MODULE 4: SIDs and STARs. Slide <#> of

Size: px
Start display at page:

Download "MODULE 4: SIDs and STARs. Slide <#> of"

Transcription

1 MODULE 4: SIDs and STARs Slide <#> of

2 OUTLINE Objective: To understand SIDs and STARs and their applications CONTENT: WHAT ARE SIDS AND STARS COMMON ELEMENTS CHARTS PROCESSING OF SIDS AND STARS VECTORING PHRASEOLOGIES Version September

3 Standard Instrument Departure SID: Standard instrument departure (SID). A designated instrument flight rule (IFR) departure route linking the aerodrome or a specified runway of the aerodrome with a specified significant point, normally on a designated ATS route, at which the en-route phase of a flight commences. Elements of a (Procedural) SID: Runway eg Runway 26 SID Name: generally the name of the waypoint where the SID joins the ATS route (some exceptions) eg EGMAS or UTULO SID Identifier: a numeric or alpha numeric suffix after the SID name. SID are numbered from 1 to 9 then restart from 1 (can also have an alpha character associated with the SID) eg EGMAS 1 or UTULO 1 (Reference is ICAO Annex 11 Appendix 3)

4 Lateral Path: Described on a chart and coded into a navigation database via a series of waypoints (ARINC 424 coding) ATC is not authorised to cancel the SID below MVA Vertical Path: Described as a series of altitude constraints or requirements. Work in conjunction with STAR altitude constraints or requirements Speed limits: A design requirement from ICAO DOC 8168 for airspace containment, terrain avoidance, track segregation, turn containment ATC is not authorised to cancel: a SID below MVA! Speed restrictions used for terrain separation and track containment Text on SID plate. 4

5 Standard Instrument Departure 5

6 PROCESSING OF A SID: Delivery of SID: usually by the Tower on Clearance issue: Speedbird 624 cleared to Johannesburg via EGMAS, planned route, EGMAS 1 departure Runway 26, Maintain 10000FT, squawk code 3232, departure frequency Pilot will read back clearance in total including the SID. The SID is programmed in the FMS or GPS system. Aircraft will fly the lateral and vertical path adhering to any speed or altitude constraints. 6

7 EXCEPTIONS Sometimes a TRANSITION is used where the SID serves multiple routes: e.g. many routes north of FYWH One SID can serve many routes with a transition from the SID waypoint to an enroute waypoint 7

8 Standard Instrument Departure with Transitions 8

9 PROCESSING OF A SID WITH TRANSITIONS: Delivery of SID: usually by the Tower on Clearance issue: Speedbird 624 cleared to Oomagulabi via NUTUBE, planned route, Nanaimo eight departure Runway 34, NUTUBE Transition, Maintain 10000FT, squawk code 3232, departure frequency Pilot will read back clearance in total including the SID and Transition. The SID is programmed in the FMS or GPS system. Aircraft will fly the lateral and vertical path adhering to any speed or altitude constraints. 9

10 VECTORING OFF A SID AND PHRASEOLOGIES: Due weather (CAUTION must be at or ABV MVA!) NMB222, CANCEL SID track as required, clear of weather track DCT EGMAS Due traffic (CAUTION must be at or ABV MVA!) NMB222, CANCEL SID turn left/right heading xxx due traffic Not because a pilot wants to cancel the SID and do his own thing! Clear of traffic DCT to first enroute waypoint NMB222 RESUME OWN NAVIGATION, re-cleared DCT EGMAS 10

11 RADAR SID Issue a heading for departure Aircraft turns to assigned heading at a certain altitude Caters for terrain requirements 11

12 Standard Instrument Arrival STAR: Standard Instrument Arrival (STAR). A designated instrument flight rule (IFR) arrival route linking a significant point, normally on an ATS route, with a point from which aa published instrument procedure can be commenced Elements of a STAR: Runway eg Runway 26 STAR Name: generally the name of the waypoint where the STAR leaves the ATS route some exceptions) eg ATUPI or AXODA STAR Identifier: a numeric or alpha numeric suffix after the SID name. SID are numbered from 1 to 9 then restart from 1 (can also have an alpha character associated with the SID) eg ATUPI 1 or AXODA 1 (Reference is ICAO Annex 11 Appendix 3)

