1 The Traffic Management Act (TMA) 2004 and roadworks; and lane rental under the New Roads and Streetworks Act (1991) in England Introduction and purpose of note In view of the review of SRWC functions, this briefing note has been prepared to explain the powers available to and responsibilities placed on English and Welsh local authorities related to roadworks by both roads (highway) authorities and statutory undertakers (called in this note utilities ) that were brought into being by the TMA (2004), which does not apply in Scotland. One of the aims of the TMA was to reduce congestion and traffic delays due to roadworks by utilities and roads authorities. The Act amends the powers in the NRSWA Provisions particularly relevant to roadworks by roads authorities and utilities and their contractors are: Part 3 Made provision for street authorities to implement chargeable permit schemes. Part 4 Changed requirements on utilities to give notice of works in the road, increased fine levels for non-compliance and introduced fixed penalty notices (FPN) for a wider range of offences. The note goes on to review some evidence of the use of these powers in England. It also reports briefly on two of the trials of lane rental under English regulations made under the New Roads and Streetworks Act (NRSWA) It is based on local authority committee reports, reports produced Transport for London, and reports by utilities themselves, as listed in the bibliography. A good summary of the English legislative situation is provided in House of Commons Library briefing note SN739 (2014). Permit schemes Roads authorities in England may make a permit scheme, so not all have one, but their use has been increasing particularly since the need to obtain Secretary of State approval was removed in A permit scheme fundamentally changes the nature of the utility/roads authority relationship. Under the NRSWA in Scotland utilities notify the roads authority and Roadworks Commissioner of where and when they will occupy the road. Under the TMA, for those LAs that have adopted permit schemes, utilities and the roads authority itself must secure permission from the roads authority before going into the road (for emergency openings, they must apply for a permit within 2 hours of the work starting); and roads authorities can refuse, or put conditions on permissions, including those for emergency works. It is also possible to give offer reduced charges for permits for utility companies that meet certain KPIs and improve their performance year on year. It appears from the regulations that permit schemes must be cost-neutral. They also apply to the roads authority s own roadworks. Norfolk County Council adopted its permit scheme in April First year results are: Utilities requested permits, of which were granted (85%). Almost all were subject to conditions. The most common conditions were related to date/time of the works and to working out of hours; to space for traffic; and to traffic control. The proportion of reinstatements that are permanent increased. Total days of occupation of streets by utilities declined from in 2013/14 to in 2014/15. TRI Edinburgh Napier University March tri@napier.ac.uk

2 The 10 Greater Manchester authorities scheme came into force on 29 th April The first year results were (quoted from the first year monitoring report): Over 138,900 permit applications and variations were made, with 84% being granted and 10% refused. Average number of days of occupation of works reduced from 4.63 days to 3.81 days. Accuracy of information supplied by works promoters improved. The Yorkshire common permit scheme came into force in 6 authorities in June 2012 (a further three joined in 2015). It shows results similar to those in Manchester: Over 54,000 permit applications and variations were checked and coordinated in evaluation period, with approximately 70% being granted and 30% being refused. Permit conditions are applied whether or not the applicant is a utility or the roads authority itself. The proportion of works that started as planned and permitted without cancellation increased. In comparison with the pre-permit baseline data the average duration of works fell from 6.10 days to 4.60 days, with 77,188 fewer days of highway occupation. The London scheme started 11 th January 2010 in 16 of 33 boroughs and on the TfL network. First year results are as follows: Permits cost between 30 and 240 depending on the location and type of works permits were granted, refused (12% of applications). Days of disruption saved through joint working increased from 726 in 2009 to 1793 in 2010: 2.7 million in congestion was therefore saved in 2010 compared to the previous year. 237% increase in the proportion of their own works that are formally recorded by roads authorities. Works by utilities reduced 17% within permitting authorities but only 7% in non-permitting authorities, saving approximately 149,136 days of streetworks in the former. Congestion and unreliability (measured using TfL s standard methodology) worsened less in permitting than non-permitting authorities. Charges, fines and fixed penalty notices The TMA added to the range of offences subject to Fixed Penalty Notice (FPN) in relation to utilities work in the road. These offences relate as in Scotland to notification of works in the road, or failure to do so. However, where an authority has a permit scheme, it can issue FPNs to utilities that work without a permit; or those that work in breach of a permit condition. The TMA amended the NRSWA to allow new regulations in relation to existing charges for over-running agreed work periods for road works. These allowed the charges to vary from 250 per day to 10,000 per day depending on the type of street. Where an authority has a permit scheme, the agreed work period is that set out in the permit, making it easier to monitor than in the former NRSWA notification regime. Charges for over-running are not levied in the existing NRSWA regime in Scotland. TRI Edinburgh Napier University March tri@napier.ac.uk

