ORGANIZATION OF THE STIP

Size: px
Start display at page:

Download "ORGANIZATION OF THE STIP"

Transcription

1 ORGANIZATION OF THE STIP The State Transportation Improvement Program (STIP) contains funding information and schedules for transportation divisions including: Highways, Rail, Bicycle and Pedestrian, Ferry, Enhancements and Public Transportation. Prefix Program Funding Source I Interstate Interstate Maintenance (IM) National Highway System (NHS) The transportation program in the STIP is organized by highway divisions. Projects are listed by county within each division. This results in some duplication since highway projects frequently extend across county and division lines. When this duplication occurs, a project is listed in each county in which it is found. Specific projects in each county are listed under Highway and Public Transportation programs. Highway Program projects are subdivided by category: interstate, rural, urban, federal bridge, municipal bridge, mitigation, bicycle and pedestrian, congestion mitigation, enhancements, hazard elimination, ferry, passenger rail, roadside environmental, and safe routes to schools. Interstate, rural, urban, federal bridge, and ferry projects are listed in order of route number. Municipal bridge, bike and pedestrian projects are listed by city or county. Enhancement projects are listed by city while mitigation projects are listed by county. Congestion mitigation and passenger rail projects are listed alphabetically by city or county. Hazard elimination projects may be listed by route, city or county. The Public Transportation program list projects first by the transportation partners and providers then by I.D. numbers. In the Highway Program projects in the Intrastate or Urban Loop System are listed under the appropriate funding program, but are identified with an asterisk (*) following the project I.D. number. Ferry projects are also part of the highway program and have been assigned to their respective connecting highway route numbers where possible and the division where they are assigned to operate. T Public State, Federal and Local The type or phase of work is shown for each interstate, rural Transportation and urban project in the county-by-county listing. Right of way and construction phases of each project are shown as FY. The cost of right of way, utilities and construction, with their anticipated funding sources, are also listed. The Aviation and Division Managed Construction projects (County Construction) are not included in this statewide transportation improvement program. NCDOT and the respective county boards of commissioners develop the division managed construction program annually. The descriptions for most projects are preliminary and subject to change. All major projects require extensive planning, environmental impact and design studies. The location and exact type of improvements are subject to refinement and modification during the planning and design phases. The State Transportation Improvement Program is available on line at R, A M, X Rural Special NHS, Surface Transportation Program (STP), State, Highway Trust Fund (T) U Urban NHS, STP, State and T B, BD, Bridge BF, BK, Replacements BP, BR, BS C E, EB EL, ER, L S Congestion Mitigation Enhancements, Roadside, Bike- Pedestrian and Local Replacement and Rehabilitation, State, Federal and Municipal Federal, Local and Other State, Federal (STP), Local and Other EE Mitigation State, Federal and Other K, L Rest Area Landscape P, SB, Y, Z SR W, SF, SI Passenger Rail Safe Routes to School Hazard Elimination (Highway Safety) Y, Z Railroad-Highway Crossings Interstate, NHS, STP Personalized License Plate Funds State and Federal State and Federal Safety, State and Federal (HES) Ferry, State and Federal F Ferry Ferry, State and Federal FS Feasibility Study NHS, STP and State

2

3 T STATE TRANSPORTATION IMPROVEMENT PROGRAM Transportation

4

5 NORTH CAROLINA TRANSPORTATION IMPROVEMENT PROGRAM Strategic Prioritization PROGRAM DEVELOPMENT In the development of the STIP a more data-driven approach was used to score projects across the state. In order to score projects against similar projects within NCDOT's new prioritization process, each project is classified under one of the Department's three primary goals (Safety, Mobility, Infrastructure Health) and three tiers (Statewide, Regional, and Subregional). Projects classified as Infrastructure Health were further classified by Submode (Interstate Pavement, Modernization, and Highway Miscellaneous). The initial prioritization process focused primarily on highway projects and was based on a combination of quantitative data, qualitative input, and multimodal characteristics. This process was inclusive of NCDOT s planning partners (Metropolitan Planning Organizations (MPOs) and Rural Planning Organizations (RPOs)) and internal staff, specifically NCDOT s Division (or field) Offices. Quantitative data included volume-to-capacity ratios, crash rates, and pavement condition ratings. Qualitative input was based on the top 25 priorities of each respective MPO s, RPO s, and Division. Multi-modal characteristics addressed whether the project benefited more than one mode of transportation. The process also tied back to the Department s emphasis on improving system performance across the three goals (Safety, Mobility, and Infrastructure Health) and across three system tiers (Statewide, Regional, and Subregional) of its 79,000 mile network. Each project was subsequently categorized and scored through a matrix that was weighted by goal and tier and ultimately used to rank individual projects. The Urban Loop Prioritization Process, separate from NCDOT's overall Strategic Prioritization process, is exclusively focused on prioritization projects for the ten urban loops established by the 1989 Highway Trust Fund and subsequent amendments. The ten loops are located in Asheville, Charlotte, Durham, Fayetteville, Gastonia, Greensboro, Greenville, Raleigh, Wilmington, and Winston-Salem. The formula is based on needs NCDOT uses crash data and traffic congestion figures to calculate the role the project would play in improving safety and mobility; and benefits The department examines factors such as travel time savings, economic development and future traffic levels to determine how the project would enhance the region. With every project, each factor under Needs and Benefits is given a score. Those points are added up and divided by the project s total cost. The result is the number NCDOT uses to rank the project. Non-highway (Ferry, Bicycle and Pedestrian, Rail, Aviation, Public Transportation) projects were also prioritized by goal and system classification. Most of these projects were prioritized in a qualitative manner based on need and coordination with local officials. After projects were categorized and released to the public, a series of investment summits were held to determine funding allocation for each category. To support these deliberations and tie future investment to expected performance NCDOT developed a Level of Service (LOS) concept. LOS is simply defined as the quality of service provided to the user of the transportation system. Business Units in NCDOT determined their current and 10 year LOS grades (A-F scoring, A for highest performance possible, F for lowest). LOS grades are based both on measures tied to the Department s performance dashboard and on subjective analysis. LOS for highway Mobility projects is based (for example) on congestion (as determined by volume-to-capacity ratios), while LOS for highway Infrastructure Health projects is based on pavement condition ratings. T 1

6 Once the investment strategy summit recommendations were finalized, the Department used these along with other programming considerations (i.e. Division equity, preconstruction readiness/deliverability, including document status, logical segment progression within a larger project, special funding eligibility, suitability for using funds prioritized separately and fiscal year balancing) to develop a draft STIP and 10-year Work Program. This process resulted in the release of the draft 10-year Program and Resource Plan, which included release of the draft STIP. Public Involvement for STIP Development Under the Transportation Reform effort begun by the Department in 2008, development of the STIP is now tied to production and approval of the NCDOT Policy to Projects ten-year resource and work plan. This P2P development cycle covers a two-year span, with a draft document being released after the end of the first year, and a final document being presented to the Board of Transportation for adoption at the end of the second year. A key element of this process is Strategic Prioritization, an objective, data-driven prioritization methodology for evaluating and ranking identified needs. Public involvement in the first year was handled through the Strategic Planning Office for Transportation (SPOT) working with Metropolitan and Rural Planning Organizations in development of their priorities. Those priorities were then submitted formally to SPOT along with rankings for the top 25 projects. Once SPOT s unconstrained analysis and scoring was complete, the Program Development Branch was provided the results and used those data to assemble a draft 7-year STIP, applying current statutory and financial constraint. After the draft STIP was released to the public, each of the 17 MPOs and 20 RPOs were contacted and offered the opportunity to meet with the NCDOT to review the draft document and present comments and concerns. Meetings were held during late summer and fall 2010 with all MPOs and all but five RPOs. In addition a series of public comment meetings were conducted in spring 2011 in each of the 14 NCDOT Divisions across the state, with notice of meetings advertised through various media outlets in each region. Air Quality Conformity Each Metropolitan Planning Organization (MPO) is required to develop a 20+ year Long Range Transportation Plan (LRTP). In MPOs that are listed as non-attainment or maintenance areas for air quality, there has to be a transportation conformity determination based on tests and/or budget approved by EPA. To demonstrate conformity projects have to be grouped by horizon year based on the emissions budgets approved by EPA. For each of the horizon years, the travel demand model must be run for the group of projects that will be open to traffic. From the models we get speeds and VMT and use that to calculate emissions that we compare to the budget. As long as the calculated emissions meet the budget test, the area can make a conformity finding. If the area cannot meet the budget test, then they are subject to lapse, that is their LRTP does not meet the air quality conformity test. The transportation conformity rule (40 CFR Part 93) requires us to reanalyze any project that is delayed across a horizon year or is accelerated across a horizon year to insure that the move doesn t create a lapse situation. We perform conformity on the LRTP. When a new STIP projects must be checked to make sure they are consistent with the LRTP. If there is any inconsistency between the STIP and the LRTP (conformity finding) then FHWA cannot take any federal action including approval of the STIP until conformity is redone. T 2

7 North Carolina Air Quality Non-Attainment/Maintenance Area Summary Pollutant(s) Region Counties 8-Hour Ozone CO PM2.5 Horizon Year(s) Metrolina Mountains Triad Triangle Cabarrus Gaston Iredell (Partial) Lincoln Mecklenburg Rowan Union 2015, 2025, 2035 Swain (Partial) NA Haywood (Partial) Davidson Ozone , 2025, 2035; Forsyth PM , 2021, Guilford 2015, 2035 Chatham (Partial) Durham Franklin Granville Johnston Orange Person Ozone , 2017, 2025, 2035; CO , 2025, 2035 Wake Greater Hickory/Unifour Catawba 2015, 2021, 2015, 2035 Rocky Mount Edgecombe Nash 2015, 2017, 2025, 2035 Project Descriptions EPA s Transportation Conformity Regulation states The degree of specificity required in the transportation plan and the specific travel network assumed for air quality modeling do not preclude the consideration of alternatives in the NEPA process of other project development studies. In an effort to not unduly influence the outcome of NEPA studies the STIP has used fairly generic descriptions of proposed work although the cost estimates were derived from specific future cross sections. In future documents, more specific descriptions will be used as the NEPA process determines a preferred alternative. So while the out years 6 through 10 may use a description like widen to multi-lanes as the NEPA process defines a recommended cross section this may become widen to 4 lane median-divided cross section as the project comes closer to having right of way and construction actually funded. T 3

8 Economically Disadvantaged Populations The NC Department of Commerce annually ranks the state s 100 counties based on economic well-being and assigns each a Tier designation. The 40 most distressed counties are designated as Tier 1, the next 40 as Tier 2 and the 20 least distressed as Tier 3. Tier 1 and Tier 2 counties are seen as having a more dire need for economic and community development services. Economic distress of a county was measured with three indicators: (1) per capita income, (2) unemployment rate, and (3) population growth. For a more complete description of these tier designations see % of the current STIP funding is planned in Tier 1 Counties, and according to 2009 Certified Population, 16.56% of the population lives in a Tier 1 county. Based on this analysis, it appears that the disadvantaged counties in North Carolina are being treated proportionately for STIP budget allocation based on population. Transportation Revenue Forecast State Budget HIGHWAY PROGRAM BUDGETS State transportation revenues are derived from user fees in the form of Motor Fuel Tax (MFT), driver and vehicles fees collected by the NC Division of Motor Vehicles (DMV Fees) and a Highway Use Tax (HUT) on vehicle title transfers. Federal transportation revenues are derived from a federal MFT tax and vehicle fees (mostly on trucks). North Carolina s transportation funding comprises roughly 75 percent state revenues and 25 percent federal. State Revenues are from revenue projections in the Governor s Recommended Biennium Budget are a consensus forecast by Office of State Budget and Management, Legislative Fiscal Research Division and NC Department of Transportation. The Governor s budget forecast serves as a base from which NCDOT staff develops the Work Program forecast for the remaining years. Motor Fuel revenues are forecast based on crude oil prices and expected consumption, derived from information from the US Department of Energy and IHS Global Insight, a private financial forecasting company. DMV fee revenue forecasts are based on historical transactional information, vehicle registration, licensed driver numbers and Office of State Budget and Management projected population growth in the age range Highway Use Tax revenue is forecasted based on the number of vehicles purchased or traded in, vehicle price and the statutory rate. The number of vehicles sold and the price depend on economic conditions. Regarding DMV/Title Fees, the two variables are statutory rates and the number of transactions, which is based on licensed drivers and vehicle registration. Generally, DMV fees correlate with projected changes in population. Title fees correlate closer to forecasted changes in car sales. Federal transportation funding is distributed by Congress based on multi-year reauthorization bills and annual appropriations. The forecast assumes that a new multi-year reauthorization bill will not take place until SFY 2013, and that the overall program structure will remain unchanged. In the interim, Federal-Aid revenues are assumed to remain at the FY 2010 level until 2013 and T 4

9 will then grow at the same rate assumed by the Congressional Budget Office for national revenue growth. The primary variables for both state and federal revenues are the MFT rate and fuel consumption. The state MFT rate, under state law, has a fixed portion and variable portion that is based on wholesale prices and can adjust every six months, on January 1st and July 1st. The federal MFT rate, set by Congress, is 18.4 cents per gallon for gasoline and 24.4 cents for diesel. The Fuel consumption is affected by fuel prices, which are determined by world markets and economic domestic output. Vehicle fuel efficiency and alternate fuel vehicles affect fuel consumption in the outer years of the forecast. The Highway Construction Budget The highway construction budget consists of the Federal Aid Construction Program and the Intrastate and Urban Loop Programs from the North Carolina Highway Trust Fund. Combined funding is expected to be $1.582 billion for Federal Fiscal Year (FFY) Planning and design is budgeted at $168.5 million, leaving $1.413 billion for right-of-way and construction. During the seven-year State Transportation Improvement Program (STIP) time period, $11.5 billion is expected to be available for the STIP right of way and construction. Federal Aid Program The Federal Aid Construction Program consists of many funding categories. Funding in most of these individual categories is subject to overall federal budget constraints and Federal Obligation Limitation. This effectively limits the amount of federal funds that can be utilized in any one year. In the recent past, in order to comply with overall federal budget constraints, USDOT has taken back or rescinded previously apportioned budget. While these rescissions have had minimal impact on our program to date, continued use of this budget mechanism could adversely affect future budgets. Although North Carolina s total apportionment of federal funds for FFY 2012 is expected to be about $958.4 million, it is anticipated that the obligation limitation applied to most federal aid categories will be about $785 million. Funds for other federal aid categories not subject to this obligation limit bring the total federal funds expected to be available in FFY 2012 to $909.9 million. The amount of state matching funds needed for the Federal Aid Program is expected to be $236.7 million, which will be funded by the State Highway Trust Fund. When federal funds are used on a Trust Fund eligible project, the Trust Fund law allows an amount equal to those federal funds to be used to fund state STIP construction projects, which allows the Department to also have a small annual state construction program. T 5

10 Federal Aid Construction Program - FFY 2012 ($ in Millions) Category Federal Required State Funds Matching Funds Total Interstate Maintenance Appalachian Development Bridge Program National Highway System Congestion Mitigation Surface Transportation Program Highway Safety Improvement Equity Bonus Total Apportionment Obligation Limitation Equity Bonus Appalachian Development Exempt Equity Bonus Total Estimated Federal Funding Availability Proposed Use of FFY 2012 Obligation Authority Garvee Debt Service 7% Appalachian 4% AC Conversion 82% New Projects 7% AC Conversion Garvee Debt Service Appalachian New Projects Total Funds Available = $910M The program is fiscally constrained to the amount of funds projected to be available each year in order to prevent the Department from over committing future revenues. The existing federal bill (SAFETEA-LU) expired September 30, Estimates of federal funds beyond that date are conservative, but may change greatly both in amount and program structure as Congress works to pass a new Federal Surface Transportation Bill. Advance construction (AC) allows states to T 6

11 begin a project even in the absence of sufficient Federal-aid obligation authority to cover the Federal share of project costs. It is codified in Title 23, Section 115. Advance construction eliminates the need to set aside full obligational authority before starting projects. As a result, a state can undertake a greater number of concurrent projects than would otherwise be possible. In addition, advance construction helps facilitate construction of large projects, while maintaining obligational authority for smaller ones. At some future date when the state does have sufficient obligation authority, it may convert an advance-constructed project to a Federal-aid project by obligating the permissible share of its Federal-aid funds and receiving subsequent reimbursements. Advance construction allows a state to conserve obligation authority and maintain flexibility in its transportation funding program. NCDOT uses AC both to support its GARVEE Bond program and to assist in its cash management. GARVEE Bonds In 2005, House Bill 254 authorized NCDOT to issue Grant Anticipation Revenue Vehicles (GARVEE bonds) to finance federal aid highway projects. All funds derived from GARVEE bonds are backed by the receipt of future federal funds and no state funds may be committed to the debt service. In October 2007, the Department received $287.6 million in GARVEE bond proceeds and in 2009 received $242.5 million. GARVEE Bond Program $ in Millions State Fiscal Bond Proceeds Debt Service 2008 $ $ NC State Highway Trust Fund The 1989 General Assembly created the North Carolina Highway Trust Fund to complete a 3,600-mile intrastate system of four-lane roads; widen and improve 113 miles of existing interstate highways; build multi lane loops and connectors near seven major cities (now expanded to ten); provide additional funds in order to pave all unpaved secondary roads and provide additional funds for municipal streets. T 7

12 Revenues for the Trust Fund are generated from the state motor fuels tax, the 3 percent use tax on the sale of motor vehicles, DMV titles and other fees, and interest income. The Trust Fund Law specifies that a designated amount ($ 170 million) will be transferred each year from the Trust Fund to the General Fund. Also, an inflationary adjustment was added to the $170 million base transfer. This transfer has been modified in the recent past. In 2009, $145 million was transferred to the General Fund and the remaining $25 million was allocated to the NCTA. In 2010, $106 million went to the General Fund, $40 million to NCTA, and $24 million was allocated to the new Mobility Fund. Approximately one half of Trust Fund revenues generated from title and other fees are allocated to the paving of secondary roads. A maximum of 4.2 percent of the remaining Trust Fund revenues may be used for administration of the Trust Fund Program and the NC Turnpike Authority. The balance of revenues is distributed as follows: percent to the Intrastate System; percent to Urban Loops; 6.5 percent to pave Secondary Roads; 6.5 percent to Municipal Street Aid Program (the Powell Bill program) This STIP budget is based on the budget and projections developed by NCDOT and the Office of State Budget and Management in the January of These estimates were used to develop the draft program and are the basis for air quality and fiscal constraint tests. The Trust Fund revenues available for all programs are projected to be about $825 million for FY 2012 and $6.3 billion during the 7-year period. Of this $6.3 billion in revenue, $4.6 billion is allocated to the Intrastate and Urban Loop STIP programs. The remainder is utilized for Mobility funds, NCTA, and non-stip purposes. Projected State Highway Trust Fund Revenues ($ in millions) Funding Element (SFY) Year STIP Total 25% of Motor Fuels Tax $430.5 $450.9 $453.8 $459.3 $463.0 $469.7 $474.9 $ % Use Tax Title Fees Investment Income Miscellaneous Fees Transfers Out Total Trust Fund $824.7 $857.8 $868.6 $925.0 $956.2 $950.3 $948.2 $ T 8

13 State Highway Trust Fund Allocations ($ in millions) Program (SFY) Year STIP Total Intrastate Highway System $439.0 $458.0 $472.9 $501.1 $529.1 $522.7 $523.9 $ Urban Loops Powell Bill & Secondary Roads GO Debt Service for Intrastate & Loops Program Administration Total Allocations $824.7 $857.8 $868.6 $925.0 $956.2 $950.3 $948.2 $ Mobility Program The Mobility Program is for projects where the primary purpose is to improve mobility or improve access. This includes the majority of projects which add capacity or improve travel time, even if the safety or condition of the facility is also improved. Examples include widening projects, new location projects, conversion of grade-separation to interchange projects, signal system coordination projects, dynamic message signs and traffic cameras, new multi-use trail projects, new buses for a new bus route, new passenger/commuter/light rail service, adding double track to a rail line, new ferry vessel for expanded ferry service or replacement of an existing vessel with a larger and/or faster vessel, runway extension to accommodate larger planes. The SFY 2011/2012 budget for the Mobility Program is $31 million. Anticipated Inflation Impact Inflation has not been factored into the above revenue estimates. However, when programming projects in the STIP the following inflation factors for future construction and right of way cost increases were used to reserve the budget at an overall inflation rate of 4% for the five year work plan. Project costs and revenue projections shown in this planning document budget are in constant 2011 dollars. Therefore, to find the true anticipated future year project costs, multiply the 2011 cost shown in the STIP by the following inflation factors: , , , , , , and T 9

14 STIP Budget with future Year Inflation Adjusted Costs FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 TOTAL Right of Way/ Construction Budget Prior Years Budget Authority $1,435 $1,325 $1,349 $1,435 $1,485 $1,437 $1,449 $9,915 $131 $131 $131 $131 $131 $657 Inflation Factor STIP with Inflated Cost Estimate $1,581 $1,602 $1,622 $1,606 $1,720 $1,391 $1,493 $11,015 $ Under/(Over) ($15) ($150) ($152) ($50) ($103) $56 ($44) ($457) % Under/(Over) (1.1%) (11.9%) (12.4%) (3.9%) (8.1%) 4.5% (3.6%) (5.1%) Highway Construction Budget ($ in millions) Category(FFY) Year STIP Totals Federal Aid Construction (1) Intrastate and Loops $909.9 $995.1 $ $ $ $ $ $ Mobility Funds NCTA Less: Cost Overruns Subtotal Less Planning and Design STIP R/W and Construction Budget $ $ $ $ $ $ $ $ The forecast assumes that a new multi-year reauthorization will not take place until SFY In the interim, Federal-Aid revenues are assumed to remain at the SFY 2010 level and will grow at the same rate assumed by the Congressional Budget Office for national revenue growth in the Federal Highway Trust Fund. T 10

15 Cash Model NCDOT uses a cash model to manage its operations on a cash-flow basis, the Department uses statistical models that were developed specifically to support NCDOT programs. The models are used to forecast future cash demands and financial capacity. These projections serve as the basis for the dollar values found herein. 36 Month Cash Model Sample View ($ in Millions) A cash target equivalent to 12% of anticipated revenues plus estimated Powell Bill allocation was established to constrain spending and provide for prudent cash reserves. Also, NCGS 143: 28.1 established a cash balance floor equivalent to approximately 5% of anticipated revenues. The proposed STIP was modeled to insure that the department would have adequate cash to pay for all programmed projects, operations and maintenance activities through Based on the program of projects and anticipated revenue, it appears that there should be adequate funding available to support the program. The State Transportation Improvement Program (STIP) The STIP predominantly consists of capital improvements projects. For information regarding operations and maintenance of the system, see the NCDOT From Policy to Projects: Work Program document. The Work Program is the state s annual transportation program for projects and programs for the period , grouped into five categories: Construction and Engineering preliminary engineering, construction, right of way, environmental mitigation and other elements of capital projects Maintenance activities and projects to maintain our multi-modal transportation network T 11

16 Operations activities and projects to operate our multi-modal transportation network Administration management and support services Transfers dollars that are transferred out of NCDOT to other state agencies, the General Fund and NC Global TransPark Over the next five years, NCDOT expects to invest nearly $24 billion in transportation. Of these dollars, approximately 51 percent will go to improve mobility, 2 percent to improve safety and 40 percent to improve infrastructure health. Percentages are estimates, and categories may overlap. For example, money spent to improve mobility or infrastructure health in most cases will improve safety as well. This Work Program reflects the projects, programs, and services NCDOT commits to deliver over the next five years. Successful completion of our Work Program will improve transportation safety and mobility and the health of our transportation network. The Department s long-term goal is to achieve at least a 95 percent delivery rate on projects in the Work Program. T 12

17 Accomplishments Federal Fiscal Year 2009 Projects with activity(s) scheduled during Federal Fiscal Year 2009 are listed in the Accomplishments Table on the following pages. Projects for which the indicated activity did occur are shown with a Yes in the Work Started column. Projects where the scheduled activity did not occur are shown with a No in the Work Started column. The Remarks column gives a brief explanation of the programmed activity. T-13

18

19 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS ALAMANCE B-4004 WELLS CREEK. REPLACE BRIDGE NO. 149 C YES COMPLETED ALAMANCE B-4402 TICKLE CREEK. REPLACE BRIDGE NO. 7 C YES COMPLETED ALAMANCE B-4404 SOUTH FORK CANE CREEK. C YES COMPLETED REPLACE BRIDGE NO. 102 ALAMANCE I-4714 NC 49 (MILEPOST 145) TO NC 54 (MILEPOST 148). MILL AND CG YES PAYBACK IN PROGRESS RESURFACE. ALAMANCE I-4918 NC 54 (MILEPOST 148) IN ALAMANCE COUNTY TO WEST OF SR CG YES PAYBACK IN PROGRESS 1114 (BUCKHORN ROAD) IN ORANGE COUNTY. MILL AND RESURFACE. ALAMANCE P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. ALAMANCE P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. ALAMANCE U-3303 SR 1306-SR 1363 (MEBANE STREET), SR 1158 (HUFFMAN MILL ROAD) TO NC 54 (CHAPEL HILL ROAD). WIDEN TO MULTI-LANES. ALAMANCE W-4705 SR 2142 (MT. WILLEN ROAD-SALEM CHURCH ROAD). INTERSECTION IMPROVEMENTS. ALAMANCE W-5011 IMPROVE VERTICAL ALIGNMENT ON NC 49, REMOVE SIGHT OBSTRUCTIONS, AND PROVIDE FOR CHANNELIZATION IN THE NW AND SW QUADRANTS. ALLEGHANY R-2637 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. C YES PART UNDER CONSTRUCTION ALLEGHANY R-3101 ROARING GAP TO SPARTA. UPGRADE R NO DELAYED TO 2011 ROADWAY TO TWENTY-FOUR FEET WITH TWO FOOT PAVED SHOULDERS. ALLEGHANY R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. ANSON B-3404 SOUTH FORK JONES CREEK. R YES COMPLETED IN 2010 REPLACE BRIDGE NO. 314 ANSON B-4409 WINSTON-SALEM SOUTHBOUND RAILROAD. REPLACE BRIDGE NO. 308 ANSON B-4410 WINSTON-SALEM SOUTHBOUND RAILROAD. REPLACE BRIDGE NO. 307 ANSON B-4861 RIDGE STREET. REPLACE BRIDGE NO. 88 OVER WINSTON- SALEM SOUTHBOUND RAILROAD. ASHE B-1037 SOUTH FORK NEW RIVER. REPLACE BRIDGE NO. 39 (COORDINATE WITH R-2310) ASHE B-3802 WEST FORK PINE SWAMP CREEK. REPLACE BRIDGE NO. 229 T-15

20 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS ASHE B-3806 LITTLE PHOENIX CREEK. REPLACE BRIDGE NO. 456 ASHE B-3928 SOUTH FORK NEW RIVER. REPLACE BRIDGE NO. 334 ASHE B-4011 CREEK. REPLACE BRIDGE NO. 85 ASHE B-4015 BIG HORSE CREEK. REPLACE BRIDGE NO. 165 ASHE R-2637 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. C YES PART UNDER CONSTRUCTION ASHE R-4724A PRA-BLRI 2D16. REHABILITATE PARKWAY MILEPOST TO MILEPOST ASHE R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. AVERY B-3608 NORTH TOE RIVER. REPLACE BRIDGE NO. 44 AVERY R-2637 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. C YES PART UNDER CONSTRUCTION AVERY R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. BEAUFORT B-3611 PANTEGO CREEK. R YES COMPLETED REPLACE BRIDGE NO. 77 BEAUFORT B-3809 PUNGO CREEK. REPLACE BRIDGE NO. 64 R YES COMPLETED U YES COMPLETED BEAUFORT B-4019 RUNYON CREEK. REPLACE BRIDGE NO. 103 BEAUFORT B-4025 CREEK. REPLACE BRIDGE NO. 39 BEAUFORT B-4416 CAROLINA AND NORTHWEST RAILROAD. REPLACE BRIDGE NO. R YES IN ACQUISITION 76 U YES IN PROGRESS BEAUFORT B-4417 JACK CREEK. REPLACE BRIDGE NO. 59 R YES COMPLETED U YES COMPLETED BEAUFORT B-4423 HORSE BRANCH CREEK. C NO DELAYED TO 2010 REPLACE BRIDGE NO. 67 BEAUFORT B-4424 BRANCH OF CHOCOWINITY CREEK. REPLACE BRIDGE NO. 68 C NO DELAYED TO 2010 BEAUFORT B-4428 CANAL. REPLACE BRIDGE NO. 140 R YES COMPLETED U YES COMPLETED BEAUFORT B-4500 WATERS STREET OVER TRIBUTARY OF PUNGO RIVER. R NO DELAYED TO 2010 REPLACE BRIDGE NO. 324 T-16

21 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS BEAUFORT K-3800 ACQUIRE RIGHT OF WAY AND RELOCATE REST AREA AT NEW LOCATION WITH MUNICIPAL WATER AND SEWER AVAILABLE. (COORDINATE WITH R-2510B) R YES COMPLETED BEAUFORT W-5008 SR 1306 (15TH. STREET), WEST OF WASHINGTON STREET TO EAST OF PIERCE STREET. WIDEN TO FIVE LANES. C NO DELAYED TO 2010 BERTIE B-3811 INDIAN CREEK. REPLACE BRIDGE NO. 85 BERTIE B-4026 CHOOWATIC CREEK. C YES COMPLETED REPLACE BRIDGE NO. 45 BERTIE B-4434 CASHIE RIVER. REPLACE BRIDGE NO. 14 BERTIE B-4435 ROQUIST CREEK. R YES COMPLETED REPLACE BRIDGE NO. 44 U YES COMPLETED BLADEN B-3613 SOUTH RIVER. REPLACE BRIDGE NO. 44 BLADEN W-5121 NC 131. INTERSECTION IMPROVEMENTS. R YES IN ACQUISITION C NO DELAYED TO 2010 BRUNSWICK B-4030 BEAR BRANCH. C YES COMPLETED REPLACE BRIDGE NO. 9 BRUNSWICK F-5002 SOUTHPORT RAMP-GANTRY-DOLPHIN. REPAIR AND REPLACE. C YES COMPLETED BRUNSWICK R-3324 NC 211 TO NC 87 AT SR 1525 (BETHEL C NO DELAYED TO 2013 ROAD). TWO LANE CONNECTOR ON NEW LOCATION. BRUNSWICK R-4002 WEST OF SR 1437 (OLD FAYETTEVILLE ROAD)-SR 1435 (NAVASSA ROAD) TO EAST OF US 17 INTERCHANGE RAMPS WITH DUAL LEFT TURN LANES ON NORTH RAMP TO US 17. WIDEN TO MULTI-LANES. BRUNSWICK U-3462 SR 1357 (SMITH AVENUE)-NC 130. REALIGN INTERSECTION TO C YES COMPLETED ELIMINATE OFFSET, NEW LOCATION. BUNCOMBE B-2515 SWANNANOA RIVER. REPLACE BRIDGE NO. 39 BUNCOMBE B-4034 STONY FORK CREEK. REPLACE BRIDGE NO. 134 U YES IN PROGRESS BUNCOMBE B-4343 EAST OAKVIEW ROAD OVER HOMINY CREEK. REPLACE BRIDGE NO. 52 BUNCOMBE B-4446 REEMS CREEK. REPLACE BRIDGE NO. 227 U YES IN PROGRESS BUNCOMBE I-5108 I-40, MILEPOST 45 TO MILEPOST 50. PAVEMENT REHABILITATION. CG YES PAYBACK IN PROGRESS T-17

22 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS BUNCOMBE I-5109 I-40, HAYWOOD COUNTY LINE TO MILEPOST 43 IN BUNCOMBE COUNTY. PAVEMENT REHABILITATION. CG YES PAYBACK IN PROGRESS BUNCOMBE R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. BUNCOMBE U-4014 US 25 (MCDOWELL STREET). C NO DELAYED TO 2011 UPGRADE TUNNEL. BUNCOMBE U-4919 PACK SQUARE PARK. CONSTRUCT PEDESTRIAN AND ROADWAY IMPROVEMENTS. BURKE B-4043 PARKS CREEK. REPLACE BRIDGE NO. 51 BURKE R-2824 SR 1545 (LAUREL STREET) TO SR 1001 (MALCOLM BOULEVARD). UPGRADE EXISTING ROADWAY. BURKE R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. BURKE U-2550B NC 18, US 70 BYPASS (FLEMING DRIVE) TO I-40. WIDEN TO MULTI-LANES AND REVISE INTERCHANGE. BURKE U-2551 SR 1922 (ENOLA ROAD)-SR 1924 (OLD R NO DELAYED TO 2011 NC 18), SR 2026 (ARNOLD DRIVE) TO NC 18 (SOUTH STERLING STREET). WIDEN TO MULTI-LANES AND UPGRADE INTERCHANGE. U NO DELAYED TO 2011 CABARRUS B-3421 SOUTHERN RAILWAY. REPLACE BRIDGE NO. 266 U YES IN PROGRESS CABARRUS B-4051 BLACK RUN CREEK. REPLACE BRIDGE NO. 90 CABARRUS B-5000 BURRAGE ROAD. REPLACE BRIDGE R NO DELAYED TO 2012 NO. 151 OVER THREE MILE BRANCH CABARRUS C-4918A INTERSECTION IMPROVEMENTS AND ADDITIONAL TURN LANES AT SELECTED LOCATIONS. CABARRUS C-4919 CONSTRUCT A MCEACHERN GREENWAY CONNECTOR TO DOWNTOWN CORBAN PARK. CABARRUS C-5101 PURCHASE T3 PERSONAL MOBILITY ELECTRIC VEHICLES N YES COMPLETED IN 2010 CABARRUS K-4906 RENOVATION OF REST AREA PAIR- BUILDINGS, GROUNDS AND PARKING FACILITIES. BUILDINGS TO INCLUDE DUAL RESTROOMS AND ADA COMPLIANT FAMILY RESTROOM. CABARRUS P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. CABARRUS P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. T-18

23 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS CALDWELL B-3932 MULBERRY STREET OVER LOWER CREEK. REPLACE BRIDGE NO. 68 CALDWELL B-5011 FAIRVIEW DRIVE. REPLACE BRIDGE R NO DELAYED TO 2012 NO. 74 OVER LOWER CREEK C NO DELAYED TO 2013 CALDWELL R-2637 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. C YES PART UNDER CONSTRUCTION CALDWELL R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. CALDWELL U-3437 NEW CONNECTOR, SR 1159 (PLEASANT R NO DELAYED TO 2011 HILL ROAD) EXTENSION TO SR 1160 (MT. HERMAN ROAD). TWO LANES U NO DELAYED TO 2011 ON NEW LOCATION. CAMDEN R-2414A EAST OF PASQUOTANK RIVER IN ELIZABETH CITY TO EAST OF NC 34 IN BELCROSS. WIDEN TO MULTI-LANES. CARTERET B-5001 MIMOSA BOULEVARD. REPLACE BRIDGE NO. 47 OVER PINE R NO DELAYED TO 2011 KNOLL WATERWAY CARTERET W-4700 SR 1140 TO WEST OF US 70. C NO DELAYED TO 2013 WIDEN TO 24 FEET. CASWELL C-4936B PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS CASWELL C-4936D PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS CATAWBA K-4907 RENOVATION OF REST AREA PAIR- BUILDINGS, GROUNDS AND PARKING FACILITIES. BUILDINGS TO INCLUDE DUAL RESTROOMS AND ADA COMPLIANT FAMILY RESTROOM. CHATHAM B-4064 BROOKS CREEK. REPLACE BRIDGE NO. 95 CHATHAM C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS CHATHAM C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS CHATHAM U-4726 DCHC URBAN AREA BICYCLE AND PEDESTRIAN ALLOCATION. CHATHAM U-4727 DURHAM-CHAPEL HILL-CARRBORO URBAN AREA PLANNING (DCHC) ALLOCATION AND UNIFIED PROGRAM. T-19

24 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS CHEROKEE B-3430 NANTAHALA FOREST, PFH 1331(6). HANGING DOG CREEK, REPLACE BRIDGE NO. 43 CHEROKEE B-3635 JUNALUSKA CREEK. REPLACE BRIDGE NO. 26 CHEROKEE B-4071 JUNALUSKA CREEK. REPLACE BRIDGE NO. 32 CHEROKEE B-4072 BRASSTOWN CREEK OVERFLOW. REPLACE BRIDGE NO. 98 CHEROKEE R-3622AA US AT RANGER TO TENNESSEE STATE LINE. UPGRADE EXISTING ROADWAY. CHEROKEE R-3622AB US AT RANGER TO TENNESSEE STATE LINE. UPGRADE EXISTING ROADWAY. CHEROKEE R-4048 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. CHEROKEE R-5007 S AMMONS SEQUOYAH. PE NO DELAYED TO 2011 RECONSTRUCTION. CHEROKEE R-5009 S LUCY LONG ROAD. PE NO DELAYED TO 2011 RECONSTRUCTION. CHEROKEE R-5010 S INDIAN CREEK ROAD. PE NO DELAYED TO 2011 RECONSTRUCTION. CHEROKEE R-5011 S HORNBUCKLE CREEK ROAD. PE NO DELAYED TO 2011 RECONSTRUCTION. CHEROKEE R-5012 S BLUE WING CHURCH ROAD. C NO DELAYED TO 2011 RECONSTRUCTION. CHOWAN B-4465 POLLOCK SWAMP. R YES COMPLETED REPLACE BRIDGE NO. 5 U YES IN PROGRESS CLAY A-0011BB NC 69, GEORGIA STATE LINE TO US 64. WIDEN TO FOUR LANES DIVIDED. US 64, NC 69 TO EAST OF NC 175. UPGRADE ROADWAY WITH SOME WIDENING TO FIVE LANES. C NO DELAYED TO 2010 CLAY B-4467 BRASSTOWN CREEK. REPLACE BRIDGE NO. 3 CLAY B-4854 NANTAHALA NATIONAL FOREST. R YES DELAYED TO 2011 TUNI CREEK, REPLACE BRIDGE NO. 81. C YES DELAYED TO 2011 CLAY R-4048 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. CLAY W-5119 GEORGIA STATE LINE TO US 64. INSTALL PAVED SHOULDERS AND REALIGN CURVE. CLEVELAND B-1135 BEAVERDAM CREEK. REPLACE BRIDGE NO. 139 T-20

25 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS CLEVELAND B-4075 GROG CREEK. REPLACE BRIDGE NO. 129 C NO DELAYED TO 2011 CLEVELAND B-4468 SANDY RUN CREEK. REPLACE BRIDGE NO. 144 CLEVELAND R-2707A SHELBY. FOUR LANE DIVIDED FREEWAY ON NEW LOCATION. U YES IN PROGRESS CLEVELAND R-2707B SHELBY. FOUR LANE DIVIDED FREEWAY R NO DELAYED TO 2011 ON NEW LOCATION. U NO DELAYED TO 2011 COLUMBUS B-4080 PINE LOG SWAMP. C YES COMPLETED IN 2009 REPLACE BRIDGE NO. 148 COLUMBUS R-4900 NC 242. CONSTRUCT INTERCHANGE. R YES COMPLETED IN 2009 CRAVEN B-4086 BRICE CREEK. REPLACE BRIDGE NO. 10 C NO DELAYED TO 2010 CRAVEN F-5000 CHERRY BRANCH VISITOR'S CENTER. REPLACEMENT. CRAVEN R-2301A NEW BERN BYPASS, US 17 SOUTH OF NEW BERN TO US 70. FOUR LANE DIVIDED FREEWAY ON NEW LOCATION. CRAVEN W-5101 NC 101 TO FOREST HILL DRIVE. CONSTRUCT RAISED MEDIAN. C YES COMPLETED CUMBERLAND B-4090 CROSS CREEK. REPLACE BRIDGE NO. 125 R YES IN ACQUISITION CUMBERLAND B-4091 US 301, SR 1738, SR 1741, CAPE FEAR R NO DELAYED TO 2011 RIVER. REPLACE BRIDGE NO. 85 CUMBERLAND EB-4539B CAPE FEAR RIVER GREENWAY, CLARK PARK SOUTH TO THE CAPE FEAR BOTANICAL GARDENS. CONSTRUCT SECOND PHASE OF AN OFF-ROAD MULTI-USE TRAIL. C NO DELAYED TO 2011 CUMBERLAND R-2303A WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R NO DELAYED TO 2011 CUMBERLAND U-2519DA OUTER LOOP, I-95 SOUTH OF FAYETTEVILLE TO WEST OF NC (BRAGG BOULEVARD). FREEWAY ON NEW LOCATION. C NO DELAYED TO 2011 CUMBERLAND U-2519E OUTER LOOP, I-95 SOUTH OF FAYETTEVILLE TO WEST OF NC (BRAGG BOULEVARD). FREEWAY ON NEW LOCATION. CUMBERLAND U-2809B SR 1132 (LEGION ROAD), SR 1007 (OWEN DRIVE) TO SR 1131 R YES IN ACQUISITION (CAMERON ROAD). WIDEN TO MULTI-LANES. U YES IN PROGRESS CUMBERLAND U-2810A SR 1003 (CAMDEN ROAD), NC 59 (HOPE MILLS ROAD) TO SR 1007 C NO DELAYED TO 2010 (OWEN DRIVE). WIDEN ROADWAY TO MULTI-LANES. T-21

26 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS CUMBERLAND U-3849 SR 1363 (ELK MILL ROAD), SR 1132 (LEGION ROAD) TO US 301/I- C NO DELAYED TO BUSINESS. WIDEN TO MULTI-LANES. CUMBERLAND U-4422 SR 1596 (GLENSFORD ROAD), US 401 BUSINESS (RAEFORD ROAD) TO SR 1400 (CLIFFDALE ROAD). WIDEN TO FIVE LANES, PART ON NEW LOCATION. R YES COMPLETED IN 2009 CUMBERLAND U-4444A NC 210 (MURCHISON ROAD), PROPOSED R YES COMPLETED IN 2009 FAYETTEVILLE OUTER LOOP (X-2) TO NC (BRAGG BOULEVARD) IN SPRING LAKE. WIDEN TO SIX-LANES. CUMBERLAND X-0002B EAST OF NC (BRAGG BOULEVARD) TO I-95. FREEWAY ON NEW LOCATION WITH STRUCTURE OVER THE CAPE FEAR RIVER. CUMBERLAND X-0002C EAST OF NC (BRAGG BOULEVARD) TO I-95. FREEWAY ON NEW LOCATION WITH STRUCTURE OVER THE CAPE FEAR RIVER. C NO DELAYED TO 2011 CURRITUCK B-4094 SHINGLE LANDING CREEK. C YES COMPLETED REPLACE BRIDGE NO. 28 CURRITUCK K-4700 REST AREA RENOVATION - FACILITY UPGRADES, SEWER R NO PROJECT DELETED SYSTEM IMPROVEMENTS, AND PARKING. DARE B-2500 OREGON INLET. REPLACE BRIDGE NO. 11 DARE U-3815 US 64-US 64 BYPASS-NC 345. R NO PROJECT DELETED IMPROVE INTERSECTION. DAVIDSON B-4097 NORTH POTTS CREEK. C YES COMPLETED REPLACE BRIDGE NO. 405 DAVIDSON B-4498 ABBOTTS CREEK. REPLACE BRIDGE NO. 199 DAVIDSON B-4499 US 29/70/I-85. REPLACE BRIDGE NO. 158 R YES COMPLETED U YES COMPLETED DAVIDSON C-4936B PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS DAVIDSON C-4936D PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS DAVIDSON I-2304 NORTH OF SR 2120 (EXIT 81) IN ROWAN R YES COMPLETED COUNTY TO US /I-85 BUSINESS (EXIT 87). ADDITIONAL LANES AND BRIDGE RECONSTRUCTION. (PROJECT INCLUDES B-3833) T-22

27 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS DAVIDSON K-4905 RENOVATION OF REST AREA PAIR- BUILDINGS, GROUNDS AND PARKING FACILITIES. BUILDINGS TO INCLUDE DUAL RESTROOMS AND ADA COMPLIANT FAMILY RESTROOM. C YES COMPLETED DAVIDSON R-4750 I-85 IN DAVIDSON COUNTY TO I-40 IN R NO DELAYED TO 2012 FORSYTH COUNTY. UPGRADE EXISTING ROADWAY TO INTERSTATE STANDARDS. DAVIDSON U-4741 VARIOUS GREENWAY AND SIDEWALK PROJECTS WITHIN MPO C YES COMPLETED AREA. DAVIDSON U-4742 INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS WITHIN METROPOLITAN PLANNING ORGANIZATION (MPO) AREA. C YES COMPLETED DAVIE B-3637 I-40. REPLACE BRIDGE NO. 37 CG YES PAYBACK IN PROGRESS AND REVISE INTERCHANGE. DAVIE I-3600 SR 1436 (PINEBROOK DRIVE) TO WEST CG YES PAYBACK IN PROGRESS OF NC 801. PAVEMENT REHABILITATION. DAVIE U-4741 VARIOUS GREENWAY AND SIDEWALK PROJECTS WITHIN MPO C YES COMPLETED AREA. DAVIE U-4742 INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS WITHIN METROPOLITAN PLANNING ORGANIZATION (MPO) AREA. C YES COMPLETED DUPLIN B-4105 WHITE OAK BRANCH. R YES COMPLETED REPLACE BRIDGE NO. 46 C YES COMPLETED DUPLIN B-4106 BEAVERDAM CREEK. C YES COMPLETED REPLACE BRIDGE NO. 20 DUPLIN I-4702 SR 1122 (MILEPOST 339) IN JOHNSTON COUNTY TO NC 132 C NO PROJECT DELETED (MILEPOST 420) IN NEW HANOVER COUNTY. SEAL EXISTING SHOULDERS. DUPLIN R-2303A WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R NO DELAYED TO 2011 DURHAM B-3638 CAMPUS DRIVE. REPLACE BRIDGE NO. 316 DURHAM C-4402 I-40 WEST OF NC 751 TO TRIANGLE R YES COMPLETED DRIVE IN RESEARCH TRIANGLE PARK. CONSTRUCT ON-ROAD BICYCLE FACILITY. DURHAM C-4702 TEN (10) - REPLACEMENT BUSES. A YES IN PROGRESS DURHAM C-4927 PURCHASE 5 HYBRID ELECTRIC BUSES. A NO PROJECT DELETED DURHAM C-4928 MORREENE ROAD, NEAL ROAD TO ERWIN ROAD. CONSTRUCT BIKE LANES AND SIDEWALKS. T-23

28 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS DURHAM C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS DURHAM C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS DURHAM C-5103 PURCHASE TWO (2) HYBRID ELECTRIC BUSES AND PROVIDE A YES IN PROGRESS PORTION OF OPERATING ASSISTANCE FOR TWO YEARS. O YES IN PROGRESS DURHAM C-5104 PURCHASE TWO (2) HYBRID ELECTRIC BUSES AND PROVIDE A YES IN PROGRESS PORTION OF OPERATING EXPENSE FOR THREE YEARS. O YES IN PROGRESS DURHAM EB-4707 SR 2220 (OLD CHAPEL HILL ROAD)- SR 1838 (OLD DURHAM ROAD), SR 1116 (GARRETT ROAD) IN DURHAM COUNTY TO US IN ORANGE COUNTY. BICYCLE IMPROVEMENTS. DURHAM EL-2921E AMERICAN TOBACCO RAIL TRAIL. NC 54 TO CHATHAM COUNTY R YES COMPLETED LINE. CONSTRUCT A MULTI-PURPOSE TRAIL. DURHAM P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. DURHAM P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. DURHAM R-2000AF NORTHERN WAKE FREEWAY, NC 55 R YES COMPLETED WEST OF MORRISVILLE TO US 64 EAST NEAR KNIGHTDALE. FREEWAY U YES COMPLETED ON NEW LOCATION. DURHAM U-3309A SR 2028 (T.W. ALEXANDER DRIVE), SR 1121 (CORNWALLIS ROAD) TO SR 1959 (MIAMI BOULEVARD). WIDEN TO A FOUR LANE DIVIDED FACILITY. C YES COMPLETED DURHAM U-3804 SR 1321 (HILLANDALE ROAD), I-85 TO R YES COMPLETED SR 1407 (CARVER STREET). WIDEN TO MULTI-LANES. U YES COMPLETED DURHAM U-4011 SR 1959 (SOUTH MIAMI BOULEVARD), SOUTH OF SR 2112 (METHODIST STREET) TO NORTH OF SR 1960 (BETHESDA AVENUE). WIDEN TO FIVE LANES TO PROVIDE CENTER TURN LANE. DURHAM U-4704 CHAPEL HILL-CARRBORO COMPUTERIZED TRAFFIC SIGNAL SYSTEM. DURHAM U-4726 DCHC URBAN AREA BICYCLE AND PEDESTRIAN ALLOCATION. DURHAM U-4727 DURHAM-CHAPEL HILL-CARRBORO URBAN AREA PLANNING (DCHC) ALLOCATION AND UNIFIED PROGRAM. T-24

29 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS DURHAM U-4763B NEW ROUTE - TRIANGLE PARKWAY, I-540 TO I-40. MULTI-LANE FACILITY ON NEW LOCATION. DURHAM W-5125 EAST OF NC 147. C YES COMPLETED INSTALL MEDIAN BARRIER. EDGECOMBE B-2965 TAR RIVER. REPLACE BRIDGE NO. 24 C YES COMPLETED EDGECOMBE B-4504 DEEP CREEK. REPLACE BRIDGE NO. 52 C YES COMPLETED IN 2009 EDGECOMBE C-4969B CONSTRUCT SIDEWALKS AT VARIOUS LOCATIONS IN ROCKY MOUNT. EDGECOMBE P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. EDGECOMBE U-3826 SR 1537 (DANIEL STREET EXTENSION), SR 1518 (LOOP ROAD) TO US 258-NC 122. TWO LANES ON MULTI-LANE RIGHT OF WAY, NEW LOCATION. FORSYTH B-4507 MUDDY CREEK. REPLACE BRIDGE NO. 221 AND BRIDGE NO FORSYTH B-4510 I-40 BUSINESS. REPLACE BRIDGE NO. 368 R YES COMPLETED U YES COMPLETED FORSYTH B-5004 REYNOLDS PARK ROAD. REPLACE R NO DELAYED TO 2012 BRIDGE NO. 86 OVER SALEM CREEK AND BRIDGE NO. 87 OVER BUSHY R NO DELAYED TO 2012 FORK CREEK. FORSYTH C-4936B PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS FORSYTH C-4936D PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS FORSYTH C-4979B CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. C YES COMPLETED FORSYTH C-4981A INSTALL INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AT SELECTED LOCATIONS. FORSYTH C-4981B INSTALL INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AT SELECTED LOCATIONS. FORSYTH C-4981C INSTALL INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AT SELECTED LOCATIONS. FORSYTH C-4981D INSTALL INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AT SELECTED LOCATIONS. T-25

30 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS FORSYTH EB-4010 MUDDY CREEK GREENWAY-WESTERN C YES COMPLETED FORSYTH: ROBINHOOD ROAD TO COUNTRY CLUB ROAD. FORSYTH EB-4020B BRUSHY FORK CREEK GREENWAY, PHASE A, B, C: SALEM CREEK GREENWAY TO LANSING DRIVE. PAVED MULTI-USE TRAIL. C YES COMPLETED FORSYTH EB-4020C BRUSHY FORK CREEK GREENWAY, PHASE A, B, C: SALEM CREEK GREENWAY TO LANSING DRIVE. PAVED MULTI-USE TRAIL. FORSYTH I-4717 END OF PORTLAND CEMENT CONCRETE (PCC) PAVEMENT TO C YES COMPLETED BEGINNING OF PCC PAVEMENT IN VICINITY OF US 311 INTERCHANGE. RESURFACE. FORSYTH R-0609IA HIGH POINT, SOUTH OF SR 1920 EAST OF ARCHDALE TO WEST OF HIGH POINT RESERVOIR. FOUR LANES DIVIDED, NEW LOCATION. INTEGRATION OF ITS DEVICES WITH PIEDMONT REGIONAL TRANSPORTATION MANAGEMENT AND HIGH POINT'S TRAFFIC OPERATIONS CENTER. C YES COMPLETED FORSYTH R-2201 KING-TOBACCOVILLE ROAD (MAIN STREET). RJR ENTRANCE TO SR 1115 (KIRBY ROAD). WIDEN TO MULTI-LANES. INTERSECTION IMPROVEMENTS AT SR 1105 (MEADOWBROOK ROAD). FORSYTH R-4750 I-85 IN DAVIDSON COUNTY TO I-40 IN R NO DELAYED TO 2012 FORSYTH COUNTY. UPGRADE EXISTING ROADWAY TO INTERSTATE STANDARDS. FORSYTH U-2579C WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION (FUTURE I-74), US 52 TO US 311. MULTI-LANE FREEWAY ON NEW LOCATION. R NO DELAYED TO POST YEAR FORSYTH U-2826A US 52, I-40 BYPASS TO PROPOSED WESTERN LOOP INTERCHANGE. WIDEN AND UPGRADE ROADWAY AND INTERCHANGES FORSYTH U-2826B US 52, I-40 BYPASS TO PROPOSED R YES COMPLETED WESTERN LOOP INTERCHANGE. WIDEN AND UPGRADE ROADWAY U YES COMPLETED AND INTERCHANGES FORSYTH U-2923 SR 2747 (CLEMMONSVILLE ROAD), SR 3011 (OLD SALISBURY ROAD) TO SOUTH MAIN STREET. WIDEN TO MULTI-LANES. R YES UNDER CONSTRUCTION FORSYTH U-4741 VARIOUS GREENWAY AND SIDEWALK PROJECTS WITHIN MPO C YES COMPLETED AREA. FORSYTH U-4742 INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS WITHIN METROPOLITAN PLANNING ORGANIZATION (MPO) AREA. C YES COMPLETED FORSYTH U-4918 US /I-40 BUSINESS VICINITY AT PIEDMONT TRIAD RESEARCH PARK. TRANSPORTATION IMPROVEMENTS. T-26

31 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS FORSYTH U-9999D WINSTON-SALEM-FORSYTH COUNTY METROPOLITAN PLANNING PE YES IN PROGRESS ORGANIZATION PLANNING (PL) SUPPLEMENT. FRANKLIN B-4114 CAMPING CREEK. C YES COMPLETED REPLACE BRIDGE NO. 151 FRANKLIN B-4587 CYPRESS CREEK. C YES COMPLETED REPLACE BRIDGE NO. 82 FRANKLIN C-4939 CONSTRUCT A BIKE-PEDESTRIAN PATH IN FORMER RAIL N NO PROJECT DELETED CORRIDOR (COTTON MARKET RAIL TRAIL). N NO PROJECT DELETED. DECLINED BY COUNTY. FRANKLIN C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS FRANKLIN C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS FRANKLIN EL-5100 PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS IN THE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO). FRANKLIN R-2814B NORTH OF SR 2044 (LIGON MILL ROAD) R YES COMPLETED TO NC 39 IN LOUISBURG. WIDEN TO MULTI-LANES, SOME NEW LOCATION.. U YES COMPLETED RG YES PAYBACK IN PROGRESS FRANKLIN U-5118 OPERATIONAL IMPROVEMENTS FOR SAFETY AND CONGESTION MITIGATION FRANKLIN W-5111 INTERSECTION WITH SR 1101 (DARIUS PEARCE ROAD AND SID C YES COMPLETED EAVES ROAD). INSTALL TRAFFIC SIGNAL AND LEFT TURN LANES ON US 401. GASTON B-4117 CREEK. REPLACE BRIDGE NO. 173 U YES IN PROGRESS GASTON B-4517 CROWDER'S CREEK. REPLACE BRIDGE NO. 49 GASTON B-4518 CREEK. REPLACE BRIDGE NO. 110 GASTON B-4519 LITTLE LONG CREEK. R YES UNDER CONSTRUCTION REPLACE BRIDGE NO. 155 GASTON B-4575 MICKLEY AVENUE OVER NORFOLK SOUTHERN RAILROAD. REPLACE BRIDGE NO. 165 U YES IN PROGRESS GASTON C-4934 NC 279 (NEW HOPE ROAD), BURTONWOOD DRIVE TO SR 2466 (GARRISON BOULEVARD). WIDEN TO MULTI-LANES. R NO DELALYED TO 2011 T-27

32 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS GASTON U-3405 NC 274 (GASTONIA HIGHWAY), SR 1484 (MAINE AVENUE) TO NC 275. WIDEN TO FIVE LANES WITH CURB AND GUTTER. GATES B-4520 TROTMAN CREEK. REPLACE BRIDGE NO. 32 GRAHAM B-3335 CHEOAH RIVER. REPLACE BRIDGE NO. 70 GRAHAM B-3457 PANTHER CREEK. REPLACE BRIDGE NO. 68 GRAHAM B-4122 LONG CREEK. REPLACE BRIDGE NO. 81 U YES IN PROGRESS GRAHAM B-4123 WEST BUFFALO CREEK. REPLACE BRIDGE NO. 117 GRAHAM B-4689 NANTAHALA NATIONAL FOREST, PFH 101-1(1), PANTHER CREEK. REPLACE BRIDGE NO. 99 GRAHAM R-4048 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. GRANVILLE B-4522 TAR RIVER. REPLACE BRIDGE NO. 102 GRANVILLE B-4523 FOX CREEK. REPLACE BRIDGE NO. 164 C YES COMPLETED GRANVILLE B-4524 SHELTON CREEK. C YES COMPLETED REPLACE BRIDGE NO. 193 GRANVILLE B-4525 GRASSY CREEK. C YES COMPLETED REPLACE BRIDGE NO. 133 GRANVILLE B-4526 MOUNTAIN CREEK. C YES COMPLETED REPLACE BRIDGE NO. 200 GRANVILLE C-4940 CONSTRUCT BICYCLE-PEDESTRIAN PATHS AT VARIOUS LOCATIONS. GRANVILLE C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS GRANVILLE C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS GRANVILLE EL-5100 PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS IN THE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO). GRANVILLE U-5118 OPERATIONAL IMPROVEMENTS FOR SAFETY AND CONGESTION MITIGATION GUILFORD B-4695 BALLINGER ROAD OVER HORSEPEN CREEK. REPLACE BRIDGE NO. 97 T-28

