NATS Operational CPDLC Capability Prestwick and Swanwick centres
|
|
- Jared Payne
- 6 years ago
- Views:
Transcription
1 NATS Operational CPDLC Capability Prestwick and Swanwick centres
2 NATS CPDLC Within London (EGTT) and Scottish (EGPX) areas a CPDLC service is available for both ATN and FANS aircraft at FL285 and above. (FANS service currently limited to specific airlines) service may be available FL285 and below where possible. This excludes the London and Manchester TMAs, where a CPDLC service is not provided.
3 NATS CPDLC 29 July Commenced CPDLC Limited Operational Service (LOS) at Swanwick 4 airlines (ATN & FANS), connections only no CPDLC service Identified some problems with Logons 1 August Commenced LOS at Prestwick August 4 airlines, ATN & FANS, Non profile changing messages Swanwick & Prestwick upgrade to 8 ATN airlines September 8 ATN airlines and 4 FANS airlines at each unit
4 NATS CPDLC October ATN unrestricted for all airlines Restriction on s Added DAL s Upgrade Swanwick to Profile changing messages Upgrade Prestwick to Profile changing messages Next steps Work towards unrestricted FANS for all airlines Upgrade SAATS interface to automate Logons
5 Prestwick Centre Scottish Data Authority EGPX
6 Swanwick Centre London Data Authority EGTT
7 Aircraft LOG-ON Prior to the entry time for the relevant FIR boundary (EGTT or EGPX) UK Departures: on the ground where coverage exists, AIC to advise flight crews of the appropriate CPDLC Data Authority to select prior to departure. Manchester area airports SID plates updated to include detail of first data authority
8 LOG-ON Parameters To successfully log on, the flight crew need to correctly enter: The address of the first ACC with whom they will be conducting CPDLC Mode-S Aircraft-ID ICAO (Flight plan item 7) callsign Departure and destination airfields The four letter ICAO Flight plan codes (not IATA codes) For an ATN LOG-ON Aircraft ID: 24bit address For a FANS LOG-ON Aircraft registration DO NOT INCLUDE 24 bit address if possible
9 LOG-ON Establishing Parameters Current Data Authority (CDA) For an ATN Connection Automatically establishes CDA with ground systems For a FANS connection Aircraft equipped with FANS must receive and respond to a CPDLC welcome message for CDA to be established On receipt of a response from the aircraft CDA will be established. Flight crews are requested to respond promptly when a welcome message is received.
10 Non Profile Uplink Messages London and Scottish PROCEED DIRECT TO [position] CONTACT [unit name] [frequency] CHECK STUCK MICROPHONE [frequency] London also supporting CLEARED TO [position] VIA [route clearance] STATE PREFERRED LEVEL
11 Non Profile Downlinked Messages London and Scottish REQUEST DIRECT TO [position] DUE TO WEATHER DUE TO AIRCRAFT PERFORMANCE London also supporting REQUEST [Level] REQUEST CLIMB TO [level] REQUEST DESCENT TO [level] PREFERRED LEVEL [level]
12 Profile changing messages Message set extended to include: Level changes Heading instructions (ATN only) Speed instructions London also supporting: HOLD AT [POSITION] AS PUBLISHED MAINTAIN [LEVEL] Scottish also supporting: CROSS [POSITION] AT OR AFTER [TIME] Route clearance
13 Phraseology CORRECTING A MESSAGE SENT BY CPDLC [Aircraft Callsign] DISREGARD CPDLC [message type] MESSAGE, BREAK [followed by the correct clearance, instruction information or request] FANS TIME-OUT [Aircraft Callsign] DISREGARD CPDLC [climb/route/clearance, followed by executive instruction to clarify clearance] DISCONNECT CPDLC AND REVERT TO VOICE
