1 MIAMI-DADE AVIATION DEPARTMENT MIA Runway 8R8R-26L Pavement Pavement Rehabilitation Civil Environmental Engineering Division The Project Team

2 Mission Statement C EXPERTISE + COMMITMENT = OWNERSHIP Project Site Limits of Construction

3 Program Summary Cost and Time Design Fee: $3.3 Million Duration: 6 Months Construction Cost: $27.6 Million (75% FAA Funding) Duration: 454 Calendar Days Project Understanding Scope of Work and Key Issues Pavement Rehabilitation Airfield Electrical Phasing and Maintenance of Traffic Coordination Safety and Security

4 Pavement Rehabilitation Surface Deficiencies Oxidation / Weathering Longitudinal & Transverse Cracking Surface Deformations Depressions Rutting Scope of Work Pavement Rehabilitation Runway 8R-26L Mill 1 and overlay with 3 of asphalt on keel section and connectors Texturize and overlay with 2 of asphalt outside of keel section and between connectors Overlay shoulders with 2 of asphalt Full depth reconstruction ti of taxiway pad area between Runways and 8R-26L Groove runway surface and high speed connectors

5 Pavement Rehabilitation Taxiway M and N Mill variable thickness and overlay with variable thickness to restore cross sectional slope a width of 62 feet Scope of Work Pavement Rehabilitation MILL 1 SURFACE COURSE 1.5 INTERMEDIATE COURSE 1.5 EXISTING SURFACE ASPHALT 15.5 LIME ROCK BASE 12 COMPACTED SUBGRADE 24 Proposed Pavement Section

6 Light Replacement Taxiway centerline and edge quartz fixtures replaced with LED fixtures Hold bar location between Runway and 8R-26L Light Adjustment Taxiway centerline Runway centerline, touchdown zone, edge, RGL and MALSR Duct bank and Wiring / Cable Replacement Scope of Work Existing Light Assembly

7 Remover Fixture and Top Can Scope of Work Install Cover Plate Over Bottom Can

8 Fill Space Over Plate with Asphalt Scope of Work Mill 1 of Existing Pavement

9 Overlay Milled Surface with 3 of Asphalt Scope of Work Pilot Core to Measure Depth and Order Top Can

10 Core New Pavement in Preparation For Top Can Scope of Work Install Top Can and Epoxy

11 Install Wiring, Transformer, Dam Ring and Fixture Key Issues Overall Project Layout H024C-1 RUNWAY 8R-26L PAVEMENT REHABILITATION Duration (Days): 60 Mobilization o : Sept. 14, 2009 to Nov. 12, 2009

12 Key Issues Construction Phasing H024C-1 RUNWAY 8R-26L PAVEMENT REHABILITATION Duration (Days): 120 Nov. 13, 2009 to Mar. 12, Key Issues Construction Phasing H024C-1 RUNWAY 8R-26L PAVEMENT REHABILITATION Duration (Nights): Mar. 13, to Apr. 15,

13 Key Issues Construction Phasing H024C-1 RUNWAY 8R-26L PAVEMENT REHABILITATION Taxiways L3 and M3 OPEN TO TRAFFIC Taxiways L9 and M9 OPEN TO TRAFFIC Runway 12 OPEN TO TRAFFIC Duration (Days): Apr. 16, to May 24, Key Issues Construction Phasing Taxiways L2 and M2 OPEN TO TRAFFIC Taxiways L10 and M10 OPEN TO TRAFFIC Runway 12 OPEN TO TRAFFIC Duration (Days): May 25, to June 7,

14 Key Issues Construction Phasing H024C-1 RUNWAY 8R-26L PAVEMENT REHABILITATION Duration (Nights): June 8, to Nov. 20, Key Issues Construction Phasing H024C-1 RUNWAY 8R-26L PAVEMENT REHABILITATION Duration (Days): June 8, to Nov. 20,

15 Expertise + Commitment Equals On Time Under Budget No Claims

Planning & Development Group

Planning & Development Group Planning & Development Group LAX Airside Technical Committee Meeting January 9, 2018 Mark Vicelja, P.E. 1 Airside Element Projects LAX AIRSIDE ELEMENT PROJECTS CONSTRUCTION SCHEDULE (as of January 1, 2018)

More information

Pavement Strength Analysis Prepared by Molzen Corbin September 2016

Pavement Strength Analysis Prepared by Molzen Corbin September 2016 Pavement Strength Analysis Prepared by Molzen Corbin September 2016 The Santa Fe Municipal Airport was originally constructed in 1941. It was constructed by the military as a B-24 bomber training base.