3 The author of this briefing note has been unable to find any separate evaluation of the impact of the new charging and FPN regime. However, the impacts of the permit schemes described above are likely to have been influenced by the linked charging and FPN regime. Lane rental Lane rental is a charge for occupation of the street by roads authorities and utilities, but only on the most traffic-sensitive streets at the busiest times. It is permitted under regulations to the NRSWA that have not been enacted in Scotland, but so far has only been trialled in three areas in England. The results of the Transport for London and Kent schemes are summarised here. The London scheme started in June 2012 and applies to 56% of the TfL strategic road network (325 km). Rental charges of 800 to 2,500 per day apply only at certain times of day; the more sensitive the location, the longer the period that charges apply (at most, Monday to Friday 06:30-22:00 Saturdays and Sundays 12:00-18:00) and the higher the charge. In the second 9 months of operation the following results were found compared to the first 9 months (these bullet points are taken from the scheme monitoring report (see bibliography): 1% of TfL works and 13% of utilities works paid a charge work was done at other times. There was a 2 per cent increase in the monthly average of disruption days saved. The total number of days subject to lane rental decreased. More planned utility works took place overnight without an increase in noise complaints. The increase in severe disruption was smaller in the lane rental parts of the network than those without lane rental. There was a 15 per cent reduction in user frustration from major delays to a journey by bus, cycle, driving and walking as a result of roadworks and unreliable journeys in regular market research, compared to 2011, before the scheme was introduced. Analysis of two sets of roadworks on the Hammersmith Flyover and Marylebone Road showed that the TLRS prevented over 8 million worth of delay at these two locations. The Kent scheme came into force in May 2013 and covers 5% of the county s total road network, but 40% of the traffic sensitive roads. It has a wider range of charges than in London, from 300 to 2000 a day depending on the type of road and on whether just a lane or the whole road is closed. Charges are due between 0700 and 1900 on some roads, but on others with less traffic, only peak hour occupation is chargeable. The first annual report presents a number of case studies of specific schemes as well as data summarizing all road occupations in the 12 month periods prior to and after May The conclusions are: Duration of all works fell (except minor works carried out, out of scheme hours). There was a shift to carrying out work outside congested times. Emergency occupations at charge times are completed 25% more quickly with lane rental in place compared to previously. When lane rental charges were due, work was carried out for a longer period of the day, not just ; and at weekends. TRI Edinburgh Napier University March tri@napier.ac.uk

4 The scheme acted as an incentive to utilities to plan traffic management in a way that would minimise disruption. For example, on one road, instead of installing temporary lights, parking bays were closed to permit continued two way running (and no lane rental fee was charged). The total days of occupation of the road by utilities on the part of the network covered by the scheme fell by 3,000 in that one year period. It is estimated that this equates to a travel time saving of 4.6 million at standard WebTAG values. Utilities were unspecific about the impact of the scheme on their overall costs but mentioned a figure of around a 60% increase in labour costs. However, against this needs to be set the reduced days of working in the carriageway. Utilities own experience with the TMA and lane rental It appears that utilities in negotiation with Ofgem may claim an allowance in costs and revenue for the additional costs that the TMA imposes upon them. This may affect the prices that Ofgem permit certain utilities to charge to their customers. In London, National Grid calculated the costs of the London Permit scheme and Lane Rental scheme to them, in terms of fees and FPNs paid, as well as productivity impacts, to be 8.83 million for the financial years 2011 to 2013, at 2011 prices. Enzen, a management consultancy, cite the experience of one of their clients, a utility company, in implementing new processes to deal with the requirements of Section 4 of the TMA. They note that the TMA required the utility to change its processes in Work Management, Scheduling, Mobile Work Force, GIS, Noticing Systems and integration between all these systems. The utility in question achieved compliance and did so without an increase in its workforce on street. Other utilities have noted a need to increase their workforce on street to deal with the requirements of the TMA. Conclusion The experience of permit schemes and lane rental in England is recent and so results from the initial evaluation results must be treated with caution. Nonetheless, this evidence does appear to indicate that permit schemes have led to a reduction in the number of days in which utility companies work on the affected roads and they have also improved roads authorities own behaviour in relation to managing their own roadworks. Lane rental schemes have had a similar effect. This has led to a reduction in congestion and to days affected by congestion caused by roadworks. This has been at a cost to some utilities, a cost which they are permitted by Ofgem to partially pass on through changes in regulated prices, but the limited data available indicate that the financial cost to utilities is lower than the saving in monetized travel time to the travelling public. Bibliography Enzen Ltd (2014) Traffic Management Act (TMA) Transformation UK Gas Distribution Utility TRI Edinburgh Napier University March tri@napier.ac.uk

5 House of Commons Library briefing note SN739 (2014) Roads: maintenance, repairs and street works London Councils (2011) London Permit Scheme for Road Works and Street Works First Year Evaluation Report National Grid (2013) Traffic Management Act Income Adjusting Event (IAE re-opener) Notification by National Grid Gas Plc to Ofgem in respect of North London Network Norfolk County Council (2015) Norfolk Permit Scheme Annual Report 2014/15 TfGM (2014) Greater Manchester Road Activities Permit Scheme Annual Report 2013/14 TfL (2015) Transport for London Lane Rental Scheme Monitoring Report July 2014 to March 2015 Yorkshire Authorities (2015) Yorkshire Common Permit Scheme Annual Report Year 3 ( ) TRI Edinburgh Napier University March tri@napier.ac.uk

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017

BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017 Agenda item 6 BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017 REPORT OF HEAD OF GROWTH AND INFRASTRUCTURE SAFEZONE AVERAGE SPEED CAMERA SITE ON SPRINGDALE ROAD, IN BROADSTONE, POOLE AND CORFE