14 How Crews can help ATC Respond promptly to uplink requests when able, close the dialogue rather than trigger a time-out Respond UNABLE to an unanswered message that has been corrected by voice. This closes the dialogue and avoids a time-out disconnection Check that the position element of UM79 CLEARED TO [position] VIA [route clearance] is part of the original flight plan. If not the onward route may be deleted from the FMS. Ensure full message including via is understood before responding, especially in older Boeing aircraft. Accept that UNABLE is sometimes the only response ATC can offer at that time but a subsequent clearance may be issued
15 How Crews can help ATC If disconnected from CPDLC do not quiz the controller they are unlikely to know more. Manual LOG-ON to the next ANSP will be required State preferred level response MUST be written as FL*** with no other text in the message No requirement to readback clearance by voice following a CPDLC message No requirement to state CPDLC equipped on first contact IF IN DOUBT - REVERT TO VOICE
U.S. Domestic CPDLC-DCL Users Guide. DATA COMMUNICATIONS INTEGRATED SERVICES (DCIS) Harris Corporation
U.S. Domestic CPDLC-DCL Users Guide DATA COMMUNICATIONS INTEGRATED SERVICES (DCIS) Harris Corporation 1 CONTENTS Section 1: Flight Plan Requirements... 3 Section 2: Participating DCL Airports... 6 Section
More informationNAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten
NAV CANADA and DATA LINK IMPLEMENTATION Shelley Bailey NAV CANADA May 2016 Sint Maarten OPDWLG Operational Data Link Working Group 5 members here today representing ANSPs, manufacturers and regulators
More informationSubject: Application of Data Link services within Kolkata FIR
AIP SUPPLEMENT TEL: 91-11-24632950 Extn: 2233/2245 AFS: VIDDYXAX FAX: 91-11-24611078 INDIA AERONAUTICAL INFORMATION SERVICE Sl. No.06/2006 AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG AIRPORT
More informationTHE LINK DATALINK TEST FACILITY CPDLC GROUND AUTOMATED TOOL. March By Isabelle HERAIL
THE LINK 2000+ DATALINK TEST FACILITY CPDLC GROUND AUTOMATED TOOL March 2007 By Isabelle HERAIL TABLE OF CONTENTS Introduction...2 CPDLC Ground Automated Tool...3 Objectives...3 Automated Tool Accessibility...4
More informationThe NAT OPS Bulletin Checklist, available at (Documents, NAT Docs), contains an up to date list of all current NAT Ops Bulletins.
Serial Number: 2010-006 Subject: ORCA Procedures for Shanwick Issued/Effective: 18 March 2004 The purpose of North Atlantic Operations Bulletin 2010-006 is to promulgate the Oceanic Clearance Delivery
More informationPDC VERSUS DCL. Southwest Airlines. Data Comm Update 2/26/2016
PDC VERSUS DCL 1 Clearance Delivery CPDLC DCL Cleared as filed Flight Crew logs into airport at any time (Session established when next step occurs) As Clearance Delivery approves flight plan, a session
More informationData Link Checklist. As of: 9/10/2017 1
CPDLC Preflight Setup 1. Ensure you have the following documents in paper form, EFB, or ipad: a. ICAO Global Operational Data Link Document (GOLD) b. GAC OMS-4 2. Review latest ICAO NAT Bulletins 3. Verify
More informationPilot Handbook U.S. Domestic En Route Controller Pilot Datalink Communication (CPDLC)
Pilot Handbook U.S. Domestic En Route Controller Pilot Datalink Communication (CPDLC) 1 Table of Contents Table of Contents... 2 1. Introduction... 3 2. Pilot & Flight Crew CPDLC Guidance... 4 3. U.S.
