Highway and Street Works Bulletin
|
|
- Warren Hudson
- 5 years ago
- Views:
Transcription
1 Highway and StreetWorks Bulletin Network Rail Works ECCLESTON BRIDGE VIR NETWORK RAIL -PROMOTERS Bridge (Road over Rail) ECCLESTON NATIONAL BRIDGE 05/09/ :0 30/04/ :0 Bridge refurbishment and 1800, however all surfacing works will take place at night between the hours of 2200 and It is also anticipated that up to 20 Saturday and Sunday shifts will be undertaken to allow works across access points to be completed ELIZABETH BRIDGE VIR NETWORK RAIL -PROMOTERS NATIONAL Bridge (Road over Rail) Named ELIZABETH VIR 2 12/09/ :0 08/04/ :0 Removal of existing deck surfacing in phases, Concrete repairs to bridge deck and reinstatement of existing carriageway surface. Working hours will primarily be between the hours of 0730 and 1800, however all surfacing works will take place at night between the hours of 2200 and It is also anticipated that up to 20 Saturday and Sunday shifts will be undertaken to allow works across access points to be completed. TfL - Highway Improvement Works BRESSENDEN PLACE TRANSPORT FOR LONDON Eastbound From Buckingham Palace Road to Allington Street 28/10/ :0 13/01/ :0 Kerb and footway works Fw TM Plus Width Restriction, bus stand impacted, 2 way traffic maintained Page 1 of 18
2 Highway and StreetWorks Bulletin TfL - Highway Improvement Works BRESSENDEN PLACE TRANSPORT FOR LONDON Eastbound From Buckingpalace Rd to Allington St including JW Buckingham Palace Rd 20/01/ :0 23/01/ :0 Plane off, adjust levels of binder, adjust iron work, place surface course and line markings Road closure, bus stop suspended TRANSPORT FOR LONDON Eastbound From Buckingpalace Road to Allington Street 30/08/ :0 28/10/ :0 Kerb and footway works Fw TM Plus Width Restriction, impacting bus stand, two way traffic maintained TRANSPORT FOR LONDON J/W Buckingham Palace Road. f\w. 01/11/ :0 04/11/ :0 Connections Highway Services:WORKS FOR ROAD PURPOSES: (NOTICE FOR INFORMATION ONLY):EXCAVATE TO EXPOSE SERVICE CABLE FOR A TRANSFER TO A TRAFFIC SIGNAL FEEDER PILLAR Working on behalf of TfL Street Management L-MAIN /UL1 TRANSPORT FOR LONDON OS ELAND HOUSE 14/11/ :0 04/12/ :0 ACCESS TO SEWER 36M DEEP FOR CLEANING AND REMOVAL OF MONITORING INSTRUMENTATION Page 2 of 18
3 Highway and StreetWorks Bulletin TfL - Highway Improvement Works ECCLESTON PLACE TRANSPORT FOR LONDON S/B existing cycle hire docking station, directly opposite number 27 24/10/ :0 28/10/ :0 SERCO To carry out repairs and remedial works to existing cycle hire docking station and to reinstate. GROSVENOR GARDENS L-MAIN /UL1 TRANSPORT FOR LONDON OS 38 TO 50 14/11/ :0 04/12/ :0 ACCESS TO SEWER TO COMPLETE SAFETY CRITICAL CLEANSING AND MAINTAINENCE DURING VICTORIA DEVELOPMENT VAUXHALL BRIDGE ROAD TACHBROOK TRANSPORT FOR LONDON /09/ :0 19/11/ :0 Scaffold TM: f/w works, no impact on c/w working hours: h contact: Hayley TRANSPORT FOR LONDON F/P O/S Argos (No.279) J/W Neathouse Place. f\w. 04/12/ :0 04/12/ :0 Connections Highway Services:WORKS FOR ROAD PURPOSES: (NOTICE FOR INFORMATION ONLY):EXCAVATE TO EXPOSE SERVICE CABLE FOR A DISCONNECTION TO A FEEDER PILLAR Working on behalf of TfL Street Management Page 3 of 18
4 Highway and StreetWorks Bulletin TfL - Highway Improvement Works VAUXHALL BRIDGE ROAD TACHBROOK TRANSPORT FOR LONDON F/P O/S PHILLIPPINE BANK f\w. 04/12/ :0 04/12/ :0 Connections Highway Services:WORKS FOR ROAD PURPOSES: (NOTICE FOR INFORMATION ONLY):EXCAVATE TO EXPOSE SERVICE CABLE FOR A DISCONNECTION TO A FEEDER PILLAR Working on behalf of TfL Street Management TRANSPORT FOR LONDON OS 50 22/10/ :0 24/12/ :0 Scaffold TM: f/w works 2m maintained for pedestrians, no impact on c/w working hours: h contact:daniel Wadley TRANSPORT FOR LONDON SB FW OS 278/279 26/10/ :0 27/10/ :0 CPP Maintenance: REPAIR- 2 LOOSE 600 SLABS & DAMAGED CONCRETE AROUND COVER PART F/W PART LANE TRANSPORT FOR LONDON SB FW OS /10/ :0 27/10/ :0 CPP Maintenance: REPAIR- CRACKED CONCRETE AROUND TRIPPLE COVERS PART F/W PART LANE 1 Page 4 of 18
5 Highway and StreetWorks Bulletin TfL - Highway Improvement Works VAUXHALL BRIDGE ROAD TACHBROOK TRANSPORT FOR LONDON SB FW OS /10/ :0 27/10/ :0 Maintenance: REPAIR- DAMAED CONCRETE AROUND COVER PART F/W PART LANE 1 VICTORIA STREET TRANSPORT FOR LONDON O/S Victoria Palace Theatre 02/07/ :0 02/07/ :0 Scaffold + Heras Fencing on footway. Minimum clearance required for pedestrians = 1.5m. VSU have scaffold to the right of the installation. No issues envisaged. Working hours hour contact James Friel S50/2014/26/1 TRANSPORT FOR LONDON Victoria Street j/w Buckingham Palace Road/Grosvenor Gardens 01/03/ :0 20/01/ :0 Install 355mm pe low pressure gas main on each road TRANSPORT FOR LONDON WB From Allington street to Buckingham Palace Road. South Footpath 16/01/ :0 07/04/ :0 Footway works 1.2 maintained for peds at all times Page 5 of 18