More information

MISUSE OF SLOTS ENFORCEMENT CODE ANNUAL REPORT 2014/15

MISUSE OF SLOTS ENFORCEMENT CODE ANNUAL REPORT 2014/15 MISUSE OF SLOTS ENFORCEMENT CODE ANNUAL REPORT 214/15 1. Introduction The EU Slot Regulations 24 (1) (Article 14.5) requires Member States to ensure that effective, proportionate and dissuasive sanctions

More information

The Airport Charges Regulations 2011

The Airport Charges Regulations 2011 The Airport Charges Regulations 2011 CAA Annual Report 2013 14 CAP 1210 The Airport Charges Regulations 2011 CAA Annual Report 2013 14 Civil Aviation Authority 2014 All rights reserved. Copies of this

More information

Produced by: Destination Research Sergi Jarques, Director

Produced by: Destination Research Sergi Jarques, Director Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism North Norfolk District - 2016 Contents Page Summary Results 2 Contextual analysis 4 Volume of Tourism 7 Staying Visitors

More information

Produced by: Destination Research Sergi Jarques, Director

Produced by: Destination Research Sergi Jarques, Director Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism Norfolk - 2016 Contents Page Summary Results 2 Contextual analysis 4 Volume of Tourism 7 Staying Visitors - Accommodation

More information

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION DATE: 11 November 2011 SUBJECT: REPORT OF: Proposed making of a Quality Partnership Scheme for the A6 corridor between Manchester and Hazel

More information

Cuadrilla Elswick Ltd

Cuadrilla Elswick Ltd Cuadrilla Elswick Ltd Tewmporary Shale Gas Exploration Description Roseacre Wood, Lancashire Planning Inspectorate Reference APP/Q2371/W/15/3134385 Local Authority Reference: LCC/2014/0101 CE 1/3 Summary

More information

Rail Update Station Usage Statistics and Network Rail Performance

Rail Update Station Usage Statistics and Network Rail Performance Rail Update Station Usage Statistics and Network Rail Performance Committee Operations Date of meeting 26 January 2018 Date of report 21 December 2017 Report by Senior Director 1. Object of report To update

More information

Produced by: Destination Research Sergi Jarques, Director

Produced by: Destination Research Sergi Jarques, Director Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism Norfolk - 2017 Contents Page Summary Results 2 Contextual analysis 4 Volume of Tourism 7 Staying Visitors - Accommodation

More information

LINCOLNSHIRE PARKING POLICY DRAFT

LINCOLNSHIRE PARKING POLICY DRAFT LINCOLNSHIRE PARKING POLICY DRAFT Draft 23/05/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take

More information

Written evidence submitted by National Express West Midlands (BSB 15)

Written evidence submitted by National Express West Midlands (BSB 15) Written evidence submitted by National Express West Midlands (BSB 15) National Express West Midlands 1. National Express West Midlands (West Midlands Travel Ltd) is the major bus operator in the West Midlands.

More information

Traffic calming on major roads: a traffic calming scheme at Costessey, Norfolk

Traffic calming on major roads: a traffic calming scheme at Costessey, Norfolk Traffic Advisory Leaflet 14/99 December 1999 Traffic calming on major roads: a traffic calming scheme at Costessey, Norfolk Introduction This leaflet summarises the impact of a traffic calming scheme on

More information

The Future of Air Transport

The Future of Air Transport The Future of Air Transport Summary December 2003 The White Paper and the Government s role The White Paper sets out a strategic framework for the development of airport capacity in the United Kingdom

More information

SUMMARY PROOF OF EVIDENCE. Gerald Kells Transport Policy and Campaigns Advisor

SUMMARY PROOF OF EVIDENCE. Gerald Kells Transport Policy and Campaigns Advisor Highways Inquiry Procedure Rules 1994 Doc Ref: OBJ/0125 2 For a local inquiry into: SUMMARY PROOF OF EVIDENCE Gerald Kells Transport Policy and Campaigns Advisor For Friends of the Earth Cymru / Cyfeillion

More information

New Street Works Management Permit Schemes

New Street Works Management Permit Schemes New Street Works Management Permit Schemes Cutting traffic disruption and reducing inconvenience to the public through coordinating road works is a major contemporary challenge to government. A modern

More information

Produced by: Destination Research Sergi Jarques, Director

Produced by: Destination Research Sergi Jarques, Director Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism Oxfordshire - 2016 Economic Impact of Tourism Headline Figures Oxfordshire - 2016 number of trips (day & staying) 27,592,106

More information

Riverside Heights, Norwich. Travel Plan

Riverside Heights, Norwich. Travel Plan RIVERSIDE HEIGHTS, NORWICH Client: Engineer: Taylor Wimpey East Anglia Create Consulting Engineers Limited Hungate House Princes Street Norwich Norfolk NR3 1AZ Tel: 08454507908 Email: enquiries@createconsultingengineers.co.uk

More information

LINCOLNSHIRE PARKING POLICY DRAFT

LINCOLNSHIRE PARKING POLICY DRAFT LINCOLNSHIRE PARKING POLICY DRAFT Draft 17/11/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take

More information

2009 Muskoka Airport Economic Impact Study

2009 Muskoka Airport Economic Impact Study 2009 Muskoka Airport Economic Impact Study November 4, 2009 Prepared by The District of Muskoka Planning and Economic Development Department BACKGROUND The Muskoka Airport is situated at the north end

