Rail Travel Summary for Week 07: May

Size: px
Start display at page:

Download "Rail Travel Summary for Week 07: May"

Transcription

1 Rail Travel Summary for Week 07: May Updated on: 08 May Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items are translated in the Train Operating Company Codes section. The areas covered by each sub-heading are detailed in the Geographical Scope section. Table of Contents Introduction 2 Saturday and Sunday 3 Cross-London Connections 3 Essex & Anglia 4 North & West of London 5 South & South East 6 East & North East 7 Midlands, North Wales & North West 8 Cotswolds, South Wales & West Country 10 Scotland 11 Monday to Friday 12 Cross-London Connections 12 Essex & Anglia 13 North & West of London 14 South & South East 15 East & North East 16 Midlands, North Wales & North West 17 Cotswolds, South Wales & West Country 18 Scotland 19 Train Operating Company Codes 20 Geographical Scope 21

2 Introduction This summary shows the main routes on which journeys are disrupted or amended for the dates shown above. Alterations may affect other areas and passengers are advised to check journey times with National Rail Enquiries before travelling, via or Replacement buses are unable to carry bicycles or non-folding prams, and may depart early to maintain connections. For further information regarding Cross-London Connections go to

3 Saturday and Sunday Cross-London Connections All Saturday St Pancras/Kings Cross-Liverpool Street/Fenchurch Street connections may take longer due to the partial closure of the Hammersmith & City and Circle Lines. (LT) All Weekend Cannon Street Underground station is closed. Passengers should use nearby stations. (LT)

4 Essex & Anglia 1915 Saturday-2359 Sunday Norwich-Nottingham services replaced by buses between Ely/March-Peterborough. Some fast buses also run between Norwich-Peterborough. (EM) 1955 Saturday-2359 Sunday Stansted Airport-Birmingham services replaced by buses between Cambridge-Peterborough. (XC) All Weekend Kings Cross-Kings Lynn services replaced by buses between Cambridge- Downham Market. (FC) All Weekend Cambridge-Norwich services replaced by buses between Ely/Cambridge- Brandon. (LE) Saturday from 1955 Ipswich-Peterborough services replaced by buses between Whittlesea- Peterborough. All Sunday Replaced by buses between Ely-Peterborough. (LE) All Saturday Ipswich-Cambridge services replaced by buses between Dullingham-Cambridge. All Sunday Replaced by buses between Bury St Edmunds-Cambridge. (LE) All Weekend Liverpool Street-Chingford services replaced by London Transport underground services between Seven Sisters-Liverpool Street. (LE) All Weekend Liverpool Street/Stratford-Hertford East/Stansted Airport/Cambridge services subject to diversions and delays, with bus or Underground connections required for some journeys. PASSENGERS MUST CHECK JOURNEY TIMES BEFORE TRAVELLING. (LE) Sunday to 1130 Liverpool Street-Stansted Airport services replaced by buses. (LE) 2200 Saturday-2359 Sunday Fenchurch Street-Southend via Ockendon services replaced by buses Grays-Pitsea. (CC) All Sunday Liverpool Street-Southend Victoria services replaced by buses Hockley-Southend Victoria (LE) 2050 Saturday-2359 Sunday Ipswich-Felixstowe services replaced by buses throughout. (LE)

5 North & West of London 2030 Saturday-2359 Sunday Kings Cross-Stevenage services via Hertford North replaced by bus/underground connections for whole or part of the journey. (FC) 0053 Sunday Kings Cross-Peterborough replaced by bus connections Welwyn Garden City- Peterborough. (FC) Sunday to 0800 Kings Cross-Cambridge/Peterborough services replaced by buses Welwyn Garden City-Letchworth. (FC) All Sunday Southbound trains unable to call at Alexandra Palace, Harringay and Hornsey passengers should travel via New Southgate or Finsbury Park and change as necessary. (FC) Sunday to 0915 Bedford/Luton-Sutton/Brighton services replaced by bus or Underground connections across Central London. Kentish Town also served by buses. (FC) 2350 Saturday Oxford-Banbury replaced by bus. (GW) All Sunday Euston-Watford Junction local services replaced by bus connections Queens Park-Harrow & Wealdstone-Watford Junction. (LO) Sunday to 1200 Stratford-Clapham Junction/Richmond services replaced by buses between Stratford-Highbury & Islington. (LO) Sunday to 0615 Paddington-Heathrow Airport services cancelled. (HX) 2330 Saturday-2359 Sunday Taplow/Burnham served by Bus connections to/from Slough. (GW) 2345 Saturday-2359 Sunday Paddington-Oxford services unable to call at Pangbourne bus connections available (GW) Sunday to 0810 Paddington-Reading replaced by buses Twyford-Reading (GW) Sunday to 0735 Euston-Northampton services replaced by buses throughout (LM) Sunday to 0930 Maidenhead-Marlow replaced by buses throughout (GW) Sunday Euston-Milton Keynes/Northampton services replaced by buses for whole or part of the journey. (LM) Saturday from 1500 Wembley Central and Wembley Stadium stations will be busy for the FA Cup Final. Station access in the post-match period may be controlled to prevent overcrowding. For travel back to Wigan and Manchester passengers are advised to read the notice issued by Virgin Trains at (LO/CH)

6 South & South East All Sunday Birmingham-Bournemouth services diverted with delays. Basingstoke, Winchester and Southampton Airport served by rail/road connections. (XC) All Sunday Reading-Basingstoke services replaced by buses. (GW) Sunday to 0730 Bedford/Luton-Sutton/Brighton services replaced by buses/underground across Central London. (FC) All Sunday Northbound Brighton-Bedford services do not call at London Bridge. Underground connections available. (FC) All Sunday Highbury& Islington-New Cross Gate services replaced by buses for whole or part of the Journey (LO) All Sunday Charing Cross-Ramsgate services run to/from Victoria all day. (SE) All Sunday Charing Cross-Orpington/Sevenoaks services do not run (SE) All Saturday Clandon-Guildford replaced by buses (SW) All Sunday Charing Cross-Ramsgate replaced by buses Dover-Ramsgate (SE) All Saturday Charing Cross-Tunbridge Wells don t run (SE) All Saturday Charing Cross-Orpington do not run buses Lewisham-Orpington (SE) Sunday Gatwick-Three Bridges journey time considerably delayed (SE) All Sunday Romsey-Brighton replaced by buses Worthing-Brighton (SE) All Sunday Blackfriars-Sevenoaks replaced by buses Orpington-Sevenoaks (SE) All Sunday Waterloo-Guildford services replaced by buses Surbiton/Leatherhead-Guildford (SW) All Sunday Woking-Alton buses Farnborough-Alton (SW) Sun to 0855 Waterloo-Portsmouth buses Winchester-Southampton (SW) Saturday & Sunday Twickenham will be busy for the London Sevens Rugby Tournament. Station access post-event may be controlled to prevent overcrowding. (SW)

