1 Tacoma Narrows Airport Master Plan Update Preferred Alternative Summary The Preferred Alternative represents Pierce County s vision for the long-term development of the Tacoma Narrows Airport. This Alternative ensures the development of a safe and efficient airport while taking into account the Airport s role in the community, and its role in Regional and National air transportation systems. Although the Master Plan addresses the development needs for a 20-year time period, updates are often necessary, every 7 to 10 years, as the dynamic conditions of the industry are reflected in activity and future needs. Key features of the Preferred Alternative are described below: Airside Features The relocation of Taxiways A and B4 is included to comply with FAA standards which require, based on the type of aircraft that currently use the airport and the approach minimums, a minimum runway centerline to taxiway centerline separation of 400 feet and the elimination of direct access from parking aprons to the runway, thus reducing runway incursions. The preferred alternative also provides for an alternate grass landing facility to the west of the existing runway, to support general aviation traffic. This landing facility has been requested by many airport users and tenants. Additionally, stormwater improvements are also included in the plan to improve drainage and eliminate direct runoff into the Puget Sound. Airspace Protection for a Long-term Runway Extension An extension of the runway is not currently operationally justified and the Preferred Alternative does not recommend a runway extension within the 20-year planning period. The purpose of including the runway extension in the preferred alternative is to preserve the viability of such an extension, if it were to ever become necessary in the future. Such an extension would require: Extensive justification be presented to the Federal Aviation Administration (for funding). The amendment of the Gig Harbor Peninsula Community Plan, County Code Title 19B. Update to the Airport Master Plan, including a new Public Involvement Process. A detailed Environmental Approval Process. Landside Features Landside improvements on the already developed east side of the property include the redevelopment of facilities where existing structures are beyond or near the end of their useful design life. An aviation-compatible reserve area, an aviation-compatible development area and a gateway development area are also included. On the west side of the property, proposed improvements include a new utility road, a Group I development area for smaller aircraft, an aviation-compatible development area and an area to be converted for non-aeronautical use. June of 2

2 Landside features on the northern property include designation of an aviation-compatible development area, an aviation reserve area and an area to be converted for non-aeronautical use. A gravel utility road to the wooded areas on the north side of the property is also identified. June of 2

3 Tacoma Narrows Airport Master Plan Update Frequently Asked Questions Q: What is a Master Plan? A: An Airport Master Plan is a study used to determine the long-term development plans for an airport. Because air transportation is a vital community facility, it is important that the requirements for new or improved airports be carefully reviewed and that they fit the community. It is also essential to reserve adequate resources to meet identified needs. Airport master planning is a critical tool in determining needs and programming development at individual airports. Q: What value does the airport have for the community? A: Tacoma Narrows Airport is part of the National and Regional systems of air transportation. The airport contributes more than $6.2 million to the regional economy and is an integral part of the community s emergency plan. Many businesses and residents in the area rely on the airport and support its development. The airport is a hub for jobs, supporting an estimated 40 airport based jobs and countless airport related jobs. It supports business activity with easier access to products, markets and clients, as security measures imposed at busy commercial service airports and reduced airline service to smaller communities have detracted from business efficiencies. Other uses include medical transportation for organ transplant, search and rescue, law enforcement, and flight training for future civil and military pilots. Q. How is the airport funded? Does it pay its own way? A: The Tacoma Narrows Airport typically covers its cost to operate and maintain the facilities with incoming revenues. Revenues for the operation of the airport are generated from leased facilities and fuel fees. Capital improvement projects are paid for through Federal Aviation Administration (FAA) and Washington State Department of Transportation (WSDOT) grants and Real Estate Excise Tax funds. Since airport projects have been funded through FAA-administered public funds, the County is obligated to maintain and operate the facility safely and efficiently and in accordance with specified conditions. Q: Are you going to extend the runway? A: Based on the aviation activity forecasts, a runway extension is not currently operationally justified in the 20-year planning period. Therefore, the current Master Plan does not recommend a runway extension within the planning period. A significant change in airport activity that would make a runway extension justified within the planning period would warrant a new Master Plan. However, the plan recommends protecting the viability of such an extension so that our community may make a decision on that issue, if an extension is justified in the future. Q: If the runway extension is not justified, why is it being shown? A: The runway extension is shown on the ALP to protect the viability of such an option in 10, 20, or 30 years or possibly longer into the future. The runway extension will not take place unless it June of 3

