1 ockland County Safety & Quiet Zone Project Town of Orangetown Public Meeting January 30, 2008
2 Agenda Welcome and Introductions Project Goals Project Area and ailroad Facts How to Establish a Quiet Zone Proposed Crossing Improvements Project Schedule
3 Project Goals 1. Improve safety at each ailroad crossing by construction of Supplemental Safety Measures (SSMs). 2. Establish a Quiet Zone at all the grade crossings in accordance with the Federal ailroad Administration ule. 3. Improve the safety & quality of life for ockland County residents
4 Project Evolution June 2002: County Completes Train Whistle Study June 2005: The Federal ailroad Administration passed Quiet Zone ule Aug. 2005: SAFETEA-LU transportation bill passes with $3.68 million for ockland County Quiet zones. June 2006: Sept. 2007: County has project placed in the Transportation Improvement Program (TIP). NYS DOT Executes Agreement for Preliminary Engineering Phase to begin Quiet Zone Study
5 Project Partners esidents & Elected Officials Federal ailroad Administration (FA) New York State Department of Transportation (NYS DOT) Federal Highway Administration (FHWA) County, Town and Village Highway Departments Land owners at private crossings CSX ailroad
6 Project Area 21 At-grade crossings on 23 miles of CSX West shore iver Line ailroad crosses: 3 County oads 8 Town oads 3 Village oads 7 Privately owned oads No State Highways Towns: Orangetown Clarkstown Stony Point Villages: Haverstraw West Haverstraw New Jersey Hudson iver
7 ailroad Facts CSX owns and operates West Shore iver Line Freight only, No passenger service 20 to 55 trains per day 1 to 2 trains per hour Peak days are Thursday and Friday Slowest days are Sunday and Monday Max. train speeds range from 40 mph to 50 mph Trains must blow horn within ¼ mile of crossing or 15 to 20 sec. before entering crossing Train horn is 96 to 110 decibels 40 MPH 50 MPH New Jersey Hudson iver
8 What is a Quiet Zone? A quiet zone is a section of a rail line that contains one or more consecutive railroad crossings at which Locomotive horns are not routinely sounded
9 Public Crossings: Creating a Quiet Zone At a minimum, must have flashing lights and gates, power out indicators and constant warning time circuitry Install either: Supplemental Safety Measure (SSM) or Wayside Horn or Alternative Safety Measure (ASM) Private Crossings: At a minimum, must have crossbuck, stop, and No Train Horn signs Are subject to Diagnostic Team eview (DT). The Quiet zone must install the recommendations of the DT.
10 Supplementary Safety Measure (SSM) A safety system or procedure established that is determined to be an effective substitute for the locomotive horn in the prevention of highway-rail accidents
11 Supplemental Safety Measures (SSMs) 1. Temporary Closure 2. 2 Quadrant Gates with medians 3. Upgrade 2 Quadrant gates to 4 Quadrant Gate 4. Upgrade 2 Quadrant gates to 4 Quadrant Gates with vehicle presence detection 5. Create One-way Streets with Gates 6. Grade Separation 7. Permanent Closure
12 Temporary Closure Gates on both sides of the crossing equires manual operation to open and close the crossing to vehicular access
13 2 Quadrant Gates with Medians Medians must be 100 ft. long aised with 6 inch high non-mountable curb
14 Four-Quadrant Gates Provides a full gated closure of the crossing Entrance gate Exit gate
15 4 Quadrant Gates with vehicle presence detection and enhanced monitoring Vehicle Presence Detection Detects vehicles trapped on tracks and doesn t lower exit gate Enhanced Monitoring Detects Broken Gate Wayside horn sounds to alert driver of approaching train Universal Quiet Zone Indicator goes dark to alert train operator to sound locomotive horn
16 Driver Behavior Study Motor Vehicle Violations Violations per 1000 trains Quad 4 Quad Type 1 Violations 2 Quad 4 Quad - 0 Type 2 Violations 2 Quad Gate 4 Quad Gate Violation Type: Type 1: from flashing lights to gates deployed Type 2: after gates fully deployed (drivers going around gates) * Data from USDOT Volpe esearch Center Study
17 One Way Street With Gates equires 2 gates on approach side
18 How is a Quiet Zone Established? Quiet Zone isk Index (QZI) must be below: Nationwide Significant isk Index (NWI) isk Index with Horns (IWH) QZI: The measure of risk in a quiet zone if SSMs are installed and horns are not sounded at the crossings. NWI: National average level of risk at railroad crossings equipped with flashing lights and gates and at which locomotive horns are sounded Nationwide Significant isk Threshold = IWH: The measure of risk if locomotive horns are sounded at every railroad crossing within a quiet zone.