More information

ADDENDUM NO. TWO AB

ADDENDUM NO. TWO AB ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

Aviation Summit Design and Construction Services

Aviation Summit Design and Construction Services Aviation Summit 2017 Design and Construction Services Agenda: Terminal 3 Modernization PHX Sky Train Stage 2 Terminal 4 S1 Concourse & Apron Other Capital Program Projects Terminal 3 Modernization Processor

More information

Public Notice July 14, 2017

Public Notice July 14, 2017 Public Notice July 14, 2017 PROPOSED IMPLEMENTATION OF PFC 13 NOTICE TO AIR CARRIERS AND CONSULTATION MEETING Implementation of PFC On June 14, 2017 the Omaha Airport Authority provided written notice

More information

Morristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment

Morristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment 2.0 PURPOSE AND NEED The Purpose and Need Statement in a NEPA document is a formal declaration of the overall goals and objectives of a proposed project. This statement documents the justification for

More information

Dallas Executive Airport Town Hall Meeting April 3, 2014

Dallas Executive Airport Town Hall Meeting April 3, 2014 Dallas Executive Airport Town Hall Meeting April 3, 2014 Background 1,040 acre general aviation facility owned and operated by the City of Dallas 150 based aircraft including business jets and helicopters,

More information

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT Pursuant to CFR 158.24, the City and County of Denver Department of Aviation ( City ), owner and operator of the Denver International

More information

State of the Airport Robert S. Bowen, Executive Director October 18, 2018

State of the Airport Robert S. Bowen, Executive Director October 18, 2018 Robert S. Bowen, Executive Director October 18, 2018 A Year of Change The last year will be remembered as a period when the airlines, bolstered by a growing national economy, moderate fuel prices and changing

More information

General Aviation Master Plan Update

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #2 Peter O. Knight Airport Agenda Welcome and Introductions HCAA System of Airports Purpose of Public Meetings Master Plan Status Update Next Steps Q & A 2 Our System

More information

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014 CHICAGO DEPARTMENT OF AVIATION AND THE O HARE MODERNIZATION PROGRAM Current Construction Projects May 2, 2014 O HARE INTERNATIONAL AIRPORT CURRENT CONFIGURATION 2 PHASE 1 & COMPLETION PHASE 9L-27R Completed

More information

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 Table of Contents Section Page I. Overview 2 II. Notice and Opportunity for Public Comment 3 III. Application

More information

Correction to Council Resolution No , dated June 25, Please add the following correction as part of the permanent record:

Correction to Council Resolution No , dated June 25, Please add the following correction as part of the permanent record: 1410 Memorandum 9 DATE October 20, 2014 CITY OF DALLAS TO Rosa Rios City Secretary SUBJECT Correction to Council Resolution No. 14-1030, dated Please add the following correction as part of the permanent

More information

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM 10.1 INTRODUCTION Based on the findings from the Facility Requirements and the combined plan recommended in the Alternative Analysis, a capital improvement program for North Perry Airport has been developed

More information

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application July 3, 2018 Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application The City of Kansas City (City), Missouri through its Aviation Department ( the Department

More information

SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY

SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY Executive Summary The Sacramento County Airport System Capital Improvement Plan (CIP) is comprised of projects that were identified and evaluated

More information

Airport Design-3 Geometric Design

Airport Design-3 Geometric Design Airport Design-3 Geometric Design When designing airport runways, engineers and other planners have many factors to consider. These include the type and volume of air traffic, the impact of noise, and

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

Passenger Facility Charge: No. 7 Application. Public Notice Materials. Luis Muñoz Marín International Airport San Juan Puerto Rico.