4 is justified. According to the activity forecasts, the extension will not be justified within the planning period. Q. What criteria is used to justify a runway extension? A. A runway extension is justified when the number of operations (takeoffs and/or landings) by aircraft needing a longer runway exceeds 500 for the year. The Federal Aviation Administration requires that the number of operations requiring the longer runway be documented through aviation activity studies and airport operators letters. Q: A longer runway will mean larger aircraft and more noise. A: The type of aircraft that currently operate at the airport is not forecast to change during the 20-year planning period. If a runway extension were ever justified, it will allow certain aircraft that currently use the airport to operate without reducing their passenger, cargo and/or fuel loads for takeoffs. Because these aircraft are carrying less fuel, they must stop for refueling prior to reaching their final destination. Extending the runway would allow these aircraft to increase their takeoff weight. Increased weight does not equate to greater noise, particularly since today s technology is producing aircraft engines that are much quieter. Q: The Gig Harbor Peninsula Community Plan prohibits a runway extension, why is it not being considered? A: The County acknowledges that the Gig Harbor Peninsula Plan would need to be amended to state the community s support of any runway extension. This would occur only if the runway extension becomes justified in the future. Q: Was the Stone Drive Tunnel built to support and pave the way for a runway extension? A: The tunnel was not built to support an extended runway, but rather it was built to improve the safety of the existing runway. The Stone Drive Tunnel was built to comply with FAA s Runway Safety Area (RSA) requirements. The Runway Safety Area provides a safe recovery area in case an aircraft travels beyond the runway end. The tunnel increases the safety of airport operations and the safety of the public traveling on Stone Drive. If the existing runway were ever to be extended, it would require the tunnel to be expanded to serve a taxiway extension. Thus the tunnel as it exists now would not fulfill the need of an extended runway on its own. Q: Is our tax money funding these airport projects? A: Most airport projects, including this Master Plan, are partially funded (90%) by the FAA. Pierce County is responsible for the local match (10%). In certain cases, Washington State Aviation funds 50% of the local match required by the FAA, reducing the County s local match to 5 percent. Q: Where do the federal funds come from? A: The Airport Improvement Program (AIP) was established by the Airport and Airway Improvement Act of 1982 (Public Law ). Since then, the AIP has been amended several times, most recently with the passage of the FAA Modernization and Reform Act of Funds obligated for the AIP are drawn from the Airport and Airway Trust fund, which is supported by user fees, fuel taxes, and other similar revenue sources. June of 3

5 Q: Why not prohibit helicopters from using the Airport since they generate the most noise? A: Tacoma Narrows Airport is a public facility that has accepted federal funds and is committed to Federal Grant Assurances. Grant Assurance 22, Economic Nondiscrimination, of the prescribed sponsor assurances, implements the provisions of 49 United States Code (U.S.C.) 47107(a) (1) through (6). Grant Assurance 22(a) requires that the sponsor of a federally obligated airport: will make its airport available as an airport for public use on reasonable terms and without unjust discrimination to all types, kinds, and classes of aeronautical activities. The County continues to coordinate with JBLM (Joint Base Lewis McCord) in order to address and mitigate the helicopter noise. Helicopter noise is also generated by Medevac service providers. These air ambulances provide a vital service to the community. However, due to the nature of their operations, their operation times are not as predictable. Q: What is the purpose of the Grass Runway? A: The Alternative Grass Landing Area (AGLA) is mainly for small and vintage/antique aircraft use. Q. Where do I go for more information about the Master Plan development? A. All Master Plan information, including draft chapters, PAC and Open House presentations, Development Alternatives Exhibits, Project Newsletters, and other associated materials are posted online at the airport s website: For more information, please contact: Deb Wallace, Airport and Ferry Administrator, Pierce County Public Works and Utilities, (253) / dwalla1@co.pierce.wa.us June of 3

