Part 175.D & E Aeronautical Data Originators Data Product Specification: Vertical Obstructions

Size: px
Start display at page:

Download "Part 175.D & E Aeronautical Data Originators Data Product Specification: Vertical Obstructions"

Transcription

1 Part 175.D & E Aeronautical Data Originators Data Product Specification: Vertical Obstructions ATS-DPS-0010 Version 2 Effective 22 December 2017 Prepared: Authorised: Sateesh Sathineni Aeronautical Data Analyst Grant Rawstorn ATM Data Services Manager Ensure document is current before use Airservices Australia of 12

2 Change summary Version Date Change description 1 30 September 2017 NRFC Initial Document 2 22 December 2017 Remove reference to ADO & VOD forms in Appendix B & C This document was created using Generic Document Template C-TEMP0047 Version 8. Table of contents 1 Purpose Scope CASR Part 175: Aeronautical Data Originator Vertical Obstructions Data Specification Requirements Notification Dates Object and Structure Data Electronic Format Data Alterations and Error Tracking Data Acceptance and Review Data Accuracy Requirements Definitions References... 8 Appendix A Vertical Obstruction Data Product Specification (DPS) A.1 Aeronautical Data and Aeronautical Information A.2 Attribute Definitions A.3 Vertical Obstruction Data Format of 12 Version 2: Effective 22 December 2017 ATS-DPS-0010

3 1 Purpose The purpose of this document is to ensure the AIS provider (Airservices) & Vertical Obstacle Owner/Operator/Nominated Contact Person meet the regulatory requirements of CASR Part Scope The scope of this document is to prescribe the information required to register as an Vertical Obstacle Owner/Operator/Nominated Contact Person and the data exchange protocols for the submission, modification and withdrawal of aeronautical data or information in relation to objects and structures that affect aviation safety. Which may be published in the Integrated Aeronautical Information Publication (IAIP), or Aeronautical Datasets It will enable the Vertical Obstacle Owner/Operator/Nominated Contact Person to provide aeronautical data to the AIS provider (Airservices) in a controlled manner. 3 CASR Part 175: Aeronautical Data Originator Vertical Obstructions Airservices, under CASR Part 175.E, records and publishes objects and structures that affect aviation safety, and/or meets the criteria for obstacles specified in CASR Part 139, CASR Part 173, ICAO Annex 4, Annex 14, Annex 15 or Doc * CASR Part 175.D requires the owner, operator, or person responsible for vertical obstruction to register as a Vertical Obstacle Owner/Operator/Nominated Contact Person with the AIS Provider (Airservices). The Aeronautical Data Originator has specific responsibilities under CASR Part 175, and an example of some items are provided below (for detailed instructions refer CASR Part 175): 1. Appointment of Vertical Obstacle Owner/Operator/Nominated Contact Person with the knowledge and competence to carry out the responsibilities of the position. 2. Provide in writing to the AIS provider (Airservices) any changes to the person(s) occupying the positions of Vertical Obstacle Owner/Operator/Nominated Contact Person. 3. Provide to the AIS provider (Airservices) updated aeronautical data or aeronautical information in accordance with the requirements of the Data Product Specification. Airservices is obligated to report any breaches of CASR Part 175 to CASA. * Note: Certified/Registered Aerodromes Obstacles. Responsibility for objects and structures associated with Certified or Registered Aerodromes that penetrate the obstacle limitation surface; or is required for ICAO Type A and/or Type B Aerodrome Obstacle Charts rests with the individual Aerodrome, Aeronautical Data Originator AIP Responsible Person. Further information on CASR Part 175 requirements can be found: ATS-DPS-0010 Version 2: Effective 22 December of 12

4 4 Data Specification Requirements 4.1 Notification Dates Information or data can be provided or submitted to Airservices at any time throughout the year. However, the data must be submitted by specific cut-off dates in order to be published in the next available amendment, as detailed in the publication calendar: Note: 1. Airservices aeronautical database is updated in line with the AIRAC date; incorporating the new data into our publications every three to six months. 2. The AIRAC effective date is the internationally agreed date at which time-critical aeronautical documentation, the IAIP, becomes effective. Consequently, CASR Part 175 has regulatory obligations for the AIS Provider and for the Data originator in respect of the AIRAC timing and change management processes. 3. Aeronautical data should be supplied to Airservices for publication in the IAIP and on Aeronautical Charts in alignment with the AIRAC list of effective dates. 4. Airservices may make a written request for Vertical Obstruction Data in the interest of aviation safety. Where a written request has been made, this must be complied with within 28 days after receiving the request. 4.2 Object and Structure Data Airservices, under CASR Part 175.E, collects, requests, records and publish objects and structures that affect aviation safety and/or meets the criteria for obstacles specified in CASR Part 139, CASR Part 173, ICAO Annex 4, Annex 14, Annex 15 or Doc This applies to objects or structures that: a) has a maximum height of at least 100m above ground level (as mentioned in Annex 15 to the Chicago Convention, and described below); or, Area 1: the entire territory of a State b) penetrates an obstacle data collection surface (as mentioned in Appendix 8 of Annex 15 to the Chicago Convention, and described below); or, Area 2: within the vicinity of an aerodrome, subdivided as follows (see Figure 1 and 2): Area 2a: a rectangular area around a runway that comprises the runway strip plus any clearway that exists; Area 2b: an area extending from the ends of Area 2a in the direction of departure, with a length of 10 km and a splay of 15 per cent to each side; Area 2c: an area extending outside Area 2a and Area 2b at a distance of not more than 10 km from the boundary of Area 2a; Area 2d: an area outside the Areas 2a, 2b and 2c up to a distance of 45 km from the aerodrome reference point, or to an 4 of 12 Version 2: Effective 22 December 2017 ATS-DPS-0010