19 Existing Crossing isk Levels Ex. isk Index= 99,573
20 isk Levels after Implementing SSMs Proposed Quiet Zone isk Index= 16,910 Nationwide Significant isk Threshold= 19,047 isk Index with Horns= 59,696 Proposed QZI is lower than NST and IWH
21 Andre Avenue Existing: 2 Quadrant Gates Proposed: 4 Quadrant Gates
22 Old Tappan d. Existing: 2 Quadrant Gates Proposed: 4 Quadrant Gates
23 Greenbush d. Existing: 2 Quadrant Gates Proposed: Median on east side (one way road)
24 Highview Ave. Existing: 2 Quadrant Gates Proposed: Make 1 way EB with 2 gates
25 Glenshaw St. Existing: 2 Quadrant Gates Proposed: 4 Quadrant Gates
26 Erie St. East Existing: 2 Quadrant Gates Proposed: 4 Quadrant Gates with loop detectors
27 Bradley Parkway Existing: 2 Quadrant Gates Proposed: 4 Quadrant Gates
28 Pine View d. (private) Existing: Crossbucks only Proposed: 4 Quadrant Gates
29 Schedule Jan April 2008 Public Information Meetings Submit Design eport Summer 2008 Design Approval Fall 2008 Detailed Plans CSX Construction Agreements & Bidding and Award Construction
30 ockland County Safety & Quiet Zone Project Town of Orangetown Public Meeting January 30, 2008
Quiet Zone Evaluation for Huron, Ohio
Quiet Zone Evaluation for Huron, Ohio 9601 Camp Bowie West Fort Worth, TX 76116 +1 817 886 8210 (T) www.ctcinc.com Quiet Zone Evaluation City of Huron, OH Final Report August 2015 Introduction The City
More informationThe Olathe Quiet Zone
The Olathe Quiet Zone LEARNING TO LIVE WITH THE RAILROAD AS YOUR NEIGHBOR APWA August 18, 2008 1 2 BNSF At-Grade Crossings BNSF System Track Map Emporia - 88 TPD Ft Scott - 40 TPD Southgate 8 TPD 3 BNSF
More informationQuiet Zone Process. Background:
Background: In order to reduce the impact of train horns on municipalities, the FRA (Federal Railroad Administration) has provided communities with the option to establish a QZ (Quiet Zone). A quiet zone
More informationFRONT COVER. Derby Quiet Zone Study Cover
FRONT COVER Derby Quiet Zone Study Cover DERBY QUIET ZONE STUDY City of Derby April 9 City Council The Mayor and City Council comprise the Governing Body. These elected officials are the political leaders
More informationHIGHWAY RAIL GRADE CROSSING 4 QUAD GATES. William H. Watson. Amtrak
HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES William H. Watson Amtrak Union Station 100 Gaspee Street Providence, RI 02903-1133 (617) 345-7518 (6170 345 7820 FAX watsonw@amtrak.com ABSTRACT Design, installation
More informationRAILROAD QUIET ZONE PROJECT
RAILROAD QUIET ZONE PROJECT VILLAGE OF ROSELLE Village of Roselle 31 S. Prospect Street Roselle, IL 60172 9575 WEST HIGGINS ROAD, SUITE 600 ROSEMONT, IL 60018 TEL. (847) 823-0500 FAX (847) 823-0520 Table
More informationIntroduction. The City of Elk Grove
The Quiet Zone Application Process: Lessons Learned from Elk Grove, California 8/22/05 By: Dominic Spaethling, PB; Barry Lemke, PB; Gwen Owens, City of Elk Grove, CA Introduction The City of Elk Grove
More informationSTEVENS POINT QUIET ZONE
STEVENS POINT QUIET ZONE Associate Administrator for Safety Federal Railroad Administration 1200 New Jersey Avenue, SE, MS-25 Washington, DC 20590 Mailed:, 2009 Certified Mail Article# 70000520002247320178
More informationChicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014
Chicago St. Louis High-Speed Rail Braidwood Construction Local Officials Briefing August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»