6 Tacoma Narrows Airport Master Plan Update Community Outreach Overview Pierce County s commitment to a proactive public involvement program for this study provided a mechanism for ongoing communication between Pierce County, the Tacoma Narrows Airport Advisory Commission (TNAAC), and the airport tenants, users, local citizens, local agency officials, and other stakeholders and interested parties. The following is a summary of the public involvement program for the study: Planning Advisory Committee Meetings: The County established a Planning Advisory Committee (PAC), which was a 22-member committee representing a cross section of the community. These PAC members served as community liaisons and participated in four work sessions during the planning process the study process took place over an estimated 18-month period with draft chapters and work sessions held at study milestones. During the first work session, PAC members discussed airport issues, study goals, and early findings. The next work session covered Inventory and Forecasts, which included an overview of the existing conditions of the airport. The Forecasts presented the anticipated growth in based aircraft and operations at the airport. The third work session reviewed Facility Requirements, where aviation demand was translated to airport facility needs over the next 5, 10 and 20-year time frames. During the fourth work session, the PAC identified and evaluated Development Alternatives, which addressed the facility needs of the Airport through the long-term. These alternatives considered aviation demand and facility improvement needs identified in previous master plan work sessions. Based on a comparative evaluation of the various features in each alternative, the PAC recommended a preferred alternative to Pierce County. Public Information Workshops/Open Houses: The County scheduled five public information workshops/open houses each of the first four followed a PAC meeting held on the same day and included a brief presentation and an opportunity for the public to learn about the plan progress, ask questions, identify concerns, and provide input to the plan development. The Public Information Workshops/ Open Houses held were on January 30, June 5, and September 4, in 2013, and on January 29, and June 11, in Project Newsletters: Three newsletters were published throughout the study process. Each summarized the study progress, were posted online, and made available at the Public June of 2

7 Information Workshops/Open Houses. The newsletters, titled RADAR, The Tacoma Narrows Airport Master Plan Update, are available online at Website: To keep the public informed, the County posted meeting information, public comment sheets, newsletters, draft airport master plan materials, and other pertinent information on their website at In addition to the formal outreach activities Pierce County staff also took community input when they provided numerous presentations at neighborhood associations, civic organizations and other public meetings. A copy of the input can be found on the project website: For more information, please contact: Deb Wallace, Airport and Ferry Administrator, Pierce County Public Works and Utilities, (253) / dwalla1@co.pierce.wa.us June of 2

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update Appendix D Project Newsletters Tacoma Narrows Airport Master Plan Update This appendix contains the newsletters distributed throughout the project. These newsletters provided updates and information on

More information

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview EPHRATA MUNICIPAL AIRPORT Chapter 1 Introduction and Project Overview The Port of Ephrata in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Ephrata Municipal

More information

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview Chapter 1 Introduction and Project Overview Kittitas County in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Bowers Field Airport (FAA airport identifier

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside

More information

Introduction DRAFT March 9, 2017

Introduction DRAFT March 9, 2017 Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout

More information

Chapter Seven Implementation Plan. Tacoma Narrows Airport. Master Plan Update

Chapter Seven Implementation Plan. Tacoma Narrows Airport. Master Plan Update Chapter Seven Implementation Plan Master Plan Update This chapter presents the 20-year improvement program for the continued development of the. The objectives of this chapter are to identify projects

