1 Pre-Submission Consultant Briefing January 12, 2016 L1408-S1, RUNWAY INCURSION MITIGATION STUDY AND COMPREHENSIVE AIRFIELD GEOMETRY ANALYSIS LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MA L.G. HANSCOM FIELD, BEDFORD, MA WORCESTER REGIONAL AIRPORT, WORCESTER, MA

2 Opening Remarks Agenda Flavio Leo, Director of Aviation Planning and Strategy, Strategic and Business Planning, Massport Gail Lattrell, Lead Planner, FAA Introduction Project Overview, Management and Selection Process Shailesh Gongal, Senior Airport Planner, Strategic and Business Planning, Massport Project Manager Questions 2

3 Opening Remarks Flavio Leo Gail Lattrell 3

4 Massport team Introductions FAA Attendees 4

5 Project Management Team Managed by Strategic and Business Planning Department Project Director: Flavio Leo Project Manager: Shailesh Gongal Supported by Capital Programs and Aviation Richard Bessom Sarah Dennechuk Vincent Cardillo Bobby Lynch 5

6 Overview Context What is runway incursion? Why this study now? FAA Initiative BOS hotspots Selection Process Preliminary Partial Airfield Geometry Analysis 6

7 Runway Incursion Any occurrence at an aerodrome involving the incorrect presence of an aircraft, vehicle or person on the protected area of a surface designated for the landing and take off of aircraft 7

8 Runway Incursion Severity Classification 8

9 Why this study now? FAA Initiative: Following the successful completion of RSA Program, the FAA has initiated a Runway Incursion Mitigation Program FAA Preliminary Inventory of Airport Locations with Runway Incursions Primary cause: FAA has identified Airfield Geometry as a primary cause of Runway Incursions Nationwide: 74 Airports/ 113 locations/60 hot spots 804 Cumulative Runway Incursions 395 Peak Annual Runway Incursions BOS: Incursions at 3 out of 4 hot spots 31 Cumulative Runway Incursions 9 Peak Annual Runway Incursions 9

10 BOS RI Breakdown by Hot Spots Hot Spot 1 (HS1) Cumulative RI: 7 Peak Annual RI : 2 Hot Spot 3 (HS3) Cumulative RI: 15 Peak Annual RI : 4 Hot Spot 4 (HS4) Cumulative RI: 9 Peak Annual RI : 3 10

11 Preliminary Scope of Work Inventory and Analysis: Analyze the complete airfield geometry for non-standard geometry and potential runway incursion risks Analyze the risk associated with Group VI aircraft taxiing on existing taxiways Analyze the potential locations for deicing pads without creating adverse airfield geometry issues High Fidelity Simulation of Runway and Taxiway Operations Runway Incursion Mitigation Alternatives: Propose RIM Alternatives Conduct Safety Risk Assessment of incursion mitigation alternatives Prepare preliminary engineering design/cost estimates for various alternatives Identify potential environmental issues/permit considerations Prepare Recommendations Deliverables: Updated ALP and prepare related NEPA documents Final Report and Executive Summary 11

12 Consultant Qualifications Demonstrated expertise and experience in Aviation Planning Airfield Design Standards Air traffic operations/planning Airfield Simulation And Other engineering disciplines Civil, environmental, electrical, 12

13 Selection Criteria 13

14 Schedule EVENT DATE/TIME Solicitation: Release Date 1/6/16 Consultant Briefing: Deadline for submission of written questions (12 PM, noon) 1/20/16 (12 PM, noon) Official answers published (Estimated) 1/27/16 Solicitation: Close Date / Submission Deadline 2/9/16 (12 PM, noon) Selection March 2016 Negotiate Scope of Work and Contract April 2016 Submit FAA Grant Application 5/2/16 (Monday) 14

15 Preliminary Partial Airfield Geometry Analysis Boston Logan International Airport 15

16 16

17 Logan s Taxiway System and Alternatives for Evaluation Potential Areas of Studies DRAFT 17

18 Potential Design Alternatives to Evaluate DRAFT 18

19 Potential Design Alternatives to Evaluate DRAFT 19

20 Potential Design Alternatives to Evaluate DRAFT 20

21 Potential Design Alternatives to Evaluate III. Par/401.b (5)(f) Runways used as taxiways and taxiways used as runways can lead to confusion. A runway should always be clearly identified as a runway and only a runway. DRAFT 21