6 Highway and StreetWorks Bulletin TfL - Highway Improvement Works VICTORIA STREET TRANSPORT FOR LONDON WB From Allington street to Buckingham Palace Road. South Footpath 31/10/ :0 17/02/ :0 Kerb and footway works Fw TM Plus Width Restriction. Closing west bound southern bus lane, 3.25 Running Lane TRANSPORT FOR LONDON Westbound From Allington street to Buckingham Palace Road. South Footpath 24/02/ :0 27/02/ :0 Plane off, adjust levels of binder, adjust iron work, place surface course and line markings Road closure, bus stop suspension TRANSPORT FOR LONDON Westbound JW Buckingham Palace Road 17/02/ :0 20/02/ :0 Plane off, adjust levels of binder, adjust iron work, place surface course and line markings Road closure, bus stop suspension WILTON ROAD TRANSPORT FOR LONDON OS Parnell House 02/03/ :0 09/12/ :0 Scaffold + Hoarding TM: f/w works, no impact on c/w working hours: h contact: John Gribbin Page 6 of 18
7 Highway and StreetWorks Bulletin TfL - Transport Improvement Works BUCKINGHAM PALACE ROAD LONDON TRANSPORT O/S 172, 54 m south of Elizabeth Street 31/10/ :0 02/11/ :0 W.R.P. - To Upgrade the Shelter Foundation for and on behalf of Transport for London - Bus Shelter Number 0133/ UK Power on behalf of ESP Electricity VICTORIA STREET UKP3995/IDNO1 ESP Electricity Ltd Junction of Palace Street to junction of Buckingham Gate 17/10/ :0 08/11/ :0 Excavate approx. 135m of CW and 25m of FW for installation of HV cable ducting Page 7 of 18
8 Highway and StreetWorks Bulletin Utility Works BEESTON PLACE KN1W00PIMLICO33-RJ1 BT OUTSIDE AND OPPOSITE GORING HOTEL BEESTON PLACE 01/11/ :0 14/11/ :0 DSLAM STREET CABINET & POWER INSTALLATION. Excavate to lay BT ducts, Lay concrete plinth, Stand cab. Excavate to expose low voltage cable for Power Connection and lay duct. POWER engineer to carry out inspection prior to jointing. POWER jointing team to insert cable and execute jointing works. Reinstate, Check and clear site. BRESSENDEN PLACE CI/UKE966-PH2 Verizon Business Ltd Bressenden Place junc with Warwick Row (opposite Gate 3 Nova Victoria site) 05/11/ :0 06/11/ :0 Excavate and install approx 6m 1x110mm duct for new customer connection CI/UKE966 Verizon Business Ltd Bressenden Place opposite junction with Warwick Row (o/s Gate 3 Nova Victoria site) 29/10/ :0 30/10/ :0 Excavate and install approx 6m 1x110mm duct for new customer connection 16/10/037 Zayo Group UK Ltd (formerly OPPOSITE 30 05/11/ :0 05/11/ :0 INSTALLATION OF TELECOM CHAMBERS AND DUCTS IN C/WAY - colaborating AboveNet) with BLU3 Page 8 of 18
9 Highway and StreetWorks Bulletin Utility Works BRESSENDEN PLACE 16/10/035 Zayo Group UK Ltd (formerly outside number 30 29/10/ :0 29/10/ :0 instillation of telecom chambers and ducts in c/way - colaborating with BLU3 AboveNet) D073/WWDCF/Z012 Thames Water Utilities Ltd outside Pure Gym, Portland House 28/10/ :0 30/10/ :0 Working on behalf of Thames Water in the footway (within existing TWBN site) to carry out exporitory works only CATHERINE PLACE National Grid Gas Distribution ROAD CROSSING TO FEED NO 51 Limited CATHERINE PLACE 08/11/ :0 11/11/ :0 LAY NEW DOMESTIC SERVICE 7M FROM MAIN IN THE FARSIDE OF THE CARRIAGEWAY EBURY STREET National Grid Gas Distribution O/S 127 EBURY STREET 31/10/ :0 11/11/ :0 LAY NEW 63MM LP PE MAIN AND ABANDON THE EXISTING SUPPLY TO Limited ALLOWPROPERTYTO BE RE-DEVELOPED IMGD PETER GIANNINI. Page 9 of 18
10 Highway and StreetWorks Bulletin Utility Works EBURY STREET UK POWER NETWORKS EASTERN & LONDON o/s f\w. 26/10/ :0 02/11/ :0 Network Operations Maintenance:INSTALL / REPLACE LINK BOX: (APPROX DEPTH 450mm):Replacement of a very poor condition Linkbox. Part of HSE Initiative to replace all Identified High Risk Link Boxes. Until the excavation on the link box is complete we are not certain what obstacles we may find. If service cables are found that supply customers then we need to, as per regulatory requirements, give all customers 7 days notice that their electric supply will be interrupted. ECCLESTON PLACE UK POWER NETWORKS EASTERN o/s Chester House from 25. f\w. 31/10/ :0 03/11/ :0 Connections Projects:NEW INDIVIDUAL SUPPLY::2 x trial holes To show where & LONDON our existing infrastructure is, this will enable Grosvenor Estates to plan the location of the entry pipes ECCLESTON STREET KNIGHTSBRIDGE & BELGRAVIA WP BT OPP 21, ECCLESTON STREET 27/10/ :0 31/10/ :0 Replace 1 jointbox frame and cover(s) (915mm x 445mm) in Footway Thames Water Utilities Ltd OPP 2B 26/10/ :0 28/10/ :0 Valve Repair Bolts in Carriageway. Our intention is to complete thepermanent Reinstatement in the same phase Page 10 of 18