5 existing terminal control area (TMA) boundary, whichever is nearest; Area 3: the area bordering an aerodrome movement area that extends horizontally from the edge of a runway to 90 m from the runway centre line and 50 m from the edge of all other parts of the aerodrome movement area (see Figure 3); Area 4: The area extending 900 m prior to the runway threshold and 60 m each side of the extended runway centre line in the direction of the approach on a precision approach runway, Category II or III (see Figure 4). c) penetrates the obstacle limitation surface of an aerodrome; or, d) is required for ICAO Type A and/or Type B Aerodrome Obstacle Charts; or, e) is of an interest of aviation safety. Figure 1 - Area 1 and Area 2 Figure 2 - Area 1 and Area 2 ATS-DPS-0010 Version 2: Effective 22 December of 12

6 Figure 3 - Area 3 Figure 4 - Area 4 Airservices requires the following information, described in Appendix A, about an obstacle as a minimum data requirement: a) the owner of the obstacle; b) the contact person responsible for the obstacle; c) the type of obstacle; d) the geographic location of the obstacle in WGS84 format; e) the height above ground level of the obstacle; f) the elevation above mean sea level of the obstacle; g) whether the obstacle is marked or lit; and h) Metadata regarding the obstacle as specified as Mandatory in Appendix A. Submissions of aeronautical data are to be communicated to Airservices by Vertical Obstruction Notification Form To vod@airservicesaustralia.com The standard data entry format for aeronautical information used IAIP Products is defined in Appendix A. Incomplete information may not be accepted and may be returned to the proponent for clarification purposes. A Vertical Obstacle Owner/Operator/Nominated Contact Person is responsible for ensuring that all their information is accurate, meets all regulatory requirements and is readable by pilots. 6 of 12 Version 2: Effective 22 December 2017 ATS-DPS-0010

7 The Vertical Obstacle Owner/Operator/Nominated Contact Person must also ensure that all information provided to Airservices is up-to-date and complete. 4.3 Electronic Format The authenticated electronic means by which aeronautical information and data is supplied to Airservices is a comma separated values (CSV) file which contains information and metadata in accordance with Appendix A. To ensure effective electronic data transfer, the preferred method for transferring the CSV file is to compress the file in a ZIP folder, which has a cyclic redundancy check (CRC-32) capability to ensure data integrity is not lost during transfer. 4.4 Data Alterations and Error Tracking The Vertical Obstacle Owner/Operator/Nominated Contact Person is responsible for notifying Airservices of any updates to be made to data or information regarding planned for construction, planned for demolition/deconstruction, and/or existing obstacles. Requests for alterations to the aeronautical data are to be communicated to Airservices using Vertical Obstruction notification form to: vod@airservicesaustralia.com Airservices should also be notified when an error is detected in the data or information by the registered Vertical Obstruction Owner/Operator/Nominated contact person. Please send errors detected with Vertical Obstruction data to Airservices using Vertical Obstruction Notification Form. Airservices may be advised of errors in data or information by individuals who are not the registered Vertical Obstruction Owner/Operator. Airservices investigates these reported errors or omissions and will take remedial action after confirmation with the Vertical Obstruction Owner/Operator of the data or information. Remedial action will be taken as appropriate in consideration of the safety significance of the error or omission. Under the legislation, Airservices must report significant errors to the Civil Aviation Safety Authority (CASA). 4.5 Data Acceptance and Review Aeronautical data regarding objects and structures that affect aviation safety can only be accepted from the Vertical Obstruction Owner/Operator. The Vertical Obstruction Owner/Operator has an enduring responsibility for the accuracy levels of the data or information, and must ensure that the data is reviewed at least annually. Airservices must be immediately informed of any changes to the data. The Vertical Obstruction Owner/Operator must update Airservices if there is any change to the ownership/contact details of the obstacle. The Vertical Obstacle Owner/Operator/Nominated Contact person Form be used to provide the change of these contact details. 4.6 Data Accuracy Requirements Airservices has a responsibility, to retain the data accuracy of the source data when handling, storing and publishing data provided by the Data Originator. ATS-DPS-0010 Version 2: Effective 22 December of 12

8 The Vertical Obstruction Owner/Operator is responsible for the confidence and accuracy levels of the data or information before providing it to Airservices. The data received from Aeronautical Data Originators in regards to objects and structures that affect aviation safety should meet the accuracy and integrity requirements as defined in Annex 15 of the Chicago Convention (see Table 1). Table 1 - Data Accuracy Requirements Data Value Vertical accuracy Vertical resolution Horizontal accuracy Accuracy level 30 metres 1 metre 50 metres Confidence level 90% 5 Definitions The Data Product Specification (DPS) is included as Appendix A. The DPS contains Attribute Definitionsas below Within this document, the following definitions apply: Term AGL AIP AIRAC AMSL CASA CASR DPS IAIP UOM Definition Above Ground Level Aeronautical Information Publication Aeronautical Information Regulation and Control Above Mean Sea Level Civil Aviation Safety Authority Civil Aviation Safety Regulation Data Product Specification Integrated Aeronautical Information Publication Unit of Measurement WGS-84 World Geographic System References Title ICAO Annex 4: Aeronautical Charts ICAO Annex 14: Aerodromes ICAO Annex 15: Aeronautical Information Services ICAO Doc 8168: Flight procedures CASA CASR Part 139: Aerodromes 8 of 12 Version 2: Effective 22 December 2017 ATS-DPS-0010

9 Title CASA CASR Part 173: Instrument Flight Procedure Design CASA CASR Part 175: Aeronautical Information Management ISO 9001:2015 Quality Management Systems ATS-DPS-0010 Version 2: Effective 22 December of 12

