1 The LINK2000+ Test Facility Presentation Eurocontrol LINK Programme October 2004
2 TABLE OF CONTENTS The Test Facility objectives...2 The Test Facility description...2 ATN routers...2 Air and Ground Test Tools...3 ATN/VDL-M2 Air-Ground Test System...5 Avionics Pallet...7 How the Test Facility is used by LinK2000+ Partners...9 Avionics perspective...9 ANSP perspective...10 ACSP perspective...10 Achievements...13 Upcoming in Q Page 1
3 The Test Facility objectives The LINK2000+ Test Facility is located at the Eurocontrol Experimental Center (EEC) at Bretigny-sur-Orge in France. It is part of the EEC Aeronautical Telecommunication Network (ATN)/VDL Mode2 laboratory. The main objective of the LINK2000+ Test Facility is to support the validation of operational CPDLC services and ATN/VDL Mode2 infrastructure for both air and ground implementations before they are approved in an ATC operational environment. The LINK2000+ Test Facility provides an inter-operability testing platform for the LINK baseline and offers: - support to Avionics suppliers and Airlines on CPDLC/ATN/VDL-M2 interoperability testing, - support to Maastricht UAC and other ANSPs (Air Navigation Service Providers) implementations on CPDLC/ATN interoperability testing, - support in deployment of LINK2000+ ATN/VDL-M2 Air-Ground and Ground-Ground infrastructure for ACSPs (Air-Ground Communication Service Providers). The Test Facility description The LINK2000+ Test Facility platform includes the following components: - interconnected ATN routers to build an ATN topology in the LAB, - a set of ATN End Systems hosting the CM/CPDLC application air and ground test tools, - one VDL-M2 test system from ARINC (AGTS) emulating a real VDL-M2 environment, - one avionics pallet with avionics equipment from Rockwell Collins (other avionics pallets will be added as the products become available from vendors). ATN routers A set of ATN routers supporting ICAO SARPs compliant protocols (CLNP and IDRP) are hosted on SUN, HP-UX, and LINUX PCs workstations. They are all linked together in order to build an ATN topology in LAB for testing purposes. These routers are interconnected via X.25 static circuits through the Test Facility X.25 Newbridge switches. ATN connections and adjacencies with the LINK2000+ partners (ARINC, SITA, Maastricht ) are managed via the Test Facility s main router, the ProATN operational ATN router from Sofreavia. ISDN and X.25 networks (Equant-SITA and TRANSPAC) are used for interconnection with external sites. Page 2
4 LINK2000+ Test Facility ATN topology Air and Ground Test Tools System architecture The LINK test tools are hosted on COMPAQ PC LINUX workstations equipped with Wanware X.25 boards. The test tools include ATN software and CPDLC application software from Airtel ATN: ATN lower layers, with support of X.25 and LAN SNDCFs ATN Upper Layers, CM and CPDLC Application Service Entities (ASEs) CM/CPDLC applications software based on TCL/TK HMIs Page 3
5 AIR/GROUND TEST TOOL HMI Airtel CPDLC/CM ASEs ATN Upper Layers COMPAQ EVO PC Linux OS Wanware X.25 boards Lan integrated interface Airtel TAR-TTS BIS/ES X.25 Access Ethernet Access CM and CPDLC Applications LINK2000+ Test Tools System Architecture The air and ground CM applications manage CM Logon and CM User Abort functionalities. The key components of the Test Tools are the CPDLC applications as described below: Connectivity Management Air and Ground CPDLC Test Tools support CPDLC connections (CPDLC Start, CPDLC End, CPDLC User Abort) with possibility to handle multiple aircraft on the ground test tool. Messages sets CPDLC Air and Ground Test Tools Implement LINK2000+ Baseline Air and Ground CPDLC message sets and support single and concatenated messages uplink and downlink. Support of Error Test Cases Both tools support test of error cases to check the robustness of the remote system under validation; this includes: - availability to send invalid message sequences, - availability to send invalid message identifiers or references, - availability to send the Logical Acknowledgment (LACK) back or not, - availability to generate unsupported messages. Automatic messages The CPDLC test tools manage automatic generation of erroneous messages: those messages convey an invalid reference number that automatically generates ERROR messages sent back by the remote side (no controller/pilot action requested). The erroneous messages are sent with a configurable period from 1s to 300s. Page 4
6 This functionality is used in order to evaluate the robustness of the remote system (stress situation) and to check continuity of VDL-M2 coverage during flight trials. Logs of events On both tools CPDLC messages are captured in a trace window (one window per aircraft on the ground side), and all uplink and downlink exchanges are logged for further analysis. LINK2000+ Test Tools CPDLC main and logging windows ATN/VDL-M2 Air-Ground Test System The main objective targeted by Eurocontrol with the air-ground test system facility is to get a system in the LAB functionally as similar as is possible to the operational system: - for verification of VDL-M2 intended functioning, - to have a close look at VDL-M2 Handoffs, - to be able to conduct end-to-end CPDLC testing in LAB via VDL-M2, - to get expertise on the Maastricht ACSP VDL-M2 equipment, - to help in investigations of real environment VDL-M2 problems. The core component is the ARINC VDL-M2 AGTS Page 5
