PETROLEUM INDUSTRY ACTIVITY REPORT (January 1/18 February 12/18)
|
|
- Amberlynn Cook
- 5 years ago
- Views:
Transcription
1 Petroleum Branch Ellice Ave, Winnipeg, MB R3G 3P2 T F WEEKLY WELL ACTIVITY REPORT PETROLEUM INDUSTRY ACTIVITY REPORT (January 1/18 February 12/18) DRILLING ACTIVITY To February 12/18 To February 13/ Total Drilling Licences Issued Licences Cancelled Vertical Wells Drilled Horizontal Wells Drilled Stratigraphic Test Holes Drilled Wells Drilled - Total No. of Metres Drilled Wells Re-entered Wells Being Drilled No. of Active Rigs Wells Licenced but Not Spudded Wells Completed as Potential Oil Wells Wells Abandoned Dry Wells Drilled but Not Completed Other Completions New Wells on Production GEOPHYSICAL ACTIVITY Geophysical Programs Licenced Licences Cancelled Kilometers Licenced Kilometers Run OIL PRICES (Average) $/m3 ($/bbl) $/m3 ($/bbl) Month of November (71.15) (55.87) Month of December (69.96) (62.24) OIL PRODUCTION (M3) Month of June
2 2 WEEKLY WELL ACTIVITY REPORT 12 February 2018 Lic. No.: 2594 Lic. No.: 2598 Lic. No.: 2999 Lic. No.: 6168 Lic. No.: 6766 Lic. No.: Corex OGL Kirkella (WPM) UWI: W1.00 Abandoned Producer: 09-Feb-2018 Corex OGL Kirkella (WPM) UWI: W1.00 Abandoned Producer: 09-Feb-2018 Corex OGL Kirkella (WPM) UWI: W1.00 Abandoned Producer: 09-Feb-2018 Tundra Goodlands (WPM) UWI: W1.00 Abandoned Producer: 08-Feb-2018 Tundra Sinclair HZNTL (WPM) UWI: W1.00 Status: Capable of Oil Production - Suspended (SUSP COOP) COOP - Suspended: 09-Feb-2018 Virden Roselea Unit No. 3 HZNTL (WPM) UWI: W Leg #1 UWI: W Leg #2 UWI: W Leg #2 Completing: 07-Feb-2018 Lic. No.: Lic. No.: Corval Daly Sinclair HZNTL E (WPM) UWI: W1.00 Status: Licence Cancelled (CAN) Licence Cancelled: 12-Feb-2018 Corex Daly Sinclair HZNTL B (WPM) UWI: W1.00 Spud Date: 06-Feb-2018 K.B. Elevation: m Surface Casing: m with 10.0 t Finished Drilling: 11-Feb-2018 Total Depth: m Intermediate Casing: m with 39.5 t Rig Released: 12-Feb-2018 Waiting On Service Rig: 12-Feb
3 3 Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Tundra Virden SWD DIR (WPM) UWI: W1.00 Surface Casing: m with 8.0 t Finished Drilling: 07-Feb-2018 Total Depth: m Production Casing: Run Rig Released: 08-Feb-2018 Waiting On Service Rig: 08-Feb-2018 South Pierson Unit No. 1 HZNTL (WPM) UWI: W1.00 Finished Drilling: 07-Feb-2018 Total Depth: m Intermediate Casing: m with 61.3 t Rig Released: 09-Feb-2018 Waiting On Service Rig: 09-Feb-2018 South Pierson Unit No. 1 HZNTL (WPM) UWI: W1.00 Spud Date: 09-Feb-2018 K.B. Elevation: m Surface Casing: m with 13.0 t South Pierson Unit No. 1 HZNTL A (WPM) UWI: W1.00 Completing: 05-Feb-2018 South Pierson Unit No. 1 HZNTL B (WPM) UWI: W1.00 Completing: 05-Feb-2018 Tundra McAuley DIR (WPM) UWI: W1.00 Completing: 08-Feb-2018 Daly Unit No. 4 HZNTL A (WPM) UWI: W1.00 Completing: 07-Feb-2018 Daly Unit No. 4 HZNTL B (WPM) UWI: W1.00 Completing: 06-Feb-2018 Tundra Daly Sinclair Prov. HZNTL A (WPM) UWI: W1.00 Completing: 10-Feb
4 4 Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Daly Unit No. 3 HZNTL (WPM) UWI: W1.00 Completing: 08-Feb-2018 Daly Unit No. 4 HZNTL (WPM) UWI: W1.00 Completing: 09-Feb-2018 Daly Unit No. 3 Prov. HZNTL (WPM) UWI: W1.00 Completing: 06-Feb-2018 Daly Unit No. 3 Prov. HZNTL A (WPM) UWI: W1.00 Completing: 07-Feb-2018 Waskada Unit No. 8 HZNTL A (WPM) UWI: W1.00 Completing: 10-Feb-2018 CPEC Manson HZNTL A (WPM) UWI: W1.00 Spud Date: 05-Feb-2018 K.B. Elevation: m Surface Casing: m with 13.0 t Intermediate Casing: m with 37.0 t Finished Drilling: 10-Feb-2018 Total Depth: m Rig Released: 12-Feb-2018 Waiting On Service Rig: 12-Feb-2018 Sinclair Unit No. 3 HZNTL (WPM) UWI: W1.00 Completing: 12-Feb-2018 Tundra et al Daly Sinclair HZNTL B (WPM) UWI: W1.00 Spud Date: 09-Feb-2018 K.B. Elevation: m Surface Casing: m with 8.0 t Tundra Daly Sinclair Prov. HZNTL A (WPM) UWI: W1.00 Spud Date: 05-Feb-2018 K.B. Elevation: m Surface Casing: m with 8.0 t Finished Drilling: 08-Feb-2018 Total Depth: m Intermediate Casing: m with 44.0 t Rig Released: 09-Feb
