ATN London, September SITA DATALINK SERVICES & APPLICATIONS Enabling CNS Evolution

Size: px
Start display at page:

Download "ATN London, September SITA DATALINK SERVICES & APPLICATIONS Enabling CNS Evolution"

Transcription

1 ATN 2005 London, September 2005 SITA DATALINK SERVICES & APPLICATIONS Enabling CNS Evolution

2 Overview Datalink Infrastructure Air Traffic Services Current Services & Applications Pioneering Future Services SITA/Air Navigation Service Provider Partnerships SITA Role in Link2000+ Conclusions

3 Overview Datalink Infrastructure Air Traffic Services Current Services & Applications Pioneering Future Services SITA/Air Navigation Service Provider Partnerships SITA Role in Link2000+ Conclusions

4 AIRCOM Success Story VHF AIRCOM was launched 20 years ago as SITA s first step beyond ground network services into radio communications. AIRCOM VHF network has grown to provide coverage unequalled by any other line of sight radio network run by a single operator. Satellite AIRCOM launched in 1991 AIRCOM ATS Applications launched in 2002 Future AIRCOM evolution will be increasingly driven by Air Traffic Service provider requirements

5 AIRCOM Data Link Service INMARSAT Global SITA Network Service ADLT (Singapore) X.25 or IP Airline Application System ATS Application System e.g. DCL GES PRIMARY X.25 or IP DATACOM RGS BACK-UP AOC I/W AVICOM VGS ADLT (Montréal) ATS I/W ARINC

6 AIRCOM Datalink Facts & Figures AIRCOM Datalink service is used by over 140 airline customers Over 30 Air Navigation Service Providers are connected to AIRCOM

7 VHF coverage VDL coverage

8 VDL World-Wide Coverage

9 AIRCOM Customer Airlines using VDL today Increasing numbers of aircraft using VDL AIRCOM Lufthansa QANTAS Aeroflot Air Europa Continental Airlines Air France American Airlines Japan Airlines Fedex Royal Air Maroc SAS

10 VDL Traffic VDL Traffic Traffic Volume Downlinks Uplinks Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Month

11 VDL Performance VDL Performance Over 98% of VDL messages delivered less than 10 seconds (cf. ACARS 97.9 within 30 seconds Performance (%) % % 98.00% 96.00% 94.00% n Series % 90.00% 88.00% 10 secs 20 secs 30 secs 40 secs 50 secs 60 secs 70 secs 80 secs 90 secs 100 secs 110 secs 120 secs 180 secs 360 secs Trasit delay

12 Overview Datalink Infrastructure Air Traffic Services Existing Services Existing Applications Future Services SITA/Air Navigation Service Provider Partnerships SITA Role in Link2000+ Conclusions

13 Overview Datalink Infrastructure Air Traffic Services Existing Services Existing Applications Future Services SITA/Air Navigation Service Provider Partnerships SITA Role in Link2000+ Conclusions

14 Existing Services FANS 1/A Digital-ATIS Digital-VOLMET Digital-ATIS Gateway Departure Clearance Centralised ADS Service (CADS) Flight Management Computer Waypoint Reporting Service ( CFRS ) Satellite Voice ATN/VDL Mode 2 Service

15 FANS/D-ATIS/DCL/OCL Traffic Traffic Traffic Volume FANS Pre-FANS Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Month

16 Overview Datalink Infrastructure Air Traffic Services Existing Services Existing Applications Future Services SITA/Air Navigation Service Provider Partnerships SITA Role in Link2000+ Conclusions

17 Existing Applications Airport Tower Systems Departure Clearance System ( AIRCOMclever ) Digital-ATIS System ( AIRCOMevatis ) Centralised ATS Server ( CATS ) FANS 1/A Trial Workstation (ADS/CPDLC) FANS ATN ADS/CPDLC Gateway Implementing FANS Accommodation

18 CLEVER Ground System CLEVER Terminal AIRCOM Network LAN CLEVER Ground System Flight plan data Flight Plan Data Processing System

19 EVATIS Ground System EVATIS Terminal AIRCOM Network LAN EVATIS Ground System VHF radio Meteo data Local MET system

20 SITA Centralized ATS server Airport 1 D-ATIS source RGS Airport 2 AFTN / IP / X25 Network SITA Network GES D-ATIS source Airport 3 D-VOLMET source CATS primary CATS secondary

21 ADS-CPDLC Gateway ATN aircraft VGS SITA ATN router Enable communication with both ATN and FANS aircraft. GES ADLT ATN Sub-Network ATS Operational System ATN ES ADS-CPDLC Gateway Manages CPDLC dialogs and ADS contracts. ATN implementation is Baseline 1, as per ICAO SARPS Edition 2 (9705) document. FANS aircraft RGS SITA Network Service FANS path ATN path Supports both FANS/1 and FANS/A aircraft.

22 ADS-CPDLC Trial Workstation Easy trial of ADS and CPDLC applications

23 Overview Datalink Infrastructure Air Traffic Services Existing Services Existing Applications Future Services SITA/Air Navigation Service Provider Partnerships SITA Role in Link2000+ Conclusions

24 Future Services under Evaluation Actively contributing towards future evolution in the use of CNS technology to deliver benefits Digital-OTIS selected by Eurocontrol to develop and deliver service enabling airborne access to European AIS Database Digital-TAXI playing major role in consortium selected by Eurocontrol to develop D-TAXI and trial a D-TAXI service at Brussels National Airport Regional ADS-B established partnership with Airservices Australia to promote and develop Regional ADS-B Services in Asia/Pacific Region Playing major role in UK ADS-B/Multi-lateration trial in consortium comprising UK NATS, QinetiQ selected by Eurocontrol

25 D-OTIS Trial Architecture VGS / RGS SNBA A/C VOLMET / ATIS Req / Resp BELGOCONTROL SITA AIRCOM Network X25 D-OTIS Server NOTAM Req / Resp EAD