More informationCPDLC-DCL U.S. Airports
CPDLC-DCL U.S. Airports Data Link Clearance Services December 1, 2016 Prepared by Christian Renneissen 2015 Rockwell 2015 Collins. Rockwell Collins. DCL - Data Link Clearance Service The Departure Clearance
More informationGOLD Chapter 4 Controller Procedures
GOLD Chapter 4 Controller Procedures (ICAO Seminar/workshop on the implementation of Ground Ground and Ground Air data link in the SAM Region) Lima, Peru 10-12 September 2012 GOLD Global Operational Data-link
More informationThis NAT OPS Bulletin supersedes NAT OPS Bulletin, Serial Number: Summary of Changes
Serial Number: 2015_001 Subject: Gander Data Link Oceanic Clearance Delivery (OCD) Crew Procedures Effective: 13 January 2015 The purpose of North Atlantic Operations Bulletin 2015_001 is to promulgate
More informationGENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3
IBAC TECHNICAL REPORT SUMMARY Subject: NAT Operations and Air Traffic Management Meeting: North Atlantic (NAT) Procedures and Operations Group Meeting 2 Reported by Tom Young POG2 took place at the ICAO
More informationSERIOUS INCIDENT. Aircraft Type and Registration: Boeing 737-8F2, TC-JKF. No & Type of Engines: 2 CFM 56-7B22 turbofan engines
SERIOUS INCIDENT Aircraft Type and Registration: No & Type of Engines: Boeing 737-8F2, TC-JKF 2 CFM 56-7B22 turbofan engines Year of Manufacture: 2006 Date & Time (UTC): Location: Type of Flight: 13 March
More informationRLatSM. Reduced Lateral Separation Trial. FAQs. 4 September 15
RLatSM Reduced Lateral Separation Trial FAQs 4 September 15 Purpose of this presentation: To give you access to answers to commonly asked questions relating to the Reduced Lateral Separation Trial (RLAT).
More informationExcerpt from AIP CHINA published by CAAC version (EFF ) ENR L888, Y1, Y2
ENR 3.3.2.4 L888, Y1, Y2 L888, Y1, Y2 1. Introduction 1.1 These rules describe the airspace within which data-link- based ATS will be available, and prescribe procedures for data- link service. 2. Background
More informationNAT OPS Bulletin Checklist Issued/Effective: 11 June 2012
NAT OPS Bulletin Checklist Issued/Effective: 11 June 2012 The following NAT OPS Bulletins are current: Serial Number Subject Issued/Effective date 2010-006 ORCA Procedures for Shanwick 18 March 2004 2010-007
More informationThis Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.
Serial Number: 2017_001_Rev 02 1 Subject: NAT common DLM AIC Originator: NAT SPG Issued: 19 July 2017 Effective: 21 July 2017 The purpose of North Atlantic Operations Bulletin 2017_001_Rev 02 is to provide
More informationIVAO Nordic Region November 2018 PILOT BRIEFING ROVANIEMI X-MAS FLY-IN
PILOT BRIEFING ROVANIEMI X-MAS FLY-IN GENERAL ICAO: EFRO IATA: RVN Runways: 03/21 AIP SUPPLEMENT An AIP Supplement will be in effect on the day of the event. This supplement details vital procedures for
More informationThe NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.
Serial Number: 2017_003 Subject: RLatSM Phase 2 AIC Originator: NAT SPG Issued: 15 December 2017 Effective: 15 December 2017 The purpose of North Atlantic Operations Bulletin 2017-003 is to provide guidance
More informationCIVIL AVIATION PUBLICATION CAP 10 CPDLC
CAP 10 CPDLC INDEX This Page Intentionally Left Blank CAP 10 CPDLC INDEX Section Title Page No. 1. INTRODUCTION... 1 1.1 General... 1 1.2 Applicability... 1 1.3 Terminology... 1 1.4 References... 2 2.
More informationWhat you should know: Future Air Navigation System (FANS)
WHITE PAPER What you should know: Future Air Navigation System (FANS) STC Program for Challenger 601-3A/R FANS 1/A+ STC includes CPDLC, ADS-C and provisioning for ADS-B and Link 2000+ WORLD S MOST EXPERIENCED
More informationAERONAUTICAL INFORMATION CIRCULAR 33/17
NAV CANADA 07 DEC 17 AERONAUTICAL INFORMATION CIRCULAR 33/17 Introduction NOTICE OF PLANNED EXPANSION OF THE TRIAL IMPLEMENTATION OF 25 NAUTICAL MILE LATERAL SEPARATION MINIMUM IN THE INTERNATIONAL CIVIL
More informationVersion 4.0 December 20, 2017
NAS Data Communications Guide Version 4.0 December 20, 2017 December 20, 2017 Page 1 Change History Version Date Description of Change 1.0 April 30, 2015 Initial issue of the Data Communications Implementation
More informationCPA2 1256: ft V/2.8nm H
AIRPROX REPORT No 2013054 Date/Time: 23 Jun 2013 1255Z (Sunday) Position: 5642N 00433W (N FINDO) Airspace: UAR (Class: C) Reporting Ac Reported Ac Type: B747(1) B747(2) Operator: CAT CAT Alt/FL: FL340
More informationData Link Deep Dive. Brandon Burton
Data Link Deep Dive Brandon Burton www.mygdc.com Overview of Data Link FANS 1/A Data Link ATN Data Link (PM-CPDLC) Automatic Dependent Surveillance Operational Capabilities FANS 1/A Datalink AFN Logon
More informationThe NAT OPS Bulletin Checklist, available at (Documents, NAT Docs), contains an up to date list of all current NAT Ops Bulletins.
