1 Mon SUN MONDAY 05/20/2013 Ops. Construction (650) A 3 SFO Pavings & Grounds - Crack Seal RWY 10R/28L SFO Pavings & Grounds - Repair Catch Basin SFO Engineering/Ennis-Flint - Re-install Thermoplastics FAA RWY 28L MALSR Installation Connect Giladuct to boxes, backfill west end. Slurry beneath Glide Slope Shelter/Off haul concrete. FAA/Ahtna - Installation of Airport Surface Surveillance Capability (ASSC) equipment SFO Pavings & Grounds - Excavate Fuel Vault SFO Surveyors - Survey RWY 28L btn. TWYL & TWY C. SFIA Trades - Gate??, Roof Seal and Painting Hensel Phelps, AGS - Boring Soil Samples T-3 (68-71) PM PM FAA B Escort crew to/from various turf areas btn. RWY 10's/TWY's Q/K/D B FAA B Escort Required. Survey RWY 28L from TWY L to TWY C. Mon Fri A SFO Painters: Refresh Markings PM Close Aircraft Gate?? Close RWY 10R/28L ( hrs.) Close adjacent TWY's as necessary. Note: Crack seal all degraded pavement joints, including the recently removed touchdown zone markings, from TWY R to the approach end of RWY 28L. Escort crew to/from turf area btn. TWY E/TWY C/TWY V/RWY 19R/01L. Close Taxilane M btn. B/A Gate A2 & A9. Close B/A Gates A2, A4, A6, A8, A9, A10, A12, & Spot A-18, & A-19 (RON Aircraft okay.) Site Survey. Close RWY 10R/28L ( hrs.) Close RWY 10R/28L to Departing Aircraft {arrivals only} ( hrs.) Crew will be working on the RWY 28L Trestle escorted by the FAA. Coordinate with the FAA before opening the runway. Escort crew to/from RWY 28R Glide Slope Shelter. SFPD to Monitor/Control AOA Access Gate 1 ( hrs.) FAA to Escort - Key Ahtna personnel have restrictive road access permits. Working at Aircraft Gate 102, RU10, RU11, RU12 & RU14. See site diagram for equipment/work site locations. Close Plot 50, Spot 2. Keep MR open UFN. Crew will core, bore & take soil samples every 5' from gates 68, 69, 70,71. Gates to remain open, RON okay. Steel plates until backfilled. Escort Required. Crew will install markings on all ARFF Access Roads that intersect a paved RWY surface. See Airfield Construction Dept. for details. 20 Hensel Phelps BA-E - Deliveries Escort required to/from AOA access Gates 82 & Gate 24A. 21 Hensel Phelps ATCT - Morning Deliveries A Escort required to/from Southfield Checkpoint, Gate 82 & Gate 23C. 21A Hensel Phelps/JMB ATCT - Waterline Relocation A Relocate waterline btn. T1 & T2. JMB will excavate the area and relocate the waterline. Area to be backplated prior to leaving for the day. 43 SFIA ELEC SHOP- AIRS Items PM Airfield Complex - Escort Required. 57 SFIA ELEC SHOP PM Airfield Complex - Escort Required. RWY TWY* TXL or GT VSR SITE SURVEY ASO NO IMPACT AF: ATCT: ADM: Const. Ofc: Ops: Surv: Elec: Paving: Painters: 5/17/2013 4:58 PM
2 Tue MON TUESDAY 05/21/ SFO Pavings & Grounds - Grind & Pave SFO Painters - Restore TWY C/L SFO Engineering/Ennis-Flint - Re-install Thermoplastics PM BASS/JDB - Electrical Shutdown FAA RWY 28L MALSR Installation Pavex Construction/St. Francis Elec - Connect Giladuct FAA B Escort Required. Close TWY A btn. TWY K & TWY D. Close Reporting Spots 7, 7A & associated Taxilanes. Note: Aircraft inbound/outbound from B/A Gates F69, F70, F71, F76A, F76B, & F77 must push back and/or tow to TWY D/TWY A intersection. Close Taxilane M btn. B/A Gate A2 & A9. Close B/A Gates A2, A4, A6, A8, A9, A10, A12, & Spot A-18, & A-19 (RON Aircraft okay.) Escort to/from location. Remove/replace transformer btn. RWY 28L Localizier & TWY Z. Site Survey. Close RWY 10R/28L ( hrs.) Close RWY 10R/28L to Departing Aircraft {arrivals only} ( hrs.) Crew will be working on the RWY 28L Trestle escorted by the FAA. Coordinate with the FAA before opening the runway. Escort Required. Close RWY 01R/19L ( hrs.) Note: VOR will be shutdown from hrs. 13 Diesel Fuel Tank RWY 28 Glideslope Connect Giladuct to boxes, backfill west end. FAA/Ahtna - Installation of Airport Surface Surveillance Capability (ASSC) equipment SFO Pavings & Grounds - Excavate Fuel Vault Hensel Phelps, AGS - Boring Soil Samples T-3 (68-71) SFO Surveyors - Survey RWY 28L btn. TWYL & TWY C. SFIA Trades - Gate??, Roof Seal and Painting B Escort crew, county & City inspectors to/from various turf areas B Escort crew to/from various turf areas btn. RWY 10's/TWY's Q/K FAA A B Escort Required. Survey RWY 28L from TWY L to TWY C. Mon Fri PM Close Aircraft Gate?? FAA to Escort - Key Ahtna personnel have restrictive road access permits. Working at Aircraft Gate 102, RU10, RU11, RU12 & RU14. See site diagram for equipment/work site locations. Close Plot 50, Spot 2. Keep MR open UFN. Crew will core, bore & take soil samples every 5' from gates 68, 69, 70,71. Gates to remain open, RON okay. Steel plates until backfilled. SFO Painters: Refresh Markings Escort Required. Crew will install markings on all ARFF Access Roads that intersect a paved RWY surface. See Airfield Construction Dept. for details. 