LEADS IDAHO BUSINESS S REVIEW

Size: px
Start display at page:

Download "LEADS IDAHO BUSINESS S REVIEW"

Transcription

1 IDAHO BUSINESS S REVIEW BIDS Week of May 23, 2014 East Sprague Avenue CSO Basin33-2 Control Facility / City: Spokane Bidding: 5/19/2014 1:00 PM PST / State: WA Bids To: City of Spokane Description: This project consists of the construction of approximately 1,100 linear feet of combined sanitary and storm sewer, and approximately 31 Wx185 L (outside dimensions) 270,000 gallon cast-in-place concrete control facility (tank), utility adjustments, service connections, and other related miscellaneous items. Basin Creek Culvert Replacement / City: Grangeville Bidding: 6/2/2014 4:00 PM MST / State: ID Bids To: IDAHO MONTANA ACQUISITION TEAM Description: This project is for the removal of a corrugated steel pipe on Basin Creek and replacing it with a baffled corrugated steel pipe-arch and construction of ditch relief culverts. The work includes but is not limited to clearing and grubbing, erosion control measures, structure excavation, roadway embankment, removing and disposing existing culverts, compaction, riprap, roadway surfacing, furnishing and installing a corrugated steel pipe-arch culvert, and all other incidental items necessary to complete the project in accordance with the plans and specifications. The road between the aggregate source at Adams Pit (NFSR 354) and the project site has limited geometry at Buckshot Point. Use caution when navigating this portion of the road. Evanston Middle School Renovations and Additions / City: Evanston Bidding: 5/20/2014 2:00 PM MST / State: WY Bids To: Owner Description: The work includes, renovation and additions of Evanston Middle School of approximately 86,000 including site improvements. Overhead Street Light Replacement / City: Boise Bidding: 5/28/ :00 AM MST / State: ID Bids To: City of Boise Description: The work involves the replacement of existing high pressure sodium lights with Light Emitting Diode (LED) fixtures, and other related work. It is the intent of these documents to describe the work required to complete this project in sufficient detail to secure comparable bids. All parts or work not specifically mentioned which are necessary in order to provide a complete installation shall be included in the bid and shall conform to all Local, State and Federal requirements. Town of Creston Reservoir / City: Creston Bidding: 5/22/2014 2:00 PM PST / State: WA Bids To: Town of Creston Description: Two identical 26-foot diameter by 65-foot high, 258,000 gallon cast-in- place concrete potable water storage reservoirs and appurtenances, 16 ft. x 8 ft. x 7-6 pre-cast concrete valve vault with piping, valves and appurtenances, 8-inch through 12-inch diameter site piping, valves and appurtenances, Approximate 165,000 gallon reservoir drain/overflow pond, Associated SCADA system improvements, electrical power and controls, Associates gravel, and hydro seeding surface restoration, Demolition of existing 100,000 gallon steel reservoir. Sacajawea Elementary School / City: Richland Bidding: 5/29/2014 4:00 PM PST / State: WA Bids To: Richland School District Description: A new 2 story building consisting of 65,000 square feet, including Site Work, Structures, Finishes, Fire Protection, Mechanical, and Electrical work. LEADS Gene Day Pond Phase 1 / City: Osburn Bidding: 5/9/2014 2:00 PM MST / State: ID Bids To: Idaho Department of Fish & Game Description: Work includes all materials, labor and equipment to accomplish project. Construction of approximately 5 x30 x8 cast in place concrete water control structure including waterman gate valve and angular rip rap. Shea Meadows / City: Bovill Bidding: 5/19/2014 3:00 PM PST / State: ID Bids To: Idaho Department of Fish & Game Description: The project consists of excavation of 8,770 linear feet of new channel for the East Fork Corral Creek, installation of 30 hummocks and 25 beaver, installation of 15,900 linear feet of wire fence, grading of an existing railroad berm and re-vegetation. I-90 WA St Ln to MT/ID St Ln / City: Kootenai & Shoshone Co. Bidding: 6/3/2014 2:00 PM MST / State: ID Bids To: Idaho Transportation Department Description: For the work of upgrading the existing High Pressure Sodium lighting fixtures, and LED fixtures on I-90 from Washington State Line to Montana State Line and upgrading the existing 480 volt at IC #6 Spokane St; IC #42 Kingston; IC #48 Smelterville; and IC #60 Silverton Road Maintenance / City: Dalton Gardens Bidding: 5/15/2014 3:00 PM PST / State: ID Bids To: City of Dalton Gardens Description: The project consists of chip sealing 16th Street between Dalton Ave and Wilbur Ave including associated traffic control, street cleaning and or preparation, fog coat and clean up. There are 3 Add Alternates on this project. Carlin Bay OAC Wastewater Treatment System Improve / City: Coeur d Alene Bidding: 5/19/2014 2:00 PM PST / State: ID Bids To: Carlin Bay Property Owner Association Description: The project consists of the construction of a new wastewater storage, treatment, and reuse facility. Construction also includes transmission mains and lift station. Replace Roof District Office Main Building ITD CDA City: Coeur d Alene Bidding: 5/22/2014 3:00 PM PST / State: ID Bids To: Division of Public CDA Description: The work consists of removing rock ballast, EPDM Membrane Roofing, and all flashings/trims (see drawings) to insulation and wall sheathing. The existing insulation is to remain in-place and undamaged. New substrate board and vapor barrier are to be installed prior to installing a new Mechanically Fastened Thermoplastic Polyolefin (TPO) Roofing System, which includes new flashings and trim. Roofing system is to include, but not limited to, miscellaneous framing, flashings, parapet caps, crickets, drains, etc. associated with the roof and wall areas. Exterior Wall Repair District Office Main Building / City: Coeur d Alene Bidding: 5/22/2014 3:30 PM PST / State: ID Bids To: Division of Public CDA Description: The work consists of removing portions of ceramic tile and replacing with new. Removal and replacement of grout is also included in the Project. IDAHO BUSINESS REVIEW Contact your IBR account executive to place your business message in this new LEADS publication CDBG Pedestrian Ramp / City: Nampa Bidding: 5/19/2014 2:00 PM MST / State: ID Bids To: City of Nampa Description: The 2014 CDBG Pedestrian Ramps project includes the installation of aggregate base patching, concrete curb & gutter, concrete valley gutters, storm drainage facilities and pedestrian ramp improvements at the following intersection locations: 1 9th Avenue North and 5th Street North, 2. 10th Avenue North and 4th Street North. Alley Sewer Pipe Bursting / City: Idaho Falls Bidding: 5/20/2014 2:30 PM MST / State: ID Bids To: City of Idaho Falls Description: This project consists of the Contractor furnishing all tools, labor, equipment, and materials necessary to burst approximately 1180 L.F. of 15 to 18 pipe and 50 L.F. of 18 to 24 pipe, and any additional items specified.* As per the City of Idaho Falls, The Entire Book MUST BE SUBMITTED INTACT as Part of the Book* Equipment Rental-Taylor Crossing Rock Garden Ph2 / City: Idaho Falls Bidding: 5/13/2014 2:30 PM MST / State: ID Bids To: City of Idaho Falls Description: Project is for the rental of certain equipment (3 excavators, tractor/trailer - sky dump, tractor/trailer- flat bed, skid steer, walk behind roller, loader), each with qualified experienced operators, and all other appurtenant and ancellary equipment and personnel necessary to grade, haul, and install lava rock landscaping walls along the west bank of Snake River north of Pancheri Drive, and any additional items specified. * As per the City of Idaho Falls, The Entire Book MUST BE SUBMITTED INTACT as Part of the Bid* Roof Replacement / City: Boise Bidding: 5/28/2014 1:30 PM MST / State: ID Bids To: City of Boise Description: The scope of work the item being sought to purchase is: Roof replacement at 1191 Grand Ave. Sewer Replacements 2014 / City: Idaho Falls Bidding: 5/20/2014 3:30 PM MST / State: ID Bids To: City of Idaho Falls Description: This project shall consist of the Contractor furnishing all tools, materials, labor, and equipment necessary to replace portions of sanitary and storm drain sewers in various locations throughout the City, including, but not limited to, installing approximately 20 L.F. of 8 and 250 L.F. of 12 pipe, and any additional items specified. SH-3 Bridge Deck Life Extensions / City: Benewah & Kootenai Co. Bidding: 6/3/2014 2:00 PMMST / State: ID Bids To: Idaho Transportation Department Description: For the work of refurbishing and sealing the decks & parapet rails and repave approaches of (6) bridges. Elko Water & Sewer Department Containment/Drying B / City: Elko Bidding: 5/23/2014 3:00 PM MST / State: NV Bids To: City of Elko Description: The work includes excavation, subgrade preparation, the placement of geotextile, placement of compacted gravel base, reinforced concrete walls, reinforced concrete floors, a reinforced concrete access ramp, and reinforced concrete at grade slabs. Shoshone County Airport Airfield Pavement / City: Kellogg Bidding: 5/28/ :00 AMPST / State: ID Bids To: Shoshone County Description: Work associated with proposed improvements are generally described as follows: Airfield Pavement Maintenance consisting of removing approximately 20,000 square feet of existing pavement markings; routing and sealing 5,000 linear feet of pavement cracks; 62,500 square yards of bituminous seal coat Put your business in front of key decision makers every week! Contact your IDAHO BUSINESS REVIEW account executive today for more information about advertising in this publication