Serial Number: 2010-013 Subject: Reykjavik OCD Crew Procedures Version 1 Issued: 3 June 2010 The purpose of North Atlantic Operations Bulletin 2010-013 is to provide information from ISAVIA concerning
More informationThe purpose of North Atlantic Operations Bulletin is to distribute the new issue of the Oceanic Errors Safety Bulletin (OESB).
Serial Number: 2011-020 Subject: Oceanic Errors Safety Bulletin (OESB) Issued/Effective: Aug 2011 The purpose of North Atlantic Operations Bulletin 2011-020 is to distribute the new issue of the Oceanic
More informationS1P1 CPDLC DEPARTURE CLEARANCE END2END DESCRIPTION
S1P1 CPDLC DEPARTURE CLEARANCE END2END DESCRIPTION Data Comm Implementation Team 23 April 2015 Version 2.0 DCIT Plenary Approved An overview of the FAA Segment 1 Phase 1 (S1P1) Implementation of CPDLC
More informationVersion 5.0 November 08, 2018
NAS Data Communications Guide Version 5.0 November 08, 2018 November 08, 2018 Page 1 Change History Version Date Description of Change 1.0 April 30, 2015 Initial issue of the Data Communications Implementation
More informationInternational Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, July 2010
ATM/AIS/SAR/SG/20 IP/16 05-09/7/10 International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, 05 09 July 2010 Agenda Item 11: Any
More informationVersion 3.0 February 28, 2017
NAS Data Communications Guide Version 3.0 February 28, 2017 February 28, 2017 Page 1 Change History Version Date Description of Change 1.0 April 30, 2015 Initial issue of the Data Communications Implementation
More information[EFFECTIVE DATE: 23 AUG 2012]
AIRAC AIP SUPPLEMENT TEL: 91-11-24632950 Extn: 2219/2233 AFS : VIDDYXAX FAX : 91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN
More informationSAT/FIT/11 South American Office Eleventh Meeting of FANS 1/A Interoperability Team SAT/FIT/11
International Civil Aviation Organization SAT/FIT/11 South American Office WP/06 Eleventh Meeting of FANS 1/A Interoperability Team SAT/FIT/11 Agenda item 4: System performance monitoring and maintenance.
More informationPhases of a departure
Phases of a departure Hours, days or even months prior, an airline will submit a flight plan to NATS requesting an air traffic routing to its destination. The filed route to be flown will include the designated
More informationFINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014
FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014 AIB/AAI/CAS.109 Air Accident Investigation Bureau of Singapore Ministry of Transport Singapore 11 November 2015 The Air
More informationAmendment 7 to PANS-ATM, Doc 4444
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office of Civil Aviation FOCA Safety Division Flight Operations FOCA Flight OPS Newsletter FOCA OPS 029 1 st August
More informationAny queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:
Serial Number: 2018_005 Subject: Special Procedures For In-Flight Contingencies in Oceanic Airspace Originator: NAT SPG Issued: 17 DEC 2018 Effective:28 MAR 2019 The purpose of this North Atlantic Operations
More informationINTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE. Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13)
INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13) Durban, South Africa, 4-5 June 2018 Agenda Item 4: System
More informationU.S. Domestic Data Link Overview
U.S. Domestic Data Link Overview Rockwell Collins ARINCDirect Flight Support Created by Christian Renneissen 1 2017 Rockwell Collins. All rights reserved. Proprietary Information. Getting off the Ground
More informationCLEARANCE INSTRUCTION READ BACK
CLEARANCE INSTRUCTION READ BACK 1. Introduction An ATC clearance or an instruction constitutes authority for an aircraft to proceed only in so far as known air traffic is concerned and is based solely
More informationFRA CDM. Airport Collaborative Decision Making (A-CDM) Flight Crew Briefing FRANKFURT AIRPORT. German Harmonisation
Airport Collaborative Decision Making (A-CDM) CDM Airport @ FRA Flight Crew FRANKFURT AIRPORT Table of contents: 1. General... 3 2. Target Off Block Time (TOBT)... 4 2.1 Automatically generated TOBT...
