BOSNIA AND HERZEGOVINA FEDERATION OF BOSNIA AND HERZEGOVINA JP DIREKCIJA CESTA FEDERACIJE BIH ENVIRONMENTAL MANAGEMENT PLAN

Size: px
Start display at page:

Download "BOSNIA AND HERZEGOVINA FEDERATION OF BOSNIA AND HERZEGOVINA JP DIREKCIJA CESTA FEDERACIJE BIH ENVIRONMENTAL MANAGEMENT PLAN"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized BOSNIA AND HERZEGOVINA FEDERATION OF BOSNIA AND HERZEGOVINA JP DIREKCIJA CESTA FEDERACIJE BIH ENVIRONMENTAL MANAGEMENT PLAN FOR ROAD INFRASTRUCTURE AND SAFETY PROJECT SARAJEVO, JUNE 2007 E1682

2 1. INTRODUCTION Total lenght of main and regional roads in Federation of Bosnia and Herzegovina (hereinafter FBIH) is around km, among which main roads are 2024 km and regional roads km. The main roads are administrated and managed by JP Direkcija cesta Federacije Bosne i Hercegovine (hereinafter JP DC FBiH) and regional roads by the Road Directorates or relevant ministry at the cantonal level. Road management responsibilities have been established by the Law on Roads of FBiH («Official Gazette of FBiH, no 6/02). In the period godina significant rehabilitation works on priority roads and bridges in FBIH have been achieved through the internationally financed projects. Survey of main and regional roads conditions conducted in 2004 indicated that still significant part of the road network in FBIH is in poor conditions. Rehabilitation of the important main and regional roads has high priority taking into consideration improvement of the level of service for road users, adjustment to the socio-economic development and improvement of the road safety. The main road network analyze, based on the roads, bridges and tunnels date bank in FBiH, has been conducted and work programme priorities has been established by the HDM-4. Rehabilitation cost for km of the main road network, in other words 109 road sections is estimated in the amount of 80 mil. EUR in the period Roads and bridge rehabilitation is going to be financed out by the loans provided from World Bank (WB), European Bank for Reconstruction and Development (EBRD) and European Investment Bank (EIB). Therefore, rehabilitation of 15 road sections and 7 bridges and viaducts on the main road network are proposed to be financed out from WB fund. 2. OBJECTIVES The main objective of the Environmental Management Plan (hereinafter EMP) is establishment mitigation measures for adverse environmental impacts and environmental monitoring measures during road rehabilitation works in order to prevent/reduce either direct or indirect impacts of the project on the inhabitants, flora and fauna, water, air, soil, climate, landscape, cultural heritage and material goods. 3. GENERAL DESCRIPTION OF THE PROJECT The main and regional roads conditions survey has been carried out in 2004 as important input for road, bridges and tunnels date base establishment. Survey indicated that still significant part of the road network in FBiH is in poor conditions and damages were identified on numerous main road sections in FBiH. 2

3 The following types of damages were identified and entered in the road, bridges and tunnels date base: - Longitudinal and Cross Cracking; - Network (alligator) Cracking; - Potholes and Patches; - Rutting; - Raveling; - Aggregate grains dissipation; - Bleeding; - Edge cracking; and - Deformations. Pavement damages cause: - Decrease of the service level for road users; - Decrease of the riding speed and quality; - Increase of the travel time for passengers and goods; - Decrease of the traffic safety; - Increase of the road user costs; and - Increase of the maintenance costs. Taking into consideration current conditions of the main road network and consequences of this situation, this calls for rehabilitation of certain sections on main roads. Rehabilitation includes works necessary for recovery destructed or damaged road sections in the previous state. Rehabilitation works doesn t change the conditions previously set up through urban planning and construction permits, in other words works are within road side. Detailed design for rehabilitation will be made in accordance with Construction Design on which the construction permit has been obtained previously. Rehabilitation works on the roads and bridges to be funded out by WB comprise mainly the following: - Pavement overlaying, - Drainage rehabilitation, - Slope rehabilitation, - Rehabilitation of possible settlings and landslides, and - Improvements of the road safety. Rehabilitation works on the roads and bridges will support higher level of service for road users at present as well as the future traffic condition in FBiH. 4. DESCRIPTION OF THE ROAD SECTIONS AND BRIDGES Road section and bridges envisaged to be rehabilitated from the WB fund are on the following roads: 1. Main road M17 Bosanski Samac-Doboj-Zenica-Sarajevo-Mostar-Doljani 3

4 2. Main road M18 Sicki Brod-Sarajevo-Trnovo- RS/FBH border 3. Main road M4 Doboj-Gracanica-Sicki Brod 4. Main road M5 Bihac-Klju -Jajce-Travnik-Sarajevo-Praca-Hrenovica- RS/F BH border 5. Main road M15 RS/FBiH border -Sanski Most-Kljuc 6. Main road M4.2 Velika Kladusa-Cazin-Srbljani- RS/FBH border 4.1. M17 Section Gnojnice-Dracevo (28, 4 km) Section Gnojnice-Dracevo is passing through the area known as vineyard, fruits and vegetables raising one. Agriculture terrains are very often in the road vicinity. Nearby the road, sometimes at distance of 500 m flows river Neretva. Road section overpasses tributaries of the river Neretva-Buna and Krupa by the bridges Along the section are settlements: Buna, Zitomislici, Pocitelj, Capljina, Klepci, Celjevo, Visici, Dracevo. Housing is alongside the road, particularly on the second part of the road section. The inhabitants living alongside the road using the crossings over the main road for communication between themselves. By the road there are also bus stations and schoolchild s crossings. On the left side of the road section, between Pocitelj and Dracevo, at 3-4 km distance from the road, is located a wetland - Hutovo blato. Hutovo blato has been declared Nature Park and put on the Ramssar's List of wetlands hes having international importance. Nearby the road is a town Pocitelj. Historical urban area of the town is one of the national monuments of Bosnia and Herzegovina. Rehabilitation of road section Gnojnice-Dracevo by asphalt overlaying of the alignment, will not imperiled the protected heritage and additional mitigation measures are not necessary M17 Section Ostrozac-Jablanica (11, 79 km) Section starts at 3, 8 km from Ostrozac, at the edge of the artificial accumulation of Jablanicko Lake. On the road section there are several tunnels and coming down to town Jablanica. Bridge over river Rama, Neretva's tributary is on the town entrance. This road section is passing through Jablanica urban area. After Jablanica this section is cut into Neretva river cliff and following its flow. Alongside the road are various well known traditional passenger rest areas M17 Section Stup 3-Blazuj (6, 22 km) Section is passing through Sarajevo urban area. First part of the section (around 2 km) is passing through residential areas. On the second part of the road section, on the left side are agriculture terrains, while on the right are service objects, small industry facilities and housing. 4