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

Session 6 Airport Finance 101 Funding Sources for Airports

Session 6 Airport Finance 101 Funding Sources for Airports Session 6 Airport Finance 101 Funding Sources for Airports 31 st Annual AAAE Basics of Airport Law Workshop and 2015 Legal Update November 1-3, 2015 Desk Reference Chapters 2, 19, 22 Frank J. San Martin

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Project Team Kittitas County, WA Airport Owner (Sponsor) and Operator, Land Use Century West

More information

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 Feb. 27, 2017 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Welcome Curtis Robinhold, Port of Portland 1 HILLSBORO

More information

Chapter Four ALTERNATIVES

Chapter Four ALTERNATIVES Chapter Four ALTERNATIVES Master Plan Update This chapter walks through the process of identifying and evaluating development alternatives to serve the (Airport) in the near-term to the distant future.

More information

Chapter 2 FINDINGS & CONCLUSIONS

Chapter 2 FINDINGS & CONCLUSIONS Chapter 2 FINDINGS & CONCLUSIONS 2.01 GENERAL Dutchess County acquired the airport facility in 1947 by deed from the War Assets Administration. Following the acquisition, several individuals who pursued

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

Chapter 10 FAA Compliance Review

Chapter 10 FAA Compliance Review Chapter 10 FAA Compliance Review Introduction This chapter discusses the elements associated with the operation and management of Albany Municipal Airport, as a federally-obligated airport. The Federal

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Yakima Air Terminal/McAllister Field Airport Master Plan Update Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used

More information

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 Meeting Agenda 1. Introductions and Contacts [10 Minutes] 2. Plan Overview and MPAC Role [20 Minutes] 3. MPAC Visioning

More information

Nantucket Memorial Airport Master Plan Update

Nantucket Memorial Airport Master Plan Update Nantucket Memorial Airport Master Plan Update CHAPTER 1 - INTRODUCTION & PUBLIC OUTREACH PROGRAM REVIEW DRAFT SUBJECT TO CHANGE Prepared for: Nantucket Memorial Airport Commission 14 Airport Road Nantucket,

More information

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Overview of the FAA s Office of Airports Prepared for: Presented by: 2016 ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Eduardo Angeles Associate Administrator for Airports Date:

More information

Federal Aviation Administration. Airport Land Use Compatibility Advisory Circular ACI-NA / FAA. FAA HQ Washington, DC March 27, 2013

Federal Aviation Administration. Airport Land Use Compatibility Advisory Circular ACI-NA / FAA. FAA HQ Washington, DC March 27, 2013 Airport Land Use Compatibility Advisory Circular ACI-NA / FAA FAA HQ Washington, DC March 27, 2013 The purpose of this meeting is to discuss FAA s update of the Airport Compatible Land Use Advisory Circular.

More information

SANTA MONICA AIRPORT COMMISSION JANUARY 27, 2014 MEETING AIRPORT TENANT REQUIREMENT EVALUATION

SANTA MONICA AIRPORT COMMISSION JANUARY 27, 2014 MEETING AIRPORT TENANT REQUIREMENT EVALUATION SANTA MONICA AIRPORT COMMISSION JANUARY 27, 2014 MEETING General Aviation Parcel 1948 Instrument of Transfer Marsha Parcel Acquired by City in 1949 Non-Aviation Parcel Released in 1984 AIRPORT TENANT REQUIREMENT

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

Executive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,

More information

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Public Informational Meetings August 9 & 10, 2017 Draft LTCP Overview Briefing Agenda Airport Role & Context Existing Conditions & Previous Plan

More information

Airport Master Plan 1

Airport Master Plan 1 1 Aviation Demand AIRPORT PLANNING PROCESS FAA Design Standards Financial Resources Community Goals Environmental Requirements Serve Business Community This Advisory Circular (AC) provides guidance for

More information

Ted Stevens Anchorage International Airport

Ted Stevens Anchorage International Airport Ted Stevens Anchorage International Airport 2014 MASTER PLAN UPDATE Executive Summary IN ASSOCIATION WITH: HDR DOWL HKM RIM Architects ATAC Ted Stevens Anchorage International Airport is planning for the

More information

Why are the underground fuel tanks being removed and replaced with above ground tanks?

