1 Cambrian: In service experience an Infrastructure Manager s perspective Nicola Furness, Principal Project Engineer (ERTMS) Date

2 Introduction to ERTMS on Cambrian Operation Maintenance Management of Change Reliability Management Lessons Learnt Future Deployment Date

3 Cambrian - Overview Porthmadog Pwllheli Scope ERTMS Level 2 (no line-side signals) 215 km of track 24 DMUs for passenger service 3 locos to pilot unfitted trains Upgrade of 4 Level-Crossings New control centre (Machynlleth) New axle counters & interlocking Harlech Barmouth Tywyn Machynlleth Aberystwyth Shrewsbury Welshpool Sutton Bridge Newtown Pwllheli Harlech became operational October 2010 Remainder of the route became operational March 2011 Date

4 Cambrian - Trains Date

5 Cambrian - Infrastructure Date

6 Cambrian - Technical Solution System Design Control Centre Architecture Central Traffic Contol Signalling Equipment Room Axle Counter Evaluators MTOR SEI RBC GSM-R AC AC AC AC AC AC MTOR MTOR MTOR SILAM PAP 1 PAP 2 PAP 3 SILAM PAP 1 PAP 2 PAP 3 FT Network To trackside Date

7 Cambrian Control Centre Date

8 Cambrian - Technical Solution System Design Trackside Architecture FT Network Encryption Axle Counter AC Object Controller MTOR Axle Counter Unit Point Machine Beacon Point Machine Beacon Lev el Crossing Date Axle Counter 8 Unit

9 Cambrian - Trackside Date

10 Operation - general Operating staff 2 Signallers and 1 Control Centre Technician on duty in Signalling Centre Maintenance staff for route based centrally at Machynlleth with technical support from Shrewsbury Uses new Rule Book for ERTMS operation Includes use of written orders Route barring for possessions Brand new procedure for ESR/TSR management GSMR voice communication Date

11 Operation engineering work New ERTMS rule book introduced new trackside access rules New track safety rules & competencies required for staff New engineering planning access rules required Engineering trains require ERTMS pilot loco to access site Transition between ERTMS and conventional required special access rules Staff required GSMR radios for communications trackside Date

12 Operation engineering work Management of Metrication Asset management processes in imperial measurement Cambrian linespeed metric Processes required to manage the difference so no safety impact when asset protection speeds required Management of TSRs/ESR Direct implementation of speed restrictions by Signaller No need to access track to implement speed restrictions New processes developed for planning, operations and maintenance staff Date

13 Maintenance Control Centre Technician on duty 24 hours a day Carries out maintenance of control centre equipment Carries out route barring process for possessions Supports the Signaller in the management of TSRs/ESRs Liaises with outbased maintenance staff Coordinates infrastructure data for the DRACAS process Leads fault finding across the route Date

14 Management of change New processes required to understand the impact changes will make on the system Linespeed changes Data changes required, Degraded mode Signage requires review, driveability of speed profile requires review Technical file for RBC requires update New fleet of trains to run on the line New keys require issuing impacting trains and RBC Major infrastructure change Formal update of technical file by NoBO & reauthorisation by NSA required. Date

15 Driver ERTMS Onboard Assembly Train ABC L C rossin g Offers OS Mode Acknowledge OS M ode FS Mode() Observes St G eorge's Cross Displays flashing w hite light at DCI () Observes DCI Observe s C rossing C lear() Observe s C rossing C lear() T rain strikes in Crossing operate s Reliability Management - DRACAS RELIABILITY, AVAILABILITY & MAINTAINABILITY Interlocking RAM Plan PLANS Reliability Demonstration Plan Reliability Growth Plan RAM Plan Modelling & Analysis Sig R O S I/LRBC B / ig L CO/B B Functional Block Diagram ANALYSIS System Level FMECA REQUIREMENTS & RAM TARGETS Maintainability Analysis Reliability Prediction Requirements Specifications DETAILED DESIGN REPORTS DRACAS Procedures Maintainability Demonstration Updated Reliability Prediction Spares Assessment BUILD, FAT & INTEGRATION TESTING DOORS DATABASE TARGET RAM DATA COMMISSION Endorse RAM Evidence Reliability Steering Group Reliability Growth Data IN-SERVICE MONITORING PERIOD Defect Reports DRACAS DATABASE Review Data DRACAS FORUM GRIP 8 Reliability Demonstration REPORTS Date

16 Reliability Management status SYSTEM WEEKLY DELAY FOR ALL EVENTS /10/ /10/ /10/ /11/ /11/ /11/ /11/ /12/ /12/ /12/ /12/ /12/ /01/ /01/ /01/ /01/ /02/ /02/ /02/ /02/ /03/ /03/ /03/ /03/ /04/ /04/ /04/ /04/ /04/ /05/ /05/ /05/ /05/ /06/ /06/ /06/ /06/ /07/ /07/ /07/ /07/ /07/ /08/ /08/ /08/ /08/ /09/ /09/ /09/ /09/ /09/ /10/ /10/2011 Time in minutes Date W/E Date

