1 TO: FROM: Chair and Members Engineering and Public Works Committee A.J. White, P.Eng. Commissioner of Engineering and Public Works DATE: February 9, 2012 SUBJECT: Draft 2012 Capital s And Forecasts For Transportation And Environment REPORT No: PW RECOMMENDATION THAT the Draft 2012 Capital s And Forecasts for Transportation and Environment dated January 27, 2012 be endorsed and forwarded to the Committee of the Whole Council for further consideration. ORIGIN On September 19, 2011, Council adopted resolution R85/2011-CES of the Corporate and Emergency Services Committee, which approved a timetable for the production and adoption of the 2012 corporate budget for tax supported programs. As contemplated by the approved timetable, draft 2012 Capital s and Forecasts for Transportation and Environment were received by the Engineering and Public Works Committee on January 25, ANALYSIS The draft Capital s and Forecasts for Transportation and Environment were attached as appendices to Report No. PW and are also included with this report for ease of reference. Roads (Appendix A ) The capital program for roads is driven primarily by the District s Roads Needs Study and the results of bridge inspections. In 2012, it is proposed to undertake 27.8 kilometres of asphalt resurfacing and 17.4 kilometres of high float emulsion resurfacing. In addition, 21.8 kilometres of roads previously resurfaced with high float will receive a slurry seal topping. Two bridges are scheduled to be rehabilitated one on Muskoka Road 117 at Paint Lake Creek in the Township of Lake of Bays and one on Muskoka Road 7 (Peninsula Road) at the Joseph River in the Township of Muskoka Lakes. Major road construction projects include completion of the Bonnie Lake Road (Muskoka Road 46) project commenced last year in the Town of Bracebridge; reconstruction of a 1.4 kilometre section of Muskoka Road 9 (South Portage Road) easterly from a point 9.5 km east of Muskoka Road 2 (Brunel Road) in the Township of Lake of Bays; reconstruction of most of South Bay Road (Muskoka Road 48) in the Township of Georgian Bay; and milling and paving of Muskoka Road 118 from Stephen Road to Donald Drive in Port Carling. The locations of the various road related projects are shown on the map attached as Figure 1. Managing Our Legacy Together Page 1

2 Port Carting Locks (Including James Bartleman Island Park) (Appendix B ) - Two capital projects are proposed at this facility - replacement of the roof on the small lock control building and rehabilitationheconstruction of the hatchery docks on the east side of the island. Hauled Sewage (Appendix C ) -The proposed capital program for 2012 is largely unchanged from that predicted in the forecast submitted as part of the 2011 budget process. A number of capital projects commenced in prior years are still in progress. The capital budget forecast is characterized by a pattern of investments in each lagoon site that repeats approximately every five years. This reflects an anticipated need for cell addition and/or rehabilitation, including the replacement of receiving structures, liners, pumps, etc. RespectfuIly submitted, With the concurrence of, A.J. White, P.Eng. Commissioner of Engineering and Public Works Stephen Cairns Commissioner of Finance and Corporate Services Page 2

3 5 District of Muskoka 2012 Capital Road Projects Legend Buildings Engineering Reconstruction Safety Measure Structure Rehabilitation Asphalt Sealing Double Surface Treatment Engineering Environmental Assessment Hot Mix Paving Reconstruction FIGURE 1 Page 3

4 Roads - Capital Projects Appendix "A" Roads Capital And Forecast Project Expenditures Roads - Capital Projects Roads Construction MR 18 from Winewood to James St 0.8 km ,535, , MR 25 Dawson Rd S 1.9 km ,250, MR 2 Florence St to MR km ,090, , MR 46 from 2.0 km S of Childs Pit N 5.0 km ,740, , MR km N of MR 5 to Hwy km ,000,000 3,000, MR 9 from 9.5 km E of MR 2 E 1.4 km 20,000 1,300, MR 41 from Winewood to Hwy km B&S 1,000, MR 118 from Stephen Rd to Donald Dr 1.5 km 50, , Miscellaneous Land , MR 2 Parry Sound Boundary S 4.5 km 25,000 1,250, MR 33 from Hwy 400 E 4.6 km 25, , MR 4 from MR 35 W 3.3 km 25,000 1,600, MR 30 from MR 169 to Barlochan Rd 3.5 km 25,000 1,700, MR 16 Kirby's Beach Rd W 1.7 kms 25, , MR 42 from Manitoba to Pine St 1.5 km 30,000 1,325, MR 13 from MR 49 N 2.5 km 25,000 1,450, Roadway Construction 12,015,000 12,435,000 12,880,000 13,341,000 13,742, ,200, Miscellaneous Land Future 105, , , , Miscellaneous Land , MR 4 from 3.3 km W of MR 25 to Shea Rd 50,000 1,500, MR 4 from Shea Rd to MR 25 50,000 2,000, MR 4 from MR 25 to MR 24 50,000 1,500, MR 13 from Kilworthy Rd N 3.2 km 50,000 3,200, MR 13 from 3.2 km N of Kilworthy Rd to Morrison Wood Bdry 50, MR 27 from MR 7 to Cleveland House 30, MR 28 from MR 118 to End 50, MR 3 from MR 31 W 4.0 km 20,000 1,100, MR 14 from Cedar Lane E 0.9 km 20, , MR 11 from Parry Sound Boundary S 3.0 km 560,000