26 D-OTIS Trial SITA is responsible for project management and coordination, and for developing and hosting the D-OTIS ground server. SNBA specifies the on board D-OTIS application, and will retrofit all SNBA fleet (35 a/c, Avro RJ85/100, Bae146, A319 and A330). Belgocontrol provides access to Belgium ATIS and VOLMET data. Eurocontrol provides access to European AIS Database (EAD) for NOTAM retrieval. In collaboration with other partners (Blusky, Systex)

27 D-OTIS Operational Scenario ATIS req dep, dem NOTAM + ATIS req con ATIS dep, resp NOTAM + ATIS arr resp VOLMET resp VOLMET req ATIS arr, resp NOTAM req full NOTAM resp full NOTAM resp NOTAM + ATIS Termina tion req = request, dep = departure, arr = arrival, dem = demand, con = contract, resp = response

28 D-TAXI Trial Architecture INMARSAT CWP Global SITA Network Service Modified Belgocontrol AMS System ADLT (Singapore) X.25 Operational Link for DCL SNBA Fleet Modified ACARS Pages GES RGS PRIMARY BACK-UP D-TAXI Trial Link X.25 or IP SITA COM Server Data recorder and Perf. tracker ADLT (Montréal) ATS I/W

29 D-TAXI Trial SITA is responsible for project management and coordination, and provide datalink gateway. SNBA specifies the on board D-TAXI application, and will retrofit all SNBA fleet (35 a/c, Avro RJ85/100, Bae146, A319 and A330). Belgocontrol provides will implement the D- TAXI application on Brussels ATM system. NLR will provide safety and human factors expertise. In collaboration with other partners (Blusky, heading the consortium)

30 D-TAXI Departing Scenario GROUND MOVEMENT PRE-FLIGHTPUSH-BACK TAXI-OUT TAKE-OFF STATIC PHASE STATICEXECUTIONSTATIC PHASE PHASE PHASE EXECUTION PHASE AIRCRAFT MOVING DEPARTURE CLEARANCE REQUEST DEPARTURE CLEARANCE DELIVERY PUSH-BACK REQUEST TACTICAL COMMUNICATION EXCHANGES PUSH-BACK APPROVAL/INSTRUCTIONS TACTICAL COMMUNICATION EXCHANGES READY FOR TAXI TAXI CLEARANCE/INSTRUCTIONS TAKE-OFF CLEARANCE REQUEST BAS ELIN E SCE NARI O FOR THE TRIA LS EXCLUDED!!!

31 ADS-B Partnership with Airservices Australia Airservices Australia are pioneering operational introduction of ADS-B Services SITA has partnered with Airservices to promote and develop a Regional ADS-B service in Asia/Pacific Region SITA (together with UK NATS and QinetiQ) playing major role in consortium selected to conduct UK ADS-B/Multi-lateration trial

32 Regional Service Objectives To facilitate the early, uniform and optimal deployment of ADS-B in the Asia/Pac region to: Improve safety Avoid fragmented and sub-optimal ground infrastructure deployment Avoid cost of radar installations and upgrades Reduce en-route charges Improve operational efficiency and capacity Reduce separation minima Encourage cross border data sharing

33 Luton Stansted Heathrow Gatwick

34 Overview Datalink Infrastructure Air Traffic Services Existing Services Existing Applications Future Services SITA/Air Navigation Service Provider Partnerships SITA Role in Link2000+ Conclusions

35 SITA/Air Navigation Service Provider Partnerships Future evolution of AIRCOM will be strongly influenced by Air Navigation Service Provider requirements SITA has established Datalink Service related partnerships with: AVICOM Japan JCAB Japan DECEA Brasil CATS Cambodia AENA Spain DFS Germany Many more under discussion

36 Overview Datalink Infrastructure Air Traffic Services Existing Services Existing Applications Future Services SITA/Air Navigation Service Provider Partnerships SITA Role in Link2000+ Conclusions

37 The SITA ATN Service Operational since 2004 Via SATCOM Data 3 and VDL Mode 2 Based on the Sofreavia Pro-ATN Router Numerous flight trials NLR trials aircraft Air Europa FEDEX Round-trip performances measured less than 2 seconds Supporting testing with avionics vendors/oems Honeywell Rockwell Collins AIRBUS Access to Eurocontrol Maastricht UACC CPDLC Service planned end September via SITA/ARINC internetworking Satellite Station Dual Redundant ProATN Routers ATN Customers SITA Domain SITA A/G Network Common Monitoring System ACARS Customers VGS Dual Redundant ACARS Processors

38 Link2000+ Airlines and ANSPs have a Choice.. Airlines that have elected to use the SITA VDL Service include the majority of Pioneers: Air Navigation Service Providers that have elected to use or partner with SITA include: DFS in Germany (Partner) Lufthansa AENA in Spain (Partner) NAV EP in Portugal Eurocontrol Maastricht UACC (via internetworking )

39 European VDL Coverage Comprehensive SITA/DFS/AENA VDL Coverage over Link airspace available today Operational Use Letter of Commitment/Concrete Plans Intent

40 ATN Internetworking

41 VDL Service Partnerships SITA has concluded VHF Data Link partnership agreements with: AENA (Spain) in December 2002 DFS (Germany) in December 2004 Agreements are similar in that our partners will/have assumed ownership and responsibility of control/monitoring of the VHF data link stations through which they will deliver the Link2000+ Services

42 Partnership VDL Deployment Status Spain (AENA): Deployment project completed 21 VGS (ACARS/VDL) stations deployed and now operational Germany (DFS) 19 installed VGS transferred to DFS ownership in during 1 st 6 months of 2005 Further 8 or 9 VGS to be installed in 2007 to supplement VDL coverage in Germany Negotiations with other Link ANSPs on-going

43 Partnership Architecture ATN/CPDLC ANSP VHF Network Service Interface Link2000+ CPDLC VHF stations AIRLINE Host Computer Non ANSP ATS Host Computer ANSP G/G Network Network Gateway SITA Network Service SITA ACARS Processor ACARS Based ATS Applications ATN Router R R ATN Router