5 5 Waiting On Service Rig: 09-Feb-2018 Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: CPEC Manson HZNTL (WPM) UWI: W1.00 Status: Moving In Rotary Tools (MIRT) Moving In Rotary Tools: 12-Feb-2018 Waskada Unit No. 4 HZNTL A (WPM) UWI: W1.00 Finished Drilling: 06-Feb-2018 Total Depth: m Intermediate Casing: m with 44.5 t Rig Released: 07-Feb-2018 Waiting On Service Rig: 07-Feb-2018 Waskada Unit No. 4 HZNTL (WPM) UWI: W1.00 Spud Date: 07-Feb-2018 K.B. Elevation: m Surface Casing: m with 10.0 t Finished Drilling: 10-Feb-2018 Total Depth: m Intermediate Casing: m with 44.5 t Rig Released: 11-Feb-2018 Waiting On Service Rig: 11-Feb-2018 Waskada Unit No. 16 HZNTL A (WPM) UWI: W1.00 Spud Date: 11-Feb-2018 K.B. Elevation: m Surface Casing: m with 10.0 t Tundra East McAuley HZNTL (WPM) UWI: W STH UWI: W Leg #1 UWI: W1.00 Spud Date: 08-Feb-2018 K.B. Elevation: m Surface Casing: m with 8.0 t Finished Drilling: 10-Feb-2018 Total Depth: m Status: Abandoned Stratigraphic Test Hole (ABD STH) Abandoned Stratigraphic Test Hole: 12-Feb-2018 UWI: W Leg #1 5
6 6 Lic. No.: 9979 From: To: WELL LICENCE TRANSFERS Fort Calgary Miniota HZNTL (WPM) Flow Miniota HZNTL (WPM) Effective February 7, 2018 WELL LICENCE CANCELLATIONS Lic. No.: Corval Daly Sinclair HZNTL E (WPM) Status: Licence Cancelled Date Cancelled: 12-Feb
PETROLEUM INDUSTRY ACTIVITY REPORT (January 1/18 Jul 2/18)
Petroleum Branch 360-1395 Ellice Ave, Winnipeg, MB R3G 3P2 T 204-945-6577 F 204-945-0586 www.manitoba.ca WEEKLY WELL ACTIVITY REPORT PETROLEUM INDUSTRY ACTIVITY REPORT (January 1/18 Jul 2/18) DRILLING
More informationTotal Discovery Wells
Drilling Operations Wells Data in-depth (28-21) This section aims at analyzing the count of wells drilled during the fiscal years of and. These in- depth comparisons are divided into four main divisions:
More informationUse steel clip angle as a drill template and drill through mullion. Install bolts with bolt heads on the masonry side of the jamb mullion.
Additional 200xpt and 250xpt installation instructions are shown on page 11. STICK METHOD ERECTION (refer to figures 1 and 2) Step 1 Establish all control lines and grades. Step 2 Attach steel intermediate
More informationJanuary Sunday Monday Tuesday Wednesday Thursday Friday Saturday
January 2012 1 2 Day Observed New Year s Day 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 7:00 p.m. Water and Sewer Gimli 26 27 28 29 30 31 Unless otherwise noted, hearings will be held
More informationOIL AND GAS EXPLORATION AND DEVELOPMENT ON PROVINCIAL CROWN LANDS
NATURAL RESOURCES ENERGY AND MINES July 28, 1997 INFORMATIONAL NOTICE 97-5 Introduction OIL AND GAS EXPLORATION AND DEVELOPMENT ON PROVINCIAL CROWN LANDS This interim informational notice is issued jointly
More informationDecember 2017 Quarterly Activities Report
31 January 2018 December 2017 Quarterly Activities Report Mira 6 horizontal well successfully drilled through nearly 1 km of coal Mira field work completed below budget Mira 6 / 2 horizontal-vertical well
More informationChocolate Bar GOLD Mining Claim Oro Grande, California 92368
Gold Mining Claim 20 Acres Chocolate Bar GOLD Mining Claim Oro Grande, California 92368 Sale Highlights Formerly: Branch Gold Mine Heavy GOLD & Silver Concentrations: Remaining 300' Horizontal Tunnel with
More informationG azette. Gazette. Manitoba. Manitoba THE. Table of Contents. Vol. 146 No. 9 March 4, 2017 Winnipeg le 4 mars 2017 Vol. 146 n o 9
THE Manitoba Gazette G azette DU Manitoba Vol. 146 No. 9 March 4, 2017 Winnipeg le 4 mars 2017 Vol. 146 n o 9 Table of Contents GOVERNMENT NOTICES Under The Highway Traffic Act: Operating Authority...
