Aircraft Systems and 4D Trajectory Management

Size: px
Start display at page:

Download "Aircraft Systems and 4D Trajectory Management"

Transcription

1 Aircraft Systems and 4D Trajectory Management September 2012 David De Smedt EUROCONTROL 1

2 i4d concept (SESAR) Share and synchronise airborne and ground trajectory Flying to time constraints to optimize sequences as defined by ATC 2

3 RTA example 3

4 Avionics Requirements for i4d EUROCAE WG85 / SC227, defining the worldwide standard for aircraft requirements on RNP & 4D Navigation Annex to DO-236B / ED-75B Minimum Aviation System Performance Standards (MASPS) EUROCAE WG78 / RTCA SC214 defining the worldwide standard for Advanced ATS Data Communication OSED Operational Services & Environment Definition INTEROP - Interoperability Requirements Standard SPR - Safety and Performance Requirements OSA - Operational Safety Assessment 4

5 Current requirements for ETA ETA = Estimate Time or Arrival ETA is an optional functionality (but required for RTA) ETA shall be available for each point in the flight plan ETA computation updated periodically and at any flight plan or forecast change Note: no definition of periodically Maximum error of ETA at a fix shall be less than 1% of the time of flight remaining to that fix, for the entered conditions and flight plan. Note: means perfect conditions (no forecast errors) ETA display resolution: 1 minute 5

6 ETA error example ETA error versus time to go 300 ETA error (seconds) Time to go (min.) ETA error DO-236B requirement (no meteo error) ETA error (10kts wind error, average Groundspeed 300kts) 6

7 Current requirements for RTA Optional functionality Accuracy +/- 30 seconds, 95% of the time Note: 95% undefined At least 1 RTA point in the flight plan (single flight plan fix), either on ground or flight Available climb, cruise and descent RTA entry and display resolution: 0.1 minute Time source synchronized with UTC is required (preferred that equipment is synchronised to UTC from external sources, such as GPS) Availability determined solely by the flight time to go to the RTA fix and aircraft performance 7

8 New proposed ETA/RTA requirements After initial ETA calculation, the system shall refresh the ETA calculation at least once every 60 seconds If time constraint is within the corresponding ETA min/max interval at the time of entry, the system shall be able to meet the required time of arrival with a 95% accuracy of : 30 seconds for en-route operations; 10 seconds for arrival operations in the terminal area Standard meteorological uncertainty Wind error < 10kts with 95% probability Temp. error < 2kts with 95% probability The system shall be able to compute an ETA min/max interval for any fix of the flight plan. 8

9 Example of ETA min/max function ETAmin-max (FL ft, initially 250NM, M0.75/282/250kts) Time (min.) Time to Go (min.) ETA max real ETA max reliable ETA ETA min reliable ETA min real 9

10 New proposed ETA/RTA requirements Accuracy requirement is expected to be met when a time constraint is combined with AT OR BELOW speed constraint(s) Display resolution of RTA, ETA at RTA waypoint and ETA min/max: 1 second Display resolution of ETA at all other fixes: 1 minute Control function shall give priority to the guidance to altitude and speed constraints compared to the control of the time constraint. Update of acceptable means of compliance to demonstrate the ETA accuracy and the Time of Arrival Control performance 10

11 Future datalink requirements Safety and Performance Requirements (SPR version I): ADS-C ATN downlink of airborne trajectory via Extended Predicted Profile (EPP) Sequence of (pseudo-) waypoints including: Latitude longitude, Fix, Level, Time, Speed, Level constraint value, RTA, Speed restriction value General data (A/C gross mass, speed schedule) ADS-C contract can be on demand, periodic or event based (EPP event type and EPP change parameters) ADS-C contract to downlink ETA min ETA max ADS-C contract to downlink meteo data New CPDLC messages CROSS [position] AT [RTAtimesec] CLEARED TO [position] VIA [routeclearanceenhanced] 11

