1 Mon SUN MONDAY 01/06/2014 Ops. Construction (650) SFO P&G - Power Wash PM Crew will power wash various areas around Boarding Area C. 12 Woolpert/SFO Surveyors - AGIS Survey and Report FAA / SFO Escort Survey crew from Plot 3 to GPS control stations, W1383, X1383 & A1384. See diagram. 15 SFO Surveyors - Lay Out Lead-In Lines and Gate Markers B Escort Surveyor in-and-around BA-E for lead-in line to Gate 64 and various gate markers. 19A SFO Painters: Tracking Markings for B/A E Gates PM Crew will be tracking B/A E gate markings. Painters may require assistance. 20 Hensel Phelps BA-E - Deliveries, Off- Haul, Fuel Flush B 21 Hensel Phelps ATCT - Deliveries B Escort required to/from Northfield Checkpoint, Gate 82 & Gate 24A or 24B. SFPD to Monitor/Control AOA Access Gate 24A (-1700 hrs.) Escort required to/from Southfield Checkpoint, Gate 82, Gate 23C & the Secured Connector site. Note: Anticipated delivery times & SFIA ELEC SHOP- AIRS Items PM Airfield Complex - Escort Required. 57 SFIA ELEC SHOP PM Airfield Complex - Escort Required. RWY TWY* TXL or GT VSR SITE SURVEY ASO NO IMPACT AF: ATCT: ADM: Const. Ofc: Ops: Surv: Elec: Paving: Painters: 1/3/2014 2:17 PM
2 Tue MON TUESDAY 01/07/2014 R SFO P&G - Power Wash PM Crew will power wash various areas around Boarding Area C. 2 Woolpert/SFO Surveyors - AGIS Survey and Report FAA / SFO Close RWY 10L-28R (0001- hrs.) Escort required. Meet crew at Plot 3 at 2330 hrs. to survey RWY end/threshold, RWY profile survey, RWY end photos. Continue survey & photos of NAVAIDs, if needed, after RWY opening. 19A 20 SFO Painters: Tracking Markings for B/A E Gates Hensel Phelps BA-E - Deliveries, Off- Haul, Fuel Flush PM B Crew will be tracking B/A E gate markings. Painters may require assistance. Escort required to/from Northfield Checkpoint, Gate 82 & Gate 24A or 24B. SFPD to Monitor/Control AOA Access Gate 24A (-1700 hrs.) 21 Hensel Phelps ATCT - Deliveries, B Escort required to/from Southfield Checkpoint, Gate 82, Gate 23C & the Secured Connector site. Note: Anticipated delivery times 23 SFO Spray man PM Airfield Complex - Escort as needed. 44 SFO Fuel - Fuel Vault Maintenance PM Escort required. Crew will need escort to Fuel Vaults 6,8,9,10, & 11 for weekly mandated services. Restrict TWY as necessary. 55 SFIA ELEC SHOP- AIRS Items PM Airfield Complex - Escort Required. 57 SFIA ELEC SHOP PM Airfield Complex - Escort Required. RWY TWY* TXL or GT VSR SITE SURVEY ASO NO IMPACT 1/3/2014 2:17 PM
3 Wed TUE WEDNESDAY 01/08/ SFO P&G - Power Wash PM Crew will power wash various areas around Boarding Area C. 2 Woolpert/SFO Surveyors - AGIS Survey and Report FAA / SFO Close RWY 10R-28L (0001- hrs.) Escort required. Meet crew at Plot 3 at 2330 hrs. to survey RWY end/threshold, RWY profile survey, RWY end photos. Continue survey & photos of NAVAIDs, if needed, after RWY opening. (01/06) - Close Aircraft Gate 93 (01/06-01/13) Escort as needed to/from worksite. Work to include, temp. VSR realignment, pavement removal, valve repair, pit lid extension, pavement replacement, concrete pour & cure. 20 Hensel Phelps BA-E - Deliveries, Off-Haul, Fuel Flush B 21 Hensel Phelps ATCT - Deliveries, B Escort required to/from Northfield Checkpoint, Gate 82 & Gate 24A or 24B. SFPD to Monitor/Control AOA Access Gate 24A ( hrs.) Escort required to/from Southfield Checkpoint, Gate 82, Gate 23C & the Secured Connector site. Note: Anticipated delivery times 23 SFO Spray man PM Airfield Complex - Escort as needed. 44 SFO Fuel - Fuel Vault Maintenance PM Escort required. Crew will need escort to Fuel Vaults 6,8,9,10, & 11 for weekly mandated services. Restrict TWY as necessary. 55 SFIA ELEC SHOP- AIRS Items PM Airfield Complex - Escort Required.