10 Appendix A Vertical Obstruction Data Product Specification (DPS) A.1 Aeronautical Data and Aeronautical Information The Integrated Aeronautical Information Package (IAIP) comprises the AIP book, AIP supplements and AICs, NOTAM, ERSA, DAH, DAP, IFR & VFR Charts. The Aeronautical Data Originator Vertical Obstructions is responsible for the information on objects and structures that can be published in the IAIP. More specific details of the aeronautical data and aeronautical information for which the Aeronautical Data Originator Vertical Obstructions is responsible for is contained within Attribute Definitions and the Vertical Obstruction Data Format. A.2 Attribute Definitions Attribute Name of Owner/Person Responsible Owner/Operator Contact Details Obstacle ID/Site Name Obstacle Type Obstacle Description State Country Horizontal Datum Description Name of Owner, Operator or Person Responsible required for traceability Contact Details of Owner, Operator or Person Responsible Obstacle identification or Site Name that identifies the vertical obstacle Type of obstacle Description of the vertical obstruction to provide additional information about the type of obstacle State in which the obstruction is located Country in which the obstruction is located Defines the ellipsoid/spheroid system used to define the position, Airservices only accepts data in WGS-84 Horizontal Accuracy Positional accuracy for the structure, accuracy required is 50 metres or less. This attribute must be accompanied with the unit of measurement, this can be included in the same attribute or captured separately Latitude/Longitude Vertical Datum Vertical Accuracy AMSL Geographical position, to be provided in decimal degrees or a hundredth of an arc second. Vertical Datum used in Australia is the Australian Height Datum (AHD) Height accuracy for the structure, accuracy required is 30 metres or less. This attribute must be accompanied with the unit of measurement, this can be included in the same attribute or captured separately Height of the vertical Structure Above Mean Sea Level. This attribute must be accompanied with the unit of measurement, this can be included in the same attribute or captured separately 10 of 12 Version 2: Effective 22 December 2017 ATS-DPS-0010

11 Attribute AGL Ground Elevation Obstacle Radius/Width Confidence level Multiple Obstacles / count Lit / Lighting type Marked / Markings Status Collected Data Remarks Description Height of the structure Above Ground Level. This attribute must be accompanied with the unit of measurement, this can be included in the same attribute or captured separately The elevation of the ground level. This attribute must be accompanied with the unit of measurement, this can be included in the same attribute or captured separately Overall radius of obstacle or circumference of outer most guy-wire. This attribute must be accompanied with the unit of measurement, this can be included in the same attribute or captured separately The probability that the true value of a parameter is within a certain interval around the estimate of its value. The interval is usually referred to as the accuracy of the estimate Single or group vertical obstruction and the amount of structures in a group Any lights fixed to the vertical obstruction and the type Any markings on the vertical obstruction and the type Status of the vertical obstruction Method the data was collected Remarks specific to the vertical obstruction A.3 Vertical Obstruction Data Format Required Information Format Required Accepted Code List Example Name of Owner/Operator Owner/Operator Contact Details Obstacle ID/Site Name [CHAR] Mandatory Sam Smith [CHAR] Mandatory Address: 123 Obstacle Lane, Suburb ACT 2601 Ph: smith@ .com.au [CHAR] Mandatory Wind Turbine 21B Mount Obstacle Obstacle Type [CHAR] Mandatory Wind Turbine, Building Telecommunications Tower, Radio Mast, etc. Obstacle Description [CHAR] Optional Willow Wind Farm Turbine State [CHAR] Mandatory ACT - Australian Capital Territory NSW - New South Wales NT - Northern Territory QLD - Queensland SA - South Australia TAS - Tasmania VIC - Victoria WA -Western Australia ACT ATS-DPS-0010 Version 2: Effective 22 December of 12

12 Required Information Format Required Accepted Code List Example Country [CHAR] Mandatory AUS - AUSTRALIA AUS Horizontal Datum [CHAR] Mandatory WGS-84 WGS-84 Horizontal Accuracy Horizontal Accuracy- UOM [Integer] Mandatory 10 [CHAR] Mandatory FT Feet M Metres Latitude [LAT] Mandatory [S]DDMMSS.SS S Longitude [LONG] Mandatory [E]DDDMMSS.SS E Vertical Datum [CHAR] Mandatory AHD - Australian Height Datum AHD M Vertical Accuracy [Integer] Mandatory 5 Vertical Accuracy [CHAR] Mandatory FT Feet M - UOM M Metres AMSL [Integer] Mandatory 555 AMSL - UOM [CHAR] Mandatory FT Feet M M Metres AGL (Height) [Integer] Mandatory 111 AGL - UOM [CHAR] Mandatory FT Feet M Metres Ground Elevation [Integer] Optional 444 Ground Elevation - UOM [CHAR] Optional FT Feet M Metres M Obstacle Radius/Width Obstacle Radius/Width - UOM [Integer] Mandatory 5 [CHAR] Mandatory FT Feet M Metres Confidence level [CHAR] Mandatory 90% and greater 90 Multiple Obstacles Multiple Obstacle count [CHAR] Mandatory Y = YES N = NO [Integer] Optional 10 Lighting Status [CHAR] Mandatory LIT UNLIT Lighting type (if LIT) [CHAR] Mandatory Flashing Red light Marked [CHAR] Mandatory Y = YES N = NO Markings [CHAR] Mandatory Painted orange and white stripes Status [CHAR] Mandatory E = Erected D = Dismantled Collected Data [CHAR] Mandatory Surveyed Declared Calculated Remarks [CHAR] Optional M FT Y LIT Y E Surveyed 12 of 12 Version 2: Effective 22 December 2017 ATS-DPS-0010