44 Partnership Architecture AOC ANSP VHF Network Service Interface Link2000+ CPDLC VHF stations AIRLINE Host Computer Non ANSP ATS Host Computer ANSP G/G Network Network Gateway SITA Network Service SITA ACARS Processor ACARS Based ATS Applications ATN Router R R ATN Router

45 Overview Datalink Infrastructure Air Traffic Services Existing Services Existing Applications Future Services SITA/Air Navigation Service Provider Partnerships SITA Role in Link2000+ Conclusions

46 Conclusion Departure Clearance Digital-ATIS Oceanic Clearance Classical Radar ACARS P+S RADAR VDL2 LINK Transfer of Control Clearances Microphone Check Downlink of Heading, Speed, Selected flight level Mode S EHS Mode S CASCADE Initial ADS-B services More CPDLC services More D-FIS services VDL2 Mode S 2000> 2005 > 2010 > ADS-B Receiver Strategic Context Objectives Scope Airborne Separation Trajectory negotiation Autonomous Separation Approach

47 Thank you for your attention! For further information visit or contact

AIRCOM Datalink Infrastructure

AIRCOM Datalink Infrastructure AIRCOM Datalink Infrastructure Patrick Geurts Copyright SITAONAIR 2016 August 8-11, 2016 Operational Datalink Seminar Accra, Ghana Agenda 1. High Level SITAONAIR Overview 2. SITAONAIR Aircraft Communications

More information

The LINK2000+ Test Facility Presentation. Eurocontrol LINK Programme

The LINK2000+ Test Facility Presentation. Eurocontrol LINK Programme The LINK2000+ Test Facility Presentation Eurocontrol LINK 2000+ Programme October 2004 TABLE OF CONTENTS The Test Facility objectives...2 The Test Facility description...2 ATN routers...2 Air and Ground

More information

ATC Guild, India. November 1 st, SITA AIRCOM Air Traffic Services Data Link Operational Solutions

ATC Guild, India. November 1 st, SITA AIRCOM Air Traffic Services Data Link Operational Solutions ATC Guild, India November 1 st, 2004 SITA AIRCOM Air Traffic Services Data Link Operational Solutions Akhil Sharma Director CNS Services www.sita.aero Overview SITA AIRCOM Data Link Service Air Traffic

More information

Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December

Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December 2001 - Mike Murphy ATN Systems, Inc. (ATNSI) 703-412 412-2900, 2900, Mike.Murphy@atnsi.com ATNSI, ATN Seminar 1 Presentation

More information

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning Purpose: Release 5 SESAR Solution ID #109 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution with a summary of the results stemming

More information

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October 2003

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October 2003 11/9/03 ELEVENTH AIR NAVIGATION CONFERENCE Montreal, 22 September to 3 October 2003 Agenda Item 7 : Aeronautical air-ground and air-to-air communications CURRENT TRENDS IN THE IMPLEMENTATION OF AIR TRAFFIC

More information

European ATM Development The Big Idea

European ATM Development The Big Idea European ATM Development The Big Idea Bo Redeborn Principal Director ATM EUROCONTROL CANSO Data Communications Conference Amsterdam, 6-8 th Sept 2011 The European Organisation for the Safety of Air Navigation

More information

AIR TRAFFIC MANAGMENT A growing partnership Air Ground Communication

AIR TRAFFIC MANAGMENT A growing partnership Air Ground Communication AIR TRAFFIC MANAGMENT A growing partnership Air Ground Communication ICAO Seminar/workshop on the Implementation of Ground-ground and Air- ground data links in the SAM Region - Lima, Peru 12/Sep/2012 By:

More information

Initial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg

Initial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg Initial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg Feb 5, 2013 Background: Inmarsat Aviation Services With more than 11,000 aircraft relying on global in-flight connectivity from Inmarsat,

More information

Satcom Direct Communications, Inc. and SITA DSP Contract Program Presentation for the 2007 CNS/ATM Conference. 25 April 2007

Satcom Direct Communications, Inc. and SITA DSP Contract Program Presentation for the 2007 CNS/ATM Conference. 25 April 2007 Satcom Direct Communications, Inc. and SITA DSP Contract Program Presentation for the 2007 CNS/ATM Conference 25 April 2007 Agenda Introduction About Satcom Direct About SITA Contract Details Service Architecture

More information

PENS Symposium How to join PENS

PENS Symposium How to join PENS PENS Symposium How to join PENS Speaker Organisation Date and venue Jacky POUZET Head of Communications and Frequency Coordination EUROCONTROL 17 th October 2012, Brussels The European Organisation for

More information

Australia Destroy Sri Lanka in Cricket ADS-C? ICAO CARSAM Surveillance Seminar June SITA

Australia Destroy Sri Lanka in Cricket ADS-C? ICAO CARSAM Surveillance Seminar June SITA Australia Destroy Sri Lanka in Cricket ADS-C? ICAO CARSAM Surveillance Seminar June 18 20 2007 1 SITA Overview of ADS-Contract ICAO Surveillance Seminar 18 20 th June 2007 Port of Spain Akhil Sharma Director,

More information

Electronic visibility via ADS-B for small aircraft. John Korna, NATS

Electronic visibility via ADS-B for small aircraft. John Korna, NATS Electronic visibility via ADS-B for small aircraft John Korna, NATS The SESAR General Aviation challenge SESAR is predominantly aimed at scheduled commercial air traffic and 100M+ airframes How is SESAR

More information

THE LINK DATALINK TEST FACILITY CPDLC GROUND AUTOMATED TOOL. March By Isabelle HERAIL

THE LINK DATALINK TEST FACILITY CPDLC GROUND AUTOMATED TOOL. March By Isabelle HERAIL THE LINK 2000+ DATALINK TEST FACILITY CPDLC GROUND AUTOMATED TOOL March 2007 By Isabelle HERAIL TABLE OF CONTENTS Introduction...2 CPDLC Ground Automated Tool...3 Objectives...3 Automated Tool Accessibility...4

More information

Overview of Worldwide Data Link Equipage Mandates

Overview of Worldwide Data Link Equipage Mandates Overview of Worldwide Data Link Equipage Mandates Wednesday, November 18, 2015 3:00 to 4:30 pm PRESENTED BY: Tom Kraft, FAA CPDLC and ADS-C Data Link Mandates (and Incentives) FAA Airborne Data Link Recording

