1 PROJECT LSD IAA REMOTE TOWER 28 th /29 th November 2018 Cranfield
2 2
3 Project Overview and Scope Trial the provision of Air Movements Control (AMC) and Surface Movement Control (SMC) for Cork and Shannon airports remotely from the Dublin Air Traffic Control Centre in multiple aerodrome configuration using remote tower technology. Traffic for each aerodrome in 2015 was: Airport Commercial Non Commercial Total Shannon Cork Object tracking; IR Cameras; Record/Playback Functionality Reduction in cost through provision of tower services from a central location 3
4 Project actual timeline Call for Tender October 2014 Contract with System Supplier May 2015 System Installation June 2015 to March 2016 System Site Acceptance Testing May 2016 Regulatory Acceptance for Trials June 2016 Demonstrations Commence June 27th 2016 Demonstrations Conclude September 8th 2016 Demonstration report October 14 th
5 Demonstration Report Exercise Results and main findings Procedures: The Procedures defined for the Trials worked well and there was never confusion between the Local Tower & RTC as to who had Control. Potentially more frequent use of the Monitor instruction instead of the Contact instruction. On occasion you may have to handle smaller aircraft slightly differently than you do in the local tower compared to the local tower. 5
6 Demonstration Report Systems Exercise Results and main findings During the trial we experienced no system failure requiring a hand back of Control to the Local Towers. The vast majority of the Controllers comments were positive but some elements were commented on as follows: The Out of the Window view displays objects at <1/3 the size compared to the Local Tower. (Project teams view which is an approximation only) Map overlay displays, not that useful in daylight but useful in poor visibility and night hours. Object Tracking function is a good concept and tool for the Controller but it needs more work to become more reliable. The Radar tracking labels on the Out the Window view are nice to have but not an essential tool for remote tower operation. Multiple airport control functionality worked very well. PTZ (Pan/Tilt/Zoom Camera) is an essential tool and more than one per airport is required. The Radar data display is an essential tool for assisting the Controller to locate aircraft in the Out the Window view. The Electronic Flight Strip (EFS) function is a very good tool with significant benefits over paper strips. 6
7 Demonstration Report Exercise Results and main findings Remote Tower Operation does not reduce Controller workload If 2 Controllers AMC & SMC are moderately busy in the Local Tower, 2 Controllers AMC & SMC in the Remote Tower will be moderately busy Remote Tower Operation marginally increases workload Remote Tower Out of the Window view is not the same as the Local Tower In a Multiple Tower Operation there may be delays experienced that would not occur if it was only one Tower being Controlled. 7
8 Demonstration Report Exercise Results and main findings Shannon AMC & SMC Control was conducted from the RTC successfully during reasonably busy periods. Cork AMC & SMC Control was conducted from the RTC successfully during reasonably busy periods, including with a number of VFR items in the circuit. During the trials the following were the number of movements handled. IFR VFR ARRIVAL DEPARTURE TRANSIT ARRIVAL DEPARTURE CORK SHANNON CORK SHANNON CORK SHANNON CORK SHANNON X T&G 2 X T&G TOTAL: 171 TOTAL: 173 TOTAL: 4 TOTAL: T&G TOTAL: 44 8
9 Demonstration Report Exercise Results and main findings Multiple Tower Operations from the RTC were conducted successfully during a number of trials. As an example during one exercise a single Controller operating SNN AMC & CRK AMC in one 10 minute period managed: A Departure & Arrival in Shannon in Sequence An Arrival in Shannon followed by an arrival in Cork Simultaneously * *spaced by less than the time required if both were landing at the same airport. An arrival in Cork followed by a Departure in Cork. 9
10 Exercise Results and main findings Simultaneous Aircraft Operation Departure followed by a Departure Ideally time should be allowed between the two cleared for take-off instructions so that the Controller can monitor the roll and initial departure of the first aircraft before clearing the second aircraft for take-off. 10
