Carrizo Oil & Gas Inc

Size: px
Start display at page:

Download "Carrizo Oil & Gas Inc"

Transcription

1 RMF Measured Temperature RMC Measured Temperature Source RMF RMC RM MRT RMF MRT Maximum Recorded Temperatures Circulation Stopped Time Logger On Bottom Time Unit Number Location Recorded By Witnessed By Steven Earle 3021 Ft. Morgan, CO Mark Samford AIT Sensor ohm.m 79 degf ohm.m 79 degf ohm.m 79 degf Calculated Calculated degf 19 Oct :15 21 Oct :35 MUD Fluid Loss PH Source Of Sample RM Measured Temperature Density Viscosity Logging Date Run Number Depth Driller Schlumberger Depth Bottom Log Interval Top Log Interval Casing Driller Size Depth Casing Schlumberger Bit Size Type Fluid In Hole 1403 ft in Gel and Chemical 9.4 lbm/gal 44 s 6241 ft in 1400 ft ft 7573 ft 7426 ft 19 Oct 2010 County: Field: Location: Well: Company: API Serial No Section 16 Drilling Measured From: Kelly Bushing Weld Wildcat NWNW, Sec. 16, T9N, R60W State H Carrizo Oil & Gas Inc LOCATION Log Measured From: Kelly Bushing Permanent Datum: Ground Level Lat/Long: N / W SHL: 700 FNL X 700 FWL NWNW, Sec. 16, T9N, R60W Coring Tool Mechanical Sidewall Well: Field: County: Wildcat Weld State: State H Company: Carrizo Oil & Gas Inc CO Elev.: K.B. G.L. D.F ft ft ft Elev.: ft ft above Perm. Datum Township 9N Range 60W RMF Measured Temperature RMC Measured Temperature Source RMF RMC RM MRT RMF MRT Maximum Recorded Temperatures Circulation Stopped Time Logger On Bottom Time Unit Number Location Recorded By Witnessed By MUD Fluid Loss PH Source Of Sample RM Measured Temperature Density Viscosity Logging Date Run Number Depth Driller Schlumberger Depth Bottom Log Interval Top Log Interval Casing Driller Size Depth Casing Schlumberger Bit Size Type Fluid In Hole Run 1 Run 2 Run

2 3 Run 4 DEPTH SUMMARY LISTING Depth Measuring Device Type: IDW B Serial Number: 3713 Calibration Date: 13 Sep 2009 Calibrator Serial Number: 33 Calibration Cable Type: 7 39P LXS Wheel Correction 1: 7 Wheel Correction 2: 5 Depth System Equipment Tension Device Date Created: 20 OCT :48:05 Logging Cable Type: CMTD B/A Type: 7 39P LXS Serial Number: 2787 Serial Number: 6171 Calibration Date: 13 Sep 2010 Length: FT Calibrator Serial Number: Conveyance Method: Wireline Number of Calibration Points: 10 Rig Type: LAND Calibration RMS: 26 Calibration Peak Error: 40 Log Sequence: Reference Log Name: Reference Log Run Number: Reference Log Date: Subsequent Log In the Well Depth Control Parameters 1. All Schlumberger depth policy procedures applied 2. This is the primary depth reference Depth Control Remarks DISCLAIMER THE USE OF AND RELIANCE UPON THIS RECORDED DATA BY THE HEREIN NAMED COMPANY (AND ANY OF ITS AFFILIATES, PARTNERS, REPRESENTATIVES, AGENTS, CONSULTANTS AND EMPLOYEES) IS SUBJECT TO THE TERMS AND CONDITIONS AGREED UPON BETWEEN SCHLUMBERGER AND THE COMPANY, INCLUDING: (a) RESTRICTIONS ON USE OF THE RECORDED DATA; (b) DISCLAIMERS AND WAIVERS OF WARRANTIES AND REPRESENTATIONS REGARDING COMPANY S USE OF AND RELIANCE UPON THE RECORDED DATA; AND (c) CUSTOMER S FULL AND SOLE RESPONSIBILITY FOR ANY INFERENCE DRAWN OR DECISION MADE IN CONNECTION WITH THE USE OF THIS RECORDED DATA. OTHER SERVICES1 OTHER SERVICES2 OS1: ECS OS1: OS2: FMI OS2: OS3: MSIP OS3: OS4: OS4: OS5: OS5: REMARKS: RUN NUMBER 1 REMARKS: RUN NUMBER 2 This is the third run in hole. Toolstring run as per tool sketch. Recovered 40 of 50 cores attempted. Missed 6419,6432,6474,6484,6584,6603,6605,6608,7192 and 7426

3 Rig: Xtreme 15 Crew: Mark Hoffman, Derrick Hunter RUN 1 RUN 2 SERVICE ORDER #: BHDJ SERVICE ORDER #: PROGRAM VERSION: 18C0 147 PROGRAM VERSION: FLUID LEVEL: 25 ft FLUID LEVEL: LOGGED INTERVAL START STOP LOGGED INTERVAL START STOP MCPP AA 73 GSR U/Y EQUIPMENT DESCRIPTION RUN 1 RUN 2 SURFACE EQUIPMENT DOWNHOLE EQUIPMENT LEH QT LEH QT AH Jars AH Jars 46.7 SGT E ECH KG 3681 SGC JC 2637 SGD TAA Gamma Ray MSCT AA MCEC AA 137 ECH KS 72 MCMU AA 52 BIT AA MCFU_H AA

4 Tension MSCT TOOL ZERO TOOL BOTTOM MAXIMUM STRING DIAMETER 5.25 IN MEASUREMENTS RELATIVE TO TOOL ZERO ALL LENGTHS IN FEET (in) (ft) (ft) (in) Production String Well Schematic Casing String MD OD ID OD ID MD Casing String Casing Shoe Borehole Segment

5 All Depths are Driller s Depths MSCT CORE REPORT Core Depth Recovery Remark (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered

6 (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Lost Core (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Lost Core (FT) Recovered (FT) Recovered (FT) Lost Core (FT) Lost Core (FT) Recovered (FT) Recovered (FT) Lost Core (FT) Lost Core (FT) Lost Core (FT) Lost Core (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Recovered (FT) Lost Core (FT) Lost Core Company: Well: Output DLIS Files DEFAULT MSCT_060LTP FN:45 PRODUCER 21 Oct : FT Elapsed Time (s) Event Summary Coring Stopped Marker Core 50 at (FT) Coring Stopped Marker Core 49 at (FT) Coring Stopped Marker Core 48 at (FT)

7 942.4 Coring Stopped Marker Core 47 at (FT) Coring Stopped Marker Core 46 at (FT) Coring Stopped Marker Core 45 at (FT) Coring Stopped Marker Core 44 at (FT) Time Mark Every 60 S Hydraulic Motor Current (HMCU) 0 (AMPS) 2 PIP SUMMARY Hydraulic Motor Downhole Voltage (HMDV) 500 (V) 1000 Coring Motor Downhole Voltage (CMDV) 500 (V) 1000 Motor Voltage Window From MSCT_LMVL to MSCT_UMVL Limit Switch From D3T to MSCT_ LSWI Kinematics Pressure (RPPV) 0 (PSIG) 5000 Hydraulic Pump Pressure (HPPR) Coring Motor Linear Position (CMLP) 0 (PSIG) (IN) 2.5 Coring Motor (SSTA) Current (CMCU) 0 ( (AMPS) 5 Elapsed Time (ETIM) (MN) 32 Coring Motor Pressure (CMPR) Kinematics Piston Position (CMPP) 150 (PSIG) (IN) Coring Stopped Marker Core 50 at (FT)