13 Lateral Path: Described on a chart and coded into a navigation database via a series of waypoints (ARINC 424 coding) Vertical Path: Described as a series of altitude constraints or requirements. Work in conjunction with SID altitude constraints or requirements Speed limits: A design requirement from ICAO DOC 8168 for airspace containment, terrain avoidance, track segregation, turn containment ATC is not authorised to cancel speed restrictions on a STAR! Text on STAR plate. 13

14 Standard Instrument Arrival 14

15 PROCESSING OF A STAR: Delivery of STAR: by the Enroute Controller on first contact but no later than 50NM prior to ToD (as a general rule): Speedbird 624 Star Clearance available GO ahead, Speedbird 624 Speedbird 624 Star Cleaarance, ATUPI One Arrival Runway 26, when ready descend to FL250 ATUPI One arrival Runway 26 when ready descend to FL250, Speedbird 624 Pilot will read back clearance in total including the STAR and Level if given. The STAR is programmed in the FMS or GPS system. Aircraft will fly the lateral and vertical path adhering to any speed or altitude constraints. 15

16

17 Review: WHAT ARE SIDS AND STARS COMMON ELEMENTS CHARTS PROCESSING OF SIDS AND STARS VECTORING PHRASEOLOGIES Version 1.0: 15 September

SID/STAR phraseology FAQ Canadian implementation April 27, 2017

SID/STAR phraseology FAQ Canadian implementation April 27, 2017 SID/STAR phraseology FAQ Canadian implementation April 27, 2017 The International Civil Aviation Organization (ICAO) has developed harmonized phraseology for Standard Instrument Departures (SIDs) and Standard

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen Page 1 of 6 1 INTRODUCTION Each route shall be assigned a designator that is unique for that aerodrome. The designator shall be defined in accordance with Annex 11, Appendix 3. In addition, the first 4

More information

RNAV - RNP. July 2010

RNAV - RNP. July 2010 RNAV - RNP July 2010 July 2010 Issue 1 Page 1 of 6 1 Who Issues approval to fly in P-RNAV Airspace? a) National Authority b) Euro Control c) JAA d) ICAO 2 A Fixed Published Route is? a) Alternative / Reserve

More information

CDA Continuous Descent Approach

CDA Continuous Descent Approach CDA Continuous Descent Approach Pilots view Cpt. Ir. Dirk De Winter EUROCONTROL - Brussels The European Organisation for the Safety of Air Navigation CDA Pilots Perspective What? CDA is all about the ability

More information

MINIMUM FLIGHT ALTITUDES

MINIMUM FLIGHT ALTITUDES MINIMUM FLIGHT ALTITUDES 1. Introduction Minimum flight altitudes are created first to ensure safety, awareness and adequate radio navigation reception for aircraft flying at the same time in specific

More information

Safety and Airspace Regulation Group

Safety and Airspace Regulation Group Safety and Airspace Regulation Group 24 August 2015 Policy Statement POLICY FOR POINT MERGE AND TROMBONE TRANSITION PROCEDURES 1 Introduction 1.1 The Point Merge transition procedure is an Area Navigation

More information

Understanding the Jeppesen. Updates: Changes, Errata and What s New

Understanding the Jeppesen. Updates: Changes, Errata and What s New Understanding the Jeppesen Updates: Changes, Errata and What s New www.understandingaviation.com info@understandingaviation.com Table of Contents Changes... 1 Errata... 5 What s New... 5 Changes Law Amendment

More information

CLEARANCE INSTRUCTION READ BACK

CLEARANCE INSTRUCTION READ BACK CLEARANCE INSTRUCTION READ BACK 1. Introduction An ATC clearance or an instruction constitutes authority for an aircraft to proceed only in so far as known air traffic is concerned and is based solely

More information

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016!1 GENERAL Proper use of phraseology is one of the most important thing in aviation and

More information

AERONAUTICAL INFORMATION CIRCULAR 18/18

AERONAUTICAL INFORMATION CIRCULAR 18/18 NAV CANADA 19 JUL 18 AERONAUTICAL INFORMATION CIRCULAR 18/18 GUIDANCE FOR STANDARD TERMINAL ARRIVAL (STAR) PROCEDURES The guidance currently published in the Transport Canada Aeronautical Information Manual