5 4.4. M17 Blazuj-Hadzici (9, 50 km) Section starts at the exit from Blazuj. On its right side are residential objects and smaller agriculture terrains, while on the left, at the distance of m is small river Zujevina. Between the road and the river Zujevina is railway M17 Blazuj-Stup 2 (6, 10 km) Section has the same characteristics as Item 4.3 except its direction is in opposite way M17 Overpass in Blazuj, Section Stup 3-Blazuj, km Overpass is at the entrance of settlement Blazuj. Under the overpass passing road, railway and expressway (Sarajevo west exit). In the vicinity is mostly industrial area M17 - Overpass, Section Blazuj-Stup 2, at km Overpass is inside Sarajevo urban area, at the entrance to suburb Ilidza. Road and tram passing under the overpass. Vicinity has all characteristics of the urban area M18 Bridge over river Bosna and railway Sicki Brod-Sarajevo, at km Bridge is located at the entrance to Sarajevo in the Vogosca municipality. Crossing river Bosna and railway and connect M18, through Josanica intersection, with M17. Under the bridge is smaller agriculture terrain. In the vicinity there are few residential and restaurants M18 Bridge over stream Brlog, Sicki Brod-Srajevo, at km Bridge is passing over stream Brlog. Forest hills are in the road vicinity. There is also a fish-farm ( m) and smaller pools for recreation M18 Overpass above the railway in Sicki Brod, at km Overpass is passing over the railway. In the vicinity there are no settlements, except few houses behind the overpass. Under the overpass is uncultivated soil with wild plants M4 RS/FBH border (Stanic Rijeka)-Gracanica (12, 50 km) Section is passing through slightly hilled and agriculture areas. Along the road are parts of the settlements Stanic Rijeka, Klokotnica, Brijesnica Velika, Brijesnica Mala and Stjepan polje. Several bus stations and schoolchild s crossing are on the road. No rivers in the road vicinity. 5

6 4.12. M4 Gracanica-Donja Orahovica (9, 50 km) Section is passing through slightly hilled and agriculture areas. Settlements Pribava, Donja Lohinja and Gornja Lohinja are located along the road. Several bus stations and schoolchild s crossing are on the road. No rivers in the road vicinity M5 Jajce-Jajce Jug (5, 18 km) Start of the section is in Jajce urban area. At the beginning of the section, on its left side across river Pliva is old royal town Jajce. Historical town of Jajce including fortification structures (fortress, walls, donjons, gates...); religious and old residential objects are declared national monuments of BiH. Originally constructed area of Jajce has been nominated to UNESCO World Heritage List. Road crossing river Vrbas by the bridge. Before the bridge, on the right side at the distance of 50 m of the road, is located protected natural heritage- calcareous mount Varosnica. On the right side from the bridge is another protected natural heritage- Pliva waterfalls. The rest of the section is on the right bank of river Vrbas and incorporated in the hill above the river. On the right side of the road, across river Vrbas is a big industrial zone. The worst pollution is being result of ferrosilicon production. Rehabilitation of road section Jajce-Jajce Jug by asphalt overlaying of the alignment, will not imperiled the protected heritage, so the additional mitigation measures are not necessary M5 Jajce Jug-Donji Vakuf 1 (9, 88 km) Section is going along river Vrbas. Road section is on the distance approximately m from the river Vrbas. Left from the section are hills with deciduous trees, while on the right is river Vrbas. Villages Torlakovac, Bila Voda and Vinac are situated next to the road. In the village Torlakovci there is schoolchild s crossing M5 Secercehaja's bridge-korija (3, 33 km) Section starts on the exit of Sarajevo, climbs towards the top of the hill and passes through the tunnels Korija and Krecana. On the left side the section is incorporated in hill, while the river Miljacka canyon is on the right. Right from the road alignment, at the distance of some 300 m is a National Monument Kozja cuprija M5 RS/FBH border (Praca)-Hrenovica (7, 22 km) Section is passing through the river Praca canyon. Around the section are agriculture terrains and forest hills. Before entering Praca, on the left side at the distance of approximately 500 m, road is parallel with flow of the river Praca. Praca and Hrenovica are the closest settlements. 6

7 4.17. M5 Viaduct Komar, Donji Vakuf-Travnik, at the km Viaduct is passing through the forest on the Komar mountain. No settlements in the vicinity M5 Viaduct Komar, Donji Vakuf-Travnik, at the km Viaduct is passing through the forest on the Komar mountain. No settlements in the vicinity M15 Kamicak-Kljuc (10, 00 km) Section is passing through forest, pasture lands and agriculture terrains. Villages Kraselje and Ramici (few houses) are in the vicinity. In the Krasulje there is bus station and schoolchild s crossing. No rivers in the road vicinity M15 Sanski Most 1 Sanski Most 3 (4, 76 km) In its total length section is passing through town Sanski Most. At the beginning of the section (intersection R405), on the right side, town hospital is located. Section is crossing river Sana by the bridge. First part of the section is passing through the businessresidential center of the town, while the second half goes through industrial zone (concrete factory, stone separators, various storehouses etc) M4.2 Grahovo-Skokovi (7, 80 km) Section is passing through slightly hilled area with agricultural terrains and forests. Along the section, right to the road, are settlements: Mala Kladusa, Marjanovac, Sumatac and Purici. There are several bus stations and schoolchild s crossing on the road. No rivers in the road vicinity M4.2 Skokovi-Cazin (15, 98 km) Section is passing through slightly hilled area with agriculture terrains and forests. Bigger settlements toward this section are Coralici, Cazin, and Puskari. Some parts of the settlements are next to the road. There are several bus stations and schoolchild s crossing on the road. No rivers in the road vicinity. 7

8 Part A: Mitigation Plan 8

9 Phase Issue Mitigating measure Construction Material supply a) Asphalt plant dust, fumes, workers health and safety, ecosystem disturbance b) Stone quarry dust, workers health and safety, ecosystem disturbance c) Sand and gravel borrow pit disturbance of river bed, water quality, ecosystem disturbance Material transport a) Asphalt dust, fumes b) Stone Dust c) Sand and gravel Dust d) Traffic management noise, vehicle exhaust, road congestion Construction site a) Noise disturbance to human and animal population and workers a) use existing asphalt plants; requirement for official approval or valid operating license b) use existing stone quarries; requirement for official approval or valid operating license c) use existing borrow pits or buy material at licensed separations; requirement for official approval or valid operating license A. Mitigation Plan Cost Institutional responsibility Install Operate Install Operate Comments (e.g. secondary impacts) a) NA a) NA a) Asphalt plant a) Asphalt plant a)-c) to be specified in bid documents-conditions for selection of subcontractors for material supply b) NA b) NA b) Stone quarry b) Stone quarry c) NA c) NA c) Sand and gravel or Separation c) Sand and gravel or Separation a) cover truck load a) minimal a) minimal a) Truck operator a) Truck operator a)-d) to be specified in bid documents-technical b) wet or cover truck load b) minimal b) minimal b) Truck operator b) Truck operator Specifications for realization of works c) wet or cover truck load c) minimal c) minimal c) Truck operator c) Truck operator d) haul material at off peak traffic hours; use alternative routes to minimize major traffic sites a) limit activities to daylight working hours (not between 8 p.m. and 7 a.m. or as agreed with public and authorities); operating with noise mufflers d) NA d) minimal d) Transport manager; Truck operator a) NA; minimal a) NA; minimal a) Construction d) Transport manager; Truck operator a) Construction a)-k) to be specified in bid documents-technical Specifications for realization of works 9