8 Marker 50 Marker Coring Stopped Core 49 at (FT) Coring Stopped Core 48 at (FT)

9 Coring Stopped Marker Core 47 at (FT) Coring Stopped Marker Core 46 at (FT) Coring Stopped

10 Marker 46 Marker 45 Coring Motor (SSTA) Current (CMCU) 0 ( (AMPS) 5 Motor Voltage Window From MSCT_LMVL to MSCT_UMVL Elapsed Time (ETIM) (MN) Limit Switch From D3T to MSCT_ LSWI 5 Core 45 at (FT) Core 44 at (FT) Coring Stopped Coring Motor Pressure (CMPR) Kinematics Piston Position (CMPP) 150 (PSIG) (IN) 2.5 Hydraulic Pump Pressure (HPPR) Coring Motor Linear Position (CMLP) 0 (PSIG) (IN) 2.5 Coring Motor Downhole Voltage (CMDV) 500 (V) 1000 Kinematics Pressure (RPPV) 0 (PSIG) 5000 Hydraulic Motor Downhole Voltage (HMDV) 500 (V) 1000 Hydraulic Motor Current (HMCU) 0 (AMPS) 2 Time Mark Every 60 S PIP SUMMARY Parameters DLIS Name Description Value MSCT AA: Mechanical Sidewall Coring Tool SOFF Standoff 0 IN

11 Format: MSCT_PROPRIETARY_ALL_Station Vertical Scale: 1" per 60S Graphics File Created: 21 Oct :44 OP System Version: 18C0 147 MSCT AA 18C0 147 SGT E 18C0 147 Output DLIS Files DEFAULT MSCT_060LTP FN:45 PRODUCER 21 Oct :44 Company: Well: Output DLIS Files DEFAULT MSCT_059LUP FN:44 PRODUCER 21 Oct :39 OP System Version: 18C0 147 MSCT AA 18C0 147 SGT E 18C0 147 Time Mark Every 60 S Gamma Ray (GR) 0 (GAPI) 150 PIP SUMMARY Tension (TENS) (LBF)

12 Gamma Ray (GR) 0 (GAPI) 150 Tension (TENS) (LBF) 0 PIP SUMMARY Time Mark Every 60 S Format: MSCT_DepthLog_GR Vertical Scale: 5" per 100 Graphics File Created: 21 Oct :39 OP System Version: 18C0 147 MSCT AA 18C0 147 SGT E 18C0 147 Output DLIS Files DEFAULT MSCT_059LUP FN:44 PRODUCER 21 Oct :39 Company: Well: Output DLIS Files DEFAULT MSCT_057LTP FN:42 PRODUCER 21 Oct : FT Elapsed Time (s) Event Summary Coring Stopped Marker Core 43 at (FT) Coring Stopped Marker Core 42 at (FT) Coring Stopped Marker Core 41 at (FT) Coring Stopped Marker Core 40 at (FT) Coring Stopped Marker Core 39 at (FT) Coring Stopped Marker Core 38 at (FT) Coring Stopped Marker Core 37 at (FT) Coring Stopped

13 Marker Core 36 at (FT) Coring Stopped Marker Core 35 at (FT) Coring Stopped Marker Core 34 at (FT) Coring Stopped Marker Core 33 at (FT) Coring Stopped Marker Core 32 at (FT) Coring Stopped Marker Core 31 at (FT) Coring Stopped Marker Core 30 at (FT) Coring Stopped Marker Core 29 at (FT) Coring Stopped Marker Core 28 at (FT) Coring Stopped Marker Core 27 at (FT) Coring Stopped Marker Core 26 at (FT) Coring Stopped Marker Core 25 at (FT) Coring Stopped Marker Core 24 at (FT) Coring Stopped Marker Core 23 at (FT)

14 Coring Stopped Marker Core 22 at (FT) Coring Stopped Marker Core 21 at (FT) Coring Stopped Marker Core 20 at (FT) Coring Stopped Marker Core 19 at (FT) Coring Stopped Marker Core 18 at (FT) Coring Stopped Marker Core 17 at (FT) Coring Stopped Marker Core 16 at (FT) Coring Stopped Marker Core 15 at (FT) Coring Stopped Marker Core 14 at (FT) Coring Stopped Marker Core 13 at (FT) Coring Stopped Marker Core 12 at (FT) Coring Stopped Marker Core 11 at (FT) Coring Stopped Marker Core 10 at (FT) Coring Stopped Marker 10

15 Core 9 at (FT) Coring Stopped Marker Core 8 at (FT) Coring Stopped Marker Core 7 at (FT) Coring Stopped Marker Core 6 at (FT) Coring Stopped Marker Core 5 at (FT) Coring Stopped Marker Core 4 at (FT) Coring Stopped Marker Core 3 at (FT) Coring Stopped Marker Core 2 at (FT) Coring Stopped Marker Core 1 at (FT) 0.0 Coring Stopped Time Mark Every 60 S Hydraulic Motor Current (HMCU) 0 (AMPS) 2 PIP SUMMARY Hydraulic Motor Downhole Voltage (HMDV) 500 (V) 1000 Coring Motor Downhole Voltage (CMDV) 500 (V) 1000 Motor Voltage Window From MSCT_LMVL to MSCT_UMVL Limit Switch From D3T to MSCT_ LSWI Kinematics Pressure (RPPV) 0 (PSIG) 5000 Hydraulic Pump Pressure (HPPR) Coring Motor Linear Position (CMLP) 0 (PSIG) (IN) 2.5 Coring Motor (SSTA) Current (CMCU) 0 ( (AMPS) 5 Elapsed Time (ETIM) (MN) Coring Motor Pressure (CMPR) Kinematics Piston Position (CMPP) 150 (PSIG) (IN) 2.5

