A Novel Fault-Tolerant Multi-EPON System with Sharing Protection through Bridge ONUs

Size: px
Start display at page:

Download "A Novel Fault-Tolerant Multi-EPON System with Sharing Protection through Bridge ONUs"

Transcription

1 Proeedgs of the Iteratoal MultCoferee of Egeers ad Computer Setsts 8 Vol I IMECS 8, 9- Marh, 8, Hog Kog A Novel Fault-Tolerat Mult-EPON System wth Sharg Proteto through Brdge ONUs I-Shya Hwag, Ze-Der Shyu ad Lag-Yu Ke Abstrat I the EPON, may prevous studes proposed dedated proteto arhtetures to protet the rtal ompoets whh results hgh ost for deploymet. To aheve hgh relablty ad low-ost for deploymet, ths artle proposes a ovel fault-tolerat Mult-EPON system wth ost-effetve shared proteto through Brdge ONUs. Uder the falures, the Brdge ONU otrols the faulty EPON, plays the role of OLT ad the trasmsso of faulty EPONs s restored by relayg to other teroeted adjaet EPONs. The mmum hop out relay algorthm ad the relay wdow mehasm are also proposed ths artle to help the data for relayg effetly. Furthermore, the Oe-Wat DBA eables the otroller of affeted PONs to obta more up-to-date buffer formato from eah ONU order to ehae overall system performae. The smulato results show that the proposed Mult-EPON system a provde hgh system performae for dfferet faled stuatos terms of average delay, MAX delay ad jtter, espeally hgh traff loads. Idex Terms Brdge ONU, DBA, EPON, fault-tolerat, proteto. I. INTRODUCTION I the EPON, all ONUs are served by the OLT usg a dsovery hadshake Mult-Pot Cotrol Protool ad share a ommo trasmsso hael towards the OLT by tme-dvso multple aess shemes. Oly a sgle ONU may trasmt data oe tmeslot to avod sgal ollsos. After the ONU s regstered by dsovery proess, the OLT otrols PON ad oordates the trasmsso wdow of ONUs wth grated GATE messages, whh ota the trasmsso start tme ad trasmsso legth of the orrespodg ONU. To avod sgals ollsos ad alloate badwdth farly the upstream dreto, shedule algorthms whh have bee extesvely researhed. There are two ategores of badwdth alloato shemes o EPONs: fxed badwdth alloato (FBA ad dyam badwdth alloato (DBA. I the FBA sheme, eah ONU s assged fxed tmeslots data trasmsso from the ONUs to the OLT at full lk apaty. I otrast to the FBA, the DBA further mproves the system a more effet way; the OLT alloates a varable tmeslot to eah ONU dyamally based o the badwdth request ad esures the I-Shya Hwag s wth the Departmet of Computer Egeerg ad See, Uversty of Yua-Ze, Chug-L, Tawa, 36 (phoe: ; fax: ; e-mal: shwag@satur.yzu.edu.tw. Ze-Der Shyu s wth the Departmet of Geeral Studes, Army Aademy, Chug-L, Tawa, 39 (e-mal: s949@mal.yzu.edu.tw. Lag-Yu Ke s wth the Departmet of Computer Egeerg ad See, Uversty of Yua-Ze, Chug-L, Tawa, 36 (e-mal: s9466@mal.yzu.edu.tw. Qualty-of-Serve (QoS by guarateed serve level agreemet (SLA. Furthermore, fault tolerae s also a mportat ssue PONs. There are two ategores of etwork falures EPON, oe s lk falure ad the other s ode falure. I lk falure, the falure of feeder fber wll halt the whole PON system, but the falure of a brah wll halt just oe ONU. I the ode falure, the falures of OLT or spltter wll ause the whole PON system to fault. Therefore, the OLT, feeder fber ad spltter are the most rtal ompoets the PON system. I order to protet PONs agast these serous falures, may researhers proposed dedated proteto arhtetures, however, they are ot ost-effetve, as they requre may redudat ompoets. Sharg badwdth to protet the eghborg PONs s a effet way to redue the ost of proteto. To aheve hgh relablty ad low-ost for deploymet, a ovel fault-tolerat Mult-EPON system wth shared proteto s proposed ths artle to provde proteto agast OLT falure ad feeder fber falure. The rest of ths paper s orgazed as follows. Seto deres the related work. Seto 3 proposes a ovel Fault-Tolerat Mult-EPON System whh s provded a robust fault-tolerat mehasm based o the oept of shared proteto. Seto 4 shows the smulato results terms of the average paket delay, MAX paket delay ad jtter performae. Fally, Seto 5 draws olusos ad offers further suggestos. II. LITERATURE REVIEW A. Fault-Tolerat Arhtetures Four proteto arhtetures are dsussed o PON the ITU-T Reommedato G.983. []. However, those arhtetures have a lot of reduday, ad they are ot eoomal solutos. Moreover, the proteto sheme wth oe old stadby OLT s proposed [] ad the stadby OLT utlzed to protet multple PONs. The sheme stll eeds old stadby equpmet ad supports oly oe OLT falure. A reslet fast proteto swthg sheme [3], whe a feeder fber break or equpmet falure ours etral offe (CO, ad the swthg s performed at the CO. Beause of the swth, t s more omplex ad the sheme stll eeds a redudat feeder fber to protet the feeder fber. I [4], a automat-proteto-swthg mehasm s proposed the ONU to fght agast dstrbuto fber breaks. The trasmsso of affeted ONU s restored by other teroeted ONUs whe brahes are dow. However, t aot provde ay proteto for OLT ad feeder fber whh are the most rtal ompoets of PON. I the rg topologes, the proteto sheme [5] has a large ISBN: IMECS 8

2 Proeedgs of the Iteratoal MultCoferee of Egeers ad Computer Setsts 8 Vol I IMECS 8, 9- Marh, 8, Hog Kog ovetoal rg ad a old bakup trasever ad reever to protet oe pot falure. The drawbaks of the rg topologes are more fber usage, hgher sgal atteuato ad serous ear-far problems. To address those problems, the double feeder fbers wth a hybrd small rg are trodued [6]. The sheme mmzes the fber usage ad assures o paket loss by usg hot stadby ompoets. However, the ONU s more omplex the sheme ad + proteto shemes have a low market peetrato due to ts hgh ost. Therefore, ths paper proposed a shared proteto sheme wth teroeted adjaet PONs by Brdge ONUs to avod reduday the EPON. B. ONU Prorty Shedulg To support dfferetated serve lasses, a prorty queug sheme, suh as DffServ, ad the queue maagemet tasks are arred out by eah ONU. The trasmsso of queued pakets s deded by a spef shedulg sheme. The strt prorty shedulg serves the buffered hgher-prorty pakets frst as defed IEEE 8.D. Lower-prorty pakets a oly be trasmtted whe the hgher-prorty queues are empty. Therefore, the lower-prorty pakets suffer exessve delays ad ufar reased paket loss. However, a shedulg sheme s also eessary to otrol the hgh-prorty traff f t exeeds the otrat of serve level agreemet (SLA. I [7], prorty-based shedulg s proposed to deal wth the problems by employg strt prorty shedulg wth a spef tme terval. Ths sheme provdes a bouded delay for low-prorty pakets ad esures faress by trasmttg pakets of all traff lasses. C. Dyam Badwdth Alloato The dyam badwdth alloato (DBA, suh as lmted badwdth alloato (LBA, has bee studed [8]. I the LBA, the tmeslots legth of eah ONU s upper bouded by the maxmum tmeslots legth, B max, whh ould be spefed by SLA. The drawbak of LBA s the poor utlzato for the upstream badwdth ad t restrts aggressve ompetto for the upstream badwdth, espeally uder o-uform traff. I order to better utlze the leftover badwdth from ONUs wth some traff baklogs, the authors [7] proposed a DBA sheme alled Exessve Badwdth Realloato (EBR whh ONUs were dvded to two ategores, lghtly-loaded ad heavly-loaded, aordg to ther guarateed badwdth B max. exessve badwdth, B exess, saved from lghtly-loaded group s redstrbuted to heavly-loaded ONUs to mprove effey. Ufortuately, the drawbaks of EBR are ufaress, dle perod problem ad alloatg more tha the requested badwdth to ONUs [9], whh was redefed as redudat badwdth problem our prevous researh []. To mprove badwdth utlzato, a early alloato mehasm was proposed [7], whh grats the badwdth of lghtly-loaded ONUs mmedately wthout ay delay whe t reeves the REPORT message. Moreover, the effet badwdth alloato algorthm ( wth a tme traker s proposed to address the dle perod problem []. It fores the OLT to grat the badwdth to a heavly-loaded ONU wthout watg realloato whe the upstream hael s gog to dle. However, the drawbak of [7], [] s that the serve order of ONUs hages eah serve yle, therefore, the estmato of the omg hgh prorty traff s severely mpared beause the watg tme eah ONU may hage drastally. I [], Xaofeg et al. proposed aother DBA sheme that matas faress mehasm of the exessve badwdth realloato operato well for heavly-loaded ONUs, but gores the faress of lghtly-loaded ONUs. The reaso s that the request by the lghtly-loaded ONU does ot osder the possble pakets arrvg durg the watg tme. Jtter performae studed [3] s aother mportat oer EPON, espeally for the hgh prorty serve whh s delay-varato sestve traff (e.g. voe trasmssos. I ths sheme, hgh prorty serve s proteted a separate sub-yle, therefore, the jtter performae s osderably mproved. III. THE PROPOSED NOVEL FAULT-TOLERANT MULTI-EPON SYSTEM A ovel fault-tolerat Mult-EPON system s preseted ths seto. I seto 3., we propose a fault-tolerat arhteture Mult-EPON, whh provdes proteto by sharg the badwdth wth the eghborg PONs. I seto 3., the mmum hop out relay path ma algorthm s proposed to address the shortest path to relay data ad alulates the avalable badwdth to eah PON uder falure. I seto 3.3, the Relay Wdow Mehasm s proposed to relay data betwee PONs ad ooperates wth two DBA shemes that are proposed to help the data relay ad mprove the system performae. A. Fault-Tolerat Arhteture To aheve hgh relablty ad low-ost for deploymet, eah EPON system s oeted the earest EPON by a Brdge ONU order to mmze fber usage, show Fg.. Whe the feeder fber s ut or OLT s dow, the Brdge ONU otrols the PON, plays the role of OLT ad reeves the data omg from the ONUs. The, the Brdge ONU relays the data to the OLT of the adjaet PON. I ormal stuatos, the Brdge ONU gores the upstream sgal of ONUs ad motors the sgal of dowstream hael to detet the falures. I [4], the passve optal spltter/omber (PSC broadastg the upstream sgal to all ONUs may ause potetal seurty problems ad hgher sgal power atteuato. To allevate those problems, the PSC, ostruted by a N PSC ad a PSC, s osdered the proposed arhteture, show Fg.. I the PSC, the upstream optal sgal power s oly trasmtted to OLT ad Brdge ONUs ad the dowstream optal sgal trasmtted by the Brdge ONU s broadasted to all ONUs as the dowstream sgal of OLT. I the Brdge ONU, both terfaes oet wth two adjaet EPON. Note that addto to the ovetoal trasever (a 3m trasmtter ad a 49m reever of ormal ONU mataed at the Brdge ONU, the Brdge ONU requres a extra 3m reever, a extra 49m trasmtter ad a swth. The advatages of the proposed arhteture are that o bakup feeder fbers ad bakup OLT modules are eeded ad the fber usage s lose to stadard EPON whh s wthout ay proteto mehasm. ISBN: IMECS 8

