PARK SITE MASTER PLANS WEST PARK

Size: px
Start display at page:

Download "PARK SITE MASTER PLANS WEST PARK"

Transcription

1 PARK SITE MASTER PLANS Queen Creek Road to the north, Ocotillo Road to the south, Sossaman Road to the west, and Hawes Road to the east. The land adjacent to West Park is either inactive agricultural land or residential. The northwest portion (referred to as the panhandle) of the park site is surrounded by residential properties that are within a County Island and fall under the jurisdiction of Maricopa County. The properties adjacent to the west and east of the park are currently being developed as residential subdivisions. No other development plans are known for the open lot south of the park site. The Queen Creek Wash flows southeast to northwest, dissecting the northeastern corner of the site. The portion of the site that is separated by the wash consists of a mitigation area that was established during improvements made to the Queen Creek Wash in This area is designated to remain undisturbed. West Park is one of two active community parks identified in the PTOSMP (Figure 5). Included in the Master Plan is a general description of each of the five park sites as well as pertinent information obtained during each phase of the master planning process. A general description of the site, site conditions (i.e. topography, historic/cultural features, environmental issues, etc.), site opportunities and constraints, alternatives developed, final master plan developed, cost evaluations, and conditions and issues identified that had major impacts on the development of the master plans are described. WEST PARK West Park is comprised of three parcels, totaling approximately 78 acres. The park site is located in the center of Section 17, which is bounded by Figure 5 13

2 Site Conditions Location: The Park is to be located within the northwest ¼, southwest ¼, and the southeast ¼ of Section 17, Township 2 South, Range 7 East. of 36,000 square feet and R1-43, which allows for residential lots of 43,000 square feet. The properties to the east are zoned R1-12, which allow for residential lots of 12,000 square feet. The properties to the north are Unincorporated Size: The site is 78 acres. Approximately 6.5 acres of this site are included in the area allocated for the flow channel and bank protection of the Queen Creek Wash and 2 acres are dedicated as an environmental mitigation area. There are approximately 9 acres in the panhandle area. Topography: The site consists of inactive agricultural land with scattered desert vegetation. The Queen Creek Wash traverses the northeastern corner of the site. A northwestsoutheast trending linear depression extends across the southeastern portion of the parcel at the same angle as the former agricultural rows. County or zoned PAD, which is a planned area development overlay district. The park site itself is zoned R1-43. Historic/Cultural Features: A records review was conducted to identify any prior cultural resource surveys or recorded archaeological and historical sites within 1 mile of the project area and to assess the potential for the project to affect cultural resources. The site lies at an average elevation ranging from approximately 1,370 feet in the northwest to approximately 1,380 feet in the southeast. The site slopes from the southeast down to the northwest, with approximately 5 feet of topographic relief. Surrounding Land Uses/Zoning: The park site and the adjacent properties are zoned for residential uses. The properties to the south are zoned R1-35, which allows for residential lots The northeastern edge of the West Park site had been previously surveyed; however, there are no recorded archaeological or historical sites on West Park. Refer to Appendix E: Cultural Records Review, for a full explanation of the cultural review. Environmental Issues: Approximately 2 acres of land in the northeastern corner of the site, on the east side of the Queen Creek Wash, is designated as an environmental mitigation area and is to remain undisturbed, including extensive restrictions to maintenance activities. Additionally, areas of the wash have been improved for flood control and should not be altered. 14

3 northeast to the Queen Creek Wash, which is a major regional drainage corridor. Site Access: The most feasible access to the park site is from the west, on a 110-footwide dedicated easement directly south of the Appleby Road easement. Appleby Road is the mid-section alignment and it is bounded by existing residential homes to the north and a subdivision that is currently under construction to the south. The developer of this subdivision has dedicated a 110-foot-wide right-of-way for access into the park site from Sossaman Road. Properties to the north of the roadway are within Maricopa County and currently have access via a 25-foot-wide access and irrigation easement. Geology/Soils: The surficial soils of West Park generally consist of Holocene alluvial fan, terrace, and ephemeral stream channel deposits. According to the National Resource Conservation Service (NRCS), the surficial soils at the proposed West Park are classified into two categories, Gilman Loam (Gm) and Gilman Fine Sandy Loam (Gf). Gm is a silty and sandy loam that is well-drained, with moderate water infiltration rate, and yields very little probability for water ponding. The Gm deposit is generally located west of Sonoqui Wash. Gf is a silty and fine sandy loam that is well-drained, with moderate water infiltration rate, and yields very little probability for water ponding. The Gf deposits are generally adjacent to the wash. Refer to Appendix F: Initial Geologic Evaluation, for a full explanation of the geology/soils review. As development occurs, 196th Street (the north-south mid-section alignment), may be an alternative access point to the park. Currently, there is no roadway right-of-way on 196th Street; acquisition or dedication would be required. Vegetation: Native vegetation was removed from the site when the land was put into production. The park site is currently supporting non-descript weed and volunteer species, including a variety of grasses and sedges. These plants are sustained on natural rainfall and have established within the area after agricultural activities ceased. Queen Creek Wash runs east and north of the site, resulting in limited access from the north and east. Drainage Conditions: The area is relatively flat, with even grades across the entire park site. Surface flows follow the natural grade to the northwest, for approximately 80 percent of the site. The eastern portion of the site, approximately 20 percent of the site, drains Views: The foreground and middle-ground views toward the east from this site, include the Queen Creek Wash and environmental mitigation area located in the northeast portion of the site and residential properties, which surround much of the site. Short-range views from the panhandle 15