33 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS GUILFORD C-4936B PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS GUILFORD C-4936D PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS GUILFORD EB-4709B BATTLEGROUND AVENUE RAIL-TRAIL GUILFORD EL-5101 PEDESTRIAN AND BICYCLE PROJECTS IN THE GREENSBORO URBAN AREA METROPOLITAN URBAN PLANNING ORGANIZATION (GUAMPO). GUILFORD I-4715 SR 4121 (HIGH POINT ROAD) TO CG YES PAYBACK IN PROGRESS I-85 BYPASS. MILL AND RESURFACE. GUILFORD P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. GUILFORD P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. GUILFORD R-0609IA HIGH POINT, SOUTH OF SR 1920 EAST OF ARCHDALE TO WEST OF HIGH POINT RESERVOIR. FOUR LANES DIVIDED, NEW LOCATION. INTEGRATION OF ITS DEVICES WITH PIEDMONT REGIONAL TRANSPORTATION MANAGEMENT AND HIGH POINT'S TRAFFIC OPERATIONS CENTER. C YES COMPLETED GUILFORD R-2611 SR 2007 AT COLFAX TO NC 68. R YES COMPLETED WIDEN TO MULTI-LANES. U YES COMPLETED GUILFORD R-2612A SR 3389 (WOODY MILL ROAD) AND SR 3418 (NEELLEY ROAD) SOUTH OF GREENSBORO. CONVERT AT-GRADE INTERSECTIONS TO INTERCHANGES. R YES COMPLETED GUILFORD U-2412A SR 1486-SR 1421 (GREENSBORO-HIGH POINT ROAD), HILLTOP ROAD TO PROPOSED US 311 BYPASS. WIDEN TO MULTI-LANES, PART ON NEW LOCATION. GUILFORD U-2412B SR 1486-SR 1421 (GREENSBORO-HIGH POINT ROAD), HILLTOP ROAD TO PROPOSED US 311 BYPASS. WIDEN TO MULTI-LANES, PART ON NEW LOCATION. GUILFORD U-2524AE WESTERN LOOP, NORTH OF I-85 TO LAWNDALE DRIVE. CONSTRUCT FREEWAY ON NEW LOCATION. U YES IN PROGRESS GUILFORD U-2525B EASTERN LOOP, LAWNDALE DRIVE R NO DELAYED TO 2015 TO NORTH OF I-40/85. CONSTRUCT FREEWAY ON NEW LOCATION. R NO DELAYED TO 2012 GUILFORD U-4006 BRIDFORD PARKWAY, SR 1541 (WENDOVER AVENUE) AT HORNADAY ROAD TO BURNT POPLAR ROAD AT SWING ROAD. MULTI-LANE CONNECTOR ON NEW LOCATION. T-29

34 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS GUILFORD U-4750 EXTENSION OF HORNADAY ROAD, CURRENT TERMINUS TO CHIMNEY ROCK ROAD, INCLUDING A GRADE SEPARATION OVER THE GREENSBORO URBAN LOOP. GUILFORD W-4707 SR 2128 (BUNCH ROAD). INTERSECTION IMPROVEMENTS. C NO DELAYED TO 2013 GUILFORD W-5114 SOUTH OF SR 2111 (EAST HARRELL ROAD) TO SR 4831 (BARTONSHIRE DRIVE). WIDEN TO THREE LANE SECTION WITH CENTER TURN LANE. R NO DELAYED TO 2013 GUILFORD W-5131 WEST OF MCCONNELL ROAD C YES COMPLETED TO EAST OF MCCONNELL ROAD. INSTALL MEDIAN BARRIER. HALIFAX B-4133 JACKET SWAMP. R YES UNDER CONSTRUCTION REPLACE BRIDGE NO. 11 HALIFAX B-4541 QUANKEY CREEK. R YES COMPLETED REPLACE BRIDGE NO. 24 U YES COMPLETED HARNETT B-3654 MINGO SWAMP. REPLACE BRIDGE NO. 29 AND BRIDGE NO. 53 R YES COMPLETED IN 2009 U YES COMPLETED IN 2009 HARNETT B-3655 MCLEOD CREEK. REPLACE BRIDGE NO. 59 HARNETT B-4137 NORFOLK AND SOUTHERN RAILWAY. REPLACE BRIDGE NO. 35 HARNETT B-4138 CAPE FEAR RIVER. R YES COMPLETED IN 2009 REPLACE BRIDGE NO. 46 HARNETT C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS HARNETT C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS HARNETT EL-5100 PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS IN THE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO). HARNETT I-5010 NC 55, RECONFIGURE INTERCHANGE RAMP. C NO DELAYED TO 2010 HARNETT U-5118 OPERATIONAL IMPROVEMENTS FOR SAFETY AND CONGESTION MITIGATION HAYWOOD B-3187 WEST FORK PIGEON RIVER. REPLACE BRIDGE NO. 79 U YES IN PROGRESS HAYWOOD B-3343 HEMPHILL CREEK. REPLACE BRIDGE NO. 48 HAYWOOD B-3657 CRAWFORD CREEK. REPLACE BRIDGE NO. 11 AND BRIDGE NO. 9 T-30

35 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS HAYWOOD B-4339 PISGAH NATIONAL FOREST, FINES CREEK, PFH 12-1(2). REPLACE BRIDGE NO. 214 HAYWOOD B-4674 HENDRIX STREET OVER ALLENS CREEK. REPLACE BRIDGE NO. 267 HAYWOOD B-4692 PISGAH NATIONAL FOREST, C NO DELAYED TO 2011 PFH-12(1) WESTLEYS CREEK. REPLACE BRIDGE NO. 283 HAYWOOD B-4855 PISGAH NATIONAL FOREST, COVE CREEK, PFH 12-1(3). REPLACE BRIDGE NO. 277 HAYWOOD R-4047 US (GREAT SMOKEY MOUNTAINS EXPRESSWAY) TO SR 1523 (OLD CLYDE ROAD) AT LAKE JUNALUSKA. WIDEN TO A MULTI-LANE FACILITY AND REPLACE RAILROAD STRUCTURE R-32. (INCLUDES R-2210 B) U YES IN PROGRESS HAYWOOD R-4048 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. HAYWOOD R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. HENDERSON B-4148 BOYLSTON CREEK. C YES COMPLETED REPLACE BRIDGE NO. 12 HENDERSON B-4149 CLEAR CREEK. REPLACE BRIDGE NO. 34 HENDERSON B-4545 MUD CREEK. REPLACE BRIDGE NO. 72 HENDERSON EB-4408 OKLAWAHA GREENWAY, SECTIONS 2 THROUGH 8, JACKSON PARK TO PATTON PARK. MULTI-USE PATH. HENDERSON R-0505 NC 225 NEAR ZIRCONIA TO I-26. UPGRADE TO FREEWAY. (INCLUDES BRIDGE NO. 127) HENDERSON R-4048 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. HENDERSON R-4430 US 176 TO SR 1006 (HOWARD GAP ROAD). WIDEN AND IMPROVE ROADWAY. HENDERSON R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. HENDERSON U-4428 US 64, US 25 TO SR 1180 (BLYTHE STREET). WIDEN TO THREE (3) LANES. COORDINATE WITH U-4427 HERTFORD B-4548 LIVERMAN CREEK. REPLACE BRIDGE NO. 2 HERTFORD B-4549 TAYLOR POND. REPLACE BRIDGE NO. 42 R YES COMPLETED C YES COMPLETED HYDE EB-5000 OCRACOKE ISLAND LIMITS TO C YES COMPLETED OCRACOKE CAMPGROUND. CONSTRUCT MULTI-USE TRAIL. T-31

36 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS HYDE F-5003 SWAN QUARTER VISITORS CENTER. REPLACEMENT. IREDELL B-2576 ALEXANDER RAILROAD. REPLACE BRIDGE NO. 513 SOUTHERN RAILROAD. REPLACE BRIDGE NO. 514 IREDELL B-4158 ROCKY CREEK. REPLACE BRIDGE NO. 228 IREDELL B-4553 FOURTH CREEK. R NO DELAYED TO 2011 REPLACE BRIDGE NO. 312 IREDELL I-3819A STATESVILLE, MODIFICATION OF INTERCHANGE AREA. IREDELL I-5106 I-77, MILEPOST TO MILEPOST PAVEMENT REHABILITATION. IREDELL R-3833B SR 1177 (CHUCKWOOD ROAD) TO US 21. WIDEN TO MULTI-LANES WITH INTERCHANGE AT I-77. JACKSON B-3480 EAST FORK TUCKASEGEE RIVER. REPLACE BRIDGE NO. 39 U YES IN PROGRESS JACKSON B-4163 SCOTTS CREEK. REPLACE BRIDGE NO. 123 JACKSON B-4347 NANTAHALA NATIONAL FOREST, R NO DELAYED TO 2012 PFH 1107(7), NORTON MILL CREEK. REPLACE BRIDGE NO. 3 JACKSON B-4348 NANTAHALA NATIONAL FOREST, C NO DELETED AT REQUEST OF PFH 1388(1), DICK'S CREEK. DIVISION REPLACE BRIDGE NO. 156 JACKSON B-4349 NANTAHALA NATIONAL FOREST, PFH 1388(2), DICK'S CREEK. REPLACE BRIDGE NO. 36 JACKSON R-2409C NC 107 AT CASHIERS TO US 178 AT ROSMAN. SAFETY IMPROVEMENTS AND CLIMBING LANES AT SELECTED LOCATIONS. JACKSON R-4048 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. JACKSON R-5024 NC 107 TO SR WIDEN, REALIGN AND MAKE DRAINAGE IMPROVEMENTS. JACKSON R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. JOHNSTON B-4165 SASSARIXA SWAMP. C YES COMPLETED IN 2009 REPLACE BRIDGE NO. 89 JOHNSTON B-4555 SOUTHERN RAILWAY. R YES COMPLETED REPLACE BRIDGE NO. 97 U NO DELAYED TO 2012 JOHNSTON B-4556 BLACK CREEK. REPLACE BRIDGE NO. 74 R YES COMPLETED U NO DELAYED TO 2012 T-32

37 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS JOHNSTON C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS JOHNSTON C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS JOHNSTON EB-5001 SAMS BRANCH GREENWAY. CONSTRUCT MULTI-USE TRAIL. JOHNSTON EL-5100 PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS IN THE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO). JOHNSTON I-4702 SR 1122 (MILEPOST 339) IN JOHNSTON COUNTY TO NC 132 C NO PROJECT DELETED (MILEPOST 420) IN NEW HANOVER COUNTY. SEAL EXISTING SHOULDERS. JOHNSTON P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. JOHNSTON R-2552AC CLAYTON BYPASS, I-40 IN WAKE COUNTY C YES COMPLETED TO US BUSINESS IN JOHNSTON COUNTY. FREEWAY ON NEW LOCATION. JOHNSTON R-3825AA US 70 TO SR 1003 (BUFFALOE ROAD). WIDEN TO MULTI-LANES. JOHNSTON U-3334A EXTENSION OF SR 1923 (BOOKER DAIRY ROAD), US 70 BUSINESS WEST OF SMITHFIELD TO US 301 (BRIGHT LEAF BOULEVARD). TWO LANES, PART ON NEW LOCATION. JOHNSTON U-5118 OPERATIONAL IMPROVEMENTS FOR SAFETY AND CONGESTION MITIGATION LEE EB-4981 ENDOR IRON FURNACE GREENWAY, KIWANIS FAMILY PARK ON CARBONTON ROAD TO BOONE DRIVE IN SANFORD. CONSTRUCT MULTI-USE TRAIL. C YES COMPLETED LEE R-2417C SANFORD BYPASS, WEST OF SR 1400 TO NC 87 WEST OF SR MULTI-LANE FREEWAY ON NEW LOCATION. LENOIR R-2719A CRESCENT ROAD IN KINSTON, US 70 TO NC 58. MULTI-LANES ON NEW LOCATION. LENOIR U-2928 GLOBAL TRANSPARK FREIGHT TRANSPORTATION SYSTEM. R YES UNDER CONSTRUCTION LINCOLN B-4177 HOWARDS CREEK. REPLACE BRIDGE NO. 142 LINCOLN W-4712 EAST OF NC 150 TO SR WIDEN TO PROVIDE CONTINUOUS LEFT TURN LANE. MACON B-4179 RABBIT CREEK. REPLACE BRIDGE NO. 65 T-33

38 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS MACON B-4574 CULLASAJA RIVER. REPLACE BRIDGE NO. 58 MACON R-4048 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. MACON R-4748 SR 1660 (SILER ROAD) TO SR 1662 (WILEY BROWN ROAD) SOUTH OF US 441. TWO LANE ROADWAY ON NEW LOCATION. MADISON B-3488 BIG PINE CREEK. REPLACE BRIDGE NO. 142 MADISON B-4183 MIDDLE FORK CREEK. REPLACE BRIDGE NO. 29 WITH CULVERT. CROOKED CREEK. REPLACE BRIDGE NO. 28 MADISON B-4184 IVY RIVER. REPLACE BRIDGE NO. 4 MCDOWELL B-3874 CREEK. REPLACE BRIDGE NO. 68 MCDOWELL B-4191 CREEK. REPLACE BRIDGE NO. 82 MCDOWELL B-4198 SOUTH MUDDY CREEK. REPLACE BRIDGE NO. 223 McDOWELL I-4908BB BUNCOMBE COUNTY LINE TO CG YES PAYBACK IN PROGRESS NC 226 (MILEPOST 86). PAVEMENT REHABILIATION. McDOWELL K-4909 RENOVATION OF REST AREA PAIR - BUILDINGS, GROUNDS AND PARKING FACILITIES. BUILDINGS TO INCLUDE DUAL RESTROOMS AND ADA COMPLIANT FAMILY RESTROOM. McDOWELL R-4422 NATIONAL HIGHWAY SYSTEM GUARD- RAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. McDOWELL R-5002B US 221-NC 226, WOODLAWN TO SPRUCE PINE. UPGRADE FACILITY TO IMPROVE SAFETY. McDOWELL R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. MECKLENBURG B-3677 IRVINS CREEK. REPLACE BRIDGE NO. 36 MECKLENBURG B-4579 MCINTYRE CREEK. REPLACE BRIDGE NO. 134 MECKLENBURG B-4580 REEDY CREEK. REPLACE BRIDGE NO. 177 R YES COMPLETED IN 2009 U YES COMPLETED IN 2009 MECKLENBURG C-4953 NEW REGIONAL EXPRESS BUS SERVICE TO WAXHAW WITH STOPS IN WEDDINGTON. CMAQ FUNDS TO BE TRANSFERRED TO FTA. O NO PROJECT DELETED T-34

39 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS MECKLENBURG C-4954 PURCHASE EXPANSION AND REPLACEMENT BUSES. A NO PROJECT DELETED MECKLENBURG C-4955 CENTER CITY PARKING AND WAYFINDING N YES IN PROGRESS SYSTEM. TRAFFIC-FLOW IMPROVEMENT. CMAQ FUNDS TRANSFERRED TO FTA. MECKLENBURG C-4962 ESTABLISH BIKE-PEDESTRIAN CONNECTION BETWEEN IVERSON WAY AND MARION PLACE. MECKLENBURG EB-4715B LITTLE SUGAR CREEK GREENWAY. MECKLENBURG EB-4715C LITTLE SUGAR CREEK GREENWAY. MECKLENBURG P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. MECKLENBURG P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. MECKLENBURG P-5002 CHARLOTTE, MAINLINE GRADE SEPARATION CSX-NS-CATS. C NO DELAYED TO 2014 MECKLENBURG R-0211EC I-485/SR 3468 (WEDDINGTON ROAD). R YES COMPLETED IN 2010 CONSTRUCT INTERCHANGE. MECKLENBURG R-2632AA US 21 TO SR 2693 (DAVIDSON-CONCORD R YES COMPLETED IN 2009 ROAD). WIDEN TO MULTI-LANES. MECKLENBURG U-0209B US 74 (INDEPENDENCE BOULEVARD), NC (ALBEMARLE ROAD) TO IDLEWILD ROAD. ADD ADDITIONAL LANES AND CONSTRUCT INTER- CHANGES WITH SHARON AMITY ROAD AND IDLEWILD ROAD AND SAFETY IMPROVEMENTS. RG YES IN PROGRESS MECKLENBURG U-2507A SR 2467 (MALLARD CREEK ROAD), SR 2480 (SUGAR CREEK ROAD) TO SR 2472 (MALLARD CREEK CHURCH ROAD). WIDEN TO MULTI-LANES, PART ON NEW LOCATION. U YES IN PROGRESS MECKLENBURG U-3411 NC 160 (WEST BOULEVARD) RELOCATION, R YES COMPLETED IN 2009 EAST OF I-485 (CHARLOTTE OUTER LOOP) TO HORSESHOE LANE. MULTI LANES ON NEW LOCATION. MECKLENBURG U-3447 NC 51, SOUTH CAROLINA STATE LINE C YES COMPLETED IN 2011 TO SR 3645 (DOWNS CIRCLE). WIDEN TO MULTI-LANES. MECKLENBURG U-4401 SR 2804 (REEDY CREEK ROAD) AND SR 2805 (HARRISBURG ROAD). REALIGN INTERSECTION. MECKLENBURG U-4911 BELMONT NEIGHBORHOOD INFRASTRUCTURE AND STREETSCAPE IMPROVEMENTS. MECKLENBURG U-5008 CONSTRUCT SR 2975 (SUGAR CREEK ROAD) GRADE C NO DELAYED TO 2013 SEPARATION OF NORTH CAROLINA RAILROAD CROSSING H. T-35

40 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS MECKLENBURG U-5011 CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT. CONSTRUCT FREIGHT INTERMODAL FACILITY. MECKLENBURG U-5012 SOUTH PIEDMONT FREIGHT INTERMODAL CENTER. CONSTRUCT FACILITY. MECKLENBURG U-5013 NORFOLK SOUTHERN INTERMODAL SYSTEM. MECKLENBURG U-5107 CONSTRUCT TRANSPORTATION IMPROVEMENTS AT THE MARION DIEHL CENTER (QUEENS UNIVERSITY). MECKLENBURG U-9999C MECKLENBURG-UNION METROPOLITAN PLANNING PE YES IN PROGRESS ORGANIZATION (MUMPO) PLANNING (PL) SUPPLEMENT. MECKLENBURG W-4004 NORTH OF SHARON LAKES DRIVE- SWEDEN DRIVE TO SOUTH OF ARROWOOD DRIVE-STARBROOK DRIVE. WIDEN TO PROVIDE A TWO WAY LEFT TURN LANE. MECKLENBURG W-5116 SR 2459 (EASTFIELD ROAD) AND SR 2442 (ASBURY CHAPEL ROAD). HORIZONTAL REALIGNMENT OF SR 2480 (BROWNE ROAD) TO ALIGN WITH SR INSTALL SIGNAL AND LEFT TURN LANES. R YES UNDER CONSTRUCTION MITCHELL R-5002B US 221-NC 226, WOODLAWN TO SPRUCE PINE. UPGRADE FACILITY TO IMPROVE SAFETY. MITCHELL R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. MONTGOMERY B-4206 DENSONS CREEK. REPLACE BRIDGE NO. 128 MONTGOMERY B-4582 DENSONS CREEK. R YES COMPLETED REPLACE BRIDGE NO. 121 MONTGOMERY C-4936B PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS MONTGOMERY C-4936D PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS MONTGOMERY R-2107B US 220A TO US 220 IN BISCOE. WIDEN TO MULTI-LANES. MOORE B-4207 MCLENDONS CREEK. C YES COMPLETED REPLACE BRIDGE NO. 43 MOORE B-4583 ABERDEEN CREEK. R YES COMPLETED REPLACE BRIDGE NO. 176 U YES COMPLETED MOORE B-4584 LITTLE RIVER. REPLACE BRIDGE NO. 11 R YES COMPLETED U YES COMPLETED MOORE U-3324 US 1 (SANDHILLS BOULEVARD) AND SR 1309 (MORGANTON ROAD). UPGRADE INTERCHANGE. T-36

41 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS NASH B-4585 TOISNOT SWAMP. REPLACE BRIDGE R YES COMPLETED NO. 65 AND BRIDGE NO. 66 NASH B-4587 CYPRESS CREEK. C YES COMPLETED REPLACE BRIDGE NO. 82 NASH B-4589 TOISNOT SWAMP. R YES COMPLETED IN 2010 REPLACE BRIDGE NO. 69 U YES COMPLETED IN 2010 NASH C-4969B CONSTRUCT SIDEWALKS AT VARIOUS LOCATIONS IN ROCKY MOUNT. NASH P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. NASH U-3331 SR 1616 (COUNTRY CLUB ROAD), US 64 BUSINESS TO SR 1541 (JEFFREYS ROAD). WIDEN TO MULTI-LANES. NEW HANOVER F-5002 SOUTHPORT RAMP-GANTRY-DOLPHIN. REPAIR AND REPLACE. C YES COMPLETED NEW HANOVER I-4702 SR 1122 (MILEPOST 339) IN JOHNSTON COUNTY TO NC 132 C NO PROJECT DELETED (MILEPOST 420) IN NEW HANOVER COUNTY. SEAL EXISTING SHOULDERS. NEW HANOVER U-3831A SR 2048 (GORDON ROAD), NC 132 INTERCHANGE RAMP TO WEST OF US 17 BUSINESS (MARKET STREET). WIDEN TO MULTI-LANES. C NO DELAYED TO 2013 NEW HANOVER U-4902 COLONIAL DRIVE TO SR 1402 (PORTERS NECK ROAD). ACCESS MANAGEMENT IMPROVEMENTS. NEW HANOVER U-4903 INDEPENDENCE BOULEVARD TO 17TH STREET. MILL AND C YES COMPLETED RESURFACE. NEW HANOVER U-5017A WILMINGTON COMPUTERIZED SIGNAL SYSTEM. C YES COMPLETED IN 2010 NEW HANOVER U-5017B WILMINGTON COMPUTERIZED SIGNAL SYSTEM. C YES COMPLETED IN 2010 NEW HANOVER U-5017C WILMINGTON COMPUTERIZED SIGNAL SYSTEM. C YES COMPLETED IN 2010 NEW HANOVER W-5103 GEORGE ANDERSON ROAD TO SR 1100 (RIVER ROAD). VARIOUS SAFETY IMPROVEMENTS. NORTHAMPTON R-5001 HALIFAX COUNTY LINE TO MULTI-LANE SECTION WEST OF HERTFORD COUNTY LINE. PAVEMENT STRENGTHENING AND RESURFACING. ONSLOW B-4214 NEW RIVER. REPLACE BRIDGE NO. 24 ONSLOW EB-4705 LEJEUNE BOULEVARD GREENWAY, SOUTH SIDE OF NC 24 (LEJEUNE BOULEVARD), E-3407 TO MONT- FORD POINT ROAD. ONSLOW R-5023A SOUTHWEST MIDDLE SCHOOL TO SR 1135 (MORNINGSIDE ROAD). WIDEN TO THREE LANES AND ADD TWO FOOT PAVED SHOULDERS. C YES COMPLETED T-37

42 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS ONSLOW U-3810 SR 1406 (PINEY GREEN ROAD), NC 24 TO US 17. WIDEN TO MULTI-LANES, PART ON NEW LOCATION. ONSLOW U-4007A US 17, US 17 BUSINESS/JACKSONVILLE R YES COMPLETED BYPASS TO SR 1326 (DRUMMER KELLUM ROAD). ADD ADDITIONAL LANES. ONSLOW U-4007B US 17, US 17 BUSINESS/JACKSONVILLE R YES COMPLETED BYPASS TO SR 1326 (DRUMMER KELLUM ROAD). ADD ADDITIONAL LANES. ONSLOW U-4904 SR 1308 (GUM BRANCH ROAD) TO R YES COMPLETED SR 1327 (KELLUM LOOP ROAD). UPGRADE ROADWAY. ONSLOW U-4905 US 258-NC 24 TO SR 1221 (MARROW PRONG ROAD). UPGRADE R YES COMPLETED ROADWAY. ONSLOW U-4906 EAST CITY LIMITS OF RICHLANDS TO R NO DELAYED TO 2014 SR WIDEN TO THREE LANES. ONSLOW U-4907 NORTH OF OFFICE PARK DRIVE R YES COMPLETED TO SR 1406 (PINEY GREEN ROAD). WIDEN TO THREE LANES. ONSLOW W-5106 MILEPOST 3.13 TO SR WIDEN C NO DELAYED TO 2015 TO THREE LANES. ORANGE B-4216 STROUDS CREEK. R YES COMPLETED REPLACE BRIDGE NO. 66 ORANGE B-4592 ENO RIVER. REPLACE BRIDGE NO. 64 C YES COMPLETED ORANGE C-4932A CONSTRUCT A 125 SPACE PARK AND RIDE LOT. SECTION A: DURHAM-CHAPEL HILL-CARRBORO (DCHC) MPO TO PARTICIPATE IN CONSTRUCTION AND OPERATING ASSISTANCE FOR THREE YEARS FOR A NEW TRANSIT SERVICE. O YES UNDER CONSTRUCTION ORANGE C-4932B CONSTRUCT A 125 SPACE PARK AND RIDE LOT. SECTION B: TRIANGLE AREA (TARPO) RPO TO PARTICIPATE IN CONSTRUCTION AND OPERATING ASSISTANCE FOR THREE YEARS FOR A NEW TRANSIT SERVICE. O YES IN PROGRESS ORANGE C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS ORANGE C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS ORANGE C-5104 PURCHASE TWO (2) HYBRID ELECTRIC BUSES AND PROVIDE A YES IN PROGRESS PORTION OF OPERATING EXPENSE FOR THREE YEARS. O YES IN PROGRESS T-38

43 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS ORANGE EB-4707 SR 2220 (OLD CHAPEL HILL ROAD)- SR 1838 (OLD DURHAM ROAD), SR 1116 (GARRETT ROAD) IN DURHAM COUNTY TO US IN ORANGE COUNTY. BICYCLE IMPROVEMENTS. ORANGE I-4716 I-85 TO DURHAM COUNTY LINE. GRIND AND RESEAL JOINTS. C YES COMPLETED ORANGE I-4918 NC 54 (MILEPOST 148) IN ALAMANCE COUNTY TO WEST OF SR CG YES PAYBACK IN PROGRESS 1114 (BUCKHORN ROAD) IN ORANGE COUNTY. MILL AND RESURFACE. ORANGE U-0624 NC 86 (SOUTH COLUMBIA STREET), SR 1906 PUREFOY ROAD) TO SR 1902 (MANNING DRIVE). CORRIDOR UPGRADE TO INCLUDE BICYCLE LANES. ORANGE U-4704 CHAPEL HILL-CARRBORO COMPUTERIZED TRAFFIC SIGNAL SYSTEM. ORANGE U-4726 DCHC URBAN AREA BICYCLE AND PEDESTRIAN ALLOCATION. ORANGE U-4727 DURHAM-CHAPEL HILL-CARRBORO URBAN AREA PLANNING (DCHC) ALLOCATION AND UNIFIED PROGRAM. PAMLICO B-5129 NORTH PRONG OF BAY RIVER. R YES IN ACQUISITION REPLACE BRIDGE NO. 24 VANDERMERE CREEK. REPLACE BRIDGE NO. 31 LITTLE VANDERMERE CREEK. REPLACE BRIDGE NO. 35 BEAR CREEK. REPLACE BRIDGE NO. 40 GALE CREEK. REPLACE BRIDGE NO. 42 PASQUOTANK B-3929 RIVERSIDE AVENUE OVER CHARLES CREEK. REPLACE BRIDGE NO. 28 PASQUOTANK EB-4991 US 17 BYPASS TO PRITCHARD STREET. CONSTRUCT GREENWAY. PENDER I-4702 SR 1122 (MILEPOST 339) IN JOHNSTON COUNTY TO NC 132 C NO PROJECT DELETED (MILEPOST 420) IN NEW HANOVER COUNTY. SEAL EXISTING SHOULDERS. PERSON B-4600 SOUTH FLAT RIVER. R YES COMPLETED REPLACE BRIDGE NO. 43 PERSON R-4906 REPLACEMENT OF BRIDGE NO. 59 OVER C YES COMPLETED STORY'S CREEK AND BRIDGE NO. 86 OVER A CREEK. PITT B-4233 PINELOG BRANCH. C NO DELAYED TO 2010 REPLACE BRIDGE NO. 65 PITT B-4234 CONETOE CREEK. R YES IN ACQUISITION REPLACE BRIDGE NO. 98 C NO DELAYED TO 2011 PITT B-4237 FORK SWAMP. REPLACE BRIDGE NO. 25 C NO DELAYED TO 2010 PITT B-4238 HARDEE CREEK. R YES COMPLETED REPLACE BRIDGE NO. 219 T-39

44 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS PITT EB-4702 SOUTH TAR RIVER GREENWAY, SOUTH OF TAR RIVER FROM TOWN COMMONS TO GREEN MILL RUN GREENWAY. CONSTRUCT GREENWAY. PITT EB-4996 GREEN MILL RUN GREENWAY, CHARLES BOULEVARD TO EVANS PARK. CONSTRUCT GREENWAY. PITT R-2250 GREENVILLE SOUTHWEST BYPASS, NC 11 TO US 264 GREENVILLE BYPASS. FOUR LANE DIVIDED FACILITY ON NEW LOCATION WITH BYPASS OF WINTERVILLE. U YES IN PROGRESS PITT R-2250A GREENVILLE SOUTHWEST BYPASS, NC 11 TO US 264 GREENVILLE BYPASS. FOUR LANE DIVIDED FACILITY ON NEW LOCATION WITH BYPASS OF WINTERVILLE. R YES COMPLETED PITT R-2250B GREENVILLE SOUTHWEST BYPASS, NC 11 TO US 264 GREENVILLE BYPASS. FOUR LANE DIVIDED FACILITY ON NEW LOCATION WITH BYPASS OF WINTERVILLE. R YES IN ACQUISITION PITT R-2250C GREENVILLE SOUTHWEST BYPASS, NC 11 TO US 264 GREENVILLE BYPASS. FOUR LANE DIVIDED FACILITY ON NEW LOCATION WITH BYPASS OF WINTERVILLE. R YES IN ACQUISITION POLK B-4239 PACOLET RIVER. REPLACE BRIDGE NO. 2 POLK B-4241 HOOPER CREEK. REPLACE BRIDGE NO. 24 C NO DELAYED TO 2011 POLK R-4048 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. RANDOLPH B-4613 FORK CREEK. REPLACE BRIDGE NO. 415 C YES COMPLETED RANDOLPH C-4936B PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS RANDOLPH C-4936D PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS RANDOLPH K-3807 NEW PAIR OF REST AREAS ON I-73/74 CORRIDOR SOUTH OF C YES COMPLETED ASHEBORO. RANDOLPH R-0609IA HIGH POINT, SOUTH OF SR 1920 EAST OF ARCHDALE TO WEST OF HIGH POINT RESERVOIR. FOUR LANES DIVIDED, NEW LOCATION. INTEGRATION OF ITS DEVICES WITH PIEDMONT REGIONAL TRANSPORTATION MANAGEMENT AND HIGH POINT'S TRAFFIC OPERATIONS CENTER. C YES COMPLETED RANDOLPH R-2606A SOUTH OF SR 1920 TO US 220 NORTH C YES COMPLETED OF ASHEBORO. FREEWAY ON NEW LOCATION. T-40

45 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS RANDOLPH R-2606B SOUTH OF SR 1920 TO US 220 NORTH R YES COMPLETED OF ASHEBORO. FREEWAY ON NEW LOCATION. CG YES PAYBACK IN PROGRESS RG YES PAYBACK IN PROGRESS RICHMOND B-4247 BIG MOUNTAIN CREEK. C YES COMPLETED REPLACE BRIDGE NO. 129 RICHMOND U-3456 US 1 (FAYETTEVILLE ROAD), SR 1424 (RICHMOND ROAD) TO SR 1640 (WIREGRASS ROAD)-SR 1422 (LEDBETTER ROAD). WIDEN TO MULTI-LANES. C YES COMPLETED ROBESON B-3693 RAFT SWAMP. REPLACE BRIDGE R YES COMPLETED IN 2009 NO HOLLY SWAMP REPLACE BRIDGE NO SADDLETREE SWAMP. REPLACE BRIDGE NO. 210 U YES COMPLETED IN 2009 ROBESON B-4249 ASHPOLE SWAMP. R YES COMPLETED IN 2009 REPLACE BRIDGE NO. 143 ROBESON B-4618 WOODLAND FARM POND. REPLACE BRIDGE NO. 161 AND R NO DELAYED TO 2011 BRIDGE NO. 445 ROBESON I-4413 US 301, REPLACE BRIDGE NO. 36, WIDEN R YES IN ACQUISITION TO MULTI-LANES, JACKSON COURT TO SR 1791, REVISE I-95 INTERCHANGE U YES IN PROGRESS (EXIT 22) AND INSTALL SIGNAL. ROBESON U-2519DA OUTER LOOP, I-95 SOUTH OF FAYETTEVILLE TO WEST OF NC (BRAGG BOULEVARD). FREEWAY ON NEW LOCATION. C NO DELAYED TO 2011 ROBESON U-2519E OUTER LOOP, I-95 SOUTH OF FAYETTEVILLE TO WEST OF NC (BRAGG BOULEVARD). FREEWAY ON NEW LOCATION. ROBESON W-4704 SR CONVERT AT GRADE INTERSECTION TO GRADE C YES COMPLETED IN 2009 SEPARATION. ROCKINGHAM B-4622 ROCK HOUSE CREEK. R YES COMPLETED REPLACE BRIDGE NO. 54 U YES COMPLETED ROCKINGHAM B-4625 MASSY CREEK. REPLACE BRIDGE NO. 118 R YES COMPLETED ROCKINGHAM C-4936B PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS ROCKINGHAM C-4936D PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS ROCKINGHAM U-3326A US 29 BUSINESS (FREEWAY DRIVE), SOUTH SCALES STREET TO SR 2686 (RICHARDSON DRIVE). WIDEN TO MULTI-LANES. T-41

46 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS ROCKINGHAM U-3326B US 29 BUSINESS (FREEWAY DRIVE), SR 2686 (RICHARDSON DRIVE) TO NC 14. WIDEN TO MULTI-LANES. ROWAN B-2085 NORTH ELLIS STREET OVER SOUTHERN R NO DELAYED TO POST YEAR RAILWAY. REPLACE BRIDGE NO. 393 ROWAN B-3234 CREEK. REPLACE BRIDGE NO. 78. C YES COMPLETED ROWAN B-4627 THIRD CREEK. REPLACE BRIDGE NO. 26 R YES COMPLETED ROWAN C-4910A CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. ROWAN C-4910B CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. ROWAN C-4910C CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. ROWAN C-4910D CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. ROWAN C-4910E CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. ROWAN C-4910F CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. ROWAN C-4910G CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. ROWAN C-4911 EXPANSION OF AIR QUALITY OUTREACH PROGRAM TO REDUCE N YES IN PROGRESS OZONE AIR POLLUTION. N YES IN PROGRESS ROWAN C-5101 PURCHASE T3 PERSONAL MOBILITY ELECTRIC VEHICLES N YES COMPLETED IN 2010 ROWAN I-2304 NORTH OF SR 2120 (EXIT 81) IN ROWAN R YES COMPLETED COUNTY TO US /I-85 BUSINESS (EXIT 87). ADDITIONAL LANES AND BRIDGE RECONSTRUCTION. (PROJECT INCLUDES B-3833) ROWAN I-4718 CABARRUS COUNTY LINE TO CG YES PAYBACK IN PROGRESS NC 152. REPAIR PAVEMENT AND OVERLAY. ROWAN P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. ROWAN P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. ROWAN P-4902 RAIL TRACK REPLACEMENT AND CONSTRUCTION R YES COMPLETED RUTHERFORD B-4261 FORK OF CATHY'S CREEK. REPLACE BRIDGE NO. 39 CATHY'S CREEK. REPLACE BRIDGE NO. 37 RUTHERFORD B-4262 CREEK. REPLACE BRIDGE NO. 217 T-42

47 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS RUTHERFORD B-4264 WEBB CREEK. REPLACE BRIDGE NO. 351 RUTHERFORD B-4265 FIRST BROAD RIVER. REPLACE BRIDGE NO. 202 RUTHERFORD R-2233AA SOUTH CAROLINA STATE LINE TO NORTH OF SR 1366 (ROPER LOOP ROAD). WIDEN TO MULTI-LANES WITH BYPASS OF RUTHERFORDTON ON NEW LOCATION. RUTHERFORD R-3612 SR 1920 (MAIN STREET) IN HENRIETTA TO R NO DELAYED TO 2012 SR 1941 (MELTON STREET) IN CAROLEEN. WIDENING AND RESURFACING. RUTHERFORD R-4421 NATIONAL HIGHWAY SYSTEM GUARD- RAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. SAMPSON B-3613 SOUTH RIVER. REPLACE BRIDGE NO. 44 SAMPSON B-3654 MINGO SWAMP. REPLACE BRIDGE NO. 29 AND BRIDGE NO. 53 R YES COMPLETED IN 2009 U YES COMPLETED IN 2009 SAMPSON I-4702 SR 1122 (MILEPOST 339) IN JOHNSTON COUNTY TO NC 132 C NO PROJECT DELETED (MILEPOST 420) IN NEW HANOVER COUNTY. SEAL EXISTING SHOULDERS. SAMPSON R-2303A WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R NO DELAYED TO 2011 SCOTLAND B-4641 BIG SHOE HEEL CREEK. R YES COMPLETED REPLACE BRIDGE NO. 75 U YES COMPLETED SCOTLAND B-4642 JUNIPER CREEK. R YES COMPLETED REPLACE BRIDGE NO. 28 U YES COMPLETED SCOTLAND B-5003 COMMONWEALTH AVENUE. REPLACE BRIDGE NO. 81 OVER R NO DELAYED TO 2012 LEITH CREEK SCOTLAND U-5027 SR 1674 (LAUCHWOOD DRIVE), US 501 TO US BUSINESS. WIDEN, RESURFACE, AND IMPROVE DRAINAGE. C YES COMPLETED STANLY B-3909 LONG CREEK. REPLACE BRIDGE NO. 99 C YES COMPLETED IN 2011 STANLY B-4278 ISLAND CREEK. REPLACE BRIDGE NO. 209 R YES COMPLETED IN 2009 STANLY B-4279 SCALY BARK CREEK. C YES COMPLETED IN 2010 REPLACE BRIDGE NO. 120 T-43

48 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS STANLY SF-4910A NC 740-NC 8 (WEST GOLD STREET)- SR 1440 (STEAKHOUSE ROAD) AND SR 1817 (MAIN STREET) IN NEW LONDON. INSTALL A DIRECTIONAL CROSSOVER AND TRAFFIC SIGNAL. STANLY U-3300B SR 1542 (RIDGE STREET EXTENSION), NORTHEAST CONNECTOR (U-2400) TO NC 740. TWO LANES, SOME NEW LOCATION. STATEWIDE B-4700 BRIDGE PRESERVATION ISSUES AT SELECTED SITES. STATEWIDE B-9999 BRIDGE INSPECTION PROGRAM. I YES IN PROGRESS STATEWIDE C-4903 NORTH CAROLINA AIR AWARENESS OUTREACH PROGRAM TO PROVIDE EDUCATION AND PRODUCE DAILY AIR QUALITY FORECAST. N YES IN PROGRESS STATEWIDE C-5100 SCHOOL BUS DIESEL PARTICULATE N YES IN PROGRESS FILTER AND CLOSED CASE VENTILATION SYSTEM RETROFITS. STATEWIDE E-4018 NATIONAL RECREATIONAL TRAILS. STATEWIDE EB-2956 STATEWIDE BICYCLE PROGRAM. STATEWIDE EB-2966 SAFETY-EDUCATION PROJECTS. B YES IN PROGRESS STATEWIDE EB-3119 LOCAL BICYCLE MAPS: UPDATE, MP YES IN PROGRESS REVISE AND REPRINT. STATEWIDE EB-3120 NORTH CAROLINA BICYCLING HIGHWAYS MAPS: UPDATE AND MP YES IN PROGRESS REPRINT. STATEWIDE EB-3314 STATEWIDE PEDESTRIAN FACILITIES PROGRAM. STATEWIDE EB-4013 SPOT IMPROVEMENTS: SHORT PAVEMENT SECTIONS, BICYCLE RACKS AND SIGNING NEEDS. STATEWIDE EB-4409 MAP AND SIGN: URBAN, COUNTY AND REGIONAL BIKE ROUTES. IN CALDWELL, CARTERET (MOREHEAD CITY), CATAWBA, DUPLIN, COLUMBUS (WHITEVILLE), DUPLIN,GOLDSBORO MPO, HALIFAX, IREDELL, MADISON, MONTGOMERY, PAMLICO, POLK, ROCKINGHAM, SCOTLAND, TYRELL AND STATEWIDE EB-4410 AREA-WIDE BICYCLE IMPROVEMENTS FEASIBILITY STUDIES. F YES IN PROGRESS STATEWIDE EB-4411 ROADWAY IMPROVEMENTS FOR BICYCLE SAFETY ON STATE AND LOCAL DESIGNATED BIKE ROUTES. STATEWIDE ER-2971 SIDEWALK PROGRAM IN ALL FOURTEEN HIGHWAY DIVISIONS. STATEWIDE ER-2973 ROADSIDE BEAUTIFICATION PROJECTS L YES IN PROGRESS IN ALL FOURTEEN HIGHWAY DIVISIONS. T-44

49 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS STATEWIDE ER-3100 PLANTING OF WILDFLOWERS AND PERENNIAL BULBS ON L YES IN PROGRESS FEDERAL-AID SYSTEM. STATEWIDE ER-3101 SPECIAL EVENTS PLANTING STATEWIDE. L YES IN PROGRESS STATEWIDE ER-3102 IMPLEMENTATION OF STATEWIDE N YES IN PROGRESS SCENIC BYWAYS PROGRAM. STATEWIDE ER-3611 COLOR CANOPY AND TREE PLANTING STATEWIDE. L YES IN PROGRESS STATEWIDE K-4704 INTERSTATE REST AREA SYSTEM PRESERVATION. PAVEMENT, PAVEMENT MARKING, CURB AND GUTTER, SIDE- WALKS AND OTHER REHABILITATION ITEMS. STATEWIDE L-1000 REPLACEMENT PLANTS AT SELECTED LOCATIONS WITHIN THE L YES IN PROGRESS 14 HIGHWAY DIVISIONS. LANDSCAPE. STATEWIDE L-2133 PLANTING OF PERENNIAL BULBS AND WILDFLOWERS WITHIN L YES IN PROGRESS THE 14 HIGHWAY DIVISIONS. LANDSCAPE. STATEWIDE L-2500 COLOR AND CANOPY AND TREE PLANTING. L YES IN PROGRESS STATEWIDE M-0360 DESIGN SERVICES, PRELIMINARY PE YES IN PROGRESS ENGINEERING FOR MISCELLANEOUS PROJECTS. STATEWIDE M-0376 STATEWIDE GEOTECHNICAL STUDIES PE YES IN PROGRESS AND INVESTIGATIONS PROJECT TO COVER NON-PROJECT SPECIFIC. STATEWIDE M-0391 STRUCTURE DESIGN, PRELIMINARY ENGINEERING FOR PE YES IN PROGRESS MISCELLANEOUS PROJECTS STATEWIDE M-0392 HYDRAULICS, PRELIMINARY ENGINEERING FOR PE YES IN PROGRESS MISCELLANEOUS PROJECTS. STATEWIDE M-0405 STATEWIDE MOWING MAINTENANCE CONTRACTS FOR N YES IN PROGRESS PROPERTIES ACQUIRED BY NCDOT IN ADVANCE OF STIP PROJECTS. STATEWIDE M-0412 CORRIDORS OF THE FUTURE PROGRAM. INTERSTATE MAINTENANCE DISCRETIONARY FUNDS (IMD) FOR IMPROVEMENTS TO I-95 FROM FLORIDA TO VIRGINIA. NORTH CAROLINA TO PROVIDE FUNDS TO ADJOINING STATES UNDER TERMS OF AN AGREEMENT. PE YES IN PROGRESS STATEWIDE P-3309 AT-GRADE CROSSING ELIMINATION AND IMPROVEMENT PROJECTS, CORRIDOR INVENTORIES AND STUDIES IN ALL FOURTEEN (14) DIVISIONS. STATEWIDE P-3418 PLANNING, MANAGEMENT AND RESEARCH STUDIES. F YES IN PROGRESS STATEWIDE P-3809 RAILROAD SAFETY INSPECTIONS IN ALL FOURTEEN (14) I YES IN PROGRESS DIVISIONS. T-45

50 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS STATEWIDE P-3819 FEDERALLY-DESIGNATED HIGH SPEED RAIL CORRIDOR BETWEEN CHARLOTTE AND VIRGINIA STATE LINE, ENVIRON- MENTAL STUDY, PRELIMINARY ENGIN- EERING, RIGHT OF WAY, DESIGN AND CONSTRUCTION. PE YES IN PROGRESS STATEWIDE P-4001 RAIL INDUSTRIAL ACCESS PROGRAM. STATEWIDE P-4700 RAILROAD STATION REHABILITATION PROJECTS. STATEWIDE P-4701 CAPACITY AND TRAVEL TIME IMPROVEMENTS TO FREIGHT AND PASSENGER RAIL CORRIDORS, NEW EQUIPMENT AND MATCH FOR FEDERAL FUNDS. C YES PART UNDER CONSTRUCTION STATEWIDE P-4702 MAINTENANCE OF RAILROAD TRACK AND SIGNAL IMPROVEMENTS. STATEWIDE P-5003 SOUTHEASTERN NORTH CAROLINA PASSENGER RAIL SERVICE, RALEIGH TO WILMINGTON VIA FAYETTEVILLE. STATEWIDE P-5004 SOUTHEASTERN NORTH CAROLINA PASSENGER RAIL SERVICE, RALEIGH TO WILMINGTON VIA GOLDSBORO. STATEWIDE P-5005 HIGH PRIORITY NORTH-SOUTH RAIL CORRIDOR OF THE FUTURE. C NO DELAYED TO 2011 STATEWIDE R-2929 NATIONAL PARKS SERVICE SPOT SAFETY AND SIGN REHABILITATION. STATEWIDE R-2930 NATIONAL PARKS SERVICE EMERGENCY PAVEMENT REHABILITATION. STATEWIDE R-4049 TRAFFIC OPERATIONS (INCIDENT MANAGEMENT, 511, SMARTLINK, TEC, TMC) STATEWIDE R-4067 POSITIVE GUIDANCE PROGRAM (PAVEMENT MARKINGS AND MARKERS, LED SIGNAL HEAD REPLACEMENT) STATEWIDE R-4073 ASPHALT MATERIALS TESTING LABORATORIES CORRECTIVE ACTION PLAN FOR GROUNDWATER CLEAN-UP AT 54 SITES. STATEWIDE R-4436 NPDES PERMIT, RETROFIT FOURTEEN N YES IN PROGRESS SITES PER YEAR TO PROTECT WATER QUALITY. STATEWIDE R-4701 TRAFFIC SYSTEM OPERATIONS PROGRAM (SIGNAL MAINTENANCE). STATEWIDE R-4950A STATEWIDE ENVIRONMENTAL A YES IN PROGRESS MITIGATION AND MINIMIZATION (STATE CONSTRUCTION). STATEWIDE R-4951A STATEWIDE ENVIRONMENTAL MITIGATION AND MINIMIZATION A YES IN PROGRESS (INTRASTATE). T-46

51 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS STATEWIDE R-4952A STATEWIDE ENVIRONMENTAL A YES IN PROGRESS MITIGATION AND MINIMIZATION (URBAN LOOP). STATEWIDE R-4953A STATEWIDE ENVIRONMENTAL A YES IN PROGRESS MITIGATION AND MINIMIZATION (NATIONAL HIGHWAY SYSTEM). STATEWIDE R-4954A STATEWIDE ENVIRONMENTAL MITIGATION AND MINIMIZATION (SURFACE TRANSPORTATION PROGRAM). A YES IN PROGRESS STATEWIDE R-4955A STATEWIDE ENVIRONMENTAL A YES IN PROGRESS MITIGATION AND MINIMIZATION (INTERSTATE MAINTENANCE). STATEWIDE R-4956A STATEWIDE ENVIRONMENTAL A YES IN PROGRESS MITIGATION AND MINIMIZATION (BRIDGE PROGRAM). STATEWIDE R-4957A STATEWIDE ENVIRONMENTAL A YES IN PROGRESS MITIGATION AND MINIMIZATION (HIGH PRIORITY). STATEWIDE R-4958A STATEWIDE ENVIRONMENTAL A YES IN PROGRESS MITIGATION AND MINIMIZATION (APPALACHIAN DEVELOPMENT). STATEWIDE R-8888 STATEWIDE PLANNING FOR TRAFFIC F YES IN PROGRESS FORCASTING, PRE-TIP PLANNING AND PURPOSE AND NEED STUDIES. STATEWIDE SR-5000 SAFE ROUTES TO SCHOOL PROGRAM. EDUCATIONAL,TRAINING N YES IN PROGRESS AND OTHER NON-INFRASTRUCTURE NEEDS. STATEWIDE SR-5001 SAFE ROUTES TO SCHOOL PROGRAM. PROJECTS TO IMPROVE SAFETY, REDUCE TRAFFIC, FUEL COMSUMPTION AND AIR POLLUTION IN VICINITY OF SCHOOLS. STATEWIDE W-4447 SAFETY MANAGEMENT PROGRAM, PROJECT IDENTIFICATION, PE YES IN PROGRESS ANALYSIS AND PRELIMINARY ENGINEERING. STATEWIDE W-4716 MEDIAN INLET REPLACEMENT PROJECT. STATEWIDE Y-4415 HIGHWAY-RAIL CROSSING INVENTORY. STATEWIDE Y-4800 TRAFFIC SEPARATION STUDY IMPLEMENTATION AND CLOSURES. STATEWIDE Y-9999 HIGHWAY-RAIL CROSSING SAFETY IMPROVEMENTS, PASSENGER ROUTES. STATEWIDE Z-4500 HIGHWAY-RAIL CROSSING SAFETY IMPROVEMENTS. STOKES R-2201 KING-TOBACCOVILLE ROAD (MAIN STREET). RJR ENTRANCE TO SR 1115 (KIRBY ROAD). WIDEN TO MULTI-LANES. INTERSECTION IMPROVEMENTS AT SR 1105 (MEADOWBROOK ROAD). STOKES U-4741 VARIOUS GREENWAY AND SIDEWALK PROJECTS WITHIN MPO C YES COMPLETED AREA. T-47

52 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS STOKES U-4742 INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS WITHIN METROPOLITAN PLANNING ORGANIZATION (MPO) AREA. C YES COMPLETED SURRY B-3911 SADDLE MOUNTAIN CREEK. REPLACE BRIDGE NO. 38 SURRY B-4646 TOMS CREEK. REPLACE BRIDGE NO. 132 SURRY B-4820 YADKIN RIVER, RAILROAD. REMOVE BRIDGE NO. 338 SURRY I-5103 I-77, US 21 (EXIT 79) TO MILEPOST 84. PAVEMENT REHABILITATION. SURRY R-2637 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. C YES PART UNDER CONSTRUCTION SURRY SI-4812 US 52 RAMPS TO WEST OF FOOD LION SHOPPING CENTER ENTRANCE. WIDEN TO MULTI-LANES. SWAIN B-4286 NANTAHALA RIVER. REPLACE BRIDGE NO. 3 U YES IN PROGRESS SWAIN B-4287 NANTAHALA RIVER. REPLACE BRIDGE NO. 99 AND BRIDGE NO. 100 SWAIN C-4947 EASTERN BAND OF CHEROKEE INDIANS. IMPLEMENT SHUTTLE A YES IN PROGRESS SERVICE BETWEEN CHEROKEE, NORTH CAROLINA AND GATLINBURG, TENNESSEE. SWAIN R-4048 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. SWAIN R-4730BA PHASE A - PRA-GRSM 1B17, REHABILITATE NEWFOUND GAP ROAD. PHASE B - PRA-GRSM 1B19, REHABILITATE NEWFOUND GAP ROAD. SWAIN R-4730BB PHASE A - PRA-GRSM 1B17, REHABILITATE NEWFOUND GAP ROAD. PHASE B - PRA-GRSM 1B19, REHABILITATE NEWFOUND GAP ROAD. SWAIN R-5006 S RAMSSEY WALKINGSTICK. PE NO DELAYED TO 2011 RECONSTRUCTION. SWAIN R-5008 S ELSIE RATTLER ROAD. PE NO DELAYED TO 2011 RECONSTRUCTION. SWAIN R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. TRANSYLVANIA B-4291 DAVIDSON RIVER. REPLACE BRIDGE NO. 193 TRANSYLVANIA B-4690 PISGAH NATIONAL FOREST, PFH-150(1), TUCKER CREEK. REPLACE BRIDGE NO. 55 T-48

53 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS TRANSYLVANIA R-2409C NC 107 AT CASHIERS TO US 178 AT ROSMAN. SAFETY IMPROVEMENTS AND CLIMBING LANES AT SELECTED LOCATIONS. TRANSYLVANIA R-4048 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. TRANSYLVANIA R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. TRANSYLVANIA W-5120 US 64 TO HAYWOOD COUNTY LINE. INSTALL AND REVISE GUARDRAIL. UNION B-4296 WEST FORK TWELVE MILE CREEK. C YES COMPLETED IN 2010 REPLACE BRIDGE NO. 223 UNION B-4651 SOUTH FORK CROOKED CREEK. REPLACE BRIDGE NO. 251 R YES COMPLETED IN 2009 U YES COMPLETED IN 2009 UNION C-4957A CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. UNION C-4957B CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. UNION R-2559B MONROE BYPASS. FOUR LANES DIVIDED ON NEW LOCATION. UNION R-2559C MONROE BYPASS. FOUR LANES DIVIDED ON NEW LOCATION. UNION U-2547 SR 2188 (CHARLES STREET), SR 2181 (SUNSET DRIVE) TO SR R NO PROJECT DELETED 2100 (FRANKLIN STREET). WIDEN TO MULTI-LANES. U NO PROJECT DELETED UNION U-3825 SR 1365 (STALLINGS ROAD), SR 1009 (OLD CHARLOTTE HIGHWAY) TO US 74. WIDEN TO MULTI-LANES. (COORDINATE WITH R-3329) R NO PROJECT DELETED UNION U-9999C MECKLENBURG-UNION METROPOLITAN PLANNING PE YES IN PROGRESS ORGANIZATION (MUMPO) PLANNING (PL) SUPPLEMENT. VANCE I-2810 GRANVILLE COUNTY LINE (MILEPOST C YES COMPLETED 208.5) TO US 158 BYPASS (MILEPOST 213.5) IN VANCE COUNTY. PAVEMENT CG YES PAYBACK IN PROGRESS AND BRIDGE REHABILITATION. VANCE U-4916 SR 1165 (BECKFORD DRIVE). WIDEN TO MULTILANES WAKE B-3919 AUSTIN CREEK. REPLACE BRIDGE R YES COMPLETED NO. 448, SMITHS CREEK. REPLACE BRIDGE NO. 140 WAKE B-4302 TERRIBLE CREEK. C YES COMPLETED REPLACE BRIDGE NO. 336 WAKE B-4303 LOWER BARTONS CREEK. C YES COMPLETED REPLACE BRIDGE NO. 102 WAKE B-4304 BEAVER DAM CREEK. C YES COMPLETED REPLACE BRIDGE NO. 143 T-49

54 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS WAKE B-4656 SR REPLACE BRIDGE NO. 492 U YES IN PROGRESS WAKE B-4657 NORFOLK AND SOUTHERN RAILROAD. REPLACE BRIDGE NO. 340 U YES IN PROGRESS WAKE B-4658 BUCKHORN CREEK. R NO PROJECT DELETED REPLACE BRIDGE NO. 345 WAKE B-4991 BEAVER CREEK. REPLACE BRIDGE NO. 359 WAKE C-4700 FOURTEEN (14), CLEAN DIESEL AND PARTICULATE AFV TRANSIT A YES IN PROGRESS BUSES WAKE C-4925 NC 55 (MAIN STREET). CONSTRUCT SIDEWALKS. WAKE C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS WAKE C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS WAKE EB-4978 EDWARDS MILL ROAD EXTENSION, REEDY CREEK ROAD TO TRINITY ROAD. CONSTRUCT MULTI-USE PATH. WAKE EL-5100 PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS IN THE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO). WAKE I-4709 SR 1728 (WADE AVENUE) TO EAST OF CG YES PAYBACK IN PROGRESS I-440/US 64 (MILEPOST 302). PAVEMENT REPAIR AND RESURFACING. WAKE I-4744 SR 1728 (WADE AVENUE, MILEPOST 289) TO I-440/US 1-64 R YES COMPLETED (MILEPOST 293). ADD LANES. WAKE P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. WAKE P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. WAKE R-2000AF NORTHERN WAKE FREEWAY, NC 55 R YES COMPLETED WEST OF MORRISVILLE TO US 64 EAST NEAR KNIGHTDALE. FREEWAY U YES COMPLETED ON NEW LOCATION. WAKE R-2552AC CLAYTON BYPASS, I-40 IN WAKE COUNTY C YES COMPLETED TO US BUSINESS IN JOHNSTON COUNTY. FREEWAY ON NEW LOCATION. T-50