More information

TfL Planning. 1. Question 1

TfL Planning. 1. Question 1 TfL Planning TfL response to questions from Zac Goldsmith MP, Chair of the All Party Parliamentary Group on Heathrow and the Wider Economy Heathrow airport expansion proposal - surface access February

More information

Enhancing customer service Offering the right services Improving integrated journeys Facilitating local

Enhancing customer service Offering the right services Improving integrated journeys Facilitating local London City Airport London City Airport: Background London City Airport (LCY) is the only airport so close to the centre of London. It is also London s fastest growing airport, having grown twice as fast

More information

Self Catering Holidays in England Economic Impact 2015

Self Catering Holidays in England Economic Impact 2015 Self Catering Holidays in England Economic Impact 2015 An overview of the economic impact of self catering holidays in England Published by The South West Research Company Ltd March 2017 Contents Page

More information

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network Technical Note: Impact of Boughton Heath S278 Works July 2013 SAIGHTON CAMP CHESTER COMMERCIAL ESTATES GROUP TECHNICAL NOTE: IMPACT OF BOUGHTON HEATH S278 WORKS UPON THE OPERATION OF THE LOCAL HIGHWAY

More information

Performance monitoring report for first half of 2016

Performance monitoring report for first half of 2016 Performance monitoring report for first half of 2016 Gatwick Airport Limited 1. Introduction Date of issue: 5 December 2016 This report provides an update on performance at Gatwick in the first half of

More information

WELSH GOVERNMENT STREET WORKS STRATEGY FOR WALES

WELSH GOVERNMENT STREET WORKS STRATEGY FOR WALES WELSH GOVERNMENT STREET WORKS STRATEGY FOR WALES November 2012 Contents Street Works Summary Chapter 1 Strategy Context Chapter 2 Welsh Status Chapter 3 Street Works Strategy for Wales Chapter 4 Improving

More information

South of England north-south connectivity

South of England north-south connectivity South of England north-south connectivity An outline economic case for the inclusion of north-south connectivity improvements to form part of the government s road investment strategy (RIS2) Weston-super-Mare

More information

De luchtvaart in het EU-emissiehandelssysteem. Summary

De luchtvaart in het EU-emissiehandelssysteem. Summary Summary On 1 January 2012 the aviation industry was brought within the European Emissions Trading Scheme (EU ETS) and must now purchase emission allowances for some of its CO 2 emissions. At a price of

More information

Smart Motorways Programme

Smart Motorways Programme Smart Motorways Programme M27 Junction 4 to 11 Smart Motorway Response to Statutory Instrument Consultation The introduction of variable mandatory speed limits July 2018 Contents Executive Summary 3 1.

More information

THAMES GATEWAY BRIDGE INQUIRY ENDS

THAMES GATEWAY BRIDGE INQUIRY ENDS Media Briefing May 2006 THAMES GATEWAY BRIDGE INQUIRY ENDS The public inquiry into controversial plans by Transport for London (TfL), to build a 6-lane road bridge across the Thames between east and south

More information

MAXIMUM LEVELS OF AVIATION TERMINAL SERVICE CHARGES that may be imposed by the Irish Aviation Authority ISSUE PAPER CP3/2010 COMMENTS OF AER LINGUS

MAXIMUM LEVELS OF AVIATION TERMINAL SERVICE CHARGES that may be imposed by the Irish Aviation Authority ISSUE PAPER CP3/2010 COMMENTS OF AER LINGUS MAXIMUM LEVELS OF AVIATION TERMINAL SERVICE CHARGES that may be imposed by the Irish Aviation Authority ISSUE PAPER CP3/2010 COMMENTS OF AER LINGUS 1. Introduction A safe, reliable and efficient terminal

More information

LISTED BUILDING AND FIRE STATION CENTRAL SITE WHITGIFT STREET OLD PARADISE GARDENS

LISTED BUILDING AND FIRE STATION CENTRAL SITE WHITGIFT STREET OLD PARADISE GARDENS WELCOME The London Fire Brigade (LFB) and partners U+I are working together to develop proposals for 8 Albert Embankment. Thank you to everyone who visited our previous public exhibition and provided feedback

More information

The Economic Impact of Tourism Brighton & Hove Prepared by: Tourism South East Research Unit 40 Chamberlayne Road Eastleigh Hampshire SO50 5JH

The Economic Impact of Tourism Brighton & Hove Prepared by: Tourism South East Research Unit 40 Chamberlayne Road Eastleigh Hampshire SO50 5JH The Economic Impact of Tourism Brighton & Hove 2013 Prepared by: Tourism South East Research Unit 40 Chamberlayne Road Eastleigh Hampshire SO50 5JH CONTENTS 1. Summary of Results 1 1.1 Introduction 1 1.2

More information

Sustainable Procurement Policy for Heathrow Airport Limited

Sustainable Procurement Policy for Heathrow Airport Limited Sustainable Procurement Policy for Heathrow Airport Limited Date of policy: May 2017 Author: Dianne Armstrong / Chris Allen Approved by: Exec David Ferroussat Procurement Director Pete Hughes - Head of

More information

Code of Practice for filming in East Lothian

Code of Practice for filming in East Lothian Code of Practice for filming in East Lothian Film Edinburgh Part of Marketing Edinburgh Ltd Tel +44 (0)131 622 7337 Email: info@filmedinburgh.org Web: www.filmedinburgh.org filmedinburgh.org In order to