Part 175.E Request for data. concerning objects and structures. that affect aviation safety

Part 175.E Request for data. concerning objects and structures. that affect aviation safety Part 175.E Request for data concerning objects and structures that affect aviation safety Airservices Australia 2015 Page 1 of 7 Table of contents 1 Background...3 2 Purpose...3 3 Part 175.E Data Suppliers...3

More information

Electronic Terrain and Obstacle Data

Electronic Terrain and Obstacle Data International Civil Aviation Organization Electronic Terrain and Obstacle Data David Lewtas Chief, Aeronautical Information Unit (MET/AIM) 24 November 2010 ICAO CAR AIM Seminar Kingston, Jamaica 22-24

More information

Overview ICAO Standards and Recommended Practices for Aerodrome Mapping Data reported to AIM

Overview ICAO Standards and Recommended Practices for Aerodrome Mapping Data reported to AIM Overview ICAO Standards and Recommended Practices for Aerodrome Mapping Data reported to AIM References ICAO SARPS Annex 14 Vol. I, 7 th Edition, July 2016 ICAO SARPS Annex 15, 15 th Edition, July 2016

More information

ADVISORY CIRCULAR AC-AD-005

ADVISORY CIRCULAR AC-AD-005 GHANA CIVIL AVIATION AUTHORITY ADVISORY CIRCULAR AC-AD-005 AERODROME QUALITY DATA SYSTEM GENERAL Ghana Civil Aviation Authority (GCAA) Advisory Circulars from Aerodrome Safety and Standards (ASAS) contain

More information

PART 175.D Aeronautical Data Originators Data Product Specification: Certified / Registered Aerodromes

PART 175.D Aeronautical Data Originators Data Product Specification: Certified / Registered Aerodromes PART 175.D Aeronautical Data Originators Data Product Specification: Certified / Registered Aerodromes ATS-DPS-0001 Version 3 30 September 2017 Prepared: Bree Sarkies Aeronautical Information Officer Authorised:

More information

AIM WG: Contributing to ATM Success. Roland Baumann Head Planning & Development AIM skyguide

AIM WG: Contributing to ATM Success. Roland Baumann Head Planning & Development AIM skyguide AIM WG: Contributing to ATM Success Roland Baumann Head Planning & Development AIM skyguide AIM Contributing to ATM Success change of the value proposition towards ATM Information Management Services the

More information

IRELAND SAFETY REGULATION DIVISION

IRELAND SAFETY REGULATION DIVISION NOTICE TO AIR NAVIGATION SERVICE PROVIDERS IRELAND SAFETY REGULATION DIVISION NR S.016 ISSUE 1 DATE 03.03.10 IRISH AVIATION AUTHORITY AVIATION HOUSE HAWKINS STREET DUBLIN 2 Tel +353 1 6718655 Fax +353

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION AIM SG/5 (Egypt, Cairo, 22 24 January 2019) AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION Presentation contents : 1. NG Aviation company overview 2. New documentation

More information

AIR LAW AND ATC PROCEDURES

AIR LAW AND ATC PROCEDURES 1 The International Civil Aviation Organisation (ICAO) establishes: A standards and recommended international practices for contracting member states. B aeronautical standards adopted by all states. C

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 171 AERONAUTICAL TELECOMMUNICATION SERVICES Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 First

More information

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS

More information

Contents. Subpart A General 91.1 Purpose... 7

Contents. Subpart A General 91.1 Purpose... 7 Contents Rule objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 6 Insertion of Amendments... 6 Effective date of rule... 6 Availability of rules... 6 Part 91

More information

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012 ICAO Aerodrome s Manual AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO 11-15 June 2012 Objectives - Identify the requirements listed in Annex 14 regarding the development and maintenance of an aerodrome

More information

International Civil Aviation Organization

International Civil Aviation Organization International Civil Aviation Organization WP22 BIS Agenda Item 11: Adoption of Amendment 36 to ICAO Annex 15 and Amendment 56 to Annex 4 and its implications to the AFI Region as per the AIS-AIM Transition

More information

Service Level Agreement. for the. Promulgation of Aeronautical Information in New Zealand. Between

Service Level Agreement. for the. Promulgation of Aeronautical Information in New Zealand. Between Service Level Agreement for the Promulgation of Aeronautical Information in New Zealand Between The Aeronautical Information Services Provider being GroupEAD Asia Pacific Ltd and/or its authorised (by

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the

More information

It is essential that planning take full account of air safety and efficiency of operations.

It is essential that planning take full account of air safety and efficiency of operations. Airspace Protection Airspace Protection It is essential that planning take full account of air safety and efficiency of operations. 7.1 INTRODUCTION Obstacles near an airport, whether they are natural

More information

Aeronautical Information Services Issue 1 30 May 2012

Aeronautical Information Services Issue 1 30 May 2012 United Kingdom Overseas Territories Aviation Circular OTAC 175-1 Aeronautical Information Services Issue 1 30 May 2012 GENERAL Effective: on issue Overseas Territories Aviation Circulars are issued to

More information

The Naroghid Wind Farm. Airservices Australia. Proponent : Naroghid Wind Farm Pty Ltd AVIATION IMPACT STATEMENT

The Naroghid Wind Farm. Airservices Australia. Proponent : Naroghid Wind Farm Pty Ltd AVIATION IMPACT STATEMENT The Naroghid Wind Farm Airservices Australia Proponent : Naroghid Wind Farm Pty Ltd AVIATION IMPACT STATEMENT 07 JUNE, 2017. Page 1 of 13. 1. Author's Name and Address Richard Gower M.I.E. Aust. 72 74

More information

CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0

CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0 CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0 January 2018 AMENDMENTS Location Date Amended by Description CONTENTS 17.1 GENERAL... 4 17.1.1 Applicability...