More informationO I L S E A R C H L I M I T E D
28 December 2006 THE AUSTRALIAN STOCK EXCHANGE (SYDNEY) LIMITED Level 4, Exchange Centre 20 Bridge Street Sydney NSW 2000 Attention: Company Announcements Officer Dear Sir/Madam Re: Oil Search Limited
More informationREPORT ON ACTIVITIES FOR THE QUARTER ENDED 30 JUNE 2016
27 July 2016 The Manager Companies ASX Limited 20 Bridge Street SYDNEY NSW 2000 (5 pages by email) Dear Madam, REPORT ON ACTIVITIES FOR THE QUARTER ENDED 30 JUNE 2016 HIGHLIGHTS Overriding Royalty Interest
More informationActive quarter setting up 2017 growth plans
Active quarter setting up 2017 growth plans Highlights Gross production from the Seram PSC was 1.39 million barrels (3,805bopd) for the year, up 14% Increased equity in South Block A PSC to 40.7% Amanah
More informationACCEPTED OFFERS PUBLIC OFFERING
ACCEPTED OFFERS PUBLIC OFFERING OF CROWN PETROLEUM AND NATURAL GAS RIGHTS OFFERED September 19, 2018 Page 1 of 4 ** PLAINS REGION ** A0104 (4-22-007) 100% TAMARACK ACQUISITION CORP. 470.66 10.10 A0105
More informationHANNAN CONTINUES DRILL SUCCESS OUTSIDE RESOURCE AREA AT KILBRICKEN, IRELAND Drill Results Include 8.0% ZnEQ and 10.
1305 1090 West Georgia Street, Vancouver, BC, V6E 3V7 Phone: +1 604 685 9316 / Fax: +1 604 683 1585 NEWS RELEASE November 27, 2017 HANNAN CONTINUES DRILL SUCCESS OUTSIDE RESOURCE AREA AT KILBRICKEN, IRELAND
More informationMedia Details 2016/17.
Media Details 2016/17 Your customers read Airfinance Journal FLEETS Published since 1979, Airfinance Journal is the leading financial news and analysis publication of the aviation finance sector. The journal
More informationECOPHON Solo Octagon. Installation Manual DESIGN AND SPECIFICATIONS. Use of the Product. Edge Detail. Attachment. Size Availability. Weight.
ECOPHON Solo Octagon Installation Manual DESIGN AND SPECIFICATIONS Use of the Product Ecophon Solo panels are a high performance sound absorber, capable of being used as the primary acoustic solution when
More informationECOPHON Solo Circle 1200
ECOPHON Solo Circle 1200 Installation Manual DESIGN AND SPECIFICATIONS Use of the Product Ecophon Solo panels are a high performance sound absorber, capable of being used as the primary acoustic solution
More informationPT Medco Energi Internasional Tbk.