12 CASSIS RTA Flight Trials (2009) 12

13 Current RTA capability RTA capability is today available on: Airbus aircraft with 2 nd generation FMS (Honeywell Pegasus or Thales-GE) Boeing B737NG (software U7.1 or later) Boeing B757/767 with Honeywell Pegasus FMS Boeing B777 Boeing with FANS 1A (s/w load 15) MD-90 / MD-11 with Honeywell Pegasus FMS RTA currently not available on any other aircraft types (regional, general aviation) 13

14 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% IATA EUROCONTROL Avionics Survey Available Planned Not Available FANS 1/A HFDL Headup Display (HUD) ATN - VDL Mode 2 Electronic Flight Bag (EFB) FMS WPR ADS-C FANS 1/A SatCom FANS 1/A - ACARS VDL Mode A 14 Other Multi-Function Display (MFD) fitted RNP AR Approach ADS-B OUT Fixed Radius Transition (FRT) APV Baro VNAV (LNAV - VNAV) Required Time of Arrival (RTA) ARINC 623 RNP Approach (LNAV) 8kHz33 VHF radios Fixed Radius Turn (RF) Multi Mode Receiver - MMR RNAV 10 GNSS MODE S ACARS RNAV 1 / P-RNAV RNAV 5 INS - IRS DME - DME position update Autothrust (A-THR) Autopilot - Flight Director VNAV EFIS Autopilot - Flight Director LNAV FMS Enhanced Vision System (EVS) LPV SBAS FANS 1/A - VDL Mode 2 GBAS Degree of Equipage

15 SESAR WP 9.1 Flight Test and Simulations i4d real Flight Trial Feb 2012: RTA + datalink tested MUAC and NORACON coupled (with Airbus cockpit) and non-coupled simulations with mixed traffic MUAC observations (March 2012): Datalink (ADS-C) very useful RTA increased workload of controllers uncertainty related to speed changes in RTA mode Mixed mode difficult to handle 15

16 Questions 16

Next Generation Airspace Developments: Key Operational Trends and Enablers

Next Generation Airspace Developments: Key Operational Trends and Enablers Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory

More information

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales 1 Single European Sky ATM Research (SESAR) - Objectives Enabling EU skies to handle 3 times

More information

Avionics requirements for State aircraft

Avionics requirements for State aircraft Avionics requirements for State aircraft EUROCONTROL has prepared a short summary offering an overview of a significant series of avionics requirements and their applicability to State aircraft. Although

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

THIS INFORMATION IS EMBRAER PROPERTY AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTEN AUTORIZATION.

THIS INFORMATION IS EMBRAER PROPERTY AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTEN AUTORIZATION. CNS / ATM CNS / ATM Agenda Introduction Roadmaps PBN LPV ADSB CPDLC Next Steps CNS / ATM Agenda Introduction Roadmaps PBN LPV ADSB CPDLC Next Steps Introduction Communication Navigation Surveillance /

More information

The Flight Trajectory: AnAirborne Perspective with ATM in mind

The Flight Trajectory: AnAirborne Perspective with ATM in mind The Flight Trajectory: AnAirborne Perspective with ATM in mind Miguel Vilaplana Boeing Research & Technology Europe COURSE 102: RESEARCH IN DECISION SUPPORT SYSTEMS FOR FUTURE AIR TRAFFIC MANAGEMENT La

More information

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning Purpose: Release 5 SESAR Solution ID #109 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution with a summary of the results stemming

More information

What you should know: Future Air Navigation System (FANS)

What you should know: Future Air Navigation System (FANS) WHITE PAPER What you should know: Future Air Navigation System (FANS) STC Program for Challenger 601-3A/R FANS 1/A+ STC includes CPDLC, ADS-C and provisioning for ADS-B and Link 2000+ WORLD S MOST EXPERIENCED

More information

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING PBN Airspace Design Workshop Area Navigation Asia and Pacific Regional Sub-Office Beijing, China 5 May 2016 Page 1 APAC RSO BEIJING Learning Objectives By the end of this presentation, you will be: Aware

More information

Contextual note SESAR Solution description form for deployment planning

Contextual note SESAR Solution description form for deployment planning Purpose: Release 4 SESAR Solution #51 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as sufficient

More information

DIGITS - Demonstration of Air Traffic Management Improvements generated by initial Trajectory Sharing