11 Highway and StreetWorks Bulletin Utility Works ECCLESTON STREET KNIGHTSBRIDGE & BELGRAVIA WP BT OPP 8, ECCLESTON STREET 27/10/ :0 31/10/ :0 Replace 1 jointbox frame and cover(s) (725mm x 225mm) in Footway WP BT OS 19A, ECCLESTON STREET 27/10/ :0 31/10/ :0 Replace 1 jointbox frame and cover(s) (915mm x 445mm) in Footway ELIZABETH STREET KNIGHTSBRIDGE & BELGRAVIA Thames Water Utilities Ltd j/o Elizabeth St. & Ebury St. S/O 139 EBURY STREET 07/11/ :0 09/11/ :0 Valve Exchange in Footway. Our intention is to complete the PermanentReinstatement in the same phase Page 11 of 18
12 Highway and StreetWorks Bulletin Utility Works GILLINGHAM STREET /SCLJND/DIS15415FB VIRGIN MEDIA J/O WITH GUILDHOUSE STREET 01/11/ :0 02/11/ :0 Core Sample- Carriageway PALACE STREET Thames Water Utilities Ltd 12 OPP 29/10/ :0 30/10/ :0 THIS PERMIT IS FOR THAMES WATER, WHICH WILL INVOLVE CARRYING OUT INTERIM TO PERMANENT REINSTATEMENT. WORKS TO TAKE PLACE ONLY IN THE CARRIAGEWAY. KN1W00PIMLICO42-RJ1 BT S/O NO. 33 wilfred street 01/11/ :0 14/11/ :0 DSLAM STREET CABINET & POWER INSTALLATION. Excavate to lay BT ducts, Lay concrete plinth, Stand cab. Excavate to expose low voltage cable for Power Connection and lay duct. POWER engineer to carry out inspection prior to jointing. POWER jointing team to insert cable and execute jointing works. Reinstate, Check and clear site. VAUXHALL BRIDGE ROAD TACHBROOK National Grid Gas Distribution 230 VAUXHALL BRIDGE ROAD, LONDON, Limited SW1V 1AU 07/11/ :0 15/11/ : CUSTOMER DRIVEN WORKS TO LAY 63mm SUPPLY TO PROPERTY TO FEED A16 POINT MANIFOLD, CONNECTION TO THE EXISTING MAIN IN CARRIAGEWAY Page 12 of 18
13 Highway and StreetWorks Bulletin Utility Works VAUXHALL BRIDGE ROAD TACHBROOK 16JHG1082 Vodafone O/S 50 SOUTH BOUND 05/11/ :0 06/11/ :0 REPAIR DEFECTIVE CHAMBER WP BT O/S CLOCK TOWER, VAUXHALL BRIDGE ROAD 23/10/ :0 27/10/ :0 Install 7m of 1 way poly duct in Footway WILFRED STREET KN1W0PIMLICO42-RJ02 BT F/O NO /11/ :0 14/11/ :0 DSLAM STREET CABINET & POWER INSTALLATION. Excavate to lay BT ducts, Lay concrete plinth, Stand cab. Excavate to expose low voltage cable for Power Connection and lay duct. POWER engineer to carry out inspection prior to jointing. POWER jointing team to insert cable and execute jointing works. Reinstate, Check and clear site WILTON ROAD Thames Water Utilities Ltd 5 29/10/ :0 30/10/ :0 Service Pipe Repair >33mm Cway in Carriageway. Our intention is tocomplete the Permanent Reinstatement in the same phase Page 13 of 18
14 Highway and StreetWorks Bulletin Utility Works WILTON ROAD National Grid Gas Distribution DIG IN NEARSIDE CARRIAGEWAY OUTSIDE Limited STOCKLEY HOUSE 07/11/ :0 11/11/ :0 DISCONNECT 1X 3" STEEL SERVICE 2M FROM MAIN IN CARRIAGEWAY WP BT O/S CLOCK TOWER, CROSS C/W TO NORTH S/O 2, WILTON ROAD 23/10/ :0 27/10/ :0 Install 12m of 1 way poly duct in Footway,Install 19m of 1 way poly duct in Carriageway WCC - Highway Improvement Works ARTILLERY ROW VINCENT SQUARE City of Westminster JW victoria street 14/11/ :0 17/12/ :0 Upgrading of existing pedestrian crossing at the junction including provision of diagonal 'Shibuya crossings'. Also carriageway resurfacing and anti skid surface treatments on the approaches to the junction on Artillery Row, Buckingham Gate & Victoria Street (westbound only). Page 14 of 18
15 Highway and StreetWorks Bulletin WCC - Highway Improvement Works BUCKINGHAM GATE City of Westminster JW victoria street 14/11/ :0 17/12/ :0 Upgrading of existing pedestrian crossing at the junction including provision of diagonal 'Shibuya crossings'. Also carriageway resurfacing and anti skid surface treatments on the approaches to the junction on Artillery Row, Buckingham Gate & Victoria Street (westbound only). BUCKINGHAM PALACE ROAD City of Westminster Between Victoria St Junction and Bressenden Place Junction 30/08/ :0 17/12/ :0 Major - Pavement reconstruction EBURY STREET City of Westminster Outside property number /10/ :0 27/10/ :0 Instllation of new bollard Page 15 of 18