11 Exercise Results and main findings Simultaneous Aircraft Operation cont d Departure followed by an Arrival Ideally time should be allowed between the cleared for take-off instruction so that the Controller can monitor the roll and initial departure of the departing aircraft before the arrival aircraft is 1nm from touchdown at the other aerodrome. 11
12 Exercise Results and main findings Simultaneous Aircraft Operation cont d Arrival followed by a Departure ideally the landing aircraft should be steady on the Runway before Clearance for take off is given to another aircraft at the other aerodrome. 12
13 Exercise Results and main findings Simultaneous Aircraft Operation cont d Arrival followed by an Arrival ideally the first landing aircraft should be steady on the Runway before the second arrival aircraft is 1nm from touchdown at the other aerodrome. 13
14 Exercise Results and main findings Simultaneous Aircraft Operation cont d Management of the arrivals to meet this guideline will be difficult due to the unpredictable relative speeds of aircraft on approach at the two airports. In the event that this guideline cannot be achieved it is suggested that the Controller will use best judgement to allow the second aircraft to continue to land or not. 14
15 Next Steps and Deployment The IAA now seeks to implement this advanced Remote Tower technology and to capitalise the money it has spent to date. The plan is to re-locate the RTC equipment that is located in Dublin and move it to the Shannon ACC. Install all of the other necessary equipment and commence trials for Shannon airport in late Q to progress to H24 Operations Q
16 Shannon Remote Tower High Level Planner Regulatory acceptance: - RTC Trial Training Plan Regulatory acceptance: - RTC Trials Safety Case to Regulator RTC Live OPS Regulatory Acceptance RTC OPS Training Needs Analysis Nov 2018 Jan 2019 Current Status Budget Approved Contract imminent with SAAB Staff Briefing complete Project Kick off complete Project teams working SRD briefing 23 rd Nov RTC Room Preparation Development of RTC Trial Training Plan Feb 2019 Console Install IAA Equipment Installation: - Main VCCS - Backup VCCS - IRVR - ANEMO RTC OPS Training for ORG RTC Staff + Others* Development of RTC Trial Safety Case Mar May June Shannon Remote Tower High Level Planner Apr 2019 Site Installation of: - SAAB RTC Equipment Safety Case to Regulator: - RTC Trials RTC Live Trials Site Acceptance of SAAB RTC Equipment Oct 2019 Jan 2020 Controller Training Feb 2020 March 31st 2020 June 2019 Shannon RTC OPS H24
17 SAAB Remote Tower Symposium Malmo 2011
18 REMOTE TOWER.. Why bother? What's wrong with the current Tower? Well Maybe..
19 Maybe you just cant afford it!
20 Better use of Controllers?
21 Maybe your tower building just won t last forever
22 Maybe it just in the way of a New Building!
23 Maybe your Tower might get a puncture
24 REMOTE TOWER..
Contextual note SESAR Solution description form for deployment planning
Purpose: Release 5 SESAR Solution ID #12 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as
More informationSAAB REMOTE TOWER. 37th Annual Pennsylvania Aviation Conference 28 September Matt Massiano
1 SAAB REMOTE TOWER 37th Annual Pennsylvania Aviation Conference 28 September 2017 Matt Massiano matt.massiano@saabsensis.com 2 AGENDA Concept U.S. launch project Updates on the international front CONCEPT:
More informationContextual note SESAR Solution description form for deployment planning
Purpose: Release 5 SESAR Solution #13 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as sufficient
More informationRemote towers at your service. First validation of remote tower for multiple airports (PJ05)
Remote towers at your service First validation of remote tower for multiple airports (PJ05) DLR (AT-One) the research perspective Remote Tower Operations from Vision to Reality Proof of Concept Since 2008
More informationWORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness
REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM 23-25 March 2015 WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness Stephen George Bruno Moitre Rapporteurs WG1 Remotely Piloted Aircraft Systems (RPAS)