3 Proeedgs of the Iteratoal MultCoferee of Egeers ad Computer Setsts 8 Vol I IMECS 8, 9- Marh, 8, Hog Kog Fg. The Brdge ONU oets two adjaet PONs Fg. 4 The Fault Iformato Message Fg. Arhteture of the PSC Fg. 3 Cost-effetve Shared Proteto System B. Mmum Hop Cout Relay Path Ma Algorthm Whe faults our, order to let the affeted PONs determe the system stuato ad dede the relay path wth mmum hop out, the Brdge ONUs wll exeute four phases the Mmum Hop Cout Relay Path Ma Algorthm, ad they are desrbed the followg subseto. Note that there are two deftos of the Brdge ONU the boudary of fault area, oe s that the Brdge ONU has a faled PON o oly oe sde (.e. Brdge ONU BC Fg. 3, the other oe s the Brdge ONU has two faled PONs o both sdes ad a faled PON of the two has oly oe Brdge ONU (.e. Brdge ONU Fg. 3. Iformato Sedg Phase Whe the fault ours, the Brdge ONUs the boudary of fault area sed the Fault Iformato Message, show Fg. 4, to the Brdge ONU sde the fault area order to let other Brdge ONUs ad affeted OLTs get the Mult-EPON system stuato, suh as the umber of hop out ad guarateed tmeslots the left ad rght paths, to dede the relay path wth mmum hop out. After sedg the Fault Iformato Message, the seder wats for the ACK Message reply by the reever. If the watg reahes tmeout, the Fault Iformato Message wll be reset after radom delay. Watg Iformato Phase Whe the Brdge ONU reeved the Fault Iformato Message, t repled a ACK Message to the seder. The, t adds oe to the Number of hop out feld ad reords the formato of the urret PON, suh as the hop out ad guarateed tmeslots felds the Fault Iformato Message, ad seds t to the ext Brdge ONU or OLT. 3 Dedg Relay Path Phase After gettg all formato of the affeted PONs, the Brdge ONU dedes the relay paths. I order to redue the paket delay durg the falure tme, eah PON hooses the relay path wth mmal hop out. 4 Calulatg Avalable Badwdth Phase The otroller of affeted PONs alulates the avalable badwdth of eah PON as follows: PON _ BW = ( T MAX yle Ng ( S k k PON / j ALL _ PON, where S k / S j ALL _ PON j s the proporto of PON a k PON get mmum guarateed badwdth from the avalable MAX badwdth, T yle s the maxmum yle tme, g s the guard tme, N s the umber of ONUs the PON provdg the badwdth to Faulty PON, S k s the sum of S k, the mmum guarateed tmeslots for the, AF ad BE traff determed by SLA of ONU k whh s the PON. Ad S j s the sum of S j, the mmum guarateed tmeslots for the, AF ad BE traff determed by SLA of ONU j whh s the relay path that ludg PON. The S j ad S k a be S = expressed as k S k S = ad j S j, {, AF, BE}. C. Relay Mehasm ad Loal DBA The PON wth fault s referred to as Faulty PON ad the PON, whh provdes proteto by sharg badwdth to the Faulty PONs, s referred to as Proteto PON. After alulatg the avalable tmeslots of the PONs, the Brdge ONUs start to otrol the adjaet PON of the dowstream relay path. The Brdge ONUs, the Faulty PON, exeute the Oe-Wat DBA for loal ONUs ad the OLT the Proteto PON exeutes the Proteto DBA for loal ONUs. The both DBA shemes ooperate wth the Relay Wdow Mehasm to help relay the data hop-by-hop the Faulty PONs. For example, the Brdge ONU otrols the PON F ad the Brdge ONU DE otrols the PON E, show Fg. 3. The Brdge ONU relays the data queug ts buffer to the Brdge ONU DE. The, the Brdge ONU DE has two kds of data ts buffer; oe s PON E omg from loal ONU; the other s PON F omg from Brdge ONU. The Brdge ONU DE relays the data queug ts buffer to the S j ISBN: IMECS 8

4 Proeedgs of the Iteratoal MultCoferee of Egeers ad Computer Setsts 8 Vol I IMECS 8, 9- Marh, 8, Hog Kog otroller of PON D that s the Brdge ONU CD ad the Brdge ONU CD relays queug data to the Brdge ONU BC. Fally, the Brdge ONU BC relays all queug data to the otroller of PON B. The proposed Relay Wdow Mehasm ad two DBA shemes are desrbed the followg subseto. Relay Wdow Mehasm There are two trasmsso wdows eah PON of the relay path. Oe s the loal DBA wdow trasmtted by loal ONUs ad the other oe s the relay wdow trasmtted by the adjaet Brdge ONU the dowstream relay path, show Fg. 5. The OLT or the Brdge ONU spefes the start tme of the relay wdow the GATE message ad trasmts t to the adjaet Brdge ONU the dowstream relay path. Whe the relay wdow begs, the Brdge ONU spefes trasmsso legth a REPORT message ad seds t to the otroller of upstream PON. After the otroller gets the REPORT message, t a kow whe the ed of relay wdow s ad the start to exeute the loal DBA. Whe a Brdge ONU trasmts a upstream paket the relay wdow, the pakets from loal ONUs or the adjaet Brdge ONU the dowstream relay path are stll arrvg. The traff lass wth the hghest prorty for strtly delay sestve serves s typally a ostat bt rate (CBR. To further redue the paket delay tme, the Brdge ONU predts the badwdth requremet durg the relay wdow by the traff rate wth the rate-based predto sheme preseted [5]. The, the Brdge ONU reports the total legth trasmttg tmeslots of ths relay yle wth upper bouded by guarateed badwdth the dowsde relay path, ad t a be expressed as = G, + m( R,, PON_ BWk k dowstreampontherelaypath (, where R, s the sum of request tmeslots for dfferetated traffs the queues of the Brdge ONU the AF BE th yle,.e. R, = R, + R, + R, + P,, the P, s the predted tmeslots of traff omg durg the relay wdow, ad PON_ BW k s the sum of avalable k dowstreampontherelaypath badwdth of Faulty PONs the dowsde of the relay path. Two DBA Shemes for Loal ONUs I the Faulty PONs, the lk utlzato s mpossble to use fully. The reaso s that the avalable badwdth s provded by the OLT Proteto PON ad s shared wth the affeted PONs. The paket delay s more mportat tha lk utlzato the Faulty PONs. However, the lk utlzato ad the paket delay are of the same mportae Proteto PON. Therefore, the two DBA are proposed to deal wth the dfferet etwork haratersts for mprovg the whole Mult-EPON system performae. Frst, the Oe-Wat DBA s proposed to redue the paket delay the Faulty PON. Seod, the Proteto DBA s proposed to mprove the hael utlzato ad redue the paket delay the Proteto PON. Oe-Wat DBA Sheme the Faulty PON The operato of tradtoal DBA shemes are that the REPORT messages pggybak data tmeslots ad report the queue legth of the ONU, but wthout osderg the paket arrvg durg the watg tme. It s observed that the paket delay those DBA shemes s lose to.5 trasmsso yle tme. Therefore, the pakets arrvg the watg tme aot be trasmtted the urret yle eve f the ONU s lghtly-loaded. Ths wll result loger paket relayed delay ad s ufar to the lghtly-loaded ONU. To mprove the drawbaks ad offer better QoS the Mult-EPON system, the proposed Oe-Wat DBA shfts the report tme of ONUs purposely order to eable the Brdge ONU to obta more up-to-date buffer oupay formato from eah ONU. Ths pot s further llustrated Fg. 6. The ONU uploads ts REPORT message betwee the (-th ad (-th ONU. Whe the Brdge ONU reeves the REPORT message of ONU, t starts to alulate avalable badwdth of ONU ad grat the avalable badwdth the GATE message to ONU mmedately. After the ed of trasmsso wdow of ONU -, the REPORT message s uploaded by (+th ONU, ad the, the ONU starts to upload the queug data grated tmeslots. Although the amout of ost guard tme the Oe-Wat DBA s twe as muh as the umber of the DBA shemes pggybakg ther REPORT messages data tmeslots. However, the average pakets delay s smaller tha oe yle tme ad lose to half of a yle tme. Therefore, the Oe-Wat DBA a redue to almost oe yle tme the average paket delay. Whe t reeves a REPORT message from a loal ONU, the Oe-Wat DBA assgs the tmeslots to the ONU based o the guarateed tmeslots mmedately ad a be expressed as G = m( R, PON_ BW ( S / S, where k k PON R s the sum of requested BW for dfferetated traffs of ONU, ad S / Fg. 5 The Relay Wdow Fg. 6 Oe-Wat DBA S k k PON s the proporto of ONU a get grated badwdth from the avalable badwdth of ths PON deoted as PON _ BW. After fshg gratg badwdth to the ONU by sedg GATE message, the Oe-Wat DBA spefes the REPORT sedg tme of ONU + at the ed of uploaded tmeslots ONU. Moreover, after gratg the last ONU loal yle, the otroller of the PON vokes the Relay Mehasm. Whe the otroller reeved the REPORT message of the adjaet Brdge ONU of the PON, t exeutes the Oe-Wat DBA aga. ISBN: IMECS 8