DIGITS - Demonstration of Air Traffic Management Improvements generated by initial Trajectory Sharing Tom MAIER Airbus Commercial Aircraft Air Traffic Management Engineering EYIBE -AU Technical Coordinator - Demonstration of Air Traffic Management Improvements generated by initial Trajectory Sharing Demonstration

More information

ATC Datalink on Boeing Airplanes

ATC Datalink on Boeing Airplanes ATC Datalink on Boeing Airplanes NAT PBCS Workshop February 2013 Gordon Sandell COPYRIGHT 2013 BOEING. ALL RIGHTS RESERVED introduced on 747-400 in 1995 Now available as standard or optional on all recent

More information

AMAN RESEARCH IN SESAR

AMAN RESEARCH IN SESAR AMAN RESEARCH IN SESAR CCA939 TAP842 AZA1480 BPA1713 Arrival MANager (AMAN) Advisories to ground in complex cross border AMAN: Time To Lose/Time To Gain (TTL/TTG) Speed Use of new avionics capabilities:

More information

Electronic visibility via ADS-B for small aircraft. John Korna, NATS

Electronic visibility via ADS-B for small aircraft. John Korna, NATS Electronic visibility via ADS-B for small aircraft John Korna, NATS The SESAR General Aviation challenge SESAR is predominantly aimed at scheduled commercial air traffic and 100M+ airframes How is SESAR

More information

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20. TELEPHONE: 1300-306-630 (local call - Aust wide, except from mobile phone) FAX: 02 6268 5111 1. INTRODUCTION 1.1 This AIP SUP amends AIP to remove navigation approvals that are no longer able to be used

More information

PBN Operational Approval Continental En Route Navigation Specifications

PBN Operational Approval Continental En Route Navigation Specifications PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation

More information

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

V3 INTEROP. Abstract. Document information

V3 INTEROP. Abstract. Document information V3 INTEROP Document information Project Title Approach Procedure with Vertical Guidance (APV) Project Number 05.06.03 Project Manager NATS Deliverable Name V3 INTEROP Deliverable ID D41 Edition 00.01.01

More information

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

Avionics requirements for State aircraft

Avionics requirements for State aircraft Avionics requirements for State aircraft EUROCONTROL has prepared a short summary offering an overview of a significant series of avionics requirements and their applicability to State aircraft. Although

More information

NEW FPL Transition Phase & Implementation Stages

NEW FPL Transition Phase & Implementation Stages International Civil Aviation Organization NEW FPL 2012 Transition Phase & Implementation Stages Victor Hernandez RO ATM/SAR New FPL implementation & Switchover Review the New FPL Strategy & Implementation

More information

Approach Specifications

Approach Specifications Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the

More information

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 New generation aircraft in the instrument approach domain Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 Agenda Video A little bit of history Today s situation A350 XWB solutions for final approaches

More information

Organización de Aviación Civil Internacional. Международная организация гражданской авиации. Ref.: AN 13/2.5-13/85 13 December 2013

Organización de Aviación Civil Internacional. Международная организация гражданской авиации. Ref.: AN 13/2.5-13/85 13 December 2013 International Civil Aviation Organization Organisation de l aviation civile internationale Organización de Aviación Civil Internacional Международная организация гражданской авиации Tel.: +1 (514) 954-6711

More information

Título ponencia: Introduction to the PBN concept

Título ponencia: Introduction to the PBN concept Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based

More information

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge ETSO Workshop 2008 New Developments in Avionic Friedhelm Runge Parts & Appliances Avionics PCM Dec. 2008 P&A section 1 Overview Single European Sky Communication Datalink 8.33 khz VHF Navigation ICAO PBN

More information

Trajectory Based Operations (TBO)

Trajectory Based Operations (TBO) Trajectory Based Operations (TBO) David Batchelor Head of International Affairs, SESAR Joint Undertaking Emerging Technologies Workshop ATC Global, Beijing, 12 September 2016 SESAR SINGLE EUROPEAN SKY

More information

NBAA IOC Oceanic Operations

NBAA IOC Oceanic Operations Oceanic Operations By: David Maloy, Operations AEA-220 NEXTGen Branch Date: So This Is Why They Paint A Centerline 2 NAT/HLA 27 o N 17 o N 3 Question 1 Approximately how many times a year does your company