More informationSECTION 4 - APPROACH CONTROL PROCEDURES
SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES
More informationDTTAS Quarterly Aviation Statistics Snapshot Quarter Report
Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 4 2015 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total
More informationDTTAS Quarterly Aviation Statistics Snapshot Quarter Report
Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 1 2018 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total
More informationDTTAS Quarterly Aviation Statistics Snapshot Quarter Report
Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 3 2018 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total
More informationSingle European Sky Awards Submission by the COOPANS Alliance. Short description of the project. (Required for website application)
Single European Sky Awards 2016 Submission by the COOPANS Alliance 27 th January 2016 Draft vfinal Short description of the project (Required for website application) The COOPANS Alliance is an international
More informationFASI(N) IoM/Antrim Systemisation Airspace Change Decision
Safety and Airspace Regulation Group FASI(N) IoM/Antrim Systemisation Airspace Change Decision CAP 1584 Contents Published by the Civil Aviation Authority, August 2017 Civil Aviation Authority, Aviation
More informationAir Accident Investigation Unit Ireland
Air Accident Investigation Unit Ireland INCIDENT REPORT Boeing 737-8AS, EI-EBE, Cork Airport, Ireland 22 July 2009 Tourism and Sport An Roinn Iompair Turasóireachta Agus Spóirt Boeing 737-8AS EI-EBE Cork
More informationRACOON PROJECT Daniele Teotino - ENAV. RACOON Project Manager Head of SESAR JU Activity Coordination
RACOON PROJECT Daniele Teotino - ENAV RACOON Project Manager Head of SESAR JU Activity Coordination RACOON in a Nutshell SESAR JU Very Large Scale Demonstration First Italian initiative on Remote TWR solutions
More informationThe pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 2 Presentation 2
The pilot and airline operator s perspective on runway incursion hazards and mitigation options Session 2 Presentation 2 Operational Hazards Workload issues during taxi that can result in a loss of situational
More informationRunway Status Lights (RWSL) in Japan. July 2015
Ministry of Land, Infrastructure, Transport and Tourism CIVIL AVIATION BUREAU OF JAPAN Runway Status Lights (RWSL) in Japan July 2015 Table of contents Civil Aviation Bureau Japan What is RWSL Background
More informationTANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS)
Page 1 of 11 AERODROME NAME: ICAO REFERENCE CODE: TRAFFIC DENSITY CLASS: (see Note 3) VISIBILITY CONDITION: (see Note 3) AERODROME INSPECTOR: DATE: S/N ICAO A SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM 1
More informationAppendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis
Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway
More information1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;
Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS
More informationCHAPTER 5 SEPARATION METHODS AND MINIMA
CHAPTER 5 SEPARATION METHODS AND MINIMA 5.1 Provision for the separation of controlled traffic 5.1.1 Vertical or horizontal separation shall be provided: a) between IFR flights in Class D and E airspaces
More informationValidation Plan & Objectives. Maik Friedrich, DLR PJ05 Braunschweig, 22 of November 2017
Validation Plan & Objectives Maik Friedrich, DLR PJ05 Braunschweig, 22 of November 2017 Validation Plan Overview of Remote Tower Activities in SESAR 2020 2 Remote Tower PJ.05 DLR (AT-One) Remotely Provided
More informationSeychelles Civil Aviation Authority. Telecomm & Information Services Unit
Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA
More informationThe pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 3 Presentation 1
The pilot and airline operator s perspective on runway incursion hazards and mitigation options Session 3 Presentation 1 Operational Hazards Workload issues during taxiing that can result in a loss of
More informationPilot Procedures Photographic Survey Flights Flight Planning, Coordination, and Control