7 It is operationally equivalent ATN/VDL-M2 capable Test facility It includes two VGSs and associated VDRs It includes Variable RF attenuators for simulation of live mobile environment It includes ATN A/G BIS and G/G BIS routers It allows registration of traces in VGSs and monitoring of the VDL-M2 traffic from a third VGS/VDR set It includes two control PC units ARINC AGTS installed at the EEC Page 6
8 Avionics Pallet The avionics currently installed at EEC LAB is a Rockwell-Collins avionics test rig consisting of the following components: Communication Management Unit CMU-900 Aircraft Personality Module APM-900 VHF Data Radio VHF-920 Multi-Function Control and Display Unit CDU-3000 Avionics pallet with Rockwell Collins equipment Page 7
9 In the LAB, the avionics set is connected to the Air/Ground test system through coaxial cable as shown on the diagram below. The objective is to perform Interop Testing between the avionics and the Ground Test Tool in a first step, and then further on between the avionics and ANSPs ground implementations. Avionics Pallet VDL M2 Air/Ground Test system:agts CMU VDR Coaxial Cable Network MCDU Vdl-2 radio Vdl-2 radio Ground Test Tool Equipment VGS Control Unit G/G router A/G router Avionics, ARINC AGTS and Ground Test Tool Synopsis Page 8
10 How the Test Facility is used by LinK2000+ Partners Avionics perspective Testing with an avionics vendor or airline follows the sequenced approach described below: The avionics partner defines an Interoperability Test plan at CM/CPDLC level for his own system In a first step the avionics is evaluated in a LAB to LAB configuration against the Test Facility Ground Test Tool(s). Evaluation includes Interop. testing defined by Avionics, as well as extra test cases such as: - Error Test cases: LACK not sent back, invalid Msg Id or Msg Ref included in a message, unsupported message sent to the air implementation, - Exercise of continuous flow of erroneous messages to test the robustness of the remote air system (this is called Tuning test ). In a second step an avionics pallet is installed at the EEC. This pallet is connected via coaxial cable to the ARINC AGTS: evaluation is performed again in front of the Ground Test Tool. Aircraft VDL-M2 handoffs behaviour is checked while exercising tuning tests from the Ground Test tool with configurable period from 10s to 3s interval. In a third step the Avionics pallet is installed in the NLR experimental aircraft. The objective is to check the aircraft behaviour during VDL-M2 handoffs in a real VDL- M2 environment while performing flight trials over Maastricht Upper Area airspace. Evaluation is done in front of the Ground Test Tool with tuning test at 10 seconds period interval. Finally testing sessions may be offered to airlines from their own test bed in order for the pilots to get some confidence in the ATN/CPDLC application installed on board. Testing Aircraft Avionics Airline Test bed ATN VDL-M2 Avionics Simulation Avionics LAB X25 / ISDN Ground TT Ground TT EEC Lab ARINC AGTS Avionics Pallet Page 9
11 Avionics Testing Architecture ANSP perspective Testing a ground implementation follows the approach described below: First, the ANSP defines an Interoperability Test plan at CM/CPDLC level for his ground system The ground application is then evaluated in a LAB to LAB configuration against the Facility Air Test Tool. Evaluation includes Interop. testing defined by the ANSP, but as well extra test cases exercised from the Air Test Tool such as: - Error Test cases: LACK not sent back, invalid Msg Id or Msg Ref included in a message, unsupported message sent to the ground implementation, - Exercise of continuous flow of erroneous messages to test the robustness of the remote ground system (also called Tuning test ). Finally, the ground ANSP application is tested against an Avionics Pallet (real aircraft equipment connected to the ARINC AGTS. This allows the ground application to be tested with realistic round trip delays, with aircraft processing VDL- M2 handoffs situations as offered by the AGTS ATSP application ATC Center X25 / ISDN Avionics Pallet Air TT EEC Lab ARINC AGTS Ground TT ANSP Testing Architecture ACSP perspective Any ACSP ATN/VDL-M2 infrastructure deployed in the context of LINK2000+ is validated by Eurocontrol following an Acceptance Test plan: The Acceptance process includes an evaluation period consisting of: - Verification of compliance based on documents provided by the ACSP - Tests performed from the ACSP LAB to EEC LAB, - Live trials conducted with an Experimental Aircraft. Page 10
