Better Access to Tokyo Metropolitan Gateways
|
|
- Silas Wells
- 5 years ago
- Views:
Transcription
1 Ministry of Land, Infrastructure, Transport and Tourism CIVIL AVIATION BUREAU, JAPAN Better Access to Tokyo Metropolitan Gateways Facility Improvement, Procedural Improvement, and Capacity Increase at Narita & Haneda Int l Airports 20 June 2009 Shigeru TAKANO Civil Aviation Bureau of Japan
2 Narita Airport -Facility Improvement - Extension of B R/W 2,180m 2,500m Including Installation/ Relocation of Nav. Aids and Aeronautical Lighting Open on 22 October 2009 (5 months in advance of the original plan ) Improvement of Taxiways New eastern taxiway of B R/W (July 2009) Improvement of the existing taxiway relating to B R/W. New Apron to provide more Parking Spots Open in March
3 Facility Improvement at Narita Airport New Taxiway (Open in July 2009) +320m Unacquired Land Original Parallel Runway (2500m) Interim Parallel Runway 2180m Cross Runway 3200m New Parallel Runway 2500m (Open on 22 nd October 2009) PTB2 Maintenance Area Cargo Area PTB1 Runway A 4000m 2
4 Facility Improvement will result in: Q Improved Capability of the Airport in case of Emergency (Closure of A R/W) When the A R/W was closed due to the aircraft accident in 2009, many flights were cancelled due to the physical limitations of the current B R/W. Q Relaxation of Restrictions on Aircraft Type to be Operated on B R/W In principle, all large-capacity, long-haul aircraft type except A380 can be accommodated. Q Capacity Increase (from S2010) 3
5 Narita Airport -Procedural Improvement - Current Procedures on the use of runways Take-offs and Landings shall be conducted using the preassigned runway. (Time slots are allocated specifying the runway to be used.) Improved Procedures (from S2010) Restrictions mentioned above will be lifted, in principle. (Time slots will be allocated without specifying runway. Runway to be used will be assigned by ATC in the course of operations.) Exceptions due to noise problems JST: Only A runway may be used JST: Current procedures will remain as they are 4
6 MLIT Improved Handling Capability, which may lead to; Q Q Q increased airport capacity, more flexibility for airlines to obtain their desired time slots reduced fuel consumption resulted from elimination or reduction of waiting/ holding time; and Change of U/L rule, as follows; Q Q Procedural Improvement will result in: Until W2009: U/L rule will be applied on the basis of preassigned runway. (Use of runway different from preassigned runway will be considered as non-use.) From S2010: Runway used will not affect the application of U/L rule, except for JST, during which the current practice will continue to apply. 5
7 Narita Airport -Capacity Increase - Based on the agreement with the local community, from S2010, number of take-offs and landings per year will be increased. approx. 200,000 approx. 220,000 Accordingly, number of slots per day will be increased. 370 (A R/W) (B R/W) 604 in total In addition, number of slots per hour will be increased. 32 (A R/W) + 14 (B R/W) 54 in total (Number of take-offs and landings shall be up to 30 per hour respectively. (No changes in this respect.)) As in previous cases, JCAB has been negotiating with its bilateral partners on additional traffic rights to and from Narita. 6
8 Capacity Increase: MLIT Special Treatment in JST As already presented, during JST, time slots will be allocated specifying the runway to be used. Number of slots at A R/W JST : JST : JST : 10 Number of slots at B R/W JST : 16 (currently 14) JST : 8 (currently 7) JST : 10 Firebreak Zone It will be established twice per day, as it is done currently. Number of slots during Firebreak Zone will be 21 per 30 min. 7
9 Narita Airport -Others - Further Increase of Capacity Narita International Airport Company (NAA), in cooperation with JCAB, started study on further increase of airport capacity up to 300,000 take-offs and landings per year. Punctuality To realize the benefit of capacity increase in 2010 and to enhance the consideration on future capacity increase, airlines are strongly requested to operate very punctually. Especially, delays during JST have been a serious problem for NAA, JCAB, and the local community. 8