2 application and repainting 18,800 square feet of pavement markings. Barker Rd to Idaho State Line Paving / City: Spokane Co. Bidding: 5/14/ :00 AM PST / State: WA Bids To: WSDOT Description: This Contract provides for the improvement of *** 6.29 miles of Interstate 90 from MP to MP by planing bituminous pavement, pavement repair excavation, paving with hot mix asphalt, applying crack seal and fog seal to shoulders, replacing guideposts, rumble strips, pavement markings, and traffic control and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. Soda Creek Culvert Replacement / City: Idaho County Bidding: 6/1/2014 4:00 PM MST / State: ID Bids To: USDA Forest Service Description: This project is for the removal and replacement of a corrugated steel pipe on an unnamed tributary to Soda Creek on National Forest System Road (NFSR) 1172 at mile post 2.6. The project also includes reconditioning and aggregate placement on 1.32 miles of NFSR The work includes but is not limited to clearing and grubbing, erosion control measures, structure excavation, roadway embankment, removing and disposing an existing culvert, compaction, riprap, roadway surfacing, furnishing and installing a corrugated steel culvert, and all other incidental items necessary to complete the project in accordance with the plans and specifications. Remodel Building 42 / City: Boise Bidding: 5/29/2014 2:00 PM PST / State: ID Bids To: Department of Veteran Affairs Description: Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the Remodel Building 42, Project # , Boise, Idaho as required by drawings and specifications. Elko County Jail Mens and Womens Housing Unit Add / City: Elko Bidding: 6/2/2014 3:00 PM PST / State: NV Bids To: Elko County Description: In general, the major improvements shall consist of a 1,129 sf. addition to Women s Dorms J and K, and two (2) new Men s Housing Units totaling 8,539 sf. Work includes, but is not limited to selective demolition; civil, landscaping, and utility sitework; new structural and architectural components; and new mechanical, plumbing, electrical, security, communications, fire sprinkler, and alarms systems. East 15th North Street Paving / City: Mountain Home Bidding: 5/22/2014 2:00 PM MST / State: ID Bids To: City of Mountain Home Description: The project consists of the following work: Furnish and install 3 inches (compacted in-place) of asphalt pavement (approximately 1153 tons) along East 15th North from North 14th East to North 10th East. Road base, grading, and preparation for paving will be completed by the City of Mountain Home prior to construction. Two additive alternatives may be awarded based on bid price and available budget. Alternative #1 includes N 1oth East from E 15th North to Glen Roi Subdivision (966 tons). Alternative #2 includes N 14th East from E 15th North to Glen Roi Subdivision (672 tons). Silverstone Subdivision Fog Coat / City: Mountain Home Bidding: 5/22/2014 2:00 PM MST / State: ID Bids To: City of Mountain Home Description: The Project consists of the following work: A fog coat of CSS-1H oil sprayed at an average rate of gallons/square yard of approximately 41,540 square yards in the Silverstone Subdivision. Two additive alternatives may be awarded based on bid price and available budget. Alternative #1 includes the Glen Roi Subdivisions (30,028 square yards). Alternative #2 includes NW Marathon Way (13,267 square yards). West 5th North Street Chip Seal / City: Mountain Home Bidding: 5/22/2014 2:00 PM MST / State: ID Bids To: City of Mountain Home Description: The Project consists of the following work: Y2 inch chips, CRS-2R Emulsion. Approximately 14,500 square yards - West 5th North Chip Seal from North Haskett Street to NW Elmcrest Street. One additive alternative may be awarded based on bid price and available budget. The alternate includes NW Marathon Way (13,300 square yards). SURC Flooring Upgrades & Program Space Improvements / City: Ellensburg Bidding: 5/29/2014 3:00 PM PST / State: WA Bids To: Central Washington University Description: This Project consists of flooring upgrades and renovation work in the Student Union Recreation Center (SURC) on the campus of Central Washington University in Ellensburg, Washington. Appleway Blvd Street Preservation / City: Spokane Valley Bidding: 5/23/ :00 AM PST / State: WA Bids To: City of Spokane Valley Description: The project consists of bituminous planing; hot mix asphalt paving and patching; PCC pavement modifications, sidewalk and curb construction; and other related work. LDS Temple Meridian ID / City: Meridian Bidding: 6/4/ :00 PM MST / State: ID Bids To: Owner Description: 1. Bid package I All work necessary for the completion of the temple and the maintenance buildings. The proposed LDS Meridian Idaho temple will be constructed of non-combustible materials. The structure is a composite concrete on metal deck system with BRB bracing. Concrete shafts are provided at the elevator towers. The building will be clad with a precast concrete panel system. The interior framing will comprise metal studs. Package I also includes all on-site work up to the property lines and up to the area outlined as bid package III for the meetinghouse pad. Rough grade for the meetinghouse pad will be included in bid package I. Scope will include bringing water, sewer and storm drain lines up 5 from the building perimeter. The work also includes small areas outside the property lines such as the northeast corner of the site along Phyllis Canal, the area west of the maintenance building and the area south of the southern drive. These areas are included for regrading of the site. Package I excludes work for bid package II which includes the Linder Road and off-site improvements. It also excludes work as listed below in bid package III for the meetinghouse pad. 2. Bid Package II Bid package II includes all work associated with the Linder Road widening improvements and the upgrades to off-site utility services. Included are updates to Right-of Way areas adjacent to Linder Road as required for regrading and road widening. Road widening Improvements are proposed from Almaden Drive up to the Phyllis Canal. Improvements include new sidewalks, new and upgraded utility services, new landscaping, new traffic signals and drainage seepage beds.; Cont... Pedestrian Bike Master Plan Safety Improvements / City: Boise Bidding: 5/22/2014 2:00 PM MST / State: ID Bids To: Division of Public Works Description: A description of the work of this project can be summarized to include demolition of existing asphalt paving and landscaping, and construction of new concrete and unit paver paving and new landscape beds (not including landscape planting and irrigation). Bid Alternates include 1) Removal of existing asphalt parking spaces and replacement with lawn and sidewalk. 2) Construction of diagonal concrete pathway. 3) Removal of existing asphalt paving and replacement with concrete paving in limited area. 4) Installation of landscape planting and irrigation in base bid beds. Phase 4 - Frontage Road Sewer / City: Wendell Bidding: 5/9/ :00 AM MST / State: ID Bids To: City of Wendell Description: The Project generally consists of the construction of approximately 5,000 feet of collection system piping; highway bore crossing; manhole Installations; surface restoration; and other associated work Well 9 Well 21 and Well 22 Control System Upgrades / City: Meridian Bidding: 5/15/2014 2:30 PM MST / State: ID Bids To: City of Meridian Description: Furnish all labor, materials, equipment and incidentals as required for the Well 9, Well 21 and Well 22 Control System Upgrades Construction, per the attached drawings and specifications. PSC New Microwave Site Black Mountain / City: Bonners Ferry Bidding: 5/21/2014 2:00 PM PST / State: ID Bids To: H2A Office Description: A description of the work of this project can generally be summarized to include: The construction of a microwave tower facility at Black Mountain near Bonners Ferry, ID. Included in the project scope will be the construction of a precast concrete communications equipment building that will also house a propane fueled emergency generator. Propane tanks will be buried underground for fire mitigation purposes. Scope includes new foundation for and the erection of an Owner furnished communications tower. CONTRACTS HIGHWAY/UTILITY PROJECTS IDAHO 4/8/ STREET MICRO-SURFACE OVERLAY CHUBBUCK ENGINEERS ESTIMATE J.K. Merrill - Aggregate - $13, VSS Internationa l -Micro-Surfacing-$199,500 4/15/2014 RECONSTRUCT RUNWAY AND REHABILITATE PARALLEL MOUNTAIN HOME $2,741, WESTERN CONSTRUCTION $2,766, GRANITE EXCAVATION $2,806, C & A PAVING $2,883, CENTRAL PAVING $2,887, KNIFE RIVER $3,482, IDAHO SAND & GRAVEL 6 Bidders 4/18/2014 SR2S PHASE III KOOSKIA $73, MCCALL CLASSIC CONSTRUCTION $79, IDAHO STAGE LLC $107, QUALITY CONTRACTORS 3 Bidders 4/22/2014 ROADWAY REMEDIATION PROGRAM 2014 ROADS PINEHURST $797, POE ASPH. PAVING $844, INTERSTATE CONC. & ASPHALT CO $879, CDA PAVING 3 Bidders 4/23/2014 WARM SPRINGS SEWER EAST OF OLD PENITENTIARY BOISE $173, TITAN TECHNOLOGIES $174, COUGAR EXCAVATION $179, DAHLE CONSTRUCTION $181, GRANITE EXCAVATION $223, MCMASTER CONSTRUCTION & DEVELOPMENT $260, AMERICAN GENERAL CONTRACTING $314, SCHMIDT CONSTRUCTION 7 Bidders SPRING 2014 CANYON COUNTY ASPHALT PAVING PARKING X=Awarded CALDWELL X PRECISION GRADING 1 Bidders 4/29/2014 EAGLE SEWER DISTRICT MACE ROAD LIFT STATION UPGRAD EAGLE $1,313, STAR CONSTRUCTION $1,891, RSCI $2,053, MCMASTER CONSTRUCTION & DEVELOPMENT $2,412, EWING COMPANY, THE 4 Bidders 4/29/2014 UTAH AVENUE ROUNDABOUT RECONSTRUCTION IDAHO FALLS $187, ENGINEERS ESTIMATE $199, DEPATCO, INC. $216, HK CONTRACTORS 2 Bidders 4/30/2014 JULIA DAVIS PARK CANCER SURVIVOR PLAZA BOISE $352, *WESTERN IDAHO CONSTRUCTION & LANDSCAPE $381, BRICON $436, EKC $444, DIAMOND CONTRACTORS, LLC $497, PERKINS CONSTRUCTION, INC. 5 Bidders 2014 LOCAL OVERLAYS PHASE B BOISE $1,044, CENTRAL PAVING

