1 Public Meeting: Metropolitan Washington Airports Authority (MWAA) Transportation Network Company (TNC) Lot on S. Eads Street Arlington County Department of Environmental Services Transportation Division March 18, 2019

2 Area Layout 2

3 Area Layout (before 10/12/2018) 3

4 Actions before Sept Meeting March 1, MWAA applied for certificate of occupancy to operate two 50-space parking lots on S. Eads Street March 16, County s Zoning Division approved certificate of occupancy April 16, MWAA started operations at S. Eads Street April 20-26, County conducted new traffic counts on S. Eads Street, monitored nearby intersections with traffic cameras May - County met with VDOT NOVA District staff to discuss impacts and possible options for Route 1 access August - MWAA, VDOT and County staff met to discuss impacts and possible solutions September - County submitted design plan for interim solution to VDOT, set counters at lot's entrance/exit and on S. Eads Street to capture traffic volumes September - VDOT reviewed the design plan and issued permit 4

5 County Actions After the Sept. Meeting Actions to date since the public meeting on Sept. 27: Oct. 12, 2018 County installed temporary signal at Route 1 and 27th Street, serving exiting traffic from the TNC lot ($45,000) Nov. 1, 2018 County collected 24-hour traffic counts on S. Eads Street at the lot entrances Nov. 16, 2018, and Jan. 25, 2019 County hosted coordination meetings with MWAA, Uber and Lyft Continuous operations coordination between County and MWAA: Adjusting signal timing, extended green phase for lot s peak hours Additional enforcement effort by Police Department 5

6 Traffic Volumes at the Lot (Nov. 2018) Time (Hour Intervals) Entrances Exit S. Eads St Time (Hour Intervals) Northern Southern Total Enter Source: County data Heading Southbound Heading Northbound Total Exit Total Volume 11/01 12:00 AM :00 AM :00 AM :00 AM :00 AM :00 AM :00 AM :00 AM :00 AM :00 AM :00 AM :00 AM :00 PM :00 PM :00 PM :00 PM :00 PM :00 PM :00 PM :00 PM :00 PM :00 PM :00 PM :00 PM Total:

7 Traffic Volumes at the Lot (Sept. 2018) Time (Hour Intervals) Entrances Exit S. Eads St Heading Heading Total Enter Time (Hour Intervals) Northern Southern Southbound Northbound Total Exit Total Volume 09/24 1:00 PM :00 PM :00 PM :00 PM :00 PM :00 PM :00 PM :00 PM :00 PM :00 PM :00 PM :00 AM /25 5:30 AM :00 AM :00 AM :00 AM :00 AM :00 AM :00 AM :00 PM Total Tube Counters had technical issue because they were calibrated to capture road traffic; staff is adjusting calibration Video/Manual counts conducted when the issue with tube counter was identified Source: County data 7

8 Traffic on S. Eads Street Base Annual Average Daily Traffic: 11,000 vehicles per day Counts collected one week after lot opening, and again in September Counter locations 8

9 Community Concerns What we ve heard: High traffic volumes on area road network, especially S. Eads Street Left-turn cars back up traffic on southbound S. Eads Street near the lot entrances U-turns at or near the lot entrances create congestion and safety concerns Noticed additional Police presence 9

10 Next Steps County Suggestions Phase II interim solution Studied feasibility of modifying intersection configuration at lot s Route 1 exit (discussed at Sept meeting), County does not recommend implementation of Phase II due to: Limited benefit Significant construction impact on traffic Cost outweighs benefit ($250,000) County is seeking creative signage options for S. Eads Street to help reduce U-turns near the lot entrances Airport Police Department continue monitoring the lot County Police Department continue monitoring traffic on S. Eads Street MWAA and TNC companies continue improving the lot management Move the TNC operation back on campus after the completion of Project Journey (MWAA has agreed to provide best effort on this) County, MWAA and TNC companies continue coordination and collaboration 10

11 DCA Project Journey Update & Transportation Network Company (TNC) Waiting Area 2780 & 2804 Jefferson Davis Highway, Crystal City, VA Presentation for Arlington County, VA Crystal City Public Meeting March 18, 2019