1 October 2011 PT Medco Energi Internasional Tbk. MedcoEnergi Will Soon Open its Operational Office in Tripoli. PT Medco Energi Internasional Tbk ( MedcoEnergi ) Chief Executive Officer, Mr. Lukman Mahfoedz,
More informationGeothermal cascade use at Geinberg, Austria
Bulletin d'hydrogt5ologie No 17 (1999) Centre d'hydrogiologie, Universiti de Neuchritel EDITIONS PETER LANG Geothermal cascade use at Geinberg, Austria by *Johann Goldbrunnerl, Robert Bauerl, Andrea Kolb'
More informationHorizontal Gas Well Geometry A Look at Industry Practices/Outcomes
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 23 26, 24 Horizontal Gas Well Geometry A Look at Industry Practices/Outcomes Rob Sutton Consultant Major Unconventional Gas Plays
More informationSeniors Housing Prairie Mountain Health
Seniors Prairie Mountain Health Disclaimer: The Seniors and Healthy Aging Branch created this directory as a public in response to older adults and families requests for information. It is a compilation
More informationICR-225 WINDOW WALL SYSTEM B - 2-1/4 x 6. Table of Contents (Drawing numbers ie V8761 used as CAD detail reference only )
ICR-225 WINDOW WALL SYSTEM B - 2-1/4 x 6 Table of Contents (Drawing numbers ie V8761 used as CAD detail reference only ) Elev-ICR-225-System B-6.00in H8707-Intermediate Horizontal H8751-Head Horizontal
More informationThe dialling plan for the area served by NPA Codes 204 and 431 will be as follows:
Number: PL- 419 Date: May 6, 2011 From: Canadian Numbering Administrator (CNA) Subject: NPA 431 to Overlay NPA 204 (Manitoba, Canada) Related Previous Planning Letters: None In Telecom Decision CRTC 2010-526
More informationECOPHON Solo Rectangle
ECOPHON Solo Rectangle Installation Manual DESIGN AND SPECIFICAT I O N S Use of the Product Ecophon Solo panels are a high performance sound absorber, capable of being used as the primary acoustic solution
More informationDALI Square Track flexibility enabling energy savings
Lighting DALI Square Track flexibility enabling energy savings DALI Square Track Designed for use with DALI projectors with a dedicated adaptor, the DALI Square Track is ideal for users who want lighting
More informationE&P in Brief. A Wintershall Fact Sheet. Wintershall in Argentina
E&P in Brief A Wintershall Fact Sheet Wintershall in Argentina Annual production in Argentina amounts to approx. 26 million barrels of oil equivalent Participating in 15 fields in Tierra del Fuego, Neuquén
More informationRCS750 3-circuit square track system flexible and multifunctional
Lighting RCS750 3-circuit square track system flexible and multifunctional 3-circuit Square RCS750 The RCS750 3-circuit square track system is made up of a solid aluminium track available in lengths of
More informationBUS 2 1. Introduction 2. Structural systems
BUS 2 1. Introduction 2. Structural systems 3. Staircases terminology, requirements 4. Staircases structures, historic review 5. Staircases 6. Expansion joints 7. Foundations terminology 8. Foundations
More informationKeeping Fun Safe. A public discussion paper on a new Amusement Ride Regulation for Manitoba
Keeping Fun Safe A public discussion paper on a new Amusement Ride Regulation for Manitoba October 2016 This information is available in alternate formats upon request. 2 Overview: The Government of Manitoba
More informationARKANSAS OIL AND GAS COMMISSION
ARKANSAS OIL AND GAS COMMISSION P. O. BOX 11510 EL DORADO, ARKANSAS 71730 3309 PHOENIX AVENUE FORT SMITH, ARKANSAS 72903 s Issued During Week Ending: October 17, 2014 Contractor Start NORTH ARKANSAS DRILLING
More informationPelican Flyer. Media Pack
Pelican Flyer Media Pack OUR BRAND Fly Pelican one of Australia s leading regional airlines based in Newcastle on the east coast of Australia; operating a fleet of 19 seat British Aerospace Jetstream 32
More informationFor personal use only
QUARTERLY REPORT JUNE 2014 Highlights for the 3 months to 30 JUNE 2014 PRODUCTION AND DEVELOPMENT Full year production 5.6 MMBOE, up 13% on previous financial year Quarterly production of 1.3 MMBOE, in
More informationRealhome LCL Lockers Specification
Realhome LCL Lockers Specification Realhome LCL Lockers are an excellent, durable and attractive range of lockers suitable for use in a wide range of industries. Realhome LCL Lockers use 13mm compact laminate
More informationExploration and Appraisal Drilling Update February 2015 (ASX:OSH ADR: OISHY POMSoX: OSH)
Exploration and Appraisal Drilling Update February 2015 (ASX:OSH ADR: OISHY POMSoX: OSH) 5 March 2015 Oil Search operated wells Well Name Objective/ targets Participants Taza 2 Oil appraisal Taza PSC,
More informationNortheast Theis Field Executive Summary