16 Highway and StreetWorks Bulletin WCC - Highway Improvement Works ELIZABETH STREET KNIGHTSBRIDGE & BELGRAVIA CRANE OPERATIONS Elizabeth St (Victoria Coach Station) 04/11/ :0 05/11/ :0 LTS - Elizabeth St (Victoria Coach Station) /10/ backup 20-21/ /11/ ref 16/09535/HLCRN. ***Night works *** VICTORIA STREET City of Westminster Between outside number 10 and number 50 26/10/ :0 28/10/ :0 Carriageway resurfacing City of Westminster JW Artilary row and buckingham gate 14/11/ :0 17/12/ :0 Upgrading of existing pedestrian crossing at the junction including provision of diagonal 'Shibuya crossings'. Also carriageway resurfacing and anti skid surface treatments on the approaches to the junction on Artillery Row, Buckingham Gate & Victoria Street (westbound only) CRANE OPERATIONS Victoria St (105) 24/10/ :0 28/10/ :0 WGL Stoneclean Ltd - Victoria St (105) /10/ ref 16/11296/HLCRN Page 16 of 18
17 Highway and StreetWorks Bulletin WCC - Highway Improvement Works VICTORIA STREET City of Westminster Victoria St (between Artillery Row & Abbey Orchard St) 26/10/ :0 30/10/ :0 SCHEME: FMC - WSP - Victoria St (between Artillery Row & Abbey Orchard St) - 26th - 30th Oct 2016 (valid for 18 months) - ref 16/09506/HLTTO ROW City of Westminster Warwick Row (jnc Bressenden Pl) 22/07/ :0 21/01/ :0 CRANE: Metro Traffic Services Ltd - Warwick Row (jnc Bressenden Pl) - 21st July 2016 to 21st January ref 16/04256/HLTTOC CRANE OPERATIONS Warwick Row 30/10/ :0 30/10/ :0 NMT Crane Hire Ltd - Warwick Row - 30/10/ backup /11/ ref 16/10269/HLCRN CRANE OPERATIONS Warwick Row 13/11/ :0 13/11/ :0 NMT Crane Hire Ltd - Warwick Row - 30/10/ backup /11/ ref 16/10269/HLCRN Page 17 of 18
18 Highway and StreetWorks Bulletin WCC - Highway Improvement Works ROW CRANE OPERATIONS Warwick Row 20/11/ :0 20/11/ :0 NMT Crane Hire Ltd - Warwick Row - 30/10/ backup /11/ ref 16/10269/HLCRN CRANE OPERATIONS Warwick Row 27/11/ :0 27/11/ :0 NMT Crane Hire Ltd - Warwick Row - 30/10/ backup /11/ ref 16/10269/HLCRN City of Westminster Warwick Row - Whole length J/O Bressenden Place - Dead end J/O Palace Place 01/08/ :0 30/10/ :0 New footway construction WILTON ROAD City of Westminster Wilton Rd (between Gillingham St & Neathouse Pl) 07/11/ :0 11/11/ :0 Utility: Mervyn Lambert Plant - Wilton Rd (between Gillingham St & Neathouse Pl) - 07th - 11th Nov ref 16/08701/HLTTO Page 18 of 18
CAMBRIDGESHIRE ROAD WORKS & EVENTS INFORMATION: HUNTS
KEY: CAMBRIDGESHIRE STATION ABBOTS RIPTON CAMBRIDGESHIRE OLD NORTH ALCONBURY WESTON CAMBRIDGESHIRE STATION BLUNTISHAM TWO-WAY CAMBRIDGESHIRE STATION BLUNTISHAM BROMHOLME LANE BRAMPTON MULTI-WAY HUNTINGDON
More informationCAMBRIDGESHIRE ROAD WORKS & EVENTS INFORMATION: SOUTH CAMBS
KEY: Organisation/Contractor Road Locality Traffic UK POWER NETWORKS EASTERN& LONDON HIGH STREET BABRAHAM TWO-WAY CAMBRIDGESHIRE SHEPRETH ROAD BARRINGTON TWO-WAY CAMBRIDGESHIRE HALL CLOSE BOURN SOME C/W
More informationCAMBRIDGESHIRE ROAD WORKS & EVENTS INFORMATION: SOUTH CAMBS
KEY: Organisation/Contractor Road Locality Traffic LITLINGTON ROAD ABINGTON PIGOTTS ROAD CLOSURE 07-Aug-2017 28-Aug-2017 Connections Projects:NEW INDIVIDUAL SUPPLY::350m of road& verge to install new low
More informationProposed End Date. Proposed Start Date. 18-Oct Oct-2016 Skip. 19-Oct Nov-2016 SKIP
KEY: Organisation/Contractor Road Locality Traffic POTTON ROAD ABBOTSLEY FIELD CLOSE ALCONBURY PRIORITY HIGH STREET ALCONBURY WESTON COLNE ROAD BLUNTISHAM COLNE ROAD BLUNTISHAM WOOD END BLUNTISHAM BT THRAPSTON
More informationHertfordshire Highways WATFORD - Active Works Bulletin - July 2011
Part 1 on site or due to start within the next 6 weeks Hertfordshire Highways WATFORD - Active Bulletin - July 2011 on site or due to start on site within the next 6 weeks Hertfordshire Highways - Scheme
More informationOhio Department of Transportation Construction Update
Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District
More informationD L R C C T R A F F I C N E W S
D L R C C T R A F F I C N E W S Saturday, 4 th February 2017 to Friday, 10 th February 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed below
More informationMEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM
MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham
More informationD L R C C T R A F F I C N E W S
D L R C C T R A F F I C N E W S Saturday, 24 th March 2018 to Friday, 30 th March 2018 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed below
More informationTown Centre Improvements Plan
Phase 1 Experience Barnsley External Works Phase 1 Town Hall Open Space Lancaster Gate side of Town Hall Shambles Street Footway and Kerbing North Side (St Mary s Place to Church street) St Mary s Place
More informationJOINT TRANSPORTATION BOARD. 10 June Non-key. That subject to the views of the Board,
JOINT TRANSPORTATION BOARD 10 June 2008 Subject: Director/Head of Service: Decision Issues: Decision: CCC Ward/KCC Division: Summary: To Resolve: Southern Gas Networks Gas Main Replacement Scheme - Broad