7 East & North East All Weekend Doncaster-Goole/Hull services via Hatfield & Stainforth diverted with delays, or replaced by buses between Doncaster-Goole. (NT) All Weekend Manchester/Doncaster-Scunthorpe/Grimsby/Cleethorpes services replaced by buses between Doncaster-Scunthorpe. Additional fast buses run between Doncaster- Grimsby/Cleethorpes All Sunday All services replaced by buses between Scunthorpe- Grimsby/Cleethorpes. (TP/NT) 2300 Saturday-0800 Sunday York/Leeds-Manchester Airport services replaced by buses for whole or part of the journey. (TP) 2200 Saturday-2359 Sunday Kings Cross-Leeds services and do not call at Wakefield. Doncaster-Wakefield-Leeds local services replaced by buses. (GR/NT) All Sunday Kings Cross-Bradford services diverted with delays between Doncaster-Wakefield Kirkgate. (GC) All Sunday St Pancras/Birmingham-Leeds/North east services do not call at Wakefield Westgate. Bus connections arranged. (EM/XC) 2220 Saturday-2359 Sunday Leeds-Sheffield local services replaced by buses between Leeds-Moorthorpe. (NT) All Saturday Lincoln-Doncaster replaced by buses (NT) All Weekend Bishops Auckland-Saltburn replaced by buses Bishops Auckland-Darlington (NT)

8 Midlands, North Wales & North West All Saturday Norton Bridge, Barlaston and Wedgwood served by buses. (LM) All Sunday Birmingham-Rugeley services replaced by buses between Walsall-Rugeley. (LM) 1300 Saturday-1500 Sunday Euston/Birmingham-Carlisle/Scotland services replaced by buses between Preston-Oxenholme. A limited of through trains run via an alternative route. (VT) 1300 Saturday-1500 Sunday Manchester Airport-Barrow in Furness/Windermere services replaced by buses between Preston-Lancaster/Oxenholme/Barrow. (TP) 1200 Saturday-1500 Sunday Manchester Airport-Edinburgh services diverted. Bolton- Haymarket inclusive served by rail/road connections. (TP) Sunday from 2200 Liverpool-Manchester Airport services diverted. Wavertree-Manchester Oxford Road inclusive served by buses. (NT) Saturday from 2300 Buses replace trains between Blackburn-Colne. (NT) All Weekend Liverpool-Wirral/Ellesmere Port/Chester services do not call at Liverpool Lime Street Low Level. Passengers should use other stations within Central Liverpool and allow additional time to make connections on journeys via Lime Street. (ME) 2300 Saturday-0800 Sunday Manchester Airport-Leeds/York services replaced by buses for whole or part of the journey. (TP) Sunday to 0730 Buses replace trains between Manchester Airport-Bolton/Blackpool. (TP) All Sunday Manchester Piccadilly-Chester services diverted. Manchester Oxford Road-Helsby inclusive served by buses. Manchester-North Wales services require a change of train at Chester. (AW) Saturday from 2300 Buses replace trains between Llandudno Junction-Holyhead. (AW) 0750 Sunday Shrewsbury-Cardiff replaced by bus between Shrewsbury-Hereford. (AW) All Sunday Derby-Crewe services replaced by buses between Derby-Stoke on Trent. (EM) Sunday to 0900 Nottingham-Mansfield Woodhouse services replaced by buses. (EM) Saturday from 2200 Buses replace trains between Birmingham-Derby/Nottingham. (XC) All Sunday Nottingham-Matlock/Birmingham services replaced by buses between Nottingham-Derby. (EM/C) All Sunday Some St Pancras-Nottingham replaced by buses between East Midlands Parkway-Nottingham. (EM) Sunday to 1200 Buses replace trains between Derby-Nottingham. (EM)

9 All Sunday Liverpool-Manchester Airport services terminate Wigan, buses operate Huyton- Manchester Oxford Road. (TP/NT) All Sunday Southport-Chester/Stockport services replaced by buses Southport-Parbold (NT) Saturday from 2210 Wolverhampton-Euston divert via Northampton (LM)

10 Cotswolds, South Wales & West Country 0148 Sunday Fishguard Harbour-Cardiff replaced by bus Carmarthen-Cardiff Central. (AW) 0750 Sunday Shrewsbury-Cardiff replaced by bus between Shrewsbury-Hereford. (AW) Sunday to 1230 Cardiff-Rhymney services replaced by buses between Cardiff-Rhymney. (AW) Sunday to 1600 Valley Lines services via Radyr services diverted. Cardiff Queen Street, Cathays and Llandaf served by buses. (AW) Sunday to 1130 Cardiff-Penarth/Barry Island services, and Cardiff-Bridgend services via Rhoose, replaced by buses for whole or part of the journey. (AW) Saturday Some Bristol Temple Meads-Severn Beach services replaced by buses between Avonmouth-Severn Beach. (GW) Sunday to 1425 Birmingham-Cardiff /Bristol/West Country services diverted with delays between Birmingham-Cheltenham Spa. Cardiff services also require a change of train en route. (XC) 1923 Saturday Portsmouth-Cardiff requires a change of train at Newport. (GW) All Sunday Cardiff-Portsmouth/Brighton services replaced by buses Newport-Bristol Parkway.. (GW) All Sunday Paddington/Swindon-Cheltenham services run to a special timetable and require a change of train at Gloucester. (GW) All Sunday Paddington/Brighton/Portsmouth-South Wales services diverted with delays. Bristol Parkway served by rail/road connections. (GW) 0830 Sunday Paddington-Swansea runs early to maintain connections at Swansea. (GW) Sunday after 2330 Manchester-Cardiff services replaced by buses Shrewsbury/Chester- Hereford (AW)