12 Live trials are performed with an aircraft provided and operated by Eurocontrol, the NLR Citation II aircraft PH-LAB based at Amsterdam-Schipol, with Rockwell Collins ATN/VDL-M2 avionics installed on board on a similar pallet as at the EEC Test Facility. The main objective of the live trials is to validate the coverage and performance delivered by the ACSP in the Maastricht Upper Area airspace by exercising continuous end to end CPDLC traffic between the avionics and the EEC ground Test Tool. NLR Citation PH-LAB aircraft Avionics equipment used in NLR Citation PH-LAB aircraft Page 11
13 The evaluation period is followed by an observation period of three months where airlines contracting the ACSP are flying over Maastricht Upper Airspace Page 12
14 Achievements Rockwell Collins: validation of CMU 900 LINK2000+ Baseline, Jul-Aug 03 Validation of the CMU 900 LINK2000+ Baseline compliant software, from Rockwell Cedar Rapids LAB to EEC LAB, and then with real avionics pallet at EEC connected to the ARINC AGTS. This was followed by flight trials with the NLR Citation aircraft. Maastricht: validation of LINK2000+ Baseline, Oct-Nov 03 Interoperability Testing between Maastricht LINK2000+ ground implementation and the Facility Air Test Tool followed by Interop Testing between Maastricht implementation and Rockwell Collins avionics pallet at EEC. ARINC: validation of ATN/VDL-M2 infrastructure in Europe, Sept-Oct 03 Flight trials, involving the Test Facility Ground Test Tool, with NLR experimental aircraft equipped with Rockwell Collins avionics, to validate ARINC ATN/VDL-M2 network deployed in Europe for LINK SAS: Preparation of Certification flight, Dec 03 Testing sessions from SAS Airlines test bed via real VDL-M2 environment to prepare the SAS ATN/CPDLC Certification flight. Testing sessions to bring SAS pilots confident in the new ATN/CPDLC application. SITA: Validation of ATN/VDL-M2 infrastructure in Europe, Jul-Sept 04 Flight trials, involving the Test Facility Ground Test Tool, with NLR experimental aircraft equipped with Rockwell Collins avionics, to validate SITA ATN/VDL-M2 network deployed in Europe for LINK Air Europa: Preparation of Certification flight, June-Aug 04 Testing sessions with Boeing from Seattle laboratory, to validate Rockwell Collins CMU 900 equipment installed in B737 for delivery to Air Europa. Testing session to prepare the Air Europa ATN/CPDLC Certification flight. Upcoming in Q FedEx: Preparation of Certification flight Testing sessions from FedEx laboratory in Memphis to prepare the FedEx ATN/CPDLC Certification flight on B737 equipped with Rockwell Collins CMU 900. ATI: Preparation of Certification flight Testing sessions from ATI grounded aircraft in Toulouse to prepare the ATI ATN/CPDLC Certification flight on A300 Beluga equipped with Rockwell Collins CMU 900. Honeywell: Validation of CMU-Mark II Validation of the CMU-Mark II LINK2000+ Baseline compliant software from Honeywell laboratory in Redmond. Page 13
THE LINK DATALINK TEST FACILITY CPDLC GROUND AUTOMATED TOOL. March By Isabelle HERAIL
THE LINK 2000+ DATALINK TEST FACILITY CPDLC GROUND AUTOMATED TOOL March 2007 By Isabelle HERAIL TABLE OF CONTENTS Introduction...2 CPDLC Ground Automated Tool...3 Objectives...3 Automated Tool Accessibility...4
More informationAir/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December
Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December 2001 - Mike Murphy ATN Systems, Inc. (ATNSI) 703-412 412-2900, 2900, Mike.Murphy@atnsi.com ATNSI, ATN Seminar 1 Presentation
More informationCOMMUNICATIONS PANEL (CP) WORKING GROUP I (WG-I) IPS over VDLm2 Feasibility Demonstration. CP WGI 19/IP January 2016
International Civil Aviation Organization INFORMATION PAPER CP WGI 19/-01 20-22 January 2016 COMMUNICATIONS PANEL (CP) WORKING GROUP I (WG-I) Montreal, QC Canada 20-22 January 2016 Agenda Item 4: Completion/evolution
More informationATN London, September SITA DATALINK SERVICES & APPLICATIONS Enabling CNS Evolution
ATN 2005 London, 20 21 September 2005 SITA DATALINK SERVICES & APPLICATIONS Enabling CNS Evolution Overview Datalink Infrastructure Air Traffic Services Current Services & Applications Pioneering Future
More informationSummary. Filename: IDOC Created: July 24, 2012 Modified: May 6, 2013
Commercial Systems 400 Collins Road NE Cedar Rapids, IA 52498 Tel.319.295.5000 Fax 319.295.5064 Title: Rockwell Collins Data Link Graphical Weather Services, Single & Dual FANS, ARINC 702A AOC Messaging
More informationAir traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning
Purpose: Release 5 SESAR Solution ID #109 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution with a summary of the results stemming
More informationEuropean Aviation Safety Agency. Report. Technical issues in the implementation of Regulation (EC) No 29/2009 (Data Link) Version 1.