3 $1,049, C & A PAVING $1,199, IDAHO SAND & GRAVEL 3 Bidders RIDGECREST DRIVE REALIGNMENT NAMPA $813, STAKER PARSONS COMPANIES $829, CENTRAL PAVING $922, GRANITE EXCAVATION $1,005, C & A PAVING 4 Bidders 5/1/ STREET PRESERVATION SEAL COAT LEWISTON $327, HERCO INC. $342, POE ASPH. PAVING 2 Bidders 2014 STREET PRESERVATION SLURRY SEAL LEWISTON $120, INTERMOUNTAIN SLURRY SEAL $125, BLACKLINE, INC. $176, VSS INTERNATIONAL INC. $185, BOSWELL PAVING 4 Bidders NORTH CAMPUS ENTRY GATEWAYS MOSCOW $320, GINNO CONSTRUCTION $364, WRIGHT BROTHERS 2 Bidders 5/7/2014 GODDARD ROAD PEDESTRIAN IMPROVEMENTS BOISE $505, C & A PAVING $510, IDAHO SAND & GRAVEL $532, WF CONSTRUCTION 3 Bidders 5/7/ MAIN STREET RECONSTRUCTION SMELTERVILLE $801, KNIFE RIVER $854, WM WINKLER CO. $896, DG & S $901, CDA PAVING $938, INTERSTATE CONC. & ASPHALT CO $1,006, POE ASPH. PAVING $1,012, MDM CONSTRUCTION 7 Bidders WASHINGTON 4/2/2014 WASHINGTON CORRECTIONS CENTER WATER METER SHELTON ALPENGLOW CONSTRUCTION $98, KAMIN EXCAVATION $128, OLYMPIC PENINSULA CONSTRUCTION 3 Bidders 4/8/2014 STADIUM WAY RESURFACING X=Awarded PULLMAN $1,091, X POE ASPH. PAVING $1,258, SHAMROCK PAVING 2 Bidders 4/15/2014 N-NE EPHRATA $72, TOMMER CONSTRUCTION $87, HLT CONSTRUCTION, INC. $126, NORTH CENTRAL CONSTRUCTION, INC. $162, ADVANCED EXCAVATION 4 Bidders BUILDING PROJECTS IDAHO 3/20/2014 WINDOW INFILL AND REPLACEMENT SCHOOL DIST #25 X=Awarded POCATELLO X C.R. CLARK CONSTRUCTION 4/16/2014 TENANT IMPROVEMENT FOR CWI QUAIL COURT BOISE $449, EXCELSIOR CONSTRUCTION CO. $468, KREIZENBECK CONSTRUCTORS, INC. $477, C2 CONSTRUCTION $481, SCOTT HEDRICK CONSTRUCTION INC $492, EKC $498, WRIGHT BROTHERS 6 Bidders 4/22/2014 MAIN WATERLINE REPLACEMENT X=Awarded POCATELLO X ROBERT CHILD PLUMBING & HEATING 4/24/2014 LDS AUTUMN FAIR MEETING HOUSE MERIDIAN SCOTT HEDRICK CONSTRUCTION INC *Apparent low bidder HIGHLAND HIGH SCHOOL BUILDING C RENOVATION POCATELLO J & S CONSTRUCTION COMPANY Apparent Low 4/30/2014 EMMETT PUBLIC LIBRARY EXPANSION EMMETT $284, WRIGHT BROTHERS 1 Bidders 5/1/2014 INTERIOR PAINTING LAKE HAZEL ELEMENTARY SCHOOL BOISE $48, NATIONAL COATINGS $65, BHM & ASSOCIATES, INC. 2 Bidders INTERIOR PAINTING CHIEF JOSEPH SCHOOL OF THE ARTS MERIDIAN $68, ALL COLORS INC $69, NATIONAL COATINGS $76, ADAM ROE PAINTING INC $102, MERIT COMPANY $128, CAPITAL TIME PAINTING 4 Bidders INTERIOR AND EXTERIOR PAINTING STAR ELEMENTARY STAR $56, ALL COLORS INC $69, BHM & ASSOCIATES, INC. 2 Bidders 5/2/2014 GRACE HATCHERY SEPTIC SYSTEM CARIBOU COUNTY $62, A & R CONSTUCTION $87, BEAR LAKE CONSTRUCTION 2 Bidders MONTANA 4/4/2014 MSU WILSON HALL EXTERIOR RENOVATION BOZEMAN $181, INGRAM - CLEVENGER INC. $214, SPRING CORP $219, JACKSON CONTRACTOR GROUP $229, MARKOVICH CONSTRUCITON $320, OUTBACK CONSTRUCTION $375, R&R TAYLOR 6 Bidders WASHINGTON 4/22/2014 LLMAN HIGH SCHOOL BID PACKAGE 1 PULLMAN NO BIDS RECEIVED 1 Bidders 5/1/2014 WASHINGTON BUILDING FIRST FLOOR REMODEL PULLMAN $487, QUALITY CONTRACTORS $497, WELLENS FARWELL CONSTRUCTION 2 Bidders 5/6/2014 INSTALL NEW IRRIGATION CONTROLLERS PHASE 2 PULLMAN $462, QUALITY CONTRACTORS 1 Bidders PERMITS CITY OF BOISE Permit No/Type/Builder/Location/Value/Date Issued ELE , ELE, ROCKYS ELECTRIC, 6414 W FAIRVIEW AVE, $6,000.00, 5/5/2014 ELE , ELE, ALL ELECTRIC, 2533 N BRUINS CIR, $3,000.00, 5/5/2014 ELE , ELE, MOUNTAIN VALLEY ELECTRIC, 910 N BALSAM ST, $4,000.00, 5/5/2014 ELE , ELE, R M E INC, 1109 W MAIN ST 200, $122,057.00, 5/6/2014 ELE , ELE, EMF ELECTRIC, 8194 S BOGUS RIDGE WAY, $6,000.00, 5/6/2014 ELE , ELE, VANZANDT ELECTRIC, 1305 E STATE ST, $6,613.00, 5/7/2014 ELE , ELE, LIGHTNING ELECTRIC INC, 350 N MILWAUKEE ST 1048, $34,000.00, 5/7/2014 ELE , ELE, ENTERPRISE ELECTRIC, 1055 N CURTIS RD, $49,505.00, 5/7/2014 ELE , ELE, TWO BEERS ELECTRIC, 1624 N 30TH ST, $4,800.00, 5/7/2014 ELE , ELE, POWER PLUS INC, 999 N CURTIS RD, $9,995.00, 5/7/2014 ELE , ELE, CLAY JACKSON ELECTRIC, 2592 N DALTON LN, $7,500.00, 5/7/2014 ELE , ELE, ULTIMATE ELECTRIC LLC, 4240 N CHAPALA WAY, $4,500.00, 5/8/2014 ELE , ELE, 45TH PARALLEL ELECTRIC LLC, W GOLDENROD AVE, $8,600.00, 5/8/2014 ELE , ELE, MARK HOYT, 895 N LANDER ST, $8,500.00, 5/9/2014 MEC , MEC, BUTLER HEATING, 2316 N 26TH ST, $3,000.00, 5/5/2014 MEC , MEC, TML LLC, 579 W RIDGELINE DR, $6,900.00, 5/5/2014 MEC , MEC, A-1 PLUMBING SERVICE INC, 9106 W ZUNI CT, $5,459.00, 5/5/2014 MEC , MEC, RIGHT NOW INC HTG & COOLING, 1422 W WRIGHT ST, $4,500.00, 5/5/2014 MEC , MEC, A-1 HEATING & AIR CONDITIONING, 2102 W BANNOCK ST, $5,125.00, 5/5/2014 MEC , MEC, A-1 HEATING & AIR CONDITIONING, 225 W SUMMIT RIDGE RD, $5,690.00, 5/5/2014 MEC , MEC, A-1 HEATING & AIR CONDITIONING, 269 W THORNBERRY DR, $15,450.00, 5/5/2014 MEC , MEC, WESTERN HEATING & A/C, 6629 W BARON DR, $7,007.00, 5/5/2014 MEC , MEC, ALLISON CLIMATE CONTROL, 4270 N EAGLE RD, $16,500.00, 5/5/2014 MEC , MEC, ALPINE GAS FIREPLACES, 1003 N 16TH ST, $4,623.00, 5/5/2014 MEC , MEC, ALLISON CLIMATE CONTROL, 1624 N 30TH ST, $4,250.00, 5/5/2014 MEC , MEC, JIMS HEATING AND COOLING, 871 N SAM- SON AVE, $11,000.00, 5/5/2014 MEC , MEC, CCI MECHANICAL INC, 8949 S FEDERAL WAY, $165,103.00, 5/5/2014 MEC , MEC, RIGHT NOW INC HTG & COOLING, 2235 N CAMDEN DR, $6,117.00, 5/5/2014 MEC , MEC, A-1 PLUMBING SERVICE INC, 9065 W VELMA ST, $7,570.00, 5/5/2014 MEC , MEC, JIMS HEATING AND COOLING, 5307 N QUAIL SUMMIT WAY, $4,000.00, 5/5/2014 MEC , MEC, RIGHT NOW INC HTG & COOLING, 9613 W OLD MILL DR, $7,756.00, 5/5/2014 MEC , MEC, ADVANCED HEATING & COOLING, 715 S CAPITOL BLVD, $5,198.00, 5/5/2014 MEC , MEC, ADVANCED HEATING & COOLING, W SPRINGDALE CT, $4,610.00, 5/5/2014 MEC , MEC, MCFATE HEATING SERVICE, 912 S ROO- SEVELT ST, $3,000.00, 5/6/2014 MEC , MEC, JIMS HEATING AND COOLING, 9281 W HACKAMORE DR, $4,000.00, 5/6/2014 MEC , MEC, ULTIMATE HEATING & AIR INC, 5742 E MIL- LET DR, $7,565.00, 5/6/2014 MEC , MEC, ULTIMATE HEATING & AIR INC, 2783 S HON- EYCOMB WAY, $6,948.00, 5/6/2014 MEC , MEC, BIG SKY HEATING AND A/C LLC, 615 S BEACH ST, $4,052.00, 5/6/2014 MEC , MEC, A-1 HEATING & AIR CONDITIONING, 1401 S