5 Proeedgs of the Iteratoal MultCoferee of Egeers ad Computer Setsts 8 Vol I IMECS 8, 9- Marh, 8, Hog Kog Proteto DBA Sheme the Proteto PON The Proteto PON s the fal hop the relay path, the performae of paket delay relay data ad lk utlzato are the key fators o the system performae. To further mprove badwdth utlzato ad paket delay of relay data, there are two trasmsso wdows the Proteto DBA. Oe s the relay wdow for Brdge ONUs to relay data; the other s loal trasmsso wdow for loal ONUs, show Fg. 7. Furthermore, to address the jtter performae of traff, the proposed Proteto DBA fxed the serve order of all loal ONUs ad the Brdge ONU the PON. Frstly, at the begg of Nth Relay Wdow to trasmt the data, the Brdge ONU lmted the trasmttg tmeslots by equato ( ad broadasts the REPORT message to the OLT order to spefy ts trasmsso legth. The, the Brdge ONU starts to relay the data queue ts buffer to OLT, show Fg. 7. Seodly, after reevg the REPORT message of the Brdge ONU, the OLT exeutes the Proteto DBA sheme to alloate badwdth to loal ONUs for (N+th trasmsso yle ad seds all GATE messages to loal ONUs. Thrdly, the OLT spefes the begg tmeslots of (N+th Relay Wdow by sedg a GATE message to the Brdge ONU. Note that the trasmssos of dfferet odes are separated by a guard tme. The detal of alloatg tmeslots for loal ONUs the proposed Proteto DBA s desrbed as follows. Frst, alulate R, of all ONUs ad talze the avalable badwdth, B avalable, whh s expressed as B avalable = PON _ BW. The, the proposed Proteto DBA wll selet the ONU wth the maxmal resdue badwdth,.e. max( S R,, from uassged ONUs. The grated badwdth for ONU, G, +, the ext yle s gve as follows G, + = m Bavalable ( S/ Sk, R., k uassged, where R s the sum of requested BW for dfferetated traffs of ONU the th yle,.e. AF BE R, = R, + R, + R, + P,, where P, s the predted tmeslots of traff wth the rate-based predto sheme preseted [5] ad S / S k s the proporto of k uassged ONU a get grated badwdth from the avalable badwdth, B avalable. Furthermore, the grated badwdth for, AF ad BE lasses are as follows: G, + = m( G, +, R, + P, AF AF. G, + = m( G, + G, +, R, BE AF G, + = G, + G, + G, + I the fal, the avalable badwdth beomes Bavalable = Bavalable G, +. The whole proess otues utl all loal ONUs have bee assged, ad the Proteto DBA fxes the trasmsso order of ONUs to mprove the jtter performae. The, the OLT seds the GATE message to all loal ONUs ad spefes the start tme of (N+th Relay Wdow by sedg a GATE message to the Brdge ONU. Fg. 7 The operato of Proteto DBA wth a Relay Wdow (a Searo (b Searo ( Searo 3 (d Searo 4 Fg. 8 Four Sgfat Searos IV. PERFORMANCE EVALUATION The system performae s aalyzed by smulatg the four sgfat searos, show Fg. 8, ad ompared wth [] terms of average paket delay, MAX paket delay ad jtter. The performae evaluato s studed usg the OPNET smulator wth oe OLT ad 3 ONUs a PON. The dowstream ad upstream apates are both Gb/s. The dstae from a ONU to the OLT s assumed km ad the dstae betwee eah PON s assumed km. Eah ONU has fte buffer ad the serve poly s frst- frst-out dsple. The traff model s haraterzed by self-smlarty ad log-rage depedee (LRD [6]. Ths model s used to geerate hghly bursty AF ad BE traff lasses wth a Hurst parameter of.7, ad paket szes are uformly dstrbuted betwee 64 ad 58 bytes. Furthermore, hgh-prorty traff s modeled usg a Posso dstrbuto ad paket sze s fxed to 7 bytes. The traff profle s as follows: % of the total geerated traff s osdered hgh prorty, ad the remag 8% equally dstrbuted betwee low- ad medum-prorty traff [7]. For smplty, the total etwork load s evely dstrbuted amogst all ONUs the same relay path ad the ONUs are equally guarateed badwdth weghted [7], [8]. A. Average Ed-to-Ed Delay Fg. 9 ompares the average paket delay from ONUs to etral offe amog the four searos ad for, AF, BE, ad total traff, respetvely. Fg. 9(a shows the proposed Mult-EPON system uder falures has better performae tha whe the traff load s greater tha 4%. The delay tme of Mult-EPON reahes ms whe the traff load s heavy, but stll s less tha.5 ms, whh s spefed by ITU-T Reommedato G.4. Fg. 9(b shows the delay tme of Mult-EPON searos for AF traff are stll shorter tha the whe traff load exeeds 7%. Fg. 9( shows that Mult-EPON yelds otable mprovemets of ad AF serves wthout degradg the BE serves. ISBN: IMECS 8