12 DCA A View of Crystal City and Washington, DC

13 DCA (Prior) - View Northward toward Exit onto GW Pkwy

14 Regional Cut-Thru Traffic - GW Pkwy to DCA to Crystal City

15 Regional & DCA Challenge: Traffic Queue to N-B GW Parkway

16 Regional Traffic Challenge Backups beyond DCA Terminals

17 Project Journey Briefing Community Update March 18, 2019

18 DCA Congestion Relief - Park Free For Up to 60 Minutes During Construction In Terminal Garages

19 $1B, multi-year construction effort to transform the passenger experience at Reagan National 2 New, Expanded Security Checkpoints Connecting Terminal B/C Gates Post-Security New 14-Gate Concourse Replacing Gate 35X 9

20 Major Project Components Construction Areas Facility Activation in

21 DCA & Project Journey Roadway Configuration Present All shuttle buses moved upstairs Taxis next to Terminal TNC and non-tnc private vehicles outer curbside

22 Current Project Journey Construction Progress

23 Obtain Project Advisories & Updates - Available Online View or sign up at flyreagan.com/projectjourney Reminders/Updates

24 Transportation Network Company Designated Waiting Area 2780 and 2804 Jefferson Davis Highway Crystal City, Virginia March 18, 2019

25 TNC Designated Waiting Area (Uber/Lyft, Limousine)

26 How the TNC Waiting Area Works Uber and Lyft have created a virtual geofence around the South Eads Street lot designated as the TNC Waiting Area Private Vehicle Rideshare drivers must be within the geofence perimeter (i.e., the Waiting Area) in order to join the queue awaiting a TNC ride request from the Uber / Lyft App Uber and Lyft assigns Airport pickup trips to TNC drivers in the queue on a first in-first out basis

27 Routes to/from TNC Designated Waiting Area

28 Continuous Improvement Actions TNC Rematch Uber & Lyft assigns airport pickups to Private Vehicle Rideshare TNC drivers immediately following completion of an airport drop off, thereby eliminating the need to have an additional vehicle enter/exit the TNC Waiting Area MWAA police presence and coordinated safety enforcement in and around the TNC Waiting Area MWAA sends license plates information of violators to Uber and Lyft to take action with TNC drivers

29 FlyReagan.com/ProjectJourney

30 FlyReagan.com/ProjectJourney

31 TNC Designated Waiting Area 8:18 AM, Friday 3/15/19) South Eads Street NB morning traffic has stopped & is backed up from points north of TNC Waiting Area

32 DCA Traffic Challenges Traffic Queue to N-B GW Parkway

33 FlyReagan.com/ProjectJourney

Arlington County Board Meeting Project Briefing. October 20, 2015

Arlington County Board Meeting Project Briefing. October 20, 2015 Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66

More information

McLean Citizens Association Transportation Committee Project Briefing

McLean Citizens Association Transportation Committee Project Briefing McLean Citizens Association Transportation Committee Project Briefing November 10, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

ACI-NA: Business Of Airports

ACI-NA: Business Of Airports 2018 ACI-NA: Business Of Airports Bakari Brock SR. DIRECTOR, LYFT BUSINESS OUR MISSION IMPROVE PEOPLE S LIVES WITH THE WORLD S BEST TRANSPORTATION LOGAN GREEN & JOHN ZIMMER LYFT HOW WE DO IT. Strong community

More information

Strategies to keep people and goods moving in and through Seattle. SR 99 Closure and the Seattle Squeeze

Strategies to keep people and goods moving in and through Seattle. SR 99 Closure and the Seattle Squeeze Strategies to keep people and goods moving in and through Seattle SR 99 Closure and the Seattle Squeeze 2018-2024 Puget Sound Regional Council Transportation Policy Board January 10, 2019 How we get around

More information

Design Public Hearing

Design Public Hearing Design Public Hearing Monday, March 7, 2016 Washington-Lee High School Cafeteria 1301 N. Stafford Street, Arlington, VA 22201 Tuesday, March 8, 2016 Eagle Ridge Middle School Cafeteria 42901 Waxpool Road,

More information

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2 Job No. 15-019 Page 2 TABLE OF CONTENTS 1.0 INTRODUCTION... 4 2.0 EXISTING CONDITIONS... 5 3.0 TRAFFIC GENERATION... 7 4.0 TRIP DISTRIBUTION... 8 5.0 FUTURE CONDITIONS... 8 6.0 SITE ACCESS...13 7.0 CONCLUSION...13

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

Understanding Your I-66 Trip

Understanding Your I-66 Trip Understanding Your I-66 Trip DETERMINING YOUR TRIP Identify the location of your most convenient entrance and then follow the map to your exit. Pricing is tracked by four gantries along the corridor. Traffic