5 Roads - Capital Projects Appendix "A" Roads Capital And Forecast MR 117 from 1.3 km E of Old Hwy 117 E 3.5 km 25,000 1,300, MR 117 from Paint Lk Bridge W 3.5 km 20,000 1,400, MR 117 from Paint Lk Bridge to KH km 25,000 1,000, MR 118 from Donald Dr to MR km 20, , MR 6 from KH 11 to Tomingas Rd 2.6 km 20, , MR 7 from 118 to Port Sandfield Bridge 3.1 km 25,000 1,000, MR 7 from Port Sandfield Bridge N 4.5 km 25,000 1,000, MR 10 from Belleview Ave to Rd km 10, , MR 15 from MR 118 to Beaver Creek Bridge 1.5 km 10, MR 17 from Brydons Bay to Hoc Roc River Bridge 1.5 km 25, , MR 17 from Oakwood Dr to Brydons Bay Rd 2.2 km 75,000 1,200,000 2,200, MR 30 from Marina Rd to Broadley Rd 20, , MR 44 from Mack's Rd to MR km 25,000 1,500, MR 6 from Tomingas Rd to 0.7 km E of Conservation Rd 25, , MR 6 from 0.7 km E of Conservation Rd to MR 20 25, , MR 169 Rehab Moon River Bridge # , , MR 117 Rehab Muskoka River Bridge ,860, MR 118 Structural Repairs Indian River Bridge , , MR 117 Rehab Paint Lk Rd Bridge 50,000 1,350, MR 7 Rehab Joe River Bridge 50,000 1,100, MR 169 Rehab Moon River Bridge # , , MR 13 Replace Jevins Creek Bridge 30, , MR 169 Rehab CPR Overhead Bridge 50,000 1,200, MR 15 Rehab Beaver Creek Bridge 50, , MR 4 Replace Bridge Lot 13 Con 4 30, , MR 169 Rehab CNR Overhead Bridge 50,000 1,200, MR 169 Reline Culvert - Lk Joe Tributary 25, , MR 10 Rehab Port Sydney Bridge 25, , Culvert Replacement Program Future 315, , , , Culvert Replacement Program , MR 6 Rehab Gartersnake River Bridge 25, , MR 45 Rehab Hoodstown Bridge 50,000

6 Roads - Capital Projects Appendix "A" Roads Capital And Forecast MR 24 Rehab Dee Bank Bridge 50, MR 39 Rehab Dorset Bridge 50, MR 5 Port Severn Bridge East 50,000 1,200, MR 42 & Cedar Ln Signals ,000, , MR 13 New Signals at CN Crossing at 9 Mile Lk Rd 75, Crossing Gates at CN Crossing at Torrance 75, MR 13 Signals & Gates at CN Crossing 1.7 km S of MR , Baysville Salt Dome 700,000 Total Roads Construction 18,155,730 10,545,000 10,240,000 10,820,000 11,210,000 11,610,000 12,015,000 12,435,000 12,880,000 13,341,000 13,742, ,200,000 Asphalt Surfacing Asphalt Surfacing Future 4,165,000 4,245,000 4,325,000 4,415,000 4,505,000 4,596,000 4,686,000 4,776,000 4,919,000 58,100, MR 21 Lumina Lodge N 150, MR 3 from W Hekkla Rd to E Hekkla Rd 6.6 km 1,365, MR 117 from Tackaberry Rd to Dickie St 1,300, MR 15 from Mr 118 to Beaver Creek Bridge 200, MR 25 from Dawson Rd S 1.9 km 251,000 Total Asphalt Surfacing 150,000 3,116,000 4,165,000 4,245,000 4,325,000 4,415,000 4,505,000 4,596,000 4,686,000 4,776,000 4,919,000 58,100,000 Micro Surfacing MR 37 from Mr 14 to KH 11 87, MR 1 from MR 118 to MR 6 231, MR 21 from KH 35 to MR 22 78, MR 36 from MR 1 to Beaver Creek 50,000 Total Micro Surfacing 446,000 Emulsion Surfacing (High Float) Emulsion Surfacing Future 1,880,000 1,920,000 1,960,000 2,000,000 2,040,000 2,080,000 2,120,000 2,160,000 2,225,000 26,300, MR 51 from MR 117 to End 533, MR 9 from MR 23 to MR , MR 28 from Clevelands House to End 157, MR 49 from MR 13 to Swing Bridge 329,000 Total Emulsion Surfacing (High Float) 1,503,000 1,880,000 1,920,000 1,960,000 2,000,000 2,040,000 2,080,000 2,120,000 2,160,000 2,225,000 26,300,000

7 Roads - Capital Projects Appendix "A" Roads Capital And Forecast Close Once Final Transactions Posted MR 12 Galla Lk Rd to Harrison Rd 5.5 km , MR 38 from Hwy 400 to Woods/Gibson Bndry 9.7 km 1,700, MR 3 from Parry Sound Bndry E 5.0 km 740, Culvert Replacement Program , MR 50 Reconstruct Signals at CN Crossing 70,000 Total Close Once Final Transactions Posted 3,480,000 Total Roads - Capital Projects 21,785,730 15,610,000 16,285,000 16,985,000 17,495,000 18,025,000 18,560,000 19,111,000 19,686,000 20,277,000 20,886, ,600,000 Total Project Expenditures 21,785,730 15,610,000 16,285,000 16,985,000 17,495,000 18,025,000 18,560,000 19,111,000 19,686,000 20,277,000 20,886, ,600,000 Project Financing Financing From Own Funds (20,848,730) (15,580,000) (16,265,000) (16,835,000) (17,445,000) (17,891,000) (18,560,000) (19,111,000) (19,686,000) (20,277,000) (20,886,000) (246,600,000) Debentures Grants External Sources (937,000) (30,000) (20,000) (150,000) (50,000) (134,000) Total Project Financing (21,785,730) (15,610,000) (16,285,000) (16,985,000) (17,495,000) (18,025,000) (18,560,000) (19,111,000) (19,686,000) (20,277,000) (20,886,000) (246,600,000) Net Project

8 Roads - Capital Projects Appendix "A" Roads Capital And Forecast Project Expenditures Roads - Non-Tangible Capital Projects Non-Capital Projects Environmental Assessment for N Transportation Corridor 100, , , Environmental Assessment for W Transportation Corridor 100, Post-Closing Project Costs - Roads 5, MR 45 from 2 km N of MR 3 to Jarvies Rd (3.6 km) 49, MR 9 from MR 23 to KH 60 (4.4 km) 60, MR 13 from Kilworthy Rd N (3 sections 3.0 km) 33, MR 14 from Frau Lk to McKay Lake (2 sections 1.7 km) 19, MR 19 from MR 13 to CN Crossing (4.0 km) 44, MR 32 From Hwy 400 to end of road (3.5 km) 42,000 Total Non-Capital Projects 105, , ,000 Total Roads - Non-Tangible Capital Projects 105, , ,000 Total Project Expenditures 105, , ,000 Project Financing Financing From Own Funds (105,000) (397,000) (200,000) Debentures Grants External Sources Total Project Financing (105,000) (397,000) (200,000) Net Project