More information

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales 1 Single European Sky ATM Research (SESAR) - Objectives Enabling EU skies to handle 3 times

More information

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018 Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s

More information

AVIATION > ICAO NAT PBCS/2. Inmarsat Update. ICAO NAT PBCS Workshop/2 Paris June th, 2015 Presented by Andrew Ives

AVIATION > ICAO NAT PBCS/2. Inmarsat Update. ICAO NAT PBCS Workshop/2 Paris June th, 2015 Presented by Andrew Ives AVIATION > ICAO NAT PBCS/2 Inmarsat Update ICAO NAT PBCS Workshop/2 Paris June 17-19 th, 2015 Presented by Andrew Ives 01 AVIATION > ICAO NAT PBCS/2 Alphasat update Alphasat Update Background Alphasat,

More information

Air Traffic Management/Safety Services

Air Traffic Management/Safety Services Air Traffic Management/Safety Services David Coiley VP Aviation Steve Kong Technical Marketing and Business Development Manager The vision and the action Already: Flight tracking Now: SwiftBroadband -

More information

THE NEXT GENERATION OF AIRCRAFT DATA LINK. Presented by: Rockwell Collins Cedar Rapids, Iowa 52498

THE NEXT GENERATION OF AIRCRAFT DATA LINK. Presented by: Rockwell Collins Cedar Rapids, Iowa 52498 THE NEXT GENERATION OF AIRCRAFT DATA LINK Presented by: Rockwell Collins Cedar Rapids, Iowa 52498 TABLE OF CONTENTS Introduction..........................................................................................1

More information

The benefits of satcom to airlines. Prepared by Helios for

The benefits of satcom to airlines. Prepared by Helios for The benefits of satcom to airlines Prepared by Helios for contents INTRODUCTION 3...What is satcom? 4..the evolution of satcom Atc benefits 5.benefits from datalink applications in oceanic ATC 6.SATCOM

More information

Aeronautical Communications: Changes Ahead - FCI

Aeronautical Communications: Changes Ahead - FCI Aeronautical Communications: Changes Ahead - FCI Aviation Electronics Europe Munich, Germany 25-26 March 2015 Nikos Fistas EUROCONTROL v 1.0 Agenda Current Status Future Communication Infrastructure (FCI)

More information

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services concept Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services 2 Why do we need Centralised Services? Europe needs to be competitive again! a

More information

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten NAV CANADA and DATA LINK IMPLEMENTATION Shelley Bailey NAV CANADA May 2016 Sint Maarten OPDWLG Operational Data Link Working Group 5 members here today representing ANSPs, manufacturers and regulators

More information

CONVERTING AN AIRLINE TO CPDLC (AIR EUROPA EXPERIENCE)

CONVERTING AN AIRLINE TO CPDLC (AIR EUROPA EXPERIENCE) CONVERTING AN AIRLINE TO CPDLC (AIR EUROPA EXPERIENCE) 1 Cpt. Apple Tree Cpt. Cherry Tree AEA is a very "Fruitful" Airline!! 2 3 Air Europa Founded in 1986 Headquarters in Mallorca (Spain) 80% Sheduled,

More information

ICAO NAM/CAR/SAM ATS Data Link Implementation Workshop

ICAO NAM/CAR/SAM ATS Data Link Implementation Workshop ICAO NAM/CAR/SAM ATS Data Link Implementation Workshop Manny Góngora St. Maarten, 18-21 April 2016 NextGen Data Comm 2 Aircraft Communications and Reporting System 3 GLOBALink/VHF Statistics: In the beginning

More information

Mandates. Airbus Fleet Implementations. AEEC 19 th June 2018

Mandates. Airbus Fleet Implementations. AEEC 19 th June 2018 Mandates Airbus Fleet Implementations AEEC 19 th June 2018 Roadmap of operational mandates DATA-LINK NAT-SPG EC EC 20% ELT ADS-B EC HUD 50% 10% 100% A/C Tracking GADSS* Recording Mandates Operationnal

More information

Benefits of CNS/ATM Implementation for the Region

Benefits of CNS/ATM Implementation for the Region Benefits of CNS/ATM Implementation for the Region IATA today www.iata.org 227 Airline Members from 143 countries accounting for 94% of total international traffic 200 partners Representation in 90 countries

More information

Next Generation Airspace Developments: Key Operational Trends and Enablers

Next Generation Airspace Developments: Key Operational Trends and Enablers Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory

More information

Place image here (10 x 3.5 ) FAA NEXTGEN DATA COMM TOWER SERVICE: CPDLC DCL NEW OPERATOR INTRODUCTION HARRIS.COM #HARRISCORP

Place image here (10 x 3.5 ) FAA NEXTGEN DATA COMM TOWER SERVICE: CPDLC DCL NEW OPERATOR INTRODUCTION HARRIS.COM #HARRISCORP Place image here (10 x 3.5 ) FAA NEXTGEN DATA COMM TOWER SERVICE: CPDLC DCL NEW OPERATOR INTRODUCTION HARRIS.COM #HARRISCORP Agenda Data Comm Basics Benefits of Data Comm Departure Clearance Explanation

More information

ATC automation: facts and steps ahead

ATC automation: facts and steps ahead ATC automation: facts and steps ahead Objectives Context Stating the problem Current solution Steps ahead Implementation constraints ATC automation: facts and steps ahead Objectives Understand why ATC

More information

Iris Information Event October Overview of SESAR P. Tavernise

Iris Information Event October Overview of SESAR P. Tavernise Iris Information Event 10-11 October 2011 Overview of SESAR P. Tavernise WHY SESAR? EUROPEAN CHALLENGES: Capacity: Air Traffic to double by 2030 Safety: Improvements linked to growth Environment: Growth