More information

Avionics requirements for civil aircraft Edition January Civil aircraft Communications requirements

Avionics requirements for civil aircraft Edition January Civil aircraft Communications requirements Avionics requirements for civil aircraft Edition January 2015 Civil aircraft Communications requirements Domain Programme Area VHF Com 8.33 KHZ Equipment The probability of the loss of voice communication

More information

International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, July 2010

International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, July 2010 ATM/AIS/SAR/SG/20 IP/16 05-09/7/10 International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, 05 09 July 2010 Agenda Item 11: Any

More information

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation

More information

Airplane Navigation Capabilities

Airplane Navigation Capabilities Airplane Navigation Capabilities Increasing Operational Safety & Efficiency June 19, 2008 The statements contained herein are based on good faith assumptions and provided for general information purposes

More information

Flight management systems have evolved to a level of sophistication that helps flight crews fly commercial airplanes more safely and efficiently.

Flight management systems have evolved to a level of sophistication that helps flight crews fly commercial airplanes more safely and efficiently. Flight management systems have evolved to a level of sophistication that helps flight crews fly commercial airplanes more safely and efficiently. 20 Contribution of Flight Systems to Performance-Based

More information

Future Air Navigation System (FANS)

Future Air Navigation System (FANS) CLAY LACY AVIATION AVIONICS Future Air Navigation System (FANS) STC Program for Challenger 601-3A/R FANS STC includes CPDLC, ADS-C and provisioning for ADS-B and Link 2000+ 2015 MANAGEMENT CHARTER SALES

More information

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY DGCA/06-IP/41 17/3/06 English only DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY Montréal, 20 to 22 March 2006 Theme 2: Improving aviation safety Topic 2.2: Management

More information

Status of PBN implementation in France

Status of PBN implementation in France Status of PBN implementation in France PBN TF/4 Dec 2010 Benoit ROTURIER (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions

More information

SESAR Solutions. Display Options

SESAR Solutions. Display Options SESAR Solutions Outputs from the SESAR Programme R&I activities which relate to an Operational Improvement (OI) step or a small group of OI steps and its/their associated enablers, which have been designed,

More information

OPERATIONS CIRCULAR. Subject: Performance Based Communication and Surveillance (PBCS) OC NO 01 of 2018 Date: 23 rd March 2018

OPERATIONS CIRCULAR. Subject: Performance Based Communication and Surveillance (PBCS) OC NO 01 of 2018 Date: 23 rd March 2018 GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 01 of 2018 Date: 23 rd March 2018 OPERATIONS CIRCULAR File No AV 22024/02/2018-FS Subject: Performance Based Communication

More information

Boeing Air Traffic Management Overview and Status

Boeing Air Traffic Management Overview and Status Boeing Air Traffic Management Overview and Status ENRI International Workshop on ATM/CNS EIWAC 2010 November 10-15, 2010 Tokyo, Japan Matt Harris Avionics Air Traffic Management Boeing Commercial Airplanes

More information

SESAR AEROMACS PROJECTS P9.16 New Communication Technology at Airport P Airport Surface Datalink

SESAR AEROMACS PROJECTS P9.16 New Communication Technology at Airport P Airport Surface Datalink SESAR AEROMACS PROJECTS P9.16 New Communication Technology at Airport P15.02.07 Airport Surface Datalink AERONAUTICAL COMMUNICATIONS PANEL (ACP) 6th Meeting of the Working Group S (Surface) Sendai, Japan

More information

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014 Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme Cockpit Initiatives for ATM ATC Global 2014 Page 2 Cockpit Initiatives for ATM Airbus vision on ATM transformation Airbus position

More information

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11 Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. 24 equipping a Fleet for required Navigation Performance required navigation performance

More information

FALCON ELITE II Make the most out of your Primus 2000 flight deck For Falcon 900EX and Falcon 900C aircraft