Pilot Procedures Photographic Survey Flights Flight Planning, Coordination, and Control 2017-01-31 2017 NAV CANADA All rights reserved. No part of this document may be reproduced in any form, including
More informationDubai contest LIDAR in Dubai DANS Wake Vortex campaign DXB Operations Dependent Diagonal Approach implementation Phase RPAT Approach concept
DANS LIDAR wake vortex data campaign, deployment of Dependent Diagonal approaches and ongoing work to prepare RNP Parallel Approach Transition (RPAT) concept for implementation Roberto Ghidini Dubai contest
More informationGold Coast Airport Aircraft Noise Information Report
Gold Coast Airport Aircraft Noise Information Report Quarter 3 2012 (July to September) 1 Version Control Version Number Detail Prepared by Date 1 - Environment 2 November 2012 2 Updated Figure 10 Environment
More informationNAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten
NAV CANADA and DATA LINK IMPLEMENTATION Shelley Bailey NAV CANADA May 2016 Sint Maarten OPDWLG Operational Data Link Working Group 5 members here today representing ANSPs, manufacturers and regulators
More informationUSE OF RADAR IN THE APPROACH CONTROL SERVICE
USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:
More informationSafety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6
Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance
More informationLOW VISIBILITY OPERATION
1. Introduction LOW VISIBILITY OPERATION Low visibility procedures exist to support low visibility operations at aerodromes. Low visibility procedures (LVP) means procedures applied at an aerodrome for
More informationQueenstown aerodrome price proposal for night operations and building upgrade. For aircraft over five tonnes
Queenstown aerodrome price proposal for night operations and building upgrade. For aircraft over five tonnes 29 October 2014 1 Purpose This document outlines Airways proposed price increase for new lights
More informationRoadmapping Breakout Session Overview
Roadmapping Breakout Session Overview Ken Goodrich October 22, 2015 Definition Roadmap: a specialized type of strategic plan that outlines activities an organization can undertake over specified time frames
More informationGround movement safety systems and procedures - an overview
Ground movement safety systems and procedures - an overview Thorsten Astheimer, Fraport AG Airside System Development Purpose of Surface Movement Guidance Systems Definition of A-SMGCS Levels (ICAO): 1)
More informationAIR TRAFFIC FLOW MANAGEMENT
AIP New Zealand ENR 1.9-1 ENR 1.9 AIR TRAFFIC FLOW MANAGEMENT 1 FLOW MANAGEMENT AND CONTROL 1.1 Flow Control 1.1.1 In order to assist traffic management, ATS sectors may introduce flow control procedures.
More informationCONTROLLED AIRSPACE CONTAINMENT POLICY
Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon
More informationATM Network Performance Report
ATM Network Performance Report 2018. Page 1 of 16 Table of contents Summary... 3 Network Wide Performance... 4 Airborne delay... 4 Sydney... 6 Airborne delay... 6 Notable events... 6 Melbourne... 9 Airborne
More informationFLIGHT STRIP MANAGEMENT - APPROACH LEVEL
FLIGHT STRIP MANAGEMENT - APPROACH LEVEL 1. Introduction The flight strip management for ATC is an important point in order to ensure aircraft management and improve safety when controlling. In real aviation,
More informationSECTION 6 - SEPARATION STANDARDS
SECTION 6 - SEPARATION STANDARDS CHAPTER 1 - PROVISION OF STANDARD SEPARATION 1.1 Standard vertical or horizontal separation shall be provided between: a) All flights in Class A airspace. b) IFR flights
More informationCAUTION: WAKE TURBULENCE
CAUTION: WAKE TURBULENCE This was the phrase issued while inbound to land at Boeing Field (BFI) while on a transition training flight. It was early August, late afternoon and the weather was clear, low
More informationLetter of Agreement. between. and
Munich FIR (EDMM) IVAO Germany 1 Document purpose Letter of Agreement between and Zürich FIR (LSAZ) IVAO Switzerland Effective: 02-APR-2015 Edition: 1.1 The purpose of this Letter of Agreement is to define
More informationIRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority
IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance
More informationConsideration will be given to other methods of compliance which may be presented to the Authority.
Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the
More informationDEMORPAS Project. Final Dissemination Forum. 10th March 2016, World ATM Congress, Madrid
DEMORPAS Project Final Dissemination Forum 10th March 2016, World ATM Congress, Madrid Workshop Contents 1. Introduction to DEMORPAS Project 2. Operational environment 3. Exercises performed 4. Analysis
More informationRACOON. Summary RACOON is the ENAV led demonstration
RACOON Summary RACOON is the ENAV led demonstration activity on Remote TWR concept and RNP APCH procedures. The project aims at demonstrating, within the Italian airport context, that these two concepts
More informationContents. Subpart A General 91.1 Purpose... 7
Contents Rule objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 6 Insertion of Amendments... 6 Effective date of rule... 6 Availability of rules... 6 Part 91
More information2018 WSGC WISCONSIN COLLEGIATE ROCKET DESIGN COMPETITION
2018 WSGC WISCONSIN COLLEGIATE ROCKET DESIGN COMPETITION 11-NOV-2017 1 Welcome WSGC 2018 CRL 2 Agenda Who is competing? What is the challenge? When and where will events be taking place? When are the important
More informationREMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM March Detect and Avoid. DI Gerhard LIPPITSCH. ICAO RPAS Panel Detect & Avoid Rapporteur
REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM 23-25 March 2015 Detect and Avoid DI Gerhard LIPPITSCH ICAO RPAS Panel Detect & Avoid Rapporteur Remotely Piloted Aircraft Systems (RPAS) Symposium, 23 25 March
More informationSJC North and South Flow
SJC North and South Flow Pre and Post OAPM Date: January 2018 Phases of Flight ATCC ARTCC ATCC 2 AviationTerms VFR- Visual Flight Rules. Pilots must maneuver to avoid clouds and are responsible for their
More informationRUNWAY INCURSION PREVENTION MEASURES AT PARIS-CHARLES DE GAULLE AIRPORT
RUNWAY INCURSION PREVENTION MEASURES ------------------------- COSCAP SEA/SA/NA: SEARAST/SARAST/NARAST meetings ( Bangkok, Thailand, 8-9/11-12/15-16 January 2007) ------------------------------------------
More informationLos Angeles Basin Terminal Airspace Redesign
Los Angeles Basin Terminal Airspace Redesign Presentation to: GT CDA Workshop Name: Walter White & Kathryn Higgins Date: January 20, 2006 0 0 SCT Airspace Redesign Overview Raise initial LAX Departure
More informationStandard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control
SUBJ: Air Traffic Control This order prescribes air traffic control procedures and phraseology for use by personnel providing air traffic control services. Controllers are required to be familiar with
More informationDepartures over the north-west, west and south-west from Runway 25. Arrivals from the south on Runways 34L and 34R.
Mode 7 Method of operation Departures over the north-west, west and south-west from Runway 25. Arrivals from the south on Runways 34L and 34R. Departures over the north and northwest from Runway 34L for
More informationIt is essential that planning take full account of air safety and efficiency of operations.
Airspace Protection Airspace Protection It is essential that planning take full account of air safety and efficiency of operations. 7.1 INTRODUCTION Obstacles near an airport, whether they are natural
More informationOverview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge
ETSO Workshop 2008 New Developments in Avionic Friedhelm Runge Parts & Appliances Avionics PCM Dec. 2008 P&A section 1 Overview Single European Sky Communication Datalink 8.33 khz VHF Navigation ICAO PBN
More informationCHANGE CONTROL PROCEDURE
CHANGE CONTROL PROCEDURE Page - 1 - of 9 Revision Record Date Revision By Approver Description 13/02/15 V1.0 Jez Davis Jez Davis Original Issue 23/03/15 V2.0 Jez Davis Jez Davis Amended following CAA SARG
More informationWakeNet3-Europe Concepts Workshop
WakeNet3-Europe Concepts Workshop Benefits of Conditional Reduction of Wake Turbulence Separation Minima London, 09.02.2011 Jens Konopka (jens.konopka@dfs.de) DFS Deutsche Flugsicherung GmbH 2 Outline
More informationAppendix F ICAO MODEL RUNWAY INCURSION INITIAL REPORT FORM
Appendix F ICAO MODEL RUNWAY INCURSION INITIAL REPORT FORM Report no.: A. Date/time of runway incursion (in UTC) (YYYYMMDDhhmm) Day Night B. Person submitting the report Name: Job title: Telephone no.:
More informationBetter regulation for general aviation (update July 2010) July 2010 Better regulation for General Aviation 1
Better regulation for general aviation (update July 2010) July 2010 Better regulation for General Aviation 1 Table of contents The background behind the Better regulation for GA Where are we now? What
More informationThe pilot and airline operator s perspective on runway excursion hazards and mitigation options. Session 2 Presentation 1
The pilot and airline operator s perspective on runway excursion hazards and mitigation options Session 2 Presentation 1 Communications Communication hazards and mitigation The failure to provide timely,
More informationPBN, ADQ, ADQ2 IR EUROCONTROL Activities Status
PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation PBN IR
More informationSAFETYSENSE LEAFLET AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE
SAFETYSENSE LEAFLET 8e AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE 1 INTRODUCTION 2 NON-RADAR SERVICES 3 RADAR SERVICES 4 HOW TO OBTAIN A SERVICE 5 RADAR SERVICE LIMITATIONS 1 INTRODUCTION a) In this
More informationWake Turbulence Evolution in the United States
Wake Turbulence Evolution in the United States Briefing to WakeNet Europe Paris May 15, 2013 Wake Turbulence Program ATO Terminal Services May 2013 Outline Operational overview of wake turbulence effect
More informationEUROCONTROL approach to the execution of the PBN IR Mandate
EUROCONTROL approach to the execution of the PBN IR Mandate Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation
More informationVFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons.
VFR PHRASEOLOGY 1. Introduction 1.1. What is phraseology? The phraseology is the way to communicate between the pilot and air traffic controller. This way is stereotyped and you shall not invent new words.
More informationSECURITY OVERSIGHT AGENCY June 2017 ALL WEATHER (CAT II, CAT III AND LOW VISIBILITY) OPERATIONS
ADVISORY CIRCULAR CIVIL AVIATION SAFETY AND CAA:AC-OPS052 SECURITY OVERSIGHT AGENCY June 2017 1.0 PURPOSE ALL WEATHER (CAT II, CAT III AND LOW VISIBILITY) OPERATIONS This Order provides guidance to the
More informationLFPG / Paris-Charles de Gaulle / CDG
This page is intended to draw commercial and private pilots attention to the aeronautical context and main threats related to an aerodrome. They have been identified in a collaborative way by the main
More informationBaggage Check Weighing Machines. Service Overview. Prepare for Check In
Baggage Check Weighing Machines Service Overview Prepare for Check In Introduction The business model for air travel is continually evolving. In recent years a number of budget airlines have cut airfares
More informationTwo s Too Many BY MARK LACAGNINA
BY MARK LACAGNINA Two s Too Many Angled taxiways limiting the pilots view of the runway, clearances issued and read back hastily and incorrectly, and crossed radio transmissions 1 were among the common
More informationAlternate WX SIDs And Routes Ernst Potzel / Klaus Lang, DFS ACC Munich
Ernst Potzel / Klaus Lang, DFS ACC Munich Background: In order to reduce the operational impact and the arising thereby delay due to adverse weather, new alternate WX SIDs and routings will be established.
More informationR-2515 R-2508 COMPLEX
R-2515 R-2508 COMPLEX Edwards AFB PPR Briefing Edwards AFB and Edwards Class D Surface Area lie within Restricted Area 2515: R-2515 and Edwards Class D Surface Area contain many flight hazards for aircrews
More informationSESAR Delivering Digital Remote Tower Solutions
SESAR Delivering Digital Remote Tower Solutions Olivier Mongénie Airport Programme Manager, SESAR Joint Undertaking International Remote Tower Seminar, 9 October 2018 ENAC, Toulouse Agenda Introduction
More informationS 2 BAS Space Services Benefits in Aviation Systems. 2 nd ARTES Applications Workshop April 19 th, 2012 Harwell, UK
S 2 BAS Space Services Benefits in Aviation Systems April 19 th, 2012 Harwell, UK General Aviation and Business traffic will expand in the near future (4-6% per year. Source: Eurocontrol, 2011) Regional
More informationAll aviation except commercial aviation. Including but not limited to business aviation, air taxi operations and technical flights.