More information

Noise Action Plan Summary

Noise Action Plan Summary 2013-2018 Noise Action Plan Summary Introduction The EU Noise Directive 2002/49/EU and Environmental Noise (Scotland) Regulations 2006 requires airports with over 50,000 movements a year to produce a noise

More information

Tram Passenger Survey

Tram Passenger Survey Key findings Autumn 2015 Foreword Jeff Halliwell Now in its third year, our Tram Passenger Survey has covered passengers views of their journey in six network areas in Britain. For the second time this

More information

Workplace Parking Levies: the contribution of commuters to funding public transport. Sue Flack Consultant

Workplace Parking Levies: the contribution of commuters to funding public transport. Sue Flack Consultant Workplace Parking Levies: the contribution of commuters to funding public transport Sue Flack Consultant Summary 1. 2. 3. 4. 5. Example of Nottingham, UK Use of Workplace Parking Levy Revenue Why Workplace

More information

Permit Schemes a Utility Perspective

Permit Schemes a Utility Perspective Permit Schemes a Utility Perspective Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Paul Gerrard

More information

"TOUCAN" - An unsegregated crossing for pedestrians and cyclists

TOUCAN - An unsegregated crossing for pedestrians and cyclists Traffic Advisory Leaflet 10/93 August 1993 "TOUCAN" - An unsegregated crossing for pedestrians and cyclists Summary This leaflet gives advice on the design and use of the Toucan signal controlled crossing,

More information

Code of Conduct Annual Report 2016/2017

Code of Conduct Annual Report 2016/2017 Issued: September 2017 Code of Conduct Annual Report 2016/2017 The Code of Conduct applies to all ABTA Members and is central to achieving ABTA s aims, in particular delivering higher standards for customers

More information

Southwark s Joined up Approach to Tacking Fly-tipping. London Borough of Southwark

Southwark s Joined up Approach to Tacking Fly-tipping. London Borough of Southwark Southwark s Joined up Approach to Tacking Fly-tipping London Borough of Southwark Anti-social behaviour and enviro-crimes have been identified as major concerns for local people within Southwark. Residents

More information

JOINT TRANSPORTATION BOARD. 10 June Non-key. That subject to the views of the Board,

JOINT TRANSPORTATION BOARD. 10 June Non-key. That subject to the views of the Board, JOINT TRANSPORTATION BOARD 10 June 2008 Subject: Director/Head of Service: Decision Issues: Decision: CCC Ward/KCC Division: Summary: To Resolve: Southern Gas Networks Gas Main Replacement Scheme - Broad

More information

Capital Metropolitan Transportation Authority. Monthly Performance Report

Capital Metropolitan Transportation Authority. Monthly Performance Report Capital Metropolitan Transportation Authority Monthly Performance Report AUGUST 2010 Ridership Report August 23, 2010 Budget to Actual Ridership Budget Target: 2,290,590 Actual: 2,300,796 Ridership Comparison

More information

COASTAL CAR PARK CHARGING TRAFFIC REGULATION ORDER FREQUENTLY ASKED QUESTIONS

COASTAL CAR PARK CHARGING TRAFFIC REGULATION ORDER FREQUENTLY ASKED QUESTIONS COASTAL CAR PARK CHARGING TRAFFIC REGULATION ORDER FREQUENTLY ASKED QUESTIONS Q1. Why are parking charges being introduced to East Lothian`s coastal car parks? The coastal car parks are required to assist

More information

Norfolk Parking Partnership Joint Committee

Norfolk Parking Partnership Joint Committee Norfolk Parking Partnership Joint Committee Item No Report title: Annual Report 2015/16 Date of meeting: 29 September 2016 Responsible Chief Tom McCabe - Director of Community and Officer: Environmental

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

Traffic Calming Special Authorisations

Traffic Calming Special Authorisations Traffic Advisory Leaflet 3/93 May 1993 Traffic Calming Special Authorisations Introduction Legislation is now available to allow a wide range of traffic calming measures to be used on public roads. Some

More information

Reducing traffic: a new plan for public transport

Reducing traffic: a new plan for public transport Reducing traffic: a new plan for public transport Our five point plan to improve Heathrow s public transport in 2015/16 1 2 3 4 5 Make public transport more attractive for passengers Ensure major rail

More information

2.3 On 27 November, the Department for Transport issued guidance on the use of the powers contained in the Act.

2.3 On 27 November, the Department for Transport issued guidance on the use of the powers contained in the Act. Director: Dave Pearson, Director of Transport Services Report to: Bradford District Consultation Sub-Committee Date: 22 January 2018 Subject: Information Report 1 Purpose 1.1 Matters of information relating

More information

1.2) "Agent" means Yorkshire Coastal Cottages whose registered office is at 11a Crossley Street, Wetherby LS22 6RT

1.2) Agent means Yorkshire Coastal Cottages whose registered office is at 11a Crossley Street, Wetherby LS22 6RT PLEASE READ THIS CAREFULLY. WHEN YOU MAKE A RESERVATION REQUEST WITH US (WHETHER BY EMAIL, TELEPHONE OR POST), THESE CONDITIONS ARE DEEMED TO HAVE BEEN ACCEPTED BY YOU. 1. DEFINITIONS 1.1) "Additional