20 Hensel Phelps BA-E - Concrete Pour Escort required to/from AOA access Gates 59 & Gate 24A. SFPD to Monitor/Control AOA Access Gates 55 & 24A ( hrs.) 21 Hensel Phelps ATCT - Deliveries A Escort required to/from Southfield Checkpoint, Gate 82 & Gate 23C. 21A Hensel Phelps/JMB ATCT - Waterline Relocation A Relocate waterline btn. T1 & T2. JMB will excavate the area and relocate the waterline. Area to be backplated prior to leaving for the day. 23 SFO Sprayman PM Airfield Complex - Escort as needed. 43 SFIA ELEC SHOP- AIRS Items PM Airfield Complex - Escort Required. 57 SFIA ELEC SHOP PM Airfield Complex - Escort Required. RWY TWY* TXL or GT VSR SITE SURVEY ASO NO IMPACT 5/17/2013 4:58 PM
3 Wed TUE WEDNESDAY 05/22/ SFO Pavings & Grounds - Grind & Pave. Kerf Cut. SFO Engineering/Ennis-Flint - Re-install Thermoplastics Pavex Construction/St. Francis Elec - Connect Giladuct FAA RWY 28L MALSR Installation PM B FAA Escort Required. Close TWY A btn. TWY K & Reporting Spot 7A. Close TWY K btn. TWY A & TWY B. Close Taxilane M btn. B/A Gate A2 & A9. Close B/A Gates A2, A4, A6, A8, A9, A10, A12, & Spot A-18, & A-19 (RON Aircraft okay.) Escort Required. Close RWY 01R/19L ( hrs.) Note: VOR will be shutdown from hrs. Site Survey. Close RWY 10R/28L ( hrs.) Close RWY 10R/28L to Departing Aircraft {arrivals only} ( hrs.) Crew will be working on the RWY 28L Trestle escorted by the FAA. Coordinate with the FAA before opening the runway BASS/JDB - Electrical Shutdown Connect Giladuct to boxes, backfill btn. RWY 28L/TWY F/ RWY 01L/01R Haul in & install baserock, cut conforms on VSR for overlay. FAA/Ahtna - Installation of Airport Surface Surveillance Capability (ASSC) equipment, SFO Pavings & Grounds - Excavate Fuel Vault Hensel Phelps, AGS - Boring Soil Samples T- 3 (68-71) SFO Surveyors - Survey RWY 28L btn. TWY D & RWY 01L. SFIA Trades - Gate??, Roof Seal and Painting B B FAA A B Escort Required. Survey RWY 28L from TWY D to RWY 01L Mon Fri SFO Painters: Refresh Markings PM Close Aircraft Gate?? 0137 SFO/ZodicAero - Install Wind Sensor B Escort Crew to green area btn. A/A1/01R. Occasional escort to/from location. Remove/replace transformer btn. RWY 28L Localizier & TWY Z. Full time ASO to Monitor Building 710. Escort crew to/from various turf areas btn. RWY 28L/TWY F/ RWY 01L/01R. Escort crew to/from RWY 28R Glide Slope Shelter. SFPD to Monitor/Control AOA Access Gate 1 ( hrs.) FAA to Escort - Key Ahtna personnel have restrictive road access permits. Working at Aircraft Gate 102, RU10, RU11, RU12 & RU14. See site diagram for equipment/work site locations. Close Plot 50, Spot 2. Keep MR open UFN. Crew will core, bore & take soil samples every 5' from gates 68, 69, 70,71. Gates to remain open, RON okay. Steel plates until backfilled. Escort Required. Crew will install markings on all ARFF Access Roads that intersect a paved RWY surface. See Airfield Construction Dept. for details. 20 Hensel Phelps BA-E - Deliveries Escort required to/from AOA access Gates 82 & Gate 24A. 21 Hensel Phelps ATCT - Deliveries A Escort required to/from Southfield Checkpoint, Gate 82 & Gate 23C. 21A Hensel Phelps/JMB ATCT - Waterline Relocation A 23 SFO Sprayman PM Airfield Complex - Escort as needed. 43 SFIA ELEC SHOP- AIRS Items PM Airfield Complex - Escort Required. Relocate waterline btn. T1 & T2. JMB will excavate the area and relocate the waterline. Area to be backplated prior to leaving for the day. 57 SFIA ELEC SHOP PM Airfield Complex - Escort Required. RWY TWY* TXL or GT VSR SITE SURVEY ASO NO IMPACT
4 Thu WED THURSDAY 05/23/ SFO Elec Shop - Restore TWY Lights A SFO Pavings & Grounds - Prep. & Pave PAPI Pad adjacent to VSR FAA RWY 28L MALSR Installation PM FAA 1 Escort Required. Close TWY A btn. TWY K & TWY D. Close Reporting Spots 7, 7A & associated Taxilanes. Note: Aircraft inbound/outbound from B/A Gates F69, F70, F71, F76A, F76B, & F77 must push back and/or tow to TWY D/TWY A intersection. Close RWY 10R/28L ( hrs.) Escort crew to/from RWY 10R PAPI site btn. RWY 10L/28R & RWY 10R/28L. Site Survey. Close RWY 10R/28L ( hrs.) Close RWY 10R/28L to Departing Aircraft {arrivals only} ( hrs.) Crew will be working on the RWY 28L Trestle escorted by the FAA. Coordinate with the FAA before opening the runway. Pavex Construction/St. Francis Elec - Install Gila-Duct beneath TWY F B Escort Required. Close TWY F btn. TWY L and RWY 28L. Close TWY C btn. RWY 10L/28R & RWY 10R/28L. SFO Surveyors - Survey VOR B Escort Required. Survey VOR area. Connect Giladuct to boxes, backfill