16 Coring Stopped Marker Core 43 at (FT) Coring Stopped Marker Core 42 at (FT) Coring Stopped Marker Core 41 at (FT)

17 Marker 41 Marker Core 40 at (FT) Core 39 at (FT) Coring Stopped Coring Stopped

18 Marker 39 Marker Coring Stopped Core 38 at (FT) Coring Stopped Core 37 at (FT) Coring Stopped

19 Marker 37 Core 36 at (FT) Coring Stopped Marker Core 35 at (FT)

20 Marker 35 Marker Coring Stopped Core 34 at (FT) Coring Stopped Core 33 at (FT)

21 Marker 33 Marker Core 32 at (FT) Coring Stopped Core 31 at (FT) Coring Stopped 133 Coring Stopped

22 Marker 31 Marker 30 Marker Core 30 at (FT) Coring Stopped Core 29 at (FT) Coring Stopped Core 28 at (FT)

23 Marker 28 Marker Coring Stopped Core 27 at (FT) Coring Stopped Core 26 at (FT) Coring Stopped

24 Marker 26 Marker 25 Marker Core 25 at (FT) Coring Stopped Core 24 at (FT) Coring Stopped Core 23 at (FT)

25 Coring Stopped Marker Core 22 at (FT) Coring Stopped Marker Core 21 at (FT) Coring Stopped 88

26 Marker Core 20 at (FT) Coring Stopped Marker Core 19 at (FT) Coring Stopped

27 Marker 19 Marker Core 18 at (FT) Coring Stopped Core 17 at (FT) Coring Stopped

28 Marker Core 16 at (FT) Coring Stopped Marker Core 15 at (FT) Coring Stopped Marker Core 14 at (FT) Coring Stopped 55

29 Marker Core 13 at (FT) Coring Stopped Marker Core 12 at (FT) Coring Stopped Marker Core 11 at (FT)

30 Coring Stopped Marker Core 10 at (FT) Coring Stopped Marker Core 9 at (FT) Coring Stopped

31 Marker 9 32 Core 8 at (FT) Coring Stopped Marker 8 28 Core 7 at (FT) Coring Stopped Marker 7 23 Core 6 at (FT)

32 Coring Stopped Marker 6 20 Core 5 at (FT) Coring Stopped Marker 5 15 Core 4 at (FT) Coring Stopped

33 Marker 4 10 Core 3 at (FT) Coring Stopped Marker 3 5 Core 2 at (FT) Coring Stopped Marker 2 1 Core 1 at (FT)

34 Coring Motor (SSTA) Current (CMCU) 0 ( (AMPS) 5 Motor Voltage Window From MSCT_LMVL to MSCT_UMVL Elapsed Time (ETIM) (MN) Limit Switch From D3T to MSCT_ LSWI 0 Coring Stopped Coring Motor Pressure (CMPR) Kinematics Piston Position (CMPP) 150 (PSIG) (IN) 2.5 Hydraulic Pump Pressure (HPPR) Coring Motor Linear Position (CMLP) 0 (PSIG) (IN) 2.5 Coring Motor Downhole Voltage (CMDV) 500 (V) 1000 Kinematics Pressure (RPPV) 0 (PSIG) 5000 Hydraulic Motor Downhole Voltage (HMDV) 500 (V) 1000 Hydraulic Motor Current (HMCU) 0 (AMPS) 2 Time Mark Every 60 S PIP SUMMARY Parameters DLIS Name Description Value MSCT AA: Mechanical Sidewall Coring Tool SOFF Standoff 0 IN Format: MSCT_PROPRIETARY_ALL_Station Vertical Scale: 1" per 60S Graphics File Created: 21 Oct :14 OP System Version: 18C0 147 MSCT AA 18C0 147 SGT E 18C0 147 Output DLIS Files DEFAULT MSCT_057LTP FN:42 PRODUCER 21 Oct :14 Company: Well: Output DLIS Files DEFAULT MSCT_056LUP FN:41 PRODUCER 21 Oct :05 OP System Version: 18C0 147 MSCT AA 18C0 147 SGT E 18C0 147 Time Mark Every 60 S Gamma Ray (GR) 0 (GAPI) 150 PIP SUMMARY Tension (TENS) (LBF)

35

36 Gamma Ray (GR) 0 (GAPI) 150 Tension (TENS) (LBF) 0 PIP SUMMARY Time Mark Every 60 S Format: MSCT_DepthLog_GR Vertical Scale: 5" per 100 Graphics File Created: 21 Oct :05 OP System Version: 18C0 147 MSCT AA 18C0 147 SGT E 18C0 147 Output DLIS Files DEFAULT MSCT_056LUP FN:41 PRODUCER 21 Oct :05 Company: Well: Field: County: State: Carrizo Oil & Gas Inc State H Wildcat Weld CO Mechanical Sidewall Coring Tool

Quick Start Guide 3500 AquaVent

Quick Start Guide 3500 AquaVent Quick Start Guide 3500 AquaVent Please read this document carefully before using the AquaVent. High Quality Groundwater and Surface Water Monitoring Instrumentation Note: For information on using your

More information

Display Systems. 1. General. A. Multi-Function Display (MFD) B. Primary Flight Display (PFD)

Display Systems. 1. General. A. Multi-Function Display (MFD) B. Primary Flight Display (PFD) CIRRUS AIRPLANE MAINTENANCE MANUAL Display Systems CHAPTER 31-60: DISPLAY SYSTEMS GENERAL 31-60: DISPLAY SYSTEMS 1. General This section covers those systems and components which give visual display of

More information

SERVICE BULLETIN SERIAL NUMBERS

SERVICE BULLETIN SERIAL NUMBERS TITLE ENGINE INDICATING - ENGINE TREND MONITOR CALIBRATION EFFECTIVITY MODEL SERIAL NUMBERS 560 (Citation Ultra) -0387, -0392, -0404, -0410, -0415, -0420, -0426, -0452, -0456, -0462, -0468, -0472, -0495,

More information

Geothermal cascade use at Geinberg, Austria

Geothermal cascade use at Geinberg, Austria Bulletin d'hydrogt5ologie No 17 (1999) Centre d'hydrogiologie, Universiti de Neuchritel EDITIONS PETER LANG Geothermal cascade use at Geinberg, Austria by *Johann Goldbrunnerl, Robert Bauerl, Andrea Kolb'

More information

4 REPORTS. The Reports Tab. Nav Log

4 REPORTS. The Reports Tab. Nav Log 4 REPORTS This chapter describes everything you need to know in order to use the Reports tab. It also details how to use the TripKit to print your flight plans and other FliteStar route data. The Reports

More information

SERVICE LETTER REVISION

SERVICE LETTER REVISION Citation Revision 1 SERVICE LETTER REVISION SL750-71-13 TRANSMITTAL SHEET This sheet transmits Revision 1 to SL750-71-13. A. Attaches the latest revision of the Rolls-Royce Notice To Operators (NTO) Number

More information

User manual for awning blind AMZ Z-Wave

User manual for awning blind AMZ Z-Wave GB User manual for awning blind AMZ ZWave Contents 1. Safety standards...2 2. Description...3 3. Programming the appliance...4 4. Association Groups...5 5. Compatibility of other producers appliances in

More information

UNODOS + / FLOCDOS +

UNODOS + / FLOCDOS + Operation manual UNODOS+ / FLOCDOS+ (01-09) page 1 of 7 UNODOS + / FLOCDOS + Table of contents page 1. Technical description... 2 1.1 The function... 2 1.2 Technical details... 2 1.3 The dosing performance...

More information

YMA TRAINING CATALOG 2017

YMA TRAINING CATALOG 2017 E Learning Solutions Centum VP Virtual Operator Trainer Process, Safety and basic Engineering courses Safe System of Work Range Safety Awareness range Environmental Range Process Operation and technology

More information

Hiway Gateway Specification and Technical Data

Hiway Gateway Specification and Technical Data L Hiway Gateway Specification and Technical Data HG03-400 8/92 detergant coffee chocolate Page 2 TDC 3000 Hiway Gateway Specification and Technical Data Introduction This publication defines the significant

More information

Penberthy Series LL, LM, LH, GL and GH Jet Pumps for Pumping Liquids

Penberthy Series LL, LM, LH, GL and GH Jet Pumps for Pumping Liquids Practical, simple and cost-effective alternatives for process industries to pump a range of liquids Features Simple design with no moving parts to wear out. No lubrication required. Virtually maintenance-free.