10 Phase Issue Mitigating measure b) Dust b) water construction site and material storage sites as appropriate c) Vibrations resulting from work d) Traffic disruption during construction activity e) Reduced access to roadside activities f) Vehicle and pedestrian safety when there is no construction activity g) Water and soil pollution from improper material storage, management and usage c) limit work activities to daylight working hours (not between 8 p.m. and 7 a.m. or as agreed with public and authorities) d) traffic management plan with appropriate measures to redirect traffic that are easily seen or easy to follow; include traffic police e) provide alternative access to roadside activities f) appropriate lighting and well defined safety signs g) organize and cover material storage areas; isolate concrete, asphalt and other works from watercourse by using scaled formwork; isolate wash down areas of concrete and asphalt trucks and other from watercourse by selecting areas for washing that are not free draining directly or indirectly into watercourse; Cost Institutional responsibility Install Operate Install Operate b)minimal b)minimal b) Construction c)na c)na c) Construction d)minimal d)minimal d) Construction e) depends on the way of access providing e)minimal e) Construction f)minimal f)minimal f) Construction g)minimal g)minimal g) Construction b) Construction c) Construction d) Construction e) Construction f) Construction g) Construction Comments (e.g. secondary impacts) 10

11 Phase Issue Mitigating measure h) Water and soil pollution from improper disposal of waste materials i) Potential contamination of soil and water from improper maintenance and fueling of j) Destruction of crops, trees, meadows, etc. eventually treat/discharge water to remove solids h) dispose waste material at appropriate location protected from washing out i) proper handling of lubricants, fuel and solvents by secured storage; ensure proper loading of fuel and maintenance of ; collect all waste and dispose to permitted waste recovery facility j) ensure control of working zone and land acquisition; compensate damage k)workers safety k) provide workers with safety instructions and protective (glasses, masks, helmets, boots, etc); safe organization of bypassing traffic Operation Maintenance a) Noise disturbance to human and animal population and workers a) limit activities to daylight working hours (not between 8 p.m. and 7 a.m. or as agreed with public and authorities); operating with noise mufflers Cost Institutional responsibility Install Operate Install Operate h)depends on location h)minimal h) Construction i)minimal i)minimal i) Construction j) NA j)depends on quantity of damage j) Construction ; Road Directorate k)minimal k)minimal k) Construction a) NA; minimal a) NA; minimal a) Maintenance h) Construction i) Construction j) Construction ; Road Directorate k) Construction a) Maintenance Comments (e.g. secondary impacts) a)-d) to be specified in maintenance contract documents-technical Specifications for realization of maintenance works 11

12 Phase Issue Mitigating measure b) Possible air, water and soil pollution dust, vehicle exhaust, fuel and lubricants spills b) ensure proper handling of lubricants, fuel and solvents by secured storage; ensure proper loading of fuel and maintenance of ; collect all waste and dispose to permitted waste recovery facility; limit operation speed (max 40 km/h) properly organize and cover material storage areas; isolate concrete, asphalt and other works from watercourse by using sealed formwork; isolate wash down areas of concrete and asphalt trucks and other from watercourse by selecting areas for washing that are not free draining directly or indirectly into watercourse; dispose waste material at appropriate location protected from washing out c) Vibrations c) limit activities to daylight working hours (not between 8 p.m. and 7 a.m. or as agreed with public and authorities) d) Workers safety d) provide workers with safety instructions and protective ; safe org. of bypassing traffic Cost Institutional responsibility Install Operate Install Operate b) minimal b) minimal b) Maintenance c) NA c) NA c) Maintenance d) minimal d) minimal d) Maintenance b) Maintenance c) Maintenance d) Maintenance Comments (e.g. secondary impacts) 12

13 Phase Issue Mitigating measure Exploitation a) Increased volume and speed of traffic noise, dust, vehicle exhaust, fuel and lubricant spills a) installation of protection measures (noise barriers, planting hedges along roadside, etc); limit vehicle speed) Road safety a) Increased vehicle speed a) install appropriate traffic signs for speed limit b) Erosion, rockfall, hazardous conditions a) install appropriate warning signs (rockfall, landslide, wet or slippery conditions, dangerous curve, animal or pedestrian crossing, school, slow moving vehicles, merge), reflective markers to indicate steep edge or convex mirrors to see oncoming traffic at blind curves; locate warnings at points considered appropriate by good engineering practice or as agreed with public and authorities Cost Institutional responsibility Install Operate Install Operate a) depends on the way of protection a) minimal a) for environment protection works; Traffic police a) minimal a) minimal a) Maintenance b) minimal b) minimal b) Maintenance a) Maintenance ; Traffic police a) Maintenance b) Maintenance Comments (e.g. secondary impacts) a)-b) to be specified in maintenance contract documents-technical Specifications for realization of maintenance works 13

14 Part B: Monitoring Plan 14

15 Phase What parameter is to be Construction Material supply a) Asphalt plant a) possession of official approval or valid operating license b) Stone quarry b) possession of official approval or valid operating c) Sand and gravel borrow pit license c) possession of official approval or valid operating license Material transport a) Asphalt a) truck load covered Where is the a) asphalt plant b) stone quarry c) sand and gravel borrow pit or separation How is the / type of monitoring B. Monitoring Plan When is the (frequency of measurement or continuous) a) inspection a) before work begins b) inspection b) before work begins c) inspection c) before work begins a) job site a) supervision a) unannounced inspections during work Why is the (optional) a)-c) assure plant compliance with environment, health and safety Cost Institutional responsibility Install Operate Install Operate a) NA a) NA a) Plant Operator requirements b) NA b) NA b) Quarry Operator a)-d) assure compliance of performance with environment, health and c) NA c) NA c) Borrow pit or Separation Operator a) Plant Operator b) Quarry Operator c) Borrow pit or Separation Operator a) NA a) minimal a) NA a) Supervision 15

16 Phase What parameter is to be b) Stone b) truck load covered or wetted c) Sand and gravel c) truck load covered or d) Traffic management Construction site a) Noise disturbance to human and animal population and workers wetted d) hours and routes selected a) noise levels; equivalent noise level, b) Air pollution b) dust (solid particles), Where is the How is the / type of monitoring When is the (frequency of measurement or continuous) b) job site b) supervision a) unannounced inspections during work c) job site c) supervision a) unannounced inspections during work d) job site d) supervision a) unannounced inspections during work a) job site; nearest homes b) at and near job site a) noise meter and analyzer, inspection a) once for each machine and when works start and on complain b) visual b) during material delivery and construction Why is the (optional) safety requirements and enable as little disruption to traffic as it is possible a)-k) assure compliance of performance with environment, health and safety requirements and enable as little disruption to traffic as it is possible Cost Institutional responsibility Install Operate Install Operate b) NA b) minimal b) NA b) Supervision c) NA c) minimal c) NA c) Supervision d) NA d) minimal d) NA d) Supervision a) NA a) minimal a) Monitoring b) NA b) minimal b) Monitoring a) Monitoring b) Monitoring 16