btn. RWY 28L/TWY F/ RWY 01L/01R AC Pave around GS shelter, tower foundation, boxes, & VSR's B B Escort crew to/from various turf areas btn. RWY 28L/TWY F/ RWY 01L/01R. Escort crew to/from RWY 28R Glide Slope Shelter. SFPD to Monitor/Control AOA Access Gate 1 ( hrs.) 13 FAA/Ahtna - Installation of Airport Surface Surveillance Capability (ASSC) equipment SFO Pavings & Grounds - Excavate Fuel Vault Hensel Phelps, AGS - Boring Soil Samples T- 3 (68-71) SFIA Trades - Gate??, Roof Seal and Painting FAA A Mon Fri SFO Painters: Refresh Markings PM Close Aircraft Gate?? 0137 FAA to Escort - Key Ahtna personnel have restrictive road access permits. Working at Aircraft Gate 102, RU10, RU11, RU12 & RU14. See site diagram for equipment/work site locations. Close Plot 50, Spot 2. Keep MR open UFN. Crew will core, bore & take soil samples every 5' from gates 68, 69, 70,71. Gates to remain open, RON okay. Steel plates until backfilled. Escort Required. Crew will install markings on all ARFF Access Roads that intersect a paved RWY surface. See Airfield Construction Dept. for details. 20 Hensel Phelps BA-E - Concrete Pour Escort required to/from AOA access Gates 59 & Gate 24A. SFPD to Monitor/Control AOA Access Gates 55 & 24A ( hrs.) 21 Hensel Phelps ATCT - Deliveries A Escort required to/from Southfield Checkpoint, Gate 82 & Gate 23C. 21A Hensel Phelps/JMB ATCT - Waterline Relocation A Relocate waterline btn. T1 & T2. JMB will excavate the area and relocate the waterline. Area to be backplated prior to leaving for the day. 23 SFO Sprayman PM Airfield Complex - Escort as needed. 43 SFIA ELEC SHOP- AIRS Items PM Airfield Complex - Escort Required. RWY TWY* TXL or GT VSR SITE SURVEY ASO NO IMPACT 5/17/2013 4:58 PM
5 Fri THU FRIDAY 05/24/ SFO Paint Shop - Refresh RWY 10L-28R Centerline PM Close RWY 10L/28R ( hrs.) Pavex Construction/St. Francis Elec - Install Gila-Duct beneath TWY F B Escort Required. Close TWY F btn. TWY L and RWY 28L. Connect Giladuct to boxes, backfill remaining boxes, east/west end B Escort crew to/from various turf areas. FAA/Ahtna - Installation of Airport Surface Surveillance Capability (ASSC) equipment SFO Pavings & Grounds - Excavate Fuel Vault FAA FAA to Escort - Key Ahtna personnel have restrictive road access permits. Working at Aircraft Gate 102, RU10, RU11, RU12 & RU14. See site diagram for equipment/work site locations. Close Plot 50, Spot 2. Keep MR open UFN. Hensel Phelps, AGS - Boring Soil Samples T- 3 (68-71) SFIA Trades - Gate??, Roof Seal and Painting A Mon Fri PM Close Aircraft Gate?? Crew will core, bore & take soil samples every 5' from gates 68, 69, 70,71. Gates to remain open, RON okay. Steel plates until backfilled. 20 Hensel Phelps BA-E - Concrete Pour Escort required to/from AOA access Gates 59 & Gate 24A. SFPD to Monitor/Control AOA Access Gates 55 & 24A ( hrs.) 21 Hensel Phelps ATCT - Deliveries A Escort required to/from Southfield Checkpoint, Gate 82 & Gate 23C. Hensel Phelps/JMB ATCT - Waterline 21A Relocation A Relocate waterline btn. T1 & T2. JMB will excavate the area and relocate the waterline. Area to be backplated prior to leaving for the day. 43 SFIA ELEC SHOP- AIRS Items PM Airfield Complex - Escort Required. 57 SFIA ELEC SHOP PM Airfield Complex - Escort Required. RWY TWY* TXL or GT VSR SITE SURVEY ASO NO IMPACT 5/17/2013 4:58 PM
6 Sat FRI SATURDAY 05/25/ SFO Sweeper/Vactor/Mower Driver Available if requested PM Contact via Maint. Control if needed. RWY TWY TXL or GT VSR SITE SURVEY ASO NO IMPACT 5/17/2013 4:58 PM
7 Sun SAT SUNDAY 05/26/ SFO Sweeper/Vactor/Mower Driver Available if requested PM Contact via Maint. Control if needed. RWY TWY TXL or GT VSR SITE SURVEY ASO NO IMPACT 5/17/2013 4:58 PM
8 2013 Airport or Tenant Project # Description **** CONTRACTOR PHONE NUMBERS **** SFIA CONTRACT MGR. // SFIA INSPECTOR // CONTRACTOR CONTACT 8670A 8670B 8595B RSA RWY 10R Paving & Lighting RSA RWY 10L/28R Paving & Lighting STORM DRAINAGE SYSTEM IMPROVEMENT - PHASE 1 PROJECT MANAGER-TANIA GHARECHEDAGHY SFIA INSPECTOR - ARNOLD GALANG GALLAGER & BURK PROJECT ENG. - QUIN HANCE CONSTRUCTION MANAGER, CHERIE GUBISCH, SFIA INSPECTOR, LOVELL COVERSON PAVEX PROJECT MAN., DANNY LABRADOR, PROJECT MANAGER- J.C. PANGANIBAN SFIA INSPECTOR - JIM MARSH SCHEMBRI PROJECT MANAGER - CHARLES SCHEMBRI BOARDING AREAS C, E RAMP REPAIR PROJECT MANAGER - KRISTIN ALLEN //SFIA INSPECTOR RAMONE DOMINGUEZ // PAVEX PROJECT MAN., DANNY LABRADOR, AIRFIELD PAVEMENT RECONSTRUCTION/ RWY RUBBER REMOVAL PROJECT MANAGER - STAN PALAT , DANIEL LEE, C 8255CR FAA Ahtna FAA Tower FAA RWY 28L MALSR 9100 RSA Southfield AS Needed Utility Repair ASDE R&C CONSULING GeoTech borings (11/12-16, 2011) MALSR Installation on RWY 28L Trestle AIRPORT TELECOMMUNICATIONS CONSTRUCTION & REPAIRS PROJECT MANAGER-CHRIS MCMANUS SFIA INSPECTOR - WILLIAM CHIONG DISNEY CONSTRUCTION -George Foote cell(650) Main Phone (650) PROJECT MANAGER - NORA MILL SFIA INSPECTOR - LOVELL COVERSON , SYNERGY PRG MGR - DON GILLALAND PROJECT MANAGER - PATRICK ROYCE , CELL , FAA - ROY DICKERSON PROJECT MANAGER - DON PETERSON ; PRIME FLIGHT (SECURITY) DAVEN KUMAR ; PROJECT MANAGER - MARISSA TRIAS-RUIZ - CELL PROJECT MANAGER- OMAR DAPIAOEN SFIA INSPECTOR - - BASS ELECTRIC PROJECT MANAGER - JAWAAD MITCHELL - Mobile: (415) Page 8 of 8