17 Pareto Analysis for On-board Failures Pareto distribution of failure cause since the selected date Events between 17/09/2011 and 14/10/ Cab closing/opening/coupling issue Odometry sub-system failure Not yet known DMI Failure when cab closed Odo Subsystem Failure when moving Start of Service delay off Cambrian Cab 52 not fully opened Start of Service delay at Machynlleth BTM quick power off/on issue Fan Rack fault Unexpected transition to trip mode GSM-R data radio hole No further information ERTMS isolated for unknown reason Incorrect wheel diameter entered BTM failure Driver configuration/initialisation issues EVC constraint error Driver did not complete SoM BTM failure without BTM alarm Intercorrelation radar fault Hardware Failure Not a fault Driver started mission in wrong mode BTM failure with FPGA alarm Unable to obtain brake release Not Onboard ERTMS fault GSM-R data connection not opened Loss of National values No fault found GSM-R voice interface fault BTM power up failure over Balise EVC Hardware Vandalism Duplicate entry DMI visibility issue - Kontron Driver unfamiliar with ERTMS Incorrect de-isolation procedure Transition issues at Harlech Installation error Train parameters GSM-R voice registration DMI MID Fault Unexpected transition to Standby Mode Count Failure Causes Date

18 Issues arising from pilot operation Management of speed profiles across the route Management of gradient data Management of SPADs/ EoA breaches Reliability and availability of the FTN system Effective working relationship between Signallers and Drivers Closer working relationship between infrastructure maintainers and train maintainers Sharing of data from infrastructure and onboard systems Date

19 Lessons learnt Importance of managing ERTMS implementation and operation as a System Require a team of Operators (infrastructure and trains) and Engineers (infrastructure and trains) Criticality of understanding the operational concept before commencing engineering design Understanding that a minor change trackside can have a significant impact to the operability/driveability of the train Criticality of managing reliability growth from a systems perspective with a comprehensive DRACAS system Date

20 Deployment of ERTMS in the UK Scotland 2020 s WCML (North) Late 2020 s Wales 2020 s Cambrian Lines 2011 MML (South) ECML (South) Hertford Loop 2013 (Integration Facility Thameslink) GWML (to Bristol) Overlay (signals away 2025) South of England Late 2030 s Thameslink Core 2015 Date

21 Industry View of Future System Configuration Control Centre Voice comms On board train detection Movement authority Advisory speed Automatic Train Operation Intelligent Traffic Management Key nodes Limited signalling Limited train detection Date

22 Technical Development Road Map DAS Traffic Mgt Pilot Centres All Centres Signalling Safety Layer Control System Layer ATO HNIF Thameslink ETCS L1/L2 HNIF GWML ECML South GPRS HNIF Modular Sig INESS VISION MCB-OD Pilot Routes Secondary Routes ETCS L3 HNIF DAS = Driver Advisory System ATO = Automatic Train Operation HNIF = Hertford National Integration Facility MCB-OD = Level Crossing with Obstacle Detector Date

Module TW8. Level crossings - drivers instructions. GE/RT8000/TW8 Rule Book. Issue 7. September 2015

Module TW8. Level crossings - drivers instructions. GE/RT8000/TW8 Rule Book. Issue 7. September 2015 GE/RT8000/TW8 Rule Book Module TW8 Level crossings - drivers instructions Issue 7 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document is available

More information

Issue 8. Module TW8. Level crossings - drivers instructions. GERT8000-TW8 Rule Book

Issue 8. Module TW8. Level crossings - drivers instructions. GERT8000-TW8 Rule Book Uncontrolled when printed GERT8000-TW8 Rule Book Level crossings - drivers instructions Module TW8 Issue 8 September 2017 Comes into force 02 December 2017 Conventions used in the Rule Book A black line

More information

Applicability / Compatibility of STPA with FAA Regulations & Guidance. First STAMP/STPA Workshop. Federal Aviation Administration

Applicability / Compatibility of STPA with FAA Regulations & Guidance. First STAMP/STPA Workshop. Federal Aviation Administration Applicability / Compatibility of STPA with FAA Regulations & Guidance First STAMP/STPA Workshop Presented by: Peter Skaves, FAA Chief Scientific and Technical Advisor for Advanced Avionics Briefing Objectives

More information

CAMBRIAN LINES FRANCHISE 2018

CAMBRIAN LINES FRANCHISE 2018 CAMBRIAN LINES FRANCHISE 2018 For Edwina Hart MBE CStJ AM Cllr Mansel Williams Chair Cllr Trevor Roberts Vice Chair Robert Robinson Secretary Cllr Selwyn Griffiths Chair Cllr Eryl Jones - Williams Vice

More information

CAMBRIAN LINES FRANCHISE 2018 FINAL DRAFT FOR COMMENT

CAMBRIAN LINES FRANCHISE 2018 FINAL DRAFT FOR COMMENT CAMBRIAN LINES FRANCHISE 2018 FINAL DRAFT FOR COMMENT For Edwina Hart MBE CStJ AM Cllr Mansel Williams Chair Cllr Trevor Roberts Vice Chair Robert Robinson Secretary Cllr Selwyn Griffiths Chair Cllr Eryl

More information

Ground movement safety systems and procedures - an overview

Ground movement safety systems and procedures - an overview Ground movement safety systems and procedures - an overview Thorsten Astheimer, Fraport AG Airside System Development Purpose of Surface Movement Guidance Systems Definition of A-SMGCS Levels (ICAO): 1)

More information

Module TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014

Module TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014 GE/RT8000/TS9 Rule Book Level crossings - signallers regulations Module TS9 Issue 3 March 2014 Comes into force 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents

More information

Monitoring & Control Tim Stevenson Yogesh Wadadekar

Monitoring & Control Tim Stevenson Yogesh Wadadekar Monitoring & Control Tim Stevenson Yogesh Wadadekar Monitoring & Control M&C is not recognised as an SPDO Domain However the volume of work carried out in 2011 justifies a Concept Design Review M&C is

More information

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018 Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s

More information

Index. Springer International Publishing AG 2018 I. Schagaev, B.R. Kirk, Active System Control, DOI /

Index. Springer International Publishing AG 2018 I. Schagaev, B.R. Kirk, Active System Control, DOI / Index A Active black box, 286 287 Active real-time reliability, 272 Active system control (ASC), 212, 221, 231 ACSCU, 243 active, 45 aircraft classification, 270 aircraft model, 193 algorithm, 250, 252,

More information

SHREWSBURY ABERYSTWYTH RAIL LIAISON COMMITTEE MINUTES

SHREWSBURY ABERYSTWYTH RAIL LIAISON COMMITTEE MINUTES SHREWSBURY ABERYSTWYTH RAIL LIAISON COMMITTEE MINUTES Of a meeting held on Tuesday 7 th August 2018 at 11.15am in Cathays, Cathays Park, Cardiff. Present were Cllr Trevor Roberts Chair Shrewsbury Aberystwyth

More information

Aviation Safety Information Analysis and Sharing ASIAS Overview PA-RAST Meeting March 2016 ASIAS Proprietary Do Not Distribute

Aviation Safety Information Analysis and Sharing ASIAS Overview PA-RAST Meeting March 2016 ASIAS Proprietary Do Not Distribute Aviation Safety Information Analysis and Sharing ASIAS Overview PA-RAST Meeting March 2016 ASIAS Proprietary Do Not Distribute Updated: March 2016 2 12 How can safety be improved in an environment of near-zero

More information

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Aircraft Description: Model ZK- Operator GPS Description: Manufacturer Model Serial Number TSO-C129

More information

Addendum: UAV Avionics

Addendum: UAV Avionics Addendum: UAV Avionics Dr. Bérénice Mettler University of Minnesota Jan. 29, 2012 (v.1/24/13) Dr. Bérénice Mettler (University of Minnesota) Addendum: UAV Avionics Jan. 29, 2012 (v.1/24/13) 1 / 8 Overview

More information

Improving Safety at Level Crossings - JR East Developments

Improving Safety at Level Crossings - JR East Developments Signalling Seminar in TOKYO 7 th April. 2016 Improving Safety at Level Crossings - JR East Developments Takashi Kawano (MIRSE) East Japan Railway Company Contents 1. Present Situations of Level Crossings

More information

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION Space Based ADS-B ICAO SAT meeting - June 2016 1 Options to Detect an Aircraft Position Position Accuracy / Update Interval Voice Position Reporting ADS-C Position Reporting Radar Surveillance / MLAT Space

More information

Surveillance and Broadcast Services

Surveillance and Broadcast Services Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:

More information

Avionics Certification. Dhruv Mittal

Avionics Certification. Dhruv Mittal Avionics Certification Dhruv Mittal 1 Motivation Complex Avionics systems have been regulated for a long time Autonomous systems are being researched and built in avionics right now Research in avionics

More information

Definitions. U-SAFE : UAS Secure Autonomous Flight Environment. UTM: UAS Traffic Management

Definitions. U-SAFE : UAS Secure Autonomous Flight Environment. UTM: UAS Traffic Management Definitions U-SAFE : UAS Secure Autonomous Flight Environment UTM: UAS Traffic Management NUSTAR: National UAS Standardized Test and Rating 2 U-SAFE Award Dec 11, 2015 Signature Initiative in Central New

More information

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government Wales The railway in Wales and Borders plays a critical role in connecting people, businesses and communities to support both regional and national economic growth. We run the safest railway in Europe,

More information

Development of the Safety Case for LPV at Monastir

Development of the Safety Case for LPV at Monastir Development of the Safety Case for LPV at Monastir Euromed GNSS II project/medusa Final event on GNSS for aviation Philip Church Principal Consultant philip.church@askhelios.com Your logo here MEDUSA final

More information

Baggage Reconciliation System

Baggage Reconciliation System Product Description PD-TS-105 Issue 1.0 Date January 2015 The purpose of this product description is to enable the customer to satisfy himself as to whether or not the product or service would be suitable

More information

OPERATIONS CIRCULAR 01/2012. Subject: HEAD-UP DISPLAYS (HUD) AND ENHANCED VISION SYSTEMS (EVS)

OPERATIONS CIRCULAR 01/2012. Subject: HEAD-UP DISPLAYS (HUD) AND ENHANCED VISION SYSTEMS (EVS) GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION OPP. SAFDARJUNG AIRPORT, NEW DELHI 110 003 TELEPHONE: 091-011-4635261 4644768 FAX: 091-011-4644764 TELEX:

More information

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by GN Published by Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2012 Rail Safety and Standards Board Limited GK/GN0692 Issue Two: December 2012 Rail Industry Guidance Note for GK/RT0192

More information

Disruptive technologies and societal trends are changing everyday lives and shaking up competition across all industries