More information

I-66 Inside the Beltway Feasibility Study

I-66 Inside the Beltway Feasibility Study I-66 Inside the Beltway Feasibility Study Feasibility Study Study Process Context Sensitive Dialogues Corridor Assessments / Data Collection Problem Statement Refinement Concept Development Concept Evaluation

More information

Hampton Roads Express Lane Network

Hampton Roads Express Lane Network More Choices For Travelers Hampton Roads Express Lane Network James Utterback, PMP Hampton Roads District Administrator Presented to HRTPO Board July 20, 2017 Regional Express Lane Network 2 History of

More information

TETRA TECH AMT 1515 Wilson Blvd. Suite 1100 Arlington, VA USA (703)

TETRA TECH AMT 1515 Wilson Blvd. Suite 1100 Arlington, VA USA (703) DIRECTIONS TO HEADQUARTERS Included in this Guide: Directions to Tetra Tech 1 AMT Headquarters Parking Information 1 FAA National 2 Headquarter Locations Shuttle Schedule 2 Service to FAA Buildings Closest

More information

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A Columbia Rd REFINED CONCEPT 1 PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp

More information

AGENDA ITEM I-6 Public Works

AGENDA ITEM I-6 Public Works AGENDA ITEM I-6 Public Works STAFF REPORT City Council Meeting Date: 8/6/2018 Staff Report Number: 18-150-CC Informational Item: Update on the Willow Road and highway 101 interchange construction, upcoming

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

Monthly Commercial Ground Transportation Report July 2017

Monthly Commercial Ground Transportation Report July 2017 Monthly Commercial Ground Transportation Report July 2017 TABLE OF CONTENTS A - Events B - Section 1: Revenue GT Trips 1- All Ground Transportation Trips Taxi Shared Ride Van Service Rideshare Prearranged

More information

ENVISIONING AUSTIN s Airport of the Future

ENVISIONING AUSTIN s Airport of the Future ENVISIONING AUSTIN s Airport of the Future ABIA 2040 Master Plan Public Workshop #1 October 12, 2017 WHAT IS THE PURPOSE OF TODAY S WORKSHOP? Educate & Inform Solicit Input Answer Questions 2 WHAT IS A

More information

U.S. Environmental Protection Agency CERCLA Education Center Superfund 101 October 3 through 7, 2011

U.S. Environmental Protection Agency CERCLA Education Center Superfund 101 October 3 through 7, 2011 U.S. Environmental Protection Agency CERCLA Education Center Superfund 101 October 3 through 7, 2011 General Information The Superfund 101 training course will be held Monday through Friday, October 3-7,

More information

Public Information Meetings. October 5, 6, 7, and 15, 2015

Public Information Meetings. October 5, 6, 7, and 15, 2015 Public Information Meetings October 5, 6, 7, and 15, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66 eastbound

More information

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report)

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report) STAFF REPORT ACTION REQUIRED Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report) Date: March 25, 2015 To: From: Wards: Reference

More information

Report to the Strategic Development Committee. Ronald Reagan Washington National Airport Project Journey. June 2018

Report to the Strategic Development Committee. Ronald Reagan Washington National Airport Project Journey. June 2018 Report to the Strategic Development Committee Ronald Reagan Washington National Airport Project Journey June 2018 Secure National Hall Secure National Hall Project Cost Summary Prior Month Expenditures

More information

SAN JOSÉ INTERNATIONAL AIRPORT

SAN JOSÉ INTERNATIONAL AIRPORT SAN JOSÉ INTERNATIONAL AIRPORT NEAR-TERM TERMINAL CAPACITY ANALYSIS AIRPORT COMMISSION AUGUST 14, 2017 August 14, 2017 AGENDA 1. Forecast Review (with 14 MAP High Case) 2. Gate Requirements and Aircraft

More information

I-405 Express Toll Lanes Coming in 2015

I-405 Express Toll Lanes Coming in 2015 I-405 Express Toll Lanes Coming in 2015 Jennifer Charlebois Roadway Toll Systems PE, Toll Division Anne Broache Public Information, I-405/SR 167 Lynn Peterson Secretary of Transportation Market Neighborhood

More information

Report to the Strategic Development Committee

Report to the Strategic Development Committee Report to the Strategic Development Committee Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route 28 May 2016 PURPOSE Staff requests

More information

77 McDonnell-Lindbergh - Monday thru Friday NORTHBOUND Effective: March 18, Shopping Center North County. Shopping Center Washington &