More information

SITE ELEVATION AMSL...Ground Elevation in feet AMSL STRUCTURE HEIGHT...Height Above Ground Level OVERALL HEIGHT AMSL...Total Overall Height AMSL

SITE ELEVATION AMSL...Ground Elevation in feet AMSL STRUCTURE HEIGHT...Height Above Ground Level OVERALL HEIGHT AMSL...Total Overall Height AMSL ******************************************** * Federal Airways & Airspace * * Summary Report * ******************************************** File: User Assigned File Name Latitude: NAD83 Coordinate Longitude:

More information

Regional implementation of Electronic Terrain and Obstacle data (e-tod) (Presented by Jeppesen)

Regional implementation of Electronic Terrain and Obstacle data (e-tod) (Presented by Jeppesen) International Civil Aviation Organization SAM/IG/13-WP/39 South American Regional Office 5/04/14 Thirteenth Workshop/Meeting of the SAM Implementation Group English only (SAM/IG/13) - Regional Project

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2010R0073 EN 20.10.2014 001.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B COMMISSION REGULATION (EU) No 73/2010 of 26 January

More information

Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding

Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding References The Convention on International Civil Aviation (Chicago Convention) ICAO SARPS Annex 14 Vol. I, 7 th Edition, July

More information

AERODROME LICENCE APPLICATION PROCESS

AERODROME LICENCE APPLICATION PROCESS 0000180111 Page 2 Why is a Licence Required? An aerodrome licence is required for a site if it is intended to facilitate operations by commercial transport aircraft, other aerial work other than rotorcraft,

More information

MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS.

MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS. NATIONAL AIRPORTS SAFEGUARDING FRAMEWORK GUIDELINE D MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS. REVISION DATE VERSION NUMBER CHANGES MADE APPROVED

More information

Sample Regulations for Water Aerodromes

Sample Regulations for Water Aerodromes Sample Regulations for Water Aerodromes First Edition (unedited version) March 2015 Notice to users: This document is an unedited version which is made available to the public for convenience. Its content

More information

Related Rules This Advisory Circular relates specifically to CAR Part 175-Aeronautical Information Services Organisations Certification.

Related Rules This Advisory Circular relates specifically to CAR Part 175-Aeronautical Information Services Organisations Certification. Advisory Circular AC175-1 Aeronautical Information Service Organisations Certification Revision 2 23 September 2011 General Civil Aviation Authority Advisory Circulars contain information about standards,

More information

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017 Part 171 CAA Consolidation 10 March 2017 Aeronautical Telecommunication Services - Operation and Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 171 provides the

More information

COMMISSION REGULATION (EU)

COMMISSION REGULATION (EU) L 23/6 Official Journal of the European Union 27.1.2010 COMMISSION REGULATION (EU) No 73/2010 of 26 January 2010 laying down requirements on the quality of aeronautical data and aeronautical information

More information

Introduction to the Data Catalogue

Introduction to the Data Catalogue AIS-AIMSG/11-SN /11 22/04/15 AERONAUTICAL INFORMATION SERVICES-AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG) ELEVENTH MEETING Montreal, 27 April to 1 May 2015 Agenda Item 2: AIM Domain Scope

More information

Sharing UAE experience in. AIM implementation

Sharing UAE experience in. AIM implementation Sharing UAE experience in AIM implementation NCLB AIM WORKSHOP Cairo, Egypt, 11 13 September 2017 MID Region NCLB Strategy No Country Left Behind campaign help ensure all States of effective implementation

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen Page 1 of 14 1 INTRODUCTION This guidance material has been prepared for use for the definition of protected surfaces in the vicinity of aerodromes. Survey information for an aerodrome is essential for

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 173 FLIGHT CHECKING ORGANISATION APPROVAL Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 ISBN 0-11790-410-4

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-9 Notification of aerodrome data and information Revision 2 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices

More information

DP-3 ICAO Electronic Terrain and. Amendments 33 & 36

DP-3 ICAO Electronic Terrain and. Amendments 33 & 36 DP-3 ICAO Electronic Terrain and Obstacle Data Amendments 33 & 36 1 Published Amendment 33 to ICAO Annex 15, Chapter 10 July 2004, ICAO Annex 15(Aeronautical Information Services) addeda new Chapter 10

More information

ENR 1.7 ALTIMETER SETTING PROCEDURES

ENR 1.7 ALTIMETER SETTING PROCEDURES AIP LEBANON ENR 1.7-1 11 APR 2008 ENR 1.7 ALTIMETER SETTING PROCEDURES 1. Introduction: 1.1 The procedures herein describe the method used in providing adequate vertical separation between aircraft and

More information

Part 175.D Data Product Specification Aeronautical Data Originators: Military Aerodromes

Part 175.D Data Product Specification Aeronautical Data Originators: Military Aerodromes Part 175.D Data Product Specification Aeronautical Data Originators: Military Aerodromes ATS-DPS-0007 Version 3 Effective 13 February 2018 Prepared: Authorised: Sateesh Sathineni Aeronautical Data Analyst

More information

CONTROLLED AIRSPACE CONTAINMENT POLICY

CONTROLLED AIRSPACE CONTAINMENT POLICY Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon

More information

Control of Cranes and Other Temporary Obstacles

Control of Cranes and Other Temporary Obstacles United Kingdom Overseas Territories Aviation Circular OTAC 139-27 140-11 171-8 172-11 178-10 Control of Cranes and Other Temporary Obstacles Issue 1 1 June 2018 Effective on issue GENERAL Overseas Territories