11 Scotland All Weekend Dalmarnock station closed. Passengers should use Bridgeton or Rutherglen. (SR) All Sunday Glasgow Central-Carlisle services replaced by buses Glasgow Central-Barrhead (SR) All Sunday Glasgow Central-East Kilbride replaced by buses throughout (SR) 1000 Saturday-1500 Sunday Birmingham-Glasgow Central services via Newcastle run to/from Edinburgh. Haymarket, Motherwell and Glasgow served by rail connections Saturday-1500 Sunday Manchester Airport-Edinburgh services diverted. Bolton- Haymarket inclusive served by rail/road connections. (TP)

12 Monday to Friday Cross-London Connections No major services alterations reported.

13 Essex & Anglia Monday-Tuesday late evening services between Pitsea-Shoeburyness expect delays up to 20 minutes (CC)

14 North & West of London Monday-Thursday from 2130 each night Paddington-Heathrow Airport/Reading services reduced in frequency. Acton Main Line, West Ealing and Hanwell served by buses. (GW/HX/HC) Tuesday to 0405 Euston-Northampton services diverted via Rugby with extended journey time. (LM) Monday to 0500 and Friday Pangbourne served by bus connections. (GW) Monday-Thursday Burnham/Taplow served by bus connections to/from Slough. (GW) Monday-Friday each night Kings Cross-Stevenage services via Welwyn Garden City diverted, or replaced by buses Alexandra Palace-Stevenage. (FC) Tuesday-Friday 0020 Reading-Newbury bus throughout. (GW)

15 South & South East Monday to 0400 Reading-Basingstoke services replaced by buses. (GW) Tuesday-Friday 0430 Guildford-Waterloo departs early for passengers travelling to/from Woking only. (SW) Monday-Thursday each night Victoria-Gillingham/Ramsgate services replaced by buses for part of the journey. (SE) Monday-Thursday Basingstoke-Winchester/Southampton replaced by bus connections for whole or part of the Journey (SW) Tuesday-Thursday until 0430 Buses replace trains between Swanley-Bromley South (SE) Monday-Friday Lewisham-Guildford replaced by buses (SE) Tuesday-Thursday Charing Cross-Orpington replaced by buses Lewisham-Hither Green (SE)

16 East & North East Monday-Friday Doncaster-Goole/Hull services via Hatfield & Stainforth diverted with delays, or replaced by buses between Doncaster-Goole. (NT) Monday-Friday Doncaster-Scunthorpe/Grimsby/Cleethorpes services replaced by buses between Doncaster-Scunthorpe. Some fast buses also run Doncaster-Grimsby/Cleethorpes. (TP/NT)

17 Midlands, North Wales & North West Monday-Friday Norton Bridge, Barlaston and Wedgwood served by buses. (LM) Monday-Friday Liverpool-Wirral/Ellesmere Port/Chester services do not call at Liverpool Lime Street. Passengers should use other stations within Central Liverpool, and allow additional time to make connections on journeys via Lime Street. (ME) Tuesday-Thursday 2245 Wolverhampton-Euston diverted and 2254 Birmingham- Northampton terminates at Rugby. Long Buckby and Northampton served by bus. (VT/LM) Monday-Thursday each night Blackpool/Preston-Colne services replaced by buses for whole or part of the journey. (NT) Monday-Thursday each night Blackpool-Manchester services diverted, or replaced by buses for part of the journey between Preston-Manchester. (TP/NT) Monday-Thursday each night Liverpool-Manchester Victoria/Manchester Airport services replaced by buses. (NT) Monday-Thursday each night. Manchester-Wilmslow/Crewe local services diverted, or replaced by buses for part of the journey. (NT) Monday-Thursday 2200 Euston-Manchester Piccadilly diverted passengers for Crewe change at Stafford. (VT) Monday-Thursday after 2030 Shrewsbury-Welshpool replaced by bus connections. (AW) Monday-Friday late evening St Pancras-East Midlands services run later to destinations. (EM) Monday-Friday 2205 Nottingham-Worksop replaced by a bus Mansfield Woodhouse-Worksop (EM) 2221 Monday-Thursday replaced by bus connections Kirkby in Ashfield-Nottingham (EM)

18 Cotswolds, South Wales & West Country Monday-Thursday each night South West Wales services diverted, or replaced by buses in the Swansea area. (AW) Monday-Thursday 2330 Paddington-Cardiff replaced by bus connections Bristol Temple Meads

19 Scotland Monday-Friday Dalmarnock station closed. Passengers should use Bridgeton or Rutherglen. (SR) Monday-Friday Dumfries/Carlisle-Glasgow services replaced by buses for whole or part of the journey (SR)

20 Train Operating Company Codes AW CC CH EM FC GC GR GW GX HC HT HX IL LE LM LO LT ME NT SE SN SR SW TP TW VT XC Arriva Trains Wales c2c Chiltern Railways East Midlands Trains First Capital Connect Grand Central East Coast First Great Western Gatwick Express Heathrow Connect Hull Trains Heathrow Express Island Line Greater Anglia London Midland London Overground London Underground Merseyrail Northern Rail Southeastern Southern ScotRail South West Trains First TransPennine Express Tyne & Wear Metro Virgin Trains Cross Country