77 McDonnell-Lindbergh - Monday thru Friday NORTHBOUND Effective: March 18, Shopping Center North County. Shopping Center Washington & 77 McDonnell- - Monday thru Friday NORTHBOUND Effective: March 18, 2019 & Valley Industries 4:53A 4:59A 5:10A 5:18A 5:27A 5:39A 5:33A 5:39A 5:50A 5:58A 6:07A 6:19A 6:13A 6:19A 6:31A 6:39A 6:49A 7:02A 6:53A

More information

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION Traffic and Transportation Technical Report City

More information

LAX Central Terminal Area Ground Transportation Improvement Plan

LAX Central Terminal Area Ground Transportation Improvement Plan i E Los World Angeles Airports LA Central Terminal Area Ground Transportation Improvement Plan Presented to Board of Airport Commissioners November 3, 2016 CTA Traffic Volumes Have Increased 0,0-4 In Summer

More information

Are you ready for San Diego?

Are you ready for San Diego? Are you ready for San Diego? Here at ACMA, things are really gearing up for the 2013 Case Management Conference in San Diego! We are thrilled to have you joining us for the 20 th anniversary of the national

More information

FUTURE PASSENGER PROCESSING. ACRP New Concepts for Airport Terminal Landside Facilities

FUTURE PASSENGER PROCESSING. ACRP New Concepts for Airport Terminal Landside Facilities FUTURE PASSENGER PROCESSING ACRP 07-01 New Concepts for Airport Terminal Landside Facilities In association with: Ricondo & Associates, TransSolutions, TranSecure RESEARCH Background Research Objective

More information

I-95/395 HOV/Bus/HOT Lanes Project Overview

I-95/395 HOV/Bus/HOT Lanes Project Overview I-95/395 HOV/Bus/HOT Lanes Project Overview 2 I-95/395 HOV/Bus/HOT Lanes Meetings Agenda 7 p.m. to 9 p.m. Open House Information Stations and Q&A With Project Staff 7:30 p.m. and 8:30 p.m. Project Overview

More information

EXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report

EXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report II. EXISTING CONDITIONS A. INTRODUCTION The Route 107 study area extends from the south at Chestnut Street in Lynn approximately 3.7 miles to the north to Boston Street in Salem. The study area has three

More information

Community Meeting LGB Ground Transportation Study

Community Meeting LGB Ground Transportation Study Community Meeting LGB Ground Transportation Study FEBRUARY 1, 2017 DISCUSSION OVERVIEW LGB management goals Study background and methodology LGB passenger survey results Regulatory environment Best practice

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

Committee for Dulles. June 9, Jack Potter, MWAA President & CEO

Committee for Dulles. June 9, Jack Potter, MWAA President & CEO Committee for Dulles June 9, 2016 Jack Potter, MWAA President & CEO Dulles International is the Premier International Gateway to the Capital Region Dom Intl Total Mainline Airlines 10 29 37* Destinations

More information

EXHIBIT C. GROUND TRANSPORTATION OPERATING RULES & REGULATIONS Dated August 28, Section 1 Introduction

EXHIBIT C. GROUND TRANSPORTATION OPERATING RULES & REGULATIONS Dated August 28, Section 1 Introduction EXHIBIT C GROUND TRANSPORTATION OPERATING RULES & REGULATIONS Dated August 28, 2017 Section 1 Introduction The Sarasota Manatee Airport Authority has established Ground Transportation Operating Rules and

More information

Organization Date. Sound Regional Council Regional Project Evaluation Committee. Brian Nielsen, Program Administrator

Organization Date. Sound Regional Council Regional Project Evaluation Committee. Brian Nielsen, Program Administrator Organization Puget Date Sound Regional Council Regional Project Evaluation Committee Brian Nielsen, Program Administrator October 26, 2018 TODAY S FOCUS The big picture #Realign99 closure/opening the tunnel

More information

PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys

PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys 1 Summary of 2015 BBTCA Traffic and Passenger Surveys Surveys of traffic volumes and pedestrian activity were

More information

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE BRIEFING ON RONALD REAGAN WASHINGTON NATIONAL AND WASHINGTON DULLES INTERNATIONAL AIRPORTS CAPITAL CONSTRUCTION PROGRAM APRIL 2015 2015 Use & Lease

More information

General Information for Camp George Washington University:

General Information for Camp George Washington University: General Information for Camp George Washington University: Thank you for choosing Lavner Camps! We are very excited for an amazing summer! Below is some need-to-know information for our summer camps at

More information

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING May 15, 2018 Master Plan Schedule Overview Progress Since Last Master Plan