Disruptive technologies and societal trends are changing everyday lives and shaking up competition across all industries Disruptive technologies and societal trends are changing everyday lives and shaking up competition across all industries 5 years ago Now In 5 years Smartphones share (%) 18,6% 74,6% Total share? Will it

More information

INVESTIGATION REPORT. Incident to ATR registered F-GVZG on 11 September 2011 at Marseille

INVESTIGATION REPORT. Incident to ATR registered F-GVZG on 11 September 2011 at Marseille INVESTIGATION REPORT www.bea.aero (1) Except where otherwise indicated, the times in this report are in Universal Time Coordinated (UTC). (2) Pilot Flying (3) Pilot Monitoring (4) MultiFunction Computer

More information

Glossary and Acronym List

Glossary and Acronym List AFS Safety Assurance System (SAS) Overview Glossary and Acronym List This document lists and defines many SAS acronyms and terms. This is not intended to be a complete list of terms and definitions. TERM

More information

Identifying and Utilizing Precursors

Identifying and Utilizing Precursors Flight Safety Foundation European Aviation Safety Seminar Lisbon March 15-17 / 2010 Presented by Michel TREMAUD ( retired, Airbus / Aerotour / Air Martinique, Bureau Veritas ) Identifying and Utilizing

More information

Crossrail transforming travel across London - Infrarail

Crossrail transforming travel across London - Infrarail Crossrail transforming travel across London - Infrarail Jeremy Long, MTR Corporation, CEO European Business 2 May 2018 Page 1 The Crossrail Journey Construction May 2015 Dec 2018 Page 2 Crossrail the 15bn

More information

CASCADE OPERATIONAL FOCUS GROUP (OFG)

CASCADE OPERATIONAL FOCUS GROUP (OFG) CASCADE OPERATIONAL FOCUS GROUP (OFG) Use of ADS-B for Enhanced Traffic Situational Awareness by Flight Crew During Flight Operations Airborne Surveillance (ATSA-AIRB) 1. INTRODUCTION TO ATSA-AIRB In today

More information

Enabling Civilian Low-Altitude Airspace and Unmanned Aerial System (UAS) Operations. Unmanned Aerial System Traffic Management (UTM)

Enabling Civilian Low-Altitude Airspace and Unmanned Aerial System (UAS) Operations. Unmanned Aerial System Traffic Management (UTM) Enabling Civilian Low-Altitude Airspace and Unmanned Aerial System (UAS) Operations By Unmanned Aerial System Traffic Management (UTM) Parimal Kopardekar, Ph.D. UTM Principal Investigator and Manager,

More information

Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December

Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December 2001 - Mike Murphy ATN Systems, Inc. (ATNSI) 703-412 412-2900, 2900, Mike.Murphy@atnsi.com ATNSI, ATN Seminar 1 Presentation

More information

Roadmapping Breakout Session Overview

Roadmapping Breakout Session Overview Roadmapping Breakout Session Overview Ken Goodrich October 22, 2015 Definition Roadmap: a specialized type of strategic plan that outlines activities an organization can undertake over specified time frames

More information

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and

More information

Cockpit Display of Traffic Information (CDTI) Assisted Visual Separation (CAVS)

Cockpit Display of Traffic Information (CDTI) Assisted Visual Separation (CAVS) Cockpit Display of Traffic Information (CDTI) Assisted Visual Separation (CAVS) Randall Bone 6 th USA / Europe ATM 2005 R&D Seminar Baltimore, Maryland June 2005 Overview Background Automatic Dependent

More information

Not to be shared or printed without prior authorisation. Croeso Welcome. Copyright and intellectual property TfW 2018

Not to be shared or printed without prior authorisation. Croeso Welcome. Copyright and intellectual property TfW 2018 Not to be shared or printed without prior authorisation Croeso Welcome Copyright and intellectual property TfW 2018 Wales and Borders The Journey Begins Our structure So what does this mean for us For

More information

CLEARANCE INSTRUCTION READ BACK

CLEARANCE INSTRUCTION READ BACK CLEARANCE INSTRUCTION READ BACK 1. Introduction An ATC clearance or an instruction constitutes authority for an aircraft to proceed only in so far as known air traffic is concerned and is based solely

More information

Emerging Locator & Flight Data Technology

Emerging Locator & Flight Data Technology Emerging Locator & Flight Data Technology Agenda Near term Flight Locator Solutions - ACARS AOC / ACMS - ACARS ADS-C - Inmarsat Aspire 200 - SkyConnect / Iridium Flight Data Solutions - Existing Systems

More information

The organisation of the Airbus. A330/340 flight control system. Ian Sommerville 2001 Airbus flight control system Slide 1

The organisation of the Airbus. A330/340 flight control system. Ian Sommerville 2001 Airbus flight control system Slide 1 Airbus flight control system The organisation of the Airbus A330/340 flight control system Ian Sommerville 2001 Airbus flight control system Slide 1 Fly by wire control Conventional aircraft control systems

More information

Bespoke Lines. BWYDLYN

Bespoke Lines.  BWYDLYN 2017 Now firmly established as a premium meat supplier in the wholesale sector, Bwydlyn have proven that whilst rapidly growing their customer base and geographical area, quality and consistency are never

More information

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva International Civil Aviation Organization SIP/2012/ASBU/Dakar-WP/19 FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Dakar,