55 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS WAKE R-2635 WESTERN WAKE FREEWAY, NC 55 (SOUTH) TO NC 55 (NORTH). FREEWAY ON NEW LOCATION. WAKE R-2809A WAKE FOREST BYPASS, WEST OF SR 1923 (THOMSON MILL ROAD) TO EAST OF SR 2053 (JONES DAIRY ROAD). MULTI-LANES ON NEW LOCATION. C YES COMPLETED WAKE R-2814B NORTH OF SR 2044 (LIGON MILL ROAD) R YES COMPLETED TO NC 39 IN LOUISBURG. WIDEN TO MULTI-LANES, SOME NEW LOCATION.. U YES COMPLETED RG YES PAYBACK IN PROGRESS WAKE U-4410C RESEARCH TRIANGLE PARK (RTP) ACCESS ROUTES. C YES COMPLETED WAKE U-4410DA RESEARCH TRIANGLE PARK (RTP) ACCESS ROUTES. C YES COMPLETED WAKE U-4703 TIMBER DRIVE EAST EXTENSION, NC 50 TO WHITE OAK ROAD. MULTI-LANES ON NEW LOCATION. WAKE U-4763B NEW ROUTE - TRIANGLE PARKWAY, I-540 TO I-40. MULTI-LANE FACILITY ON NEW LOCATION. WAKE U-4901A SR 2000 (FALLS OF NEUSE ROAD). WIDEN TO MULTILANES AND R YES COMPLETED REALIGNMENT FROM RAVEN RIDGE ROAD TO NORTH OF NEUSE RIVER INCLUDING NEW STRUCTURE OVER THE NEUSE RIVER. U YES COMPLETED WAKE U-4901B SR 2000 (FALLS OF NEUSE ROAD). WIDEN TO MULTILANES AND R YES COMPLETED REALIGNMENT FROM RAVEN RIDGE ROAD TO NORTH OF NEUSE RIVER INCLUDING NEW STRUCTURE OVER THE NEUSE RIVER. U YES COMPLETED WAKE U-5024 NEW ROUTE - GREEN OAKS PARKWAY, SR 1152 (HOLLY C YES COMPLETED SPRINGS-NEW HILL ROAD) TO NC 55 HOLLY SPRINGS BYPASS. MULTI-LANES ON NEW LOCATION. WAKE U-5117 WALKER STREET GRADE SEPARATION R YES IN ACQUISITION WAKE U-5118 OPERATIONAL IMPROVEMENTS FOR SAFETY AND CONGESTION MITIGATION WAKE U-9999B CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO) PLANNING (PL) SUPPLEMENT. WAKE W-5129 US 64 TO NASH COUNTY LINE. C YES COMPLETED INSTALL MEDIAN BARRIER. WAKE W-5130 WEST OF SR 1728 (WADE AVENUE) C YES COMPLETED TO SR 1371 (LAKE WHEELER ROAD). INSTALL MEDIAN BARRIER. WARREN B-3706 FISHING CREEK. REPLACE BRIDGE NO. 20 C YES COMPLETED WARREN B-3921 FISHING CREEK. REPLACE BRIDGE NO. 45 C YES COMPLETED WARREN B-4307 SHOCCO CREEK. REPLACE BRIDGE NO. 4 C YES COMPLETED T-51

56 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS WARREN B-4308 SMITH CREEK. REPLACE BRIDGE NO. 107 WARREN B-4664 SMITH CREEK. REPLACE BRIDGE NO. 25 C YES COMPLETED WASHINGTON B-4314 MAUL CREEK. REPLACE BRIDGE NO. 29 C YES COMPLETED WATAUGA B-3377 COVE CREEK. REPLACE BRIDGE NO. 302 AND REMOVE BRIDGE NO. 168 WATAUGA B-3928 SOUTH FORK NEW RIVER. REPLACE BRIDGE NO. 334 WATAUGA B-4316 CREEK. REPLACE BRIDGE NO. 320 WATAUGA B-4318 WATAUGA RIVER. REPLACE BRIDGE NO. 321 WATAUGA R-2637 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. C YES PART UNDER CONSTRUCTION WATAUGA R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. WATAUGA U-4020 US 421 (KING STREET), NC 194 TO R YES COMPLETED US 321 (HARDIN STREET). WIDEN TO MULTI-LANES. WAYNE B-4671 NAHUNTA SWAMP. C YES COMPLETED REPLACE BRIDGE NO. 35 WAYNE B-4672 NAHUNTA SWAMP. R YES COMPLETED REPLACE BRIDGE NO. 37 U YES IN PROGRESS WAYNE U-5016 GOLDSBORO SIGNAL SYSTEM. WAYNE W-5010 SR 1234 (EBENEZER CHURCH ROAD- CAPPS BRIDGE ROAD) AND WEST OF SR SAFETY IMPROVEMENTS. WILKES B-4322 STONY FORK CREEK. REPLACE BRIDGE NO. 71 WILKES B-4677 CREEK. REPLACE BRIDGE NO. 99 WILKES R-2637 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. C YES PART UNDER CONSTRUCTION WILKES R-5104 PRA-BLRI 2E15. SLIDE REPAIR AT MILEPOST 270. WILKES R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. WILKES SF-4911D NC 16/18 AND SR 2545 (PLAZA DRIVE) C NO DELAYED TO 2011 NEAR NORTH WILKESBORO. WIDEN AND CONSTRUCT LEFT TURN LANE. WILSON B-4680 WHITEOAK SWAMP. R YES COMPLETED REPLACE BRIDGE NO. 122 U YES COMPLETED T-52

57 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2009 STARTED REMARKS WILSON B-4682 CONTENTNEA CREEK. REPLACE BRIDGE NO. 2 WILSON B-4992 SWAMP. REPLACE BRIDGE NO. 1 R YES COMPLETED U YES IN PROGRESS WILSON P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. WILSON W-5109 NC 58 TO THE GREENE COUNTY LINE. SAFETY IMPROVEMENTS. YADKIN B-4820 YADKIN RIVER, RAILROAD. REMOVE BRIDGE NO. 338 YADKIN I-5103 I-77, US 21 (EXIT 79) TO MILEPOST 84. PAVEMENT REHABILITATION. YADKIN R-2637 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. C YES PART UNDER CONSTRUCTION YANCEY R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. T-53

58

59 Accomplishments Federal Fiscal Year 2010 Projects with activity(s) scheduled during Federal Fiscal Year 2010 are listed in the Accomplishments Table on the following pages. Projects for which the indicated activity did occur are shown with a Yes in the Work Started column. Projects where the scheduled activity did not occur are shown with a No in the Work Started column. The Remarks column gives a brief explanation of the programmed activity. T-55

60

61 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS ALAMANCE P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. ALAMANCE P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. ALAMANCE U-3110B NEW ROUTE, US 70 TO NC 100. MULTI-LANES, PART ON NEW LOCATION. CG YES PAYBACK IN PROGRESS ALLEGHANY B-4406 CREEK. REPLACE BRIDGE NO. 9 U YES IN PROGRESS ALLEGHANY R-3101 ROARING GAP TO SPARTA. UPGRADE C NO DELAYED TO 2013 ROADWAY TO TWENTY-FOUR FEET WITH TWO FOOT PAVED SHOULDERS. ALLEGHANY R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. ANSON B-3404 SOUTH FORK JONES CREEK. C YES COMPLETED IN 2010 REPLACE BRIDGE NO. 314 ANSON R-5107 PED-10(1). REHABILITATE REFUGE ROAD AND PARKING AREA. C YES COMPLETED IN 2010 ASHE R-2100B WEST OF BLUE RIDGE PARKWAY TO EAST OF US 221-NC 16. UPGRADE TWO LANE ROADWAY AND ADD GUARDRAIL. ASHE R-4724B PRA-BLRI 2D16. REHABILITATE PARKWAY C YES COMPLETED IN 2010 MILEPOST TO MILEPOST ASHE R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. ASHE U-3812 NC 88, NC 194 TO US 221 BUSINESS. UPGRADE EXISTING ROADWAY. AVERY B-3608 NORTH TOE RIVER. C YES COMPLETED IN 2010 REPLACE BRIDGE NO. 44 AVERY R-5108 PRA-BLRI 2H13, J16. RESURFACE SECTIONS 2H AND 2J FROM MILEPOST TO MILEPOST 317.5, INCLUDING OVERLOOKS, PARKING AREAS, SPURS, AND ACCESS ROADS. AVERY R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. BEAUFORT B-3611 PANTEGO CREEK. REPLACE BRIDGE NO. 77 BEAUFORT B-3809 PUNGO CREEK. REPLACE BRIDGE NO. 64 BEAUFORT B-4413 BROAD CREEK. REPLACE BRIDGE NO. 51 R YES COMPLETED IN 2010 U YES COMPLETED IN 2010 BEAUFORT B-4415 PUNGO CREEK. REPLACE BRIDGE NO. 21 R YES IN ACQUISITION U YES IN PROGRESS T-57

62 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS BEAUFORT B-4417 JACK CREEK. REPLACE BRIDGE NO. 59 C NO DELAYED TO 2011 BEAUFORT B-4428 CANAL. REPLACE BRIDGE NO. 140 BEAUFORT B-4500 WATERS STREET OVER TRIBUTARY OF PUNGO RIVER. C NO DELAYED TO 2011 REPLACE BRIDGE NO. 324 BEAUFORT K-3800 ACQUIRE RIGHT OF WAY AND RELOCATE REST AREA AT NEW LOCATION WITH MUNICIPAL WATER AND SEWER AVAILABLE. (COORDINATE WITH R-2510B) C NO DELAYED TO 2013 BEAUFORT R-2510C WASHINGTON BYPASS, SOUTH OF C NO DELAYED TO 2011 SR 1127 (POSSUM TRACK ROAD) TO NORTH OF NC 171. FOUR LANE DIVIDED FREEWAY, SOME NEW LOCATION. RG YES PAYBACK IN PROGRESS BERTIE B-4435 ROQUIST CREEK. C YES COMPLETED REPLACE BRIDGE NO. 44 BLADEN B-4028 CAPE FEAR RIVER AND OVERFLOW. REPLACE BRIDGE NO.12, R YES IN ACQUISITION BRIDGE NO. 18 AND BRIDGE NO. 42 BLADEN B-4712 CAPE FEAR RIVER. R NO DELAYED TO 2012 REPLACE BRIDGE NO. 188 BRUNSWICK R-4732A SOUTH CAROLINA STATE LINE TO US ACCESS MANAGEMENT IMPROVEMENTS AT VARIOUS LOCATIONS. C NO PROJECT DELETED BUNCOMBE B-3619 BILL MOORE CREEK. R YES COMPLETED IN 2010 REPLACE BRIDGE NO. 56 BUNCOMBE B-4034 STONY FORK CREEK. REPLACE BRIDGE NO. 134 BUNCOMBE B-4445 NORTH HOMINY CREEK. R YES COMPLETED IN 2009 REPLACE BRIDGE NO. 256 BUNCOMBE B-4446 REEMS CREEK. REPLACE BRIDGE NO. 227 C YES COMPLETED IN 2011 BUNCOMBE R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. BUNCOMBE U-3301 NC 63 (LEICESTER HIGHWAY), SR 1615 (GILBERT ROAD) TO R NO DELAYED TO 2013 WEST OF SR 1004 (NEWFOUND ROAD). WIDEN TO MULTI-LANES, SOME RELOCATION. BURKE B-4046 WHITE OAK CREEK. REPLACE BRIDGE NO. 175, JACOB FORK RIVER. REPLACE BRIDGE NO. 38 U YES IN PROGRESS BURKE B-4983 SOUTHERN RAILROAD. R NO DELAYED TO 2012 REPLACE BRIDGE NO. 313 BURKE R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. BURKE U-2550B NC 18, US 70 BYPASS (FLEMING DRIVE) TO I-40. WIDEN TO MULTI-LANES AND REVISE INTERCHANGE. T-58

63 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS BURKE U-2551 SR 1922 (ENOLA ROAD)-SR 1924 (OLD NC 18), SR 2026 (ARNOLD DRIVE) TO NC 18 (SOUTH STERLING STREET). WIDEN TO MULTI-LANES AND UPGRADE INTERCHANGE. CABARRUS B-4048 CLEUR CREEK. REPLACE BRIDGE NO. 145 R YES COMPLETED IN 2010 U YES COMPLETED IN 2010 CABARRUS B-4049 BLACK CREEK. REPLACE BRIDGE NO. 165 R YES COMPLETED IN 2010 CABARRUS B-4050 IRISH BUFFALO CREEK. REPLACE BRIDGE NO. 30 CABARRUS B-5000 BURRAGE ROAD. REPLACE BRIDGE C NO DELAYED TO 2013 NO. 151 OVER THREE MILE BRANCH CABARRUS C-4920A CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. CABARRUS C-4920B CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. CABARRUS C-4921 CONSTRUCT SIDEWALKS TO CONNECT NEIGHBORHOODS AND TOWN CENTER. CABARRUS I-3803B US 29-NC 49 CONNECTOR, MECKLENBURG COUNTY TO NC 73 IN CABARRUS COUNTY. ADD ADDITIONAL LANES. (COORDINATE WITH U-3415) R YES COMPLETED IN 2010 CABARRUS P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. CABARRUS P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. CABARRUS R-2533CC HARRISBURG TO YADKIN RIVER. WIDEN TO MULTI-LANES. CABARRUS U-4910 SR 1445 (DERITA ROAD), SR 1394 (POPLAR TENT ROAD) TO SR C NO DELAYED TO (CONCORD MILLS BOULEVARD). WIDEN TO MULTI-LANES. C NO DELAYED TO 2011 CALDWELL B-3819 JOHNS RIVER. REPLACE BRIDGE NO. 184 CALDWELL R-2237C NORTH OF NC 268 TO MULTI-LANES NORTH OF BLOWING ROCK. WIDEN TO MULTI-LANES. CALDWELL R-5108 PRA-BLRI 2H13, J16. RESURFACE SECTIONS 2H AND 2J FROM MILEPOST TO MILEPOST 317.5, INCLUDING OVERLOOKS, PARKING AREAS, SPURS, AND ACCESS ROADS. CALDWELL R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. T-59

64 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS CALDWELL U-2211B SR 1001 (CONNELLY SPRINGS ROAD), SR 1933 (SOUTHWEST BOULEVARD) TO SR 1712 (OAK HILL SCHOOL ROAD) EAST OF US 321. WIDEN TO MULTI- LANES WITH CURB AND GUTTER, PART ON NEW LOCATION AND CONSTRUCT AN INTERCHANGE AT US 321. CALDWELL U-3437 NEW CONNECTOR, SR 1159 (PLEASANT HILL ROAD) EXTENSION TO SR 1160 (MT. HERMAN ROAD). TWO LANES ON NEW LOCATION. C NO DELAYED TO 2013 CAMDEN B-4451 JOYCE CREEK. REPLACE BRIDGE NO. 21 R YES COMPLETED U YES COMPLETED CAMDEN B-4452 SAWYER CREEK. R YES COMPLETED REPLACE BRIDGE NO. 20 U YES COMPLETED CAMDEN R-2414B EAST OF PASQUOTANK RIVER IN ELIZABETH CITY TO EAST OF NC 34 IN BELCROSS. WIDEN TO MULTI-LANES. CARTERET B-4454 DEEP CREEK. REPLACE BRIDGE NO. 43 R YES COMPLETED IN 2009 CARTERET B-5001 MIMOSA BOULEVARD. REPLACE BRIDGE NO. 47 OVER PINE KNOLL WATERWAY CARTERET F-5006 CEDAR ISLAND RAMPS AND GANTRY. REPAIR AND REPLACE. C NO DELAYED TO 2011 CASWELL C-4936B PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS CASWELL C-4936D PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS CATAWBA B-4061 HAGAN CREEK. REPLACE BRIDGE NO. 90 CATAWBA B-4062 PINCH GUT CREEK. R YES COMPLETED IN 2009 REPLACE BRIDGE NO. 127 CATAWBA B-4456 I-40. REPLACE BRIDGE NO. 49 CHATHAM B-4459 BUCKHORN CREEK. R YES UNDER CONSTRUCTION REPLACE BRIDGE NO. 56 CHATHAM C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N NO PROJECT DELETED CHATHAM C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N NO PROJECT DELETED T-60

65 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS CHATHAM U-4726 DCHC URBAN AREA BICYCLE AND PEDESTRIAN ALLOCATION. CHATHAM U-4727 DURHAM-CHAPEL HILL-CARRBORO URBAN AREA PLANNING (DCHC) ALLOCATION AND UNIFIED PROGRAM. CHEROKEE R-3622AA US AT RANGER TO TENNESSEE C YES COMPLETED IN 2009 STATE LINE. UPGRADE EXISTING ROADWAY. CHEROKEE R-3622AB US AT RANGER TO TENNESSEE STATE LINE. UPGRADE EXISTING ROADWAY. CHOWAN B-4463 QUEEN ANNE CREEK. R YES COMPLETED REPLACE BRIDGE NO. 12 U YES IN PROGRESS CHOWAN B-4465 POLLOCK SWAMP. REPLACE BRIDGE NO. 5 CHOWAN U-3419 NC 94 (SOUNDSIDE ROAD), NC 32 R NO PROJECT DELETED TO US 17 BYPASS. TWO LANES ON NEW LOCATION. U NO PROJECT DELETED CLAY B-4467 BRASSTOWN CREEK. REPLACE BRIDGE NO. 3 CLAY R-4416 CHUNKY GAL GAP WESTWARD FOR TWO MILES. CONSTRUCT TRUCK CLIMBING LANE. CLAY W-5119 GEORGIA STATE LINE TO US 64. C NO DELAYED TO 2013 INSTALL PAVED SHOULDERS AND REALIGN CURVE. CLEVELAND B-1135 BEAVERDAM CREEK. REPLACE BRIDGE NO. 139 CLEVELAND B-4468 SANDY RUN CREEK. C YES COMPLETED IN 2011 REPLACE BRIDGE NO. 144 CLEVELAND I-4928 CONSTRUCT NEW WEIGH STATION. R NO DELAYED TO 2012 CLEVELAND R-2707AA SHELBY. FOUR LANE DIVIDED FREEWAY C NO DELAYED TO 2013 ON NEW LOCATION. CLEVELAND R-2707AB SHELBY. FOUR LANE DIVIDED FREEWAY G NO DELAYED TO 2013 ON NEW LOCATION. CLEVELAND R-2707B SHELBY. FOUR LANE DIVIDED FREEWAY G NO DELAYED TO 2013 ON NEW LOCATION. COLUMBUS B-4471 JUNIPER SWAMP. R YES IN ACQUISITION REPLACE BRIDGE NO. 44 COLUMBUS B-4473 GRISSETT SWAMP. REPLACE BRIDGE R YES COMPLETED IN 2010 NO. 76 AND BRIDGE NO. 78 COLUMBUS R-0061C NC 211. CONSTRUCT INTERCHANGE. COLUMBUS R-4900 NC 242. CONSTRUCT INTERCHANGE. T-61

66 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS CRAVEN R-1015 HAVELOCK BYPASS, NORTH OF PINE GROVE TO NORTH OF CARTERET COUNTY LINE. FOUR LANE DIVIDED ON NEW LOCATION. R NO DELAYED TO 2013 CUMBERLAND B-4090 CROSS CREEK. REPLACE BRIDGE NO. 125 CUMBERLAND B-4091 US 301, SR 1738, SR 1741, CAPE FEAR RIVER. REPLACE BRIDGE NO. 85 CUMBERLAND B-4492 REESE CREEK. REPLACE BRIDGE NO. 212 R YES COMPLETED IN 2010 CUMBERLAND B-4493 BROWNS CREEK. R YES COMPLETED IN 2010 REPLACE BRIDGE NO. 48 CUMBERLAND B-4949 CROSS CREEK. REPLACE BRIDGE NO. 61 R NO DELAYED TO 2011 CUMBERLAND R-2303B WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R NO DELAYED TO 2011 CUMBERLAND R-2303C WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R NO DELAYED TO 2011 CUMBERLAND R-2303D WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R NO DELAYED TO 2011 CUMBERLAND U-2810B SR 1003 (CAMDEN ROAD), NC 59 (HOPE MILLS ROAD) TO SR 1007 (OWEN DRIVE). WIDEN ROADWAY TO MULTI-LANES. CUMBERLAND U-3423 NC (BRAGG BOULEVARD), US 401 BYPASS TO NORTH OF SR 1437 (SANTA FE DRIVE/SHAW ROAD). WIDEN TO SIX LANES. CUMBERLAND U-4422 SR 1596 (GLENSFORD ROAD), US 401 BUSINESS (RAEFORD ROAD) TO SR 1400 (CLIFFDALE ROAD). WIDEN TO FIVE LANES, PART ON NEW LOCATION. CURRITUCK B-4494 TULLS CREEK. REPLACE BRIDGE NO. 3 R YES COMPLETED CURRITUCK K-4700 REST AREA RENOVATION - FACILITY UPGRADES, SEWER C NO PROJECT DELETED SYSTEM IMPROVEMENTS, AND PARKING. DARE B-2500 OREGON INLET. REPLACE BRIDGE NO. 11 DARE F-5001 HATTERAS SOUTH DOCK BASIN REFURBISHMENT. DARE R-5105 CAHA 10(2). NC 12 (NPS ROUTE 10) NEAR CAPE HATTERAS C YES COMPLETED NATIONAL SEASHORE ENTRANCE. OVERLAY ROADWAY AND REPLACE 4 CULVERTS AND HEADWALLS. T-62

67 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS DARE U-3815 US 64-US 64 BYPASS-NC 345. C NO PROJECT DELETED IMPROVE INTERSECTION. DAVIDSON B-4498 ABBOTTS CREEK. C NO DELAYED TO 2013 REPLACE BRIDGE NO. 199 DAVIDSON B-4499 US 29/70/I-85. REPLACE BRIDGE NO. 158 DAVIDSON B-4694 REEDY CREEK. REPLACE BRIDGE NO. 52 DAVIDSON C-4936B PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS DAVIDSON C-4936D PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS DAVIDSON R-4750 I-85 IN DAVIDSON COUNTY TO I-40 IN C NO DELAYED TO 2013 FORSYTH COUNTY. UPGRADE EXISTING ROADWAY TO INTERSTATE STANDARDS. DAVIDSON U-4741 VARIOUS GREENWAY AND SIDEWALK PROJECTS WITHIN MPO AREA. DAVIDSON U-4742 INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS WITHIN METROPOLITAN PLANNING ORGANIZATION (MPO) AREA. DAVIDSON W-5115 SOUTH OF SOUTH VILLAGE DRIVE TO SR 1515 (MOUNT OLIVET CHURCH ROAD). CONSTRUCT CONTINUOUS CENTER LEFT TURN LANE. DAVIE B-3637 I-40. REPLACE BRIDGE NO. 37 CG YES PAYBACK IN PROGRESS AND REVISE INTERCHANGE. DAVIE I-3600 SR 1436 (PINEBROOK DRIVE) TO WEST CG YES PAYBACK IN PROGRESS OF NC 801. PAVEMENT REHABILITATION. DAVIE U-4741 VARIOUS GREENWAY AND SIDEWALK PROJECTS WITHIN MPO AREA. DAVIE U-4742 INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS WITHIN METROPOLITAN PLANNING ORGANIZATION (MPO) AREA. DUPLIN R-2303B WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R NO DELAYED TO 2011 DUPLIN R-2303C WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R NO DELAYED TO 2011 T-63

68 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS DUPLIN R-2303D WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R NO DELAYED TO 2011 DURHAM B-3638 CAMPUS DRIVE. REPLACE BRIDGE NO. 316 DURHAM C-4402 I-40 WEST OF NC 751 TO TRIANGLE C NO PROJECT DELETED DRIVE IN RESEARCH TRIANGLE PARK. CONSTRUCT ON-ROAD BICYCLE FACILITY. DURHAM C-4928 MORREENE ROAD, NEAL ROAD TO C NO DELAYED TO 2014 ERWIN ROAD. CONSTRUCT BIKE LANES AND SIDEWALKS. DURHAM C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N NO PROJECT DELETED DURHAM C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N NO PROJECT DELETED DURHAM C-5103 PURCHASE TWO (2) HYBRID ELECTRIC BUSES AND PROVIDE O YES IN PROGRESS PORTION OF OPERATING ASSISTANCE FOR TWO YEARS. DURHAM C-5104 PURCHASE TWO (2) HYBRID ELECTRIC BUSES AND PROVIDE O YES IN PROGRESS PORTION OF OPERATING EXPENSE FOR THREE YEARS. DURHAM EB-4707 SR 2220 (OLD CHAPEL HILL ROAD)- SR 1838 (OLD DURHAM ROAD), SR 1116 (GARRETT ROAD) IN DURHAM COUNTY TO US IN ORANGE COUNTY. BICYCLE IMPROVEMENTS. DURHAM EL-2921E AMERICAN TOBACCO RAIL TRAIL. NC 54 TO CHATHAM COUNTY R YES COMPLETED LINE. CONSTRUCT A MULTI-PURPOSE TRAIL. DURHAM P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. DURHAM P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. DURHAM R-2000AF NORTHERN WAKE FREEWAY, NC 55 WEST OF MORRISVILLE TO US 64 EAST NEAR KNIGHTDALE. FREEWAY ON NEW LOCATION. C YES COMPLETED DURHAM U-0071 EAST END CONNECTOR, NC 147 (BUCK DEAN FREEWAY) TO R NO DELAYED TO 2012 NORTH OF NC 98. MULTI-LANE DIVIDED, PART ON NEW LOCATION. U NO DELAYED TO 2012 DURHAM U-3804 SR 1321 (HILLANDALE ROAD), I-85 TO SR 1407 (CARVER STREET). WIDEN TO MULTI-LANES. T-64

69 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS DURHAM U-4724 CORNWALLIS ROAD, SOUTH ROXBORO C NO DELAYED TO 2014 ROAD TO UNIVERSITY DRIVE. BIKE AND PEDESTRIAN FEATURES. DURHAM U-4726 DCHC URBAN AREA BICYCLE AND PEDESTRIAN ALLOCATION. DURHAM U-4727 DURHAM-CHAPEL HILL-CARRBORO URBAN AREA PLANNING (DCHC) ALLOCATION AND UNIFIED PROGRAM. DURHAM U-5119 BUS RAPID TRANSIT OPERATIONAL IMPROVEMENTS DURHAM W-5110 NC 55 (ALSTON AVENUE) AT LAWSON STREET. CONSTRUCT LEFT TURN LANES ON NC 55. EDGECOMBE B-4503 TAR RIVER. REPLACE BRIDGE NO. 7 U NO DELAYED TO 2012 EDGECOMBE C-4969C CONSTRUCT SIDEWALKS AT VARIOUS LOCATIONS IN ROCKY MOUNT. EDGECOMBE C-4970D INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS IN ROCKY MOUNT. EDGECOMBE C-4970E INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS IN ROCKY MOUNT. EDGECOMBE P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. FORSYTH B-2882 GLADE STREET OVER PETERS CREEK. REPLACE BRIDGE NO. R NO DELAYED TO POST YEARS 387 FORSYTH B-4506 SR REHABILITATE BRIDGE NO. 319 AND BRIDGE NO. 335 FORSYTH B-4510 I-40 BUSINESS. REPLACE BRIDGE NO. 368 FORSYTH B TH. STREET. REPLACE BRIDGE NO. 322 R YES COMPLETED FORSYTH B-5004 REYNOLDS PARK ROAD. REPLACE BRIDGE NO. 86 OVER SALEM CREEK AND BRIDGE NO. 87 OVER BUSHY FORK CREEK. FORSYTH B-5005 SPRAGUE STREET. REPLACE BRIDGE NO. 134 OVER SOUTHERN R NO DELAYED TO POST YEARS RAILROAD. FORSYTH C-4936B PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS FORSYTH C-4936D PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS FORSYTH R-4750 I-85 IN DAVIDSON COUNTY TO I-40 IN C NO DELAYED TO 2013 FORSYTH COUNTY. UPGRADE EXISTING ROADWAY TO INTERSTATE STANDARDS. T-65

70 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS FORSYTH U-2579AB WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION R NO DELAYED TO POST YEARS (FUTURE I-74), US 52 TO US 311. MULTI-LANE FREEWAY ON NEW LOCATION U NO DELAYED TO POST YEARS FORSYTH U-2826B US 52, I-40 BYPASS TO PROPOSED WESTERN LOOP INTERCHANGE. WIDEN AND UPGRADE ROADWAY AND INTERCHANGES FORSYTH U-4741 VARIOUS GREENWAY AND SIDEWALK PROJECTS WITHIN MPO AREA. FORSYTH U-4742 INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS WITHIN METROPOLITAN PLANNING ORGANIZATION (MPO) AREA. FORSYTH U-4909 SR 2643 (UNION CROSS ROAD), SR 2691 (WALLBURG ROAD) TO SR 2632 (SEDGE GARDEN ROAD). WIDEN TO MULTI-LANES. FORSYTH U-9999D WINSTON-SALEM-FORSYTH COUNTY METROPOLITAN PLANNING PE YES IN PROGRESS (NEW TIP ORGANIZATION PLANNING (PL) SUPPLEMENT. NUMBER U-4951) FRANKLIN B-4514 TAR RIVER. REPLACE BRIDGE NO. 36 FRANKLIN C-4939 CONSTRUCT A BIKE-PEDESTRIAN PATH IN FORMER RAIL N NO PROJECT DELETED CORRIDOR (COTTON MARKET RAIL TRAIL). FRANKLIN C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N NO PROJECT DELETED FRANKLIN C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N NO PROJECT DELETED FRANKLIN EL-5100 PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS IN THE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO). FRANKLIN R-2814A NORTH OF SR 2044 (LIGON MILL ROAD) TO NC 39 IN LOUISBURG. WIDEN TO MULTI-LANES, SOME NEW LOCATION.. FRANKLIN U-5118 OPERATIONAL IMPROVEMENTS FOR SAFETY AND CONGESTION MITIGATION GASTON B-4117 CREEK. REPLACE BRIDGE NO. 173 C NO DELAYED TO 2011 GASTON B-4118 STANLEY CREEK. REPLACE BRIDGE NO. 200 U YES IN PROGRESS GASTON B-4517 CROWDER'S CREEK. C YES COMPLETED IN 2011 REPLACE BRIDGE NO. 49 GASTON B-4519 LITTLE LONG CREEK. C YES COMPLETED IN 2010 REPLACE BRIDGE NO. 155 T-66

71 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS GASTON B-4575 MICKLEY AVENUE OVER NORFOLK SOUTHERN RAILROAD. REPLACE BRIDGE NO. 165 GASTON B-4753 DUHART'S CREEK. REPLACE BRIDGE NO. 15 GASTON C-4934 NC 279 (NEW HOPE ROAD), BURTONWOOD DRIVE TO SR 2466 (GARRISON BOULEVARD). WIDEN TO MULTI-LANES. GATES B-4521 DUKE SWAMP. REPLACE BRIDGE NO. 26 R YES COMPLETED U YES IN PROGRESS GATES R-2507A US 158 TO THE VIRGINIA STATE LINE. WIDEN TO MULTI-LANES. GRAHAM B-3335 CHEOAH RIVER. REPLACE BRIDGE NO. 70 GRAHAM B-4122 LONG CREEK. REPLACE BRIDGE NO. 81 GRAHAM B-4123 WEST BUFFALO CREEK. C YES COMPLETED IN 2011 REPLACE BRIDGE NO. 117 GRANVILLE B-4522 TAR RIVER. REPLACE BRIDGE NO. 102 GRANVILLE C-4940 CONSTRUCT BICYCLE-PEDESTRIAN PATHS AT VARIOUS LOCATIONS. GRANVILLE C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N NO PROJECT DELETED GRANVILLE C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N NO PROJECT DELETED GRANVILLE EL-5100 PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS IN THE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO). GRANVILLE U-5118 OPERATIONAL IMPROVEMENTS FOR SAFETY AND CONGESTION MITIGATION GREENE B-4531 LITTLE CONTENTNEA CREEK. R NO DELAYED TO 2011 REPLACE BRIDGE NO. 36, LITTLE CONTENTNEA CREEK OVERFLOW. U NO DELAYED TO 2011 REPLACE BRIDGE NO. 35 GREENE B-4533 WHEAT SWAMP CREEK. R YES IN ACQUISITION REPLACE BRIDGE NO. 48 U YES IN PROGRESS GUILFORD C-4936B PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS T-67

72 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS GUILFORD C-4936D PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS GUILFORD EB-4709B BATTLEGROUND AVENUE RAIL-TRAIL GUILFORD EL-5101 PEDESTRIAN AND BICYCLE PROJECTS IN THE GREENSBORO URBAN AREA METROPOLITAN URBAN PLANNING C NO DELAYED TO 2011 ORGANIZATION (GUAMPO). GUILFORD P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. GUILFORD P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. GUILFORD R-2309AB SR 2182 (HORSEPEN CREEK ROAD) TO US 220-NC 68 CONNECTOR (R-2413). WIDEN TO MULTI-LANES. GUILFORD R-2413A SR 2133 (PLEASANT RIDGE ROAD) TO US 220-NC 68. MULTI-LANE CONNECTOR, ON NEW LOCATION, NC 68 TO US 220 AND MULTI-LANE US 220 TO NC 68. R NO DELAYED TO 2012 GUILFORD R-2413B SR 2133 (PLEASANT RIDGE ROAD) TO US 220-NC 68. MULTI-LANE CONNECTOR, ON NEW LOCATION, NC 68 TO US 220 AND MULTI-LANE US 220 TO NC 68. R NO DELAYED TO 2012 GUILFORD R-2413C SR 2133 (PLEASANT RIDGE ROAD) TO US 220-NC 68. MULTI-LANE CONNECTOR, ON NEW LOCATION, NC 68 TO US 220 AND MULTI-LANE US 220 TO NC 68. GUILFORD R-2611 SR 2007 AT COLFAX TO NC 68. WIDEN TO MULTI-LANES. GUILFORD R-2612A SR 3389 (WOODY MILL ROAD) AND SR 3418 (NEELLEY ROAD) SOUTH OF GREENSBORO. CONVERT AT-GRADE INTERSECTIONS TO INTERCHANGES. GUILFORD U-3615B SR 1003-SR 1820 (SKEET CLUB ROAD), C NO DELAYED TO 2014 US 311 TO NC 68 (EASTCHESTER DRIVE). WIDEN TO MULTI-LANES. GUILFORD W-5114 SOUTH OF SR 2111 (EAST HARRELL ROAD) TO SR 4831 (BARTONSHIRE DRIVE). WIDEN TO THREE LANE SECTION WITH CENTER TURN LANE. C NO DELAYED TO 2014 HALIFAX B-4133 JACKET SWAMP. REPLACE BRIDGE NO. 11 HALIFAX B-4541 QUANKEY CREEK. C YES COMPLETED REPLACE BRIDGE NO. 24 HALIFAX R-3822B NC 125 TO SOUTH OF US 158. R NO PROJECT DELETED CONSTRUCT A TWO LANE FACILITY PARALLEL TO I-95. T-68

73 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS HARNETT B-3654 MINGO SWAMP. REPLACE BRIDGE NO. 29 AND BRIDGE NO. 53 HARNETT B-4138 CAPE FEAR RIVER. REPLACE BRIDGE NO. 46 HARNETT B-4542 BARBEQUE SWAMP. R YES COMPLETED IN 2010 REPLACE BRIDGE NO. 40 HARNETT B-4543 BLACK RIVER. REPLACE BRIDGE NO. 120 R YES COMPLETED IN 2010 HARNETT C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N NO PROJECT DELETED HARNETT C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N NO PROJECT DELETED HARNETT EL-5100 PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS IN THE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO). HARNETT U-5118 OPERATIONAL IMPROVEMENTS FOR SAFETY AND CONGESTION MITIGATION HAYWOOD B-2988 EAST FORK OF PIGEON RIVER. R YES COMPLETED IN 2009 REPLACE BRIDGE NO. 13 HAYWOOD B-3187 WEST FORK PIGEON RIVER. REPLACE BRIDGE NO. 79 HAYWOOD B-3344 PISGAH CREEK. REPLACE BRIDGE NO. 5, R NO PROJECT DELETED BRIDGE NO. 6, BRIDGE NO. 7, BRIDGE NO. 225 AND BRIDGE NO. 8 HAYWOOD K-3803B CONNECT REST AREA WATER C NO DELAYED TO 2013 (SEGMENT A) AND SEWER (SEGMENT B) TO MUNICIPAL SYSTEM. HAYWOOD K-5002 ADD NEW SOUTHBOUND REST AREA ON NEW LOCATION AS A COMPANION TO EXISTING NORTHBOUND REST AREA. RENOVATE EXISTING NORTHBOUND REST AREA TO INCLUDE ADA COMPLIANT FAMILY RESTROOM, UPGRADE FIXTURES AND FINISHES. HAYWOOD R-4047 US (GREAT SMOKEY MOUNTAINS EXPRESSWAY) TO SR 1523 (OLD CLYDE ROAD) AT LAKE JUNALUSKA. WIDEN TO A MULTI-LANE FACILITY AND REPLACE RAILROAD STRUCTURE R-32. (INCLUDES R-2210 B) C NO DELAYED TO 2014 HAYWOOD R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. HAYWOOD U-4412 SR 1184 (HOWELL MILL ROAD), US 276 TO US 23 BUSINESS. UPGRADE TWO LANES AND CONSTRUCT RAILROAD GRADE SEPARATION. HENDERSON B-3346 NORTH BRANCH HUNGRY RIVER. REPLACE BRIDGE NO. 42 R NO DELAYED TO 2013 T-69

74 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS HENDERSON B-4147 RIGHT PRONG MUD CREEK. REPLACE BRIDGE NO. 75 LEFT PRONG MUD CREEK. U YES IN PROGRESS REPLACE BRIDGE NO. 76 HENDERSON R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. HERTFORD R-2507A US 158 TO THE VIRGINIA STATE LINE. WIDEN TO MULTI-LANES. HYDE B-4551 CANAL. REPLACE BRIDGE NO. 45 R YES COMPLETED HYDE R-5106 MTK-10(1). REHABILITATE EAST CANAL BRIDGE ON ROUTE 20 C YES COMPLETED AND ENTRANCE ROAD BRIDGE ON ROUTE 10. REPAIR LAKE LANDING ROAD, ROUTE 15. REPAIR CENTRAL CANAL BRIDGE. IREDELL B-4553 FOURTH CREEK. REPLACE BRIDGE NO. 312 IREDELL I-3819A STATESVILLE, MODIFICATION OF INTERCHANGE AREA. CG NO DELAYED TO 2012 IREDELL I-5107 I-77, MILEPOST 56 TO MILEPOST C YES COMPLETED IN 2010 AND MILEPOST TO MILEPOST PAVEMENT REHABILITATION. IREDELL K-4908 NEW REST AREA PAIR ON NEW LOCATION TO REPLACE TWO EXISTING PAIRS. ONE IN IREDELL COUNTY (LAKE NORMAN) AND THE OTHER AT THE IREDELL-YADKIN COUNTY LINE. TO IMPROVE SPACING AND REDUCE MAINTENANCE COST. R NO DELAYED TO 2013 JACKSON B-3480 EAST FORK TUCKASEGEE RIVER. REPLACE BRIDGE NO. 39 JACKSON B-3861 TUCKASEGEE RIVER. REPLACE BRIDGE NO. 107 JACKSON B-4159 TUCKESEGEA RIVER. REPLACE DECK ON BRIDGE NO. 108 JACKSON B-4162 SOUTHERN RAILWAY. REPLACE BRIDGE NO. 320 JACKSON B-4347 NANTAHALA NATIONAL FOREST, C NO DELAYED TO 2013 PFH 1107(7), NORTON MILL CREEK. REPLACE BRIDGE NO. 3 JACKSON B-4472 NANTAHALA NATIONAL FOREST, C NO DELAYED TO 2013 PFH 102-1(1), CANEY CREEK. REPLACE BRIDGE NO. 80 JACKSON B-4612 NANTAHALA NATIONAL FOREST, PFH 102-1(1), CANEY CREEK. REPLACE BRIDGE NO. 79 JACKSON R-2409C NC 107 AT CASHIERS TO US 178 AT ROSMAN. SAFETY IMPROVEMENTS AND CLIMBING LANES AT SELECTED LOCATIONS. C NO DELAYED TO 2013 JACKSON R-4753 SR 1002 TO NC 281. UPGRADE R NO DELAYED TO 2014 EXISTING ROADWAY. T-70

75 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS JACKSON R-5000 NC 116 TO NC 107. CONSTRUCT R NO DELAYED TO 2012 CONNECTOR ON NEW LOCATION. JACKSON R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. JOHNSTON B-4556 BLACK CREEK. REPLACE BRIDGE NO. 74 JOHNSTON B-4559 BLACK CREEK. REPLACE BRIDGE NO. 84 R YES COMPLETED U YES IN PROGRESS JOHNSTON B-4560 BLACK CREEK. REPLACE BRIDGE NO. 102 JOHNSTON C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N NO PROJECT DELETED JOHNSTON C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N NO PROJECT DELETED JOHNSTON EL-5100 PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS IN THE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO). JOHNSTON P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. JOHNSTON R-2552E CLAYTON BYPASS, I-40 IN WAKE COUNTY TO US BUSINESS IN JOHNSTON COUNTY. FREEWAY ON NEW LOCATION. JOHNSTON U-5118 OPERATIONAL IMPROVEMENTS FOR SAFETY AND CONGESTION MITIGATION JOHNSTON W-5107 SR 2305 (FIRETOWER ROAD) TO EAST R NO DELAYED TO 2012 OF SR 2310 (DAVIS MILL ROAD-STEVENS CHAPEL ROAD). SAFETY IMPROVMENTS. LEE R-2417AA SANFORD BYPASS, WEST OF SR 1400 TO NC 87 WEST OF SR MULTI-LANE FREEWAY ON NEW LOCATION. LENOIR B-4565 NEUSE RIVER. REPLACE BRIDGE NO. 42 AND BRIDGE NO. 43 R NO DELAYED TO 2013 U NO DELAYED TO 2013 LENOIR B-4567 WEST BEAR CREEK. R YES IN ACQUISITION REPLACE BRIDGE NO. 69 LENOIR B-4568 FALLING CREEK. R YES COMPLETED IN 2010 REPLACE BRIDGE NO. 67 LENOIR B-4570 GUM SWAMP CREEK. R YES COMPLETED IN 2010 REPLACE BRIDGE NO. 79 U YES COMPLETED IN 2010 LENOIR U-2928 GLOBAL TRANSPARK FREIGHT TRANSPORTATION SYSTEM. T-71

76 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS LINCOLN B-4176 CLARK CREEK. REPLACE BRIDGE NO. 118 R YES COMPLETED IN 2010 MACON B-4574 CULLASAJA RIVER. REPLACE BRIDGE NO. 58 MACON R-2408B SR 1729 (DEPOT STREET EXTENSION) TO SR 1378 (BENNETT ROAD). UPGRADE AND MAKE SAFETY IMPROVEMENTS. MACON R-4440A SR 1369 (BYRD ROAD) IN MACON COUNTYTO EXISTING PAVEMENT IN SWAIN COUNTY. UPGRADE TO SECONDARY ROAD STANDARDS. C NO DELAYED TO 2015 MACON R-4440B SR 1369 (BYRD ROAD) IN MACON COUNTYTO EXISTING PAVEMENT IN SWAIN COUNTY. UPGRADE TO SECONDARY ROAD STANDARDS. C NO DELAYED TO 2015 MACON R-4440D SR 1369 (BYRD ROAD) IN MACON COUNTYTO EXISTING PAVEMENT IN SWAIN COUNTY. UPGRADE TO SECONDARY ROAD STANDARDS. C NO DELAYED TO 2014 MACON R-4748 SR 1660 (SILER ROAD) TO SR 1662 (WILEY BROWN ROAD) SOUTH OF US 441. TWO LANE ROADWAY ON NEW LOCATION. MADISON B-3488 BIG PINE CREEK. REPLACE BRIDGE NO. 142 MADISON B-3869 BIG PINE CREEK. REPLACE BRIDGE NO. 146 MADISON B-4183 MIDDLE FORK CREEK. REPLACE BRIDGE NO. 29 WITH CULVERT. CROOKED CREEK. REPLACE BRIDGE NO. 28 MARTIN B-4185 HARDISON MILL CREEK. R NO DELAYED TO 2012 REPLACE BRIDGE NO. 16 MARTIN B-4576 READY BRANCH. REPLACE BRIDGE NO. 6 R YES COMPLETED U YES COMPLETED MCDOWELL B-3673 SECOND BROAD RIVER. R NO DELAYED TO 2013 REPLACE BRIDGE NO. 17 MCDOWELL B-4190 HOPPER CREEK. REPLACE BRIDGE NO. 37 R YES COMPLETED IN 2009 McDOWELL I-4908BB BUNCOMBE COUNTY LINE TO CG YES PAYBACK IN PROGRESS NC 226 (MILEPOST 86). PAVEMENT REHABILIATION. McDOWELL R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. McDOWELL W-5117 BUNCOMBE COUNTY LINE TO US 70. INSTALL A TALLER SINGLE-SLOPE MEDIAN WALL, REFLECTORS ON LANE LINES, AND THREE MEDIAN GATE SYSTEMS. T-72

77 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS McDOWELL W-5118 SR 1794 IN MCDOWELL COUNTY TO THE RUTHERFORD- CLEVELAND COUNTY LINE. INSTALL SHOULDER GUARDRAIL. MECKLENBURG B-4200 GAR CREEK. REPLACE BRIDGE NO. 100 MECKLENBURG B-4201 GREASY CREEK. REPLACE BRIDGE NO. 38 U NO DELAYED TO 2011 MECKLENBURG B-4580 REEDY CREEK. REPLACE BRIDGE NO. 177 MECKLENBURG C-4952A CONSTRUCT PARK AND RIDE LOTS. C NO PROJECT DELETED MECKLENBURG C-4952B CONSTRUCT PARK AND RIDE LOTS. C NO PROJECT DELETED MECKLENBURG C-4954 PURCHASE EXPANSION AND REPLACEMENT BUSES. A NO PROJECT DELETED MECKLENBURG C-4956A INTERSECTION IMPROVEMENTS AT SELECTED LOCATIONS. MECKLENBURG C-4958 BICYCLE IMPROVEMENTS AT OLD CONCORD ROAD. MECKLENBURG EB-4714 IRWIN CREEK BIKEWAY: IRWIN AVENUE ELEMENTARY SCHOOL TO CEDAR YARD (NEAR BANK OF AMERICA STADIUM). MECKLENBURG I-3803B US 29-NC 49 CONNECTOR, MECKLENBURG COUNTY TO NC 73 IN CABARRUS COUNTY. ADD ADDITIONAL LANES. (COORDINATE WITH U-3415) R YES COMPLETED IN 2010 MECKLENBURG P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. MECKLENBURG P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. MECKLENBURG P-5002 CHARLOTTE, MAINLINE GRADE SEPARATION CSX-NS-CATS. C NO DELAYED TO 2014 MECKLENBURG R-2248E CHARLOTTE WESTERN OUTER LOOP, R YES COMPLETED IN 2009 WEST OF I-77 TO I-85 NORTH. FREEWAY ON NEW LOCATION. MECKLENBURG R-2248H CHARLOTTE WESTERN OUTER LOOP, C NO DELAYED TO 2011 WEST OF I-77 TO I-85 NORTH. FREEWAY ON NEW LOCATION. MECKLENBURG R-3329A I-485 (CHARLOTTE OUTER LOOP) TO US 74 (MONROE BYPASS). MULTI- LANE FREEWAY ON NEW LOCATION. (COORDINATE WITH U-3825) R YES COMPLETED IN 2010 MECKLENBURG R-3329B I-485 (CHARLOTTE OUTER LOOP) TO R YES COMPLETED IN 2010 US 74 (MONROE BYPASS). MULTI- LANE FREEWAY ON NEW LOCATION. U YES COMPLETED IN 2010 (COORDINATE WITH U-3825) T-73

78 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS MECKLENBURG U-2507A SR 2467 (MALLARD CREEK ROAD), SR 2480 (SUGAR CREEK ROAD) TO SR 2472 (MALLARD CREEK CHURCH ROAD). WIDEN TO MULTI-LANES, PART ON NEW LOCATION. MECKLENBURG U-4401 SR 2804 (REEDY CREEK ROAD) AND SR 2805 (HARRISBURG ROAD). REALIGN INTERSECTION. MECKLENBURG U-9999C MECKLENBURG-UNION METROPOLITAN PLANNING PE YES IN PROGRESS ORGANIZATION (MUMPO) PLANNING (PL) SUPPLEMENT. MECKLENBURG W-5116 SR 2459 (EASTFIELD ROAD) AND SR 2442 (ASBURY CHAPEL ROAD). HORIZONTAL REALIGNMENT OF SR 2480 (BROWNE ROAD) TO ALIGN WITH SR INSTALL SIGNAL AND LEFT TURN LANES. MITCHELL R-2519A SR 1336 (JACK'S CREEK ROAD) TO MULTI-LANE SECTION WEST OF SPRUCE PINE. WIDEN TO MULTI- LANES. (INCLUDES B-3268) MITCHELL R-2519B SR 1336 (JACK'S CREEK ROAD) TO MULTI-LANE SECTION WEST OF SPRUCE PINE. WIDEN TO MULTI- LANES. (INCLUDES B-3268) R NO DELAYED TO 2012 MITCHELL R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. MONTGOMERY B-4204 ROCK CREEK. REPLACE BRIDGE NO. 28 C YES COMPLETED MONTGOMERY B-4206 DENSONS CREEK. REPLACE BRIDGE NO. 128 MONTGOMERY B-4582 DENSONS CREEK. REPLACE BRIDGE NO. 121 MONTGOMERY C-4936B PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS MONTGOMERY C-4936D PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS MONTGOMERY I-4406 SOUTH OF STEEDS TO NORTH OF R NO DELAYED TO POST YEARS EMERY. UPGRADE TO INTERSTATE STANDARDS. MOORE B-3680 CSX TRANSPORTATION. REPLACE BRIDGE NO. 2 MOORE B-4583 ABERDEEN CREEK. C YES COMPLETED REPLACE BRIDGE NO. 176 MOORE B-4584 LITTLE RIVER. REPLACE BRIDGE NO. 11 C YES COMPLETED MOORE R-2812 NC 73 IN WEST END TO THE TRAFFIC CIRCLE IN PINEHURST. WIDEN TO MULTI-LANES. T-74

79 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS NASH B-4211 TAR RIVER. REPLACE BRIDGE NO. 56 R YES COMPLETED U YES COMPLETED NASH B-4585 TOISNOT SWAMP. REPLACE BRIDGE C YES COMPLETED NO. 65 AND BRIDGE NO. 66 NASH B-4588 STONEY CREEK. REPLACE BRIDGE NO. 1 U NO DELAYED TO 2012 NASH B-4589 TOISNOT SWAMP. C YES COMPLETED REPLACE BRIDGE NO. 69 NASH C-4969C CONSTRUCT SIDEWALKS AT VARIOUS LOCATIONS IN ROCKY MOUNT. NASH C-4970D INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS IN ROCKY MOUNT. NASH C-4970E INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS IN ROCKY MOUNT. NASH P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. NASH U-3621B SR 1604 (HUNTER HILL ROAD), SR 1613 (NORTH WINSTEAD AVENUE) TO NC (BENVENUE ROAD). WIDEN TO MULTI- LANES. NASH U-4019 SR 1613 (NORTH WINSTEAD AVENUE), SR 1770 (SUNSET AVENUE) TO SR 1604 (HUNTER HILL ROAD). WIDEN TO MULTI- LANES. (COORDINATE WITH R-2823) NASH W-5108 NORTH OF SR 1845 TO BURROWS STREET. SAFETY IMPROVEMENTS. NEW HANOVER U-3338 SR 1175 (KERR AVENUE), RANDALL PARKWAY TO SR 2649 (MARTIN LUTHER KING, JR. PARKWAY). WIDEN TO MULTI-LANES. U NO DELAYED TO 2012 NEW HANOVER U-3338B SR 1175 (KERR AVENUE), RANDALL PARKWAY TO SR 2649 (MARTIN LUTHER KING, JR. PARKWAY). WIDEN TO MULTI-LANES. R NO DELAYED TO 2012 NEW HANOVER U-4718 US 76 (OLEANDER DRIVE) AND NC 132 (COLLEGE ROAD). R YES COMPLETED INTERSECTION IMPROVEMENTS. U YES IN PROGRESS NEW HANOVER U-4902C COLONIAL DRIVE TO SR 1402 (PORTERS NECK ROAD). ACCESS C NO DELAYED TO 2019 MANAGEMENT IMPROVEMENTS. NEW HANOVER U-4902D COLONIAL DRIVE TO SR 1402 (PORTERS NECK ROAD). ACCESS C NO DELAYED TO 2019 MANAGEMENT IMPROVEMENTS. NEW HANOVER W-5104 NC 132 (COLLEGE ROAD), US 117 (SHIPYARD BOULEVARD) TO US 421 (CAROLINA BEACH ROAD). VARIOUS SAFETY IMPROVEMENTS. T-75

80 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS NORTHAMPTON W-5016 I-95 SOUTHBOUND RAMPS TO WEST OF SR WIDEN TO THREE LANES. ONSLOW R-5023B SOUTHWEST MIDDLE SCHOOL TO SR 1135 (MORNINGSIDE ROAD). WIDEN TO THREE LANES AND ADD TWO FOOT PAVED SHOULDERS. ONSLOW R-5023C SOUTHWEST MIDDLE SCHOOL TO SR 1135 (MORNINGSIDE ROAD). WIDEN TO THREE LANES AND ADD TWO FOOT PAVED SHOULDERS. ONSLOW U-3810 SR 1406 (PINEY GREEN ROAD), NC 24 TO US 17. WIDEN TO MULTI-LANES, PART ON NEW LOCATION. ONSLOW U-4904 SR 1308 (GUM BRANCH ROAD) TO SR 1327 (KELLUM LOOP ROAD). UPGRADE ROADWAY. ONSLOW U-4905 US 258-NC 24 TO SR 1221 (MARROW PRONG ROAD). UPGRADE ROADWAY. ONSLOW U-4906 EAST CITY LIMITS OF RICHLANDS TO R NO DELAYED TO 2014 SR WIDEN TO THREE LANES. ONSLOW U-4907 NORTH OF OFFICE PARK DRIVE TO SR 1406 (PINEY GREEN ROAD). WIDEN TO THREE LANES. ONSLOW W-5105 SR 1503 TO NC 24. INSTALL PAVED SHOULDERS AND RUMBLE STRIPS. ORANGE B-4216 STROUDS CREEK. C YES COMPLETED REPLACE BRIDGE NO. 66 ORANGE C-4932A CONSTRUCT A 125 SPACE PARK AND RIDE LOT. SECTION A: DURHAM-CHAPEL HILL-CARRBORO (DCHC) MPO TO PARTICIPATE IN CONSTRUCTION AND OPERATING ASSISTANCE FOR THREE YEARS FOR A NEW TRANSIT SERVICE. O YES UNDER CONSTRUCTION ORANGE C-4932B CONSTRUCT A 125 SPACE PARK AND RIDE LOT. SECTION B: TRIANGLE AREA (TARPO) RPO TO PARTICIPATE IN CONSTRUCTION AND OPERATING ASSISTANCE FOR THREE YEARS FOR A NEW TRANSIT SERVICE. O YES IN PROGRESS ORANGE C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N NO PROJECT DELETED ORANGE C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N NO PROJECT DELETED ORANGE C-5104 PURCHASE TWO (2) HYBRID ELECTRIC BUSES AND PROVIDE O YES IN PROGRESS PORTION OF OPERATING EXPENSE FOR THREE YEARS. T-76

81 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS ORANGE EB-4707 SR 2220 (OLD CHAPEL HILL ROAD)- SR 1838 (OLD DURHAM ROAD), SR 1116 (GARRETT ROAD) IN DURHAM COUNTY TO US IN ORANGE COUNTY. BICYCLE IMPROVEMENTS. ORANGE U-2803 SR 1919 (SMITH LEVEL ROAD), ROCK HAVEN ROAD TO BRIDGE NO. 88. WIDEN TO MULTI-LANES. ORANGE U-3306 SR 1733 (WEAVER DAIRY ROAD), NC 86 TO SR 1734 (ERWIN ROAD). CORRIDOR UPGRADE, PART ON NEW LOCATION. ORANGE U-3808 ELIZABETH BRADY ROAD EXTENSION, SOUTH OF US 70 BUSINESS TO NORTH OF US 70 BYPASS AT SR 1002 (ST. MARY'S ROAD). MULTI-LANES WITH A NEW CROSSING OF ENO RIVER. R NO PROJECT DELETED ORANGE U-4726 DCHC URBAN AREA BICYCLE AND PEDESTRIAN ALLOCATION. ORANGE U-4727 DURHAM-CHAPEL HILL-CARRBORO URBAN AREA PLANNING (DCHC) ALLOCATION AND UNIFIED PROGRAM. ORANGE U-5119 BUS RAPID TRANSIT OPERATIONAL IMPROVEMENTS PERSON B-4600 SOUTH FLAT RIVER. C YES COMPLETED REPLACE BRIDGE NO. 43 PITT B-4232 SWIFT CREEK. REPLACE BRIDGE NO. 9 C NO DELAYED TO 2011 PITT B-4238 HARDEE CREEK. REPLACE BRIDGE NO. 219 PITT B-4531 LITTLE CONTENTNEA CREEK. R NO DELAYED TO 2011 REPLACE BRIDGE NO. 36, LITTLE CONTENTNEA CREEK OVERFLOW. U NO DELAYED TO 2011 REPLACE BRIDGE NO. 35 PITT B-4604 INDIAN WELLS SWAMP. R YES COMPLETED IN 2010 REPLACE BRIDGE NO. 13 U YES COMPLETED IN 2010 PITT W-5102 SR 1700 (OLD TAR ROAD) TO NC 43. VARIOUS SAFETY IMPROVEMENTS. POLK I-5100 I-26, MILEPOST 61 TO MILEPOST 71. PAVEMENT REHABILITATION. RANDOLPH B-4610 LAKE LUCAS. REPLACE BRIDGE NO. 73 R YES UNDER CONSTRUCTION RANDOLPH C-4936B PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS RANDOLPH C-4936D PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS T-77

82 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS RANDOLPH I-4407 SOUTH OF NC 134-US 220 BUSINESS TO NORTH OF SR 1462 IN ASHEBORO. SAFETY IMPROVEMENTS TO BRING FACILITY TO INTERSTATE STANDARDS. RANDOLPH R-2536B ASHEBORO SOUTHERN BYPASS, US 64 WEST TO US 64 EAST. FOUR LANE FREEWAY ON NEW LOCATION WITH INTERCHANGES AT US 220, NC 49 AND ZOO ACCESS AT NC 159. R NO DELAYED TO 2013 RANDOLPH U-3600C US 220 BUSINESS (NORTH FAYETTEVILLE STREET), SR 2261 (OLD LIBERTY ROAD) TO US 220 AT US 311. WIDEN TO MULTI- LANES. R NO PROJECT DELETED RICHMOND B-4614 NAKED CREEK. REPLACE BRIDGE NO. 41 R YES COMPLETED RICHMOND R-3421B ROCKINGHAM BYPASS. FOUR LANES DIVIDED ON NEW LOCATION. U YES IN PROGRESS RICHMOND R-5107 PED-10(1). REHABILITATE REFUGE ROAD AND PARKING AREA. C YES COMPLETED IN 2010 ROBESON B-3693 RAFT SWAMP. REPLACE BRIDGE NO HOLLY SWAMP REPLACE BRIDGE NO SADDLETREE SWAMP. REPLACE BRIDGE NO. 210 ROBESON B-4616 CSX RAILROAD. REPLACE BRIDGE NO. 18 R NO DELAYED TO 2015 ROBESON B-4618 WOODLAND FARM POND. REPLACE BRIDGE NO. 161 AND BRIDGE NO. 445 ROBESON B-4619 HOG SWAMP. REPLACE BRIDGE R NO DELAYED TO 2015 NO. 116 AND BRIDGE NO. 117 ROBESON I-4927 CONSTRUCT NEW WEIGH STATION. R YES COMPLETED IN 2010 ROCKINGHAM B-4622 ROCK HOUSE CREEK. C YES COMPLETED REPLACE BRIDGE NO. 54 ROCKINGHAM B-4625 MASSY CREEK. REPLACE BRIDGE NO. 118 C YES COMPLETED ROCKINGHAM C-4936B PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS ROCKINGHAM C-4936D PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS ROCKINGHAM R-2413A SR 2133 (PLEASANT RIDGE ROAD) TO US 220-NC 68. MULTI-LANE CONNECTOR, ON NEW LOCATION, NC 68 TO US 220 AND MULTI-LANE US 220 TO NC 68. R NO DELAYED TO 2012 ROCKINGHAM R-2413B SR 2133 (PLEASANT RIDGE ROAD) TO US 220-NC 68. MULTI-LANE CONNECTOR, ON NEW LOCATION, NC 68 TO US 220 AND MULTI-LANE US 220 TO NC 68. R NO DELAYED TO 2012 T-78