More information

Transportation Guide

Transportation Guide 2018 schedules Transportation Guide train pass to go here POWER HOUR: 5:30-6:30 pm, Saturday - Monday! (appointments recommended) An opportunity to extend meetings an additional hour after the 5:30 pm

More information

Washington State Transportation Commission

Washington State Transportation Commission Washington State Transportation Commission I-405 express toll lanes Patty Rubstello, Assistant Secretary of Tolling May 17, 2016 Agenda I-405 Six Month Update Key Takeaways Performance update Impact to

More information

Report to the Dulles Corridor Advisory Committee

Report to the Dulles Corridor Advisory Committee Report to the Dulles Corridor Advisory Committee Information Report on Dulles Toll Road Toll Rate Adjustment Process and Tentative Schedule and Overview of Traffic and Revenue Study Update May 2018 Purpose

More information

Sky Temporary Car Park Transport Statement

Sky Temporary Car Park Transport Statement 001 Issue 26 August 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM The Robert B. Balter Company (Balter) has an extensive and continuously active involvement with the expansion of Washington Dulles International Airport (IAD) and Ronald Reagan Washington National Airport

More information

JANUARY MODERNIZATION UPDATE: MAJOR PROJECTS ON TAP AT LAX AS NEW YEAR BEGINS

JANUARY MODERNIZATION UPDATE: MAJOR PROJECTS ON TAP AT LAX AS NEW YEAR BEGINS For Immediate Release January 2, 2018 Contact: Charles H. Pannunzio (424) 646-5260 JANUARY MODERNIZATION UPDATE: MAJOR PROJECTS ON TAP AT LAX AS NEW YEAR BEGINS Access to Parking Structure 4 from the Upper/Departure

More information

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg) RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information

More information

TRAFFIC & PARKING STUDY FOR PROPOSED BIRMINGHAM BOUTIQUE HOTEL

TRAFFIC & PARKING STUDY FOR PROPOSED BIRMINGHAM BOUTIQUE HOTEL TRAFFIC & PARKING STUDY FOR PROPOSED BIRMINGHAM BOUTIQUE HOTEL Prepared for LORIENT CAPTIAL LLC Birmingham, MI By GIFFELS WEBSTER Washington Township, MI April 2017 i CONTENTS EXECUTIVE SUMMARY. ii INTRODUCTION.

More information

MEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015

MEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015 MEMORANDUM To: VDOT Northern Virginia District From: I-66 Project Team Date: November 5, 2015 Subject: Open Section Background The purpose of this technical memorandum is to provide narrative and technical

More information

Existing Conditions AIRPORT PROFILE Passenger Terminal Complex 57 air carrier gates 11,500 structured parking stalls Airfield Operations Area 9,000 North Runway 9L-27R 6,905 Crosswind Runway 13-31 5,276

More information

This report was prepared by the Lake Zurich Police Department Traffic Safety Division. Intersection location and RLR camera approaches identified:

This report was prepared by the Lake Zurich Police Department Traffic Safety Division. Intersection location and RLR camera approaches identified: POLICE DEPARTMENT 200 Mohawk Trail Lake Zurich, Illinois 60047 (847) 719-1690 LakeZurich.org April 1, 2018 This report is being submitted regarding the red-light cameras. According to the Red Light Running

More information

Aurora Hills. Getting There

Aurora Hills. Getting There Aurora Hills Aurora Hills is neighborhood near Crystal City and Pentagon City. Ball fields, ball courts, a very short trail, and a combination ibrary/fire Station are the central pieces of a recreation

More information

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway Master Plan Advisory Committee (MPAC) Alternatives September 28, 2017 AGENDA Review of Previous Work Ultimate Land

More information

New Technologies and Digital Transformation of the Passenger Process in Airport Terminals

New Technologies and Digital Transformation of the Passenger Process in Airport Terminals RELIABLE BUILDING OPERATION AT AIRPORTS Gateway Gardens at Frankfurt Airport Sept 27-28, 2018 New Technologies and Digital Transformation of the Passenger Process in Airport Terminals Jens Grabeleu Fraport

More information

Western Placer County Transit Operators Short Range Transit Plan Updates FY to FY Project Update and Alternatives Discussion

Western Placer County Transit Operators Short Range Transit Plan Updates FY to FY Project Update and Alternatives Discussion Western Placer County Transit Operators Short Range Transit Plan Updates FY 2018-19 to FY 2024-25 Project Update and Alternatives Discussion Public Workshop Purpose Present various transit service, capital

