1 Pavement Management Report 2012 Status Report November 2012

2

3 Chapter 1: Table of Contents 1. Introduction Pavement Management Systems - Background Evaluation Criteria for CCC Data Collection Survey of Cape Cod Communities PMS Activities Barnstable PMS Activities Bourne PMS Activities Dennis PMS Activities Eastham PMS Activities PMS Activities Harwich PMS Activities Sandwich PMS Activities Truro PMS Activities armouth PMS Activities Summary of PMS Efforts VHB Pavement Management System Analyses MassDOT evaluations of Pavement s CCC evaluations of Pavement s Windshield Surveys CCC evaluations of Pavement s ATR Sites Municipal evaluations of Pavement s Recommendations for Achieving Improved Pavement Conclusion/Recommendations for PMS Enhancement Appendices: Cape Cod Commission Survey Data Cape Cod Commission Automatic Traffic Recorder Location Data Chapter 1: List of Figures Figure 1 - Pavement Deterioration Curve... 2 Figure 2 - Sample Deterioration Curve Figure 3 - MassDOT Evaluation of Municipal s Figure MassDOT Evaluation of Municipal s: Upper Cape Figure MassDOT Evaluation of Municipal s: Mid-Cape Figure MassDOT Evaluation of Municipal s: Lower Cape Figure CCC Pavement Surveys: Upper Cape Figure CCC Pavement Surveys: Mid-Cape Figure CCC Pavement Surveys: Lower Cape Figure 10 - MassDOT & CCC Evaluations ( ): Upper Cape Cape Cod Pavement Management Status Report November 2012

4 Figure 11 - MassDOT & CCC Evaluations ( ): Mid-Cape Figure 12 - MassDOT & CCC Evaluations ( ): Lower Cape Figure Pavement s at ATR Locations: Upper Cape Figure Pavement s at ATR Locations: Mid-Cape Figure Pavement s at ATR Locations: Lower Cape Figure 16 - Barnstable PCI Map Figure 17 - Sandwich PCI Map Chapter 1: List of Tables Table 1 - CCC Evaluation Criteria... 3 Table 2 - Summary of Responding s PMS Techniques... 9 Table 3 - Treatment Band Descriptions Table 4 RTP MassDOT Data Available by Jurisdiction Table 5 - MassDOT way Inventory Pavement s - Miles Table 6 - CCC Surveys of Pavement - miles Table 7 - Summary of Pavement s at ATR Sites Table 8 - Change in Pavement RTP Improvement Strategy November 2012 Cape Cod Pavement Management Status Report

5 1. Introduction As an essential task required by the Cape Cod Metropolitan Planning Organization (MPO) through its Unified Planning Work Program, this report provides the status of pavement condition assessment activities on Cape Cod. The objectives of this effort are to collect data and implement a regional pavement management system for Cape Cod to provide an objective rating of pavement conditions and needs. The pavement management process is conducted with the intent to keep the roadway system in the best possible condition with the most efficient use of available funds. There are distinct advantages to managing pavement condition and significant cost savings that can take place with preventative or rehabilitation measures rather than waiting until a road is in need of reconstruction. As stated in the MPO-approved Cape Cod Regional Transportation Plan, the goal of the pavement management process is for all federal aid-eligible roads to be maintained in excellent condition. Of course, due to the reality of limited financial resources, it is necessary to prioritize pavement repair based on affordability. Deciding which roads to improve and by what technique in a fiscally responsible manner is the essence of Pavement Management. 1.1 PAVEMENT MANAGEMENT SSTEMS - BACKGROUND Pavement Management is the practice of planning for pavement repairs and maintenance with the goal of maximizing the value and life of a pavement network. To accomplish this, a community needs to have several repair techniques in its arsenal and the knowledge of when to apply them. This is where pavement management comes into play. With a comprehensive database of road conditions, the pavement management software can model when to perform which repairs on a road network. Of course, engineering judgment is required to finalize any list of street repairs, as no computer model can take every variable analyzed in making a repair decision into account. The computer system is a great springboard to help a community start its repair program for each year and is an excellent method of storing the repair data. Below is a model of how a street s pavement deteriorates over time. Interpreting the curve, a street starts out in excellent condition when it is newly constructed. Midway through its life, a low cost repair such as crack seal and full depth patch will cost approximately a dollar a square yard. It takes only a few years for the window of opportunity to perform this low cost maintenance to pass after which the road would need an overlay costing $13 - $17 per square yard. By performing timely maintenance, road conditions can be improved today thereby extending the life of the road. Cape Cod Pavement Management Status Report November 2012 Page 1

6 Figure 1 - Pavement Deterioration Curve Source: Vanasse Hangen Brustlin 1.2 EVALUATION CRITERIA FOR CCC DATA COLLECTION The Cape Cod Commission has continues to collect pavement condition data in 2011 and 2012 through two distinct efforts: a series of Windshield Surveys and spot observations at specific locations where the seasonal traffic technicians were installing Automatic Traffic Recorders (ATRs). In both cases observers were given photographs and descriptions of example pavement distresses. Observers used a 1 5 rating system and made notations of particular distresses. Copies of the observations are provided in the appendix of this report. The following table is a summary of the guidance given to observers: November 2012 Cape Cod Pavement Management Status Report Page 2

7 Table 1 - CCC Evaluation Criteria Description Criteria 1 Very Good to Excellent No cracking rutting, raveling/ signs of wear 2 Good to Very Good No cracking, rutting, showing a little wear Showing evidence or more wear and possibly repairs that are in good condition 4 Evidence of cracking, rutting, serious wear 5 Poor Severe cracking, rutting, potholes 1.3 SURVE OF CAPE COD COMMUNITIES PMS ACTIVITIES In early September 2011, and survey was sent to each of the 15 towns Department of Public Works directors. Follow-up inquiries were made in the spring of The survey included the following questions: 1. Do you maintain records of pavement quality on your community s roadways? 2. Can you send [electronically preferred] summaries of pavement quality assessments? 3. What system/method do you use to assess pavement quality? 4. Can you send us a report/documentation of methods used? Cape Cod Pavement Management Status Report November 2012 Page 3

8 5. What method do you use to determine repair strategies? 6. Do you have estimated costs for implementing various repair strategies? 7. Can you forward us cost estimates sheets? 8. Do you have a capital plan for pavement improvement? 9. Can you forward us a copy of the capital plan? Several communities have responded as summarized in the following sections BARNSTABLE PMS ACTIVITIES The of Barnstable utilizes detailed survey and analysis performed by VHB as a Consultant. Their work is entered onto Barnstable s database and periodic reports are provided and discussed. The DPW participates in the data analysis, particularly in the cost analysis. DPW reviews project bids received by the and establishes base line costs for each pavement treatment band, these costs are discussed with the town s consultant - then utilized in the pavement conditions report. In addition to the VHB work, the DPW maintains a record of roadway repairs and relies upon experienced field personnel to assist in planning for individual maintenance tasks such as crack & chip seal. DPW also informally monitors the performance of all treatments. Key to the pavement management program is coordination with other utilities and proposed roadway rehabilitation information is passed to utility companies. A moratorium is in place for 5 years after application of a new surface. The of Barnstable does not maintain a public "5 year plan" - because of political considerations. Submitted materials include: VHB-prepared 2010 Pavement Management Report. See section for discussion of VHB Pavement Management Systems. Excel workbook containing typical costs for various items involved in pavement repair and related road work. November 2012 Cape Cod Pavement Management Status Report Page 4

9 1.3.1 BOURNE PMS ACTIVITIES Bourne is currently doing road resurfacing on an as-needed basis. The town tries to repave four to five miles of roadway each year. In doing that, the town has kept their main roads as their top priority and then broken off into the subdivisions. Bourne does not currently have a capital plan. The town is in discussion with a consultant to look at Bourne s roads and begin working toward a formal pavement management plan DENNIS PMS ACTIVITIES The of Dennis uses VHB s Pavement Management for guidance. The term guidance is used because while VHB keeps Dennis pavement quality records, does field verification on a 1/5th per year basis, grades the town s roads and makes recommendations for repairs, the town has to spend road funds based on several factors that the program is not designed to consider. These local parameters are: some work in each of Dennis 5 villages each year, reconstruction of failed roads, resurfacing of dirt roads and lumping the type of repair to give off-cape vendors enough to give the town a reasonable rate. The town has not had an assessment prepared of estimated costs for various repair strategies for several years. The town s capital plan for pavement improvement allocates $600,000 per year for secondary roads. Chapter 90 funds are used exclusively for primary roads EASTHAM PMS ACTIVITIES The of Eastham is developing a pavement management system. Current efforts include detailed spreadsheets identifying treatment strategies. Submitted materials include: Spreadsheet listing of town roads with summary of face type Spreadsheet listing of & Private s in of Eastham with summary of surface type Spreadsheet listing of town roads with itemized surface type Cape Cod Pavement Management Status Report November 2012 Page 5