More informationA63 Castle Street, Hull HullBID Network Lunch 24 August 2017
A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme
More informationSky Temporary Car Park Transport Statement
001 Issue 26 August 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility
More informationD L R C C T R A F F I C N E W S
D L R C C T R A F F I C N E W S Saturday, 23 rd September 2017 to Friday, 29 th September 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed
More informationPrince Albert Road Towpath Ramp, Camden Feasibility Report
Prince Albert Road Towpath Ramp, Camden Feasibility Report Function Location: RE-004 Date: 25 October 2012 Report No: 5016-UA003174-UT31R-03 Prince Albert Road Towpath Ramp, Camden Feasibility Report
More informationSouth Westminster Traffic Management Study Stakeholder Group
South Westminster Traffic Management Study Stakeholder Group Minutes of the second meeting March 19 th 2012, Land Securities offices Present Paul Bak, Qatari Diar Terence Bendixson, Chelsea Alan Cook,
More informationRoad Closures for w/c 13 th February 2016
Road Closures for w/c 13 th February In the attachment Diversion Route Maps (for this week) please scroll to the appropriate Log No. to view the actual diversion route plan Log No. Type (i.e. f/w or road
More informationCrenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018
Crenshaw/LAX Transit Project Construction Update Community Meeting November 15, 2018 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH)
More informationHENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September Chock Lane Traffic Calming scheme Monitoring Report
HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September 2015 Title: Officer: Chock Lane Traffic Calming scheme Monitoring Report Rob Grieve, Principal Officer, Highways and Traffic,
More informationErmine Street Environmental Enhancements
Ermine Street Environmental Enhancements As part of Urban&Civic s commitment to minimise the impacts and maximise the benefits of the Alconbury Weald development, the design team have worked up a scheme
More information5.7 Local road upgrades
5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and
More informationPART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT
PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT NOVEMBER 2012 1.0 INTRODUCTION This report has been prepared in support
More informationChapter 2 Route window W25 Maidenhead station. Transport for London
Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,
More informationBusiness Forum. 16 March 2016
Business Forum 16 March 2 Rebuilding London Bridge: An update Mary Jordan Business Change Manager, Network Rail London Bridge station update 2015 Platforms 4 to 9 are currently closed for redevelopment,
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationADDENDUM 2 APPENDIX D STANDARD DRAWINGS
ADDENDUM 2 APPENDIX D STANDARD DRAWINGS Overview This Addendum to Appendix D Standard Drawings replaces Standard Drawing Figures 001 to 020 with new Standard Drawings EDCM 301 to EDCM 704 - as listed below.
More informationN11 Arklow / Rathnew & N7 Newlands Cross PPP Contract. Kieran Kelly
N11 Arklow / Rathnew & N7 Newlands Cross PPP Contract Kieran Kelly N7/N11 PPP CONTRACT - OVERVIEW Section A N11 Arklow/Rathnew Scheme Section B Upgrade Works on Existing M11 (Arklow Bypass & Arklow to
More informationAYRSHIRE ROADS AUTHORITIES AND UTILITIES COMMITTEE
Present: David Shaw (DS) Ayrshire Roads Alliance (Chair) Lynne Lyle (LL) Ayrshire Roads Alliance John Stewart (JS) - Ayrshire Roads Alliance Hugh Raeside (HR) Ayrshire Roads Alliance Tommy Thorburn (TT)
More informationChapter 8 Route Window NE7 Chadwell Heath station. Transport for London
Chapter 8 Route Window NE7 Chadwell Heath station Transport CHADWELL HEATH STATION 8 Route Window NE7 Chadwell Heath station Baseline conditions 8.6 This route window lies within the London Boroughs of
More informationCONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018
FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures
More informationConstruction Open Evening
Construction Open Evening 16 February 2017 www.gov.uk/hs2 Forward Look www.gov.uk/hs2 Euston Station and Approach four week look ahead Week 1 Commencing 13 February 42 Water Main trial trenches Albany
More informationVictoria Station Upgrade
Kings College Construction Law Association 20 th May 2008 Peter Lynch Project Director Deryck Povey Design Manager & Assurance Manager Key drivers for change Heavy congestion and station closures currently
More informationATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation. December 28, Prepared by.
ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation December 28, 2011 Prepared by Peter Bush Background This report documents the results and recommendations of an all-terrain
More informationPort of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management
Port of Long Beach 2012 Capital Program Update G.J. Cardamone, PE, FCMAA Director of Construction Management Who We Are 3,500 acres of land 4,600 acres of water 6 container terminals 66 Ship-to-Shore cranes
More informationD L R C C T R A F F I C N E W S
D L R C C T R A F F I C N E W S Saturday, 24 th June 2017 to Friday, 30 th June 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed below are
More informationEPPING FOREST DISTRICT COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIGHWAY PANEL 2 nd JULY 2018 REPORT 1 APPROVED SCHEMES UPDATE
EPPING FOREST DISTRICT COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIGHWAY PANEL 2 nd JULY 2018 REPORT 1 APPROVED SCHEMES UPDATE The following report provides an update on the current position of all of the
More informationHospital Link Project Project Update Winter 2018
Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open
More informationLESLIE BARNS & CONNECTION TRACK. Leslieville BIA Meeting May 2, 2014
LESLIE BARNS & CONNECTION TRACK Leslieville BIA Meeting May 2, 2014 1 OVERVIEW Communications Queen/Leslie Intersection Closure Overview Next Steps - Coordination of TTC Track Upgrades (Queen streetcar
More informationTHE ENTIRE GRADE A SIXTH FLOOR AVAILABLE NOW
THE ENTIRE GRADE A SIXTH FLOOR AVAILABLE NOW THREE FURTHER FLOORS AVAILABLE Q1 2017 5,400 SQ FT (502 SQ M) 39,530 SQ FT (3,672 SQ M) WESTMINSTER CATHEDRAL ZIG ZAG BUILDING NEW SCOTLAND YARD 55 VICTORIA
More information2.0 POLICY AND DEVELOPMENT FRAMEWORK. Introduction. Transport21. Celbridge Development Plan 2002
2.0 POLICY AND DEVELOPMENT FRAMEWORK Introduction 2.1 This section of the report highlights the key elements of both Transport21, and the Celbridge Development Plan 2002, both of which include a number
More informationA350 and C13 route management scheme
A350 and C13 route management scheme Dorset County Council is working with town and parish councils to agree a medium-term solution for the A350 and C13. Dorset County Council has received 2,492,000 from
More informationPennDOT Interstate Work next week March 30-April 3:
PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)
More informationMALDON DISTRICT LOCAL HIGHWAY PANEL Approved Works Programme September 2018 Update
MALDON DISTRICT LOCAL HIGHWAY PANEL Approved Works September 2018 Update The following report provides an update on the current position of all of the schemes which the District Local Highway Panel (LHP)
More informationLondon Borough of Barnet Traffic & Development Design Team
London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair
More informationQueen s Circus Roundabout
Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member
More informationWhittier Bridge Project
Amesbury / Newburyport / Salisbury Whittier Bridge / I-95 Improvement Project Original Whittier Bridge Proposed Whittier Bridges 10/21/2016 Whittier Bridge Project 1 Project Description The project limits
More informationAll reports. 1. Governance Service receive draft report Name of GSO DPR
DELEGATED POWERS REPORT NO. SUBJECT: Redevelopment at Grahame Park Estate, NW9, Phase 1B Sub-phase 1 Highways Agreement under Sections 38 and 278 of the Highways Act 1980. Control sheet All of the following
More informationIsleworth & Brentford Area Forum Action Plan
Isleworth & Brentford Area Forum Action Plan 2015-2018 SUMMARY This document sets out the priorities of the Isleworth & Brentford Area Forum until May 2018. It will be held as a standing item on the agenda
More informationConstruction Staging Adelaide Street West
REPORT FOR ACTION Construction Staging Adelaide Street West Date: October 6, 2016 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More informationCHELMSFORD CITY LOCAL HIGHWAYS PANEL MINUTES 21 JUNE 2017 at 13:00 at the Civic Centre, Chelmsford
CHLP1 CHELMSFORD CITY LOCAL HIGHWAYS PANEL MINUTES 21 JUNE 2017 at 13:00 at the Civic Centre, Chelmsford Chairman: Panel Members: County Councillor Dick Madden Chelmsford City Council Councillors Michael
More informationPRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction
PRESENTED TO Town of Middlebury, VT PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction Meeting with you today Brian Carpenter, Middlebury Selectboard Chair Jim Gish, Middlebury
More informationChapter 7 Route Window C6 Farringdon station. Transport for London
Chapter 7 Route Window C6 Farringdon station FARRINGDON STATION 7 Route Window C6 Farringdon station Fox and Knot Street Worksite Farringdon Crossover Worksite This worksite will be situated on the triangular
More informationCAPITA SYMONDS PHASE 2 KESWICK TOWN CENTRE ENVIRONMENTAL IMPROVEMENTS STAGE 3 ROAD SAFETY AUDIT. Work Order: 31986
0 KESWICK TOWN CENTRE ENVIRONMENTAL IMPROVEMENTS PHASE 2 STAGE 3 ROAD SAFETY AUDIT Work Order: 31986 Project Client: Cumbria County Council COUNTY COUNCIL Ju/y2004 IQUALlTY SYSTEM MANUAL I REPORT COVER
More informationYour Travelcard only needs to be valid for Zone One. Nearest tube stations. Circle Line (yellow line) Victoria Line (blue line)
Local information for Johnson House Johnson House You are situated in Belgravia, which is in Zone 1 of Central London. Located to the northwest is Hyde Park, which offers various sports and leisure opportunities.