Passenger Facility Charge: No. 7 Application. Public Notice Materials. Luis Muñoz Marín International Airport San Juan Puerto Rico. Passenger Facility Charge: No. 7 Application December 2013 Public Notice Materials Luis Muñoz Marín International Airport San Juan Puerto Rico INTRODUCTION Aerostar Airport Holdings has initiated the process

More information

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 Meeting Agenda 1. Introductions and Contacts [10 Minutes] 2. Plan Overview and MPAC Role [20 Minutes] 3. MPAC Visioning

More information

SOUTH CAROLINA AERONAUTICS COMMISSION

SOUTH CAROLINA AERONAUTICS COMMISSION SOUTH CAROLINA AERONAUTICS COMMISSION STATEWIDE AIRFIELD PAVEMENT MANAGEMENT SYSTEM UPDATE AIRPORT: LEXINGTON COUNTY AT PELION 106 AIRPORT ROAD PELION, SC 29123 SOUTH CAROLINA AERONAUTICS COMMISSION 2553

More information

GREATER ORLANDO AVIATION AUTHORITY

GREATER ORLANDO AVIATION AUTHORITY GREATER ORLANDO AVIATION AUTHORITY Amendment to PFC Applications #7, 8, and 16 and New PFC Application #18 PUBLIC NOTICE June 7, 2016 1 P age Table of Contents PUBLIC NOTICE... 3 PROPOSED ACTIONS... 3

More information

Appendix B PAVEMENT CONDITION AND HISTORY

Appendix B PAVEMENT CONDITION AND HISTORY Appendix B PAVEMENT CONDITION AND HISTORY The Sunport maintains a pavement management program (PMP) in order monitor the condition of pavements and to plan for repair/replacement in a timely manner. The

More information

Wellington International Airport Runway Overlay

Wellington International Airport Runway Overlay Wellington International Airport Runway Overlay 2009. Parties involved Fulton Hogan Wellington Contractor. BECA - Consultant. Wellington international airport Ltd - Client. Contract Scope The contract

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington

More information

PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT

PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT Date of Public Notice: 8/15/2016 In accordance with the requirements of Section 158.24 of Federal Aviation

More information

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m.

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m. AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting May 14, 2014 Approval of Minutes: Special

More information

Longitudinal Joint Construction. Mike Robinson, PE

Longitudinal Joint Construction. Mike Robinson, PE Longitudinal Joint Construction Mike Robinson, PE Inherently weaker than surrounding pavement Prone to deterioration Often drives rehabilitation FOD Longitudinal Joints Two predictors of success Density

More information

II. Purpose and Need. 2.1 Background

II. Purpose and Need. 2.1 Background II. 2.1 Background The Metropolitan Washington Airports Authority is preparing an Environmental Assessment of potential environmental impacts associated with proposed enhancements to the Runway 4-22 and

More information

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1 PHASING PLAN - PHASE 1 2 Weeks PHASE 1 SCOPE OF WORK Phase 1 consists of the reconstruction of a portion of Taxiway 'A' and the crack seal and seal coat of the North Apron. The portion of Taxiway 'A' to

More information

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017 Pierre Regional Airport Airport Master Plan Kickoff Meeting April 7, 2017 Agenda Introductions Airport Master Planning Planning Considerations Master Plan Elements Schedule Public Involvement Basics about

More information

New PFC Application #13

New PFC Application #13 PUBLIC CONSULTATION New PFC Application #13 Buffalo, NY December 16, 2015 Agenda PFC Program at Notice to Carriers and Consultation Meeting Class of Carrier Not Required to Collect PFC Air Carrier Requirements

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA XI Seminar, Santiago, Chile September 1-5,

More information

Airport Markings and Lighting

Airport Markings and Lighting Airport Markings and Lighting Dr. A. A. Trani Associate Professor of Civil Engineering Associate Director of NEXTOR Virginia Tech Blacksburg, VA April 21, 1998 NEXTOR - National Center of Excellence for

More information

Rebuilding Plan For Mosul International Airport

Rebuilding Plan For Mosul International Airport Rebuilding Plan For Mosul International Airport Contents Part- 1 General Information About Mosul International Airport (MIA) Before 2014 Part -2 Brief Description to Current Situation Part -2 Reconstruction

More information

2018 Appropriation Budget Table of Contents Board Approved August 18, 2017

2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 INDIANAPOLIS AIRPORT AUTHORITY 2018 APPROPRIATION BUDGET ORDINANCE NO. 1-2017 BOARD APPROVED AUGUST 18, 2017 2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 1 Appropriation Summary

More information

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007 JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 27 11242 1 of 14 Sponsor: City of Naples Airport Authority NPIAS No.: 12-53 Sponsor ID: 122 Airport ID: APF Site No.: 3379.*A 11242 Airport Project ID: 1