17 Phase c) Vibrations resulting from work d) Traffic disruption during construction activity e) Reduced access to roadside activities What parameter is to be c) limited time of activities d) existence of traffic management plan; traffic patterns e) provided alternative access Where is the How is the / type of monitoring c) job site b) supervision (instrument - FFT data collector) d) at and near job site c) inspection; observation When is the (frequency of measurement or continuous) c)unannounced inspections during work and on complain c) before works start; once per week at peak and non peak periods e) job site d) supervision d) during construction Why is the (optional) Cost Institutional responsibility Install Operate Install Operate c) NA c) minimal c) NA c) Supervision d) NA d) minimal d) NA d) Supervision e) NA e) minimal e) NA e) Supervision f) Vehicle and pedestrian safety when there is no construction activity g) Water and soil pollution from material storage, management and usage f) visibility and appropriatene ss f) at and near job site g) water and soil quality (suspended solids, oil and grease) g) runoff from site, material storage areas; wash down areas of f) observation f) once per week in the evening g) gravity; observation; mobile laboratory with necessary (water analyzer); g) during material delivery and construction, especially during precipitation (rain, snow, etc) f) NA f) minimal f) NA f) Supervision g) NA g) minimal g) Monitoring g) Monitoring 17

18 Phase h) Water and soil pollution from disposal of waste materials i) Potential contamination of soil and water from maintenance and fueling of j) Destruction of crops, trees, meadows, etc. What parameter is to be h) water and soil quality (suspended solids, oil and grease) i) water and soil quality (suspended solids, oil and grease); procedures of work j) land acquisition k) Workers safety k) protective (glasses, masks, helmets, boots, etc); organization of bypassing traffic Where is the h) depository site i) job site; maintenance facilities How is the / type of monitoring h) mobile laboratory with necessary (water analyzers); observation i) mobile laboratory with necessary (water analyzers); When is the (frequency of measurement or continuous) h) in case of provisional disposal of waste at construction site and on complain i) in case of fueling of at construction site and on complain observation j) job site j) supervision j) during material delivery and construction k) job site k) inspection k) unannounced inspections during work Why is the (optional) Cost Institutional responsibility Install Operate Install Operate h) NA h) minimal h) Monitoring i) NA i) NA i) Monitoring h) Monitoring i) Monitoring j) NA j) minimal j) NA j) Supervision k) NA k) minimal k) NA k) Supervision 18

19 19

BOSNIA AND HERZEGOVINA: FLOODS

BOSNIA AND HERZEGOVINA: FLOODS BOSNIA AND HERZEGOVINA: FLOODS 2 July 24 The Federation s mission is to improve the lives of vulnerable people by mobilizing the power of humanity. It is the world s largest humanitarian organization and

More information

Wind Power Plant Podveležje

Wind Power Plant Podveležje Wind Power Plant Podveležje Public Information Meeting Mostar, Topics 1. PROJECT BACKGROUND AND OBJECTIVES 2. PROJECT DESCRIPTION 3. PERMITTING STATUS 4. DESCRIPTION OF THE ENVIRONMENTAL CONDITIONS Physical

More information

BRIEF ENVIRONMENT REPORT

BRIEF ENVIRONMENT REPORT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PEOPLE COMMITTEE OF HOCHI MINH CITY WORLD BANK HO CHI MINH CITY DEVELOPMENT PROJECT HDP

More information

Bosnia and Herzegovina Corridor VC 2 Project. Non-technical Summary

Bosnia and Herzegovina Corridor VC 2 Project. Non-technical Summary Bosnia and Herzegovina Corridor VC 2 Project Non-technical Summary Project: Report: Prepared by: Financed by: Bosnia and Herzegovina Corridor VC 2 Project Environmental and Social Assessment Non-technical

More information

THE CITIZEN ASSOCIATION OF THE SUBMERGED AREAS OF LISIČIĆI KONJIC

THE CITIZEN ASSOCIATION OF THE SUBMERGED AREAS OF LISIČIĆI KONJIC "CONSTRUCTION OF A HYDROELECTRIC POWER PLANT DAM JABLANICA: THE HUMAN RIGHTS VIOLATIONS OF THE POPULATION FROM THE SUBMERGED AREAS OF THE JABLANIČKO LAKE" ASJA BORIĆ THE CITIZEN ASSOCIATION OF THE SUBMERGED

More information

INVESTMENT PROJECT Preparation and management for professional automatic greenhouses

INVESTMENT PROJECT Preparation and management for professional automatic greenhouses INVESTMENT PROJECT Preparation and management for 10-100 professional automatic greenhouses Ministry of Economy of the Central Bosnia Canton Travnik, 2015. Ministry of Economy of the Central Bosnia Canton

More information

FACTORY CONSTRUCTION FOR THE PRODUCTION OF FERROSILICIUM IN GORNJI VAKUF - USKOPLJE MINISTRY OF ECONOMY, CENTRAL BOSNIAN CANTON

FACTORY CONSTRUCTION FOR THE PRODUCTION OF FERROSILICIUM IN GORNJI VAKUF - USKOPLJE MINISTRY OF ECONOMY, CENTRAL BOSNIAN CANTON FACTORY CONSTRUCTION FOR THE PRODUCTION OF FERROSILICIUM IN GORNJI VAKUF - USKOPLJE MINISTRY OF ECONOMY, CENTRAL BOSNIAN CANTON Travnik, september 2013 Ministry of economy, Central Bosnian Canton Construction

More information

INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA. CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI

INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA. CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI No: JPAC 841-B80-17 This Invitation for Tenders is published

More information

Ministry of Communications and Transport

Ministry of Communications and Transport more than 100,000 houses and other buildings in Bosnia and Herzegovina (May 2014) were no longer fit to use and that over a million people had been cut off from clean water supplies. Ministry of Communications

More information

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010 MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010 This is a compilation of issues and outcomes identified by the CAC. It is a work in progress,

More information

Workshop on WATER-FOOD-ENERGY-ECOSYSTEMS NEXUS ASSESSMENT IN THE SAVA RIVER BASIN. Sectoral goals in the Sava River Basin

Workshop on WATER-FOOD-ENERGY-ECOSYSTEMS NEXUS ASSESSMENT IN THE SAVA RIVER BASIN. Sectoral goals in the Sava River Basin Workshop on WATER-FOOD-ENERGY-ECOSYSTEMS NEXUS ASSESSMENT IN THE SAVA RIVER BASIN Sectoral goals in the Sava River Basin B&H : Strategic orientation in energy sector Zagreb, 4.3. 14. Prof. Tarik Kupusović

More information

Technical Explanation Introduction

Technical Explanation Introduction Technical Explanation Introduction Local population of Volkovo and Orman has objected through their authorised representatives about the location of the North Bypass of Skopje route. The objections are