4 and other areas of the site include large-lot residential, many of which have equestrian properties. The distant and skyline views include the San Tan Mountains to the southwest and the Goldmine Mountains to the south and southeast. These mountains are visible throughout the and they contribute to the identity of the Town. There are more distant views of the Red and Superstition mountains to the north and northeast. These mountains are much farther away, resulting in less detail being visible. However, they still contribute to the skyline views from the site. Infrastructure and Utilities Water: Existing water lines are fairly accessible to the park, as the site borders several residential properties. Existing water facilities are owned and operated by the Queen Creek Water Company. There is an existing 6-inch water line along Appleby Road from Sossaman Road to 194 th Street. Additionally, an existing 6-inch water line bisects the site along the 196 th Street alignment. Water service for park amenities can be provided through the middle, at the north finger, or along the west side of the site. residential properties in the direct vicinity of the park use septic tanks for sanitary disposal. The does own an existing 24- inch gravity sewer in Sossaman Road that has an 8-inch sewer stub in Appleby Road. Roadways: The existing arterial roadways within the vicinity of the park include Sossaman, Ocotillo, and Hawes roads. These roads are 2- lane and 26 to 28 feet wide, with a posted speed limit of 45 miles per hour. The General Plan, 2002, classifies these roads as principal arterials in the ultimate build-out. This classification requires 5 to 6 lanes and a half street right-of-way width of 70 feet. Currently, there are no immediate improvements planned by the Town for these roadways. Appleby Road is an existing 24-foot-wide unpaved local roadway located entirely within the County Island. There is a 25-foot-wide irrigation, road, and utility easement along the roadway, from Sossaman Road to 196 th Street. The Lucia at Queen Creek Subdivision, which is currently being developed adjacent to the west boundary of the park site, has provided a 110-foot dedicated right-of-way from Sossaman Road to the park s western property boundary. Other Utilities: Irrigation There are several privately owned concretelined irrigation ditches throughout the West Park site. Specifically, there is a ditch in the center of Sewer: The sanitary sewer infrastructure is limited near West Park, as many of the 16

5 the park site that turns at the northern boundary of the site. This system serves an Irrigation District that comprises the County Island and the undeveloped parcel north of Queen Creek Wash and south of Queen Creek Road. The ditch through the site is actively used by this Irrigation District and will need to be piped underground with the West Park improvements. In addition, there is a concrete-lined irrigation ditch, which conveys water along the west property line of the Arroya de la Reina Subdivision from Ocotillo Road to the southern property line of the West Park. This irrigation line could feed a basin or pond in the southeastern corner of the park site. There are two concrete-lined irrigation canals located on the site that are still in use and provide irrigation to active agricultural fields directly south of the park site. One of the irrigation canals runs north and south along the east side of 196 th Street, and the other canal runs east/west along the north side of Appleby Road. The has recently completed a study for future use of effluent water. When park development occurs the status of the effluent distribution system should be researched and, if available, considered for use for park irrigation. Refer to Appendix G: Utility/Roadway Access Report for a full explanation of utility analysis. Site Opportunities and Constraints Site features and conditions have been identified during the data collection and site analysis phase that have influenced the design of the park (Figure 6). Site Opportunities: Due to its gentle grades and limited vegetation, the majority of the site is conducive for a variety of recreational uses. Skyline views of the San Tan Mountains to the south and southwest, the Goldmine Mountains to the south and southeast, and the Superstition Mountains to the northeast are visible from anywhere on the site and offer unique focal elements. The Queen Creek Wash and environmental mitigation area provide a natural buffer to residents adjacent to the east of the site. Recent improvements to the wash have included the placement of rock rip rap to reduce bank erosion and the planting of various desert plants to mitigate the bank improvements. These flood control improvements also have provided a paved connection from the park site to the multiuse trail adjacent to the east side of the wash. This trail provided a connection to the regional trail network. The site is located in an area of Town that has established residential neighborhoods along with newly developed subdivisions. The site is convenient for many existing Queen Creek residents. The designated environmental mitigation area provides a buffer for the newly developed residential areas adjacent to this portion of the site and establishes a small habitat area for wildlife. Site Constraints: The long, narrow peninsula is challenging from a design perspective, both because of its configuration and its close proximity to existing residents. The amenities for this portion of the site should be limited to passive park elements that are more conducive to the configuration and will abate impacts to the adjacent neighbors. The newly dedicated 110-foot right-ofway south of the Appleby Road easement is currently the only public access route 17

6 Figure 6 18

7 identified for the park site. Other possible access routes include 196 th Street, which would provide access from the south, and Twin Acres, which would provide limited access to the north. To establish additional access, the Town will want to acquire right-ofway or an easement agreement, respectively. In order to maintain this park and other proposed parks and trail corridors identified in the Master Plan, a maintenance yard is requested to be accommodated on the site. The designated environmental mitigation area that comprises the northeastern corner of the park site is to remain undisturbed. This rules out access into this portion of the site. The Queen Creek Wash has been improved for flood control purposes and should not be altered. Recreational Facilities Program Recommendations from the PTOSMP and the Committee: Primary amenities for the West Park site were identified in the PTOSMP. During the planning process the PTOS Committee participated in refining the items outlined in the PTOSMP and identified the following amenities for possible inclusion in the West Park Master Plan: Skate park Dog park Water/splash pad Adult softball fields (four-plex) Level 2 trailhead Covered play grounds Lake/water feature with canoe/kayak/boat access Youth baseball fields Youth soccer fields Large recreation center (50,000 square feet) Frisbee golf course Walking/hiking trails Maintenance facility Recommendation from the Public: Public participation was an essential part of the planning process. There were several opportunities for community members to participate in the planning process. Comments received helped identify issues and recreational preferences for the park. Many of the comments received corresponded with items outlined in the PTOSMP and identified by the Committee. In general, all types of playfields (baseball, softball, football, soccer, etc.) were desired amenities for this park site, along with ramadas/picnic areas, playgrounds, water feature/splash pad, and trails. There also were a number of recommendations to incorporate a recognition feature on the site, to honor the military veterans. Additionally, there was support for a lake or pond feature for passive use and possible non-motorized boating and fishing opportunities. Master Plan Alternatives Through the combined efforts of the Committee and the planning team, three design alternatives were developed for the park site. These alternatives incorporated recommendations from the public, the Committee, and items outlined in the PTOSMP. The alternatives developed were at a conceptual stage of design and were intended to illustrate major concepts and facilities programmed for the site. The alternative park designs were presented to the public during a public open house. The open house provided an opportunity for the community to give their opinions and offer feedback on the alternatives developed. The intent of the park designs was to provide multiple active use fields, courts, and other activeuse amenities, while accommodating passiveuse areas, such as open turf, ramadas, and trails. A description of each of the three alternatives and the advantages and disadvantages identified through the public participation process and subsequent Committee meetings are included below. 19