FALCON ELITE II Make the most out of your Primus 2000 flight deck For Falcon 900EX and Falcon 900C aircraft Falcon Elite II Make the most out of your Primus 2000 flight deck FALCON ELITE II Make the most out of your Primus 2000 flight deck For Falcon 900EX and Falcon 900C aircraft FALCON Elite II Make the most

More information

Aeronautical Communications: Changes Ahead - FCI

Aeronautical Communications: Changes Ahead - FCI Aeronautical Communications: Changes Ahead - FCI Aviation Electronics Europe Munich, Germany 25-26 March 2015 Nikos Fistas EUROCONTROL v 1.0 Agenda Current Status Future Communication Infrastructure (FCI)

More information

A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System

A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System GANIS Montreal, December 2017 Paco Salabert, EUROCONTROL The European Organisation for the Safety of Air Navigation

More information

DRAFT. AND/OR one or more of the following to indicate the serviceable COM/NAV/approach aid equipment and capabilities:

DRAFT. AND/OR one or more of the following to indicate the serviceable COM/NAV/approach aid equipment and capabilities: AIP ENR 1.10 Amendment ITEM 10: EQUIPMENT AND CAPABILITIES Radio Communication, Navigation and Approach Aid Equipment and Capabilities INSERT one letter as follows: N if no COM/NAV/approach aid equipment

More information

ICAO Air Navigation Panels/Study Groups Work Programme

ICAO Air Navigation Panels/Study Groups Work Programme NPF/SIP/2010-WP/24 ICAO Air Navigation Panels/Study Groups Work Programme SAULO DA SILVA International Civil Aviation Organization Workshop on the development of National Performance Framework for Air

More information

Taking your Pro Line 21 Hawker into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR HAWKER

Taking your Pro Line 21 Hawker into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR HAWKER Taking your Pro Line 21 Hawker into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR HAWKER Pro Line 21 Hawker upgrades Baseline package includes the latest AFD software version 10.4 and FMS

More information

Challenges in Complex Procedure Design Validation

Challenges in Complex Procedure Design Validation Challenges in Complex Procedure Design Validation Frank Musmann, Aerodata AG ICAO Workshop Seminar Aug. 2016 Aerodata AG 1 Procedure Validation Any new or modified Instrument Flight Procedure is required

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications PBN Operational Approval Oceanic and Remote En Route Navigation Specifications Navigation Specifications Applicable to Oceanic/Remote RNAV 10 (RNP 10) RNP 4 RNP 2 A-RNP 2 Prior Guidance Material RNP 10

More information

Status of SESAR. Iris Public Event 04/02/2013 Peter Hotham (SESAR JU)

Status of SESAR. Iris Public Event 04/02/2013 Peter Hotham (SESAR JU) Status of SESAR Iris Public Event 04/02/2013 Peter Hotham (SESAR JU) Activating Deployment Set up a binding framework at EU level ATM Master plan Guidance Material & Common Projects With which instruments?

More information

A Pilot s perspective

A Pilot s perspective The Challenges of Modern Approaches, from NPA/PA to 2D/3D operations airborne perspective A Pilot s perspective Stefan Fiedler IFALPA, VC German Cockpit IFALPA Position on PBN (December 2014) IFALPA welcomes

More information

Flightplan form completion guide.

Flightplan form completion guide. Help using Flightplan Flightplan form completion guide. General instructions Adhere closely to the prescribed format Report hours in Universal Time Coordinated (UTC). Use the 24-hour clock (e.g. 1800,

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL MOBILITY AND TRANSPORT Ref. Ares(2013)362601-18/03/2013 EUROPEAN COMMISSION DIRECTORATE-GENERAL MOBILITY AND TRANSPORT Directorate E Aviation and International Transport Affairs E2 Single European Sky Brussels, 8 March 2013

More information

DSNA NAVIGATION STRATEGY

DSNA NAVIGATION STRATEGY DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,

More information

Implementation challenges for Flight Procedures

Implementation challenges for Flight Procedures Implementation challenges for Flight Procedures A Data-house perspective for comprehensive Procedure Design solution: A need today Sorin Onitiu Manager Business Affairs, Government & Military Aviation,