10 Haneda Airport -Facility Improvement - Opening of D R/W (2,500m) (Oct. 2010) Development of Taxiways, Aprons (Oct. 2010) Construction of International Flight Service Area (Passenger and Cargo Terminals) (Oct. 2010) Extension of C R/W (3000m 3360m) (Approx. 5 years from now) 9
11 Facility Re-expansion Improvement Project at at Haneda Airport Extension of C Runway (open in approx. 5 years) C Runway 3,000m 360m 接続部 D Runway Construction 滑走路整備事業 (open in October 2010) D Runway 2,500m 多摩川河口法線 Connection 接続部 B Runway 2,500m Cargo 貨物ターミナル地区 Terminal Passenger 旅客ターミナル地区 Terminal 2 Domestic Flight Service Area Cargo 貨物ターミナル地区 Terminal Passenger 旅客ターミナル地区 Terminal 1 A Runway 3,000m 給油 Maintenance 整備地区 Area地区 International 国際線地区 Flight Service Area Pier 桟橋側 section Pier 桟橋部 section Reclamatio Elastic 伸縮装置 equipmentsn 埋立側 area 台座コンクリート エプロンゾーン Apron Cargo 国際貨物ゾーン Terminal International 国際線地区整備事業 Flight Service Area Development (PFI 事業 ) (open in October 2010) Passenger 国際旅客ゾーン Terminal Arterial Ring Road 環八通り NO.8 東京モノレール Tokyo Monorail 京浜急行 Keikyu Railway Line A 滑走路平行方向断面図 cross section of runway 10
12 Introduction of International Scheduled Services To Haneda Airport: Based on the decision made by the Cabinet, international scheduled services will be introduced at Haneda Airport from Oct. 2010, making use of additional slots, as follows: daytime hours: 30,000 slots per year will be used for short-haul passenger services covering business demand to Asian major cities late night and early morning hours: 30,000 slots per year will be used for passenger and/or all-cargo services to worldwide major cities 11
13 Introduction of International Scheduled Services To Haneda Airport (Cont.): JCAB has been negotiating with its bilateral partners on the traffic rights to and from Haneda Airport. Slot coordination will be done by NRT/KIX schedule coordination office. Detailed information will be presented to the next session of the Conference in November. 12
14 MLIT Thank you very much! Q & A 13
Haneda Airport Int l Terminal Station 羽田空港国際線ターミナル
DIRECTIONS FROM HANEDA AIRPORT TO ICU If you are arriving at Haneda Airport, take the Keihin Kyuko Train 京浜急行電鉄 (Keikyu for short) to arrive Tokyo Station transferring at Shinagawa Station. The Arrival
More informationCommission on the Promotion of Business Jets. Interim Report
Commission on the Promotion of Business Jets Interim Report June 2011 Contents Introduction 1 1. Current Situation Regarding Business Jets 2 2. Specific Initiatives to Promote Business Jets 7 3. Working
More informationMinistry of Land, Infrastructure, Transport and Tourism. Civil Aviation Bureau. Improvements in Business Aviation in Japan
Ministry of Land, Infrastructure, Transport and Tourism Civil Aviation Bureau Improvements in Business Aviation in Japan Ministry of Land, Infrastructure, Transport and Tourism April 2016 ABACE2016 Asian
More informationEN-024 A Simulation Study on a Method of Departure Taxi Scheduling at Haneda Airport
EN-024 A Simulation Study on a Method of Departure Taxi Scheduling at Haneda Airport Izumi YAMADA, Hisae AOYAMA, Mark BROWN, Midori SUMIYA and Ryota MORI ATM Department,ENRI i-yamada enri.go.jp Outlines
More informationReference Material. Year Ended FY09 Earnings Explanatory Meeting
Year Ended FY09 Earnings Explanatory Meeting Reference Material I. Summary of our business and characteristics II. III. IV. Efforts related to the Tokyo International Airport Re-expansion Project Changes
More informationARRIVAL INSTRUCTIONS
ARRIVAL INSTRUCTIONS In planning your trip to Japan, please read these arrival instructions carefully, for they provide important and useful information for your smooth arrival in Japan. IMPORTANT DATES
More informationFirst Half-Year Earnings Explanatory Meeting April 1 to September 30, Reference Material
First Half-Year Earnings Explanatory Meeting April 1 to September 30, 2010 Reference Material I. Summary of our business and characteristics II. III. IV. Efforts related to the Tokyo International Airport
More informationIntroduction of HANEDA and Infrastructure investment by Japan. Oct 18, 2014 Japan Airport Terminal Co., Ltd.
