AFI Region AIXM e-aip Implementation Workshop Dakar, Senegal, 3-5 October 2016
|
|
- Audra Chandler
- 6 years ago
- Views:
Transcription
1 AFI Region AIXM e-aip Implementation Workshop Dakar, Senegal, 3-5 October 2016 Razvan GULEAC EUROCONTROL
2 AIXM 5.1 Logical Model - UML UML Class Diagrams Classes (simple inheritance only) Attributes, data types, lists of values Associations Until 5.1 IBM Rational Rose Data Modeller AIXM migration to Sparx EA (8.1) Important note: UML model is static (Temporality Concept applied directly in the XML Schema generation process) In order to keep the diagrams relatively de-cluttered
3 Stereotypes: feature vs. object <<object>> <<feature>> <<object>> another <<feature>>
4 AIXM Packages 245 classes around 2200 attributes + associations
5 Airport package
6 AirportHeliport feature OPERATE
7 Airport collocation Fully collocated with EBBR EBMB EBBR
8 Runway 02/ THR
9 Airport mapping data Construction Area Stand Guidance Line
10 Airport usage restrictions NORMAL, LIMITED, CLOSED PERMIT, FORBID, COND LANDING, TAKEOFF, ALTN_LANDING
11 Airport Usage Restrictions AND, OR engine type, wing span, etc. IFR/VFR, status, scheduled, etc.
12 Airport services
13 Airport services
14 Airport services - schedule
15 Questions?
16 Shared packages
17 Shared packages
18 Geometries
19 Notes AirportHeliport, etc. cityserved DESCRIPTION Point, Address, etc. language
20 Shared packages
21 Address, phone, link
22 Schedules 01/04 30/09 SR, SS SR+30 FRI HOL MON 17:00 UTC, UTC+1 06:00 Yes NO
23 Airspace layers <<object>> "SFC" "UNL" AIP Text "...Limit" Value GND UNL "...Limit "XXXX FT AGL" XXXXX FT SFC "XXXX FT AMSL" XXXXX FT MSL "XXXX M AGL" XXXXX M SFC "XXXX M AMSL" XXXXX M MSL "FL XXX" XXX FL STD "SM XXX" XXX SM STD "ITS LOWER LIMIT" FLOOR OTHER - empty - "ITS UPPER LIMIT" CEILING OTHER - empty - "...LimitReference"
24 Standard Levels IFR, IFR-RVSM, VFR ODD, EVEN FL, SM RVSM, NON-RVSM
25 Questions?
26 Airspace
27 Airspace
28 Airspace P EBP01 BRUSSELS CITY Use of GML for Aviation Data
29 Airspace defined by aggregation BASE UNION 1 2
30 Airspace aggregation By reference - between synchronized databases
31 Airspace aggregation By copying the geometry - geometrical data for direct consumption Combined also possible
32 Geoborder and significant point references Use of GML for Aviation Data
33 Airspace activation <<object>> AVLB_FOR_ACTIVATION, ACTIVE, CEILING, 1000 FT, FLOOR, 300 FT,
34 Airspace classification C D
35 Other Airspace aspects ENTRY, EXIT, ENTRY_EXIT OWN, DLGT,
36 ATC and other Services
37 Questions?
38 Point and Navaid Package
39 Navaids VOR/DME FLO FLORA 00:00-24:00 VOR (DVOR) DME OPERATIONAL
40 NAVAID Equipment
41 Points ASNUL ICAO
42 Significant Points
43 Questions?
44 Route package
45 U M 170 Routes ATS IFR INT
46 Route Segment 660 (FL) 195 (FL) STD STD 8.1 (NM) COMPULSORY YES <<choice>> AIXM DINKI 5.1 UML LNO
47 Route availability <<object>> What about CDR routes? FORWARD OPEN 660 (FL) 195 (FL) STD STD
48 AIXM 5.1 and extensions Additional information exchanged between selected partners Core AIXM Aeronautical information that is relevant for the whole ATM community (AIP, NOTAM, CRAM, etc.)