More information

Data Link Checklist. As of: 9/10/2017 1

Data Link Checklist. As of: 9/10/2017 1 CPDLC Preflight Setup 1. Ensure you have the following documents in paper form, EFB, or ipad: a. ICAO Global Operational Data Link Document (GOLD) b. GAC OMS-4 2. Review latest ICAO NAT Bulletins 3. Verify

More information

COMMUNICATIONS PANEL (CP) WORKING GROUP I (WG-I) IPS over VDLm2 Feasibility Demonstration. CP WGI 19/IP January 2016

COMMUNICATIONS PANEL (CP) WORKING GROUP I (WG-I) IPS over VDLm2 Feasibility Demonstration. CP WGI 19/IP January 2016 International Civil Aviation Organization INFORMATION PAPER CP WGI 19/-01 20-22 January 2016 COMMUNICATIONS PANEL (CP) WORKING GROUP I (WG-I) Montreal, QC Canada 20-22 January 2016 Agenda Item 4: Completion/evolution

More information

SESAR AEROMACS PROJECTS P9.16 New Communication Technology at Airport P Airport Surface Datalink

SESAR AEROMACS PROJECTS P9.16 New Communication Technology at Airport P Airport Surface Datalink SESAR AEROMACS PROJECTS P9.16 New Communication Technology at Airport P15.02.07 Airport Surface Datalink AERONAUTICAL COMMUNICATIONS PANEL (ACP) 6th Meeting of the Working Group S (Surface) Sendai, Japan

More information

PBCS Flight Plan RCP RSP Codes

PBCS Flight Plan RCP RSP Codes Session 3 - Performance-based Communication and Surveillance (PBCS) PBCS Flight Plan RCP RSP Codes Presented to: (Accra, Ghana) By: Tom Kraft, FAA tom.kraft@faa.gov Date: 8 12 August 2016 Flight Plan RCP

More information

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY DGCA/06-IP/41 17/3/06 English only DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY Montréal, 20 to 22 March 2006 Theme 2: Improving aviation safety Topic 2.2: Management

More information

[EFFECTIVE DATE: 23 AUG 2012]

[EFFECTIVE DATE: 23 AUG 2012] AIRAC AIP SUPPLEMENT TEL: 91-11-24632950 Extn: 2219/2233 AFS : VIDDYXAX FAX : 91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN

More information

Review History of ADS-B Study and Implementation Task Force and ADS- B related developments by AN Conf/11 and APANPIRG -Presented by Secretariat

Review History of ADS-B Study and Implementation Task Force and ADS- B related developments by AN Conf/11 and APANPIRG -Presented by Secretariat Review History of ADS-B Study and Implementation Task Force and ADS- B related developments by AN Conf/11 and APANPIRG -Presented by Secretariat Bangkok, Thailand, 21-22 March 2005 - Slide 1 Contents of

More information

OVERVIEW OF THE FAA ADS-B LINK DECISION

OVERVIEW OF THE FAA ADS-B LINK DECISION June 7, 2002 OVERVIEW OF THE FAA ADS-B LINK DECISION Summary This paper presents an overview of the FAA decision on the ADS-B link architecture for use in the National Airspace System and discusses the

More information

THIRTEENTH AIR NAVIGATION CONFERENCE

THIRTEENTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization WORKING PAPER AN-Conf/13-WP/197 1 26/9/18 (Information Paper) English and Chinese only THIRTEENTH AIR NAVIGATION CONFERENCE Montréal, Canada, 9 to 19 October 2018

More information

Performance Metrics for Oceanic Air Traffic Management. Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team

Performance Metrics for Oceanic Air Traffic Management. Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team Performance Metrics for Oceanic Air Traffic Management Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team Agenda Metrics Team Michele Merkle, FAA AUA-600 Lynne Hamrick,

More information

Annex/FANS 17. ADS/CPDLC Report EUR/SAM Corridor: Index. Systems Direction Navigation and Surveillance Division. 2. Traffic Data Summary

Annex/FANS 17. ADS/CPDLC Report EUR/SAM Corridor: Index. Systems Direction Navigation and Surveillance Division. 2. Traffic Data Summary Annex/FANS 17 ADS/CPDLC Report EUR/SAM Corridor: 2017 Systems Direction Navigation and Surveillance Division Index 2. Traffic Data Summary 3. Airlines Aircraft types 4. CRM 2017 results 5. Conclusions

More information

Implementation Status

Implementation Status ADS-C Technical aspects and Implementation Status ICAO Seminar on the Implementation of Aeronautical Surveillance and Automation Systems in the SAM Region San Carlos de Bariloche, Argentina, 6 to 8 December

More information

Status of SESAR. Iris Public Event 04/02/2013 Peter Hotham (SESAR JU)

Status of SESAR. Iris Public Event 04/02/2013 Peter Hotham (SESAR JU) Status of SESAR Iris Public Event 04/02/2013 Peter Hotham (SESAR JU) Activating Deployment Set up a binding framework at EU level ATM Master plan Guidance Material & Common Projects With which instruments?

More information

Data link Implementation in Singapore FIR Kwek Chin Lin

Data link Implementation in Singapore FIR Kwek Chin Lin Data link Implementation in Singapore FIR Kwek Chin Lin Operational Data Link Seminar 2-4 May 2016 Scope Brief introduction to CAAS and Singapore FIR LORADS III ATM system History of data link in Singapore

More information

ASPASIA Project. ASPASIA Overall Summary. ASPASIA Project

ASPASIA Project. ASPASIA Overall Summary. ASPASIA Project ASPASIA Project ASPASIA Overall Summary ASPASIA Project ASPASIA Project ASPASIA (Aeronautical Surveillance and Planning by Advanced ) is an international project co-funded by the European Commission within

More information

Sixth Meeting of CNS/MET Sub-Group of APANPIRG. Bangkok, Thailand, July 2002 SITA ENHANCED GROUND TO AIR (EGTA) VOICE SERVICE

Sixth Meeting of CNS/MET Sub-Group of APANPIRG. Bangkok, Thailand, July 2002 SITA ENHANCED GROUND TO AIR (EGTA) VOICE SERVICE International Civil Aviation Organization CNS/MET/SG/6-IP/42 Sixth Meeting of CNS/MET Sub-Group of APANPIRG Bangkok, Thailand, 15 19 July 2002 Agenda Item 4: Air-ground Communications SITA ENHANCED GROUND