83 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS ROCKINGHAM R-2413C SR 2133 (PLEASANT RIDGE ROAD) TO US 220-NC 68. MULTI-LANE CONNECTOR, ON NEW LOCATION, NC 68 TO US 220 AND MULTI-LANE US 220 TO NC 68. ROWAN B-2085 NORTH ELLIS STREET OVER SOUTHERN C NO DELAYED TO POST YEARS RAILWAY. REPLACE BRIDGE NO. 393 ROWAN B-4257 CHURCH CREEK. REPLACE BRIDGE NO. 143 ROWAN B-4627 THIRD CREEK. REPLACE BRIDGE NO. 26 C YES COMPLETED ROWAN B-4629 SECOND CREEK. REPLACE BRIDGE NO. 25 ROWAN C-4908A CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. C YES COMPLETED ROWAN C-4908B CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. ROWAN C-4908C CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. ROWAN C-4908D CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. C YES COMPLETED ROWAN C-4908E CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. C NO DELAYED TO 2014 ROWAN C-4908F CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. ROWAN C-4908G CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. C NO DELAYED TO 2013 ROWAN C-4908H CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. C NO DELAYED TO 2015 ROWAN C-4909 STATESVILLE BOULEVARD, JAKE ALEXANDER BOULEVARD WEST TO WEST INNES STREET.CONSTRUCT SIDEWALK. ROWAN C-4911 EXPANSION OF AIR QUALITY OUTREACH PROGRAM TO REDUCE N YES IN PROGRESS OZONE AIR POLLUTION. ROWAN C-4916A CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. ROWAN C-4916B CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. ROWAN C-4916C CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. ROWAN EB-4713 KELSEY-SCOTT PARK, CATAWBA C NO PROJECT DELETED COLLEGE GREENWAY CONNECTOR. C NO DELAYED TO 2011 ROWAN I-4718 CABARRUS COUNTY LINE TO CG YES PAYBACK IN PROGRESS NC 152. REPAIR PAVEMENT AND OVERLAY. ROWAN P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. ROWAN P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. T-79

84 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS RUTHERFORD B-4261 FORK OF CATHY'S CREEK. REPLACE BRIDGE NO. 39 CATHY'S CREEK. REPLACE BRIDGE NO. 37 RUTHERFORD B-4632 CLINCHFIELD RAILROAD. REPLACE BRIDGE NO. 69 RUTHERFORD B-4633 CREEK. REPLACE BRIDGE NO. 32 R YES COMPLETED IN 2009 RUTHERFORD R-2233AB SOUTH CAROLINA STATE LINE TO NORTH OF SR 1366 (ROPER LOOP ROAD). WIDEN TO MULTI-LANES WITH BYPASS OF RUTHERFORDTON ON NEW LOCATION. RUTHERFORD W-5118 SR 1794 IN MCDOWELL COUNTY TO THE RUTHERFORD- CLEVELAND COUNTY LINE. INSTALL SHOULDER GUARDRAIL. SAMPSON B-3654 MINGO SWAMP. REPLACE BRIDGE NO. 29 AND BRIDGE NO. 53 SAMPSON R-2303B WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R NO DELAYED TO 2011 SAMPSON R-2303C WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R NO DELAYED TO 2011 SAMPSON R-2303D WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R NO DELAYED TO 2011 SCOTLAND B-4641 BIG SHOE HEEL CREEK. REPLACE BRIDGE NO. 75 SCOTLAND B-4642 JUNIPER CREEK. C YES COMPLETED REPLACE BRIDGE NO. 28 SCOTLAND B-5003 COMMONWEALTH AVENUE. REPLACE BRIDGE NO. 81 OVER C NO DELAYED TO 2013 LEITH CREEK STANLY R-2533CC HARRISBURG TO YADKIN RIVER. WIDEN TO MULTI-LANES. STATEWIDE B-4700 BRIDGE PRESERVATION ISSUES AT SELECTED SITES. STATEWIDE B-9999 BRIDGE INSPECTION PROGRAM. I YES IN PROGRESS STATEWIDE C-4901 RAIL DIVISION, CONSTRUCT A SECOND MAIN LINE BETWEEN THOMASVILLE AND LEXINGTON IN DAVIDSON COUNTY. STATEWIDE C-4903 NORTH CAROLINA AIR AWARENESS OUTREACH PROGRAM TO PROVIDE EDUCATION AND PRODUCE DAILY AIR QUALITY FORECAST. N YES IN PROGRESS STATEWIDE E-4018 NATIONAL RECREATIONAL TRAILS. T-80

85 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS STATEWIDE EB-2956 STATEWIDE BICYCLE PROGRAM. STATEWIDE EB-2966 SAFETY-EDUCATION PROJECTS. B YES IN PROGRESS STATEWIDE EB-3119 LOCAL BICYCLE MAPS: UPDATE, MP YES IN PROGRESS REVISE AND REPRINT. STATEWIDE EB-3120 NORTH CAROLINA BICYCLING HIGHWAYS MAPS: UPDATE AND MP YES IN PROGRESS REPRINT. STATEWIDE EB-3314 STATEWIDE PEDESTRIAN FACILITIES PROGRAM. STATEWIDE EB-4013 SPOT IMPROVEMENTS: SHORT PAVEMENT SECTIONS, BICYCLE RACKS AND SIGNING NEEDS. STATEWIDE EB-4409 MAP AND SIGN: URBAN, COUNTY AND REGIONAL BIKE ROUTES. IN CALDWELL, CARTERET (MOREHEAD CITY), CATAWBA, DUPLIN, COLUMBUS (WHITEVILLE), DUPLIN,GOLDSBORO MPO, HALIFAX, IREDELL, MADISON, MONTGOMERY, PAMLICO, POLK, ROCKINGHAM, SCOTLAND, TYRELL AND STATEWIDE EB-4410 AREA-WIDE BICYCLE IMPROVEMENTS FEASIBILITY STUDIES. F YES IN PROGRESS STATEWIDE EB-4411 ROADWAY IMPROVEMENTS FOR BICYCLE SAFETY ON STATE AND LOCAL DESIGNATED BIKE ROUTES. STATEWIDE ER-2971 SIDEWALK PROGRAM IN ALL FOURTEEN HIGHWAY DIVISIONS. STATEWIDE ER-2973 ROADSIDE BEAUTIFICATION PROJECTS L YES IN PROGRESS IN ALL FOURTEEN HIGHWAY DIVISIONS. STATEWIDE ER-3100 PLANTING OF WILDFLOWERS AND PERENNIAL BULBS ON L YES IN PROGRESS FEDERAL-AID SYSTEM. STATEWIDE ER-3101 SPECIAL EVENTS PLANTING STATEWIDE. L YES IN PROGRESS STATEWIDE ER-3102 IMPLEMENTATION OF STATEWIDE N YES IN PROGRESS SCENIC BYWAYS PROGRAM. STATEWIDE ER-3611 COLOR CANOPY AND TREE PLANTING STATEWIDE. L YES IN PROGRESS STATEWIDE K-4704 INTERSTATE REST AREA SYSTEM PRESERVATION. PAVEMENT, PAVEMENT MARKING, CURB AND GUTTER, SIDE- WALKS AND OTHER REHABILITATION ITEMS. STATEWIDE L-1000 REPLACEMENT PLANTS AT SELECTED LOCATIONS WITHIN THE L YES IN PROGRESS 14 HIGHWAY DIVISIONS. LANDSCAPE. STATEWIDE L-2133 PLANTING OF PERENNIAL BULBS AND WILDFLOWERS WITHIN L YES IN PROGRESS THE 14 HIGHWAY DIVISIONS. LANDSCAPE. STATEWIDE L-2500 COLOR AND CANOPY AND TREE PLANTING. L YES IN PROGRESS STATEWIDE M-0360 DESIGN SERVICES, PRELIMINARY PE YES IN PROGRESS ENGINEERING FOR MISCELLANEOUS PROJECTS. T-81

86 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS STATEWIDE M-0376 STATEWIDE GEOTECHNICAL STUDIES PE YES IN PROGRESS AND INVESTIGATIONS PROJECT TO COVER NON-PROJECT SPECIFIC. STATEWIDE M-0391 STRUCTURE DESIGN, PRELIMINARY ENGINEERING FOR PE YES IN PROGRESS MISCELLANEOUS PROJECTS STATEWIDE M-0392 HYDRAULICS, PRELIMINARY ENGINEERING FOR PE YES IN PROGRESS MISCELLANEOUS PROJECTS. STATEWIDE M-0405 STATEWIDE MOWING MAINTENANCE CONTRACTS FOR N YES IN PROGRESS PROPERTIES ACQUIRED BY NCDOT IN ADVANCE OF STIP PROJECTS. STATEWIDE M-0412 CORRIDORS OF THE FUTURE PROGRAM. INTERSTATE MAINTENANCE DISCRETIONARY FUNDS (IMD) FOR IMPROVEMENTS TO I-95 FROM FLORIDA TO VIRGINIA. NORTH CAROLINA TO PROVIDE FUNDS TO ADJOINING STATES UNDER TERMS OF AN AGREEMENT. PE YES IN PROGRESS STATEWIDE P-3309 AT-GRADE CROSSING ELIMINATION AND IMPROVEMENT PROJECTS, CORRIDOR INVENTORIES AND STUDIES IN ALL FOURTEEN (14) DIVISIONS. STATEWIDE P-3418 PLANNING, MANAGEMENT AND RESEARCH STUDIES. F YES IN PROGRESS STATEWIDE P-3809 RAILROAD SAFETY INSPECTIONS IN ALL FOURTEEN (14) I YES IN PROGRESS DIVISIONS. STATEWIDE P-3819 FEDERALLY-DESIGNATED HIGH SPEED RAIL CORRIDOR BETWEEN CHARLOTTE AND VIRGINIA STATE LINE, ENVIRON- MENTAL STUDY, PRELIMINARY ENGIN- EERING, RIGHT OF WAY, DESIGN AND CONSTRUCTION. PE YES IN PROGRESS STATEWIDE P-4001 RAIL INDUSTRIAL ACCESS PROGRAM. STATEWIDE P-4700 RAILROAD STATION REHABILITATION PROJECTS. STATEWIDE P-4701 CAPACITY AND TRAVEL TIME IMPROVEMENTS TO FREIGHT AND PASSENGER RAIL CORRIDORS, NEW EQUIPMENT AND MATCH FOR FEDERAL FUNDS. STATEWIDE P-4702 MAINTENANCE OF RAILROAD TRACK AND SIGNAL IMPROVEMENTS. STATEWIDE P-5003 SOUTHEASTERN NORTH CAROLINA PASSENGER RAIL SERVICE, RALEIGH TO WILMINGTON VIA FAYETTEVILLE. STATEWIDE P-5004 SOUTHEASTERN NORTH CAROLINA PASSENGER RAIL SERVICE, RALEIGH TO WILMINGTON VIA GOLDSBORO. STATEWIDE P-5005 HIGH PRIORITY NORTH-SOUTH RAIL CORRIDOR OF THE FUTURE. STATEWIDE R-2929 NATIONAL PARKS SERVICE SPOT SAFETY AND SIGN REHABILITATION. T-82

87 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS STATEWIDE R-2930 NATIONAL PARKS SERVICE EMERGENCY PAVEMENT REHABILITATION. STATEWIDE R-4049 TRAFFIC OPERATIONS (INCIDENT MANAGEMENT, 511, SMARTLINK, TEC, TMC) STATEWIDE R-4067 POSITIVE GUIDANCE PROGRAM (PAVEMENT MARKINGS AND MARKERS, LED SIGNAL HEAD REPLACEMENT) STATEWIDE R-4073 ASPHALT MATERIALS TESTING LABORATORIES CORRECTIVE ACTION PLAN FOR GROUNDWATER CLEAN-UP AT 54 SITES. STATEWIDE R-4436 NPDES PERMIT, RETROFIT FOURTEEN N YES IN PROGRESS SITES PER YEAR TO PROTECT WATER QUALITY. STATEWIDE R-4500 ECONOMIC DEVELOPMENT. STATEWIDE R-4701 TRAFFIC SYSTEM OPERATIONS PROGRAM (SIGNAL MAINTENANCE). STATEWIDE R-4950A STATEWIDE ENVIRONMENTAL A YES IN PROGRESS MITIGATION AND MINIMIZATION (STATE CONSTRUCTION). STATEWIDE R-4951A STATEWIDE ENVIRONMENTAL MITIGATION AND MINIMIZATION A YES IN PROGRESS (INTRASTATE). STATEWIDE R-4952A STATEWIDE ENVIRONMENTAL A YES IN PROGRESS MITIGATION AND MINIMIZATION (URBAN LOOP). STATEWIDE R-4953A STATEWIDE ENVIRONMENTAL A YES IN PROGRESS MITIGATION AND MINIMIZATION (NATIONAL HIGHWAY SYSTEM). STATEWIDE R-4954A STATEWIDE ENVIRONMENTAL MITIGATION AND MINIMIZATION (SURFACE TRANSPORTATION PROGRAM). A YES IN PROGRESS STATEWIDE R-4955A STATEWIDE ENVIRONMENTAL A YES IN PROGRESS MITIGATION AND MINIMIZATION (INTERSTATE MAINTENANCE). STATEWIDE R-4956A STATEWIDE ENVIRONMENTAL A YES IN PROGRESS MITIGATION AND MINIMIZATION (BRIDGE PROGRAM). STATEWIDE R-4957A STATEWIDE ENVIRONMENTAL A YES IN PROGRESS MITIGATION AND MINIMIZATION (HIGH PRIORITY). STATEWIDE R-4958A STATEWIDE ENVIRONMENTAL A YES IN PROGRESS MITIGATION AND MINIMIZATION (APPALACHIAN DEVELOPMENT). STATEWIDE R-8888 STATEWIDE PLANNING FOR TRAFFIC F YES IN PROGRESS FORCASTING, PRE-TIP PLANNING AND PURPOSE AND NEED STUDIES. T-83

88 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS STATEWIDE SR-5000 SAFE ROUTES TO SCHOOL PROGRAM. EDUCATIONAL,TRAINING N YES IN PROGRESS AND OTHER NON-INFRASTRUCTURE NEEDS. STATEWIDE SR-5001 SAFE ROUTES TO SCHOOL PROGRAM. PROJECTS TO IMPROVE SAFETY, REDUCE TRAFFIC, FUEL COMSUMPTION AND AIR POLLUTION IN VICINITY OF SCHOOLS. STATEWIDE U-4500 ECONOMIC DEVELOPMENT. STATEWIDE W-4447 SAFETY MANAGEMENT PROGRAM, PROJECT IDENTIFICATION, PE YES IN PROGRESS ANALYSIS AND PRELIMINARY ENGINEERING. STATEWIDE W-4714 RUMBLE STRIPS, SHOULDERS, ROADSIDE SAFETY IMPROVEMENTS, AUXILIARY TURN LANES, RAISED PAVEMENT MARKERS AND PROFILE PAVEMENT MARKINGS. STATEWIDE Y-4415 HIGHWAY-RAIL CROSSING INVENTORY. STATEWIDE Y-4800 TRAFFIC SEPARATION STUDY IMPLEMENTATION AND CLOSURES. STATEWIDE Y-9999 HIGHWAY-RAIL CROSSING SAFETY IMPROVEMENTS, PASSENGER ROUTES. STATEWIDE Z-4500 HIGHWAY-RAIL CROSSING SAFETY IMPROVEMENTS. STOKES U-4741 VARIOUS GREENWAY AND SIDEWALK PROJECTS WITHIN MPO AREA. STOKES U-4742 INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS WITHIN METROPOLITAN PLANNING ORGANIZATION (MPO) AREA. SURRY I-5101 I-77, I-74 (EXIT 101) TO VIRGINIA STATE LINE (MILEPOST 106). C NO PROJECT DELETED PAVEMENT REHABILITATION. SURRY I-5102 I-77, MILEPOST 91 TO MILEPOST 95. PAVEMENT C NO PROJECT DELETED REHABILITATION. SWAIN B-4286 NANTAHALA RIVER. REPLACE BRIDGE NO. 3 SWAIN B-4287 NANTAHALA RIVER. REPLACE BRIDGE NO. 99 AND BRIDGE NO. 100 SWAIN R-4440A SR 1369 (BYRD ROAD) IN MACON COUNTYTO EXISTING PAVEMENT IN SWAIN COUNTY. UPGRADE TO SECONDARY ROAD STANDARDS. C NO DELAYED TO 2015 SWAIN R-4440B SR 1369 (BYRD ROAD) IN MACON COUNTYTO EXISTING PAVEMENT IN SWAIN COUNTY. UPGRADE TO SECONDARY ROAD STANDARDS. C NO DELAYED TO 2015 SWAIN R-4440D SR 1369 (BYRD ROAD) IN MACON COUNTYTO EXISTING PAVEMENT IN SWAIN COUNTY. UPGRADE TO SECONDARY ROAD STANDARDS. C NO DELAYED TO 2014 T-84

89 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS SWAIN R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. TRANSYLVANIA B-4288 EAST FORK FRENCH BROAD RIVER. REPLACE BRIDGE NO. 85 TRANSYLVANIA B-4289 NORTH FORK FRENCH BROAD RIVER. REPLACE BRIDGE NO. 93 U YES IN PROGRESS TRANSYLVANIA B-4291 DAVIDSON RIVER. REPLACE BRIDGE NO. 193 TRANSYLVANIA B-4690 PISGAH NATIONAL FOREST, PFH-150(1), TUCKER CREEK. REPLACE BRIDGE NO. 55 TRANSYLVANIA R-2409C NC 107 AT CASHIERS TO US 178 AT ROSMAN. SAFETY IMPROVEMENTS AND CLIMBING LANES AT SELECTED LOCATIONS. C NO DELAYED TO 2013 TRANSYLVANIA R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. TYRRELL B-4647 NORTHWEST FORK. R YES COMPLETED REPLACE BRIDGE NO. 6 U YES IN PROGRESS UNION B-4293 CREEK. REPLACE BRIDGE NO. 219 UNION B-4294 WAXHAW CREEK. REPLACE BRIDGE NO. 184 UNION B-4650 WEST FORK TWELVE MILE CREEK. REPLACE BRIDGE NO. 221 R YES COMPLETED IN 2010 UNION C-4960 INTERSECTION IMPROVEMENTS AT INDIAN TRAIL AND OLD MONROE ROAD. UNION R-3329A I-485 (CHARLOTTE OUTER LOOP) TO US 74 (MONROE BYPASS). MULTI- LANE FREEWAY ON NEW LOCATION. (COORDINATE WITH U-3825) R YES COMPLETED IN 2010 UNION R-3329B I-485 (CHARLOTTE OUTER LOOP) TO R YES COMPLETED IN 2010 US 74 (MONROE BYPASS). MULTI- LANE FREEWAY ON NEW LOCATION. U YES COMPLETED IN 2010 (COORDINATE WITH U-3825) UNION U-3825 SR 1365 (STALLINGS ROAD), SR 1009 (OLD CHARLOTTE HIGHWAY) TO US 74. WIDEN TO MULTI-LANES. (COORDINATE WITH R-3329) C NO PROJECT DELETED UNION U-9999C MECKLENBURG-UNION METROPOLITAN PLANNING PE YES IN PROGRESS ORGANIZATION (MUMPO) PLANNING (PL) SUPPLEMENT. VANCE U-4916 SR 1165 (BECKFORD DRIVE). WIDEN TO MULTILANES VANCE W-5126 US 158 NORTHWARD TO I-85. C YES COMPLETED INSTALL MEDIAN BARRIER. WAKE B-3919 AUSTIN CREEK. REPLACE BRIDGE NO. 448, SMITHS CREEK. REPLACE BRIDGE NO. 140 T-85

90 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS WAKE B-4656 SR REPLACE BRIDGE NO. 492 C NO DELAYED TO 2013 WAKE B-4658 BUCKHORN CREEK. C NO PROJECT DELETED REPLACE BRIDGE NO. 345 WAKE B-4660 NEUSE RIVER. REPLACE BRIDGE NO. 19 WAKE B-4661 POWELL CREEK. REPLACE BRIDGE NO. 151 WAKE B-4697 WHITE OAK CREEK. REPLACE BRIDGE NO. 55 WAKE C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N NO PROJECT DELETED WAKE C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N NO PROJECT DELETED WAKE EL-5100 PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS IN THE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO). WAKE I-4744 SR 1728 (WADE AVENUE, MILEPOST 289) TO I-440/US 1-64 (MILEPOST 293). ADD LANES. CG YES PAYBACK IN PROGRESS WAKE P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. WAKE P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. WAKE R-2000AF NORTHERN WAKE FREEWAY, NC 55 WEST OF MORRISVILLE TO US 64 EAST NEAR KNIGHTDALE. FREEWAY ON NEW LOCATION. C YES COMPLETED WAKE R-2552E CLAYTON BYPASS, I-40 IN WAKE COUNTY TO US BUSINESS IN JOHNSTON COUNTY. FREEWAY ON NEW LOCATION. WAKE R-2814A NORTH OF SR 2044 (LIGON MILL ROAD) TO NC 39 IN LOUISBURG. WIDEN TO MULTI-LANES, SOME NEW LOCATION.. WAKE U-5117 WALKER STREET GRADE SEPARATION WAKE U-5118 OPERATIONAL IMPROVEMENTS FOR SAFETY AND CONGESTION MITIGATION WAKE U-9999B CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (NEW TIP (CAMPO) PLANNING (PL) SUPPLEMENT. NUMBER U-4850) WAKE W-5127 SOUTH OF SR 1644 (GLOBE ROAD). C YES COMPLETED INSTALL MEDIAN BARRIER. T-86

91 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS WAKE W-5128 I-440 TO SR 2547 (JONES SAUSAGE C YES COMPLETED ROAD). INSTALL MEDIAN BARRIER. WATAUGA B-3924 MEAT CAMP CREEK. R YES COMPLETED IN 2010 REPLACE BRIDGE NO. 33 WATAUGA B-4315 BAIRD CREEK. REPLACE BRIDGE NO. 62, BRIDGE NO. 68 AND R YES COMPLETED IN 2009 BRIDGE NO. 70 WATAUGA R-2237C NORTH OF NC 268 TO MULTI-LANES NORTH OF BLOWING ROCK. WIDEN TO MULTI-LANES. WATAUGA R-2710 AVERY COUNTY LINE TO SR 1112 IN VALLE CRUCIS. SAFETY IMPROVEMENTS AND RESURFACE. WATAUGA R-5108 PRA-BLRI 2H13, J16. RESURFACE SECTIONS 2H AND 2J FROM MILEPOST TO MILEPOST 317.5, INCLUDING OVERLOOKS, PARKING AREAS, SPURS, AND ACCESS ROADS. WATAUGA R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. WAYNE B-4672 NAHUNTA SWAMP. REPLACE BRIDGE NO. 37 WAYNE B-4673 WALNUT CREEK. REPLACE BRIDGE NO. 120 U NO DELAYED TO 2012 WAYNE W-5124 US 117 ALTERNATE, EAST OF US 117 BUSINESS TO US 70. US 70, US 117 ALTERNATE TO SR 1711 (OAK FOREST ROAD). INSTALL MEDIAN BARRIER. C YES COMPLETED WILKES B-4677 CREEK. REPLACE BRIDGE NO. 99 C YES COMPLETED IN 2010 WILKES R-3405 SR 1002 (MOUNTAIN VIEW ROAD) C NO DELAYED TO 2013 TO SR WIDEN TO THREE LANES. WILKES R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. WILSON B-4328 GREAT SWAMP. REPLACE BRIDGE NO. 3 WILSON B-4680 WHITEOAK SWAMP. C YES COMPLETED REPLACE BRIDGE NO. 122 WILSON B-4992 SWAMP. REPLACE BRIDGE NO. 1 WILSON P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. YANCEY R-2519A SR 1336 (JACK'S CREEK ROAD) TO MULTI-LANE SECTION WEST OF SPRUCE PINE. WIDEN TO MULTI- LANES. (INCLUDES B-3268) T-87

92 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2010 STARTED REMARKS YANCEY R-2519B SR 1336 (JACK'S CREEK ROAD) TO MULTI-LANE SECTION WEST OF SPRUCE PINE. WIDEN TO MULTI- LANES. (INCLUDES B-3268) R NO DELAYED TO 2012 YANCEY R-5111 PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. T-88

93 Accomplishments Federal Fiscal Year 2011 Projects with activity(s) scheduled during Federal Fiscal Year 2011 are listed in the Accomplishments Table on the following pages. Projects for which the indicated activity did occur are shown with a Yes in the Work Started column. Projects where the scheduled activity did not occur are shown with a No in the Work Started column. The Remarks column gives a brief explanation of the programmed activity. T-89

94

95 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS ALAMANCE BD-5107 DIVISION 7 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. ALAMANCE I-4714 NC 49 (MILE POST 145) TO NC 54 (MILE CG YES PAYBACK IN PROGRESS POST 148). MILL AND RESURFACE. ALAMANCE I-4918 NC 54 (MILE POST 148) IN ALAMANCE COUNTY TO WEST OF SR CG YES COMPLETED IN (BUCKHORN ROAD) IN ORANGE COUNTY. MILL AND RESURFACE. ALAMANCE I-5207 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 7. ALAMANCE P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. ALAMANCE P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. ALAMANCE P-2918E TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. O YES IN PROGRESS ALAMANCE P-2918F TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. ALAMANCE P-2918G TRAIN 73/74 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. ALAMANCE P-2918H TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. R YES COMPLETED ALAMANCE P-2918I TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. ALAMANCE P-4405 PRIVATE CROSSING SAFETY INITIATIVE PE YES IN PROGRESS TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN R NO DELAYED TO 2013 RALEIGH AND CHARLOTTE. ALAMANCE P-5203 PIEDMONT CORRIDOR, BURLINGTON STATION PLATFORM EXTENSION. ALAMANCE P-5205 GRAHAM TO HAW RIVER. PE YES IN PROGRESS SIDING AND CURVE REALIGNMENT.. R NO DELAYED TO 2012 C NO DELAYED TO 2013 ALAMANCE U-3110B NEW ROUTE, US 70 TO NC 100. MULTI-LANES, PART ON NEW LOCATION. ALEXANDER B-5229 BRANCH OF SOUTH YADKIN RIVER. REPLACE BRIDGE NO. 48 ALEXANDER BD-5112 DIVISION 12 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. T-91

96 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS ALLEGHANY B-4406 CREEK. REPLACE BRIDGE NO. 9 U YES IN PROGRESS ALLEGHANY BD-5111 DIVISION 11 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. ALLEGHANY R-2637 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. ALLEGHANY R-3101 ROARING GAP TO SPARTA. UPGRADE ROADWAY TO TWENTY-FOUR FEET WITH TWO FOOT PAVED SHOULDERS. ANSON B-4861 RIDGE STREET. REPLACE BRIDGE NO. 88 OVER WINSTON- SALEM SOUTHBOUND RAILROAD. ANSON BD-5110 DIVISION 10 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. ANSON W-5326 US 74 AND NC 218. INSTALL R NO DELAYED TO 2011 DIRECTIONAL CROSSOVERS AT INTERSECTION. ASHE BD-5111 DIVISION 11 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. ASHE R-2637 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. ASHE U-3812 NC 88, NC 194 TO US 221 BUSINESS. UPGRADE EXISTING ROADWAY. AVERY BD-5111 DIVISION 11 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. AVERY R-2637 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. AVERY R-5108B PRA-BLRI 2H13, J16. RESURFACE SECTIONS 2H AND 2J, MILE MARKER TO MILE MARKER 317.5, INCLUDING OVERLOOKS, PARKING AREAS, SPURS, AND ACCESS ROADS. BEAUFORT B-3611 PANTEGO CREEK. REPLACE BRIDGE NO. 77 BEAUFORT B-4413 BROAD CREEK. REPLACE BRIDGE NO. 51 U YES COMPLETED IN 2010 R YES COMPLETED IN 2010 BEAUFORT B-4415 PUNGO CREEK. REPLACE BRIDGE NO. 21 U YES COMPLETED IN 2011 R YES COMPLETED IN 2011 BEAUFORT B-4417 JACK CREEK. REPLACE BRIDGE NO. 59 BEAUFORT B-4418 ST. CLAIR CREEK. U YES COMPLETED IN 2011 REPLACE BRIDGE NO. 54 R YES COMPLETED IN 2011 BEAUFORT B-4421 DURHAM CREEK. R YES COMPLETED IN 2011 REPLACE BRIDGE NO. 42 T-92

97 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS BEAUFORT B-4422 BLOUNTS CREEK. R YES COMPLETED REPLACE BRIDGE NO. 81 C YES COMPLETED IN 2011 BEAUFORT B-4500 WATERS STREET OVER TRIBUTARY OF PUNGO RIVER. REPLACE BRIDGE NO. 324 BEAUFORT B-5200 BLOUNTS CREEK. R YES COMPLETED IN 2011 REPLACE BRIDGE NO. 60 BEAUFORT BD-5102 DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. BEAUFORT R-2510C WASHINGTON BYPASS, SOUTH OF SR 1127 (POSSUM TRACK ROAD) TO NORTH OF NC 171. FOUR LANE DIVIDED FREEWAY, SOME NEW LOCATION. BEAUFORT W-5008 SR 1306 (15TH. STREET), WEST OF WASHINGTON STREET TO EAST OF PIERCE STREET. WIDEN TO FIVE LANES. C NO DELAYED TO 2011 BERTIE BD-5101 DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. BLADEN B-4028 CAPE FEAR RIVER AND OVERFLOW. REPLACE BRIDGE NO.12, U YES COMPLETED IN 2011 BRIDGE NO. 18 AND BRIDGE NO. 42 R YES COMPLETED IN 2011 BLADEN B-5116 SOUTH RIVER OVERFLOW. U YES COMPLETED IN 2011 REPLACE BRIDGE NO. 150 R YES COMPLETED IN 2011 BLADEN B-5411 REPLACE BRIDGE NO. 124 OVER JOHNSON POND SPILLWAY R YES COMPLETED IN 2011 WITH A CULVERT. BLADEN BD-5106 DIVISION 6 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. BLADEN W-5121 NC 131. INTERSECTION IMPROVEMENTS. BRUNSWICK BD-5103 DIVISION 3 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. BUNCOMBE B-3619 BILL MOORE CREEK. REPLACE BRIDGE NO. 56 BUNCOMBE B-5178 SR 3431 (POND ROAD) AND HOMINY U YES IN PROGRESS CREEK. REPLACE BRIDGE NO. 235 AND BRIDGE NO. 238 BUNCOMBE BD-5113 DIVISION 13 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. BUNCOMBE I-5213 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 13. BUNCOMBE U-4014 US 25 (MCDOWELL STREET). UPGRADE TUNNEL. T-93

98 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS BUNCOMBE W-5308 NC 197, US (FUTURE I-26) TO WEST R YES COMPLETED IN 2011 OF SR INSTALL 2 FOOT PAVED SHOULDERS. BURKE B-4046 WHITE OAK CREEK. U YES IN PROGRESS REPLACE BRIDGE NO. 175, JACOB FORK. REPLACE BRIDGE NO. 38 BURKE B-5232 JACOB FORK RIVER. REPLACE BRIDGE NO. 118 BURKE BD-5113 DIVISION 13 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. BURKE I-5213 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 13. BURKE U-2550B NC 18, US 70 BYPASS (FLEMING DRIVE) TO I-40. WIDEN TO MULTI-LANES AND REVISE INTERCHANGE. BURKE U-2551 SR 1922 (ENOLA ROAD)-SR 1924 (OLD U YES IN PROGRESS NC 18), SR 2026 (ARNOLD DRIVE) TO NC 18 (SOUTH STERLING STREET). WIDEN TO MULTI-LANES AND UPGRADE INTERCHANGE. CABARRUS B-4050 IRISH BUFFALO CREEK. U YES IN PROGRESS REPLACE BRIDGE NO. 30 CABARRUS B-5000 BURRAGE ROAD. REPLACE BRIDGE R NO DELAYED TO 2012 NO. 151 OVER THREE MILE BRANCH CABARRUS B-5223 WOLF MEADOW CREEK. REPLACE BRIDGE NO. 191 CABARRUS BD-5110 DIVISION 10 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. CABARRUS C-4918A INTERSECTION IMPROVEMENTS AND ADDITIONAL TURN LANES AT SELECTED LOCATIONS. CABARRUS C-4918B INTERSECTION IMPROVEMENTS AND ADDITIONAL TURN LANES AT SELECTED LOCATIONS. CABARRUS C-4919 CONSTRUCT A MCEACHERN GREENWAY CONNECTOR TO DOWNTOWN CORBAN PARK. CABARRUS C-4921 CONSTRUCT SIDEWALKS TO CONNECT NEIGHBORHOODS AND TOWN CENTER. CABARRUS C-4922 CONSTRUCT TURN LANES ON MT OLIVET ROAD AT NC 3. CABARRUS I-5210 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 10. CABARRUS P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. T-94

99 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS CABARRUS P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. CABARRUS P-2918E TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. O YES IN PROGRESS CABARRUS P-2918F TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. CABARRUS P-2918G TRAIN 73/74 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. CABARRUS P-2918H TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. R YES COMPLETED CABARRUS P-2918I TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. CABARRUS P-4405 PRIVATE CROSSING SAFETY INITIATIVE PE YES IN PROGRESS TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN R NO DELAYED TO 2013 RALEIGH AND CHARLOTTE. CABARRUS P-5207 PIEDMONT CORRIDOR, KANAPOLIS STATION PLATFORM PE YES IN PROGRESS CANOPY. CABARRUS P-5208 PIEDMONT CORRIDOR, RESTORE DOUBLE TRACK, HAYDCOCK PE YES IN PROGRESS TO JUNKER. R NO DELAYED TO 2013 C NO DELAYED TO 2014 CABARRUS R-2246B CONCORD-KANNAPOLIS, GEORGE LILES PARKWAY, NC 49 TO U YES IN PROGRESS SOUTH OF I-85. WIDEN TO FOUR LANES DIVIDED, SOME NEW LOCATION. CABARRUS R-2533CC HARRISBURG TO YADKIN RIVER. WIDEN TO MULTI-LANES. CABARRUS U-3440 NC 3, PROPOSED WEST SIDE BYPASS R NO DELAYED TO 2013 (U-2009) TO SR 1691 (LOOP ROAD). WIDEN TO MULTI-LANES. CABARRUS U-4910 SR 1445 (DERITA ROAD), SR 1394 POPLAR TENT ROAD) TO SR C NO DELAYED TO (CONCORD MILLS BOULEVARD). WIDEN TO MULTI-LANES. CALDWELL B-3819 JOHNS RIVER. REPLACE BRIDGE NO. 184 U YES IN PROGRESS CALDWELL BD-5111 DIVISION 11 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. CALDWELL R-2237C NORTH OF NC 268 TO MULTI-LANES NORTH OF BLOWING ROCK. WIDEN TO MULTI-LANES. T-95

100 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS CALDWELL R-2637 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. CALDWELL R-5108B PRA-BLRI 2H13, J16. RESURFACE SECTIONS 2H AND 2J, MILE MARKER TO MILE MARKER 317.5, INCLUDING OVERLOOKS, PARKING AREAS, SPURS, AND ACCESS ROADS. CALDWELL U-3437 INTERSECTION OF SR 1160 (MT. HERMAN ROAD) AND ROY E. U YES IN PROGRESS COFFEY DRIVE. INTERSECTION IMPROVEMENTS. CALDWELL U-5204 GRACE CHAPEL ROAD TO TOWN STREET. CONSTRUCT A TWO-LANE FACILITY ON NEW LOCATION. CAMDEN BD-5101 DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. CAMDEN R-2414B EAST OF PASQUOTANK RIVER IN ELIZABETH CITY TO EAST OF NC 34 IN BELCROSS. WIDEN TO MULTI-LANES. CAMDEN U-4438 US 158, US 17 BUSINESS (NORTH ROAD STREET) TO EAST OF PASQUOTANK RIVER. RECONSTRUCT ROADWAY AND REPLACE BRIDGE NO. 19. INCLUDES B CARTERET B-5001 MIMOSA BOULEVARD. REPLACE BRIDGE NO. 47 OVER PINE R NO DELAYED TO 2011 KNOLL WATERWAY CARTERET BD-5102 DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. CARTERET F-5006 CEDAR ISLAND RAMPS AND GANTRY. REPAIR AND REPLACE. C NO UNDER CONSTRUCTION CASWELL BD-5107 DIVISION 7 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. CASWELL C-4936 PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS CATAWBA B-3545 PINCH GUT CREEK. REPLACE BRIDGE NO. 127 CATAWBA B-4061 HAGAN CREEK. REPLACE BRIDGE NO. 90 U YES IN PROGRESS CATAWBA B-4456 I-40. REPLACE BRIDGE NO. 49 U YES IN PROGRESS CATAWBA BD-5112 DIVISION 12 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. CATAWBA I-5212 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 12. CATAWBA SF-5112A NC 127, SR 1128 TO SR CONSTRUCT CONTINUOUS LEFT TURN LANE. T-96

101 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS CHATHAM B-4064 BROOKS CREEK. REPLACE BRIDGE NO. 95 CHATHAM BD-5108 DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. CHATHAM C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS CHATHAM C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS CHATHAM U-4726 DCHC URBAN AREA BICYCLE AND PEDESTRIAN ALLOCATION. CHATHAM U-4727 DURHAM-CHAPEL HILL-CARRBORO URBAN AREA PLANNING PE YES IN PROGRESS (DCHC) ALLOCATION AND UNIFIED PROGRAM. CHATHAM U-5206 DURHAM-CHAPEL HILL-CARRBORO MPO. RESERVE FOR N YES IN PROGRESS FUNDS TO BE FLEXED TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS. CHEROKEE BD-5114 DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. CHEROKEE R-3622AB US AT RANGER TO TENNESSEE STATE LINE. UPGRADE EXISTING ROADWAY. CHEROKEE R-5007 S AMMONS SEQUOYAH. PE NO PROJECT DELETED RECONSTRUCTION. CHEROKEE R-5009 S LUCY LONG ROAD. PE NO PROJECT DELETED RECONSTRUCTION. CHEROKEE R-5010 S INDIAN CREEK ROAD. PE NO PROJECT DELETED RECONSTRUCTION. CHEROKEE R-5011 S HORNBUCKLE CREEK ROAD. PE NO PROJECT DELETED RECONSTRUCTION. CHEROKEE R-5012 S BLUE WING CHURCH ROAD. C NO PROJECT DELETED RECONSTRUCTION. CHEROKEE S-5103 NANTAHALA BYWAY-WOOD FARM. VIEWSHED PROTECTION VIA A YES IN PROGRESS A CONSERVATION EASEMENT ON WOOD FARM. CHOWAN B-4463 QUEEN ANNE CREEK. U YES IN PROGRESS REPLACE BRIDGE NO. 12 R YES COMPLETED CHOWAN BD-5101 DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. CLAY B-4467 BRASSTOWN CREEK. REPLACE BRIDGE NO. 3 T-97

102 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS CLAY B-4854 NANTAHALA NATIONAL FOREST. TUNI CREEK, REPLACE BRIDGE NO. 81. CLAY BD-5114 DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. CLAY R-4416 CHUNKY GAL GAP WESTWARD FOR TWO MILES. CONSTRUCT TRUCK CLIMBING LANE. CLEVELAND B-1135 BEAVERDAM CREEK. REPLACE BRIDGE NO. 139 CLEVELAND B-4075 GROG CREEK. REPLACE BRIDGE NO. 129 CLEVELAND BD-5112 DIVISION 12 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. CLEVELAND C-5146 TRUCK STOP ELECTRIFICATION AT I-85 (EXIT 5). CLEVELAND I-5212 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 12. CLEVELAND R-2707AA SHELBY. FOUR LANE DIVIDED FREEWAY C NO DELAYED TO 2013 ON NEW LOCATION. CLEVELAND R-2707AB SHELBY. FOUR LANE DIVIDED FREEWAY G NO DELAYED TO 2013 ON NEW LOCATION. CLEVELAND R-2707B SHELBY. FOUR LANE DIVIDED FREEWAY U YES IN PROGRESS ON NEW LOCATION. CLEVELAND W-5320 US 74 BYPASS AT US 74 BUSINESS (WESTERN INTERSECTION). R YES COMPLETED IN 2011 REALIGN US 74 BUSINESS APPROACH AND IMPROVE CURVE SUPERELEVATION. COLUMBUS B-4471 JUNIPER SWAMP. U YES COMPLETED IN 2011 REPLACE BRIDGE NO. 44 R YES COMPLETED IN 2011 COLUMBUS B-4473 GRISSETT SWAMP. REPLACE BRIDGE U YES COMPLETED IN 2010 NO. 76 AND BRIDGE NO. 78 R YES COMPLETED IN 2010 COLUMBUS BD-5106 DIVISION 6 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. COLUMBUS R-0061C NC 211. CONSTRUCT INTERCHANGE. CRAVEN BD-5102 DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. CUMBERLAND B-4090 CROSS CREEK. REPLACE BRIDGE NO. 125 U YES COMPLETED IN 2011 R YES COMPLETED IN 2011 CUMBERLAND B-4091 US 301, SR 1738, SR 1741, CAPE FEAR U YES COMPLETED IN 2011 RIVER. REPLACE BRIDGE NO. 85 R YES COMPLETED IN 2011 T-98

103 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS CUMBERLAND B-4949 CROSS CREEK. REPLACE BRIDGE NO. 61 U YES COMPLETED IN 2011 R YES COMPLETED IN 2011 CUMBERLAND BD-5106 DIVISION 6 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. CUMBERLAND EB-4539B CAPE FEAR RIVER GREENWAY, CLARK PARK SOUTH TO THE CAPE FEAR BOTANICAL GARDENS. CONSTRUCT SECOND PHASE OF AN OFF-ROAD MULTI-USE TRAIL. CUMBERLAND I-5206 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 6. CUMBERLAND R-2303A WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R YES COMPLETED IN 2011 CUMBERLAND R-2303B WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R YES COMPLETED IN 2011 CUMBERLAND R-2303C WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R YES COMPLETED IN 2011 CUMBERLAND R-2303D WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R YES COMPLETED IN 2011 CUMBERLAND SF-4906K SR 1141 (CUMBERLAND ROAD), NC 59 (HOPE MILLS ROAD) TO C YES COMPLETED IN 2011 SR 1135 (JOHN SMITH ROAD). VARIOUS SAFETY IMPROVEMENTS. CUMBERLAND SF-4906M SR 1102 (GILLIS HILL ROAD) AT SR 3791 R YES COMPLETED (CELTIC DRIVE) AND HORIZONTAL CURVES ON SR CONSTRUCT TURN LANE AND INSTALL GUARDRAIL DELINEATORS. CUMBERLAND U-4422 SR 1596 (GLENSFORD ROAD), US 401 BUSINESS (RAEFORD ROAD) TO SR 1400 (CLIFFDALE ROAD). WIDEN TO FIVE LANES, PART ON NEW LOCATION. CUMBERLAND U-5207 FAYETTEVILLE URBAN AREA PLANNING ALLOCATION AND UNIFIED PROGRAM. CUMBERLAND X-0002BC WEST OF NC (BRAGG BOULEVARD) TO I-95. FREEWAY ON NEW LOCATION WITH STRUCTURE OVER THE CAPE FEAR RIVER. G YES PAYBACK IN PROGRESS T-99

104 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS CUMBERLAND X-0002CA WEST OF NC (BRAGG BOULEVARD) TO I-95. FREEWAY ON NEW LOCATION WITH STRUCTURE OVER THE CAPE FEAR RIVER. G YES PAYBACK IN PROGRESS CUMBERLAND X-0002CB WEST OF NC (BRAGG BOULEVARD) TO I-95. FREEWAY ON NEW LOCATION WITH STRUCTURE OVER THE CAPE FEAR RIVER. G YES PAYBACK IN PROGRESS CURRITUCK B-4494 TULLS CREEK. REPLACE BRIDGE NO. 3 R YES COMPLETED CURRITUCK BD-5101 DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. CURRITUCK R-2576 MID-CURRITUCK BRIDGE, COINJOCK R NO DELAYED TO 2013 TO COROLLA. NEW STRUCTURE OVER CURRITUCK SOUND AND C NO DELAYED TO 2013 UPGRADE APPROACHES. DARE B-2500 OREGON INLET. REPLACE BRIDGE NO. 11 DARE BD-5101 DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. DARE F-5001 HATTERAS SOUTH DOCK BASIN REFURBISHMENT. DARE R-3116D NORTH OF THE VILLAGE OF RODANTHE R NO DELAYED TO 2012 TO NORTH OF PEA ISLAND NATIONAL WILDLIFE REFUGE BOUNDARY. INTERIM IMPROVEMENTS TO MAINTAIN ROADWAY. DAVIDSON B-4498 ABBOTTS CREEK. REPLACE BRIDGE NO. 199 DAVIDSON B-4499 US 29/70/I-85. REPLACE BRIDGE NO. 158 DAVIDSON B-4694 REEDY CREEK. REPLACE BRIDGE NO. 52 DAVIDSON BD-5109 DIVISION 9 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. DAVIDSON C-4936 PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS DAVIDSON EL-5108 STREETSCAPE IMPROVEMENTS IN THE WINSTON-SALEM MPO AREA. DAVIDSON I-2304AC NORTH OF SR 2120 (EXIT 81) IN ROWAN CG YES UNDER CONSTRUCTION COUNTY TO US /I-85 BUSINESS (EXIT 87). ADDITIONAL LANES AND RG YES COMPLETED BRIDGE RECONSTRUCTION. (PROJECT INCLUDES B-3833) DAVIDSON I-2304AD NORTH OF SR 2120 (EXIT 81) IN ROWAN COUNTY TO US /I-85 BUSINESS (EXIT 87). ADDITIONAL LANES AND RG YES PAYBACK IN PROGRESS BRIDGE RECONSTRUCTION. (PROJECT INCLUDES B-3833) T-100

105 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS DAVIDSON I-2304AE NORTH OF SR 2120 (EXIT 81) IN ROWAN PE NO DELAYED TO 2012 COUNTY TO US /I-85 BUSINESS (EXIT 87). ADDITIONAL LANES AND R NO NO LONGER PROGRAMMED BRIDGE RECONSTRUCTION. (PROJECT INCLUDES B-3833) C NO DELAYED TO 2013 DAVIDSON I-5209 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 9. DAVIDSON P-4405 PRIVATE CROSSING SAFETY INITIATIVE PE YES IN PROGRESS TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN R NO DELAYED TO 2013 RALEIGH AND CHARLOTTE. DAVIDSON R-4750 I-85 IN DAVIDSON COUNTY TO SOUTH R NO DELAYED TO 2012 OF I-40/US 311 IN FORSYTH COUNTY. PAVEMENT REHABILITATION AND UPGRADING TO INTERSTATE STANDARDS. DAVIDSON U-4741 VARIOUS GREENWAY AND SIDEWALK PROJECTS WITHIN MPO AREA. DAVIDSON U-4742 INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS WITHIN METROPOLITAN PLANNING ORGANIZATION (MPO) AREA. DAVIDSON U-5209 WINSTON-SALEM MPO. RESERVE FOR FUNDS TO BE FLEXED N YES IN PROGRESS TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS. DAVIDSON W-5115 SOUTH OF SOUTH VILLAGE DRIVE TO SR 1515 (MOUNT OLIVET CHURCH ROAD). CONSTRUCT CONTINUOUS CENTER LEFT TURN LANE. DAVIE B-3637 I-40. REPLACE BRIDGE NO. 37 CG YES COMPLETED IN 2009 AND REVISE INTERCHANGE. DAVIE BD-5109 DIVISION 9 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. DAVIE EL-5108 STREETSCAPE IMPROVEMENTS IN THE WINSTON-SALEM MPO AREA. DAVIE I-3600 SR 1436 (PINEBROOK DRIVE) TO WEST CG YES COMPLETED OF NC 801. PAVEMENT REHABILITATION. DAVIE I-5209 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 9. DAVIE U-4741 VARIOUS GREENWAY AND SIDEWALK PROJECTS WITHIN MPO AREA. DAVIE U-4742 INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS WITHIN METROPOLITAN PLANNING ORGANIZATION (MPO) AREA. DAVIE U-5209 WINSTON-SALEM MPO. RESERVE FOR FUNDS TO BE FLEXED N YES IN PROGRESS TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS. DUPLIN BD-5103 DIVISION 3 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. T-101

106 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS DUPLIN I-5203 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 3. DUPLIN R-2303A WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R YES COMPLETED IN 2011 DUPLIN R-2303B WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R YES COMPLETED IN 2011 DUPLIN R-2303C WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R YES COMPLETED IN 2011 DUPLIN R-2303D WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R YES COMPLETED IN 2011 DURHAM BD-5105 DIVISION 5 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. DURHAM C-4928 MORREENE ROAD, NEAL ROAD TO C NO DELAYED TO 2014 ERWIN ROAD. CONSTRUCT BIKE LANES AND SIDEWALKS. DURHAM C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS DURHAM C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS DURHAM C-5104 PURCHASE TWO (2) HYBRID ELECTRIC BUSES AND PROVIDE O YES IN PROGRESS PORTION OF OPERATING EXPENSE FOR THREE YEARS. DURHAM EB-4707 SR 2220 (OLD CHAPEL HILL ROAD)- SR 1838 (OLD DURHAM ROAD), SR 1116 (GARRETT ROAD) IN DURHAM COUNTY TO US IN ORANGE COUNTY. BICYCLE IMPROVEMENTS. DURHAM I-5145 NORTH OF US 70 IN DURHAM COUNTY TO NORTH OF NC 56 IN GRANVILLE COUNTY. PAVEMENT PRESERVATION. DURHAM I-5205 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 5. DURHAM P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. T-102

107 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS DURHAM P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. DURHAM P-2918E TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. O YES IN PROGRESS DURHAM P-2918F TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. DURHAM P-2918G TRAIN 73/74 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. DURHAM P-2918H TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. R YES COMPLETED DURHAM P-2918I TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. DURHAM P-4405 PRIVATE CROSSING SAFETY INITIATIVE PE YES IN PROGRESS TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN R NO DELAYED TO 2013 RALEIGH AND CHARLOTTE. DURHAM U-3308 NC 55 (ALSTON AVENUE), NC 147 (I. L. "BUCK" DEAN FREEWAY) TO US 70 BUSINESS-NC 98 (HOLLOWAY STREET). WIDEN TO FOUR LANE DIVIDED FACILITY AND REPLACE NORFOLK-SOUTHERN RAILROAD BRIDGES. R NO DELAYED TO 2012 DURHAM U-3309A SR 2028 (T.W. ALEXANDER DRIVE), SR 1121 (CORNWALLIS ROAD) TO SR 1959 (MIAMI BOULEVARD). WIDEN TO A FOUR LANE DIVIDED FACILITY. DURHAM U-4716A SR 1978 (HOPSON ROAD), SR 1980 (CHURCH STREET), AND PE YES IN PROGRESS NORFOLK SOUTHERN RAILROAD-NORTH CAROLINA RAILROAD, SOUTH OF I-40 TO NORTH OF MCCRIMMON PARKWAY. R NO DELAYED TO 2012 CONSTRUCT A GRADE SEPARATION AT HOPSON ROAD, EXTEND CHURCH STREET TO HOPSON ROAD, CLOSE CHURCH STREET CROSSING M OF THE NORFOLK SOUTHERN-NORTH CAROLINA RAILROAD, CONSTRUCT SECOND TRACK, AND WIDEN HOPSON ROAD FROM EAST OF SR 1999 (DAVIS DRIVE) TO NC 54. C NO DELAYED TO 2013 DURHAM U-4716C SR 1978 (HOPSON ROAD), SR 1980 (CHURCH STREET), AND PE YES IN PROGRESS NORFOLK SOUTHERN RAILROAD-NORTH CAROLINA RAILROAD, SOUTH OF I-40 TO NORTH OF MCCRIMMON PARKWAY. R NO DELAYED TO 2012 CONSTRUCT A GRADE SEPARATION AT HOPSON ROAD, EXTEND CHURCH STREET TO HOPSON ROAD, CLOSE CHURCH STREET CROSSING M OF THE NORFOLK SOUTHERN-NORTH CAROLINA RAILROAD, CONSTRUCT SECOND TRACK, AND WIDEN HOPSON ROAD FROM EAST OF SR 1999 (DAVIS DRIVE) TO NC 54. C NO DELAYED TO 2013 DURHAM U-4724 CORNWALLIS ROAD, SOUTH ROXBORO C NO DELAYED TO 2014 ROAD TO UNIVERSITY DRIVE. BIKE AND PEDESTRIAN FEATURES. DURHAM U-4726 DCHC URBAN AREA BICYCLE AND PEDESTRIAN ALLOCATION. T-103

108 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS DURHAM U-4727 DURHAM-CHAPEL HILL-CARRBORO URBAN AREA PLANNING PE YES IN PROGRESS (DCHC) ALLOCATION AND UNIFIED PROGRAM. DURHAM U-4763B NEW ROUTE - TRIANGLE PARKWAY, NC-540 TO I-40. MULTI-LANE FACILITY ON NEW LOCATION. DURHAM U-5119 BUS RAPID TRANSIT OPERATIONAL IMPROVEMENTS PE NO DELAYED TO 2012 DURHAM U-5206 DURHAM-CHAPEL HILL-CARRBORO MPO. RESERVE FOR N YES IN PROGRESS FUNDS TO BE FLEXED TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS. DURHAM W-5110 NC 55 (ALSTON AVENUE) AT LAWSON STREET. CONSTRUCT R YES IN ACQUISITION LEFT TURN LANES ON NC 55. EDGECOMBE B-4503 TAR RIVER. REPLACE BRIDGE NO. 7 U NO DELAYED TO 2012 EDGECOMBE BD-5104 DIVISION 4 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. EDGECOMBE C-5112 EXPANSION AND UPGRADE OF TRAFFIC SIGNAL SYSTEM. EDGECOMBE P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. EDGECOMBE R-4418 NATIONAL HIGHWAY SYSTEM GUARD- RAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. FORSYTH B-4506 SR REHABILITATE BRIDGE NO. 319 AND BRIDGE NO. 335 U YES IN PROGRESS FORSYTH B-4510 I-40 BUSINESS. REPLACE BRIDGE NO. 368 FORSYTH B-5004 REYNOLDS PARK ROAD. REPLACE BRIDGE NO. 86 OVER SALEM CREEK AND BRIDGE NO. 87 OVER BUSHY FORK CREEK. R NO DELAYED TO 2012 FORSYTH BD-5109 DIVISION 9 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. FORSYTH C-4936 PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS FORSYTH EL-5108 STREETSCAPE IMPROVEMENTS IN THE WINSTON-SALEM MPO AREA. FORSYTH I-5209 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 9. FORSYTH R-4750 I-85 IN DAVIDSON COUNTY TO SOUTH R NO DELAYED TO 2012 OF I-40/US 311 IN FORSYTH COUNTY. PAVEMENT REHABILITATION AND UPGRADING TO INTERSTATE STANDARDS. T-104

109 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS FORSYTH U-2826B US 52, SOUTH OF I-40/US 311 TO PROPOSED WESTERN LOOP INTERCHANGE. WIDEN AND UPGRADE ROADWAY AND INTERCHANGES. FORSYTH U-2923 SR 2747 (CLEMMONSVILLE ROAD), SR 3011 (OLD SALISBURY ROAD) TO SOUTH MAIN STREET. WIDEN TO MULTI-LANES. FORSYTH U-4741 VARIOUS GREENWAY AND SIDEWALK PROJECTS WITHIN MPO AREA. FORSYTH U-4742 INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS WITHIN METROPOLITAN PLANNING ORGANIZATION (MPO) AREA. FORSYTH U-4918A US /I-40 BUSINESS VICINITY AT PIEDMONT TRIAD RESEARCH PARK. TRANSPORTATION IMPROVEMENTS. FORSYTH U-5209 WINSTON-SALEM MPO. RESERVE FOR FUNDS TO BE FLEXED N YES IN PROGRESS TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS. FORSYTH U-9999D WINSTON-SALEM-FORSYTH COUNTY METROPOLITAN PLANNING PE YES IN PROGRESS (NEW TIP ORGANIZATION PLANNING (PL) SUPPLEMENT. NUMBER U-4850) FRANKLIN BD-5105 DIVISION 5 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. FRANKLIN C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS FRANKLIN C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS FRANKLIN EL-5100 PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS IN THE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO). FRANKLIN R-2814B NORTH OF SR 2044 (LIGON MILL ROAD) TO NC 39 IN LOUISBURG. WIDEN TO MULTI-LANES, SOME NEW LOCATION.. CG YES UNDER CONSTRUCTION FRANKLIN U-5118 OPERATIONAL IMPROVEMENTS FOR SAFETY AND CONGESTION MITIGATION FRANKLIN U-9999B CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION PE YES IN PROGRESS (NEW TIP (CAMPO) PLANNING (PL) SUPPLEMENT. NUMBER U-4850) FRANKLIN W-5112 US 1 TO GRANVILLE COUNTY LINE. R YES COMPLETED INSTALL PAVED SHOULDERS, RESURFACE, AND INSTALL THERMOPLASTIC MARKINGS AND RAISED REFLECTORS. GASTON B-4118 STANLEY CREEK. U YES IN PROGRESS REPLACE BRIDGE NO. 200 T-105