8 Alternative A Primary Features (Figure 7): Baseball/softball fields (four-plex) Four multi-use fields (football/soccer) Skate park Large recreational center (50,000 square feet) Splash pad area A 5-acre lake for recreational use and to serve as an irrigation reservoir Natural stream in the panhandle Recognition feature Disc golf course in the panhandle Basketball courts Sand volleyball courts Children s play areas with shade canopy Large and small ramadas Level two trailhead Multi-use trail throughout the park Exercise trail in the panhandle 1/2-acre maintenance yard. The plan also shows a main boulevard through the site from Appleby Road to 196 th Street Advantages: There are a number of advantages associated with the configuration of the park amenities in Alternative A. The recreation center is oriented to the southwest in order to take advantage of views from within the center looking over the lake and to the San Tan Mountains in the distance. The lake feature not only offers a number of recreational opportunities, such as fishing, canoeing, and kayaking for park users, it also provides a buffer to adjacent residents from active-use amenities which are primarily Figure 7 20

9 concentrated on the east side of the park. The lake flows into a stream that crosses under the western entrance drive and meanders north through the panhandle where it terminates into a pond where there is a recognition feature located on a small island. Other amenities identified for the panhandle include a disc golf course and an exercise trail around the perimeter. Each of these amenities is considered passive-use and minimizes impacts to the adjacent residents. The locations of the parking lots, throughout the site, have been situated so as to allow for shared uses between the various active- and passive-use amenities. The parking lot, adjacent to the recreation center, can serve as overflow parking during softball tournaments. The parking lot west of the multi-use fields can be used to accommodate those using the fields or those using the basketball courts, volleyball courts, or skate park to the west. The parking lot adjacent to the wash can serve both the multi-use fields and the ballfields. The equestrian parking lot is separate from the other parking areas in order to provide safe conditions for loading and unloading horses. In addition, the close proximity of the equestrian parking lot to the wash allows for easy access to the existing trail system within the wash. This also allows trail users to stop at the trailhead restroom facility while they travel along the trail corridor. Disadvantages: The lake feature is viewed as more of a passive-use element, and having active-use facilities, such as the skate park, basketball courts, and volleyball courts in such close proximity would create excessive noise and negatively impact those using the lake and surrounding open turf areas. The recognition feature, located in the northern portion of the panhandle, is only accessible from the trail located around the perimeter. There was some concern that users would not be able to walk to the recognition feature, because it is too far north, and noted that parking should be made available closer to the feature or that the recognition feature be moved closer to proposed parking. The equestrian parking lot is adjacent to the ballfields and there is a concern of a potential conflict between the two uses. The maintenance yard, as shown on the alternative, is too small to accommodate equipment needed to maintain not only this park but other convenient parks and portions of the Queen Creek Trail. Alternative B Primary Features: Alternative B includes many of the same primary features as Alternative A; however, the features have been arranged differently in this alternative. In Alternative B the recreation center is oriented in the center of the site at the end of the secondary access road (196 th Street). The ballfields (fourplex) are located in the southeastern portion of the site and the four multi-use fields are located near the southwestern boundary. A pecan orchard lines each side of the panhandle where there is an elevated grass mound at the northern end, with an overlook area facing south towards the park (Figure 8). Advantages: There are a number of advantages associated with the configuration of the park amenities in Alternative B. The recreation center is in a more centralized location and acts as a focal point as one enters the park from the west or south. A bridge crossing over a 5-acre lake accentuates the view to the recreation center as one enters the site. The recreation center is oriented to the south taking advantage of views from within the center, looking over the lake and bridge feature and to the Goldmine Mountains in the distance. The locations of the parking lots throughout the site have been situated so as to allow for shared uses between the various active- and passiveuse amenities. In addition, park amenities such as the lake and recreation center are located adjacent to the main boulevard to minimize the 21

10 Figure 8 amount of parking located along the main drive through the park site. The pecan trees around the perimeter of the panhandle provide a buffer to adjacent residents. Other amenities identified for the panhandle include a lawn mall, elevated grass mound, and meandering trail. Each of these amenities is considered passive-use and minimizes impacts to the adjacent residents. The maintenance yard, as shown on the alternative, will be able to accommodate equipment used to maintain not only the West Park site but other smaller park sites in the area. This would eliminate the need to dedicate area for maintenance yards at the smaller parks, allowing them to maximize usable park space. Disadvantages: There is no additional buffer provided to the residents adjacent to the west and south from the multi-use fields, ballfields, and parking lots. Active-use fields are separated by passive -use elements, such as the lake. There is a concern that excessive noise from the active-use areas would negatively impact those using more passive park elements. There is no recognition feature incorporated into Alternative B. The bridge adds cost to the project that is more of an aesthetic appeal and does not increase recreational opportunities. 22

11 Alternative C Primary Features: Alternative C includes many of the same primary features as Alternatives A and B, however, the features have been arranged differently in this alternative. In Alternative C, the recreation center is located in the center of the site, similar to Alternative B, however, it is oriented southwest to northeast. The ballfields (four-plex) are located in the southwest portion of the site and the multi-use fields are located in the southeastern portion of the site, same location as in Alternative A. The multi-use field closest to the wash has been replaced with a 2-acre maintenance yard. The lake is located to the northeast of the recreation center and wraps around the southeastern portion of the building. There is a large open turf area adjacent to the northeastern side of the lake that also abuts the Queen Creek Wash (Figure 9). Advantages: There are a number of advantages associated with the configuration of the park amenities in Alternative C. The recreation center is in a more centralized location and acts as a focal point as one enters the park from the west or south. The recreation center is oriented to the northeast, overlooking the lake, open turf area, and the Queen Creek Wash. These elements provide more of a buffer for residents to the north and northeast of the park site. The arrangement of the lake, open turf area, Queen Creek Wash, and the mitigation area combines the primary passive-use elements. This establishes a significant area of the park where the users can relax in the setting of the park and be away from the high-levels of activity associated with the sports fields. Figure 9 23