Introduction of HANEDA and Infrastructure investment by Japan Oct 18, 2014 Japan Airport Terminal Co., Ltd. INDEX 1. Overview of HANEDA Airport and Functional Enhancement of Japan s Metropolitan Airports
More informationImprovements for Business Aviation in Japan
Ministry of Land, Infrastructure, Transport and Tourism Civil Aviation Bureau Improvements for Business Aviation in Japan Ministry of Land, Infrastructure, Transport and Tourism October 21, 2014 NBAA2014
More informationOutline of Japan Schedule Coordination (JSC)
2018 Version Outline of Japan Schedule Coordination (JSC) To alleviate the congestion at busy airports! Japan Schedule Coordination (JSC) Japan Aeronautic Association (JAA) Service Outline of Japan Schedule
More informationChapter 4 Noise. 1. Airport noise
Chapter 4 Noise 1. Airport noise Airport noise includes the following: 1) Flight noise (engine noise during takeoff and landing) 2) Ground noise (i) Aircraft engine operation noise on the ground (ii) APU
More informationResearch on Flight Operational Efficiency for Fuel and Noise
Research on Flight Operational Efficiency for Fuel and Noise Japan Aerospace Exploration Agency Aeronautical Technology Directorate Technology Demonstration Research Unit Naoki Matayoshi Outline 1. Background
More informationAviation Policy for the Advent of the LCC Age. Akihiko TAMURA. January 8 th 2013 Director-General, Civil Aviation Bureau,
Aviation Policy for the Advent of the LCC Age January 8 th 213 Director-General, Civil Aviation Bureau, Ministry of Land, Infrastructure, Transport and Tourism Akihiko TAMURA Ministry of Land, Infrastructure,
More informationNotice Concerning Change the Lease Contract of IIF Haneda Airport Maintenance Center, Tokyo
Industrial & Infrastructure Fund Investment Corporation (Tokyo Stock Exchange Company Code: 3249) News Release August 9, 2010 Notice Concerning Change the Lease Contract of IIF Haneda Airport Maintenance
More informationNarita International Airport Today and Outlook for the Future
Narita International Airport Today and Outlook for the Future TFWA Asia Pacific Exhibition & Conference Workshop A : Rediscovering Japan 8 May, 2017 Hideki Hayashida Senior Vice President and Executive
More informationBackground of the project
D runway of Tokyo International Airport DESIGN-BUILD PROCUREMENT SCHEME FOR THE EXPANSION OF THE TOKYO INTERNATIONAL AIRPORT Mitsuhiko OKADA The Overseas Coastal Area Development Institute of Japan (OCDI)
More informationTWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)
INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda
More information30th IBSC Conference - Stavanger, Norway June, Takahiro TOKUI
Bird Strike Control and Reduction in JAPAN 30th IBSC Conference - Stavanger, Norway 25-29 June, 2012 Takahiro TOKUI Civil Aviation Bureau (CAB), Ministry of Land Infrastructure, Transport and Tourism (MLIT),
More informationThe JITI Journal. Welcome. In This Issue: Quick Links. Upcoming Events. Our Sponsor PAST:
The JITI Journal Volume 3, Issue 3 May 2016 Quick Links Welcome Visit our website. The JITI Journal is a bimonthly publication of the Japan International Transport Institute, USA (JITI), in which JITI
More informationThe Ever Evolving Naha Airport (Outline of Naha Airport Passenger Terminal Building) Naha Airport Building Co., Ltd.
The Ever Evolving Naha Airport (Outline of Naha Airport Passenger Terminal Building) August 2018 Naha Airport Building Co., Ltd. 1. Current Naha Airport Hours of Operation: 24 hours Runway: One 3,000 meter
More informationEarnings Explanatory Meeting April 1, 2010 to March 31, Reference Material
Earnings Explanatory Meeting April 1, 2010 to March 31, 2011 Reference Material 1. Overview and characteristics of Japan Air Terminal s Business 2. Efforts related to the Tokyo International Airport Re-expansion
More informationAsian Breeze (20) ( 亜細亜の風 )
Asian Breeze (20) ( 亜細亜の風 ) Happy New Year to you all 23 February, 2012 A Happy New Year may sound little too late, but the "Spring Festival," the literal translation of the Chinese name of( 春節 ), was
More informationVision for the Next 10 Years at Narita Airport
Vision for the Next 10 Years at Narita Airport 26 May, 2008 Mike GAMO Executive Officer Vice President, Planning Department Corporation NAA 1 Contents Part 1 Narita Airport Today Airport operations : 3
More informationCollaborative Decision Making at JCAB ATMC
CIVIL AVIATION BUREAU of JAPAN Collaborative Decision Making at JCAB ATMC First Meeting of Asia/Pacific ATFM Steering Group Tokyo, Japan, December 8-1, 21 Kimihiko Ito ATC Division, ATS Department, JCAB
More informationPre-Coordination Runway Scheduling Limits Winter 2014
Appendices 1 Runway Scheduling Limits 2 Additional Runway Scheduling Constraints 3 Terminal Scheduling Limits 4 Load Factors - to be used for terminal scheduling calculations 5 Stand Limits 6 Additional
More information2010 OCEA Award (Outstanding Civil Engineering Achievement Award)
2010 OCEA Award (Outstanding Civil Engineering Achievement Award) Group Ⅱ This award is presented to milestone projects that made an outstanding contribution to the development of civil engineering technology.