More information

IFR SEPARATION WITHOUT RADAR

IFR SEPARATION WITHOUT RADAR 1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s

More information

Northern Regional Training Scheme. EGNT Newcastle Aerodrome Pilot s Guide. REVISION 2 (Wednesday, 03 August 2011 at 15:51)

Northern Regional Training Scheme. EGNT Newcastle Aerodrome Pilot s Guide. REVISION 2 (Wednesday, 03 August 2011 at 15:51) Northern Regional Training Scheme EGNT Newcastle Aerodrome Pilot s Guide REVISION 2 (Wednesday, 03 August 2011 at 15:51) PUBLISHED Wednesday, 03 August 2011 1 Contents 1 Contents... 2 2 Departures... 3

More information

Pilot Briefing Document Cross The Pond 2013 Heathrow Airport EGLL/LHR

Pilot Briefing Document Cross The Pond 2013 Heathrow Airport EGLL/LHR Pilot Briefing Document Cross The Pond 2013 Heathrow Airport EGLL/LHR VATSIM-UK and the Heathrow Regional Training Scheme look forward to welcoming you into Heathrow! We ll have all our controllers briefed

More information

ALTIMETER SETTING PROCEDURES

ALTIMETER SETTING PROCEDURES AIP New Zealand ENR 1.7-1 ENR 1.7 ALTIMETER SETTING PROCEDURES 1 INTRODUCTION 1.1 General 1.1.1 The requirements for altimeter setting are detailed in CAR Part 91. The requirements are summarised in this

More information

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole

More information

EXPLANATION OF TPP TERMS AND SYMBOLS

EXPLANATION OF TPP TERMS AND SYMBOLS U.S. TERMINAL PROCEDURES PUBLICATION 52 EXPLANATION OF TPP TERMS AND SYMBOLS The discussions and examples in this section will be based primarily on the IFR (Instrument Flight Rule) Terminal Procedures

More information

AIR LAW AND ATC PROCEDURES

AIR LAW AND ATC PROCEDURES 1 The International Civil Aviation Organisation (ICAO) establishes: A standards and recommended international practices for contracting member states. B aeronautical standards adopted by all states. C

More information

34 th Airline/ATS Safety Forum

34 th Airline/ATS Safety Forum 34 th Airline/ATS Safety Forum Colleen Kitson, Senior ATS Specialist Outline RNP1 - including Albury Future applications Workshop Background ICAO Global Air Navigation Plan specifies PBN as the highest

More information

SECTION 4 - APPROACH CONTROL PROCEDURES

SECTION 4 - APPROACH CONTROL PROCEDURES SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES

More information

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions; Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS

More information

IFR SEPARATION USING RADAR

IFR SEPARATION USING RADAR IFR SEPARATION USING RADAR 1. Introduction When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s traffic,

More information

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications: AIP CANADA (ICAO) PART 3 AERODROMES (AD) AD 2. AERODROMES AD 2.1 Aerodrome Location Indicator and Name For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

More information

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations Anchorage ARTCC Phraseology Guide Clearance Delivery Operations Initial Contact: The first time an aircraft calls you, you MUST identify your position, i.e. AWE123 Anchorage Delivery. Clearance Delivery:

More information

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY. Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation

More information

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL FLIGHT STRIP MANAGEMENT - APPROACH LEVEL 1. Introduction The flight strip management for ATC is an important point in order to ensure aircraft management and improve safety when controlling. In real aviation,

More information

PHILIPPINES ATC EXPERIENCE ON PBN 6/15/ CIVIL AVIATION AUTHORITY OF THE PHILIPPINES

PHILIPPINES ATC EXPERIENCE ON PBN 6/15/ CIVIL AVIATION AUTHORITY OF THE PHILIPPINES PHILIPPINES ATC EXPERIENCE ON PBN a Brief History Dependency to Ground Navigational Aids In June 2010, the outage of the Manila DVOR/DME and ILS system brought air traffic to a halt. The very low visibility

More information

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

ENR 1.7 ALTIMETER SETTING PROCEDURES

ENR 1.7 ALTIMETER SETTING PROCEDURES AIP LEBANON ENR 1.7-1 11 APR 2008 ENR 1.7 ALTIMETER SETTING PROCEDURES 1. Introduction: 1.1 The procedures herein describe the method used in providing adequate vertical separation between aircraft and