21 Geographical Scope Cross-London Connections Underground links between the Central London termini Essex & East Anglia All services from/to London Fenchurch Street/Liverpool Street, and connecting branch lines Rural services in Cambridgeshire, Suffolk and Norfolk. Stansted Airport/Norwich-Peterborough North & West of London Suburban services between London and: Stevenage/Cambridge/Peterborough St Albans/Luton/Bedford Watford Junction/Tring/Milton Keynes/Northampton Aylesbury Banbury/Birmingham/Stratford-upon-Avon via High Wycombe Reading/Newbury/Bedwyn/Oxford East London/North London/West London Lines and Gospel Oak-Barking Associated branch lines of the above South & South East South London, Kent, Surrey, Sussex, Hampshire, Dorset Coast Waterloo-Salisbury/Yeovil/Exeter Services via Richmond/Hounslow Reading-Basingstoke/Gatwick Airport Reading-Bournemouth Westbury-Southampton Castle Cary-Weymouth Isle of Wight East & North East London-Doncaster/North East/Scotland * Lincolnshire, Yorkshire, Humberside North East England Leeds-Morecambe/Carlisle and Newcastle-Carlisle Midlands, North Wales & North West London-East Midlands/Sheffield * London-West Midlands/North West/Scotland * East & West Midlands suburban/rural services Birmingham-Reading * Birmingham-Sheffield/Peterborough Mid Wales & North Wales, Greater Manchester, Merseyside & North West England Cotswolds, South Wales & West Country London-Bristol/South Wales/Devon/Cornwall and branches * South Wales Local Service Llanelli-Shrewsbury & Newport-Shrewsbury Oxford-Worcester-Hereford Scotland All services in Scotland * Other than the suburban services listed in the North & West of London area.

Rail Travel Summary for Week 05: 27 April 03 May

Rail Travel Summary for Week 05: 27 April 03 May Rail Travel Summary for Week 05: 27 April 03 May Updated on: 25 April Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 03: April

Rail Travel Summary for Week 03: April Rail Travel Summary for Week 03: 13-19 April Updated on: 09 April Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items

More information

Rail Travel Summary for Week 37: December

Rail Travel Summary for Week 37: December Rail Travel Summary for Week 37: 08-14 December Updated on: 6 December 2012 Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Rail Travel Summary for Week 24: 7-13 September

Rail Travel Summary for Week 24: 7-13 September Rail Travel Summary for Week 24: 7-13 September Updated on: 03 September Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 21: August

Rail Travel Summary for Week 21: August Rail Travel Summary for Week 21: 16-22 August Updated on: 05 August Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 5: 25 April-May 1

Rail Travel Summary for Week 5: 25 April-May 1 Rail Travel Summary for Week 5: 25 April-May 1 Updated on: 20 April Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 49: 1-7 March

Rail Travel Summary for Week 49: 1-7 March Rail Travel Summary for Week 49: 1-7 March Updated on: 20 February Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items

More information

Rail Travel Summary for Week 22: August

Rail Travel Summary for Week 22: August Rail Travel Summary for Week 22: 24-30 August Updated on: 22 August Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items

More information

Rail Travel Summary for Week 33: 8-14 November

Rail Travel Summary for Week 33: 8-14 November Rail Travel Summary for Week 33: 8-14 November Updated on: 29 October Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Rail Travel Summary for Week 23: 30 August-5 September

Rail Travel Summary for Week 23: 30 August-5 September Rail Travel Summary for Week 23: 30 August-5 September Updated on: 27 August Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the

More information

Rail Travel Summary for Week 46: 7-13 February

Rail Travel Summary for Week 46: 7-13 February Rail Travel Summary for Week 46: 7-13 February Updated on: 04 February Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Rail Travel Summary for Week 6: 3-9 May

Rail Travel Summary for Week 6: 3-9 May Rail Travel Summary for Week 6: 3-9 May Updated on: 28 April Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items are

More information

Rail Travel Summary for Week 31: 26 October-1 November

Rail Travel Summary for Week 31: 26 October-1 November Rail Travel Summary for Week 31: 26 October-1 November Updated on: 16 October Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end

More information

Rail Travel Summary for Week 49: 28 February-6 March

Rail Travel Summary for Week 49: 28 February-6 March Rail Travel Summary for Week 49: 28 February-6 March Updated on: 24 February Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the

More information

Rail Travel Summary for Week 29: October

Rail Travel Summary for Week 29: October Rail Travel Summary for Week 29: 10-16 October Updated on: 29 September Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Rail Travel Summary for Week 28: 4-10 October

Rail Travel Summary for Week 28: 4-10 October Rail Travel Summary for Week 28: 4-10 October Updated on: 02 October Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 34: November

Rail Travel Summary for Week 34: November Rail Travel Summary for Week 34: 15-21 November Updated on: 11 November Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Rail Travel Summary for Week 43: January

Rail Travel Summary for Week 43: January Rail Travel Summary for Week 43: 17-23 January Updated on: 06 January Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Rail Travel Summary for Week 35: 26 November 2 December

Rail Travel Summary for Week 35: 26 November 2 December Rail Travel Summary for Week 35: 26 November 2 December Updated on: 23 November Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the

More information

Rail Travel Summary for Week 21: August

Rail Travel Summary for Week 21: August Rail Travel Summary for Week 21: 20-26 August Updated on: 16 August Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 31: October

Rail Travel Summary for Week 31: October Rail Travel Summary for Week 31: 25-31 October Updated on: 24 October Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Rail Travel Summary for Week 11: June

Rail Travel Summary for Week 11: June Rail Travel Summary for Week 11: 11-17 June Updated on: 02 June Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items

More information

Rail Travel Summary for Week 15: July 4-10

Rail Travel Summary for Week 15: July 4-10 Rail Travel Summary for Week 15: July 4-10 Updated on: 02 July Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items

More information

Rail Travel Summary for Week 52: March

Rail Travel Summary for Week 52: March Rail Travel Summary for Week 52: 21-27 March Updated on: 10 March Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 23: 3-9 September

Rail Travel Summary for Week 23: 3-9 September Rail Travel Summary for Week 23: 3-9 September Updated on: 30 August Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 52: March

Rail Travel Summary for Week 52: March Rail Travel Summary for Week 52: 19-24 March Updated on: 15 March Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 51: March

Rail Travel Summary for Week 51: March Rail Travel Summary for Week 51: 15-21 March Updated on: 10 March Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items

More information

Rail Travel Summary for Week 3: April

Rail Travel Summary for Week 3: April Rail Travel Summary for Week 3: 11-17 April Updated on: 01 April Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 13: 25 June-1 July

Rail Travel Summary for Week 13: 25 June-1 July Rail Travel Summary for Week 13: 25 June-1 July Updated on: 17 June Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 33: 7-13 November

Rail Travel Summary for Week 33: 7-13 November Rail Travel Summary for Week 33: 7-13 November Updated on: 27 October Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Rail Travel Summary for Week 27: 26 September-2 October