More informationHow ATFM Assists with Disaster Recovery
CIVIL AVIATION BUREAU of JAPAN How ATFM Assists with Disaster Recovery ICAO Air Traffic Flow Management Seminar 13-15 December 2016 Civil Aviation Bureau Japan 1. Outline of The Great East Japan Earthquake
More informationQuality Transport - Key to enhance Connectivity and Sustainability -
UNESCAP Regional EGM on Policy Options for Sustainable Transport Development, 27-29 Nov 2013, Incheon, Republic of Korea Quality Transport - Key to enhance Connectivity and Sustainability - 28 November,
More informationAI AIRCRAFT SERIOUS INCIDENT INVESTIGATION REPORT J-AIR CORPORATION J A J
AI2015-3 AIRCRAFT SERIOUS INCIDENT INVESTIGATION REPORT J-AIR CORPORATION J A 2 0 2 J April 23, 2015 The objective of the investigation conducted by the Japan Transport Safety Board in accordance with
More informationRunway Status Lights (RWSL) in Japan. July 2015
Ministry of Land, Infrastructure, Transport and Tourism CIVIL AVIATION BUREAU OF JAPAN Runway Status Lights (RWSL) in Japan July 2015 Table of contents Civil Aviation Bureau Japan What is RWSL Background
More informationBasic Policies on Operation of National Airports Utilizing Skills of the Private Sector
(TRANSLATION)(for Reference Only) Basic Policies on Operation of National Airports Utilizing Skills of the Private Sector I. The Purpose and Objectives in Operating etc. National Airports etc. by Utilizing
More informationEarnings Explanatory Meeting April 1, 2011 to March 31, Reference Material
Earnings Explanatory Meeting April 1, 2011 to March 31, 2012 Reference Material 1. Overview and Characteristics of Japan Air Terminal (JAT) s Business 2. Efforts Related to the Tokyo International Airport
More informationAsian Breeze (39) ( 亜細亜の風 )
Asian Breeze (39) ( 亜細亜の風 ) Happy Spring to you 22 April, 2015 Dear Coordinators and Facilitators in Asia/Pacific region. I wanted to begin this issue by saying Sakura is full bloom now in Tokyo, but sakura
More informationBird Strike Control. Naoki AMITANI July 2013, Bangkok, Thailand JAPAN CIVIL AVIATION BUREAU
Bird Strike Control 01-04 July 2013, Bangkok, Thailand Naoki AMITANI JAPAN CIVIL AVIATION BUREAU Ministry of Land, Infrastructure, Transport and Tourism Summary of Presentation Bird Strike Control - Introduction
More informationMGU UC Pre-Departure Information Handout (Spring Semester 2017)
MGU UC Pre-Departure Information Handout (Spring Semester 2017) The MGU Exchange Program provides an opportunity for English-speaking students from our exchange partners to pursue undergraduate studies
More informationANA HOLDINGS Announces Mid-Term Corporate Strategy for FY ~Strengthening the foundations of the business and looking into the future~
ANA HOLDINGS NEWS ANA HOLDINGS Announces Mid-Term Corporate Strategy for FY2018-2022 ~Strengthening the foundations of the business and looking into the future~ TOKYO, February 1, 2018 ANA HOLDINGS (hereinafter
More informationRunway Scheduling Limits Summer 2015
Appendix 1 Runway Scheduling Limits Summer 2015 Arrivals Hour (UTC) 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 Average Total Summer 2014 38 39 37 40 40 41 40 43 43 41 41 44 44 43 38 44 20 39.8
More informationASSEMBLY 39TH SESSION
International Civil Aviation Organization WORKING PAPER 30/8/16 ASSEMBLY 39TH SESSION EXECUTIVE COMMITTEE Agenda Item 28: No Country Left Behind Initiative QUICK RESPONSE AFTER EARTHQUAKE IN KUMAMOTO AIRPORT
More informationCase Study on Station Redevelopment in Japanese Railways