9 Port Carling Locks - Capital Projects Appendix "B" Port Carling Locks Capital And Forecast Project Expenditures Port Carling Locks - Capital Projects Small Locks Repair Small Lock Sluice Valves , Small Lock Building Roof 25, Small Lock Hydraulic System 75, Small Lock Structural/Mechanical/Electrical 25, , , Small Lock Hydraulic Power/Gates & Sluice Valves 150,000 Total Small Locks 75,000 25,000 75, , , ,000 Large Locks New Lockmaster Building & Washrooms 26, , , Gate Upgrades & Cleaning 80, Large Lock Gate Drive/Actuators & Electrical Panel 95, Large Lock Walls 100, Large Lock Gearboxes & Brakes 70, Large Lock Gates 60, Large Lock Structural/Mechanical/Electrical 25, , ,000 Total Large Locks 80,000 95, ,000 70,000 26, , ,000 25, , ,000 Docks Hatchery Docks 125, Island Boardwalk 160, , Lower Docks 280, , Lower Floating Docks 135,000 Total Docks 125, , , , , ,000

10 Port Carling Locks - Capital Projects Appendix "B" Port Carling Locks Capital And Forecast Park Park Gazebo 200, Stage 3 Development Future 420, Stage 2 Landscaping/Lookout/Walkways 80, , , New Pedestrian/Maintenance Vehicle Ramp 420, Washroom Renovation 160, Rebuild Sewage Pump Chamber & Controls 50, New Lockmaster Building & Washrooms 4,000 52,000 44,000 Total Park 160, , ,000 52,000 44, , , ,000 Close Once Final Transactions Posted Lockmaster Building Roof 20,000 Total Close Once Final Transactions Posted 20,000 Total Port Carling Locks - Capital Projects 175, , , , , , , , , ,000 1,000,000 2,170,000 Total Project Expenditures 175, , , , , , , , , ,000 1,000,000 2,170,000 Project Financing Financing From Own Funds (175,000) (150,000) (320,000) (330,000) (380,000) (360,000) (380,000) (420,000) (485,000) (500,000) (1,000,000) (2,170,000) Debentures Grants External Sources Total Project Financing (175,000) (150,000) (320,000) (330,000) (380,000) (360,000) (380,000) (420,000) (485,000) (500,000) (1,000,000) (2,170,000) Net Project

11 Hauled Sewage - Capital Projects Appendix "C" Hauled Sewage Capital And Forecast Project Expenditures Hauled Sewage - Capital Projects Hauled Sewage Watt Exfiltration Pond/Property/Rehabilitation ,000 50, Freeman Upgrade/Expansion ,000 50, Medora Monitoring Wells & Assessment , McLean Upgrade/Expansion 75, , ,000 75, , , Baxter Upgrade/Expansion 200, , ,000 75, , , , Stephenson Upgrade , , , Ryde Upgrade/Expansion & Property , , , Bracebridge Lagoon Upgrade/Expansion , , , Medora Spray Irrigation Expansion , , , Receiving Facilities HV Sewage Plant 2,000, Receiving Facilities GH Sewage Plant 2,000, Franklin Exfiltration Pond Expansion Future 75, , ,000 75, , Ryde Lagoon Property Acquisition 400, Mobile Dewatering Equipment 500, Watt Rehabilitation Future 75, , , , Freeman Spray Irrigation Expansion Future 75, , ,000 75, , Ryde Upgrade/Expansion & Property Future 75, , , , Stephenson Upgrade Future 75, , , , Bracebridge Lagoon Upgrade/Expansion Future 75, , , , Medora Spray Irrigation Expansion Future 75, , , ,000 Total Hauled Sewage 825, , , , , , , , ,000 2,475, ,000 6,875,000

12 Hauled Sewage - Capital Projects Appendix "C" Hauled Sewage Capital And Forecast Bird's Mill BB Bird's Mill Dam ,500 Total Bird's Mill 161,500 Total Hauled Sewage - Capital Projects 986, , , , , , , , ,000 2,475, ,000 6,875,000 Total Project Expenditures 986, , , , , , , , ,000 2,475, ,000 6,875,000 Project Financing Financing From Own Funds (986,500) (825,000) (725,000) (975,000) (500,000) (550,000) (575,000) (425,000) (400,000) (2,475,000) (500,000) (6,875,000) Debentures Grants External Sources Total Project Financing (986,500) (825,000) (725,000) (975,000) (500,000) (550,000) (575,000) (425,000) (400,000) (2,475,000) (500,000) (6,875,000) Net Project

13 Hauled Sewage - Capital Projects Appendix "C" Hauled Sewage Capital And Forecast Project Expenditures Hauled Sewage - Non-Tangible Capital Projects Non-Capital Projects Post-Closing Project Costs - Hauled Sewage 9,541 Total Non-Capital Projects 9,541 Total Hauled Sewage - Non-Tangible Capital Projects 9,541 Total Project Expenditures 9,541 Project Financing Total Financing From Own Funds (9,541) Debentures Grants External Sources Total Project Financing (9,541) Net Project

The District Municipality of Muskoka 2014 Tax Supported Operating & Capital Budget Sources of Financing

The District Municipality of Muskoka 2014 Tax Supported Operating & Capital Budget Sources of Financing The District Municipality of Muskoka 2014 Tax Supported Operating & Sources of Financing Reserves and Reserve Funds Page No. Capital Reserve Funds Corporate 1-2 Computer Equipment 3 Fleet.. 4 Ambulance..

More information

The District Municipality of Muskoka 2015 Tax Supported Operating & Capital Budget Sources of Financing

The District Municipality of Muskoka 2015 Tax Supported Operating & Capital Budget Sources of Financing The District Municipality of Muskoka 2015 Tax Supported Operating & Sources of Financing Reserves and Reserve Funds Page No. Capital Reserve Funds Corporate 1-2 Computer Equipment 3 Fleet.. 4 Ambulance..