More information

Views of London Forum of Amenity and Civic Societies to the House of Commons Environmental Audit Committee on the Airports Commission report

Views of London Forum of Amenity and Civic Societies to the House of Commons Environmental Audit Committee on the Airports Commission report Views of London Forum of Amenity and Civic Societies to the House of Commons Environmental Audit Committee on the Airports Commission report Summary i) We strongly recommend that the Government reject

More information

Performance monitoring report for first half of 2015

Performance monitoring report for first half of 2015 Performance monitoring report for first half of 2015 Gatwick Airport Limited 1. Introduction Date of issue: 11 November 2015 This report provides an update on performance at Gatwick in the first half of

More information

PORTABLE LIGHT SIGNALS

PORTABLE LIGHT SIGNALS ROADS AUTHORITIES & UTILITIES COMMITTEE (SCOTLAND) ADVICE NOTE 8 PORTABLE LIGHT SIGNALS Version 1.20 December 2006 VERSION HISTORY Version Date Notes PORTABLE LIGHT SIGNALS 1.00 Mar 05 Approved by RAUC(S)

More information

Report on the Crafthole Traffic Light Project 3 rd July th September 2017

Report on the Crafthole Traffic Light Project 3 rd July th September 2017 Report on the Crafthole Traffic Light Project 3 rd July 2017 4 th September 2017 Brief History The village of Crafthole sits on the B3247 road, one of the 2 Gateways to the Rame Peninsula, the other being

More information

Transport Services Public Transport Patronage Performance 12 months to March 2018

Transport Services Public Transport Patronage Performance 12 months to March 2018 Addendum to Item 10 Business Report April 2018 Transport Services Public Transport Patronage Performance 12 months to March 2018 Ref:- AT Monthly Indicators Report 1.3 AT Metro patronage breakdown. For

More information

LOCAL AREA TOURISM IMPACT MODEL. Wandsworth borough report

LOCAL AREA TOURISM IMPACT MODEL. Wandsworth borough report LOCAL AREA TOURISM IMPACT MODEL Wandsworth borough report London Development Agency May 2008 CONTENTS 1. Introduction... 3 2. Tourism in London and the UK: recent trends... 4 3. The LATI model: a brief

More information

CONSULTATION ON ISSUES AFFECTING PASSENGERS ACCESS TO UK AIRPORTS A REVIEW OF SURFACE ACCESS. Response by Newcastle International Airport Ltd

CONSULTATION ON ISSUES AFFECTING PASSENGERS ACCESS TO UK AIRPORTS A REVIEW OF SURFACE ACCESS. Response by Newcastle International Airport Ltd CONSULTATION ON ISSUES AFFECTING PASSENGERS ACCESS TO UK AIRPORTS 1. Introduction A REVIEW OF SURFACE ACCESS Response by Newcastle International Airport Ltd Newcastle is the largest airport in the North

More information

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period

More information

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC Chair Cabinet Economic Growth and Infrastructure Committee Office of the Minister of Transport REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC Proposal 1. I propose that the

More information

AIRPORT NOISE AND CAPACITY ACT OF 1990

AIRPORT NOISE AND CAPACITY ACT OF 1990 AIRPORT NOISE AND CAPACITY ACT OF 1990 P. 479 AIRPORT NOISE AND CAPACITY ACT OF 1990 SEC. 9301. SHORT TITLE This subtitle may be cited as the Airport Noise and /Capacity Act of 1990. [49 U.S.C. App. 2151

More information

REVIEW OF THE STATE EXECUTIVE AIRCRAFT POOL

REVIEW OF THE STATE EXECUTIVE AIRCRAFT POOL STATE OF FLORIDA Report No. 95-05 James L. Carpenter Interim Director Office of Program Policy Analysis And Government Accountability September 14, 1995 REVIEW OF THE STATE EXECUTIVE AIRCRAFT POOL PURPOSE

More information

A carbon offsetting and reduction scheme for international aviation

A carbon offsetting and reduction scheme for international aviation Regulatory Impact Statement A carbon offsetting and reduction scheme for international aviation Agency Disclosure Statement The Ministry of Transport (the Ministry) has prepared this Regulatory Impact

More information

Section 226 Town and Country Planning Act 1990 S.13 Local Government (Miscellaneous Provisions) Act 1976 Acquisition of Land Act 1981

Section 226 Town and Country Planning Act 1990 S.13 Local Government (Miscellaneous Provisions) Act 1976 Acquisition of Land Act 1981 Report Section 226 Town and Country Planning Act 1990 S.13 Local Government (Miscellaneous Provisions) Act 1976 Acquisition of Land Act 1981 The London Borough of Barnet (Brent Cross Cricklewood) Compulsory

More information

TAKING THE NORTH FURTHER

TAKING THE NORTH FURTHER TAKING THE NORTH FURTHER STAKEHOLDER NEWSLETTER JULY / AUGUST 2018 Dear Stakeholder Summer is here and things are definitely hotting up in terms of our transformation. The Class 185 upgrade is very close

More information

KING STREET TRANSIT PILOT

KING STREET TRANSIT PILOT KING STREET TRANSIT PILOT Update toronto.ca/kingstreetpilot #kingstreetpilot HIGHLIGHTS TRANSIT RIDERSHIP TRANSIT CAPACITY To respond to this growth in ridership, the TTC has increased the capacity of