JAY V. MCGOVERN CERTIFIED PETROLEUM GEOLOGIST No. 1170 4226 Petronila Creek, Corpus Christi, TX 78410 Work (361) 883-8606 Mobile (361) 537-2394 Home (361) 767-3206 Northeast Theis Field Executive Summary
More informationPrairie Drought: Precedents and Prospects
Prairie Drought: Precedents and Prospects Dave Sauchyn Prairie Adaptation Research Collaborative, University of Regina Managing Climate and Weather Risks for Peace River District Agriculture, Grande Prairie,
More informationAlberta Urban Municipalities Association November 23. Tom Sampson Chief, Calgary Emergency Management Agency Commander, Canada Task Force 2
Alberta Urban Municipalities Association 2017 November 23 Tom Sampson Chief, Calgary Emergency Management Agency Commander, Canada Task Force 2 ISC: Unrestricted 1 Canada Task Force 2 2 3 What is our role
More informationNorthern Territory. Ark wishes to extend the strike and further define the size of the Golden Honcho deposit, with the
Ark Secures Approval to Commencee Mining Activities at Project, Northern Territory Sydney, 19 August 2014: The Board of Ark Mines Ltd (ASX: AHK) is pleased to announce that it has obtained approval from
More informationAustralian Mines increases Marymia ground holding
11 June 2015 Australian Mines increases Marymia ground holding Australian Mines Limited ( Australian Mines or the Company ) is pleased to advise shareholders that it has entered into a farm-in and joint
More informationFor personal use only
NEW HOPE CORPORATION LIMITED ABN: 38 010 653 844 QUARTERLY ACTIVITIES REPORT 31 JANUARY 2015 25 February 2015 Quarter Ended 6 Months Ended Jan 15 ( 000t) Jan 14 ( 000t) Change (%) Jan 15 ( 000t) Jan 14
More informationBARS, FIREPITS, FIREPLACES, PATIOS, PILLARS, SEAT WALLS, TABLES + WATERFALLS. Stone Oasis Landscape Kits
BARS, FIREPITS, FIREPLACES, PATIOS, PILLARS, SEAT WALLS, TABLES + WATERFALLS Stone Oasis Landscape Kits Your Garage 4 2 Your Home option 1 option 2 You can choose what s best for your outdoor spaces from
More informationThird Parties/Crossing
Third Parties/Crossing Presentation by Bill Scheers Canadian Association of Petroleum Land Administration Surface Land Administration Advisory Committee November 29, 2011 Agenda EAPUOC Guide for Working
More informationflatbed kit InstalLation Instructions kit contents KIT (tacoma ) kit (hilux )
InstalLation Instructions flatbed kit 300721-KIT (tacoma 1995-2004) 301047-kit (hilux 1984-1995) kit contents 5356 PINE AVE FRESNO, CA 93727 USA TOLL FREE: 877.4X4.TOYS WORLDWIDE: 559.252.4950 WWW.TRAIL-GEAR.COM
More informationManitoba DIRECT SERVICE POINTS
Alexander MB3 $750 Yes Altamont MB3 $4000 Yes Altona MB3 Yes Anola MB3 $750 Yes Arborg MB3 $750 Yes Arden MB3 $4000 Yes Argyle MB3 $750 Yes Arnaud MB3 $2000 Yes Arnes MB3 $2000 Yes Arrow River MB3 $5000
More informationDALI Square Track flexibility enabling energy savings
Lighting DALI Square Track flexibility enabling energy savings DALI Square Track Designed for use with DALI projectors with a dedicated adaptor, the DALI Square Track is ideal for users who want lighting
More informationATWOOD OCEANICS, INC.
ATWOOD OCEANICS, INC. Bank of America Securities 2005 Energy Conference November 13 15, 2005 Forward Looking Disclaimer Except for the historical information contained herein, the matters discussed in
More information2016 Commercial Real Estate. Review and Forecast
2016 Commercial Real Estate Review and Forecast February 4, 2016 Colliers International Saskatchewan Economic Overview Real GDP Growth 6.0% 2014 2015 2016f 5.0% 4.0% 3.0% 2.0% 1.0% 0.0% -1.0% Vancouver
More informationManitoba DIRECT SERVICE POINTS
Alexander MB3 $750 Yes Altamont MB3 $6000 Yes Altona MB3 Yes Anola MB3 $750 Yes Arborg MB3 $750 Yes Arden MB3 $6000 Yes Argyle MB3 $750 Yes Arnaud MB3 $750 Yes Arnes MB3 $750 Yes Arrow River MB3 $7000
More informationReliance-TC-Type ll Thermal Composite Type ll - Horizontals and Verticals w/ Aluminum Pressure Plate - 2-1/2 x 6
Reliance-TC-Type ll Thermal Composite Type ll - Horizontals and Verticals w/ Aluminum Pressure Plate - 2-1/2 x 6 Table of Contents (Drawing numbers ie H6504 used as CAD detail reference only ) Elev-RcwTC-Type
More informationLGO Energy plc. Trinidad An opportunity for Investors. Neil Ritson, Chief Executive Officer. 21 October 2016,London
LGO Energy plc Trinidad An opportunity for Investors Neil Ritson, Chief Executive Officer 21 October 2016,London London (AIM): LGO www.lgo-energy.com 1 Topics to Cover Today Who are LGO Energy plc? Trinidad
More informationWeekly Performance Update
Pr. Rupert Vancouver Grain Monitoring Program Weekly Performance Update February 19, 19 For Grain (18-19 CY) Summary 1. Stocks in Store (' tonnes) Country Elevators % of Working T his Week Last Week Var.
More informationTenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)
Tenders Manitoba Infrastructure Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Reference No. 0000087389 SUPPLY
More informationCore 2 Workshop Locations
Core 2 Workshop Locations WINTER 2018 (MARCH 10 & 11, 2018) This document lists the workshop locations for candidates registered in the Winter 2018 Core 2 module. In each location, the sessions run at
More informationKeencut. Evolution E2
0.2mm Guaranteed Accuracy That s 1:15000 Guaranteed Cutting Straightness! Flip over sub bench parking provides full unobstructed bench surface 5 year guarantee Evolution E2 ACCURACY In 1999 the original
More informationFat biplane. Project from
Project: Fat Biplane Page 1 of 23 Fat biplane Playing games is an integral part of every person s life. The game is very important for growing up the child, because children fully concentrate to it, they
More informationWeekly Performance Update
Pr. Rupert Vancouver Grain Monitoring Program Weekly Performance Update January, 19 For Grain (1-19 CY) Summary 1. Stocks in Store (' tonnes) Country Elevators % of Working T his Week Last Week Var. fro
More informationARGENTINA Analyst Review. Abundant Opportunity. Higher Prices. Rob Johnston
ARGENTINA 2008 Analyst Review Abundant Opportunity Higher Prices Rob Johnston The following discussions contain certain forward looking statements as defined by the Private Securities Litigation Reform
More informationSupertrack 2. A versatile 3-circuit lighting track system, with a full range of power feeds, connectors, couplers and suspensions.
Supertrack 2 A versatile 3-circuit lighting track system, with a full range of power s, s, couplers and suspensions 16A track units in high quality extruded aluminium with three separately switchable circuits.
More informationReliance-TC-Type ll Thermal Composite Type ll - Horizontals and Verticals w/ Aluminum Pressure Plate - 2-1/2 x 7-1/4
Reliance-TC-Type ll Thermal Composite Type ll - Horizontals and Verticals w/ Aluminum Pressure Plate - 2-1/2 x 7-1/4 Table of Contents (Drawing numbers ie H6404 used as CAD detail reference only ) Elev-RcwTC-Type
More informationAlberta Tourism Market Monitor
Alberta Tourism Market Monitor Federal Budget 2017 shows commitment to tourism industry The Federal budget announced in March contains encouraging news for the tourism industry. Starting in 2018-19, Parks
More informationWeekly Performance Update
Pr. Rupert Vancouver Grain Monitoring Program Weekly Performance Update January, 19 For (1-19 CY) Summary 1. Stocks in Store (' tonnes) Country Elevators % of Working T his Week Last Week Var. fro m Last
More informationBHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES. July 2002 September 2002
NEWS RELEASE Release Time IMMEDIATE Date 24 October 2002 Number 55/02 BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES July 2002 September 2002 This report covers exploration and
More informationGrain Monitoring Program
Pr. Rupert Vancouver Grain Monitoring Program Weekly Performance Update.November, 1 For 1 (1-19 CY) Summary 1. Stocks in Store (' tonnes) Country Elevators % of Working T his Week Last Week Var. fro m
More informationCampsite Cooking using a Bean Hole
Campsite Cooking using a Bean Hole What you will need This project will cook bean and bacon stew, with boiled rice Spade Cast iron cooking pot, with a lid and another saucepan Brush Firewood Large log
More informationBHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES. July September 2001
NEWS RELEASE Release Time IMMEDIATE Date 26 October 2001 Number 25/01 BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES July 2001 - September 2001 This report covers exploration and
More informationALPINE PIPELINE RIVER CROSSINGS 2009 MONITORING REPORT
ALPINE PIPELINE RIVER CROSSINGS 2009 MONITORING REPORT Submitted to ConocoPhillips Alaska, Inc. Submitted by Michael Baker, Jr., Inc. 1400 West Benson Blvd., Suite 200 Anchorage, Alaska 99503 TABLE OF
More informationFalkland Oil and Gas Limited ( FOGL or the Company ) Preliminary Results for the year ended 31 December 2007
Wednesday 12 March 2008 Falkland Oil and Gas Limited ( FOGL or the Company ) Preliminary Results for the year ended 31 December 2007 FOGL, the oil and gas exploration company focused on its extensive licence
More informationPNG. Civil Aviation Rules. Part 47. Aircraft Registration and Marking
Part 47 1 PNG Civil Aviation Rules Part 47 Aircraft Registration and Marking Effective 1 January 2004. Part 47 2 Schedule of Rules Subpart A General 3 47.1 Purpose...3 47.3 Definitions...3 Subpart B Aircraft
More informationB is for British Columbia. A is For Alberta
C is for Canada A is For Alberta Alberta is one of the only provinces in Canada with 2 NHL teams. Edmonton, the capital of Alberta is the home of the West Edmonton Mall, which is the largest shopping mall
More information$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES.