10 1.3.2 FALMOUTH PMS ACTIVITIES uses VUEWorks Asset Management Software to track their Public Works Assets. has just begun to use the Pavement rating system that is a module of the system. It is based on the ASTM rating system. has provided a copy of their Pavement Manual, a report of the roads they have rated so far, and a sample report of one of the roads. uses a couple of strategies to determine their repair schedule. The town has a 10-year roadway plan for major repairs. This is funded by the town operating budget and a Capital Plan. has provided both of these documents. The town also has a service call/ work order system to take requests from the public for signs, potholes, sweeping and grading, etc. does not have cost estimate sheets. The town does some work in-house and contracts its crack sealing and large repairs out. These are covered by the town operating budget and Capital Plan. Submitted materials include: Sample Pavement Form VUEWorks Pavement Management System Training Guide F Capital Improvement Program summary form Public Works Department way Maintenance Program F HARWICH PMS ACTIVITIES The of Harwich DPW utilizes an online database that was developed with Bonsai Logic (a small local software developer) to maintain a road inventory, to develop cost estimates, to reconcile DPW estimates against actual expenses and to maintain a roadwork history. The DPW does not utilize the database to develop a PCI (Pavement Index). The town rates roads in 1 of 4 structural conditions: good, fair, deficient, intolerable The DPW does have a 5 year road maintenance plan that is updated every few years and is available on the Harwich website. The town uses Chris Nickerson, Highway Manager who is a certified pavement inspector, to develop a plan based on his experience, training and knowledge of Harwich s 481 public roads (142 miles). The November 2012 Cape Cod Pavement Management Status Report Page 6

11 town attempts to balance maintenance with repair in an attempt to avoid costly reconstruction utilizing many different processes and procedures. For costs, the town utilizes county bid pricing (p. 2 of the town s Five ear Maintenance Plan). Submitted materials include: Summary of roadwork since 2005: excludes any TIP projects F Capital Plan Proposed spending for town capital improvements including pavement maintenance/repair work job examples - Detailed itemized breakdown at pavement repair work at two town locations. 5 ear Maintenance Plan F11-F15 detailed plan of various repair proposals for many town roads, including itemized costs. Harwich Inventory 2010 listing of all town roads. Includes information such as surface width and type, condition (scale of 1 to 4), and length SANDWICH PMS ACTIVITIES The of Sandwich retained the firm of Vanasse Hangen Brustlin (VHB) to perform pavement management services. A comprehensive study was undertaken to re-evaluate pavement conditions in Sandwich and to allow for the analysis of various funding scenarios. VHB performed a detailed inspection of the condition of the pavement on all town-maintained roads and updated a database of this information using VHB s Manager software. To determine road repair strategies, the town mainly uses PCI (Pavement Index) and Benefit. For estimated costs for implementing various repair strategies, the town uses the County s bid process and incorporates these into their own spreadsheets. The town s 5-ear plan changes dramatically year-to-year but provides a guide to follow as funds become available. Submitted materials included the following: VHB Presentation on Sandwich Pavement Management Cape Cod Pavement Management Status Report November 2012 Page 7

12 Program Map color coded map of town roads assigned to years ( ) Excel workbook listing town roads with PCI, Benefit, and Repair Alternative information Excel workbook itemizing bid costs for various repairs by various vendors Excel workbook itemized by road, listing planned paving projects Excel workbook itemizing repair type, treatment, and comments for town roads, separately for each year Pavement Management Update Study VHB-prepared 2006 report. See section for discussion of VHB Pavement Management Systems TRURO PMS ACTIVITIES Truro uses local knowledge to determine pavement repair priorities ARMOUTH PMS ACTIVITIES The of armouth retained the firm of Vanasse Hangen Brustlin (VHB) to perform pavement management services. VHB services consist of performing a comprehensive study to evaluate pavement conditions in armouth and to allow for the analysis of various funding scenarios; perform a detailed inspection of the condition of the pavement on all town-maintained roads and update a database of this information using VHB s Manager software. To determine repair strategies, the town reviews an initial list generated by the software and then decides whether to apply chip seal, double ship seal, or overlay. Main roads are treated with rubber chip seal or overlay. In the town s capital plan, annual spending ranges from $1.3 million to $1.5 million for roadway maintenance. November 2012 Cape Cod Pavement Management Status Report Page 8

13 1.4 SUMMAR OF TOWN PMS EFFORTS Based on responses from the September survey and follow-up in the spring of 2012, the following table summarizes the techniques that responding towns use for pavement management. Table 2 - Summary of Responding s PMS Techniques Pavement Management Technique Barnstable VHB Pavement Management System Bourne Local knowledge as needed basis Dennis VHB Pavement Management System Eastham Locally developed -spreadsheets VUEWorks Asset Management Software Harwich Bonsai Logic way Inventory Sandwich VHB Pavement Management System Truro Local knowledge armouth VHB Pavement Management System VHB PAVEMENT MANAGEMENT SSTEM The most prevalent technique (as identified by many of the towns responding to the survey) is the Pavement Management System developed by Vanasse Hangen Brustlin (VHB). The following sections contain excerpts describing the VHB techniques. These techniques are included in the reports submitted by the various towns: Methodology VHB performed a detailed condition evaluation of each town s public roadways to build the pavement management system. The first step was to identify the roadway network. The second step was to further break each street in the roadway network into pavement management sections. The third step was to carefully categorize, measure, and record the individual pavement distresses within each pavement management section and perform the inventory of sidewalks, curbs, and ramps. Finally, the fourth step was to customize the road repair treatment selection and unit costs within the pavement management software through discussions with officials. All these steps were performed prior to the study of future funding scenarios. Cape Cod Pavement Management Status Report November 2012 Page 9

14 Network Identification Network Identification builds an inventory of streets that describe the municipality s complete roadway network. The direction of travel, street length, width, ownership, classification, zone and pavement type are among the items identified at this initial phase in the pavement management process. This integral step ensures the streets surveyed are the definitive set to be analyzed. Pavement Management Section Identification Once the Network Identification is complete, the field work begins. Each street contains one or more pavement management sections. A pavement management section defines the limits of previous construction or maintenance activities within each street. Sections are defined by having the same width, typical distresses, functional class, etc. The goal is to set up homogenous areas of pavement to aid in assigning the appropriate repair. A street may be one section, or it may be comprised of several pavement management sections, depending on its construction history. Surface Distress Assessment For each pavement management section, the severity and extent of nine major pavement distresses are recorded, and then entered into a weighted formula to arrive at a Pavement Index (PCI). The distresses are categorized as base related or surface related distresses. Base related distresses indicate that the pavement structure is inadequate for the existing traffic load and soil conditions. Streets that show significant base related distresses may need to have the pavement structure strengthened with either thicker or stronger base or pavement materials. Surface related distresses are caused by age and weathering of the pavement. Streets that have predominantly surface related distresses are excellent candidates for maintenance sealing to inhibit further pavement oxidization (the main effect of aging). Streets with more of the base related distresses will most likely need some full depth patching, structural overlays or reclamation/reconstruction. The four base related distresses are: potholing or non-utility patching alligator cracking distortion rutting The five surface related distresses are: block cracking transverse or longitudinal cracking bleeding or polished aggregate surface wear or raveling shoving, slippage or corrugation November 2012 Cape Cod Pavement Management Status Report Page 10

15 PCI Defined A PCI is generated for each inventoried pavement management section in the town using the surface distress data collected by VHB. PCI is measured on a scale of zero to one hundred, with one hundred representing a pavement in perfect condition and zero describing a road in impassable condition. Each type of observed pavement distress is assigned a deduct value based on the type, severity and extent of the distress. A weighted sum of the deduct points is subtracted from the perfect one hundred road in order to generate a PCI for each pavement management section. In general, base related (pavement foundation) distresses are weighted more heavily than surface related distresses. For example, if 15% of a road section had medium severity Alligator Cracking it would receive a deduct of 40 points. Whereas the same area of Block Cracking would only receive a deduct of 15 points. The actual PCI calculation follows: PCI = 100 (Highest Deduct Value) (25% of remaining base related deduct values) (10% of remaining surface related deduct values) Cape Cod Pavement Management Status Report November 2012 Page 11