6 Proeedgs of the Iteratoal MultCoferee of Egeers ad Computer Setsts 8 Vol I IMECS 8, 9- Marh, 8, Hog Kog searo searo searo3 searo4 Avg. Delay (a BE Avg. Delay searo searo searo3 searo searo searo searo3 searo4 AF Avg. Delay searo searo searo3 searo4 B. MAX Ed-to-Ed Delay Fg. ompares the maxmum paket delay amog the four searos ad for all traff lasses. Fg. (a shows the proposed Mult-EPON system has better performae tha the whe traff load exeeds 6% the traff. I Mult-EPON searos, the MAX delay for traff reases smoothly wth traff loads ad mples the otrol ablty the Mult-EPON. The MAX delay for traff at full traff load s less tha 9%. The reaso s that the trasmsso yle reahes T MAX yle results the rate-based predto of traff more aurately. I Fg. (b, the MAX delay performae of for AF traff s better tha the Mult-EPON searos, beause the AF paket eouters log relay tme the relay path. However, whle the traff s betwee 6%-8%, the has the logest MAX delay beause of the trasmsso order of ONUs hagg drastally. I Fg. (, the MAX delay for BE traff reases rapdly whe the traff load exeeds 9% beause the system s full load. C. Jtter Performae The delay varae s alulated as N - σ = d d ( N, where the d s the delay tme of = paket ad N s the total umber of reeved pakets. As Fg. shows, the delay varaes of Mult-EPON are hgher tha the whe traff load s below 7%. The reaso s that the pakets omg from PONs wth falures may be relayed by other Brdge ONUs. However, the delay varae of sheme reases drastally whe traff load exeeds 8%. The reaso s that the serve yle order every yle of the s haged drastally ad the order of Mult-EPON s always fxed (b Avg. Delay searo searo searo3 searo ( (d Fg. 9 Average Ed-to-Ed Delay MAX Delay Fg. (a MAX Delay BE MAX Delay searo searo searo3 searo Fg. ( BE MAX Delay Delay Varae (ms.... searo searo searo3 searo4 AF MAX Delay Fg. (b AF MAX Delay searo searo searo3 searo4 Jtter Fg. Jtter for traff V. CONCLUSION I ths artle, a ovel fault-tolerat Mult-EPON system s proposed to protet the rtal PON elemet falure, suh as OLT falure or feeder fber ut. Beause of o lmted umber of teroeted EPONs ad wthout ay redudat ompoets, the proposed system s very flexble, ost-effetve ad uses smple shared proteto arhteture o EPON. Overall, the smulato results ofrm that the fault-tolerat Mult-EPON system yelds otable mprovemets average paket delay, MAX paket delay ad delay varato for traff uder dfferet falures. RERENCES [] ITU-T, Study Group 5. G.983: Hgh Speed Optal Aess Systems based o Passve Optal Network (PON tehques,. [] Y.M. Km, J.Y. Cho, J.H. Ryou, H.M. Baek, O.S. Lee, H.S. Park, M. Kag, ad J.H. Yoo, Cost effetve proteto arhteture to provde dverse proteto demads Etheret passve optal etwork, Iteratoal Coferee o Commuato Tehology, Vol., pp. 7 74, 3. [3] M.K. Abdullah, W.T. P g, P.W. Lau, ad E.R. Tee, FTTH aess etwork proteto usg a swth, The 9 th Asa-Paf Coferee o Commuatos, Vol. 3, pp. 9, Sept. 4, 3. [4] N. Nadarajah, E. Wog, M. Attygalle, ad A. Nrmalathas, Proteto swthg ad loal area etwork emulato passve optal etworks, Joural of Lghtwave Tehology, Vol. 4, Issue 5, pp , May 6. [5] X. Zhao, X. Che, ad X. Fu, A ovel proteto swthg sheme for PONs wth rg plus tree topology, Proeedgs of the SPIE, Vol. 6, pp , Nov. 5. [6] D. Hossa, H. Erka, R. Dorsvlle, M. Al, S. Sham, ad C. Ass, Proteto for a Rg-Based EPON Arhteture, d Iteratoal Coferee o Broadbad Networks, Vol., pp , Ot. 3 7, 5. [7] C. Ass, Y. Ye, S. Dxt, ad M.A. Al, Dyam badwdth alloato for Qualty-of-Serve over Etheret PONs, IEEE Joural o Seleted Areas Commuatos, Vol., o. 9, pp , Nov. 3. [8] G. Kramer, B. Mukherjee, ad G. Pesaveto, Iterleaved pollg wth adaptve yle tme (IPACT: A dyam badwdth dstrbuto sheme a optal aess etwork, Photo Network Commuatos, Vol. 4, o., pp. 89 7, Ja.. [9] B. Che, J. Che, ad S. He, Effet ad fe shedulg algorthm for badwdth alloato Etheret passve optal etworks, IEEE Joural of Seleted Tops Quatum Eletros, Vol., o. 4, pp , July Aug. 6. [] I.S. Hwag, Z.D. Shyu, L.Y. Ke, ad C.C. Chag, A Novel Early DBA Mehasm wth Predto-based Far Exessve Badwdth Realloato Sheme EPON, The 6 th Iteratoal Coferee o Networkg (ICN 7, Sate Lue, Martque, Aprl -8, 7. [] J. Zheg, Effet badwdth alloato algorthm for Etheret passve optal etworks, IEE Proeedgs Commuatos, Vol. 53, Issue 3, pp , Jue 6. [] X. Ba, A. Sham, ad C. Ass, O the faress of dyam badwdth alloato shemes Etheret passve optal etworks, Computer Commuatos, Vol. 9, o., pp. 3 35, July 6. [3] A. Sham, B. Xaofeg, C.M. Ass, ad N. Gha, Jtter performae Etheret passve optal etworks, Joural of Lghtwave Tehology, Vol.3, Issue 4, pp , Apr. 5. [4] S.R. Sherf, A. Hadjatos, G. Ellas, C. Ass, ad M.A. Al, A ovel deetralzed Etheret-based PON aess arhteture for provsog dfferetated QoS, Joural of Lghtwave Tehology, Vol., Issue, pp , Nov. 4. [5] G. Kramer, B. Mukherjee, S. Dxt, Y. Ye, ad R. Hrth, O supportg dfferetated lasses of serve EPON-based aess etworks, Joural of Optal Networkg, Vol., o. 8/9, pp., Aug.. [6] W. Wllger, M.S. Taqqu, ad A. Erramll, A bblographal gude to self-smlar traff ad performae modelg for moder hgh-speed etworks, Stohast Networks, 996. Avalable: ISBN: IMECS 8

ENERGY CHARACTERISTICS OF Pp-330/140-P55 STEAM BOILER

ENERGY CHARACTERISTICS OF Pp-330/140-P55 STEAM BOILER Aals of the Uversty of Petroşa, Mechacal Egeerg, 5 (03), 8-33 8 ENERGY CHARACTERISTICS OF Pp-330/0-P55 STEAM OILER ION OŞA, AN CORUŢ PETRILEAN Abstract: Eergy characterstc of a boler represets the fuel

More information

Model of Multi-Criteria Evaluation for Railway Lines

Model of Multi-Criteria Evaluation for Railway Lines World Academy of Scece, Egeerg ad Techology Iteratoal Joural of Idustral ad Maufacturg Egeerg Model of Mult-Crtera Evaluato for Ralway Les Juraj Camaj, Mart Kedra, Jaroslav Masek Iteratoal Scece Idex,

More information

Optimisation of Production and Transportation Cost of Ashanti Foam Factory Limited, Ghana*

Optimisation of Production and Transportation Cost of Ashanti Foam Factory Limited, Ghana* Optmsato of Producto ad Trasportato Cost of Ashat Foam Factory Lmted, Ghaa* 1 G. Adje, 1 J. Acquah, ad 1 S. Al Hassa 1 Uversty of Mes ad Techology, Box 237, Tarkwa, Ghaa Adje, G., Acquah, J., ad Al-Hassa,

More information

Semi-Markov Model of the Operation and Maintenance Process of City Buses

Semi-Markov Model of the Operation and Maintenance Process of City Buses THE ARCHIVES OF TRANSPORT VOL. XXV-XXVI NO 1-2 213 Sem-Markov Model of the Operato ad Mateace Process of Cty Buses Mrosław Szubartowsk Receved December 212 Abstract Ths paper presets a model of the operato

More information

Mathematical Function of Physical Variable. and Material Transport Deposition Map in the. River Estuary

Mathematical Function of Physical Variable. and Material Transport Deposition Map in the. River Estuary Advaced Studes Theoretcal Physcs Vol. 8, 04, o. 3, 003-03 HIKARI Ltd, www.m-hkar.com http://dx.do.org/0.988/astp.04.49 Mathematcal Fucto of Physcal Varable ad Materal Trasport Deposto Map the Rver Estuary

More information

Safety of users in road evacuation: design of path choice models for emergency vehicles

Safety of users in road evacuation: design of path choice models for emergency vehicles Urba Trasport XIII: Urba Trasport ad the Evromet the 21st Cetury 803 Safety of users road evacuato: desg of path choce models for emergecy vehcles A. Vtetta, A. Quattroe & A. Polme Departmet of Computer

More information

Spatial Disparity Analysis of Inner Mongolia Based on GIS

Spatial Disparity Analysis of Inner Mongolia Based on GIS 2015 AASRI Iteratoal Coferece o Idustral Electrocs ad Applcatos (IEA 2015) Spatal Dsparty Aalyss of Ier Mogola Based o GIS Xaolag Lu, Zhyag Ja, Wal Lu Toursm ad Culture College of Yua Uversty, Ljag, Cha

More information

Methods: Spatial autocorrelation Daniel A. Griffith, Ashbel Smith Professor University of Texas at Dallas, Richardson, Texas, USA

Methods: Spatial autocorrelation Daniel A. Griffith, Ashbel Smith Professor University of Texas at Dallas, Richardson, Texas, USA Methods: Spatal autoorrelato Dael A. Grffth, Ashbel Smth Professor Uversty of Texas at Dallas, Rhardso, Texas, USA Address Dr. Dael A. Grffth, Ashbel Smth Professor of Geospatal Iformato See Shool of Soal

More information

Two mathematical formulations for the containers drayage problem with time windows

Two mathematical formulations for the containers drayage problem with time windows It. Joural of Busess See ad Aled Maagemet, Volume 7, Issue 3, 2012 To mathematal formulatos for the otaers draage roblem th tme dos Mlorad Vdovć Uverst of Belgrade, Logsts Deartmet, Fault of Trasort ad

More information

RUNWAY OPERATIONS: Computing Runway Arrival Capacity

RUNWAY OPERATIONS: Computing Runway Arrival Capacity RUNWAY OPERATIONS: Computig Ruway Arrival Capacity OR750 /SYST660 USE Ruway Capacity Spreadsheet Sprig 2008 Lace Sherry 1 CENTER FOR AIR TRANSPORTATION SYSTEMS RESEARCH Backgroud Air Trasportatio System

More information

Determining routes for an auxiliary fleet in presence of emergencies on a railway line

Determining routes for an auxiliary fleet in presence of emergencies on a railway line Determg rotes for a alary fleet presee of emergees o a ralay le Fraso A. Ortega 1 Ja A. Mesa 2 Mgel A. ozo 3 1 2 3 Uersty of Selle Sella Spa {reos@s.es mesa@s.es mgelpozo@s.es} Abstrat. Trasportato o-demad

More information

Keywords - Fuzzy sets, Fuzzy numbers, Fuzzy transportation problem, Fuzzy ranking, Fuzzy arithmetic

Keywords - Fuzzy sets, Fuzzy numbers, Fuzzy transportation problem, Fuzzy ranking, Fuzzy arithmetic M. Shaugasudar, K. Gaesa / Iteratoal Joural of Egeerg Research ad Applcatos (IJERA) ISSN: 2248-9622 www.era.co Vol. 3, Issue 1, Jauary -February 2013, pp.1416-1424 A Novel Approach for the fuzzy optal