More information

THE D1sTR1a MUNICIPALITY OF MusKOKA

THE D1sTR1a MUNICIPALITY OF MusKOKA THE D1sTR1a MUNICIPALITY OF MusKOKA 3a August23,2017 THAT the request by Mitchell Shnier for leave to make a delegation/deputation with respect to the proposed hydro-electric generating station at the

More information

THE DISTRICT MUNICIPALITY OF MUSKOKA ENGINEERING AND PUBLIC WORKS COMMITTEE. Meeting No. PW Council Chamber, District Administration Building

THE DISTRICT MUNICIPALITY OF MUSKOKA ENGINEERING AND PUBLIC WORKS COMMITTEE. Meeting No. PW Council Chamber, District Administration Building THE DISTRICT MUNICIPALITY OF MUSKOKA ENGINEERING AND PUBLIC WORKS COMMITTEE Meeting No. PW-6-2008 PLACE: TIME: Council Chamber, District Administration Building 9:00 a.m. DATE: April 30, 2008 PRESENT:

More information

THE D1sTR1a MuN1c1PALITY OF MusKOKA

THE D1sTR1a MuN1c1PALITY OF MusKOKA THE D1sTR1a MuN1c1PALITY OF MusKOKA 4a THAT the rules of procedure relating to motions and debate be suspended for the duration of the budget discussions and that they be reinstated at the conclusion of

More information

City of Grand Island Tuesday, December 12, 2017 Council Session

City of Grand Island Tuesday, December 12, 2017 Council Session City of Grand Island Tuesday, December 12, 2017 Council Session Item E-3 Public Hearing on One & Six Year Street Improvement Plan Council action will take place under Resolution item I-1. Staff Contact:

More information

INCORPORATED VILLAGE OF HILTON BEACH MINUTES

INCORPORATED VILLAGE OF HILTON BEACH MINUTES INCORPORATED VILLAGE OF HILTON BEACH MINUTES Council Meeting October 11, 2017 5:00 p.m. Council Chambers, Hilton Beach Municipal Office 3100 Bowker Street, Hilton Beach, Ontario The meeting was called

More information

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY Village of Lombard, Illinois Capital Improvement Plan FY 15 FY 24 thru FUNDING SOURCE SUMMARY Source FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 FY 24 Construction Fund 6,318,700 2,354,800 2,430,800

More information

CAPITAL PROGRAM SUMMARY

CAPITAL PROGRAM SUMMARY 2017 2018 CAPITAL PROGRAM SUMMARY MISC A 2017 NEIGHBOURHOOD REHABILITATION Pitt River Road - Mary Hill to Kingsway Victoria Drive - Toronto to Holtby Pooley Avenue - High Pressure Watermain Culvert Replacement

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

2016/17 Alberta Parks Capital Programs

2016/17 Alberta Parks Capital Programs 2016/17 Alberta s Capital Programs Capital Maintenance and Renewal (CMR) Major Projects Region Description Central Blackfoot/Cooking Lake Provincial Trail System Upgrade Central Jarvis Bay Upgrade Central

More information

Electrical Quarterly Load Update

Electrical Quarterly Load Update Electrical Quarterly Load Update Photo: Sunset Marina, Lake Chelan January 7, 2019 Andy Wendell Director of Customer Services Chad Rissman Director of Engineering & Asset Management Today s Agenda New

More information

,271

,271 Reserve Analysis by Berrera and Company (January 2016) Page 1 Section I: Capital Reserve Funding - Estimated Cash Reserve Balances And Unfunded Liability: Effective 1/1/2019 Assumption Table: Interest

More information

THE DISTRIG MUNICIPALITY OF MUSKOKA

THE DISTRIG MUNICIPALITY OF MUSKOKA THE DISTRIG MUNICIPALITY OF MUSKOKA 4a MOVED BY: -"'-------'----7"-+-./7 THAT the rules of procedure be suspended for the duration of the budget discussions and that they be re-instated at the conclusion

More information

DEPARTMENT OF PARKS & RECREATION

DEPARTMENT OF PARKS & RECREATION DEPARTMENT OF PARKS & RECREATION 2016 Budget Presentation 1 RONALD ZUBER, DIRECTOR March 7, 2016 2015 ACCOMPLISHMENTS OFFICE OF DIRECTOR Hosted the National Junior Disability Championships from July 16

More information

WASHTENAW COUNTY PARKS AND RECREATION COMMISSION

WASHTENAW COUNTY PARKS AND RECREATION COMMISSION WASHTENAW COUNTY PARKS AND RECREATION COMMISSION - BUDGET PROPOSED FISCAL YEARS JANUARY 1, DECEMBER 31, And PROJECTED FISCAL YEARS JANUARY 1, DECEMBER 31, Robert L. Tetens, Director TABLE OF CONTENTS Millage

More information

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt

More information

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING Clause No. 9 in Report No. 9 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on May 15, 2014. 9 CONSTRUCTION OF BATHURST

More information

Capital Planning City of Ocean City 1

Capital Planning City of Ocean City 1 City of Ocean City Capital Planning 2015-2019 City of Ocean City 1 Road Improvements Project Completion Date 2012 Fall Road Improvement Spring, 2014 Program - (Paving 7 th Street, 8 th Street, 800 Block

More information

REPORT TO COMMITTEE. COMMITTEE: PUBLIC WORKS COMMITTEE DATE: January 9, 2018 PROPOSED 2018 CAPITAL BUDGET AND CAPITAL PLAN

REPORT TO COMMITTEE. COMMITTEE: PUBLIC WORKS COMMITTEE DATE: January 9, 2018 PROPOSED 2018 CAPITAL BUDGET AND CAPITAL PLAN REPORT TO COMMITTEE COMMITTEE: PUBLIC WORKS COMMITTEE DATE: January 9, 2018 DEPARTMENT: FINANCE & ADMINISTRATION SUBJECT: PROPOSED 2018 CAPITAL BUDGET AND 2019 2027 CAPITAL PLAN RECOMMENDATION: THAT THE

More information

City of Penticton: Financial Plan Reporting Structure

City of Penticton: Financial Plan Reporting Structure City of Penticton: Financial Plan Reporting Structure General Utilities Transportation Services Recreation and Culture Environmental Health Services Public Health and Safety Protective Services Environmental

More information

Media Release For Immediate Release Tuesday, April 17, 2018

Media Release For Immediate Release Tuesday, April 17, 2018 Media Release For Immediate Release Tuesday, April 17, 2018 2018 Budget focuses on enhancements to roads and infrastructure Investing in roads and infrastructure is a priority for the County s 2018 budget.