Report Technical issues in the implementation of Regulation (EC) No 29/2009 (Data Link) Version 1.1 In response to the EC letter ref. DG MOVE E2/GO/cd D(2013), Ares(2013)3672917 Page 1 of 193 Report Technical
More informationTHE NEXT GENERATION OF AIRCRAFT DATA LINK. Presented by: Rockwell Collins Cedar Rapids, Iowa 52498
THE NEXT GENERATION OF AIRCRAFT DATA LINK Presented by: Rockwell Collins Cedar Rapids, Iowa 52498 TABLE OF CONTENTS Introduction..........................................................................................1
More informationASPASIA Project. ASPASIA Overall Summary. ASPASIA Project
ASPASIA Project ASPASIA Overall Summary ASPASIA Project ASPASIA Project ASPASIA (Aeronautical Surveillance and Planning by Advanced ) is an international project co-funded by the European Commission within
More informationSESAR AEROMACS PROJECTS P9.16 New Communication Technology at Airport P Airport Surface Datalink
SESAR AEROMACS PROJECTS P9.16 New Communication Technology at Airport P15.02.07 Airport Surface Datalink AERONAUTICAL COMMUNICATIONS PANEL (ACP) 6th Meeting of the Working Group S (Surface) Sendai, Japan
More informationi4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales
i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales 1 Single European Sky ATM Research (SESAR) - Objectives Enabling EU skies to handle 3 times
More informationExcerpts from ICAO PBCS Manual
IBAC Bulletin - 8 Dec. 2017 Attachment A Excerpts from ICAO PBCS Manual Chapter 4. Complying with and RCP/RSP specification 4-8 4.3.1.7 The ANSP should establish the following, subject to a bilateral,
More informationElectronic visibility via ADS-B for small aircraft. John Korna, NATS
Electronic visibility via ADS-B for small aircraft John Korna, NATS The SESAR General Aviation challenge SESAR is predominantly aimed at scheduled commercial air traffic and 100M+ airframes How is SESAR
More informationOVERVIEW OF THE FAA ADS-B LINK DECISION
June 7, 2002 OVERVIEW OF THE FAA ADS-B LINK DECISION Summary This paper presents an overview of the FAA decision on the ADS-B link architecture for use in the National Airspace System and discusses the
More informationNAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten
NAV CANADA and DATA LINK IMPLEMENTATION Shelley Bailey NAV CANADA May 2016 Sint Maarten OPDWLG Operational Data Link Working Group 5 members here today representing ANSPs, manufacturers and regulators
More informationATC Guild, India. November 1 st, SITA AIRCOM Air Traffic Services Data Link Operational Solutions
ATC Guild, India November 1 st, 2004 SITA AIRCOM Air Traffic Services Data Link Operational Solutions Akhil Sharma Director CNS Services www.sita.aero Overview SITA AIRCOM Data Link Service Air Traffic
More informationBoeing Air Traffic Service (ATS) Data Link Perspectives and Capabilities
Boeing Air Traffic Service (ATS) Data Link Perspectives and Capabilities Mike Matyas SAT FIT/11 June 2016 Export of this technology is controlled under the United States Export Administration Regulations
More informationForty years of vision. The EUROCONTROL Maastricht UAC story. years of vision EUROCONTROL MAASTRICHT UAC EUROCONTROL
1972-2012 Forty years of vision The EUROCONTROL Maastricht UAC story years of vision EUROCONTROL MAASTRICHT UAC EUROCONTROL years of vision EUROCONTROL MAASTRICHT UAC Since the dawn of time, man has dreamed
More informationTHE LARGEST FAMILY-OWNED BUSINESS AVIATION SERVICE CENTER IN THE WORLD
THE LARGEST FAMILY-OWNED BUSINESS AVIATION SERVICE CENTER IN THE WORLD DISCUSSION TOPIC In the early 1980s, the International Civil Aviation Organization (ICAO) became concerned with the aging infrastructure
More informationAircraft Systems and 4D Trajectory Management
Aircraft Systems and 4D Trajectory Management September 2012 David De Smedt EUROCONTROL 1 i4d concept (SESAR) Share and synchronise airborne and ground trajectory Flying to time constraints to optimize
More informationAeronautical Communications: Changes Ahead - FCI
Aeronautical Communications: Changes Ahead - FCI Aviation Electronics Europe Munich, Germany 25-26 March 2015 Nikos Fistas EUROCONTROL v 1.0 Agenda Current Status Future Communication Infrastructure (FCI)
More informationTDR Mode S and ADS-B Transponders
Business and Regional Systems Marketing Bulletin TDR Mode S and ADS-B Transponders Ref. No. BRS-110102.2M Pub Date 06/2012 Offering a variety of system solutions to meet Elementary/Enhanced Surveillance
More informationOPERATIONS CIRCULAR. Subject: Performance Based Communication and Surveillance (PBCS) OC NO 01 of 2018 Date: 23 rd March 2018
GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 01 of 2018 Date: 23 rd March 2018 OPERATIONS CIRCULAR File No AV 22024/02/2018-FS Subject: Performance Based Communication
More informationDual Use of Commercial Avionics Data Links for the U. S. Air Force
Dual Use of Commercial Avionics Data Links for the U. S. Air Force Mary M. Girard, Richard F. Brady The MITRE Corporation Center for Air Force C2 Systems Bedford, Massachusetts Capt. Stephen W. Hill United
More informationARINC Project Initiation/Modification (APIM)
Project Initiation/Modification proposal for the AEEC Draft - 14 February 2017 ARINC Project Initiation/Modification (APIM) 1.0 Name of Proposed Project APIM 17-005 Timely Recovery of Flight Data (TRFD)
More informationAIRCOM Datalink Infrastructure
AIRCOM Datalink Infrastructure Patrick Geurts Copyright SITAONAIR 2016 August 8-11, 2016 Operational Datalink Seminar Accra, Ghana Agenda 1. High Level SITAONAIR Overview 2. SITAONAIR Aircraft Communications
More informationDANUBE FAB real-time simulation 7 November - 2 December 2011
EUROCONTROL DANUBE FAB real-time simulation 7 November - 2 December 2011 Visitor Information DANUBE FAB in context The framework for the creation and operation of a Functional Airspace Block (FAB) is laid
More informationRTCA SC-216 Aeronautical Systems Security
RTCA SC-216 Aeronautical Systems Security FAA SW&AEH Aug 20-21, 21, 2008 Denver, CO Presented by: Dr. Daniel P. Johnson, Co-Chair Chair RTCA SC-216 Contact: daniel.p.johnson@honeywell.com Topics RTCA SC-216,
More informationIntegrated Modular Avionics. The way ahead for aircraft computing platforms?