More information

Inmarsat Aviation Safety Services Update

Inmarsat Aviation Safety Services Update Inmarsat Aviation Safety Services Update ICAO NAT PBCS Workshop, Paris, 20-22 February 2013 Andrew Ives, Gary Colledge 1 System Capacity (logarithmic scale) Inmarsat Satellites & Aeronautical Services

More information

Boeing Air Traffic Service (ATS) Data Link Perspectives and Capabilities

Boeing Air Traffic Service (ATS) Data Link Perspectives and Capabilities Boeing Air Traffic Service (ATS) Data Link Perspectives and Capabilities Mike Matyas SAT FIT/11 June 2016 Export of this technology is controlled under the United States Export Administration Regulations

More information

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance

More information

2.6% /14 Forward Plan. 4.1 Traffic Outlook. Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015

2.6% /14 Forward Plan. 4.1 Traffic Outlook. Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015 4 2013/14 Forward Plan 2.6% Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015 4.1 Traffic Outlook Traffic levels continue to be affected by a combination of the fragile economic situation in the

More information

GOLD. Global Operational Data Link Document (GOLD) Implementation and Amendments. AFI CNS SG /4, Dakar, Senegal, July 2011

GOLD. Global Operational Data Link Document (GOLD) Implementation and Amendments. AFI CNS SG /4, Dakar, Senegal, July 2011 Global Operational Data Link Document () Implementation and Amendments AFI CNS SG /4, Dakar, Senegal, 25-29 July 2011 Presented by the Secretariat Overview Status About the Implementation considerations

More information

International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, July 2010

International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, July 2010 ATM/AIS/SAR/SG/20 IP/16 05-09/7/10 International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, 05 09 July 2010 Agenda Item 11: Any

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011) IP-5 INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE (Dakar, Senegal, 20 22nd July 2011) Agenda item: Presented by: Implementation of a African Regional Centralised Aeronautical

More information

COMMUNICATIONS PANEL. WG-I 20 Meeting

COMMUNICATIONS PANEL. WG-I 20 Meeting International Civil Aviation Organization CP/WG-I20/WP-04 29/02/2016 WORKING PAPER COMMUNICATIONS PANEL WG-I 20 Meeting Montreal, Canada 29 Feb 4 Mar, 2016 Agenda Item xx: Title: IP Environment for UAS

More information

Boeing Air Traffic Management Overview and Status

Boeing Air Traffic Management Overview and Status Boeing Air Traffic Management Overview and Status ENRI International Workshop on ATM/CNS EIWAC 2010 November 10-15, 2010 Tokyo, Japan Matt Harris Avionics Air Traffic Management Boeing Commercial Airplanes

More information

FAA GBAS Program Update January 29, 2010

FAA GBAS Program Update January 29, 2010 US-India Aviation Cooperation Program FAA GBAS Program Update January 29, 2010 Carlos A. Rodriguez FAA GBAS Program Manager Major milestone completed in the history of the FAA GBAS program FAA completed

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations

More information

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge ETSO Workshop 2008 New Developments in Avionic Friedhelm Runge Parts & Appliances Avionics PCM Dec. 2008 P&A section 1 Overview Single European Sky Communication Datalink 8.33 khz VHF Navigation ICAO PBN

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

SESAR Solutions. Display Options

SESAR Solutions. Display Options SESAR Solutions Outputs from the SESAR Programme R&I activities which relate to an Operational Improvement (OI) step or a small group of OI steps and its/their associated enablers, which have been designed,

More information

MID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec Status of implementation of CNS/ATM Systems in the MID Region

MID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec Status of implementation of CNS/ATM Systems in the MID Region MID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec. 2005 Status of implementation of CNS/ATM Systems in the MID Region Mohamed Smaoui RO/AIS/MAP, ICAO MID Office, Cairo Contents

More information

Global ATM System ~Interoperability and Harmonization ~

Global ATM System ~Interoperability and Harmonization ~ SIP/2009-WP/7 Business case Global ATM System ~Interoperability and Harmonization ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case

More information

U.S. Domestic CPDLC Flight and Route Planning Guide

U.S. Domestic CPDLC Flight and Route Planning Guide U.S. Domestic CPDLC Flight and Route Planning Guide Data Communications Integrated Services (DCIS) Harris Corporation TABLE OF CONTENTS Introduction... 3 Flight Planning Guidance... 3 ICAO FPL... 3 Field

More information

NextGen Trajectory-Based Operations Status Update Environmental Working Group Operations Standing Committee

NextGen Trajectory-Based Operations Status Update Environmental Working Group Operations Standing Committee NextGen Trajectory-Based Operations Status Update Environmental Working Group Operations Standing Committee May 17, 2010 Rose Ashford Rose.Ashford@nasa.gov 1 Outline Key Technical Concepts in TBO Current

More information

AVBUYER THIS MONTH. GAMA 2014 Year-End Shipment Analysis. Safety Focus: Keeping Pace with Technology. Aircraft Comparative Analysis - Bell 206B-3

AVBUYER THIS MONTH. GAMA 2014 Year-End Shipment Analysis. Safety Focus: Keeping Pace with Technology. Aircraft Comparative Analysis - Bell 206B-3 AVBUYER March 2015 B U S I N E S S A V I A T I O N I N T E L L I G E N C E THIS MONTH GAMA 2014 Year-End Shipment Analysis Safety Focus: Keeping Pace with Technology Aircraft Comparative Analysis - Bell

More information

ICAO provisions on data link implementation

ICAO provisions on data link implementation ICAO provisions on data link implementation Crystal Kim Technical Officer, Airspace Management and Optimization Section Secretary of Operational Data Link Working Group (OPDLWG) and Air Traffic Management

More information

French DSNA approach to CNS rationalization & evolution

French DSNA approach to CNS rationalization & evolution French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single