More information

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area KALAMAZOO AREA TRANSPORTATION STUDY FY 2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM MARCH 2019 AMENDMENTS The program is developed using the continuing, What is the TIP? cooperative, and comprehensive

More information

RESOLUTION No APPROVAL OF WAYNE COUNTY AIRPORT AUTHORITY FISCAL YEAR 2018 BUDGET. By Board Member Mark Ouimet

RESOLUTION No APPROVAL OF WAYNE COUNTY AIRPORT AUTHORITY FISCAL YEAR 2018 BUDGET. By Board Member Mark Ouimet RESOLUTION 17-87 APPROVAL OF WAYNE COUNTY AIRPORT AUTHORITY FISCAL YEAR 2018 BUDGET By Board Member Mark Ouimet WHEREAS, the Wayne County Airport Authority (the Authority ), pursuant to the Aeronautics

More information

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan. Business Item No. 2015-XXX Metropolitan Parks and Open Space Commission Meeting date: July 7, 2015 For the Community Development Committee meeting of July 20, 2015 For the Metropolitan Council meeting

More information

Capital Improvement Program Fiscal Year

Capital Improvement Program Fiscal Year Capital Improvement Program Fiscal Year 2013-2014 Tustin City Council Mayor Al Murray Mayor Pro Tem Charles E. Chuck Puckett Council Members John Nielsen Rebecca Beckie Gomez Allan Bernstein CITY OF TUSTIN

More information

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities **11 Mile culvert over the Blackwood Drain East of Milford **12 Mile Inkster and Southfield and Northwestern Hwy Farmington Hills **Adams bridge over Clinton River **Airport **Conklin **Greenfield (northbound

More information

Pavement Management Study

Pavement Management Study Town of South Bethany, DE 2016 Pavement Management Study Prepared by: Kercher Engineering, Inc. December 13, 2016 Mr. Melvin Cusick Town Manager Town of South Bethany 402 Evergreen Road South Bethany,

More information

2018 Capital Improvement Budget Department Summary by Funding Source

2018 Capital Improvement Budget Department Summary by Funding Source Department Summary by Funding Source Department Bonds State Federal Other Total Fire 3,470 - - 290 3,760 Health & Human Services 217 - - 75 292 Information Technology - - - 5,937 5,937 Library 590 - -

More information

CAPITAL ASSET MANAGEMENT PLANNING Updated February 26, Bridges & Large Culverts Storms Sewers Vehicles (Rolling Stock), Machinery & Equipment

CAPITAL ASSET MANAGEMENT PLANNING Updated February 26, Bridges & Large Culverts Storms Sewers Vehicles (Rolling Stock), Machinery & Equipment CAPITAL ASSET MANAGEMENT PLANNING Updated February 26, 2019 Plan Includes: Other Capital Assets: Other Assets: Roads Bridges & Large Culverts Storms Sewers Vehicles (Rolling Stock), Machinery & Equipment

More information

Mr. J. Corcoran, Public Works Superintendent

Mr. J. Corcoran, Public Works Superintendent THE CORPORATION OF THE TOWNSHIP OF GEORGIAN BAY Public Works Coinmiltee Minutes of the Regular Meeting held at the Port Severn Community Centre, Port Severn, Ontario on Tuesday, January 28th, 1997. Members

More information

DATE: April 19, 2016 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration

DATE: April 19, 2016 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration PUBLIC WORKS COMMISSION DATE: April 19, 2016 REPORT NO. PW2016-034 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger General Manager, Public Works Commission

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington

More information

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 INDIANAPOLIS AIRPORT AUTHORITY 2017 APPROPRIATION BUDGET ORDINANCE NO. 2-2016 BOARD APPROVED AUGUST 19, 2016 2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 1 Appropriation Summary

More information

SOUTHWESTERN PENNSYLVANIA COMMISSION YEAR DRAFT TRANSPORTATION IMPROVEMENT PROGRAM GREENE COUNTY WASHINGTON. 5 Clarksville MORGAN

SOUTHWESTERN PENNSYLVANIA COMMISSION YEAR DRAFT TRANSPORTATION IMPROVEMENT PROGRAM GREENE COUNTY WASHINGTON. 5 Clarksville MORGAN 76 422 3 4 3 422 79 79 79 7 579 8 422 1 76 3 22 SOUTHWESTERN PENNSYLVANIA COMMISSION YEAR 29-2 DRAFT TRANSPORTATION IMPROVEMENT PROGRAM GREENE COUNTY Legend TIP Projects TIP Routes Major Roads ««MORRIS

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

DRAFT. Dorabelle Campground Rehabilitation

DRAFT. Dorabelle Campground Rehabilitation DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section

More information

Our Focus: Your Future AWARD OF TENDER FOR ROAD RESURFACING HOT MIX ASPHALT CONTRACT IS.07RSRF (H)

Our Focus: Your Future AWARD OF TENDER FOR ROAD RESURFACING HOT MIX ASPHALT CONTRACT IS.07RSRF (H) Town of Fort Erie Infrastructure Services Our Focus: Your Future Prepared for Council-in-Committee Report No. IS-25-07 Agenda Date May 22, 2007 File No. 230803-126 Subject AWARD OF TENDER FOR ROAD RESURFACING