16 The Five Treatment Bands The pavement management system uses broad ranges to group the individual repair types into five major treatment bands. Treatment bands are a useful tool to summarize data on a -wide basis. An individual road segment will fall into a particular category based on the strategy table s output of repair types and will vary due to functional classification. The goal is to gain a broad understanding of the existing conditions in simple yet meaningful terms. Table 3 - Treatment Band Descriptions TREATMENT BAND PCI* Description DO NOTHING Excellent condition - in need of no maintenance. ROUTINE MAINTENANCE PREVENTIVE MAINTENANCE STRUCTURAL IMPROVEMENT BASE REHABILITATION Good condition may be in need of crack sealing or minor localized repair. Fair condition pavement surface may be in need of surface sealing, full depth patch and/or crack sealing. Deficient condition pavement surface structure in need of added strength for existing traffic. Typical repairs are overlay with or without milling. Poor condition in need of base improvement. Typical repairs are reclamation or full depth reconstruction. *Note: Treatment bands are defined below. These are only general PCI ranges for reference purposes, and represent only one pavement type. There are several fields considered by the strategy table when assigning repair types to each individual street. Source: VHB Do Nothing The Do Nothing category exhibits roads which are in need of no maintenance. These roads are in excellent condition and existing distresses generally do not need to be addressed. November 2012 Cape Cod Pavement Management Status Report Page 12

17 Routine Maintenance Routine maintenance activities are those which are taken to correct a specific pavement distress. Routine maintenance usually addresses localized pavement defects and includes activities such as: Full depth patching; Skin patching; Crack sealing. Preventive Maintenance Preventive maintenance activities are those which are performed at planned intervals to protect and seal the pavement. Seals are designed to provide one or more of the following benefits: Prevent the intrusion of air and moisture; Fill small cracks and voids; Rejuvenate an oxidized binder; Provide a new wearing surface. Structural Improvement Structural improvement includes the work necessary to restore the pavement to a condition that will allow it to perform satisfactorily for several years. Generally a structural improvement will consist of a milling the existing pavement down and applying a new Hot Mix Asphalt Overlay allowing existing grades to be maintained. When the existing grade can be increased a new Hot Mix Asphalt course can simply be placed upon the existing surface. Structural improvements also include the work necessary to prepare the pavement for an overlay, either with or without milling. The major activities involved in the rehabilitation process are: Partial depth patching; Full depth patching; Joint and crack sealing. Grinding and milling Hot Mix Asphalt Leveling Courses. Cape Cod Pavement Management Status Report November 2012 Page 13

18 Base Rehabilitation Base rehabilitation utilizes one of two methods: Reclamation; Reconstruction. Reclamation is the process of rehabilitating existing deteriorated pavements. The existing pavement and base, subbase, and possibly subgrade are pulverized and blended to create a homogenous pavement base. This reclaimed pavement base is then paved with a new Hot Mix Asphalt surface. Reconstruction is the complete removal and replacement of a failed pavement, and might also involve widening, realignment, traffic control devices, safety hardware, and major base and drainage work. Customizing Repair Strategies VHB meet with the DPW to review VHB's typical repair strategies, and to learn how to customize these strategies to meet the 's specific needs. VHB also refines repair unit costs. VHB s goal was to understand the town s decision making process and simulate that process in the budget analysis software based on the pavement condition and other criteria of each pavement section. Preparing Budget Scenarios Once the roadway conditions are inventoried and analyzed, and the repair strategies are defined, the impact of various spending programs on the roadway network is assessed. These studies can range from 1 to 20 years; typically 5-year studies are used. The purpose of the budget planning process is to determine the impact of various spending levels to find a funding level that will best meet the town s needs. The budget analysis software uses pavement deterioration curves, unit costs, and the strategy tables developed in the repair strategy definition phase to assign each street a repair type and associated cost for each year of the study. The software also assigns each street a benefit value that is used to prioritize which streets the software will select for repair each year. It is important to understand that a pavement management system is a network-wide planning tool, and is not intended to give definitive street-by-street repair data. Field verification and testing are recommended to confirm any street repair list generated. Deterioration Curves In order to properly plan for future repairs, the budget analysis feature of the pavement management system uses deterioration curves. The deterioration curves estimate the rate at which the pavement condition decreases over time. These pavement deterioration curves depict two major categories of functional classification - arterials November 2012 Cape Cod Pavement Management Status Report Page 14

19 and collectors in one curve and local roads in the other. An example deterioration curve is presented in the following figure: Figure 2 - Sample Deterioration Curve Source: VHB Strategy Table The pavement management system uses a table of repair strategies to assign specific road repair types to individual roadway segments. The repair strategy table incorporates PCI ranges as well as functional class and pavement type to simulate decisions consistent with Barnstable s repair practices and procedures. Project Prioritization The budget analysis software prioritizes needed system repairs based on the estimated Benefit Value. The Benefit Value formula is calculated using variables representing traffic volume, repair service life, PCI, and unit repair costs for each pavement management section. For each plan year, the software prepares a future roadway condition projection, exhausts the assigned budget, and then produces an annual list of roads included in the repair program. The system also allows the user to enter an inflation rate to account for estimated increases in future year construction costs. A 4% inflation rate is typically used. The Benefit Value prioritization process generally favors cost effective maintenance alternatives. Repair actions are typically delayed on those sections that require reconstruction or major rehabilitation because the benefits for dollars spent are Cape Cod Pavement Management Status Report November 2012 Page 15

20 generally lower than maintenance candidates. After the relatively good roads are "saved," improvements are directed towards the poorer arterial and collector roads, and then to the local roads in need of major rehabilitation. 1.5 ANALSES The data collected in the monitoring process will be continually compared to the measures developed to define congestion. The comparison will be used to identify congested areas and trigger an investigation into the nature of the demand problems MASSDOT EVALUATIONS OF PAVEMENT CONDITIONS As seen in the following table presented in the Cape Cod Regional Transportation Plan, the Cape Cod Region possesses miles of roadway eligible for federal funding. Of those miles, are under the jurisdiction of the Cape s local communities. Table 4 RTP MassDOT Data Available by Jurisdiction MassDOT evaluates roads under their own jurisdiction and a selection of municipallyowned roadways. The following table lists the corresponding rating from Excellent to Poor, based on a PSI rating roughly analogous to the Pavement Index (PCI) commonly used. Pavement Excellent Good Fair Poor PSI Range PSI >=3.5 PSI PSI PSI < 2.3 November 2012 Cape Cod Pavement Management Status Report Page 16

21 The following map identifies the roadways that have been evaluated (shown in red) and those that lack evaluation (shown in blue). Figure 3 - MassDOT Evaluation of Municipal s A recent effort undertaken by the CCC technical staff utilizing recent Massachusetts way Inventory information has identified a slightly lower mileage (80.09) of federal-aid eligible municipal roadways with pavement condition evaluation (vs miles in table above). As seen in the table below, MassDOT way Inventory information is available for miles of federal-aid eligible municipal roadways of those miles are in excellent condition, almost 20.5 miles are in good condition, miles are in fair condition, and about 6.7 miles of evaluated roads are in poor condition. The Geographic Information System pavement file shows 1,040 road segments of varying length evaluated for pavement condition between Over 800 of these segments were evaluated in 2009, less than 200 were evaluated in 2006, and the remainder in Cape Cod Pavement Management Status Report November 2012 Page 17

22 Table 5 - MassDOT way Inventory Pavement s - Miles Excellent Good Fair Poor Totals Barnstable Bourne Brewster Chatham Dennis Eastham Harwich Mashpee Orleans Provincetown Sandwich Truro Wellfleet armouth Totals Source: MassDOT, Data The maps in the following figures shows the four categories of pavement condition(see Table 5) on the MassDOT-evaluated roadways available in a series of three maps (Upper Cape, Mid-Cape, and Lower Cape). The MassDOT evaluations are shown as thick solid colored lines ranging from Blue (Excellent) to Red (Poor). November 2012 Cape Cod Pavement Management Status Report Page 18

23 Figure MassDOT Evaluation of Municipal s: Upper Cape Cape Cod Pavement Management Status Report November 2012 Page 19

24 Figure MassDOT Evaluation of Municipal s: Mid- Cape November 2012 Cape Cod Pavement Management Status Report Page 20

25 Figure MassDOT Evaluation of Municipal s: Lower Cape Cape Cod Pavement Management Status Report November 2012 Page 21

26 1.5.2 CCC EVALUATIONS OF PAVEMENT CONDITIONS WINDSHIELD SURVES Using the MassDOT pavement evaluation discussed in the previous section as a basis for new data collection, CCC staff undertook a series of Windshield Surveys throughout Barnstable County. Selecting at least one road in each town listed as Municipal s without Evaluation, CCC staff observed pavement conditions according to the criteria in Table 1. Copies of the detailed observations are available in the appendix. The following table provides a summary by town of CCC windshield survey data. Table 6 - CCC Surveys of Pavement - miles Very Good to Excellent Good to Very Good Fair to Good Poor to Fair Poor Totals Barnstable Bourne Brewster Chatham Dennis Eastham Harwich Mashpee Orleans Provincetown Sandwich Truro Wellfleet armouth Totals As shown in the table above, over 200 miles of survey data were collected throughout the 15 towns of Barnstable County in 2011 and The most common rating Fair to November 2012 Cape Cod Pavement Management Status Report Page 22