More informationSID/STAR phraseology FAQ Canadian implementation April 27, 2017
SID/STAR phraseology FAQ Canadian implementation April 27, 2017 The International Civil Aviation Organization (ICAO) has developed harmonized phraseology for Standard Instrument Departures (SIDs) and Standard
More informationOverview of Worldwide Data Link Equipage Mandates
Overview of Worldwide Data Link Equipage Mandates Wednesday, November 18, 2015 3:00 to 4:30 pm PRESENTED BY: Tom Kraft, FAA CPDLC and ADS-C Data Link Mandates (and Incentives) FAA Airborne Data Link Recording
More informationTHIS MONTH. Aircraft Finance Review Engine-Maintenance Management Aircraft Comparative Analysis Phenom 300 Safety Focus: When No is Necessary
AVBUYER February 2015 B U S I N E S S A V I A T I O N I N T E L L I G E N C E proudly presents 2014 Gulfstream G650 Serial Number 6088 See pages 32-35 for further details THIS MONTH Aircraft Finance Review
More informationEASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments
EASA NPA on SERA Part ENAV Response sheet GENERAL COMMENTS ON NPA PACKAGE te: Specific comments are provided after the General Comments 1 SERA Parts C and D ENAV still misses clarity on the whole scope
More informationAnchorage ARTCC Phraseology Guide. Clearance Delivery Operations
Anchorage ARTCC Phraseology Guide Clearance Delivery Operations Initial Contact: The first time an aircraft calls you, you MUST identify your position, i.e. AWE123 Anchorage Delivery. Clearance Delivery:
More informationChapter 6. Brize Radar, Speedbird 213 Heavy, request radar advisory. Speedbird 123 change call sign to BA 123
INTRODUCTION The procedures for and VFR are mostly identical but some words and procedures are generally only used by large commercial aircraft; hence they appear in this section. In this chapter we will
More informationCPDLC END2END DESCRIPTION Data Comm Implementation Team
CPDLC END2END DESCRIPTION Data Comm Implementation Team December 20, 2017 Version 1.1 DCIT Approved An overview of the FAA Segment 1 Phase 1 (S1P1) and Segment 1 Phase 2 (S1P2) Implementation of CPDLC
More informationThis Advisory Circular provides guidance to facilitate compliance with the requirements for a Flight Radiotelephone Operator rating.