22 Potential Design Alternatives to Evaluate DRAFT 22

23 QUESTIONS? Ask Away Or Not! Everything you say will be monitored or recorded!! 23

L1408 S1, RUNWAY INCURSION MITIGATION STUDY AND COMPREHENSIVE AIRFIELD

L1408 S1, RUNWAY INCURSION MITIGATION STUDY AND COMPREHENSIVE AIRFIELD MASSACHUSETTS PORT AUTHORITY STRATEGIC AND BUSINESS PLANNING DEPARTMENT LOGAN OFFICE CENTER SUITE 200S ONE HARBORSIDE DRIVE EAST BOSTON MA 02128-2909 REQUEST FOR QUALIFICATIONS L1408 S1, RUNWAY INCURSION

More information

L1555-D1 Electric Vehicle and Ground Service Equipment Charging Initiative

L1555-D1 Electric Vehicle and Ground Service Equipment Charging Initiative Consultant Briefing Electric Vehicle and Ground Service Massport Facilities in Greater Boston, Massachusetts Massport Contract No. L1555-D1 April 5, 2018 Massport has established an initiative to install

More information

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017 JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017 1 Agenda Program Description Runway Incursions Design and Geometry Deficiencies Runway 8/26 Operations Potential Mitigation Next Steps

More information

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice 14 C.F.R. Part 158 Passenger Facility Charge Program Logan International Airport Public Notice Summary of Proposed 2018 PFC Application PFC Project Descriptions and Justifications PFC Financial Plan Class

More information

L1584-D1 North Service Area Improvements Program

L1584-D1 North Service Area Improvements Program Consultant Briefing North Service Area Improvements Program Logan International Airport East Boston, Massachusetts Massport Contract No. L1584-D1 May 25, 2018 Massport has been evaluating possible improvements

More information

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, 2014 1:30 PM Casper/Natrona County International Airport Master Plan Update Policy

More information

Massport Study Team Evaluation of CAC Noise Study Alternatives. October 2010

Massport Study Team Evaluation of CAC Noise Study Alternatives. October 2010 Massport Study Team Evaluation of CAC Noise Study Alternatives October 2010 Massport s Evaluation Team Aviation Planning Capital Programs Aviation Operations Environmental Permitting Consultation with

More information

General Aviation Master Plan Update

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #2 Peter O. Knight Airport Agenda Welcome and Introductions HCAA System of Airports Purpose of Public Meetings Master Plan Status Update Next Steps Q & A 2 Our System

More information

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Public Informational Meetings August 9 & 10, 2017 Draft LTCP Overview Briefing Agenda Airport Role & Context Existing Conditions & Previous Plan

More information

Nantucket Memorial Airport Master Plan Update

Nantucket Memorial Airport Master Plan Update Nantucket Memorial Airport Master Plan Update CHAPTER 1 - INTRODUCTION & PUBLIC OUTREACH PROGRAM REVIEW DRAFT SUBJECT TO CHANGE Prepared for: Nantucket Memorial Airport Commission 14 Airport Road Nantucket,

More information

For Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018

For Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018 COUNTY OF INYO REQUEST FOR QUALIFICATIONS For Airport Environmental Services Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018 County of Inyo Public Works Department P.O.

More information

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by: Draft AIRPORT MASTER PLAN Newport State Airport () Prepared for: 2000 Post Road Warwick, Rhode Island 02886-1533 THE Louis Berger Group, INC. 20 Corporate Woods Boulevard Albany, New York 12211-2370 Prepared

More information

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview EPHRATA MUNICIPAL AIRPORT Chapter 1 Introduction and Project Overview The Port of Ephrata in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Ephrata Municipal

More information

Office of Airport Safety and Standards

Office of Airport Safety and Standards Office of Airport Safety and Standards Airport Lighting Program To: By: Illuminating Engineering Society Aviation Lighting Committee Government Contacts Subcommittee Michael O Donnell, Director Office

More information

FY16 18 CONSTRUCTION ESCORT SUPPORT

FY16 18 CONSTRUCTION ESCORT SUPPORT MASSACHUSETTS PORT AUTHORITY CAPITAL PROGRAMS AND ENVIRONMENTAL AFFAIRS DEPARTMENT SUITE 209S LOGAN OFFICE CENTER SUITE 209S ONE HARBORSIDE DRIVE EAST BOSTON MA 02128-2909 REQUEST FOR QUALIFICATIONS MPA