More information

Rehabilitation and development of navigation on the Sava river

Rehabilitation and development of navigation on the Sava river Rehabilitation and development of navigation on the Sava river 3rd Joint Statement Implementation Meeting, Vienna, April 5-6, 2011 Background of the project Recognized as a priority project in the framework

More information

ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN FOR THE PROJECT OF THE REHABILITATION OF THE BRIDGE OVER THE PLIVA RIVER

ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN FOR THE PROJECT OF THE REHABILITATION OF THE BRIDGE OVER THE PLIVA RIVER ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN FOR THE PROJECT OF THE REHABILITATION OF THE BRIDGE OVER THE PLIVA RIVER July, 2017 Table of Contents EXECUTIVE SUMARY... 5 1. INTRODUCTION... 8 2. METHODOLOGY

More information

Chuckanut Ridge Fairhaven Highlands EIS Scoping Concerns

Chuckanut Ridge Fairhaven Highlands EIS Scoping Concerns Chuckanut Ridge Fairhaven Highlands EIS Scoping Concerns Coalition of Southside Neighborhoods CSN Comments for Fairhaven Highlands EIS Scope Hearing, Jan 16, 2008 1 Chuckanut Ridge Hilly Terrain: Potential

More information

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update APPENDIX D: SUSTAINABLE TRAIL DESIGN APPENDICES Town of Chili Parks and Recreation Master Plan Update Sustainable Trail Construction Sustainable trails are defined by the US Forest Service as trails having

More information

Gravel and Rock Extraction Highway Maintenance, Recapitalization and Twinning

Gravel and Rock Extraction Highway Maintenance, Recapitalization and Twinning Gravel and Rock Extraction Highway Maintenance, Recapitalization and Twinning Backgrounder: Mountain National Parks A Need for Change Existing supplies of aggregate (sand and gravel) for highway maintenance,

More information

Prof. Mile Dimitrovski, UNSCM

Prof. Mile Dimitrovski, UNSCM 4 3 2 1 Prof. Mile Dimitrovski, UNSCM Republic of Macedonia 5 km Skopje - 1944 Skopje is located in the north of the Republic of Macedonia, in the center of the Balkan peninsula. The city is built in the

More information

REAL ESTATES IN BOSNIA AND HERZEGOVINA

REAL ESTATES IN BOSNIA AND HERZEGOVINA REAL ESTATES IN BOSNIA AND HERZEGOVINA BAHRAIN-BOSNIA Connect with us today YOUR GATEWAY TO A PARTNERSHIP ILIDZA RIVER APARTMENTS 1 House in Konjic City area, with beautiful view on the Jablanicko Lake

More information

Public Seminar 30 October 2018, Lisbon. Water sector in B&H

Public Seminar 30 October 2018, Lisbon. Water sector in B&H Public Seminar 30 October 2018, Lisbon Water sector in B&H Ministry of Foreign Trade and Economic Relations www.mvteo.gov.ba Boško Kenjić, Head of Department Tel: +387 33 262 155 E-mail: bosko.kenjic@mvteo.gov.ba

More information

2. STAKEHOLDER FEEDBACK // What We Heard

2. STAKEHOLDER FEEDBACK // What We Heard 1. QUARRY ROAD TRAIL // Welcome to the Information Session PROJECT DESCRIPTION WHY WE ARE HERE Quarry Road Trail is a popular commuter trail and recreational area for Calgarians. 1. To report citizen feedback

More information

THE MUNICIPALITY of PROZOR-RAMA

THE MUNICIPALITY of PROZOR-RAMA Bosnia and Herzegovina Federation of Bosnia and Herzegovina Herzegovina-Neretva Canton THE MUNICIPALITY of PROZOR-RAMA I T S D E V E L O P M E N T S T R A T E G Y B U S I N E S S ZONES S U B S I D Y S

More information

Presentation from 2015 World Water Week in Stockholm. The authors, all rights reserved. SIWI siwi.org

Presentation from 2015 World Water Week in Stockholm.   The authors, all rights reserved. SIWI siwi.org Presentation from 2015 World Water Week in Stockholm www.worldwaterweek.org The authors, all rights reserved SIWI siwi.org WORLD WATER WEEK Stockholm, 23 th August 2015 Co-operative water governance: catalyst

More information

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP. 4.5 TRAFFIC AND CIRCULATION This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP. 4.5.1 Environmental Setting Existing

More information

Permittees under Sector S are primarily engaged in the following types of activities:

Permittees under Sector S are primarily engaged in the following types of activities: S. Air Transportation 1. Authorized Stormwater Discharges The requirements in Sector S apply to stormwater discharges associated with industrial activity from air transportation facilities as identified

More information

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director 1. Expanding Heathrow The expansion of Heathrow will be one of the largest infrastructure projects in

More information

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land 1.0 Authority 1.1 This rule is promulgated pursuant to 23 V.S.A. 3506. Section 3506 (b)(4) states that an

More information

ES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description:

ES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description: ES-301-1.06 Aircraft Deicing Document Identification Number ES-301-1.06 Date: March 15, 2018 Document Owner: Keith Pass 1) Activity Description: Aircraft deicing is the application of aircraft deicing

More information

Expert Working Group (EWG)

Expert Working Group (EWG) DSC, ACS Yury Padun Version 2 (02.11.2010) Expert Working Group (EWG) Disposal of Surplus of Weapons and Ammunition in AF BiH, Management of Storage Sites Contents Role of International Organizations engaged

More information

LEGISLATIVE OFFICIALS, GOVERNMENT ADMINISTRATORS AND GOVERNMENT EXECUTIVES; MANAGERS

LEGISLATIVE OFFICIALS, GOVERNMENT ADMINISTRATORS AND GOVERNMENT EXECUTIVES; MANAGERS CODE FRAME 1: OCCUPATION For use in the following questions: d3_12d d5_5a, d5_31a and d5_40a d6_4b LEGISLATIVE OFFICIALS, GOVERNMENT ADMINISTRATORS AND GOVERNMENT EXECUTIVES; MANAGERS 11 Legislative officials,

More information

INTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC

INTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC REQUEST FOR QUALIFICATIONS: PROFESSIONAL, EXPERIENCED TRAIL BUILDERS FOR THE CONSTRUCTION OF THE FONTA FLORA STATE TRAIL LAKE JAMES SECTION BURKE COUNTY COMMUNITY DEVELOPMENT INTRODUCTION Burke County

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS APPENDIX 15.1-3 LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN Purpose of the Structure Plan Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS LSP-P1 The District

More information

Invest in the Mostar Quarry Iinvest into man s eternal need: CONSTRUCTION

Invest in the Mostar Quarry Iinvest into man s eternal need: CONSTRUCTION Invest in the Mostar Quarry Iinvest into man s eternal need: CONSTRUCTION Mostar Quarry Investment With this investment all of the required conditions would be provided for opening and starting up of the

More information

Bosnia and Herzegovina

Bosnia and Herzegovina Bosnia and Herzegovina Country Report by Damir Mrđen PC for Water Management for Adriatic Sea RBD in FBIH, by Damir Mrđen 1 Geographic, Social and Economic Context - Total surface area 51,197 km 2, - Population