Case Study on Station Redevelopment in Japanese Railways Ryoko NAKANO Assistant Manager, Technical Headquarters Japan International Consultants for Transportation Co., Ltd. 16/03/2016 Contents 1. Overview
More informationSubject: Replacing Critical parts without Spare Parts Certification for Aircraft used for International
Circular No. 4-015 June 30, 2004 October 1, 2005 March 28, 2007 June 30, 2011 March 30, 2012 First Issue (KOKU-KU-KI-1359) Amended (KOKU-KU-KI-682) Amended (KOKU-KU-KI-1360) Amended (KOKU-KU-KI-282) Amended
More informationToward Japan-US Infrastructure Cooperation
Toward Japan-US Infrastructure Cooperation Japan s contributions through extensive PPP experience and advanced maintenance technologies November 7, 2018 Yasuhiro Shinohara Vice Minister for International
More informationBNA Master Plan Update Public Meeting No. 2
A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation
More informationRegulations on Passenger Service Facility Charge for International Flights at Kansai International Airport
Regulations on Passenger Service Facility Charge for International Flights at Kansai International Airport Last updated: August 30, 2018, Regulation No. 58 (January 20, 2016, Regulation No. 20) Article
More information2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)
2018 Airport Master Plan Overview of Development Concepts Greg Ballentine (WSP) Thank You Stakeholder and community consultation has included discussions with over 40 stakeholder groups including airport
More informationBNA Master Plan Update Community Advisory Committee Meeting No. 5
A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,
More informationASSEMBLY 39TH SESSION
International Civil Aviation Organization WORKING PAPER A39-WP/278 25/8/16 ASSEMBLY 39TH SESSION TECHNICAL COMMISSION Agenda Item 36: Aviation safety and air navigation implementation support SUGGESTION
More informationHEATHROW NIGHT MOVEMENT AND QUOTA ALLOCATION PROCEDURES Version 3
LOCAL RULE 1 HEATHROW NIGHT MOVEMENT AND QUOTA ALLOCATION PROCEDURES Version 3 1. POLICY All Night Flights require the prior allocation of a slot and corresponding Night Quota (movement and noise quota).
More informationBirmingham Airport 2033
Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted
More informationSTATUS REPORT JAPAN. (ATMC) Japan Civil Aviation Bureau. CIVIL AVIATION BUREAU of JAPAN. 6th Global Air Traffic Flow Management Conference
CIVIL AVIATION BUREAU of JAPAN STATUS REPORT JAPAN 6th Global Air Traffic Flow Management Conference (ATMC) Japan Civil Aviation Bureau ATMC (RJJJ) Fukuoka ACC (RJDG) KYOTO FUKUOKA TOKYO 2 Evolution from
More informationImplementation Policy on. the Qualified Project, etc., for Airport Operation of. the Four National Airports in Hokkaido
(TRANSLATION) (for Reference Only) Implementation Policy on the Qualified Project, etc., for Airport Operation of the Four National Airports in Hokkaido The original of this document shall be prepared
More informationAviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers
Aviation Data and Analysis Seminar 20-23 February 2017 Economics of Airports and Air Navigation Services Providers 250 7000 6000 200 5000 150 4000 Growth of air transport World recession SARS Freight Tonne
More informationChallenges for Suriname s Air Integration with South America The way forward
for s Air Integration with The way forward Timothy Mendonça Workshop on Air integration - 11 th of September, 2014 I.I.R.S.A. COSIPLAN Rio de Janeiro, Brasil 1 Contents JAPI -Airport of Air Integration