Integrated Modular Avionics The way ahead for aircraft computing platforms? 1 Contents The Need for IMA IMA Structure and Services Design Using IMA Related Subjects Conclusion 2 Integrated Modular Avionics
More informationData Link Deep Dive. Brandon Burton
Data Link Deep Dive Brandon Burton www.mygdc.com Overview of Data Link FANS 1/A Data Link ATN Data Link (PM-CPDLC) Automatic Dependent Surveillance Operational Capabilities FANS 1/A Datalink AFN Logon
More informationATC automation: facts and steps ahead
ATC automation: facts and steps ahead Objectives Context Stating the problem Current solution Steps ahead Implementation constraints ATC automation: facts and steps ahead Objectives Understand why ATC
More informationEuropean ATM Development The Big Idea
European ATM Development The Big Idea Bo Redeborn Principal Director ATM EUROCONTROL CANSO Data Communications Conference Amsterdam, 6-8 th Sept 2011 The European Organisation for the Safety of Air Navigation
More informationGOLD / PBCS Operational Approval (Compliance)
Session 3: Preparation for data link implementation (Operator) GOLD / PBCS Operational Approval (Compliance) Presented to: Operational Data Link Familiarization Seminar (Nairobi, Kenya) By: Tom Kraft tom.kraft@faa.gov
More informationInternational Civil Aviation Organization Automatic Dependent Surveillance Broadcast (ADS-B) Study and Implementation Task Force
ADS-B-SITF/IP/6 International Civil Aviation Organization Automatic Dependent Surveillance Broadcast (ADS-B) Study and Implementation Task Force Brisbane, Australia, 24-26 March 2003 Agenda Item 3: Evaluate
More informationAdvisory Circular. Special Authorization (SA) for Required Communications Performance (RCP) 240 and Required Surveillance Performance (RSP) 180
Advisory Circular Subject: Special Authorization (SA) for Required Communications Performance (RCP) 240 and Required Surveillance Performance (RSP) 180 Issuing Office: Civil Aviation, Standards Document
More informationINTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)
IP-5 INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE (Dakar, Senegal, 20 22nd July 2011) Agenda item: Presented by: Implementation of a African Regional Centralised Aeronautical
More information853D ELECTRONIC SYSTEMS GROUP
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 853D ELECTRONIC SYSTEMS GROUP ACTFAST BRIEFING Mark Vollmer 412 TH ENV (contr) Edwards AFB, CA Date: April 2007 Overview high level system testing
More informationFirst Review Meeting of AFI VSAT Network Managers (AFI VSAT Review/1) (Dakar, Senegal, 3 to 5 October 2011) SUMMARY
AFI VSAT/2 WP/04B INTERNATIONAL CIVIL AVIATION ORGANIZATION Western and Central African (WACAF) Office First Review Meeting of AFI VSAT Network Managers (AFI VSAT Review/1) (Dakar, Senegal, 3 to 5 October
More informationAVBUYER THIS MONTH. GAMA 2014 Year-End Shipment Analysis. Safety Focus: Keeping Pace with Technology. Aircraft Comparative Analysis - Bell 206B-3
AVBUYER March 2015 B U S I N E S S A V I A T I O N I N T E L L I G E N C E THIS MONTH GAMA 2014 Year-End Shipment Analysis Safety Focus: Keeping Pace with Technology Aircraft Comparative Analysis - Bell
More informationAMAN RESEARCH IN SESAR
AMAN RESEARCH IN SESAR CCA939 TAP842 AZA1480 BPA1713 Arrival MANager (AMAN) Advisories to ground in complex cross border AMAN: Time To Lose/Time To Gain (TTL/TTG) Speed Use of new avionics capabilities:
More informationAustralia Destroy Sri Lanka in Cricket ADS-C? ICAO CARSAM Surveillance Seminar June SITA
Australia Destroy Sri Lanka in Cricket ADS-C? ICAO CARSAM Surveillance Seminar June 18 20 2007 1 SITA Overview of ADS-Contract ICAO Surveillance Seminar 18 20 th June 2007 Port of Spain Akhil Sharma Director,
More informationCOMMUNICATIONS PANEL. WG-I 20 Meeting
International Civil Aviation Organization CP/WG-I20/WP-04 29/02/2016 WORKING PAPER COMMUNICATIONS PANEL WG-I 20 Meeting Montreal, Canada 29 Feb 4 Mar, 2016 Agenda Item xx: Title: IP Environment for UAS
More informationTHIS MONTH. Aircraft Finance Review Engine-Maintenance Management Aircraft Comparative Analysis Phenom 300 Safety Focus: When No is Necessary
AVBUYER February 2015 B U S I N E S S A V I A T I O N I N T E L L I G E N C E proudly presents 2014 Gulfstream G650 Serial Number 6088 See pages 32-35 for further details THIS MONTH Aircraft Finance Review
More informationHome LIST OF ACRONYMS
LIST OF ACRONYMS 6. List of s A/G A-CDM ADS-C AF AFP/ACH AFUA AMAN ANSP AOP APCH APV ARES ASBU ASM A-SMGCS ATC ATCO ATFCM ATM ATM MP ATN ATSP AU CBA CCO CDM CDO CEF CPDLC CPs CTM CTOT DCB DCT DL DLS DMAN