More information

Tbilisi Railway Bypass Project

Tbilisi Railway Bypass Project Your opinion and comments in the process of project assessment have significant importance Tbilisi Railway Bypass Project The Brochure will introduce you with Tbilisi Railway Bypass project and give a

More information

Code of Practice for filming in East Lothian

Code of Practice for filming in East Lothian Code of Practice for filming in East Lothian Film Edinburgh Part of Marketing Edinburgh Ltd Tel +44 (0)131 622 7337 Email: info@filmedinburgh.org Web: www.filmedinburgh.org filmedinburgh.org In order to

More information

IPA Cross-Border project "Una - Spring of Life" (Croatia - Bosnia and Herzegovina)

IPA Cross-Border project Una - Spring of Life (Croatia - Bosnia and Herzegovina) IPA Cross-Border project "Una - Spring of Life" (Croatia - Bosnia and Herzegovina) Prepered by MSc Lamija Abdijevic, Architect Conservator (Expert Advisor at the Institute of Protection of Monuments in

More information

SELF-ASSESSMENT CHECKLIST

SELF-ASSESSMENT CHECKLIST Tourism and Mountains A Practical Guide to Managing the Environmental and Social Impacts of Mountain Tours Using this Self-Assessment Checklist This checklist has been developed to help mountain-based

More information

Briarhill Neighborhood Polecat Priority List. Exhibit D-4

Briarhill Neighborhood Polecat Priority List. Exhibit D-4 Briarhill Neighborhood Polecat Priority List Exhibit D-4 March 11, 2013 The following list of trail head issues and design elements was developed by Briarhill 2/3 neighborhood residents living near the

More information

Government of Montenegro. Ministry of Transport and Maritime Affairs. Podgorica, April 2013

Government of Montenegro. Ministry of Transport and Maritime Affairs. Podgorica, April 2013 Government of Montenegro Ministry of Transport and Maritime Affairs Podgorica, April 2013 1 I RAIL INFRUSTRUCTURE 1. Rehabilitation of railway line Bar Vrbnica, according to the study Italferr: Technical

More information

SUPPORT TO WATER RESOURCES MANAGEMENT IN THE DRINA RIVER BASIN DRAFT ROOF REPORT INTRODUCTION AND GENERAL APPROACH

SUPPORT TO WATER RESOURCES MANAGEMENT IN THE DRINA RIVER BASIN DRAFT ROOF REPORT INTRODUCTION AND GENERAL APPROACH SUPPORT TO WATER RESOURCES MANAGEMENT IN THE DRINA RIVER BASIN DRAFT ROOF REPORT INTRODUCTION AND GENERAL APPROACH Nadja Zeleznik, REC Public Concultation Beograd, Serbia, 4 July 2017 1 1. Introduction

More information

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) Part 7 General Regulations Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) 61.1 A comprehensive site plan shall be provided to the satisfaction of the Development Authority that shows

More information

[Owner s or Custodian s Company Name] VGP Annual Towing Vessel Inspection Report Form

[Owner s or Custodian s Company Name] VGP Annual Towing Vessel Inspection Report Form Form Vessel General Permit Compliance Instructions: (1) This form must be completed at least once every 12 months. Visually inspect all areas of the vessel affected by the requirements in the VGP that

More information

Technical Assistance to support implementation of

Technical Assistance to support implementation of Technical Assistance to support implementation of water & sanitation programme This project is funded by the European Union Project implemented by IGIP GmbH in consortium with NAMA S.A. and EXERGIA S.A.

More information

Williamson Rock/Pacific Crest National Scenic Trail (PCT) Project EIS. Notice of intent to prepare an Environmental Impact Statement.

Williamson Rock/Pacific Crest National Scenic Trail (PCT) Project EIS. Notice of intent to prepare an Environmental Impact Statement. [3411-15-P] DEPARTMENT OF AGRICULTURE Forest Service Angeles National Forest; Los Angeles County, CA Williamson Rock/Pacific Crest National Scenic Trail (PCT) Project EIS AGENCY: ACTION: Forest Service,

More information

Appendix 1: Best Management Practices For Hang Gliding and Paragliding in Jasper National Parks

Appendix 1: Best Management Practices For Hang Gliding and Paragliding in Jasper National Parks Appendix 1: Best Management Practices For Hang Gliding and Paragliding in Jasper National Parks Name of Best Management Practice Best Management Practices for Hang Gliding and Paragliding in Jasper National

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

CHILD WELL-BEING ANNUAL REPORT: Overview for 2015.

CHILD WELL-BEING ANNUAL REPORT: Overview for 2015. CHILD WELL-BEING ANNUAL REPORT: Overview for 2015. CHILD WELL-BEING ANNUAL REPORT: OVERVIEW FOR 2015 3 CONTENTS FOREWORD WHO WE ARE WHERE WE WORK WHAT WE DO Children are Protected and Cared for Children

More information

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10

More information

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 ETOBICOKE CREEK NORTH TRAIL PROJECT May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 1 Purpose of Open House The purpose of today s open house is to present the design

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

Technical Assistance to support implementation of

Technical Assistance to support implementation of Technical Assistance to support implementation of water & sanitation programme This project is funded by the European Union Project implemented by IGIP GmbH in consortium with NAMA S.A. and EXERGIA S.A.

More information

Lessons Learned from the Floods this May

Lessons Learned from the Floods this May Building Resiliance to Disasters in Western Balkans and Turkey Design a Regional Multi-Hazard EWS Composed of harmonized National EWS econd Meeting of the Design Team 9 11 September 2014, Durrës, Albania

More information

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES BRITISH COLUMBIA MINISTRY OF TRANSPORTATION & INFRASTRUCTURE AVALANCHE & WEATHER PROGRAMS THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES British Columbia Ministry of Transportation & Infrastructure

More information

Advisory Circular CT

Advisory Circular CT (CAA logo, name of the country, etc.) Advisory Circular CT-42-009 SUBJECT: Airport Movement Area and Related Facilities Maintenance DATE: MM/YYYY ASSOCIATED RULES According with (name of the country) Civil

More information

CA AUGUST 2018 Page 1 of 5

CA AUGUST 2018 Page 1 of 5 AVIATION ENVIRONMENTAL PROTECTION, AVIATION INFRASTRUCTURE Form Number: CA 139-12 Section/department/division Telephone number: 011-545-1000 Fax Number: 011 545 1455 Physical address Ikhaya Lokundiza,

More information

Heritage Legislation - Bosnia-Herzegovina

Heritage Legislation - Bosnia-Herzegovina Published on HEREIN System (http://www.herein-system.eu) Home > Heritage Legislation - Bosnia-Herzegovina Heritage Legislation - Bosnia-Herzegovina Country: Bosnia-Herzegovina 7.1.A Council of Europe conventions

More information

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure: Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