49 easm extension of AIXM 5.1 CDR1, CDR2, Extensions are published on the AIXM extension page
50 Questions?
51 Flight Restrictions Package (erad)
52 Flight (routing) restrictions
53 Overview
54 Conditions
55 Routings
56 Questions?
57 Procedures (SID/STAR/IAP)
58 Procedure = SID, STAR or Approach
59 AIXM 5.1 Procedure Model - Overview Procedure The terminal area procedures and related concepts (MSA, TAA...) Navaids Points Guidance Service, Point Reference, and Segment Points Holding Holding Patterns Service For Information services (ATIS) and ATC services Shared.Surface Assesment
60 AIXM 5.1 Procedure Model - Overview Designator SID & STAR: designator (+ name?) Approach: name + 6 first attributes of class InstrumentApproachProcedure approachprefix = Blank approachtype = VOR multipleidentification = X coptertrack = Blank circlingidentification = Blank coursereversalinstruction = Blank
61 Procedure design vs Procedure encoding The AIXM model defines the class SegmentLeg which represents an elementary portion of a Procedure A SegmentLeg is associated to a Procedure. A procedure is designed by attaching several SegmentLeg to the procedure A Procedure can be divided into a series of Procedure Transitions More optimised for Procedure Encoding Procedure Design <<feature>> Procedure (from Procedure Overview) 1 contains 0..* +flighttransition <<object>> ProcedureTransition (from Procedure Overview) 0..* <<feature>> StandardInstrumentDeparture (f rom Dep arture Pro ced ure ) +departure 0..1 ispartof 1..* <<feature>> DepartureLeg (from Procedure Overview) <<feature>> StandardInstrumentArrival (from Arrival Procedure) +arrival 0..1 ispartof 1..* <<feature>> ArrivalLeg (from Procedure Ove rview) <<feature>> InstrumentApproachProcedure (from 1 - Approach) +approach * <<feature>> ApproachLeg (from Procedure Overview) iscomposedof +transitionleg 0..* <<feature>> SegmentLeg (from P rocedure Ove rview) Procedure Encoding
62 Procedure Transition & SegmentLeg Approach Transition GEBTI Approach Transition VFA Final Approach Missed Approach SegmentLeg HoldingPattern
63 SegmentLeg SegmentLeg contains a set of attributes inspired from the Arinc424 specification Note: It is not mandatory to use Arinc424 concepts => legpath For a SID For a STAR For an Approach SegmentLeg is an abstract class which is specialised: - 1st specialisation per type of procedure - 2nd specialisation per type of transition for approach procedures For a missed approach For an approach transition For a final approach
64 Path Terminators 14 RNAV Types Course to an Altitude - CA Course to a Fix - CF Direct to a Fix - DF Fix to an Altitude - FA Fix to a Manual Termination - FM Racetrack Course Reversal (Alt Term) - HA Racetrack (Single Circuit - Fix Term) - HF Racetrack (Manual Termination) - HM Initial Fix - IF Track to a Fix - TF Constant Radius Arc - RF Heading to an Altitude - VA Heading to an Intercept - VI Heading to a Manual Termination - VM
65 Approach Conditions ApproachCondition finalapproachpath = STRAIGHT_IN AircraftCharacteristics aircraftlandingcategory = C Minima altitude = 218 ft altitudecode = OCA altitudereference = MSL height = 200 ft heightcode = OCH heightreference = HAT
66 Questions?
67 Organisation Authority / Unit / Service
68 Organisation/Authority States ANSP Civil Aviation Authority Ministry of Transportation OWNED_BY, MEMBER, Airport Authority Military Authority Airline Eurocontrol Etc.