4 Thu WED THURSDAY 01/09/ SFO P&G - Power Wash PM Crew will power wash various areas around Boarding Area C. 2 Woolpert/SFO Surveyors - AGIS Survey and Report FAA / SFO Close RWY 1R-19L ( hrs.) Escort required. Meet crew at Plot 3 at 2330 hrs. to survey RWY end/threshold, RWY profile survey, RWY end photos. Continue survey & photos of NAVAIDs after RWY opening. At ~1000 hrs. coordinate with ATCT for short closure for survey photos at the end of the runway 19A 20 SFO Painters: Tracking Markings for B/A E Gates Hensel Phelps BA-E - Deliveries, Off-Haul, Fuel Flush PM B 21 Hensel Phelps ATCT - Deliveries B Crew will be tracking B/A E gate markings. Painters may require assistance. Escort required to/from Northfield Checkpoint, Gate 82 & Gate 24A or 24B. SFPD to Monitor/Control AOA Access Gate 24A (-1700 hrs.) Escort required to/from Southfield Checkpoint, Gate 82, Gate 23C & the Secured Connector site. Note: Anticipated delivery times & SFO Spray man PM Airfield Complex - Escort as needed. 44 SFO Fuel - Fuel Vault Maintenance PM Escort required. Crew will need escort to Fuel Vaults 6,8,9,10, & 11 for weekly mandated services. Restrict TWY as necessary. 55 SFIA ELEC SHOP- AIRS Items PM Airfield Complex - Escort Required. 57 SFIA ELEC SHOP PM Airfield Complex - Escort Required. RWY TWY* TXL or GT VSR SITE SURVEY ASO NO IMPACT 1/3/2014 2:17 PM
5 Fri THU FRIDAY 01/10/ SFO P&G - Power Wash PM Crew will power wash various areas around Boarding Area C. 1A SFO P&G - Grind and Pave FH# PM Grind & Pave behind Fire House #1. 2 Woolpert/SFO Surveyors - AGIS Survey and Report FAA / SFO Close RWY 1L-19R ( hrs.) Escort required. Meet crew at Plot 3 at 2330 hrs. to survey RWY end/threshold, RWY profile survey, RWY end photos. Continue survey & photos of NAVAIDs after RWY opening. At ~1000 hrs. coordinate a short closure with ATCT for survey photos at the end of the runway SFO Painters: Tracking Markings for B/A E 19A Gates 20 Hensel Phelps BA-E - Deliveries, Off-Haul, Fuel Flush PM B 21 Hensel Phelps ATCT - Deliveries B Crew will be tracking B/A E gate markings. Painters may require assistance. Escort required to/from Northfield Checkpoint, Gate 82 & Gate 24A or 24B. SFPD to Monitor/Control AOA Access Gate 24A (-1700 hrs.) Escort required to/from Southfield Checkpoint, Gate 82, Gate 23C & the Secured Connector site. Note: Anticipated delivery times 44 SFO Fuel - Fuel Vault Maintenance PM Escort required. Crew will need escort to Fuel Vaults 6,8,9,10, & 11 for weekly mandated services. Restrict TWY as necessary. 55 SFIA ELEC SHOP- AIRS Items PM Airfield Complex - Escort Required. 57 SFIA ELEC SHOP PM Airfield Complex - Escort Required. RWY TWY* TXL or GT VSR SITE SURVEY ASO NO IMPACT 1/3/2014 2:17 PM
6 Sat FRI SATURDAY 01/11/ SFO Sweeper/Vactor/Mower Driver Available if requested PM Contact via Maint. Control if needed. 44 SFO Fuel - Fuel Vault Maintenance PM Escort required. Crew will need escort to Fuel Vaults 6,8,9,10, & 11 for weekly mandated services. Restrict TWY as necessary. RWY TWY TXL or GT VSR SITE SURVEY ASO NO IMPACT 1/3/2014 2:17 PM
7 Sun SAT SUNDAY 01/12/ SFO Sweeper/Vactor/Mower Driver Available if requested PM Contact via Maint. Control if needed. RWY TWY TXL or GT VSR SITE SURVEY ASO NO IMPACT 1/3/2014 2:17 PM
8 2014 Airport or Project # Description **** CONTRACTOR PHONE NUMBERS **** SFIA CONTRACT MGR. // SFIA INSPECTOR // CONTRACTOR CONTACT 8788 AIRFIELD PAVEMENT RECONSTRUCTION/ RWY RUBBER REMOVAL PROJECT MANAGER - STAN PALAT , DANIEL LEE, A 8671B ATCT Tower RSA RWY 01L & 01R Paving & Lighting Hensel Phelps Superintendent - Jason Coyne - (650) , (831) Cell. Project Manager - Mark Fantozzi P.E. - (650) , (408) Cell T3 B/A E Upgrade Project Manager - Tony Breslin - (650) , Hensel Phelps - Kayla Burtness - (650) , (650) Cell T Signature Flight Support FBO Hanger C 8673 Airfield Operations Building Project Director - Vinson Heine - (510) Office, (415) Mobile, Overaa - Supervisor - (510) Project Manager - Derek Homer - SFIA Inspector - Robert Stalf - (650) , (650) Cell, Superintendent - Gus Lotti - (415) , (415) Cell PM Burns & McDonnell - Fuel Pit Extension Project Manager - Kurt Janisch Burns & Mcdonnell, (816) , (816) Alt. Contacts: Luke Clisbee (816) , Rick Parra (858) , Tyler Mclroy (816) Page 8 of 8