More information

Training Manual. Hand Rope Pump, P Model. Module 1: Production

Training Manual. Hand Rope Pump, P Model. Module 1: Production Training Manual PI-Model Rope Pump, Module 1, Production Training Manual Hand Rope Pump, P Model Module 1: Production June 2006, Chibombo, Zambia July 2006, Chimoio, Mozambique Arrakis September 2006 Arrakis

More information

DECISION NUMBER NINETEEN TO THE TREATY ON OPEN SKIES

DECISION NUMBER NINETEEN TO THE TREATY ON OPEN SKIES DECISION NUMBER NINETEEN TO THE TREATY ON OPEN SKIES OSCC.DEC 19 12 October 1994 SUPPLEMENTARY PROVISIONS FOR THE COMPLETION OF THE MISSION PLAN AND FOR THE CONDUCT OF AN OBSERVATION FLIGHT The Open Skies

More information

200-BP-CAL-KIT. Sphygmomanometer Calibration Kit INSTRUCTION MANUAL

200-BP-CAL-KIT. Sphygmomanometer Calibration Kit INSTRUCTION MANUAL 200-BP-CAL-KIT Sphygmomanometer Calibration Kit INSTRUCTION MANUAL Netech Corporation 110 Toledo Street Farmingdale N.Y. 11735 Phone: 631-531-0100 Fax: 631-531-0101 www.netechcorporation.com Sphygmomanometer

More information

NOISE AND FLIGHT PATH MONITORING SYSTEM MELBOURNE QUARTERLY REPORT JULY - SEPTEMBER 2011

NOISE AND FLIGHT PATH MONITORING SYSTEM MELBOURNE QUARTERLY REPORT JULY - SEPTEMBER 2011 NOISE AND FLIGHT PATH MONITORING SYSTEM MELBOURNE QUARTERLY REPORT JULY - SEPTEMBER 211 Date Version Comments Page 2 Foreword Airservices Australia has established a Noise and Flight Path Monitoring System

More information

NOISE AND FLIGHT PATH MONITORING SYSTEM MELBOURNE QUARTERLY REPORT JULY - SEPTEMBER 2013

NOISE AND FLIGHT PATH MONITORING SYSTEM MELBOURNE QUARTERLY REPORT JULY - SEPTEMBER 2013 NOISE AND FLIGHT PATH MONITORING SYSTEM MELBOURNE QUARTERLY REPORT JULY - SEPTEMBER 213 Date Version Comments Page 2 Foreword Airservices Australia has established a Noise and Flight Path Monitoring System

More information

NOISE AND FLIGHT PATH MONITORING SYSTEM MELBOURNE QUARTERLY REPORT OCTOBER - DECEMBER 2012

NOISE AND FLIGHT PATH MONITORING SYSTEM MELBOURNE QUARTERLY REPORT OCTOBER - DECEMBER 2012 NOISE AND FLIGHT PATH MONITORING SYSTEM MELBOURNE QUARTERLY REPORT OCTOBER - DECEMBER 212 Date Version Comments Page 2 Foreword Airservices Australia has established a Noise and Flight Path Monitoring

More information

Pump Fillage Calculation (PFC) Algorithm for Well Control

Pump Fillage Calculation (PFC) Algorithm for Well Control 6 th Annual Sucker Rod Pumping Workshop Wyndham Hotel, Dallas, Texas September 14 17, 2010 Pump Fillage Calculation (PFC) Algorithm for Well Control Victoria Ehimeakhe, Ph.D. Weatherford Introduction For

More information

COMPLETE COMPOSITE CURING SOLUTIONS

COMPLETE COMPOSITE CURING SOLUTIONS COMPLETE COMPOSITE CURING SOLUTIONS Applications Composite Curing Composite Repair Prepregs Wet Lay-ups Resin Infusion Metal Bonding Composite Fabrication Engineered Solutions Industries Aviation Marine

More information

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT JULY - SEPTEMBER 2011

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT JULY - SEPTEMBER 2011 NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT JULY - SEPTEMBER 211 Date Version Comments Page 2 Foreword Airservices Australia has established a Noise and Flight Path Monitoring System

More information

WEIGHT, BALANCE & EQUIPMENT LIST

WEIGHT, BALANCE & EQUIPMENT LIST WEIGHT, BALANCE & EQUIPMENT LIST For Aircraft Fitted with 65litre Fuel Tank P/No 4217092 Table of Contents 6.1. Introduction 2 6.2. Aircraft Weight Record 2 6.3. Loading System 3 6.3.1. General 3 6.3.2.

More information

Model Crosspoint Matrix

Model Crosspoint Matrix Model 3000 4380 256 Crosspoint Matrix 90401270 Page 1 All technical data and specifications in this publication are subject to change without prior notice and do not represent a commitment on the part

More information

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT OCTOBER - DECEMBER 2013

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT OCTOBER - DECEMBER 2013 NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT OCTOBER - DECEMBER 213 Date Version Comments Page 2 Foreword Airservices Australia has established a Noise and Flight Path Monitoring System

More information

Eclipse Hermetic Gas Boosters Series HB

Eclipse Hermetic Gas Boosters Series HB Datasheet 620 7/6/2012 Eclipse Hermetic Gas Boosters Series HB Version 1.1 Type Designations The booster is identified by catalog model, assembly number, and ordering part number. The catalog model number

More information

Gas Conversion Kits and Instructions

Gas Conversion Kits and Instructions Gas Conversion Kits and Instructions INSTALLATION FORM RGM 432/433-GC (Version D.1) Obsoletes Form RGM 432/433-GC (Version D) APPLIES TO: Model FT and Model SFT All gas conversion must be done by a qualified

More information

34070 Sec13 SpecialtyV1 6/21/03 12:17 PM Page 339 SPECIALTY TOOLS 13

34070 Sec13 SpecialtyV1 6/21/03 12:17 PM Page 339 SPECIALTY TOOLS 13 SPECIALTY TOOLS 13 TELESCOPIC MAGNETIC RETRIEVING TOOL Versatile telescoping handle and all-angle ball joint. 2375 16-3 4" to 26-3 4".40 Fed l Specs.: GGG-F-360B INSPECTION MIRRORS Versatile all-angle

More information

Technical Standard Order

Technical Standard Order Department of Transportation Federal Aviation Administration Aircraft Certification Service Washington, DC TSO-C145a Effective Date: 09/19/02 Technical Standard Order Subject: AIRBORNE NAVIGATION SENSORS

More information

NASA S SPACE GRANT MIDWEST HIGH-POWER ROCKET COMPETITION THE ROLL/ORIENTATION CHALLENGE

NASA S SPACE GRANT MIDWEST HIGH-POWER ROCKET COMPETITION THE ROLL/ORIENTATION CHALLENGE NASA S SPACE GRANT 2017-2018 MIDWEST HIGH-POWER ROCKET COMPETITION THE ROLL/ORIENTATION CHALLENGE SPRING 2018 COMPETITION LAUNCH HOSTED BY THE MN SPACE GRANT CONSORTIUM AND BY TRIPOLI MN Informational

More information

B 270 Superwite D Requirements deviating from these specifications must be defined in writing in a customer agreement.