More informationGOVERNMENT OF INDIA AERONAUTICAL INFORMATION SERVICES DIRECTOR GENERAL OF CIVIL AVIATION OPPOSITE SAFDARJUNG AIRPORT NEW DELHI
Telephone No. : 4622495 Telegraphi Address: Commercial : AIRCIVIL NEW DELHI Aeronautical : VIDDYAYX E Mail: dri@dgca.delhi.nic.in Fax 011 24629221 GOVERNMENT OF INDIA AERONAUTICAL INFORMATION SERVICES
More informationToward More Competitive Economy and Society
Chapter 5: Toward More Competitive Economy and Society Transport networks improvement Developing highways Japan is lagging behind the U.S. and European countries in terms of highway development. The country
More informationNorfolk International Airport
Norfolk International Airport Master Plan Update Technical Advisory Committee Meeting #1 Community Advisory Committee Meeting #1 January 24, 2018 Agenda Project Background Introductions Overview of Airport
More informationFlight Regularity Administrative Regulations
Flight Regularity Administrative Regulations (Ministry of Transport 2016 #56) As of March 24, 2016, the Flight Regularity Administrative Regulations has been approved on the 6 th ministerial meeting. It
More informationEXECUTIVE VICE PRESIDENT. Masaki OGATA. Copyright 2010 East Japan Railway Company. All rights reserved 1
EXECUTIVE VICE PRESIDENT Masaki OGATA Copyright 2010 East Japan Railway Company. All rights reserved 1 Company Profile of JR East Copyright 2010 East Japan Railway Company. All rights reserved 2 Company
More informationAn Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018
s An Overview of GMR Megawide Consortium s Unsolicited Proposal March 2018 1 Metro Manila requires a multi-airport system and NAIA shall continue to play an anchor role in this system. Multi-Airport system
More informationThe benefits of opening Japan s sky for competition
The benefits of opening Japan s sky for competition The European Business Council Airlines Committee (EBC) is committed to promote the further development of a dynamic travel industry in Japan. However
More informationREVITALISATION OF OUTBOUND TOURISM
REVITALISATION OF OUTBOUND TOURISM Revitalisation of Outbound Tourism YEARLY STATUS REPORT: Good Progress The Government continues to allocate substantial funds to promote Japan as a tourist destination.
More informationYakima Air Terminal/McAllister Field Airport Master Plan Update
Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used
More informationClassification: Public
Appendices 1 Runway Scheduling Limits 2 Additional Runway Scheduling Constraints 3 Terminal Scheduling Limits 4 Load Factors - to be used for terminal scheduling calculations 5 Stand Limits 6 Additional
More informationAsian Breeze (23) ( 亜細亜の風 )
Asian Breeze (23) ( 亜細亜の風 ) Happy summer vacation to you 10 August, 2012 Dear coordinators and facilitators in Asia/Pacific region. It is really hot here in Tokyo because of a global warming. It was reported
More informationCORPORATE STEVE BOOKING SMITH CHANNELS
JAPAN AIRLINES: NAVIGATING THE FUTURE Steve Myer, Tokyo September 30, 2016 CORPORATE STEVE BOOKING SMITH CHANNELS VICE PRESIDENT, GLOBAL & STRATEGIC SALES, THE AMERICAS SEPTEMBER 20, 2016 RENO, NEVADA
More informationThe entry into force of the EU-US. US Open Skies Agreement. Pablo Mendes de Leon Airneth Annual Conference, 17 April 2008
The entry into force of the EU-US US Open Skies Agreement Pablo Mendes de Leon Airneth Annual Conference, 17 April 2008 Contents: I. Introduction/ historical notes II. The mandate III. Achievements IV.