9
10
SFO Construction and Maintenance Schedule 2013
Mon SUN MONDAY 08/05/2013 Ops. Construction (650)821-3341 Item # Activity/Contractor Time 1 SFO P&G - Crack Seal RWY 10R/28L 0000-0600 4 6 Clean Harbors/Superior Drilling/SFIA Water Treatment - Excavation/Cleaning
More informationSFO Construction and Maintenance Schedule 2013
Mon SUN MONDAY 05/20/2013 Ops. Construction (650)821-3341 1 1A 3 SFO Pavings & Grounds - Crack Seal RWY 10R/28L SFO Pavings & Grounds - Repair Catch Basin SFO Engineering/Ennis-Flint - Re-install Thermoplastics
More informationAIRPORT SECURITY BULLETIN
AIRPORT SECURITY BULLETIN 17-11 Temporary Badge Program Background: Safety and Security is the Airport s first priority. In order to tighten security, the Airport has eliminated the Visitor V and Construction
More informationPlanning & Development Group
Planning & Development Group LAX Airside Technical Committee Meeting January 9, 2018 Mark Vicelja, P.E. 1 Airside Element Projects LAX AIRSIDE ELEMENT PROJECTS CONSTRUCTION SCHEDULE (as of January 1, 2018)
More informationCertAlert. Hurricane Field Condition Report
CertAlert DOT/Federal Aviation Administration, Southern Region Airports Division, Airport Certification Safety Team (ASO-620), P.O. Box 20636, Atlanta, Georgia 30320 (404) 305-6700; FAX: (404) 305-6730
More informationSan Bernardino International Airport Authority Ramp Joint Seal Replacement & Pavement Repair Project
San Bernardino International Airport Authority Ramp Joint Seal Replacement & Pavement Repair Project Construction Safety and Phasing Plan 1601 E. Third St. San Bernardino, California 92408 As an authorized
More informationDallas Love Field Community Weekly Update
DALLAS LOVE FIELD COMMUNITY WEEKLY UPDATE June 6-June 12, 2015 Dallas Love Field Community Weekly Update IN THIS ISSUE A Love Note from Me to You by Ms. Courtenay Shorter Important Announcement Beginning
More informationA Love Note from Me to You
Community Weekly Update for September 8- September 14, 2012 A Love Note from Me to You Dear Neighbors, Please be advised that we have a scheduled closure of our Preferential Runway 13R/31L (Denton) Friday
More informationA Love Note from Me to You
Community Weekly Update for December 22- December 28, 2012 A Love Note from Me to You Dear Neighbors, We hope that you all have a merry and joyous Christmas holiday! There are a few events for you to be
More informationInput Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot
Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot community Airport Advisory Board meetings Elected Officials
More informationA Love Note from Me to You
Community Weekly Update for November 9- November 15, 2013 A Love Note from Me to You Dear Neighbors, The Dallas Mavericks will have one home game this week on Tuesday November 12th. Please be advised that
More informationOLD AIRPORT (PFN) RW 05/23 RW 14/32. 4,884-FEET X 150-FEET MIRL 4-BOX VASIs (5 & 23 APPROACHES) REILS
FAITH ADAMS AGENDA AIRPORT RELOCATION CHALLENGES AIRFIELD LIGHTING & SIGNAGE NAVAIDS AIRFIELD LIGHTING VAULT L-890 ALCMS AIR TRAFFIC CONTROL TOWER (ATCT) CONCLUSION AIRPORT RELOCATION OLD AIRPORT (PFN)
More informationSURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM PLAN. Los Angeles International Airport
SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM PLAN Los Angeles International Airport Surface Movement Guidance and Control System (SMGCS) Plan The SMGCS Plan for Los Angeles International Airport (LAX)
More informationCHICO MUNICIPAL AIRPORT NON-MOVEMENT AREA DRIVER TRAINING PROGRAM
CHICO MUNICIPAL AIRPORT NON-MOVEMENT AREA DRIVER TRAINING PROGRAM Introduction In an effort to provide the safest and most efficient operating environment for tenants and users of the Chico Municipal Airport
More informationDallas Love Field Community Weekly Update
DALLAS LOVE FIELD COMMUNITY WEEKLY UPDATE January 24-January 30, 2015 Dallas Love Field Community Weekly Update LOVE FIELD THEN AND NOW IN THIS ISSUE A Love Note from Me to You by Ms. Courtenay Shorter