More information

Airport Safety Management Systems: Integrating Planning Into the Process

Airport Safety Management Systems: Integrating Planning Into the Process Airport Safety Management Systems: Integrating Planning Into the Process Kenneth Jacobs Senior Airport Planner FAA Airport Planning and Environmental Division ken.jacobs@faa.gov SMS Defined A process for

More information

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview Chapter 1 Introduction and Project Overview Kittitas County in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Bowers Field Airport (FAA airport identifier

More information

SAN JOSE CAPITAL OF SILICON VALLEY

SAN JOSE CAPITAL OF SILICON VALLEY CITY OF C2 SAN JOSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL COUNCIL AGENDA: 3/29/16 ITEM: t»-\ Memorandum FROM: Kimberly J. Becker SUBJECT: SEE BELOW DATE: March 16, 2016 Approved

More information

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017 Pierre Regional Airport Airport Master Plan Kickoff Meeting April 7, 2017 Agenda Introductions Airport Master Planning Planning Considerations Master Plan Elements Schedule Public Involvement Basics about

More information

AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA

AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA MEETING DATE: Wednesday, June 1, 2011 TIME: 2:30 PM (1½ Hours) LOCATION: Duluth Airport Terminal Building, Skyline Room (2 nd Floor) This meeting

More information

2015 PURDUE ROAD SCHOOL March 11, 2015

2015 PURDUE ROAD SCHOOL March 11, 2015 2015 PURDUE ROAD SCHOOL March 11, 2015 Runway Protection Zone (RPZ) Definition It is a trapezoidal shape formed off the end of a runway and its geometry it a function of the airport s aircraft approach

More information

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Yakima Air Terminal/McAllister Field Airport Master Plan Update Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used

More information

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM. April 10 th 2017

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM. April 10 th 2017 JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM April 10 th 2017 1 Agenda Recap Potential Mitigation Response to Stakeholder Questions Next Steps 2 Recap 3 Background Master Plan considered the runway

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3 Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus

More information

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

BNA Master Plan Update Public Meeting No. 2

BNA Master Plan Update Public Meeting No. 2 A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation

More information

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item. Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

PUBLIC SCOPING MEETING APRIL 2018

PUBLIC SCOPING MEETING APRIL 2018 Photo credit: Patrick Schneider PUBLIC SCOPING MEETING APRIL 2018 Welcome to the meeting! The Federal Aviation Administration (FAA) is preparing an Environmental Impact Statement (EIS) to evaluate the

More information

Appendix 6.1: Hazard Worksheet

Appendix 6.1: Hazard Worksheet Appendix 6.1: Appendix 6.1: Ref. Condition, real or potential; that can cause injury, illness, etc. This is a prerequisite for an Airfield Hazards 1. Taxiway Geometry Direct access to runway from ramp

More information

MONTROSE REGIONAL AIRPORT

MONTROSE REGIONAL AIRPORT MONTROSE REGIONAL AIRPORT FEBRUARY 25, 2016 DRAFT AGENDA READY FOR TAKE OFF WHAT ARE WE GOING TO DO TODAY? Introductions Why conduct an airport master plan? Master Plan Process Deliverables Schedule Identify

More information

Planning, Development and Environment Committee

Planning, Development and Environment Committee Page 1 of 7 MEMORANDUM TO: Planning, Development and Environment Committee FROM: Neil Ralston, Airport Planner Airport Development (726-8129) SUBJECT: 2035 MSP LONG TERM COMPREHENSIVE PLAN FORECAST, FACILITY

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

AERODROME SAFETY COORDINATION

AERODROME SAFETY COORDINATION AERODROME SAFETY COORDINATION Julio Garriga, RO/TA International Civil Aviation Organization North American, Central American and Caribbean Office ICAO NACC Regional Office Page 1 Coordination of the aerodrome

More information

Creating a Clear Vision with your Airport Layout Plan

Creating a Clear Vision with your Airport Layout Plan Creating a Clear Vision with your Airport Layout Plan Presentation & Panel Discussion NCAA 38 th Annual Conference The Economic Impact of Aviation March 28, 2017 Pinehurst, NC Photo Credit: Jason Barnette

More information

Friedman Memorial Airport Authority. Regular Meeting June 5, 2012

Friedman Memorial Airport Authority. Regular Meeting June 5, 2012 Friedman Memorial Airport Authority Regular Meeting June 5, 2012 AIRPORT STAFF BRIEF Employee of the 1 st Quarter, 2012 Ms. Christine Keyes The Car Park UNFINISHED BUSINESS Airport Solutions Chairman Report