110 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS GASTON B-4753 DUHART'S CREEK. U YES IN PROGRESS REPLACE BRIDGE NO. 15 GASTON BD-5112 DIVISION 12 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. GASTON C-4934 NC 279 (NEW HOPE ROAD), U YES IN PROGRESS BURTONWOOD DRIVE TO SR 2466 (GARRISON BOULEVARD). WIDEN TO MULTI-LANES. GASTON C-5147 SIDEWALKS ALONG NC 150. GASTON C-5148 SIDEWALKS ALONG MOUNTAIN STREET. GASTON EB-5016 DOWNTOWN CRAMERTON-SOUTH FORK RIVER GREENWAY C NO PROJECT DELETED EXTENSION. PEDESTRIAN BRIDGES AND TRAIL. GASTON I-5212 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 12. GASTON R-5215 US TO EXISTING BRIDGE NO. 7 R YES COMPLETED IN 2011 OVER BACKWATER OF SOUTH CATAWBA RIVER. REALIGN ROADWAY. GASTON U-3321 GARDEN PARKWAY, I-85 WEST OF GASTONIA TO I-485 IN U YES IN PROGRESS MECKLENBURG COUNTY. MULTI-LANES ON NEW LOCATION. GASTON W-5311 US 321 AT SR 2416 (ROBINSON ROAD). REMOVE AND REPLACE R YES COMPLETED IN 2011 OVERHEAD RAILROAD BRIDGE. INSTALL TRAFFIC SIGNAL. CONSTRUCT RIGHT TURN LANE FOR US 321 NORTHBOUND APPROACH AND RECONSTRUCT APPROXIMATELY 150 FEET OF SR 2416 TO WIDEN FOR TWO-WAY TRAFFIC. GATES BD-5101 DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. GATES R-2507A US 158 TO THE VIRGINIA STATE LINE. U YES IN PROGRESS WIDEN TO MULTI-LANES. R YES COMPLETED GRAHAM B-3457 PANTHER CREEK. REPLACE BRIDGE NO. 68 GRAHAM B-3458 STECOAH CREEK. REPLACE BRIDGE NO. 114 GRAHAM BD-5114 DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. GRANVILLE B-4522 TAR RIVER. REPLACE BRIDGE NO. 102 GRANVILLE B-5219 GRASSY CREEK. R YES COMPLETED REPLACE BRIDGE NO. 139 T-106

111 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS GRANVILLE BD-5105 DIVISION 5 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. GRANVILLE C-4940 CONSTRUCT BICYCLE-PEDESTRIAN PATHS AT VARIOUS LOCATIONS. GRANVILLE C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS GRANVILLE C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS GRANVILLE C-5115 EAST LYON STATION ROAD CONNECTOR. R YES COMPLETED GRANVILLE C-5144 CROSS-TOWN PEDESTRIAN-BICYCLE SIDEWALK AND TRAIL. CONSTRUCT A MULTI-USE TRAIL. GRANVILLE EL-5100 PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS IN THE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO). GRANVILLE I-5145 NORTH OF US 70 IN DURHAM COUNTY TO NORTH OF NC 56 IN GRANVILLE COUNTY. PAVEMENT PRESERVATION. GRANVILLE I-5205 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 5. GRANVILLE U-5118 OPERATIONAL IMPROVEMENTS FOR SAFETY AND CONGESTION MITIGATION GRANVILLE U-9999B CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION PE YES IN PROGRESS (NEW TIP (CAMPO) PLANNING (PL) SUPPLEMENT. NUMBER U-4850) GRANVILLE W-5136 SOUTH OF SR 1705 (OLD FRANKLIN ROAD). REALIGN NC 96 TO REDUCE THE HORIZONAL CURVATURE. GREENE B-4531 LITTLE CONTENTNEA CREEK. U YES COMPLETED IN 2011 REPLACE BRIDGE NO. 36, LITTLE CONTENTNEA CREEK OVERFLOW. R YES COMPLETED IN 2011 REPLACE BRIDGE NO. 35 GREENE B-4533 WHEAT SWAMP CREEK. U YES COMPLETED IN 2011 REPLACE BRIDGE NO. 48 R YES COMPLETED IN 2011 GREENE BD-5102 DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. GUILFORD B-4695 BALLINGER ROAD OVER HORSEPEN CREEK. REPLACE BRIDGE NO. 97 GUILFORD B-4760 US 29/US 70/I-85 BUSINESS. REPLACE BRIDGE NO. 77 T-107

112 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS GUILFORD BD-5107 DIVISION 7 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. GUILFORD C-4936 PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS GUILFORD C-5105 GREENSBORO TRANSIT AUTHORITY (GTA) EXPANDED EVENING I NO PROJECT DELETED - SERVICE SERVICE ROUTES FROM SEVEN TO FIFTEEN. IMPLEMENTED UNDER PROJECT TO-5101 GUILFORD EB-4709B BATTLEGROUND AVENUE RAIL-TRAIL. GUILFORD EL-5101 PEDESTRIAN AND BICYCLE PROJECTS IN THE GREENSBORO URBAN AREA METROPOLITAN URBAN PLANNING ORGANIZATION (GUAMPO). GUILFORD I-4715 SR 4121 (HIGH POINT ROAD) TO CG YES COMPLETED IN 2009 I-85 BYPASS. MILL AND RESURFACE. GUILFORD I-5207 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 7. GUILFORD P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. GUILFORD P-2912A PIEDMONT CORRIDOR, STATION REHABILITATION AND PARKING. R YES COMPLETED GUILFORD P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. GUILFORD P-2918E TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. O YES IN PROGRESS GUILFORD P-2918F TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. GUILFORD P-2918G TRAIN 73/74 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. GUILFORD P-2918H TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. R YES COMPLETED GUILFORD P-2918I TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. GUILFORD P-4405 PRIVATE CROSSING SAFETY INITIATIVE PE YES IN PROGRESS TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN R NO DELAYED TO 2013 RALEIGH AND CHARLOTTE. T-108

113 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS GUILFORD P-5204 PIEDMONT CORRIDOR, CAMERON ROAD CROSSING CLOSURE PE YES IN PROGRESS AND ROAD REALIGNMENT. R NO DELAYED TO 2012 C NO DELAYED TO 2013 GUILFORD R-2611 SR 2007 AT COLFAX TO NC 68. WIDEN TO MULTI-LANES. GUILFORD R-2612A SR 3389 (WOODY MILL ROAD) AND SR 3418 (NEELLEY ROAD) SOUTH OF GREENSBORO. CONVERT AT-GRADE INTERSECTIONS TO INTERCHANGES. GUILFORD SF-4907D NC 68 AND SR 2269 (ALCORN ROAD). CONSTRUCT TURN LANES ON ALCORN ROAD APPROACHES AND UPGRADE SIGNAL. GUILFORD U-2524C WESTERN LOOP, NORTH OF I-85 TO U YES IN PROGRESS LAWNDALE DRIVE. CONSTRUCT FREEWAY ON NEW LOCATION. GUILFORD W-4707 SR 2128 (BUNCH ROAD). INTERSECTION IMPROVEMENTS. C NO DELAYED TO 2013 HALIFAX B-4133 JACKET SWAMP. REPLACE BRIDGE NO. 11 HALIFAX BD-5104 DIVISION 4 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. HALIFAX I-5204 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 4. HALIFAX R-4418 NATIONAL HIGHWAY SYSTEM GUARD- RAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. HARNETT B-4542 BARBEQUE CREEK. R YES COMPLETED IN 2010 REPLACE BRIDGE NO. 40 HARNETT BD-5106 DIVISION 6 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. HARNETT C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS HARNETT C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS HARNETT EL-5100 PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS IN THE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO). HARNETT I-5206 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 6. HARNETT R-5185 US 401, NC 210 TO NORTH OF SR 1436 (MATTHEWS ROAD). WIDEN TO MULTI-LANES. T-109

114 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS HARNETT U-5118 OPERATIONAL IMPROVEMENTS FOR SAFETY AND CONGESTION MITIGATION HARNETT U-9999B CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION PE YES IN PROGRESS (NEW TIP (CAMPO) PLANNING (PL) SUPPLEMENT. NUMBER U-4850) HAYWOOD B-3187 WEST FORK PIGEON RIVER. REPLACE BRIDGE NO. 79 HAYWOOD B-3656 PIGEON RIVER. REPLACE BRIDGE NO (COORDINATE WITH PROJECT R-4406) HAYWOOD B-4692 PISGAH NATIONAL FOREST, PFH-12(1) WESTLEYS CREEK. REPLACE BRIDGE NO. 283 HAYWOOD BD-5114 DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. HAYWOOD C-5150 OCONALUFTEE VISITORS CENTER IN NORTH CAROLINA TO N YES IN PROGRESS SUGARLAND VISITORS CENTER IN TENNESSEE. PARK SHUTTLE SERVICE. HAYWOOD C-5151 GREAT SMOKIES NATIONAL PARK. CONSTRUCT A MIXED-USE PATHWAY. HAYWOOD I-5214 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 14. HAYWOOD I-5402 MILE POST 35 TO MILE POST 36. R NO DELAYED TO 2012 ADDRESS SLOPE INSTABILITY THROUGH REPAIRS AND STREAM RESTORATION. HAYWOOD K-5002 ADD NEW SOUTHBOUND REST AREA ON NEW LOCATION AS A COMPANION TO EXISTING NORTHBOUND REST AREA. RENOVATE EXISTING NORTHBOUND REST AREA TO INCLUDE ADA COMPLIANT FAMILY RESTROOM, UPGRADE FIXTURES AND FINISHES. HAYWOOD R-4047 US (GREAT SMOKEY MOUNTAINS U YES IN PROGRESS EXPRESSWAY) TO SR 1523 (OLD CLYDE ROAD) AT LAKE JUNALUSKA. WIDEN TO A MULTI-LANE FACILITY AND REPLACE RAILROAD STRUCTURE R-32. (INCLUDES R-2210 B) HAYWOOD R-5110 PRA-BLRI 2Y13. BIG WITCH TUNNEL, DRAINAGE AND PAVEMENT REPAIR. HAYWOOD U-4412 SR 1184 (HOWELL MILL ROAD), US 276 TO US 23 BUSINESS. UPGRADE TWO LANES AND CONSTRUCT RAILROAD GRADE SEPARATION. HENDERSON B-4147 RIGHT PRONG MUD CREEK. U YES IN PROGRESS REPLACE BRIDGE NO. 75 LEFT PRONG MUD CREEK. REPLACE BRIDGE NO. 76 HENDERSON BD-5114 DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. HENDERSON I-5214 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 14. T-110

115 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS HENDERSON R-5109 PRA-BLRI 2S17. FERRIN KNOB TUNNEL #1, REPAIR SLOPE EROSION, CONSTRUCT NEW RETAINING WALLS AND PATCH AND REPAIR PAVEMENT. HENDERSON R-5207A SR 1539 (JACKSON ROAD) TO US 64. UPGRADE ROADWAY. HENDERSON R-5207B SR 1539 (JACKSON ROAD) TO US 64. UPGRADE ROADWAY. U YES IN PROGRESS HENDERSON U-5105 NC 225/SR 1164 (ERKWOOD DRIVE)/SR 1779(SHEPHERD STREET). IMPROVE INTERSECTION. HERTFORD B-4548 LIVERMAN CREEK. REPLACE BRIDGE NO. 2 HERTFORD BD-5101 DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. HERTFORD R-2507A US 158 TO THE VIRGINIA STATE LINE. U YES IN PROGRESS WIDEN TO MULTI-LANES. R YES COMPLETED HERTFORD R-2583 MURFREESBORO BYPASS TO US 13 R YES COMPLETED WEST OF WINTON. WIDEN TO MULTI- LANES, PART ON NEW LOCATION. HOKE BD-5108 DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. HYDE B-4551 CANAL. REPLACE BRIDGE NO. 45 U YES IN PROGRESS R YES COMPLETED HYDE BD-5101 DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. HYDE F-5004 OCRACOKE GANTRY. REPAIR AND REPLACE. HYDE F-5005 OCRACOKE SOUTH DOCK GANTRY. REPAIR AND REPLACE. IREDELL B-4553 FOURTH CREEK. REPLACE BRIDGE NO. 312 IREDELL BD-5112 DIVISION 12 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. IREDELL C-5153 MAGNOLIA AVENUE-FIELDSTONE NEIGHBORHOOD. CONSTRUCT IREDELL I-3819A STATESVILLE, MODIFICATION OF INTERCHANGE AREA. CG NO DELAYED TO 2012 IREDELL I-5212 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 12. JACKSON B-3480 EAST FORK TUCKASEGEE RIVER. REPLACE BRIDGE NO. 39 T-111

116 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS JACKSON B-3861 TUCKASEGEE RIVER. REPLACE BRIDGE NO. 107 JACKSON B-4159 TUCKESEGEA RIVER. REPLACE DECK ON BRIDGE NO. 108 JACKSON B-4160 TUCKASEGEE RIVER. REPLACE DECK BRIDGE NO. 82 JACKSON B-4162 SOUTHERN RAILWAY. REPLACE BRIDGE NO. 320 JACKSON B-4347 NANTAHALA NATIONAL FOREST, PFH 1107(7), NORTON MILL CREEK. REPLACE BRIDGE NO. 3 JACKSON B-4472 NANTAHALA NATIONAL FOREST, C NO DELAYED TO 2013 PFH 102-1(1), CANEY CREEK. REPLACE BRIDGE NO. 80 JACKSON B-4612 NANTAHALA NATIONAL FOREST, C YES CONSTRUCTION AUTHORIZED PFH 102-1(1), CANEY CREEK. BY FHWA REPLACE BRIDGE NO. 79 JACKSON BD-5114 DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. JACKSON R-5000 NC 116 TO NC 107. CONSTRUCT R NO DELAYED TO 2012 CONNECTOR ON NEW LOCATION. JACKSON R-5206 SR 1449 (COPE CREEK ROAD), SR 1710 U YES IN PROGRESS TO US 23/74. SAFETY IMPROVEMENTS AND WIDENING TO 10 FEET LANES. JOHNSTON B-4560 BLACK CREEK. REPLACE BRIDGE NO. 102 JOHNSTON BD-5104 DIVISION 4 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. JOHNSTON C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS JOHNSTON C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS JOHNSTON EL-5100 PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS IN THE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO). JOHNSTON I-5204 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 4. JOHNSTON I-5404 INTERCHANGE AT US 70 BUSINESS (EAST MARKET STREET - EXIT 95). IMPROVEMENTS TO INTERCHANGE INCLUDINGWIDENING FOR ADDITIONAL LANES, DRAINAGE, PAVEMENT MARKINGS, EROSION CONTROL, CONCRETE CHANNELIZATION, SIGNAL MODIFICATION AND SIGNS. T-112

117 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS JOHNSTON P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. JOHNSTON R-2552E CLAYTON BYPASS, I-40 IN WAKE COUNTY TO US BUSINESS IN JOHNSTON COUNTY. FREEWAY ON NEW LOCATION. JOHNSTON R-4418 NATIONAL HIGHWAY SYSTEM GUARD- RAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. JOHNSTON U-5118 OPERATIONAL IMPROVEMENTS FOR SAFETY AND CONGESTION MITIGATION JOHNSTON U-9999B CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION PE YES IN PROGRESS (NEW TIP (CAMPO) PLANNING (PL) SUPPLEMENT. NUMBER U-4850) JOHNSTON W-5107 SR 2305 (FIRETOWER ROAD) TO EAST C NO DELAYED TO 2013 OF SR 2310 (DAVIS MILL ROAD-STEVENS CHAPEL ROAD). SAFETY IMPROVMENTS. JONES BD-5102 DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. JONES W-5330 SOUTH OF SR 1002 NORTHWEST TO SOUTH OF SR IMPROVE SUPERELEVATION, OVERLAY PAVEMENT, INSTALL OUTSIDE RUMBLE STRIPES, SNOWPLOWABLE MARKERS AND INSTALL THERMOPLASTIC PAVEMENT MARKINGS. LEE BD-5108 DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. LEE R-2417AA SANFORD BYPASS, WEST OF SR 1400 TO NC 87 WEST OF SR MULTI-LANE FREEWAY ON NEW LOCATION. LENOIR B-4567 WEST BEAR CREEK. R YES COMPLETED IN 2011 REPLACE BRIDGE NO. 69 LENOIR BD-5102 DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. LENOIR W-5134 WEST OF US 70 BUSINESS-US 258 BUSINESS-NC 58 NORTH (QUEEN STREET) AND US 258 SOUTH TO WEST NC 58 SOUTH. CONSTRUCT RAISED MEDIAN WITH LEFT TURNS AT US 258 SOUTH AND SR 1357 (MEADOWBROOK DRIVE) AND RESURFACE. C NO DELAYED TO 2013 LINCOLN B-4176 CLARK CREEK. REPLACE BRIDGE NO. 118 LINCOLN B-4573 LIPPARD CREEK. REPLACE BRIDGE NO. 183 LINCOLN B-5230 LEONARD FORK CREEK. REPLACE BRIDGE NO. 29 LINCOLN BD-5112 DIVISION 12 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. T-113

118 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS LINCOLN C-5149 CLONINGER RAIL TRAIL EXTENSION. MACON B-4574 CULLASAJA RIVER. REPLACE BRIDGE NO. 58 MACON BD-5114 DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. MACON R-4440A SR 1369 (BYRD ROAD) IN MACON COUNTYTO EXISTING PAVEMENT IN SWAIN COUNTY. UPGRADE TO SECONDARY ROAD STANDARDS. C NO DELAYED TO 2015 MACON R-4440B SR 1369 (BYRD ROAD) IN MACON COUNTYTO EXISTING PAVEMENT IN SWAIN COUNTY. UPGRADE TO SECONDARY ROAD STANDARDS. C NO DELAYED TO 2015 MACON R-4440D SR 1369 (BYRD ROAD) IN MACON COUNTYTO EXISTING PAVEMENT IN SWAIN COUNTY. UPGRADE TO SECONDARY ROAD STANDARDS. C NO DELAYED TO 2014 MACON R-4748 SR 1660 (SILER ROAD) TO SR 1662 (WILEY BROWN ROAD) SOUTH OF US 441. TWO LANE ROADWAY ON NEW LOCATION. MACON S-5102 MOUNTAIN WATERS SCENIC BYWAY- DRY FALLS. RESTORATION AND IMPROVEMENTS IN THE CULLASAJA GORGE. MADISON B-4183 MIDDLE FORK CREEK. REPLACE BRIDGE NO. 29 WITH CULVERT. CROOKED CREEK. REPLACE BRIDGE NO. 28 MADISON BD-5113 DIVISION 13 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. MADISON I-5213 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 13. MARTIN BD-5101 DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. McDOWELL BD-5113 DIVISION 13 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. McDOWELL I-5213 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 13. McDOWELL R-5208 BLRI 2M. RAMP AT NC 80. CONSTRUCTION. McDOWELL W-5117 BUNCOMBE COUNTY LINE TO US 70. INSTALL A TALLER SINGLE-SLOPE MEDIAN WALL, REFLECTORS ON LANE LINES, AND THREE MEDIAN GATE SYSTEMS. MECKLENBURG B-4200 GAR CREEK. REPLACE BRIDGE NO. 100 U YES IN PROGRESS T-114

119 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS MECKLENBURG B-4201 GREASY CREEK. U YES IN PROGRESS REPLACE BRIDGE NO. 38 MECKLENBURG B-4579 MCINTYRE CREEK. REPLACE BRIDGE NO. 134 MECKLENBURG BD-5110 DIVISION 10 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. MECKLENBURG C-4956A INTERSECTION IMPROVEMENTS AT SELECTED LOCATIONS. MECKLENBURG C-4958 BICYCLE IMPROVEMENTS AT OLD CONCORD ROAD. MECKLENBURG C-4962 ESTABLISH BIKE-PEDESTRIAN CONNECTION BETWEEN IVERSON WAY AND MARION PLACE. MECKLENBURG C-5206 GEM STREET EXTENSION EASTWARD PE NO PROJECT DELETED TO OAK STREET. CONSTRUCT A NEW CONNECTOR. R NO PROJECT DELETED MECKLENBURG EB-4714 IRWIN CREEK BIKEWAY: IRWIN AVENUE ELEMENTARY SCHOOL TO CEDAR YARD (NEAR BANK OF AMERICA STADIUM). MECKLENBURG I-5210 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 10. MECKLENBURG P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. MECKLENBURG P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. MECKLENBURG P-2918E TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. O YES IN PROGRESS MECKLENBURG P-2918F TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. MECKLENBURG P-2918G TRAIN 73/74 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. MECKLENBURG P-2918H TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. R YES COMPLETED MECKLENBURG P-2918I TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. MECKLENBURG P-4405 PRIVATE CROSSING SAFETY INITIATIVE PE YES IN PROGRESS TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN R NO DELAYED TO 2013 RALEIGH AND CHARLOTTE. T-115

120 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS MECKLENBURG P-5002 CHARLOTTE, MAINLINE GRADE SEPARATION CSX-NS-CATS AND PE YES IN PROGRESS MOVE TRYON YARD TO PINOCA YARD. R NO DELAYED TO 2013 C NO DELAYED TO 2014 MECKLENBURG R-2248H CHARLOTTE WESTERN OUTER LOOP, WEST OF I-77 TO I-85 NORTH. FREEWAY ON NEW LOCATION. MECKLENBURG R-3329 I-485 (CHARLOTTE OUTER LOOP) TO US 74 (MONROE BYPASS). MULTI- LANE FREEWAY ON NEW LOCATION. (COORDINATE WITH U-3825) MECKLENBURG U-2507A SR 2467 (MALLARD CREEK ROAD), SR 2480 (SUGAR CREEK ROAD) TO SR 2472 (MALLARD CREEK CHURCH ROAD). WIDEN TO MULTI-LANES, PART ON NEW LOCATION. MECKLENBURG U-3321 GARDEN PARKWAY, I-85 WEST OF GASTONIA TO I-485 IN U YES IN PROGRESS MECKLENBURG COUNTY. MULTI-LANES ON NEW LOCATION. MECKLENBURG U-3411 NC 160 (WEST BOULEVARD) R YES COMPLETED IN 2011 RELOCATION, EAST OF I-485 (CHARLOTTE OUTER LOOP) TO HORSESHOE LANE. MULTI- LANES ON NEW LOCATION. MECKLENBURG U-3850 I-277 (JOHN BELK FREEWAY) AT I-77. INERCHANGE R NO DELAYED TO 2013 IMPROVEMENTS. MECKLENBURG U-4911 BELMONT NEIGHBORHOOD INFRASTRUCTURE AND STREETSCAPE IMPROVEMENTS. MECKLENBURG U-5011 CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT. CONSTRUCT FREIGHT INTERMODAL FACILITY. MECKLENBURG U-5012 SOUTH PIEDMONT FREIGHT INTERMODAL CENTER. CONSTRUCT FACILITY. MECKLENBURG U-5013 NORFOLK SOUTHERN INTERMODAL SYSTEM. MECKLENBURG U-5014 SOUTH BOULEVARD SIGNAL SYSTEM. C YES COMPLETED IN 2010 MECKLENBURG U-5107 CONSTRUCT TRANSPORTATION IMPROVEMENTS AT THE MARION DIEHL CENTER (QUEENS UNIVERSITY). MECKLENBURG U-5210 FLEX STP FUNDING TO CHARLOTTE AREA TRANSIT SYSTEM I YES IN PROGRESS (CATS) MECKLENBURG U-9999C MECKLENBURG-UNION METROPOLITAN PLANNING PE YES IN PROGRESS ORGANIZATION (MUMPO) PLANNING (PL) SUPPLEMENT. MITCHELL BD-5113 DIVISION 13 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. MITCHELL R-2519A SR 1336 (JACK'S CREEK ROAD) TO MULTI-LANE SECTION WEST OF SPRUCE PINE. WIDEN TO MULTI- LANES. (INCLUDES B-3268) T-116

121 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS MONTGOMERY B-4206 DENSONS CREEK. REPLACE BRIDGE NO. 128 MONTGOMERY B-4582 DENSONS CREEK. REPLACE BRIDGE NO. 121 MONTGOMERY BD-5108 DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. MONTGOMERY C-4936 PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS MONTGOMERY I-5208 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 8. MONTGOMERY R-4444 UWHARRIE NATIONAL FOREST, PFH 49-1(3). REPLACE REEVES CREEK VENTED FORD AND PAVE NORTH END OF FH 49. MOORE BD-5108 DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. MOORE W-5144 AT SR 1809 (GRADY ROAD)-SR 1814 (BRYANT ROAD). LOWER GRADE ON WESTERN LEG OF NC AND INSTALL LEFT-TURN LANES ON BOTH APPROACHES ON NC MOORE W-5302 SR 2080 (US 1 BUSINESS) TO SOUTHERN INTERSECTION OF SR 1871 (ST. JOSEPH ROAD/ARO ROAD). INSTALL MEDIAN BARRIER. NASH B-4211 TAR RIVER. REPLACE BRIDGE NO. 56 U NO DELAYED TO 2012 NASH B-4588 STONEY CREEK. REPLACE BRIDGE NO. 1 U NO DELAYED TO 2012 NASH BD-5104 DIVISION 4 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. NASH C-5112 EXPANSION AND UPGRADE OF TRAFFIC SIGNAL SYSTEM. NASH I-5204 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 4. NASH P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. NASH U-3331 SR 1616 (COUNTRY CLUB ROAD), US 64 BUSINESS TO SR 1541 (JEFFREYS ROAD). WIDEN TO MULTI-LANES. NASH U-3621B SR 1604 (HUNTER HILL ROAD), SR 1613 (NORTH WINSTEAD AVENUE) TO NC (BENVENUE ROAD). WIDEN TO MULTI- LANES. T-117

122 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS NASH U-4019 SR 1613 (NORTH WINSTEAD AVENUE), SR 1770 (SUNSET AVENUE) TO SR 1604 (HUNTER HILL ROAD). WIDEN TO MULTI- LANES. (COORDINATE WITH R-2823) NASH W-5108 NORTH OF SR 1845 TO BURROWS STREET. SAFETY IMPROVEMENTS. NASH W-5334 SOUTH OF THE NASH COUNTY REST AREA ACCELERATION RAMP TO THE SR 1524 (RED OAK-BATTLEBORO ROAD) OVER- PASS BRIDGE. EXTEND ACCELERATION RAMP AND WIDEN SHOULDERS ON EAST SIDE, OVERLAY ROADWAY AND RAMP, PAVEMENT MARKINGS, RUMBLE STRIPS, AND CLEAR ZONE IMPROVEMENTS. NEW HANOVER BD-5103 DIVISION 3 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. NEW HANOVER I-5203 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 3. NEW HANOVER U-3338 SR 1175 (KERR AVENUE), RANDALL PARKWAY TO SR 2649 (MARTIN LUTHER KING, JR. PARKWAY). WIDEN TO MULTI-LANES. U NO DELAYED TO 2012 NEW HANOVER U-3338B SR 1175 (KERR AVENUE), RANDALL PARKWAY TO SR 2649 (MARTIN LUTHER KING, JR. PARKWAY). WIDEN TO MULTI-LANES. R NO DELAYED TO 2012 NEW HANOVER W-5132 US 76 (OLEANDER DRIVE) AT US 117- NC 132 (COLLEGE ROAD). CONSTRUCT A RIGHT TURN LANE ON US 76 WEST- BOUND ONTO US 117-NC 132. NEW HANOVER W-5306 US 117-NC 132 IN CASTLE HAYNE. CONSTRUCT A ROUNDABOUT. NORTHAMPTON BD-5101 DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. NORTHAMPTON I-5201 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 1. NORTHAMPTON W-5016 I-95 SOUTHBOUND RAMPS TO WEST OF SR WIDEN TO THREE LANES. ONSLOW BD-5103 DIVISION 3 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. ONSLOW EB-4705 LEJEUNE BOULEVARD GREENWAY, SOUTH SIDE OF NC 24 (LEJEUNE BOULEVARD), E-3407 TO MONT- FORD POINT ROAD. ONSLOW R-5023B SR 1135 (MORNINGSIDE ROAD) TO WEST OF SR 1109 (HOLLY SHELTER ROAD). WIDEN TO THREE LANES AND ADD TWO FOOT PAVED SHOULDERS. ONSLOW R-5023C SR 1135 (MORNINGSIDE ROAD) TO WEST OF SR 1109 (HOLLY SHELTER ROAD). WIDEN TO THREE LANES AND ADD TWO FOOT PAVED SHOULDERS. T-118

123 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS ONSLOW U-3810 SR 1406 (PINEY GREEN ROAD), US 17 TO NC 24. WIDEN TO MULTI-LANES, PART ON NEW LOCATION. ONSLOW U-4007B US 17, US 17 BUSINESS (JACKSONVILLE BYPASS) TO SR 1326 (DRUMMER KELLUM ROAD). ADD ADDITIONAL LANES AND CONSTRUCT ROUTES ON NEW LOCATION. ONSLOW U-4906 EAST CITY LIMITS OF RICHLANDS TO R NO DELAYED TO 2014 SR WIDEN TO THREE LANES. ONSLOW U-5132 NC 24 (LEJEUNE BOULEVARD). CONSTRUCT A TRUMPET INTERCHANGE BETWEEN SR 1308 (BELL FORK ROAD) AND US 17 BYPASS. ONSLOW W-5105 SR 1503 TO NC 24. INSTALL PAVED SHOULDERS AND RUMBLE R YES COMPLETED STRIPS. ONSLOW W-5147 US 17 (NORTH MARINE BOULEVARD) AT R YES COMPLETED SR 1470 (WESTERN BOULEVARD), US 17 BUSINESS (NORTH MARINE BOULEVARD) AT SR 1308 (GUM BRANCH ROAD AND BELL FORK ROAD) AND SR 1470 (WESTERN BOULEVARD) AT SR 1403 (COUNTRY CLUB ROAD), ONSLOW COUNTY. INSTALL HIGH VISIBILITY CROSSWALKS WITH ACTUATED PEDESTRIAN HEADS, NEW PAVEMENT MARKINGS, WHEEL CHAIR RAMPS AND REFUGE ISLANDS. ORANGE BD-5107 DIVISION 7 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. ORANGE C-4932B CONSTRUCT A PARK AND RIDE SHELTER AND INSTALL BIKE RACKS ON BUSES. SECTION B: TRIANGLE AREA RPO (TARPO) TO PARTICIPATE IN CONSTRUCTION AND OPERATING ASSISTANCE FOR THREE YEARS FOR A NEW TRANSIT SERVICE. O YES IN PROGRESS ORANGE C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS ORANGE C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS ORANGE C-5104 PURCHASE TWO (2) HYBRID ELECTRIC BUSES AND PROVIDE O YES IN PROGRESS PORTION OF OPERATING EXPENSE FOR THREE YEARS. ORANGE EB-4707 SR 2220 (OLD CHAPEL HILL ROAD)- SR 1838 (OLD DURHAM ROAD), SR 1116 (GARRETT ROAD) IN DURHAM COUNTY TO US IN ORANGE COUNTY. BICYCLE IMPROVEMENTS. T-119

124 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS ORANGE EL-4828 MORGAN CREEK GREENWAY (WEST). SMITH LEVEL ROAD TO UNIVERSITY LAKE. CONSTRUCT GREENWAY. ORANGE EL-4994 BOLIN CREEK GREENWAY. C NO TO BE ACCOMPLISHED UNDER PROJECT U-4726DE ORANGE I-4918 NC 54 (MILE POST 148) IN ALAMANCE COUNTY TO WEST OF SR CG YES COMPLETED IN (BUCKHORN ROAD) IN ORANGE COUNTY. MILL AND RESURFACE. ORANGE I-5207 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 7. ORANGE U-2803 SR 1919 (SMITH LEVEL ROAD), ROCK HAVEN ROAD TO BRIDGE NO. 88. WIDEN TO MULTI-LANES. ORANGE U-4726 DCHC URBAN AREA BICYCLE AND PEDESTRIAN ALLOCATION. ORANGE U-4727 DURHAM-CHAPEL HILL-CARRBORO URBAN AREA PLANNING PE YES IN PROGRESS (DCHC) ALLOCATION AND UNIFIED PROGRAM. ORANGE U-5119 BUS RAPID TRANSIT OPERATIONAL IMPROVEMENTS PE NO DELAYED TO 2012 ORANGE U-5206 DURHAM-CHAPEL HILL-CARRBORO MPO. RESERVE FOR N YES IN PROGRESS FUNDS TO BE FLEXED TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS. PAMLICO BD-5102 DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. PASQUOTANK B-4599 KNOBBS CREEK. REPLACE BRIDGE U NO DELAYED TO 2012 NO. 1 AND BRIDGE NO. 2 R YES COMPLETED PASQUOTANK B-4922 KNOBB'S CREEK. U NO DELAYED TO 2012 REPLACE BRIDGE NO. 23 PASQUOTANK BD-5101 DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. PASQUOTANK EB-4991 US 17 BYPASS TO PRITCHARD STREET. CONSTRUCT GREENWAY. PASQUOTANK U-4438 US 158, US 17 BUSINESS (NORTH ROAD STREET) TO EAST OF PASQUOTANK RIVER. RECONSTRUCT ROADWAY AND REPLACE BRIDGE NO. 19. INCLUDES B PENDER BD-5103 DIVISION 3 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. PENDER I-5203 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 3. PENDER W-5135 SR 1523 (SHAW HIGHWAY) TO NC 50. INSTALL SPIRAL WIDENING THROUGH THE CURVES AND INSTALL VIBRALINE ALONG BOTH EDGELINES. T-120

125 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS PERQUIMANS BD-5101 DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. PERSON B-5220 BRANCH. REPLACE BRIDGE NO. 93 PERSON BD-5105 DIVISION 5 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. PITT B-4232 SWIFT CREEK. REPLACE BRIDGE NO. 9 PITT B-4234 CONETOE CREEK. REPLACE BRIDGE NO. 98 PITT B-4791 FORK OF SWIFT CREEK. R YES COMPLETED IN 2011 REPLACE BRIDGE NO. 154 PITT B-5214 EAST BRANCH OF SWIFT CREEK. C YES COMPLETED IN 2011 REPLACE BRIDGE NO. 37 PITT BD-5102 DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. PITT U-5018A NC 43, US 264 TO US 13-NC 11 (MEMORIAL DRIVE). WIDEN TO A FOUR-LANE DIVIDED FACILITY. PITT W-5102 SR 1700 (OLD TAR ROAD) TO NC 43. VARIOUS SAFETY C NO DELAYED TO 2011 IMPROVEMENTS. POLK B-4241 HOOPER CREEK. REPLACE BRIDGE NO. 24 POLK BD-5114 DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. POLK I-5214 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 14. RANDOLPH BD-5108 DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. RANDOLPH C-4936 PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS RANDOLPH I-5208 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 8. RANDOLPH R-2606B SOUTH OF SR 1920 TO US 220 NORTH CG YES UNDER CONSTRUCTION OF ASHEBORO. FREEWAY ON NEW LOCATION. RG YES PAYBACK IN PROGRESS RICHMOND BD-5108 DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. RICHMOND R-3421C ROCKINGHAM BYPASS. FOUR LANES U YES IN PROGRESS DIVIDED ON NEW LOCATION. T-121

126 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS ROBESON B-3693 RAFT SWAMP. REPLACE BRIDGE NO HOLLY SWAMP REPLACE BRIDGE NO SADDLETREE SWAMP. REPLACE BRIDGE NO. 210 ROBESON B-4251 OLD FIELD SWAMP. REPLACE BRIDGE NO. 94 ROBESON BD-5106 DIVISION 6 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. ROBESON I-5206 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 6. ROBESON W-5139 AT SR 1563 (UNION CHAPEL ROAD). CONSTRUCT A LEFT-TURN LANE ON THE EASTBOUND SR 1563 APPROACH AND A RIGHT-TURN LANE ON THE WESTBOUND SR 1515 APPROACH. ROBESON W-5140 AT SR 1540 (SALLY'S ROAD). REALIGN SR 1515 TO PROVIDE A CONTINUOIS MOVEMENT AND REALIGN SR 1540 TO TIE INTO SR 1515 WITH SR 1540 BEING UNDER STOP SIGN CONTROL. ROBESON W-5141 NC 711 TO NC 710. CONSTRUCT TWO FOOT PAVED SHOULDERS ON BOTH SIDES OF ROAD. ROCKINGHAM BD-5107 DIVISION 7 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. ROCKINGHAM C-4936 PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM. N YES IN PROGRESS ROCKINGHAM U-3326A US 29 BUSINESS (FREEWAY DRIVE), SOUTH SCALES STREET TO SR 2686 (RICHARDSON DRIVE). WIDEN TO MULTI-LANES. ROCKINGHAM U-3326B US 29 BUSINESS (FREEWAY DRIVE), SR 2686 (RICHARDSON DRIVE) TO NC 14. WIDEN TO MULTI-LANES. ROCKINGHAM W-5142 AT SR 1110 SOUTH OF MADISON. FIRST MEDIAN OPENING SOUTH OF INTERSECTION, PROVIDE A LIMITED MOVEMENT CROSSOVER, CONSTRUCT A BULB-OUT AND UPGRADE TWO LEFT-TURN LANES. R NO DELAYED TO 2012 ROCKINGHAM W-5324 NC 68 TO VIRGINIA STATE LINE. INSTALL MEDIAN BARRIER. ROWAN B-4257 CHURCH CREEK. U YES IN PROGRESS REPLACE BRIDGE NO. 143 ROWAN B-4629 SECOND CREEK. U YES IN PROGRESS REPLACE BRIDGE NO. 25 ROWAN BD-5109 DIVISION 9 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. T-122

127 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS ROWAN C-4907 TRAFFIC SIGNAL SYSTEM. IMPROVE OPERATION AND C NO PROJECT DELETED - UPGRADE EQUIPMENT. TO BE ACCOMPLISHED UNDER C-5553 ROWAN C-4911 EXPANSION OF AIR QUALITY OUTREACH PROGRAM TO REDUCE N YES IN PROGRESS OZONE AIR POLLUTION. ROWAN C-4916C CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. C NO DELAYED TO 2014 ROWAN EB-4713 KELSEY-SCOTT PARK, CATAWBA C NO PROJECT DELETED COLLEGE GREENWAY CONNECTOR. ROWAN I-2304AC NORTH OF SR 2120 (EXIT 81) IN ROWAN CG YES UNDER CONSTRUCTION COUNTY TO US /I-85 BUSINESS (EXIT 87). ADDITIONAL LANES AND RG YES COMPLETED BRIDGE RECONSTRUCTION. (PROJECT INCLUDES B-3833) ROWAN I-2304AD NORTH OF SR 2120 (EXIT 81) IN ROWAN COUNTY TO US /I-85 BUSINESS (EXIT 87). ADDITIONAL LANES AND RG YES PAYBACK IN PROGRESS BRIDGE RECONSTRUCTION. (PROJECT INCLUDES B-3833) ROWAN I-2304AE NORTH OF SR 2120 (EXIT 81) IN ROWAN PE NO DELAYED TO 2012 COUNTY TO US /I-85 BUSINESS (EXIT 87). ADDITIONAL LANES AND R NO NO LONGER PROGRAMMED BRIDGE RECONSTRUCTION. (PROJECT INCLUDES B-3833) C NO DELAYED TO 2013 ROWAN I-4718 CABARRUS COUNTY LINE TO NC 152. REPAIR PAVEMENT AND CG YES PAYBACK IN PROGRESS OVERLAY. ROWAN I-5209 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 9. ROWAN P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. ROWAN P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. ROWAN P-2918E TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. O YES IN PROGRESS ROWAN P-2918F TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. ROWAN P-2918G TRAIN 73/74 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. ROWAN P-2918H TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. R YES COMPLETED ROWAN P-2918I TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. T-123

128 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS ROWAN P-4405 PRIVATE CROSSING SAFETY INITIATIVE PE YES IN PROGRESS TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN R NO DELAYED TO 2013 RALEIGH AND CHARLOTTE. ROWAN P-5206 RESTORE DOUBLE TRACK, REID TO NORTH KANNAPOLIS. PE YES IN PROGRESS R NO DELAYED TO 2013 C NO DELAYED TO 2014 ROWAN U-3459 SR 2541 (KLUMAC ROAD), CONSTRUCT PE YES IN PROGRESS A GRADE SEPARATION WITH THE NORTH CAROLINA RAILROAD. R NO DELAYED TO 2012 C NO DELAYED TO 2013 ROWAN W-5146 AT SR 1006 (OREGAN CHURCH ROAD). CONVERT INTERSECTION FROM A FOUR-LEGGED CROSSROAD TO TWO T-INTERSECTIONS AND IMPROVE SIGHT DISTANCES. ROWAN W-5303 SR 2380 (ODDIE ROAD). INTERSECTION IMPROVEMENTS. RUTHERFORD B-4632 CLINCHFIELD RAILROAD. U YES IN PROGRESS REPLACE BRIDGE NO. 69 RUTHERFORD BD-5113 DIVISION 13 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. RUTHERFORD R-2233AB SOUTH CAROLINA STATE LINE TO NORTH OF SR 1366 (ROPER LOOP ROAD). WIDEN TO MULTI-LANES WITH BYPASS OF RUTHERFORDTON ON NEW LOCATION. RUTHERFORD W-5310 SR 1008, US TO SR INSTALL GUARDRAIL AT SELECTED LOCATIONS. SAMPSON BD-5103 DIVISION 3 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. SAMPSON I-5203 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 3. SAMPSON R-2303A WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R YES COMPLETED IN 2011 SAMPSON R-2303B WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R YES COMPLETED IN 2011 SAMPSON R-2303C WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R YES COMPLETED IN 2011 SAMPSON R-2303D WEST OF SR 1006 (MAXWELL ROAD- CLINTON ROAD) IN CUMBERLAND COUNTYTO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION. R YES COMPLETED IN 2011 T-124

129 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS SCOTLAND B-5003 COMMONWEALTH AVENUE. REPLACE BRIDGE NO. 81 OVER R NO DELAYED TO 2012 LEITH CREEK WITH CULVERT. SCOTLAND BD-5108 DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. STANLY B-4644 HARDY CREEK. REPLACE BRIDGE NO. 57 STANLY BD-5110 DIVISION 10 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. STANLY R-2533CC HARRISBURG TO YADKIN RIVER. WIDEN TO MULTI-LANES. STATEWIDE B-4700 BRIDGE PRESERVATION ISSUES AT SELECTED SITES. C YES COMPLETED STATEWIDE B-9999 BRIDGE INSPECTION PROGRAM. I YES IN PROGRESS STATEWIDE C-4901 RAIL DIVISION, CONSTRUCT A SECOND PE YES COMPLETED MAIN LINE BETWEEN THOMASVILLE AND LEXINGTON IN DAVIDSON COUNTY. R YES COMPLETED STATEWIDE C-4903 NORTH CAROLINA AIR AWARENESS OUTREACH PROGRAM TO PROVIDE EDUCATION AND PRODUCE DAILY AIR QUALITY FORECAST. N YES IN PROGRESS STATEWIDE E-4018 NATIONAL RECREATIONAL TRAILS. STATEWIDE E-9999 ENHANCEMENT BALANCE. STATEWIDE EB-2956 STATEWIDE BICYCLE PROGRAM. STATEWIDE EB-2966 SAFETY-EDUCATION PROJECTS. B YES IN PROGRESS STATEWIDE EB-3314 STATEWIDE PEDESTRIAN FACILITIES PROGRAM. STATEWIDE EB-4013 SPOT IMPROVEMENTS: SHORT PAVEMENT SECTIONS, BICYCLE RACKS AND SIGNING NEEDS. STATEWIDE EB-4410 AREA-WIDE BICYCLE IMPROVEMENTS FEASIBILITY STUDIES. F YES IN PROGRESS STATEWIDE EB-4411 ROADWAY IMPROVEMENTS FOR BICYCLE SAFETY ON STATE AND LOCAL DESIGNATED BIKE ROUTES. STATEWIDE EB-5130A BICYCLE MAPS AND ROUTES. REVISE, UPDATE, REPRINT MAPS MP YES IN PROGRESS AND SIGN ROUTES. STATEWIDE EB-5130B BICYCLE MAPS AND ROUTES. REVISE, UPDATE, REPRINT MAPS MP YES IN PROGRESS AND SIGN ROUTES. STATEWIDE EB-5130C BICYCLE MAPS AND ROUTES. REVISE, UPDATE, REPRINT MAPS MP YES IN PROGRESS AND SIGN ROUTES. STATEWIDE ER-2971 SIDEWALK PROGRAM IN ALL FOURTEEN HIGHWAY DIVISIONS. T-125

130 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS STATEWIDE ER-2973 ROADSIDE BEAUTIFICATION PROJECTS L YES IN PROGRESS IN ALL FOURTEEN HIGHWAY DIVISIONS. STATEWIDE ER-3100 PLANTING OF WILDFLOWERS AND PERENNIAL BULBS ON L YES IN PROGRESS FEDERAL-AID SYSTEM. STATEWIDE ER-3101 SPECIAL EVENTS PLANTING STATEWIDE. L YES IN PROGRESS STATEWIDE ER-3102 IMPLEMENTATION OF STATEWIDE N YES IN PROGRESS SCENIC BYWAYS PROGRAM. STATEWIDE ER-3611 COLOR CANOPY AND TREE PLANTING STATEWIDE. L YES IN PROGRESS STATEWIDE I-9998 INTERSTATE PREVENTATIVE MAINTENANCE. STATEWIDE I-9999 IM BALANCE. STATEWIDE K-4704 INTERSTATE REST AREA SYSTEM PRESERVATION. PAVEMENT, PAVEMENT MARKING, CURB AND GUTTER, SIDE- WALKS AND OTHER REHABILITATION ITEMS. STATEWIDE L-1000 REPLACEMENT PLANTS AT SELECTED LOCATIONS WITHIN THE L YES IN PROGRESS 14 HIGHWAY DIVISIONS. LANDSCAPE. STATEWIDE L-2133 PLANTING OF PERENNIAL BULBS AND WILDFLOWERS WITHIN L YES IN PROGRESS THE 14 HIGHWAY DIVISIONS. LANDSCAPE. STATEWIDE L-2500 COLOR AND CANOPY AND TREE PLANTING. L YES IN PROGRESS STATEWIDE M-0360 DESIGN SERVICES, PRELIMINARY PE YES IN PROGRESS ENGINEERING FOR MISCELLANEOUS PROJECTS. STATEWIDE M-0376 STATEWIDE GEOTECHNICAL STUDIES PE YES IN PROGRESS AND INVESTIGATIONS PROJECT TO COVER NON-PROJECT SPECIFIC. STATEWIDE M-0391 STRUCTURE DESIGN, PRELIMINARY ENGINEERING FOR PE YES IN PROGRESS MISCELLANEOUS PROJECTS STATEWIDE M-0392 HYDRAULICS, PRELIMINARY ENGINEERING FOR PE YES IN PROGRESS MISCELLANEOUS PROJECTS. STATEWIDE M-0405 STATEWIDE MOWING MAINTENANCE CONTRACTS FOR N YES IN PROGRESS PROPERTIES ACQUIRED BY NCDOT IN ADVANCE OF STIP PROJECTS. STATEWIDE P-3309 AT-GRADE CROSSING ELIMINATION AND IMPROVEMENT PROJECTS, CORRIDOR INVENTORIES AND STUDIES IN ALL FOURTEEN (14) DIVISIONS. STATEWIDE P-3414 TRAVEL TIME IMPROVEMENTS TO FREIGHT AND PASSENGER RAIL CORRIDORS BETWEEN RALEIGH AND CHARLOTTE AND MATCH FEDERAL FUNDS. STATEWIDE P-3418 PLANNING, MANAGEMENT F YES IN PROGRESS AND RESEARCH STUDIES. T-126

131 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS STATEWIDE P-3809 RAILROAD SAFETY INSPECTIONS IN ALL FOURTEEN (14) I YES IN PROGRESS DIVISIONS. STATEWIDE P-3819 FEDERALLY-DESIGNATED HIGH SPEED RAIL CORRIDOR BETWEEN CHARLOTTE AND VIRGINIA STATE LINE, ENVIRON- MENTAL STUDY, PRELIMINARY ENGIN- EERING, RIGHT OF WAY, DESIGN AND CONSTRUCTION. STATEWIDE P-3819A FEDERALLY-DESIGNATED HIGH SPEED PE YES COMPLETED RAIL CORRIDOR BETWEEN CHARLOTTE AND VIRGINIA STATE LINE, ENVIRON- R YES COMPLETED MENTAL STUDY, PRELIMINARY ENGIN- EERING, RIGHT OF WAY, DESIGN AND CONSTRUCTION. STATEWIDE P-4001 RAIL INDUSTRIAL ACCESS PROGRAM. STATEWIDE P-4701 CAPACITY AND TRAVEL TIME IMPROVEMENTS TO FREIGHT AND PASSENGER RAIL CORRIDORS, NEW EQUIPMENT AND MATCH FOR FEDERAL FUNDS. C YES COMPLETED STATEWIDE P-4702 MAINTENANCE OF RAILROAD TRACK AND SIGNAL IMPROVEMENTS. STATEWIDE P-5005 HIGH PRIORITY NORTH-SOUTH RAIL CORRIDOR OF THE FUTURE. STATEWIDE P-5005A HIGH PRIORITY NORTH-SOUTH RAIL CORRIDOR OF THE FUTURE. PE YES COMPLETED R YES COMPLETED STATEWIDE P-5005B HIGH PRIORITY NORTH-SOUTH RAIL CORRIDOR OF THE FUTURE. PE YES COMPLETED R YES COMPLETED STATEWIDE P-5202 ENVIRONMENTAL STUDIES FOR RAIL CAPITAL PROJECTS. STATEWIDE R-2929 NATIONAL PARKS SERVICE SPOT SAFETY AND SIGN REHABILITATION. STATEWIDE R-2930 NATIONAL PARKS SERVICE EMERGENCY PAVEMENT REHABILITATION. STATEWIDE R-4049 TRAFFIC OPERATIONS (INCIDENT MANAGEMENT, 511, SMARTLINK, TEC, TMC) STATEWIDE R-4067 POSITIVE GUIDANCE PROGRAM (PAVEMENT MARKINGS AND MARKERS, LED SIGNAL HEAD REPLACEMENT) STATEWIDE R-4073 ASPHALT MATERIALS TESTING LABORATORIES CORRECTIVE ACTION PLAN FOR GROUNDWATER CLEAN-UP AT 54 SITES. STATEWIDE R-4436 NPDES PERMIT, RETROFIT FOURTEEN N YES IN PROGRESS SITES PER YEAR TO PROTECT WATER QUALITY. T-127

132 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS STATEWIDE R-4500 ECONOMIC DEVELOPMENT. STATEWIDE R-4701 TRAFFIC SYSTEM OPERATIONS PROGRAM (SIGNAL MAINTENANCE). STATEWIDE R-8888 STATEWIDE PLANNING FOR TRAFFIC F YES IN PROGRESS FORECASTING, PRE-TIP PLANNING AND PURPOSE AND NEED STUDIES. STATEWIDE SR-5000 SAFE ROUTES TO SCHOOL PROGRAM. EDUCATIONAL,TRAINING N YES IN PROGRESS AND OTHER NON-INFRASTRUCTURE NEEDS. STATEWIDE SR-5001 SAFE ROUTES TO SCHOOL PROGRAM. PROJECTS TO IMPROVE R YES COMPLETED SAFETY, REDUCE TRAFFIC, FUEL COMSUMPTION AND AIR POLLUTION IN VICINITY OF SCHOOLS. STATEWIDE W-4447 SAFETY MANAGEMENT PROGRAM, PE YES IN PROGRESS PROJECT IDENTIFICATION, ANALYSIS AND PRELIMINARY ENGINEERING. STATEWIDE W-4714 RUMBLE STRIPS, SHOULDERS, ROADSIDE SAFETY IMPROVEMENTS, AUXILIARY TURN LANES, RAISED PAVEMENT MARKERS AND PROFILE PAVEMENT MARKINGS. STATEWIDE W-4715 POSITIVE MEDIAN BARRIER PROJECTS. STATEWIDE W-5300 SIGNAL RETIMING TO IMPROVE SAFETY. STATEWIDE W-5301 LANE DEPARTURE SYSTEMIC IMPROVEMENTS. STATEWIDE Y-4100 HIGHWAY-RAIL CROSSINGS SAFETY IMPROVEMENTS AND INVENTORY PASSENGER ROUTES. STATEWIDE Y-4415 HIGHWAY-RAIL CROSSING INVENTORY. STATEWIDE Y-9999 HIGHWAY-RAIL CROSSING SAFETY IMPROVEMENTS, PASSENGER ROUTES. STATEWIDE Z-9999 HIGHWAY-RAIL CROSSING SAFETY IMPROVEMENTS. STOKES BD-5109 DIVISION 9 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. STOKES EL-5108 STREETSCAPE IMPROVEMENTS IN THE WINSTON-SALEM MPO AREA. STOKES U-4741 VARIOUS GREENWAY AND SIDEWALK PROJECTS WITHIN MPO AREA. STOKES U-4742 INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS WITHIN METROPOLITAN PLANNING ORGANIZATION (MPO) AREA. STOKES U-5209 WINSTON-SALEM MPO. RESERVE FOR FUNDS TO BE FLEXED N YES IN PROGRESS TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS. T-128

133 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS SURRY B-4284 MILL CREEK. REPLACE BRIDGE NO. 29 SURRY B-5245 FISHER RIVER. R YES COMPLETED IN 2011 REPLACE BRIDGE NO. 326 SURRY BD-5111 DIVISION 11 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. SURRY I-5211 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 11. SURRY R-2637 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. SURRY W-5307 NC 89, SOUTH OF NC 18 TO SOUTH OF NC 18. CURVE RE-ALIGNMENT, PAVEMENT WIDENING, AND PAVED SHOULDERS. SWAIN B-4287 NANTAHALA RIVER. REHABILITATE BRIDGE NO. 99 AND BRIDGE NO. 100 SWAIN BD-5114 DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. SWAIN C-5150 OCONALUFTEE VISITORS CENTER IN NORTH CAROLINA TO N YES IN PROGRESS SUGARLAND VISITORS CENTER IN TENNESSEE. PARK SHUTTLE SERVICE. SWAIN C-5151 GREAT SMOKIES NATIONAL PARK. CONSTRUCT A MIXED-USE PATHWAY. SWAIN R-4440A SR 1369 (BYRD ROAD) IN MACON COUNTYTO EXISTING PAVEMENT IN SWAIN COUNTY. UPGRADE TO SECONDARY ROAD STANDARDS. C NO DELAYED TO 2015 SWAIN R-4440B SR 1369 (BYRD ROAD) IN MACON COUNTYTO EXISTING PAVEMENT IN SWAIN COUNTY. UPGRADE TO SECONDARY ROAD STANDARDS. C NO DELAYED TO 2015 SWAIN R-4440D SR 1369 (BYRD ROAD) IN MACON COUNTYTO EXISTING PAVEMENT IN SWAIN COUNTY. UPGRADE TO SECONDARY ROAD STANDARDS. C NO DELAYED TO 2014 SWAIN R-5006 S RAMSSEY WALKINGSTICK. PE NO PROJECT DELETED RECONSTRUCTION. SWAIN R-5008 S ELSIE RATTLER ROAD. PE NO PROJECT DELETED RECONSTRUCTION. SWAIN R-5118 BRYSON CITY, SR 1321 TO SR WIDENING, REALIGNMENT AND DRAINAGE IMPROVEMENTS. TRANSYLVANIA B-4288 EAST FORK FRENCH BROAD RIVER. REPLACE BRIDGE NO. 85 U YES IN PROGRESS TRANSYLVANIA B-4289 NORTH FORK FRENCH BROAD RIVER. REPLACE BRIDGE NO. 93 U YES IN PROGRESS T-129

134 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS TRANSYLVANIA B-4291 DAVIDSON RIVER. REPLACE BRIDGE NO. 193 TRANSYLVANIA B-4989 CREEK. REPLACE BRIDGE NO. 148 TRANSYLVANIA BD-5114 DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. TRANSYLVANIA U-5104 US 64 BUSINESS, SR 1349 (WEST MAIN STREET) TO US 64. WIDEN ROADWAY. TYRRELL B-4647 NORTHWEST FORK. U YES IN PROGRESS REPLACE BRIDGE NO. 6 R YES COMPLETED TYRRELL BD-5101 DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. UNION B-4294 WAXHAW CREEK. REPLACE BRIDGE NO. 184 UNION B-4651 SOUTH FORK CROOKED CREEK. REPLACE BRIDGE NO. 251 UNION BD-5110 DIVISION 10 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. UNION C-4957A CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. UNION C-4957B CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS. UNION C-4960 INTERSECTION IMPROVEMENTS AT INDIAN TRAIL AND OLD MONROE ROAD. UNION R-2559 MONROE BYPASS. FOUR LANES DIVIDED ON NEW LOCATION. UNION R-3329 I-485 (CHARLOTTE OUTER LOOP) TO US 74 (MONROE BYPASS). MULTI- LANE FREEWAY ON NEW LOCATION. (COORDINATE WITH U-3825) UNION U-3467A SR 1316 (REA ROAD) EXTENSION, NC 16 TO SR 1008 (INDIAN R NO DELAYED TO 2016 TRAIL-WAXHAW ROAD). MULTI-LANES, PART ON NEW LOCATION. UNION U-9999C MECKLENBURG-UNION METROPOLITAN PLANNING PE YES IN PROGRESS ORGANIZATION (MUMPO) PLANNING (PL) SUPPLEMENT. UNION W-5309 SR 1520 (INDIAN TRAIL FAIRVIEW ROAD) AND SR 1514 (ROCKY R YES COMPLETED IN 2011 RIVER ROAD). CONVERT EXISTING INTERSECTION TO A ROUNDABOUT. VANCE BD-5105 DIVISION 5 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. VANCE I-2810 GRANVILLE COUNTY LINE (MILE POST 208.5) TO US 158 BYPASS (MILE POST 213.5) IN VANCE COUNTY. PAVEMENT AND BRIDGE REHABILITATION. CG YES PAYBACK IN PROGRESS T-130