More informationEffective: PERTH AIRPORT AIRSIDE SURFACE MONITORING FOR FORRESTFIELD AIRPORT LINK TUNNELLING
AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AERONAUTICAL INFORMATION CIRCULAR
More informationSan Bernardino International Airport Authority Building 795
San Bernardino International Airport Authority Building 795 Construction Safety and Phasing Plan 1601 E. Third St. San Bernardino, California 92408 As an authorized representative of, (Company) I (Name
More informationNotice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application
July 3, 2018 Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application The City of Kansas City (City), Missouri through its Aviation Department ( the Department
More informationSection 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft
Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations Section: Page 32.A General... 32-1 32.B Aircraft... 32-4 32-i THIS PAGE INTENTIONALLY LEFT BLANK 32-i SECTION 32 Airfield and Aircraft Operations
More informationGround Vehicle Operations Training READING REGIONAL AIRPORT
Ground Vehicle Operations Training READING REGIONAL AIRPORT October 22, 2014 Airport Operations Area (AOA) Movement Areas Non-Movement Areas Non-Movement Area Markings Never cross solid line with out ATC
More informationInauguration 2017 Dulles Tower
Inauguration 2017 Dulles Tower Presented to: IAD Users By: IAD Staff, Management and NATCA Date:1/3/2017 General Information Inauguration takes place Friday, January 20, 2017 at 1200 (noon) local. The
More informationDallas Love Field Community Weekly Update
DALLAS LOVE FIELD COMMUNITY WEEKLY UPDATE March 28-April 3, 2015 Dallas Love Field Community Weekly Update DAWN FROM THE HISTORY OF DALLAS COLLECTION BY DAVID NEWTON IN THIS ISSUE A Love Note from Me to
More informationDallas. Weekly Update. Field. Thursday. Thursday. Love Field lo. vefield.com and. complaints via. the Airport.
. DALLAS LOVE FIELD COMMUNITY WEEKLY UPDATE July 11 July 17, 215 Dallas Love Field Community Weekly Update IN THIS ISSUE Crazy little thing called Love By: Kevin Keith Field Announcements Thanks to all
More informationCONSTRUCTION SAFETY AND PHASING PLAN (CSPP)
TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT DIVISION 1 GENERAL REQUIREMENTS 2019 ANNUAL AIRFIELD PAVEMENT REHABILITATION SECTION CONSTRUCTION SAFETY AND PHASING PLAN CONTRACT NO. 201947110 CONSTRUCTION
More informationCommunity Notices. Upcoming Yongergnow. January 12th 2017 JANUARY
January 12th 2017 Community Notices Upcoming Events KONGA FITNESS CLASSES Commencing at Ongerup Hall 9am Tuesday 7th February. Contact Kara Mitchell for more information. 0400 233066 @ Yongergnow FRIDAY
More informationSpecial Modification To Standards Process for Airplane Design Group VI. The Boeing Federal Aviation Administration
Special Modification To Standards Process for Airplane Design Group VI The Boeing 747-8 Presented to: ACI-NA First B-747-8 Airport Compatibility Meeting By: George Legarreta, Office of Airport Safety and
More informationRECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1
PHASING PLAN - PHASE 1 2 Weeks PHASE 1 SCOPE OF WORK Phase 1 consists of the reconstruction of a portion of Taxiway 'A' and the crack seal and seal coat of the North Apron. The portion of Taxiway 'A' to
More information50 Ways to Improve Your Airport: Engaging Airport Management on Key Issues
50 Ways to Improve Your Airport: Engaging Airport Management on Key Issues Tuesday, November 17, 2015 1:00 p.m. 2:00 p.m. PRESENTED BY: Charles D. Lamb, P.E. Airfield Lighting Image Source: Delta Airport
More informationChapter Seven COST ESTIMATES AND FUNDING A. GENERAL
Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction
More informationSECTION 32. Airfield and Aircraft Operations
SECTION 32 Airfield and Aircraft Operations 32.A Airfields General. 32.A.01 The following safety requirements shall be in addition to the airfield's safety requirements. When an airfield has safety requirements
More informationFY Five Year Airport Capital Plan Supplemental Project List As of 12/12/16
Cost Center Project Name REVIEW Tax Status 5-Year Total Supplemental CAC047 - Airfield 10507 Advanced Visual Docking Guidance System (A-VDGS) NOT APPLICABLE AMT 7,000,000 3,993,664 Project has existing