More information

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS P U B L I C N O T I C E MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application 10-07-C-00-MBS INTRODUCTION: This Public Notice is issued as part of a Federal Aviation

More information

OLD AIRPORT (PFN) RW 05/23 RW 14/32. 4,884-FEET X 150-FEET MIRL 4-BOX VASIs (5 & 23 APPROACHES) REILS

OLD AIRPORT (PFN) RW 05/23 RW 14/32. 4,884-FEET X 150-FEET MIRL 4-BOX VASIs (5 & 23 APPROACHES) REILS FAITH ADAMS AGENDA AIRPORT RELOCATION CHALLENGES AIRFIELD LIGHTING & SIGNAGE NAVAIDS AIRFIELD LIGHTING VAULT L-890 ALCMS AIR TRAFFIC CONTROL TOWER (ATCT) CONCLUSION AIRPORT RELOCATION OLD AIRPORT (PFN)

More information

SUMMARY OF QUANTITES NO. ITEM DESCRIPTION UNIT QUANTITY DRAWING NUMBER TITLE GENERAL ELECTRICAL

SUMMARY OF QUANTITES NO. ITEM DESCRIPTION UNIT QUANTITY DRAWING NUMBER TITLE GENERAL ELECTRICAL SRQ-D-FOTS-G000 DRAWING NUMBER TITLE GENERAL 1 SRQ-D-FOTS-G000 COVER SHEET 2 SRQ-D-FOTS-G001 DRAWING INDEX AND SUMMARY OF QUANTITIES 3 SRQ-D-FOTS-G002 LEGEND AND ABBREVIATIONS 4 SRQ-D-FOTS-G101 OVERALL

More information

City of Tallahassee, FL Department of Aviation

City of Tallahassee, FL Department of Aviation City of Tallahassee, FL Department of Aviation Proposed Application to Federal Aviation Administration For Authority to Impose a Passenger Facility Charge (PFC) at Tallahassee International Airport and

More information

Kansas City Aviation Department. Update to Airport Committee October 20, 2016

Kansas City Aviation Department. Update to Airport Committee October 20, 2016 Kansas City Aviation Department Update to Airport Committee October 20, 2016 1 Status of Customer Service Improvements Additional electric outlets in public areas Wayfinding / Rental car signage Review

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application PUBLIC NOTICE ***************************** New Castle Airport Intention to File a Passenger Facility Charge (PFC) Application The Delaware River & Bay Authority (DRBA), the sponsor of the New Castle Airport

More information

Chapter 14. Design of Flexible Airport Pavements AC 150/5320-6D

Chapter 14. Design of Flexible Airport Pavements AC 150/5320-6D Chapter 14 Design of Flexible Airport Pavements AC 150/5320-6D AIRCRAFT CONSIDERATIONS. a. Load. maximum anticipated takeoff weight of the aircraft. The design procedure assumes 95 percent of the gross

More information

AVIATION AND SPACEPORT OFFICE DISTRICT 6 REPORT JU NE STATEWIDE. Airfield. Pavement Management

AVIATION AND SPACEPORT OFFICE DISTRICT 6 REPORT JU NE STATEWIDE. Airfield. Pavement Management F L O R I D A D E PA R T M E N T O F T R A N S P O R T A T I O N AVIATION AND SPACEPORT OFFICE DISTRICT 6 REPORT JU NE 2 0 1 5 STATEWIDE Airfield Pavement Management P R O G R A M Pavement Evaluation

More information

FULL DEPTH RECLAMATION (FDR)

FULL DEPTH RECLAMATION (FDR) FULL DEPTH RECLAMATION (FDR) Virginia Experience Past and Present Michael Wells, P.E. March 2, 2018 Outline What is Full Depth Reclamation (FDR) VDOT Experience Full Depth Reclamation (FDR) Bound layers

More information

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB MICHIGAN AIRPORT DEVELOPMENT PROGRAM AIP CAPITAL IMPROVEMENT PLAN 20102019 FEDERAL/STATE/LOCAL Ann Arbor, MI Date of Latest ALP 2008 ACIP Airport Code A Airport Identifier ARB Prepared by: MDOTAERO Sponsor:

More information

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Yakima Air Terminal/McAllister Field Airport Master Plan Update Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used