More information

Airbus Pegasus FMS for the Airbus A330 and A320 Series. Technical Summary

Airbus Pegasus FMS for the Airbus A330 and A320 Series. Technical Summary Airbus Pegasus FMS for the Airbus A330 and A320 Series Technical Summary TABLE OF CONTENTS Overview and System Description Honeywell Pegasus II FM Cardset Computer and LCD MCDU Airbus Pegasus FMS Software

More information

AVBUYER THIS MONTH. GAMA 2014 Year-End Shipment Analysis. Safety Focus: Keeping Pace with Technology. Aircraft Comparative Analysis - Bell 206B-3

AVBUYER THIS MONTH. GAMA 2014 Year-End Shipment Analysis. Safety Focus: Keeping Pace with Technology. Aircraft Comparative Analysis - Bell 206B-3 AVBUYER March 2015 B U S I N E S S A V I A T I O N I N T E L L I G E N C E THIS MONTH GAMA 2014 Year-End Shipment Analysis Safety Focus: Keeping Pace with Technology Aircraft Comparative Analysis - Bell

More information

Overview of NextGen Institute Project

Overview of NextGen Institute Project Overview of NextGen Institute Project Optimizing Aircraft Sequencing and Spacing in the Terminal Area Airspace to Increase Airport Capacity, Reduce Fuel Burn and Emissions, and Reduce Noise on Developed

More information

Initial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg

Initial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg Initial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg Feb 5, 2013 Background: Inmarsat Aviation Services With more than 11,000 aircraft relying on global in-flight connectivity from Inmarsat,

More information

The NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.

The NAT OPS Bulletin Checklist is available at  & NAT Documents, NAT Documents, then NAT Ops Bulletins. Serial Number: 2017_003 Subject: RLatSM Phase 2 AIC Originator: NAT SPG Issued: 15 December 2017 Effective: 15 December 2017 The purpose of North Atlantic Operations Bulletin 2017-003 is to provide guidance

More information

Taking your Pro Line 21 King Air into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR KING AIR

Taking your Pro Line 21 King Air into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR KING AIR Taking your Pro Line 21 King Air into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR KING AIR Pro Line 21 King Air upgrades Baseline package includes the latest AFD version 10.4 and FMS software

More information

Operator and Airport Enablers. Supplement to NextGen Investment for Operators and Airports, FAA s NextGen Implementation Plan, March 2012

Operator and Airport Enablers. Supplement to NextGen Investment for Operators and Airports, FAA s NextGen Implementation Plan, March 2012 Operator and Airport Enablers Supplement to NextGen Investment for Operators and Airports, FAA s NextGen Implementation Plan, March 2012 NextGen Operator and Airport Enablers These detailed descriptions

More information

Pat Reines Avionics Support for GBAS and Performance Based Navigation (PBN)

Pat Reines Avionics Support for GBAS and Performance Based Navigation (PBN) Pat Reines (pat.reines@honeywell.com)) Avionics Support for GBAS and Performance Based Navigation (PBN) Honeywell.com 26 ILS Approaches = 26 Localizers and Glide Slopes 2 Honeywell.com 26 ILS Approaches

More information

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different

More information

ATNS. Performance Based Navigation Roadmap SOUTH AFRICA

ATNS. Performance Based Navigation Roadmap SOUTH AFRICA ATNS Performance Based Navigation Roadmap SOUTH AFRICA ATNS/HO/CO9/30/02/01 SOUTH AFRICA PBN ROADMAP Page 1 of 19 July 28, 2009 Table of Contents 1. Introduction... 3 2. Background... 3 3. Performance

More information

Rethink Convention. LINEAGE 1000E

Rethink Convention. LINEAGE 1000E Rethink Convention. LINEAGE 1000E 01 WE BRING YOU THE LUXURY OF ROOM TO SPARE. MAKE OF IT WHAT YOU WILL. Our ultra-large Lineage 1000E offers five cabin zones in hundreds of configurations. That s true

More information

ERASMUS. Strategic deconfliction to benefit SESAR. Rosa Weber & Fabrice Drogoul

ERASMUS. Strategic deconfliction to benefit SESAR. Rosa Weber & Fabrice Drogoul ERASMUS Strategic deconfliction to benefit SESAR Rosa Weber & Fabrice Drogoul Concept presentation ERASMUS: En Route Air Traffic Soft Management Ultimate System TP in Strategic deconfliction Future 4D