4 LUSK ST, $3,474.00, 5/6/2014 MEC , MEC, A-1 HEATING & AIR CONDITIONING, 289 W RIDGELINE DR, $4,161.00, 5/6/2014 MEC , MEC, WESTERN HEATING & A/C, 3085 N COLE RD, $6,935.00, 5/6/2014 MEC , MEC, RIGHT NOW INC HTG & COOLING, 187 E WISHBONE CT, $7,284.00, 5/6/2014 MEC , MEC, RIGHT NOW INC HTG & COOLING, 2330 W CANAL ST, $3,387.00, 5/6/2014 MEC , MEC, RIGHT NOW INC HTG & COOLING, 4300 N STRATFORD DR, $6,241.00, 5/6/2014 MEC , MEC, JIMS HEATING AND COOLING, 2311 W NOR- CREST DR, $7,000.00, 5/6/2014 MEC , MEC, TVR INC, 9306 W OVERLAND RD, $6,400.00, 5/6/2014 MEC , MEC, WESTERN HEATING & A/C, 3491 S WILLIAMSBURG WAY, $6,330.00, 5/6/2014 MEC , MEC, WESTERN HEATING & A/C, 1933 N 18TH ST, $9,250.00, 5/6/2014 MEC , MEC, AIR CARE LLC, 2072 N PAINTED ROCK LN, $13,660.00, 5/6/2014 MEC , MEC, ACCESS HEATING & A/C, 9890 W WESTVIEW DR, $9,057.00, 5/6/2014 MEC , MEC, YMC INC, W EXECUTIVE STE B, $4,500.00, 5/6/2014 MEC , MEC, PREMIER HEATING & AIR CONDITIONING, 3708 S VINTAGE WAY, $10,000.00, 5/7/2014 MEC , MEC, PAIGE MECHANICAL GROUP INC, 981 W GROVE ST, $4,650.00, 5/7/2014 MEC , MEC, RIGHT NOW INC HTG & COOLING, 2488 N BOGUS BASIN RD, $6,253.00, 5/7/2014 MEC , MEC, RIGHT NOW INC HTG & COOLING, 5795 N WELLSPRING WAY, $3,450.00, 5/7/2014 MEC , MEC, AIR SOURCE HEATING & COOLING, 1118 W LEMP ST, $3,000.00, 5/7/2014 MEC , MEC, FM INC, 702 W IDAHO ST 801, $5,000.00, 5/7/2014 MEC , MEC, OWYHEE SHEET METAL, W MCMIL- LAN RD, $39,520.00, 5/7/2014 MEC , MEC, TOTAL SYSTEMS SERVICES INC, 6066 S PLATEAU VIEW WAY, $5,182.00, 5/7/2014 MEC , MEC, TOTAL SYSTEMS SERVICES INC, W JE- NILYN CT, $3,804.00, 5/7/2014 MEC , MEC, ADVANCED HEATING & COOLING, 2599 S OLD HICKORY WAY, $10,542.00, 5/7/2014 MEC , MEC, HOBSON FABRICATING CORP, 1109 W MAIN ST 200, $118,581.00, 5/8/2014 MEC , MEC, ADVANCED HEATING & COOLING, 2613 S HONEYCOMB WAY, $10,835.00, 5/8/2014 MEC , MEC, TML LLC, 8905 W CORNWALL DR, $8,340.00, 5/8/2014 MEC , MEC, TML LLC, 6222 E PLAYWRIGHT ST, $8,414.00, 5/8/2014 MEC , MEC, TML LLC, W GERONIMO ST, $4,445.00, 5/8/2014 MEC , MEC, A-1 PLUMBING SERVICE INC, 2024 S ROO- SEVELT ST, $4,523.00, 5/8/2014 MEC , MEC, IDAHO HEATING & COOLING, 2592 N DAL- TON LN, $7,000.00, 5/8/2014 MEC , MEC, FIREPLACE WHOLESALE, 6330 W MONTANA AVE, $4,400.00, 5/8/2014 MEC , MEC, BOISE REFRIGERATION, 4719 S MARKET ST, $40,725.00, 5/9/2014 MEC , MEC, BUNCH SHEET METAL, 5078 N ARROW CREST WAY, $6,500.00, 5/9/2014 PLM , PLM, ADVANCED CONSTRUCTION & EXCAVATION, 5301 E WARM SPRINGS AVE, $15,380.00, 5/5/2014 PLM , PLM, CCI MECHANICAL INC, 8949 S FEDERAL WAY, $116,655.00, 5/5/2014 PLM , PLM, LURRE CONSTRUCTION INC, 1055 N CURTIS RD, $18,140.00, 5/6/2014 PLM , PLM, BUSS MECHANICAL SERVICES INC, 9306 W OVERLAND RD, $3,000.00, 5/6/2014 PLM , PLM, PARK CENTER PLUMBING, 7189 W OVER- LAND RD, $9,000.00, 5/6/2014 PLM , PLM, SUPERIOR WATER & AIR, 7333 W USTICK RD, $6,500.00, 5/6/2014 PLM , PLM, DEBEST PLUMBING INC, 9989 W EMERALD ST, $13,999.00, 5/6/2014 PLM , PLM, HOFFMANS LANDSCAPING INC, 423 N MITCHELL ST, $5,500.00, 5/6/2014 PLM , PLM, PRO RAIN SPRINKLERS, 3501 N MOUNTAIN VIEW DR, $3,500.00, 5/6/2014 PLM , PLM, BLACKBURN IRRIGATION & LANDSCAPE LL, 6223 W DORIAN ST, $3,500.00, 5/7/2014 PLM , PLM, VETERANS PLUMBING, 2500 N 36TH ST, $3,200.00, 5/7/2014 PLM , PLM, CNE PLUMBING, 6939 W WINSTON LN, $8,207.00, 5/7/2014 PLM , PLM, A-1 PLUMBING SERVICE INC, 1004 N 13TH ST, $5,928.00, 5/7/2014 PLM , PLM, PAIGE MECHANICAL GROUP INC, 1919 S ROOSEVELT ST, $10,000.00, 5/7/2014 PLM , PLM, MAGEES PLUMBING, 1624 N 30TH ST, $3,200.00, 5/7/2014 PLM , PLM, EXPRESS PLUMBING SERVICE, 8620 W EMERALD ST 162, $8,325.00, 5/7/2014 PLM , PLM, CLEARWATER PLUMBING, 2416 W ANDER- SON ST, $4,000.00, 5/7/2014 PLM , PLM, GALE PLUMBING, 4241 N EDELWEISS ST, $7,500.00, 5/7/2014 PLM , PLM, PELOTON PLUMBING & MECHANICAL PIPE, 3034 N 28TH ST, $7,000.00, 5/8/2014 PLM , PLM, PINYON PEAK LLC, 2325 S APPLE ST, $3,000.00, 5/8/2014 PLM , PLM, BAKERS PLUMBING SOLUTIONS LLC, 350 N MILWAUKEE ST 1048, $7,294.00, 5/8/2014 PLM , PLM, MARK HOYT, 895 N LANDER ST, $4,000.00, 5/9/2014 CITY OF CALDWELL Permit No/Type/Address/Status/Contr/Valuation/Issue Date E , Commercial Electrical, 1906 Fairview Ave, Ste 400, Caldwell, ID 83605, Permit Issued, ANDERSON & WOOD CON- STRUCTION CO. INC., $ , 05/08/2014 M , Commercial Mechanical, 105 N 21ST AVE, CALD- WELL, ID, Permit Issued, HEATING EQUIPMENT COMPANY, $ , 05/05/2014 M , Commercial Mechanical, 621 CLEVELAND BLVD CALDWELL, ID, Pass & Closed, AIR COMFORT INC, $ , 05/06/2014 M , Commercial Mechanical, 1906 Fairview Ave, Ste 400, Caldwell, ID 83605, Permit Issued, DEBEST PLUMBING INC., $ , 05/09/2014 M , Commercial Mechanical, 1906 Fairview Ave, Ste 400, Caldwell, ID 83605, Permit Issued, YMC INC, $ , 05/09/2014 P , Commercial Plumbing, 1906 Fairview Ave, Ste 400, Caldwell, ID 83605, Permit Issued, DEBEST PLUMBING INC, $ , 05/09/2014 BC , Commercial Repair, 405 E DENVER ST, Caldwell, ID 83605, Permit Issued, MARK WALTERS, $800.00, 05/09/2014 BC , Commercial Tenant Improvement, 1906 Fairview Ave, Ste 400, Caldwell, ID 83605, Permit Issued, DATUM CON- STRUCTION, $ , 05/06/2014 FP , Fire Sprinkler Permit, 908 SPECHT AVE, CALDWELL, ID, Issued Fire Sprinkler Permit, TREASURE VALLEY FIRE PROTECTION, 05/07/2014 E , Non New Residential Electrical, Moosehorn Way, Caldwell, ID 83607, Pass & Close, PowerHouse Electric, 05/05/2014 E , Non New Residential Electrical, 1302 N OHIO AVE, CALDWELL, ID, Pass & Close, ASAP ELECTRIC LLC, 05/05/2014 E , Non New Residential Electrical, 2114 MOON SHADOW DR, CALDWELL, ID 83607, Pass & Close, Extreme Electric Company Inc, 05/05/2014 E , Non New Residential Electrical, 3908 PRESTON AVE, CALDWELL, ID 83605, Pass & Close, WOODYS ELECTRIC LLC, 05/05/2014 E , Non New Residential Electrical, 411 N ALASKA AVE, CALDWELL, ID, Issued, K F ELECTRIC INC., 05/05/2014 E , Non New Residential Electrical, 217 CLEVELAND BLVD, CALDWELL, ID 83605, Pass & Close, Beck Electric, 05/06/2014 E , Non New Residential Electrical, BOULDER RIDGE WAY NAMPA, ID 83651, Pass & Close, Extreme Electric Company Inc, 05/06/2014 E , Non New Residential Electrical, 323 Berrypark Pl, Caldwell, ID 83605, Closed, 45th Parallel Electric, 05/08/2014 E , Non New Residential Electrical, 1517 E USTICK RD, CALDWELL, ID, Pass & Close, J.V. ELECTRIC, 05/06/2014 E , Non New Residential Electrical, 4317 CHALLENGER WAY, CALDWELL, ID 83605, Pass & Close, Grizzly Electric, 05/07/2014 E , Non New Residential Electrical, 407 APPALACHIAN ST, CALDWELL, ID 83607, Pass & Close, CENTERS ELECTRIC INC, 05/07/2014 E , Non New Residential Electrical, FEWKES ST, CALDWELL, ID 83605, Pass & Close, Extreme Electric Company Inc, 05/07/2014 E , Non New Residential Electrical, 201 S HOMEDALE AVE CALDWELL, ID, Pass & Close, ALL-STAR ELECTRIC, 05/07/2014 M , Non New Residential Mechanical, 3223 SALEM ST, CALDWELL, ID, Issued, J & D Heating & AC, 05/06/2014 M , Non New Residential Mechanical, BOULDER RIDGE WAY NAMPA, ID 83651, Issued, DOUG ANDERSON, 05/05/2014 M , Non New Residential Mechanical, 3907 LEXINGTON ST, CALDWELL, ID, Issued, CAPITAL CITY HEATING AND COOLING, 05/05/2014 M , Non New Residential Mechanical, BLOOM- FIELD DR, CALDWELL, ID 83607, Issued, Franklin Building Supply, 05/05/2014 M , Non New Residential Mechanical, MOOSE- HORN WAY, CALDWELL, ID 83607, Issued, Franklin Building Supply, 05/05/2014 M , Non New Residential Mechanical, 1811 WYOMING AVE, CALDWELL, ID, Issued, RIGHT NOW INC, 05/05/2014 M , Non New Residential Mechanical, 3819 STONEGATE WAY CALDWELL, ID, Pass & Close, RIGHT NOW INC, 05/05/2014 M , Non New Residential Mechanical, FEWKES ST, CALDWELL, ID 83605, Issued, DRAKE MECHANICAL INC, 05/06/2014 M , Non New Residential Mechanical, 219 FOREST PARK WAY CALDWELL, ID, Issued, RIGHT NOW INC, 05/06/2014 M , Non New Residential Mechanical, 3116 MAGNOLIA AVE, CALDWELL, ID, Issued, RIGHT NOW INC, 05/06/2014 M , Non New Residential Mechanical, 3103 OWYHEE LN, CALDWELL, ID, Issued, RIGHT NOW INC, 05/06/2014 M , Non New Residential Mechanical, 3221 S KIMBALL AVE, CALDWELL, ID, Issued, RIGHT NOW INC, 05/07/2014 M , Non New Residential Mechanical, 2205 E Linden St, Trlr 4, Caldwell, ID 83605, Issued, HEATING EQUIPMENT COM- PANY, 05/08/2014 M , Non New Residential Mechanical, YUCAIPA ST, CALDWELL, ID 83607, Pass & Close, PREMIER HEATING & AIR INC., 05/07/2014 M , Non New Residential Mechanical, PHEASANT RUN CT, CALDWELL, ID 83607, Issued, Franklin Building Supply, 05/08/2014 M , Non New Residential Mechanical, 1919 NIXON ST, CALDWELL, ID, Issued, RIGHT NOW INC, 05/08/2014 M , Non New Residential Mechanical, 2212 RICE AVE, CALDWELL, ID, Issued, RIGHT NOW INC, 05/09/2014 M , Non New Residential Mechanical, 1716 CAROL AVE, CALDWELL, ID, Issued, A-1 HEATING & AIR CONDITIONING, 05/09/2014 P , Non New Residential Plumbing, DIETZ WAY, CALDWELL, ID 83605, Issued, RIGHT NOW INC HTG & COOLING, 05/05/2014 P , Non New Residential Plumbing, 202 W LOGAN ST, CALDWELL, ID, Issued, RIGHT NOW INC HTG & COOLING, 05/05/2014 P , Non New Residential Plumbing, 606 E SPRUCE ST, CALDWELL, ID, Pass & Close, AIR COMFORT INC, 05/06/2014 P , Non New Residential Plumbing, MOOSEHORN WAY, CALDWELL, ID 83607, Pass & Close, WOOD BROTHERS TRUCKING LLC, 05/06/2014 P , Non New Residential Plumbing, 3103 OWYHEE LN, CALDWELL, ID, Issued, RIGHT NOW INC, 05/06/2014 P , Non New Residential Plumbing, 3221 S KIMBALL AVE, CALDWELL, ID, Issued, A to Z Plumbing Service Inc, 05/06/2014 P , Non New Residential Plumbing, BRUSH CREEK AVE, CALDWELL, ID 83607, Pass & Close, HARD ROCK CON- STRUCTION INC, 05/07/2014 P , Non New Residential Plumbing, CUMULUS WAY, CALDWELL, ID 83607, Pass & Close, HARD ROCK CON- STRUCTION INC, 05/07/2014 P , Non New Residential Plumbing, 2705 MEADOW AVE, CALDWELL, ID, Issued, Workhorse Plumbing, 05/07/2014 P , Non New Residential Plumbing, 323 BERRYPARK PL, CALDWELL, ID, Pass & Close, HARD ROCK CONSTRUCTION INC, 05/07/2014 P , Non New Residential Plumbing, 1919 NIXON ST, CALDWELL, ID, Issued, RIGHT NOW INC HTG & COOLING, 05/08/2014 BR , Residential New, BOULDER RIDGE WAY NAMPA, ID 83651, Permit Issued, COREY BARTON HOMES INC, $ , 05/09/2014 BR , Residential New, WARBLER WAY, CALDWELL, ID 83607, Permit Issued, COREY BARTON HOMES INC, $ , 05/09/2014 BR , Residential New, 4515 JULIE ST, CALDWELL, ID 83607, Permit Issued, HUBBLE HOMES LLC, $ , 05/06/2014 P , Residential Plumbing, 4618 ANN MARIE AVE, CALD- WELL, ID 83607, Issued, MAGIC PLUMBING, 05/06/2014 P , Residential Plumbing, PEARL POINTE DR, CALDWELL, ID 83605, Issued, MAGIC PLUMBING, 05/06/2014 P , Residential Plumbing, Pheasant Run Ct, Caldwell, ID 83605, Issued, MAD RIVER PLUMBING, 05/08/2014 P , Residential Plumbing, 2724 SPRINGCREST ST, CALD- WELL, ID 83607, Issued, JRS PLUMBING, 05/08/2014