More information

SIOUX FALLS REGIONAL AIRPORT - SIOUX FALLS, SOUTH DAKOTA PFC Quarterly Report - Project Activity Page 1

SIOUX FALLS REGIONAL AIRPORT - SIOUX FALLS, SOUTH DAKOTA PFC Quarterly Report - Project Activity Page 1 Page 1 Projects [$4.50 rate] Est. Charge Approval of Project Project Quarter Cumulative Amount of Current Variance APPLICATION 16-01-C-00-FSD Effective Date Use Date Start Stop Expenditures Expenditures

More information

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and

More information

The following criteria shall be applied within the boundaries of the AO District:

The following criteria shall be applied within the boundaries of the AO District: Sec. 419 (a) Purpose AIRPORT OVERLAY DISTRICT (AO) The purpose of the Airport Overlay District is to regulate and restrict the height of structures, objects, or natural growth, regulate the locations of

More information

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Project Team Kittitas County, WA Airport Owner (Sponsor) and Operator, Land Use Century West

More information

Chapter 9 - AIRPORT SYSTEM DESIGN

Chapter 9 - AIRPORT SYSTEM DESIGN Chapter 9 - AIRPORT SYSTEM DESIGN 9.01 GENERAL This chapter discusses the development program for Dutchess County Airport to the year 2020. This airport system design is based upon the airport's existing

More information

Application to Impose and Use Passenger Facility Charges - #16

Application to Impose and Use Passenger Facility Charges - #16 Application to Impose and Use Passenger Facility Charges - #16 Submitted to: The Federal Aviation Administration By: The Des Moines International Airport June 23, 2017 Ms. Sheila Bridges PFC Coordinator

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

Chapter 9 Airport Financial Plan

Chapter 9 Airport Financial Plan Chapter 9 Airport Financial Plan Introduction The purpose of this chapter is to present the projects identified in the twenty-year Airport Capital Improvement Program (ACIP) that have been developed and

More information

Winona Runway Shift Project

Winona Runway Shift Project Winona Runway Shift Project Sandy DePottey Dakota-Minnesota ADO Fall MnDOT FAAWorkshop St Cloud, Minnesota November 5, 2014 Update on 0 0 Challenges we faced The main runway 12/30 at Winona Municipal Airport

More information

Advisory Circular CT

Advisory Circular CT (CAA logo, name of the country, etc.) Advisory Circular CT-42-009 SUBJECT: Airport Movement Area and Related Facilities Maintenance DATE: MM/YYYY ASSOCIATED RULES According with (name of the country) Civil

More information

The Evolution of the YOW De-Icing Facility SWIFT Conference & Trade Show September 14-17, Hyatt Regency Montreal

The Evolution of the YOW De-Icing Facility SWIFT Conference & Trade Show September 14-17, Hyatt Regency Montreal The Evolution of the YOW De-Icing Facility 2015 SWIFT Conference & Trade Show September 14-17, Hyatt Regency Montreal September 17, 2015 Agenda 1 The Origin of the Ottawa Airport 2 Central De-icing Facilities

More information

Airport Master Plan 1

Airport Master Plan 1 1 Aviation Demand AIRPORT PLANNING PROCESS FAA Design Standards Financial Resources Community Goals Environmental Requirements Serve Business Community This Advisory Circular (AC) provides guidance for

More information

CATCODE ] CATCODE

CATCODE ] CATCODE Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class

More information

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

Salt Lake City International Airport April 23, 2013 Budget Briefing. Page 1

Salt Lake City International Airport April 23, 2013 Budget Briefing. Page 1 Budget Briefing Fiscal Year 2014 Budget Honorable Members of the City Council April 23, 2013 Page 1 FY 2014 Budget Goals and Objectives Develop and implement a plan of execution for the terminal redevelopment

More information

Budapest, Hungary 2015

Budapest, Hungary 2015 Budapest, Hungary 2015 Runway Pavement Roughness Considering Pavement Surface Drainage and Boeing Bump Index Injun Song, Ph.D., P.E. SRA International, Inc. Acknowledgement Jeffrey Gagnon, P.E., FAA Airport

More information

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan Technical Report #7 Palm Beach International Airport Layout Plan Palm Beach International Airport Prepared for Palm Beach County