27 Good yielded over 98 miles. This is followed by almost 72 miles of, almost 24 miles of Good to Very Good and over five miles for both Very Good to Excellent and Poor. The following figures provide a graphic of the CCC survey data in a series of three maps (Upper Cape, Mid-Cape, and Lower Cape). The CCC evaluations are shown as colored parallel lines ranging from Blue (Very Good to Excellent) to Red (Poor). Cape Cod Pavement Management Status Report November 2012 Page 23

28 Figure CCC Pavement Surveys: Upper Cape November 2012 Cape Cod Pavement Management Status Report Page 24

29 Figure CCC Pavement Surveys: Mid-Cape Cape Cod Pavement Management Status Report November 2012 Page 25

30 Figure CCC Pavement Surveys: Lower Cape November 2012 Cape Cod Pavement Management Status Report Page 26

31 When combined with MassDOT s Municipal s with Evaluation information, the following figures represent conditions of many of the County s Municipal s. In some cases CCC evaluations were made on sections of roads also evaluated by MassDOT. The figures are presented geographically (Upper Cape, Mid-Cape, and Lower Cape) and show the combined evaluations by colored lines. For MassDOT evaluations, the colors of the thick solid lines range from Blue (Excellent) to Red (Poor). For the CCC evaluations, the colors of the parallel lines range from Blue (Very Good to Excellent) to Red (Poor). Cape Cod Pavement Management Status Report November 2012 Page 27

32 Figure 10 - MassDOT & CCC Evaluations ( ): Upper Cape November 2012 Cape Cod Pavement Management Status Report Page 28

33 Figure 11 - MassDOT & CCC Evaluations ( ): Mid-Cape Cape Cod Pavement Management Status Report November 2012 Page 29

34 Figure 12 - MassDOT & CCC Evaluations ( ): Lower Cape November 2012 Cape Cod Pavement Management Status Report Page 30

35 1.5.3 CCC EVALUATIONS OF PAVEMENT CONDITIONS ATR SITES Starting in mid-summer of 2011, CCC traffic technicians were tasked with collecting pavement condition data as part of their work in setting up Automatic Traffic Recorders (ATRs). Including data collected in 2012, this yielded pavement condition data at 250 unique locations throughout the Cape s 15 towns. Also, since a 48-hour traffic count was collected from each ATR, results include a Weighted pavement condition for each town. By multiplying the Annual Average Daily Traffic at each location times that locations observed pavement condition, we then totaled these results and divided by the sum of Annual Average Daily Traffic from that town s ATR s. Annual Average Daily Traffic is calculated by multiplying the appropriate MassDOT monthly adjustment factor times the observed average daily traffic over the 48 hour ATR data collection period. The following table presents town-wide averages of the pavement condition information collected at ATR sites. Table 7 - Summary of Pavement s at ATR Sites TOWN # of Sites Avg. AADT Avg. Weighted Barnstable 26 5, Bourne 25 5, Brewster 8 5, Chatham 11 5, Dennis 22 7, Eastham 9 4, , Harwich 16 6, Mashpee 13 6, Orleans 14 7, Provincetown 7 5, Sandwich 24 5, Truro 10 5, Wellfleet 12 3, armouth 24 7, Cape Cod Pavement Management Status Report November 2012 Page 31

36 See Table 1 for descriptions of pavement conditions (ranging from Excellent = 1 to Poor =5). Pavement conditions including comments and other ATR data for each of the 250 collection sites are presented in the appendix. The following figures are a graphical display of the individual site data for sections of Barnstable County (Upper Cape, Mid- Cape, and Lower Cape). The pavement condition at each ATR site is shown as a colored circle ranging from Blue (Very Good to Excellent) to Red (Poor). November 2012 Cape Cod Pavement Management Status Report Page 32

37 Figure Pavement s at ATR Locations: Upper Cape Cape Cod Pavement Management Status Report November 2012 Page 33

38 Figure Pavement s at ATR Locations: Mid- Cape November 2012 Cape Cod Pavement Management Status Report Page 34

39 Figure Pavement s at ATR Locations: Lower Cape Cape Cod Pavement Management Status Report November 2012 Page 35

40 1.5.4 MUNICIPAL EVALUATIONS OF PAVEMENT CONDITIONS Several communities have active PMS and have provided examples of pavement condition reporting. Two of these towns (Barnstable and Sandwich) have submitted maps showing roadways with evaluations of pavement conditions. The color-coding is based on the average Pavement Index (PCI) as described in Section , with the pavement in the best condition (highest PCI) shown in blue and the poorest condition (lowest PCI) shown in red. The Barnstable and Sandwich PCI maps are presented in the following two figures. November 2012 Cape Cod Pavement Management Status Report Page 36

41 Figure 16 - Barnstable PCI Map Source: of Barnstable/VHB 2009 Data Cape Cod Pavement Management Status Report November 2012 Page 37

42 Figure 17 - Sandwich PCI Map Source: of Sandwich/VHB Data November 2012 Cape Cod Pavement Management Status Report Page 38

43 1.6 RECOMMENDATIONS FOR ACHIEVING IMPROVED PAVEMENT CONDITION The Regional Transportation Plan included an initial effort at providing a comprehensive county-wide policy for improved pavement condition. The information in this section was originally published in the 2012 RTP. By considering the additional data collected since the 2012 RTP was finalized, more detailed estimates will be available for implementation see discussion in the next section of this report. Based on costs estimated by the Old Colony Planning Council, improving a Good road to Excellent requires $40,400 per mile; improving from Fair requires $405,146 per mile; and improving from Poor requires $697,980 per mile. Improving all of Cape Cod s municipally-owned Federal-Aid roadways to Excellent requires $118,944,832. While Excellent pavement is the ultimate goal of the MPO, this figure is well in excess of the financial constraints outlined in the recently-approved RTP. A strategy is required to responsibly allocate available funding to maintaining and improving pavement condition on Cape Cod. As can be observed by the costs listed above and also demonstrated in Figure 1, allowing pavement to deteriorate to the lowest condition requires a significantly magnified cost to improve. To get closer to the MPO s ultimate goal, resources spent on improving Fair pavement would result in far more miles of resulting Excellent pavement than directing resources to Poor pavement. Nevertheless, Poor pavement cannot be ignored. Therefore, the strategy of the Cape Cod MPO is to evenly divide investment across the lower two categories. Based on expected resources identified in the RTP, the following table lists the resulting totals of each category: Table 8 - Change in Pavement RTP Improvement Strategy Pavement Base Percent Base Miles Improvement Cost Miles Improved New Miles New Percent Excellent 26.40% % Good 32.96% % Fair 26.36% $ 10,367, % Poor 14.28% $ 10,367, % Totals % $ 20,735, % Cape Cod Pavement Management Status Report November 2012 Page 39

44 Implementation of this strategy results in overall improvement of pavement quality. The percentage of Excellent municipally-owned Federal-Aid roadways increases from 26 to 34 percent. Good roadways are maintained at 33%. Fair roadways are reduced from 26 to 22%, and Poor roadways are reduced from 14 to 12 percent. 1.7 CONCLUSION/RECOMMENDATIONS FOR PMS ENHANCEMENT During F 2013, Cape Cod Commission staff will continue advance PMS activities throughout the 15 towns of Barnstable County. Efforts will continue such as: Identify individual towns methods for pavement condition evaluation and programming for improvements Identify gaps in pavement condition information on Municipally-owned Federal Aid eligible roadways and prioritize and implement CCC data collection activities on these roadways Improve CCC skills in performing pavement evaluations Analyze local communities bid prices to develop Cape-specific improvement costs of various pavement conditions November 2012 Cape Cod Pavement Management Status Report Page 40