Capacity declaration Amsterdam Airport Schiphol: Summer 2019 1. Definitions The following definitions apply: Commercial Aviation: General Aviation: Night departure slot: Night arrival slot: Night slot:
More informationCranfield Safety Management and Investigation Course
Cranfield Safety Management and Investigation Course 2005 Asia-Pacific Conference on Risk Management and Safety Hong Kong, 1 December 2005 Hong Kong, 28 November 2005 Safety Management System Safety Management
More informationFREQUENTLY ASKED QUESTIONS
FREQUENTLY ASKED QUESTIONS Question: What is the scope of the Basic Regulation regarding aerodromes foreseen under Art. 4 Para. 3a? Art. 4 of Regulation (EC) No 216/2008 [3a] Aerodromes, including equipment,
More informationThe SESAR Airport Concept
Peter Eriksen The SESAR Airport Concept Peter Eriksen EUROCONTROL 1 The Future Airport Operations Concept 1.1 Airports The aim of the future airport concept is to facilitate the safe and efficient movement
More informationJanuary 2018 Air Traffic Activity Summary
January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279
More informationOperational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)
International Civil Aviation Organization SAM/IG/22-IP/19 South American Regional Office 12/11/2018 Twenty Second Workshop/Meeting of the SAM Implementation Group (SAM/IG/22) - Regional Project RLA/06/901
More informationDate: 29 Jun 2018 Time: 1502Z Position: 5325N 00312W Location: 5nm NW Liverpool Airport
AIRPROX REPORT No 2018158 Date: 29 Jun 2018 Time: 1502Z Position: 5325N 00312W Location: 5nm NW Liverpool Airport PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft
More informationIFR SEPARATION USING RADAR
IFR SEPARATION USING RADAR 1. Introduction When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s traffic,
More informationRecommendations for Northbound Aircraft Departure Concerns over South Minneapolis
Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis March 21, 2012 Noise Oversight Committee Agenda Item #4 Minneapolis Council Member John Quincy Background Summer of 2011
More informationSRC POSITION PAPER. Edition March 2011 Released Issue
E U R O C O N T R O L SRC POSITION PAPER Safety Assessment of Optimised Operations in Low Visibility Conditions Utilising Landing Clearance Delivery Position and/or Landing Clearance Line Concept, Edition1.5,
More informationCLEARANCE INSTRUCTION READ BACK
CLEARANCE INSTRUCTION READ BACK 1. Introduction An ATC clearance or an instruction constitutes authority for an aircraft to proceed only in so far as known air traffic is concerned and is based solely
More informationACI EUROPE POSITION PAPER. Airport Slot Allocation
ACI EUROPE POSITION PAPER Airport Slot Allocation June 2017 Cover / Photo: Madrid-Barajas Adolfo Suárez Airport (MAD) Introduction The European Union s regulatory framework for the allocation of slots
More informationDevelopment of the Safety Case for LPV at Monastir
Development of the Safety Case for LPV at Monastir Euromed GNSS II project/medusa Final event on GNSS for aviation Philip Church Principal Consultant philip.church@askhelios.com Your logo here MEDUSA final
More informationChapter 16. Airports Authority of India Manual of Air Traffic Services Part RESPONSIBILITY IN REGARD TO MILITARY TRAFFIC
Chapter 16 16.1 RESPONSIBILITY IN REGARD TO MILITARY TRAFFIC 16.1.1 It is recognized that some military aeronautical operations necessitate non-compliance with certain air traffic procedures. In order
More informationOfficial Journal of the European Union L 186/27
7.7.2006 Official Journal of the European Union L 186/27 COMMISSION REGULATION (EC) No 1032/2006 of 6 July 2006 laying down requirements for automatic systems for the exchange of flight data for the purpose
More informationCivil Approach Procedural Controller Military Terminal Radar Controller