B 270 Superwite D Requirements deviating from these specifications must be defined in writing in a customer agreement. B 270 uperwite B 270 uperwite D 0092 B 270 uperwite is a clear high transmission crown glass (modified soda-lime glass) available in form of sheets, optical rods, profiled rods, strips and chain moulded

More information

TRT800 ATC Transponder Mode A, A-C, S P/N 800ATC-(1XX)-(1XX) Operation Manual. Document No.: e Revision 1.00 Datum:

TRT800 ATC Transponder Mode A, A-C, S P/N 800ATC-(1XX)-(1XX) Operation Manual. Document No.: e Revision 1.00 Datum: TRT800 ATC Transponder Mode A, A-C, S P/N 800ATC-(1XX)-(1XX) Operation Manual Document No.: 03.2101.010.11e Revision 1.00 Datum: 19.04.2006 Gewerbestraße 2 86875 Waal phone: 08246 / 96 99-0 fax: 08246

More information

AIRSERVICES AUSTRALI A

AIRSERVICES AUSTRALI A AIRSERVICES AUSTRALI A NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT JANUARY - MARCH 211 Page 2 Foreword Airservices Australia has established a Noise and Flight Path Monitoring System

More information

The Past, Present, and Future of Nortek and Glider Measurements

The Past, Present, and Future of Nortek and Glider Measurements The Past, Present, and Future of Nortek and Glider Measurements Peter J. Rusello Scientist Nortek Since 2005, Nortek has collaborated with leading researchers to develop specialized acoustic Doppler current

More information

TANK MONITOR MODEL # (12V DC) (24V DC) (32V DC) OPERATION AND INSTALLATION INSTRUCTIONS

TANK MONITOR MODEL # (12V DC) (24V DC) (32V DC) OPERATION AND INSTALLATION INSTRUCTIONS TANK MONITOR MODEL # 1510012 (12V DC) - 1510024 (24V DC) - 1510032 (32V DC) OPERATION AND INSTALLATION INSTRUCTIONS WARNING: Raritan Engineering Company,Inc.recommends that a qualified person install this

More information

Final. Hydroacoustic and Airborne Monitoring at the Naval Station. Mayport Interim Report June 2015

Final. Hydroacoustic and Airborne Monitoring at the Naval Station. Mayport Interim Report June 2015 Final Hydroacoustic and Airborne Monitoring at the Naval Station Submitted to: Naval Facilities Engineering Command Atlantic under HDR Environmental, Operations and Construction, Inc. Contract No. N62470-10-D-3011,

More information

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E. Prepared for: Prepared by: Marquette County Road Commission Coleman Engineering Company Marquette, Michigan Iron Mountain, MI December 2011 Hydraulic Report Trail 5 Snowmobile Trail Over Mulligan Creek

More information

RIGGING & TRADESHOW SUSPENSION APPLICATIONS

RIGGING & TRADESHOW SUSPENSION APPLICATIONS RIGGING & TRADESHOW SUSPENSION APPLICATIONS VOLUME VI 1 GRIPLOCK SYSTEMS Griplock Systems has been providing manufacturers and contractors with the world s highest quality and most reliable cable suspension

More information

SUPPLEMENT OCTOBER CITATION PERFORMANCE CALCULATOR (CPCalc) MODEL AND ON REVISION 8 68FM-S17-08

SUPPLEMENT OCTOBER CITATION PERFORMANCE CALCULATOR (CPCalc) MODEL AND ON REVISION 8 68FM-S17-08 MODEL 680 680-0001 AND ON CITATION PERFORMANCE CALCULATOR (CPCalc) COPYRIGHT 2005 CESSNA AIRCRAFT COMPANY WICHITA, KANSAS, USA 68FM-S17-08 REVISION 8 17 OCTOBER 2005 7 MARCH 2014 U.S. S17-1 SECTION V -

More information

AIRSERVICES AUSTRALI A

AIRSERVICES AUSTRALI A AIRSERVICES AUSTRALI A NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT APRIL - JUNE 211 Date Version Comments Page 2 Foreword Airservices Australia has established a Noise and Flight

More information

EASA.SAS.A.094 Sukhoi Su-31 Page 1 of 6 Issue 5 20 January European Aviation Safety Agency EASA SPECIFIC AIRWORTHINESS SPECIFICATION.

EASA.SAS.A.094 Sukhoi Su-31 Page 1 of 6 Issue 5 20 January European Aviation Safety Agency EASA SPECIFIC AIRWORTHINESS SPECIFICATION. EASA.SAS.A.094 Sukhoi Su-31 Page 1 of 6 European Aviation Safety Agency EASA SPECIFIC AIRWORTHINESS SPECIFICATION for SUKHOI SU-31 This Specific Airworthiness Specification is issued in accordance with

More information

ENR 1.7 ALTIMETER SETTING PROCEDURES

ENR 1.7 ALTIMETER SETTING PROCEDURES AIP LEBANON ENR 1.7-1 11 APR 2008 ENR 1.7 ALTIMETER SETTING PROCEDURES 1. Introduction: 1.1 The procedures herein describe the method used in providing adequate vertical separation between aircraft and

More information

Polyamide 12 as Liner Material in Pipelines

Polyamide 12 as Liner Material in Pipelines Polyamide 12 as Liner Material in Pipelines Osvaldo Gotera, Dr. Daniel Demicoli, Jürgen Franosch Evonik s 6 th Oil & Gas Symposium Houston, the 4 th of October 2016 Problem Statement How to cost effectively

More information

NK Multi-stage submersible pumps

NK Multi-stage submersible pumps NK Multi-stage submersible pumps PERFORMANCE RANGE Flow rate up to 120 l/min (7.2 m³/h) Head up to 10 m APPLICATION LIMITS Maximum liquid temperature +40 C Maximum sand content 0 g/m³ 20 m maximum immersion

More information

7-Nov-15 PHYS Elastic Collision. To study the laws of conservation of momentum and energy in an elastic collision. Glider 1, masss m 1.

7-Nov-15 PHYS Elastic Collision. To study the laws of conservation of momentum and energy in an elastic collision. Glider 1, masss m 1. Objective Elastic Collision To study the laws of conservation of momentum and energy in an elastic collision. Introduction If no net external force acts on a system of particles, the total linear momentum

More information

CASM electric cylinders

CASM electric cylinders CASM electric cylinders 2 The modular electric cylinder system CASM electric cylinders are ideally suited to performing fast and powerful linear movements. Unlike pneumatic or hydraulic cylinders, CASM

More information

RFC Dallas, Inc. AIRCRAFT QUESTIONNAIRE

RFC Dallas, Inc. AIRCRAFT QUESTIONNAIRE RFC Dallas, Inc. AIRCRAFT QUESTIONNAIRE Version 1.3 8/15/09 Name: Date: Aircraft: Cherokee 180 Model: PA-28-180 Registration Number: N4746L Answer the following questions by using the information contained

More information

Introduction 2. Other Applicable Documents 2. Scope of Delivery 3. Attaching the Snap-on Ferrite Suppressor 4

Introduction 2. Other Applicable Documents 2. Scope of Delivery 3. Attaching the Snap-on Ferrite Suppressor 4 H-206.F2 6-Axis Precision Alignment System Contents Introduction 2 Other Applicable Documents 2 Scope of Delivery 3 Attaching the Snap-on Ferrite Suppressor 4 Connecting the Hexapod to the C-887 with the