45 APPENDI Cape Cod Commission Pavement Survey Data Cape Cod Pavement Management Status Report November 2012

46 Cape Cod Commission - Pavement Surveys Barnstable Cedar St Rt to end Date 8/9/2012 Observer PL Poor rutting, weathering, stripping, edge loss longitudinal cracking, edge drop off, potholes patches failing, block cracking, potholes serious wear, patches failing Willow St 25' East of Kettlehole Rd 75' West of Kettlehole Rd end Barnstable Church St (W. Barnstable) Parker Rd -- Rt 149 Date 8/9/2012 Observer PL wearing, drainage issue, some cracks pothole, some rutting Pine St. Rt 149 Barnstable Craigville Beach Rd Smith St. -- Strawberry Hill Rd Date 8/9/2012 Observer LAM minor crack seal Cape Cod Commission printed: 10/26/2012

47 Cape Cod Commission - Pavement Surveys Barnstable Gosnold/Sea/Ocean Av/Marston Av/Smith St Old Colony Rd -- Craigville Beach Rd Date 8/9/2012 Observer LAM patches, rutting longitudinal cracking, rutting longitudinal pipe patch 0.1 mi Sea St Ocean Ave 0.7 mi., Marston Ave 1.0 mi., Scudder Av/Smith St 1.3 mi., Craigville Beach Rd Barnstable High School Rd Main St (Hyannis) -- Bearses Way Date 9/18/2012 Observer LM Very Good to Excellent new pavement Barnstable High St Old County Rd/Sandwich TL -- Rt 6A Date 9/4/2012 Observer LM potholes, patches, longitudinal cracks Rt 6A Barnstable Lumbert Mill Rd Five Corners Rd -- Ost.-W.Barnstable Rd Date 9/18/2012 Observer LM occ. cracking potholes, spalling, long. cracking Rt 28 Ost.-W.Barnstable Rd Cape Cod Commission printed: 10/26/2012

48 Cape Cod Commission - Pavement Surveys Barnstable Main St(Centerville) Phinneys Ln/Hyannis Rd Old Stage Rd/Main St -- Rt 6A Date 8/9/2012 Observer LAM Potholes, many patches, a lot of crack seal patches & rutting 0.6 mi., Rt 28 Rt 132 Rt 6A Barnstable Oak St Rt 6A -- Old Stage Rd Date 8/8/2012 Observer LAM potholes, rutting, crack seal minor roughness, patches 1.0 mi., Service Rd 1.9 mi., Old Stage Rd Barnstable Old Colony Rd (Hyannis) South St -- Gosnold St Date 8/9/2012 Observer LAM some rutting, roughness 0.8 mi. Barnstable Old Rd Ost-W.Barnstable -- Race Ln Date 9/18/2012 Observer LM Good to Very Good Cape Cod Commission printed: 10/26/2012

49 Cape Cod Commission - Pavement Surveys Barnstable Old Rd Osterville-W. Barnstable Rd -- Rt 149 Date 8/8/2012 Observer LAM potholes, rutting, patches rough pavement 0.4 mi., Flint St 1.2 mi., Rt 149 Barnstable Old Stage Rd Race Ln -- Service Rd Date 8/8/2012 Observer LAM occ. patch, minor cracking. Barnstable Osterville-W. Barnstable Rd. Rt Rt 28 Date 8/8/2012 Observer LAM Good to Very Good edge raveling, potholes, crack seal crack seal, minor cracking patches, potholes, edge raveling.7 mi., Woodside Dr 1.0 mi., Race Ln Old Rd 2.7 mi., Rt 28 Barnstable Parker Rd (W. Barnstable) Rt 6A -- Church St Date 8/9/2012 Observer PL uneven/rutting some cracks, repairs Cape Cod Commission printed: 10/26/2012

50 Cape Cod Commission - Pavement Surveys Barnstable Parker (Osterville) Main St -- Sea View Ave Date 8/8/2012 Observer LAM occasional patches Barnstable Pond St, Bumps River Rd Main St (Osterville) -- Five Corners Rd Date 9/18/2012 Observer LM occ. patches potholes Bumps River Rd Old Mill Rd Five Corners Rd Barnstable Race Ln Sandwich TL to Old Stage Rd Date 9/11/2011 Observer PNWL Good to Very Good minor linear crack serious wear, utility patch wear better here more wear & crack sealing (linear) more wear & minor linear cracking Trotters Ln Mill Race Rd Rt 149 Evergreen Osterville-W.Barnstable Rd Old Stage Rd Cape Cod Commission printed: 10/26/2012

51 Cape Cod Commission - Pavement Surveys Barnstable S. County Rd/Main St (Osterville) Rt Parker Rd Date 8/8/2012 Observer LAM occasional patches Barnstable Sea View Avenue Parker -- Wianno Ave Date 8/8/2012 Observer LAM potholes, rutting Barnstable Stevens St North St -- Winter St Date 9/18/2012 Observer LM Very Good to Excellent new pavement Barnstable Strawberry Hill Rd Craigville Beach Rd -- Rt 28 Date 8/9/2012 Observer LAM crack seal, minor rutting Cape Cod Commission printed: 10/26/2012

52 Cape Cod Commission - Pavement Surveys Barnstable Wakeby Rd, River Rd, Lovell's Ln Sandwich TL/Asa Meiggs Rd -- Rt 149 Date 9/4/2012 Observer LM rutting, crack seal, longitudinal cracks longitudinal cracking, crack seal, rutting rutting potholes, edge raveling weathering Newtown Rd River Rd Lovell's Ln Rt 149 Barnstable Winter St Barnstable Rd -- Main St (Hyannis) Date 9/18/2012 Observer LM rutting, continuous trench patch weathering Stevens St Main St Bourne Bournedale Rd & Head of the Bay Rd Rt 6 Scenic - Wareham TL Date 9/4/2012 Observer LM weathering edge raveling, alligator cracking, long. cracking weathering.5 mi Head of the Bay Rd Cape Cod Commission printed: 10/26/2012

53 Cape Cod Commission - Pavement Surveys Bourne Clay Pond Rd Rt 28 to County Rd Date 7/15/2011 Observer GDC cracking Bourne County Rd Trowbridge Rd to Rt 28A Date 6/30/2011 Observer GDC Good to Very Good cracking 500 ft. N of Clay Pond Rd Rt 28A Bourne Main St (Rt 6/28) Memorial Circle (Rt 6 Bypass) - Belmont Cir Date 9/4/2012 Observer LM Very Good to Excellent minor cracking new pavement Summer St Bourne Megansett Rd & red Brook Harbor Rd Fal TL (Garnet Av) -- Shore Rd Date 8/23/2012 Observer LM minor cracking crack seal Red Brook Harbor Rd Shore Rd Cape Cod Commission printed: 10/26/2012

54 Cape Cod Commission - Pavement Surveys Bourne Shore Rd & Trowbridge Rd Red Brook Harbor Rd -- Bourne Rotary Date 8/23/2012 Observer LM crack seal minor weathering Barlows Landing Rd Bourne Rotary Brewster Foster Rd Rt 6A -- Point of Rocks Rd Date 9/6/2012 Observer LM potholes, cracks, edge raveling Brewster Freeman's Way Rt Rt 137 Date 9/6/2012 Observer LM occ. crack seal Brewster Lower Rd Rt 6A (east) -- Rt 6A (west) Date 9/6/2012 Observer LM weathering, minor cracking Cape Cod Commission printed: 10/26/2012

55 Cape Cod Commission - Pavement Surveys Brewster Millstone Rd Rt Rt 6A Date 9/6/2012 Observer LM crack seal, edge raveling Brewster Point of Rocks Rd Foster Rd -- Rt 6A Date 9/6/2012 Observer LM rutting, edge raveling, crack seal, patches Brewster Setucket Rd & Stony Brook Rd (E) Dennis TL to Rt 6A Date 9/9/2011 Observer LAM lots of crack sealing, unreported holes, occasional cracking large patches, crack seal Stony Brook Rd (mile 2.0) Rt 6A (mile 2.8) Brewster Slough Rd Setucket Rd -- Harwich TL Date 9/6/2012 Observer LM occ. crack seal potholes, crack seal Elbow Pond Dr. Harwich TL Cape Cod Commission printed: 10/26/2012

56 Cape Cod Commission - Pavement Surveys Brewster Stony Brook Rd (W) Rt 6A (W) to Setucket Rd Date 9/19/2011 Observer LAM cracks, edge raveling, wear wheel path cracking, wear, edge raveling A.P. Newcomb Rd (0.9 mi) Setucket Rd (1.5 mi) Brewster Tubman Rd Rt 6A to Rt 137 Date 9/19/2011 Observer LAM crack seal, wear, rutting, occ. patches wear, crack seal, transverse cracking, patches Rt 124 Rt 137 (1.5 mi) Chatham Crowell Rd Rt 28 (N) to Rt 28 (W) Date 9/9/2011 Observer LAM occasional patches, minor cracking Rt 28 (mile 1.4) Cape Cod Commission printed: 10/26/2012