More information

CEE 320. Fall Route Choice

CEE 320. Fall Route Choice Route Choice Route Choice Fial step i sequetial approach Trip geeratio (umber of trips) Trip distributio (origis ad destiatios) Mode choice (bus, trai, etc.) Route choice (specific roadways used for each

More information

UNIFAC. Documentation. DDBSP Dortmund Data Bank Software Package

UNIFAC. Documentation. DDBSP Dortmund Data Bank Software Package UNIFAC Docuetato DDBSP Dortud Data Ba Software Pacage DDBST Dortud Data Ba Software & Separato Techology GbH Mare-Cure-Straße 10 D-26129 Oldeburg Tel.: +49 441 36 18 19 0 Fax: +49 441 36 18 19 10 support@ddbst.co

More information

Noise propagation simulation in and around buildings using improved integral energy equations

Noise propagation simulation in and around buildings using improved integral energy equations ose oagato sulato a aou bulgs usg ove tegal eegy equatos Kyosh Masua Tase Cooato, Jaa ABTRACT If the alulato otos fo ose oagato a aou bulgs ae efetly sle, the age-soue etho o ay-tag etho a be ale. Howeve,

More information

A New Methodology of Spatial Crosscorrelation Analysis

A New Methodology of Spatial Crosscorrelation Analysis A Ne ethodolog of Spatal Crossorrelato Aalss aguag Che Departmet of Geograph, College of Urba ad Erometal Sees, Pekg Uerst, 0087, Beg, Cha. Emal: heg@pku.edu. Abstrat: he dea of spatal rossorrelato as

More information

A Decomposition Algorithm for Solving A Class of Bi-Criteria Multistage Transportation Problem With Case Study

A Decomposition Algorithm for Solving A Class of Bi-Criteria Multistage Transportation Problem With Case Study ISS: 39-8753 Iteratoal Joural of Iovatve Research Scece Egeerg ad Techology (A ISO 397: 007 Certfed Orgaato) Vol. Issue 9 Septeber 03 A Decoposto Algorth for Solvg A Class of B-Crtera Multstage Trasportato

More information

South Norwood branch closure 22/05/2018. Help and support for personal and business customers

South Norwood branch closure 22/05/2018. Help and support for personal and business customers South Norwood brach closure 22/05/2018 Help ad support for persoal ad busiess customers Facts are correct as at 12/02/2018 Customer ad Commuity Egagemet followig closure aoucemet We wrote to customers

More information

Comparative Analysis of Flame Image Features for Combustion Analysis

Comparative Analysis of Flame Image Features for Combustion Analysis Ida Joural of Scece ad Techology, Vol 9(6), DOI: 0.7485/jst/06/v96/79904, February 06 ISSN (Prt) : 0974-6846 ISSN (Ole) : 0974-5645 Comparatve Aalyss of Flame Image Features for Combusto Aalyss Ab P. Mathew

More information

Cottingham branch closure 29/05/2018. Help and support for personal and business customers

Cottingham branch closure 29/05/2018. Help and support for personal and business customers Cottigham brach closure 29/05/2018 Help ad support for persoal ad busiess customers Facts are correct as at 09/03/2018 Customer ad Commuity Egagemet followig closure aoucemet We wrote to customers of Cottigham

More information

Long Term Preventive Generation Maintenance Scheduling with Network Constraints Ali Badri a*, Ahmad Norozpour Niazi b, Seyyed Mehdi Hoseini c

Long Term Preventive Generation Maintenance Scheduling with Network Constraints Ali Badri a*, Ahmad Norozpour Niazi b, Seyyed Mehdi Hoseini c Avalable onlne at www.scencedrect.com Energy Proceda 14 (2012) 1889 1895 ICAEE2011 Long Term Preventve Generaton Mantenance Schedulng wth Network Constrants Al Badr a*, Ahmad Norozpour Naz b, Seyyed Mehd

More information

Preferential Trade Agreement in Services and Its impact on Welfare

Preferential Trade Agreement in Services and Its impact on Welfare Prefereal Trade Agreeme Serves ad Is mpa o Welfare Masaru Umemoo Researh Asssa Professor, ICSEAD Worg Paper Seres Vol. - Jue The vews epressed hs publao are hose of he auhor(s) ad do o eessarl refle hose

More information

On The Use of Transportation Techniques to Determine the Cost of Transporting Commodity

On The Use of Transportation Techniques to Determine the Cost of Transporting Commodity IOSR Joural of Matheatcs (IOSR-JM) e-issn: 2278-5728,p-ISSN: 2319-765X, Volue 6, Issue 4 (May - Ju 213), PP 23-28 wwwosrjouralsorg O The Use of Trasportato Techques to Detere the Cost of Trasportg Coodty

More information

The Late, Late Show: How a Priority Flight System Can Reduce the Cost of Air Traffic Delays

The Late, Late Show: How a Priority Flight System Can Reduce the Cost of Air Traffic Delays 14 TRANSPORTATION RESEARCH RECORD 1161 The Late, Late Show: How a Priority Flight System Can Redue the Cost of Air Traffi Delays CHRISTOPHER J. MAYER Air traffi delays, although not new, have beome inreasingly

More information

Formulation of a Combined Transportation and Inventory Optimization Model with Multiple Time Periods

Formulation of a Combined Transportation and Inventory Optimization Model with Multiple Time Periods G.Krshauar. It. Joural of Egeerg Research ad Applcatos ISSN: 2248-9622, Vol. 6, Issue, (Part - 1) March 216, pp.8-87 RESEARCH ARTICLE www.era.co OPEN ACCESS Forulato of a Cobed Trasportato ad Ivetory Optzato

More information

Application of queuing theory to the container terminal at Alexandria seaport

Application of queuing theory to the container terminal at Alexandria seaport Joural of Soil Sciece ad Evirometal Maagemet Vol 1 (4), pp 77-85, Jue 2010 Available olie at http://wwwacademicjouralsorg/jssem ISSN 2141-2391 2010 Academic Jourals Full Legth Research Paper Applicatio

More information

Cardiff University Hospital of Wales branch closure 30/05/2018. Help and support for personal and business customers

Cardiff University Hospital of Wales branch closure 30/05/2018. Help and support for personal and business customers Cardiff Uiversity Hospital of Wales brach closure 30/05/2018 Help ad support for persoal ad busiess customers Facts are correct as at 09/03/2018 Customer ad Commuity Egagemet followig closure aoucemet

More information

Merchant Shipping (Fees) Regulations 2017 MERCHANT SHIPPING (FEES) REGULATIONS 2017

Merchant Shipping (Fees) Regulations 2017 MERCHANT SHIPPING (FEES) REGULATIONS 2017 Merhant Shipping (Fees) Regulations 2017 Index MERCHANT SHIPPING (FEES) REGULATIONS 2017 Index Regulation Page 1 Title... 3 2 Commenement... 3 3 Interpretation... 3 4 Fees payable... 7 5 Revoation... 7

More information

InstructionSheet LightCrimp*XTC/NeXTC FiberOpticConnectorKits

InstructionSheet LightCrimp*XTC/NeXTC FiberOpticConnectorKits InstructonSheet LghtCrmp*XTC/NeXTC 408-9860 FberOptcConnectorKts 21APR11 RevL For Procedure on Inspectng the Fber, Refer to Secton 6 VerfythatInstructonSheet(408-Seres) PertanstoConnectorKtBengTermnated

More information

Aerodynamic Centers of Arbitrary Airfoils

Aerodynamic Centers of Arbitrary Airfoils Utah State Uverst gtaloos@usu ll Graduate Theses ad ssertatos Graduate Studes -7 erodac eters of rbtrar rfols Orr ea Pope Utah State Uverst Follow ths ad addtoal works at: https://dgtalcoos.usu.edu/etd

More information

MT- RJ Fiber Optic Connector Kits

MT- RJ Fiber Optic Connector Kits MT- RJ Fber Optc Connector Kts Instructon Sheet For 1.8- mm Mn Zpcord Cable and 408-4540 2.8- mm DUALAN* Fber Optc Cable Assembles 04 NOV 13 Crmp Eyelet for DUALAN Fber Optc Cable Assembly Stran Relef

More information

~ CODED NOTES: r.: R"" "' t- DDPand ~

~ CODED NOTES: r.: R ' t- DDPand ~ o CODED NOTES: ""t- D z "t EAST MAN STREET SDE""ALK PATRON PARKNG V "' t- ' v '" - --- - - R"" - --- - 41'-0'1" - - ---f:--- - ~9- - - - R~~ -~~ ~ EMPLOYEE PARKNG ENCLOSED FRE ~NAC DUMPSTER ESCAPE TO REMAN

More information

Backpack. Travel Gear for the Avid Golfer. Limited One-Year Warranty

Backpack. Travel Gear for the Avid Golfer. Limited One-Year Warranty Limited Oe-Year Warraty Acushet Compay warrats its Titleist products for a period of oe year from the date of purchase agaist defects i materials or workmaship. Should your Titleist product fail to perform

More information

AVIONICS L. Independent Guided Study

AVIONICS L. Independent Guided Study MODULE DESCRIPTOR TITLE SI MODULE CODE CREDITS 4 AVIOICS 55-4909-00L LEVEL 20 JACS CODE H430 SUBJECT GROUP Engineering Design Technology DEPARTMET Engineering and Mathematics MODULE LEADER J. Holding MODULE