$6.60 (incl. GST) 2018 2014 November 28, 2013 November 23, 2017 TO to January 2, 7, 2019 2015 Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES NEW SOUTH
More informationADAGIO 35 HORIZONTAL ADAGIO 35 HORIZONTAL
15 ADAGIO 35 HORIZONTAL ADAGIO 35 HORIZONTAL A stylish horizontal column radiator. The Adagio 35 Horizontal is the perfect example of a radiator designed for its stylish looks as well as its ability to
More informationCarrizo Oil & Gas Inc
RMF Measured Temperature RMC Measured Temperature Source RMF RMC RM MRT RMF MRT Maximum Recorded Temperatures Circulation Stopped Time Logger On Bottom Time Unit Number Location Recorded By Witnessed By
More informationSEASONAL ANCHOR SYSTEM FOR PAIR OF PORTABLE SOCCER GOALS
INSTALLATION & USAGE MANUAL SEASONAL ANCHOR SYSTEM FOR PAIR OF PORTABLE SOCCER GOALS No. 00417-040 Set of Four No. 00417-080 Set of Eight ALL PORTABLE SOCCER GOALS MUST BE ANCHORED, TO COMPLY WITH THE
More information$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES.
$6.60 (incl. GST) 2019 2014 November 28, 2013 November 22, 2018 TO to January 1, 7, 2020 2015 Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES NEW SOUTH
More informationWv410 window. Installation Instructions
Wv410 window Installation Instructions Part NO. Y007 February 2014 TABLE OF CONTENTS SECTION PAGE I. Product Description and Limitations..........3 II. General Statements and Definitions........3 III.
More informationRailway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways
Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways SHORT TITLE 1. These Guidelines may be cited as the Railway-Highway Crossing at Grade Guidelines.
More informationThe S.S. City of Medicine Hat in the spring of (Alberta Provincial Archives)
The S.S. City of Medicine Hat in the spring of 1907. (Alberta Provincial Archives) S. S. CITY OF MEDICI NE HAT INFORMATION S HEET AND CHRONOLOGY 1 The S.S. City of Medicine Hat, a steam-powered sternwheeler,
More informationAlberta Tourism Market Monitor
Alberta Tourism Market Monitor Record-breaking 2016 for national parks visitation Alberta s national parks experienced new highs in 2016 as the provincial economy entered into recovery. Among the highs
More informationSuspended Signage Solutions
Suspended Signage Solutions For all types of signage and displays - Aesthetically pleasing - Easy and efficient installation - Complete off-site solutions Angel Foot Options Express Page 6 Page 5 Standard
More informationPast practice - Fernie Derrick restoration
Published August 26, 2011 INDUSTRY NEWS Past practice - Fernie Derrick restoration James Waterman Staff Writer About one hundred years ago, aspiring oilmen tried their luck in the environs of Akamina Creek
More informationTO EXPLORE / EXPLOIT FOR GAS AND CRUDE OIL EGAS
TO EXPLORE / EXPLOIT FOR GAS AND CRUDE OIL EGAS EGAS Ministry of Petroleum N. Idku. (A) RWE N. El Amriya RWE Rosetta North BG W. Delta Deep Marine Area-5 BG N. Damietta BALTIM E. IEOC N. Gamasa BG W. ABU
More informationARKANSAS OIL AND GAS COMMISSION HEARING AGENDA October 25, 2011, 9:00 am Fort Smith, Arkansas
ARKANSAS OIL AND GAS COMMISSION HEARING AGENDA October 25, 2011, 9:00 am Fort Smith, Arkansas Note: Due to a large number of docket items, the hearing may run multiple days 1. REGULAR DOCKET DOCKET # 286
More informationPart 175.E Request for data. concerning objects and structures. that affect aviation safety
Part 175.E Request for data concerning objects and structures that affect aviation safety Airservices Australia 2015 Page 1 of 7 Table of contents 1 Background...3 2 Purpose...3 3 Part 175.E Data Suppliers...3
More informationDecember 2014 Quarterly Report
Corporate Structure Shares 35,970,000 Options 7,250,000 Perf. Rights 5,000,000 Cash $4.2m ASX Code - BBR Directors Patrick Ford Non-Executive Chairman Chris Cowan Executive Director Nelson Reynolds Non-Executive
More informationEvander Gold Mining (Pty) Ltd
Evander Gold Mining (Pty) Ltd Prospecting Right: MP 30/5/1/1/2/14910 PR Prospecting Right and Environmental Authorisation for the Evander East 2 Project Dunrose Trading 186 (PTY) Ltd T/A Shango Solutions
More informationWOOLGAR PROJECT DRILL PROGRAM RESULTS NOVEMBER 2004