More information

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications: AIP CANADA (ICAO) PART 3 AERODROMES (AD) AD 2. AERODROMES AD 2.1 Aerodrome Location Indicator and Name For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

More information

Airport Obstruction Standards

Airport Obstruction Standards Airport Obstruction Standards Dr. Antonio Trani Department of Civil and Environmental Engineering Virginia Tech Outline of this Presentation Obstructions to navigation around airports Discussion of Federal

More information

Part 121, Amendment 26. Air Operations Large Aeroplanes. Docket 14/CAR/3

Part 121, Amendment 26. Air Operations Large Aeroplanes. Docket 14/CAR/3 Docket 14/CAR/3 Contents Rule objective... 3 Extent of consultation... 3 Summary of submissions... 3 Examination of submissions... 3 Insertion of Amendments... 3 Effective date of rule... 4 Availability

More information

Implementation of the new CNS/ATM systems in the region

Implementation of the new CNS/ATM systems in the region SEACG/12 WP/9 03/05/05 International Civil Aviation Organization The Twelfth Meeting of the South East Asia ATS Coordination Group (SEACG/12) Bangkok, Thailand, 3 6 May 2005 Agenda Item 5: Implementation

More information

GBAS ICAO Provisions. Presented by Sylvie GRAND-PERRET EUROCONTROL Navigation Unit

GBAS ICAO Provisions. Presented by Sylvie GRAND-PERRET EUROCONTROL Navigation Unit GBAS ICAO Provisions Presented by Sylvie GRAND-PERRET EUROCONTROL Navigation Unit ICAO EUR GBAS Implementation Workshop Paris 18th March 2010 Applicable ICAO provisions ICAO Global provisions ANNEX 10

More information

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop Presented To: Caribbean States By: FAA Office of Airports OBJECTIVE Development of an Aerodrome Manual (AM). 2 ICAO ANNEX 14 - SECTION

More information

Change History. Table of Contents. Contents of Figures. Content of Tables

Change History. Table of Contents. Contents of Figures. Content of Tables Change History Version Status Date Affected Pages Author Cause and Summary of the Change 00.01 Draft 2017-03-29 All H. Scherzer First draft 01.00 Released 2017-03-30 All H. Scherzer Released version Table

More information

Aerodrome Obstacle Survey Information Checks

Aerodrome Obstacle Survey Information Checks United Kingdom Overseas Territories Aviation Circular OTAC 139-20 Aerodrome Obstacle Survey Information Checks Issue 2.00 26 May 2017 Effective on issue GENERAL Overseas Territories Aviation Circulars

More information

AIR NAVIGATION ORDER

AIR NAVIGATION ORDER CLEARANCE AREAS AND OBSTACLE LIMITATION SURFACES AT AIR NAVIGATION ORDER VERSION : 2.0 DATE OF IMPLEMENTATION : 15-02-2013 OFFICE OF PRIME INTEREST : AERODROME STANDARDS BRANCH. (Directorate of Airspace

More information

Lufthansa Systems AIM from a navigation data house perspective

Lufthansa Systems AIM from a navigation data house perspective AIM/SAM/10, August 2017 Lima Peru Lufthansa Systems AIM from a navigation data house perspective genda The Company & Products Electronic Terrain and Obstacle Data (etod) Transition from AIS to AIM Aeronautical

More information

Noble Energy, Inc. MX3501-N Communication Tower. FAA and FCC Data

Noble Energy, Inc. MX3501-N Communication Tower. FAA and FCC Data Noble Energy, Inc. MX3501-N Communication Tower FAA and FCC Data Submitted to: Garfield County Building & Planning Department OA Project No. 011-2632 January 10, 2012 Notice Criteria Tool https://oeaaa.faa.gov/oeaaa/external/gistools/gisaction.jsp?action=dononoticerequired...

More information

Introduction. Appendix D: Airspace Protection

Introduction. Appendix D: Airspace Protection Preliminary PreliminaryDraft DraftMaster MasterPlan Plan Bankstown Airport Introduction : Airspace Protection D Preliminary Master Plan Draft Master Plan Airspace protection D1 OVERVIEW The protection

More information

Part 129. Foreign Air Transport Operator - Certification. CAA Consolidation. 18 May Published by the Civil Aviation Authority of New Zealand

Part 129. Foreign Air Transport Operator - Certification. CAA Consolidation. 18 May Published by the Civil Aviation Authority of New Zealand Part 129 CAA Consolidation 18 May 2018 Foreign Air Transport Operator - Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 129 prescribes the certification and operating

More information

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016) AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, 23-26 August 2016) Aerodromes Certification- ICAO Requirements Arthemon Ndikumana RO/AGA, Nairobi 08/09/2016 AFI Plan

More information

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control

More information

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each) Gestão de Tráfego Aéreo 2015/2016 Exam 2016.01.04 Name Student ID Number I (5.5/20, 0.5 each) What is each contracting state of ICAO required to provide? [ ] Modern radio navigation facilities for aeroplanes

More information

AVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street Oakland, CA 94607

AVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street Oakland, CA 94607 AVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street When Do I Need to File an FAA Form 7460-1? Objects Affecting Navigable Airspace (14CFR77) June 2013 Background The Federal

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT (Kuwait, 17 to 20 September 2003) International

More information

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN

More information

made under regulations and of the Civil Aviation Safety Regulations 1998.

made under regulations and of the Civil Aviation Safety Regulations 1998. Part 145 Manual of Standards (MOS) (as amended) made under regulations 145.005 and 145.015 of the Civil Aviation Safety Regulations 1998. This compilation was prepared on 4 July 2012 taking into account