12 This park configuration provides large parking areas that are geometric in shape. This allows for an efficient parking lot layout maximizing the number of spaces in the smallest area. The simple use of disc golf and an exercise trail in the panhandle provides very low-impact uses adjacent to the residents in this area. This configuration of the ballfield, in relation to the recreation center, provides a direct and relatively short distance from the ballfield concession building to the main entry of the recreation center. The equestrian trailhead and trailer parking are located in an area with immediate access to the trail corridor of Queen Creek Wash. This area of the site also will be comparatively quiet, which will minimize the risk of the horses getting startled. The maintenance yard, as shown on the alternative, will be able to accommodate equipment used to maintain not only the West Park site but other smaller park sites in the area. This would eliminate the need to dedicate an area for maintenance yards at the smaller parks allowing them to maximize usable park space. Disadvantages: The simple recreational uses indicated in the panhandle do not effectively use the space and maximize the value of the park area. The park entry drive is lined with parking, limiting the experience of driving through a park setting. The orientation of the ballfields are not north/ south. The location of the field will cause the lights to impact the existing and future residents south and west of the site. Ballfield noise also will impact these residents. The geometric parking lots appear to be typical for a shopping center rather than a park setting. The play area on the peninsula in the lake could create a potential unsafe condition for youngsters wandering away from their parent s observation and having access to the lake. The court games are removed from the recreation center, which increases the difficulty of managing those facilities. The recreation center is in close proximity to the residential properties just north of the site. Preferred Alternative Site Plan Of the three alternative plans presented to the public, one was identified as the preferred alternative (Figure 10). Public comments were reviewed with the Committee, which then came to a consensus on which of the alternatives to move forward with as a base for the preferred alternative site plan. The Committee also provided direction to the planning team on modifications to be made to the preferred plan based on the public s comments. A final master plan was developed, presented to the public,and reviewed with the Committee for final adjustments prior to finalizing the Master Plan. Alternative A was identified by the public and agreed upon by the Committee to use as the base for the preferred alternative site plan for West Park. Description of Primary Features: The final master plan for the West Park site includes the same primary features as Alternative A with the following modifications: The recognition feature has been relocated next to the lake just south of the west entry drive (Figure 11). The lake provides an aesthetic backdrop for the recognition feature. The evaporation from the lake also creates a microclimate, cooling the adjacent recognition plaza making the area more comfortable during the summer months. The recognition feature also is in close proximity to parking making it easily accessible to users. 24

13 Figure 10 25

14 The skate park was removed from near the lake and relocated adjacent to the promenade northeast of the recreational center (Figure 14). In this location the skate park is highly visible, easily accessible from the parking lots, and space is provided for spectators. There is an enclosure proposed around the skate park to help control access and close it during off hours. Figure 11 A re-circulating stream system with deep pools (4 feet to 6 feet) has been incorporated into the panhandle area (Figure 12). A ½-mile multi-use trail and exercise loop meanders around the stream feature with exercise stations staggered around the perimeter. Riparian species would be planted in the area surrounding the stream. The stream (and the lake) could accommodate fish and are intended to be included in the Urban Fishing Program managed by the Arizona Game and Fish Department. An accessible fishing pier with an individual ramada is located adjacent to a large pool at the northern end of the site. Parking is provided off of Twin Acres, at the northern end. The parking lot located on the east side of the park has been reconfigured to extend north and wrap around the ballfields. The equestrian parking lot and node area has been relocated southeast of the newly reconfigured parking lot. This provides a buffer between the ballfields and the equestrian area and provides riders with direct access to the Queen Creek Wash. The play area and splash pad has been removed from near the lake and re-located in front of the recreation center. A graphic illustrates how the play area and splash pad The size of the lake has been reduced to provide more open turf around the lake. The overall surface area of the ponds in the stream area and the lake are close to 5 acres (Figure 13). It was expressed that the lake and the adjacent area should be passive and provide an opportunity for quiet relaxation. Therefore, the volleyball and basketball courts have been removed from near the lake. The courts have been relocated to the east side of the ballfields near the ceremonial plaza. The basketball courts are intended to serve as an extension of the plaza area during ceremonial events. Figure 12 26

15 A number of seating areas are located at the edge of the play/splash area, with a sidewalk around the entire perimeter for those who wish to bypass the play area altogether. There are also separate entrances on either side of the play/splash area that could be designated as senior or youth entrances. Cost Evaluation The cost evaluation was prepared using current cost standards based on present market conditions. Costs are subject to change. (Figure 16) Figure 13 could be integrated within the entrance of the recreation center (Figure 15). The entire area is approximately 180-feet in diameter, with the splash pad area, approximately 40-feet by 80-feet, set off to one side. It is intended that the entire area is to be shaded using canopy structures that are integrated into the architecture. The front of the play/splash area has a 4-foot-high glass rail that acts as a barrier so that children do not wander off but allows visibility into the area and recreation center. Figure 14 27

16 Figure 15 28

17 Figure 16 29

Northeast Quadrant Distinctive Features

Northeast Quadrant Distinctive Features NORTHEAST QUADRANT Northeast Quadrant Distinctive Features LAND USE The Northeast Quadrant includes all the area within the planning area that is east of Interstate 5 and to the north of State Route 44.

More information

2.0 Physical Characteristics

2.0 Physical Characteristics _ 2.0 Physical Characteristics 2.1 Existing Land Use for the Project The site is comprised of approximately 114 acres bounded by Highway 101 to the north, the existing town of Los Alamos to the east, State

More information

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township: D. PARKS AND TRAILS 1. Introduction Stillwater Township s population is relatively low, with most residents living on rural residences on large lots. The need for active park space has been minimal in

More information

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Community Liaison Committee Meeting #3 July 15, 2013 6:30 to 8:30 pm Flemingdon Park Library Agenda 1. Welcome 2. Housekeeping and Updates a) Housekeeping b) CLC

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

SOUTH INTERCHANGE AREA

SOUTH INTERCHANGE AREA Santaquin City General Plan 1 Location and Characteristics The South Interchange Area of Santaquin is located west of Interstate 15 and south of 500 South (Figure 1). It includes properties already annexed

More information

Lake Myra County Park. Wake County, North Carolina Community Forum #2 June 12, 2008