More information

Optimization of Airspace and Procedures in the Metroplex

Optimization of Airspace and Procedures in the Metroplex Optimization of Airspace and Procedures in the Metroplex Administration SoCal Metroplex Project Overview Brief To: By: Los Angeles World Airport Rob Henry, Manager SoCal Metroplex Jose Gonzalez, SoCal

More information

FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014

FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014 FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014 AIB/AAI/CAS.109 Air Accident Investigation Bureau of Singapore Ministry of Transport Singapore 11 November 2015 The Air

More information

CHAPTER 5 SEPARATION METHODS AND MINIMA

CHAPTER 5 SEPARATION METHODS AND MINIMA CHAPTER 5 SEPARATION METHODS AND MINIMA 5.1 Provision for the separation of controlled traffic 5.1.1 Vertical or horizontal separation shall be provided: a) between IFR flights in Class D and E airspaces

More information

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR) San Juan CERAP Standard Operation Procedures Version 2.2 May 5th, 2013 Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR) You are entering one of the most fascinating Combined Enroute Radar Approach Control

More information

AIP PORTUGAL ENR NOV-2007

AIP PORTUGAL ENR NOV-2007 AIP PORTUGAL ENR 1.6-1 ENR 1.6 RADAR SERVICES AND PROCEDURES PROVISION OF RADAR SERVICES WITHIN LISBOA AND SANTA MARIA FIR / UIR Introduction Air Traffic Control Services within Lisboa and Santa Maria

More information

Letter of Agreement. between. and

Letter of Agreement. between. and Munich FIR (EDMM) IVAO Germany 1 Document purpose Letter of Agreement between and Zürich FIR (LSAZ) IVAO Switzerland Effective: 02-APR-2015 Edition: 1.1 The purpose of this Letter of Agreement is to define

More information

Chapter 6. Brize Radar, Speedbird 213 Heavy, request radar advisory. Speedbird 123 change call sign to BA 123

Chapter 6. Brize Radar, Speedbird 213 Heavy, request radar advisory. Speedbird 123 change call sign to BA 123 INTRODUCTION The procedures for and VFR are mostly identical but some words and procedures are generally only used by large commercial aircraft; hence they appear in this section. In this chapter we will

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT CHAP 7-1 CHAPTER 7 COMMUNICATION AND NAVIGATION EQUIPMENT 7.1 COMMUNICATION EQUIPMENT 7.1.1 An aeroplane shall be provided with radio communication equipment capable of: a) conducting two-way communication

More information

INTERNATIONAL FEDERATION OF AIR TRAFFIC CONTROLLERS ASSOCIATIONS. Agenda Item: B.5.12 IFATCA 09 WP No. 94

INTERNATIONAL FEDERATION OF AIR TRAFFIC CONTROLLERS ASSOCIATIONS. Agenda Item: B.5.12 IFATCA 09 WP No. 94 INTERNATIONAL FEDERATION OF AIR TRAFFIC CONTROLLERS ASSOCIATIONS 48 th ANNUAL CONFERENCE - Dubrovnik, 20 th to 24 th April 2009 Agenda Item: B.5.12 IFATCA 09 WP No. 94 Study Go Around Procedures When on

More information

HOLDING STACK MANAGEMENT

HOLDING STACK MANAGEMENT 1. Introduction HOLDING STACK MANAGEMENT When an air traffic controller has such an amount of traffic in his approach area that he cannot handle more traffic for a determined or non-determined period of

More information

Phases of a departure

Phases of a departure Phases of a departure Hours, days or even months prior, an airline will submit a flight plan to NATS requesting an air traffic routing to its destination. The filed route to be flown will include the designated

More information

PBN Airspace Concept. ATS requirements

PBN Airspace Concept. ATS requirements INTERNATIONAL CIVIL AVIATION ORGANIZATION PBN Airspace Concept ATS requirements Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office 1 Gate to Gate concept Phases

More information

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications PBN Operational Approval Oceanic and Remote En Route Navigation Specifications Navigation Specifications Applicable to Oceanic/Remote RNAV 10 (RNP 10) RNP 4 RNP 2 A-RNP 2 Prior Guidance Material RNP 10