9
10
11
SFO Construction and Maintenance Schedule 2013
Mon SUN MONDAY 08/05/2013 Ops. Construction (650)821-3341 Item # Activity/Contractor Time 1 SFO P&G - Crack Seal RWY 10R/28L 0000-0600 4 6 Clean Harbors/Superior Drilling/SFIA Water Treatment - Excavation/Cleaning
More informationSFO Construction and Maintenance Schedule 2013
Mon SUN MONDAY 01/06/2014 Ops. Construction (650)821-3341 2 2 1 1 1 1 SFO P&G - Power Wash 0130-0430 PM Crew will power wash various areas around Boarding Area C. 12 Woolpert/SFO Surveyors - AGIS Survey
More informationOLD AIRPORT (PFN) RW 05/23 RW 14/32. 4,884-FEET X 150-FEET MIRL 4-BOX VASIs (5 & 23 APPROACHES) REILS
FAITH ADAMS AGENDA AIRPORT RELOCATION CHALLENGES AIRFIELD LIGHTING & SIGNAGE NAVAIDS AIRFIELD LIGHTING VAULT L-890 ALCMS AIR TRAFFIC CONTROL TOWER (ATCT) CONCLUSION AIRPORT RELOCATION OLD AIRPORT (PFN)
More informationPlanning & Development Group
Planning & Development Group LAX Airside Technical Committee Meeting January 9, 2018 Mark Vicelja, P.E. 1 Airside Element Projects LAX AIRSIDE ELEMENT PROJECTS CONSTRUCTION SCHEDULE (as of January 1, 2018)
More informationCertAlert. Hurricane Field Condition Report
CertAlert DOT/Federal Aviation Administration, Southern Region Airports Division, Airport Certification Safety Team (ASO-620), P.O. Box 20636, Atlanta, Georgia 30320 (404) 305-6700; FAX: (404) 305-6730
More informationRECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1
PHASING PLAN - PHASE 1 2 Weeks PHASE 1 SCOPE OF WORK Phase 1 consists of the reconstruction of a portion of Taxiway 'A' and the crack seal and seal coat of the North Apron. The portion of Taxiway 'A' to
More informationSURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM PLAN. Los Angeles International Airport
SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM PLAN Los Angeles International Airport Surface Movement Guidance and Control System (SMGCS) Plan The SMGCS Plan for Los Angeles International Airport (LAX)
More informationMIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division
MIAMI-DADE AVIATION DEPARTMENT MIA Runway 8R8R-26L Pavement Pavement Rehabilitation Civil Environmental Engineering Division The Project Team Mission Statement C EXPERTISE + COMMITMENT = OWNERSHIP Project
More informationSUMMARY OF QUANTITES NO. ITEM DESCRIPTION UNIT QUANTITY DRAWING NUMBER TITLE GENERAL ELECTRICAL
SRQ-D-FOTS-G000 DRAWING NUMBER TITLE GENERAL 1 SRQ-D-FOTS-G000 COVER SHEET 2 SRQ-D-FOTS-G001 DRAWING INDEX AND SUMMARY OF QUANTITIES 3 SRQ-D-FOTS-G002 LEGEND AND ABBREVIATIONS 4 SRQ-D-FOTS-G101 OVERALL
More informationAIRPORT SECURITY BULLETIN
AIRPORT SECURITY BULLETIN 17-11 Temporary Badge Program Background: Safety and Security is the Airport s first priority. In order to tighten security, the Airport has eliminated the Visitor V and Construction
More informationSan Bernardino International Airport Authority Ramp Joint Seal Replacement & Pavement Repair Project
San Bernardino International Airport Authority Ramp Joint Seal Replacement & Pavement Repair Project Construction Safety and Phasing Plan 1601 E. Third St. San Bernardino, California 92408 As an authorized
More informationNotice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application
July 3, 2018 Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application The City of Kansas City (City), Missouri through its Aviation Department ( the Department
More informationRules and Regulations
APPENDIX 1 LOW-VISABILITY OPERATIONS/SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM (LVO/SMGCS) PLAN TABLE OF CONTENTS TITLE PAGE 1.0 INTRODUCTION 2 2.0 DEFINITIONS 3 3.0 FACILITIES, SERVICES AND EQUIPMENT
More informationADDENDUM NO. TWO AB
ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County
More informationLos Angeles International Airport (LAX) Airside $907M
Los Angeles International Airport (LAX) $3,948M Airside $907M Airfield Electrical Systems Rehabilitation Bradley West Core Renovation, East Ramp and Concourse Demolition Imperial Terminal Aircraft Parking
More informationMOST aircraft need a runway for landing and takeout.