69 Unit ATC Centre TWR NOTAM Office Etc. 0..* 0..* +ownerorganisation <<feature>> OrganisationAuthority airportlocation 0..1 <<feature>> AirportHeliport (f rom Airport/Heliport)
70 Service <<f eature>> OrganisationAuthority (from Organisation) ownerorganisation 0..* 0..* 0..1 <<f eature>> Unit (from Organisation) +serv iceprov ider <<f eature>> Inf ormationserv ice <<f eature>> AirTraf f icmanagementserv ice <<f eature>> AirportGroundService <<f eature>> SearchRescueServ ice <<f eature>> TrafficSeparationService <<f eature>> PassengerServ ice <<f eature>> FireFightingServ ice <<f eature>> AirportClearanceServ ice <<f eature>> AirTraf f iccontrolserv ice <<f eature>> GroundTraf f iccontrolserv ice <<f eature>> Aircraf tgroundserv ice <<f eature>> AirportSuppliesServ ice
71 Questions?
AREA NAVIGATION RNAV- MANAGEMENT
1. Introduction AREA NAVIGATION RNAV- MANAGEMENT RNAV is an instrument-based navigation method that leads to fly from a fix (geographic point inside an airspace) to another fix directly. Contrary to conventional
More informationAeronautical Information Services Update on Aeronautical Information Exchange Model (AIXM)
Aeronautical Information Services Update on Aeronautical Information Exchange Model (AIXM) Presented to: ATIEC 2016 By: D. Cowell (FAA), E. Porosnicu (EUROCONTROL) Date: 22 August 2016 Content AIXM versions
More informationNav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation
Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different
More informationPBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies
PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance
More informationGlobal Information Management. Status Report: AIXM
Global Information Management Status Report: AIXM Presented By: Allen Proper, FAA Date: August 25, 2015 Content AIXM versions in use AIXM Change Control Board activity FAA perspective AIXM 4.5 Published:
More informationGestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)
Gestão de Tráfego Aéreo 2015/2016 Exam 2016.01.04 Name Student ID Number I (5.5/20, 0.5 each) What is each contracting state of ICAO required to provide? [ ] Modern radio navigation facilities for aeroplanes
More informationPBN Operational Approval Continental En Route Navigation Specifications
PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation
More informationDevelopment and validation of procedures
Development and validation of procedures 07 10 April 2015 Procedure Design Procedure Design includes ATS Routes (enroute, arrival, departure) and Instrument Approach procedures Design criteria in ICAO
More informationATIEC Presented by: D. Cowell (FAA) & E. Porosnicu (EUROCONTROL)
ATIEC 2017 Presented by: D. Cowell (FAA) & E. Porosnicu (EUROCONTROL) Content AIXM usage - current and future Interoperability Digital NOTAM AIXM intended use AIXM 2.1/3.3/4.5 - developed for the EAD (European
More informationAIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory.
AIRSPACE STRUCTURE 1. Introduction In aeronautics, s are the portion of the atmosphere controlled by a country above its territory. There are two kinds of : Controlled is of defined dimensions within which
More informationEXPLANATION OF TPP TERMS AND SYMBOLS
U.S. TERMINAL PROCEDURES PUBLICATION 52 EXPLANATION OF TPP TERMS AND SYMBOLS The discussions and examples in this section will be based primarily on the IFR (Instrument Flight Rule) Terminal Procedures
More informationHoneywell.com PBN Concepts Krakow, Poland
PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure
More informationPBN Airspace Concept. ATS requirements
INTERNATIONAL CIVIL AVIATION ORGANIZATION PBN Airspace Concept ATS requirements Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office 1 Gate to Gate concept Phases
More informationChallenges in Complex Procedure Design Validation
Challenges in Complex Procedure Design Validation Frank Musmann, Aerodata AG ICAO Workshop Seminar Aug. 2016 Aerodata AG 1 Procedure Validation Any new or modified Instrument Flight Procedure is required
More informationINTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME
INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016!1 GENERAL Proper use of phraseology is one of the most important thing in aviation and
More informationPBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING
PBN Airspace Design Workshop Area Navigation Asia and Pacific Regional Sub-Office Beijing, China 5 May 2016 Page 1 APAC RSO BEIJING Learning Objectives By the end of this presentation, you will be: Aware
More informationStandard Operating Procedures (SOPs) for UAE Centre (OMAE)
Standard Operation Procedures for UAE Centre (OMAE) Pag.1 of 10 Standard Operating Procedures (SOPs) for UAE Centre (OMAE) Standard Operation Procedures for UAE Centre (OMAE) Pag.2 of 10 Index 1. Foreword...
More informationPBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationJordan Airspace Manual. Prepared by: Aboud Horani & Mahmoud Odeh XM-AOC / XM-ADIR
Jordan Airspace Manual Prepared by: Aboud Horani & Mahmoud Odeh XM-AOC / XM-ADIR 1 Contents 1.0 Introduction:... 3 1.1 Airport Information:... 3 1.2 Adjoining FIRs:... 3 1.3 ATC Units:... 4 2.0 Procedures:...
More informationEffective: AUSTRALIAN INTERNATIONAL AIRSHOW AVALON 2019, AVALON AIRPORT 19 FEBRUARY - 5 MARCH 2019, IFR OPERATIONS AVALON AIRPORT
AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AIP SUPPLEMENT (SUP) H 02/19
More informationAvitech GmbH AIXM Capabilities & Experiences
Avitech GmbH AIXM Capabilities & Experiences Werner Schwarze Regional Sales Director Dakar/04. October 2016 Avitech Introduction Avitech GmbH of Germany, is a key piece in Indra ATM being the unique provider
More informationAIM, AICM and AIXM Introduction. AIXM 5 Second Design Review June 26, 2006 Madrid, Spain
AIM, AICM and AIXM Introduction AIXM 5 Second Design Review June 26, 2006 Madrid, Spain 1 1 Topics AIS to AIM AIS Data and Web Services Purpose and advantages Worldwide implementation of AIS interoperability
More informationAERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)
AIS-AIMSG/5-IP/3 02/11/11 AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG) FIFTH MEETING Montréal, 7 to 11 November 2011 Agenda Item 9: Other Business Report
More informationDesign Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation
Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which
More informationMetroAir Virtual Airlines
MetroAir Virtual Airlines NAVIGATION BASICS V 1.0 NOT FOR REAL WORLD AVIATION GETTING STARTED 2 P a g e Having a good understanding of navigation is critical when you fly online the VATSIM network. ATC
More informationAir Traffic Management (GTA) First semester, 2017/2018
Instituto Superior Técnico Air Traffic Management (GTA) First semester, 2017/2018 First test Solution proposal Name: Number: Read carefully each question before answering The answers should be given exclusively
More informationAD 2. AERODROMES FYWE AD 2.1 AERODROME LOCATION INDICATOR AND NAME. FYWE - Windhoek (Eros) Airport
AIP FYWE AD 2-1 Republic of Namibia 20 JUL 2017 AD 2. AERODROMES FYWE AD 2.1 AERODROME LOCATION INDICATOR AND NAME FYWE - Windhoek (Eros) Airport FYWE AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
More informationCONTROLLED AIRSPACE CONTAINMENT POLICY
Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon
More informationOverview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1
Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1 1 Learning Objectives RNAV applications in a continental en-route context Characteristics of available navigation specifications
More informationLeverage and demonstrate one of AIXM s main benefits: Make AIS Dynamic Data Understandable and Usable for Computer-driven Applications!