More information

François CAHUZAC / Arnaud BIARD

François CAHUZAC / Arnaud BIARD Sixth IAASS-Session 2 Regulations and standards for safety FSOA AND ASSOCIATED REGULATIONS APPLIED TO FUTURE EUROPEAN LAUNCHERS A5 ES GALILEO, A5ME, A6 François CAHUZAC / Arnaud BIARD Date : 2013, May

More information

Level Crossing Risk Assessment Polegate MCB

Level Crossing Risk Assessment Polegate MCB Level Crossing Risk Assessment Polegate MCB Polegate MCB Level Crossing Risk Assessment 1 CONTENTS 1 INTRODUCTION 3 1.1 Background 3 1.2 Reason for the risk assessment 3 2 DESCRIPTION OF THE SITE 4 2.1

More information

SAFETY & AIRCRAFT OPERATIONS LEGISLATIVE & REGULATORY ADVOCACY NETWORKING & COMMERCE EDUCATION & CAREER DEVELOPMENT BUSINESS MANAGEMENT RESOURCES

SAFETY & AIRCRAFT OPERATIONS LEGISLATIVE & REGULATORY ADVOCACY NETWORKING & COMMERCE EDUCATION & CAREER DEVELOPMENT BUSINESS MANAGEMENT RESOURCES DEDICATED TO HELPING BUSINESS ACHIEVE ITS HIGHEST GOALS. NBAA RESOURCE Integrated Operational Management and Oversight for suas May 13, 2016 Disclaimer: This NBAA publication is intended to provide members

More information

Place image here (10 x 3.5 ) FAA NEXTGEN DATA COMM TOWER SERVICE: CPDLC DCL NEW OPERATOR INTRODUCTION HARRIS.COM #HARRISCORP

Place image here (10 x 3.5 ) FAA NEXTGEN DATA COMM TOWER SERVICE: CPDLC DCL NEW OPERATOR INTRODUCTION HARRIS.COM #HARRISCORP Place image here (10 x 3.5 ) FAA NEXTGEN DATA COMM TOWER SERVICE: CPDLC DCL NEW OPERATOR INTRODUCTION HARRIS.COM #HARRISCORP Agenda Data Comm Basics Benefits of Data Comm Departure Clearance Explanation

More information

AERODROME OPERATING MINIMA

AERODROME OPERATING MINIMA Title: Determination of Aerodrome Operating Minima Page 1 of 8 AERODROME OPERATING MINIMA 1. PURPOSE 1.1 The purpose of this Advisory Circular is to provide methods to be adopted by operators in determining

More information

PRO LINE FUSION INTEGRATED AVIONICS SYSTEM. Pro Line Fusion on Gulfstream G280: Your direct path to see and access more.

PRO LINE FUSION INTEGRATED AVIONICS SYSTEM. Pro Line Fusion on Gulfstream G280: Your direct path to see and access more. Pro Line Fusion on Gulfstream G280: Your direct path to see and access more. Starting with its baseline features, the Pro Line Fusion avionics in your Gulfstream PlaneView280 flight deck offer capabilities

More information

U.S. Domestic CPDLC-DCL Users Guide. DATA COMMUNICATIONS INTEGRATED SERVICES (DCIS) Harris Corporation

U.S. Domestic CPDLC-DCL Users Guide. DATA COMMUNICATIONS INTEGRATED SERVICES (DCIS) Harris Corporation U.S. Domestic CPDLC-DCL Users Guide DATA COMMUNICATIONS INTEGRATED SERVICES (DCIS) Harris Corporation 1 CONTENTS Section 1: Flight Plan Requirements... 3 Section 2: Participating DCL Airports... 6 Section

More information

DANUBE FAB real-time simulation 7 November - 2 December 2011

DANUBE FAB real-time simulation 7 November - 2 December 2011 EUROCONTROL DANUBE FAB real-time simulation 7 November - 2 December 2011 Visitor Information DANUBE FAB in context The framework for the creation and operation of a Functional Airspace Block (FAB) is laid

More information

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 2 nd User Group Meeting Overview of the Platform List of Use Cases UC1: Airport Capacity Management UC2: Match Capacity

More information

Appendix E NextGen Appendix

Appendix E NextGen Appendix Appendix E NextGen Appendix NEXTGEN BACKGROUND This appendix is intended to supplement the information provided in the chapter to give additional technological background to NextGen. ADS-B Services ADS-B,

More information

Fly at the speed of ingenuity on your Learjet 85

Fly at the speed of ingenuity on your Learjet 85 rockwell collins Pro Line Fusion Avionics Fly at the speed of ingenuity on your Learjet 85 Image courtesy of Bombardier. Experience the most advanced avionics system ever offered on a mid-size jet. Achieve

More information

Flight inspection and validation

Flight inspection and validation We build on long traditions of Norwegian leading edge aviation experience. We employ a dedicated and highly skilled team of engineers. Strategic partnerships positions Norwegian Special Mission AS as one

More information

An Automated Airspace Concept for the Next Generation Air Traffic Control System

An Automated Airspace Concept for the Next Generation Air Traffic Control System An Automated Airspace Concept for the Next Generation Air Traffic Control System Todd Farley, David McNally, Heinz Erzberger, Russ Paielli SAE Aerospace Control & Guidance Committee Meeting Boulder, Colorado