More information

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931 International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic

More information

LAS PILOT BRIEFING MCCARRAN INTERNATIONAL AIRPORT

LAS PILOT BRIEFING MCCARRAN INTERNATIONAL AIRPORT LAS PILOT BRIEFING MCCARRAN INTERNATIONAL AIRPORT COAST, LAKE, DESERT FNO FRIDAY, AUGUST 17, 2018 TABLE OF CONTENTS GENERAL BRIEFING 2 AIRPORT/RUNWAY CONFIGURATIONS 3 DEPARTURE BRIEFING 4 ARRIVAL BRIEFING

More information

Clearance & Ground Air Traffic Control. Clearance Delivery An Introduction to Ground Control... 2

Clearance & Ground Air Traffic Control. Clearance Delivery An Introduction to Ground Control... 2 Clearance & Ground Air Traffic Control Table of Contents Clearance Delivery.................................. 1 An Introduction to Ground Control...................... 2 Initial Contact and Position Determination.................3

More information

RWY 24. Designator Route Remarks. All traffic shall initially climb to 4000FT QNH with climb gradient 3.3% MNM, unless instructed otherwise by ATC.

RWY 24. Designator Route Remarks. All traffic shall initially climb to 4000FT QNH with climb gradient 3.3% MNM, unless instructed otherwise by ATC. AD 2.ELLX-15 DISKI 2Y GTQ 7X GTQ 7Y MMD 7X RAPOR 4X 3.2.2 Climb Requirements RWY 24 Designator Route Remarks R-238 LUX to 8 DME LUX, RT to intercept R-222 NTM to 24 DME NTM, RT R-156 DIK, LT R-115 LUX

More information

Approach (TMA) Air Traffic Control. An Introduction to Approach/Departure Control Airspace and Operating Positions... 2

Approach (TMA) Air Traffic Control. An Introduction to Approach/Departure Control Airspace and Operating Positions... 2 Approach (TMA) Air Traffic Control Table of Contents An Introduction to Approach/Departure Control................. 1 Airspace and Operating Positions........................... 2 Procedural Reference....................................

More information

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line. International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based

More information

Northern Regional Training Scheme. EGBB Birmingham Airport Pilot s Guide. REVISION 1 (Monday, 30 January 2012)

Northern Regional Training Scheme. EGBB Birmingham Airport Pilot s Guide. REVISION 1 (Monday, 30 January 2012) Northern Regional Training Scheme EGBB Birmingham Airport Pilot s Guide REVISION 1 (Monday, 30 January 2012) PUBLISHED Monday, 30 January 2012 Contents Contents... 2 Section - 1 Departures... 3 1.1 Stand

More information

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments EASA NPA on SERA Part ENAV Response sheet GENERAL COMMENTS ON NPA PACKAGE te: Specific comments are provided after the General Comments 1 SERA Parts C and D ENAV still misses clarity on the whole scope

More information

AIRAC AIP SUPPLEMENT A 16/17 08 June 2017

AIRAC AIP SUPPLEMENT A 16/17 08 June 2017 Phone: 66 02 568 8831 Fax: 66 02 576 1903 AFTN: VTBAYOYX E-mail: aisthai@caat.or.th ais@caat.or.th THE CIVIL AVIATION AUTHORITY OF THAILAND Aeronautical Information Service Department 333/105 Lak Si Plaza,

More information

THE TOWER CONTROL POSITION (TWR)

THE TOWER CONTROL POSITION (TWR) 1. Introduction THE TOWER CONTROL POSITION (TWR) The Aerodrome Local Control, or Tower (called TWR) controller has the responsibility of ensuring Air Traffic Control (ATC) Services within a restricted

More information

Chapter 6. Nonradar. Section 1. General DISTANCE

Chapter 6. Nonradar. Section 1. General DISTANCE 12/10/15 JO 7110.65W Chapter 6. Nonradar Section 1. General 6 1 1. DISTANCE Use mileage based (DME and/or ATD) procedures and minima only when direct pilot/controller communications are maintained. FIG

More information

Standard Operating Procedures (SOPs) for Arabian Control (OGCC)