Why are the underground fuel tanks being removed and replaced with above ground tanks? AIRPORT/CITIZEN FAQ This list of Frequently Asked Questions (FAQs) with responses are provided to share information related to airport topics with the Citizens of Georgetown. The questions / responses

More information

Ted Stevens Anchorage International Airport

Ted Stevens Anchorage International Airport Ted Stevens Anchorage International Airport 2014 MASTER PLAN UPDATE Executive Summary IN ASSOCIATION WITH: HDR DOWL HKM RIM Architects ATAC Ted Stevens Anchorage International Airport is planning for the

More information

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012 Nantucket Memorial Airport Commission Master Plan Workshop October 26, 2012 Agenda Introductions Master Plan 101 Airport Planning Issues Noise Abatement Activities Environmental Monitoring Public Outreach

More information

GENERAL AVIATION AIRPORT AGREEMENTS

GENERAL AVIATION AIRPORT AGREEMENTS 33 rd Annual Basics of Airport Law Workshop and 2017 Legal Update Session #17 GENERAL AVIATION AIRPORT AGREEMENTS W. Eric Pilsk Kaplan Kirsch & Rockwell Corinne C. Nystrom, A.A.E., Airport Director Mesa-Falcon

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings

More information

Purpose and Need for the Proposed Project

Purpose and Need for the Proposed Project Purpose and Need for the Proposed Project Introduction Snohomish County Airport/Paine Field (PAE) is located in Snohomish County, Washington, approximately 20 miles north of Seattle. Figure A1 depicts

More information

Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018

Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018 Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018 Agenda» Website Update» Alternatives» Discussion» Evaluation» Schedule Agenda» Website Update» Alternatives» Discussion» Evaluation»

More information

AIRPORT COMPLIANCE th Texas Aviation Conference. 3/29/2018 Date. Footer Text

AIRPORT COMPLIANCE th Texas Aviation Conference. 3/29/2018 Date. Footer Text AIRPORT COMPLIANCE 2018 36 th Texas Aviation Conference 3/29/2018 AWOS FCC LICENSE RENEWAL Needs renewal every 10 years (renew 90 days before expiration). Needs update if there is name change, coordinate

More information

Regular Board Meeting August 4, 2015

Regular Board Meeting August 4, 2015 Regular Board Meeting August 4, 2015 1616 Airport Circle Hailey, ID 83333 208.788.4956 PUBLIC COMMENT FY 16 Rates & Charges FY 16 Budget Approval Rates & Charges will provide the Board the ability to operate

More information

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item. Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed

More information

Chapter 1: Introduction Draft

Chapter 1: Introduction Draft Chapter 1: Draft TABLE OF CONTENTS 1... 4 1.6.1 Stakeholder Engagement Plan... 10 Chapter 1 Page 2 TABLE OF EXHIBITS Exhibit 1.1-1 ABIA Annual Growth Since 1993... 5 Exhibit 1.4-1: ABIA Location Map...

More information

Chapter 1: Introduction

Chapter 1: Introduction Chapter 1: TABLE OF CONTENTS 1... 4 1.1 Master Plan Study Content... 4 1.2 Purpose and Scope of Master Plan Study... 4 1.3 Airport History and Role... 6 1.4 Airport Location and Service Area... 6 1.5 ABIA

More information

MassDOT Aeronautics Division Capital Improvements Presentation

MassDOT Aeronautics Division Capital Improvements Presentation MassDOT Aeronautics Division Capital Improvements Presentation MassDOT Board Retreat October 27, 2011 Presentation Agenda Capital Improvement Plan (CIP) Overview Airports Capital Improvement Plan (ACIP)

More information

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future: 2014 GEORGIA INFRASTRUCTURE REPORT CARD B + RECOMMENDATIONS Plan and Fund for the Future: While the system continues to enjoy excess capacity and increased accessibility it still needs continued focus