xnotam/amdb study Study on the applicability of the xnotam concept for updating Airport Mapping Database (AMDB) applications Darmstadt University under contract of EUROCONTROL Christian Grothe grothe@fsr.tu-darmstadt.de
More informationUser Forum AIM/EAD Evolutions. Thanos PAPAVRAMIDIS, Head of Airspace and AIS Data Management EUROCONTROL Network Management
User Forum 2011 AIM/EAD Evolutions Thanos PAPAVRAMIDIS, Head of Airspace and AIS Data Management EUROCONTROL Network Management The European Organisation for the Safety of Air Navigation EAD General Concept
More informationPBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationAeronautical Information Exchange Model (AIXM) Lessons learned
Aeronautical Information Exchange Model (AIXM) Lessons learned railml.org conference, Paris Speaker: Eduard Porosnicu EUROCONTROL, Senior AIM Specialist 18 Sep 2013 Contents About Eurocontrol AIXM purpose
More informationAERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen
Page 1 of 6 1 INTRODUCTION Each route shall be assigned a designator that is unique for that aerodrome. The designator shall be defined in accordance with Annex 11, Appendix 3. In addition, the first 4
More information10+ years of EAD: picking the low-hanging fruit. guido HAESEVOETS EAD Customer Management 29/01/2015
10+ years of EAD: picking the low-hanging fruit guido HAESEVOETS EAD Customer Management 29/01/2015 10+ years of EAD Principles EUROCONTROL operates and manages the EAD on behalf of its Member States,
More informationICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES
AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based
More informationIVAO Flight Operations Department Indonesia (ID) Division Procedures
IVAO Flight Operations Department Indonesia (ID) Division Procedures Revised April 12 rd, 2010 Please consult also the local application of common procedures on http://www.ivao.web.id 1. General 1.1 In
More informationChapter 6. Nonradar. Section 1. General DISTANCE
12/10/15 JO 7110.65W Chapter 6. Nonradar Section 1. General 6 1 1. DISTANCE Use mileage based (DME and/or ATD) procedures and minima only when direct pilot/controller communications are maintained. FIG
More informationRNAV - RNP. July 2010
RNAV - RNP July 2010 July 2010 Issue 1 Page 1 of 6 1 Who Issues approval to fly in P-RNAV Airspace? a) National Authority b) Euro Control c) JAA d) ICAO 2 A Fixed Published Route is? a) Alternative / Reserve
More informationPREDANNACK AD LOCATION INDICATOR AND NAME PREDANNACK PREDANNACK AD AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA. 2nm SE of Mullion.
AD 2 - - 1-1 AD 2.1 - LOCATION INDICATOR AND NAME AD 2.2 - AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP Co-ordinates and site at AD: 2 Direction and distance from City: 3 Elevation/Reference Temperature:
More informationStatus of PBN implementation in France
Status of PBN implementation in France PBN TF/4 Dec 2010 Benoit ROTURIER (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions
More informationStandard Operating Procedures (SOPs) for Arabian Control (OGCC)
Standard Operation Procedures for Arabian Control (OGCC) Pag.1 of 12 Standard Operating Procedures (SOPs) for Arabian Control (OGCC) Standard Operation Procedures for Arabian Control (OGCC) Pag.2 of 12
More informationLecture Minimum safe flight altitude
Lecture Minimum safe flight altitude Calculate of minimum safe flight altitude, safe flight altitude in approach zone, in circle zone (circle altitude), minimum safe flight altitude in aerodrome area,
More informationManual of Radiotelephony
Doc 9432 AN/925 Manual of Radiotelephony Approved by the Secretary General and published under his authority Fourth Edition - 2007 International Civil Aviation Organization AMENDMENTS The issue of amendments
More informationOPERATIONS MANUAL PART A
PAGE: 1 Table of Content A.GENERAL /CHAPTER 7 -....3 7.... 3 7.1 Minimum Flight Altitudes /Flight Levels VFR Flight... 3 7.2 Minimum Flight Altitudes /Flight Levels IFR Flight... 4 7.2.1 IFR flights non
More informationStandard Operating Procedures (SOPs) for BAGHDAD (ORBI)
Pag.1 of 11 Standard Operating Procedures (SOPs) for BAGHDAD (ORBI) Index 1. FOREWORD... 3 2. ATC UNITS... 3 3. RECOMMENDATIONS... 3 3.1. TRANSITION ALTITUDE/LEVEL... 3 3.2. SEMI-CIRCULAR FLIGHT LEVEL
More informationTHE TOWER CONTROL POSITION (TWR)
1. Introduction THE TOWER CONTROL POSITION (TWR) The Aerodrome Local Control, or Tower (called TWR) controller has the responsibility of ensuring Air Traffic Control (ATC) Services within a restricted
More informationIFR SEPARATION WITHOUT RADAR
1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s
More informationAIR LAW AND ATC PROCEDURES
1 The International Civil Aviation Organisation (ICAO) establishes: A standards and recommended international practices for contracting member states. B aeronautical standards adopted by all states. C
More informationIFR 91.157 Must be instrument rated to fly special VFR at Night (civil twilight to civil twilight, sun 6 degrees below horizon) 91.159 Unless in a holding pattern of 2 minutes or less, VFR cruising altitude
More informationLFMN / Nice Côte-d Azur / NCE
This page is intended to draw commercial and private pilots attention to the aeronautical context and main threats related to an aerodrome. They have been identified in a collaborative way by the main
More informationEASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments
EASA NPA on SERA Part ENAV Response sheet GENERAL COMMENTS ON NPA PACKAGE te: Specific comments are provided after the General Comments 1 SERA Parts C and D ENAV still misses clarity on the whole scope
More informationDenver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES
Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES OCTOBER 7, 2018 Definition of Airspace Colorado Springs Class C airspace is defined as show in Appendix 1. Definition of Positions
More informationOrientation Booklet The New Airline Chart Series
Orientation Booklet The New Airline Chart Series Copyright 2007 Jeppesen. All rights reserved. Table of Contents Introduction...1 Approach Chart...2 Heading...2 Plan View...2 Profile View... Minimums...