More information

Firth Park Sheffield branch closure 11/06/2018. Help and support for personal and business customers

Firth Park Sheffield branch closure 11/06/2018. Help and support for personal and business customers Firth Park Sheffield brach closure 11/06/2018 Help ad support for persoal ad busiess customers Facts are correct as at 09/03/2018 Customer ad Commuity Egagemet followig closure aoucemet We wrote to customers

More information

Kinematics and Dynamics Simulation Research for Roller Coaster Multi-body System Gening Xu a, Hujun Xin b, Fengyi Lu c,mingliang Yang d

Kinematics and Dynamics Simulation Research for Roller Coaster Multi-body System Gening Xu a, Hujun Xin b, Fengyi Lu c,mingliang Yang d Advanced Materals Research Vol. 4 (0) pp 7-80 Onlne avalable snce 0/Dec/0 at www.scentfc.net (0) Trans Tech Publcatons, Swtzerland do:0.408/www.scentfc.net/amr.4.7 Knematcs and Dynamcs Smulaton Research

More information

Exeter University of Exeter branch closure 14/06/2018. Help and support for personal and business customers

Exeter University of Exeter branch closure 14/06/2018. Help and support for personal and business customers Exeter Uiversity of Exeter brach closure 14/06/2018 Help ad support for persoal ad busiess customers Facts are correct as at 09/03/2018 Customer ad Commuity Egagemet followig closure aoucemet We wrote

More information

When designing a tariff for the transport of electricity, the main difficulty

When designing a tariff for the transport of electricity, the main difficulty Chapter 4 COST RECOVERY AND SHORT-RUN EFFICIENCY Claude Crampes Grema ad Ide, Uversty of Toulouse, Frace Whe des a tarff for the trasport of electrcty, the ma dffculty s that the trasport dustry apparetly

More information

Safety & reliability of software-controlled systems. Part 7: Risk & safety

Safety & reliability of software-controlled systems. Part 7: Risk & safety Safety & reliability of software-cotrolled systems Part 7: Ris & safety Prof. Dr.-Ig. Stefa Kowalewsi Chair Iformati 11, Embedded Software Laboratory RWTH ache Uiversity Summer term 2014 Remider: Termiology

More information

Granting in a multi-lane environment

Granting in a multi-lane environment Granting in a multi-lane environment www.huawei.com Author/ Email: Version: V1.0(20YYMMDD) HUAWEI TECHNOLOGIES CO., LTD. vm 1 vm 2 vm N How should we grant bonded channels Two Options; Grant all lanes

More information

Opportunistic Maintenance in Aircraft using Relevant Condition Parameter based Approach

Opportunistic Maintenance in Aircraft using Relevant Condition Parameter based Approach Opportunstc Mantenance n Araft usng Relevant Condton Parameter based Approach Hartha Saranga * Indan Insttute of Management Calcutta P O Box 16757, Alpore (Post) Calcutta 700 027, INDIA Emal:hartha@mcal.ac.n

More information

Bristol Blackboy Hill branch closure 21/06/2018. Help and support for personal and business customers

Bristol Blackboy Hill branch closure 21/06/2018. Help and support for personal and business customers Bristol Blackboy Hill brach closure 21/06/2018 Help ad support for persoal ad busiess customers Facts are correct as at 09/03/2018 Customer ad Commuity Egagemet followig closure aoucemet We wrote to customers

More information

10G - PON. By Mark Pflum RVW, Inc.

10G - PON. By Mark Pflum RVW, Inc. 10G - PON By Mark Pflum RVW, Inc. 10G - PON There are several different 10G PON (Passive Optical Networks) Standards / Architectures. XG-PON1: 10 Gbps downstream and 2.5 Gbps upstream (fixed optics). XGS-PON:

More information

The Future of Business Air Travel

The Future of Business Air Travel TRANSPORTATION RESEARCH RECORD 156 The Future of Business Air Travel DAVIDE. RAPHAEL AND CLAIRE STARRY Reent data indiate that business travel is slowing, and most business travelers are aggressively pursuing

More information

RIVER WATER QUALITY IN THE MIDLANDS 1998

RIVER WATER QUALITY IN THE MIDLANDS 1998 'K'P av/51 1''oy? f e w RVR WATR QUALTY N TH MDLANDS Ackowledgemets Ths report was compled by Gll ellamy ad atl Fuell (Water Qualty Plag Secto, Olto ourt). May thaks to everyoe who cotrbuted to the report.

More information

Yes, Frederic, from today you rank as a full-blown member of our pirate band.

Yes, Frederic, from today you rank as a full-blown member of our pirate band. RTH REDERIC: REDERIC: REDERIC: REDERIC: RTH: Yes, rederic, from today you rak as a full-low memer of our irate ad. Hurrah! y frieds, I thak you all, from my heart, for your kidly wishes. fortuately, I

More information

Transfer Scheduling and Control to Reduce Passenger Waiting Time

Transfer Scheduling and Control to Reduce Passenger Waiting Time Transfer Scheduling and Control to Reduce Passenger Waiting Time Theo H. J. Muller and Peter G. Furth Transfers cost effort and take time. They reduce the attractiveness and the competitiveness of public

More information

Airport Apron Capacity Estimation Model Enhancement

Airport Apron Capacity Estimation Model Enhancement Avalable onlne at www.scencedrect.com Proceda Socal and Behavoral Scences 0 (011) 1108 1117 14 th EWGT & 6 th MEC & 1 st RH Arport Apron Capacty Estmaton Model Enhancement Bojana Mrkovc a,* a Unversty

More information

Specialist's Factual Report of Investigation Cockpit Voice Recorder

Specialist's Factual Report of Investigation Cockpit Voice Recorder nondsclosure NATIONAL TRANSPORTATION SAFETY BOARD Vehcle Recorders Dvson Washngton, D.C. 20594 Aprl 30, 2002 Specalst's Factual Report of Investgaton Cockpt Voce Recorder NTSB Number: DCA0MA064 A. EVENT

More information

Estimating Avoidable Delay in the NAS

Estimating Avoidable Delay in the NAS Estimating Avoidable Delay in the NAS Bala Chandran Avijit Mukherjee Mark Hansen Jim Evans University of California at Berkeley Outline Motivation The Bertsimas-Stock model for TFMP. A case study: Aug

More information

This is the first draft for the X108 Owner's Manual translated from a Chinese original.

This is the first draft for the X108 Owner's Manual translated from a Chinese original. Th he f df f he X08 Owe' Ml led f hee gl. Th l wll be eved & eed e e. Plee fee fee fwd e, ebellhe d gge f@i. Rev Obe 25, 204 I HF TRANSEIVER X08 XIEGU TEH USER S MANUAL V.0 I ygh 204 I All Rgh Reeved Nh

More information

Background. Military aviation and runway incursions. EAPPRI and military. Conclusion

Background. Military aviation and runway incursions. EAPPRI and military. Conclusion Appedix I Guidace for Joit-Use Civil/Military Aerodromes Backgroud Military aviatio ad ruway icursios EAPPRI ad military Coclusio Europea Actio Pla for the Prevetio of Ruway Icursios - Editio 2.0 I1 Appedix

More information

Using [3.3] indicate whether there are any hot deserts located near the: a

Using [3.3] indicate whether there are any hot deserts located near the: a Learning about 80 1 a Read the two quotes on page 78 and desribe the differene of opinion the two people have about deserts. b Examine the date when eah statement was made. Why do you think these views

More information

2018 Cub Scout Day Camp Parents Guide Passport to Adventure

2018 Cub Scout Day Camp Parents Guide Passport to Adventure 2018 Cub Day Camp Parets Guide Passport to Adveture Everythig you eed to kow: What to brig Cotact Ifo Sample Schedule Advacemet Leadership FAQs Sig up with your pack olie at the Hawkeye Area Coucil website:

More information

Dynamic Revenue Management in Airline Alliances

Dynamic Revenue Management in Airline Alliances Dynami Revenue Management in Airline Allianes Christopher P. Wright, Harry Groenevelt Simon Graduate Shool of Business, University of Rohester, Rohester, New Yor 14627 wright1@simon.rohester.edu, groenevelt@simon.rohester.edu

More information

Development of Performance Measurement for Freight Transportation

Development of Performance Measurement for Freight Transportation Developmet of Performace Measuremet for Freght Trasportato Dr. Peter Kelle Iformato Systems ad Decso Sceces Lousaa State Uversty Drs. Mgzhou J ad Xaoya Zhu Idustral ad Systems Egeerg Uversty of Teessee

More information

booked( checki GUESTFORROOM AND TAX.

booked( checki GUESTFORROOM AND TAX. Fr ontdes kpol c esandpr ocedur es Room t ypet hegues thas booked( 1bed,2bedorROH) Check nandcheckoutdat e HTBonusoffer ( whenappl cabl e) S ngl eusecr ed tcar d nf or mat ont obechar gedat check n Amountt

More information

Quality Control. Ignacio Cascos Depto. Estadística, Universidad Carlos III 1

Quality Control. Ignacio Cascos Depto. Estadística, Universidad Carlos III 1 Qualty Control 5 Ignaco Cascos Depto. Estadístca, Unversdad Carlos III 1 Outlne 1. Introducton, control charts 2. Varables control charts (X-bar chart) 3. Attrbutes control charts (p and np charts) Ignaco