135 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS VANCE I-5205 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 5. VANCE U-4916 SR 1165 (BECKFORD DRIVE). C NO FUNDED-CONSTRUCTION NOT WIDEN TO MULTILANES AUTHORIZED WAKE B-4656 SR 1012 (WESTERN BOULEVARD). REMOVE BRIDGE NO. 492 AND RECONSTRUCT INTERSECTIONS. WAKE B-4660 NEUSE RIVER. REPLACE BRIDGE NO. 19 WAKE B-4661 POWELL CREEK. U YES IN PROGRESS REPLACE BRIDGE NO. 151 WAKE B-4697 WHITE OAK CREEK. REPLACE BRIDGE NO. 55 WAKE B-4991 BEAVER CREEK. REPLACE BRIDGE NO. 359 WAKE BD-5105 DIVISION 5 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. WAKE C-4923 CITYWIDE UPGRADE OF SIGNAL SYSTEM. WAKE C-4925 NC 55 (MAIN STREET). CONSTRUCT SIDEWALKS. WAKE C-5102A TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS WAKE C-5102B TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. N YES IN PROGRESS WAKE EB-4978 EDWARDS MILL ROAD EXTENSION, REEDY CREEK ROAD TO TRINITY ROAD. CONSTRUCT MULTI-USE PATH. WAKE EB-5002 MINGO CREEK GREENWAY. WAKE EL-5100 PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS IN THE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO). WAKE I-4709 SR 1728 (WADE AVENUE) TO EAST OF CG YES PAYBACK IN PROGRESS I-440/US 64 (MILE POST 302). PAVEMENT REPAIR AND RESURFACING. WAKE I-4744 SR 1728 (WADE AVENUE, MILE POST 289) C YES COMPLETED TO I-440/US 1-64 (MILE POST 293). ADD LANES. CG YES PAYBACK IN PROGRESS WAKE I-5112 EAST OF I-540 TO WADE AVENUE (EXIT 289) INCLUDING RAMPS, AND SR 1728 (WADE AVENUE) FROM I-40 TO SR 3009 (EDWARDS MILL ROAD). MILL AND RESURFACE ROADWAY, SHOULDERS AND RAMPS. CG YES PAYBACK IN PROGRESS T-131

136 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS WAKE I-5205 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 5. WAKE P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. WAKE P-2918 TRAIN 73/74 OPERATIONS BETWEEN O YES IN PROGRESS CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. WAKE P-2918E TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. O YES IN PROGRESS WAKE P-2918F TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. WAKE P-2918G TRAIN 73/74 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. WAKE P-2918H TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. R YES COMPLETED WAKE P-2918I TRAIN 73/74 OPERATIONS BETWEEN PE YES COMPLETED CHARLOTTE AND RALEIGH AND CAPITAL YARD MAINTENANCE FACILITY. WAKE P-3803 STATION UPLIFT. PE YES IN PROGRESS WAKE P-4405 PRIVATE CROSSING SAFETY INITIATIVE PE YES IN PROGRESS TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN R NO DELAYED TO 2013 RALEIGH AND CHARLOTTE. WAKE P-5201 MORRISVILLE PARKWAY GRADE SEPARATION. PE YES IN PROGRESS R NO DELAYED TO 2013 WAKE R-2552E CLAYTON BYPASS, I-40 IN WAKE COUNTY TO US BUSINESS IN JOHNSTON COUNTY. FREEWAY ON NEW LOCATION. WAKE R-2635 WESTERN WAKE FREEWAY, NC 55 (SOUTH) TO NC 55 (NORTH). FREEWAY ON NEW LOCATION. WAKE R-2814B NORTH OF SR 2044 (LIGON MILL ROAD) TO NC 39 IN LOUISBURG. WIDEN TO MULTI-LANES, SOME NEW LOCATION.. CG YES UNDER CONSTRUCTION WAKE U-4703 TIMBER DRIVE EAST EXTENSION, NC 50 TO WHITE OAK ROAD. MULTI-LANES ON NEW LOCATION. T-132

137 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS WAKE U-4716A SR 1978 (HOPSON ROAD), SR 1980 (CHURCH STREET), AND PE YES IN PROGRESS NORFOLK SOUTHERN RAILROAD-NORTH CAROLINA RAILROAD, SOUTH OF I-40 TO NORTH OF MCCRIMMON PARKWAY. R NO DELAYED TO 2012 CONSTRUCT A GRADE SEPARATION AT HOPSON ROAD, EXTEND CHURCH STREET TO HOPSON ROAD, CLOSE CHURCH STREET CROSSING M OF THE NORFOLK SOUTHERN-NORTH CAROLINA RAILROAD, CONSTRUCT SECOND TRACK, AND WIDEN HOPSON ROAD FROM EAST OF SR 1999 (DAVIS DRIVE) TO NC 54. C NO DELAYED TO 2013 WAKE U-4716C SR 1978 (HOPSON ROAD), SR 1980 (CHURCH STREET), AND PE YES IN PROGRESS NORFOLK SOUTHERN RAILROAD-NORTH CAROLINA RAILROAD, SOUTH OF I-40 TO NORTH OF MCCRIMMON PARKWAY. R NO DELAYED TO 2012 CONSTRUCT A GRADE SEPARATION AT HOPSON ROAD, EXTEND CHURCH STREET TO HOPSON ROAD, CLOSE CHURCH STREET CROSSING M OF THE NORFOLK SOUTHERN-NORTH CAROLINA RAILROAD, CONSTRUCT SECOND TRACK, AND WIDEN HOPSON ROAD FROM EAST OF SR 1999 (DAVIS DRIVE) TO NC 54. C NO DELAYED TO 2013 WAKE U-4763B NEW ROUTE - TRIANGLE PARKWAY, NC-540 TO I-40. MULTI-LANE FACILITY ON NEW LOCATION. WAKE U-5118 OPERATIONAL IMPROVEMENTS FOR SAFETY AND CONGESTION MITIGATION WAKE U-9999B CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION PE YES IN PROGRESS (NEW TIP (CAMPO) PLANNING (PL) SUPPLEMENT. NUMBER U-4850) WAKE W-5138 SR 3851 (SOUTH MOUNTAIN DRIVE) TO CARY LEE ROAD. REALIGN SR 1010 TO FLATTEN TWO HORIZONTAL CURVES. WARREN BD-5105 DIVISION 5 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. WARREN I-5205 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 5. WASHINGTON BD-5101 DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE R NO DELAYED TO 2012 REPLACEMENT PROJECTS AT SELECTED LOCATIONS. WATAUGA B-3924 MEAT CAMP CREEK. REPLACE BRIDGE NO. 33 WATAUGA B-4315 BAIRD CREEK. REPLACE BRIDGE NO. 62, BRIDGE NO. 68 AND BRIDGE NO. 70 WATAUGA B-4668 COVE CREEK. REPLACE BRIDGE NO. 29 U YES IN PROGRESS WATAUGA BD-5111 DIVISION 11 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. WATAUGA R-2237C NORTH OF NC 268 TO MULTI-LANES NORTH OF BLOWING ROCK. WIDEN TO MULTI-LANES. WATAUGA R-2637 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. WATAUGA R-5108B PRA-BLRI 2H13, J16. RESURFACE SECTIONS 2H AND 2J, MILE MARKER TO MILE MARKER 317.5, INCLUDING OVERLOOKS, PARKING AREAS, SPURS, AND ACCESS ROADS. T-133

138 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS WAYNE B-4673 WALNUT CREEK. U NO DELAYED TO 2012 REPLACE BRIDGE NO. 120 WAYNE BD-5104 DIVISION 4 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. WAYNE R-4418 NATIONAL HIGHWAY SYSTEM GUARD- RAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. WAYNE U-3609A US 13 (BERKELEY BOULEVARD), SR 1560 (ROYAL AVENUE) TO NORTH OF SR 1705 (HOOD SWAMP ROAD). WIDEN TO MULTI- LANES. WAYNE W-5010 SR 1234 (EBENEZER CHURCH ROAD- CAPPS BRIDGE ROAD) AND WEST OF SR SAFETY IMPROVEMENTS. WAYNE W-5332 SR 1120 (O'BERRY ROAD). REMOVE SIGNAL AND FLASHER, CONSTRUCT MAINLINE DIRECTIONAL CROSSOVER WITH MEDIAN U-TURN ON US 117 APPROXIMATELY 1000 FEET NORTH AND SOUTH OD SR WAYNE W-5333 SR 1135 (COUNTRY CLUB ROAD). MODIFY EXISTING CROSSOVER BY CONSTRUCTING A MAINLINE DIRECTIONAL CROSSOVER WITH MEDIAN U-TURN LOCATIONS APPROXIMATELY 1000 FEET NORTH AND SOUTH OF SR WILKES B-4323 NORTH PRONG LEWIS FORK CREEK. REPLACE BRIDGE NO. 104 WILKES B-4325 MIDDLE FORK REDDIES RIVER. REPLACE BRIDGE NO. 718 WILKES BD-5111 DIVISION 11 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. WILKES R-2637 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. WILKES R-3405 SR 1002 (MOUNTAIN VIEW ROAD) TO SR WIDEN TO THREE LANES. WILKES SF-4911D NC AND SR 2545 (PLAZA DRIVE) NEAR NORTH WILKESBORO. WIDEN AND CONSTRUCT LEFT TURN LANE. WILSON B-4328 GREAT SWAMP. REPLACE BRIDGE NO. 3 WILSON BD-5104 DIVISION 4 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. WILSON I-5204 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 4. WILSON P-2908 CAPITAL AND OPERATIONS COST OF O YES IN PROGRESS TRAIN 79/80 BETWEEN CHARLOTTE AND ROCKY MOUNT. T-134

139 ACCOMPLISHMENTS COUNTY ID NO. DESCRIPTION TYPE FEDERAL FISCAL YEAR 2011 STARTED REMARKS WILSON R-4418 NATIONAL HIGHWAY SYSTEM GUARD- RAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. WILSON W-5331 SOUTH OF SR 1626 (FAIRFIELD DAIRY ROAD) NORTHWARD ONE R YES COMPLETED MILE. CONSTRUCT LEFT TURN LANE AT SR 1626, OVERLAY WITH FRICTION COURSE, RE-STRIPE WITH THERMOPLASTIC MARKINGS AND INSTALL CENTERLINE PAVEMENT MARKINGS. YADKIN BD-5111 DIVISION 11 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. YADKIN I-5211 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 11. YADKIN R-2637 GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS. YANCEY B-4851 CREEK. REPLACE BRIDGE NO. 31 U YES IN PROGRESS YANCEY BD-5113 DIVISION 13 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS. YANCEY R-2519A SR 1336 (JACK'S CREEK ROAD) TO MULTI-LANE SECTION WEST OF SPRUCE PINE. WIDEN TO MULTI- LANES. (INCLUDES B-3268) T-135

140

141 Completions/Deletions Federal Fiscal Year 2009 Projects where all activities were Completed or Deleted during Federal Fiscal Year 2009 are listed in the following Completions/Deletions Table. T-137

142

143 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION ALAMANCE SR 1002 B-4000 COMPLETED REPLACED BRIDGE NO. 45 OVER JORDAN CREEK. ALAMANCE SR 2116 B-4002 COMPLETED REPLACED BRIDGE OVER VARNALS CREEK. ALAMANCE VARIOUS E-4123 COMPLETED HISTORIC PRESERVATION FOUNDATION OF NORTH CAROLINA, INC. CONSTRUCTED STREET-SCAPE AND PEDESTRIAN TRAILS IN GLENCOE MILL AND MILL VILLAGE. ALAMANCE GRAHAM E-4940 COMPLETED COMPLETED COURT SQUARE STREETSCAPE, ALONG THE 100 BLOCKS OF NORTH AND SOUTH MAIN STREETS AND EAST AND WEST ELM STREETS, AND CROSSWALK IMPROVEMENTS AND ADD CURBING AROUND CIVIL WAR MEMORIAL. ALAMANCE I-40/85 I-5113 DELETED EAST OF SR 3056 (ROCK CREEK DAIRY ROAD) TO WEST OF SR 1226 (UNIVERSITY DRIVE). MILL AND RESURFACE THE NORTH AND SOUTHBOUND LANES. PROJECT DELETED. TO BE ACCOMPLISHED UNER I ALAMANCE BURLINGTON U-2905A COMPLETED WESTERN ALAMANCE LOOP. CONSTRUCTED RAMP AT I-40/85 INTERCHANGE. ALEXANDER VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. ALLEGHANY SR 1471 B-5224 DELETED BRUSH CREEK. REPLACE BRIDGE NO. 36. PROJECT DELETED BY DIVISION FORCES. ASHE NC B-3300 COMPLETED BUFFALO CREEK. REPLACE BRIDGE NO. 57 ASHE SR 1366 B-3606 COMPLETED HORSE CREEK. REPLACED BRIDGE NO. 70 ASHE SR 1169 (CONLEY CHEEK ROAD) B-3803 COMPLETED SOUTH FORK NEW RIVER. REPLACED BRIDGE NO. 334 ASHE SR 1507 B-3805 COMPLETED BUFFALO CREEK. REPLACED BRIDGE NO. 310 ASHE SR 1320 B-4013 COMPLETED CREEK. REPLACED BRIDGE NO. 338 ASHE SR 1599 B-5225 DELETED PEAK CREEK. REPLACE BRIDGE NO PROJECT DELETED BY DIVISION FORCES. ASHE VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. AVERY VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. BEAUFORT NC 32 B-4018 COMPLETED BROAD CREEK. REPLACE BRIDGE NO. 104 BEAUFORT SR 1410 B-4021 COMPLETED LATHAM CREEK. REPLACE BRIDGE NO. 84 COMPLETED IN FY 2008 T-139

144 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION BEAUFORT SR 1414, SR 1556 B-4022 COMPLETED TRANTERS CREEK REPLACE BRIDGE NO. 90 COMPLETED IN FY 2008 BEAUFORT SR 1743 B-4431 COMPLETED BRANCH OF BACK CREEK. REPLACE BRIDGE NO. 178 COMPLETED IN FY 2007 BEAUFORT US 13, US 17, US 64, US 70, US 158, US 264 R-4401 COMPLETED NATIONAL HIGHWAY SYSTEM (NHS) GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL,END TREATMENTS AND BRIDGE ANCHOR UNITS. COMPLETED IN FY BERTIE SR 1123 B-3612 COMPLETED BRANCH INDIAN CREEK. REPLACE BRIDGE NO. 143 BERTIE US 13, US 17, US 64, US 70, US 158, US 264 R-4401 COMPLETED NATIONAL HIGHWAY SYSTEM (NHS) GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL,END TREATMENTS AND BRIDGE ANCHOR UNITS. COMPLETED IN FY BLADEN SR 1760 B-3812 COMPLETED ELKTON SWAMP. REPLACE BRIDGE NO. 50 BLADEN US 701 B-4710 DELETED BROWNS CREEK. REPLACE BRIDGE NO. 3 TO BE INCLUDED WITH R BLADEN NC 87 R-2562 COMPLETED ELIZABETHTOWN BYPASS IN BLADEN COUNTY TO MULTI- LANES AT I-95 IN CUMBERLAND COUNTY. WIDEN TO MULTI- LANES. BLADEN US 17, US 74, US 76, US 117, NC 24, NC 87 R-4405 COMPLETED HNATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. BRUNSWICK NC 211 US 421 F-5002 COMPLETED SOUTHPORT RAMP-GANTRY-DOLPHIN. REPAIR AND REPLACE. BRUNSWICK US 17, US 74, US 76, US 117, NC 24, NC 87 R-4405 COMPLETED HNATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. BUNCOMBE NC 9 BK-5122 COMPLETED BROAD RIVER. REPLACED BRIDGE NO. 79 BUNCOMBE VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. BUNCOMBE NC 146 R-2813C COMPLETED NC 191 TO US 25. WIDEN TO MULTI- LANES WITH CURB AND GUTTER. BUNCOMBE BLUE RIDGE PARKWAY R-4725 COMPLETED PRA-BLRI 2P15. REHABILITATE CRAGGY PINNACLE TUNNELS. BURKE VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. BURKE NC 18 W-5014 COMPLETED SOUTH OF SR 1001 TO NORTH OF SR INSTALL FRICTION PAVEMENT OVERLAY, RUMBLE STRIPS, AND SNOWPLOWABLE RAISED PAVEMENT MARKERS. INSTALL LEFT TURN LANE AT SR T-140

145 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION CABARRUS NC 49 R-2533B COMPLETED NC 49 FROM WEST OF IRISH BUFFALO CREEK TO EAST OF SR 2630 (WALKER ROAD) CALDWELL SR 1728 B-3126 COMPLETED BRIDGE #90 OVER GUNPOWDER CREEK & APPROACHES ON SR 1728 CALDWELL NC 90 B-3818 COMPLETED BRIDGE OVER LOST COVE CREEK AND APPROACHES ON NC 90. CALDWELL SR 1517 B-4054 COMPLETED YADKIN RIVER. REPLACED BRIDGE NO. 334 CALDWELL VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. CALDWELL NC 268 E-5104 DELETED HISTORIC HAPPY VALLEY BYWAY, UPPER YADKIN VALLEY RIVER BASIN-HAPPY VALLEY. SCENIC BYWAY, PATTERSON IN CALWELL COUNTY TO WILKESBORO IN WILKES COUNTY. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. CARTERET SR 1124 B-3625 COMPLETED EAST PRONG OF BROAD CREEK. REPLACE BRIDGE NO. 20 CARTERET US 13, US 17, US 64, US 70, US 158, US 264 R-4401 COMPLETED NATIONAL HIGHWAY SYSTEM (NHS) GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL,END TREATMENTS AND BRIDGE ANCHOR UNITS. COMPLETED IN FY CASWELL SR 1565 B-3629 COMPLETED REPLACED BRIDGE NO. 11 OVER COUNTRY LINE CREEK. REPLACED BRIDGE NO. 72 OVER PRONG OF COUNTY LINE CREEK. CASWELL US , US 29, US 158, US 220, US 421, NC 68 R-4403 COMPLETED NATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADED SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS CASWELL US 29 W-4821 COMPLETED INSTALLED SHOULDER RUMBLE STRIPS FROM US 29 BUSINESS IN ROCKINGHAM COUNTY TO VIRGINIA STATE LINE. CHATHAM SR 1525 B-3824 COMPLETED FERRELL'S CREEK. REPLACED BRIDGE NO. 88 CHATHAM SR 2170 B-4065 COMPLETED REPLACED BRIDGE NO. 142 OVER MEADOWS CREEK. CHATHAM US 421 R-2610A COMPLETED SOUTH OF SR 1007 (PLANK ROAD) TO NORTH OF SR 1010 (GOLDSTON-PITTSBORO ROAD) - COMPLETED ROAD. CHATHAM US 421 R-2610B COMPLETED NORTH OF SR 1010 (GOLDSTON-PITTSBORO ROAD) TO MULTILANES SOUTH OF SILER CITY - COMPLETED ROAD. CHATHAM VARIOUS R-4425 COMPLETED UPGRADE GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS ON VARIOUS NATIONAL HIGHWAY SYSTEM ROUTES. CHATHAM SR 1176 (OLD US 421) SF-4908D COMPLETED NC 902. INSTALLED SIGNS AND STANDARD OVERHEAD FLASHER. CHEROKEE SR 1331 BEAVERDAM ROAD FH 60 B-3431 COMPLETED NANTAHALA FOREST, PFH 60(1), BEAVERDAM CREEK. REPLACED BRIDGE NO. 45 T-141

146 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION CLAY VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. CLEVELAND VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. COLUMBUS NC 904 B-4079 COMPLETED FORK JUNIPER SWAMP. REPLACE BRIDGE NO. 20 COLUMBUS US 17, US 74, US 76, US 117, NC 24, NC 87 R-4405 COMPLETED HNATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. CRAVEN SR 1005 B-4085 COMPLETED BACHELOR CREEK. REPLACE BRIDGE NO. 212 COMPLETED IN FY 2008 CRAVEN SR 1615 B-4088 COMPLETED BRANCH UPPER BROAD CREEK. REPLACE BRIDGE NO. 74 COMPLETED IN 2008 CRAVEN SR 1420 B-5176 DELETED CASWELL BRANCH.REPLACE BRIDGE NO. 187 FY ACCOMPLISHED BY DIVISION. CRAVEN US 17 R-3403 COMPLETED MILLS STREET IN BRIDGETON TO NC 43. WIDEN TO MULTI- LANES. SEGMENT "BA" COMPLETE IN FY CUMBERLAND SR 1728 B-4093 COMPLETED GUM LOG CREEK. REPLACE BRIDGE NO. 81 CUMBERLAND I-95 B-5175 DELETED BRIDGE NO. 19, NO. 156 AND NO. 159 IN CUMBERLAND COUNTY AND BRIDGE NO. 37, NO. 57, NO. 66 AND NO. 80 IN HARNETT COUNTY. CORRECT VERTICAL CLEARANCE. ( TO BE ACCOMPLISHED UNDER I-4745.) CUMBERLAND I-95 I-4917 COMPLETED ROBESON COUNTY LINE TO I-295 & US-13 GARVEE FUNDED PROJECT DUE TO PAYBACK. CUMBERLAND I-95 K-4904 COMPLETED RENOVATION OF REST AREA PAIR-BUILDINGS, GROUNDS AND PARKING FACILITIES. BUILDINGS TO INCLUDE DUAL RESTROOMS AND ADA COMPLIANT FAMILY RESTROOM. CUMBERLAND NC 87 R-2562 COMPLETED ELIZABETHTOWN BYPASS IN BLADEN COUNTY TO MULTI- LANES AT I-95 IN CUMBERLAND COUNTY. WIDEN TO MULTI- LANES. CUMBERLAND US 17, US 74, US 76, US 117, NC 24, NC 87 R-4405 COMPLETED HNATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. CUMBERLAND HOPE MILLS U-0620 COMPLETED HOPE MILLS BYPASS, SR 1141 (BINGHAM DRIVE) TO SR 1363 (ELK MILL ROAD). MULTI-LANES ON NEW LOCATION. COMPLETED IN FY CUMBERLAND FAYETTEVILLE U-2912 COMPLETED OWEN DRIVE EXTENSION, I-95 BUSINESS TO NC 87. MULTI- LANES ON NEW LOCATION. COMPLETED IN FY CUMBERLAND FAYETTEVILLE U-3311B COMPLETED SR 1141 (BINGHAM DRIVE), PROPOSED HOPE MILLS BYPASS TO US 401 (RAEFORD ROAD). WIDEN TO MULTI-LANES. T-142

147 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION CUMBERLAND FAYETTEVILLE U-4421 COMPLETED SR 1141 (CUMBERLAND ROAD), SR 1133 (GEORGE OWEN ROAD) TO WEST OF NC-50 (HOPE MILLS ROAD). WIDEN TO MULTI-LANES. CURRITUCK SR 1222 B-2950 COMPLETED TULLS CREEK. REPLACE BRIDGE NO. 4 CURRITUCK NC 615 B-3445 COMPLETED CREEK. REPLACE BRIDGE NO. 7 COMPLETED IN FY DAVIDSON US AND NORTHBOUND LANE I-85 BUSINESS B-3157 COMPLETED SR 1242 AND MICHAEL CREEK. COMPLETED BRIDGE AND APPROACH. DAVIDSON SR 1243 B-3446 COMPLETED SOUTHERN RAILROAD. REPLACED BRIDGE NO. 415 DAVIDSON SR 1741 B-4100 COMPLETED REPLACED BRIDGE NO. 142 OVER ABBOTTS CREEK. DAVIDSON SR 1741 B-4101 COMPLETED SPURGEON CREEK. REPLACED BRIDGE NO. 141 DAVIDSON SR 2550 B-4103 COMPLETED REPLACED BRIDGE NO. 416 OVER BEAVERDAM CREEK. DAVIDSON LEXINGTON C-4968 DELETED NATIONAL BOULEVARD AND 5TH AVENUE INTERSECTION IMPROVEMENTS, TURN LANES AND SIGNALIZATION. PROJECT DELETED BY CITY REQUEST. DAVIDSON COUNTYWIDE C-5125 DELETED REPLACEMENT OF TWO 15 PASSENGER FLEET VANS WITH TWO HYBRID 15 PASSENGER VANS. PROJECT DELETED. PROJECT DECLINED BY COUNTY. DAVIDSON NC 109 SF-4909B COMPLETED INTERSECTION WITH SR 2266 (HANNERVILLE ROAD- CLARKSBURY CHRUCH ROAD) SOUTH OF THOMASVILLE. INSTALLED LEFT TURN LANES. DAVIDSON SR 2183 SR 2097 SF-4909C COMPLETED IMPROVED SIGHT DISTANCE ON SR 2183 (FISHER FERRY ROAD- DENTON ROAD) AND SR 2097 (MT. ZION CHURCH ROAD- NOAHTOWN ROAD). DAVIDSON I-85 BUSINESS / US W-4822 COMPLETED SECTION A, I-85 NORTHWARD TO SWEARING CREEK IN DAVIDSON COUNTY; SECTION B, RANDOLPH COUNTY LINE NORTHWARD TO I-85 IN GUILFORD COUNTY. INSTALLED SHOULDER RUMBLE STRIPS. DAVIE NC 801 B-4104 COMPLETED REPLACED BRIDGE NO. 21 OVER FULTON CREEK. DAVIE NC 801 B-4256 COMPLETED SOUTH YADKIN RIVER. REPLACED BRIDGE NO. 80. DAVIE I-40 I-3600 COMPLETED SR 1436 (PINEBROOK DRIVE) TO WEST OF NC 801. PERFORMED PAVEMENT REHABILITATION. DUPLIN NC 111 B-3836 COMPLETED PANTHER CREEK. REPLACE BRIDGE NO. 35 DUPLIN SR 1826 B-4108 COMPLETED NINE MILE CREEK. REPLACE BRIDGE NO. 188 DUPLIN I-40 I-4702 DELETED SR 1122 (MILEPOST 339) IN JOHNSTON TO NC 132 (MILEPOST 420) IN NEW HANOVER COUNTY. SEAL EXISTING SHOULDERS PROJECT IS NO LONGER NEEDED. DUPLIN NC 41 R-3409A COMPLETED I-40 TO EAST OF SR WIDEN TO TWENTY-FOUR FEET COMPLETE, DONE BY NCMA PROJECT. T-143

148 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION DUPLIN NC 41 R-3409B COMPLETED EAST OF SR 1945 TO EAST OF SR WIDEN TO TWENTY- FOUR FEET. COMPLETE, DONE BY NCMA PROJECT. DUPLIN US 17, US 74, US 76, US 117, NC 24, NC 87 R-4405 COMPLETED HNATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. DURHAM SR 1402 B-3169 COMPLETED REPLACED BRIDGE NO. 158 OVER CREEK. DURHAM SR 1303 B-4109 COMPLETED MUD CREEK. REPLACED BRIDGE NO DURHAM SR 1616 B-4110 COMPLETED REPLACED BRIDGE NO. 5 OVER MOUNTAIN CREEK DURHAM DURHAM E-4529 COMPLETED WEST POINT ON THE ENO PARK TO PENNY'S BEND NATURE RESERVE. CONSTRUCTED OFF-ROAD MULTI-USE TRAIL. DURHAM DURHAM E-4924 COMPLETED CONSTRUCTED PEDESTRIAN MEDIANS AND A REFUGE ISLANDS ON CLUB BOULEVARD, OVAL DRIVE TO OAKLAND AVENUE AT THE INTERSECTIONS OF WEST CLUB BOULEVARD WITH OVAL DRIVE AND OAKLAND AVENUE. DURHAM I-85 I-0306C COMPLETED EAST OF SR 1401 (COLE MILL ROAD) TO WEST OF BROAD STREET. DURHAM I-85 I-4903 COMPLETED REPAIRED PAVEMENT FROM SOUTH OF DURHAM/GRANVILLE COUNTY LINE IN DURHAM COUNTY TO US 15 IN GRANVILLE COUNTY DURHAM I-540 NC 54 R-2000AE COMPLETED INSTALLED ITS DEVICES. DURHAM NC 55 R-2906 COMPLETED WIDENED NO 55 TO MULTILANES FROM US 64 IN WAKE COUNTY TO SR 1121 (CORNWALLIS ROAD) IN DURHAM COUNTY. DURHAM SR 1004 R-4752A COMPLETED STRENGTHENED AND RESURFACED PAVEMENT, ADDED TURN LANES, AND INSTALLED THERMOPLASTIC PAVEMENT MARKINGS FROM SR 2602 (RED MILL ROAD) TO THE MERCK PHAMACEUTICAL PLANT DURHAM US 501 SF-4905A COMPLETED SR 1601 (MOORES MILL ROAD)-SR 1468 (QUAIL ROOST FARM ROAD). INSTALLED TRAFFIC SIGNAL. DURHAM RESEARCH TRIANGLE PARK U-4410DB COMPLETED CONSTRUCTED RTP ACCESS FACILITIES ON SR 2957 (HOPSON ROAD) FROM NC 55 TO LOUIS STEPHENS DRIVE. DURHAM DURHAM U-4446 COMPLETED NC 147 (DURHAM FREEWAY), I-40 TO I-85. INSTALLED ITS INFRASTRUCTURE IMPROVEMENTS. DURHAM VARIOUS U-4729 DELETED CONGESTION MANAGEMENT STUDY FOR DURHAM COUNTY. PROJECT DELETED - ACCOMPLISHED UNDER U DURHAM DURHAM U-5147 DELETED ITS INSTALLATION OF CAMERAS AT 11 SELECTED LOCATIONS. PROJECT DELETED. PROJECT DECLINED BY DIVISION. DURHAM I-85 US US 70 NC 147 W-4811 COMPLETED INSTALLED MILLED RUMBLE STRIPS ON THE INSIDE AND OUTSIDE PAVED SHOULDERS ON SECTIONS OF I-85 (DURHAM AND GRANVILLE COUNTIES), US 70, US AND NC 147 (DURHAM COUNTY).. DURHAM I-40 W-5125 COMPLETED INSTALLED MEDIAN BARRIER EAST OF NC 147. T-144

149 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION EDGECOMBE SR 1135 B-4111 COMPLETED COKEY SWAMP. REPLACE BRIDGE NO. 19 COMPLETED IN FY 2008 EDGECOMBE US 258 B-4934 COMPLETED DEEP CREEK. REPLACE BRIDGE NO. 85 COMPLETED IN FY 2008 EDGECOMBE TARBORO E-4751 COMPLETED SR 1588 (EAST NORTHERN BOULEVARD), NC 33 TO END OF DANIEL STREET. CONSTRUCT BIKE LANES. EDGECOMBE MCNAIR ROAD EXTENSION R-4434 COMPLETED NC 111 (WILSON STREET) TO SR 1344 (SARA LEE INDUSTRIAL ROAD). TWO LANES ON NEW LOCATION. COMPLETE IN FY FORSYTH SR 1631 B-4112 COMPLETED REPLACED BRIDGE NO. 30 OVER MUDDY CREEK. FORSYTH WINSTON-SALEM EB-4010 COMPLETED CONSTRUCTED MUDDY CREEK GREENWAY FROM ROBINHOOD ROAD TO COUNTRY CLUB ROAD. FORSYTH I-40 I-2102 COMPLETED SR 1101 (HARPER ROAD, EXIT 182). MODIFIED INTERCHANGE. FORSYTH I-40 / US 311 I-4717 COMPLETED COMPLETED RESURFACING FROM EAST OF US 52 TO US 311 INTERCHANGE. FORSYTH I-40 I-4926 COMPLETED COMPLETED PAVEMENT REHABILITATION FROM WESTGATE CENTER DRIVE TO JONESTOWN ROAD (US 421/I-40 BUSINESS) WEST OF WINSTON-SALEM FORSYTH CLEMMONS U-3119 COMPLETED WIDENED SR 1103 (LEWISVILLE-CLEMMONS ROAD) FROM SR 1891 (PEACE HAVEN ROAD) TO NORTH OF US 421 AND REPLACED BRIDGE NO. 213 OVER US 421. FORSYTH WINSTON-SALEM U-3837 COMPLETED WIDENED SR 3153 (HANES MALL BOULEVARD) FROM KESTER MILL ROAD TO WEST OF WESTGATE CENTER DRIVE. FORSYTH WINSTON-SALEM U-4413 DELETED SR 1646 (BROAD STREET), WACHOVIA STREET TO SECOND STREET. WIDEN STRUCTURE H178 AND IMPROVE APPROACHES. PROJECT DELETED - FACILITY NO LONGER ON STATE-MAINTAINED SYSTEM FRANKLIN US 1 W-4422 COMPLETED CONSTRUCTED LEFT TURN LANES AT EXISTING MEDIAN OPENINGS FROM SOUTH OF US 1A TO NORTH OF SR FRANKLIN US 401 W-5111 DELETED INTERSECTION WITH SR 1101 (DARIUS PEARCE ROAD AND SID EAVES ROAD). INSTALL TRAFFIC SIGNAL AND LEFT TURN LANES ON US 401. PROJECT DELETED. COMPLETED BY DIVISION MAINTENANCE. GASTON GASTONIA E-4810 COMPLETED STREETSCAPE IN DOWNTOWN BETWEEN THE CBD AND WEST GASTONIA INCLUDING THE HISTORIC LORAY MILL AND MILL VILLAGE. GASTON GASTONIA U-3806 DELETED US (FRANKLIN BOULEVARD), SR 2200 (COX ROAD) TO SR 2339 (CHURCH STREET). ADD LANE IN THE EASTBOUND DIRECTION. (PROJECT DELETED DUE TO LOW PRIORITY). GRAHAM SR 1233 FH 101 B-4689 COMPLETED NANTAHALA NATIONAL FOREST, PFH 101-1(1), PANTHER CREEK. REPLACED BRIDGE NO. 99 T-145

150 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION GRAHAM VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. GRANVILLE SR 1004 B-3643 COMPLETED REPLACED BRIDGE NO. 72 OVER HATCHER'S RUN (COMPLETED IN FY 2005) GRANVILLE SR 1141 B-4124 COMPLETED TAR RIVER. REPLACED BRIDGE NO. 84. GRANVILLE SR 1412 B-4525 COMPLETED GRASSY CREEK. REPLACED BRIDGE NO. 133; AND COMPLETED DESCRIBED UNDER B GRANVILLE SR 1435 B-4526 COMPLETED MOUNTAIN CREEK. REPLACED BRIDGE NO. 200 ( PERFORMED UNDER B-4525). GRANVILLE I-85 I-4903 COMPLETED REPAIRED PAVEMENT FROM SOUTH OF DURHAM/GRANVILLE COUNTY LINE IN DURHAM COUNTY TO US 15 IN GRANVILLE COUNTY GRANVILLE OXFORD U-5125 DELETED US 158 BYPASS, US 15 TO US 158 BUSINESS. PATCH AND RESURFACE. PROJECT DELETED. COMPLETED UNDER R GRANVILLE I-85 US US 70 NC 147 W-4811 COMPLETED INSTALLED MILLED RUMBLE STRIPS ON THE INSIDE AND OUTSIDE PAVED SHOULDERS ON SECTIONS OF I-85 (DURHAM AND GRANVILLE COUNTIES), US 70, US AND NC 147 (DURHAM COUNTY).. GREENE SR 1438 B-4127 COMPLETED RAINBOW CREEK. REPLACE BRIDGE NO. 43 COMPLETED IN FY 2008 GUILFORD SR 2770 B-3462 COMPLETED REPLACED BRIDGE NO. 194 OVER BUFFALO CREEK (COMPLETED IN FY 2004) GUILFORD SR 3000 B-3649 COMPLETED REPLACED BRIDGE NO. 227 OVER LITTLE ALAMANCE CREEK GUILFORD SR 4121 B-3652 COMPLETED REPLACED BRIDGE NO. 20 OVER DEEP RIVER. GUILFORD SR 2717 B-3849 COMPLETED REPLACED BRIDGE NO. 188 OVER PRONG OF REEDY FORK CREEK. GUILFORD SR 3163 B-3851 COMPLETED REPLACED BRIDGE NO. 21 OVER US GUILFORD SR 3389 B-3852 COMPLETED REPLACED BRIDGE NO. 449 OVER ALAMANCE CREEK GUILFORD GREENSBORO B-3930 COMPLETED REPLACED BRIDGE NO. 579 (16TH STREET) OVER NORFOLK- SOUTHERN RAILWAY. GUILFORD OAK RIDGE E-4778 DELETED LANDSCAPE INTERSECTION OF NC 68 AND NC 150. PROJECT DELETED. PROJECT NOT PURSUED BY TOWN. GUILFORD FUTURE I-73 FS-0507A COMPLETED COMPLETED STUDY TO DETERMINE ROUTING OF FUTURE I-73 IN THE GREENSBORO AREA. GUILFORD I-40 AND I-85 I-3603 DELETED WEST CITY LIMITS TO EAST CITY LIMITS IN GREENSBORO. INSTALL LIGHTING ON ROUTES. PROJECT DELETED; ACCOMPLISHED UNDER ANOTHER PROJECT. T-146

151 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION GUILFORD I-40/85 I-4907 COMPLETED MILLED AND RESURFACED ROADWAY FROM EAST/NORTH OF SR 3056 (ROCK CREEK DAIRY ROAD) TO EAST/NORTH OF SR 3045 (MOUNT HOPE CHURCH ROAD) RAMP GUILFORD I-40/85 I-5113 DELETED EAST OF SR 3056 (ROCK CREEK DAIRY ROAD) TO WEST OF SR 1226 (UNIVERSITY DRIVE). MILL AND RESURFACE THE NORTH AND SOUTHBOUND LANES. PROJECT DELETED. TO BE ACCOMPLISHED UNER I GUILFORD US , US 29, US 158, US 220, US 421, NC 68 R-4403 COMPLETED NATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADED SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS GUILFORD SR 1005 SI-4718 COMPLETED SR 1002 (SCALESVILLE ROAD) AT SR 2305 (WITTY ROAD). INSTALLED CENTER TRAFFIC ISLAND WITH STOP SIGNS ON SR GUILFORD COLFAX SI-4719 COMPLETED SR 1008 (MARKET STREET) AT SR 2007 (BUNKER HILL ROAD). CONSTRUCTED LEFT TURN LANE ON MARKET STREET AND INSTALLED TRAFFIC SIGNAL. GUILFORD GREENSBORO WESTERN LOOP U-2524AB COMPLETED NORTH OF I-85 NEAR SR 1129 (GROOMETOWN ROAD) TO NORTH OF SR 4121 (HIGH POINT ROAD) - COMPLETED ROAD. GUILFORD GREENSBORO WESTERN LOOP U-2524AC COMPLETED NORTH OF SR 4121 (HIGH POINT ROAD) TO SOUTH OF I-40 - COMPLETED ROAD. GUILFORD GREENSBORO WESTERN LOOP U-2524BA COMPLETED SOUTH OF I-40 TO NORTH OF SR 2147 (WEST FRIENDLY AVENUE) - COMPLETED ROAD. GUILFORD GREENSBORO WESTERN LOOP U-2524BB COMPLETED NORTH OF SR 2147 (WEST FRIENDLY AVENUE) TO NORTH OF SR 2176 (BRYAN BOULEVARD) - COMPLETED ROAD. GUILFORD ARCHDALE HIGH POINT U-2702 COMPLETED SR 1595 (SURRETT DRIVE), SOUTH OF EDEN TERRACE- CORPORATION DRIVE NORTH TO WEST FAIRFIELD ROAD. WIDENED SURRETT DRIVE TO THREE LANES AND IMPROVED GRADE AND DRAINAGE IN AREA. GUILFORD HIGH POINT U-2717 COMPLETED SR 1113 (KIVETT DRIVE), PENDLETON STREET TO US WIDENED TO MULTI-LANES WITH CURB AND GUTTER AND REPLACED BRIDGE NO GUILFORD GREENSBORO U-3313 COMPLETED SR 1129 (GROOMETOWN ROAD), SR 1383 (WILEY DAVIS ROAD) TO SR 1479 (WAYNE ROAD). WIDENED TO A FOUR-LANE DIVIDED CURB AND GUTTER FACILITY WITH A RAISED GRASS MEDIAN. GUILFORD GREENSBORO U-3314B DELETED I-40/85 CORRIDOR. IVHS TO INCLUDE VARIABLE MESSGE SIGNS, TRAFFIC FLOW, INCIDENT MANAGEMENT SIGNS, COMMUNICATIONS SYSTEMS, COORDINATED SIGNALS, ETC. PROJECT DELETED - INCORPORATED INTO I-2201S, I- 2402, AND U GUILFORD GREENSBORO U-3612 COMPLETED WIDENED SR 1424 (HILLTOP ROAD) FROM SR 1546 (GUILFORD COLLEGE ROAD) TO ADAMS FARM PARKWAY GUILFORD HIGH POINT U-4017 COMPLETED CONSTRUCTED PIEDMONT PARKWAY ON NEW LOCATION FROM SR 1552 (TARRANT ROAD) TO SR 1541 (WENDOVER AVENUE). T-147

152 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION GUILFORD GREENSBORO U-4746 DELETED PURCHASE 8 BUSES FOR GREENSBORO TRANSIT AUTHORITY FLEET EXPANSION. PROJECT DELETED. FUNDS FLEXED IN FY 05 AND ACCOMPLISHED UNDER TA GUILFORD I-85 BUSINESS / US W-4822 COMPLETED SECTION A, I-85 NORTHWARD TO SWEARING CREEK IN DAVIDSON COUNTY; SECTION B, RANDOLPH COUNTY LINE NORTHWARD TO I-85 IN GUILFORD COUNTY. INSTALLED SHOULDER RUMBLE STRIPS. HALIFAX NC 561 B-3853 COMPLETED MARSH SWAMP. REPLACE BRIDGE NO. 82 HALIFAX SR 1804 B-4135 COMPLETED CYPRESS SWAMP. REPLACE BRIDGE NO. 72 COMPLETED IN FY 2008 HALIFAX SR 1103 B-4538 COMPLETED CONOCONNARA SWAMP. REPLACE BRIDGE NO. 25 HALIFAX SR 1315 B-4540 COMPLETED LITTLE FISHING CREEK. REPLACE BRIDGE NO. 142 HALIFAX I-95 I-5013 COMPLETED NC 561 (MILEPOST 160) TO SR 1600 (MILEPOST 167). RESURFACE. COMPLETED IN FY HARNETT SR 1002 B-4951 DELETED I-95. REPLACE BRIDGE NO. 57 TO BE ACCOMPLISHED AS PART OF I-4745 HARNETT I-95 B-5175 DELETED BRIDGE NO. 19, NO. 156 AND NO. 159 IN CUMBERLAND COUNTY AND BRIDGE NO. 37, NO. 57, NO. 66 AND NO. 80 IN HARNETT COUNTY. CORRECT VERTICAL CLEARANCE. ( TO BE ACCOMPLISHED UNDER I-4745.) HARNETT I-95 R-4736 COMPLETED DUNN, REALIGN I-95 NORTHBOUND OFF RAMP AND SERVICE ROAD. HAYWOOD SR 1309 FOX RUN ROAD B-3854 COMPLETED BRIDGE OVER JONATHAN CREEK & APPROACHES ON SR 1309 HAYWOOD SR 1129 FH 100 B-4141 COMPLETED EAST FORK PIGEON RIVER, PFH 100-1(1). REPLACED BRIDGE NO. 91 HAYWOOD SR 1129 FH 100 B-4142 COMPLETED EAST FORK LITTLE PIGEON RIVER, PFH 100-1(2). REPLACED BRIDGE NO. 87 HAYWOOD SR 1129 FH 100 B-4143 COMPLETED LITTLE EAST FORK PIGEON RIVER, PFH 100-1(1). REPLACED BRIDGE NO. 90 HENDERSON SR 1238 B-3856 COMPLETED CULVERT ON MUD CREEK & APPROACHES ON SR 1238 HENDERSON VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. HERTFORD SR 1118 B-4150 COMPLETED AHOSKIE CREEK. REPLACE BRIDGE NO. 67 HERTFORD US 13, US 17, US 64, US 70, US 158, US 264 R-4401 COMPLETED NATIONAL HIGHWAY SYSTEM (NHS) GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL,END TREATMENTS AND BRIDGE ANCHOR UNITS. COMPLETED IN FY HOKE SR 1422 B-4152 COMPLETED REPLACED BRIDGE NO. 53 OVER PUPPY CREEK T-148

153 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION HOKE VARIOUS R-4425 COMPLETED UPGRADE GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS ON VARIOUS NATIONAL HIGHWAY SYSTEM ROUTES. HOKE US 401 SF-4908K COMPLETED INTERSECTION WITH SR 1409 (LAKE PARK ROAD) AND SR 1303 (SCULL ROAD) NEAR RAEFORD. CONSTRUCTED A DIRECTIONAL CROSSOVER. HOKE RAEFORD U-3816 COMPLETED PALMER STREET EXTENSION, FROM NC 211 AT SR 1149 TO NC 20 AT SR CONSTRUCTED TWO LANES ON NEW LOCATION. HYDE US 264 B-3348 COMPLETED WALLACE CANAL. REPLACE BRIDGE NO. 52 AND BRIDGE NO. 54. HYDE US 264 B-3349 COMPLETED ROSE BAY CREEK. REPLACE BRIDGE NO. 32. HYDE SR 1110 B-3858 COMPLETED LANDING CANAL. REPLACE BRIDGE NO. 6 COMPLETED IN FY IREDELL SR 1333 (EUFOLA ROAD) B-2146 COMPLETED BRIDGE OVER BUFFALO SHOALS CREEK AND APPROACHES ON SR 1333 (EUFOLA ROAD) NORTH OF THE CATAWBA RIVER IREDELL SR 1581 B-4157 COMPLETED BRIDGE OVER SNOW CREEK AND APPROACHES ON SR 1581 IREDELL VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. IREDELL I-77 I-4411 COMPLETED SR 1102 (LANGTREE ROAD), CONVERT GRADE SEPARATION TO AN INTERCHANGE. IREDELL US 70 R-2911A COMPLETED SR 2318 IN STATESVILLE TO ROWAN COUNTY LINE. WIDEN TO MULTI-LANES, PART ON NEW LOCATION. JACKSON COUNTYWIDE E-4971 DELETED PHASE I: CONSTRUCT SCOTTS CREEK GREENWAY. SYLVA TO DILLSBORO. (PROJECT DELETED. COUNTY DECIDED TO PARTICPATE IN PROJECT). JACKSON VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. JACKSON BLUE RIDGE PARKWAY R-4728 COMPLETED PRA-BLRI 2Y11. REHABILITATE LICKSTONE AND BUNCHES BALD TUNNELS. JACKSON US 23 & 74 W-5015 COMPLETED GRADING, PAVING, AND GUARDRAIL ON US 23 & 74 FROM SOUTHWEST OF THE HAYWOOD COUNTY LINE TO SR JOHNSTON NC 96 B-3481 COMPLETED LITTLE RIVER. REPLACE BRIDGE NO. 94 COMPLETED IN FY JOHNSTON SR 1718 B-3672 COMPLETED BUFFALO CREEK. REPLACE BRIDGE NO. 415 COMPLETED IN FY JOHNSTON SR 1722 B-3863 COMPLETED LITTLE RIVER. REPLACE BRIDGE NO. 151 COMPLETED IN FY T-149

154 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION JOHNSTON NC 96 B-4164 COMPLETED LITTLE SWAMP. REPLACE BRIDGE NO. 52 COMPLETED IN FY 2008 JOHNSTON I-40 I-4702 DELETED SR 1122 (MILEPOST 339) IN JOHNSTON TO NC 132 (MILEPOST 420) IN NEW HANOVER COUNTY. SEAL EXISTING SHOULDERS PROJECT IS NO LONGER NEEDED. JOHNSTON I-40 SF-4904B DELETED MILE POST 18.9 TO MILE POST INSTALL THERMOPLASTIC PAVEMENT MARKINGS. TO BE ACCOMPLISHED UNDER I-5123 JONES NC 41 B-4168 COMPLETED MUSSEL SHELL CREEK. REPLACE BRIDGE NO. 13 JONES SR 1129 B-4169 COMPLETED BIG CHINQUAPIN BRANCH. REPLACE BRIDGE NO. 7 COMPLETED IN FY 2008 LEE SR 1318 B-4774 COMPLETED REPLACED BRIDGE NO. 56 OVER RACCOON CREEK. LEE SANFORD E-4946 COMPLETED COMPLETED CHARLOTTE AVENUE, MOORE STREET AND US (HAWKINS AVENUE) STREETSCAPE NORTH SIDE. LEE US 421-NC 87 R-2417AB COMPLETED WEST OF US TO EAST OF US COMPLETED ROAD. LEE VARIOUS R-4425 COMPLETED UPGRADE GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS ON VARIOUS NATIONAL HIGHWAY SYSTEM ROUTES. LEE US 421 SF-4908B COMPLETED SR 1529 (COX MILL ROAD). INSTALLED TURN LANES, REMOVED CONCRETE ISLAND, AND INSTALLED TRAFFIC SIGNAL. LENOIR NC 55 B-4172 COMPLETED JERICHO RUN. REPLACE BRIDGE NO. 9 LENOIR SR 1004 B-4173 COMPLETED STONYTON CREEK. REPLACE BRIDGE NO. 6 COMPLETED IN FY 2008 LENOIR SR 1515 B-4174 COMPLETED MOSELY CREEK REPLACE BRIDGE NO. 128 COMPLETED IN FY 2008 LENOIR SR 1800 B-4175 COMPLETED EAGLE CREEK. REPLACE BRIDGE NO. 12 COMPLETED IN FY 2008 LENOIR US 13, US 17, US 64, US 70, US 158, US 264 R-4401 COMPLETED NATIONAL HIGHWAY SYSTEM (NHS) GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL,END TREATMENTS AND BRIDGE ANCHOR UNITS. COMPLETED IN FY MACON VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. MADISON VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. T-150

155 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION MARTIN SR-1415 B-4186 COMPLETED CONOHO CREEK. REPLACE BRIDGE NO. 107 COMPLETED IN FY 2008 MARTIN US 13, US 17, US 64, US 70, US 158, US 264 R-4401 COMPLETED NATIONAL HIGHWAY SYSTEM (NHS) GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL,END TREATMENTS AND BRIDGE ANCHOR UNITS. COMPLETED IN FY McDOWELL SR 1552 B-3872 COMPLETED CREEK. REPLACE BRIDGE NO. 195 OVER BEAR CREEK. McDOWELL VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. McDOWELL I-40 I-4908A COMPLETED I-40 FROM BUNCOMBE COUNTY LINE TO BRIDGE NUMBER 30 EAST OF EXIT 73. MECKLENBURG I-77 I-3311D COMPLETED I-77 FROM I-485 TO SR 2136 (GILEAD ROAD) EXIT 23 MECKLENBURG I-485 I-4721 DELETED I-77 TO NC 51 AND TWO BRIDGE SITES WEST OF JOHNSTON ROAD. PAVEMENT REHABILITATION. PROJECT COMPLETED AND DELETED FROM STIP 12/17/09. MECKLENBURG I-485 R-2248BB COMPLETED I-485 FROM NORTH OF I-85 TO NORTH OF NC 27. FREEWAY ON NEW LOCATION. MECKLENBURG CHARLOTTE U-4442 COMPLETED NORTH-SOUTH CORRIDOR TRANSITWAY PROJECT. REVIEW AREA'S LAND USE PATTERNS TO CONCENTRATE DEVELOPMENT WITHIN MAJOR TRAVEL CORRIDORS TO ENHANCE HIGH CAPACITY TRANSIT SERVICE. STUDY COMPLETE. MITCHELL SR 1199 B-4581 DELETED WHITE OAK CREEK. REPLACE BRIDGE NO. 57. DELETE AT REQUEST OF DIVISION. MITCHELL VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. MONTGOMERY SR 1310 B-4205 COMPLETED REPLACED BRIDGE NO. 133 OVER DOOMAS CREEK. MONTGOMERY US 220 / FUTURE I-73/74 R-2231 COMPLETED CONSTRUCTED FREEWAY ON NEW LOCATION FROM SOUTH OF SR 1448 SOUTH OF ELLERBE TO US 220A SOUTH OF EMERY. MOORE ROBBINS E-4784 DELETED REHABILITATION OF THE OLD ELISE RAIL DEPOT TO CREATE A VISITOR CENTER-TRANSPORTATION MUSEUM. PROJECT DELETED. PROJECT DECLINED BY TOWN. MOORE VARIOUS R-4425 COMPLETED UPGRADE GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS ON VARIOUS NATIONAL HIGHWAY SYSTEM ROUTES. MOORE US SF-4908G COMPLETED NC 73 INTERSECTION AND SR 1838 INTERSECTION. INSTALLED TRAFFIC SIGNALS. NASH SR 1004 B-3876 COMPLETED BASKET CREEK. REPLACE BRIDGE NO. 34. COMPLETED IN FY T-151

156 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION NASH SR 1101 B-3877 COMPLETED TURKEY CREEK. REPLACE BRIDGE NO. 52. COMPLETED IN FY NASH SR 1151 B-4210 COMPLETED TURKEY CREEK. REPLACE BRIDGE NO. 95 NASH I-95 I-4703 COMPLETED SOUTH OF WILSON COUNTY LINE (MILEPOST 124) TO THE TAR RIVER (MILEPOST 128). PAVEMENT REPAIR. COMPLETED IN FY NASH I-95 K-4903 COMPLETED RENOVATION OF REST AREA PAIR-BUILDINGS, GROUNDS AND PARKING FACILITIES. BUILDINGS TO INCLUDE DUAL RESTROOMS AND ADA COMPLIANT FAMILY RESTROOM. NEW HANOVER US B-4990 COMPLETED CAPE FEAR RIVER. REPLACEMENT OF MOVABLE SPAN ELECTRICAL CONTROL SYSTEM. NEW HANOVER NC 211 US 421 F-5002 COMPLETED SOUTHPORT RAMP-GANTRY-DOLPHIN. REPAIR AND REPLACE. NEW HANOVER I-40 I-4702 DELETED SR 1122 (MILEPOST 339) IN JOHNSTON TO NC 132 (MILEPOST 420) IN NEW HANOVER COUNTY. SEAL EXISTING SHOULDERS PROJECT IS NO LONGER NEEDED. NORTHAMPTON NC 35 B-4212 COMPLETED KIRBY'S CREEK. REPLACE BRIDGE NO. 77 COMPLETED IN FY 2008 NORTHAMPTON SR 1201 B-4213 COMPLETED BEAVERPOND CREEK. REPLACE BRIDGE N0. 58 COMPLETED IN FY 2008 ONSLOW NC 210 B-4215 COMPLETED STONE CREEK. REPLACE BRIDGE NO. 19 ONSLOW JACKSONVILLE EB-3407 COMPLETED US 17-USMC RAIL TRAIL, ONSLOW DRIVE TO MARINE JUNCTION ALONG US 17, CONTINUING ALONG THE USMC RAILROAD TO CAMP LEJEUNE MARINE BASE MAIN GATE. COMPLETED IN FY ONSLOW US 17, US 74, US 76, US 117, NC 24, NC 87 R-4405 COMPLETED HNATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. ORANGE SR 1730 B-4218 COMPLETED REPLACED BRIDGE NO. 108 OVER NEW HOPE CREEK. ORANGE SR 1002 (ST. MARY'S ROAD) E-4779 DELETED ACQUIRE SCENIC CONSERVATION EASEMENTS AT SELECTED LOCATIONS. PROJECT DELETED. COUNTY UNABLE TO PROCEED. ORANGE CARRBORO / CHAPEL HILL EB-5021 COMPLETED SR 1780 (ESTES DRIVE), SR 1772 (GREENSBORO STREET) TO SR 1843 (SEAWELL SCHOOL ROAD). ADDED PAVED SHOULDERS TO ACCOMMODATE BICYCLES. ORANGE US , US 29, US 158, US 220, US 421, NC 68 R-4403 COMPLETED NATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADED SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS ORANGE SR 1538 SI-4807 COMPLETED SR 1538 (NEW SHARON CHURCH ROAD). INSTALLED CENTER ISLAND WITH STOP SIGN. ORANGE CHAPEL HILL U-4008 COMPLETED US /ERWIN ROAD. INTERSECTION WAS IMPROVED. ORANGE CHAPEL HILL U-4449 COMPLETED IMPLEMENTED REAL-TIME INFORMATION SYSTEM. T-152

157 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION ORANGE CHAPEL HILL U-5158 DELETED NC 86 (MARTIN LUTHER KING JR. BOULEVARD). INSTALLATION OF TRANSIT BUS PRIORITY SIGNALIZATION. PROJECT DELETED. PROJECT DECLINED BY TOWN. PAMLICO SR 1316 B-4927 DELETED TRENT CREEK. REPLACE BRIDGE NO. 18 STRUCTURE TO BE REMOVED BY DIVISION. PASQUOTANK US 13, US 17, US 64, US 70, US 158, US 264 R-4401 COMPLETED NATIONAL HIGHWAY SYSTEM (NHS) GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL,END TREATMENTS AND BRIDGE ANCHOR UNITS. COMPLETED IN FY PENDER I-40 I-4702 DELETED SR 1122 (MILEPOST 339) IN JOHNSTON TO NC 132 (MILEPOST 420) IN NEW HANOVER COUNTY. SEAL EXISTING SHOULDERS PROJECT IS NO LONGER NEEDED. PERQUIMANS SR 1110 B-4226 COMPLETED BEAR SWAMP CANAL. REPLACE BRIDGE NO. 62 PERQUIMANS SR 1222 B-4227 COMPLETED SWAMP, REPLACE BRIDGE NO. 69 COMPLETED IN FY 2007 PERQUIMANS SR 1304 B-4228 COMPLETED SUTTON CREEK. REPLACE BRIDGE NO. 59 COMPLETED IN FY 2008 PITT SR 1414, SR 1556 B-4022 COMPLETED TRANTERS CREEK REPLACE BRIDGE NO. 90 COMPLETED IN FY 2008 PITT NC 102 B-4231 COMPLETED SWIFT CREEK. REPLACE BRIDGE NO. 53 COMPLETED IN FY 2008 PITT GREENVILLE EB-5103 DELETED GREEN MILL RUN GREENWAY. PHASE II, ONE MILE FROM CHARLES BOULEVARD TO HOOKER ROAD. FY TO BE ACCOMPLISHED BY EB PITT US 13, US 17, US 64, US 70, US 158, US 264 R-4401 COMPLETED NATIONAL HIGHWAY SYSTEM (NHS) GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL,END TREATMENTS AND BRIDGE ANCHOR UNITS. COMPLETED IN FY PITT NC 43 R-4749 COMPLETED EDGECOMBE COUNTY LINE TO US 13-NC11. ADD TWO-FOOT PAVED SHOULDERS, TURN LANES, MILLING AND SHOULDER RECONSTRUCTION. COMPLETED IN FY PITT GREENVILLE U-3613 DELETED SR 1708 (FIRE TOWER ROAD), SR 1128 (DAVENPORT FARM ROAD) TO EAST OF SR 1709 (CORY ROAD). WIDEN TO A FIVE LANE FACILITY, SOME NEW OCATION. DELETE, TO BE ACCOMPLISHED BY U-5006 (SEGMENT "A" ONLY) PITT GREENVILLE U-3613A DELETED SR 1708 (FIRE TOWER ROAD), SR 1128 (DAVENPORT FARM ROAD) TO EAST OF SR 1709 (COREY ROAD). WIDEN TO A FIVE LANE FACILITY, SOME NEW LOCATION. DELETE SEGMENT "A". TO BE ACCOMPLISHED UNDER U PITT GREENVILLE U-3839 DELETED 14TH STREET, RAILROAD GRADE SEPARATION AT CSX TRANSPORTATION CROSSING E. DELETE, TO BE ACCOMPLISHED BY U T-153