More information

Twenty First Meeting of the Africa-Indian Ocean Planning and Implementation Regional Group (APIRG/21) (Nairobi, Kenya, 9 11 October 2017)

Twenty First Meeting of the Africa-Indian Ocean Planning and Implementation Regional Group (APIRG/21) (Nairobi, Kenya, 9 11 October 2017) Twenty First Meeting of the Africa-Indian Ocean Planning and Implementation Regional Group (APIRG/21) (Nairobi, Kenya, 9 11 October 2017) Agenda Item 3: Performance Framework for Regional Air Navigation

More information

Data Link Deep Dive. Brandon Burton

Data Link Deep Dive. Brandon Burton Data Link Deep Dive Brandon Burton www.mygdc.com Overview of Data Link FANS 1/A Data Link ATN Data Link (PM-CPDLC) Automatic Dependent Surveillance Operational Capabilities FANS 1/A Datalink AFN Logon

More information

FALCON SERVICE ADVISORY

FALCON SERVICE ADVISORY Falcon Pro Line 21: Overview, List of Features and Improvements Jul 29, 2016 Classification: Maint&Ops F10 F20 F200 F50 F900 F2000 F7 - -5 - E A/B C E EASy D L - E EASy D L S LS REASON EECUTIVE SUMMARY

More information

The Economics of ANSPs

The Economics of ANSPs The Economics of ANSPs Alexander ter Kuile - Secretary General Tegucigalpa - September 2002 Presentation Content Introducing CANSO ANSP Costs ANSP Revenues Our Message to the Audience Introducing CANSO

More information

Performance monitoring report 2017/18

Performance monitoring report 2017/18 Performance monitoring report /18 Gatwick Airport Limited 1. Introduction Date of issue: 20 July 2018 This report provides an update on performance at Gatwick in the financial year /18, ending 31 March

More information

ACARS: Timeless tech for the connected aircraft age

ACARS: Timeless tech for the connected aircraft age ACARS: Timeless tech for the connected aircraft age Since 1978, ACARS the Aircraft Communications Addressing and Reporting System has been an invaluable primary aircraft data messaging system for airlines,

More information

OVERVIEW OF ADS-B COST BENEFIT STUDY

OVERVIEW OF ADS-B COST BENEFIT STUDY ADS-B Workshop SP/15 The Global Voice of ATM OVERVIEW OF ADS-B COST BENEFIT STUDY Presentation Outline Background & Objectives Project Scope Study Assumptions Traffic Forecast & Aircraft Equipage Benefits

More information

Dual Use of Commercial Avionics Data Links for the U. S. Air Force

Dual Use of Commercial Avionics Data Links for the U. S. Air Force Dual Use of Commercial Avionics Data Links for the U. S. Air Force Mary M. Girard, Richard F. Brady The MITRE Corporation Center for Air Force C2 Systems Bedford, Massachusetts Capt. Stephen W. Hill United

More information

(Presented by the United States)

(Presented by the United States) International Civil Aviation Organization 31/07/09 North American, Central American and Caribbean Office (NACC) Tenth Meeting of Directors of Civil Aviation of the Central Caribbean (C/CAR/DCA/10) Grand

More information

Problem Reporting and System Performance Analysis

Problem Reporting and System Performance Analysis Problem Reporting and System Performance Analysis (ICAO Seminar/workshop on the implementation of Ground Ground and Ground Air data link in the SAM Region) Lima, Peru 10-12 September 2012 Post Implementation

More information

NEW FPL Transition Phase & Implementation Stages

NEW FPL Transition Phase & Implementation Stages International Civil Aviation Organization NEW FPL 2012 Transition Phase & Implementation Stages Victor Hernandez RO ATM/SAR New FPL implementation & Switchover Review the New FPL Strategy & Implementation

More information

Summary. Filename: IDOC Created: July 24, 2012 Modified: May 6, 2013

Summary. Filename: IDOC Created: July 24, 2012 Modified: May 6, 2013 Commercial Systems 400 Collins Road NE Cedar Rapids, IA 52498 Tel.319.295.5000 Fax 319.295.5064 Title: Rockwell Collins Data Link Graphical Weather Services, Single & Dual FANS, ARINC 702A AOC Messaging

More information

THIS MONTH. Aircraft Finance Review Engine-Maintenance Management Aircraft Comparative Analysis Phenom 300 Safety Focus: When No is Necessary

THIS MONTH. Aircraft Finance Review Engine-Maintenance Management Aircraft Comparative Analysis Phenom 300 Safety Focus: When No is Necessary AVBUYER February 2015 B U S I N E S S A V I A T I O N I N T E L L I G E N C E proudly presents 2014 Gulfstream G650 Serial Number 6088 See pages 32-35 for further details THIS MONTH Aircraft Finance Review

More information

January 2018 Air Traffic Activity Summary

January 2018 Air Traffic Activity Summary January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279

More information

AIR GROUND DATA LINK IN SOUTH ATLANTIC REGION. NAM/ CAR/ SAM ATS DATALINK IMPLEMENTATION WORKSHOP (Philisburg, Sint Maarten, April 2016)

AIR GROUND DATA LINK IN SOUTH ATLANTIC REGION. NAM/ CAR/ SAM ATS DATALINK IMPLEMENTATION WORKSHOP (Philisburg, Sint Maarten, April 2016) AIR GROUND DATA LINK IN SOUTH ATLANTIC REGION NAM/ CAR/ SAM ATS DATALINK IMPLEMENTATION WORKSHOP (Philisburg, Sint Maarten, 18 21 April 2016) CONTENTS BACKGROUND SAT FANS 1/A INTEROPERABILITY TEAM FANS

More information

Aircraft Systems and 4D Trajectory Management

Aircraft Systems and 4D Trajectory Management Aircraft Systems and 4D Trajectory Management September 2012 David De Smedt EUROCONTROL 1 i4d concept (SESAR) Share and synchronise airborne and ground trajectory Flying to time constraints to optimize

More information

OPERATIONS CIRCULAR. Subject: Performance Based Communication and Surveillance (PBCS) OC NO 01 of 2018 Date: 23 rd March 2018