More informationQUIET ZONE UPDATE. PUBLIC WORKS DEPARTMENT June 14, 2016
QUIET ZONE UPDATE PUBLIC WORKS DEPARTMENT June 14, 2016 Update Council on Quiet Zones in Novato Status of Quiet Zone No. 1 Highway 37 Freight Only Quiet Zone State Access Road Pedestrian Crossing Next
More informationReport on Installation of Wayside Horns at Railroad Crossings and Railroad Trench System
City Council Agenda November 4, 2014 Mayor and Council Agenda Item No. B.01 Reviewed by City Mgr s office: /KLM Memo to: From: Manteca City Council Karen L. McLaughlin, City Manager Date: October 28, 2014
More informationTown of Gordonsville, Virginia Agenda Item Summary June 18, 2012
Town of Gordonsville, Virginia Agenda Item Summary June 18, 2012 AGENDA ITEM 10a Unfinished Business AGENDA TITLE: Discussion of Railroad Quiet Zone DISPOSITION: [ ] Action Required [X] For Discussion
More informationQuiet Zone along FEC Corridor. Paul Calvaresi Regional Transportation Planner
Quiet Zone along FEC Corridor Paul Calvaresi Regional Transportation Planner Calvaresip@browardmpo.org About the Quiet Zone Throughout all of Broward County on the FEC Tracks Deerfield Beach Pompano Beach
More informationGrade Crossings in High Speed Rail Corridors
Grade Crossings in High Speed Rail Corridors 59 th ANNUAL ILLINOIS TRAFFIC ENGINEERING & SAFETY CONFERENCE October 21, 2010 Champaign, IL Michael E. Stead Rail Safety Section Illinois Commerce Commission
More informationPrivate Crossing Treatments on the North Carolina Sealed Corridor
Private Crossing Treatments on the North Carolina Sealed Corridor Patrick Bien-aime 2013 National Highway-Rail Grade Crossing Safety Training Conference November 05, 2013 The National Transportation Systems
More information25 th Avenue Grade Separation. September 13, 2017
25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationPART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS
Part 8. Traffic Controls for Highway-Rail Grade Crossings Page 8TC-1 PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS Page CHAPTER 8A. GENERAL...........................................
More information25 th Avenue Grade Separation. December 13, 2017
25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationAREMA C&S Manual Index (Includes 2018 Revisions) Volume SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS
SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS 3.1 General Recommendations 3.1.1 36-1 Recommended Guidelines for Grade Crossing Warning Devices 5 Reaffirmed 2017 3.1.5 36-1 Recommended References
More informationChicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014
Chicago St. Louis High-Speed Rail Enos Park Neighborhood Association May 13, 2014 1 Illinois High-Speed Rail Program 2 Chicago-St. Louis Corridor» IDOT has actively developed the corridor since the mid1980
More informationHISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION
HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION H ugh Kendall General Railway Signal Company IN T R O D U C T IO N Warning systems at railroad/highway
More informationLANDER COUNTY RAIL ASSESSMENT NOVEMBER 2006
of hydrologic features. A substantial proportion of the land between and north of the railroad tracks contain wetlands, as identified by the US Fish and Wildlife Service National Wetlands Inventory (NWI).