More information

Session 10 Non-aeronautical Development of Airport Land

Session 10 Non-aeronautical Development of Airport Land Session 10 Non-aeronautical Development of Airport Land 31 st Annual AAAE Basics of Airport Law Workshop and 2015 Legal Update November 1-3, 2015 Desk Reference Chapters 14, 15, 23, 28 Daniel S. Reimer

More information

AIRPORT NOISE AND CAPACITY ACT OF 1990

AIRPORT NOISE AND CAPACITY ACT OF 1990 AIRPORT NOISE AND CAPACITY ACT OF 1990 P. 479 AIRPORT NOISE AND CAPACITY ACT OF 1990 SEC. 9301. SHORT TITLE This subtitle may be cited as the Airport Noise and /Capacity Act of 1990. [49 U.S.C. App. 2151

More information

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN LAST UPDATE JULY 2013 Acknowledgements The preparation of this document was financed in part by a grant from the Federal Aviation Administration (Project No: 3-27-0000-07-10), with the financial support

More information

Next Generation Air Transportation System Financing Reform Act of 2007

Next Generation Air Transportation System Financing Reform Act of 2007 Next Generation Air Transportation System Financing Reform Act of 2007 Funding Proposal An ACC Summary of Key Provisions in the USDOT s FAA Reauthorization Proposal Overall, the change in the aviation

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

Update on FAA Standard Operating Procedures (SOP)

Update on FAA Standard Operating Procedures (SOP) Update on FAA Standard Operating Procedures (SOP) SOP 2.0 - Airport Layout Plan (ALP) SOP 3.0 - Exhibit A Airport Property Map Presented to: Association of California Airports (ACA); ACA Annual Conference,

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3 This is the presentation for the third Master Plan Update Working Group Meeting being conducted for the Ted Stevens Anchorage International Airport Master Plan Update. It was given on Thursday March 7

More information

Developing an Aircraft Weight Database for AEDT

Developing an Aircraft Weight Database for AEDT 17-02-01 Recommended Allocation: $250,000 ACRP Staff Comments This problem statement was also submitted last year. TRB AV030 supported the research; however, it was not recommended by the review panel,

More information

Airport. Improvement Program (AIP) Overview. Federal Aviation Administration. Texas Aviation Conference Ben Guttery, Texas ADO April 2017

Airport. Improvement Program (AIP) Overview. Federal Aviation Administration. Texas Aviation Conference Ben Guttery, Texas ADO April 2017 Airport Improvement Program (AIP) Overview Texas Aviation Conference Ben Guttery, Texas ADO April 2017 Objectives Status of AIP Legislative Authority History and Summary of AIP AIP funding formulas 2 AIP

More information

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP) 6.0 The addresses the phased scheduling of projects identified in this Master Plan and their financial implications on the resources of the Airport and the City of Prescott. The phased Capital Improvement

More information

Passenger Facility Charge Application #1

Passenger Facility Charge Application #1 Passenger Facility Charge Application #1 February 2017 APPLICATION PUNTA GORDA AIRPORT PFC ASSURANCES CERTIFICATION STATEMENT The undersigned Chair of the Charlotte County Airport Authority assures

More information

AVIATION. MichiganReportCard.com 5

AVIATION. MichiganReportCard.com 5 MichiganReportCard.com 5 GRADE C AVIATION OVERVIEW Michigan s 200+ airports bring $4.3 billion into the economy each year. The state s Tier 1 and Tier 2 airports were evaluated based on six key infrastructure

More information

Sunshine Coast Airport Master Plan September 2007

Sunshine Coast Airport Master Plan September 2007 Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

FAA Proposals for Safety Management Systems

FAA Proposals for Safety Management Systems FAA Proposals for Safety Management Systems DISCUSSION PAPER I. Background Safety Management Systems The Federal Aviation Administration (FAA) defines a safety management system (SMS) as a formalized approach