More information

In your area. Stonebroom to Clay Cross LA09. June Introduction

In your area. Stonebroom to Clay Cross LA09. June Introduction June 2018 www.hs2.org.uk In your area to Clay Cross LA09 Midland Main Line Shirland Tupton Clay Cross A61 Stretton Midland Main Line to Chesterfield and Sheffield Pilsley A6175 HS2 Phase 2b spur Morton

More information

A303 Stonehenge Amesbury to Berwick Down

A303 Stonehenge Amesbury to Berwick Down A303 Stonehenge Amesbury to Berwick Down The case for the scheme Contents The A303 Corridor 4 Amesbury to Berwick Down 5 The case for the scheme 5 Map of the area 6 Objective 1: Transport 7 Objective 2:

More information

ANNUAL REPORT PREPARED BY PETER J FALLA SENIOR MANAGER, PROJECTS & ROADS

ANNUAL REPORT PREPARED BY PETER J FALLA SENIOR MANAGER, PROJECTS & ROADS ANNUAL REPORT 2013 PREPARED BY PETER J FALLA SENIOR MANAGER, PROJECTS & ROADS Contents 1 EXECUTIVE SUMMARY 3 2 ESTABLISHING THE BRAND OF GUERNSEY ROADS 4 3 TRANSFORMING THE WAY GUERNSEY ROADS OPERATES

More information

National Rail Passenger Survey Main Report Spring 2018

National Rail Passenger Survey Main Report Spring 2018 National Rail Passenger Survey Main Report Spring 2018 Transport Focus is the independent transport user watchdog Our mission is to get the best deal for passengers and road users. With a strong emphasis

More information

The decision on whether to take enforcement action falls outside the scope of delegated powers.

The decision on whether to take enforcement action falls outside the scope of delegated powers. 5k 16/0031 Reg d: 19.01.2016 Expires: 15.03.201 6 Ward: Nei. 24.02.201 BVPI Full Number of 11/8 On Con. 6 Target Weeks on Target? Exp: Cttee Day: GE No LOCATION: PROPOSAL: TYPE: Phillips Court, 32 Goldsworth

More information

Non-technical summary

Non-technical summary Introduction NTS1 NTS2 NTS3 Troika Developments Ltd (Troika) has submitted a planning application to Bournemouth Borough Council (BBC) for an extension of time to implement planning permission 7/2004/16450/G,

More information

Borders Railway: What is the impact two years on?

Borders Railway: What is the impact two years on? STAR 2018 Borders Railway: What is the impact two years on? Rachel Thomas, Peter Brett Associates, Scott Leitham, Peter Brett Associates, and Rebecca Rossi, Transport Scotland 1 INTRODUCTION The Borders

More information

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers) Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and

More information

The Regulation Works! An analysis of the Impact Assessment On Proposal for the Amendment of Regulation 261/2004 on Air Passengers Rights

The Regulation Works! An analysis of the Impact Assessment On Proposal for the Amendment of Regulation 261/2004 on Air Passengers Rights The Regulation Works! An analysis of the Impact Assessment On Proposal for the Amendment of Regulation 261/2004 on Air Passengers Rights Contact: Patrick Gibbels, APRA Secretary General, Clos du Parnasse

More information

Abruzzo Airport. Commercial Policy Development Routes

Abruzzo Airport. Commercial Policy Development Routes Abruzzo Airport Commercial Policy Development Routes Abruzzo Airport's main objective is to stimulate the development of air traffic by encouraging carriers to operate new routes and upgrade existing ones,

More information

Terms and Conditions of Use of Express Platinum Services, Dublin Airport

Terms and Conditions of Use of Express Platinum Services, Dublin Airport Terms and Conditions of Use of Express Platinum Services, Dublin Airport This document sets out the terms and conditions of use for Express Platinum Services at Dublin Airport which is provided by daa

More information

M621. Junctions 1 to 7 Improvement scheme. Share your views

M621. Junctions 1 to 7 Improvement scheme. Share your views M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,

More information

Produced by: Destination Research Sergi Jarques, Director

Produced by: Destination Research Sergi Jarques, Director Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism Epping Forest - 2014 Economic Impact of Tourism Headline Figures Epping Forest - 2014 Total number of trips (day & staying)

More information

Aviation Trends Quarter

Aviation Trends Quarter Aviation Trends Quarter 4 214 Contents Introduction... 2 1. Historical overview of traffic see note 5 on p.15... 3 a. Terminal passengers... 4 b. Commercial flights... 5 c. Cargo tonnage... 6 2. Terminal

More information

Chapter 25 Route Window SE6 Plumstead portal. Transport for London

Chapter 25 Route Window SE6 Plumstead portal. Transport for London Chapter 25 Route Window SE6 Plumstead portal PLUMSTEAD PORTAL 25 Route Window SE6 Plumstead portal Introduction 25.1 The Crossrail route will follow the present alignment of the North Kent Line from a

More information

Application Decision. White Rock South Surrey Taxi Ltd th Avenue, Surrey BC V3S 6C4

Application Decision. White Rock South Surrey Taxi Ltd th Avenue, Surrey BC V3S 6C4 Application Decision Application: Applicant: Trade Names: Address: Principals: Special Authorization: Summary: Related Applications: (for cross reference only) AV2639-05 White Rock South Surrey Taxi Ltd.