More informationCity of Tallahassee, FL Department of Aviation
City of Tallahassee, FL Department of Aviation Proposed Application to Federal Aviation Administration For Authority to Impose a Passenger Facility Charge (PFC) at Tallahassee International Airport and
More informationDallas Love Field Community Weekly Update
DALLAS LOVE FIELD COMMUNITY WEEKLY UPDATE January 10-January 16, 2015 Dallas Love Field Community Weekly Update LOVE FIELD ART GALLERY- HISTORY OF LOVE FIELD EXHIBIT IN THIS ISSUE A Love Note from Me to
More informationCONSENT DECREE & 3,500 RUNWAY
CONSENT DECREE & 3,500 RUNWAY FAA Airfield Design Standards FAA AC 150/5300-13A Change 1 (2/26/2014) Joseph Schmitz, PhD Airport Commission Member Graphics: Andrew Wilder Resolves Ongoing FAA v. City of
More informationDallas Love Field Community Weekly Update
DALLAS LOVE FIELD COMMUNITY WEEKLY UPDATE October 18-October 24, 2014 Dallas Love Field Community Weekly Update FOR OUR LITTLE PASSENGERS-THE LIL LOVE LOUNGE IS LOCATED IN THE STEM OF THE TERMINAL IN THIS
More informationLANCASTER AIRPORT DRIVER TRAINING PROGRAM
LANCASTER AIRPORT DRIVER TRAINING PROGRAM INTRODUCTION 1. Airfield Driving Basics 2. Movement / Non-Movement Area 3. Airfield Signs, Markings & Lighting 4. Airfield Communications 5. Aviation Phonetics
More informationWinona Runway Shift Project
Winona Runway Shift Project Sandy DePottey Dakota-Minnesota ADO Fall MnDOT FAAWorkshop St Cloud, Minnesota November 5, 2014 Update on 0 0 Challenges we faced The main runway 12/30 at Winona Municipal Airport
More information18 Sep 07 Oct 2018 $ 5998
Dream Maker Travel (Australia) Pty Ltd Metropol Shopping Centre, 742 Creek Road, Carindale QLD 4152 Tel: 07 3343 5422 Fax: 07 3849 5770 Email: info@dreammakertravel.com.au Web Site: www.dreammakertravel.com.au
More informationBeginning balance available for Priority I Projects: $1,737,029
2016 COAR Grant Cycle Priority I Projects Airport Name Project Name Requested Grant Amount Match % of Grant Match Total Project Cost or Total FAA Grant Match Amount required RUNNING TOTAL (Available Balance)
More informationProgress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.
Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High 64 5 2 45 /2/6 Wednesday Daily Precipitation. Weather Conditions: Clear 2 Progress
More informationGuide to Creating a Practice Runway
Guide to Creating a Practice Runway This document is intended for airport owners, pilot groups, airport support groups or others interested in creating a practice runway at an airport to improve pilot
More informationSAN FRANCISCO INTERNATIONAL AIRPORT
1 SAN FRANCISCO INTERNATIONAL AIRPORT Runway Safety Area Program ACI-NA Operations and Technical Affairs Conference April 7, 2011 RSA Status Completed RSA Studies Environmental Assessment ongoing and on
More informationTeterboro Airport Overview
Teterboro Airport Overview Teterboro Airport consists of two intersecting runways. Runway 6-24 is 6,013 ft long and 150 ft wide, and is equipped with High Intensity Runway Edge Lights (HIRL) and Runway
More informationSecond Street Improvements Project Project Update Archive
Second Street Improvements Project Project Update Archive 12/03/18: In observance of the Holiday Moratorium, crews have paused a majority of construction activity on 2nd Street until January 2, 2019. A
More information18 Sep 07 Oct 2018 $ 5998
Dream Maker Travel (Australia) Pty Ltd Metropol Shopping Centre, 742 Creek Road, Carindale QLD 4152 Tel: 07 3343 5422 Fax: 07 3849 5770 Email: info@dreammakertravel.com.au Web Site: www.dreammakertravel.com.au
More information18 Sep 19 Oct 2018 $ 7998
Dream Maker Travel (Australia) Pty Ltd. Metropol Shopping Centre, 742 Creek Rd, Carindale QLD 4152 Tel: 07 3343 5422 Mobile:- 0414 445 279 Email: info@dreammakertravel.com.au Web Site: www.dreammakertravel.com.au
More informationDallas Love Field Community Weekly Update
DALLAS LOVE FIELD COMMUNITY WEEKLY UPDATE March 12th March 18th, Dallas Love Field Community Weekly Update IN THIS ISSUE Crazy little thing called Love Field By: Young Hour Announcements Please be advised