158 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION POLK VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. RANDOLPH SR 2849 B-3691 COMPLETED FORK CREEK. REPLACED BRIDGE NO RANDOLPH SR 1504 B-4243 COMPLETED REPLACED BRIDGE NO. 71 OVER REEK CREEK. RANDOLPH SR 2215 B-4244 COMPLETED CREEK. REPLACED BRIDGE NO RANDOLPH SR 2824 B-4245 COMPLETED REPLACED BRIDGE NO. 257 OVER RICHLAND CREEK. RANDOLPH SR 2834 B-4246 COMPLETED REPLACED BRIDGE NO. 228 OVER RICHLAND CREEK. RANDOLPH ARCHDALE E-4944 COMPLETED CONSTRUCTED MULTI-USE FACILITY FROM BELGIAN DRIVE TO POWELL WAY. RANDOLPH VARIOUS R-4425 COMPLETED UPGRADE GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS ON VARIOUS NATIONAL HIGHWAY SYSTEM ROUTES. RANDOLPH US 64 SF-4908F COMPLETED SR 2469 (BROWNS CROSSROADS ROAD)-SR 2628 (PARKS CROSSROADS CHURCH ROAD). INSTALLED WARNING SIGNS AND FLASHERS. RANDOLPH ARCHDALE HIGH POINT U-2702 COMPLETED SR 1595 (SURRETT DRIVE), SOUTH OF EDEN TERRACE- CORPORATION DRIVE NORTH TO WEST FAIRFIELD ROAD. WIDENED SURRETT DRIVE TO THREE LANES AND IMPROVED GRADE AND DRAINAGE IN AREA. RANDOLPH ASHEBORO U-3401 COMPLETED COMPLETED IMPROVEMENTS TO US 64 / NC 49 INTERSECTION WITH NC 42. RANDOLPH ASHEBORO U-3600 DELETED US 220 BUSINESS (NORTH FAYETTEVILLE STREET), SR 2261 (OLD LIBERTY ROAD) TO US 220 AT US 311. WIDEN TO MULTI- LANES. PROJECT DELETED BASED ON REVIEW OF PUBLIC COMMENT AND PROJECT REASSESSMENT. RANDOLPH I-85 BUSINESS / US W-4822 COMPLETED SECTION A, I-85 NORTHWARD TO SWEARING CREEK IN DAVIDSON COUNTY; SECTION B, RANDOLPH COUNTY LINE NORTHWARD TO I-85 IN GUILFORD COUNTY. INSTALLED SHOULDER RUMBLE STRIPS. RICHMOND SR 1321 B-4247 COMPLETED REPLACED BRIDGE NO. 129 OVER BIG MOUNTAIN CREEK. RICHMOND US 220 / FUTURE I-73/74 R-2231 COMPLETED CONSTRUCTED FREEWAY ON NEW LOCATION FROM SOUTH OF SR 1448 SOUTH OF ELLERBE TO US 220A SOUTH OF EMERY. RICHMOND VARIOUS R-4425 COMPLETED UPGRADE GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS ON VARIOUS NATIONAL HIGHWAY SYSTEM ROUTES. RICHMOND US 74 R-4738 COMPLETED INSTALLED MEDIAN GUARDRAIL FROM PEE DEE RIVER TO EAST OF SR 1615 ROBESON SR 1725 B-3897 COMPLETED LITTLE MARSH SWAMP. REPLACE BRIDGE NO. 3 ROBESON US 74 R-0513BB COMPLETED US 74 FROM WEST OF SR 1157TO NC 41 T-154

159 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION ROBESON US 17, US 74, US 76, US 117, NC 24, NC 87 R-4405 COMPLETED HNATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. ROBESON NC 41 R-5017 COMPLETED SR 2033 TO SR UPGRADE ROADWAY. ROCKINGHAM SR 3003 B-3509 COMPLETED SMITH RIVER. REPLACED BRIDGE NO. 75 ROCKINGHAM SR 1138 B-3694 COMPLETED REPLACED BRIDGE NO. 55 OVER BELEWS LAKE SPILLWAY. ROCKINGHAM SR 1001 B-3899 COMPLETED REPLACED BRIDGE NO. 21 OVER TROUBLESOME CREEK ROCKINGHAM SR 1376 B-3900 COMPLETED REPLACED BRIDGE NO. 165 OVER CREEK ROCKINGHAM SR 1767 B-4253 COMPLETED REPLACED BRIDGE NO. 109 OVER BIRCH FORK CREEK. ROCKINGHAM SR 2627 B-4254 COMPLETED REPLACED BRIDGE NO. 89 OVER ROSE CREEK. ROCKINGHAM SR 2670 B-5154 DELETED US 29 BUSINESS / US 158. REPLACE BRIDGE NO. 56. PROJECT DELETED. TO BE ACCOMPLISHED UNDER U ROCKINGHAM VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. ROCKINGHAM US , US 29, US 158, US 220, US 421, NC 68 R-4403 COMPLETED NATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADED SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS ROCKINGHAM US 29 W-4821 COMPLETED INSTALLED SHOULDER RUMBLE STRIPS FROM US 29 BUSINESS IN ROCKINGHAM COUNTY TO VIRGINIA STATE LINE. ROWAN SR 1949 B-3234 COMPLETED REPLACED BRIDGE NO. 78 OVER CREEK. ROWAN SR 2200 B-3236 COMPLETED REPLACED BRIDGE NO. 381 OVER SOUTHERN RAILWAY (COMPLETED IN FY 2005) ROWAN NC 801 B-4255 COMPLETED REPLACED BRIDGE NO. 28 OVER WITHROW CREEK ROWAN NC 801 B-4256 COMPLETED SOUTH YADKIN RIVER. REPLACED BRIDGE NO. 80. ROWAN KANNAPOLIS E-4792 COMPLETED CONSTRUCTED A TEN-FOOT GREENWAY AND PEDESTRIAN WALKWAY LINKING BAKER'S CREEK PARK TO THE CENTRAL BUSINESS DISTRICT (CBD). ROWAN KANNAPOLIS EB-4985 COMPLETED COMPLETED 8TH STREET GREENWAY, PHASE 1 AND PHASE 2. ROWAN SR 1221 SF-4909E DELETED FY09 PROJECT DELETED (TRAFFIC ENGINEERING): INTERSECTION WITH SR 1006 (ORGAN CHURCH ROAD) NEAR ROCKWELL. REALIGN SR 1121 (OLD BEATTY FORD ROAD) TO CONSTRUCT TWO OFFSET T-TYPE INTERSECTIONS. RUTHERFORD VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. T-155

160 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION RUTHERFORD US 74 EASTBOUND SF-4913A COMPLETED US 74 EASTBOUND, BROAD RIVER EASTWARD FOR 0.5 MILE. RESURFACE ROADWAY WITH OPEN-GRADED FRICTION COURSE. SAMPSON SR 1214 B-4269 COMPLETED LITTLE COHARIE CREEK REPLACE BRIDGE NO. 90 SAMPSON SR 1246 B-4271 COMPLETED BIG SWAMP, REPLACE BRIDGE NO. 98 SAMPSON I-40 I-4702 DELETED SR 1122 (MILEPOST 339) IN JOHNSTON TO NC 132 (MILEPOST 420) IN NEW HANOVER COUNTY. SEAL EXISTING SHOULDERS PROJECT IS NO LONGER NEEDED. SAMPSON US 17, US 74, US 76, US 117, NC 24, NC 87 R-4405 COMPLETED HNATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. SCOTLAND SR 1108 B-3373 COMPLETED GUM SWAMP CREEK SPILLWAY. REPLACE BRIDGE NO. 62 AND REMOVE BRIDGE NO. 61 SCOTLAND NC 144 B-4274 COMPLETED REPLACED BRIDGE NO. 14 OVER BIG SHOE HEEL CREEK. SCOTLAND GIBSON E-4945 DELETED PHASE I: REHABILITATE AND RESTORE THE GIBSON TRAIN DEPOT AT MAIN AND TEAL STREETS. PROJECT DELETED. PROJECT DECLINED BY TOWN. SCOTLAND VARIOUS R-4425 COMPLETED UPGRADE GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS ON VARIOUS NATIONAL HIGHWAY SYSTEM ROUTES. SCOTLAND US 74 SF-4908A COMPLETED SR 1321 (ELMORES CROSSROADS). CONSTRUCTED DIRECTIONAL CROSSOVER. STATEWIDE US 52, US 74, & NC 49 R-4414 COMPLETED NATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS STOKES NC 8 B-4280 COMPLETED REPLACED BRIDGE NO. 14 OVER TOWN FORK CREEK. REPLACED BRIDGE NO. 44 OVER TOWN FORK CREEK OVERFLOW. STOKES NC 8 / NC 89 B-4281 COMPLETED REPLACED BRIDGE NO. 60 OVER DAN RIVER. STOKES NC 66 B-4282 COMPLETED REPLACED BRIDGE NO. 54 OVER PINCH GUT CREEK. STOKES VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. SWAIN VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. SWAIN US 19 SI-4815 DELETED SR 1152 (HUGHES BRANCH ROAD). CONSTRUCT LEFT TURN LANE. PROJECT DELETED AT REQUEST OF DIVISION - PROJECT TO BE COMPLETED WITH OTHER FUNDING SOURCES. T-156

161 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION TRANSYLVANIA DAVIDSON RIVER ROAD, FH 50 B-4445 COMPLETED PISGAH NATIONAL FOREST, PHF 50-(5). FISH HATCHERY TO US 276. RESURFACE. TRANSYLVANIA VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. TRANSYLVANIA NC 281 R-0619EI COMPLETED GRADING AND DRAINAGE ON NC 281 FROM WEST OF SR 1306 TO NORTH OF SR TRANSYLVANIA DAVIDSON RIVER ROAD, FH 50 R-4445 COMPLETED PISGAH NATIONAL FOREST, PHF 50-1(5). FISH HATCHERY TO US 276. RESURFACE. TRANSYLVANIA DAVIDSON RIVER ROAD, FH 50 R-4446 COMPLETED PISGAH NATIONAL FOREST, PFH 50-1(6). PAVED FROM FISH HATCHERY TO COVE CREEK CAMPGROUND. TYRRELL US 13, US 17, US 64, US 70, US 158, US 264 R-4401 COMPLETED NATIONAL HIGHWAY SYSTEM (NHS) GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL,END TREATMENTS AND BRIDGE ANCHOR UNITS. COMPLETED IN FY TYRRELL SR 1110 OLD COLUMBIA ROAD R-4452 COMPLETED WEST OF SR 1112 TO SR UPGRADE ROADWAY. COMPLETED IN FY UNION SR 1103 B-4649 COMPLETED BRIDGE OVER WASHAW CREEK AND APPROACHES ON SR 1103 (MAGGIE ROBINSON ROAD) VANCE SR 1107 B-4298 COMPLETED RUIN CREEK. REPLACED BRIDGE NO. 3 VANCE HENDERSON U-4443 COMPLETED EMBASSY PROJECT IN HISTORIC DOWNTOWN AREA. STREETS WIDENED IN THE EMBASSY COMPLEX INCLUDING BRECKENRIDGE, MONTGOMERY, CHESTNUT, WINDER AND WYCHE STREETS. WAKE SR 1375 B-3375 COMPLETED REPLACED BRIDGE NO. 301 OVER SWIFT CREEK, AND REPLACED BRIDGE NO. 471 OVER LAKE WHEELER SPILLWAY. WAKE SR 2564 B-3376 COMPLETED REPLACED BRIDGE NO. 246 OVER BIG BRANCH CREEK WAKE SR 1613 B-3526 COMPLETED REPLACED BRIDGE NO. 65 OVER CREEK WAKE SR 1404 B-3703 COMPLETED REPLACED BRIDGE NO. 317 OVER MIDDLE CREEK WAKE US 401 B-3916 COMPLETED MIDDLE CREEK. REPLACED BRIDGE NO. 63 WAKE SR 1006 B-4299 COMPLETED REPLACED BRIDGE NO. 255 OVER CREEK WAKE WAKE FOREST E-4928 COMPLETED COMPLETED STREETSCAPING ALONG BOTH SIDES OF SR 1941 (SOUTH WHITE STREET), ROOSEVELT AVENUE TO WAIT AVENUE AND THE WEST SIDE TO JONES STREET. WAKE FUQUAY-VARINA EB-4402 COMPLETED CONSTRUCTED GREENWAY HERITAGE TRAIL FROM CAROL H. JOHNSON PARK TO SOUTH PARK. T-157

162 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION WAKE I-40, I-440 I-4902 DELETED SR 1728 (WADE AVENUE) TO EAST OF I-440/US 64 (MILEPOST 302) AND I-440, US 1-64 AT I-40 TO I-40 NEAR SR 2544 (SUNNYBROOK ROAD). SIGNING REVISIONS AND UPGRADES. PROJECT DELETED. TO BE COMPLETED UNDER I WAKE I-540 NC 54 R-2000AE COMPLETED INSTALLED ITS DEVICES. WAKE NC 55 R-2906 COMPLETED WIDENED NO 55 TO MULTILANES FROM US 64 IN WAKE COUNTY TO SR 1121 (CORNWALLIS ROAD) IN DURHAM COUNTY. WAKE US 1 SF-4905B DELETED US 1A (MAIN STREET) / NEW FALLS OF NEUSE BOULEVARD. CONSTRUCT LEFT TURN LANE. PROJECT DELETED PER DIVISION. WAKE NC 50 W-4421 COMPLETED INSTALLED GUARDRAIL ALONG BOTH SHOULDERS OF NC 50 AND CONSTRUCTED A NORTHBOUND LEFT TURN LANE AT SR 1842 (SHOOTING CLUB ROAD). WAKE US 264 W-5129 COMPLETED INSTALLED MEDIAN BARRIER BETWEEN US 64 AND NASH COUNTY LINE. WAKE I-40 W-5130 COMPLETED INSTALLED MEDIAN BARRIER BETWEEN SR 1728 (WADE AVENUE) AND SR 1371 (LAKE WHEELER ROAD). WARREN SR 1306 B-4309 COMPLETED SIX POUND CREEK. REPLACED BRIDGE NO. 38 WARREN SR 1337 B-4310 COMPLETED PRONG HUBQUARTER CREEK. REPLACED BRIDGE NO. 62. WARREN SR 1337 B-4311 COMPLETED HUBQUARTER CREEK. REPLACED BRIDGE NO. 63. WARREN SR 1613 B-4312 COMPLETED SHOCCO CREEK. REPLACED BRIDGE NO. 42. WARREN SR 1206 B-4664 COMPLETED REPLACE BRIDGE NO. 25 OVER SMITH CREEK. WARREN SR 1304 B-4665 COMPLETED REPLACED BRIDGE NO. 36 OVER HAWTREE CREEK. WARREN WARRENTON E-4926 DELETED SOUTH MAIN STREET INSIDE THE WARRENTON HISTORIC DISTRICT. CONSTRUCT SIDEWALKS. PROJECT DELETED. PROJECT DECLINED BY TOWN. WATAUGA BLUE RIDGE PARKWAY B-3937 COMPLETED PRA-BLRI 2f22, REHABILITATE GOSHEN CREEK BRIDGE. WATAUGA SR 1153 B-4316 COMPLETED CREEK. REPLACE BRIDGE NO. 320 WATAUGA SR 1541 B-4317 COMPLETED BRIDGE OVER MIDDLE FORK CREEK AND APPROACHES ON SR 1541 WATAUGA VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. WAYNE SR 1222 B-3538 COMPLETED NEUSE RIVER OVERFLOW. REPLACE BRIDGE NO. 296 COMPLETED IN FY WAYNE SR1918 B-4321 COMPLETED CREEK. REPLACE BRIDGE NO. 17 T-158

163 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2009 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION WAYNE SR 1532 B-4671 COMPLETED NAHUNTA SWAMP. REPLACE BRIDGE NO. 35 WILKES SR 1567 B-3266 COMPLETED REPLACED BRIDGE NO. 264 OVER NORTH FORK REDDIES RIVER. WILKES NC 268 B-3714 COMPLETED MULBERRY CREEK. REPLACED BRIDGE NO. 83 WILKES VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. WILKES NC 268 E-5104 DELETED HISTORIC HAPPY VALLEY BYWAY, UPPER YADKIN VALLEY RIVER BASIN-HAPPY VALLEY. SCENIC BYWAY, PATTERSON IN CALWELL COUNTY TO WILKESBORO IN WILKES COUNTY. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. WILSON SR 1001 B-4326 COMPLETED BLOOMERY SWAMP. REPLACE BRIDGE NO. 79 WILSON I-95 I-4703 COMPLETED SOUTH OF WILSON COUNTY LINE (MILEPOST 124) TO THE TAR RIVER (MILEPOST 128). PAVEMENT REPAIR. COMPLETED IN FY YADKIN VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. YADKIN I-77 I-2808A COMPLETED I-77 FROM SOUTH OF SR 1125 TO US 21 YANCEY NC 197 FH 18 B-3094 COMPLETED PISGAH FOREST, PFH 18-2(1). BRANCH, REPLACED BRIDGE NO. 16 YANCEY VARIOUS E-5102 DELETED BLUE RIDGE MUSIC TRAILS. PROMOTE VISITATION AND CAPITALIZE ON NATIONAL AND INTERNATIONAL REPUTATION OF WESTERN NORTH CAROLINA MUSIC TRADITIONS. DELETED - PROJECT TO BE ACCOMPLISHED WITH FUNDS OUTSIDE STIP. T-159

164

165 Completions/Deletions Federal Fiscal Year 2010 Projects where all activities were Completed or Deleted during Federal Fiscal Year 2010 are listed in the following Completions/Deletions Table. T-161

166

167 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2010 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION ALAMANCE SR 1504 B-4402 COMPLETED REPLACED BRIDGE NO. 7 OVER TICKLE CREEK. ALAMANCE I-40/85 I-5118 COMPLETED COMPLETED MILLING AND RESURFACING FROM SR 3056 (ROCK CREEK DAIRY ROAD) TO SR 1311 (UNIVERSITY ROAD). ALAMANCE GRAND OAKS BOULEVARD EXTENSION U-3304 COMPLETED SR 1146 (KIRKPATRICK ROAD) TO NC 62. WIDEN TO MULTILANES, SOME NEW LOCATION. ALEXANDER SR 1331 B-4005 COMPLETED GRASSY CREEK. REPLACED BRIDGE NO. 70 ALEXANDER SR 1446 B-4006 COMPLETED ROCKY RIVER. REPLACED BRIDGE NO. 8 ALLEGHANY SR 1193 B-4008 COMPLETED LITTLE RIVER. REPLACE BRIDGE NO. 39 ALLEGHANY NC 93 R-5156 COMPLETED NC 93 FROM US 221 TO THE VIRGINIA STATE LINE. ALLEGHANY NC 18 R-5160 COMPLETED NC 18, SR 1173 (TAYSON ROAD) TO SR 1138 (OSBORNE ROAD). ADD LEFT TURN LANE AND REALIGN SR 1138 (OSBORNE ROAD). ANSON SR 1127 B-3404 COMPLETED SOUTH FORK JONES CREEK. REPLACED BRIDGE NO. 314 ANSON NC 742 B-5368 DELETED NORTH FORK JONES CREEK. REPLACE BRIDGE NO. 22. DELETE REPLACED BY BK B-5368 NEVER APPROVED AS PART OF STIP. ANSON US 52, US 74, NC 49 R-4413 COMPLETED NATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. ANSON NC 218 R-5114 COMPLETED NC 218, I-485 (CHARLOTTE OUTER LOOP) TO US 74 IN ANSON COUNTY. UPGRADE TO 24 FEET ROADWAY AND RE-SURFACE. ANSON NC 109 SOUTH R-5193 DELETED SOUTH CAROLINA LINE TO SR MILL AND RESURFACE. DELETED PER DIVISION REQUEST. ANSON WADESBORO U-5009 COMPLETED US 74, NORTH OF GRAHAM STREET TO NC 109. REVISE ROAD ALIGNMENT TO IMPROVE SAFETY. ASHE SR 1106 B-4011 COMPLETED BRIDGE NO. 85 OVER MILL CREEK AND APPROACHES ON SR 1106 (RAILROAD GRADE ROAD). ASHE SR 1118 B-4012 COMPLETED NORTH FORK NEW RIVER. REPLACED BRIDGE NO. 117 ASHE SR 1362 B-4015 COMPLETED BRIDGE NO. 165 OVER BIG HORSE CREEK & APPROACHES ON SR 1362 AVERY US 19E B-3608 COMPLETED NORTH TOE RIVER. REPLACED BRIDGE NO. 44 AVERY NC 194 R-5158 COMPLETED NC 194, US 221 TO US 19 EAST. WIDENING AND PAVEMENT PREHABILITATION. BEAUFORT NC 32 B-4019 COMPLETED RUNYON CREEK REPLACE BRIDGE NO. 103 BEAUFORT SR 1403 B-4020 COMPLETED TRANTERS CREEK. REPLACE BRIDGE NO. 8 BEAUFORT US 17 R-2510B COMPLETED WASHINGTON BYPASS, SOUTH OF SR 1127 (POSSUM TRACK ROAD) TO NORTH OF NC 171. FOUR LANE DIVIDED FREEWAY, SOME NEW LOCATION. T-163

168 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2010 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION BERTIE SR 1100 B-4026 COMPLETED CHOOWATIC CREEK. REPLACE BRIDGE NO. 45 BERTIE NC 308 R-5130 COMPLETED EAST CITY LIMITS OF KELFORD TO WEST CITY LIMITS OF KELFORD. RESURFACE. BERTIE NC 308 R-5131 COMPLETED SR 1119 TO SR RESURFACE BERTIE NC 305 R-5133 COMPLETED US 13 TO NC 11. MILL, STRENGTHEN AND RESURFACE. BERTIE US R-5187 COMPLETED ROANOKE RIVER TO SR RESURFACE BERTIE US R-5195 COMPLETED SR 1106 TO SR STRENGTHEN PAVEMENT, RESURFACE AND INSTALL LONG LIFE PAVEMENT MARKINGS. BLADEN US 701 B-4710 DELETED BROWN'S CREEK. REPLACE BRIDGE NO. 3. DELETE - TO BE INCLUDED IN R BRUNSWICK NC 179 B-4031 COMPLETED JINNY'S BRANCH. REPLACE BRIDGE NO. 72 BRUNSWICK SR 1500 (MIDWAY ROAD), SR 1401 R-5216 COMPLETED MIDWAY ROAD, NC 211 TO US 17 BUSINESS AND GALLOWAY ROAD, US 17 BUSINESS TO US 17 BYPASS, MILL AND RESURFACE BUNCOMBE NC 81 B-2515 COMPLETED BRIDGE OVER SWANNANOA RIVER AND APPROACHES ON NC 81. BUNCOMBE SR 2804 B-3119 COMPLETED BROAD RIVER. REPLACED BRIDGE NO. 653 BUNCOMBE SR 1742 B-3813 COMPLETED FLAT CREEK. REPLACED BRIDGE NO. 249 AND BRIDGE NO. 250 BUNCOMBE SR 2098 B-4036 COMPLETED REEMS CREEK. REPLACED BRIDGE NO. 220 BUNCOMBE ASHEVILLE EB-4724 DELETED AZALEA PARK CONNECTOR. PER TOM NORMAN, DELETE AT REQUEST OF CITY OF CHARLOTTE. BUNCOMBE ASHEVILLE U-3302 COMPLETED I-240, US 25 (MERRIMON AVENUE) AND SR 1781 (BROADWAY STREET). REVISED INTERCHANGE. BUNCOMBE ASHEVILLE U-5172 DELETED CLINGMAN AVENUE STREETSCAPE. DELETE PROJECT DETERMINED INELIGIBLE FOR ARRA (STIMULUS) FUNDING. BUNCOMBE ASHEVILLE U-5176 DELETED PATTON AVENUE, REGENT PARK BOULEVARD TO LEICHESTER HIGHWAY. CONSTRUCT SIDEWALK. PROJECT DELETED - STIMULUS NOT USED ON PROJECT. BUNCOMBE ASHEVILLE U-5203 DELETED MODIFY EXISTING SIGNS AND INSTALL NEW DIRECTIONAL SIGNS TO PROVIDE POSITIVE GUIDANCE FOR TRAVELING PUBLIC. DELETE PROJECT - TO BE ACCOMPLISHED UNDER R BURKE SR 1250 B-3814 COMPLETED CANOE CREEK. REPLACED BRIDGE NO. 56 BURKE SR 1248 B-4042 COMPLETED CANOE CREEK. REPLACED BRIDGE NO. 274 BURKE SR 1258 B-4717 DELETED ROSE CREEK. REPLACE BRIDGE NO. 58. PROJECTS DELETED FROM STIP AND FUNDED AS A MAINTENANCE REHAB. CABARRUS SR 1394 B-4449 COMPLETED REPLACE BRIDGE NO. 2 OVER CODDLE CREEK. T-164

169 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2010 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION CABARRUS CONCORD C-4913 COMPLETED BIO-DIESEL FUEL STORAGE SYSTEM. INSTALLED STORAGE TANK AND DISPENSING OF INFRASTRUCTURE FOR HEAVY- DUTY VEHICLES. CABARRUS CONCORD C-4915 COMPLETED REPLACED TWO GAS POWERED TWO-CYCLE VEHICLES FOR POLICE DEPARTMENT USAGE IN PARKING ENFORCEMENT AND GREENWAY PATROL. CABARRUS KANNAPOLIS C-5101 COMPLETED PURCHASED T3 PERSONAL MOBILITY ELECTRIC VEHICLES. CABARRUS CONCORD CABARRUS AVENUE E-4560A COMPLETED "GATEWAY TO CENTER CITY". PHASE A-1, ROUNDABOUT AT INTERSECTION OF CABARRUS AVENUE, OLD CHARLOTTE ROAD AND THE REALIGNED CASCADE DRIVE TO WHITE STREET. PHASE A-2, WHITE STREET TO US 29. STREETSCAPE IMPROVEMENTS. CABARRUS CONCORD EB-5007 COMPLETED DOWNTOWN CONNECTOR TO CORBAN PARK GREENWAY. CABARRUS CONCORD EB-5123 DELETED ROCKY RIVER GREENWAY. CONSTRUCT THE MOSS CREEK PHASE. PROJECT DELETED - WAS NOT FUNDED WITH STIMULUS FUNDS. CABARRUS KANNAPOLIS EB-5124 DELETED IRISH BUFFALO CREEK GREENWAY. CONSTRUCT PHASE A. PROJECT DELETED - STIMULUS FUNDS NOT SECURED. CABARRUS KANNAPOLIS EB-5125 DELETED OAKWOOD AVENUE SIDEWALKS. PROJECT DELETED - STIMULUS FUNDS NOT SECURED. CABARRUS MOUNT PLEASANT EB-5126 DELETED MOUNT PLEASANT GREENWAY. CONSTRUCT DUTCH BUFFALO PHASE. PROJECT DELETED - STIMULUS FUNDS NOT SECURED. CABARRUS I-85 I-5119 COMPLETED US TO NC 73. REHABILITATE PAVEMENT. CABARRUS US 52, US 74, NC 49 R-4413 COMPLETED NATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. CABARRUS CONCORD U-5197 DELETED MAIN AND FIRST STREETS. UPGRADE THREE TRAFFIC SIGNALS WITH METAL PLES AND MAST ARMS AND INSTALL ONE NEW TRAFFIC SIGNAL. PROJECT DELETED - UNABLE TO FUND WITH STIMULUS FUNDS. CALDWELL SR 1328 B-3624 COMPLETED JOHNS RIVER. REPLACED BRIDGE NO. 190 CALDWELL NC 268 B-4052 COMPLETED YADKIN RIVER. REPLACED BRIDGE NO. 7 CALDWELL US 321 U-5141 COMPLETED US 321 SOUTHBOUND LANE FROM SR 1178 TO THE SOUTH CITY LIMITS OF LENOIR. CARTERET SR 1124 B-4055 COMPLETED BRANCH NEWPORT RIVER. REPLACE BRIDGE NO. 22 CARTERET SR 1125 SF-4902F COMPLETED SR 1124 NORTH FOR 1.5 MILES. CONSTRUCT PAVED SHOULDERS AND REVISE PAVEMENT MARKINGS. CASWELL SR 1503 B-4057 COMPLETED REPLACED BRIDGE NO. 39 OVER HOGAN'S CREEK. CASWELL VARIOUS B-5189 DELETED BRIDGE EXPANSION JOINT REPAIRS AT SELECTED LOCATIONS. UNFUNDED ARRA CANDIDATE. T-165

170 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2010 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION CASWELL US 29 W-4821 COMPLETED US 29 BUSINESS IN ROCKINGHAM COUNTY NORTH THROUGH CASWELL COUNTY TO THE VIRGINIA STATE LINE. INSTALLED SHOULDER RUMBLE STRIPS. CATAWBA SR 1156 B-4059 COMPLETED HILDEBRAN CREEK. REPLACED BRIDGE NO. 79 CATAWBA NEWTON R-4911 COMPLETED WIDEN NC 10 AND UPGRADE US 321-NC 10 INTERCHANGE. CHATHAM NC 902 B-4063 COMPLETED REPLACED BRIDGE NO. 20 OVER SANDY BRANCH. CHATHAM CHATHAM COUNTY C-4974 COMPLETED IMPLEMENTED NOON TRANSIT ROUTE BETWEEN PITTSBORO AND CHAPEL HILL CHEROKEE SR 1331 B-3826 COMPLETED BATES CREEK. REPLACED BRIDGE NO. 166 CHEROKEE SR 1347 B-4070 COMPLETED HANGING DOG CREEK. REPLACED BRIDGE NO. 112 CHEROKEE VARIOUS FOREST HIGHWAY ROUTES R-5217 COMPLETED RESURFACED FOREST HIGHWAY ROUTES AT SELECTED LOCATIONS. CHOWAN SR 1226 B-4073 COMPLETED DILLARD CREEK. REPLACE BRIDGE NO. 13 CLAY VARIOUS FOREST HIGHWAY ROUTES R-5217 COMPLETED RESURFACED FOREST HIGHWAY ROUTES AT SELECTED LOCATIONS. COLUMBUS SR 1504 B-3829 COMPLETED PORTER COW BRANCH. REPLACE BRIDGE NO. 185 COLUMBUS SR 1437 B-4080 COMPLETED PINE LOG SWAMP. REPLACE BRIDGE NO. 148 COLUMBUS SR 1843 B-4082 COMPLETED DAN'S CREEK. REPLACE BRIDGE NO. 280 AND BRIDGE NO. 281 CRAVEN US 70 BUSINESS B-2532 COMPLETED TRENT RIVER. REPLACED BRIDGE NO. 60 CRAVEN RIVER BEND E-4505 COMPLETED SR 1420 (CASWELL BRANCH BRICK ROAD) AND BRIDGE REHABILITATION AND RHEM ROD LANDSCAPING. CRAVEN NEW BERN E-4508 COMPLETED TRYON PALACE HISTORIC SITES AND GARDENS-DCR. STREETSCAPING OF GEORGE STREET. CRAVEN HAVELOCK E-4735 COMPLETED RESTORATION OF HAVELOCK TRAIN STATION. (COMPLETED IN FY 2008) CRAVEN NEW BERN E-4737 COMPLETED TRYON PALACE HISTORIC SITE AND GARDENS. POLLOCK STREET ENHANCEMENTS, METCALF STREET TO EDEN STREET. CRAVEN BRICES CREEK ROAD EB-4977 DELETED EAST TO HOWELL ROAD TO US 70 BUSINESS. WIDEN PAVED SHOULDERS. DELETED, PROJECT COSTS EXCEEDED PROJECT BENEFITS. CRAVEN NEW BERN U-4755 COMPLETED US 70 BUSINESS (BROAD STREET), SR 1200 (FIRST STREET) TO US 70 BUSINESS (EAST FRONT STREET). REDUCE TRAFFIC PATTERN TO ONE LANE IN EACH DIRECTION WITH PARKING, MEDIAN PLANTING STRIP AND OTHER IMPROVEMENTS ALONG CORRIDOR. T-166

171 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2010 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION CRAVEN US 70 W-4800 COMPLETED SECTION A, SR 1323 TO SR 1603 IN LENOIR COUNTY; SECTION B, WEST OF NC 43 TO THE TRENT RIVER BRIDGE IN CRAVEN COUNTY. CONSTRUCT MILLED BUMBLE STRIPS WITH THERMOPLASTIC STRIPING ON THE MEDIAN AND OUTSIDE SHOULDERS OF THE EASTBOUND AND WESTBOUND LANES. CUMBERLAND SR 1108 B-4092 COMPLETED LITTLE ROCKFISH CREEK REPLACE BRIDGE NO. 80 CUMBERLAND SR 1003 CAMDEN ROAD B-5238 DELETED CSX TRANSPORTATION. REPLACE BRIDGE NO DELETE, TO BE ACCOMPLISHED UNDER U-2810B PER ROADWAY DESIGN. (7/12/2010) CUMBERLAND SR 2008 BK-5110 COMPLETED CREEK. REPLACE BRIDGE NO. 11 CUMBERLAND FAYETTEVILLE E-4118 COMPLETED FAYETTEVILLE AREA CONVENTION AND VISITORS BUREAU. PHASE A: DEPOT RESTORATION AND ESTABLISHMENT OF VISITOR CENTER-TRANSPORTATION MUSEUM IN CAPE FEAR AND YADKIN VALLEY DEPOT, PHASE B: LANDSCAPING AND STREETSCAPING ON THE AREA OF THE DEPOT. CUMBERLAND AVERASBORO E-4768 COMPLETED MOVE AND REHABILITATE THE OAK GROVE PLANTATION HOUSE. CUMBERLAND I-95 I-5011 COMPLETED SOUTH CAROLINA STATE LINE TO VIRGINIA SATE LINE. TRAFFIC OPERATIONAL IMPROVEMENTS. CUMBERLAND FAYETTEVILLE U-4756 COMPLETED SR 1404 (MORGANTON ROAD), SYCAMORE DAIRY ROAD TO SR 1596 (GLENSFORD DRIVE). ADD LANE IN EACH DIRECTION AN REPLACE STRUCTURE NO. 228 CURRITUCK SR 1222 B-4094 COMPLETED SHINGLE LANDING CREEK. REPLACE BRIDGE NO. 28 CURRITUCK NC 168 F-5300 COMPLETED CURRITUCK FERRY TERMINAL DOCK. REPLACE RAMPS, GANTRY AND DOLPHINS. COMPLETED IN FY CURRITUCK SR 1222 TULLS CREEK ROAD R-4429 COMPLETED NC 168 TO NORTH OF SR 1232 AND SR 1213 TO SR UPGRADE EXISTING FACILITY. (COMPLETED IN FY 2009) DARE NC 12 F-4006 COMPLETED MANNS HARBOR MAINTENANCE FACILITY. PHASE 3: CONSTRUCT A PAINT BUILDING FOR FERRY FLEET. DARE US 158 K-4900 COMPLETED REST AREA RENOVATION - BUILDINGS, GROUNDS AND PARKING FACILITIES. ENCLOSE LOBBY AND ADD ADA COMPLIANT FAMILY RESTROOM. DARE US 264 R-5125 COMPLETED NAVY RANGE TO SR RESURFACE. DAVIDSON I-85 BUSINESS / US B-4095 COMPLETED REPLACED BRIDGE NO. 128 AND BRIDGE NO. 130 OVER ABBOTTS CREEK. DAVIDSON SR 1147 (SALISBURY ROAD) B-4097 COMPLETED NORTH POTTS CREEK. REPLACE BRIDGE NO. 405 DAVIDSON NC 47 B-4739 DELETED FOUR MILE BRANCH. REPLACE BRIDGE NO. 46. STRUCTURE REHABILITATED IN LIEU OF REPLACEMENT. DAVIDSON VARIOUS R-5171 COMPLETED RESURFACING ON FEDERAL-AID ROUTES. DAVIDSON VARIOUS R-5172 COMPLETED RESURFACING ON FEDERAL-AID ROUTES. T-167

172 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2010 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION DAVIE VARIOUS R-5172 COMPLETED RESURFACING ON FEDERAL-AID ROUTES. DUPLIN NC 403 B-4105 COMPLETED WHITE OAK BRANCH. REPLACE BRIDGE NO. 46 DUPLIN NC 903 B-4106 COMPLETED BEAVERDAM CREEK. REPLACE BRIDGE NO. 20. DUPLIN SR 1826 B-4108 COMPLETED NINE MILE CREEK. REPLACE BRIDGE NO. 188 DUPLIN NC 24 R-5218 COMPLETED NC 24 BUSINESS-KENANSVILLE BYPASS IN DUPLIN COUNTY TO US 258 AT JARMAN'S FORK IN ONSLOW COUNTY. MILL AND RESURFACE. DURHAM SR 1004 (OLD OXFORD ROAD) R-5135 COMPLETED US 501 BUSINESS (NORTH ROXBORO STREET) TO THE GRANVILLE COUNTY LINE. WIDEN AND RESURFACE. DURHAM NC 98 (HOLLOWAY STREET) U-4010 COMPLETED EAST OF US 70 TO EAST OF JUNCTION ROAD. WIDENING. DURHAM DURHAM U-5122 COMPLETED NC 98, SR 1838 (JUNCTION ROAD) TO SR 1811 (SHERRON ROAD). MILL AND RESURFACE. DURHAM DURHAM U-5124 COMPLETED DURHAM, SR 1978 (OLD PAGE ROAD), SR 1926 (ANGIER AVENUE) TO SR 2095 (PAGE ROAD EXTENSION). PATCH AND RESURFACE. DURHAM DURHAM U-5126 COMPLETED US 501 BYPASS (DUKE STREET), SR 1443 (HORTON ROAD) TO HUDSON STREET. MILL AND RESURFACE. DURHAM DURHAM U-5127 COMPLETED DURHAM, SR 1321 (HILLANDALE-FULTON STREET), I-85 TO SR 1320 (ERWIN ROAD). MILL AND RESURFACE. DURHAM DURHAM U-5143 COMPLETED NC 55, SR 1171 (RIDDLE ROAD) INTERSECTION. CONSTRUCT TURN LANES. EDGECOMBE US 301 B-3453 COMPLETED FISHING CREEK. REPLACE BRIDGE NO. 23 FISHING CREEK OVERFLOW. REPLACE BRIDGE NO. 17 EDGECOMBE SR 1505 B-4504 COMPLETED DEEP CREEK. REPLACE BRIDGE NO. 52 FORSYTH SR 1725 (UNIVERSITY PARKWAY) B-4745 COMPLETED 20TH STREET. REPLACE BRIDGE NO FORSYTH SR 2377 (WEST MOUNTAIN STREET) B-4970 DELETED SOUTHERN RAILWAY. REPLACE BRIDGE NO PROJECT DELETED. STRUCTURE NOT ELIGIBLE. FORSYTH SR 1001 (COUNTRY CLUB ROAD) B-5148 DELETED NC 67. REPLACE BRIDGE NO STRUCTURE TO BE REPRIORITIZED IN NEXT PROGRAM CYCLE. FORSYTH CLEMMONS C-4977 COMPLETED MIDDLEBROOK DRIVE, US 158 (CLEMMONS ROAD) TO AMBERLY LANE. CONSTRUCT SIDEWALK. FORSYTH RURAL HALL C-4978 COMPLETED BETHANIA-RURAL HALL ROAD, JACKSON STREET TO NORTHRIDGE PARK DRIVE. CONSTRUCTED SIDEWALK. FORSYTH WINSTON-SALEM C-4979 COMPLETED SEGMENT A: ON CARVER SCHOOL ROAD, AIRPORT ROAD TO WHITE STREET, AND SEGMENT B: ON PEACE HAVEN ROAD, CHESTER ROAD TO WINCHELSEA ROAD. CONSTRUCTED SIDEWALKS. T-168

173 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2010 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION FORSYTH I-40 I-5132 COMPLETED SR 1101 (HARPER ROAD) TO JONESTOWN ROAD. PAVEMENT REHABILITATION. FORSYTH VARIOUS U-5144 COMPLETED RESURFACING AT SELECTED LOCATIONS IN WINSTON-SALEM MPO AREA. FORSYTH VARIOUS U-5144B COMPLETED RESURFACING AT SELECTED LOCATIONS IN WINSTON-SALEM MPO AREA. FRANKLIN SR 1146 (CAMPING CREEK ROAD) B-4114 COMPLETED CAMPING CREEK. REPLACE BRIDGE NO FRANKLIN SR 1419 B-4115 COMPLETED REPLACED BRIDGE NO. 57 OVER SYCAMORE CREEK. FRANKLIN VARIOUS C-4939 DELETED CONSTRUCT A BIKE-PEDESTRIAN PATH IN FORMER RAIL CORRIDOR (COTTON MARKET RAIL TRAIL). PROJECT DELETED. DECLINED BY COUNTY. FRANKLIN US 1 R-5136 COMPLETED RESURFACED FROM WAKE COUNTY LINE TO NC 56. FRANKLIN US 64 R-5137 COMPLETED MILLED AND RESURFACED FROM US 264 TO NASH COUNTY LINE. GASTON SR 1618 B-4116 COMPLETED BEAVER DAM CREEK. REPLACED BRIDGE NO. 148 GASTON GASTONIA U-2408 COMPLETED NC 274, NC 275 TO US WIDEN TO MULTI-LANES. GATES NC 137 FS-0201B DELETED GATESVILLE, WESTERN CITY LIMITS TO NC 37 (MAIN STREET). TRUCK ROUTE STUDY. DELETE, AT THE REQUEST OF THE DIVISION. GRAHAM VARIOUS FOREST HIGHWAY ROUTES R-5217 COMPLETED RESURFACED FOREST HIGHWAY ROUTES AT SELECTED LOCATIONS. GRANVILLE SR 1309 B-4524 COMPLETED REPLACED BRIDGE NO. 193 OVER SHELTON CREEK. GRANVILLE OXFORD U-5125 COMPLETED US 158 BYPASS, US 15 TO US 158 BUSINESS. PATCH AND RESURFACE. GREENE SR 1091 B-4125 COMPLETED WHEAT SWAMP CREEK. REPLACE BRIDGE NO. 46 GREENE US 258 R-5190 COMPLETED CONTENINEA CREEK TO NC 123. WIDEN AND RESURFACE. GUILFORD SR 1001 B-3337 COMPLETED REPLACED BRIDGE NO. 527 OVER NORTH BUFFALO CREEK. GUILFORD SR 1549 B-4128 COMPLETED REPLACED BRIDGE NO. 73 OVER BULL RUN CREEK. GUILFORD SR 3045 B-4130 COMPLETED REPLACED BRIDGE NO. 228 OVER ALAMANCE CREEK. GUILFORD SR 3394 B-4131 COMPLETED REPLACED BRIDGE NO. 11 OVER LITTLE ALAMANCE CREEK. GUILFORD HIGH POINT C-4938 COMPLETED PERFORMED TRAFFIC STUDY ALONG KIVETT DRIVE AND ENGLISH ROAD. GUILFORD GREENSBORO C-5190 DELETED GREENSBORO TRANSIT AUTHORITY. IMPROVEMENTS TO GTA ROUTE 8 BATTLEGROUND AVENUE. PROJECT DELETED AT REQUEST OF GREENSBORO MPO. T-169

174 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2010 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION GUILFORD GREENSBORO C-5191 DELETED GREENSBORO TRANSIT AUTHORITY. IMPROVEMENTS TO GTA ROUTE 3 NORTH ELM CONNECTOR. PROJECT DELETED AT REQUEST OF GREENSBORO MPO. GUILFORD GREENSBORO C-5192 DELETED GREENSBORO TRANSIT AUTHORITY. IMPROVEMENTS TO GTA ROUTE 9 WEST MARKET STREET CONNECTOR. PROJECT DELETED AT REQUEST OF GREENSBORO MPO. GUILFORD GREENSBORO C-5193 DELETED GREENSBORO TRANSIT AUTHORITY. PURCHASE 3 NEW HYBRID BUSES FOR NEW BATTLEGROUND, NORTH ELM, AND WEST MARKET CONNECTORS. PROJECT DELETED AT REQUEST OF GREENSBORO MPO. GUILFORD HIGH POINT E-4939 COMPLETED CONSTRUCTED HIGH POINT GREENWAY TRAIL ALONG SR 1538 (DEEP RIVER ROAD) FROM MARSDEN ROAD TO DEEP RIVER. GUILFORD I-85 I-5117 COMPLETED US INTERCHANGE TO GROOMETOWN ROAD. MILLING AND RESURFACING. GUILFORD I-40/85 I-5118 COMPLETED COMPLETED MILLING AND RESURFACING FROM SR 3056 (ROCK CREEK DAIRY ROAD) TO SR 1311 (UNIVERSITY ROAD). GUILFORD HIGH POINT U-4017 COMPLETED PIEDMONT PARKWAY, SR 1552 (TARRANT ROAD) TO SR 1541 (WENDOVER AVENUE). CONSTRUCTED FOUR LANE DIVIDED FACILITY ON NEW LOCATION. GUILFORD US 421 U-5157B COMPLETED RANDOLPH COUNTY LINE TO NORTH OF SR 3485 (HARMONT DRIVE). MILLING AND RESURFACING. GUILFORD NC 68 U-5164 COMPLETED SR 2011 (EDGEFIELD ROAD) TO NC 65 WEST. RESURFACING. HALIFAX US 301 B-3453 COMPLETED FISHING CREEK. REPLACE BRIDGE NO. 23 FISHING CREEK OVERFLOW. REPLACE BRIDGE NO. 17 HALIFAX NC 561 B-4132 COMPLETED LOOKING GLASS SWAMP. REPLACE BRIDGE NO. 97 HALIFAX SR 1434 B-4541 COMPLETED QUANKEY CREEK. REPLACE BRIDGE NO. 24 HALIFAX SR 1602 BK-5106 COMPLETED CHOCKOYOTTE CREEK. REPLACE BRIDGE NO. 164 HALIFAX I-95 I-5011 COMPLETED SOUTH CAROLINA STATE LINE TO VIRGINIA SATE LINE. TRAFFIC OPERATIONAL IMPROVEMENTS. HALIFAX I-95 I-5012 COMPLETED NC 481 (MILEPOST 154) TO NC 561 (MILEPOST 160). PAVEMENT REPAIRS. HALIFAX I-95 I-5018 COMPLETED SR 1600 (MILEPOST 166) TO SOUTH OF US 158 (MILEPOST 172). REHABILITATE. HARNETT I-95 I-5011 COMPLETED SOUTH CAROLINA STATE LINE TO VIRGINIA SATE LINE. TRAFFIC OPERATIONAL IMPROVEMENTS. HAYWOOD I-40 I-4910 COMPLETED TENNESSEE STATE LINE (MILE POST 0.0) TO EXIT 15 (MILE MARKER 14.8). PAVEMENT REHABILITATION. HAYWOOD VARIOUS FOREST HIGHWAY ROUTES R-5217 COMPLETED RESURFACED FOREST HIGHWAY ROUTES AT SELECTED LOCATIONS. HENDERSON SR 1329 B-4148 COMPLETED BOYLSTON CREEK. REPLACED BRIDGE NO. 12 T-170

175 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2010 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION HENDERSON SR 1587 B-4149 COMPLETED CLEAR CREEK. REPLACED BRIDGE NO. 34 HENDERSON HENDERSONVILLE U-4427 COMPLETED CONSTRUCT CLOSED LOOP SIGNAL SYSTEM ALONG US 64 AND US 25. (COORDINATE WITH U-4428) HENDERSON FLAT ROCK U-5182 COMPLETED WALKWAY EXTENSION IN VILLAGE OF FLAT ROCK ON EAST SIDE OF US 225 NORTH AND SOUTH OF LITTLE RIVER ROAD. HERTFORD US 13 R-5121 COMPLETED SR 1130 TO NC 45/461. STRENGTHEN AND RESURFACE. HERTFORD NC 11 BUSINESS & NC 308 R-5128 COMPLETED NC 11 BUSINESS FROM NC TO AULANDER ECL AND 3 SECTIONS OF NC 308 IN AND AROUND WINDSOR. PAVEMENT REHABILITATION. HERTFORD NC 308 R-5129 COMPLETED KING STREET TO STERLINGWORTH STREET. RESURFACE HYDE OCRACOKE ISLAND EB-5000 COMPLETED OCRACOKE ISLAND LIMITS TO OKRACOKE CAMPGROUND. CONSTRUCT MULTI-USE TRAIL HYDE NC 12 R-5149 COMPLETED NORTHERN FERRY DOCK TO OCRACOKE VILLAGE. RESURFACE AND WIDEN TO ACCOMMODATE BICYCLES. IREDELL SR 1526 B-4552 COMPLETED CREEK. REPLACED BRIDGE NO. 100 IREDELL MOORESVILLE C-5143 DELETED MAGNOLIA AVENUE IN THE FIELDSTONE NEIGHBORHOOD. CONSTRUCT SIDEWALK. PROJECT DELETED - DUPLICATE OF C IREDELL I-77 I-5106 COMPLETED I-77 FROM MILEPOST TO MILEPOST IREDELL I-40 I-5120 COMPLETED I-40 FROM MILEPOST 146 TO MILESPOST 151 JACKSON VARIOUS FOREST HIGHWAY ROUTES R-5217 COMPLETED RESURFACED FOREST HIGHWAY ROUTES AT SELECTED LOCATIONS. JOHNSTON SR 1162 B-4165 COMPLETED SASSARIXA SWAMP. REPLACE BRIDGE NO. 89 JOHNSTON I-95 B-5020 COMPLETED US 701 (BRIDGE NO. 67), SR 1162 (HOCKADAY ROAD - BRIDGE NO. 62), SR 2137 (PITTMAN ROAD - BRIDGE NO. 109), SR 2339 (BAGLEY ROAD - BRIDGE NO. 112) AND SR 2399 (TRUCK STOP ROAD) - BRIDGE NO. 117). ELEVATE STRUCTURES TO PROVIDE 16 FEET MINIMUM ROADWAY CLEARAN JOHNSTON I-95 I-2703B DELETED HARNETT COUNTY LINE TO US 70 (EXIT 97). PAVEMENT REHABILITATION. DELETE, TO BE ACCOMPLISHED UNDER I-5137, I-5318, & I JOHNSTON I-95 I-5011 COMPLETED SOUTH CAROLINA STATE LINE TO VIRGINIA SATE LINE. TRAFFIC OPERATIONAL IMPROVEMENTS. JOHNSTON I-40 K-5102 COMPLETED RENOVATION OF REST AREA PAIR-BUILDINGS, GROUNDS AND PARKING FACILITIES. BUILDING TO INCLUDE DUAL RESTROOMS AND ADA COMPLIANT FAMILY ROOM. JOHNSTON SR 1178 KEEN ROAD R-4071 COMPLETED SR 1164 (ALLENDALE ROAD) IN FOUR OAKS TO US-301. WIDEN TO THREE-LANES WITH CURB AND GUTTER. T-171

176 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2010 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION JONES BRICES CREEK ROAD EB-4977 DELETED EAST TO HOWELL ROAD TO US 70 BUSINESS. WIDEN PAVED SHOULDERS. DELETED, PROJECT COSTS EXCEEDED PROJECT BENEFITS. LEE US 1 R-5139 COMPLETED COMPLETED RESURFACING FROM US 1 BUSINESS TO SR 1423 (FARRELL ROAD). LEE NC 78 R-5141 COMPLETED US 1 TO EAST OF SR 1146 (ST. ANDREWS CHURCH ROAD). WIDENING. LENOIR KINSTON E-4976 COMPLETED KINSTON-LENOIR COUNTY PARKS AND RECREATION DEPARTMENT AND LENOIR COUNTY. RENOVATIONAND CONSTRUCTION OF A 2200 SQUARE FOOT VISITORS CENTER AT INTERSECTION OF US 70 AND US 258. LENOIR US 70 W-4800 COMPLETED SECTION A, SR 1323 TO SR 1603 IN LENOIR COUNTY; SECTION B, WEST OF NC 43 TO THE TRENT RIVER BRIDGE IN CRAVEN COUNTY. CONSTRUCT MILLED BUMBLE STRIPS WITH THERMOPLASTIC STRIPING ON THE MEDIAN AND OUTSIDE SHOULDERS OF THE EASTBOUND AND WESTBOUND LANES. LINCOLN SR 1193 B-4177 COMPLETED HOWARDS CREEK. REPLACED BRIDGE NO. 142 MACON NC 28 SR 1323 R-2408A COMPLETED SR 1729 (DEPOT STREET EXTENSION) TO SR 1378 (BENNETT ROAD). UPGRADE AND MAKE SAFETY IMPROVEMENTS. MACON VARIOUS FOREST HIGHWAY ROUTES R-5217 COMPLETED RESURFACED FOREST HIGHWAY ROUTES AT SELECTED LOCATIONS. MADISON SR 1565 B-4184 COMPLETED IVY RIVER. REPLACED BRIDGE NO. 4 MARTIN SR 1320 B-4578 COMPLETED CONOHO CREEK. REPLACE BRIDGE NO. 8 MARTIN US 17 BUSINESS R-3134 COMPLETED NC 125 TO END OF CURB AND GUTTER. RESURFACE MARTIN US 64 R-5120 COMPLETED US 64 ALTERNATE TO JAMESVILLE. MILL AND RESURFACE. MARTIN US 17 BUSINESS R-5134 COMPLETED NC 125 TO END OF CURB AND GUTTER SECTION. RESURFACE. MARTIN US 64 ALTERNATE R-5188 COMPLETED SR 1446 TO SR MILL AND RESURFACE. McDOWELL SR 1763 B-3492 COMPLETED NORTH MUDDY CREEK. REPLACED BRIDGE NO. 56 McDOWELL SR 1552 B-3872 COMPLETED CREEK. REPLACED BRIDGE NO. 195 McDOWELL SR 1103 B-4192 COMPLETED JACKSON CREEK. REPLACED BRIDGE NO. 264 McDOWELL SR 1123 B-4193 COMPLETED CREEK. REPLACED BRIDGE NO. 51 McDOWELL SR 1163 B-4195 COMPLETED SECOND BROAD RIVER. REPLACED BRIDGE NO. 42 McDOWELL SR 1506 B-4196 COMPLETED CREEK. REPLACED BRIDGE NO. 238 McDOWELL SR 1552 B-4197 COMPLETED DALES CREEK. REPLACED BRIDGE NO. 73 McDOWELL SR 1782 B-4199 COMPLETED SECOND BROAD RIVER. REPLACED BRIDGE NO. 198 T-172

177 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2010 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION McDOWELL OLD FORT EB-3416 DELETED OLD US 70: OLD FORT MONTREAT BLACK MOUNTAIN. BICYCLE TRAIL. DELETE PROJECT COMPLETED WITH NON-TIP FUNDS. MECKLENBURG CHARLOTTE C-4406 COMPLETED REAGAN DRIVE AND SUGAR CREEK ROAD. INTERSECTION IMPROVEMENTS. PROJECT COMPLETE. MECKLENBURG CHARLOTTE C-4953 DELETED CHARLOTTE AREA TRANSIT SYSTEM (CATS). TDM AND VANPOOL EXPANSION. CMAQ FUNDS TO BE TRANSFERRED TO FTA. PROJECT DELETED. MECKLENBURG CHARLOTTE C-4961 COMPLETED INTERSECTION IMPROVEMENTS AT SELECTED LOCATIONS. (COMPLETED IN FY 2009) MECKLENBURG CHARLOTTE C-4972 COMPLETED PARKING FOR 74X EXPRESS BUS SERVICE. MECKLENBURG I-77 I-5126 DELETED I-77, 2200 FEET NORTH OF SR 2117 (HAMBRIGHT ROAD) TO EXIT 28 (CATAWBA AVENUE). ADD ONE LANE IN NORTHBOUND DIRECTION, EXIT 23 TO EXIT 28 AND ON LANE IN SOUTH SOUTHBOUND DIRECTION, NORTH OF SR 2117 (HAMBRIGHT ROAD) TO EXIT 28 (CATAWBA AVENUE). DELETED AT THE REQUEST OF MECKLENBURG-UNION MPO. MECKLENBURG US 52, US 74, NC 49 R-4413 COMPLETED NATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. MECKLENBURG NC 218 R-5114 COMPLETED NC 218, I-485 (CHARLOTTE OUTER LOOP) TO US 74 IN ANSON COUNTY. UPGRADE TO 24 FEET ROADWAY AND RE-SURFACE. MECKLENBURG CHARLOTTE U-2100 COMPLETED SR 3998 (SOUTH BOULEVARD) SR 3814 (WOODLAWN ROAD). INTERSECTION REVISION. MECKLENBURG WEDDINGTON ROAD U-5025 COMPLETED WEDDINGTON ROAD, TRADE STREET TO I-485. WIDEN TO MULTI- LANES. MECKLENBURG CHARLOTTE U-5116 DELETED CONSTRUCT LITTLE ROCK ROAD RE-LOCATION. PROJECT DELETED - WAS NOT SELECTED AS A STIMULUS PROJECT. MECKLENBURG US 21 U-5128 DELETED US 21 (STATESVILLE AVENUE), NORTHCROSS CENTER COURT TO BOAT HOUSE COURT. WIDEN TO MULTI-LANES. DELETED AT THE REQUEST OF MECKLENBURG-UNION MPO. MECKLENBURG WESTMORELAND ROAD U-5129 DELETED WESTMORELAND ROAD, SR 5544 (WEST CATAWBA AVENUE) TO US 21. WIDEN TO MULTI-LANES. DELETED AT THE REQUEST OF MECKLENBURG-UNION MPO. MECKLENBURG JIM COOKE ROAD U-5130 DELETED JIM COOKE ROAD, NORTHCROSS DRIVE EXTENSION TO 90 DEGREE CURVE ON SR 2145 (BAILEY ROAD). CONSTRUCT A THREE LANE FACILITY ON NEW LOCATION. DELETED AT THE REQUEST OF MECKLENBURG-UNION MPO. MECKLENBURG NORTHCROSS DRIVE EXTENSION U-5131 DELETED NORTHCROSS DRIVE EXTENSION, JIM COOKE ROAD EXTENSION TO EAGLE RIDGE WAY DRIVE, CONSTRUCT A THREE LANE FACILITY ON NEW LOCATION. DELETED AT THE REQUEST OF MECKLENBURG-UNION MPO. MECKLENBURG DAVIDSON U-5136 COMPLETED DAVIDSON, SR 2693 (CONCORD ROAD) SR 2420 (EAST ROCKY RIVER ROAD). CONSTRUCTED A ROUNDABOUT AT INTERSECTION. T-173