5 P , Residential Plumbing, PAOLETTI ST, CALD- WELL, ID 83607, Issued, SHILO PLUMBING & MECHANICAL, 05/08/2014 P , Residential Plumbing, PAOLETTI ST, CALD- WELL, ID 83607, Issued, SHILO PLUMBING & MECHANICAL, 05/08/2014 P , Residential Plumbing, BOULDER RIDGE WAY NAMPA, ID 83651, Issued, SHILO PLUMBING & MECHANICAL, 05/08/2014 SP , Sign Permit, 2415 Blaine St, Caldwell, ID 83605, Issued, ANDERSON & WOOD CONSTRUCTION, $ , 05/05/2014 CITY OF EAGLE Permit No/Date/Subdivision/Address/Type/Sqft/Improvement Value , Canyon Crest Homes Inc, 5/7/14, Corrente Bello #2, 955 N Cherry Bello Drive, NH, 3330, $412, A, Paradigm Construction, 5/7/14, Corrente Bello #2, 1663 N Iron Bello Place, MISC, 0, $ , Adera Homes LLC, 5/7/14, Snoqualmie Falls #2, 1509 N Luge Ave, NH, 3085, $381, A, Clyde Development Inc, 5/8/14, Mace River Ranch #1, 814 S Island Glenn Way, MISC, 0, $ A, Clyde Development Inc, 5/8/14, Ashbury #1, 2948 S Rhein River Avenue, MISC, 0, $ , Coleman Homes LLC, 5/8/14, The Preserve #1, 5600 W Rotherham Drive, NH, 1500, $212, , Owner/Lessee - Builder, 5/5/14, The Colony #1, 354 N Cove Colony Way, G/S, 0, $63, , Kenley Enterprises LLC, 5/6/14, Covenant Hill, 992 N Terrabella Avenue, PL, 0, $53, , Alturas Construction LLC, 5/6/14, Ashbury #1, 2961 S Brandenberg Avenue, NH, 2626, $345, , Coleman Homes LLC, 5/8/14, The Preserve #2, 5376 W Steadmoore Drive, NH, 1900, $233, , Earthcraft Construction Inc, 5/9/14, Randall Acres, 508 S Conover Street, NH, 2670, $323, , Sherburne-Marrs, 5/8/14, lakemoor #4, 3116 S Brookwater Lane, NH, 3643, $447, , Clyde Development Inc, 5/6/14, Ashbury #1, 2847 S Brandenberg Avenue, NH, 3215, $393, , Boise Hunter Homes, 5/7/14, Reynard #1, 3208 S Fox Leash Avenue, NH, 3066, $391, , Ed s Handyman s Service, 5/5/14, Snoqualmie Falls #1, 5654 W Founders Drive, RR, 0, $ , Owner/Lessee - Builder, 5/7/14, Lexington Hills #06, 2369 E Faunhill Drive, MISC, 0, $ , Owner/Lessee - Builder, 5/7/14, Lexington Hills #05, 1659 N Trellis Place, MISC, 0, $ , Owner/Lessee - Builder, 5/7/14, Lexington Hills #01, 1402 N Prestwick Way, MISC, 0, $ , Aspen Exterirors, 5/5/14, Redwood Creek #2, 2590 W Timber Drive, MISC, 0, $ , Aspen Exteriors, 5/5/14, Ranch Estates, 2379 N Equestrian Place, MISC, 0, $ , Aspen Exteriors, 5/5/14, Downing Downs, 1102 N Arlington Drive, MISC, 0, $ , Aspen Exteriors, 5/5/14, Ranch Estates, 264 W Rush Court, MISC, 0, $ , All Pro Xteriors Inc, 5/5/14, Brookwood #04, 1592 N watson way, MISC, 0, $ , All Pro Xteriors Inc, 5/5/14, Countryside Estates #2, 2271 W Forest Hill Court, MISC, 0, $ , Aspen Exteriors, 5/5/14, Brookwood#03, 1608 N Kenwood Place, MISC, 0, $ , Aspen Exteriors, 5/5/14, Sierra, 176 S Riverview Street, MISC, 0, $ , Aspen Exteriors, 5/5/14, Kestrel Cove, 270 S Neskowin Way, MISC, 0, $ , Infinity Roofing & Siding Inc, 5/5/14, Melvin s Eagle Pointe #7, 1971 E Cypress Point, RR, 0, $ , RoofPro Exteriors, 5/7/14, Lexington Hills #05, 2432 E Heathfield Court, RR, 0, $ , Madison Roofing, 5/5/14, Great Sky Estates #3, 2571 E Bridgecreek Drive, MISC, 0, $ , Little Buckaroo Construction, 5/5/14, Lexington Hills #02, 1782 E Highgate Court, MISC, 0, $ , Little Buckaroo Construction, 5/5/14, 120 E Aikens Street, MISC, 0, $ , Little Buckaroo Construction, 5/5/14, 162 E Aikens Street, MISC, 0, $ , Little Buckaroo Construction, 5/5/14, Echohawk Estates #4, 779 N Caracaras Place, MISC, 0, $ , Little Buckaroo Construction, 5/5/14, 161 E Aikens Street, MISC, 0, $ , Little Buckaroo Construction, 5/5/14, 102 S 1st, MISC, 0, $ , All Pro Xteriors Inc, 5/6/14, Brookwood #04, 1523 N Crosswater Way, MISC, 0, $ , All Pro Xteriors Inc, 5/6/14, Timberland Estates, 37 N Pinedale Way, MISC, 0, $ , All Pro Xteriors Inc, 5/6/14, Berkshire Estates, 1182 N Falling Water, MISC, 0, $ , All Pro Xteriors Inc, 5/6/14, Tuesday Subdivision #2, 918 N Caledonia Place, MISC, 0, $ , All Pro Xteriors Inc, 5/6/14, Eagle Village #2, 279 E Mission Drive, MISC, 0, $ , All Pro Xteriors Inc, 5/6/14, Rick s River Ridge, 708 W Aikens Street, MISC, 0, $ , All Pro Xteriors Inc, 5/6/14, Countryside Estates #2, 2200 W Forest Hill Court, MISC, 0, $ , Infinity Roofing & Siding Inc, 5/6/14, Melvin s Eagle Pointe #7, 1146 N Pinnacle Way, MISC, 0, $ , Infinity Roofing & Siding Inc, 5/6/14, Melvin s Eagle Pointe #7, 1903 E Poppy Hills Street, MISC, 0, $ , Rolling River Construction, 5/6/14, Crown Point #2, 1485 E Feather Nest, MISC, 0, $ , Aspen Exteriors, 5/8/14, Downing Downs, 1051 Preakness Drive, RR, 0, $ , Signature Roofing, 5/8/14, Eagle Hills West, 1215 E Cerramar Court, MISC, 0, $ , Signature Roofing, 5/8/14, Oakley Estates, 1782 W Janet Court, MISC, 0, $ , Aspen Exteriors, 5/8/14, N/A, RR, 0, $ , Team Construction LLC, 5/8/14, Echohawk Estates #2, 872 N Caracaras Place, RR, 0, $ , Team Construction LLC, 5/8/14, Chaumont #2, 2339 E Courtland Drive, RR, 0, $ , Western Roofing, 5/9/14, Van Engelen Estates #3, 1548 W Kenai Court, MISC, 0, $ , Western Roofing, 5/9/14, Copperfield, 4587 W Clear Field Drive, MISC, 0, $ , Aspen Exteriors, 5/9/14, Ranch Estates, 2201 N Canter Place, MISC, 0, $0.00 CITY OF MERIDIAN Permit No/Type/Issue Date/Valuation/Address/Sqft/Subdivision/Lot/ Block/Owner/Contractor/Contractor Address/Description C-CO , COMMERCIAL, CO Walkthru, 5/9/14, 633 E KING ST, 2176, MERIDIAN BUSINESS PARK, 11, 3, MITCHELL EN- TERPRISES INC, STRAIGHT-LINE BUILDING SOLUTIONS LLC, 633 E. KING STREET ADA County, MERIDIAN, ID 83642, Straight-Line Building Solutions, LLC C-CO , COMMERCIAL, CO Walkthru, 5/9/14, 1200 N EAGLE RD, 30624, 3N 1E 09, TFCM ASSOCIATES LLC, NO CON- TRACTOR, PARTY CITY DBA HALLOWEEN CITY C-ROOF , COMMERCIAL, ReRoof, 5/5/14, 830 N MAIN ST, Gary Benoit, Dotson Roofing & Construction, 2613 S. Liberty, Boise, ID 83709, Generations II Building C-SIGN , COMMERCIAL, Sign, 5/6/14, 250 E OVER- LAND RD, 3N 1E 18, CHETWOOD PROPERTIES LP, GOLDEN WEST ADVERTISING INC, 114 E 37TH ST ADA County, GARDEN CITY, ID 83714, KENDALL FORD C-SIGN , COMMERCIAL, Sign, 5/5/14, 2020 E OVER- LAND RD, DESTINATION PLACE SUB, 2, 3, MAJESTIC PROPERTIES LLC, AIM SIGN COMPANY INC, 112 W 38TH ST, BOISE, ID 83714, Majestic Marketplace R-ADD , RESIDENTIAL, Additions, 5/7/14, $6,156.00, 785 S SPELMAN LN, MEADOWLAKE VILLAGE PHASE 1, FRANS CONSTRUCTION INC, POWAY ROAD #221 SAN DIEGO County, POWAY, CA 92064, ADDITION R-FEN , RESIDENTIAL, Fence, 5/9/14, 436 E PINE AVE, COTTAGE HOME ADD, 1, 2, PIERCE SHEILA MARIE, PROPERTY OWNER, 436 E PINE, R-MISC , RESIDENTIAL, Miscellaneous, 5/9/14, $1,080.00, 626 E EDGAR ST, BEDFORD PLACE SUB NO 04, 6, 6, BY- INGTON JUSTIN T, PROPERTY OWNER, BALCONY R-NEW , RESIDENTIAL, New, 5/7/14, $370,270.00, 1231 E TUTTLE ST, 3456, MADELYNN ESTATES SUB, 6, 4, BHH MADELYNN ESTATES LLC, BHH LLC DBA BOISE HUNTER HOMES, 1025 S. BRIDGEWAY PLACE, STE 290 ADA County, EAGLE, ID 83616, NEW RES R-NEW , RESIDENTIAL, New, 5/6/14, $141,837.00, 355 E PRODUCER DR, 1301, VENTANA SUB NO 02, 18, 6, BARTON COREY, COREY BARTON HOMES INC, 1977 E OVERLAND RD ADA County, MERIDIAN, ID R-NEW , RESIDENTIAL, New, 5/5/14, $323,692.00, 6993 N SUNSET MAPLE WAY, 2809, JAYKER SUB PHASE 01, 3, 12, SPURWING GREENS LLC, SHADOW MOUNTAIN CONSTRUCTION INC, 52 N PALMETTO AVE SUITE 102 ADA County, EAGLE, ID 83616, NEW RES R-NEW , RESIDENTIAL, New, 5/5/14, $292,798.00, 2695 E MOUNT ETNA DR, 2695, MESSINA MEADOWS SUB NO 04, 5, 31, BRIGHTON HOMES IDAHO INC, W Explorer Dr. Ste #200, Boise, ID 83713, NEW RES R-NEW , RESIDENTIAL, New, 5/6/14, $185,022.00, 502 W RAMSBROOK ST, 1758, CEDARCREEK SUB, 5, 5, BARTON COREY, COREY BARTON HOMES INC, 1977 E OVERLAND RD ADA County, MERIDIAN, ID 83642, NEW RES R-NEW , RESIDENTIAL, New, 5/8/14, $269,048.00, 4909 W TORANA ST, 2494, OAKCREEK SUB NO 03, 7, 11, COLE- MAN HOMES LLC, 1859 S Topaz Way #200 Ada County, Meridian, ID R-NEW , RESIDENTIAL, New, 5/7/14, $303,935.00, 3787 E DARLINGTON DR, 2910, KINGSBRIDGE SUB PHASE NO 03, 14, 13, BHH LLC DBA BOISE HUNTER HOMES, 1025 S. BRIDGEWAY PLACE, STE 290 ADA County, EAGLE, ID 83616, NEW RES R-NEW , RESIDENTIAL, New, 5/6/14, $259,537.00, 2706 E ROCHESTER CT, 2274, ZEBULON VILLAGE, 5, 1, TRESIDIO CORPORATION, 4585 N Camas Way ADA County, MERIDIAN, ID 83646, NEW RES R-NEW , RESIDENTIAL, New, 5/8/14, $219,717.00, 4951 W TORANA ST, 2104, OAKCREEK SUB NO 03, 4, 11, COLE- MAN HOMES LLC, 1859 S Topaz Way #200 Ada County, Meridian, ID 83642, NEW RES R-NEW , RESIDENTIAL, New, 5/9/14, $201,299.00, 2637 E DEERHILL DR, 1850, MESSINA MEADOWS SUB NO 01, 63, 5, MESSINA MEADOWS 38 LLC, BERKELEY BUILDING COMPANY INC, 5300 S HAYSEED WAY Ada County, BOISE, ID 83716, NEW RES R-NEW , RESIDENTIAL, New, 5/6/14, $353,830.00, 3637 E SHAVER ST, 3096, ASTORIA, 25, 3, DAVE EVANS CON- STRUCTION LLC, 7761 W RIVERSIDE DR STE 100 ADA County, GARDEN CITY, ID 83714, NEW RES R-NEW , RESIDENTIAL, New, 5/8/14, $205,658.00, 99 E HAVASU FALLS CT, 1881, SOLITUDE PLACE SUB NO 03, 14, 15, HUBBLE HOMES LLC, 701 SOUTH ALLEN ST ADA County, MERID- IAN, ID 83642, NEW RES R-NEW , RESIDENTIAL, New, 5/8/14, $195,258.00, 129 E HAVASU FALLS CT, 1881, SOLITUDE PLACE SUB NO 03, 12, 15, HUBBLE HOMES LLC, 701 SOUTH ALLEN ST ADA County, MERID- IAN, ID 83642, NEW RES R-NEW , RESIDENTIAL, New, 5/8/14, $303,782.00, 157 E HAVASU FALLS CT, 2966, SOLITUDE PLACE SUB NO 03, 10, 15, HUBBLE HOMES LLC, 701 SOUTH ALLEN ST ADA County, MERID- IAN, ID 83642, NEW RES R-NEW , RESIDENTIAL, New, 5/6/14, $382,738.00, 3890 E KINGSBRIDGE ST, 3534, KINGSBRIDGE SUB PHASE NO 03, 8, 12, MOUNTAIN VIEW CONSTRUCTION AND ROOFING INC, 3900 E GREENHURST CANYON County, NAMPA, ID 83686, NEW RES R-NEW , RESIDENTIAL, New, 5/8/14, $242,159.00, 4602 N BRIGHT ANGEL AVE, 2314, 4N 1E 31, HARPE LARRY C, EN- VISION 360 INC, 104 E FAIRVIEW AVE #220 ADA County, MERID- IAN, ID 83642, NEW RES R-NEW , RESIDENTIAL, New, 5/8/14, $256,273.00, 4623 N BRIGHT ANGEL AVE, 2446, CRESTWOOD SUB NO 01, EN- VISION 360 INC, 104 E FAIRVIEW AVE #220 ADA County, MERID- IAN, ID 83642, NEW RES R-NEW , RESIDENTIAL, New, 5/7/14, $303,508.00, 3761 E DARLINGTON DR, 2830, KINGSBRIDGE SUB PHASE NO 03, 15, 13, BOISE HUNTER HOMES, 1025 S. BRIDGEWAY PLACE, EAGLE, ID 83616, NEW RES R-NEW , RESIDENTIAL, New, 5/9/14, $203,290.00, 2623 E DEERHILL DR, 1897, MESSINA MEADOWS SUB NO 01, 64, 5, MESSINA MEADOWS 38 LLC, BERKELEY BUILDING COMPANY INC, 5300 S HAYSEED WAY Ada County, BOISE, ID 83716, NEW RES R-PATIO , RESIDENTIAL, Patio Covers, 5/9/14, $7,575.00, 1230 N VINEYARDS AVE, 505, VINEYARDS SUB NO 04, 27, 5, HEWITT JAMES A, KRISTOPHER ZIMMERMAN, PO BOX 4361, BOISE, ID R-PATIO , RESIDENTIAL, Patio Covers, 5/8/14, $3,750.00, 2219 N HICKORY WAY, 250, PACKARD SUB NO 02, 5, 5, CARSTENSEN GEORGE R, PROPERTY OWNER, R-POOL , RESIDENTIAL, Pools, 5/9/14, $33,733.00, 1590 E COMMANDER ST, 2716, RESERVE SUB, 3, 1, GARCIA RAUL, IDAHO LAWN AND POOL SERVICES LLC, 347 S EDGEWOOD LN SUITE 180 Ada County, EAGLE, ID R-ROOF , RESIDENTIAL, ReRoof, 5/5/14, 2863 W GEM- STONE DR, SUNBURST SUB NO 02, 26, 3, STRINGER LAWRENCE ALAN &, CUTHILL CONSTRUCTION LLC, 5025 LARRY LN ADA County, MERIDIAN, ID R-ROOF , RESIDENTIAL, ReRoof, 5/5/14, 1975 N PEARTREE AVE, GOLF VIEW ESTATES SUB NO 02, 15, 6, HUG JOHN H &, Roof Pro Exteriors, 950 W Bannock Drive Suite 1100, Boise, ID R-ROOF , RESIDENTIAL, ReRoof, 5/5/14, 2767 W WILLARD ST, HAVEN COVE NO 03, 5, 6, NUNLEY JAMES M &, Roof Pro Exteriors, 950 W Bannock Drive Suite 1100, Boise, ID R-ROOF , RESIDENTIAL, ReRoof, 5/5/14, 1823 W SANTA CLARA DR, VINEYARDS SUB NO 03, 12, 5, KLINGER DON- ALD A, CF CONSTRUCTION, 2300 E DEER POINT CT ADA County,