More information

Produced by: Destination Research Sergi Jarques, Director

Produced by: Destination Research Sergi Jarques, Director Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism Oxfordshire - 2015 Economic Impact of Tourism Headline Figures Oxfordshire - 2015 Total number of trips (day & staying)

More information

A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement

A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement Broadway Broad Street Birmingham B15 1BL HIGHWAYS AGENCY A5-M1 LINK (DUNSTABLE NORTHERN BYPASS) EXPLANATORY STATEMENT Introduction The Highways

More information

Financial Scrutiny Unit Briefing Tourism in Scotland

Financial Scrutiny Unit Briefing Tourism in Scotland The Scottish Parliament and Scottish Parliament Infor mation C entre l ogos. Financial Scrutiny Unit Briefing Tourism in Scotland Jim Dewar 2 June 2011 11/35 This briefing provides information on the legislative

More information

ANA Traffic Growth Incentives Programme Terms and Conditions

ANA Traffic Growth Incentives Programme Terms and Conditions ANA Traffic Growth s Programme Terms and Conditions 1. Introduction The ANA Traffic Growth s Programme (hereinafter referred to as the Programme) aims to stimulate the growth of commercial air traffic

More information

Transport Focus Train punctuality the passenger perspective. 2 March 2017 Anthony Smith, Chief Executive

Transport Focus Train punctuality the passenger perspective. 2 March 2017 Anthony Smith, Chief Executive Transport Focus Train punctuality the passenger perspective 2 March 2017 Anthony Smith, Chief Executive Transport Focus Independent transport user watchdog Rail passengers in Great Britain Bus, coach &

More information

Visit Wales Research Update

Visit Wales Research Update Visit Wales Research Update 19 January 21 This update summarises tourism performance by drawing upon Visit Wales own research and information from other relevant sources. It is based upon information available

More information

A140 study and Major Road Network

A140 study and Major Road Network A140 study and Major Road Network Executive Summary The Government s new Transport Investment Strategy sets out a new long-term approach for government infrastructure spending. Funding will be targeted

More information

National Rail Performance Report - Quarter /14

National Rail Performance Report - Quarter /14 A London TravelWatch report The voice of transport users National Rail Performance Report - July 2014 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

Employment and Skills Briefing (March 2015)

Employment and Skills Briefing (March 2015) Neil Brown Policy and Intelligence Officer t: 0115 854 1313 e: neilb@emfec.co.uk The following information summarises the DWP (Central England Group) State of the Group Report March 2015 and provides a

More information

Frequently Asked Questions

Frequently Asked Questions What is VBS? The Vehicle Booking System is a slot allocation system designed to manage the flow of traffic in and out of the terminal. Why have a VBS? The idea of the VBS is to smooth the peaks and troughs

More information

The Economic Impact of Tourism Brighton & Hove Prepared by: Tourism South East Research Unit 40 Chamberlayne Road Eastleigh Hampshire SO50 5JH

The Economic Impact of Tourism Brighton & Hove Prepared by: Tourism South East Research Unit 40 Chamberlayne Road Eastleigh Hampshire SO50 5JH The Economic Impact of Tourism Brighton & Hove 2014 Prepared by: Tourism South East Research Unit 40 Chamberlayne Road Eastleigh Hampshire SO50 5JH CONTENTS 1. Summary of Results 1 1.1 Introduction 1 1.2

More information

Environment Committee 24 September 2015

Environment Committee 24 September 2015 Environment Committee 24 September 2015 Title Enforcement of Single Yellow Lines on Bank Holidays Report of Commissioning Director - Environment Wards All Status Public Urgent No Enclosures Key No Appendix

More information

Bus Passenger Survey

Bus Passenger Survey March 2012 Contents 1 Foreword 3 2 Key findings 4 3 Results by area Merseyside PTE (Merseytravel) South Yorkshire PTE Transport for Greater Manchester (TfGM) West Yorkshire PTE (Metro) Tyne & Wear PTE

More information

Notification to Suppliers

Notification to Suppliers Notification to Suppliers Engagement of Auditors Regarding Certification for the PSO Levy Reference CER/17/021 Date Published 22/02/2017 Closing Date N.A. Executive Summary In the 2016/17 Public Service

More information

Caravan & Camping Park Sector Annual Report 2011

Caravan & Camping Park Sector Annual Report 2011 W Scottish Accommodation Occupancy Surveys Caravan & Camping Park Sector Annual Report 211 211 TNS UK Limited JN218761 May 212 211 TNS UK Ltd P a g e Contents Executive summary p. 1 Survey method p. 3

More information

Briefing note for new Air Passenger Duty operators

Briefing note for new Air Passenger Duty operators Briefing note for new Air Passenger Duty operators 1. Background 1.1. Ministers announced in the 2011 Autumn Statement that with effect from 1 2013, Air Passenger Duty (APD) will be extended to the carriage

More information

Aviation Trends. Quarter Contents

Aviation Trends. Quarter Contents Aviation Trends Quarter 3 2014 Contents Introduction... 2 1. Historical overview of traffic... 3 a. Terminal passengers... 4 b. Commercial flights... 5 c. Cargo tonnage... 6 2. Terminal passengers at UK

More information