38th Annual Concrete Paving Workshop Upcoming Airport Projects January 17, 2017 MOST aircraft need a runway for landing and takeout. 1 Airport Improvement Program AIP Eligibility The federal AIP grants
More informationJACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007
JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 27 11242 1 of 14 Sponsor: City of Naples Airport Authority NPIAS No.: 12-53 Sponsor ID: 122 Airport ID: APF Site No.: 3379.*A 11242 Airport Project ID: 1
More informationWinona Runway Shift Project
Winona Runway Shift Project Sandy DePottey Dakota-Minnesota ADO Fall MnDOT FAAWorkshop St Cloud, Minnesota November 5, 2014 Update on 0 0 Challenges we faced The main runway 12/30 at Winona Municipal Airport
More informationSecond Street Improvements Project Project Update Archive
Second Street Improvements Project Project Update Archive 12/03/18: In observance of the Holiday Moratorium, crews have paused a majority of construction activity on 2nd Street until January 2, 2019. A
More informationDallas. Weekly Update. Field. Thursday. Thursday. Love Field lo. vefield.com and. complaints via. the Airport.
. DALLAS LOVE FIELD COMMUNITY WEEKLY UPDATE July 11 July 17, 215 Dallas Love Field Community Weekly Update IN THIS ISSUE Crazy little thing called Love By: Kevin Keith Field Announcements Thanks to all
More informationPUBLIC NOTICE Passenger Facility Charge Application #8 San Francisco International Airport. December 28, 2017
PUBLIC NOTICE Passenger Facility Charge Application #8 San Francisco International Airport December 28, 2017 Introduction Pursuant to 14 Code of Federal Regulations ( CFR ) Part 158.24, the San Francisco
More informationLOGAN - CACHE AIRPORT AUTHORITY BOARD MEETING SEPTEMBER 3, 2014 MINUTES
LOGAN - CACHE AIRPORT AUTHORITY BOARD MEETING SEPTEMBER 3, 2014 MINUTES The Logan-Cache Airport Authority Board convened in a regular session on September 3, 2014 at 7:30 a.m. in the Cache County Historic
More informationPUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application
PUBLIC NOTICE ***************************** New Castle Airport Intention to File a Passenger Facility Charge (PFC) Application The Delaware River & Bay Authority (DRBA), the sponsor of the New Castle Airport
More informationAGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m.
AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting May 14, 2014 Approval of Minutes: Special
More information50 Ways to Improve Your Airport: Engaging Airport Management on Key Issues
50 Ways to Improve Your Airport: Engaging Airport Management on Key Issues Tuesday, November 17, 2015 1:00 p.m. 2:00 p.m. PRESENTED BY: Charles D. Lamb, P.E. Airfield Lighting Image Source: Delta Airport
More informationMASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4
MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #4 December 14, 2017 Today s Agenda o Welcome o Introductions o Progress update o Alternatives analysis
More informationCHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014
CHICAGO DEPARTMENT OF AVIATION AND THE O HARE MODERNIZATION PROGRAM Current Construction Projects May 2, 2014 O HARE INTERNATIONAL AIRPORT CURRENT CONFIGURATION 2 PHASE 1 & COMPLETION PHASE 9L-27R Completed
More informationPUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT
PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT Date of Public Notice: 8/15/2016 In accordance with the requirements of Section 158.24 of Federal Aviation
More informationA Love Note from Me to You
Community Weekly Update for September 8- September 14, 2012 A Love Note from Me to You Dear Neighbors, Please be advised that we have a scheduled closure of our Preferential Runway 13R/31L (Denton) Friday
More informationSAN FRANCISCO INTERNATIONAL AIRPORT
1 SAN FRANCISCO INTERNATIONAL AIRPORT Runway Safety Area Program ACI-NA Operations and Technical Affairs Conference April 7, 2011 RSA Status Completed RSA Studies Environmental Assessment ongoing and on
More informationCorrection to Council Resolution No , dated June 25, Please add the following correction as part of the permanent record:
1410 Memorandum 9 DATE October 20, 2014 CITY OF DALLAS TO Rosa Rios City Secretary SUBJECT Correction to Council Resolution No. 14-1030, dated Please add the following correction as part of the permanent
More informationSection 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft
Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations Section: Page 32.A General... 32-1 32.B Aircraft... 32-4 32-i THIS PAGE INTENTIONALLY LEFT BLANK 32-i SECTION 32 Airfield and Aircraft Operations
More informationDenver International Airport CONCOURSE B WEST GSE PAVEMENT REHABILITATION - PHASE I
Denver International Airport DIA Project No. WEST - PHASE I ISSUED FOR BID ISSUE : JANUARY 8, 2013 4700 S. SYRACUSE ST., SUITE 300, COLORADO 80237 PHONE 303.409.9700 FAX 303.409.9701 S.H.C. GEOTECHNICAL
More informationAnn Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB
MICHIGAN AIRPORT DEVELOPMENT PROGRAM AIP CAPITAL IMPROVEMENT PLAN 20102019 FEDERAL/STATE/LOCAL Ann Arbor, MI Date of Latest ALP 2008 ACIP Airport Code A Airport Identifier ARB Prepared by: MDOTAERO Sponsor:
More informationSECTION 32. Airfield and Aircraft Operations
SECTION 32 Airfield and Aircraft Operations 32.A Airfields General. 32.A.01 The following safety requirements shall be in addition to the airfield's safety requirements. When an airfield has safety requirements
More informationFrom concept through completion, CGA is your AVIATION engineering firm!