More information

Civil Approach Procedural Controller Military Terminal Radar Controller

Civil Approach Procedural Controller Military Terminal Radar Controller AIR TRAFFIC CONTROLLER APPRENTICESHIP STANDARD Air Traffic Controller Civil Area/ Terminal Controller Civil Approach Controller Military Weapons Controller Military Area Radar Controller Civil Approach

More information

PROJECT LSD IAA REMOTE TOWER. 28 th /29 th November 2018 Cranfield

PROJECT LSD IAA REMOTE TOWER. 28 th /29 th November 2018 Cranfield PROJECT LSD 02.04 IAA REMOTE TOWER 28 th /29 th November 2018 Cranfield 2 Project Overview and Scope Trial the provision of Air Movements Control (AMC) and Surface Movement Control (SMC) for Cork and Shannon

More information

E-RECORDS. Our Innovation journey - a Paperless operation SWARAN SIDHU - HEAD OF FLEET TECHNICAL MANAGEMENT

E-RECORDS. Our Innovation journey - a Paperless operation SWARAN SIDHU - HEAD OF FLEET TECHNICAL MANAGEMENT Our Innovation journey - a Paperless operation SWARAN SIDHU - HEAD OF FLEET TECHNICAL MANAGEMENT something about us > What we do: We are low-cost European point-to-point short-haul airline. > Where we

More information

ASPASIA Project. ASPASIA Overall Summary. ASPASIA Project

ASPASIA Project. ASPASIA Overall Summary. ASPASIA Project ASPASIA Project ASPASIA Overall Summary ASPASIA Project ASPASIA Project ASPASIA (Aeronautical Surveillance and Planning by Advanced ) is an international project co-funded by the European Commission within

More information

Mode S & ACAS Programme Operational Introduction of SSR Mode S

Mode S & ACAS Programme Operational Introduction of SSR Mode S Mode S & ACAS Programme Operational Introduction of SSR Mode S John Law Programme Manager john.law@eurocontrol.int Tel: +32 2 729 3766 European 1 Organisation for the Safety of Air Navigation Mode S Airborne

More information

Minutes of the Meeting of the Board of Scottish Canals held on 23rd August 2012 at The Kingsmills Hotel, Inverness at 9.00am.

Minutes of the Meeting of the Board of Scottish Canals held on 23rd August 2012 at The Kingsmills Hotel, Inverness at 9.00am. Minutes of the Meeting of the Board of Scottish Canals held on 23rd August 2012 at The Kingsmills Hotel, Inverness at 9.00am. Present: Dr Jon Hargreaves - Chair Geoff Aitkenhead - Acting Vice Chair Tanya

More information

Mercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017

Mercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017 Mercer SCOOT Adaptive Signal Control Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017 Our mission, vision, and core values Mission: deliver a high-quality transportation system for Seattle Vision: connected

More information

Glacier National Park: Going-to-the-Sun Road Rehabilitation

Glacier National Park: Going-to-the-Sun Road Rehabilitation National Rural ITS Conference August 14, 2006 Gary Danczyk, P.E. Glacier National Park Glacier National Park: Going-to-the-Sun Road Rehabilitation Using ITS to stretch resources, manage congestion and

More information

Integrated Modular Avionics. The way ahead for aircraft computing platforms?

Integrated Modular Avionics. The way ahead for aircraft computing platforms? Integrated Modular Avionics The way ahead for aircraft computing platforms? 1 Contents The Need for IMA IMA Structure and Services Design Using IMA Related Subjects Conclusion 2 Integrated Modular Avionics

More information

TABLE OF CONTENTS 1.0 INTRODUCTION...

TABLE OF CONTENTS 1.0 INTRODUCTION... Advisory Circular Subject: Publication of the Level of Service with Respect to Departure Below RVR 2600 (½ Statute Mile) Issuing Office: Civil Aviation, Standards Document No.: AC 302-001 File Classification

More information

SESAR Solutions. Display Options

SESAR Solutions. Display Options SESAR Solutions Outputs from the SESAR Programme R&I activities which relate to an Operational Improvement (OI) step or a small group of OI steps and its/their associated enablers, which have been designed,

More information

SCAF Workshop Integrated Cost and Schedule Risk Analysis. Tuesday 15th November 2016 The BAWA Centre, Filton, Bristol

SCAF Workshop Integrated Cost and Schedule Risk Analysis. Tuesday 15th November 2016 The BAWA Centre, Filton, Bristol The following presentation was given at: SCAF Workshop Integrated Cost and Schedule Risk Analysis Tuesday 15th November 2016 The BAWA Centre, Filton, Bristol Released for distribution by the Author www.scaf.org.uk/library

More information

FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014

FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014 FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014 AIB/AAI/CAS.109 Air Accident Investigation Bureau of Singapore Ministry of Transport Singapore 11 November 2015 The Air

More information

Flight Safety Officer Aydın Özkazanç

Flight Safety Officer Aydın Özkazanç Flight Safety Officer Aydın Özkazanç Loss of Control Workshop Salzburg, Austria 2012 Thank you to Dr. Dieter and his team Message and best wishes from Turkish Airlines Flight Safety Department Manager

More information

CMATS The Civil Military ATM System

CMATS The Civil Military ATM System CMATS The Civil Military ATM System OneSKY Australia Program Update Michael Berechree National Manager Aviation Meteorological Services Bureau of Meteorology OneSKY Australia program By 2021, Australia