Advisory Circular AC65-6 Air traffic Service Personnel Licences and Ratings Flight Radiotelephone Operator Rating Revision 2 18 October 2011 General Civil Aviation Authority Advisory Circulars contain
More informationModernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018
Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s
More informationFuture Air Navigation System (FANS)
CLAY LACY AVIATION AVIONICS Future Air Navigation System (FANS) STC Program for Challenger 601-3A/R FANS STC includes CPDLC, ADS-C and provisioning for ADS-B and Link 2000+ 2015 MANAGEMENT CHARTER SALES
More informationNOVEMBER 2014 UPDATE NAT ATS SURVELLANCE AIRSPACE PHASE 2 OF THE NORTH ATLANTIC REGIONAL DATA LINK MANDATE
Publication Information. The FAA Notice below will be published in the 11 December 2014 edition of FAA Notices To Airmen, Domestic/International. It will be located in Part 3, Section 2 (International
More informationSan Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)
San Juan CERAP Standard Operation Procedures Version 2.2 May 5th, 2013 Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR) You are entering one of the most fascinating Combined Enroute Radar Approach Control
More informationU.S. Domestic CPDLC Flight and Route Planning Guide
U.S. Domestic CPDLC Flight and Route Planning Guide Data Communications Integrated Services (DCIS) Harris Corporation TABLE OF CONTENTS Introduction... 3 Flight Planning Guidance... 3 ICAO FPL... 3 Field
More informationREPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES
Phone: 248-384000 AFS: FSIAYNYX FAX: 248-384030 Email: sezais@scaa.sc REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES AIP SUPPLEMENT S02/09
More informationBeijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014
Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme Cockpit Initiatives for ATM ATC Global 2014 Page 2 Cockpit Initiatives for ATM Airbus vision on ATM transformation Airbus position
More informationINSTRUMENT RATING (SENIOR PRIVATE PILOT) UK FLIGHT TEST STANDARDS
INSTRUMENT RATING (SENIOR PRIVATE PILOT) UK FLIGHT TEST STANDARDS This document applies to Senior Private Pilot exams within UK airspace only, and should not be used elsewhere as some subjects are only
More informationAFI REGIONAL MONITORING AGENCY (ARMA) ARMA forms for use in obtaining information from a State authorities and/or Service Providers
ARMA forms for use in obtaining information from a State authorities and/or Service Providers NOTES TO AID COMPLETION OF ARMA FORMS 1. Please read these notes before attempting to complete forms for the
More informationOfficial Journal of the European Union L 186/27
7.7.2006 Official Journal of the European Union L 186/27 COMMISSION REGULATION (EC) No 1032/2006 of 6 July 2006 laying down requirements for automatic systems for the exchange of flight data for the purpose
More informationPlace image here (10 x 3.5 ) FAA NEXTGEN DATA COMM TOWER SERVICE: CPDLC DCL NEW OPERATOR INTRODUCTION HARRIS.COM #HARRISCORP
Place image here (10 x 3.5 ) FAA NEXTGEN DATA COMM TOWER SERVICE: CPDLC DCL NEW OPERATOR INTRODUCTION HARRIS.COM #HARRISCORP Agenda Data Comm Basics Benefits of Data Comm Departure Clearance Explanation
More informationAppendix A COMMUNICATION BEST PRACTICES
Appendix A COMMUNICATION BEST PRACTICES 1. GENERAL 1.1 It is apparent from investigation reports and surveys regarding runway safety occurrences that communication issues are frequently a causal or contributory
More informationImplementing Downlink Aircraft Parameters
Implementing Downlink Aircraft Parameters (DAP) @LVNL BACKGROUND Objective DAP usage for LVNL Downlink of Aircraft Parameters (DAP) through Mode-S Enhanced Surveillance (EHS) could assist to further improve
More informationAir/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December
Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December 2001 - Mike Murphy ATN Systems, Inc. (ATNSI) 703-412 412-2900, 2900, Mike.Murphy@atnsi.com ATNSI, ATN Seminar 1 Presentation
More informationi4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales
i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales 1 Single European Sky ATM Research (SESAR) - Objectives Enabling EU skies to handle 3 times
More information1. Background. 2. Summary and conclusion. 3. Flight efficiency parameters. Stockholm 04 May, 2011
Stockholm 04 May, 2011 1. Background By this document SAS want to argue against a common statement that goes: Green departures are much more fuel/emission efficient than green arrivals due to the fact
More informationFederal Aviation Administration Operations in the New York Center Oceanic CTA/FIR