AIR TRAFFIC CONTROLLER APPRENTICESHIP STANDARD Air Traffic Controller Civil Area/ Terminal Controller Civil Approach Controller Military Weapons Controller Military Area Radar Controller Civil Approach
More informationHOLIDAY VISITORS BY AGE
REGIONAL REPORT Report Period: Year Ending e 20 e 2015 LASSETERS HOTEL, ALICE SPRINGS OVERVIEW OVERNIGHT Visitors Holiday VFR Business Visitor nights ALOS (nights) Domestic 226 2 22 75 1,1 4.9 Intra-Territory
More informationInvestigating the Safety-Relevance of Limited Distinctive Features on a Multi Remote Tower-Working Position
Investigating the Safety-Relevance of Limited Distinctive Features on a Multi Remote Tower-Working Position Lothar Meyer and Hartmut Fricke Presented by Lothar Meyer 6TH SESAR INNOVATION DAYS 9 November
More informationAERODROME CONTROLLER (ADC) EXAM BRIEFING GUIDE AND EXAM STANDARDS
AERODROME CONTROLLER (ADC) EXAM BRIEFING GUIDE AND EXAM STANDARDS 1. Introducton This briefing is created to help candidates understand the purpose of this exam. 2. Requirements Before applying for this
More informationConsideration will be given to other methods of compliance which may be presented to the Authority.
Advisory Circular AC 139-11 Revision 2 Use of day-vfr aerodromes 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that
More informationNetwork Operations Performance
User Forum 2013 Network Operations Performance Operations performance in 2012 Ged Boydell Head Operational Analysis & Reporting 23 January 2013 Traffic and Capacity/Delay headlines 32000 30000 28000 26000
More informationModernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018
Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s
More informationNorth Atlantic Initiatives
North Atlantic Initiatives Monday, 17 March 2014; Session 4 (3:30 5:00) PRESENTED BY: Terry Cecil FAA International Operators Conference Tampa, FL March 17 20, 2014 Briefing Objective North Atlantic Initiatives
More informationFrom: Commanding Officer, Naval Air Station Pensacola. Subj: NAVAL AIR STATION PENSACOLA CLOSED CONTROL TOWER AIRFIELD OPERATIONS
DEPARTMENT OF THE NAVY COMMANDING OFFICER NAS PENSACOLA 150 HASE ROAD STE-A PENSACOLA, FLORIDA 32508-1051 NAVAL AIR STATION PENSACOLA INSTRUCTION 3710.1 NASPCOLAINST 3710.1 N32 From: Commanding Officer,
More informationSherburn Aero Club CAP1122 Review CAP 725 Framework Meeting October 26, 2016
Sherburn Aero Club CAP1122 Review CAP 725 Framework Meeting October 26, 2016 The Structure of the Presentation The Draft CAP725 ACP Document The Safety Case Document Discussion Actions The Draft CAP725
More informationAnalysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator
Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator Camille Shiotsuki Dr. Gene C. Lin Ed Hahn December 5, 2007 Outline Background Objective and Scope Study Approach
More informationOps Credit for Advanced Aircraft Equipment Improving Accessibility at Secondary Airports
Ops Credit for Advanced Aircraft Equipment Improving Accessibility at Secondary Airports ICAO Final Approach Symposium 1 st February 217 Dr Jean-Philippe Ramu NetJets Europe pilot & SESAR Technical Manager
More informationEvaluation of Pushback Decision-Support Tool Concept for Charlotte Douglas International Airport Ramp Operations
Evaluation of Pushback Decision-Support Tool Concept for Charlotte Douglas International Airport Ramp Operations Miwa Hayashi, Ty Hoang, Yoon Jung NASA Ames Research Center Waqar Malik, Hanbong Lee Univ.
More information4.2 AIRSPACE. 4.2 Airspace. Supplemental Draft Environmental Impact Statement August 2008 Military Training Activities at Mākua Military Reservation
4.2 AIRSPACE 4.2.1 Impact Methodology Impacts on airspace use were assessed by evaluating the potential effects of the proposed training activities on the principal attributes of airspace use, as described
More information