Lake Myra County Park. Wake County, North Carolina Community Forum #2 June 12, 2008 Lake Myra County Park Wake County, North Carolina Community Forum #2 June 12, 2008 Welcome and Introduction Meeting Agenda Welcome Introductions of Project Team Master Plan Process Community Forum #1 Updates

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

THOMAS A. SWIFT METROPARK Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics

THOMAS A. SWIFT METROPARK Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics THOMAS A. SWIFT METROPARK Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics Introduction As an open meadow park positioned along the Mahoning River,

More information

National Forests and Grasslands in Texas

National Forests and Grasslands in Texas United States Department of Agriculture Forest Service National Forests and Grasslands in Texas Sam Houston NF 394 FM 1375 West New Waverly, Texas 77358 Phone 936-344-6205 Dear Friends, File Code: 1950

More information

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL

More information

APPENDIX OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE

APPENDIX OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE APPENDIX A OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE INTRODUCTION: The Official Map of Hamiltonban Township has been prepared to identify those lands and features that Hamiltonban

More information

BRACEVILLE NATURE PRESERVE Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics

BRACEVILLE NATURE PRESERVE Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics BRACEVILLE NATURE PRESERVE Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics Introduction Braceville Nature Preserve is one of MetroParks largest preserves.

More information

Southwest Quadrant Distinctive Features

Southwest Quadrant Distinctive Features SOUTHWEST QUADRANT Southwest Quadrant Distinctive Features LAND USE The 31.17 square mile Southwest Quadrant includes all the area within the planning area west of I-5 and south of the Sacramento River.

More information

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan SUMMER VILLAGE OF SILVER SANDS Municipal Development Plan Bylaw 253-2014 Adopted August 22, 2014 Summer Village of Silver Sands Municipal Development Plan Bylaw No. 253-2014 Page 2 1 INTRODUCTION 1.1 SETTING

More information

Understanding user expectations And planning for long term sustainability 1

Understanding user expectations And planning for long term sustainability 1 Understanding user expectations And planning for long term sustainability 1 What is a natural surface trail? It can be as simple has a mineral soil, mulched or graveled pathway, or as developed as elevated

More information

Trail Feasibility Study

Trail Feasibility Study VOLUSIA COUNTY MPO CITY OF NEW SMYRNA BEACH FINAL REPORT JUNE 30, 2009 Trail Feasibility Study What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way

More information

4.19 Parks, Recreation, and Conservation Lands

4.19 Parks, Recreation, and Conservation Lands interchange would have on the Reed Paige Clark Homestead located on the north side of Stonehenge Road. Alternative D would also affect Palmer Homestead, E.F. Adams House, and Knapp Brothers Shoe Manufacturing

More information

Flow Stand Up Paddle Board Parkway Plan Analysis

Flow Stand Up Paddle Board Parkway Plan Analysis Regional Parks Department Jeffrey R. Leatherman, Director County of Sacramento Divisions Administration Golf Leisure Services Maintenance Rangers Therapeutic Recreation Services Flow Stand Up Paddle Board

More information

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road Logo Department Name Agency Organization Organization Address Information United States Forest Coronado National Forest 5700 North Sabino Canyon Road Department of Service Santa Catalina Ranger District

More information

J. Recreation Plan of Conservation and Development. The Town of Hebron. Section 2. Preservation of Unique Assets. 1 P a g e

J. Recreation Plan of Conservation and Development. The Town of Hebron. Section 2. Preservation of Unique Assets. 1 P a g e The Town of Hebron Section 2 2014 Plan of Conservation and Development Preservation of Unique Assets J. Recreation Open spaces, parks, sports fields, and recreational programs are considered essential

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

Classifications, Inventory and Level of Service

Classifications, Inventory and Level of Service Classifications, Inventory and Level of Service Section 3 Kenmore Park, Recreation and Open Space Plan 1 P a g e Classifications and Inventory Park Classifications Kenmore classifies its parks based upon

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

Wilds. Headwaters. Lakes. Oxbows. Falls

Wilds. Headwaters. Lakes. Oxbows. Falls 56 5 4 3 Wilds Headwaters Lakes Oxbows Falls 57 Zones It could be said the on-the-ground essence of this master plan appears within the next 6 pages of this report. As we learned in the preceding Cultural

More information

Appendix L Technical Memorandum Aesthetics

Appendix L Technical Memorandum Aesthetics Technical Memorandum Aesthetics 1.0 AESTHETICS This section provides a discussion of the aesthetic resources in the vicinity of ARTIC. Aesthetics pertain to the elements that make a certain view pleasing

More information

Park Design and Location Criteria

Park Design and Location Criteria Park Design and Location Criteria This section is presented in the interest of assisting park and recreation agencies in the development of a system of parks and recreation areas. A recreation system is

More information

DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03

DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03 DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD Revised 12/12/03 As recommended for approval by the Plan Commission General Project Description

More information

LONG TERM (OPERATION) IMPACTS AND POTENTIAL MITIGATION

LONG TERM (OPERATION) IMPACTS AND POTENTIAL MITIGATION 3.6 This chapter provides a project-level analysis of potential impacts to recreation sites in the study area including parks, natural areas, open spaces, trails, and playfields, as well as amenities such

More information

PROPOSED ALTERATION AND EXPANSION OF THE MOUNT PEARL MUNICIPAL BOUNDARY TO INCLUDE THE AREA OF THE FORMER PEARL ESTATE LANDS & ENVIRONS

PROPOSED ALTERATION AND EXPANSION OF THE MOUNT PEARL MUNICIPAL BOUNDARY TO INCLUDE THE AREA OF THE FORMER PEARL ESTATE LANDS & ENVIRONS PROPOSED ALTERATION AND EXPANSION OF THE MOUNT PEARL MUNICIPAL BOUNDARY TO INCLUDE THE AREA OF THE FORMER PEARL ESTATE LANDS & ENVIRONS JANUARY 4, 2007 INTRODUCTION In accordance with Sections 3 to 6 inclusive

More information

MASTER PLAN EXECUTIVE SUMMARY

MASTER PLAN EXECUTIVE SUMMARY Biscuit Run State Park Scottsville Road (State Route 20) Charlottesville, VA 22902 Biscuit Run State Park MASTER PLAN EXECUTIVE SUMMARY Department of Conservation and Recreation Division of Planning and

More information

The Baker/Carver Regional Trail is intended to

The Baker/Carver Regional Trail is intended to Section V Design Guidance The Baker/Carver Regional Trail is intended to safely accommodate 183,000 annual visits, an array of non-motorized uses, a variety of skill levels, and persons with special needs.