Operations in the New York Center Oceanic CTA/FIR Presented to: Teterboro User Group By: Workforce Development Date: The New York Oceanic FIR is divided into two Oceanic Control Areas (OCA): OCA-East-
More informationAtlantic Interoperability Initiative to Reduce Emissions AIRE
ICAO Colloquium on Aviation and Climate Change ICAO ICAO Colloquium Colloquium on Aviation Aviation and and Climate Climate Change Change Atlantic Interoperability Initiative to Reduce Emissions AIRE Célia
More informationU.S. Domestic CPDLC Flight and Route Planning Guide
U.S. Domestic CPDLC Flight and Route Planning Guide Data Communications Integrated Services (DCIS) Harris Corporation TABLE OF CONTENTS Introduction... 3 Flight Planning Guidance... 3 ICAO FPL... 3 Field
More informationInternational Civil Aviation Organization
International Civil Aviation Organization ADS-B SITF/14 IP/07 AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST SEMINAR AND FOURTEENTH MEETING OF AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) STUDY AND IMPLEMENTATION
More informationOPEN SKIES CAT B NDS Subject to NOTAM: Yes (by Airspace Regulation)
AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2017-05-0338 1 16 May 2017 16 May 2017 Op GREENFINCH 1/17 OPEN SKIES CAT B NDS Subject
More informationSAFE WINGS. This issue LEVEL BUST AN INCIDENT INVOLVING LEVEL BUST. * For Internal Circulation Only
SAFE WINGS Issue 40, SEPTEMBER 2015 This issue ü ü LEVEL BUST AN INCIDENT INVOLVING LEVEL BUST * For Internal Circulation Only SAFE WINGS September Edition 40 EDITORIAL In today s busy and congested airspace,
More informationCentral Reporting Agency (CRA) Issues List
Central Reporting Agency (CRA) Issues List Global Operational Data Link (GOLD) Familiarization with Performance Based Communications and Surveillance (PBCS) Workshop Dakar, Senegal 11-15 September 2017
More informationAlbany ATCT Standard Operating Procedures
Albany ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world
More informationTHE AREA CONTROL CENTRE (CTR) POSITION
THE AREA CONTROL CENTRE (CTR) POSITION 1. Introduction The Area Control Centre (ACC) also known as en-route controller and called CTR on IVAO, has the responsibility of ensuring Air Traffic Control (ATC)
More informationVFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons.
VFR PHRASEOLOGY 1. Introduction 1.1. What is phraseology? The phraseology is the way to communicate between the pilot and air traffic controller. This way is stereotyped and you shall not invent new words.
More informationATM 1 Understanding the Causes of Level Busts
Level Bust Briefing Notes Air Traffic Management ATM 1 Understanding the Causes of Level Busts 1. Introduction 1.1. Most level busts result because the pilot flies the aircraft through the cleared level
More informationTEMPORARY OPERATING INSTRUCTION
PD/1++ Trial Report Appendix B TEMPORARY OPERATING INSTRUCTION APPENDIX B Appendix B is a direct copy of the temporary operating instructions given to the participating controllers prior to the PD/1++
More informationIATA In-flight Broadcast Procedure (IFBP) AFI Region
IATA In-flight Broadcast Procedure (IFBP) AFI Region 1. Listening Watch A listening watch should be maintained on the designated frequency (126.9MHz in AFI), 10 minutes before entering the designated airspace
More informationAIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES
AIP ENR 1.6-1 JORDAN 12 DEC 2013 ENR 1.6 RADAR SERVICES AND PROCEDURES 1. GENERAL 1.1 SERVICES a) Radar units in the Amman FIR operate as integral parts of the ATS system and provide Radar Control Service
More informationGENERAL INFO NOTICE 1. BACKGROUND
GENERAL INFO NOTICE 1. BACKGROUND Precision-RNAV (P-RNAV) is the natural progression from Basic RNAV (B-RNAV) which became mandatory in European Airspace in April 1998 for en-route operations. Initial
More informationSECTION 4 - APPROACH CONTROL PROCEDURES
SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES
More informationVATSIM-UK Essex RTS STANSTED CROSS THE POND PILOT GUIDE 25th October 2014
VATSIM-UK Essex RTS STANSTED CROSS THE POND PILOT GUIDE 25th October 2014 VATSIM UK and The Essex RTS a happy to welcome you to London Stansted as part of this year s CTP Eastbound event. Please take a
More informationRECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES
RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES Abbreviations ACI ADS ADS-B ADS-C AFTN AIDC AIP ANSP AMHS APAC APANPIRG ASBU ASIOACG ATFM ATM ATS AUSEP CHG CNL CPDLC CPL DARP DLA EOBT FAA FIR FIRBX
More informationOPERATIONS MANUAL PART A
PAGE: 1 Table of Contents A.GENERAL /CHAPTER 32. -...3 32. OF THE AIRBORNE COLLISION AVOIDANCE... 3 32.1 ACAS Training Requirements... 3 32.2 Policy and Procedures for the use of ACAS or TCAS (as applicable)...