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue

More information

Weekly Bid Results. Friday, March 4, Fire Protection Upgrade, Oil Storage Room Water. Prefabricate & Deliver Bridge & Footings for Twin

Weekly Bid Results. Friday, March 4, Fire Protection Upgrade, Oil Storage Room Water. Prefabricate & Deliver Bridge & Footings for Twin Fire Protection Upgrade, Oil Storage Room Water Bid Date 2/26/2016 Location Libby, MT $654,200.00 National Native American Construction, Inc. Prefabricate & Deliver Bridge & Footings for Twin Bid Date

More information

Weekly Bid Results. Friday, August 28, ITD - I-84 Roto Mill and Overlay Crack Test Project. Clearwater Parking Lot Sealcoat - Orofino

Weekly Bid Results. Friday, August 28, ITD - I-84 Roto Mill and Overlay Crack Test Project. Clearwater Parking Lot Sealcoat - Orofino ITD - I-84 Roto Mill and Overlay Crack Test Project Bid Date 8/21/2015 Location Canyon County, ID $75,600.00 C & A Paving Co Clearwater Parking Lot Sealcoat - Orofino Bid Date 8/24/2015 Location Orofino,

More information

DRAFT. Dorabelle Campground Rehabilitation

DRAFT. Dorabelle Campground Rehabilitation DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section

More information

Weekly Bid Results. Friday, October 16, Clearwater Water District Water System Improvem. Epoxy Coating on Multi Purpose Floor - Harrison

Weekly Bid Results. Friday, October 16, Clearwater Water District Water System Improvem. Epoxy Coating on Multi Purpose Floor - Harrison Clearwater Water District Water System Improvem Bid Date 10/1/2015 Location Clearwater, ID $1,348,555.50 Western Construction $1,355,880.00 Debco Construction $1,372,789.55 Cascade Pipeline Corp. $1,465,712.95

More information

Weekly Bid Results. Friday, August 12, North Idaho Correctional Institution, Wastewater. Soldier Creek Culvert Replacement, Materials - Bo

Weekly Bid Results. Friday, August 12, North Idaho Correctional Institution, Wastewater. Soldier Creek Culvert Replacement, Materials - Bo Friday, August 12, 2016 North Idaho Correctional Institution, Wastewater Bid Date 8/5/2016 Location Cottonwood, ID $263,130.00 Fire Mountain Farms, Inc. $280,000.00 MVP Environmental Services $384,650.00

More information

BID RESULTS EAGLE CREEK BID, CARSON CITY. BID RESULTS AS OF 5/22/2015 Contech Engineering Solutions $39, Big R Bridge $49,750.

BID RESULTS EAGLE CREEK BID, CARSON CITY. BID RESULTS AS OF 5/22/2015 Contech Engineering Solutions $39, Big R Bridge $49,750. EAGLE CREEK BID, CARSON CITY CARSON CITY FINANCE DEPT 201 N. Carson Street, Ste 11 Carson City, NV 89701 PH: (775) 283-7137 Fax: (775) 887-2107 Contech Engineering Solutions $39,401.00 Big R Bridge $49,750.00

More information

Weekly Bid Results. Friday, January 20, Broadway Storm Drain, 400 North to 700 North - T. CRL Litter Fence - Casper

Weekly Bid Results. Friday, January 20, Broadway Storm Drain, 400 North to 700 North - T. CRL Litter Fence - Casper Broadway Storm Drain, 400 North to 700 North - T Bid Date 1/17/2017 Location Tooele, UT $557,740.00 Silver Spur Construction $598,614.00 Newman $626,804.37 Broken Arrow $634,825.00 Dennis Leer II Construction

More information

Weekly Bid Results. Friday, January 15, RFP Replacement of Heating/Cooling/Hot Water S. Hot Springs Waterline Replacement - Pleasant Vie

Weekly Bid Results. Friday, January 15, RFP Replacement of Heating/Cooling/Hot Water S. Hot Springs Waterline Replacement - Pleasant Vie RFP Replacement of Heating/Cooling/Hot Water S Bid Date 1/4/2016 Location Owyhee, NV All Bids Rejected Hot Springs Waterline Replacement - Pleasant Vie Bid Date 1/5/2016 Location Pleasant View, UT $89,726.00

More information

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY Village of Lombard, Illinois Capital Improvement Plan FY 15 FY 24 thru FUNDING SOURCE SUMMARY Source FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 FY 24 Construction Fund 6,318,700 2,354,800 2,430,800

More information

FY Transportation Improvement Program Basic Project List (in Thousands)

FY Transportation Improvement Program Basic Project List (in Thousands) FY2010-2014 Transportation Improvement Program Basic Project List (in Thousands) Project Name Key # Year Project Cost 16th Avenue North, 7th Street North to Garrity Boulevard GU09308 2011 $592 21st Avenue

More information

Weekly Bid Results. Friday, October 21, Red Lodge Creek Road Bridge Replacement (RL2) WWTF Pretreatment Building, Embankment, & An

Weekly Bid Results. Friday, October 21, Red Lodge Creek Road Bridge Replacement (RL2) WWTF Pretreatment Building, Embankment, & An Red Lodge Creek Road Bridge Replacement (RL2) Bid Date 10/17/2016 Location Red Lodge, MT $259,030.00 Battle Ridge Builders, LLC $311,667.00 D.W. Oxendahl Construction, LLC $314,359.52 Eagle Rock Timber,

More information

BID RESULTS FENCE-BULL RUN FIRE RESTORTATION-HUMBOLDT-TOIYABE NF, ELKO COUNTY #AG S

BID RESULTS FENCE-BULL RUN FIRE RESTORTATION-HUMBOLDT-TOIYABE NF, ELKO COUNTY #AG S ELKO COUNTY JAIL MEN'S & WOMEN'S HOUSING UNIT ADDITIONS, ELKO Elko County Commissioners 994 River Street Elko, NV 89801 PH: 000-000-0000 ARCHITECT: LOMBARD-CONRAD ARCHITECTS 392 5th Street Elko, NV 89801

More information

±2.47 ACRES AT THE VILLAGE AT MERIDIAN EXCLUSIVE LISTING MERIDIAN, ADA COUNTY, IDAHO

±2.47 ACRES AT THE VILLAGE AT MERIDIAN EXCLUSIVE LISTING MERIDIAN, ADA COUNTY, IDAHO ±2.47 ACRES AT THE VILLAGE AT MERIDIAN EXCLUSIVE LISTING MERIDIAN, ADA COUNTY, IDAHO CALL FOR OFFERS! Offers due Friday, September 8th at 2 PM. OFFERING Land Advisors Organization is pleased to present

More information

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

THREE MILE PLAN TOWN OF SUPERIOR COLORADO THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate

More information

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

BID FORM. Bid by: Name of Bidder. Address:  Address: To the Texas Department of Transportation hereinafter called the Agent. BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway

More information

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and

More information

CITY OF NAMPA, Department of Building Safety Permit Activity Type Report

CITY OF NAMPA, Department of Building Safety Permit Activity Type Report CITY OF NAMPA, Department of Building Safety Permit Activity Type Report 411 3rd Street South, Nampa, ID 83651 Ph - (208) 468-5435, Fax - (208) 468-5439 Website - http://www.cityofnampa.us Project Type:

More information

ADDENDUM NO. TWO AB

ADDENDUM NO. TWO AB ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County

More information

FY Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded

FY Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded FY2011-2015 Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded Requesting Agency: ACHD Project Name Key # Year Project Cost ACHD Thin Lift Overlay Projects 11922

More information

±158 INDUSTRIAL ACRES

±158 INDUSTRIAL ACRES ±158 INDUSTRIAL ACRES EXCLUSIVE LISTING WEST CALDWELL, IDAHO wy 30 LOCATION The Property is located north of Simplot Boulevard at the corner of Roedel Avenue and Riverside Street in West Caldwell, Idaho.