More informationCity of Berkeley Railroad Quiet Zone Study
City of Berkeley Railroad Quiet Zone Study Final Report Prepared for the City of Berkeley April 13, 2009 2 Adavant Consulting City of Berkeley Railroad Quiet Zone Study Final Report Adavant Consulting
More informationLake Erie Commerce Center Traffic Analysis
LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table
More informationDRAPER CITY RESOLUTION NO
DRAPER CITY RESOLUTION NO. 12-29 A RESOLUTION OF THE DRAPER CITY COUNCIL AUTHORIZING THE EXECUTION OF AN INTERLOCAL AGREEMENT BETWEEN DRAPER CITY, UTAH TRANSIT AUTHORITY, AND THE CITIES OF LEHI, SALT LAKE,
More informationNational Highway-Rail Crossing Inventory Rule & GCIS
F E D E R A L R A I L R O A D A D M I N I S T R A T I O N National Highway-Rail Crossing Inventory Rule & GCIS 2015 National Highway-Rail Grade Crossing Safety Training Conference Arlington, TX November
More informationHIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM
HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM To decrease unnecessary train traffic exposure to life and property, promote public safety, and improve traffic conditions, the Texas Department of Transportation
More informationVasona Light Rail Signal Design Challenges. Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority
Vasona Light Rail Signal Design Challenges Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority Abstract The Vasona line is the most recent extension of
More informationSAN RAFAEL CITY COUNCIL AGENDA REPORT
Agenda Item No: 5.e Meeting Date: October 3, 2016 Department: Public Works SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepared by: Bill Guerin, Director of Public Works TOPIC: QUIET ZONE DESIGNATION City Manager
More informationAttachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION
Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014
More information25 th Avenue Grade Separation. Community Meeting November 13, 2018
25 th Avenue Grade Separation Community Meeting November 13, 2018 Agenda I. Project Need II. Project Benefits III. Project Description IV. Funding V. Schedule VI. Construction VII. Next Steps 2 Project
More informationWest Charlotte CORRIDOR STUDY
West Charlotte CORRIDOR STUDY EXECUTIVE SUMMARY... 3 A. West Summit Avenue (Crossing # 716 172N)... 5 1. Short-Term... 5 2. Long-Term... 5 B. Berryhill Road (Crossing # 716 176R)... 5 1. Short-Term...
More informationWelcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,
Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how
More informationV. DATA COLLECTION PROGRAM
V. DATA COLLECTION PROGRAM As discussed in Section IV, an extensive data assembly and data collection program was undertaken to develop the data necessary to calibrate the existing Portway Extensions model
More information5.21 DUTY OF RAILROAD AT PUBLIC HIGHWAY GRADE CROSSING (Approved before 1983) A. In General
CHARGE 5.21 Page 1 of 5 5.21 DUTY OF RAILROAD AT PUBLIC HIGHWAY GRADE CROSSING (Approved before 1983) A. In General Every railroad company is required to maintain at each highway crossing at grade a conspicuous
More informationIC Chapter 7.7. Railroad Grade Crossings Fund
IC 8-6-7.7 Chapter 7.7. Railroad Grade Crossings Fund IC 8-6-7.7-1 "Grade crossing" Sec. 1. The term "grade crossing" as used in this chapter means a crossing of any railroad and any public highway, street
More informationG Street Undercrossing. City Council Meeting Date: November 3, 2008
G Street Undercrossing City Council Meeting Date: November 3, 2008 Introduction G Street undercrossing Long-term goal of the City In General Plan since 1997 In City s Public Facilities Financing Plan
More informationMarch 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31
THOMAS P. DiNAPOLI STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK 12236 STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER March 4, 2008 Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation
More informationState of New York * County of Monroe Established in 1822
Town of Chili State of New York * County of Monroe Established in 1822 Work is completed adding 37 parking stalls. Project is completed. 8/1/12 Stone is in, paving by end of summer. OLD BUSINESS 2/3/11
More informationBUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION
BUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION Please call the Commission s file room (717-787-1013) for the official report DOCKET # MONTH/YEAR AUGUST 2005 CAPTION TYPE
More informationClaremont Project Background and Update Community Meeting September 11, 2017
Claremont Project Background and Update Community Meeting September 11, 2017 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions
More informationConnectivity is the new currency. -Mayor Pete Buttigieg, South Bend
2014 HDR Architecture, 2014 HDR, Inc., all rights reserved. Connectivity is the new currency. -Mayor Pete Buttigieg, South Bend What is it? Major capital investment to double track 16 miles of our railroad