More information

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE BRIEFING ON RONALD REAGAN WASHINGTON NATIONAL AND WASHINGTON DULLES INTERNATIONAL AIRPORTS CAPITAL CONSTRUCTION PROGRAM APRIL 2015 2015 Use & Lease

More information

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Project Team Kittitas County, WA Airport Owner (Sponsor) and Operator, Land Use Century West

More information

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING May 15, 2018 Master Plan Schedule Overview Progress Since Last Master Plan

More information

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

Airport Master Plan Update

Airport Master Plan Update Duttchessss Countty Airrporrtt Masstterr Plan Updatte Airport Master Plan Update Final Report Dutchess County Airport Town of Wappingers, New York C&S Engineers, Inc. 499 Col. Eileen Collins Blvd. Syracuse,

More information

Massport and FAA RNAV Pilot Study Overview Public Briefing. February 22, 2017 State Transportation Bld. Boston, MA

Massport and FAA RNAV Pilot Study Overview Public Briefing. February 22, 2017 State Transportation Bld. Boston, MA Massport and FAA RNAV Pilot Study Overview Public Briefing February 22, 2017 State Transportation Bld. Boston, MA As of 02/10/2017 Agenda Welcoming Remarks Tom Glynn (Massport CEO) David Carlon (Massport

More information

Boston Logan. Airport Noise Study

Boston Logan. Airport Noise Study Boston Logan International Airport Boston Logan Airport Noise Study Level 3 Screening Analysis December 2012 Prepared by Ricondo & Associates, Inc. Prepared for Federal Aviation Administration in collaboration

More information

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and

More information

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, 2017 Prepared by: File: Attendees: Shannon Eibert, C&S Companies N93.012.001 See Sign-In List A third meeting was held

More information

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016 PORT OF SEATTLE MEMORANDUM COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016 DATE: TO: FROM: Michael Ehl, Director, Airport Operations Wayne Grotheer, Director, Aviation Project

More information

Massport and FAA RNAV Pilot Study Overview Briefing to Massport CAC. December 8, 2016

Massport and FAA RNAV Pilot Study Overview Briefing to Massport CAC. December 8, 2016 Massport and FAA RNAV Pilot Study Overview Briefing to Massport CAC December 8, 2016 Contents FAA/Massport RNAV MOU Context Boston Logan Context FAA RNAV MOU, Overview Q&A 12/8/2016 2 FAA/Massport RNAV

More information

~ s: Memorandum

~ s: Memorandum Memorandum CITY OF DALLAS DATe November 13, 2015 ro sva..rc~ Members of the Economic Development Committee: Rickey D. Callahan (Chair), Casey Thomas, II (Vice Chair), Lee M. Kleinman, Adam Medrano, Carolyn

More information

International Civil Aviation Organization. Runway and Ground Safety Working Group. Third Meeting (RGS WG/3) (Cairo, Egypt, September 2016)

International Civil Aviation Organization. Runway and Ground Safety Working Group. Third Meeting (RGS WG/3) (Cairo, Egypt, September 2016) 01/09/2016 International Civil Aviation Organization Runway and Ground Safety Working Group Third Meeting (RGS WG/3) (Cairo, Egypt, 19-22 September 2016) Agenda Item 3: Implementation of Aerodrome Safety

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

SAFETY. Global Safety Network (GSN) Diploma Programme

SAFETY. Global Safety Network (GSN) Diploma Programme SAFETY Global Safety Network (GSN) Diploma Programme Global Safety Network (GSN) Diploma Enhancing levels of safety to meet regulatory standards and best operational practice Silver diploma: GSN 1 to GSN

More information

Forecast and Overview

Forecast and Overview Forecast and Overview DENVER INTERNATIONAL AIRPORT Overall goals of the (MPR): Work with DEN to refine the preferred airport development plan to guide the development over an approximate 25-year planning

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

The Ohio State University Airport Master Plan Update Public Meeting 2

The Ohio State University Airport Master Plan Update Public Meeting 2 The Ohio State University Airport Master Plan Update Public Meeting 2 Date: Tuesday, March 12, 2019 Time: 6:00-8:00 p.m. Location: Ohio State Airport, 2160 West Case Road, Columbus, OH 43235 Meeting Summary

More information

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #1 September 24, Peter O. Knight Airport