More informationLETTER OF AGREEMENT. Between. and RELATING TO
LETTER OF AGREEMENT Between NATS (En Route) plc, Scottish Area Control (Prestwick) NATS (Services) Ltd, Edinburgh ATC NATS (Services) Ltd, Glasgow ATC and BRITISH GLIDING ASSOCIATION (BGA) RELATING TO
More informationTCAS Pilot training issues
November 2011 TCAS Pilot training issues This Briefing Leaflet is based in the main on the ACAS bulletin issued by Eurocontrol in February of 2011. This Bulletin focuses on pilot training, featuring a
More informationAFI REGIONAL MONITORING AGENCY (ARMA) ARMA forms for use in obtaining information from a State authorities and/or Service Providers
ARMA forms for use in obtaining information from a State authorities and/or Service Providers NOTES TO AID COMPLETION OF ARMA FORMS 1. Please read these notes before attempting to complete forms for the
More information4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.
Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs
More information2.6% /14 Forward Plan. 4.1 Traffic Outlook. Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015
4 2013/14 Forward Plan 2.6% Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015 4.1 Traffic Outlook Traffic levels continue to be affected by a combination of the fragile economic situation in the
More informationBurlington ATCT Standard Operating Procedures
This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for
More informationETABLISSEMENT NATIONAL DE LA NAVIGATION AERIENNE MANUEL DE LIAISON DE DONNEES ( FANS1/A ) DES SERVICES ATS EXPERIMENTATION CPDLC IN ALGIERS FIR
ETABLISSEMENT NATIONAL DE LA NAVIGATION AEIENNE MANUEL DE LIAISON DE DONNEES ( FANS1/A ) DES SEVICES ATS EXPEIMENTATION CPDLC IN ALGIES FI Version 2.1 August 2008 1 AMENDMENTS No. Date Section Observations
More informationTHE LARGEST FAMILY-OWNED BUSINESS AVIATION SERVICE CENTER IN THE WORLD
THE LARGEST FAMILY-OWNED BUSINESS AVIATION SERVICE CENTER IN THE WORLD DISCUSSION TOPIC In the early 1980s, the International Civil Aviation Organization (ICAO) became concerned with the aging infrastructure
More informationCAT E Subject to NOTAM: No
AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2015-09-0091 V1.0 10 June 2016 10 June 2016 TALLA DVOR/DME CALIBRATION CAT E Subject to
More information1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;
Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS
More informationEUROCONTROL Call Sign Similarity Project
EUROCONTROL Call Sign Similarity Project Call Sign Similarity Tool (CSST) ICAO MID Region 1 st Call Sign Confusion Ad-hoc Working Group Abu Dhabi, United Arab Emirates 16-18 February 2015 Richard Lawrence
More informationCONVERTING AN AIRLINE TO CPDLC (AIR EUROPA EXPERIENCE)
CONVERTING AN AIRLINE TO CPDLC (AIR EUROPA EXPERIENCE) 1 Cpt. Apple Tree Cpt. Cherry Tree AEA is a very "Fruitful" Airline!! 2 3 Air Europa Founded in 1986 Headquarters in Mallorca (Spain) 80% Sheduled,
More informationP-RNAV GENERAL INFO NOTICE. 1. Background
GENERAL INFO NOTICE 1. Background Precision-RNAV (P-RNAV) is the natural progression from Basic RNAV (B-RNAV) which became mandatory in European airspace in April of 1998 for enroute operations. Initial
More informationThe benefits of satcom to airlines. Prepared by Helios for
The benefits of satcom to airlines Prepared by Helios for contents INTRODUCTION 3...What is satcom? 4..the evolution of satcom Atc benefits 5.benefits from datalink applications in oceanic ATC 6.SATCOM
More informationkhz CHANNEL SPACING
1. Introduction This instruction updates section 47: 8.33 khz CHANNEL of the IFPS Users Manual 21.1. Next edition of the manual (22.0 due in the spring 2018) will incorporate the present update. 2. Update
More informationREPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE
AFS: WSSSYNYX caas_singaporeais@caas.gov.sg www.caas.gov.sg REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE
More information