More informationEducation for Pedestrians at Level Crossings. Taro KITAMURA Takuji HONZAWA Transport Safety Department East Japan Railway Company
Education for Pedestrians at Level Crossings Taro KITAMURA Takuji HONZAWA Transport Safety Department East Japan Railway Company 1 Contents 1. Outline of JR East 2. JR East Group Safety Plan 2018 (five-year
More informationU.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County
U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE
More informationGetting to The Juilliard School
Getting to The Juilliard School TRANSPORTATION FROM AREA AIRPORTS Airport Shuttles Super Shuttle (800) BLUE-VAN (800-258-3826) https://www.supershuttle.com/ NYC Airporter (718) 777-5111 http://www.nycairporter.com/
More informationATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE
ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where
More informationGround Transportation Driver Operations 2007/8. Driver Operations Training
Ground Transportation Driver Operations 2007/8 Driver Operations Training EGE GT Parking Operations and Vehicular Flow EGE GT Vehicle Operations Vehicle operation requirements Unattended vehicles not permitted
More informationThe Railroad Commission of California
Introduction to the CPUC Rail Academy Roger Clugston Deputy Director, Office of Rail Safety 1 California Public Utilities Commission Presentation to: League of California Cities Public Works Officers Institute
More informationPortable Noise Monitor Report
Portable Noise Monitor Report Chicago O Hare International Airport Site 2114 5516 N. Neenah Avenue, Chicago July 12, 217 through August 9, 217 USH5-ILH19-ILS1-CHI45 Visit the O Hare Noise webpage on the
More informationLESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #6 January 30, 2014
LESLIE BARNS & CONNECTION TRACK Construction Liaison Group Meeting #6 January 30, 2014 Construction Liaison Group Jan 30 2014 1 OVERVIEW HAPPY BELATED NEW YEAR Works to Date Underground Utilities Bell
More informationTRANSPORT CANADA RAILWAY SAFETY DIRECTORATE GUIDELINE NO. 1 PROCEDURE AND CONDITIONS FOR ELIMINATING WHISTLING AT PUBLIC CROSSINGS
TRANSPORT CANADA RAILWAY SAFETY DIRECTORATE GUIDELINE NO. 1 PROCEDURE AND CONDITIONS FOR ELIMINATING WHISTLING AT PUBLIC CROSSINGS Background Engine whistling requirements are controlled through the Canadian
More informationCurrent Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications
Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway
More informationDISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com
DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii
More informationTRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712
TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712 Meeting Agenda Thursday, May 25, 2017 7:00 p.m. Village Hall Council Chambers 6900 N. Lincoln Ave. Lincolnwood,
More informationHENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September Chock Lane Traffic Calming scheme Monitoring Report
HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September 2015 Title: Officer: Chock Lane Traffic Calming scheme Monitoring Report Rob Grieve, Principal Officer, Highways and Traffic,
More informationBUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018
BUILD C O N ST R U C T I O N Update August 2018 In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4 AVENUE 12 CEDAR VIADUCT A VIEW FROM ROAD 27 ABOVE HSR CONSTRUCTION FRESNO
More informationTraffic Management Plan 2018
Traffic Management Plan 2018 Jesuit College Preparatory School of Dallas Amendment to Planned Development No. 353 Dallas, Texas June 6, 2018 Prepared for Jesuit College Preparatory School of Dallas Prepared
More informationOverview of Highway 37 Project. Napa County Board of Supervisors December 20, 2016
Overview of Highway 37 Project Napa County Board of Supervisors December 20, 2016 1 Project Location-Caltrans District 4 2 SR 37 Corridor Features 2 to 4 lane 21 mile corridor traversing Solano, Sonoma,
More informationLOOK OUT COLLISION AWARENESS. Our Products Alert Employees Of Dangerous Collisions BEFORE They Occur! LEADERS OF INTERSECTION PROTECTION
COLLISION AWARENESS LOOK OUT LEADERS OF INTERSECTION PROTECTION MADE in the U.S.A. Our Products Alert Employees Of Dangerous Collisions BEFORE They Occur! KEEP YOUR WORKFORCE PROTECTED! We re the Leader
More informationFull I-35E Mainlane Closure at Beckley Avenue - July 27-30
July 20, 2018 Media Contact: Keith Bilbrey Public Involvement Manager The Southern Gateway Project kbilbrey@kstrategies.com 972-989-9995 Full I-35E Mainlane Closure at Beckley Avenue - July 27-30 DALLAS
More informationConstruction Update. Local Officials Briefing March 2016
Construction Update Local Officials Briefing March 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service 1992 Designated a HSR Corridor EIS
More informationJPB BOARD MEETING FEBRUARY 7, Correspondence Packet as of January 31, 2019, 1 p.m.