More information

Runway Status Lights (RWSL) in Japan. July 2015

Runway Status Lights (RWSL) in Japan. July 2015 Ministry of Land, Infrastructure, Transport and Tourism CIVIL AVIATION BUREAU OF JAPAN Runway Status Lights (RWSL) in Japan July 2015 Table of contents Civil Aviation Bureau Japan What is RWSL Background

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 30-

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 3-

More information

PIERCE COUNTY-THUN FIELD AIRPORT MASTER PLAN MASTER PLAN ADVISORY COMMITTEE (MPAC) AIRPORT TOUR RD AVE. E., PUYALLUP, WA WEDNESDAY,

PIERCE COUNTY-THUN FIELD AIRPORT MASTER PLAN MASTER PLAN ADVISORY COMMITTEE (MPAC) AIRPORT TOUR RD AVE. E., PUYALLUP, WA WEDNESDAY, PIERCE COUNTY-THUN FIELD AIRPORT MASTER PLAN MASTER PLAN ADVISORY COMMITTEE (MPAC) AIRPORT TOUR 16915-103RD AVE. E., PUYALLUP, WA 98374 WEDNESDAY, SEPTEMBER 27, 2017 (2:00 to 4:00 PM) PLU AIRPORT LOCATION

More information

6.4 Aviation AVIATION FACILITIES AND SERVICES

6.4 Aviation AVIATION FACILITIES AND SERVICES 2035 Transportation Plan 6.4 Aviation This chapter describes existing aviation facilities and services in Placer County and projected needs. This chapter also discusses potential aviation issues related

More information

MONTROSE REGIONAL AIRPORT

MONTROSE REGIONAL AIRPORT MONTROSE REGIONAL AIRPORT FEBRUARY 25, 2016 DRAFT AGENDA READY FOR TAKE OFF WHAT ARE WE GOING TO DO TODAY? Introductions Why conduct an airport master plan? Master Plan Process Deliverables Schedule Identify

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014 DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation

More information

Passenger Facility Charge Application #1

Passenger Facility Charge Application #1 Passenger Facility Charge Application #1 February 2017 APPLICATION PUNTA GORDA AIRPORT PFC ASSURANCES CERTIFICATION STATEMENT The undersigned Chair of the Charlotte County Airport Authority assures

More information

IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel Fax

IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel Fax IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel +353 61 703750 Fax +353 61 366245 DUBLIN AIRPORT (EIDW) RUNWAY 10/28 UPGRADE PHASE 1 AND PHASE 2

More information

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012 Nantucket Memorial Airport Commission Master Plan Workshop October 26, 2012 Agenda Introductions Master Plan 101 Airport Planning Issues Noise Abatement Activities Environmental Monitoring Public Outreach

More information

Passenger Facility Charge New Application #8 Phoenix Sky Harbor International Airport

Passenger Facility Charge New Application #8 Phoenix Sky Harbor International Airport Passenger Facility Charge New Application #8 Phoenix Sky Harbor International Airport Airline Consultation and Public Notice Materials Date: May 4, 2017 Agenda PFC Program Status PFC #8 New Application

More information

Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018

Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018 Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018 Agenda» Website Update» Alternatives» Discussion» Evaluation» Schedule Agenda» Website Update» Alternatives» Discussion» Evaluation»

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

Source: Chippewa Valley Regional Airport ASOS, Period of Record

Source: Chippewa Valley Regional Airport ASOS, Period of Record Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

Construction of Pyongyang International Airport IP6

Construction of Pyongyang International Airport IP6 Construction of Pyongyang International Airport IP6 (Presented by GACA, DPR Korea) Summary The purpose of this paper is to update members regarding airport construction by outlining the successes and experiences

More information

Speaker: Jonathan Leach - Chicago Department of Aviation & Todd Merrihew, P.E. - Jacobs Date: February 22, 2017

Speaker: Jonathan Leach - Chicago Department of Aviation & Todd Merrihew, P.E. - Jacobs Date: February 22, 2017 TRACK: TRACK C (AIRSIDE/ENGINEERING) Title: Upcoming Airfield Programs WORKSHOP: Speaker: Jonathan Leach - Chicago Department of Aviation & Todd Merrihew, P.E. - Jacobs Date: February 22, 2017 Image: O

More information

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, 2014 1:30 PM Casper/Natrona County International Airport Master Plan Update Policy