More informationAIR TRAFFIC MANAGMENT A growing partnership Air Ground Communication
AIR TRAFFIC MANAGMENT A growing partnership Air Ground Communication ICAO Seminar/workshop on the Implementation of Ground-ground and Air- ground data links in the SAM Region - Lima, Peru 12/Sep/2012 By:
More informationCONVERTING AN AIRLINE TO CPDLC (AIR EUROPA EXPERIENCE)
CONVERTING AN AIRLINE TO CPDLC (AIR EUROPA EXPERIENCE) 1 Cpt. Apple Tree Cpt. Cherry Tree AEA is a very "Fruitful" Airline!! 2 3 Air Europa Founded in 1986 Headquarters in Mallorca (Spain) 80% Sheduled,
More informationICAO provisions on data link implementation
ICAO provisions on data link implementation Crystal Kim Technical Officer, Airspace Management and Optimization Section Secretary of Operational Data Link Working Group (OPDLWG) and Air Traffic Management
More informationWhat you should know: Future Air Navigation System (FANS)
WHITE PAPER What you should know: Future Air Navigation System (FANS) STC Program for Challenger 601-3A/R FANS 1/A+ STC includes CPDLC, ADS-C and provisioning for ADS-B and Link 2000+ WORLD S MOST EXPERIENCED
More informationICNS 2014 Workshop Integration of Advanced CNS Capabilities supporting NextGen/SESAR/CARATS
ICNS 2014 Workshop Integration of Advanced CNS Capabilities supporting NextGen/SESAR/CARATS Introduction to the Workshop With this year s ICNS, we would like to start a new approach for an even more intense
More informationCentral Reporting Agency (CRA) Issues List
Central Reporting Agency (CRA) Issues List Global Operational Data Link (GOLD) Familiarization with Performance Based Communications and Surveillance (PBCS) Workshop Dakar, Senegal 11-15 September 2017
More informationNEXT GENERATION SATELLITE SYSTEMS FOR AERONAUTICAL COMMUNICATIONS
NEXT GENERATION SATELLITE SYSTEMS FOR AERONAUTICAL COMMUNICATIONS Participating Units at U of Maryland: : National Center of Excellence for Aviation Operations Research : Center for Satellite and Hybrid
More informationWORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness
REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM 23-25 March 2015 WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness Stephen George Bruno Moitre Rapporteurs WG1 Remotely Piloted Aircraft Systems (RPAS)
More informationFAA GBAS Program Update January 29, 2010
US-India Aviation Cooperation Program FAA GBAS Program Update January 29, 2010 Carlos A. Rodriguez FAA GBAS Program Manager Major milestone completed in the history of the FAA GBAS program FAA completed
More informationELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October 2003
11/9/03 ELEVENTH AIR NAVIGATION CONFERENCE Montreal, 22 September to 3 October 2003 Agenda Item 7 : Aeronautical air-ground and air-to-air communications CURRENT TRENDS IN THE IMPLEMENTATION OF AIR TRAFFIC
More informationInternational Civil Aviation Organization
International Civil Aviation Organization THE FOURTH MEETING OF STUDY AND IMPLEMENTATION TASK FORCE ( SITF/4) Nadi, Fiji, 26-28 October 2005 Agenda Item 13: Discuss issues observed during the trial and
More informationPlace image here (10 x 3.5 ) FAA NEXTGEN DATA COMM TOWER SERVICE: CPDLC DCL NEW OPERATOR INTRODUCTION HARRIS.COM #HARRISCORP
Place image here (10 x 3.5 ) FAA NEXTGEN DATA COMM TOWER SERVICE: CPDLC DCL NEW OPERATOR INTRODUCTION HARRIS.COM #HARRISCORP Agenda Data Comm Basics Benefits of Data Comm Departure Clearance Explanation
More information[EFFECTIVE DATE: 23 AUG 2012]
AIRAC AIP SUPPLEMENT TEL: 91-11-24632950 Extn: 2219/2233 AFS : VIDDYXAX FAX : 91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN
More informationSeychelles Civil Aviation Authority. Telecomm & Information Services Unit
Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA
More informationSatcom Direct Communications, Inc. and SITA DSP Contract Program Presentation for the 2007 CNS/ATM Conference. 25 April 2007
Satcom Direct Communications, Inc. and SITA DSP Contract Program Presentation for the 2007 CNS/ATM Conference 25 April 2007 Agenda Introduction About Satcom Direct About SITA Contract Details Service Architecture
More informationCRISTAL Toulouse. Fourth Meeting of ADS-B Study and Implementation Task Force October 2005 Nadi, Fiji
CRISTAL Toulouse Fourth Meeting of ADS-B Study and Implementation Task Force 26-28 October 2005 Nadi, Fiji CASCADE Validation Approach EUROCONTROL Project focusing on ADS and Data Link Include validation