Rail Travel Summary for Week 27: 26 September-2 October Rail Travel Summary for Week 27: 26 September-2 October Updated on: 17 September Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at

More information

Rail Travel Summary for Week 50: 7-13 March

Rail Travel Summary for Week 50: 7-13 March Rail Travel Summary for Week 50: 7-13 March Updated on: 04 March Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 49: 27 February-4 March

Rail Travel Summary for Week 49: 27 February-4 March Rail Travel Summary for Week 49: 27 February-4 March Updated on: 25 February Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the

More information

Rail Travel Summary for Week 32: 5 11 November

Rail Travel Summary for Week 32: 5 11 November Rail Travel Summary for Week 32: 5 11 November Updated on: 27 October Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Technical specification: BS 4449:2005 GRADE B500B BAR AND COIL

Technical specification: BS 4449:2005 GRADE B500B BAR AND COIL BS 4449:2005 GRADE B500B BAR AND COIL DIAMETER SIZE EXTRA* COIL EXTRA* 8 mm 40.00 15.00 10 mm 25.00 15.00 12 mm 20.00 15.00 Base price + the following extras per size and/or format (coil) 16 mm - 15.00

More information

Rail Travel Summary for Week 31: 29 October 4 November

Rail Travel Summary for Week 31: 29 October 4 November Rail Travel Summary for Week 31: 29 October 4 November Updated on: 27 October Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the

More information

Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013

Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013 Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013 Compiled by Paul Murphy August 2013 Correct as of Friday 23 rd August 2013 CONTENTS Road Closures & Map Changes

More information

Early May Bank Holiday Travel Summary 2012

Early May Bank Holiday Travel Summary 2012 Early May Bank Holiday Travel Summary 2012 Photo Attribution: Pete Ashton on Flickr Train service and engineering work information from National Rail Enquiries for customers travelling over the Early May

More information

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE Correct at time of publication 2018 Sat 22 December Sun 23 December Mon 24 December (Christmas Eve) Tues 25 December (Christmas Day) Weds 26 December (Boxing Day)

More information

Easter Improvement Works. London Euston Closed Friday 19 until Monday 22 April virgintrains.com/spanner nationalrail.co.

Easter Improvement Works. London Euston Closed Friday 19 until Monday 22 April virgintrains.com/spanner nationalrail.co. Easter Improvement Works London Euston Closed Friday 19 until Monday 22 April 2019 virgintrains.com/spanner nationalrail.co.uk/westcoast @virgintrains virgintrains What's happening? We recommend that

More information

Inverness LOCH NESS CALEDONIAN LOCH OICH LOCH LOCHY WATERWAY MAP Key SCALE 0 50 kilometres Fort William Managed by British Waterways 0 10 20 30 miles Managed by British Waterways Scotland Perth Dundee

More information

75,402 sq ft. 88,866 sq ft NOTTINGHAM. panattoni park CONSTRUCTION UNDER. Two industrial/warehouse units TO LET AVAILABLE Q3 2018

75,402 sq ft. 88,866 sq ft NOTTINGHAM. panattoni park CONSTRUCTION UNDER. Two industrial/warehouse units TO LET AVAILABLE Q3 2018 panattoni park Two industrial/warehouse units 88,866 sq ft TO LET AVAILABLE Q3 2018 75,402 sq ft TO LET AVAILABLE Q4 2018 /J26 UNDER CONSTRUCTION INDICATIVE IMAGE www.pp.com panattoni park NG16 NN7 4DE

More information

Oriel 2018 (2019intake) Hospital and Health Board Employers

Oriel 2018 (2019intake) Hospital and Health Board Employers Oriel 2018 (2019intake) Hospital and Health Board Employers Employer Name ABERTAWE BRO MORGANNWG UNIVERSITY HEALTH BOARD AINTREE UNIVERSITY HOSPITAL NHS FOUNDATION TRUST AIREDALE NHS FOUNDATION TRUST ALDER

More information

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c. Abellio ScotRail Arriva Rail London Alliance Rail Arriva Trains Wales c2c Chiltern Railways Colas Rail CrossCountry DB Cargo (UK) Limited Devon & Cornwall Railway Direct Rail Services East Midlands Trains

More information

TIMETABLES ETC in the collection of John Hinson

TIMETABLES ETC in the collection of John Hinson TIMETABLES ETC in the collection of John Hinson Public Timetables SR all lines Summer 1948 LMS all lines Summer 1946 LNER all lines (except London suburban) Summer 1946 (damaged) Railway and Road-way holidays

More information

S31 Grant determination for a high needs strategic planning fund in : DCLG ref 31/2916

S31 Grant determination for a high needs strategic planning fund in : DCLG ref 31/2916 S31 Grant determination for a high needs strategic planning fund in 2016-17: DCLG ref 31/2916 Purpose of the fund Local authorities can use this fund to carry out a strategic review of their high needs

More information

Christmas Engineering Works

Christmas Engineering Works THE GREAT NORTH RAIL PROJECT COLLEAGUE UPDATE Christmas Engineering Works 2018 until 2019 Thursday 27 December Tuesday 01 January This past year has seen significant progress in Network Rail s Great North

More information

School improvement monitoring and brokering grant provisional allocations for illustrative purposes

School improvement monitoring and brokering grant provisional allocations for illustrative purposes School improvement monitoring and brokering grant provisional allocations for illustrative purposes The school improvement monitoring and brokering grant was announced on 30 November 2016. This grant of

More information

Happiness is a town called Harrogate destination named happiest place to live for THIRD year running

Happiness is a town called Harrogate destination named happiest place to live for THIRD year running Rightmove plc 3 rd & 4 th Floor 33 Soho Square London W1D 3QU Under embargo until 00.01 Thursday 6 th August Happiness is a town called Harrogate destination named happiest place to live for THIRD year

More information

Sixth Form University Open Days

Sixth Form University Open Days Sixth Form Open Days 2017-2018 A of Aberdeen Abertay Aberystwyth Anglia Ruskin Saturday 7 th Wednesday 8 th Saturday 11 th Aston Saturday 7 th Saturday 4 th B Bangor Sunday 15 th Bath Spa of Bedfordshire

More information

#element of bullying / harassment South West 2gether NHS FT Mental Health Small

#element of bullying / harassment South West 2gether NHS FT Mental Health Small 1 South West 2gether NHS FT Mental Health Small 3 2 0 3 0 Aintree University Hospital NHS FT Yorks and Humber Airedale NHS FT Combined Acute and Community Small 28 0 8 7 1 North West Alder Hey Children's

More information

Census 2011: City snapshot

Census 2011: City snapshot Census Snapshot September 2012 Census 2011: snapshot Rachel Smith, September 2012 On 16 July 2012 the first outputs from the Census 2011 for England and Wales were released, followed on 19 September 2012

More information

Healthwatch is the independent champion for people who use health and social care services.