More information

Revision of IATA RP1743e IATA Irregularity codes

Revision of IATA RP1743e IATA Irregularity codes Ground Products & Procedures Global Work Instruction - detailed 08-040 Topic: Revision of IATA RP1743e IATA Irregularity codes Content page 1. Changes in use of Baggage Irregularity Codes (RL Codes) according

More information

PERFORMANCE REPORT NOVEMBER 2017

PERFORMANCE REPORT NOVEMBER 2017 PERFORMANCE REPORT NOVEMBER 2017 Note: New FY2018 Goal/Target/Min or Max incorporated in the Fixed Route and Connection Dashboards. Keith A. Clinkscale Performance Manager INTRODUCTION/BACKGROUND In June

More information

AIR LAW AND ATC PROCEDURES

AIR LAW AND ATC PROCEDURES 1 The International Civil Aviation Organisation (ICAO) establishes: A standards and recommended international practices for contracting member states. B aeronautical standards adopted by all states. C

More information

MODEL AERONAUTICAL ASSOCIATION OF AUSTRALIA

MODEL AERONAUTICAL ASSOCIATION OF AUSTRALIA MODEL AERONAUTICAL ASSOCIATION OF AUSTRALIA FIRST PERSON VIEW (FPV) AND SELF GUIDED MODEL AIRCRAFT POLICY MOP066 PPROVED: MAAA PRESIDENT Date: 10/08/2016 Amendments made to MOP066 Paragraph Brief description

More information

Remotely Piloted Operations Integration

Remotely Piloted Operations Integration ITALIAN AIR FORCE Remotely Piloted Operations Integration Colonel Claudio CASTELLANO Bruxelles, 25.10.2018 Analize RP operations Define RP operations due regard/accommodation solutions with effective interaction

More information

Accessible Air Travel : Airport services to disabled and reduced mobility passengers

Accessible Air Travel : Airport services to disabled and reduced mobility passengers Accessible Air Travel : Airport services to disabled and reduced mobility passengers Ref Code: CAA 1 Date of issue: 13 September 2010 Appendix 1 : CAA Questions Service provision (Article 9.1) 1.) Who

More information

Aeros 40D Sky Dragon. TYPE CERTIFIED BY: United States Federal Aviation Administration Civil Aviation Authorities: Europe and Asia

Aeros 40D Sky Dragon. TYPE CERTIFIED BY: United States Federal Aviation Administration Civil Aviation Authorities: Europe and Asia Aeros 40D Sky Dragon The Aeros 40D Sky Dragon Airship The United States Federal Aviation Administration (FAA) Type Certified Aeros 40D Sky Dragon is the most advanced non rigid airship, incorporating innovative

More information

Signaling System and Communication System on Shinkansen of JR-EAST

Signaling System and Communication System on Shinkansen of JR-EAST Signaling System and Communication System on Shinkansen of JR-EAST Hiroshi KANEKO Manager, East Japan Railway Company, Japan 12th July, Session: Infrastructure 3 - Power supply & Signaling Contents Outline

More information

Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017

Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017 Crossrail transforming travel across the capital - Railtex conference Jeremy Long, MTR Corporation, CEO European Business 9 May 2017 Page 1 The Crossrail Journey Construction May 2015 Dec 2018 Page 2 Crossrail

More information

Handbook 18. Handbook 18. Duties of a level crossing attendant. GE/RT8000/HB18 Rule Book

Handbook 18. Handbook 18. Duties of a level crossing attendant. GE/RT8000/HB18 Rule Book GE/RT8000/HB18 Rule Book Uncontrolled When Printed Handbook 18 Duties of a level crossing attendant Handbook 18 Issue 4 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative

More information

All-Weather Operations Training Programme

All-Weather Operations Training Programme GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 3 OF 2014 Date: OPERATIONS CIRCULAR Subject: All-Weather Operations Training Programme 1. INTRODUCTION In order to

More information

Session III Issues for the Future of ATM

Session III Issues for the Future of ATM NEXTOR Annual Research Symposium November 14, 1997 Session III Issues for the Future of ATM Synthesis of a Future ATM Operational Concept Aslaug Haraldsdottir, Boeing ATM Concept Baseline Definition Aslaug

More information

Head-up Guidance & Vision Technologies Enabling Safer and More Efficient Airline Operations

Head-up Guidance & Vision Technologies Enabling Safer and More Efficient Airline Operations Head-up Guidance & Vision Technologies Enabling Safer and More Efficient Airline Operations March, 2017 2017 Rockwell 2017 Collins. Rockwell Collins. Agenda > HGS Introduction > HGS Value Safety & Economics

More information

CLASS RATING INSTRUCTOR FOR SINGLE PILOT SINGLE ENGINE AEROPLANES

CLASS RATING INSTRUCTOR FOR SINGLE PILOT SINGLE ENGINE AEROPLANES CLASS RATING INSTRUCTOR FOR SINGLE PILOT SINGLE ENGINE AEROPLANES TRAINING SYLLABUS 1 The syllabus is divided into three sections as follows:- ANDREWSFIELD AVIATION LIMITED SYLLABUS Section One Section

More information

Front Line Managers (FLMs) and Airline Pilots Training for Operational Evaluation! of enhanced Final Approach Runway Occupancy Signal (efaros) at DFW!