Berbera Tog Wajaale Road. Herb Miedema Manager Design HP Gauff Ingenieure JBG

Berbera Tog Wajaale Road. Herb Miedema Manager Design HP Gauff Ingenieure JBG Berbera Tog Wajaale Road Herb Miedema Manager Design HP Gauff Ingenieure JBG Connects Berbera Port to Addis Ababa Important for Regional and Local Trade 240 Km in Somaliland Built 30 years ago No substantial

More information

MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management

MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management 200 S. Spruce St. P.O. Box 20,000 Grand Junction, Colorado 81502-5022

More information

PAVEMENT CONDITION REPORT

PAVEMENT CONDITION REPORT PAVEMENT CONDITION REPORT Department of Facility Maintenance December 2012 TABLE OF CONTENTS Executive Summary...1 Figure 1. Inputs to Pavement Condition Index...1 Figure 2. Summary Oahu Pavement Condition

More information

Your partner in Bosnia & Herzegovina

Your partner in Bosnia & Herzegovina Your partner in Bosnia & Herzegovina for design, building, installation and servicing Your partner in Bosnia & Herzegovina 1 1.1 History of EGW Dear Sir, Madam, You have just turned over the first page

More information

CONVENTION ON THE PROHIBITION OF THE USE, STOCKPILING, PRODUCTION AND TRANSFER OF ANTI-PERSONNEL MINES AND ON THEIR DESTRUCTION

CONVENTION ON THE PROHIBITION OF THE USE, STOCKPILING, PRODUCTION AND TRANSFER OF ANTI-PERSONNEL MINES AND ON THEIR DESTRUCTION CONVENTION ON THE PROHIBITION OF THE USE, STOCKPILING, PRODUCTION AND TRANSFER OF ANTI-PERSONNEL MINES AND ON THEIR DESTRUCTION Reporting Formats for Article 7 STATE [PARTY]: Bosnia and Herzegovina (annual

More information

Gas network development in BiH

Gas network development in BiH USAID Energy Investment Activity Gas network development in BiH Conference on Security of Gas Supply in Bosnia and Herzegovina Fahrudin Kulic Jahorina, 2 July 2018 CONTENTS Existing gas network in BiH

More information

Land Use and Environmental Control

Land Use and Environmental Control ICAO-ACI/LAC Seminar on Bird Hazards, Environmental Protection and Land Use at Airports for the NAM/CAR/SAM (Americas) Regions Miami, 24-27 April 2001 Land Use and Environmental Control Michiel Vreedenburgh

More information

ADVISORY CIRCULAR ON LAND USE AND ENVIRONMENTAL MANAGEMENT IN THE VICINITY OF AERODROMES

ADVISORY CIRCULAR ON LAND USE AND ENVIRONMENTAL MANAGEMENT IN THE VICINITY OF AERODROMES Page 1 of 9 1.0 PURPOSE 1. The purpose of this Advisory Circular (AC) is to provide guidance on land use practices and activities in the vicinity of aerodromes. 2.0 REFERENCE 2.1 The Civil Aviation (Aerodromes)

More information

"ST. KLIMENT OHRIDSKI FACULTY OF GEOLOGY AND GEOGRAPHY

ST. KLIMENT OHRIDSKI FACULTY OF GEOLOGY AND GEOGRAPHY SOFIA UNIVERSITY "ST. KLIMENT OHRIDSKI FACULTY OF GEOLOGY AND GEOGRAPHY APPLICATION OF THE MODEL "DRIVING FORCES PRESSURE STATE - RESPONSE FOR ASSESSMENT OF FLOOD RISK RADOSTINA BORISOVA DOCHEVA Bachelor

More information

Passenger Facility Charge: No. 7 Application. Public Notice Materials. Luis Muñoz Marín International Airport San Juan Puerto Rico.

Passenger Facility Charge: No. 7 Application. Public Notice Materials. Luis Muñoz Marín International Airport San Juan Puerto Rico. Passenger Facility Charge: No. 7 Application December 2013 Public Notice Materials Luis Muñoz Marín International Airport San Juan Puerto Rico INTRODUCTION Aerostar Airport Holdings has initiated the process

More information

Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting

Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting 10.27.16 Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting Agenda Welcome / Introductions DFW

More information

F I N A L EIA R E P O R T

F I N A L EIA R E P O R T Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Consulting Services for Environment Impact Assessment in the Neretva and Trebišnjica

More information

Recent Erosion and Mass Wasting Observed in Sunset Cliffs Natural Park. Craig Barilotti and Camilla Ingram Sunset Cliffs Association

Recent Erosion and Mass Wasting Observed in Sunset Cliffs Natural Park. Craig Barilotti and Camilla Ingram Sunset Cliffs Association Recent Erosion and Mass Wasting Observed in Sunset Cliffs Natural Park Craig Barilotti and Camilla Ingram Sunset Cliffs Association 15 February 2011 Executive Summary A major source of nearshore pollution

More information

PROGRESS REPORT No.7 (up to )

PROGRESS REPORT No.7 (up to ) BOSNIA AND HERZEGOVINA FEDERATION OF BOSNIA AND HERZEGOVINA PUBLIC COMPANY MOTORWAYS IN FEDERATION OF BOSNIA AND HERZEGOVINA LTD. MOSTAR PROJECT: MOTORWAY ON CORRIDOR 5c IN FEDERATION OF BiH PROGRESS REPORT

More information

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM To decrease unnecessary train traffic exposure to life and property, promote public safety, and improve traffic conditions, the Texas Department of Transportation

More information

PROPOSED PARK ALTERNATIVES

PROPOSED PARK ALTERNATIVES 8 Chimne y Rock State Park M a ster Pl an 2011 PROPOSED PARK ALTERNATIVES Introduction Three different park development concepts were prepared and presented to the citizens of North Carolina through a

More information

The Priority Environmental Investment Programme for SEE (PEIP) BACKGROUND DOCUMENT NR: 4. Country name: BOSNIA I HERZEGOVINA

The Priority Environmental Investment Programme for SEE (PEIP) BACKGROUND DOCUMENT NR: 4. Country name: BOSNIA I HERZEGOVINA The Priority Environmental Investment Programme for SEE (PEIP) Analytical Report on progress on developing and implementing environmental investment projects in the SEE. BACKGROUND DOCUMENT NR: 4 Country

More information

REVIEW OF GOLD COAST AIRPORT Noise Abatement Procedures

REVIEW OF GOLD COAST AIRPORT Noise Abatement Procedures REVIEW OF GOLD COAST AIRPORT Noise Abatement Procedures Introduction The purpose of this document is to present an overview of the findings of the review of the Noise Abatement Procedures (NAPs) in place

More information

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of environment, mining and spatial planning Department of project

More information

waterview connection Completing the Western Ring Route the Waterview Connection

waterview connection Completing the Western Ring Route the Waterview Connection waterview connection MAY 2009 Completing the Western Ring Route the Waterview Connection The NZ Transport Agency (NZTA) has a new proposal to complete the Western Ring Route around Auckland by connecting

More information

HYDRAULIC STUDY OF THE NERETVA RIVER (FROM MOSTAR TO THE BORDER WITH THE REPUBLIC OF CROATIA)

HYDRAULIC STUDY OF THE NERETVA RIVER (FROM MOSTAR TO THE BORDER WITH THE REPUBLIC OF CROATIA) HYDRAULIC STUDY OF THE NERETVA RIVER (FROM MOSTAR TO THE BORDER WITH THE REPUBLIC OF CROATIA) B.Sc. Draženka Kvesić, civ. eng. PRONING DHI d.o.o., Račkog 3, Zagreb Croatia. Email: drazenka@proning-dhi.hr.