Standard Operating Procedures (SOPs) for Arabian Control (OGCC) Standard Operation Procedures for Arabian Control (OGCC) Pag.1 of 12 Standard Operating Procedures (SOPs) for Arabian Control (OGCC) Standard Operation Procedures for Arabian Control (OGCC) Pag.2 of 12

More information

MetroAir Virtual Airlines

MetroAir Virtual Airlines MetroAir Virtual Airlines NAVIGATION BASICS V 1.0 NOT FOR REAL WORLD AVIATION GETTING STARTED 2 P a g e Having a good understanding of navigation is critical when you fly online the VATSIM network. ATC

More information

DEPARTURE, HOLDING, AND APPROACH PROCEDURES

DEPARTURE, HOLDING, AND APPROACH PROCEDURES AIP New Zealand ENR 1.5-1 ENR 1.5 DEPARTURE, HOLDING, AND APPROACH PROCEDURES 1 GENERAL 1.1 Use of PANS-OPS 1.1.1 Instrument holding, approach, and departure procedures in New Zealand are designed using

More information

PHRASEOLOGY COMMON MISTAKES

PHRASEOLOGY COMMON MISTAKES 1. How to read this manual PHRASEOLOGY COMMON MISTAKES This document is not a usual document that teaches only what to do, but this document will present the usual mistakes that every member can hear on

More information

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

Validation & Implementation Considerations Module 14 Activities 11 to 17

Validation & Implementation Considerations Module 14 Activities 11 to 17 Validation & Implementation Considerations Module 14 Activities 11 to 17 European Airspace Concept Workshops for PBN Implementation Objective This module provides an overview airspace and Flight Procedure

More information

CHAPTER 6:VFR. Recite a prayer (15 seconds)

CHAPTER 6:VFR. Recite a prayer (15 seconds) CHAPTER 6:VFR Recite a prayer (15 seconds) ATM TOPIC 1. INTRODUCTION TO AIR TRAFFIC MANAGEMENT,TYPE OF CONTROL AREAS & FLIGHT PLAN 2. AERODROME CONTROL 3. AREA CONTROL 4. APPROACH CONTROL --------------------------------------mid-term

More information

OPERATIONS MANUAL PART A

OPERATIONS MANUAL PART A PAGE: 1 Table of Contents A.GENERAL /CHAPTER 32. -...3 32. OF THE AIRBORNE COLLISION AVOIDANCE... 3 32.1 ACAS Training Requirements... 3 32.2 Policy and Procedures for the use of ACAS or TCAS (as applicable)...

More information

Burlington ATCT Standard Operating Procedures

Burlington ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for

More information

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different

More information

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC Effective Date: 1 November 2007 0400Z I. Scope: This agreement is made by and between Miami ARTCC (herein ZMA) and Jacksonville ARTCC

More information

Contents VoxATC Reference... 32

Contents VoxATC Reference... 32 User Manual Contents Introduction... 5 Getting Started... 6 Example VFR Flight... 8 Example IFR Flight... 16 Example IFR with a SID and STAR... 22 Creating Flights For VoxATC... 28 Starting Enroute...

More information

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11 KURDISTAN REGIONAL GOVERNMENT SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11 SEPARATION STANDARDS & APPLICATIONS International and Local Procedures ( First Edition ) April 2012 Ff Prepared By Fakhir.F.

More information

PILOT BRIEFING GENEVA RFE 2018

PILOT BRIEFING GENEVA RFE 2018 PILOT BRIEFING GENEVA RFE 2018 Introduction The aim of this pilot briefing for the RFE is to inform pilots about local procedures and to prepare them for a lot of traffic. To be able to achieve a good

More information

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements. Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs

More information

Eastern Caribbean PIARCO Virtual FIR. PIARCO Control Zone (CTR)

Eastern Caribbean PIARCO Virtual FIR. PIARCO Control Zone (CTR) PIARCO Control Zone (CTR) Eastern Caribbean PIARCO Virtual FIR NOT TO BE USED FOR REAL WORLD AVIATION, STRICTLY FOR USE ON THE VATSIM VIRTUAL ATC NETWORK. 1. Introduction 1.1 Objective of this SOP is to