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #1 September 24, Peter O. Knight Airport Peter O. Knight Airport Public Meeting #1 Peter O. Knight Airport 1 Agenda Welcome and Introductions The Master Plan Update Questions and Comments 2 Hillsborough County Aviation Authority Enabling Legislation

More information

Merritt Island Airport

Merritt Island Airport TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory

More information

Airport Commission Meeting. November 13, 2017

Airport Commission Meeting. November 13, 2017 Airport Commission Meeting November 13, 2017 Agenda 1. Call to Order & Orders of the Day 2. Public Record 3. Public Comment 4. Consent Calendar 5. Noise Report/Community Noise Concerns 6. Reports and Information

More information

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012 Meeting Presentation Master Plan Update October 30, 2012 Agenda We encourage open discussion during today s meeting Team Goals Background (Airport Master Plans) Areas of Emphasis Schedule Special Concerns

More information

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 2 Presentation 2

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 2 Presentation 2 The pilot and airline operator s perspective on runway incursion hazards and mitigation options Session 2 Presentation 2 Operational Hazards Workload issues during taxi that can result in a loss of situational

More information

Overview of Boston Logan Operations and Noise from Overflights. Presentation to Massport Board March 19, 2015

Overview of Boston Logan Operations and Noise from Overflights. Presentation to Massport Board March 19, 2015 Overview of Boston Logan Operations and Noise from Overflights Presentation to Massport Board March 19, 2015 Contents How the Airport Operates Massport s Noise Abatement Program for Logan Recent Trends

More information

RUNWAY SAFETY GO-TEAM METHODOLOGY

RUNWAY SAFETY GO-TEAM METHODOLOGY RUNWAY SAFETY GO-TEAM METHODOLOGY INTRODUCTION The ICAO Runway Safety Programme (RSP) promotes the establishment of Runway Safety Teams (RSTs) at airports as an effective means to reduce runway related

More information

Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163

Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163 Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163 INTRODUCTION The City of Hutchinson is issuing a Request For Proposal (RFP) for the private or commercial use of the Hangar

More information

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS EXECUTIVE SUMMARY ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS PAGE NO. CHAPTER 1-INTRODUCTION... 1-1 1.01 General...1-1 1.02 Purpose and Scope of Study...1-1 1.03 The Planning Process...1-2

More information

Introduction DRAFT March 9, 2017

Introduction DRAFT March 9, 2017 Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout

More information

The Calgary Airport Authority. Parallel Runway Project. Public Consultation Meetings April 30 th, May 2 nd & May 4 th

The Calgary Airport Authority. Parallel Runway Project. Public Consultation Meetings April 30 th, May 2 nd & May 4 th The Calgary Airport Authority Parallel Runway Project Public Consultation Meetings April 30 th, May 2 nd & May 4 th 1 Welcome AGENDA The Airport Authority The Project The Environmental Assessment Process

More information

Runway Safety through Standardized Stop Bars Practices

Runway Safety through Standardized Stop Bars Practices Runway Safety through Standardized Stop Bars Practices The UAE National Runway Safety Team (NRST) has identified Management of Stop Bars as one of the highest runway safety priorities in the prevention

More information

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update Appendix D Project Newsletters Tacoma Narrows Airport Master Plan Update This appendix contains the newsletters distributed throughout the project. These newsletters provided updates and information on

More information

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization NPF/SIP/2010-WP/19 Aerodrome Safety H.V. SUDARSHAN International Civil Aviation Organization Workshop on the development of National Performance Framework for Air Navigation Systems (Nairobi, 6-10 December

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate

More information

AIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI

AIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI AIRPORT MASTER PLAN FOR charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI Prepared For The City of Kansas City, Missouri By Coffman Associates, Inc. January 2004 "The contents of these documents

More information

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012 Nantucket Memorial Airport Commission Master Plan Workshop October 26, 2012 Agenda Introductions Master Plan 101 Airport Planning Issues Noise Abatement Activities Environmental Monitoring Public Outreach

More information

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016 Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand

More information

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017 Lopez Island Airport Master Plan Update Public Meeting June 15, 2017 Master Plan Update Team Reid Middleton/Everett, WA Shannon Kinsella, Project Manager Melania Haagsma, Project Engineer Mead & Hunt/Tulsa,

More information

Public Information Meeting. September 2015

Public Information Meeting. September 2015 W ki P O & T / Working Papers One & Two/ Public Information Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Papers