More informationAPP/P3.1/ENG. Engineering Main Proof of Evidence Jeremy Gardner
Engineering Main Proof of Evidence Jeremy Gardner 1 Introduction Qualifications and Experience 1.1 My name is Jeremy Donald Gardner. I am a Director with AECOM, a consultancy firm specialising in architecture,
More informationChapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London
Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts MILE END PARK AND ELEANOR STREET SHAFTS 14 Route Window C12 Mile End Park and Eleanor Street shafts Introduction 14.1 Crossrail s twin
More informationChapter 25 Route Window SE6 Plumstead portal. Transport for London
Chapter 25 Route Window SE6 Plumstead portal PLUMSTEAD PORTAL 25 Route Window SE6 Plumstead portal Introduction 25.1 The Crossrail route will follow the present alignment of the North Kent Line from a
More informationHILGAY PARISH COUNCIL
HILGAY PARISH COUNCIL Draft minutes of the Parish Council meeting held on Thursday 9 th January 2014 7.00pm in Hilgay village hall. Present: Chairman Cllr G Carter, vice chair Cllr R Houghton, Cllr C Wills,
More informationBusiness Case Approved. Under Construction. Business Case Approved. Under Construction
Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations
More informationChapter 4 Route Window NE3 Manor Park station. Transport for London
Chapter 4 Route Window NE3 Manor Park station MANOR PARK STATION 4 Route Window NE3 Manor Park station 4.7 Highway access to Manor Park station is very good. A117 Station Road connects with A116 to the
More informationACORNS PROJECTS LIMITED
ACORNS PROJECTS LIMITED A4 London Road, M4 J5 to Sutton Lane, Slough, Berkshire Combined Stage 1 and 2 Road Safety Audit For Slough Borough Council Prepared by Acorns Projects Limited Safety Traffic Project
More informationD L R C C T R A F F I C N E W S
D L R C C T R A F F I C N E W S Saturday, 25 th February 2017 to Friday, 3 rd March 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed below
More informationTransport Assessment Appendix M: Avonmouth Impacts
Portishead Branch Line (MetroWest Phase 1) Environmental Impact Assessment Transport Assessment Appendix M: Avonmouth Impacts Prepared for West of England Councils December 2016 1 The Square Temple Quay
More informationDay and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 2 July 2018 Ref: N0202 Day and night work: Hills M2 Motorway tunnel portals and Coral Tree
More information170 apartments of the highest specification, on the doorstep of Buckingham Palace, and at the centre of one of London s most prestigious
Core A, B, C + D 170 apartments of the highest specification, on the doorstep of Buckingham Palace, and at the centre of one of London s most prestigious neighbourhoods. Side elevation: West view Not to
More informationThe Traffic Management Act (TMA) 2004 and roadworks; and lane rental under the New Roads and Streetworks Act (1991) in England
The Traffic Management Act (TMA) 2004 and roadworks; and lane rental under the New Roads and Streetworks Act (1991) in England Introduction and purpose of note In view of the review of SRWC functions,
More informationHigh Lane Residents Association
High Lane Residents Association Meeting Notes & Updates Meeting 7 th December 2017 High Lane Library Actions and Updates since Last Meeting 1.1 Withdrawal of 303 Local Shopper Bus Service: we have had
More information4 Storage cupboards SCALA
Our SCALA laboratory furniture system provides a vast selection of storage variants for fast access and safe storage. All storage cupboards can be variably equipped and provide optimum space utilisation
More informationPORTABLE LIGHT SIGNALS
ROADS AUTHORITIES & UTILITIES COMMITTEE (SCOTLAND) ADVICE NOTE 8 PORTABLE LIGHT SIGNALS Version 1.20 December 2006 VERSION HISTORY Version Date Notes PORTABLE LIGHT SIGNALS 1.00 Mar 05 Approved by RAUC(S)
More informationU.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County
U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE
More informationCabinet Member Report
Cabinet Member Report Decision Maker: Cabinet Member for City Highways Date: 23 August 2017 Cabinet Member for Planning and Public Realm Classification: Title: Wards Affected: City for All Summary: Key
More informationAppendix - Storm Eva. 26/27 December 2015
Appendix - Storm Eva 26/27 December 2015 1 Storm Eva Rainfall 48hr UK RAINFALL TOTALS 9am 25 DEC 9am 27 DEC 2015 SITE AREA STONYHURST LANCASHIRE 100 SHAP CUMBRIA 86.4 SPADEADAM CUMBRIA 79.4 PRESTON, MOOR
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More informationCertainTeed. Access Covers and Gratings. REXUS Manhole Covers
CertainTeed Access Covers and Gratings REXUS Manhole Covers Advanced Ergonomics REXUS enables utility personnel to undertake visual inspections and routine maintenance of underground networks with the
More informationWoodford Community Council
Woodford Community Council MINUTES OF THE ANNUAL GENERAL MEETING HELD ON THURSDAY, 26 NOVEMBER 2015 WCC members present: Paul Rodman Chairman Helen Buszard Secretary David Buszard, Ken Coxey, Bryan Leck,
More informationMaidenhead Bridge. Proposed Work
W1.1 Maidenhead Bridge Proposed Work The Maidenhead Bridge over the River Thames at Maidenhead is a Grade II* listed structure. Installation of overhead electrification on top of the structure would be
More informationD L R C C T R A F F I C N E W S
D L R C C T R A F F I C N E W S Saturday, 9 th September 2017 to Friday, 15 th September 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed
More informationMovement Strategy. November On behalf of Barton Oxford LLP