More information

C-172-S Checkout Questionnaire

C-172-S Checkout Questionnaire C-172-S Checkout Questionnaire Name Date Certificate and Ratings Certificate# Total Time Instructor (if applicable) Airspeeds 1. What are the following V speeds in KIAS? Vr Vx Vy Vs Vso Vno Vne Va Vfe

More information

Aerospace. Light Weight and Flexible Qualified to Industry Standards. Fluid Conveyance

Aerospace. Light Weight and Flexible Qualified to Industry Standards. Fluid Conveyance Aerospace Fluid Conveyance Aeroquip Brand Rubber Hose, & Assemblies for Aerospace Applications Light and Flexible Qualified to Industry Standards 303, 302A Medium Pressure Hose,, and Assemblies Construction:

More information

July 2018 RV PRODUCTION. Overview of towable and motorised recreational vehicles manufactured in Australia. Data Provided by nemaustralasia

July 2018 RV PRODUCTION. Overview of towable and motorised recreational vehicles manufactured in Australia. Data Provided by nemaustralasia y RV PRODUCTION Overview of towable and motorised recreational vehicles manufactured in Australia. Data Provided by nemaustralasia This research is undertaken in partnership between the National Association

More information

X-Series Hexapod Assembly Instructions

X-Series Hexapod Assembly Instructions X-Series Hexapod Assembly Instructions General Warnings and Cautions Danger (May cause serious injury or death) Keep water, flammables, solvents and other liquids clear from actuator. Never place fingers,

More information

49 CFR PART 571 FMVSS No. 302 FLAMMABILITY OF INTERIOR MATERIALS

49 CFR PART 571 FMVSS No. 302 FLAMMABILITY OF INTERIOR MATERIALS 49 CFR PART 571 FMVSS No. 302 FLAMMABILITY OF INTERIOR MATERIALS Development of Standards No. Revised Issue Date Effective Date 1. 36FR22902 1971/12/2 2. 40FR14319 1975/3/31 3. 40FR42747 1975/9/16 4. 40FR56667

More information

Special edition paper Development of a Crew Schedule Data Transfer System

Special edition paper Development of a Crew Schedule Data Transfer System Development of a Crew Schedule Data Transfer System Hideto Murakami* Takashi Matsumoto* Kazuya Yumikura* Akira Nomura* We developed a crew schedule data transfer system where crew schedule data is transferred

More information

AXICOM COMPOSITE HOLLOW CORE INSULATORS STANDARD TYPES

AXICOM COMPOSITE HOLLOW CORE INSULATORS STANDARD TYPES AXICOM COMPOSITE HOLLOW CORE INSULATORS STANDARD TYPES Normal sheds 2 AXICOM composite hollow core Table of contents Table of contents Presentation 3 I Normal sheds How to design your own AXICOM Insulator?

More information

Process Guide Version 2.5 / 2017

Process Guide Version 2.5 / 2017 Process Guide Version.5 / 07 Jettware Overview Start up Screen () After logging in to Jettware you will see the main menu on the top. () Click on one of the menu options in order to open the sub-menu:

More information

3) There have some basic terminology of a flight plan and it is the fuel calculations

3) There have some basic terminology of a flight plan and it is the fuel calculations QUESTION BANK FLIGHT PLANNING (CHAPTER 1) Introduction to Flight Planning 1) It is a duty of flight operation officer (FOO) to do a flight plan before the aircraft want to fly. a) i. Give the definition

More information

REPORT IN-017/2011 DATA SUMMARY

REPORT IN-017/2011 DATA SUMMARY REPORT IN-017/2011 DATA SUMMARY LOCATION Date and time Thursday, 9 June 2011 at 09:40 UTC 1 Site Tenerife North Airport (GCXO), Tenerife AIRCRAFT Registration Type and model Operator EC-KDP PIPER PA-34-200T

More information

Pelican AMR Gateway User Guide

Pelican AMR Gateway User Guide Pelican AMR Gateway User Guide Document Reference: 8194 June 2016 Version: 2 Version Date Author Changes Number 1 Feb 2014 Bettina Rubek-Slater 2 Jun 2016 Sam Smith Branding updated API section updated

More information

PublicVue TM Flight Tracking System. Quick-Start Guide

PublicVue TM Flight Tracking System. Quick-Start Guide PublicVue TM Flight Tracking System Quick-Start Guide DISCLAIMER Data from the PublicVue TM Flight Tracking System (FTS) is being provided to the community as an informational tool, designed to increase

More information

RETRACTABLE HOSE REEL

RETRACTABLE HOSE REEL RETRACTABLE HOSE REEL 30 METRE HOSE LENGTH MODEL NO. YWRHR30A OPERATING INSTRUCTIONS INTRODUCTION - MODEL NO. YWRHR30A This reel is made of high-quality materials and parts, driven and released by a spring,

More information

6275-S1 PNEUMATIC DRILL OPERATING MANUAL ORIGINAL INSTRUCTIONS. P/N November 2014 Revision 1

6275-S1 PNEUMATIC DRILL OPERATING MANUAL ORIGINAL INSTRUCTIONS. P/N November 2014 Revision 1 6275-S1 PNEUMATIC DRILL OPERATING MANUAL ORIGINAL INSTRUCTIONS P/N 80749 November 2014 Revision 1 2014 Climax Portable Machining and Welding Systems or its subsidiaries. All rights reserved. Except as

More information

QuickSilver Controls, Inc. Application Note:QCI-AN034

QuickSilver Controls, Inc. Application Note:QCI-AN034 Date: 18 July 2008 www.quicksilvercontrols.com Rotary Knife Included files: QCI-AN034 Rotary Knife.pdf: This document Rotary Knife Simple - Fixed.qcp Rotary Knife Simple - Dynamic.qcp Rotary Knife - Registration.qcp

More information

Mathey Dearman's revolutionary MagnaCut XM enables

Mathey Dearman's revolutionary MagnaCut XM enables Pipe and Plate Cutter & Welder (PATENTED) Mathey Dearman's revolutionary enables the welder and pipefitter to cut, bevel, and even weld steel pipe and steel plate without having to secure the machine to

More information

Blocking Sea Intrusion in Brackish Karstic Springs

Blocking Sea Intrusion in Brackish Karstic Springs European Water 1/2: 17-23, 3. 3 E.W. Publications Blocking Sea Intrusion in Brackish Karstic Springs The Case of Almiros Spring at Heraklion Crete, Greece A. Maramathas, Z. Maroulis, D. Marinos-Kouris

More information

Flight inspection service of LGS Radionavigation Aids in 2017

Flight inspection service of LGS Radionavigation Aids in 2017 Annex 5 1. Subject TECHNICAL SPECIFICATION Flight inspection service of LGS Radionavigation Aids in 2017 (identification Nr. LGS 2016/107) 1.1. Flight inspection of LGS radio navigation aids for one year.