The State of Iowa has 120 general aviation airports. Our staff specializes in serving these airports with their engineering needs. Aviation lighting and navigational aids Environmental and financial feasibility
More informationDallas Love Field Community Weekly Update
. DALLAS LOVE FIELD COMMUNITY WEEKLY UPDATE August 22 28, 2015 Dallas Love Field Community Weekly Update Crazy little thing called Love Field By: Lanre Olaniyan IN THIS ISSUE Announcements Dalfort Aerospace
More informationSpeaker: Jonathan Leach - Chicago Department of Aviation & Todd Merrihew, P.E. - Jacobs Date: February 22, 2017
TRACK: TRACK C (AIRSIDE/ENGINEERING) Title: Upcoming Airfield Programs WORKSHOP: Speaker: Jonathan Leach - Chicago Department of Aviation & Todd Merrihew, P.E. - Jacobs Date: February 22, 2017 Image: O
More informationCity of Tallahassee, FL Department of Aviation
City of Tallahassee, FL Department of Aviation Proposed Application to Federal Aviation Administration For Authority to Impose a Passenger Facility Charge (PFC) at Tallahassee International Airport and
More informationTeterboro Airport Overview
Teterboro Airport Overview Teterboro Airport consists of two intersecting runways. Runway 6-24 is 6,013 ft long and 150 ft wide, and is equipped with High Intensity Runway Edge Lights (HIRL) and Runway
More informationARIZONA DEPARTMENT OF TRANSPORTATION Aeronautics Division FIVE-YEAR AIRPORT DEVELOPMENT PROGRAM FY
ARIZONA DEPARTMENT OF TRANSPORTATION Aeronautics Division FIVE-YEAR AIRPORT DEVELOPMENT PROGRAM FY 2005 2009 Kearny Airport Airport of the Year-2003 Arizona Department of Transportation Aeronautics Division
More informationSACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY
SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY Executive Summary The Sacramento County Airport System Capital Improvement Plan (CIP) is comprised of projects that were identified and evaluated
More informationSource: Chippewa Valley Regional Airport ASOS, Period of Record
Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size
More informationMEMORANDUM VILLAGE OF NORTHBROOK
MEMORANDUM VILLAGE OF NORTHBROOK TO: Staff COPY: Village President & Board of Trustees Department Heads FROM: Richard Nahrstadt, Village Manager DATE: April 29, 2016 SUBJECT: STAFF BRIEFING WEEK OF April
More information1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION
1.1.3 Taxiways EWN has an extensive network of taxiways and taxilanes connecting the terminal, air cargo, and general aviation areas with the runways as listed in Figure 1-15. A 50-foot wide parallel taxiway
More informationDallas Love Field Community Weekly Update
DALLAS LOVE FIELD COMMUNITY WEEKLY UPDATE June 6-June 12, 2015 Dallas Love Field Community Weekly Update IN THIS ISSUE A Love Note from Me to You by Ms. Courtenay Shorter Important Announcement Beginning
More informationInauguration 2017 Dulles Tower
Inauguration 2017 Dulles Tower Presented to: IAD Users By: IAD Staff, Management and NATCA Date:1/3/2017 General Information Inauguration takes place Friday, January 20, 2017 at 1200 (noon) local. The
More informationLANCASTER AIRPORT DRIVER TRAINING PROGRAM
LANCASTER AIRPORT DRIVER TRAINING PROGRAM INTRODUCTION 1. Airfield Driving Basics 2. Movement / Non-Movement Area 3. Airfield Signs, Markings & Lighting 4. Airfield Communications 5. Aviation Phonetics
More informationTECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan
TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan Technical Report #7 Palm Beach International Airport Layout Plan Palm Beach International Airport Prepared for Palm Beach County
More informationDallas Love Field Community Weekly Update
. DALLAS LOVE FIELD COMMUNITY WEEKLY UPDATE August 29 September 4, 2015 Dallas Love Field Community Weekly Update Crazy little thing called Love Field By: Lanre Olaniyan IN THIS ISSUE Announcements In
More informationCHICO MUNICIPAL AIRPORT NON-MOVEMENT AREA DRIVER TRAINING PROGRAM
CHICO MUNICIPAL AIRPORT NON-MOVEMENT AREA DRIVER TRAINING PROGRAM Introduction In an effort to provide the safest and most efficient operating environment for tenants and users of the Chico Municipal Airport
More informationLong water shutdown scheduled for Tuesday, September 18
Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility
More informationA Love Note from Me to You
Community Weekly Update for December 22- December 28, 2012 A Love Note from Me to You Dear Neighbors, We hope that you all have a merry and joyous Christmas holiday! There are a few events for you to be
More informationTO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017
TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017 Please find attached for your review prior to the PAC Meeting #4,
More informationHollaway Consulting Engineers, LLC Statement of Qualifications
Deliberate, Strategic, Connected.Delivering tangible solutions for aviation design and construction management. Hollaway Consulting Engineers, LLC Statement of Qualifications Professional Experience Sheri
More informationChapter Seven COST ESTIMATES AND FUNDING A. GENERAL
Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction
More informationTrick or Treat Process M
AIP Design Lessons Trick or Treat Halloween Sharing October 25, 2017 By: FAA DMA ADO staff Dave P. Anderson Brian P. Schuck Mark J. Holzer 1 Trick or Treat Process M FAA staff of Dave, Brian and Mark shall
More informationBuchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan
Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business Plan Steering Committee December 14, 2006 Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business
More informationSan Bernardino International Airport Authority Building 795
San Bernardino International Airport Authority Building 795 Construction Safety and Phasing Plan 1601 E. Third St. San Bernardino, California 92408 As an authorized representative of, (Company) I (Name
More informationProgress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.
Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High 64 5 2 45 /2/6 Wednesday Daily Precipitation. Weather Conditions: Clear 2 Progress
More informationREALIGNMENT OF AIRCRAFT STANDS AT CARGO APRON & DETAILS OF TAXIWAY L2 INDIRA GANDHI INTERNATIONAL AIRPORT, NEW DELHI (VIDP)
TEL: 91-11-24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: 91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG AIRPORT NEW
More informationCHAPTER 2 INVENTORY EXISTING CONDITIONS 2.1 AIRFIELD FACILITIES Airspace
OF EXISTING CONDITIONS The inventory phase of the planning process provides an overview of the various facilities located at Cecil Field (VQQ). A variety of information sources were utilized in compiling
More informationAppendix F Cultural Resource Consultation
Appendix F Cultural Resource Consultation FAA Consultation Letter to the California State Historic Preservation Officer Response Letter from the California State Historic Preservation Officer STATE
More informationDallas Love Field Community Weekly Update
. DALLAS LOVE FIELD COMMUNITY WEEKLY UPDATE September 26 October 2, 2015 Dallas Love Field Community Weekly Update Crazy little thing called Love Field By: Lanre Olaniyan IN THIS ISSUE Announcements Unmanned
More informationEffective: PERTH AIRPORT AIRSIDE SURFACE MONITORING FOR FORRESTFIELD AIRPORT LINK TUNNELLING
AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AERONAUTICAL INFORMATION CIRCULAR
More informationAERODROME CHART ATIS CLNC DEL 121.4
AERODROME CHART ATIS 124.6 CLNC DEL 121.4 GND 121.7 (S) 127.15 (N) 275.8 -AD TWR 118.7 (S) 119.55 (N) 226.5 DEP 126.12 (N) 132.3 (S) 363.8 DECL DISTS 08R 26L 08L 26R 13 31 TORA 11500 11500 9940 9940 7300
More informationGround Vehicle Operations Training READING REGIONAL AIRPORT
Ground Vehicle Operations Training READING REGIONAL AIRPORT October 22, 2014 Airport Operations Area (AOA) Movement Areas Non-Movement Areas Non-Movement Area Markings Never cross solid line with out ATC
More informationAIRPORT MASTER PLAN UPDATE
AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo
More informationDallas Love Field Community Weekly Update
DALLAS LOVE FIELD COMMUNITY WEEKLY UPDATE March 12th March 18th, Dallas Love Field Community Weekly Update IN THIS ISSUE Crazy little thing called Love Field By: Young Hour Announcements Please be advised
More informationThe Future of Aviation for Central New Mexico
The Future of Aviation for Central New Mexico MISSION STATEMENT THE WHOLE AIRPORT EXPERIENCE HISTORY SPECIFICATIONS FACILITIES SERVICES RECENT IMPROVEMENTS FUTURE DEVELOPMENT & USE USER PROFILE The mission
More informationA Love Note from Me to You
Community Weekly Update for November 9- November 15, 2013 A Love Note from Me to You Dear Neighbors, The Dallas Mavericks will have one home game this week on Tuesday November 12th. Please be advised that
More informationFY Five Year Airport Capital Plan Supplemental Project List As of 12/12/16
Cost Center Project Name REVIEW Tax Status 5-Year Total Supplemental CAC047 - Airfield 10507 Advanced Visual Docking Guidance System (A-VDGS) NOT APPLICABLE AMT 7,000,000 3,993,664 Project has existing
More informationCommunity Newsletter
Community Newsletter Week of March 12-16, 2018 A publication of the City of Dodge City Public Information Office 1. Cavalier Field recently received a new scoreboard measuring 36 wide. The new scoreboard
More informationRESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM
The Robert B. Balter Company (Balter) has an extensive and continuously active involvement with the expansion of Washington Dulles International Airport (IAD) and Ronald Reagan Washington National Airport
More informationKBLI MEDIUM. Bellingham Intl Airport Bellingham, Washington, United States. Diagram #1: All Runways. NOISE ABATEMENT PROCEDURES by Whispertrack
Diagram #1: p. 1 of 5 Diagram #2: p. 2 of 5 OVERVIEW Bellingham International Airport (BLI) is a full service commercial airport located in Whatcom County, approximately 3 miles N.W. of the city limits
More informationDALLAS/FORT WORTH INTERNATIONAL AIRPORT SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM SMGCS PLAN FOR ARRIVAL RUNWAYS 17L-35R, 17C-35C, AND 18R
DALLAS/FORT WORTH INTERNATIONAL AIRPORT SURFACE MOVEMENT GUIDANCE AND CONTROL SYEM SMGCS PLAN FOR ARRIVAL RUNWAYS 7L-35R, 7C-35C, AND 8R DEPARTURE RUNWAYS 7R-35L AND 8L-36R Published September 30, 20 (Reviewed
More informationHow to be Prepared for an Airport Emergency and What to Look for When Inspecting Your Airfield
How to be Prepared for an Airport Emergency and What to Look for When Inspecting Your Airfield David Decoteau, A.A.E., C.A.E. Hayward Executive Airport Job of Airport Operations Commercial vs GA Airfield
More informationIRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel Fax
IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel +353 61 703750 Fax +353 61 366245 DUBLIN AIRPORT (EIDW) RUNWAY 10/28 UPGRADE PHASE 1 AND PHASE 2