More information

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

CITY OF PEMBROKE 2004 BUDGET. July 6, 2004

CITY OF PEMBROKE 2004 BUDGET. July 6, 2004 2004 BUDGET July 6, 2004 2004 TAX RATES Municipal Education Total Residential 0.01434078 0.00296000 0.01730078 Multi-residential 0.02674555 0.00296000 0.02970555 Commercial 0.02940061 0.02268611 0.05208672

More information

Town of Rocky Mountain House

Town of Rocky Mountain House Town of Rocky Mountain House Corporate Services Finance, HR, IT, Health and Safety, Legislative Services, External Municipal Employees (RCMP), Airport Equalized Assessment Alberta midsize communities

More information

Appendix G.1: 6-20 year capital improvements program (CIP) - Repair and replacement (R&R)

Appendix G.1: 6-20 year capital improvements program (CIP) - Repair and replacement (R&R) Appendix G.1: 6-20 year capital improvements program (CIP) - Repair and replacement (R&R) Action Park/projects Total 2,014 2,015 2,016 2,017 2,018 2,019 2020+ Athletic fields ac stop ep ace e t, o e u

More information

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio

More information

Document 2 - Capital Projects Recommended for Closure

Document 2 - Capital Projects Recommended for Closure Surplus/ (Deficit) Tax & Other Rate Development Charges Agriculture & Rural Affairs 903158 Rural Water Supply Requirements 705,000 697,467 7,533 2,260-5,273-903845 Rural Road Operational Improve 450,000

More information

OFFICE OF THE CITY MANAGER MEMORANDUM August 30, 2013

OFFICE OF THE CITY MANAGER MEMORANDUM August 30, 2013 OFFICE OF THE CITY MANAGER MEMORANDUM August 30, 2013 TO: FROM: Honorable Mayor and City Council Alan Tandy, City Manager AT/ al SUBJECT: General Information In observation of Labor Day, City offices will

More information

Members of the Administrative Staff Committee. Award of Tender T Trans Canada Trail Extension

Members of the Administrative Staff Committee. Award of Tender T Trans Canada Trail Extension To: From: Members of the Administrative Staff Committee W.H. Jackson, Director of Utility Services Meeting Date: August 26, 2015 Subject: Report USEC15-021 Award of Tender T-54-15 - Trans Canada Trail

More information

Bill Authorization Reference: BRCOTW ; Minute Item 5.1 THE REGIONAL MUNICIPALITY OF NIAGARA BY-LAW NO

Bill Authorization Reference: BRCOTW ; Minute Item 5.1 THE REGIONAL MUNICIPALITY OF NIAGARA BY-LAW NO THE REGIONAL MUNICIPALITY OF NIAGARA BY-LAW NO. 2017-105 A BY-LAW TO ADOPT THE 2018 CAPITAL BUDGET FOR THE REGIONAL MUNICIPALITY OF NIAGARA WHEREAS subsection 289 (1) of the Municipal Act, 2001, S.O. 2001,

More information

Completion: August 2011 LS #321 Design LS #8

Completion: August 2011 LS #321 Design LS #8 1 CIPNumber c350406 2 c350302 3 c350902 LEGEND PERMITTING/ BIDDING CHARLOTTE COUNTY UTILITIES Burnt Store Water Reclamation Facility (Expansion to 0.75 MGD) East Port Expansion Water Reclamation Facility

More information

Henry s Fork Angler Access. Above Mesa Falls

Henry s Fork Angler Access. Above Mesa Falls Henry s Fork Angler Access Above Mesa Falls Table of Contents 1. Frome Park 2. Henry s Lake Fish Hatchery 3. Henry s Lake State Park 4. Highway 20 Bridge 5. Flat Ranch 6. Big Springs 7. Big Springs Water

More information

STREET CONSTRUCTION PROGRAM SUMMARY CALENDAR YEAR 2018 / 2019 FISCAL YEAR Street From To Construction Type Cost Estimate

STREET CONSTRUCTION PROGRAM SUMMARY CALENDAR YEAR 2018 / 2019 FISCAL YEAR Street From To Construction Type Cost Estimate CALENDAR YEAR 2018 / 2019 FISCAL YEAR 2019 Grandview & University Roundabout Grandview & University Intersection Street / Intersection Reconstruction 900,000 TSF, ICAAP, STP 850,000 East-West Corridor

More information

Fall 2015 Tender Release

Fall 2015 Tender Release Tender Close 001-05-00 Hwy. 1, Thin Overlay, 4km past the sintaluta access to 4km short of the JCT. Hwy 1, km 43.25 to 53.40 Thin Overlay Southern December 2015 January 2016 Length = 10.15 km Asphalt Concrete

More information

Creating Connections in Niagara Region

Creating Connections in Niagara Region Creating Connections in Niagara Region GERRY CHAPUT, CHIEF CAPITAL OFFICER - METROLINX ERIN MOROZ, DIRECTOR OF COMMUNICATIONS AND COMMUNITY RELATIONS - METROLINX METROLINX PRESENTATION TO NIAGARA REGION

More information

THE CORPORATION OF THE TOWN OF BRACEBRIDGE COUNCIL MEETING - MINUTES WEDNESDAY, JANUARY 30,2002

THE CORPORATION OF THE TOWN OF BRACEBRIDGE COUNCIL MEETING - MINUTES WEDNESDAY, JANUARY 30,2002 THE CORPORATION OF THE TOWN OF BRACEBRIDGE COUNCIL MEETING - MINUTES WEDNESDAY, JANUARY 30,2002 The Regular Meeting of the Bracebridge Municipal Council was held in the Municipal Council Chamber on Wednesday,

More information

Brevard County Utility Services Department

Brevard County Utility Services Department Brevard County Utility Services Department April 3, 2018 Jim Helmer, Department Director Brian Sorensen, W/WW Manager 1 Utility Services Department 9 TREATMENT PLANTS 6 WASTEWATER, 3 WATER 163 EMPLOYEES

More information

City of Olathe, Kansas Capital Improvement Plan Projects 2016 thru 2020

City of Olathe, Kansas Capital Improvement Plan Projects 2016 thru 2020 Capital Improvement Plan Projects ECONOMIC VIABILITY PROJECTS 2016 2017 2018 2019 Page Coffee Creek Regional Detention 20905B 1,688,005 - - - - 1,688,005 31 Hedge Lane Relocation - Olathe Schools 3-B-080-13