More information

US National and International Records

US National and International Records US National and International Records http://www.fai.org/gliding/ http://naa.aero/ Revised 10/1/2015 Notification of a record flight must be provided to NAA within 7 days of the flight we strongly recommend

More information

Antenna Tower Positioning System

Antenna Tower Positioning System Model 1052 Antenna Tower Positioning System User Manual (Antenna not included) ETS-Lindgren L.P. reserves the right to make changes to any product described herein in order to improve function, design,

More information

Stratomaster Maxi Single

Stratomaster Maxi Single Stratomaster Maxi Single ASI-3 Airspeed indicator (ASI) with automatic flight log The ASI-3 airspeed indicator is a 3.5 instrument that provides a wide range airspeed indication in both digital and analog

More information

CHAPTER 22 WEIGHT CONTROL OF AIRCRAFT

CHAPTER 22 WEIGHT CONTROL OF AIRCRAFT May 2016 Page 1 of 8 CHAPTER 22 WEIGHT CONTROL OF AIRCRAFT 1. Introduction 1.1. The mass and centre of gravity of aircraft should be determined prior to the initial issuance of the Certificate of Airworthiness.

More information

Cessna 182R Initial Quiz Tail: N2365C Engine manufacturer, RPM. 7. How many fuel system drains are there?, where are they located?

Cessna 182R Initial Quiz Tail: N2365C Engine manufacturer, RPM. 7. How many fuel system drains are there?, where are they located? PILOT INSTRUCTOR_ DATE Cessna 182R Initial Quiz Tail: N2365C 04-17-08 Maximum normal category takeoff gross weight: lbs. Useful normal category load: lbs. Empty weight: lbs. What is the maximum landing

More information

, -400 Combi, -400ER Freighter, -400ER Freighter Domestic

, -400 Combi, -400ER Freighter, -400ER Freighter Domestic 9.0 SCALED 747-400 DRAWINGS 9.1 9.5 747-400, -400 Combi, -400ER 9.6 9.10 747-400 Freighter, -400ER Freighter 9.11 9.15 747-400 Domestic DECEMBER 2002 187 9.0 SCALED DRAWINGS The drawings in the following

More information

Pareto s annual Oil & Offshore Conference: Presentation of Kværner ASA Jan Arve Haugan, President & CEO

Pareto s annual Oil & Offshore Conference: Presentation of Kværner ASA Jan Arve Haugan, President & CEO Pareto s annual Oil & Offshore Conference: Presentation of Kværner ASA Jan Arve Haugan, President & CEO 1 HSE our licence to operate Our HSE mindset is a core value We: strive continuously for zero harm

More information

WISH NEBRASKA INC CUSTOMER : LOCKWOOD TOWER FT SYSTEM PSI AT TOP OF PIVOT

WISH NEBRASKA INC CUSTOMER : LOCKWOOD TOWER FT SYSTEM PSI AT TOP OF PIVOT WISHNE-SAMPLE WISH NEBRASKA INC JANUARY 20, 2010 WISHNE-SAMPLE CUSTOMER : LOCKWOOD 2000 7 TOWER - 1317.98 FT SYSTEM 800 GPM @ 40 PSI AT TOP OF PIVOT FIELD : NELSON R3000 ROTATORS LEGAL : NELSON 20 PSI

More information

Valley Fliers 1402 Auburn Way North, #223 Auburn WA 98002

Valley Fliers 1402 Auburn Way North, #223 Auburn WA 98002 Valley Fliers 1402 Auburn Way North, #223 Auburn WA 98002 Instructor: Check Out Date: Phase 1: Pre-Flight Name: Certificate Number: Certificate Type: Ratings: Total Flight Time: Last 90 Days: Club check

More information

DOWN MANUAL. Aeros Ltd. St. Post-Volinskaya, 5 Kiev, UKRAINE

DOWN MANUAL. Aeros Ltd. St. Post-Volinskaya, 5 Kiev, UKRAINE DOWN HG & PG rescue parachute system MANUAL Aeros Ltd. St. Post-Volinskaya, 5 Kiev, 03061 UKRAINE Tel. +(380 44) 455 41 20 Fax. +(380 44) 455 41 16 E-mail: aerosint@aerosint.kiev.ua http://www.aeros.com.ua

More information

IGC-APPROVAL FOR GNSS FLIGHT RECORDER Recorder Name: Peschges VP-8 Level of Approval: All IGC Badges and Distance Diplomas

IGC-APPROVAL FOR GNSS FLIGHT RECORDER Recorder Name: Peschges VP-8 Level of Approval: All IGC Badges and Distance Diplomas THE FAI INTERNATIONAL GLIDING COMMISSION (IGC) GLOBAL NAVIGATION SATELLITE SYSTEM (GNSS) FLIGHT RECORDER (FR) APPROVAL COMMITTEE (GFAC) FAI web site: www.fai.org IGC web site: www.fai.org/gliding To: FAI

More information

Contents. Beam pump Controller. Energy Efficiency in On shore Exploration- Oil Pumping Application

Contents. Beam pump Controller. Energy Efficiency in On shore Exploration- Oil Pumping Application Energy Efficiency in On shore Exploration- Oil Pumping Application Beam pump Controller Contents Beam pump general Regeneration control ENA System Speed control for Beam Pumps and related problems Speed

More information

SSA BADGE & RECORD PROCEDURES GUIDE 2009 Including Changes effective 1 October 2009

SSA BADGE & RECORD PROCEDURES GUIDE 2009 Including Changes effective 1 October 2009 I. Planning Take advantage of online resources. At SSA.org, use links to Soaring Achievement, Soaring Badges, US & State Records, Badge Info, and Forms to access - - Badge & Record FAQ - SSA Official Observer

More information

Video Media Center - VMC 1000 Getting Started Guide

Video Media Center - VMC 1000 Getting Started Guide Video Media Center - VMC 1000 Getting Started Guide Video Media Center - VMC 1000 Getting Started Guide Trademark Information Polycom, the Polycom logo design, Video Media Center, and RSS 2000 are registered

More information

Power Tong Torque Manual

Power Tong Torque Manual Power Tong Torque Manual 1 Contents Power Tong Torque Monitor 1. Description:... 3 2. System Functions:... 3 3. Future Optional Functionality:... 3 4. Panel Display and Operation:... 6 4.1. Setting the

More information

CESSNA SECTION 5 PERFORMANCE

CESSNA SECTION 5 PERFORMANCE CESSNA SECTION 5 TABLE OF CONTENTS Page Introduction............................................5-3 Use of Performance Charts................................5-3 Sample Problem........................................5-4

More information

CASM electric cylinders The modular electric cylinder system

CASM electric cylinders The modular electric cylinder system CASM electric cylinders The modular electric cylinder system CASM electric cylinders are ideally suited to performing fast and powerful linear movements. Unlike pneumatic or hydraulic cylinders, CASM electric

More information

Old-Style Aging Cell 316 Stainless Steel mL Capacity. Part No Instruction Manual. Updated 8/21/2014 Ver. 1.7

Old-Style Aging Cell 316 Stainless Steel mL Capacity. Part No Instruction Manual. Updated 8/21/2014 Ver. 1.7 Old-Style Aging Cell 316 Stainless Steel - 500-mL Capacity Part No. 175-70 Instruction Manual Updated 8/21/2014 Ver. 1.7 OFI Testing Equipment, Inc. 11302 Steeplecrest Dr. Houston, Texas 77065 U.S.A. Tele:

More information

KGP 560. Enhanced Ground Proximity Warning System for General Aviation SEAMLESS SAFETY INTEGRATION THROUGH IHAS