More information

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE INTRODUCTION The Renovated East Building Alternative would include the continued use of the renovated West Building and the renovation

More information

Bosnia and Herzegovina: Floods

Bosnia and Herzegovina: Floods Bosnia and Herzegovina: Floods DREF operation n MDRBA004 GLIDE n FL-2009-000136-BIH 17 July 2009 The International Federation s Disaster Relief Emergency Fund (DREF) is a source of un-earmarked money created

More information

HOME OWNER PRE- DELIVERY INSTRUCTIONS

HOME OWNER PRE- DELIVERY INSTRUCTIONS Congratulations on your decision to enjoy the finest spas available Welcome to the growing family of Sundance Spa owners HOME OWNER PRE- DELIVERY INSTRUCTIONS Please take the time to read these instructions

More information

Global Sustainable Tourism Destinations Criteria

Global Sustainable Tourism Destinations Criteria Global Sustainable Tourism Destinations Criteria Draft destination level Global Sustainable Tourism Criteria as proposed after Destinations and International Standards joint working group meeting and follow-up

More information

Pumped storage hydroelectric power plants: Issues and applications BIH Case Study

Pumped storage hydroelectric power plants: Issues and applications BIH Case Study Pumped storage hydroelectric power plants: Issues and applications BIH Case Study Sasa Scekic, Head of Licensing and Technical Affairs Dpt., SERC BIH www. erranet.org Power System of Bosnia and Herzegovina

More information

Ivan Lovrić. Telephone Mobile phone Fax

Ivan Lovrić. Telephone Mobile phone Fax PERSONAL INFORMATION Surname and first name Ivan Lovrić Address Work: Faculty of Civil Engineering, University of Mostar, Matice hrvatske bb, 88000 Mostar, Bosnia and Herzegovina Telephone +387 36 355

More information

Cruise Industry Perspective on OWS and Waste Management

Cruise Industry Perspective on OWS and Waste Management Cruise Industry Perspective on OWS and Waste Management MAX1 OWS Studies Conference Wilmington, NC, 24 June 2015 James R. Van Langen, P.E. Environmental, Safety, Quality & Sustainability Consultant Cruise

More information

Proceedings, 2012 International Snow Science Workshop, Anchorage, Alaska

Proceedings, 2012 International Snow Science Workshop, Anchorage, Alaska I-90 SNOQUALMIE PASS: OPERATING A HIGHWAY AVALANCHE PROGRAM DURING A MAJOR CONSTRUCTION PROJECT John Stimberis, Washington State Department of Transportation ABSTRACT: Snoqualmie Pass, WA (921m) receives

More information

Finn Creek Park. Management Direction Statement Amendment

Finn Creek Park. Management Direction Statement Amendment Finn Creek Park Management Direction Statement Amendment November 2013 Management Direction Statement Amendment Approved by: Jeff Leahy Regional Director, Thompson Cariboo BC Parks November 12, 2013 Date

More information

THE TARIFF OF PORT FEES AND CHARGES SZCZECIN AND ŚWINOUJŚCIE SEAPORTS AUTHORITY

THE TARIFF OF PORT FEES AND CHARGES SZCZECIN AND ŚWINOUJŚCIE SEAPORTS AUTHORITY THE TARIFF OF PORT FEES AND CHARGES SZCZECIN AND ŚWINOUJŚCIE SEAPORTS AUTHORITY CONTENTS 1. APPLICATION... 3 2. COLLECTION.... 3 3. COLLECTION OF WASTE FROM SHIPS... 4 4. SERVICES PROVIDED BY PORT RESCUE

More information

Geoscape Toronto The Oak Ridges Moraine Activity 2 - Page 1 of 10 Information Bulletin

Geoscape Toronto The Oak Ridges Moraine Activity 2 - Page 1 of 10 Information Bulletin About 13,000 years ago as the Laurentide Ice Sheet melted, glacial meltwater accumulated between the ice sheet and the Niagara Escarpment. This formed a lake basin into which gravel and sand were deposited.

More information

FLIGHT PATH FOR THE FUTURE OF MOBILITY

FLIGHT PATH FOR THE FUTURE OF MOBILITY FLIGHT PATH FOR THE FUTURE OF MOBILITY Building the flight path for the future of mobility takes more than imagination. Success relies on the proven ability to transform vision into reality for the betterment

More information

Project of E-763 Motorway Construction, Section: Belgrade Ostružnica - Požega Boljare/ Border of Montenegro

Project of E-763 Motorway Construction, Section: Belgrade Ostružnica - Požega Boljare/ Border of Montenegro Project of E-763 Motorway Construction, Section: Belgrade Ostružnica - Požega Boljare/ Border of Montenegro I Legal Framework: Preparation of design for construction of E-763 motorway, section: Belgrade

More information

Coronado National Forest Santa Catalina Ranger District

Coronado National Forest Santa Catalina Ranger District United States Department of Agriculture Forest Service Coronado National Forest Santa Catalina Ranger District File Code: 1950 Date: October 14, 2015 Dear Interested Party: The Santa Catalina Ranger District

More information

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS CHAPTER III Trail Design Standards, Specifications & Permits This chapter discusses trail standards, preferred surface types for different activities, permits, and other requirements one must consider

More information

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS 1.Define wind Coverage (AUC NOV/DEC 2010),(AUC NOV/DEC 2011)

More information

SUTTER COUNTY. General Plan Update Technical Background Report

SUTTER COUNTY. General Plan Update Technical Background Report SUTTER COUNTY General Plan Update Technical Background Report February 2008 SUTTER COUNTY GENERAL PLAN UPDATE TECHNICAL BACKGROUND REPORT PREPARED FOR: SUTTER COUNTY PREPARED BY: PBS&J IN PARTNERSHIP

More information

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan Appendix C Tenderfoot Mountain Trail System Road and Trail Rehabilitation Plan All rehabilitation work would be under the direction of the District Fisheries Biologist, the Forest Hydrologist, and/or the

More information

E40. Temporary activities

E40. Temporary activities E40. Temporary activities E40.1. Background Temporary activities contribute to Auckland's vibrancy and to the social, cultural and economic well-being of communities. Temporary activities also enable filming

More information

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X ROUTE CLASSIFICATION For use of this form, see ATP 3-34.81/MCWP 3-17.4; the proponent agency is TRADOC. SECTION I 1. SERIAL NUMBER 2. TO 3. FOR INFORMATION 4. DATE/TIME GROUP 5. NUMBER OF SHEETS OR ENCLOSURES

More information