More information

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1 Chapter 6 6.1 ESSENTIAL LOCAL TRAFFIC 6.1.1 Information on essential local traffic known to the controller shall be transmitted without delay to departing and arriving aircraft concerned. Note 1. Essential

More information

Effective: AUSTRALIAN INTERNATIONAL AIRSHOW AVALON 2019, AVALON AIRPORT 19 FEBRUARY - 5 MARCH 2019, AVALON EAST (YAVE) OPERATIONS

Effective: AUSTRALIAN INTERNATIONAL AIRSHOW AVALON 2019, AVALON AIRPORT 19 FEBRUARY - 5 MARCH 2019, AVALON EAST (YAVE) OPERATIONS AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AIP SUPPLEMENT (SUP) H 01/19

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

Standard Operational Procedures

Standard Operational Procedures Standard Operational Procedures Aerodrome Ostrava Mošnov VERSION 1.2 CHANGES AND UPDATES Effective Version Change 24 JUN 09 1.1 LVP added. 12 FEB 11 1.2 General text revision. NOTES Official scenery and

More information

S2 Tower Controller. Allama Iqbal Int l Airport Lahore ( OPLA ) June 2016 Pakistan vacc

S2 Tower Controller. Allama Iqbal Int l Airport Lahore ( OPLA ) June 2016 Pakistan vacc S2 Tower Controller Allama Iqbal Int l Airport Lahore ( OPLA ) June 2016 Pakistan vacc Introduction: The next stage in your controlling at Lahore as a tower controller is S2 rating. To be an S2 Controller

More information

IVAO Flight Operations Department Indonesia (ID) Division Procedures

IVAO Flight Operations Department Indonesia (ID) Division Procedures IVAO Flight Operations Department Indonesia (ID) Division Procedures Revised April 12 rd, 2010 Please consult also the local application of common procedures on http://www.ivao.web.id 1. General 1.1 In

More information

Doha Hamad International OTHH - Guideline for pilots

Doha Hamad International OTHH - Guideline for pilots Page.1 of 10 Doha Hamad International OTHH - Guideline for pilots Page.2 of 10 Index 1. INCOMING TRAFFIC... 3 1.1. GENERAL NOTES... 3 1.2. DESCENT PLANNING... 3 1.3. WHICH RUNWAY?... 3 1.4. ENTRY INTO

More information

Continuous Climb Operations (CCO) Manual

Continuous Climb Operations (CCO) Manual Doc 9993 AN/495 Continuous Climb Operations (CCO) Manual NOTICE TO USERS This document is an unedited advance version of an ICAO publication as approved, in principle, by the Secretary General, which is

More information

Doncaster Sheffield Airport Airspace Change Proposal for the Introduction of RNAV (GNSS) Departure and Approach Procedures ANNEX B TO PART B

Doncaster Sheffield Airport Airspace Change Proposal for the Introduction of RNAV (GNSS) Departure and Approach Procedures ANNEX B TO PART B Doncaster Sheffield Airport Airspace Change Proposal for the Introduction of RNAV (GNSS) Departure and Approach Procedures ANNEX B TO PART B ANNEX B TO PART B: Runway 20 Westerly Departure UPTON 2B 2 Contents

More information

Safety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures

Safety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures Safety Enhancement Action: Implementers: Statement of Work: Safety Enhancement 213.5 RNAV Safe Operating and Design Practices for STARs and RNAV Departures To mitigate errors on Standard Terminal Arrival

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

Unit II Clearance Delivery

Unit II Clearance Delivery Unit II Clearance Delivery 1- Introduction The function of the Clearance Delivery controller is to issue an IFR clearance to aircraft planning to depart IFR, and to gather and issue flight information

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

AERODROME CONTROLLER (ADC) EXAM BRIEFING GUIDE AND EXAM STANDARDS

AERODROME CONTROLLER (ADC) EXAM BRIEFING GUIDE AND EXAM STANDARDS AERODROME CONTROLLER (ADC) EXAM BRIEFING GUIDE AND EXAM STANDARDS 1. Introducton This briefing is created to help candidates understand the purpose of this exam. 2. Requirements Before applying for this

More information

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012 VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP EFFECTIVE OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012 I. PURPOSE With the establishment of the VATNZ division of the Oceania Region on 1 January 2007, the Oakland

More information

ATC Training Syllabus Philippines vacc Version 1.1 September 25, 2016

ATC Training Syllabus Philippines vacc Version 1.1 September 25, 2016 ATC Training Syllabus Philippines vacc Version 1.1 Intor Distribution and Scope This document outlines the training that will be undergone by students within the Philippines vacc and shall be used by both

More information

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons.