More informationCOMOX VALLEY AIRPORT. Strategic Plan Summary. October 2010
COMOX VALLEY AIRPORT Strategic Plan 2011-2015 Summary October 2010 COMOX VALLEY AIRPORT Introduction History The Comox Airport was constructed by the Department of National Defence in 1942. The Comox Airport
More information(i) Adopted or adapted airworthiness and environmental standards;
TECHNICAL ARRANGEMENT FOR THE ACCEPTANCE OF AIRWORTHINESS AND ENVIRONMENTAL APPROVAL OF CIVIL AERONAUTICAL PRODUCTS BETWEEN THE CIVIL AVIATION BUREAU, MINISTRY OF LAND, INFRASTRUCTURE AND TRANSPORT, JAPAN
More informationAsia Pacific Initiative to Reduce Emission. Brian Bagstad Senior ATO Representative, FAA
Asia Pacific Initiative to Reduce Emission Brian Bagstad Senior ATO Representative, FAA CANSO Asia Pacific Collaborative ATM Operations Workshop, Colombo 7 May 2014 Asia Pacific Initiative to Reduce Emissions
More informationBadgery s Creek Airport Presention. Revised from NAN 2015 AGM
Badgery s Creek Airport Presention Revised from NAN 2015 AGM Contents History Badgery s Creek Objectives Why is another airport required? Badgery s Creek Airport key facts, approval process and timeline
More informationTERMINAL DEVELOPMENT PLAN
5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,
More informationStation Development Eki-naka concept and practice. Hironori Tsujimura East Japan Railway Company London Office
Station Development Eki-naka concept and practice Hironori Tsujimura East Japan Railway Company London Office agenda 1. Outline of East Japan Railway Company 2. Before Privatisation 3. After Privatisation
More informationANA s Growth Strategy
ANA s Growth Strategy Shinya Katanozaka Member of the Board of Directors, Senior Executive Vice President All Nippon Airways Co., Ltd. January 08, 2013 ANA s History 2 Rising to the Challenges ~ Always
More information50th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS, Bangkok, Thailand, 1 4 July 2013
50th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS, Bangkok, Thailand, 1 4 July 2013 1 Contents Japan s International Cooperation in the Airport Sector Much experience, Advanced
More informationCASE STUDY The New Guayaquil International Airport
www.jacobs.com worldwide CASE STUDY The New Guayaquil International Airport Prepared for ICAO Airport Planning Seminar for the SAM Region Lima, Peru 10-14 Sep. 2018 September 11, 2018 Outline Existing
More informationData Extracted from the Air Navigation Services Department s Database Becomes Available
February 27, 2015 Air Navigation Services Department Civil Aviation Bureau, MLIT Data Extracted from the Air Navigation Services Department s Database Becomes Available The Committee for Promoting Renovation
More informationAIP GEN SRI LANKA REGULATIONS AND REQUIREMENTS 25 MAY 17 GEN 1.2 ENTRY, TRANSIT AND DEPARTURE OF AIRCRAFT
AIP GEN.2- SRI LANKA REGULATIONS AND REQUIREMENTS 25 MAY 7 GEN.2 ENTRY, TRANSIT AND DEPARTURE OF AIRCRAFT. GENERAL. All flights into / from or over the territory of Sri Lanka and landing in such territory
More informationLand Use Policy Considerations
Land Use Policy Considerations Challenges to Implementing Successful Land Use Strategies at Airports ACRP Insight Event: Washington DC Stephen D. Van Beek, Ph.D. April 11, 2018 Land Use Policy Considerations
More informationThank you for participating in the financial results for fiscal 2014.
Thank you for participating in the financial results for fiscal 2014. ANA HOLDINGS strongly believes that safety is the most important principle of our air transportation business. The expansion of slots
More informationLong-term Strategic Vision
ANA Group Corporate Strategy Long-term Strategic Vision In January 215, the ANA Group announced its Long-term Strategic Vision for taking business opportunities for our growth strategies. The main thrust
More informationMaster Plan Update Community Advisory Committee Kick-off Meeting
Nashville International Airport Master Plan Update Community Advisory Committee Kick-off Meeting September 13, 2018 Agenda Welcome and Introductions Master Plan Objectives Master Plan Process BNA Vision
More informationApplewood Heights Community Open House
Applewood Heights Community Open House Agenda TORONTO PEARSON BACKGROUND Toronto Pearson: For you. The World. Our goal: To become North America s premier gateway airport. Our job is to get you better connected
More informationPromoting Civil-Military Dual-Use of Yokota Air Base
Promoting Civil-Military Dual-Use of Yokota Air Base Tokyo Metropolitan Government April 2017 1. Overview of the Civil-Military Dual-Use Initiative Yokota Air Base, which is a U.S. military base with a
More informationRecent Developments on International Aviation and Climate Change