More informationMINIMUM FLIGHT ALTITUDES
MINIMUM FLIGHT ALTITUDES 1. Introduction Minimum flight altitudes are created first to ensure safety, awareness and adequate radio navigation reception for aircraft flying at the same time in specific
More informationRNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.
RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks
More informationValidation & Implementation Considerations Module 14 Activities 11 to 17
Validation & Implementation Considerations Module 14 Activities 11 to 17 European Airspace Concept Workshops for PBN Implementation Objective This module provides an overview airspace and Flight Procedure
More informationDynamic Management. of the. European Airspace Network. ADR Data Catalogue. Annex A: Supported Services
EUROCONTROL Dynamic Management of the European Airspace Network ADR Data Catalogue Annex A: Supported Services Prepared by Guido Van Laethem and Maria Scott CFMU Date 10 th June 2011 Version 0.4 EUROCONTROL
More informationRWY 24. Designator Route Remarks. All traffic shall initially climb to 4000FT QNH with climb gradient 3.3% MNM, unless instructed otherwise by ATC.
AD 2.ELLX-15 DISKI 2Y GTQ 7X GTQ 7Y MMD 7X RAPOR 4X 3.2.2 Climb Requirements RWY 24 Designator Route Remarks R-238 LUX to 8 DME LUX, RT to intercept R-222 NTM to 24 DME NTM, RT R-156 DIK, LT R-115 LUX
More informationAD 2. AERODROMES VAKS AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AD 2-1 AD 2. AERODROMES AD 2.1 AERODROME LOCATION INDICATOR AND NAME - KESHOD / DOMESTIC AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 Aerodrome reference point coordinates and its site 2 Direction
More informationClearance & Ground Air Traffic Control. Clearance Delivery An Introduction to Ground Control... 2
Clearance & Ground Air Traffic Control Table of Contents Clearance Delivery.................................. 1 An Introduction to Ground Control...................... 2 Initial Contact and Position Determination.................3
More informationCE 563 Airport Design
CE 563 Airport Design Prevent aircraft collisions Prevent aircraft collisions with obstructions Expedite and maintain an orderly flow of air traffic Air traffic control system command center Herndon, VA
More informationAMXM Airport Mapping picking-up SWIM
Global Information Management AMXM Airport Mapping picking-up SWIM Presented By: Sam Van der Stricht Date: August 25, 2015 AMDB Applications EUROCAE / RTCA Applications: Moving Map Routing Runway Safety
More informationAnalysis of Instrument Approaches to GA Aerodromes in the World
Analysis of Instrument Approaches to GA Aerodromes in the World Jakub Kraus ATM Systems Laboratory, Department of Air Transport, Faculty of Transportation Sciences, Czech Technical University Horská 3,
More informationLGB HELICOPTER OPERATIONS
LGB HELICOPTER OPERATIONS For informational purposes only. Textual information derived from LGB TWR/HELICOPTER OPERATORS LETTER OF AGREEMENT Dated September, 06 HELICOPTER OPERATIONS 5. b. (8) 5. a. ()
More informationStandard Operational Procedures
Standard Operational Procedures Aerodrome Ostrava Mošnov VERSION 1.2 CHANGES AND UPDATES Effective Version Change 24 JUN 09 1.1 LVP added. 12 FEB 11 1.2 General text revision. NOTES Official scenery and
More informationTítulo ponencia: Introduction to the PBN concept
Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based
More informationALTIMETER SETTING PROCEDURES
AIP New Zealand ENR 1.7-1 ENR 1.7 ALTIMETER SETTING PROCEDURES 1 INTRODUCTION 1.1 General 1.1.1 The requirements for altimeter setting are detailed in CAR Part 91. The requirements are summarised in this
More informationLearning Objectives. By the end of this presentation you should understand:
Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The
More informationSeychelles Civil Aviation Authority. Telecomm & Information Services Unit
Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA
More informationAirservices Australia 2016
Airservices Australia 2016 Airservices Australia 2016 Airservices Australia 2015 Airservices Australia 2016 Airservices Australia 2016 ATIS (H24) (TWR HR) APP TWR SMC ACD FIA (AH) GOLD COAST, QLD (YBCG)
More informationPBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN
PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components
More informationIFR SEPARATION USING RADAR
IFR SEPARATION USING RADAR 1. Introduction When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s traffic,
More informationSID/STAR phraseology FAQ Canadian implementation April 27, 2017
SID/STAR phraseology FAQ Canadian implementation April 27, 2017 The International Civil Aviation Organization (ICAO) has developed harmonized phraseology for Standard Instrument Departures (SIDs) and Standard
More informationPerformance Based Navigation Implementation of Procedures
Performance Based Navigation Implementation of Procedures Dr. Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) Minsk, April 10th, 2015 DIESER TEXT DIENT DER NAVIGATION First of all thank you
More informationInternational Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez
International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate
More informationEVTA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVTA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
18 NOV 2010 AIP LATVIA EVTA AD 2-1 18 NOV 2010 Note: The following sections in this chapter are intentionally left blank: AD-2.11, AD-2.14, AD-2.15, AD-2.16, AD- 2.19, AD-2.20, AD-2.21, AD-2.23 EVTA AD
More informationEUROCONTROL Guidance for Military Aeronautical Information Publications Consistency with ICAO Annex 15 EUROCONTROL
EUROCONTROL Guidance for Military Aeronautical Information Publications Consistency with ICAO Annex 15 EUROCONTROL DOCUMENT CHARACTERISTICS LE EUROCONTROL Guidance for Military Aeronautical Information
More informationPBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931
International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic
More informationEastern Caribbean PIARCO Virtual FIR. PIARCO Control Zone (CTR)
PIARCO Control Zone (CTR) Eastern Caribbean PIARCO Virtual FIR NOT TO BE USED FOR REAL WORLD AVIATION, STRICTLY FOR USE ON THE VATSIM VIRTUAL ATC NETWORK. 1. Introduction 1.1 Objective of this SOP is to
More informationDynamic Airspace Overview concepts, complexities, benefits and outlook
KUNDENNAME NM User Forum 2018 Dynamic Airspace Overview concepts, complexities, benefits and outlook CFSP view Agenda 01 Concepts 03 Benefits 02 Complexities & Issues 04 Outlook & Recommendations 2 Concepts
More informationWhat is Flexible Use of Airspace (FUA)?