Front Line Managers (FLMs) and Airline Pilots Training for Operational Evaluation! of enhanced Final Approach Runway Occupancy Signal (efaros) at DFW! ! Front Line Managers (FLMs) and Airline Pilots Training for Operational Evaluation! of enhanced Final Approach Runway Occupancy Signal (efaros) at DFW! Maria Picardi Kuffner! September 2008, updated July

More information

Federal Aviation. Administration Unmanned Aircraft Human Factors Research Program. Federal Aviation Administration

Federal Aviation. Administration Unmanned Aircraft Human Factors Research Program. Federal Aviation Administration Unmanned Aircraft Human Factors Research Program Kevin W. Williams, AAM-510 William Krebs, AAR-100 May 26, 2005 0 0 Overview The Problem Completed Human Factors Initiatives Accident Data Identification

More information

USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL

USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL Jackie Davies, Senior Technical Officer (UTC), Bristol City Council Traffic Signals Synopsis Bristol City Council has received

More information

AIRSPACE. Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers

AIRSPACE. Aviation Consultancy at its best.  Specialist aviation support to help solve problems for airports and airport developers AIRSPACE Enabling Excellence in Aviation Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers www.cyrrus.co.uk AIRSPACE Airspace is a

More information

WELCOME TO THE AGE OF THE CONNECTED AIRCRAFT

WELCOME TO THE AGE OF THE CONNECTED AIRCRAFT WELCOME TO THE AGE OF THE CONNECTED AIRCRAFT The Connected Aircraft Honeywell is changing the way people communicate on and with an aircraft today and in the future making the business of flying safer,

More information

Standardization of CBTC Systems Mixed Operation on Shared Lines in accordance with ERTMS/ETCS Standards

Standardization of CBTC Systems Mixed Operation on Shared Lines in accordance with ERTMS/ETCS Standards Standardization of CBTC Systems Mixed Operation on Shared Lines in accordance with ERTMS/ETCS Standards C. Schmelzer Siemens AG, Sector Industry, Division Mobility, Brunswick, Germany Megatrend urbanization

More information

Water Industry Commission for Scotland Integrating customer perspectives in a regulatory setting

Water Industry Commission for Scotland Integrating customer perspectives in a regulatory setting Water Industry Commission for Scotland Integrating customer perspectives in a regulatory setting National Water Forum Adelaide A presentation by Alan D A Sutherland Chief Executive Officer 11 November

More information

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations Section: Page 32.A General... 32-1 32.B Aircraft... 32-4 32-i THIS PAGE INTENTIONALLY LEFT BLANK 32-i SECTION 32 Airfield and Aircraft Operations

More information

Hypermotion Smart solutions for mobility and logistics

Hypermotion Smart solutions for mobility and logistics Hypermotion Smart solutions for mobility and logistics 20 22.11.2017, Frankfurt am Main Messe Frankfurt Exhibition GmbH Under the patronage of: Hypermotion 4 good reasons Building on the two mega-trends

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary of this Rule... 4... 6... 6... 7... 7... 7... 8... 8... 8... 8... 9... 9...

More information

EASA RNP (AR) Workshop The Landscape Working Together

EASA RNP (AR) Workshop The Landscape Working Together EASA RNP (AR) Workshop The Landscape Working Together 20 October 2010 Cologne Capt Herbert Meyer EASA Certification Flight Standards Content Aspects for Consideration Conventional versus RNP AR approaches

More information

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire INTERNAL AUDIT DIVISION REPORT 2014/111 Audit of air operations in the United Nations Operation in Côte d Ivoire Overall results relating to the effective management of air operations in the United Nations

More information

General Information Applicant Name and Address: Tel./Fax/ Contact Person Name/Tel./Fax/

General Information Applicant Name and Address: Tel./Fax/  Contact Person Name/Tel./Fax/ Application for steep approach approval Completion of form: Each relevant box should be completed with a tick ( ) or a (X). Form must be completed by referring to a document of applicant's documentation

More information

CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0

CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0 CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0 January 2018 AMENDMENTS Location Date Amended by Description CONTENTS 17.1 GENERAL... 4 17.1.1 Applicability...

More information

SPEDESTER Series QUICK REFERENCE GUIDE

SPEDESTER Series QUICK REFERENCE GUIDE Spedester series Digital DC Drives come with an extensive range of standard software blocks, it can take control of the most demanding motion control tasks. Designed for industrial applications, Spedester

More information

EMMA2 Introduction. EMMA2 Demonstration Day Malpensa, Michael Roeder. Internet:

EMMA2 Introduction. EMMA2 Demonstration Day Malpensa, Michael Roeder. Internet: EMMA2 Introduction EMMA2 Demonstration Day Malpensa, 2009-02-26 Michael Roeder Internet: http://www.dlr.de/emma2 Integrated Project of the Sixth Framework Programme, Priority 1.4: Aeronautics and Space,

More information

Available Technologies. Asia / Pacific Regional Runway Safety Seminar Session 4

Available Technologies. Asia / Pacific Regional Runway Safety Seminar Session 4 Available Technologies Asia / Pacific Regional Runway Safety Seminar Session 4 Runway Incursions, Confusion and Excursions are a leading cause of Aviation Accidents Runway Incursion & Confusion Runway

More information