More information

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011 DP-7 The need for QMS controlled processes in AIS/AIM Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, 17 19 May 2011 Werner Kurz Director International Relations Jeppesen

More information

Performance Based Navigation (PBN) Implementation Plan Republic of Mauritius

Performance Based Navigation (PBN) Implementation Plan Republic of Mauritius Performance Based Navigation (PBN) Implementation Plan Republic of Mauritius Table of Contents Para Description Page Number 1 Introduction 1 2 Back ground 1 3 Performance Based Navigation 2 4 RNAV Current

More information

Overview of On-Going and Future R&D. 20 January 06 Ray Miraflor, NASA Ames Research Center

Overview of On-Going and Future R&D. 20 January 06 Ray Miraflor, NASA Ames Research Center Overview of On-Going and Future R&D 20 January 06 Ray Miraflor, NASA Ames Research Center Outline JPDO and NGATS FAA - Aviation Environmental Design Tool NASA Research Airspace Concept Evaluation System

More information

International Civil Aviation Organization

International Civil Aviation Organization International Civil Aviation Organization THE FOURTH MEETING OF STUDY AND IMPLEMENTATION TASK FORCE ( SITF/4) Nadi, Fiji, 26-28 October 2005 Agenda Item 13: Discuss issues observed during the trial and

More information

SOUTH AFRICA. Performance Based Navigation (PBN) Roadmap

SOUTH AFRICA. Performance Based Navigation (PBN) Roadmap SOUTH AFRICA Performance Based Navigation (PBN) Roadmap ATS/HO/CO9/30/02/01 SOUTH AFRICA PBN ROADMAP Page 1 of 21 05 03 2012 ENDORSEMENTS In 2007 at the 36th International Civil Aviation Organization (ICAO)

More information

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018 IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry

More information

NEWLY ENACTED INTENT CHANGES TO ADS-B MASPS: EMPHASIS ON OPERATIONS, COMPATIBILITY, AND INTEGRITY

NEWLY ENACTED INTENT CHANGES TO ADS-B MASPS: EMPHASIS ON OPERATIONS, COMPATIBILITY, AND INTEGRITY NEWLY ENACTED INTENT CHANGES TO ADS-B MASPS: EMPHASIS ON OPERATIONS, COMPATIBILITY, AND INTEGRITY Richard Barhydt NASA Langley Research Center Hampton, Virginia Anthony W. Warren Boeing Air Traffic Management

More information

APAC PBN UPDATE Slide 1 of xx

APAC PBN UPDATE Slide 1 of xx APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide

More information

Life Cycle Solutions

Life Cycle Solutions Life Cycle Solutions Increasing Operational Safety & Efficiency June 17, 2008 The statements contained herein are based on good faith assumptions and provided for general information purposes only. These

More information

Trajectory Based Operations

Trajectory Based Operations Trajectory Based Operations Far-Term Concept Proposed Trade-Space Activities Environmental Working Group Operations Standing Committee July 29, 2009 Rose.Ashford@nasa.gov Purpose for this Presentation

More information

ADS-B - A Boeing Perspective

ADS-B - A Boeing Perspective ADS-B - A Boeing Perspective NAM/CAR/SAM Automatic Dependent Surveillance Broadcast (ADS-B) Implementation Meeting/Workshop (ADS-B/IMP) Lima, Peru 13-16 November 2017 William (Bill) Richards Technical

More information

AERONAUTICAL INFORMATION CIRCULAR 33/17

AERONAUTICAL INFORMATION CIRCULAR 33/17 NAV CANADA 07 DEC 17 AERONAUTICAL INFORMATION CIRCULAR 33/17 Introduction NOTICE OF PLANNED EXPANSION OF THE TRIAL IMPLEMENTATION OF 25 NAUTICAL MILE LATERAL SEPARATION MINIMUM IN THE INTERNATIONAL CIVIL

