (1,948 SQ M) TO LET A NEWLY REFURBISHED HIGH QUALITY OFFICE BUILDING

HOUSE WATERSIDE RIVERSIDE UXBRIDGE 20,996 SQ FT (1,948 SQ M) TO LET A NEWLY REFURBISHED HIGH QUALITY OFFICE BUILDING RIVERSIDE UXBRIDGE TO LET A NEWLY REFURBISHED HIGH QUALITY OFFICE BUILDING 20,996 SQ FT (,948 SQ M) This two storey building with striking curved frontage, is set in a pleasant waterside location overlooking

More information

London and Crossrail 2. Chris Moores Transport for London

London and Crossrail 2. Chris Moores Transport for London London and Crossrail 2 Chris Moores Transport for London 1 Contents 2 1 The region needs Crossrail 2 2 Crossrail 2 can be more than just a railway 3 Planning and Delivering Crossrail 2 Issues facing London

More information

EAST WEST RAIL EASTERN SECTION. prospectus for growth

EAST WEST RAIL EASTERN SECTION. prospectus for growth EAST WEST RAIL EASTERN SECTION prospectus for growth September 2018 executive summary The East West Rail Consortium, a partnership of local authorities, rail operators and Network Rail, continues to promote

More information

High Speed Two. A Greengauge 21 Proposition. June Production of this Report has been sponsored by the Railway Forum

High Speed Two. A Greengauge 21 Proposition. June Production of this Report has been sponsored by the Railway Forum A Greengauge 21 Proposition June 2007 Production of this Report has been sponsored by the Railway Forum A Greengauge 21 Proposition June 2007 contents Executive Summary 1 1. Introduction 5 2. What would

More information

Editorial text from Grand Union Alliance Report of First Old Oak Common & Park Royal Charette, held in Brent on 15 November 2014:

Editorial text from Grand Union Alliance Report of First Old Oak Common & Park Royal Charette, held in Brent on 15 November 2014: Editorial text from Grand Union Alliance Report of First Old Oak Common & Park Royal Charette, held in Brent on 15 November 2014: Morning session Theresa Magee, Wesley Estate Residents Associaton (Ealing)

More information

EALING CROSS 85 UXBRIDGE ROAD LONDON

EALING CROSS 85 UXBRIDGE ROAD LONDON EALING CROSS 85 UXBRIDGE ROAD LONDON IT S ALL IN A FEALING 0 EALING CROSS EIGHT FLOORS OF NATURAL LIGHT AND LOTS OF LOVELY SPACE. THIS IS EALING S MOST MODERN BUILDING. 0 FEALING DYNAMIC Less than seven

More information

HIGH WYCOMBE SWORD HOUSE, TOTTERIDGE ROAD, HP13 6DG

HIGH WYCOMBE SWORD HOUSE, TOTTERIDGE ROAD, HP13 6DG LONG INCOME OFFICE INVESTMENT LET TO ENERGISER GROUP PLC FOR A FURTHER 83 YEARS HIGH WYCOMBE SWORD HOUSE, TOTTERIDGE ROAD, HP13 6DG INVESTMENT CONSIDERATIONS A rare opportunity to acquire a single let

More information

MOVING AHEAD ISSUE 31 SPRING 2014 LAST OF THE GREAT MACHINES LAUNCHED FREEPOST CROSSRAIL

MOVING AHEAD ISSUE 31 SPRING 2014 LAST OF THE GREAT MACHINES LAUNCHED FREEPOST CROSSRAIL MOVING AHEAD www.crossrail.co.uk 0345 602 3813 FREEPOST CROSSRAIL ISSUE 31 SPRING 2014 LAST OF THE GREAT MACHINES LAUNCHED Tunnel Boring Machine (TBM) Ellie has begun her journey from Pudding Mill Lane

More information

UNITS 4 & 5 AVAILABLE TO LET CV35 9JY TWO NEW INDUSTRIAL / WAREHOUSE OPPORTUNITIES ON AN ESTABLISHED PARK

UNITS 4 & 5 AVAILABLE TO LET CV35 9JY TWO NEW INDUSTRIAL / WAREHOUSE OPPORTUNITIES ON AN ESTABLISHED PARK IMMEDIATELY AVAILABLE TO LET UNITS 4 & 5 CV35 9JY TWO NEW INDUSTRIAL / WAREHOUSE OPPORTUNITIES ON AN ESTABLISHED PARK SAY HELLO TO THE SWEET SP T UNIT 5 66,500 SQ FT UNIT 4 51,500 SQ FT Strategic location

More information

CASE STUDY. Transport For London

CASE STUDY. Transport For London CASE STUDY Transport For London It s good to work with people who care as much as I do. The level of professionalism was immense. It was an intense, exciting time that produced an exceptional result. Roberto

More information

Technical specification: BS 4449:2005 GRADE B500B BAR AND COIL

Technical specification: BS 4449:2005 GRADE B500B BAR AND COIL BS 4449:2005 GRADE B500B BAR AND COIL DIAMETER SIZE EXTRA* COIL EXTRA* 8 mm 40.00 15.00 10 mm 25.00 15.00 12 mm 20.00 15.00 Base price + the following extras per size and/or format (coil) 16 mm - 15.00

More information

Crossrail. Development Pipeline Study. gva.co.uk. Report. March 2014

Crossrail. Development Pipeline Study. gva.co.uk. Report. March 2014 Crossrail Development Pipeline Study Report March 2014 gva.co.uk Crossrail Regional Map MAIDENHEAD BURNHAM LANGLEY WEST DRAYTON HEATHROW AIRPORT 1,2,3 HAYES & HARLINGTON HANWELL EALING BROADWAY TAPLOW

More information