More information

395 Express Lanes Project Update

395 Express Lanes Project Update 395 Express Lanes Project Update Key Dates Milestone Date Limited Notice to Proceed February 2017 Early Works March-June 2017 Full Notice to Proceed July 2017 Preparatory Work Summer 2017 Draft Noise Abatement

More information

Report on the Crafthole Traffic Light Project 3 rd July th September 2017

Report on the Crafthole Traffic Light Project 3 rd July th September 2017 Report on the Crafthole Traffic Light Project 3 rd July 2017 4 th September 2017 Brief History The village of Crafthole sits on the B3247 road, one of the 2 Gateways to the Rame Peninsula, the other being

More information

State of Hawaii Dept. of Transportation Airports Division Capital Improvement Program Update

State of Hawaii Dept. of Transportation Airports Division Capital Improvement Program Update State of Hawaii Dept. of Transportation Airports Division Capital Improvement Program Update Enabling Inter-Island Improvements for Mauka CC Honolulu International Airport Before After Mauka Concourse

More information

Welcome! USAID Washington, D.C. Learning Center. Creating a better future. In This Guide: Welcome to the USAID Washington, D.C. Learning Center!

Welcome! USAID Washington, D.C. Learning Center. Creating a better future. In This Guide: Welcome to the USAID Washington, D.C. Learning Center! The The The USAID Washington, D.C. Learning Center Welcome! In This Guide: Welcome to the USAID Washington, D.C. Learning Center, p. 1 WLC Features, p. 2 WLC Details, p. 3 Floor Plan, p. 4-5 Additional

More information

FINAL TERMINAL TRAFFIC MONITORING STUDY

FINAL TERMINAL TRAFFIC MONITORING STUDY FINAL TERMINAL 91 216 TRAFFIC MONITORING STUDY Prepared for: Port of Seattle February 15, 217 Prepared by: 12131 113 th Avenue NE, Suite 23 Kirkland, WA 9834-712 Phone: 425-821-3665 www.transpogroup.com

More information

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer Agenda Dashboard 2019 Project Advertisements for Construction 2019 New Projects

More information

MEMORANDUM. for HOV Monitoring on I-93 North and the Southeast Expressway, Boston Region MPO, November, 2011.

MEMORANDUM. for HOV Monitoring on I-93 North and the Southeast Expressway, Boston Region MPO, November, 2011. MEMORANDUM Date: January 12, 2012 To: Congestion Management Process Files From: Seth Asante, Ryan Hicks, and Efi Pagitsas MPO Staff Re: Historical Trends: Travel Times and Vehicle Occupancy Levels for

More information

Norfolk International Airport

Norfolk International Airport Norfolk International Airport Master Plan Update Technical Advisory Committee Meeting #1 Community Advisory Committee Meeting #1 January 24, 2018 Agenda Project Background Introductions Overview of Airport

More information

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4 MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #4 December 14, 2017 Today s Agenda o Welcome o Introductions o Progress update o Alternatives analysis

More information

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017 Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society

More information

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District Evaluation of Significant Transportation Projects in Northern Virginia Transportation District Fact Sheet #3 Winter 2015 Virginia Department of Transportation Update - Project Evaluation And Rating Since

More information

Score. Category. Access Aesthetics Community Resources

Score. Category. Access Aesthetics Community Resources NO BUILD ALTERNATIVE The No Build Alternative is the do nothing option that is used for comparison to the build alternatives. The screening assumes no new facilities are constructed as part of the I-93

More information

Watts St westbound thru

Watts St westbound thru Executive Summary At the request of the Hudson Square Business Improvement District, Sam Schwartz Engineering, DPC (Sam Schwartz) has completed a technical analysis of various congestion pricing and/or

More information

A retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation

A retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation Page 2 of 20 Background TPB staff has been managing data collection along the region s HOV facilities since the late 1990's, and documenting the results, which include counts of auto occupants, vehicles

More information

STUDY DESCRIPTION MEMORANDUM. DATE April 20, 2011

STUDY DESCRIPTION MEMORANDUM. DATE April 20, 2011 DATE April 0, 0 TO FROM RE MEMORANDUM Congestion Management Program Files Ariel Godwin, CMP Manager Boston Region MPO Staff Limited-Access Highway Counts and Traffic Volumes, Summer 00 This memorandum

More information

BG Peter D. Hidalgo (Retired) Internment at Arlington National Cemetery, Virginia