More information

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY 216 INTERNATIONAL CIVIL AVIATION ORGANIZATION SAM/IG/9-WP/15 South American Regional Office Regional Project RLA/06/901 12/04/12 Assistance for the implementation of a regional ATM system according to

More information

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules Subpart B Certification Requirements 175.51 Personnel Requirements (a) Each applicant for the grant of an aeronautical information service certificate shall engage, employ or contract: (1) a senior person

More information

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY. Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'S',

More information

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011 DP-7 The need for QMS controlled processes in AIS/AIM Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, 17 19 May 2011 Werner Kurz Director International Relations Jeppesen

More information

FIT FOR PURPOSE: A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR PURPOSE INFORMATION

FIT FOR PURPOSE: A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR PURPOSE INFORMATION FIT FOR : A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR INFORMATION I TABLE OF CONTENTS SECTION A: GENERAL MATERIAL 2 SECTION B: PUBLICATION SPECIFIC FIT

More information

AERONAUTICAL INFORMATION SERVICES-AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

AERONAUTICAL INFORMATION SERVICES-AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG) AIS-AIMSG/11-SN/6 20/04/2015 AERONAUTICAL INFORMATION SERVICES-AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG) Agenda Item 4: Information Distribution 4.1: AIP ELEVENTH MEETING Montreal, April

More information

Effective: AUSTRALIAN FORMULA ONE GRAND PRIX, ALBERT PARK, MARCH 2018

Effective: AUSTRALIAN FORMULA ONE GRAND PRIX, ALBERT PARK, MARCH 2018 AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AIP SUPPLEMENT (SUP) H 25/18

More information

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG) AIS-AIMSG/5-IP/3 02/11/11 AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG) FIFTH MEETING Montréal, 7 to 11 November 2011 Agenda Item 9: Other Business Report

More information

EFFECTIVE 0901Z 29 MARCH 2018 TO 0901Z 24 MAY 2018 AIP CANADA (ICAO) Part 3 Aerodromes (AD)

EFFECTIVE 0901Z 29 MARCH 2018 TO 0901Z 24 MAY 2018 AIP CANADA (ICAO) Part 3 Aerodromes (AD) EFFECTIVE 0901Z 29 MARCH 2018 TO 0901Z 24 MAY 2018 AIP CANADA (ICAO) Part 3 Aerodromes (AD) Published by in accordance with ICAO Annexes 4 and 15 of the Convention on International Civil Aviation 2018

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

Establishing a new Aerodrome/Heliport in the AIPNZ

Establishing a new Aerodrome/Heliport in the AIPNZ Establishing a new Aerodrome/Heliport in the AIPNZ The Aeronautical Information Management (AIM) unit of Airways are responsible for publishing new aerodromes and heliports in the AIPNZ. Applicants are

More information

NOTICE OF PROPOSED RULE MAKING

NOTICE OF PROPOSED RULE MAKING NOTICE OF PROPOSED RULE MAKING Services Proposed CASR Part 175 of the Civil Aviation Safety Regulations 1998 (CASR) This NPRM will be of interest to: Airservices Australia; publishers of aeronautical information

More information

SERVICE LEVEL AGREEMENT. Aeronautical Information Service (AIS) NAME Page 1 of 26 AGREEMENT. Aeronautical Information Service

SERVICE LEVEL AGREEMENT. Aeronautical Information Service (AIS) NAME Page 1 of 26 AGREEMENT. Aeronautical Information Service NAME Page 1 of 26 CONTROLLED COPY SERVICE LEVEL Aeronautical Information Service No section of this work may be reproduced or copied, stored, transmitted, on electronic format, photocopy, recording, or

More information

Data Origination, Management and WGS 84. ICAO PBN Seminar Data Origination & Management and WGS 84

Data Origination, Management and WGS 84. ICAO PBN Seminar Data Origination & Management and WGS 84 Data Origination, Management and WGS 84 1 Learning Objectives Overview Understand the implication of publishing incorrect navigational data in the State s AIP Identify why it is essential to use a common

More information

The aim of any instrument approach is to allow the aircraft to safely descend to a low altitude in order to become visual.

The aim of any instrument approach is to allow the aircraft to safely descend to a low altitude in order to become visual. INSTRUMENT APPROACH CHARTS "An instrument approach is just a series of straight lines joined by rate one turns" Ron Magrath The aim of any instrument approach is to allow the aircraft to safely descend

More information

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation

More information

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES Abbreviations ACI ADS ADS-B ADS-C AFTN AIDC AIP ANSP AMHS APAC APANPIRG ASBU ASIOACG ATFM ATM ATS AUSEP CHG CNL CPDLC CPL DARP DLA EOBT FAA FIR FIRBX

More information

Air Law. Iain Darby NAPC/PH-NSIL IAEA. International Atomic Energy Agency

Air Law. Iain Darby NAPC/PH-NSIL IAEA. International Atomic Energy Agency Air Law Iain Darby NAPC/PH-NSIL International Atomic Energy Agency Aviation Regulations International Civil Aviation Organisation (ICAO) Convention on International Civil Aviation also known as the Chicago

More information

Part 175. Aeronautical Information Service Organisations Certification. CAA Consolidation. 10 March 2017

Part 175. Aeronautical Information Service Organisations Certification. CAA Consolidation. 10 March 2017 Part 175 CAA Consolidation 10 March 2017 Aeronautical Information Service Organisations Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 175 prescribes rules governing

More information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

Curriculum for AIM Training Module 2: ARO Officer

Curriculum for AIM Training Module 2: ARO Officer Curriculum for AIM Training Module 2: ARO Officer 1. THE AERONAUTICAL INFORMATION SERVICES The general objectives are to enable students to: Appreciate how the aeronautical information services function;