Healthwatch is the independent champion for people who use health and social care services. B R I E F I N G State of Support Local Healthwatch Funding 2017/18 30 November 2017 Overview Healthwatch is the independent champion for people who use health and social care services. Across the country

More information

EMPIRE. Bromley Clydebank Newcastle Sunderland ODEON UK & IRELAND

EMPIRE. Bromley Clydebank Newcastle Sunderland ODEON UK & IRELAND CINEWORLD ABERDEEN UNION SQUARE ALDERSHOT ASHFORD ASHTON-UNDER-LYNE BEDFORD BEXLEYHEATH BIRMINGHAM BROAD STREET BOLDON BOLTON BRADFORD BRAINTREE BRIGHTON BRISTOL BURTON-ON-TRENT CARDIFF CASTLEFORD CHELTENHAM

More information

PHASE 2 UNDER CONSTRUCTION

PHASE 2 UNDER CONSTRUCTION PRACTICAL COMPLETION SUMMER 2017 / J11 OX16 4XD INDICATIVE CGI PHASE 2 UNDER CONSTRUCTION BUILDING 7-95,000 SQ FT (8,826 SQ M) BUILDING 8-78,000 SQ FT (7,246 SQ M) www.central.co.uk / J11 BUILDING 7 SPECIFICATION

More information

UNITS 4 & 5 AVAILABLE TO LET CV35 9JY TWO NEW INDUSTRIAL / WAREHOUSE OPPORTUNITIES ON AN ESTABLISHED PARK

UNITS 4 & 5 AVAILABLE TO LET CV35 9JY TWO NEW INDUSTRIAL / WAREHOUSE OPPORTUNITIES ON AN ESTABLISHED PARK IMMEDIATELY AVAILABLE TO LET UNITS 4 & 5 CV35 9JY TWO NEW INDUSTRIAL / WAREHOUSE OPPORTUNITIES ON AN ESTABLISHED PARK SAY HELLO TO THE SWEET SP T UNIT 5 66,500 SQ FT UNIT 4 51,500 SQ FT Strategic location

More information

2016-BASED HOUSEHOLD PROJECTIONS

2016-BASED HOUSEHOLD PROJECTIONS 2016-BASED HOUSEHOLD PROJECTIONS PLANNING DESIGN ENVIRONMENT PEGASUSGROUP.CO.UK ECONOMICS 2016-BASED HOUSEHOLD PROJECTIONS The Office for National Statistics (ONS) released its 2016-household projections

More information

PQ Local Authorities with exceedances of NO 2 annual mean limit value (based on 2015

PQ Local Authorities with exceedances of NO 2 annual mean limit value (based on 2015 PQ 47949 - Local Authorities with exceedances of NO 2 annual mean limit value (based on 2015 compliance assessment) Local Authorities with exceedances of NO 2 annual mean limit value (based on 2015 compliance

More information

Planned Expenditure by Local Authorities: Services for Young People

Planned Expenditure by Local Authorities: Services for Young People Planned Expenditure by Local Authorities: Services for Young People Section 251 Under Section 251 of the Apprenticeships, Skills, Children and Learning Act 2009, local authorities are required to submit

More information

IMPORTANT. Anyway, here is the list of the sections of routes on which passes may be used: 007 Deal Canterbury Bluewater Eltham Eltham VCS

IMPORTANT. Anyway, here is the list of the sections of routes on which passes may be used: 007 Deal Canterbury Bluewater Eltham Eltham VCS Whilst passes are not valid on most of the National Express network, on certain sections which have been registered as "local routes", they may be used for free travel. IMPORTANT Free passes are accepted

More information

1.6 million sq ft TO LET/FOR SALE AVAILABLE Q4 2019

1.6 million sq ft TO LET/FOR SALE AVAILABLE Q4 2019 ON SITE NOW 1.6 illion sq ft TO LET/FOR SALE AVAILABLE Q4 019 / WEEDON ROAD NN7 4DE Build-to-suit and speculative buildings Direct access to Junction 16 Clear height up to 18 Three speculatively built

More information

CONSTRUCTION UNDER. Cross-docked warehouse/distribution unit 550,270 sq ft TO LET AVAILABLE Q M1/J26 PANATTONI PARK NOTTINGHAM NOTTINGHAM 550

CONSTRUCTION UNDER. Cross-docked warehouse/distribution unit 550,270 sq ft TO LET AVAILABLE Q M1/J26 PANATTONI PARK NOTTINGHAM NOTTINGHAM 550 UNDER CONSTRUCTION PANATTONI PARK NOTTINGHAM Cross-docked warehouse/distribution unit 550,270 sq ft TO LET AVAILABLE Q1 2019 /J26 INDICATIVE IMAGE NN7 NG16 4DE 3RY /J26 Panattoni Park Nottingham is a 55

More information

Most regions saw price falls during 2012

Most regions saw price falls during 2012 www.nationwide.co.uk/hpi Embargoed until 0700 Thurs 3 Jan 2013 Most regions saw price falls during 2012 11 out of 13 UK regions saw annual price falls during 2012 London best performing region in 2012

More information

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: and Merseyside conurbation. (extract from HS2 High Speed to Nowhere)

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: and Merseyside conurbation. (extract from HS2 High Speed to Nowhere) APPENDIX 3 CNNECTIVITY IMPRVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FR: IVERP and Merseyside conurbation (extract from HS2 High Speed to Nowhere) Appendix 3 : iverpool Page 268 Introduction & key results

More information

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere)