KGP 560. Enhanced Ground Proximity Warning System for General Aviation SEAMLESS SAFETY INTEGRATION THROUGH IHAS KGP 560 Enhanced Ground Proximity Warning System for General Aviation SEAMLESS SAFETY INTEGRATION THROUGH IHAS KGP 560 GA-EGPWS Depicted here on the KMD 850 Multi-Function Display T HE H AZARD OF CFIT

More information

NORTHFIELD CORPORATION 1870 COMMERCE DR. DE PERE, WI UNITED STATES

NORTHFIELD CORPORATION 1870 COMMERCE DR. DE PERE, WI UNITED STATES 1 MANUFACTURER: MODEL: NORTHFIELD CORPORATION 1870 COMMERCE DR. DE PERE, WI 54115 UNITED STATES NORTHFIELD CLS SPECIFICATIONS: VOLTAGE: FREQUENCY: CURRENT: AIR: 115VAC-230VAC 50/60Hz 5 AMP 80 PSI (for

More information

Motion 2. 1 Purpose. 2 Theory

Motion 2. 1 Purpose. 2 Theory Motion 2 Equipment Capstone, motion sensor, meter stick, air track+ 2 gliders, 2 blocks, and index cards. Air Tracks In this experiment you will be using an air track. This is a long straight triangular

More information

ASTM E 1886 and ASTM E 1996 TEST REPORT. Report No.: A Rendered to: CORAL ARCHITECTURAL PRODUCTS Tuscaloosa, Alabama

ASTM E 1886 and ASTM E 1996 TEST REPORT. Report No.: A Rendered to: CORAL ARCHITECTURAL PRODUCTS Tuscaloosa, Alabama Architectural Testing ASTM E 1886 and ASTM E 1996 TEST REPORT Report No.: A2651.02 401 44 Rendered to: CORAL ARCHITECTURAL PRODUCTS Tuscaloosa, Alabama PRODUCT TYPE: 90 Corner Curtain Wall SERIES/MODEL:

More information

DURATION: The objective is a flight of at least 5 hours after release from tow.

DURATION: The objective is a flight of at least 5 hours after release from tow. The Silver Badge It s as Easy as 1,2,3 1. An easy gain of 3,281 feet after release from tow 2. A 5 hour flight with no other objective 3. A short, straight line flight of only 50km (31.1 miles). 4/12/2018

More information

BHP Billiton: A Strategy of Diversification

BHP Billiton: A Strategy of Diversification Olympic Dam, Australia BHP Billiton: A Strategy of Diversification Andrew Mackenzie Chief Executive Non-Ferrous 9 June 2010 Disclaimer Reliance on Third Party Information The views expressed here contain

More information

Alpha Systems AOA Classic & Ultra CALIBRATION PROCEDURES

Alpha Systems AOA Classic & Ultra CALIBRATION PROCEDURES Alpha Systems AOA Calibration Overview The calibration of the Alpha Systems AOA has 3 simple steps 1.) (On the Ground) Zero calibration 2.) (In-flight) Optimum Alpha Angle (OAA) calibration 3.) (In-flight)

More information

distance and time to descend from a given level or altitude. LO Find the frequency and/or identifiers of radio-navigation aids from charts.

distance and time to descend from a given level or altitude. LO Find the frequency and/or identifiers of radio-navigation aids from charts. Anne II to ED Decision 2016/008/R (1) For mass definitions, please refer to Chapter D. Syllabus 033 00 00 00 FLIGHT PLANNING AND MONITORING Aeroplane Helicopter / 033 01 00 00 FLIGHT PLANNING FOR VFR FLIGHTS

More information

[Docket No. FAA ; Directorate Identifier 2004-CE-24-AD; Amendment ; AD ]

[Docket No. FAA ; Directorate Identifier 2004-CE-24-AD; Amendment ; AD ] [Federal Register: December 16, 2004 (Volume 69, Number 241)] [Rules and Regulations] [Page 75236-75243] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr16de04-7] DEPARTMENT

More information

Design and Construction of Berm Breakwaters

Design and Construction of Berm Breakwaters Design and Construction of Berm Breakwaters Jentsje van der Meer - Van der Meer Consulting UNESCO-IHE Sigurdur Sigurdarson - Icelandic Road and Coastal Administration IceBreak Consulting Engineers New

More information

Using HARDSIL to minimize the impact of extreme temperature on CMOS integrated circuits. VORAGO TECHNOLOGIES Austin, Texas

Using HARDSIL to minimize the impact of extreme temperature on CMOS integrated circuits. VORAGO TECHNOLOGIES Austin, Texas Using HARDSIL to minimize the impact of extreme temperature on CMOS integrated circuits VORAGO TECHNOLOGIES Austin, Texas Introduction There is a growing trend to increase the sophistication of electronics

More information

Physics Activity Guide

Physics Activity Guide Physics Activity Guide 2 TABLE OF CONTENTS Earthbound Astronauts 3 Mechanics of Motion 4 Angles and Arcs 5 Angles and Arcs II 6 Viking Voyager 7 Bamboozler 8 Zulu 9 Finnish Fling 10 Autobahn 11 Scrambler

More information

USGS Methods of Collecting High Water Marks (HWMs)

USGS Methods of Collecting High Water Marks (HWMs) USGS Methods of Collecting High Water Marks (HWMs) A. Thomas Ruby III Supervisory Hydrologist Indiana-Kentucky Water Science Center U.S. Department of the Interior U.S. Geological Survey Outline: Overview

More information

Toyostove Error Code EE 2 (EE 6)

Toyostove Error Code EE 2 (EE 6) Toyostove Error Code EE 2 (EE 6) WARNING Rural Energy Enterprises, Inc. does not accept liability for the improper use of this information. Installation, service, and maintenance of heating equipment should

More information

AVIAT AIRCRAFT INC. P.O. Box South Washington Afton, WY USA Tel: Fax:

AVIAT AIRCRAFT INC. P.O. Box South Washington Afton, WY USA Tel: Fax: DATE: 14 June 1999 REVIION: A (12/14/99) AIRCRAFT: HUKY A-1/A-1A/A-1B P.O. Box 1240 672 outh ashington Afton, Y 83110 UA Tel: 307-886-3151 Fax: 307-886-9674 e-mail: aviat@aviataircraft.com UBJECT: Fluidyne

More information

Unit 6: Probability Plotting

Unit 6: Probability Plotting Unit 6: Probability Plotting Ramón V. León Notes largely based on Statistical Methods for Reliability Data by W.Q. Meeker and L. A. Escobar, Wiley, 1998 and on their class notes. 9/12/2004 Stat 567: Unit

More information

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 2 AUGUST 13 TH - AUGUST 18 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606

More information

ANSWER BOOK. Everest Primus Full Size Cylinders High Security with Geographical Exclusivity for Dealers and End Users

ANSWER BOOK. Everest Primus Full Size Cylinders High Security with Geographical Exclusivity for Dealers and End Users Answer Book ANSWER PRIMUS DO NOT DUPLICATE Pat. 5,809,816 PRIMUS Everest Primus Full Size Cylinders PRIMUS High Security with Geographical Exclusivity for Dealers and End Users PAT. 5,715,717 Everest Conventional

More information