More information

QMS for AIS/MAP Service Implementation Workshop

QMS for AIS/MAP Service Implementation Workshop TITLE DP-9 QMS for AIS/MAP Service Implementation Workshop AIS to AIM transitions: The AFI challenges The global evolution from AIS to AIM capability is considered an essential and over-arching objective

More information

LATVIAN AIP DATA SET

LATVIAN AIP DATA SET LATVIAN AIP DATA SET Interregional EUR/MID PANS AIM Workshop (Paris, France, 10-12 July 2018) Dr. Vadim Tumarkin Head of AIS Latvijas Gaisa Satiksme vadims.tumarkins@lgs.lv GENERAL PROVISION FOR DIGITAL

More information

Air Law and ATC Procedures Subject: AIR LAW AND ATC PROCEDURES

Air Law and ATC Procedures Subject: AIR LAW AND ATC PROCEDURES Air Law and ATC Procedures Subject: Classroom Instruction: YES (Workshop) Appr. # of Instruction Hrs: 3 Internal Examination: YES ITSS (online) / Offline International Law: Conventions, Agreements and

More information

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements. Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs

More information

Manual of Radiotelephony

Manual of Radiotelephony Doc 9432 AN/925 Manual of Radiotelephony Approved by the Secretary General and published under his authority Fourth Edition - 2007 International Civil Aviation Organization AMENDMENTS The issue of amendments

More information

AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION

AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION VOLUME I AERODROME DESIGN AND OPERATIONS The amendment to Annex 14, Volume I contained

More information

GREATER GEELONG PLANNING SCHEME PROPOSED AMENDMENT FOR THE PROTECTION OF EMERGENCY MEDICAL SERVICE HELICOPTER FLIGHTPATHS SERVING GEELONG HOSPITAL

GREATER GEELONG PLANNING SCHEME PROPOSED AMENDMENT FOR THE PROTECTION OF EMERGENCY MEDICAL SERVICE HELICOPTER FLIGHTPATHS SERVING GEELONG HOSPITAL GREATER GEELONG PLANNING SCHEME PROPOSED AMENDMENT FOR THE PROTECTION OF EMERGENCY MEDICAL SERVICE HELICOPTER FLIGHTPATHS SERVING GEELONG HOSPITAL APRIL 2014 Report Prepared for The Minister for Health

More information

Part 77 CAA Consolidation 1 April 2014 Objects and Activities Affecting Navigable Airspace

Part 77 CAA Consolidation 1 April 2014 Objects and Activities Affecting Navigable Airspace Part 77 CAA Consolidation 1 April 2014 Objects and Activities Affecting Navigable Airspace Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 77 prescribes rules for persons proposing

More information

Republika e Kosovës Republika Kosovo Republic of Kosovo. Autoriteti i Aviacionit Civil Autoritet Civilnog Vazduhoplovstva Civil Aviation Authority

Republika e Kosovës Republika Kosovo Republic of Kosovo. Autoriteti i Aviacionit Civil Autoritet Civilnog Vazduhoplovstva Civil Aviation Authority Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil Autoritet Civilnog Vazduhoplovstva Civil Aviation Authority The Director General of Civil Aviation Authority of Kosovo,

More information

Services Charter. 2014/15 to 2015/16

Services Charter. 2014/15 to 2015/16 Services Charter 2014/15 to 2015/16 Services Charter Overview Objective Airservices Australia is a governmentowned organisation providing safe and environmentally sound air traffic management, aviation

More information

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4 International Civil Aviation Organization Amendment 37,38 to Annex 15 Amendment 57 to Annex 4 Roberta Luccioli TO/AIM Seminario de la OACI sobre la Transicion al AIM Fases1 3 Outline 1. Amendment 37 to

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 174 METEOROLOGICAL SERVICES FOR AVIATION Published by Air Safety Support International Ltd Air Safety Support International Limited 2017 First Issue

More information

LATVIJAS CIVILĀS AVIĀCIJAS AĂENTŪRA EKSAMINĒŠANA AIR LAW PPL(A) Variants: 107 WEB. Jautājumu skaits - 20 Eksāmena ilgums 60 minūtes

LATVIJAS CIVILĀS AVIĀCIJAS AĂENTŪRA EKSAMINĒŠANA AIR LAW PPL(A) Variants: 107 WEB. Jautājumu skaits - 20 Eksāmena ilgums 60 minūtes LATVIJAS CIVILĀS AVIĀCIJAS AĂENTŪRA EKSAMINĒŠANA AIR LAW PPL(A) Variants: 107 WEB Jautājumu skaits - 20 Eksāmena ilgums 60 minūtes 1 Interception Procedure by DAY or NIGHT: If the pilot of an intercepted

More information

MINIMUM FLIGHT ALTITUDES

MINIMUM FLIGHT ALTITUDES MINIMUM FLIGHT ALTITUDES 1. Introduction Minimum flight altitudes are created first to ensure safety, awareness and adequate radio navigation reception for aircraft flying at the same time in specific

More information

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

Application for amendment to Tauranga control zone and control areas Consultation

Application for amendment to Tauranga control zone and control areas Consultation Application for amendment to Tauranga control zone and control areas Civil Aviation Authority Table of Contents 1. Introduction... 1 2. Background... 1 3. Proposal... 1 3. Effect on users... 2 a. VFR traffic...

More information

Regulations & Obligations

Regulations & Obligations Regulations & Obligations Thursday, March 24, 2015 9:00 a.m. 10:00 a.m.) PRESENTED BY: John Harpool Richard White Adam Hartley International Operators Conference San Diego, CA March 21 24, 2016 Sources:

More information