More information

Public Workshop #7 Land Use Planning June 28, 2016

Public Workshop #7 Land Use Planning June 28, 2016 Public Workshop #7 Land Use Planning June 28, 2016 Land Use Planning and Vision 2040 What is Land Use Planning in the context of the Vision 2040 process? Vision 2040 Aeronautical Development Land Use Compatibility

More information

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot community Airport Advisory Board meetings Elected Officials

More information

Merritt Island Airport

Merritt Island Airport TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

Preliminary Findings of Proposed Alternative

Preliminary Findings of Proposed Alternative Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be

More information

Whangarei Airport. Prepared by Carine Andries 10/20173

Whangarei Airport. Prepared by Carine Andries 10/20173 Whangarei Airport Prepared by Carine Andries 10/20173 March 2010 TABLE OF CONTENTS 1 2 3 INTRODUCTION... 3 AIRPORT ROLE AND FUNCTION... 3 AIRPORT FEATURES AND CAPACITY... 3 3.1 3.2 3.3 3.4 3.5 3.5.1 3.5.2

More information

AIRPORT EMERGENCY CONTINGENCY PLAN TEMPLATE V 3.3 April 27, 2012

AIRPORT EMERGENCY CONTINGENCY PLAN TEMPLATE V 3.3 April 27, 2012 AIRPORT EMERGENCY CONTINGENCY PLAN TEMPLATE V 3.3 April 27, 2012 Section 42301 of the FAA Modernization and Reform Act of 2012 1 (the Act) requires airport operators to submit emergency contingency plans

More information

NON-AERONAUTICAL DEVELOPMENT OF AIRPORT LAND

NON-AERONAUTICAL DEVELOPMENT OF AIRPORT LAND 33 rd Annual Basics of Airport Law Workshop and 2017 Legal Update Session #11 NON-AERONAUTICAL DEVELOPMENT OF AIRPORT LAND Daniel S. Reimer Denver International Airport John E. Putnam Kaplan Kirsch & Rockwell

More information

Chapter One PROJECT DESCRIPTION

Chapter One PROJECT DESCRIPTION Chapter One PROJECT DESCRIPTION Environmental Impact Report Monterey Peninsula Airport 1.1 INTRODUCTION This Environmental Impact Report (EIR) analyzes and documents the potential environmental impacts

More information

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017 Pierre Regional Airport Airport Master Plan Kickoff Meeting April 7, 2017 Agenda Introductions Airport Master Planning Planning Considerations Master Plan Elements Schedule Public Involvement Basics about

More information

AIRPORT LAND USE COMPATILIBILTY AIRPORT LAND USE COMPATIBILIITY

AIRPORT LAND USE COMPATILIBILTY AIRPORT LAND USE COMPATIBILIITY CHAPTER 7 AIRPORT LAND USE COMPATILIBILTY CHAPTER 7 AIRPORT LAND USE COMPATIBILIITY 7.0 INTRODUCTION On airport aviation related development is typically compatible with aircraft operations. On airport

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

AIRPORT REGULATORY REQUIREMENTS THAT AFFECT ENVIRONMENTAL COMPLIANCE AND SUSTAINABILITY

AIRPORT REGULATORY REQUIREMENTS THAT AFFECT ENVIRONMENTAL COMPLIANCE AND SUSTAINABILITY AIRPORT REGULATORY REQUIREMENTS THAT AFFECT ENVIRONMENTAL COMPLIANCE AND SUSTAINABILITY 19 April 2016 Dave Full, RS&H Katie van Heuven, Kaplan Kirsch & Rockwell TODAY S PRESENTATION ACRP Update Overview

More information

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010 MSP Noise Oversight Committee (NOC) November 17, 2010 Operations Update Technical Advisor s Report Summary MSP Complaints September October 2010 3,025 3,567 2009 6,350 6,001 Total Operations September