More informationADS-B. Installation Challenges. July 13, Federal Aviation Administration. James Marks ADS-B Focus Team Lead FAA Flight Standards Service
ADS-B Installation Challenges July 13, 2017 James Marks ADS-B Focus Team Lead FAA Flight Standards Service Agenda ADS-B Out Mandate Equipage Enablers Installation Challenges Rule Performance Monitoring
More informationDiscuss issues observed during the trial and implementation of ADS-B including review items from ADS-B Problem report database ADS-B ISSUES
ADS-B SITF/6-IP/3 International Civil Aviation Organization AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) SEMINAR AND THE SIXTH MEETING OF ADS-B STUDY AND IMPLEMENTATION TASK FORCE (ADS-B SITF/6)
More informationHoneywell Advanced Technologies Europe Radek Zaruba, May, ANTARES WP33 User Terminal for General Aviation
Honeywell Advanced Technologies Europe Radek Zaruba, May, 2010 ANTARES WP33 User Terminal for General Aviation What is GA? - GA Definitions are ambiguous: The British Business and General Aviation Association:
More informationATC-Wake: Integrated Air Traffic Control Wake Vortex Safety and Capacity System
ATC-Wake: Integrated Air Traffic Control Wake Vortex Safety and Capacity System L.J.P. (Lennaert) Speijker, speijker@nlr.nl WakeNet Europe, 8/9 January 2009 http://www.nlr.nl/public/hosted-sites/atc-wake
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL MOBILITY AND TRANSPORT
Ref. Ares(2013)362601-18/03/2013 EUROPEAN COMMISSION DIRECTORATE-GENERAL MOBILITY AND TRANSPORT Directorate E Aviation and International Transport Affairs E2 Single European Sky Brussels, 8 March 2013
More informationFALCON SERVICE ADVISORY
Falcon Pro Line 21: Overview, List of Features and Improvements Jul 29, 2016 Classification: Maint&Ops F10 F20 F200 F50 F900 F2000 F7 - -5 - E A/B C E EASy D L - E EASy D L S LS REASON EECUTIVE SUMMARY
More informationNATS Operational CPDLC Capability Prestwick and Swanwick centres
NATS Operational CPDLC Capability Prestwick and Swanwick centres NATS CPDLC Within London (EGTT) and Scottish (EGPX) areas a CPDLC service is available for both ATN and FANS aircraft at FL285 and above.
More informationU.S. Domestic Data Link Overview
U.S. Domestic Data Link Overview Rockwell Collins ARINCDirect Flight Support Created by Christian Renneissen 1 2017 Rockwell Collins. All rights reserved. Proprietary Information. Getting off the Ground
More informationSpectral Efficient COMmunications for future Aeronautical Services. Jan Erik Håkegård ICT
Spectral Efficient COMmunications for future Aeronautical Services Jan Erik Håkegård 1 Outline Overview aeronautical communication today International activities SECOMAS activities Impact on Norwegian
More informationAERONAUTICAL INFORMATION CIRCULAR 33/17
NAV CANADA 07 DEC 17 AERONAUTICAL INFORMATION CIRCULAR 33/17 Introduction NOTICE OF PLANNED EXPANSION OF THE TRIAL IMPLEMENTATION OF 25 NAUTICAL MILE LATERAL SEPARATION MINIMUM IN THE INTERNATIONAL CIVIL
More informationDIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY
DGCA/06-IP/41 17/3/06 English only DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY Montréal, 20 to 22 March 2006 Theme 2: Improving aviation safety Topic 2.2: Management
More informationInitial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg
Initial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg Feb 5, 2013 Background: Inmarsat Aviation Services With more than 11,000 aircraft relying on global in-flight connectivity from Inmarsat,
More informationGlobal ATM System ~Interoperability and Harmonization ~
SIP/2009-WP/7 Business case Global ATM System ~Interoperability and Harmonization ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case
More informationASBU IMPLEMENTATION. ASBU industry consideration. Date 16/08/2017. Edson Fagundes Gomes
ASBU IMPLEMENTATION ASBU industry consideration Date 16/08/2017 Edson Fagundes Gomes GOAL To present to the attendants of this workshop the industry considerations for ASBU modules. In this sense, we will
More informationAIRPORTS AUTHORITY OF INDIA S AIRPORT COLLABORATIVE DECISION MAKING SYSTEM. (Presented by Airports Authority of India) SUMMARY
12 th Meeting of Arabian Sea-Indian Ocean ATS Coordination Group ASIOACG/12) & 8 th Meeting of Indian Ocean Strategic Partnership to Reduce Emissions (INSPIRE/8) New Delhi, India, 20-21 September 2017
More informationTHIS INFORMATION IS EMBRAER PROPERTY AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTEN AUTORIZATION.