More information

Weekly Bid Results. Friday, November 4, ITD - EAGLE RD; I-84 to SH-44 - Ada County. ITD - Ironwood Intersection - Coeur d'alene

Weekly Bid Results. Friday, November 4, ITD - EAGLE RD; I-84 to SH-44 - Ada County. ITD - Ironwood Intersection - Coeur d'alene Friday, November 4, 2016 ITD - EAGLE RD; I-84 to SH-44 - Ada County Bid Date 11/1/2016 Location Ada County, ID $1,452,425.00 Geneva Rock Prodcuts Inc. $1,515,000.00 Intermountain Slurry Seal Inc. $1,580,000.00

More information

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT Miller Creek Consultants LLC CONCRETE RECAP 1/29/2009 ESTIMATE DATE: 1-Jan-09 Project: 4000 psi 95.00 Location: 3000 psi 88.00 PROJECT DATA PROJECT NAME: Concrete Estimate THIS IS A BUDGET ONLY DESCRIPTION

More information

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where

More information

Permit Number: COM Situs: N Brinson St 110 Nampa, Id Permit Number: COM Situs: N Holbrook Ave Nampa, Id 83687

Permit Number: COM Situs: N Brinson St 110 Nampa, Id Permit Number: COM Situs: N Holbrook Ave Nampa, Id 83687 CITY OF NAMPA, Department of Building Safety Permit Activity Type Report 411 3rd Street South, Nampa, ID 83651 Ph - (208) 468-5435, Fax - (208) 468-5439 Website - http://www.cityofnampa.us 11/05/2018 to

More information

9' - 0" Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF

9' - 0 Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF Bu i l d i n g Co mmi t t e e T u e s d a y Au g u s t 1 3, 2 0 1 3 9' - 0" Remove Windows Fire Wall Remove Windows 1 First Floor Plan 1/8" = 1'-0" Locker Bay 237 SF Lobby 393 SF Main Vestibule 227 SF

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'

More information

CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $

CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $ CITY OF IMPERIAL PROPOSAL BID SHEET (02-06-2015) Page 1 of 2 FOR STREET IMPROVEMENT PROJECT PHASE 2 ASPHALT RUBBER COMPOSITE LAYER OVERLAY ON DESIGNATED STREETS BID NO. 2015-01 Item No. Description Units

More information

Wichita Falls MPO - MTP Project List 1 of 6

Wichita Falls MPO - MTP Project List 1 of 6 Wichita Falls MPO - MTP Project List 1 of 6 FUNDING SCHEDULE FOR WICHITA FALLS MPO 2015-2040 M TxDOT Ten-Year Plan 2016-2026 TxDOT STATE, PROJECTS (TABLE I) ESTIMATED STATUS HIGHWAY CSJ PROJECT LIMITS

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016 RELEASE: IMMEDIATE Aug. 12, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Stafford County Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov

More information

BID RESULTS. May 12, Award Date May 19, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner

BID RESULTS. May 12, Award Date May 19, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner BID RESULTS May 12, 2016 Award Date May 19, 2016 COMMISSION DISTRICT 1 Bob Ruwart - Commissioner Job 1 Federal Project NHPPI-I806199 involving grading, draining, milling plant mix and concrete, placing

More information

2018 Capital Improvement Budget Department Summary by Funding Source

2018 Capital Improvement Budget Department Summary by Funding Source Department Summary by Funding Source Department Bonds State Federal Other Total Fire 3,470 - - 290 3,760 Health & Human Services 217 - - 75 292 Information Technology - - - 5,937 5,937 Library 590 - -

More information

CITY OF BROOKFIELD Capital Improvement Fund Budget

CITY OF BROOKFIELD Capital Improvement Fund Budget CITY OF BROOKFIELD Capital Improvement Fund Budget The City adopts an annual capital improvement budget, based on a five-year capital improvement program (CIP). The annual budget and CIP are prepared by

More information

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, , FIRE Equipment Fire Training Equipment 105,000-105,000 - - - - - - - - - - Total of Equipment 105,000-105,000 - - - - - - - - - - Fire Apparatus Aerial Ladder Replacement 5,320,000 1,120,000 - - 1,400,000

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

Opened: Feb 12 Estimated at: Total All Schedules: $8,921, Total Schedules 1, 2, 3, 4, 5 & 6

Opened: Feb 12 Estimated at: Total All Schedules: $8,921, Total Schedules 1, 2, 3, 4, 5 & 6 Billings, MT Runway 10L-28R Rehabilitation (CIC Job #: 2013-0085 ) Opened: Feb 12 Estimated at: Total All Schedules: $8,921,200.00 Total Schedules 1, 2, 3, 4, 5 & 6 Low Riverside Contracting, Inc. Missoula,

More information

Capital Improvement Program Fiscal Year

Capital Improvement Program Fiscal Year Capital Improvement Program Fiscal Year 2013-2014 Tustin City Council Mayor Al Murray Mayor Pro Tem Charles E. Chuck Puckett Council Members John Nielsen Rebecca Beckie Gomez Allan Bernstein CITY OF TUSTIN

More information

Weekly Bid Results. Monday, November 14, Permanent Patch Program - Reno. ITD - I-90, MP 2.0 to MP Kootenai County &

Weekly Bid Results. Monday, November 14, Permanent Patch Program - Reno. ITD - I-90, MP 2.0 to MP Kootenai County & Monday, November 14, 2016 2017 Permanent Patch Program - Reno Bid Date 11/7/2016 Location Reno, NV $1,313,007.00 Sierra Nevada Construction, Inc. $1,326,900.00 Q&D $1,440,950.00 West Coast Paving ITD -

More information

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019 City of Madera Engineering Division Citizen s Oversight Committee February 13, 2019 INTRODUCTION The City of Madera uses Measure T funds to support various programs as outlined in the Annual Expenditure

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids COUNTY'S ESTIMATE HARDY & HARPER, INC. Schedule 1: Project No. B6-0472 Santa Ana, CA 92705 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 731521 MINOR CONCRETE (SIDEWALK)

More information

LEADS IDAHO BUSINESS S REVIEW

LEADS IDAHO BUSINESS S REVIEW IDAHO BUSINESS S REVIEW BIDS Week of July 25, 2014 Brushy Forks Culvert Replacement / City: Kooskia Bidding: 7/30/2014 4:00 PM MST / State: ID Bids To: R1-IMAT Nez Perce-Clearwater NF Description: This

More information

Building 712 Repair Kitchen and Dining Area / City: Boise Bidding: 8/26/2014 3:30 PM MST / State: ID Bids To: State of Idaho Military Division

Building 712 Repair Kitchen and Dining Area / City: Boise Bidding: 8/26/2014 3:30 PM MST / State: ID Bids To: State of Idaho Military Division IDAHO BUSINESS S REVIEW Week of August 29, 2014 LEADS IDAHO BUSINESS REVIEW Contact your IBR account executive to place your business message in this new LEADS publication. 208.336.3768 BIDS Phase 1, Facility

More information

Microsoft Enterprise Agreement Renewal and Software License Management Awarded to Softchoice Corporation

Microsoft Enterprise Agreement Renewal and Software License Management Awarded to Softchoice Corporation City of Coquitlam Closed Bids 2010 Closed Request for Information (RFI) 84431 - Engineering Consultant Design Services 2010/2011 Infrastructure Projects Kerr Wood Leidal Associates Ltd. Dayton and Knight

More information

FORMER NEANY BUILDING. FOR LEASE/SALE 44,000 sq. ft. Warehouse/Office. LEASE AND/OR SALE OPPORTUNITY WAREHOUSE/ INDUSTRIAL

FORMER NEANY BUILDING. FOR LEASE/SALE 44,000 sq. ft. Warehouse/Office.   LEASE AND/OR SALE OPPORTUNITY WAREHOUSE/ INDUSTRIAL Road LEASE AND/OR SALE OPPORTUNITY WAREHOUSE/ INDUSTRIAL FOR LEASE/SALE 44,000 sq. ft. Warehouse/Office Size: 8.67 Acres (Can Be Subdivided) 44,000 sq. ft. Warehouse/Office Building Improved Office = 3,300

More information

BID RESULTS LINCOLN METERING & HYDROELECTRIC STATION, ROCKLIN

BID RESULTS LINCOLN METERING & HYDROELECTRIC STATION, ROCKLIN LINCOLN METERING & HYDROELECTRIC STATION, ROCKLIN Placer County Water Agency 144 Ferguson Road Auburn, CA 95603 PH: (530) 823-4886 Fax: (530) 823-4884 BID RESULTS AS OF 7/1/2014 SYBLON REID $1,120,775.00

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign

More information

Contractors and Service Providers Registered to Work on Arrowhead Lake Association Properties April 1, 2018 March 31, 2019

Contractors and Service Providers Registered to Work on Arrowhead Lake Association Properties April 1, 2018 March 31, 2019 Contractors and Service Providers Registered to Work on Arrowhead Lake Association Properties April 1, 2018 March 31, 2019 Licensed Dock Contractors All American Dock Pros, LLC. (Aaron Lawler) P.O. Box

More information

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT RV PARK REQUIREMENTS SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION P.O. Box 1188 Bountiful, UT 84011-118 The following RV Park requirements were voted on and approved by the Swan Creek Village HOA Board of

More information

MEMORANDUM VILLAGE OF NORTHBROOK

MEMORANDUM VILLAGE OF NORTHBROOK MEMORANDUM VILLAGE OF NORTHBROOK TO: Staff COPY: Village President & Board of Trustees Department Heads FROM: Richard Nahrstadt, Village Manager DATE: April 29, 2016 SUBJECT: STAFF BRIEFING WEEK OF April

More information

35 Bee Tree Park Planning Zone 3

35 Bee Tree Park Planning Zone 3 35 Bee Tree Park Planning Zone 3 2701 Finestown Road Visit Date: August 2016 St. Louis County Parks Master Plan Page 1 35 Bee Tree Park 2701 Finestown Road St. Louis County Parks Master Plan Planning Zone

More information

GOODALE TRAIL PROPERTY

GOODALE TRAIL PROPERTY GOODALE TRAIL PROPERTY EXCLUSIVE LISTING 7015 W GOODALE TRAIL LANE NORTH OF EAGLE, IDAHO ADDRESS 7015 W Goodale Sage Trail Lane Canyon PARCEL R5415100020 SIZE ±6.19 acres ZONING Residential/Agriculture

More information

Arizona Sales Rep. - Mace T. Coleman, Jr

Arizona Sales Rep. - Mace T. Coleman, Jr Last Update January 28th, 2014 Alaska Sales Rep. - Mace T. Coleman, Jr. 800-275-5463 Alaska Industrial Hardware 2192 Viking Dr, Anchorage 907-276-7201 Alaska Industrial Hardware 2716 Commercial Dr, Anchorage

More information

Scope of Work: Remove 3 walls and saw cut concrete for future plumbing and remove drop ceiling.

Scope of Work: Remove 3 walls and saw cut concrete for future plumbing and remove drop ceiling. CITY OF NAMPA, Department of Building Safety Permit Activity Type Report 411 3rd Street South, Nampa, ID 83651 Ph - (208) 468-5435, Fax - (208) 468-5439 Website - http://www.cityofnampa.us Project Type:

More information

Kansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max:

Kansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max: Page 1 of 20 518045 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025600 FIELD OFFICE AND LABORATORY (TYPE A) 3 012340 FOUNDATION STABILIZATION (SET PRICE) 4 025323 MOBILIZATION 5

More information

Ohio Department of Transportation Construction Update

Ohio Department of Transportation Construction Update Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District

More information

District of Squamish Financial Plan for the Years Capital Revenues and Expenditures

District of Squamish Financial Plan for the Years Capital Revenues and Expenditures Reserves 2007 Budget Reserves C 118 Application of Capital Funding: C 119 C 124 Buildings C 129 Municipal Hall - Outside Paint / Canopy 3,148 3,148 2,300 2,300 C 134 Total Buildings 3,148 3,148 - - - -

More information

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date. FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities **11 Mile culvert over the Blackwood Drain East of Milford **12 Mile Inkster and Southfield and Northwestern Hwy Farmington Hills **Adams bridge over Clinton River **Airport **Conklin **Greenfield (northbound

More information

CONSTRUCTION COMMITTEE MEETING AGENDA

CONSTRUCTION COMMITTEE MEETING AGENDA CONSTRUCTION COMMITTEE MEETING AGENDA DATE: Tuesday, January 02, 2018 TIME: 8:30 a.m. PLACE: GOAA ANNEX BUILDING, 1ST FLOOR - CONFERENCE ROOMS (APOLLO/GEMINI/TAURUS), 5855 CARGO ROAD, ORLANDO INTERNATIONAL

More information

Project Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon

Project Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon Date: 06-24-16 To: Derek Hackett, Public Information Officer From: Sunil Jeboo, Traffic Engineer Re: Road Closure for the Week of 06-27-16 (3236.1) 6 th Pump Station Western Ave. and 6 th SW Western Ave.