More informationTable of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update
Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East
More informationPLANNING & CONSTRUCTION COMMITTEE MEETING MINUTES May 14, 10:30 a.m. Conference Room A/B
PLANNING & CONSTRUCTION COMMITTEE MEETING MINUTES May 14, 2013 @ 10:30 a.m. Conference Room A/B Attendees: Committee Chair: Vice Committee Chair: Committee Members: Other Trustees: Legal Counsel: Airport
More informationDallas Love Field Community Weekly Update
DALLAS LOVE FIELD COMMUNITY WEEKLY UPDATE January 10-January 16, 2015 Dallas Love Field Community Weekly Update LOVE FIELD ART GALLERY- HISTORY OF LOVE FIELD EXHIBIT IN THIS ISSUE A Love Note from Me to
More informationSafety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013
New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts
More informationNew PFC Application #13
PUBLIC CONSULTATION New PFC Application #13 Buffalo, NY December 16, 2015 Agenda PFC Program at Notice to Carriers and Consultation Meeting Class of Carrier Not Required to Collect PFC Air Carrier Requirements
More informationCATCODE ] CATCODE
Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class
More informationAppendix 6.1: Hazard Worksheet
Appendix 6.1: Appendix 6.1: Ref. Condition, real or potential; that can cause injury, illness, etc. This is a prerequisite for an Airfield Hazards 1. Taxiway Geometry Direct access to runway from ramp
More informationAddendum - Airport Development Alternatives (Chapter 6)
Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary
More informationTECHNICAL REPORT #3 Palm Beach International Airport Demand/Capacity and Facility Requirements
TECHNICAL REPORT #3 Palm Beach International Airport Demand/Capacity and Facility Requirements Technical Report #3 Palm Beach International Airport Demand/Capacity and Facility Requirements Palm Beach
More informationNOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018
NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED
More informationFAA Office of Airport Safety and Standards
FAA Office of Airport Safety and Standards Airport and Runway Safety and Technology Presented to: Pan American Regional Aviation Safety Team (PA-RAST) By: Michael Meyers, Deputy Manager Airport Engineering
More informationChallenges to Airport Ramp & Runway Debris Control
BASIC AIRPORT SAFETY & OPERATIONS SCHOOL FAA/AAAE Challenges to Airport Ramp & Runway Debris Control Airport Technology Boeing Commercial Airplanes October 2010 Airport Ramp & Runway Debris Control What
More informationChapter 4 Airport Facility Requirements
Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT
More informationMorristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment
2.0 PURPOSE AND NEED The Purpose and Need Statement in a NEPA document is a formal declaration of the overall goals and objectives of a proposed project. This statement documents the justification for
More informationChippewa-Eau Claire Metropolitan Planning Area Long Range Transportation Plan
1.2.7 2010 Eau Claire County Comprehensive Plan According to Eau Claire County s most recent comprehensive plan, the County will limit land use development adjacent to EAU in order to preserve the ability
More informationInput Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot
Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot community Airport Advisory Board meetings Elected Officials
More informationMAR-A-LAGO POTUS TFR USER & STAKEHOLDER BRIEFING. Federal Aviation Administration. By: PBI Air Traffic Control Date: January 19, 2017
MAR-A-LAGO POTUS TFR USER & STAKEHOLDER BRIEFING By: PBI Air Traffic Control Date: 1 December 26, 2016 PBI Departure PBI Arrival BCT CAYSL Arrival BCT Departure 2 PBIA & Mar-a-Lago 2.1 NM 3 POTUS TFR Surface-17,999
More informationCLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257
Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and
More informationProgress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.
Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High 55 45 99 45 2/7/7 Tuesday Daily Precipitation. Weather Conditions: Clear Progress Report
More informationMOLDOVA MOLDATSA. Moldavian Air Traffic Services Authority Bd. Dacia 80/4, MD-2026 Chisinau, Republica MOLDOVA
Tel: + 373 22 50 28 12 AFS: LUKKYNYX Fax: + 373 22 50 28 13 E-mail: nof@moldatsa.md MOLDOVA MOLDATSA Moldavian Air Traffic Services Authority Bd. Dacia 80/4, MD-2026 Chisinau, Republica MOLDOVA NOTAM LIST
More informationPavement Strength Analysis Prepared by Molzen Corbin September 2016
Pavement Strength Analysis Prepared by Molzen Corbin September 2016 The Santa Fe Municipal Airport was originally constructed in 1941. It was constructed by the military as a B-24 bomber training base.
More informationOJAI AD 2.3 JORDAN 01 AUG 2009
AIP AD 2.1 JORDAN 01 AUG 2009 OJAI AD 2.1 AERODROME LOCATION INDICATOR AND NAME OJAI - Queen Alia International OJAI AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site at
More information