More information

Appendix B PAVEMENT CONDITION AND HISTORY

Appendix B PAVEMENT CONDITION AND HISTORY Appendix B PAVEMENT CONDITION AND HISTORY The Sunport maintains a pavement management program (PMP) in order monitor the condition of pavements and to plan for repair/replacement in a timely manner. The

More information

POP-UP ENVIRONMENTS: 2018 Muskoka Pop-up Villages

POP-UP ENVIRONMENTS: 2018 Muskoka Pop-up Villages POP-UP ENVIRONMENTS: 2018 Muskoka Pop-up Villages OUR WORK OUR PHILOSOPHY WE ARE BRAND STORYTELLERS Ballance Design brings your brand to life using visual storytelling. We are experts at creating tangible,

More information

MERIDIAN A \[0~~~~1' AGENDA CHARTER TOWNSHIP OF MERIDIAN MERIDIAN TRANSPORTATION COMMISSION January 18, :00 p.m.

MERIDIAN A \[0~~~~1' AGENDA CHARTER TOWNSHIP OF MERIDIAN MERIDIAN TRANSPORTATION COMMISSION January 18, :00 p.m. ~ MERIDIAN A \[0~~~~1' ~ AGENDA CHARTER TOWNSHIP OF MERIDIAN MERIDIAN TRANSPORTATION COMMISSION January 18, 2018 6:00 p.m. 1. CALL MEETING TO ORDER 2. APPROVAL OF AGENDA 3. APPROVAL OF MINUTES A.November16,2017

More information

Central Region 2013 Welcome

Central Region 2013 Welcome Central Region 2013 Welcome OHMPA Road Tour June 3, 2013 1 Presentation Overview Budget Highlights Delivery Models Innovation 2012 Year in Review 2 The 2013 Provincial Budget Ensuring the flow of people

More information

Tenders. Manitoba Infrastructure

Tenders. Manitoba Infrastructure Tenders Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Email: jocelyn@mhca.mb.ca Manitoba Infrastructure Reference

More information

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting WELCOME! TSPE DFW MID-CITIES Check-in/Networking Announcements / Lunch Service Speaker Presentation 11:30AM 12:00PM 12:00PM 12:15PM 12:15PM 1:00PM January Chapter Meeting Thank You to Our Sponsors Interested

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No.

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No. Committee Report Business Item No. 2015-168 Community Development Committee For the Metropolitan Council meeting of August 12, 2015 Subject: Coon Creek Regional Trail Master Plan, Anoka County Proposed

More information

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

Public Works Department. Fiscal Year 2019 Projects

Public Works Department. Fiscal Year 2019 Projects Public Works Department Fiscal Year 2019 Projects Palm Avenue Drainage Improvements Description: Neighborhood drainage improvement and flood abatement Phase: Currently in design (began FY18) Schedule:

More information

Table of Contents

Table of Contents Table of Contents 1.0 2.0 3.0 4.0 4.1 4.2 4.3 5.0 6.0 INTRODUCTION 1 SITE DESCRIPTION AND SURROUNDING LAND USES 2 DESCRIPTION OF PROPOSAL 3 PLANNING ANALYSIS Provincial Policy Statement (2014) 4 District

More information

2018 Appropriation Budget Table of Contents Board Approved August 18, 2017

2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 INDIANAPOLIS AIRPORT AUTHORITY 2018 APPROPRIATION BUDGET ORDINANCE NO. 1-2017 BOARD APPROVED AUGUST 18, 2017 2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 1 Appropriation Summary

More information

Township of Wilmot Municipal Budget. Total Expenditures (excluding user-pay) Total Revenues (excluding user-pay) Expenditures $ 8,795,905

Township of Wilmot Municipal Budget. Total Expenditures (excluding user-pay) Total Revenues (excluding user-pay) Expenditures $ 8,795,905 TOWNSHIP OF WILMOT 2014 4 MUNICIPAL BUDGET The Corporation of the Township of Wilmot Council Mayor Les Armstrong Councillors Ward 1 Al Junker Ward 2 Peter Roe Ward 3 Barry Fisher Ward 4 Jeff Gerber Ward

More information

Final Report. Community Recreation Inventory Burwash Landing. Capital Management Engineering Limited. April 2016 Project Number

Final Report. Community Recreation Inventory Burwash Landing. Capital Management Engineering Limited. April 2016 Project Number Capital Management Engineering Limited EMPOWERING OUR CLIENTS WITH KNOWLEDGE 5531 Cornwallis Street, Halifax, NS, Canada B3K 1B3 Phone: 902 429 4412 Fax: 902 423 4945 Final Report Burwash Landing April

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER TO: FROM: SUBJECT: OFFICE OF THE CITY MANAGER Honorable Mayor and City Council Alan Tandy, City Manager AT General Information May 26, 2017 Good News: City offices will be closed Monday, May 29 th, in

More information

CAPITAL IMPROVEMENT PLAN

CAPITAL IMPROVEMENT PLAN CITY OF SOLDOTNA CITY HALL 77 N BIRCH ST. SOLDOTNA, AK 99669 STEPHANIE QUEEN, AICP SOLDOTNA CITY MANAGER SQUEEN@SOLDOTNA.ORG 907.714.1240 866.593.6994 KYLE KORNELIS, P. E., PUBLIC WORKS DIRECTOR KKORNELIS@SOLDOTNA.ORG

More information

Tenders. Manitoba Infrastructure

Tenders. Manitoba Infrastructure Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Email: jocelyn@mhca.mb.ca Tenders Manitoba Infrastructure Reference

More information

Capital Five-Year Fiscal Forecast

Capital Five-Year Fiscal Forecast Capital Five-Year Fiscal Forecast Budget Forecast Forecast Forecast Forecast REVENUES 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021 State sources: CO&DS distributed to district $ 310,000 $ 310,000

More information

Palm Beach County Traffic Report August 24 through August 31, 2012

Palm Beach County Traffic Report August 24 through August 31, 2012 For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane

More information

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue

More information

Public Works designs, manages and builds more than $4 billion in construction projects across San Francisco. DOING BID ON OUR PROJECTS. JOIN THE CITY TEAM. BUSINESSwith BUILDINGS PLAYGROUNDS STREET RESURFACING

More information

Capital Improvement Program

Capital Improvement Program Capital Improvement Program TOPIC PAGE Capital Improvement Policy... 246-248 Overview... 246 Criteria for Evaluating Projects... 247 Procedure for Annual Capital Improvement Plan... 247-248 All Funds Five-Year

More information

View Painted Plow Blades & New Equipment Public Works Week May 20 st to 26 th, 2018

View Painted Plow Blades & New Equipment Public Works Week May 20 st to 26 th, 2018 Page County of Peterborough Special Meeting Agenda - County Council Road Tour Wednesday, May 30, 2018-9:00 a.m. Douro Depot, 713 County Road 4, Peterborough, ON 1. Call To Order 2. Moment of Silent Reflection

More information

Guide to. Road Construction Projects

Guide to. Road Construction Projects Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or

More information

RE: School Safety Enhancement Options

RE: School Safety Enhancement Options HALDIMAND COUNTY Report PW-ES-11-2014 of the General Manager of Public Works For Consideration by RE: School Safety Enhancement Options OBJECTIVE: To provide Council with options to enhance safety in school

More information

Township of Centre Wellington Committee of the Whole Agenda Tuesday, February 2, :00 am Council Chamber, 1 MacDonald Square, Elora Page

Township of Centre Wellington Committee of the Whole Agenda Tuesday, February 2, :00 am Council Chamber, 1 MacDonald Square, Elora Page Township of Centre Wellington Committee of the Whole Agenda Tuesday, February 2, 2016 9:00 am Council Chamber, 1 MacDonald Square, Elora Page 1. CALL TO ORDER 2. DISCLOSURE OF PECUNIARY INTEREST UNDER

More information

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report)

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report) STAFF REPORT ACTION REQUIRED Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report) Date: March 25, 2015 To: From: Wards: Reference

More information

Additional Economic Development Strategy submissions- Klickitat County

Additional Economic Development Strategy submissions- Klickitat County Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of

More information

CITY OF MERCED Planning & Permitting Division. FROM: Kim Espinosa, PLANNING COMMISSION Planning Manager MEETING DATE: May 23, 2018

CITY OF MERCED Planning & Permitting Division. FROM: Kim Espinosa, PLANNING COMMISSION Planning Manager MEETING DATE: May 23, 2018 CITY OF MERCED Planning & Permitting Division STAFF REPORT: #18-11 AGENDA ITEM: 4.2 FROM: Kim Espinosa, PLANNING COMMISSION Planning Manager MEETING DATE: May 23, 2018 PREPARED BY: Steven C. Son, Deputy

More information

Staff Report on Brevard County Area Projects (See pages 32-60) Staff will present a report on District Projects in the Brevard County area.

Staff Report on Brevard County Area Projects (See pages 32-60) Staff will present a report on District Projects in the Brevard County area. Call to Order - Chair Netts will call the meeting to order. Pledge of Allegiance - Commissioner Sansom will lead the Pledge of Allegiance. Roll Call - Secretary Gernert will call the roll. Additions or

More information

Ministry of Transportation. OHMPA 2016 Partners In Quality Road Tour Jasan Boparai, P. Eng. Manager/ A, Program Planning Office

Ministry of Transportation. OHMPA 2016 Partners In Quality Road Tour Jasan Boparai, P. Eng. Manager/ A, Program Planning Office OHMPA 2016 Partners In Quality Road Tour Jasan Boparai, P. Eng. Manager/ A, Program Planning Office Outline Capital Budgets - Provincial West Region 2015/16 The Year Past Accomplishments 2016/17 The Year

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) DATE: March 27, 2012 METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000 TDD (651) 291-0904 TO: Metropolitan Parks and Open Space Commission FROM: Arne Stefferud, Planning

More information

State Project Reconstruction I-84

State Project Reconstruction I-84 State Project 151-273 Reconstruction I-84 Waterbury, Connecticut FROM WASHINGTON STREET TO PIERPONT ROAD I-84 Constructors J.V. Robert Turner Area Engineer Ken Fargnoli District Engineer John Dunham Assistant

More information

CAPITAL IMPROVEMENT PLAN FOR THE FIVE YEAR PERIOD ENDING JUNE 30, 2023 ALLOCATION OF RESOURCES. Cash - General Fund Transfer Total

CAPITAL IMPROVEMENT PLAN FOR THE FIVE YEAR PERIOD ENDING JUNE 30, 2023 ALLOCATION OF RESOURCES. Cash - General Fund Transfer Total Cash - General Fund Transfer Cash - General Fund Transfer Total - - - - - - Cash - Greenbrier TIF Intersection Improvements: Battlefield Blvd. at Volvo Pkwy. 40-230 125,000 550,000 - - - 675,000 Right

More information

CITY OF BROOKFIELD Capital Improvement Fund Budget

CITY OF BROOKFIELD Capital Improvement Fund Budget CITY OF BROOKFIELD Capital Improvement Fund Budget The City adopts an annual capital improvement budget, based on a five-year capital improvement program (CIP). The annual budget and CIP are prepared by

More information

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures

More information

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects Pittsburgh - PennDOT is pleased to announce the 2016 Allegheny County transportation improvement project list for state-owned

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

AGENDA GUEMES ISLAND FERRY OPERATIONS PUBLIC FORUM

AGENDA GUEMES ISLAND FERRY OPERATIONS PUBLIC FORUM AGENDA GUEMES ISLAND FERRY OPERATIONS PUBLIC FORUM Wednesday, August 17, 211 6: p.m. Guemes Island Community Hall ~ 7549 Guemes Island Road Thank you for attending the second Annual Public Forum in 211.

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER August 29, 2014 TO: FROM: Subject: Honorable Mayor and City Council Alan Tandy, City Manager AT / al General Information City offices will be closed on Monday, September 1 st,

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related