More information

CAPITAL PROGRAM SUMMARY

CAPITAL PROGRAM SUMMARY 2017 2018 CAPITAL PROGRAM SUMMARY MISC A 2017 NEIGHBOURHOOD REHABILITATION Pitt River Road - Mary Hill to Kingsway Victoria Drive - Toronto to Holtby Pooley Avenue - High Pressure Watermain Culvert Replacement

More information

Mason Street Bike/Pedestrian Trail Project

Mason Street Bike/Pedestrian Trail Project Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits

More information

ROSEVILLE INNOVATION PARK 8040 FOOTHILLS BOULEVARD, ROSEVILLE CA ±160,000 SQUARE FEET AVAILABLE

ROSEVILLE INNOVATION PARK 8040 FOOTHILLS BOULEVARD, ROSEVILLE CA ±160,000 SQUARE FEET AVAILABLE ROSEVILLE INNOVATION PARK 8040 FOOTHILLS BOULEVARD, ROSEVILLE CA ±160,000 SQUARE FEET AVAILABLE ROSEVILLE INNOVATION PARK As one of the premier submarkets in the Greater Sacramento region, Roseville offers

More information

City of Redding Airports

City of Redding Airports City of Redding Airports Benton Airpark Redding Municipal Airport DEVELOPMENT AND USE GUIDELINES FOR GENERAL AVIATION HANGARS April 7, 2009 PREFACE The City of Redding, as owner of federally obligated

More information

CAPITAL IMPROVEMENT PLAN

CAPITAL IMPROVEMENT PLAN CITY OF SOLDOTNA CITY HALL 77 N BIRCH ST. SOLDOTNA, AK 99669 STEPHANIE QUEEN, AICP SOLDOTNA CITY MANAGER SQUEEN@SOLDOTNA.ORG 907.714.1240 866.593.6994 KYLE KORNELIS, P. E., PUBLIC WORKS DIRECTOR KKORNELIS@SOLDOTNA.ORG

More information

CONTRACTS AWARDED FIRE STATION SITE GRADING & CLASS I TRAIL PROJECT, ROSEVILLE #15-15

CONTRACTS AWARDED FIRE STATION SITE GRADING & CLASS I TRAIL PROJECT, ROSEVILLE #15-15 FIRE STATION SITE GRADING & CLASS I TRAIL PROJECT, ROSEVILLE #15-15 CITY OF ROSEVILLE 311 Vernon Street Roseville, CA 95678 PH: (916) 774-5200 Fax: (916) 746-1339 Joe Vicini, Inc. $1,123,999.75 ELKO REGIONAL

More information

Weekly Bid Results. Friday, December 2, Antelope & North Laterals Piping - Manila. ITD - FY17 D4 Preservation - Gooding County

Weekly Bid Results. Friday, December 2, Antelope & North Laterals Piping - Manila. ITD - FY17 D4 Preservation - Gooding County Friday, December 2, 2016 Antelope & North Laterals Piping - Manila Bid Date 11/22/2016 Location Manila, UT $1,757,517.00 JCI $1,760,897.25 MD Nursery and Landscaping $1,782,474.00 Brinkerhoff Excavating

More information

DATA BOOK IV : COST ESTIMATE

DATA BOOK IV : COST ESTIMATE The Study on Comprehensive Disaster Prevention around Mayon Volcano DATA BOOK IV : COST ESTIMATE DT IV List of (1/5) Clearing and Grubbing ha 59,192.92 Excavation (Road way & Drainage) Mech. cu.m 80.55

More information

PennDOT Interstate Work next week March 30-April 3:

PennDOT Interstate Work next week March 30-April 3: PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)

More information

City of Sutherlin Planning Commission Meeting Tuesday, September 15, :00 p.m. Sutherlin Civic Auditorium Agenda

City of Sutherlin Planning Commission Meeting Tuesday, September 15, :00 p.m. Sutherlin Civic Auditorium Agenda City of Sutherlin Planning Commission Meeting Tuesday, September 15, 2015 7:00 p.m. Sutherlin Civic Auditorium Agenda Pledge of Allegiance Welcome and Introductions Introduction of Media Approval of Minutes:

More information

CITY COUNCIL AGENDA MEMORANDUM

CITY COUNCIL AGENDA MEMORANDUM To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development

More information

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK

More information

,271

,271 Reserve Analysis by Berrera and Company (January 2016) Page 1 Section I: Capital Reserve Funding - Estimated Cash Reserve Balances And Unfunded Liability: Effective 1/1/2019 Assumption Table: Interest

More information

June 2013: Capital Improvements Update. through $ 126,196,202 Available Funding through 2018 $ 149,783,656. Staff s Recommendation

June 2013: Capital Improvements Update. through $ 126,196,202 Available Funding through 2018 $ 149,783,656. Staff s Recommendation Capital Improvements Update June 2013: Pl dp j t Planned Projects through 2018 - $ 126,196,202 Available Funding through 2018 $ 149,783,656 pp p,, Un-appropriated - $ 23,587,454 Staff s Recommendation

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg) RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information

More information

Plaza Leyenda N. Frank Lloyd Wright Blvd. Scottsdale, AZ Project No:

Plaza Leyenda N. Frank Lloyd Wright Blvd. Scottsdale, AZ Project No: Plaza Leyenda 10737 N. Frank Lloyd Wright Blvd. Scottsdale, AZ 85259-2663 Project No: 1111 OWNER: Plaza Leyenda Investment L.P. 14362 N. Frank Lloyd Wright Blvd., Suite #1310 Scottsdale, AZ 85260 Mike

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

Monthly Permit List Report Dates:

Monthly Permit List Report Dates: Monthly Permit List Report Dates: Permit #: 15-1273 Residential Building Permit Application Date: 05/14/2015 Issued Date: 08/24/2015 Valuation: $125,729.00 Fees Paid: $3,784.50 Owner: TKO Homes, LLC 1166

More information

ATTACHMENT B. Reference No.

ATTACHMENT B. Reference No. ATTACHMENT B Projects in the Five-Year Capital Improvement Program for Fiscal Years Ending 2014-2018 GOVERNMENT CODE SECTION 65402 GENERAL PLAN CONFORMITY ANALYSIS 1 4 Orcutt GS Station 21 (Orcutt) Rebuild

More information

Apparent Bids for Letting of November 13, 2018

Apparent Bids for Letting of November 13, 2018 Apparent Bids for Letting of November 13, 2018 Letting ID: 11132018 Cut-Off Time: 02:00:59 PM 010-0425552 Anderson Anderson County Longline paint contract 1DU007 DURA MARK, INC. 72 EMERALD AVENUE STREETSBORO,

More information

Board of Park Commissioners Project Summary

Board of Park Commissioners Project Summary Board of Park Commissioners Project Summary Lawton Park Cannon Monument Restoration Project Scope of Work: Work includes but is not limited to the removal of cannon from its base, surface cleaning, corrosion

More information

Capital Improvement Plan

Capital Improvement Plan PROGRAM DESCRIPTION: The represents City Council approved projects and includes each of the project's total costs and the estimated funding requirements for the next five years. Projects are funded by

More information

Changes in TIP projects Draft vs. Final Draft

Changes in TIP projects Draft vs. Final Draft Attachment 2 Dollars in $1,000 Key 08698 Franklin Road and Cloverdale Road Intersection Changes in TIP projects Draft vs. Final Draft RW - $1,314 UT - $1,000 CE - $341 CN - $3,675 CN - $499 09438 Caldwell

More information

Contractors and Service Providers Registered to Work on Arrowhead Lake Association Properties April 1, 2019 March 31, 2020

Contractors and Service Providers Registered to Work on Arrowhead Lake Association Properties April 1, 2019 March 31, 2020 Contractors and Service Providers Registered to Work on Arrowhead Lake Association Properties April 1, 2019 March 31, 2020 Licensed A Contractors All American Dock Pros, LLC. (Aaron Lawler) P.O. Box 973,

More information

Capital Five-Year Fiscal Forecast

Capital Five-Year Fiscal Forecast Capital Five-Year Fiscal Forecast Budget Forecast Forecast Forecast Forecast REVENUES 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021 State sources: CO&DS distributed to district $ 310,000 $ 310,000

More information

*As per the City the Entire Book MUST BE SUBMITTED INTACT as Part of the Bid*

*As per the City the Entire Book MUST BE SUBMITTED INTACT as Part of the Bid* IDAHO BUSINESS S REVIEW Week of April 11, 2014 LEADS IDAHO BUSINESS REVIEW Contact your IBR account executive to place your business message in this new LEADS publication. 208.336.3768 BIDS 2014 Catch

More information

Project Update Utah Water Users Workshop March 14, 2012

Project Update Utah Water Users Workshop March 14, 2012 Project Update Utah Water Users Workshop March 14, 2012 Jeffrey D. Budge, P.E. Operations and Engineering Manager Steven H. Cain Facilities and Lands Manager Organized in 1935 Deer Creek Division of the

More information

Progress Report for Projects of Regional Significance

Progress Report for Projects of Regional Significance Rosedale Highway facing west January 2017 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance EDITION Status Information on: Safety & Maintenance...this section

More information

CAPITAL IMPROVEMENT PROGRAM 2018 CAPITAL BUDGET ADOPTED CITY OF ELMIRA, NEW YORK

CAPITAL IMPROVEMENT PROGRAM 2018 CAPITAL BUDGET ADOPTED CITY OF ELMIRA, NEW YORK 2018 CAPITAL BUDGET 2018 FIVE-YEAR PROJECTION FUNDING SOURCES State & Other Government Funding CHIPS Funding (NYSDOT) 791,000 791,000 791,000 791,000 791,000 PAVE NY (NYSDOT) 172,153 172,153 172,153 172,153

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER TO: FROM: SUBJECT: OFFICE OF THE CITY MANAGER Honorable Mayor and City Council Alan Tandy, City Manager AT General Information May 26, 2017 Good News: City offices will be closed Monday, May 29 th, in

More information

APPENDIX F List of Commitments

APPENDIX F List of Commitments APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators

More information

Guide to. Road Construction Projects

Guide to. Road Construction Projects Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth) RELEASE: IMMEDIATE March 8, 2019 CONTACT: Tina.Bundy 540-907-8325 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 10 March 16, 2019 All work is scheduled weather permitting. Real-time information

More information

FULL DEPTH RECLAMATION (FDR)

FULL DEPTH RECLAMATION (FDR) FULL DEPTH RECLAMATION (FDR) Virginia Experience Past and Present Michael Wells, P.E. March 2, 2018 Outline What is Full Depth Reclamation (FDR) VDOT Experience Full Depth Reclamation (FDR) Bound layers

More information

±34 ACRES - LAKE AVENUE

±34 ACRES - LAKE AVENUE ±34 ACRES - LAE AVENUE EXCLUSIVE LISTING NAMPA, IDAHO PROPERTY OVERVIEW LOCATION Offering includes approximately 34 acres of beautiful country land located near Lake Lowell/Deerflat Wildlife Preserve and

More information