More informationDATE OF AERIAL PHOTOGRAPHY:
DESCRIPTION RUNWAY SAFETY AREA RUNWAY PROTECTION ZONE TAXIWAY OBJECT FREE AREA DATE OF AERIAL PHOTOGRAPHY: 6-17-01 RUNWAY SAFETY AREA FOR PORTION OF RUNWAY 16L-34R SOUTH OF RUNWAY BRIDGE HAS A FAA WAIVER
More informationOPERATING DIRECTIVE Number: D Aviation Authority Revised: 03/26/13
OPERATING DIRECTIVE Number: D343.00.06 Effective: 10/01/88 Aviation Authority Revised: 03/26/13 Page: 1 of 11 Subject: Vehicles and Personnel Access to Movement and Safety Areas PURPOSE: To establish procedures
More informationPUBLIC NOTICE. Table 1 Projects Proposed by Amendment
PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the
More informationSYSTEM BRIEF DAILY SUMMARY
SYSTEM BRIEF SUMMARY * ANNUAL (PEAK HOURS 7:00 AM TO 10:00 PM MON-SAT) MaxTemp NEL (MWH) Hr Ending Hr Ending LOAD ENERGY (MWH) INCREMENTAL COST DAY DATE Civic TOTAL MAXIMUM @Max MINIMUM @Min FACTOR ON
More informationMASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4
MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #4 December 14, 2017 Today s Agenda o Welcome o Introductions o Progress update o Alternatives analysis
More informationNON MOVEMENT AREA DRIVERS TRAINING
NON MOVEMENT AREA DRIVERS TRAINING Introduction Introduction The Federal Aviation Administration (FAA) and the Transportation Security Administration (TSA) have instituted rules and regulations requiring
More informationdispatch September 2018 VOlume 11. Issue 3
The MMU dispatch September 2018 VOlume 11. Issue 3 Table of Contents Airport News Page 1-2: Recap of RWY 13-31 Construction Page 3: MMU Customs Association Increasing Clearance Fees Page 4: Upcoming MMU
More informationCity of Grand Island Tuesday, December 12, 2017 Council Session
City of Grand Island Tuesday, December 12, 2017 Council Session Item E-3 Public Hearing on One & Six Year Street Improvement Plan Council action will take place under Resolution item I-1. Staff Contact:
More informationPublic Information Center August 12, 2010
Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General
More informationPREFERRED PLAN Kahului Airport Master Plan and Noise Compatibility Program Update
PREFERRED PLAN Kahului Airport Master Plan and Noise Compatibility Program Update AIRPORTS DIVISION DEPARTMENT OF TRANSPORTATION March 13, 2012 AGENDA Introduction Purpose and Meeting Objectives Kahului
More informationA Love Note from Me to You
Community Weekly Update for June 7- June 13, 2014 A Love Note from Me to You Dear Neighbors, Our preferential runway, 13R/31L(Denton), is currently closed for approximately 45 days to facilitate two airfield
More informationRENO-TAHOE INTERNATIONAL AIRPORT USERS COMMITTEE BRIEF OF MINUTES May 18, :30 p.m.
RENO-TAHOE INTERNATIONAL AIRPORT USERS COMMITTEE BRIEF OF MINUTES May 18, 2015 4:30 p.m. COMMITTEE MEMBERS PRESENT Bill Eck, Chair Bob Larkin, Vice-Chair Lt. Col. Tony Machabee Robert Meurer Tom Hegge
More informationChapter 4 Airport Facility Requirements
Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT
More informationMEMORANDUM VILLAGE OF NORTHBROOK
MEMORANDUM VILLAGE OF NORTHBROOK TO: Staff COPY: Village President & Board of Trustees Department Heads FROM: Richard Nahrstadt, Village Manager DATE: April 29, 2016 SUBJECT: STAFF BRIEFING WEEK OF April
More informationTECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan
TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan Technical Report #7 Palm Beach International Airport Layout Plan Palm Beach International Airport Prepared for Palm Beach County
More informationPUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT
PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT Date of Public Notice: 8/15/2016 In accordance with the requirements of Section 158.24 of Federal Aviation
More informationDallas Love Field Community Weekly Update
DALLAS LOVE FIELD COMMUNITY WEEKLY UPDATE March 7-March 13, 2015 Dallas Love Field Community Weekly Update SNOW DAY AT DALLAS LOVE FIELD! IN THIS ISSUE A Love Note from Me to You by Ms. Courtenay Shorter
More informationProgress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.
Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High 55 45 99 45 2/7/7 Tuesday Daily Precipitation. Weather Conditions: Clear Progress Report
More informationDallas Love Field Community Weekly Update
. DALLAS LOVE FIELD COMMUNITY WEEKLY UPDATE September 26 October 2, 2015 Dallas Love Field Community Weekly Update Crazy little thing called Love Field By: Lanre Olaniyan IN THIS ISSUE Announcements Unmanned
More informationModernizing Safety. Air. Land. Sea.
Modernizing Safety. Air. Land. Sea. Formed in 1987 WOSB Aircraft Parts & Supplies Exploring Niche Solar Signal Aviation & Obstruction Marine Traffic Innovation Focus & Diversification Composite Frangible
More informationMCAS Cherry Point Course Rules Brief
MCAS Cherry Point Course Rules Brief 121024 Course Rules Brief Requirement All pilots and NFOs shall receive an MCAS Cherry Point course rules brief prior to conducting flight operations from MCAS Cherry
More informationPUBLIC MEETING GRAND COUNTY AIRPORT BOARD REGULAR MEETING AGENDA. December 3 rd, :00 P.M. County Council Chambers 125 E Center St Moab, UT 84532
A. Call to Order B. General Business PUBLIC MEETING GRAND COUNTY AIRPORT BOARD REGULAR MEETING AGENDA December 3 rd, 2018 5:00 P.M. County Council Chambers 125 E Center St Moab, UT 84532 1. Approve minutes
More informationCHAPTER 2 INVENTORY EXISTING CONDITIONS 2.1 AIRFIELD FACILITIES Airspace
OF EXISTING CONDITIONS The inventory phase of the planning process provides an overview of the various facilities located at Cecil Field (VQQ). A variety of information sources were utilized in compiling
More informationTABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved
TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING
More informationGeneral Aviation Master Plan Update
Peter O. Knight Airport Public Meeting #2 Peter O. Knight Airport Agenda Welcome and Introductions HCAA System of Airports Purpose of Public Meetings Master Plan Status Update Next Steps Q & A 2 Our System
More informationSEYCHELLES CIVIL AVIATION AUTHORITY Seychelles International Airport. Summer Schedule 2017 (5 th Edition)
SEYCHELLES CIVIL AVIATION AUTHORITY Seychelles International Airport Summer Schedule 2017 (5 th Edition) Friday 01 st September Saturday 28 th October 2017 DAY FLIGHT AC TYPE FROM STA STD TO REMARKS SUN
More informationAppendix D Airfield Ongoing Projects Alternatives
Appendix D Appendix D D.1 Introduction The set of alternatives for each of the airfield facilities was compared with respect to each other and the existing condition. 1 The screening and evaluation process
More informationProgress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.
Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High 4 33 83 45 /7/7 Tuesday Daily Precipitation.25" Weather Conditions: Rain Progress Report
More informationMerritt Island Airport
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory
More informationPublic Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California
Public Review Draft South County Airport Master Plan Report County of Santa Clara San Martin, California July 2005 County of Santa Clara Board of Supervisors Donald F. Gage Blanca Alvarado Peter A. McHugh
More information22 Days Escorted Tour Fly & Cruise Scandinavia Celebrity Host Ian Healy Denmark, Sweden, Russia Finland
Dream Maker Travel (Australia) Pty Ltd METROPOL SHOPPING CENTRE 742 Creek Road (Cnr Creek Rd & Pine Mountain Rd) MOUNT GRAVATT EAST QLD 4122 Tel: 07 3343 5422 Fax: 07 3849 5770 Email: info@dreammakertravel.com.au
More informationDECA Facility Hours As of 29 January 2018
DECA Facility Hours Normal Hours Sunday 1030-1900 Monday 0900-2000 Tuesday 0900-2000 Wednesday 0900-2000 Thursday 0900-2000 Friday 0900-2000 Saturday 1030-1900 Operating hours on federal holidays are from
More informationKansas City Aviation Department. Update to Airport Committee October 20, 2016
Kansas City Aviation Department Update to Airport Committee October 20, 2016 1 Status of Customer Service Improvements Additional electric outlets in public areas Wayfinding / Rental car signage Review
More information1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION
1.1.3 Taxiways EWN has an extensive network of taxiways and taxilanes connecting the terminal, air cargo, and general aviation areas with the runways as listed in Figure 1-15. A 50-foot wide parallel taxiway
More informationTO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017
TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017 Please find attached for your review prior to the PAC Meeting #4,