5 th ITPU International Seminar (55 th Public Policy Seminar) University of Tokyo 19 February 2010 Recent Developments on International Aviation and Climate Change ~ ICAO s activities, COP/15 and beyond
More informationNational Coordination Committee
National Coordination Committee Local Guideline Proposal - Lisbon 01.OUT.2014 Local Guideline Proposal - Lisbon Special noise regime during the night and early morning period (00:00-06:00 LT) Night Restrictions
More informationKJFK Runway 13R-31L Rehabilitation ATFM Strategies
Advanced ATM Techniques Symposium and Workshops Today s Opportunities for Saving Fuel and Reducing Emissions 4 6 November 2013, ICAO Headquarters, Montréal KJFK Runway 13R-31L Rehabilitation ATFM Strategies
More informationAIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI
AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE Vineet Gulati GM(ATM-IPG), AAI AIR TRAFFIC FLOW MANAGEMENT ATFM is a service provided with the objective to enhance the efficiency of the ATM system by,
More informationExhibitor Prospectus
Exhibitor Prospectus 1. CONGRESS OVERVIEW What is IAIN? The International Association of Institutes of Navigation (IAIN), is a non-profit NGO uniting national and multinational institutes and organizations
More informationAIP GEN SRI LANKA REGULATIONS AND REQUIREMENTS 25 MAY 17 GEN 1.2 ENTRY, TRANSIT AND DEPARTURE OF AIRCRAFT
AIP GEN.2- SRI LANKA REGULATIONS AND REQUIREMENTS 25 MAY 7 GEN.2 ENTRY, TRANSIT AND DEPARTURE OF AIRCRAFT. GENERAL. All flights into / from or over the territory of Sri Lanka and landing in such territory
More informationREPUBLIC OF LATVIA. State Joint-stock Company Latvijas Gaisa Satiksme Aeronautical Information Service Riga Int. Airport, LV-1053, Latvia
REPUBLIC OF LATVIA Phone: +371 67300664 Fax: +371 67300660 Email: ais@lgs.lv AFS: EVRAYNYX State Joint-stock Company Latvijas Gaisa Satiksme Aeronautical Information Service Riga Int. Airport, LV-1053,
More informationTANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS)
Page 1 of 11 AERODROME NAME: ICAO REFERENCE CODE: TRAFFIC DENSITY CLASS: (see Note 3) VISIBILITY CONDITION: (see Note 3) AERODROME INSPECTOR: DATE: S/N ICAO A SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM 1
More informationJCAB Circular No
September 30, 2005 June 30, 2011 Overall revision Partial amendment JCAB Circular No. 1-013 Director, Airworthiness Division Aviation Safety and Security Department Japan Civil Aviation Ministry of Land,
More informationATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT
AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,
More informationAviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011
Aviation Planning in Maine and Our Region Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011 Overview The National Aviation System Maine s Economic Dependence
More informationDMAN-SMAN-AMAN Optimisation at Milano Linate Airport
DMAN-SMAN-AMAN Optimisation at Milano Linate Airport Giovanni Pavese, Maurizio Bruglieri, Alberto Rolando, Roberto Careri Politecnico di Milano 7 th SESAR Innovation Days (SIDs) November 28 th 30 th 2017
More informationGOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDURJUNG AIRPORT, NEW DELHI
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDURJUNG AIRPORT, NEW DELHI ENVIRONMENT CIRCULAR 2 OF 2010 File No. 04-01/2010-AED Dated: July 1, 2010 Subject:
More informationNARITA INTERNATIONAL AIRPORT OVERSEAS
NARITA INTERNATIONAL AIRPORT OVERSEAS BUSINESS About Narita Airport Narita International Airport Corporation(NAA) owns the airport land, runways, terminals and other facilities at Narita Airport. We manage
More informationJapanese Inbound & Outbound Travel Market Update
/ Japanese Inbound & Outbound Travel Market Update Japan Association of Travel Agents May 2017 Global Trend (results) International Tourists Arrival: 1,235 million Average Annual Growth Rate: 3.9% (2005-2016)
More informationUltra s Experience with A-CDM
Ultra s Experience with A-CDM Simon Wilkins Chief Technology Officer ICAO A-CDM Workshop 20 October 2016 Objectives of A-CDM Improve predictability of operations Improve on-time performance Optimise utilisation
More informationLanguage Proficiency Certification System in Japan
Language Proficiency Certification System in Japan IALS/2, Montreal, May 8, 2007 Mr. Kenichi Tenma Inspector of Airmen Licensing Civil Aviation Bureau Ministry of Land, Infrastructure, and Transport Tokyo,
More informationII.J. 14 CFR and Publications
References: 14 CFR Parts 1, 61, 91; NTSB Part 830; AC 00-2; FAA-H-8083-25; POH/AFM; AIM Objectives Key Elements Elements Schedule Equipment IP s Actions SP s Actions Completion Standards The student should
More information