2nd December 2004 Announcements Officer Australian Stock Exchange Limited Level 10 20 Bond Street Sydney NSW 2000 ACN 008 901 380 ABN 35 008 901 380 Level 1 173 Mounts Bay Road Perth, Western Australia
More informationCascade Flue System Guide
Cascade Flue System Guide For use with the following appliances: CPM 58 CPM 77 CPM 96 CPM 116 EF80 EF100 EF120 CPM_ANCIL/CASCADE FLUE GUIDE_V1_JANUARY 2016 1 P a g e Introduction This guide has been produced
More informationCrystal Compact Housing and Winter Kit
Crystal Compact Housing and Winter Kit Operating instructions Page 3 Installation instructions Page 6 To be kept in the vehicle! Sales and Service in UK and Eire: Truma (UK) Ltd. Truma House, Eastern Avenue,
More information25 th Avenue Grade Separation. December 13, 2017
25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationInstalling a Drainage Chimney. Written by Nevin Sunday, 28 May :35 - Last Updated Tuesday, 18 July :52
Many, many years ago when we put the first tanks on the back of the garage, the council inspector had said that I needed to put in a rubble drain to take the stormwater from the roof of the garage. This
More informationMedia Log Report Rev.01/26/12 From: 07/02/2018 0:58
7/9/18 22:11 18WS004307 Lafountain St / Roger St 7/9/18 20:14 18WS004306 Motor Vehicle Complaint / 7/9/18 19:48 18WS004305 TRO/FRO Violation / Bus Stop 7/9/18 18:19 18WS004304 Hood St / Bellevue St 7/9/18
More informationStrut Clamp Pipe & Conduit
PRODUCT SPECIFICATIONS 0F Strut Clamp Pipe & Conduit Size: Steel pipe sizes 2" through 0" Finish: Electro-Galvanized Pipe clamps are designed to fit into the opening of 5 /8" wide channel profiles Pre-Assembled
More informationBrine Lithium Properties Chile For Sale/Option
Brine Lithium Properties Chile For Sale/Option 3 Brine Lithium Properties 10,800 Ha (25,686 acres) on 3 Salars 2 Salar de Atacama The highest grade lithium salar in the world Salar de Atacama is the world's
More informationAlaskan landscape evolution and glacier change in response to changing climate
Alaskan landscape evolution and glacier change in response to changing climate Following the publication of two pictures comparing the length of the Muir Glacier in Alaska, USA in the June 2005 issue of
More information3-circuit square RCS750
Lighting 3-circuit square RCS750 3-circuit Square RCS750 The Philips 3-circuit square track system consists of an anodised aluminium profile in natural anodised or painted white in lengths of 1, 2, 3 and
More informationCrown Point Ventures Ltd. November 2010 Marketing
Crown Point Ventures Ltd. November 2010 Marketing Forward Looking Statements 2 The information in this presentation contains certain forward-looking statements. These statements relate to future events
More informationGoodLife Personal Trainer Institute Course Schedule
GoodLife Personal Trainer Institute Course Schedule October 2017 Pickering, ON October 20, 2017 FROM 9 am TO 6 pm October 21, 2017 FROM 9 am TO 6 pm October 22, 2017 FROM 9 am TO 6 pm November 2017 1755
More informationEKKN FIELD. Potential for continued and enhanced oil recovery at EKKN (Elang-Kakatua-Kakatua North) JPDA - Timor Sea
EKKN FIELD Potential for continued and enhanced oil recovery at EKKN (Elang-Kakatua-Kakatua North) Background: JPDA - Timor Sea Oil was discovered in Elang-1 in February 1994 and the size of the oilfield
More informationDAILY & WOODS A PROFESSIONAL LIMITED LIABILITY COMPANY ATTORNEYS AT LAW
JERRY L. CANFIELD, P.A. THOMAS A. DAILY, P.A. WYMAN R. WADE, JR., P.A. DOUGLAS M. CARSON, P.A. ROBERT R. BRIGGS, P.A. C. MICHAEL DAILY, P.A.! L. MATTHEW DAVIS, P.A. COLBY T. ROE Also Licensed in Oklahoma!
More informationFor personal use only
29 July 2014 QUARTERLY ACTIVITIES REPORT To 30 th June 2014 Blue Energy Limited (ASX: BUL ) is pleased to report increased activity during the 30 June 2014 quarter across proven and emerging basins in
More informationUS 8,197,000 B1. Jun. 12, (45) Date of Patent: (10) Patent No.: Cohen. (12) United States Patent (54) Warren Cohen, Philadelphia, PA (US)
US008197000B1 (12) United States Patent Cohen (10) Patent No.: (45) Date of Patent: US 8,197,000 B1 Jun. 12, 2012 (54) (76) (*) (21) (22) (63) (51) (52) (58) (56) CHAIR STRUCTURE HAVING AUXLARY BACKREST
More information