57 Cape Cod Commission - Pavement Surveys Dennis Airline Rd Rt 134 to Rt 6A Date 9/19/2011 Observer LAM Good to Very Good potholes, a lot of crack seal rare patch crack seal (Gap for Setucket ) long. cracks, minor edge ravel, patches, wear Old Chatham Rd 200' before Setucket Setucket Rd (W) from Setucket (E) to Rt 6A (2.9 mi) Dennis Bayview Rd, Horsefoot Path Shore Dr -- Beach St Date 9/6/2012 Observer LM occ. crack seal Horsefoot Path Beach St Dennis Beach St, New Boston Rd Horsefoot Path -- Rt 6A Date 9/6/2012 Observer LM Good to Very Good New Boston Rd Rt 6A Cape Cod Commission printed: 10/26/2012

58 Cape Cod Commission - Pavement Surveys Dennis Highbank Rd & Great Western Rd Bass River -- Harwich TL Date 8/13/2012 Observer LAM occasional patches Rt 134 Harwich TL Dennis Hokum Rock Rd Rt Old Bass River Rd Date 9/6/2012 Observer LM Good to Very Good surface treated, rough Perkins Way Old Bass River Rd Dennis Lower County Rd Harwich TL - Rt 28 Date 8/13/2012 Observer LAM Cape Cod Commission printed: 10/26/2012

PAVEMENT CONDITION REPORT

PAVEMENT CONDITION REPORT PAVEMENT CONDITION REPORT Department of Facility Maintenance December 2012 TABLE OF CONTENTS Executive Summary...1 Figure 1. Inputs to Pavement Condition Index...1 Figure 2. Summary Oahu Pavement Condition

More information

FFY Development. Transportation Improvement Program (TIP) March 11, 2016 Cape Cod Joint Transportation Committee

FFY Development. Transportation Improvement Program (TIP) March 11, 2016 Cape Cod Joint Transportation Committee FFY 2017-2021 Transportation Improvement Program (TIP) Development March 11, 2016 Cape Cod Joint Transportation Committee Transportation Improvement Program (TIP) + The TIP is a five-year schedule of regional

More information

Pavement Management Study

Pavement Management Study Town of South Bethany, DE 2016 Pavement Management Study Prepared by: Kercher Engineering, Inc. December 13, 2016 Mr. Melvin Cusick Town Manager Town of South Bethany 402 Evergreen Road South Bethany,

More information

SOUTH CAROLINA AERONAUTICS COMMISSION

SOUTH CAROLINA AERONAUTICS COMMISSION SOUTH CAROLINA AERONAUTICS COMMISSION STATEWIDE AIRFIELD PAVEMENT MANAGEMENT SYSTEM UPDATE AIRPORT: LEXINGTON COUNTY AT PELION 106 AIRPORT ROAD PELION, SC 29123 SOUTH CAROLINA AERONAUTICS COMMISSION 2553

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA XI Seminar, Santiago, Chile September 1-5,

More information

FULL DEPTH RECLAMATION (FDR)

FULL DEPTH RECLAMATION (FDR) FULL DEPTH RECLAMATION (FDR) Virginia Experience Past and Present Michael Wells, P.E. March 2, 2018 Outline What is Full Depth Reclamation (FDR) VDOT Experience Full Depth Reclamation (FDR) Bound layers

More information

Statewide Airfield Pavement Management Program. District 7 Report

Statewide Airfield Pavement Management Program. District 7 Report STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION AVIATION OFFICE Statewide Airfield Pavement Management Program District 7 Report June 2012 Pavement Evaluation Report District 7 June 2012 TABLE OF CONTENTS

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 30-

More information

Pavement Strength Analysis Prepared by Molzen Corbin September 2016

Pavement Strength Analysis Prepared by Molzen Corbin September 2016 Pavement Strength Analysis Prepared by Molzen Corbin September 2016 The Santa Fe Municipal Airport was originally constructed in 1941. It was constructed by the military as a B-24 bomber training base.

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 3-

More information

Appendix B PAVEMENT CONDITION AND HISTORY

Appendix B PAVEMENT CONDITION AND HISTORY Appendix B PAVEMENT CONDITION AND HISTORY The Sunport maintains a pavement management program (PMP) in order monitor the condition of pavements and to plan for repair/replacement in a timely manner. The

More information

Statewide Airfield Pavement Management Program. District 5 Report

Statewide Airfield Pavement Management Program. District 5 Report STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION AVIATION OFFICE Statewide Airfield Pavement Management Program District 5 Report June 2012 Pavement Evaluation Report District 5 June 2012 TABLE OF CONTENTS

More information

2009 Muskoka Airport Economic Impact Study

2009 Muskoka Airport Economic Impact Study 2009 Muskoka Airport Economic Impact Study November 4, 2009 Prepared by The District of Muskoka Planning and Economic Development Department BACKGROUND The Muskoka Airport is situated at the north end

More information

REPORT. Pavement Evaluation Summary Brookshire Way & Duluth Park Gwinnett County Duluth, Georgia. Project Number

REPORT. Pavement Evaluation Summary Brookshire Way & Duluth Park Gwinnett County Duluth, Georgia. Project Number REPORT Pavement Evaluation Summary Brookshire Way & Duluth Park Duluth, Georgia Project Number 2013.4154.01 February 11, 2014 Revised March 20, 2014 UNITED CONSULTING 625 Holcomb Bridge Road Norcross,

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

EXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report

EXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report II. EXISTING CONDITIONS A. INTRODUCTION The Route 107 study area extends from the south at Chestnut Street in Lynn approximately 3.7 miles to the north to Boston Street in Salem. The study area has three

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

City of Tallahassee, FL Department of Aviation

City of Tallahassee, FL Department of Aviation City of Tallahassee, FL Department of Aviation Proposed Application to Federal Aviation Administration For Authority to Impose a Passenger Facility Charge (PFC) at Tallahassee International Airport and

More information

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting WELCOME! TSPE DFW MID-CITIES Check-in/Networking Announcements / Lunch Service Speaker Presentation 11:30AM 12:00PM 12:00PM 12:15PM 12:15PM 1:00PM January Chapter Meeting Thank You to Our Sponsors Interested

More information

Aloha Township Local Road Ratings Report for 2018

Aloha Township Local Road Ratings Report for 2018 Cheboygan County Road Commission Aloha Township Local s Report for 2018 The goal of the Road Commission is to use Asset Management Strategies when planning projects for the roads under the jurisdiction

More information

Statewide Airfield Pavement Management Program. District 1 Report

Statewide Airfield Pavement Management Program. District 1 Report STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION AVIATION OFFICE Statewide Airfield Pavement Management Program District 1 Report June 2012 Pavement Evaluation Report District 1 June 2012 TABLE OF CONTENTS

More information

MEMORANDUM. for HOV Monitoring on I-93 North and the Southeast Expressway, Boston Region MPO, November, 2011.

MEMORANDUM. for HOV Monitoring on I-93 North and the Southeast Expressway, Boston Region MPO, November, 2011. MEMORANDUM Date: January 12, 2012 To: Congestion Management Process Files From: Seth Asante, Ryan Hicks, and Efi Pagitsas MPO Staff Re: Historical Trends: Travel Times and Vehicle Occupancy Levels for

More information

Street, Sidewalk, Curb, and Alley Assessment

Street, Sidewalk, Curb, and Alley Assessment Street, Sidewalk, Curb, and Alley Assessment Contributing Organizations: Department of Public Works (DPW) School of Public and Environmental Affairs (SPEA) (Indiana University Purdue University, Indianapolis)

More information

2.8 SUB-REGIONAL ISSUES

2.8 SUB-REGIONAL ISSUES 2.8 SUB-REGIONAL ISSUES Each town, village, business district, and even each neighborhood will have a slightly different (and in a handful of cases a drastically different) set of options and conditions

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

METROBUS SERVICE GUIDELINES

METROBUS SERVICE GUIDELINES METROBUS SERVICE GUIDELINES In the late 1990's when stabilization of bus service was accomplished between WMATA and the local jurisdictional bus systems, the need for service planning processes and procedures

More information

General Relativity of Pavement Condition Rating and Its Global Impact

General Relativity of Pavement Condition Rating and Its Global Impact Ministry of Transportation General Relativity of Pavement Condition Rating and Its Global Impact Li Ningyuan Ministry of Transportation of Ontario Ontario, Canada 29th RPUG Meeting Denver, Colorado November