JPB BOARD MEETING FEBRUARY 7, 2019 Correspondence Packet as of January 31, 2019, 1 p.m. From: Berry, Annette Rene [mailto:annette.berry@amtrak.com] Sent: Thursday, September 06, 2018 7:08 AM To: Board
More informationStrategies to keep people and goods moving in and through Seattle. SR 99 Closure and the Seattle Squeeze
Strategies to keep people and goods moving in and through Seattle SR 99 Closure and the Seattle Squeeze 2018-2024 Puget Sound Regional Council Transportation Policy Board January 10, 2019 How we get around
More informationDriving Training Class. Presented by: Lancaster Airport Authority
Driving Training Class Presented by: Lancaster Airport Authority Driving is a Privilege Driving on the airport, airport apron and ramps is a privilege and can be revoked at anytime for any reason. Violations
More informationPortable Noise Monitor Report
Portable Noise Monitor Report Chicago O Hare International Airport Site 2117 5843 N. Christiana Avenue, Chicago July 14, 217 through August 2, 217 USH5-ILH15-ILS8-CHI39 Visit the O Hare Noise webpage on
More informationAgenda Cover Memorandum
Agenda Cover Memorandum Meeting Date: April 9, 2012 Item Title: Photo Enforcement at Railroad Crossings Action Requested: Approval For discussion Feedback requested For your information Staff Contact:
More informationWhat do they mean to you?
CANADA S NEW GRADE CROSSING REGULATIONS What do they mean to you? May 2, 2015 Floris van Weelderen, P.Eng., PTOE Becky Lai, EIT THE ACCIDENTAL GRADE CROSSING Gare Montparnasse, Paris October 22, 1895 2
More informationI-94 at Grand Avenue Interchange: The Ride before the Roller Coaster
I-94 at Grand Avenue Interchange: The Ride before the Roller Coaster Introduction Presenters Lanyea Griffin, Executive Project Engineer, Illinois Tollway Rob Deming, Project Manager, Primera Engineers,
More informationSquint s Ranch and Airport
Squint s Ranch and Airport Lake Arrowhead, CA Airport Project Summary The Lake Arrowhead Airport at The Lost Ranch is a valuable asset to the surrounding communities. Not only does it provide residents
More informationLANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS
LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS Presented at the SEE Development Excellence Workshop By Councilmember Wendy Davis, City of Fort Worth March 24,
More informationGK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by
GN Published by Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2012 Rail Safety and Standards Board Limited GK/GN0692 Issue Two: December 2012 Rail Industry Guidance Note for GK/RT0192
More informationPortable Noise Monitor Report
Portable Noise Monitor Report Chicago O Hare International Airport Site 221 5716 N. Virginia Avenue, Chicago July 23, 214 through August 11, 214 Visit the O Hare Noise Management Webpage on the Internet
More informationRAILWAY INVESTIGATION REPORT R10E0056 CROSSING COLLISION
RAILWAY INVESTIGATION REPORT R10E0056 CROSSING COLLISION VIA RAIL CANADA INC. PASSENGER TRAIN NUMBER 1 MILE 10.76, EDSON SUBDIVISION WINTERBURN, ALBERTA 04 MAY 2010 The Transportation Safety Board of Canada
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016
RELEASE: IMMEDIATE Aug. 12, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Stafford County Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov
More informationFDOT Treasure Coast Traffic Report through
FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;
More informationCotton Belt Corridor PE/EIS
February 28, 2011 February 28 2011 Prepared by Stantec Consulting, Inc Table of Contents 1.0 INTRODUCTION... 1 2.0 BACKGROUND... 1 3.0 METHODOLOGY... 3 4.0 DOCUMENT REVIEW... 3 5.0 REVIEW OF THE CORRIDOR
More informationSTATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION IN RE: IGUS BEARINGS, INC. : DOCKET NO. 4652 PETITION FOR A PRIVATE AT-GRADE CROSSING : REPORT AND ORDER On September 30, 2016,
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More informationExit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)
RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information
More informationBOARD OF DIRECTORS REGULAR MEETING MINUTES October 5, :30 PM 5401 Old Redwood Highway, 1 st Floor Petaluma, CA 94954
BOARD OF DIRECTORS REGULAR MEETING MINUTES October 5, 2016-1:30 PM 5401 Old Redwood Highway, 1 st Floor Petaluma, CA 94954 1. Call to Order Chair Arnold called the meeting to order at 1:30 PM. Directors
More informationAdd-A-Lane Contract V. along a Section of I-95 includes 6 Bridges
Newton Needham Chamber of Commerce Add-A-Lane Contract V along a Section of I-95 includes 6 Bridges Project File No. 603711 July 29, 2014 1 Agenda Project Update Overview Bid and Contract Award Schedule