More information

Lawrence Loop SWOT Analysis

Lawrence Loop SWOT Analysis Alignment: D1 (Map Color: Dark Blue) Description: This alignment connects to the north end of the Burroughs Creek Trail and continues along the west side of the Railroad to 8 th Street. Strengths: - This

More information

Chapter 6. Action Program. Heart of the Lakes Area Recreation Plan

Chapter 6. Action Program. Heart of the Lakes Area Recreation Plan Heart of the Lakes Area Recreation Plan 1. Design and construct the following trails (please see the following map): a. the Speedway Trail 1) primary pathway the main trail 2) secondary pathway the proposed

More information

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating. Parks, Open Space and Trails PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN TRAILS PLAN CONTENTS The components of the trails plan are: Intent Definitions Goals, Policies, and Action Strategies Trails Map

More information

Town of Queen Creek Park and Facility Rentals Click on each park or facility for additional information

Town of Queen Creek Park and Facility Rentals Click on each park or facility for additional information Town of Queen Creek Park and Facility Rentals Click on each park or facility for additional information Queen Creek Library Ocotillo Road Hawes Road Desert Mountain Park Ellsworth Loop Road Ellsworth Road

More information

Washington Township MASTER PLAN. Addendum: Washington Township Master Plan

Washington Township MASTER PLAN. Addendum: Washington Township Master Plan Washington Township MASTER PLAN Addendum: Washington Township Master Plan CHAPTER XI RECREATION CORE DISTRICT Introduction The Recreation Core District generally encompasses the areas north of 30 Mile

More information

Header i

Header i Header i 048285014.10 Header Sub Title Body Text here. Body text here. Body text here. Section 1... 1 Executive Summary... 1 Opportunities and Constraints... 3 Overall Opportunities and Constraints Map

More information

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT Welcome KROSNO CREEK DIVERSION PROJECT PUBLIC INFORMATION CENTRE # 1 Tonight s Presentation Study Overview Background Existing Conditions Alternative Solutions Preliminary Preferred Solution Next Steps

More information

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION PIONEER PARK INTRODUCTION Pioneer Park is a 7 acre neighborhood park located east of Interstate 270 and south of Manchester Road along Tallie Road. The park is situated in a residential neighborhood with

More information

VOLUME II APPENDIX F DETAILED PHYSICAL DESCRIPTION OF PROJECT RESERVOIRS AND LANDS

VOLUME II APPENDIX F DETAILED PHYSICAL DESCRIPTION OF PROJECT RESERVOIRS AND LANDS VOLUME II APPENDIX F DETAILED PHYSICAL DESCRIPTION OF PROJECT RESERVOIRS AND LANDS THE CENTRAL NEBRASKA PUBLIC POWER AND IRRIGATION DISTRICT FERC PROJECT NO. 1417 PHYSICAL DESCRIPTION OF PROJECT LANDS

More information

CLEVELAND PARK LOCATION AND HISTORY EXISTING CONDITIONS AND CHARACTER LOCATION

CLEVELAND PARK LOCATION AND HISTORY EXISTING CONDITIONS AND CHARACTER LOCATION CLEVELAND PARK LOCATION LOCATION AND HISTORY Attempts to create a neighborhood park and playground in the Cleveland neighborhood began in 1926, when the park board designated for acquisition the block

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

NORTH HEMPSTEAD BEACH PARK MASTER PLAN

NORTH HEMPSTEAD BEACH PARK MASTER PLAN NORTH HEMPSTEAD BEACH PARK MASTER PLAN COMMUNITY DESIGN CHARRETTE Supervisor Judi Bosworth Viviana L. Russell Peter J. Zuckerman Angelo P. Ferrara Anna M. Kaplan Lee R. Seeman Dina M. De Giorgio VISIONING

More information

Stage 2 - November 2017 Survey and Map Comments (verbatim)

Stage 2 - November 2017 Survey and Map Comments (verbatim) Stage 2 - November 2017 Survey and Map Comments (verbatim) Identifying information removed to meet Freedom of Information and Protection of Privacy Act (FOIP Act). Comments are recorded exactly as they

More information

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK LUCY LANEY COMMUNITY SCHOOL N 33RD AVE N 33RD AVE SINGLE-FAMILY RESIDENTIAL MULTI-USE DIAMOND

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

Theme: Predominately natural/natural appearing; rustic improvements to protect resources. Size*: 2,500 + acres Infrastructure**:

Theme: Predominately natural/natural appearing; rustic improvements to protect resources. Size*: 2,500 + acres Infrastructure**: Recreation Opportunity Spectrum (ROS) Classes The Recreation Opportunity Spectrum (ROS) provides a way to describe the variations in the degree of isolation from the sounds and influences of people, and

More information

II. GENERAL DESCRIPTION OF ENVIRONMENTAL SETTING

II. GENERAL DESCRIPTION OF ENVIRONMENTAL SETTING II. GENERAL DESCRIPTION OF ENVIRONMENTAL SETTING A. LOCATION AND BOUNDARIES The proposed Canyon Hills project site is located at 8000 West La Tuna Canyon Road in the City of Los Angeles (the City ). The

More information

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan Appendix 3 Greenway Design Standards This chapter discusses two design standards for the greenway types discussed above. First, trail design standards are presented together with trailhead facilities and

More information

Dover Park Master Plan. Community Design Event Tuesday, May 22, 5 7 pm

Dover Park Master Plan. Community Design Event Tuesday, May 22, 5 7 pm Dover Park Master Plan Community Design Event Tuesday, May 22, 5 7 pm Agenda I. Introduction / Overview 20 minutes II. Small Group Design Activity 60 minutes III. Small Group Report Out IV. Conclusion