OPERATIONS CIRCULAR. Subject: Performance Based Communication and Surveillance (PBCS) OC NO 01 of 2018 Date: 23 rd March 2018 GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 01 of 2018 Date: 23 rd March 2018 OPERATIONS CIRCULAR File No AV 22024/02/2018-FS Subject: Performance Based Communication

More information

CNS/ATM Systems Interoperability and Harmonization

CNS/ATM Systems Interoperability and Harmonization SIP/2004-WP18 Business case Special Implementation Project CNS/ATM Systems Interoperability and Harmonization (Presented by H.V.SUDARSHAN) Workshop on the development of business case for the implementation

More information

Pat Reines Avionics Support for GBAS and Performance Based Navigation (PBN)

Pat Reines Avionics Support for GBAS and Performance Based Navigation (PBN) Pat Reines (pat.reines@honeywell.com)) Avionics Support for GBAS and Performance Based Navigation (PBN) Honeywell.com 26 ILS Approaches = 26 Localizers and Glide Slopes 2 Honeywell.com 26 ILS Approaches

More information

AERONAUTICAL INFORMATION CIRCULAR 33/17

AERONAUTICAL INFORMATION CIRCULAR 33/17 NAV CANADA 07 DEC 17 AERONAUTICAL INFORMATION CIRCULAR 33/17 Introduction NOTICE OF PLANNED EXPANSION OF THE TRIAL IMPLEMENTATION OF 25 NAUTICAL MILE LATERAL SEPARATION MINIMUM IN THE INTERNATIONAL CIVIL

More information

CPDLC-DCL U.S. Airports

CPDLC-DCL U.S. Airports CPDLC-DCL U.S. Airports Data Link Clearance Services December 1, 2016 Prepared by Christian Renneissen 2015 Rockwell 2015 Collins. Rockwell Collins. DCL - Data Link Clearance Service The Departure Clearance

More information

FALCON ELITE II Make the most out of your Primus 2000 flight deck For Falcon 900EX and Falcon 900C aircraft

FALCON ELITE II Make the most out of your Primus 2000 flight deck For Falcon 900EX and Falcon 900C aircraft Falcon Elite II Make the most out of your Primus 2000 flight deck FALCON ELITE II Make the most out of your Primus 2000 flight deck For Falcon 900EX and Falcon 900C aircraft FALCON Elite II Make the most

More information

The NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.

The NAT OPS Bulletin Checklist is available at  & NAT Documents, NAT Documents, then NAT Ops Bulletins. Serial Number: 2017_003 Subject: RLatSM Phase 2 AIC Originator: NAT SPG Issued: 15 December 2017 Effective: 15 December 2017 The purpose of North Atlantic Operations Bulletin 2017-003 is to provide guidance

More information

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION Space Based ADS-B ICAO SAT meeting - June 2016 1 Options to Detect an Aircraft Position Position Accuracy / Update Interval Voice Position Reporting ADS-C Position Reporting Radar Surveillance / MLAT Space

More information

THIS INFORMATION IS EMBRAER PROPERTY AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTEN AUTORIZATION.

THIS INFORMATION IS EMBRAER PROPERTY AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTEN AUTORIZATION. CNS / ATM CNS / ATM Agenda Introduction Roadmaps PBN LPV ADSB CPDLC Next Steps CNS / ATM Agenda Introduction Roadmaps PBN LPV ADSB CPDLC Next Steps Introduction Communication Navigation Surveillance /

More information

EUROCONTROL General Presentation

EUROCONTROL General Presentation EUROCONTROL General Presentation Luc Tytgat, Director DSS EUROCONTROL The European Organisation for the Safety of Air Navigation One day s traffic General Presentation 2 ATM Today Air Transport Air Navigation

More information

SESAR CONCEPT DEVELOPMENT: AN ANSP CASE STUDY. Owen DAVIES Brussels Representative Department of International Affairs, NATS

SESAR CONCEPT DEVELOPMENT: AN ANSP CASE STUDY. Owen DAVIES Brussels Representative Department of International Affairs, NATS SESAR CONCEPT DEVELOPMENT: AN ANSP CASE STUDY Owen DAVIES Brussels Representative Department of International Affairs, NATS Content of Presentation Introduction Overview of NATS involvement in SESAR Beyond

More information

Data Link Operation and PBCS Implementation in Japan

Data Link Operation and PBCS Implementation in Japan Ministry of Land Infrastructure Transport and Tourism CIVIL AVATION BUREAU OFJAPAN Data Link Operation and PBCS Implementation in Japan 17-19, June Paris. France Second PBCS Workshop Ministry of Land,

More information

The D-AIM Project and Trials. Roger Li, D-AIM Project Manager LFV AIXM/WXXM Conference Washington DC, May 13, 2009

The D-AIM Project and Trials. Roger Li, D-AIM Project Manager LFV AIXM/WXXM Conference Washington DC, May 13, 2009 The D-AIM Project and Trials Roger Li, D-AIM Project Manager LFV AIXM/WXXM Conference Washington DC, May 13, 2009 D-AIM Background Cooperation between LFV (Swedish Airports and Air Navigation Services)

More information

AeroMACS. Why it is important for aviation. AeroMACS Open Day Firenze, 06/07/2018 Nikos Fistas and Víctor Flores EUROCONTROL

AeroMACS. Why it is important for aviation. AeroMACS Open Day Firenze, 06/07/2018 Nikos Fistas and Víctor Flores EUROCONTROL AeroMACS Why it is important for aviation AeroMACS Open Day Firenze, 06/07/2018 Nikos Fistas and Víctor Flores EUROCONTROL Introduction Context Standards Current Developments Benefits 2 Aeronautical Mobile

More information

ADS-B via Low Earth Orbiting Satellites Benefits Assessment

ADS-B via Low Earth Orbiting Satellites Benefits Assessment ADS-B via Low Earth Orbiting Satellites Benefits Assessment Jeff Dawson Director, Operational Support NAM/CAR ANI/WG/1 July 2013 Aireon LLC is a joint venture between NAV CANADA and Iridium to finance,

More information