More information

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION PLANNING ORGANIZATIO BOSTON REGION MPO NMETROPOLITAN BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Stephanie Pollack, MassDOT Secretary and CEO and MPO Chair Karl H. Quackenbush, Executive Director,

More information

Agenda: SASP SAC Meeting 3

Agenda: SASP SAC Meeting 3 Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local CHAPTER 10 TRANSPORTATION Introduction The system of public roads in East Pikeland Township is decidedly rural in character. Since the 1984, the road network has remained much the same, with the addition

More information

Project Planning, Compliance, and Funding

Project Planning, Compliance, and Funding Project Planning, Compliance, and Funding The plans above offer high level guidance to ensure that the A.T. is managed effectively as a whole unit in a decentralized management structure. Cooperative management

More information

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire INTERNAL AUDIT DIVISION REPORT 2014/111 Audit of air operations in the United Nations Operation in Côte d Ivoire Overall results relating to the effective management of air operations in the United Nations

More information

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

MEMORANDUM. Lynn Hayes LSA Associates, Inc. MEMORANDUM To: Lynn Hayes LSA Associates, Inc. Date: May 5, 217 From: Zawwar Saiyed, P.E., Senior Transportation Engineer Justin Tucker, Transportation Engineer I Linscott, Law & Greenspan, Engineers LLG

More information

ROAD SURFACE ASSET MANAGEMENT

ROAD SURFACE ASSET MANAGEMENT ROAD SURFACE ASSET MANAGEMENT Northwest Michigan (Prosperity Region 2) 2016 Federal-Aid Pavement Ratings i ii Acknowledgements The 2016 transportation asset management data collection effort in northwest

More information

Abstract. Introduction

Abstract. Introduction COMPARISON OF EFFICIENCY OF SLOT ALLOCATION BY CONGESTION PRICING AND RATION BY SCHEDULE Saba Neyshaboury,Vivek Kumar, Lance Sherry, Karla Hoffman Center for Air Transportation Systems Research (CATSR)

More information

AVIATION AND SPACEPORT OFFICE DISTRICT 3 REPORT J UNE 2015 STATEWIDE. Airfield. Pavement Management

AVIATION AND SPACEPORT OFFICE DISTRICT 3 REPORT J UNE 2015 STATEWIDE. Airfield. Pavement Management F L O R I D A D E PA R T M E N T O F T R A N S P O R T A T I O N AVIATION AND SPACEPORT OFFICE DISTRICT 3 REPORT J UNE 2015 STATEWIDE Airfield Pavement Management P R O G R A M Pavement Evaluation Report

More information

Gulf Carrier Profitability on U.S. Routes

Gulf Carrier Profitability on U.S. Routes GRA, Incorporated Economic Counsel to the Transportation Industry Gulf Carrier Profitability on U.S. Routes November 11, 2015 Prepared for: Wilmer Hale Prepared by: GRA, Incorporated 115 West Avenue Suite

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN LAST UPDATE JULY 2013 Acknowledgements The preparation of this document was financed in part by a grant from the Federal Aviation Administration (Project No: 3-27-0000-07-10), with the financial support

More information

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM Backcountry Trail Flood Rehabilitation A June 2013 Flood Recovery Program Summary In June 2013, parts of Southern Alberta were devastated from significant

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

AVIATION AND SPACEPORT OFFICE DISTRICT 6 REPORT JU NE STATEWIDE. Airfield. Pavement Management

AVIATION AND SPACEPORT OFFICE DISTRICT 6 REPORT JU NE STATEWIDE. Airfield. Pavement Management F L O R I D A D E PA R T M E N T O F T R A N S P O R T A T I O N AVIATION AND SPACEPORT OFFICE DISTRICT 6 REPORT JU NE 2 0 1 5 STATEWIDE Airfield Pavement Management P R O G R A M Pavement Evaluation

More information

Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport

Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport Pursuant to 14 CFR Part 158.24(a) (1) (III), the Broward County

More information

CONGESTION MONITORING THE NEW ZEALAND EXPERIENCE. By Mike Curran, Manager Strategic Policy, Transit New Zealand

CONGESTION MONITORING THE NEW ZEALAND EXPERIENCE. By Mike Curran, Manager Strategic Policy, Transit New Zealand CONGESTION MONITORING THE NEW ZEALAND EXPERIENCE 26 th Australasian Transport Research Forum Wellington New Zealand 1-3 October 2003 By, Manager Strategic Policy, Transit New Zealand Abstract New Zealand

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington

More information

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM 10.1 INTRODUCTION Based on the findings from the Facility Requirements and the combined plan recommended in the Alternative Analysis, a capital improvement program for North Perry Airport has been developed

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2 Job No. 15-019 Page 2 TABLE OF CONTENTS 1.0 INTRODUCTION... 4 2.0 EXISTING CONDITIONS... 5 3.0 TRAFFIC GENERATION... 7 4.0 TRIP DISTRIBUTION... 8 5.0 FUTURE CONDITIONS... 8 6.0 SITE ACCESS...13 7.0 CONCLUSION...13

More information

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

Community Development Committee

Community Development Committee C Community Development Committee For the Metropolitan Council meeting of October 31, 2012 Committee Report Item:2012-316 ADVISORY INFORMATION October 16, 2012 Date Prepared: Subject: Intercity Regional

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

Making the most of school-level per-student spending data

Making the most of school-level per-student spending data InterstateFinancial Making the most of school-level per-student spending data Interstate Financial (IFR) was created by states, for states, to meet the financial data reporting requirement under ESSA and

More information

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this

More information

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

Chapter 14. Design of Flexible Airport Pavements AC 150/5320-6D

Chapter 14. Design of Flexible Airport Pavements AC 150/5320-6D Chapter 14 Design of Flexible Airport Pavements AC 150/5320-6D AIRCRAFT CONSIDERATIONS. a. Load. maximum anticipated takeoff weight of the aircraft. The design procedure assumes 95 percent of the gross

More information

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input

More information

Revenue Management in a Volatile Marketplace. Tom Bacon Revenue Optimization. Lessons from the field. (with a thank you to Himanshu Jain, ICFI)

Revenue Management in a Volatile Marketplace. Tom Bacon Revenue Optimization. Lessons from the field. (with a thank you to Himanshu Jain, ICFI) Revenue Management in a Volatile Marketplace Lessons from the field Tom Bacon Revenue Optimization (with a thank you to Himanshu Jain, ICFI) Eyefortravel TDS Conference Singapore, May 2013 0 Outline Objectives

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

FIXED-SITE AMUSEMENT RIDE INJURY SURVEY FOR NORTH AMERICA, 2016 UPDATE

FIXED-SITE AMUSEMENT RIDE INJURY SURVEY FOR NORTH AMERICA, 2016 UPDATE FIXED-SITE AMUSEMENT RIDE INJURY SURVEY FOR NORTH AMERICA, 2016 UPDATE Prepared for International Association of Amusement Parks and Attractions Alexandria, VA by National Safety Council Research and Statistical

More information

City of Berkeley, CA Streetlight Condition Assessment

City of Berkeley, CA Streetlight Condition Assessment City of Berkeley, CA Streetlight Condition Assessment Project Background The City of Berkeley contracted with Tanko Lighting to evaluate the condition of the City s metal streetlights and develop a plan

More information

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area KALAMAZOO AREA TRANSPORTATION STUDY FY 2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM MARCH 2019 AMENDMENTS The program is developed using the continuing, What is the TIP? cooperative, and comprehensive

More information

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

Port of Friday Harbor

Port of Friday Harbor REQUEST FOR STATEMENTS OF QUALIFICATIONS (RFQ) TO PROVIDE ENGINEERING / CONSULTANT SERVICES AT FRIDAY HARBOR AIRPORT Dated: February 15, 2018 Pursuant to RCW, Chapter 39.80 and FAA AC 150/5100-14E, the

More information

Central Coast Origin-Destination Survey

Central Coast Origin-Destination Survey Central Coast Origin-Destination Survey July 2016 Central Coast Origin-Destination Survey Prepared for: Santa Barbara County Association of Governments San Luis Obispo Council of Governments Ventura County

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

Proof of Concept Study for a National Database of Air Passenger Survey Data

Proof of Concept Study for a National Database of Air Passenger Survey Data NATIONAL CENTER OF EXCELLENCE FOR AVIATION OPERATIONS RESEARCH University of California at Berkeley Development of a National Database of Air Passenger Survey Data Research Report Proof of Concept Study

More information

TRANSPORTATION ELEMENT

TRANSPORTATION ELEMENT Transportation TRANSPORTATION ELEMENT Data, Inventory, and Analysis Prepared by Contents 1.0 INTRODUCTION... 1 2.0 EXISTING CONDITIONS... 1 2.1 Roadways... 1 2.1.1 Jurisdiction... 1 2.1.2 Functional Classification...