More information

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000, DA 40 NG AFM Garmin G1000, P-RNAV Operation SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG Integrated Avionics System Garmin G1000, Doc. No. : 6.01.15-E Date of Issue : Design Change Advisory :

More information

ADS-B Seminar. National Institutes of Aviation Management and Research (NIAMAR) Rangpuri, Maharuli, New Delhi

ADS-B Seminar. National Institutes of Aviation Management and Research (NIAMAR) Rangpuri, Maharuli, New Delhi ADS-B Seminar National Institutes of Aviation Management and Research (NIAMAR) Rangpuri, Maharuli, New Delhi Mike Grove January 28, 2010 Topics ADS-B Aircraft Equipment & Architecture Summary Honeywell

More information

ANNEX F PRELIMINARY IMPACT ASSESSMENT ON CIVIL-MILITARY ORGANISATION

ANNEX F PRELIMINARY IMPACT ASSESSMENT ON CIVIL-MILITARY ORGANISATION ANNEX F PRELIMINARY IMPACT ASSESSMENT ON CIVIL-MILITARY ORGANISATION F.1 Introduction F.1.1 PBN Mandate covers civil-military coordination The European Commission mandated Eurocontrol to develop a draft

More information

Intentionally left blank

Intentionally left blank Supplement D42L AFM Intentionally left blank Page 9-S4-2 Supplement D42L AFM Intentionally left blank Page 9-S4-4 D42L AFM Supplement LIST OF EFFECTIVE PAGES Chapter Page Date 0 DOT-approved 9-S4-1 24-May-11

More information

Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December

Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December 2001 - Mike Murphy ATN Systems, Inc. (ATNSI) 703-412 412-2900, 2900, Mike.Murphy@atnsi.com ATNSI, ATN Seminar 1 Presentation

More information

APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL

APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL Applicants are strongly advised to read the 'RNP Approach Notes for Completion' before completing the form. Please complete the form in BLOCK

More information

Benefits of CNS/ATM Implementation for the Region

Benefits of CNS/ATM Implementation for the Region Benefits of CNS/ATM Implementation for the Region IATA today www.iata.org 227 Airline Members from 143 countries accounting for 94% of total international traffic 200 partners Representation in 90 countries

More information

ICNS 2014 Workshop Integration of Advanced CNS Capabilities supporting NextGen/SESAR/CARATS

ICNS 2014 Workshop Integration of Advanced CNS Capabilities supporting NextGen/SESAR/CARATS ICNS 2014 Workshop Integration of Advanced CNS Capabilities supporting NextGen/SESAR/CARATS Introduction to the Workshop With this year s ICNS, we would like to start a new approach for an even more intense

More information

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation Considerations for RNP to xls Operations Juergen Ruppert Regional Director Air Traffic Optimisation Services GE Aviation RNP to ILS 2 Content Why RNP to XLS What is the technology How does it work now?

More information

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat) International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for

More information

Global ATM System ~Interoperability and Harmonization ~

Global ATM System ~Interoperability and Harmonization ~ SIP/2009-WP/7 Business case Global ATM System ~Interoperability and Harmonization ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

IFR SEPARATION WITHOUT RADAR

IFR SEPARATION WITHOUT RADAR 1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s

More information

Advisory Circular. Radius to Fix (RF) Path Terminator

Advisory Circular. Radius to Fix (RF) Path Terminator Advisory Circular Subject: Radius to Fix (RF) Path Terminator Issuing Office: Standards Document No.: AC 700-027 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 7617945 V12 Effective Date:

More information

Atlantic Interoperability Initiative to Reduce Emissions AIRE

Atlantic Interoperability Initiative to Reduce Emissions AIRE ICAO Colloquium on Aviation and Climate Change ICAO ICAO Colloquium Colloquium on Aviation Aviation and and Climate Climate Change Change Atlantic Interoperability Initiative to Reduce Emissions AIRE Célia

More information

What is B-RNAV? 1. 1 Adaptado de [ ]

What is B-RNAV? 1. 1 Adaptado de  [ ] What is B-RNAV? 1 RNAV is a method of navigation which permits a/c operations on any desired flight path within the coverage of station referenced navigation aids or the limits of the capability of self-contained

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations

More information