More information

Legacy Rawhide Hose HOSE. Rawhide 1-Wire 4000 PSI Black Hose. Rawhide 1-Wire 3000 PSI Smooth Non-Marking Hose. Rawhide Smooth Cover Black Hose

Legacy Rawhide Hose HOSE. Rawhide 1-Wire 4000 PSI Black Hose. Rawhide 1-Wire 3000 PSI Smooth Non-Marking Hose. Rawhide Smooth Cover Black Hose HOSE Legacy Rawhide Hose Superior abrasio-resistat cover hose for use with: hot- or cold-water pressure Washer 1 solid ed ad 1 swivel ed (both eds) Rawhide 1-Wire 4000 PSI Black Hose Class A ORS (Oil Resistace

More information

Large Eddy Simulation of Humaninduced Contaminant Transports

Large Eddy Simulation of Humaninduced Contaminant Transports 204 Yose Cv Egeerg Large Ey Smato of Hmace Cotamat Trasports Jg- Cho Dept. of Comptatoa Scece & Egeerg Yose Uversty Jack R. Ewars Dept. Mechaca & Aerospace Egeerg North Caroa State Uversty Motvatos Cotamat

More information

ATM Seminar 2015 OPTIMIZING INTEGRATED ARRIVAL, DEPARTURE AND SURFACE OPERATIONS UNDER UNCERTAINTY. Wednesday, June 24 nd 2015

ATM Seminar 2015 OPTIMIZING INTEGRATED ARRIVAL, DEPARTURE AND SURFACE OPERATIONS UNDER UNCERTAINTY. Wednesday, June 24 nd 2015 OPTIMIZING INTEGRATED ARRIVAL, DEPARTURE AND SURFACE OPERATIONS UNDER UNCERTAINTY Christabelle Bosson PhD Candidate Purdue AAE Min Xue University Affiliated Research Center Shannon Zelinski NASA Ames Research

More information

Airline Route Structure Competition and Network Policy

Airline Route Structure Competition and Network Policy TI 2013-189/VIII Tnbergen Insttute Dscusson Paper Arlne Route Structure Competton and Network Polcy Hugo Emlo Slva Erk Verhoef Vncent van den Berg Faculty of Economcs and Busness Admnstraton, VU Unversty

More information

The Efficacy and Efforts of Interest Groups in Post Elections Policy Formation

The Efficacy and Efforts of Interest Groups in Post Elections Policy Formation The Effcac a Efforts of Iterest Groups Post Electos Polc Formato Gl S. Epste Yosef Mealem Shmuel Ntza CESIFO WORKING PPER NO. 49 CTEGORY : PULIC CHOICE NOVEMER electroc verso of the paper ma be owloae

More information

RUNWAY OPERATIONS: Computing Runway Arrival Capacity

RUNWAY OPERATIONS: Computing Runway Arrival Capacity RUNWAY OPERATIONS: Computing Runway Arrival Capacity SYST 560/460 USE Runway Capacity Spreadsheet Fall 2008 Lance Sherry 1 CENTER FOR AIR TRANSPORTATION SYSTEMS RESEARCH Background Air Transportation System

More information

A RECURSION EVENT-DRIVEN MODEL TO SOLVE THE SINGLE AIRPORT GROUND-HOLDING PROBLEM

A RECURSION EVENT-DRIVEN MODEL TO SOLVE THE SINGLE AIRPORT GROUND-HOLDING PROBLEM RECURSION EVENT-DRIVEN MODEL TO SOLVE THE SINGLE IRPORT GROUND-HOLDING PROBLEM Lili WNG Doctor ir Traffic Management College Civil viation University of China 00 Xunhai Road, Dongli District, Tianjin P.R.

More information

Operator's Manual. PCB Separator MAESTRO 3E

Operator's Manual. PCB Separator MAESTRO 3E Operator's Manual PCB Separator MAESTRO 3E 2 Operator's Manual - Translaton of the Orgnal Verson 2 for the followng products Descrpton Type PCB Separator MAESTRO 3E/450 PCB Separator MAESTRO 3E/600 Edton:

More information

Temporal concentration Competition

Temporal concentration Competition Do an carriers dominate their connecting markets? A methodology for the analysis of market concentration on transfer routes * & Jaap de Wit *Dept of Planning Faculty of Geosciences Utrecht University,

More information

Surface Congestion Management. Hamsa Balakrishnan Massachusetts Institute of Technology

Surface Congestion Management. Hamsa Balakrishnan Massachusetts Institute of Technology Surface Congestion Management Hamsa Balakrishnan Massachusetts Institute of Technology TAM Symposium 2013 Motivation 2 Surface Congestion Management Objective: Improve efficiency of airport surface operations

More information

A Comparison of Cirque Features in the Sierra Nevada and Trinity Mountains. Iris Surname Benjamin Holt Christopher Surname

A Comparison of Cirque Features in the Sierra Nevada and Trinity Mountains. Iris Surname Benjamin Holt Christopher Surname A Compariso of Cirque Features i the Sierra Nevada ad Triity Moutais Iris Surame Bejami Holt Christopher Surame April, 26 INTRODUCTION Cirques are geerally semicircular, amphitheatre like bowls with a

More information

A Macroscopic Approach to Creating Exotic Matter

A Macroscopic Approach to Creating Exotic Matter PHYSICS/00007 A Maosop Appoah to Ceatg Exot Matte Chales T. dgely hales@dgely.ws Hee the Casm effet s used to peset a smple maosop vew o eatg exot matte. The eegy asg betwee two ealy pefetly odutg paallel

More information

Spares are readily available to help maximise the working life of every (page 49) Pushbutton. Lever. Water-saving flushing. Close-coupled.

Spares are readily available to help maximise the working life of every (page 49) Pushbutton. Lever. Water-saving flushing. Close-coupled. LIFE STYLE 4-4:MASTER SPREAD.qxd /06/0 6:57 Page Exposed cisters Dudley exposed plastic cisters have established a urivalled track record i millios of successful Our light to medium duty cisters are perfect

More information

._,_.:_ 3. ~ ~~0e.ei,~ c;- _) -,~... .~. I(.) ,:, ',,/ CATE:,., '\ l, j. i!!... : Camposll, FDR CRFi CSR #13921 I I. '.ii - -"\.

._,_.:_ 3. ~ ~~0e.ei,~ c;- _) -,~... .~. I(.) ,:, ',,/ CATE:,., '\ l, j. i!!... : Camposll, FDR CRFi CSR #13921 I I. '.ii - -\. ~ ~~0e.e,~ c- ~~'@ -- -- -,, CATE:,., ~ ---:~ _' : Camposll, FDR CRF CSR #13921 0 0 0._,_.:_ 3 -_,_ Lr.,-,_, _.. 0 0. 0.. ' '\ l, j J /J ~ _) -,~... J../').,/ ' ) \ ) '. - -"\.J,J : ) (.),:, ',,/... '

More information

Identification of MIMO Hammerstein models using Singular Value Decomposition approach

Identification of MIMO Hammerstein models using Singular Value Decomposition approach Iteratoal Joral of Copter Applcatos (975 8887) Vole 4 No.9, March Idetfcato of MIMO Haerste odels sg Sglar Vale Decoposto approach Badredde Lohch Laboratory of Sceces ad echqes of Atoatc cotrol & copter

More information

INSECT S. DISEASE 'MANAGEMENT

INSECT S. DISEASE 'MANAGEMENT spiclq PRONG FOREST 'Alpo INSECT S. DISEASE 'MANAGEMENT A3 USDA FOREST SERVICE NORTHERN REGION State & Private Forestry Missoula, MT 59801 3400 November 1978 Report No. 78-18 NONEFFECTIVENESS OF RIBES

More information

Fuzzy Expert System For The Selection Of Tourist Hotels

Fuzzy Expert System For The Selection Of Tourist Hotels INRNAIONAL JOURNAL OF SCINIFIC & CHNOGY RSARCH VOLUM, ISSU 09, SPMBR 06 ISSN 77-866 Fuzzy pert System For he Selecton Of ourst Hotels PAL SINGH Abstract : In the present work, a smple and very effectve

More information

Multiple comparison of green express aviation network path optimization research

Multiple comparison of green express aviation network path optimization research Multiple comparison of green express aviation network path optimization research XIANGCHAO LIU CHANGSONG MA HUA HE LI LUO Tian Fu College of Southwestern University of Finance and Economics IFSPA2012 HongKong

More information

THE RURAL TERRITORIAL INFRASTRUCTURE, THE SUPPORT FOR RURAL TOURISM ECONOMY IN THE DANUBIAN AREA OF THE SOUTH MUNTENIA REGION

THE RURAL TERRITORIAL INFRASTRUCTURE, THE SUPPORT FOR RURAL TOURISM ECONOMY IN THE DANUBIAN AREA OF THE SOUTH MUNTENIA REGION THE RURAL TERRITORIAL INFRASTRUCTURE, THE SUPPORT FOR RURAL TOURISM ECONOMY IN THE DANUBIAN AREA OF THE SOUTH MUNTENIA REGION Iulia DRĂGHICI 1,Ioaa ŢUGUI 2 1 Uiversity of Agricultural Scieces ad Veteriary