More informationNorth America West Coast Central America West Coast WAMS
North America West Coast Central America West Coast WAMS NORTHBOUND SERVICE HIGHLIGHTS n Weekly, reliable service from Central America West Coast, including Mexico, Nicaragua, Costa Rica, Panama, El Salvador
More informationJUNEAU INTERNATIONAL AIRPORT (JNU) RESTRICTED AREA TEST
JUNEAU INTERNATIONAL AIRPORT (JNU) RESTRICTED AREA TEST USE SEPARATE ANSWER SHEET: DO NOT MARK ON THIS TEST 1. Penalties for violating the JNU Airport Security rules may include all of the following except:
More informationCOLLEGE FOOTBALL PLAYOFF NATIONAL CHAMPIONSHIP
2017 College Football Playoff National Championship Notices to Airmen COLLEGE FOOTBALL PLAYOFF NATIONAL CHAMPIONSHIP SPECIAL AIR TRAFFIC PROCEDURES TAMPA, January 8 10, 2017 In anticipation of a large
More informationWill it Fit? Preliminary Findings
Will it Fit? Preliminary Findings Presented by John Dickson Airport System Development Committee, Chair Transportation Committee October 24, 2018 Agenda Introduction & overview Airport site planning considerations
More informationPUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application
PUBLIC NOTICE ***************************** New Castle Airport Intention to File a Passenger Facility Charge (PFC) Application The Delaware River & Bay Authority (DRBA), the sponsor of the New Castle Airport
More informationRFP No C001 Fixed Base Operator, Dulles Airport. May 3, 2017
RFP No. 6-17-C001 Fixed Base Operator, Dulles Airport May 3, 2017 Questions and Answers Notice: Questions may have been edited for clarity and relevance. 1. Question: RFP Section I.I. Is Jet Aviation Dulles,
More informationTable of Contents. Overview Objectives Key Issues Process...1-3
Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5
More informationWINTER NEWS LETTER-2018
WINTER NEWS LETTER-2018 75400 North Avenue-PO Box 306 Armada Mi 48005 (586)-784-8050 office or cell (586)-489-6144 JANUARY-FEBRUARY-MARCH Donna Peitz-Director HAPPY NEW YEAR! I hope the Holidays were good
More informationAirside Construction Safety: The Human Factor
Airside Construction Safety: The Human Factor Presented by The Massachusetts Port Authority Houssam H. Sleiman, P.E., CCM Director, Capital Programs and Environmental Affairs September 25, 2010 ACI-NA
More informationAddendum - Airport Development Alternatives (Chapter 6)
Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary
More informationCAPITAL IMPROVEMENT PROGRAM LEE S SUMMIT AIRPORT
CAPITAL IMPROVEMENT PROGRAM 2007-2011 LEE S SUMMIT AIRPORT AIRPORT Pg. No. Project Yrs. 1 Air Traffic Control Tower 2,000 - - - - - - 2,000 2 Develop East Terminal Area 1,10 177,7 4,97 - - - 9,877 Land
More information14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice
14 C.F.R. Part 158 Passenger Facility Charge Program Logan International Airport Public Notice Summary of Proposed 2018 PFC Application PFC Project Descriptions and Justifications PFC Financial Plan Class
More informationDenver International Airport
Denver International Airport Denver, Colorado Construction Safety Operational Plan (CSOP) Issued for Bid For Terminal Water Quality Pond Construction Contract No. 201100141 June 2011 Contents 1.0 PURPOSE...
More informationHollaway Consulting Engineers, LLC Statement of Qualifications
Deliberate, Strategic, Connected.Delivering tangible solutions for aviation design and construction management. Hollaway Consulting Engineers, LLC Statement of Qualifications Professional Experience Sheri
More informationVaccine Summit - Driving Growth, Creating Impact
RFP Details RFP Name Response Due Date Decision Date RFP Type RFP Code Description Decision Factors Billing Information MRK02653 - Vaccine Summit - Driving Growth, Creating Fri, 16-Oct-2015 Fri, 23-Oct-2015
More informationWhat is an Airport Master Plan?
What is an Airport Master Plan? The goal of a master plan is to provide the framework needed to guide future airport development that will cost-effectively satisfy aviation demand, while considering potential
More informationKansas City, Missouri (direct, non-stop destination from RSW)
Kansas City, Missouri (direct, non-stop destination from RSW) Kansas City straddles the Missouri-Kansas state line, sometimes causing travelers to wonder which state they are in. Here are a few tips to
More informationProject Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon
Date: 06-24-16 To: Derek Hackett, Public Information Officer From: Sunil Jeboo, Traffic Engineer Re: Road Closure for the Week of 06-27-16 (3236.1) 6 th Pump Station Western Ave. and 6 th SW Western Ave.
More information