BG Peter D. Hidalgo (Retired) Internment at Arlington National Cemetery, Virginia BG Peter D. Hidalgo (Retired) Internment at Arlington National Cemetery, Virginia SERVICE Date: Tuesday, February 17, 2009 Time: 1100 Please arrive at Arlington National Cemetery by 10:30 and proceed to

More information

Airport Preliminary Master Plan Workshop Board of County Commissioners April 18, 2017

Airport Preliminary Master Plan Workshop Board of County Commissioners April 18, 2017 Airport Preliminary Master Plan Workshop Board of County Commissioners April 18, 2017 (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY Agenda (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR

More information

Frequently Asked Questions (FAQs)

Frequently Asked Questions (FAQs) Frequently Asked Questions (FAQs) 1. WHEELCHAIR SERVICE I will need a wheelchair when I arrive at the airport for my departing flight. How do I get one? Wheelchair service is provided through the airlines.

More information

Northern Virginia Community College (NOVA)-Annandale Campus STUDENT SERVICES BUILDING, ROOM CA Little River Turnpike ANNANDALE, VA 22003

Northern Virginia Community College (NOVA)-Annandale Campus STUDENT SERVICES BUILDING, ROOM CA Little River Turnpike ANNANDALE, VA 22003 Northern Virginia Community College (NOVA)-Annandale Campus STUDENT SERVICES BUILDING, ROOM CA-302 8333 Little River Turnpike ANNANDALE, VA 22003 ***We highly recommend you arrive at the school at least

More information

TRANSPORTATION COMMISSION

TRANSPORTATION COMMISSION TRANSPORTATION COMMISSION Minutes of Meeting of August 15, 2018 Volume 65 No. 8 Members Present: Thomas Soyk, Deputy Commissioner of Parking, Acting Chairman John P. Larson, Commissioner of Parking James

More information

Baltimore Ravens Egress Study

Baltimore Ravens Egress Study Baltimore Ravens Egress Study Presented by: Matt Snare, P.E., PTOE Amy Jackson, P.E. April 19, 2016 Agenda History of Ravens in Baltimore Traditional Traffic Studies vs. Stadium Work Ravens Egress Study

More information

Brisbane Airport Ground Transport Operators Forum Tuesday 25 July, 2pm Brisbane Airport Meeting Room Ground Transport Operators

Brisbane Airport Ground Transport Operators Forum Tuesday 25 July, 2pm Brisbane Airport Meeting Room Ground Transport Operators MEETING MINUTES Event: Date & Time: Venue: Attendees: Brisbane Airport Ground Transport Operators Forum Tuesday 25 July, 2017 @ 2pm Brisbane Airport Meeting Room Ground Transport Operators Agenda Item

More information

FLL Master Plan Update Policy Advisory Committee (PAC) Briefing #2 July 10, 2017

FLL Master Plan Update Policy Advisory Committee (PAC) Briefing #2 July 10, 2017 FLL Master Plan Update Policy Advisory Committee (PAC) Briefing #2 July 10, 2017 (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY PAC Committee (PRELIMINARY DRAFT) WORK IN PROGRESS -

More information

Fairfax County Transportation Advisory Commission (TAC)

Fairfax County Transportation Advisory Commission (TAC) Fairfax County Transportation Advisory Commission (TAC) January 17, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Development Manager

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016 RELEASE: IMMEDIATE Aug. 12, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Stafford County Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov

More information

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps Section 106 Update Memo #1 Attachment D Traffic Diversion & APE Expansion Methodology & Maps I-65/I-70 North Split Interchange Reconstruction Project (Des. Nos. 1592385 & 1600808) Traffic Diversion and

More information

REPORT TO THE BUSINESS ADMINISTRATION COMMITTEE PROPOSED AMENDMENT TO METROPOLITAN WASHINGTON AIRPORTS REGULATIONS ON TAXICAB DISPATCH FEE AT RONALD REAGAN WASHINGTON NATIONAL AIRPORT JANUARY 2009 ACTION

More information

Washington-Baltimore Regional Airport System Plan Ground Access Element Update

Washington-Baltimore Regional Airport System Plan Ground Access Element Update Washington-Baltimore Regional Airport System Plan Ground Access Element Update March 2007 Metropolitan Washington Council of Governments National Capital Region Transportation Planning Board ABSTRACT

More information

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015 Evaluation of Significant Transportation Projects in Northern Virginia Transportation District HB 599 Ratings Overview NVTA - January 22, 2015 Study Approach NVTA and CTB nominate projects Define Project