More information

OPTIMIZED GRAVEL ROAD MANAGEMENT SYSTEMS

OPTIMIZED GRAVEL ROAD MANAGEMENT SYSTEMS 21st Century Non-Paved Roads OPTIMIZED GRAVEL ROAD MANAGEMENT SYSTEMS Roozbeh Rashedi, Ph.D., P.Eng. VP-Technology, Infrastructure Solutions Inc. 2019 OGRA Conference Gravel Roads Who cares? GRAVEL ROADS

More information

2006 WEEKDAY TRAFFIC PROFILE. June 15, 2007

2006 WEEKDAY TRAFFIC PROFILE. June 15, 2007 June 15, 2007 Mr. Gary Stobb, P.E. Director of Planning/Operations Harris County Toll Road Authority 330 Meadowfern, Suite 200 Houston, TX 77067 Re: Westpark Tollway Value Pricing Analysis Dear Mr. Stobb:

More information

FIXED-SITE AMUSEMENT RIDE INJURY SURVEY, 2015 UPDATE. Prepared for International Association of Amusement Parks and Attractions Alexandria, VA

FIXED-SITE AMUSEMENT RIDE INJURY SURVEY, 2015 UPDATE. Prepared for International Association of Amusement Parks and Attractions Alexandria, VA FIXED-SITE AMUSEMENT RIDE INJURY SURVEY, 2015 UPDATE Prepared for International Association of Amusement Parks and Attractions Alexandria, VA by National Safety Council Research and Statistical Services

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

THIRTEENTH AIR NAVIGATION CONFERENCE

THIRTEENTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/13-WP/22 14/6/18 WORKING PAPER THIRTEENTH AIR NAVIGATION CONFERENCE Agenda Item 1: Air navigation global strategy 1.4: Air navigation business cases Montréal,

More information

2004 SOUTH DAKOTA MOTEL AND CAMPGROUND OCCUPANCY REPORT and INTERNATIONAL VISITOR SURVEY

2004 SOUTH DAKOTA MOTEL AND CAMPGROUND OCCUPANCY REPORT and INTERNATIONAL VISITOR SURVEY 2004 SOUTH DAKOTA MOTEL AND CAMPGROUND OCCUPANCY REPORT and INTERNATIONAL VISITOR SURVEY Prepared By: Center for Tourism Research Black Hills State University Spearfish, South Dakota Commissioned by: South

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,

More information

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE) 2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE) TABLE OF CONTENTS Introduction 1 Transportation Planning Activities 2 Identification of Problem Areas and Recommended Solutions 7 DeKalb County Projects

More information

2017/2018 Q3 Performance Measures Report. Revised March 22, 2018 Average Daily Boardings Comparison Chart, Page 11 Q3 Boardings figures revised

2017/2018 Q3 Performance Measures Report. Revised March 22, 2018 Average Daily Boardings Comparison Chart, Page 11 Q3 Boardings figures revised 2017/2018 Q3 Performance Measures Report Revised March 22, 2018 Average Daily Boardings Comparison Chart, Page 11 Q3 Boardings figures revised Contents Ridership & Revenue... 1 Historical Revenue & Ridership...

More information

Norman Y. Mineta San José International Airport 2017 Annual Noise Report

Norman Y. Mineta San José International Airport 2017 Annual Noise Report Norman Y. Mineta San José International Airport 2017 Annual Noise Report Annual Noise Report for Norman Y. Mineta San José International Airport Introduction and Purpose The purpose of this annual report

More information

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview Chapter 1 Introduction and Project Overview Kittitas County in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Bowers Field Airport (FAA airport identifier

More information

Boeing Aircraft and the Impact on Airports

Boeing Aircraft and the Impact on Airports International Civil Aviation Organization on Pavement Management Systems Lima, Peru November 19-22, 2003 Boeing Aircraft and the Impact on Airports Orest Shepson Principal Engineer - Airport Technology

More information

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future: 2014 GEORGIA INFRASTRUCTURE REPORT CARD B + RECOMMENDATIONS Plan and Fund for the Future: While the system continues to enjoy excess capacity and increased accessibility it still needs continued focus

More information

CHAPTER 4 DEMAND/CAPACITY ANALYSIS

CHAPTER 4 DEMAND/CAPACITY ANALYSIS CHAPTER DEMAND/CAPACITY ANALYSIS INTRODUCTION The demand/capacity analysis examines the capability of the airfield system at Blue Grass Airport (LEX) to address existing levels of activity as well as determine

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur INTERNAL AUDIT DIVISION REPORT 2017/051 Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur There was a need to effectively address issues identified and

More information

PASSENGER SHIP SAFETY. Damage stability of cruise passenger ships: Monitoring and assessing risk from operation of watertight doors

PASSENGER SHIP SAFETY. Damage stability of cruise passenger ships: Monitoring and assessing risk from operation of watertight doors E MARITIME SAFETY COMMITTEE 93rd session Agenda item 6 MSC 93/6/9 11 March 2014 Original: ENGLISH PASSENGER SHIP SAFETY Damage stability of cruise passenger ships: Monitoring and assessing risk from operation

More information

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and

More information

GREATER ORLANDO AVIATION AUTHORITY

GREATER ORLANDO AVIATION AUTHORITY GREATER ORLANDO AVIATION AUTHORITY Amendment to PFC Applications #7, 8, and 16 and New PFC Application #18 PUBLIC NOTICE June 7, 2016 1 P age Table of Contents PUBLIC NOTICE... 3 PROPOSED ACTIONS... 3

More information

UC Berkeley Working Papers

UC Berkeley Working Papers UC Berkeley Working Papers Title The Value Of Runway Time Slots For Airlines Permalink https://escholarship.org/uc/item/69t9v6qb Authors Cao, Jia-ming Kanafani, Adib Publication Date 1997-05-01 escholarship.org

More information

BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING

BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING Date of Hearing: September 14, 2016 #1 SUBJECT: ELECTION DISTRICT: Proposed FY2017-FY2022 Secondary Road Six-Year Plan

More information

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba Evaluation of Alternative Aircraft Types Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 5: 10 March 2014

More information

Passenger Facility Charge: No. 7 Application. Public Notice Materials. Luis Muñoz Marín International Airport San Juan Puerto Rico.

Passenger Facility Charge: No. 7 Application. Public Notice Materials. Luis Muñoz Marín International Airport San Juan Puerto Rico. Passenger Facility Charge: No. 7 Application December 2013 Public Notice Materials Luis Muñoz Marín International Airport San Juan Puerto Rico INTRODUCTION Aerostar Airport Holdings has initiated the process

More information

PASSENGER SHIP SAFETY. Damage stability of cruise passenger ships. Submitted by the Cruise Lines International Association (CLIA) SUMMARY

PASSENGER SHIP SAFETY. Damage stability of cruise passenger ships. Submitted by the Cruise Lines International Association (CLIA) SUMMARY E MARITIME SAFETY COMMITTEE 93rd session Agenda item 6 MSC 93/6/6 11 March 2014 Original: ENGLISH PASSENGER SHIP SAFETY Damage stability of cruise passenger ships Submitted by the Cruise Lines International

More information

Time-series methodologies Market share methodologies Socioeconomic methodologies

Time-series methodologies Market share methodologies Socioeconomic methodologies This Chapter features aviation activity forecasts for the Asheville Regional Airport (Airport) over a next 20- year planning horizon. Aviation demand forecasts are an important step in the master planning

More information

STUDY DESCRIPTION MEMORANDUM. DATE April 20, 2011

STUDY DESCRIPTION MEMORANDUM. DATE April 20, 2011 DATE April 0, 0 TO FROM RE MEMORANDUM Congestion Management Program Files Ariel Godwin, CMP Manager Boston Region MPO Staff Limited-Access Highway Counts and Traffic Volumes, Summer 00 This memorandum

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/13 1/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum capacity and efficiency through

More information

Evaluating Lodging Opportunities

Evaluating Lodging Opportunities Evaluating Lodging Opportunities This section explores market opportunities for new lodging accommodations in the downtown area. It will help you understand travel and visitation trends, existing competition,

More information

Pavement maintenance management systems

Pavement maintenance management systems Pavement maintenance management systems Hamad Al-Ajami Member of Training Authority,Public Authority for Applied Education and Training, Kuwait * E-mail of the corresponding author: h.alasidan@hotmail.com

More information