More information

Annual Weather Book RECORDED BY NW RESEARCH & OUTREACH CTR. By: Michael Leiseth

Annual Weather Book RECORDED BY NW RESEARCH & OUTREACH CTR. By: Michael Leiseth Annual Weather Book RECORDED BY NW RESEARCH & OUTREACH CTR. By: Michael Leiseth Table I II 1 2 3 4 5 6 7 8 9, 10 11, 12 13, 14 15, 16 17 18 An average year in Crookston, MN. Seasonal extremes in Crookston,

More information

Università Cattolica del Sacro Cuore A.A From weak periodic potentials to band structure

Università Cattolica del Sacro Cuore A.A From weak periodic potentials to band structure nestà Cattola del Sao Cuoe A.A. 5-6 Fo wea peod potentals to band stutue Fsa dello Stato soldo - I Modulo Bande elettone nestà Cattola del Sao Cuoe A.A. 5-6 One an gan substantal nsgt nto te stutue posed

More information

OPTIMIZATION OF OPERATING COSTS OF AIRLINE

OPTIMIZATION OF OPERATING COSTS OF AIRLINE OPTIMIZATION OF OPERATING COSTS OF AIRLINE Sláva Tarajčáková Róbert Rozenberg This article provides a survey of the operatg costs of full service carriers and their standardized distribution. It offers

More information

TRAFFIC IMPACT STUDY. for TOLLGATE VILLAGE. Thompson s Station, Tennessee. February 25, Prepared for:

TRAFFIC IMPACT STUDY. for TOLLGATE VILLAGE. Thompson s Station, Tennessee. February 25, Prepared for: TRAFFIC IMPACT STUDY for TOLLGATE VILLAGE Thompson s Staton, Tennessee February 25, 2015 Prepared for: MBSC TN HOMEBUILDERS, LLC 402 S. Gay Street, Sute 202 Knoxvlle, Tennessee 37902 Prepared by: RAGAN-SMITH-ASSOCIATES,

More information

MAY 10 Rev A

MAY 10 Rev A TERMASHIELD* Ferrule Crmpng Des for Tools 59500 and 69270-1 408-1662 26 MAY 10 PROPER USE GUIDELINES Cumulatve Trauma Dsorders can result from the prolonged use of manually powered hand tools. Hand tools

More information

Air-baggage drop-off during train ride to the airport

Air-baggage drop-off during train ride to the airport Air-baggage drop-off during train ride to the airport Dr. Bernhard RÜGER Vienna University of Technology TerminalOnRail Limitation of temperature rise: Initial position EU-wide reduction of greenhouse

More information

Risk-capacity Tradeoff Analysis of an En-route Corridor Model

Risk-capacity Tradeoff Analysis of an En-route Corridor Model Risk-capacity Tradeoff Analysis of an En-route Corridor Model Bojia Ye, Minghua Hu College of Civil Aviation, Nanjing University of Aeronautics and Astronautics Nanjing, China yebojia2010@gmail.com Abstract

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base II xhibit -40, udget ine Item ustification: 2016 avy ate: ebruary 2015 ppropriation / udget ctivity / udget ub ctivity: 1508: rocurement of mmo, avy & / 01: roc mmo, avy / 1: avy mmunition -1 ine Item

More information

The effect of the High Aswan Dam on the hydrological regime of the River Nile

The effect of the High Aswan Dam on the hydrological regime of the River Nile The nfluence of man on the hydrologcal regme wth specal reference to representatve and expermental basns L'nfluence de l'homme sur le régme hydrologque avec référence partculère aux études sur les bassns

More information

A SEGMENTED ARCHITECTURE APPROACH TO PROVIDE A CONTINUOUS, LONG-TERM, ADAPTIVE AND COST- EFFECTIVE GLACIERS MONITORING SYSTEM

A SEGMENTED ARCHITECTURE APPROACH TO PROVIDE A CONTINUOUS, LONG-TERM, ADAPTIVE AND COST- EFFECTIVE GLACIERS MONITORING SYSTEM 1st IAA Latin American Symposium on Small Satellites: Advanced Technologies and Distributed Systems A SEGMENTED ARCHITECTURE APPROACH TO PROVIDE A CONTINUOUS, LONG-TERM, ADAPTIVE AND COST- EFFECTIVE GLACIERS

More information

Research On Reducing The Cost of Stopping Port By Queuing Theory

Research On Reducing The Cost of Stopping Port By Queuing Theory Research O Reducig Cost of Stoppig Port By Queuig ory Astract Ligyu Dog Merchat shippig college, Shaghai maritime uiversity, Shaghai 20306, Chia. 20940000@qq.com With the developmet of gloal ecoomic itegratio,

More information

Improvement of Rail-sea Multimodal Transport with Dry Port Construction: Case Study of Ningbo-Zhoushan Port

Improvement of Rail-sea Multimodal Transport with Dry Port Construction: Case Study of Ningbo-Zhoushan Port Scece Joural of Busess a Maagemet 207; 5(2): 78-87 http://www.scecepublshggroup.com/j/sjbm o: 0.648/j.sjbm.2070502.6 ISSN: 233-0626 (Prt); ISSN: 233-0634 (Ole) Improvemet of Ral-sea Multmoal Trasport wth

More information

Improving Bus Service Reliability: The Singapore Experience

Improving Bus Service Reliability: The Singapore Experience Improvig Bus Service Reliability: The Sigapore Experiece Waiya Leog a*,kare Goh b, Stephae Hess c, Paul Murphy d a Lad Trasport Authority, No. 1 Hampshire Road Sigapore 219428. b Miistry of Commuicatios

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base. FY 2017 Base FY 2017 OCO. Total Obligation Authority

UNCLASSIFIED FY 2017 OCO. FY 2017 Base. FY 2017 Base FY 2017 OCO. Total Obligation Authority II xhibit -40, udget ine Item ustification: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508: rocurement of mmo, avy & / 01: roc mmo, avy / 1: avy mmunition -1 ine Item

More information

South Park Blocks Framework Master Plan: Property Owner Interview Summary

South Park Blocks Framework Master Plan: Property Owner Interview Summary Portland State Unversty PDXScholar Portland Cty Archves Oregon Sustanable Communty Dgtal Lbrary --980 South Park Blocks Framework Master Plan: Property Owner ntervew Summary Portland (Or.). Development

More information

Evaluating the Robustness and Feasibility of Integer Programming and Dynamic Programming in Aircraft Sequencing Optimization

Evaluating the Robustness and Feasibility of Integer Programming and Dynamic Programming in Aircraft Sequencing Optimization Evaluating the Robustness and Feasibility of Integer Programming and Dynamic Programming in Aircraft Sequencing Optimization WPI Advisors Jon Abraham George Heineman By Julia Baum & William Hawkins MIT

More information

Thermal Stability Influence of the Enclosure Structure on the Building s Energy Efficiency

Thermal Stability Influence of the Enclosure Structure on the Building s Energy Efficiency Termal Stability Influene of te Enlosure Struture on te Building s Energy Effiieny Daria Zaborova 1,*, Marina Petroenko 1 and Ludmila Cernenkaya 1 1 Peter te Great Saint-Petersburg Polyteni University,

More information

SAFETY STOCK ESTIMATION OF UNIT LOAD DEVICES FOR INTERNATIONAL AIRLINE OPERATIONS

SAFETY STOCK ESTIMATION OF UNIT LOAD DEVICES FOR INTERNATIONAL AIRLINE OPERATIONS Joural of Marie Sciece ad Techology, Vol. 2, No. 4, pp. 43-44 (22) 43 DOI:.69/JMST--322- SAFETY STOCK ESTIMATION OF UNIT LOAD DEVICES FOR INTERNATIONAL AIRLINE OPERATIONS Hua-A Lu ad Chie-Yi Che 2 Key

More information

WELCOME. Please sign in. brampton.ca/lrtextension 3-1-1

WELCOME. Please sign in. brampton.ca/lrtextension 3-1-1 WELCE Please sgn n brampton.ca/lrtextenson -- Wllams Pkwy What s the LRT Extenson udy? Extendng the planned urontaro LRT from the at eeles Avenue to the G aton s a key transt prorty and ctybuldng project

More information

Massachusetts Institute of Technology. Airport Systems Planning & Design

Massachusetts Institute of Technology. Airport Systems Planning & Design An Investgaton of Shared Gate Assgnment Case study n Termnal C of Boston s Logan Internatonal Arport nal Presentaton, 8 December 2009 Gerasmos Skaltsas An Investgaton of Shared Gate Assgnment Case study

More information

Birmingham City Centre Vision for Movement

Birmingham City Centre Vision for Movement Birmingham City Centre Vision for Movement Wes Sedman - Centro Commissioning Team Laying the foundations for a vibrant and liveable global city Birmingham Big City Plan - A City Centre Masterplan A vision

More information

EUROCONTROL RPAS ATM CONOPS. Edition 4.0

EUROCONTROL RPAS ATM CONOPS. Edition 4.0 EUROCONTROL RPAS ATM CONOPS Editio 4.0 DOCUMENT DESCRIPTION Documet Title RPAS ATM CONOPS Iteral Code ATM.STR.CONOPS-RPAS.V(E) Type Editio Editio Date Applicatio Date CONOPS V4.0 21/02/2017 21/02/2017

More information

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 II xhibit -40, udget Item ustification heet: 2014 avy ate: pril 2013 ppropriation / udget ctivity / udget ub ctivity: 1508: rocurement of mmo, avy & / 01: roc mmo, avy / 1: avy mmunition -1 ine Item omenclature:

More information