More informationSAN RAFAEL City Council January 20, 2015
SONOMA MARIN AREA RAIL TRANSIT SMART CENTRAL SAN RAFAEL STATUS UPDATE SAN RAFAEL City Council January 20, 2015 CENTRAL SAN RAFAEL SMART SOUTH OF PUERTO SUELLO TUNNEL 1. Active Construction 2. Construction
More informationAirside Construction Safety: The Human Factor
Airside Construction Safety: The Human Factor Presented by The Massachusetts Port Authority Houssam H. Sleiman, P.E., CCM Director, Capital Programs and Environmental Affairs September 25, 2010 ACI-NA
More informationN. Central St. & W. Jackson Ave. Streetscape Projects
N. Central St. & W. Jackson Ave. Streetscape Projects October 13, 2016 Meeting Overview North Central Street City of Knoxville KUB History & Vision Plan Timing Project Area Overview Schedule Communications
More informationHAWAI I POLICE DEPARTMENT
PUNA CRIME STATISTICS FOR MAY 18 - MAY 24th 2015 BURGLARY: = 5 On May 19th, approximately 12:25 pm on Road 5 in Hawaiian Acres. Victim reported unknown suspects entered her residence and removed powertools
More informationLevel Crossing Risk Assessment Polegate MCB
Level Crossing Risk Assessment Polegate MCB Polegate MCB Level Crossing Risk Assessment 1 CONTENTS 1 INTRODUCTION 3 1.1 Background 3 1.2 Reason for the risk assessment 3 2 DESCRIPTION OF THE SITE 4 2.1
More informationOctober 31, 2014 Chuck McGinness, (954)
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October
More informationSTAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk
STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route
More informationHighway & Bridge Construction Market Update Southern Region
Highway & Bridge Construction Market Update Southern Region Alison Premo Black, PhD ARTBA Senior VP & Chief Economist November 26, 2016 2016 ARTBA. All rights reserved. No part of this document may be
More informationDIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018
DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018 1 US EPA CONSENT DECREE NDOT HAS MET OR EXCEEDED ALL DEADLINES FOR REQUIREMENTS CONTAINED IN THE CONSENT DECREE WITH THE US EPA NO STIPULATED PENALTIES
More informationBecker County Trail Routing Feasibility Study
2016 Becker County Trail Routing Feasibility Study CONNECTING DETROIT MOUNTAIN AND MOUNTAIN VIEW RECREATIONAL AREA TO THE HEARTLAND TRAIL BECKER COUNTY ULTEIG ENGINEERS Contents Acknowledgements...2 INTRODUCTION...3
More informationNon-Motorized Transportation
Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can
More informationAppendix E. Build Alternative Design Information
Appendix E. Build Alternative Design Information NORTHERN LIGHTS EXPRESS C/L SHIFTED MAINLINE TRACK C/L MAINLINE TRACK 5" 24: PROFILE GRADE 24: 24: PROFILE GRADE 24: 22' - 0" 22' - 0" SINGLE TRACK ON CURVES
More informationAppendix 4.8 A. Agency Correspondence and Final APE Statement
Appendix 4.8 A Agency Correspondence and Final APE Statement Area of Potential Effect for Cultural Resources Introduction The South Coast Rail project requires review by the Army Corps of Engineers (Corps),
More informationGuide to. Road Construction Projects
Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or
More informationPublic Meeting: Metropolitan Washington Airports Authority (MWAA) Transportation Network Company (TNC) Lot on S. Eads Street
Public Meeting: Metropolitan Washington Airports Authority (MWAA) Transportation Network Company (TNC) Lot on S. Eads Street Arlington County Department of Environmental Services Transportation Division
More informationRELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)
RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)
More informationLUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS
LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS Prepared for Skip Coddington GSC Development, Inc PO Box 1623 Woodinville WA 9872 Prepared by 1141 NE 124 th St., #59 Kirkland, WA 9834 425.522.4118
More informationThis quarterly brochure is compiled by the New York Metropolitan Transportation Council. Data Monitoring and Analysis Unit
Travel Patterns in the New York Metropolitan Area for 2017 s Second Quarter provides an overview of regional travel patterns. On an average weekday in the Second Quarter, there were 10,326,385 total bus,
More informationRV RULES OCTOBER 1, 2016
RV RULES OCTOBER 1, 2016 1 WELCOME Welcome to Las Vegas Motor Speedway! We are glad you are here and hope you enjoy the schedule of events planned during your visit. Please read the enclosed information
More information