More information

Dungeness Recreation Area County Park Master Plan

Dungeness Recreation Area County Park Master Plan Dungeness Recreation Area County Park Public Outreach Meeting October 10, 2007 Project Overview USFWS Site Dungeness Recreation Area County Park Meeting Objectives: Re-Introduce project; provide status

More information

Chapter eight. Parks and Recreation. Introduction. Crystal Lake Park District

Chapter eight. Parks and Recreation. Introduction. Crystal Lake Park District Chapter eight Parks and Recreation Introduction One of the indicators of quality of life in a city is the parks and recreation system. The City of Crystal Lake is fortunate to have an excellent parks and

More information

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS INTRODUCTION The Municipal docks in both Newboro and Portland were transferred to the Township of Rideau Lakes by Parks Canada in 2002. Little has been done to improve the docks physical condition or role

More information

CITY COUNCIL AGENDA MEMORANDUM

CITY COUNCIL AGENDA MEMORANDUM To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development

More information

Port Gamble Shoreline Area Conceptual Trail Proposal

Port Gamble Shoreline Area Conceptual Trail Proposal The North Kitsap Trails Association is pleased to be a partner to the Kitsap Forest and Bay Project and assist Kitsap County, Forterra, Olympic Property Group, Great Peninsula Conservancy and the Port

More information

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts Note: Trails in the Clear Creek Canyon area (Segments 2 5 and a future JCOS connection) will be finalized in the future to minimize wildlife impacts Trail Phasing Plan P Parking 3 Easy Trail Intermediate

More information

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East Proposed Residential Development, Old Church Road, Caledon East TABLE CONTENTS: 1.0 DEVELOPMENT 1.1 Introduction-Analysis of Guiding Principles and Documents 1.2 Community Design and Architectural Design

More information

Memorandum / Letter of Intent

Memorandum / Letter of Intent VERONA WAUKESHA KENOSHA APPLETON WESTON Memorandum / Letter of Intent To: Adam Sayre, Director of Planning & Development, City of Verona From: Kevin Yeska, JSD Professional Services, Inc. www.jsdinc.com

More information

Town of Oakfield Agricultural and Farmland Protection Plan

Town of Oakfield Agricultural and Farmland Protection Plan SECTION III COMMUNITY OVERVIEW A. Regional Setting / Location The Town of Oakfield is located in the northwestern portion of Genesee County. Located west of New York's Finger Lakes, the Town is uniquely

More information

BASSETTS CREEK SECTION CONTENTS: BASSETTS CREEK BRYN MAWR LUCE LINE

BASSETTS CREEK SECTION CONTENTS: BASSETTS CREEK BRYN MAWR LUCE LINE BASSETTS CREEK SECTION CONTENTS: BASSETTS CREEK BRYN MAWR LUCE LINE GLENWOOD AVE MULTI-USE DIAMONDS VINCENT AVE N MORGAN AVE N PENN AVE N DOG PARK MULTI-USE FIELDS PLAYGROUND AK E RD S CHESTNUT AVE DA

More information

NEW MEADOWS PARK PROPOSED MASTER PLAN

NEW MEADOWS PARK PROPOSED MASTER PLAN NEW MEADOWS PARK PROPOSED MASTER PLAN A vision for your neighborhood park, the draft master plan is ready for your review. Tuesday September 12 th, 2017 5:30-7:00 PM Hellgate School District #4 middle

More information

CRANE LAKE TRAILS NETWORK AND SPACES

CRANE LAKE TRAILS NETWORK AND SPACES CRANE LAKE TRAILS NETWORK AND SPACES AREA TRAILS COMMUNITY TRAILS GOLD COAST TRAIL LAKE PARK OPTION ONE LAKE PARK OPTION TWO OVERFLOW TRAILHEAD PARKING THE GATE AREA TRAILS Trails are a major resource

More information

Ragged Mountain Natural Area. Public Planning Meeting #1 February 29 th, 2016

Ragged Mountain Natural Area. Public Planning Meeting #1 February 29 th, 2016 Ragged Mountain Natural Area Public Planning Meeting #1 February 29 th, 2016 Planning During dam construction P&R approached by various groups asking if the rules would be changed once the dam was complete

More information

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS CHAPTER III Trail Design Standards, Specifications & Permits This chapter discusses trail standards, preferred surface types for different activities, permits, and other requirements one must consider

More information

and plant some trees, but that was only accomplished through state and federal work-relief programs.

and plant some trees, but that was only accomplished through state and federal work-relief programs. PEAVEY LOCATION AND HISTORY Peavey Park sits in the Phillips Community on a large block bounded by major streets: Franklin Avenue, Chicago Avenue, and Park Avenue. The southern continue through to Chicago

More information

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land 1.0 Authority 1.1 This rule is promulgated pursuant to 23 V.S.A. 3506. Section 3506 (b)(4) states that an

More information

DRAFT. Dorabelle Campground Rehabilitation

DRAFT. Dorabelle Campground Rehabilitation DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section

More information

Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN. Introduction

Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN. Introduction Special study Areas Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN Introduction Beyond the boundaries of the 2030 General Plan, the City has defined Special Study

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602 1000 TDD (651) 291 0904 DATE: June 19, 2007 TO: Metropolitan Parks and Open Space Commission FROM: Jan Youngquist, Senior

More information

APPLICATION FOR SITE DEVELOPMENT PLAN LETTER OF INTENT Amended

APPLICATION FOR SITE DEVELOPMENT PLAN LETTER OF INTENT Amended Est. 1982 Est. 1982 Urban Planning Community Design Landscape Architecture 731 North Weber Street, Suite 10, Colorado Springs, CO 80903, 719 633-9700 http://www.gumanltd.com/ Members American society of

More information

EXECUTIVE SUMMARY FALL Introduction. Findings

EXECUTIVE SUMMARY FALL Introduction. Findings EXECUTIVE SUMMARY FALL 2004 Introduction Trails are one of the most popular and highly desirable recreational resources in communities of all sizes throughout the country. In addition to providing a safe

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

Welcome to the future of Terwillegar Park a Unique Natural Park

Welcome to the future of Terwillegar Park a Unique Natural Park Welcome to the future of Terwillegar Park a Unique Natural Park 1 Introduction The Terwillegar Park Concept Plan study will develop an overall concept plan, management objectives and development guidelines