More information

Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport

Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport 1 DUBLIN-LONDON 28.4 No.1 +2,200 MILLION PASSENGERS BUSIEST ROUTE IN EUROPE &No. 2 IN THE WORLD

More information

Grove Field Airport Environmental Assessment

Grove Field Airport Environmental Assessment Grove Field Airport Environmental Assessment Advisory Committee Meeting #2 December 9, 2008 Port of Camas-Washougal Conference Room 6:00 7:30 PM Agenda: Welcome and Overview Dave Ripp, Director, Port of

More information

CHAPTER 2 INVENTORY EXISTING CONDITIONS 2.1 AIRFIELD FACILITIES Airspace

CHAPTER 2 INVENTORY EXISTING CONDITIONS 2.1 AIRFIELD FACILITIES Airspace OF EXISTING CONDITIONS The inventory phase of the planning process provides an overview of the various facilities located at Cecil Field (VQQ). A variety of information sources were utilized in compiling

More information

MONTROSE REGIONAL AIRPORT APRIL 12, 2016

MONTROSE REGIONAL AIRPORT APRIL 12, 2016 MONTROSE REGIONAL AIRPORT APRIL 12, 2016 AGENDA READY FOR TAKE OFF WHAT ARE WE GOING TO DO TODAY? Introductions Why conduct an airport master plan? Master Plan Process Deliverables Schedule Identify Goals

More information

Trick or Treat Process M

Trick or Treat Process M AIP Design Lessons Trick or Treat Halloween Sharing October 25, 2017 By: FAA DMA ADO staff Dave P. Anderson Brian P. Schuck Mark J. Holzer 1 Trick or Treat Process M FAA staff of Dave, Brian and Mark shall

More information

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM PORT OF PORTLAND Chapter Seven CAPITAL IMPROVEMENT PROGRAM CHAPTER SEVEN PORT OF PORTLAND CAPITAL IMPROVEMENT PROGRAM The analyses conducted in the previous chapters evaluated airport development needs

More information

BELFAST MUNICIPAL AIRPORT OVERVIEW

BELFAST MUNICIPAL AIRPORT OVERVIEW BELFAST MUNICIPAL AIRPORT OVERVIEW LOCATION AND HISTORY Belfast Municipal Airport (Federal Aviation Administration (FAA) airport code BST, International Civil Aviation Organization airport code KBST, FAA

More information

LOS ANGELES INTERNATIONAL AIRPORT MAY 2014

LOS ANGELES INTERNATIONAL AIRPORT MAY 2014 1. Purpose and Need 1.1 Introduction The City of Los Angeles, through its aviation department, Los Angeles World Airports (LAWA), proposes to construct improvements to the Runway Safety Area (RSA) for

More information

AERODROME MARKINGS AND SIGNALIZATION

AERODROME MARKINGS AND SIGNALIZATION 1. Introduction AERODROME MARKINGS AND SIGNALIZATION This article will present the main aerodrome markings and signalization on runways and taxiways. 2. Runway Markings This chapter will show the runway

More information

MOST aircraft need a runway for landing and takeout.

MOST aircraft need a runway for landing and takeout. 38th Annual Concrete Paving Workshop Upcoming Airport Projects January 17, 2017 MOST aircraft need a runway for landing and takeout. 1 Airport Improvement Program AIP Eligibility The federal AIP grants

More information

AIRPORTS DIVISION. The Hawaii Airports System Is Self-Supporting

AIRPORTS DIVISION. The Hawaii Airports System Is Self-Supporting AIRPORTS DIVISION Department of Transportation AIRPORTS DIVISION The Hawaii Airports System Is Self-Supporting The State of Hawaii s General Fund (tax revenues) does not fund the operation of the Airports

More information

INCREASING AIRPORT OPERATION SAFETY BASED ON UPDATED OR ENHANCED AIRPORT PAVEMENT MARKINGS: A CASE STUDY PAPER

INCREASING AIRPORT OPERATION SAFETY BASED ON UPDATED OR ENHANCED AIRPORT PAVEMENT MARKINGS: A CASE STUDY PAPER INCREASING AIRPORT OPERATION SAFETY BASED ON UPDATED OR ENHANCED AIRPORT PAVEMENT MARKINGS: A CASE STUDY PAPER 09-2020 By Chun-Hsing Ho, Dwight D. Eisenhower Fellow Department of Civil and Environmental

More information