What is Flexible Use of Airspace (FUA)? An airspace management concept. A methodology of capacity management. Airspace should not be designated as either purely civil or purely military airspace. Airspace
More informationAIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES
AIP ENR 1.6-1 JORDAN 12 DEC 2013 ENR 1.6 RADAR SERVICES AND PROCEDURES 1. GENERAL 1.1 SERVICES a) Radar units in the Amman FIR operate as integral parts of the ATS system and provide Radar Control Service
More informationMODULE 4: SIDs and STARs. Slide <#> of
MODULE 4: SIDs and STARs Slide of OUTLINE Objective: To understand SIDs and STARs and their applications CONTENT: WHAT ARE SIDS AND STARS COMMON ELEMENTS CHARTS PROCESSING OF SIDS AND STARS VECTORING
More informationREGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application
Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation
More informationInternational Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN
International Civil Aviation Organization AIRARDTF/2 IP03 Second Meeting of the Advanced Inter-Regional ATS Route Development Task Force (AIRARDTF/02) Astana, Kazakhstan, 26-27 October 2017 Agenda Item
More informationOpen Questions & Collecting Lessons Learned
Open Questions & Collecting Lessons Learned 2nd joint ICAO EUR PBN TF EUROCONTROL RAiSG meeting Rick Farnworth EUROCONTROL 12-14 March 2014 Summary Objective List of Open Questions Options for making Information
More informationAnnecy Airport IFR briefing For indication only
1 DISCLAIMER The pieces of information provided are published only for indication, and are not exhaustive. We make our best effort to keep them updated. They are a valuable complement for flight preparation
More informationAnchorage ARTCC Phraseology Guide. Clearance Delivery Operations
Anchorage ARTCC Phraseology Guide Clearance Delivery Operations Initial Contact: The first time an aircraft calls you, you MUST identify your position, i.e. AWE123 Anchorage Delivery. Clearance Delivery:
More informationIVAO Switzerland Division
IVAO ATC Operations Zurich Tower Date Updated by Update description 08.01.2016 CH-TC Document Creation 30.10.2017 CH-AOC Document Revision 1 Contents 1-Objective... 3 2-Zurich Tower LSZH_TWR... 4 3-Operating
More informationAPPENDIX F AIRSPACE INFORMATION
APPENDIX F AIRSPACE INFORMATION Airspace Use DEFINITION OF AIRSPACE Airspace, or that space which lies above a nation and comes under its jurisdiction, is generally viewed as being unlimited. However,
More informationPROCEDURES SPECIAL OPERATIONS
Intentionally left blank A318/A319/A320/A321 PRELIMINARY PAGES - TABLE OF CONTENTS PRO-SPO-51 Required Navigation Performance (RNP) General...A RNAV 10 / RNP 10... B RNAV 5 / BRNAV...C RNAV 1 RNAV 2 /
More informationINSTRUMENT RATING (SENIOR PRIVATE PILOT) UK FLIGHT TEST STANDARDS
INSTRUMENT RATING (SENIOR PRIVATE PILOT) UK FLIGHT TEST STANDARDS This document applies to Senior Private Pilot exams within UK airspace only, and should not be used elsewhere as some subjects are only
More informationRequired Navigation Performance (RNP) in the United States
Required Navigation Performance (RNP) in the United States Overview FAA Roadmap for Performance-Based Navigation Moving to Performance-Based Navigation (RNAV and RNP) Definitions Operational attributes
More information(RN R A N V A V & & RN R P N
PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance
More informationOverview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation
Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation
More informationDEPARTURE, HOLDING, AND APPROACH PROCEDURES
AIP New Zealand ENR 1.5-1 ENR 1.5 DEPARTURE, HOLDING, AND APPROACH PROCEDURES 1 GENERAL 1.1 Use of PANS-OPS 1.1.1 Instrument holding, approach, and departure procedures in New Zealand are designed using
More informationCape Area Airports Standard Operating Procedures
Cape Area Airports Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world
More informationTVSC CANOUAN/Canouan Is. (ST. VINCENT AND THE GRENADINES)
AIP AD 2. AERODROMES AD 2.921 17 MAY 01 TVSC AD 2.1 AERODROME LOCATION INDICATOR AND NAME TVSC CANOUAN/Canouan Is. (ST. VINCENT AND THE GRENADINES) TVSC AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE
More informationOther Business, within the Terms of Reference of the AIS/MAP/SG. (Presented by United States) SUMMARY
AIS/MAP/SG/9-IP/06 International Civil Aviation Organization 31/06/05 CAR/SAM Regional Planning and Implementation Group (GREPECAS) Ninth Meeting of the GREPECAS Aeronautical Information Services Subgroup
More information