More information

Frederickson LUAC. Community Plan Update. Parks & Recreation. September 25, 2017

Frederickson LUAC. Community Plan Update. Parks & Recreation. September 25, 2017 Frederickson LUAC Community Plan Update Parks & Recreation September 25, 2017 Kimberly Freeman Resource Stewardship Superintendent kimberly.freeman@co.pierce.wa.us 253-798-4261 Joseph Coppo Senior Parks

More information

FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT. August 31, 2010

FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT. August 31, 2010 FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT August 31, 2010 MANDATE AND SCOPE OF WORK: In order to achieve the earliest possible relocation of Marine Corps Air Station Futenma, the

More information

PLANNING COMMISSION AGENDA REPORT May 10, Members of the Planning Commission. Joyce Parker-Bozylinski, Contract Planner

PLANNING COMMISSION AGENDA REPORT May 10, Members of the Planning Commission. Joyce Parker-Bozylinski, Contract Planner PLANNING COMMISSION AGENDA REPORT May 10, 2007 TO: FROM: PROPOSAL: APPLICANT: RECOMMENDATION: Members of the Planning Commission Joyce Parker-Bozylinski, Contract Planner Approval of the Calabasas Trails

More information

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019 APPLICANT: REFER TO: St. Louis and Lake Counties Regional Rail Authority 2018-01942-ARC Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019 SECTION:404 - Clean Water Act 1. APPLICATION FOR

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS NORTH CENTRAL CAC AREA LITTLE VALLEY ROAD TO JUG HANDLE CREEK PLANNING AREA This planning area includes Cleone, Noyo,

More information

River Parks Trail: Tulsa, Oklahoma

River Parks Trail: Tulsa, Oklahoma River Parks Trail: Tulsa, Oklahoma Purpose: The purpose of the River Parks Trail is to maintain, preserve, develop, and promote the Arkansas River for the economic and cultural benefit of the community.

More information

M E S T I Z O C U R T I S P A R K

M E S T I Z O C U R T I S P A R K ARAPAHOE CONNECTION TO BUS ROUTE AT ND AND LAWRENCE, FUTURE LIGHT RAIL STATION LEGEND SOCIAL TRAIL FLAGSTONE PAVING TO RESTORE/MAINTAIN CONCRETE PAVING DIAGONAL CURVILINEAR SOCIAL ROUTE IS OUT OF HISTORIC

More information

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS CL&P s approach for identifying the best routes for the needed transmission system improvements included a determination

More information

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY Santa Fe, Oregon, and California ational Historic Trails : overview 99: p.134 100: p.135 GARDER JUCTIO 102: p.137 56: p.126 EDGERTO Burlington orthern Intermodal and Logistics 98: p.133 101: p.136 S Waverly

More information

Chapter 2: Summary of Existing Open Space System

Chapter 2: Summary of Existing Open Space System Chapter 2: Summary of Existing Open Space System In 1976, the Wake County Board of Commissioners established the Wake County Parks and Recreation Department in order to provide park facilities and programs

More information

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside

More information

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017 NPS Form 10900-a (Rev. 8/2002) OMB No. 10240018 United States Department of the Interior National Park Service Boundary Expansion Listed in National Register January 11, 2017 National Register of Historic

More information

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired 1 The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired the Chu property for open space with a contribution

More information

BRYAN REGIONAL PARK. Presented by: Burditt Consultants November 13, 2018

BRYAN REGIONAL PARK. Presented by: Burditt Consultants November 13, 2018 BRYAN REGIONAL PARK Presented by: Burditt Consultants November 13, 2018 AGENDA 1. Project Purpose & Mission 2. Project Vision & Goals 3. Stakeholder Feedback 4. Program Overview 5. Phase A Plan Overview

More information

Citrus Heights Creek Corridor Trail Project. Trail Advisory Group Meeting #3 July 8, 2013

Citrus Heights Creek Corridor Trail Project. Trail Advisory Group Meeting #3 July 8, 2013 Citrus Heights Creek Corridor Trail Project Trail Advisory Group Meeting #3 July 8, 2013 Agenda Introductions Recap: Community Workshop, Survey Findings, and TAG Field Trip Community Concern Discussion:

More information

ROAD AND TRAIL PROJECT APPROVAL

ROAD AND TRAIL PROJECT APPROVAL ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:

More information

SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN

SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN River basin description. A general description of the river basin or subbasin, as appropriate, in which

More information

Mt. Hood National Forest

Mt. Hood National Forest United States Department of Agriculture Forest Service Mt. Hood National Forest Zigzag Ranger District 70220 E. Highway 26 Zigzag, OR 97049 503-622-3191 Fax: 503-622-5622 File Code: 1950-1 Date: June 29,

More information

Business Item No

Business Item No Metropolitan Parks and Open Space Commission Meeting date: February 6, 2018 For the Community Development Committee meeting of February 20, 2018 For the Metropolitan Council meeting of February 28, 2018

More information

4MRV Parks Master Plan: Site Analysis

4MRV Parks Master Plan: Site Analysis 4MRV Parks Master Plan: Site Analysis Lardner/Klein Landscape Architects in association with: RK&K Grimm + Parker Kittelson & Associates Partners for Economic Solutions RIB U.S.Cost Civil Engineering Architecture

More information

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local CHAPTER 10 TRANSPORTATION Introduction The system of public roads in East Pikeland Township is decidedly rural in character. Since the 1984, the road network has remained much the same, with the addition

More information

Environmental Development of River Road Ranch

Environmental Development of River Road Ranch Environmental Development of River Road Ranch New Braunfels, Texas Alix Scarborough GEO 3426 April 2012 Introduction The 2,400-acre Word-Borcher ranch has been owned by the Word family since 1941. Located

More information

Blue River Trail Master Plan JSA to Town Hall June 2004

Blue River Trail Master Plan JSA to Town Hall June 2004 Blue River Trail Master Plan JSA to Town Hall June 2004 Prepared for: Silverthorne Town Council Silverthorne SPORT Committee Department of Recreation and Culture Silverthorne Public Works Silverthorne

More information