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere) APPNDIX L2 CONNCTIVITY IMPROVMNTS ACHIVD BY HS2 AND HIGH SPD UK FOR: LICSTR (extract from HS2 High Speed to Nowhere) Appendix L2 : Leicester Page 262 Introduction & key results Page 263 Timeline of comparative

More information

Winners of the Exemplar Awards 2016

Winners of the Exemplar Awards 2016 Winners of the Exemplar Awards 2016 Winner of the Exemplar Award 2016 Leeds City Council Winner of the Peer Award 2016 David Lloyd, Huntingdonshire District Council Data Quality & Performance Awards 2016

More information

Numbers achieving 3 A grades in specific A-Level combinations by school type and LEA

Numbers achieving 3 A grades in specific A-Level combinations by school type and LEA Numbers achieving 3 A grades in specific A-Level combinations by school type and LEA Statistics Report Series No. 9 Joanne L. Emery February 2009 Research Division Statistics Group Assessment, Research

More information

Dear Louise. I can confirm that the full list of approved sites for this study is:

Dear Louise. I can confirm that the full list of approved sites for this study is: From: TOTENHOFER, Ashley (HEALTH RESEARCH AUTHORITY) Sent: 28 June 2018 13:06 To: SAVIC, Louise (LEEDS TEACHING HOSPITALS NHS TRUST) Subject: RE: DALES 232512 Dear Louise I can confirm that the full list

More information

PHASE 3 UNDER CONSTRUCTION

PHASE 3 UNDER CONSTRUCTION UNIT 5 AVAILABLE SPRING 2019 / J11 OX16 4XD INDICATIVE CGI PHASE 3 UNDER CONSTRUCTION BUILDING 5 333,000 SQ FT (30,937 SQ M) www.central.co.uk / J11 Gas & Elec Sub. tpa th Chalker Way Chalker Way 20 No.

More information

House prices in London continue to climb

House prices in London continue to climb www.nationwide.co.uk/hpi Q2 2014 Embargoed until 0700 Wed 2 Jul 2014 House prices in London continue to climb All UK regions saw annual price rises in Q2 2014 London continues to lead, with annual price

More information

Council Tax since

Council Tax since 27 December 2015 Council Tax since 1996-97 Since 2010, central government has offered grants to local authorities to freeze or cut Council Tax. Additionally, local authorities wishing to Council Tax by

More information

YouGov PlaceIndex results

YouGov PlaceIndex results YouGov PlaceIndex results PlaceIndex is an exciting new way of scoring Britain s major cities. It can help understand why people want to visit, work and live in certain cities and this information can

More information

Department for Transport (DfT) Response to the Recommendations of Passenger Focus for the New Cross Country Rail Franchise.

Department for Transport (DfT) Response to the Recommendations of Passenger Focus for the New Cross Country Rail Franchise. Department for Transport (DfT) Response to the Recommendations of Passenger Focus for the New Cross Country Rail Franchise. Introduction We welcome your input to the New Cross Country (NCC) consultation

More information

Improving stations: improving passenger satisfaction. October 2016

Improving stations: improving passenger satisfaction. October 2016 Improving stations: improving passenger satisfaction October 2016 1 Contents Introduction... 3 Summary of overall satisfaction... 5 Trends over time... 7 Station-specific examples... 9 Reading station...

More information

House prices fall in most regions during the third quarter

House prices fall in most regions during the third quarter www.nationwide.co.uk/hpi Q3 2010 Embargoed until 0700 Thurs 30 Sep 2010 House prices fall in most regions during the third quarter House prices fell in nine out of thirteen UK regions in the third quarter

More information

Council Performance Ratings 2010

Council Performance Ratings 2010 Council Performance Ratings 2010 Tameside Metropolitan Borough Council North West 4 - Performs excellently Wandsworth Borough Council London 4 - Performs excellently City of Westminster Council London

More information

550,270 sq ft TO LET AVAILABLE Q1 2019

550,270 sq ft TO LET AVAILABLE Q1 2019 UNDER CONSTRUCTION 10 EASTWOOD NG16 3RY CROSS-DOCKED WAREHOUSE/DISTRIBUTION UNIT,270 sq ft TO LET Q1 2019 junction 26-7 minutes Ample car & HGV parking with potential for more 50m yards on both sides 15m

More information

PHASE 3 UNDER CONSTRUCTION

PHASE 3 UNDER CONSTRUCTION UNIT 5 AVAILABLE SPRING 2019 / J11 OX16 4XD INDICATIVE CGI PHASE 3 UNDER CONSTRUCTION BUILDING 5 333,000 SQ FT (30,936 SQ M) www.central.co.uk / J11 Gas & Elec Sub. tpa th Chalker Way Chalker Way 20 No.

More information

Transport Focus Informed Traveller monitoring initial findings, 9 March April- 13 April

Transport Focus Informed Traveller monitoring initial findings, 9 March April- 13 April Appendix A Transport Focus Informed Traveller monitoring initial findings, 9 March 2018 1. Is the timetable correct six weeks ahead? In the first two weeks of our monitoring at T-6 Transport Focus has

More information

National Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29)

National Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29) National Rail Passenger Survey: User Guidance Report Autumn 2013 (wave 29) Rebecca Joyner Research Director Tel: 020 7490 9148 rebecca.joyner@bdrc continental.com Contents Page No. 1. Background... 1 2.

More information

Spring 2017 Customer Report

Spring 2017 Customer Report Spring 2017 Customer Report Aberdeen Stonehaven Montrose Dundee Arbroath Glasgow Central Motherwell Inverkeithing Haymarket Cupar Markinch Leuchars Ladybank Kirkcaldy Edinburgh Waverley Dunbar Berwick-upon-Tweed

More information

ALDERNEY GUERNSEY 3 BARRA BENBECULA 1 BELFAST CITY (GEORGE BEST) BELFAST INTERNATIONAL 17 BELFAST INTERNATIONAL LIVERPOOL (JOHN LENNON) 1

ALDERNEY GUERNSEY 3 BARRA BENBECULA 1 BELFAST CITY (GEORGE BEST) BELFAST INTERNATIONAL 17 BELFAST INTERNATIONAL LIVERPOOL (JOHN LENNON) 1 Landings Diverted To Classified by Airport of and Table 7.1 ABERDEEN DUNDEE 2 DURHAM TEES VALLEY 1 EAST MIDLANDS INTERNATIONAL 1 EDINBURGH 8 GLASGOW 7 HUMBERSIDE 3 INVERNESS 10 PRESTWICK 1 Total ABERDEEN