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons. VFR PHRASEOLOGY 1. Introduction 1.1. What is phraseology? The phraseology is the way to communicate between the pilot and air traffic controller. This way is stereotyped and you shall not invent new words.

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

Radio procedures for glider pilots August 2009

Radio procedures for glider pilots August 2009 Radio procedures for glider pilots August 2009 The use of radio is for aircraft to make calls to enhance the see and be seen environment, lookout is still the main weapon against collision but use of the

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

AREA NAVIGATION (B-RNAV & P-RNAV) Online Course

AREA NAVIGATION (B-RNAV & P-RNAV) Online Course Page 1/12 TABLE OF CONTENT LEGAL CAUTION... 2 (RNAV)... 2 INTRODUCTION... 2 ARINC 424:... 2 (RNAV):... 2 Basic Area Navigation (BRNAV):... 2 Closed Termination:... 2 Course to a Fix:... 2 FLY-BY waypoints:...

More information

SUBJECT: Kai Tak International Airport (VHHX) Standard Operating Procedure

SUBJECT: Kai Tak International Airport (VHHX) Standard Operating Procedure STANDARD OPERATING PROCEDURE (SOP) DOCUMENT NUMBER: HKVACC-SOP003-R0 DATE ISSUED: 26 APRIL 2015 REVISION: 0 SUBJECT: Kai Tak International Airport (VHHX) Standard Operating Procedure EFFECTIVE DATE: 26

More information

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017 Presented to: UC Davis Aviation Symposium By: Michael Valencia & Dianna Johnston Date: Overview Part 1 Air Traffic Controllers History Safety and Navigation Terminology Air Traffic Facility Types Equipment

More information

EFFECTIVE 0901Z 29 MARCH 2018 TO 0901Z 24 MAY 2018 AIP CANADA (ICAO) Part 3 Aerodromes (AD)

EFFECTIVE 0901Z 29 MARCH 2018 TO 0901Z 24 MAY 2018 AIP CANADA (ICAO) Part 3 Aerodromes (AD) EFFECTIVE 0901Z 29 MARCH 2018 TO 0901Z 24 MAY 2018 AIP CANADA (ICAO) Part 3 Aerodromes (AD) Published by in accordance with ICAO Annexes 4 and 15 of the Convention on International Civil Aviation 2018

More information

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI)

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI) Pag.1 of 11 Standard Operating Procedures (SOPs) for BAGHDAD (ORBI) Index 1. FOREWORD... 3 2. ATC UNITS... 3 3. RECOMMENDATIONS... 3 3.1. TRANSITION ALTITUDE/LEVEL... 3 3.2. SEMI-CIRCULAR FLIGHT LEVEL

More information

LETTER OF AGREEMENT. Between

LETTER OF AGREEMENT. Between LETTER OF AGREEMENT Between Romania vacc and Moldova vacc Bucharest FIR Chisinau FIR Effective: 01/12/2015 Version: 1.0 Purpose: The purpose of this Letter of Agreement is to define the coordination procedures

More information

CONTROLLED AIRSPACE CONTAINMENT POLICY

CONTROLLED AIRSPACE CONTAINMENT POLICY Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon

More information

Letter of Agreement (LOA)

Letter of Agreement (LOA) Page 1 of 8 Letter of Agreement (LOA) Between Sanya FIR (ZJSA), People s Republic of China Division (VATPRC) and Hong Kong FIR (VHHK), Southeast Asia Division (VATSEA) Revision: New Release Effective Date:

More information

Pilot Procedures Photographic Survey Flights Flight Planning, Coordination, and Control

Pilot Procedures Photographic Survey Flights Flight Planning, Coordination, and Control Pilot Procedures Photographic Survey Flights Flight Planning, Coordination, and Control 2017-01-31 2017 NAV CANADA All rights reserved. No part of this document may be reproduced in any form, including

More information