More information

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012 Meeting Presentation Master Plan Update October 30, 2012 Agenda We encourage open discussion during today s meeting Team Goals Background (Airport Master Plans) Areas of Emphasis Schedule Special Concerns

More information

Master Plan Update Technical Advisory Committee Meeting

Master Plan Update Technical Advisory Committee Meeting Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives

More information

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014 DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation

More information

Part 150 and Part 161: Purpose, Elements, and Process

Part 150 and Part 161: Purpose, Elements, and Process Part 150 and Part 161: Purpose, Elements, and Process Presentation to: Noise Compatibility Committee January 29, 2015 Ted Baldwin Part 150, Airport Noise Compatibility Planning FAA created in response

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

ORDER REQUESTING PROPOSALS

ORDER REQUESTING PROPOSALS Order 2017-2-4 Served: February 13, 2017 DEPARTMENT UNITED OF STATES TRANSPORTATION OF AMERICA UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. Issued by the

More information

FAA COMPLIANCE ENFORCEMENT, PART 16 AND RECENT LITIGATION

FAA COMPLIANCE ENFORCEMENT, PART 16 AND RECENT LITIGATION 30 th Annual AAAE Basics of Airport Law Workshop and 2014 Legal Update October 19-21, 2014 FAA COMPLIANCE ENFORCEMENT, PART 16 AND RECENT LITIGATION Desk Reference Chapter 10 W. Eric Pilsk Kaplan Kirsch

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

General Aviation Master Plan Update

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #2 Peter O. Knight Airport Agenda Welcome and Introductions HCAA System of Airports Purpose of Public Meetings Master Plan Status Update Next Steps Q & A 2 Our System

More information

Sam Imperati Facilitator

Sam Imperati Facilitator Sam Imperati Facilitator 1 Introductions 1) Facilitator Introduction a) Name b) Occupation c) Role 2) Chair and Member Introductions: a) Name b) Affiliations c) Occupation 3) Project Team Introductions:

More information

SAFETY, SECURITY, AND TORT LIABILITY (AND OTHER THINGS THAT GO BUMP IN THE NIGHT)

SAFETY, SECURITY, AND TORT LIABILITY (AND OTHER THINGS THAT GO BUMP IN THE NIGHT) 34 th Annual Basics of Airport Law Workshop and 2018 Legal Update Session #13 SAFETY, SECURITY, AND TORT LIABILITY (AND OTHER THINGS THAT GO BUMP IN THE NIGHT) Steven L. Osit Nicholas M. Clabbers Kaplan

More information

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline

More information

PILOTS FOR MONTANA AIRPORTS

PILOTS FOR MONTANA AIRPORTS PILOTS FOR MONTANA AIRPORTS Montana s Community Airports and MDT Aeronautics are in critical need of help and the solution is quite SIMPLE! 1. The Aviation Fuel tax has remained static at $0.04/gal since

More information

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO Wyoming Valley Airport Proposed Improvements Presented June 26, 2012 By The WBW Airport Advisory Board & FBO Contents Purpose of meeting Airport overview Background of proposed improvements SWOT analysis

More information

ACTION TRANSMITTAL

ACTION TRANSMITTAL Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2018-16 DATE: February 9, 2018 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East

More information

Planning Advisory Committee Meeting #4 September 12, 2017

Planning Advisory Committee Meeting #4 September 12, 2017 Planning Advisory Committee Meeting #4 September 12, 2017 1 HILLSBORO AIRPORT MASTER PLAN UPDATE Welcome and Meeting Introduction Jerry Willey, Committee Chair Anne Pressentin, EnviroIssues 2 Agenda Welcome

More information

AIRPORT MINIMUM STANDARDS

AIRPORT MINIMUM STANDARDS AIRPORT MINIMUM STANDARDS South Carolina Aviation Association Annual Conference Presented by: Bill Dunn, President What s the real name for these documents and guidance? Minimum Standards for COMMERCIAL

More information