More information

National Rail Passenger Survey: User Guidance Report

National Rail Passenger Survey: User Guidance Report National Rail Passenger Survey: User Guidance Report Autumn 2015 (Wave 33) Rebecca Joyner Director Tel: 020 7490 9148 rebecca.joyner@bdrc-continental.com Contents Page No. 1. Background... 1 2. Summary

More information

Annex 3: CCGs confirmed for waves 1, 2, 3 and 4 for authorisation

Annex 3: CCGs confirmed for waves 1, 2, 3 and 4 for authorisation Annex 3: s confirmed for waves 1, 2, 3 and 4 for authorisation Below is a list of the clinical commissioning groups (s) which will be put forward for authorisation in wave 1, split by Commissioning Board

More information

Autumn 2017 Customer Report

Autumn 2017 Customer Report Autumn 2017 Customer Report Glasgow Motherwell Dundee Inverkeithing Haymarket Cupar Markinch Edinburgh Waverley Aberdeen Leuchars Ladybank Kirkcaldy Arbroath Stonehaven Montrose Dunbar Berwick-upon-Tweed

More information

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere)

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere) APPNIX H2 CONNCTIVITY IMPROVMNTS ACHIV BY HS2 AN HIGH SP UK FOR: HURSFIL (extract from HS2 High Speed to Nowhere) Appendix H2 : Page 244 Introduction & key results Page 245 Timeline of comparative journey

More information

550,270 sq ft TO LET AVAILABLE Q1 2019

550,270 sq ft TO LET AVAILABLE Q1 2019 UNDER CONSTRUCTION 10 EASTWOOD NG16 3UA CROSS-DOCKED WAREHOUSE/DISTRIBUTION UNIT 550,270 sq ft TO LET Q1 2019 J26-7 minutes Ample car and HGV parking with potential for more 50m yards on both sides 15m

More information

Supplementary information for Parliamentary Questions UIN : VOA Closures and UIN : VOA Staff. 15 December 2017

Supplementary information for Parliamentary Questions UIN : VOA Closures and UIN : VOA Staff. 15 December 2017 Supplementary information for Parliamentary Questions UIN 117327: VOA Closures and UIN 117328: VOA Staff 15 December 2017 Notes about this release All dates shown in the attached pack are provisional and

More information

City employment: An overview from the Business Register & Employment Survey (BRES)

City employment: An overview from the Business Register & Employment Survey (BRES) employment September 2012 employment: An overview from the Business Register & Employment Survey (BRES) Rachel Smith, September 2012 On 28 September, the latest employment estimates for 2011, taken from

More information

Regional Spread of Inbound Tourism

Regional Spread of Inbound Tourism Regional Spread of Inbound Tourism Foresight issue 164 VisitBritain Research, January 2019 1 Contents Introduction Summary Key metrics by UK area Analysis by UK area Summary of growth by UK area Scotland

More information

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: MANCHESTER AIRPORT. (extract from HS2 High Speed to Nowhere)

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: MANCHESTER AIRPORT. (extract from HS2 High Speed to Nowhere) APPNDIX M2 CONNCIVIY IMPOVMNS ACHIVD BY HS2 AND HIGH SPD UK FO: MANCHS AIPO (extract from HS2 High Speed to Nowhere) Appendix M2 : Airport Page 292 Introduction & key results Page 293 imeline of comparative

More information

WCML Service Plans. The Purpose, Background and Method

WCML Service Plans. The Purpose, Background and Method The Purpose, Background and Method WCML Service Plans This article refers to and should be read in conjunction with several other articles. Towards a High Speed Network is the original, and seeks to make

More information

UK Universities Quick Dial

UK Universities Quick Dial UK Universities Quick Dial To use the abbreviated dialling codes, press *11 on your handset followed by the appropriate code below. There is no need key 9 for an outside line. University Telephone No Abbreviated

More information

National Rail Passenger Survey Virgin Trains East Coast TOC Report Spring 2018 (Wave 38)

National Rail Passenger Survey Virgin Trains East Coast TOC Report Spring 2018 (Wave 38) National Rail Passenger Survey TOC Report 18 (Wave 38) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk

More information

National Rail Passenger Survey: User Guidance Report

National Rail Passenger Survey: User Guidance Report National Rail Passenger Survey: User Guidance Report Spring 2015 (Wave 32) Rebecca Joyner Director Tel: 020 7490 9148 rebecca.joyner@bdrc continental.com Contents Page No. 1. Background... 1 2. Summary

More information

NHS South Warwickshire CCG

NHS South Warwickshire CCG 1 West Midlands South Worcestershire, Redditch, Bromsgrove & Wyre Forest (Fast Track with 2 & 3) NHS Redditch and Bromsgrove Worcestershire West Midlands NHS South Worcestershire NHS Wyre Forest 2 West

More information

MEET WITH MERCURE Venue reference guide

MEET WITH MERCURE Venue reference guide MEET WITH MERCURE Venue reference guide MEET WITH MERCURE Our commitment to quality means we take care every detail your meeting. Your dedicated meeting planner will organise every aspect your day: they

More information

Anglia Winter Key Route Strategy (KRS) 2017/18

Anglia Winter Key Route Strategy (KRS) 2017/18 Anglia Winter Key Route Strategy (KRS) 2017/18 This is an overview of the train service plan should Key Route Strategy be declared. The principle of the KRS is to ensure we can run a service during conditions

More information

Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014

Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014 Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014 Compiled by Paul Murphy-Kasp August 2014 CONTENTS Road Closures & Map Changes to Bus routes & Map Transport

More information

National Rail Passenger Survey: User Guidance Report. Spring 2014 (wave 30)

National Rail Passenger Survey: User Guidance Report. Spring 2014 (wave 30) National Rail Passenger Survey: User Guidance Report Spring 2014 (wave 30) Rebecca Joyner Director Tel: 020 7490 9148 rebecca.joyner@bdrc continental.com Contents Page No. 1. Background... 1 2. Summary

More information