Movement Strategy November 2014 On behalf of Barton Oxford LLP BARTON PARK, OXFORD. Movement Strategy 17/11/2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Date
More informationShallow IC of 5
Shallow IC 250 1 of 5 Description 250mm diameter polypropylene inspection chamber for adoptable and non-adoptable applications. Compliant with Sewers for Adoption 7th edition [SfA7]. Single unit with integral
More information- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule
Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and
More informationEnergy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B
Energy from Waste and Recycling Facility Trident Park, Cardiff Planning History January 2010 Ref: 402-0036-0306B Viridor Ltd. i 402/0036/00306B CONTENTS 1.0 INTRODUCTION... 1 2.0 GENERAL HISTORY... 3
More informationNight work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex
More informationTHE ENTIRE GRADE A SIXTH FLOOR NOW AVAILABLE SIXTH FLOOR 21,845 SQ FT (2,030 SQ M)
THE ENTIRE GRADE A SIXTH FLOOR NOW AVAILABLE SIXTH FLOOR 21,845 SQ FT (2,030 SQ M) WESTMINSTER CATHEDRAL ZIG ZAG BUILDING NEW SCOTLAND YARD 55 VICTORIA STREET LONDON EYE HOUSES OF PARLIAMENT THE HOME OFFICE
More informationSoutham Town Centre Community Highway Improvement Project HAVE YOUR SAY
Town Centre Community Highway Improvement Project HAVE YOUR SAY Consultation Period th November - th December 0 Town Centre Highway Improvement Project When a major development is implemented, it is usually
More informationTexas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge
Texas Department of Transportation Corpus Christi District Corpus Christi Harbor Bridge Presented by Russel W. Lenz, P.E. Corpus Christi District Engineer For 2009 Texas Ports and Waterways Conference
More informationPalm Beach County Traffic Report August 24 through August 31, 2012
For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will
More information14' x 32' x 12' Round Top Round Style Shelter Assembly Instructions
14' x 32' x 12' Round Top Round Style Shelter Assembly Instructions Description Model # 14' x 32' x 12' RoundTop Garage - Gray 62669 Recommended Tools Please read instructions COMPLETELY before assembly.
More informationAYRSHIRE ROADS AUTHORITIES AND UTILITIES COMMITTEE
Present: David Shaw (DS) Ayrshire Roads Alliance (Chair) Lynne Lyle (LL) Ayrshire Roads Alliance John Stewart (JS) - Ayrshire Roads Alliance Hugh Raeside (HR) Ayrshire Roads Alliance Craig McDonald (CMcD)
More informationRegular Inspections/Contract - Yes Yes Yes Yes Yes Trees/Hedges/Grass Cutting. Risk Assessment Yes Yes Yes Yes Yes
ENVIRONMENTAL MANAGEMENT FIVE YEAR PLAN RECREATION GROUNDS BALL FIELD, CRANBROOK - T.M.P.F.T. YEAR 1-2018/2019 YEAR 2-2019/2020 YEAR 3-2020/2021 YEAR 4-2021/2022 YEAR 5-2022/2023 Regular Inspections/Contract
More informationChapter 6 Route Window NE5 Seven Kings station. Transport for London
Chapter 6 Route Window NE5 Seven Kings station Transport SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated
More informationSUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY. September 25, 2018
SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY September 25, 2018 The members of the Woods Hole, Martha s Vineyard and Nantucket Steamship Authority ( SSA
More informationSOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016
SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016 Go Ultra Low City Bid Success Announced on Monday 25 January, the Department for Transport (DfT) allocated 7M to the four West of England authorities
More informationWELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE
PROJECT EVERGREEN 3 WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE Chiltern Railways is proposing a railway improvement scheme between Oxford and Bicester (the Evergreen
More informationLYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS
APPENDIX 15.1-3 LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN Purpose of the Structure Plan Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS LSP-P1 The District
More informationTRAFFIC MANAGEMENT. Planned Works and Night Closures Review EAST MIDLANDS GATEWAY RAIL FREIGHT INTERCHANGE
EAST MIDLANDS GATEWAY RAIL FREIGHT INTERCHANGE TRAFFIC MANAGEMENT Planned Works and Night Closures Review W/C Mon 20 th Nov 17 W/C Mon 27 th Nov 17 W/C Mon 4 th Dec 17 Updated Tuesday 15 th Nov 17 EAST
More informationProjected Advertisement Date
2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over
More informationSecond Street Improvements Project Project Update Archive
Second Street Improvements Project Project Update Archive 12/03/18: In observance of the Holiday Moratorium, crews have paused a majority of construction activity on 2nd Street until January 2, 2019. A
More informationNeighbourhood Governance Note of Dormers Wells Ward Forum Meeting
Neighbourhood Governance Note of Dormers Wells Ward Forum Meeting Thursday, 29 October 2009, 7pm at Greenford Park Residents' Hall, 18 Queens Avenue, Greenford UB6 9BX Present: Councillors Dheer (Chairman),
More informationMALDON DISTRICT LOCAL HIGHWAY PANEL Approved Works Programme June 2018 Update
MALDON DISTRICT LOCAL HIGHWAY PANEL Approved Works June 2018 Update The following report provides an update on the current position of all of the schemes which the Maldon District Local Highway Panel (LHP)
More informationTherme storage water heater. Table of contents. Symbols used. Symbols used Symbol indicates a possible hazard. Installation instructions
Therme storage water heater Table of contents Symbols used... 8 Installation instructions Water supply... 9 Choice of location... 9 Installation of the Therme... 9 Fitting the draining and venting valve...
More information