More information

Traffic Management Plan 2018

Traffic Management Plan 2018 Traffic Management Plan 2018 Jesuit College Preparatory School of Dallas Amendment to Planned Development No. 353 Dallas, Texas June 6, 2018 Prepared for Jesuit College Preparatory School of Dallas Prepared

More information

San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1

San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1 San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1 OVERVIEW Brief recap from October Traffic Analysis Findings Draft Environmental Document Summarized Outcomes Questions

More information

CONGESTION REPORT 1 st Quarter 2018

CONGESTION REPORT 1 st Quarter 2018 CONGESTION REPORT 1 st Quarter 2018 A quarterly update of the National Capital Region s traffic congestion, travel time reliability, top-10 bottlenecks and featured spotlight Feburary 11, 2019 ABOUT TPB

More information

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis ITB MAIN TERMINAL DEPARTURES LEVEL & BOARDING AREAS A & G ALTERNATIVES ANALYSIS

More information

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY RONALD REAGAN WASHINGTON NATIONAL AIRPORT TRANSPORTATION NETWORK COMPANY SERVICES PERMIT NO.

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY RONALD REAGAN WASHINGTON NATIONAL AIRPORT TRANSPORTATION NETWORK COMPANY SERVICES PERMIT NO. METROPOLITAN WASHINGTON AIRPORTS AUTHORITY RONALD REAGAN WASHINGTON NATIONAL AIRPORT TRANSPORTATION NETWORK COMPANY SERVICES This Permit is granted to Lyft, Inc. ( Permit Holder ) pursuant to the provisions

More information

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager Arlington County Board Work Session Eastbound Widening January 17, 2017 Amanda Baxter, VDOT Special Projects Development Manager Program Area Map 2 Program Scope Tolling during weekdays, peak hours, peak

More information

TABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary.

TABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary. TABLE OF CONTENTS Section Page Section Page 1.0 INTRODUCTION... 1 1.1 Purpose of an... 1 1.2 Goals and Objectives... 1 1.3 Mission Statement... 2 1.4 Stakeholder/Public Involvement... 2 1.5 Major Deliverables...

More information

RONALD REAGAN WASHINGTON NATIONAL AIRPORT NOVEMBER 2016

RONALD REAGAN WASHINGTON NATIONAL AIRPORT NOVEMBER 2016 2. Purpose and Need 2.1 Background The Metropolitan Washington Airports Authority (the Authority) is preparing an Environmental Assessment (EA) of potential environmental impacts associated with the proposed

More information

Alternate Access Routes to/from:

Alternate Access Routes to/from: Alternate Access Routes to/from: Centennial Medical Center... 2 Downtown... 2 Farmer s Market... 3 Frist Center... 3 Germantown... 4 HCA Buildings on Park Plaza between 31 st and 25 th... 4 HCA Building

More information

BNA Master Plan Update Public Meeting No. 2

BNA Master Plan Update Public Meeting No. 2 A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation

More information

Transportation Network Companies Airport Access Recommendations. Board of Airport Commissioners December 18, 2014

Transportation Network Companies Airport Access Recommendations. Board of Airport Commissioners December 18, 2014 Transportation Network Companies Airport Access Recommendations Board of Airport Commissioners December 18, 2014 Objectives 1. Respond to Mayor Garcetti s September 25, 2014 letter seeking recommendations

More information

Airports in the Region Case Study

Airports in the Region Case Study Crystal City Plan Feasibility Study Arlington, Virginia Planning for Redevelopment near Ronald Reagan Washington National Airport By Alex Iams, Arlington Economic Development Arlington County planners

More information

Transportation Demand Management Plan for the Proposed Hampton Inn & Suites in San Mateo, California

Transportation Demand Management Plan for the Proposed Hampton Inn & Suites in San Mateo, California Memorandum Date: October 3, 207 To: From: Subject: Tricia Schimpp, City of San Mateo Gary Black Ricky Williams Transportation Demand Management Plan for the Proposed Hampton Inn & Suites in San Mateo,

More information

Legislature was called to order by the Chairman of the Chemung County Legislature. The following members were present when the Clerk called roll:

Legislature was called to order by the Chairman of the Chemung County Legislature. The following members were present when the Clerk called roll: Public Hearing MINUTES OF MEETING November 6, 2017 Public hearing on the proposed agreement with Lyft, Inc. 6:55 P.M. Public Hearing for the purpose of hearing any and all public comment in relation to

More information