More information

Port of Friday Harbor

Port of Friday Harbor REQUEST FOR STATEMENTS OF QUALIFICATIONS (RFQ) TO PROVIDE ENGINEERING / CONSULTANT SERVICES AT FRIDAY HARBOR AIRPORT Dated: February 15, 2018 Pursuant to RCW, Chapter 39.80 and FAA AC 150/5100-14E, the

More information

STUDY WORK GROUP MEETING No. 3. November 29, 2016

STUDY WORK GROUP MEETING No. 3. November 29, 2016 STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity

More information

Explanatory Note to Decision 2017/021/R

Explanatory Note to Decision 2017/021/R CERTIFICATION SPECIFICATIONS AND GUIDANCE MATERIAL FOR AERODROME DESIGN (CS-ADR-DSN) CS-ADR-DSN ISSUE 4 RELATED NPA/CRD 2017-04 RMT.0591 The objective of this Decision is to update the certification specifications

More information

The Commonwealth of Wassachusetts

The Commonwealth of Wassachusetts Deval L. Patrick GOVERNOR Timothy P. Murray LIEUTENANT GOVERNOR Ian A. Bowles SECRETARY The Commonwealth of Wassachusetts Executive Ofice of ~nvironmentaljffairs 100 Cam6dge Street, Suite 900 Boston, MA

More information

Preferred Alternative Summary

Preferred Alternative Summary Tacoma Narrows Airport Master Plan Update Preferred Alternative Summary The Preferred Alternative represents Pierce County s vision for the long-term development of the Tacoma Narrows Airport. This Alternative

More information

4.5 Other aviation safety matters AERODROME SAFETY PROGRAMS UPDATE. (Presented by United States)

4.5 Other aviation safety matters AERODROME SAFETY PROGRAMS UPDATE. (Presented by United States) International Civil Aviation Organization 20/06/12 North American, Central American and Caribbean Office (NACC) Twelfth Meeting of Directors of Civil Aviation of the Central Caribbean (C/CAR/DCA/12) Punta

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

FAA Office of Airport Safety and Standards

FAA Office of Airport Safety and Standards FAA Office of Airport Safety and Standards Airport and Runway Safety and Technology Presented to: Pan American Regional Aviation Safety Team (PA-RAST) By: Michael Meyers, Deputy Manager Airport Engineering

More information

Kelly Field at Port San Antonio Airport Master Plan

Kelly Field at Port San Antonio Airport Master Plan Kelly Field at Port San Antonio Airport Master Plan Board of Directors / Steering Committee Briefing Today s Agenda What is an Airport Master Plan? Master Planning Process and Project Background Community

More information

ENVISIONING AUSTIN s Airport of the Future

ENVISIONING AUSTIN s Airport of the Future ENVISIONING AUSTIN s Airport of the Future ABIA 2040 Master Plan Public Workshop #1 October 12, 2017 WHAT IS THE PURPOSE OF TODAY S WORKSHOP? Educate & Inform Solicit Input Answer Questions 2 WHAT IS A

More information

Study Committee Meeting. September 2015

Study Committee Meeting. September 2015 W ki P T / Working Paper Two/ Study Committee Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments,

More information

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 Table of Contents Section Page I. Overview 2 II. Notice and Opportunity for Public Comment 3 III. Application

More information

Request for Proposals

Request for Proposals E CONOMIC DEVELOPMENT AUTHORITY of the City of Norfolk Board of Directors Officers Robert E. Garris, Jr., Chairman Executive Director Michael W. Lee, Vice Chairman Peter Chapman Jeffrey F. Brooke Kim Brown

More information

Ted Stevens Anchorage International Airport

Ted Stevens Anchorage International Airport Ted Stevens Anchorage International Airport 2014 MASTER PLAN UPDATE Executive Summary IN ASSOCIATION WITH: HDR DOWL HKM RIM Architects ATAC Ted Stevens Anchorage International Airport is planning for the

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

Ted Stevens Anchorage International Airport

Ted Stevens Anchorage International Airport Ted Stevens Anchorage International Airport 2014 MASTER PLAN UPDATE Executive Summary IN ASSOCIATION WITH: HDR DOWL HKM RIM Architects ATAC Ted Stevens Anchorage International Airport is planning for the

More information

Session Six: State Aviation System Plan Overview GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau

Session Six: State Aviation System Plan Overview GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau Session Six: State Aviation System Plan Overview 2018 GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau STUDY GOALS AND OBJECTIVES The purpose of the Georgia Statewide

More information