CNS / ATM CNS / ATM Agenda Introduction Roadmaps PBN LPV ADSB CPDLC Next Steps CNS / ATM Agenda Introduction Roadmaps PBN LPV ADSB CPDLC Next Steps Introduction Communication Navigation Surveillance /
More informationRPAS INTEGRATION INTO EU AIRSPACE. INTERNATIONAL CONFERENCE On CIVIL RPAS OPERATIONS
RPAS INTEGRATION INTO EU AIRSPACE INTERNATIONAL CONFERENCE On CIVIL RPAS OPERATIONS Experimental flights and demonstration activities under IT-CAA permit to flight of the HERO VTOL-RPAS and application
More informationBenefits of CNS/ATM Implementation for the Region
Benefits of CNS/ATM Implementation for the Region IATA today www.iata.org 227 Airline Members from 143 countries accounting for 94% of total international traffic 200 partners Representation in 90 countries
More informationOn Time. Total Airspace Management. 8 th Global ATFM Conference Cancun - Mexico. 12/30/2014 Commercial-in-Confidence 1
On Time Total Airspace Management 8 th Global ATFM Conference Cancun - Mexico 12/30/2014 Commercial-in-Confidence 1 ATFM 101 Services Airspace capacity optimization Flight Procedure PBN design SID s STARS
More informationModernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018
Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s
More informationAir Traffic Management/Safety Services
Air Traffic Management/Safety Services David Coiley VP Aviation Steve Kong Technical Marketing and Business Development Manager The vision and the action Already: Flight tracking Now: SwiftBroadband -
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization 17/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative
More informationWorkshop Exercise, EGYPT Air Navigation Plan 10 /12/2010
Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010 INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR
More informationATC Datalink on Boeing Airplanes
ATC Datalink on Boeing Airplanes NAT PBCS Workshop February 2013 Gordon Sandell COPYRIGHT 2013 BOEING. ALL RIGHTS RESERVED introduced on 747-400 in 1995 Now available as standard or optional on all recent
More informationNEW FPL Transition Phase & Implementation Stages
International Civil Aviation Organization NEW FPL 2012 Transition Phase & Implementation Stages Victor Hernandez RO ATM/SAR New FPL implementation & Switchover Review the New FPL Strategy & Implementation
More informationU.S. Domestic CPDLC-DCL Users Guide. DATA COMMUNICATIONS INTEGRATED SERVICES (DCIS) Harris Corporation
U.S. Domestic CPDLC-DCL Users Guide DATA COMMUNICATIONS INTEGRATED SERVICES (DCIS) Harris Corporation 1 CONTENTS Section 1: Flight Plan Requirements... 3 Section 2: Participating DCL Airports... 6 Section
More informationTaking your Pro Line 21 Hawker into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR HAWKER
Taking your Pro Line 21 Hawker into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR HAWKER Pro Line 21 Hawker upgrades Baseline package includes the latest AFD software version 10.4 and FMS
More informationFollow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES
RAAC/15-WP/28 International Civil Aviation Organization 04/12/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,
More informationApplicability / Compatibility of STPA with FAA Regulations & Guidance. First STAMP/STPA Workshop. Federal Aviation Administration
Applicability / Compatibility of STPA with FAA Regulations & Guidance First STAMP/STPA Workshop Presented by: Peter Skaves, FAA Chief Scientific and Technical Advisor for Advanced Avionics Briefing Objectives
More informationMULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING
International Civil Aviation Organization Global Tracking 2014-WP/1 5/5/14 WORKING PAPER MULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING Montréal, 12 May to 13 May 2014 Agenda item 1: Explore the need
More informationRAAC/15-WP/14 International SUMMARY REFERENCES. A Safety
RAAC/15-WP/14 International Civil Aviation Organization 14/ /11/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,
More informationSOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT
PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for
More informationRECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES
RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES Abbreviations ACI ADS ADS-B ADS-C AFTN AIDC AIP ANSP AMHS APAC APANPIRG ASBU ASIOACG ATFM ATM ATS AUSEP CHG CNL CPDLC CPL DARP DLA EOBT FAA FIR FIRBX
More informationInternational Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, July 2010
ATM/AIS/SAR/SG/20 IP/16 05-09/7/10 International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, 05 09 July 2010 Agenda Item 11: Any
More informationCNS/ATM Systems Interoperability and Harmonization
SIP/2004-WP18 Business case Special Implementation Project CNS/ATM Systems Interoperability and Harmonization (Presented by H.V.SUDARSHAN) Workshop on the development of business case for the implementation
More informationCIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0
CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0 January 2018 AMENDMENTS Location Date Amended by Description CONTENTS 17.1 GENERAL... 4 17.1.1 Applicability...
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT
EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE
More informationSESAR Solutions. Display Options
SESAR Solutions Outputs from the SESAR Programme R&I activities which relate to an Operational Improvement (OI) step or a small group of OI steps and its/their associated enablers, which have been designed,
More informationMITRE DATA COMMUNICATION LABORATORY INITIATIVE FOR DEPARTURE CLEARANCE (DCL)
MITRE DATA COMMUNICATION LABORATORY INITIATIVE FOR DEPARTURE CLEARANCE (DCL) John Gonda, Dongsong Zeng, Juliana Goh, Mike Bernock, and Jon Salisbury, The MITRE Corporation, McLean, Virginia Abstract In
More informationMandates. Airbus Fleet Implementations. AEEC 19 th June 2018
Mandates Airbus Fleet Implementations AEEC 19 th June 2018 Roadmap of operational mandates DATA-LINK NAT-SPG EC EC 20% ELT ADS-B EC HUD 50% 10% 100% A/C Tracking GADSS* Recording Mandates Operationnal
More information