178 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2010 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION MECKLENBURG HUNTERSVILLE U-5139 DELETED REALIGNMENT OF SR 2695 (VERHOEFF DRIVE) AT THE INTERSECTION WITH NC 115 (OLD STATESVILLE ROAD). INCLUDES GRADE SEPARATED CROSSING OF THE NORFOLK SOUTHERN RAILROAD AND ELIMINATION OF AN AT-GRADE RAIL CROSSING BETWEEN NC 115 AND SOUTH CHURCH STREET. PROJECT MECKLENBURG CORNELIUS U-5140 DELETED SR 2415 (BAILEY ROAD), US 21 (STATESVILLE ROAD) TO SR 2415 (BAILEY ROAD). SAFETY IMPROVEMENTS AND REALIGN CURVE. PROJECT DELETED - WAS NOT SELECTED AS A STIMULUS PROJECT. MITCHELL NC 197 B-1443 COMPLETED NORTH TOE RIVER. REPLACED BRIDGE NO. 61 MITCHELL SR 1304 B-2848 COMPLETED NORTH TOE RIVER. REPLACED BRIDGE NO. 143 MOORE SR 1105 (PINE BLUFF LAKE ROAD) B-4583 COMPLETED ABERDEEN CREEK. REPLACE BRIDGE NO NASH SR 1131 B-4209 COMPLETED TURKEY CREEK. REPLACE BRIDGE NO. 17 NASH SR 1001 B-4585 COMPLETED TOISNOT SWAMP. REPLACE BRIDGE NO. 65 AND BRIDGE NO. 66 NASH SR 1945 B-4589 COMPLETED SR1945 OVER TOISNOT SWAMP. REPLACE BRIDGE 69. NASH I-95 I-3319 DELETED SR 1745 (MILEPOST 128) TO SR 1524 (MILEPOST 143). PAVEMENT REHABILITATION. DELETE, TO BE ACCOMPLISHED UNDER I-5133 NASH I-95 I-3607 DELETED SR 1309 (MILEPOST 123) TO SR 1745 (MILEPOST 128). PAVEMENT REHABILITATION. DELETE, TO BE ACCOMPLISHED UNDER I NASH I-95 I-5011 COMPLETED SOUTH CAROLINA STATE LINE TO VIRGINIA SATE LINE. TRAFFIC OPERATIONAL IMPROVEMENTS. NASH I-95 I-5017 COMPLETED TAR RIVER (MILEPOST 128) TO SR 1524 (MILEPOST 143). RESURFACE NASH I-95 I-5137 COMPLETED SOUTH OF NASH COUNTY LINE (MILE POST 123) TO SOUTH OF NC 58 (MILE POST 128). PAVEMENT REHABILITATION. NASH ROCKY MOUNT Z-4004G COMPLETED HOWELL STREET AT NASH COUNTY RAILROAD CROSSING T. SAFETY IMPROVEMENTS. NASH ROCKY MOUNT Z-4004H COMPLETED TILLERY STREET AT NASH COUNTY RAILROAD CROSSING A. SAFETY IMPROVEMENTS. NEW HANOVER WILMINGTON U-5017A COMPLETED WILMINGTON COMPUTERIZED SIGNAL SYSTEM. (SOUTHERN SECTION) NEW HANOVER WILMINGTON U-5017B COMPLETED WILMINGTON COMPUTERIZED SIGNAL SYSTEM. PHASE II NEW HANOVER WILMINGTON U-5017C COMPLETED WILMINGTON COMPUTERIZED SIGNAL SYSTEM. (NORTHWESTERN AND EASTERN SECTIONS. NEW HANOVER WILMINGTON U-5200 DELETED 3RD. STREET, SOUTH OF BRIDGE NO. 35 OVER ABANDONED RAILROAD TO US 17 BUSINESS (MARKET STREET). RESURFACE ROADWAY. DELETE, TO BE ACCOMPLISHED BY DIVISION. T-174

179 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2010 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION NORTHAMPTON US 158 B-5001 COMPLETED HALIFAX COUNTY LINE TO MULTI-LANE SECTION WEST OF HERTFORD COUNTY LINE. PAVEMENT STRENGTHENING AND RESURFACING. NORTHAMPTON I-95 I-5011 COMPLETED SOUTH CAROLINA STATE LINE TO VIRGINIA SATE LINE. TRAFFIC OPERATIONAL IMPROVEMENTS. NORTHAMPTON US 158 R-5001 COMPLETED HALIFAX COUNTY LINE TO MULTI-LANE SECTION WEST OF HERTFORD COUNTY LINE. PAVEMENT STRENGTHENING AND RESURFACING. NORTHAMPTON US 258 R-5122 COMPLETED ROANOKE RIVER TO NC 305. STRENGTHEN AND RESURFAVE NORTHAMPTON NC 35 R-5126 COMPLETED US 158 TO SR RESURFACE. NORTHAMPTON NC 48 R-5127 COMPLETED SR 1200 TO EAST CITY LINE OF GASTON. RESURFACING ONSLOW NC 24 R-5218 COMPLETED NC 24 BUSINESS-KENANSVILLE BYPASS IN DUPLIN COUNTY TO US 258 AT JARMAN'S FORK IN ONSLOW COUNTY. MILL AND RESURFACE. ONSLOW SNEADS FERRY R-5219 COMPLETED INTERSECTION OF NC 172-NC 210, CONSTRUCT RIGHT TURN LANES ON NC 172 WESTBOUND AND NC 210 NORTHBOUND ORANGE SR 1561 B-4592 COMPLETED REPLACED BRIDGE NO. 64 OVER ENO RIVER. ORANGE SR 1006 (ORANGE GROVE ROAD) EB-4980 COMPLETED COMPLETED FEASIBILITY STUDY FOR PEDESTRIAN BRIDGE OVER I-40 ORANGE HILLSBOROUGH U-3808 DELETED ELIZABETH BRADY ROAD EXTENSION, SOUTH OF US 70 BUSINESS TO NORTH OF US 70 BYPASS AT SR 1002 (ST. MARY'S ROAD). MULTI-LANES WITH A NEW CROSSING OF ENO RIVER. PROJECT DELETED. PLANNING DISCONTINUED BASED ON LOCAL/PUBLIC INPUT. PAMLICO SR 1316 B-4927 DELETED TRENT CREEK. REPLACE BRIDGE NO. 18 PAMLICO BRICES CREEK ROAD EB-4977 DELETED EAST TO HOWELL ROAD TO US 70 BUSINESS. WIDEN PAVED SHOULDERS. DELETED, PROJECT COSTS EXCEEDED PROJECT BENEFITS. PAMLICO NC 55 R-2539C COMPLETED SR 1129 (BENNETT-TINGLE ROAD) TO NC 304 IN BAYBORO. WIDEN TO MULTI-LANES. PASQUOTANK US 17 BYPASS R-5196 COMPLETED SELECTED LOCATIONS ON BOTH THE NORTH AND SOUTHBOUND LANES BETWEEN MILEPOST AND MILEPOST RESURFACING. PENDER NC 210 B-4223 COMPLETED NORTHEAST CAPE FEAR RIVER. REPLACE BRIDGE NO. 21 PERQUIMANS US 17 B-5019 COMPLETED PERQUIMANS RIVER. REHABILITATE DECK ON BRIDGE NO. 14. HYDRO-DEMOLITION AND LATEX MODIFIED CONCRETE OVERLAY. PERQUIMANS US 17 R-5150 COMPLETED SR 1302 TO SR STRENGTHEN PAVEMENT. PERSON ROXBORO C-4942 COMPLETED CONSTRUCTED SIDEWALKS, US 501 (GARRETT STREET), SOUTH MAIN STREET, AND ROXBORO COMMONS SHOPPING CENTER. T-175

180 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2010 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION PITT SR 1214 B-4601 DELETED PINELOG CREEK. REPLACE BRIDGE NO. 64 DELETE, TO BE ACCOMPLISHED BY DIVISION. PITT SR 1255 B-4688 COMPLETED LAWRENCE RUN OVERFLOW. REPLACE BRIDGE NO. 157 REMOVED BRIDGE # 93 ONLY - REPLACED WITH CULVERT PITT GREENVILLE EB-5129 DELETED GREEN MILL RUN GREENWAY: PHASE 11, ONE MILE FROM CHARLES BOULEVARD TO HOOKER ROAD. CONSTRUCT GREENWAY. DELETE - TO BE ACCOMPLISHED BY EB PITT SR 2241 IVEY ROAD SF-4902A COMPLETED SR 1727 (EASTERN PINES ROAD). IMPROVE INTERSECTION. PITT GREENVILLE U-3613 COMPLETED SR 1708 (FIRE TOWER ROAD), NC TO EAST OF SR 1709 (COREY ROAD). WIDEN TO A FIVE LANE FACILITY, SOME NEW LOCATION. PITT GREENVILLE U-5160 COMPLETED SR 1467 (STANTONSBURG ROAD) AT ARLINGTON BOULEVARD. CONSTRUCT AN ADDITIONAL LEFT TURN LANE. PITT GREENVILLE U-5193 COMPLETED SR 1708 (FIRE TOWER ROAD), SR 1709 (COREY ROAD) TO NC 43 (CHARLES BOULEVARD). MILL AND RESURFACE. POLK SR 1517 B-3019 COMPLETED PACOLET RIVER. REPLACED BRIDGE NO. 19 RANDOLPH SR 2873 B-4613 COMPLETED REPLACED BRIDGE NO. 415 OVER FORK CREEK. RICHMOND ROCKINGHAM U-3456 COMPLETED US 1 (FAYETTEVILLE ROAD), SR 1424 (ROBERDEL ROAD) TO SR 1640 (WIREGRASS ROAD) / SR 1422 (LEDBETTER ROAD). WIDEN TO MULTI-LANES. ROBESON I-95 I-5011 COMPLETED SOUTH CAROLINA STATE LINE TO VIRGINIA SATE LINE. TRAFFIC OPERATIONAL IMPROVEMENTS. ROBESON NC 211 R-5018 COMPLETED NC 72 (ROBERTS AVENUE) TO EAST OF SR 2110 (SNAKE ROAD). WIDEN TO THREE LANES. ROCKINGHAM NC 700 R-5179B COMPLETED DAN RIVER BRIDGE TO SR 1902 (DIBRELL ROAD). ROCKINGHAM SR 2670 (SCALES STREET) U-5167 DELETED WENTWORTH STREET TO US BUSINESS (FREEWAY DRIVE) IN REIDSVILLE. STREET IMPROVEMENTS. TO BE COMPLETED UNDER E ROCKINGHAM US 29 W-4821 COMPLETED US 29 BUSINESS IN ROCKINGHAM COUNTY NORTH THROUGH CASWELL COUNTY TO THE VIRGINIA STATE LINE. INSTALLED SHOULDER RUMBLE STRIPS. ROWAN KANNAPOLIS C-5101 COMPLETED PURCHASED T3 PERSONAL MOBILITY ELECTRIC VEHICLES. ROWAN I-85 I-2511 COMPLETED COMPLETED BRIDGE REHABILITATION AND WIDENING FROM US CONNECTOR (EXIT 68) TO NORTH OF SR 2120 (EXIT 81). ROWAN VARIOUS R-5173 COMPLETED RESURFACING ON FEDERAL-AID ROUTES. RUTHERFORD SR 1155 B-3697 COMPLETED BROAD RIVER. REPLACED BRIDGE NO. 270 RUTHERFORD SR 1549 B-4263 COMPLETED CATHEY'S CREEK. REPLACED BRIDGE NO. 41 T-176

181 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2010 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION RUTHERFORD SR 1733 B-4265 COMPLETED FIRST BROAD RIVER. REPLACED BRIDGE NO. 202 RUTHERFORD SR 1347 B-4631 COMPLETED CREEK. REPLACED BRIDGE NO. 526 SAMPSON NC 41 B-1382 COMPLETED BLACK RIVER. REPLACE BRIDGE NO. 12 BLACK RIVER OVERFLOW. REPLACE BRIDGE NO. 26 SCOTLAND SR 1433 (CALEDONIA ROAD) B-4642 COMPLETED JORDAN CREEK. REPLACE BRIDGE NO. 28. SCOTLAND LAURINBURG U-5027 COMPLETED SR 1674 (LAUCHWOOD DRIVE), US 501 TO US BUSINESS. WIDEN, RESURFACE, AND IMPROVE DRAINAGE. STANLY SR 1963 B-4279 COMPLETED SCALY BARK CREEK. REPLACED BRIDGE NO. 120 STANLY US 52, US 74, NC 49 R-4413 COMPLETED NATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. STATEWIDE VARIOUS M-0386 COMPLETED STATEWIDE TRANSPORTATION MANAGEMENT CENTER FEASIBILITY STUDY. SURRY SR 1330 B-3910 COMPLETED MITCHELL RIVER. REPLACED BRIDGE NO. 37 SURRY SR 1330 B-3911 COMPLETED SADDLE MOUNTAIN CREEK. REPLACED BRIDGE NO. 38. SURRY SR 1625 B-4285 COMPLETED PAULS CREEK. REPLACED BRIDGE NO. 221 SURRY SR 2024 B-4646 COMPLETED TOMS CREEK. REPLACED BRIDGE NO SURRY I-77 I-4025 COMPLETED YADKIN RIVER, REHABILITATE BRIDGE NO. 6 ON NORHTBOUND LANE AND REPLACE BRIDGE NO. 13 ON SOUTHBOUND LANE. SWAIN SR 1309 B-3701 COMPLETED ALARKA CREEK. REPLACED BRIDGE NO. 106 SWAIN CHEROKEE C-4947 COMPLETED EASTERN BAND OF CHEROKEE INDIANS. IMPLEMENTED SHUTTLE SERVICE BETWEEN CHEROKEE, NC AND GATLINBURG, TN. SWAIN NEW ROUTE R-4908 DELETED NORTH SHORE ROAD. CONSTRUCT A TWO LANE FACILITY ON NEW LOCATION IN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. PROJECT DELETED - STUDY FINISHED SWAIN QUALLA BOUNDARY R-5004 COMPLETED S YELLOW HILL (PEAVINE). OVERLAY SWAIN QUALLA BOUNDARY R-5005 COMPLETED S GOOSE CREEK ROAD. OVERLAY TRANSYLVANIA US 276 R-5146 COMPLETED US 276 FROM PISGAH FOREST TO BREVARD. TRANSYLVANIA VARIOUS FOREST HIGHWAY ROUTES R-5217 COMPLETED RESURFACED FOREST HIGHWAY ROUTES AT SELECTED LOCATIONS. TYRRELL US 64 R-5132 COMPLETED ALLIGATOR RIVER BRIDGE TO THE NEW PAVEMENT. RESURFACE UNION SR 1137 B-4295 COMPLETED WAXHAW CREEK. REPLACED BRIDGE NO. 188 UNION SR 1321 B-4296 COMPLETED WEST FORK TWELVE MILE CREEK. REPLACED BRIDGE NO T-177

182 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2010 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION UNION US 601 R-2616 COMPLETED SOUTH CAROLINA STATE LINE TO US 74 IN MONROE. WIDEN TO MULTI-LANES. UNION US 52, US 74, NC 49 R-4413 COMPLETED NATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDARD GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. UNION NC 218 R-5114 COMPLETED NC 218, I-485 (CHARLOTTE OUTER LOOP) TO US 74 IN ANSON COUNTY. UPGRADE TO 24 FEET ROADWAY AND RE-SURFACE. UNION NC 205 R-5201 DELETED SR 1006 (OLIVE BRANCH ROAD) TO MARSHVILLE CITY LIMITS AND US 74 TO CURB AND GUTTER AT MARSHVILLE CITY LIMITS. REHABILITATE PAVEMENT. DELETE PROJECT. TO BE ACCOMPLISHED UNDER CONTRACT RESURFACING PROGRAM. UNION INDIAN TRAIL U-5109 COMPLETED INTERSECTION OF FAITH CHURCH ROAD AND UNIONVILLE INDIAN TRAIL. CONSTRUCTION INTERSECTION IMPROVEMENTS. UNION MONROE U-5138 DELETED SR 1009 (CHARLOTEE AVENUE), WALNUT STREET TO PHIFFER STREET. CHARLOTTE AVENUE TURN LANE IMPROVEMENTS, INCLUDING REALIGNMENT OF CONCORD AVENUE TO INTERSECT WITH CHARLOTTE AVENUE AT ICEMORELEE STREET. PROJECT DELETED - WAS NOT SELECTED AS A STIMULUS PROJECT VANCE US 1 B-4653 DELETED US 1 BUSINESS-US 158. REPLACE BRIDGE NO. 42 AND BRIDGE NO. 44. PROJECT DELETED FROM STIP BY DIVISION REQUEST. SCOPE OF REDUCED TO ALLOW DIV FORCES TO COMPLETE WITH DIV BRIDGE FUNDS. VANCE US 1 BYPASS B-4829 DELETED US 1 BUSINESS AND CSX RAILROAD. REPLACE BRIDGE NO. 4. PROJECT DELETED AT REQUEST OF DIVISION. VANCE I-85 I-2810 COMPLETED GRANVILLE COUNTY LIN (MILE POST 208.5) TO US 158 BYPASS (MILEPOST 213.5) IN VANCE COUNTY. PAVEMENT AND BRIDGE REHABILITATION. (5 MILES) WAKE SR 1839 B-3528 COMPLETED REPLACED BRIDGE NO. 429 OVER SYCAMORE CREEK. WAKE SR 2045 B-3705 COMPLETED REPLACED BRIDGE NO. 125 OVER SMITHS CREEK. WAKE SR 1379 B-3917 COMPLETED REPLACED BRIDGE NO. 311 OVER SWIFT CREEK. WAKE SR 1007 B-4300 COMPLETED REPLACED BRIDGE NO. 29 OVER CLARKS CREEK. WAKE SR 1007 (POOLE ROAD) B-4301 COMPLETED POPLAR CREEK. REPLACE BRIDGE NO WAKE SR 1844 B-4303 COMPLETED REPLACED BRIDGE NO. 102 OVER LOWER BARTONS CREEK. WAKE SR 2217 (OLD MILBURNIE ROAD) B-4304 COMPLETED BEAVER DAM CREEK. REPLACE BRIDGE NO WAKE RALEIGH B-4331 COMPLETED STONEYBROOK DRIVE. BRIDGE NO. 661 OVER MARSH CREEK REPLACED BY CITY OF RALEIGH. WAKE RALEIGH C-5174 DELETED I-440 RAMP METERING. INSTALL RAMP METERS AND ASSOCIATED IMPROVEMENTS AT HILLSBOROUGH STREET, WESTERN BOULEVARD AND JONES FRANKLIN ROAD. PROJECT DELETED AT REQUEST OF CAMPO. T-178

183 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2010 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION WAKE HOLLY SPRINGS E-4925 COMPLETED CONSTRUCTED STREETSCAPING ALONG NC 55 (MAIN STREET) FROM CENTER ROAD TO RALEIGH STREET. WAKE WAKE FOREST E-4928 COMPLETED COMPLETED STREETSCAPING ALONG BOTH SIDES OF SR 1941 (SOUTH WHITE STREET), ROOSEVELT AVENUE TO WAIT AVENUE AND THE WEST SIDE TO JONES STREET. WAKE I-440 I-5115 COMPLETED MILLED AND RESURFACED FROM SR 1728 (WADE AVENUE-Exit 4) TO SR 2000 (WAKE FOREST ROAD-EXIT 10). WAKE I-540 I-5116 COMPLETED I-40 TO US 70. MILL AND RESURFACE. WAKE I-440 I-5124 COMPLETED INSTALLED INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES FROM I-40 INTERCHANGE TO I-40/US WAKE US 64 R-5137 COMPLETED MILLED AND RESURFACED FROM US 264 TO NASH COUNTY LINE. WAKE SR 1728 (WADE AVENUE) R-5169A COMPLETED FAIRCLOTH STREET TO US /NC 50 (CAPITAL BOULEVARD). MILLING AND RESURFACING. WAKE SR 1435 (OLD RALEIGH ROAD) R-5169B COMPLETED MANSON STREET TO SR 1521 (LAKE PINE DRIVE); SR 1521 (LAKE PINE DRIVE) FROM SR 1435 (OLD RALEIGH ROAD) TO US 64. RESURFACING. WAKE MORRISVILLE U-3344 COMPLETED WIDENED SR 3015 (AIRPORT BOULEVARD) TO MULTI-LANES FROM NC 54 TO I-40. WAKE SR 2000 (WAKE FOREST ROAD) W-4404 COMPLETED WIDENED SR 2000 AND CONSTRUCTED DUAL LEFT TURN LANES ONTO I-440 (INNER AND OUTER BELTLINE); WIDENED I- 440 ON-RAMPS TO ACCEPT DUAL LEFT TURN LANES. REVISED TRAFFIC SIGNALS PROVIDING PROTECTED TURN PHASE FOR DUAL LEFT TURN LANES. WARREN SR 1100 (SATTERWHITE ROAD) B-3706 COMPLETED FISHING CREEK. REPLACE BRIDGE NO. 20. WARREN SR 1507 (DAVIS ROAD) B-3707 COMPLETED POND CREEK. REPLACE BRIDGE NO. 67. WARREN SR 1600 (BALTIMORE ROAD) B-3921 COMPLETED FISHING CREEK. REPLACE BRIDGE NO. 45. WARREN US 401 B-4307 COMPLETED SHOCCO CREEK. REPLACE BRIDGE NO. 4. WASHINGTON SR 1103 B-4313 COMPLETED WELCH CREEK. REPLACE BRIDGE NO. 18 WATAUGA SR 1217 AND SR 1233 B-3377 COMPLETED COVE CREEK. REPLACE BRIDGE NO. 302 AND REMOVE BRIDGE NO WATAUGA SR 1598 B-4318 COMPLETED WATAUGA RIVER. REPLACE BRIDGE NO. 321 WATAUGA SR 1340 B-5226 DELETED MEAT CAMP CREEK. REPLACE BRIDGE NO. 37. PROJECT DELETED PER STATE BRIDGE MANAGEMENT UNIT. WATAUGA US 421 K-4703 COMPLETED REST AREA ON US 421 WAYNE SR 1915 B-5104 COMPLETED SLEEPY CREEK. REPLACE BRIDGE NO. 98 T-179

184 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2010 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION WAYNE GOLDSBORO E-4754 COMPLETED 0N-ROAD BICYCLE PILOT PROJECT AT BERKLEY BOULEVARD AND PARKWAY DRIVE INTERSECTION. WAYNE MOUNT OLIVE E-4921 COMPLETED NORTHWEST CENTER STREET, JAMES STREET TO JOHN STREET. LANDSCAPING. WAYNE US 117 ALTERNATE / US 70 W-5124 COMPLETED US 117 ALTERNATE, EAST OF US 117 BUSINESS TO US 70. US 70, US 117 ALTERNATE TO SR 1711 (OAK FOREST ROAD). INSTALL MEDIAN BARRIER. WILKES NC 268 B-3714 COMPLETED MULBERRY CREEK. REPLACED BRIDGE NO. 83 WILKES SR 1167 B-4322 COMPLETED STONY FORK CREEK. REPLACED BRIDGE NO. 71 WILKES SR 1001 B-4675 COMPLETED ROCKY CREEK. REPLACED BRIDGE NO. 34 WILKES SR 1317 B-4677 COMPLETED CREEK. REPLACED BRIDGE NO. 99 WILKES US 421 K-4703 COMPLETED REST AREA ON US 421 WILSON SR 1507 B-4680 COMPLETED WHITEOAK SWAMP. REPLACED BRIDGE NO. 122 WILSON I-95 I-3607 DELETED SR 1309 (MILEPOST 123) TO SR 1745 (MILEPOST 128). PAVEMENT REHABILITATION. DELETE, TO BE ACCOMPLISHED UNDER I WILSON I-95 I-5011 COMPLETED SOUTH CAROLINA STATE LINE TO VIRGINIA SATE LINE. TRAFFIC OPERATIONAL IMPROVEMENTS. WILSON I-95 I-5137 COMPLETED SOUTH OF NASH COUNTY LINE (MILE POST 123) TO SOUTH OF NC 58 (MILE POST 128). PAVEMENT REHABILITATION. WILSON WILSON U-3823 COMPLETED SR-1158 (AIRPORT BOULEVARD), NORTH OF NC 42 TO US 264 ALTERNATE. WIDEN TO MULTI-LAANES, PART ON NEW LOCATION. YADKIN I-77 I-4025 COMPLETED YADKIN RIVER, REHABILITATE BRIDGE NO. 6 ON NORHTBOUND LANE AND REPLACE BRIDGE NO. 13 ON SOUTHBOUND LANE. YADKIN NC 67 R-3415 COMPLETED SR 1355 (MESSICK ROAD) TO WEST OF HOWARD AVENUE (N.S.) IN BOONVILLE. WIDEN ROADWAY AND CONSTRUCT TURN LANES. YANCEY NC 197 B-1443 COMPLETED NORTH TOE RIVER. REPLACED BRIDGE NO. 61 YANCEY SR 1158 B-4330 COMPLETED CREEK. REPLACED BRIDGE NO. 289 YANCEY SR 1373 EL-5105 COMPLETED SR 1373 (NORTH MAIN STREET) TO RAY CORT PARK ENTRANCE. T-180

185 Completions/Deletions Federal Fiscal Year 2011 Projects where all activities were Completed or Deleted during Federal Fiscal Year 2011 are listed in the following Completions/Deletions Table. T-181

186

187 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION ALAMANCE SR 2363 (BEALE ROAD) B-4004 COMPLETED WELLS CREEK. REPLACE BRIDGE NO ALAMANCE SR 2181 (MCBANE MILL ROAD) B-4404 COMPLETED REPLACED BRIDGE NO. 102 OVER SOUTH FORK CANE CREEK. ALAMANCE VARIOUS B-5188 COMPLETED BRIDGE EXPANSION JOINT REPAIRS AT SELECTED LOCATIONS. ALAMANCE NC R-2543 DELETED US 70 IN HAW RIVER TO US 158 IN YANCEYVILLE. UPGRADE ROADWAY AND CONSTRUCT MULTI-LANES AT SELECTED LOCATIONS. (30.9 MILES) ALAMANCE NC 87 R-2560 DELETED SR 1547 IN ALAMANCE COUNTY TO US 29 IN REIDSVILLE. WIDEN TO MULTI-LANES. (19.1 MILES) ALAMANCE NC 119 R-3105 DELETED SOUTH OF SR 1917 IN ALAMANCE COUNTY TO NC 62 IN CASWELL COUNTY. WIDEN NC 119 IN ALAMANCE COUNTY TO SR 1901 AND CONSTRUCT A CONNECTOR TO NC 62 ON NEW LOCATION. (10 MILES) ALAMANCE BURLINGTON R-5175A COMPLETED RESURFACING - US 70, SR 1716 (GRAHAM-HOPEDALE) TO NC 62. ALAMANCE BURLINGTON R-5175B COMPLETED RESURFACING - SR 2100 (EAST GILBREATH STREET), NC 87 TO SR 2111 (CHEEK LANE) - SR 2109 (COOPER ROAD). ALAMANCE BURLINGTON R-5175C COMPLETED RESURFACING - NC 119, MEBANE NORTH CITY LIMITS NEAR SR 1921 (STAGE COACH ROAD) TO THE CASWELL COUNTY LINE. ALAMANCE BURLINGTON U-2410 DELETED SR 1716 (GRAHAM-HOPEDALE ROAD), PROVIDENCE ROAD TO US 70. WIDEN TO MULTI-LANES WITH A RAILROAD GRADE SEPARATION. (1.2 MILES) ALAMANCE MEBANE U-2546 DELETED US 70, HAW RIVER BYPASS TO MEBANE CITY LIMITS WIDEN TO MULTI-LANES. (4.6 MILES) ALAMANCE BURLINGTON U-2906B DELETED SOUTHERN LOOP, NC 62 AT GRAND OAKS BOULEVARD TO NC 87. WIDEN TO MULTI-LANES AND CONSTRUCT MULTI-LANE CONNECTORS ON NEW LOCATION. (5.3 MILES) ALAMANCE BURLINGTON U-3407 DELETED SOUTHERN LOOP, NC 62 AT GRAND OAKS BOULEVARD TO NC 87. WIDEN TO MULTI-LANES AND CONSTRUCT MULTI-LANE CONNECTORS ON NEW LOCATION. (5.3 MILES) ALEXANDER NC 16 R-2403 DELETED CATAWBA RIVER TO WILKES COUNTY LINE. UPGRADE TWO LANE ROADWAY. PROJECT WAS NOT FUNDED IN DRAFT STIP. ALEXANDER US 64-NC 90 R-2550 DELETED NC 18 IN CALDWELL COUNTY TO WEST OF SR 1313 IN ALEXANDER COUNTY. UPGRADE ROADWAY. PROJECT WAS NOT FUNDED IN DRAFT STIP. T-183

188 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION ALEXANDER NC 127 R-3603 DELETED SR 1400 (CLONINGER MILL ROAD)- SR 1351 (1 ST. STREET NW) IN CATAWBA COUNTY TO US 64-NC 90 IN ALEXANDER COUNTY. UPGRADE TWO LANES AND PROVIDE SOME MULTI-LANE CURB AND GUTTER. PROJECT WAS NOT FUNDED IN DRAFT STIP. ALEXANDER US 64 R-5143 COMPLETED NC 90 IN IREDELL COUNTY TO NC 90 IN ALEXANDER COUNTY. MICROSURFACE OVERLAY. ALLEGHANY NC 18 R-2516 DELETED BLUE RIDGE PARKWAY SOUTH OF CITRON TO SPART. UPGRADE EXISTING FACILITY. PROJECT WAS NOT FUNDED IN DRAFT STIP. ALLEGHANY NC 93 R-4756 DELETED NC 113 TO US 221. UPGRADE EXISTING ROADWAY. PROJECT WAS NOT FUNDED IN DRAFT STIP. ALLEGHANY NC 18 R-5022 DELETED SPARTA, INTERSECTIONS OF SOUTH GRAYSON STREET, SR 1138 (OSBORNE ROAD), SR 1419 (NAPCO ROAD) AND SR 1182 (MOXELY HOLLOW ROAD). UPGRADE INTERSECTION. PROJECT WAS NOT FUNDED IN DRAFT STIP. ALLEGHANY BLUE RIDGE PARKWAY R-5111 COMPLETED PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. ALLEGHANY US 21 R-5119 DELETED SR 1900 (OLD RAILROAD GRADE ROAD) IN WILKES COUNTY TO SR 1100 (OKLAHOMA ROAD) IN ALLEGHANY COUNTY. UPGRADE EXISTING ROADWAY. PROJECT WAS NOT FUNDED IN DRAFT STIP. ALLEGHANY NC 93 R-5157 COMPLETED SR 1337 (MT. CARMEL ROAD) TO VIRGINIA STATE LINE. PAVEMENT REHABILITATION. ANSON US 74 R-2411 DELETED WADESBORO BYPASS, SR 1422 TO LILESVILLE. FOUR LANE DIVIDED FREEWAY ON NEW LOCATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. ANSON US 74 R-2556 DELETED WADESBORO, EAST OF SR 1259 TO NORTH RUTHERFORD STREET. RELOCATE ROADWAY. PROJECT WAS NOT FUNDED IN DRAFT STIP. ANSON US 74 R-4441 DELETED MONROE BYPASS (R-2559) TO ROCKINGHAM BYPASS (R-0512). UPGRADE TO FREEWAY STANDARDS WITH BYPASS OF WADESBORO. PROJECT WAS NOT FUNDED IN DRAFT STIP. ANSON PEE DEE WILDLIFE REFUGE R-5107 COMPLETED PED-10(1). REHABILITATE REFUGE ROAD AND PARKING AREA. ANSON US 74 WESTBOUND R-5192 COMPLETED UNION COUNTY LINE TO DIVIDED HIGHWAY WEST OF SR PAVEMENT REHABILITATION, PAVED SHOULDERS AND GUARDRAIL. ASHE SR 1573 B-3806 COMPLETED LITTLE PHOENIX CREEK. REPLACE BRIDGE NO ASHE SR 1362 B-4015 COMPLETED BRIDGE NO. 165 OVER BIG HORSE CREEK & APPROACHES ON SR 1362 ASHE JEFFERSON E-4131 COMPLETED NEW RIVER COMMUNITY PARTNERS. VISITOR CENTER IN ASHE COUNTY COURTHOUSE. T-184

189 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION ASHE US 221 R-2310 DELETED NC 16 TO THE ALLEGHANY COUNTY LINE. UPGRADE EXISTING FACILITY. PROJECT WAS NOT FUNDED IN DRAFT STIP. ASHE NC 88 R-2563 DELETED WATAUGA COUNTY LINE TO NC 194 IN WARRENSVILLE. UPGRADE TWO LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. ASHE NC 16 R-4058 DELETED US 221-NC 88 IN JEFFERSON TO THE VIRGINIA STATE LINE. UPGRADE ROADWAY. PROJECT WAS NOT FUNDED IN DRAFT STIP. ASHE BLUE RIDGE PARKWAY R-4724 COMPLETED PRA-BLRI 2D16. REHABILITATE PARKWAY MILE MARKER TO MILE MARKER ASHE BLUE RIDGE PARKWAY R-4724 COMPLETED PRA-BLRI 2D16. REHABILITATE PARKWAY MILE MARKER TO MILE MARKER ASHE BLUE RIDGE PARKWAY R-5111 COMPLETED PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. ASHE JEFFERSON, WEST JEFFERSON R-5116 DELETED NC 194 BYPASS, NC 88 TO US 221 BUSINESS-SR 1149 (MOUNT JEFFERSON ROAD). CONSTRUCT TWO-LANE FACILITY. PROJECT WAS NOT FUNDED IN DRAFT STIP. ASHE NC 16 R-5154 COMPLETED NC 16, NC 88 TO VIRGINIA STATE LINE. PAVEMENT REHABILITATION AND INSTALL GUARDRAIL. AVERY SR 1310 B-5379 DELETED REPLACE BRIDGE NO. 99 OVER CREEK. PROJECT TO BE REPLACED WITH DIVISION FORCES. AVERY BANNER ELK E-4567 COMPLETED SHAWNEEHAW GREENWAY, TOWN PARK TO DOWNTOWN, TO THE MILL POND AND ALONG SHAWNEEHAW AVENUE AND ELK RIVER. COMPLETE IN FY 08, BUT SHOWN IN FY 10. AVERY NEWLAND E-4801 COMPLETED PHASE A: STREETSCAPE ALONG BOTH SIDES OF NC 194 (CRANBERRY STREET), NC 181 (LINVILLE ROAD) TO NOTTALLEE STREET AND ON NORTH SIDE OF NC 181 FOR 250 FEET. AVERY BANNER ELK E-4957 COMPLETED NC 194 (SCENIC BYWAY), CENTER OF TOWN TO LEES-MCRAE COLLEGE. CONSTRUCT SIDEWALKS ON BOTH SIDES. COMPLETE IN FY 08, BUT SHOWN IN FY AVERY NEWLAND E-4958 COMPLETED NC 194 (CRANBERRY STREET), NOTTALLEE ROAD TO NC 181. STREETSCAPEING BOTH SIDES. AVERY NC 184 R-2811 DELETED NC 105 TO NC 194 (MAIN STREET) IN BANNER ELK. WIDEN TO MULTI-LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. AVERY BLUE RIDGE PARKWAY R-5108 COMPLETED BLUE RIDGE PARKWAY. PRA-BLRI 2H13, J16. RESURFACE SECTIONS 2H AND 2J, MILE MARKER TO MILE MARKER 317.5, INCLUDING OVERLOOKS, PARKING AREAS, SPURS, AND ACCESS ROADS. AVERY BLUE RIDGE PARKWAY R-5111 COMPLETED PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. T-185

190 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION AVERY NC 184 R-5307 DELETED NC 184, NC 105 TO SR 1342 (HICKORY NUT GAP ROAD). WIDEN TO MULTI-LANES AND REPLACE BRIDGE NO. 19 AND BRIDGE NO. 79. PROJECT WAS NOT FUNDED IN DRAFT STIP. BEAUFORT NC 99 B-3809 COMPLETED PUNGO CREEK. REPLACE BRIDGE NO. 64 BEAUFORT SR-1136 ROAD GRAY B-4423 COMPLETED HORSE BRANCH CREEK. REPLACE BRIDGE NO. 67 BEAUFORT SR 1626 B-4428 COMPLETED CANAL. REPLACE BRIDGE NO. 140 BEAUFORT US 17 R-2510 COMPLETED WASHINGTON BYPASS, SOUTH OF SR 1127 (POSSUM TRACK ROAD) TO NORTH OF NC 171. FOUR LANE DIVIDED FREEWAY, SOME NEW LOCATION. - R-2510A COMPLETE. DO NOT REMOVE FROM FILE DUE TO GARVEE PAYOUT. BEAUFORT US 17 R-2510A COMPLETED WASHINGTON BYPASS, SOUTH OFSR 1127 (POSSUM TRACK ROAD) TO SOUTH OF SR 1149 PRICE ROAD) BEAUFORT US 264 R-2601 DELETED NC 32 TO NC 99 AT BELHAVEN. WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION BEAUFORT US 264 R-3422 DELETED WASHINGTON NORTHERN BYPASS, SR 1409 (WHARTON STATION ROAD) WEST OF WASHINGTON TO SR 1600 (BRADDY ROAD) EAST OF WASHINGTON. FOUR LANES DIVIDED ON NEW LOCATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION BEAUFORT WASHINGTON U-2723 DELETED SR 1501 (OLD BATH HIGHWAY), SR 1306 (12TH STREET) TO SR 1507 (SLATESTONE ROAD). WIDEN TO MULTI-LANES. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. BEAUFORT NC 306 X-0004 DELETED CONSTRUCT BRIDGE AND APPROACHES ACROSS THE PAMLICO RIVER. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION BERTIE SR 1100 B-4435 COMPLETED ROQUIST CREEK. REPLACE BRIDGE NO. 44 BERTIE NC 45 B-5194 COMPLETED ROANOKE RIVER. REHABILITATE BRIDGE NO. 7 BERTIE SR 1221 B-5197 COMPLETED CONNARITSA SWAMP. REPLACE BRIDGE NO. 36 BERTIE SR 1260 B-5198 COMPLETED CASHIE RIVER. REPLACE BRIDGE NO. 16 BERTIE NC 11/SR 1212 R-2900 DELETED NC 903 IN MARTIN COUNTY TO US 13 NORTH OF AHOSKIE IN HERTFORD COUNTY. WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION BLADEN NC 41 B-3613 COMPLETED SOUTH RIVER. REPLACE BRIDGE NO. 44 BLADEN NC 210 B-4029 COMPLETED CANAL. REPLACE BRIDGE NO. 8 BLADEN BLADENBORO E-4763 COMPLETED CONSTRUCT A FIVE-FOOT CONCRETE SIDEWALK ON WEST SIDE OF SR 1100 (VILLAGE STREET). T-186

191 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION BLADEN WHITE LAKE E-4933 COMPLETED SR 1515 (WHITE LAKE DRIVE), MELWOOD STREET TO THE REALIGNMENT OF SR CONSTRUCT SIDEWALK ON THE WEST SIDE. BLADEN US 701 R-5184 COMPLETED US 701, NC 87 BUSINESS TO NC 53. CONSTRUCT FOUR FOOT PAVED SHOULDERS. BRUNSWICK SR 1172 B-0682 COMPLETED INTERCOASTAL WATERWAY TO SUNSET BEACH. REPLACE BRIDGE NO. 198 BRUNSWICK NC 130 B-4030 COMPLETED BEAR BRANCH. REPLACE BRIDGE NO. 9 BRUNSWICK SR 1115 STONE CHIMNEY ROAD B-5215 COMPLETED BRANCH OF LOCKWOOD FOLLY RIVER. REPLACE BRIDGE NO. 49 BRUNSWICK SR 1115 STONE CHIMNEY ROAD B-5216 COMPLETED BRANCH OF LOCKWOOD FOLLY RIVER. REPLACE BRIDGE NO. 58 BRUNSWICK NC 87 FS-0803C DELETED PROPOSED NORTH CAROLINA INTERNATIONAL PORT TO US 17. EVALUATE EXISTING AND NEW ROUTES TO PROVIDE A MULT- LANE FACILITY. FEASIBILITY STUDY DELETED - NCIT PROJECT IS ON HOLD. BRUNSWICK I-74 K-4001 DELETED NEW REST AREA-WELCOME CENTER AT STATE LINE ON I DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION BRUNSWICK NEW ROUTE R-2245 COMPLETED SR 1104 (BEACH DRIVE) TO NC 211. WIDEN SR 1105 (MIDDLETON AVENUE), SR 1104 TO SR REPLACE BRIDGE NO. 206 OVER DAVIS CREEK AND CONSTRUCT MULTI-LANES, SR 1190 (OAK ISLAND DRIVE) TO NC 211 ON NEW LOCATION. BRUNSWICK NEW ROUTE R-3436 DELETED PROPOSED I-74 CORRIDOR, SOUTH CAROLINA STATE LINE AT US 17 IN BRUNAWICK COUNTY TO US EAST OF WHITEVILLE IN COLUMBUS COUNTY. MULTI-LANES ON NEW LOCATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION BRUNSWICK US R-4462 DELETED WHITEVILLE TO THE PROPOSED US 17 WILMINGTON BYPASS (R-2633). UPGRADE TO INTERSTATE STANDARDS. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. BRUNSWICK US 17 R-4732 DELETED SOUTH CAROLINA STATE LINE TO US ACCESS MANAGEMENT IMPROVEMENTS AT VARIOUS LOCATIONS. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. BRUNSWICK NC 133 RIVER ROAD SF-4903C DELETED SR 1551 (BLACKWELL ROAD/MAIN STREET) TO US IN BELVILLE. VARIOUS SAFETY IMPROVEMENTS. DELETE AT REQUEST OF DIVISION - TO BE INCORPORATED INTO A FUTURE STIP PROJECT. BRUNSWICK SHALLOTE U-3462 COMPLETED SR 1357 (SMITH AVENUE)-NC 130. REALIGN INTERSECTION TO ELIMINATE OFFSET, NEW LOCATION. BRUNSWICK SHALLOTTE U-3463 DELETED NEW ROUTE, NC 179 TO US 17 BUSINESS. TWO LANES ON NEW LOCATION. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. T-187

192 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION BRUNSWICK SHALLOTTE U-3473 DELETED US 17 TO NC 130 (WHITEVILLE ROAD). CONSTRUCT A TWO LANE FACILITY, US 17 AT SR 1153 (OCEAN ISLE BEACH ROAD) TO SR 1320 (MCMILEY ROAD) ON NEW LOCATION AND UPGRADE SR 1320 TO NC 130. PROJECT DELETED FY 11. SCHEDULED FOR PRIORITIZATION. BRUNSWICK SR 1112 SUNSET HARBOR ROAD W-4805 COMPLETED INSTALL PAVED SHOULDERS ON BOTH SIDES OF SR 1112 THROUGHOUT THE SIXTEEN CURVES. BUMCOMBE SR 2105 B-4446 COMPLETED REEMS CREEK. REPLACED BRIDE NO. 227 BUNCOMBE NC 9 B-4032 COMPLETED BROAD RIVER. REPLACED BRIDGE NO. 130 BUNCOMBE SR 3452 B-4037 COMPLETED SOUTH HOMINY CREEK. REPLACED BRIDGE NO. 262 BUNCOMBE VARIOUS B-5179 COMPLETED I-26, I-40, I-240, US 19, US 25, AND SR BRIDGE DECKS PRESERVATION. ONLY PART "A" COMPLETE. BUNCOMBE ASHEVILLE E-4814 COMPLETED CONSTRUCT SIDEWALKS, CG AND STORM DRAINAGE ON EAST SIDE OF AVON RD, EAST ASHEVILLE LIBRARY AND COMMUNITY CENTER TO HAW CREEK PARK. ON WEST SIDE OF AVON RD, HAW CREEK PARK TO BEVERLY RD AND ON SOUTH SIDE OF SR 2032 (NEW HAW CREEK RD), ARCO TO BEVERLY RD. BUNCOMBE ASHEVILLE EB-5133 DELETED FRENCH BROAD RHODODENDRON MUTI-USE TRAIL. DELETED AT REQUEST OF NCDOT'S BIKE/PED DIVISION. BUNCOMBE ASHEVILLE FS-0213A COMPLETED NC 112 (SARDIS ROAD-SAND HILL ROAD), US (SMOKEY PARK HIGHWAY) TO NC 191 (BREVARD ROAD). WIDEN TO MULTI-LANES. FS-0213A-FEASIBILITY STUDY COMPLETE- PROJECT NOT FUNDED AND REMOVED FROMS TIP. BUNCOMBE I-40/US 74 I-2502 DELETED HAYWOOD COUNTY LINE TO WEST OF US A.PAVEMENT AND BRIDGE REHABILITATION. PROJECT DELETED FY 11-WAS NOT FUNDED IN DRAFT STIP BUNCOMBE I-40 I-2801 DELETED US (EXIT 44) TO US 25A. PAVEMENT. BRIDGE REHABILITATION AND SAFETY IMPROVEMENTS. PROJECT DELETED FY 11-WAS NOT FUNDED IN DRAFT STIP BUNCOMBE I-40 I-4401 COMPLETED I-240 TO WEST OF US ADD ADDITIONAL LANES. BUNCOMBE I-40 / US I-4742 COMPLETED ASHEVILLE, REPLACED SUB-STANDARD HIGH MAST LIGHTING FOR SAFETY. LIGHTING TO BE SALVAGED AND USED IN THE RE- CONSTRUCTION OF THE INTERCHANGE AS PART OF PROJECT I BUNCOMBE I-40 I-5108 COMPLETED MILE MARKER 45 TO MILE POST 50. PAVEMENT REHABILITATION. PROJECT COMPLETE - DO NOT REMOVE FROM FILE DUE TO GARVEE PAYOUT. BUNCOMBE I-40 I-5109 COMPLETED HAYWOOD COUNTY LINE TO MILE MARKER 43 IN BUNCOMBE COUNTY. PAVMENT REHABILITATION. PROJECT COMPLETE - DO NOT REMOVE FROM FILE DUE TO GARVEE PAYOUT. BUNCOMBE I-26 I-5122 COMPLETED I-26, MILE MARKER 31 TO MILE MARKER 37. MILL AND RESURFACE. BUNCOMBE I-40 I-5131 COMPLETED SR 2838 (EXIT 55) TO MILE MARKER 67. PAVEMENT REHABILITATION. T-188

193 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION BUNCOMBE ASHEVILLE P-3804 DELETED STATION CONSTRUCTION. PROJECT NOT FUNDED IN DRAFT STIP. BUNCOMBE NC 146 (LONG SHOALS ROAD) R-2813 DELETED NC 191 TO US 25. WIDEN TO MULTI-LANES WITH CURB AND GUTTER. PROJECT DELETED FROM STIP - SEGMENTS B AND C COMPLETE. SEGMENT A WAS NOT FUNDED. BUNCOMBE BLUE RIDGE PARKWAY R-3816 COMPLETED PRA-BLRI 2P14. REHABILITATE PARKWAY MILE MARKER TO MILE MARKER SLIDE REPAIR AT MILE MARKER BUNCOMBE BLUE RIDGE PARKWAY R-5111 COMPLETED PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. BUNCOMBE I-26 SF-5113A COMPLETED I-26 EASTBOUND OFF RAMP AT NC 280. WIDEN OFF RAMP TO PROVIDE ADDITIONAL LEFT TURN LANES AND REVISE TRAFFIC SIGNAL. BUNCOMBE ASHEVILLE U-3403 DELETED NC 191 (BREVARD ROAD-OLD HAYWOOD ROAD), NC 280 TO NC 112 (SARDIS ROAD). WIDEN TO MULTI-LANES. PROJECT DELETED FY 11-WAS NOT FUNDED IN DRAFT STIP BUNCOMBE ASHEVILLE U-4013 DELETED US 25 (MERRIMON AVENUE), I-240 TO SR 2230 (BEAVERDAM ROAD), OPERATIONAL AND SAFETY IMPROVEMENTS. PROJECT DELETED FY 11-WAS NOT FUNDED IN DRAFT STIP BUNCOMBE ASHEVILLE U-4715 DELETED ASHEVILLE SIGNAL SYSTEM. PROJECT DELETED FY 11-WAS NOT FUNDED IN DRAFT STIP BUNCOMBE ASHEVILLE U-4739 DELETED SR 3556 (AMBOY ROAD-MEADOW ROAD), I-240 TO US 25 (BILTMORE AVENUE). WIDEN TO MULTI- LANES WITH NEW BRIDGE OVER THE FRENCH BROAD RIVER. PROJECT DELETED FY 11-WAS NOT FUNDED IN DRAFT STIP BUNCOMBE ASHEVILLE U-4814 COMPLETED CONSTRUCT SIDEWALKS, CG AND STORM DRAINAGE ON EAST SIDE OF AVON RD., EAST ASHEVILLE LIBRARY AND COMMUNITY CENTER TO HAW CREEK PARK. ON WEST SIDE OF AVON RD., HAW CREEK PARK TO BEVERLY RD., SOUTH SIDE OF SR 2032 (NEW HAW CREEK RD.), ARCO RD TO BEVERLY RD. BUNCOMBE ASHEVILLE U-4919 COMPLETED PACK SQUARE PARK. CONSTRUCTED PEDESTRIAN AND ROADWAY IMPROVEMENTS. BURKE NC 183 B-4038 COMPLETED LINVILLE RIVER. REPLACED BRIDGE NO. 26 BURKE SR 1424 B-4043 COMPLETED PARKS CREEK. REPLACE BRIDGE NO. 51 BURKE SR 1736 B-4045 COMPLETED CREEK. REPLACED BRIDGE NO. 19 BURKE LAKE JAMES EB-5134 DELETED BICYCLE FACILITIES IN LAKE JAMES. SR 1001 AND CONNELY SPRINGS ROAD TO I-40. DELETED AT REQUEST OF NCDOT'S BIKE/PED DIVISION. BURKE LAKE JAMES EB-5135 DELETED NC 126. ADD WIDE PAVED SHOULDERS. DELETED AT THE REQUEST OF NCDOT'S BIKE/PED DIVISION. BURKE I-40 I-5003 COMPLETED EXIT 119 IN BURKE COUNTY TO SR 1753 (MILE MARKER 146) IN IREDELL COUNTY. PAVEMENT REHABILITATION. T-189

194 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION BURKE I-40 I-5008 DELETED SR 1734-SR 1826 (EXIT 111). REVISE INTERCHANGE TO DIAMOND CONFIGURATION. PROJECT NOT FUNDED IN DRAFT STIP. BURKE I-40 I-5009 DELETED I-40 AND US 64 (BURKEMONT ROAD). INTERCHANGE IMPROVEMENTS. PROJECT NOT FUNDED IN DRAFT STIP. BURKE US 64-NC 18 R-2549 DELETED MULTI-LANES NORTH OF MORGANTON TO MULTI-LANES IN GAMEWELL. WIDEN TO MULTI-LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. BURKE NEW ROUTE R-2920 DELETED NORTHEAST BURKE COUNTY CORRIDOR, SR 1001 (MALCOLM BOULEVARD) IN RUTHERFORD COLLEGE TO SR 1608 (SHADY GROVE CHURCH ROAD). UPGRADE SR 1611, SR 1614, SR 1653 AND WIDEN SR 1625 TO A MULTI-LANE FACILITY. PROJECT WAS NOT FUNDED IN DRAFT STIP. BURKE BLUE RIDGE PARKWAY R-5108 COMPLETED BLUE RIDGE PARKWAY. PRA-BLRI 2H13, J16. RESURFACE SECTIONS 2H AND 2J, MILE MARKER TO MILE MARKER 317.5, INCLUDING OVERLOOKS, PARKING AREAS, SPURS, AND ACCESS ROADS. BURKE BLUE RIDGE PARKWAY R-5111 COMPLETED PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. BURKE HICKORY, LONGVIEW U-2528 DELETED NORTHWEST LOOP, 33RD STREET, I-40 TO AIRPORT ROAD AT US 321. MULTI-LANE IMPROVEMENTS, CONNECTOR ON NEW LOCATION AND NEW INTERCHANGE AT SR 1124 AND I-40. PROJECT WAS NOT FUNDED IN DRAFT STIP. BURKE GLEN ALPINE U-2814 DELETED SR 1147 (CAUSBY ROAD) TO US 70. TWO LANE CONNECTOR ON NEW LOCATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. BURKE MORGANTON U-3446 DELETED STONEBRIDGE DRIVE EXTENSION, NC 18 (SOUTH STERLING STREET) TO US 70 BYPASS (FLEMMING DRIVE). TWO LANE CONNECTOR, PART ON NEW LOCATION. PROJECT NOT FUNDED IN DRAFT STIP. CABARRUS SR 1138 B-4049 COMPLETED BLACK CREEK. REPLACED BRIDGE NO. 165 CABARRUS SR 1394 B-4449 COMPLETED REPLACE BRIDGE NO. 2 OVER CODDLE CREEK. CABARRUS NC 73 R-2410 DELETED WEST OF SR 2408 IN CONCORD TO ALBEMARLE. UPGRADE TWO LANE ROADWAY. PROJECT WAS NOT FUNDED IN DRAFT STIP. CABARRUS US 52 R-2903 DELETED MULTI-LANES SOUTH OF NC 49 AT RICHFIELD TO I-85 NORTH OF SALISBURY. FOUR LANES DIVIDED ON NEW LOCATION. (COORDINATE WITH I-2511). PROJECT WAS NOT FUNDED IN DRAFT STIP. CABARRUS KANNAPOLIS U-2009 DELETED KANNAPOLIS PARKWAY, SOUTH OF I-85 TO SR 1616 (TUCKASEEGEE ROAD) MULTI-LANES ON NEW LOCATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. CABARRUS CONCORD U-3828 DELETED US , SR 1002 (CABARRUS AVENUE) TO SR 2000 (JACKSON PARK ROAD). SIGNAL COORDINATION.PROJECT WAS NOT FUNDED IN DRAFT STIP. T-190

195 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION CABARRUS KANNAPOLIS U-4701 DELETED REPLACEMENT OF AT-GRADE RAILROAD CROSSING AT WINECOFF SCHOOL ROAD WITH AN AT-GRADE CROSSING AT MOUNT OLIVET ROAD. PROJECT WAS NOT FUNDED IN DRAFT STIP. CABARRUS KANNAPOLIS U-4702 DELETED SR 1766 (UNIVERSAL STREET) SR 1625 (ROGERS LAKE ROAD). CONSTRUCT RAILROAD GRADE SEPARATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. CABARRUS NC 73 U-5137 COMPLETED NC 73 IN MOUNT PLEASANT RESURFACE. CABARRUS SR 1394 AND SR 1448 U-5211 COMPLETED SR 1394 (POPULAR TENT ROAD) AND SR 1448 (COX MILL ROAD). INSTALL TURN LANES AT INTERSECTION AND WIDEN BRIDE NO. 7 OVER ROCKY RIVER. CALDWELL US 64-NC 18 R-2549 DELETED MULTI-LANES NORTH OF MORGANTON TO MULTI-LANES IN GAMEWELL. WIDEN TO MULTI-LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. CALDWELL NC 268 R-2602 DELETED US 321 TO SR 1162 IN WILKES COUNTY. UPGRADE ROADWAY. PROJECT WAS NOT FUNDED IN DRAFT STIP. CALDWELL SR 1107 R-2619 DELETED US 321 A TO US 321 IN GRANITE FALLS. WIDEN TO MULTI- LANES AND MODIFY INTERCHANGE. PROJECT WAS NOT FUNDED IN DRAFT STIP. CALDWELL NC 90 R-2622 DELETED NC 90. PAVE UNPAVED SECTIONS TO SECONDARY ROAD STANDARDS. PROJECT WAS NOT FUNDED IN DRAFT STIP. CALDWELL SR 1001, CONNELLY SPRINGS ROAD R-3430 DELETED SR 1115 ( DRY PONDS ROAD) TO SR 1933 (LENOIR SOUTH-WEST BOULEVARD). WIDEN TO MULTI-LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. CALDWELL NC 90 R-4061 DELETED SR 1656 (JOHNS RIVER ROAD) AT COLLETSVILLE TO SR 1352 (VALWAY ROAD). UPGRAD ROADWAY, IMPROVE CURVES, RESURFACE AND ADD GUARDRAIL. PROJECT WAS NOT FUNDED IN DRAFT STIP. CALDWELL BLUE RIDGE PARKWAY R-5108 COMPLETED BLUE RIDGE PARKWAY. PRA-BLRI 2H13, J16. RESURFACE SECTIONS 2H AND 2J, MILE MARKER TO MILE MARKER 317.5, INCLUDING OVERLOOKS, PARKING AREAS, SPURS, AND ACCESS ROADS. CALDWELL BLUE RIDGE PARKWAY R-5111 COMPLETED PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. CALDWELL HICKORY U-3614 DELETED NEW ROUTE, US 321 TO NC 127. TWO LANES ON FOUR LANE RIGHT OF WAY SOME NEW LOCATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. CARTERET SR 1140 ROBERTS ROAD BK-5103 COMPLETED BRANCH OF NEWPORT RIVER. REPLACE BRIDGE NO. 40 CARTERET US 70 R-3307A COMPLETED PRESERVATION OF BRIDGE NO 29 (GRAYSDEN PAUL BRIDGE). PRESERVE STRUCTURE FOR USE AS A DETOUR ROUTE DURING CONSTRUCTION OF R CARTERET NEW ROUTE R-3437 DELETED NEWPORT, US 70 TO NC 101. TWO LANE CONNECTOR ON NEW LOCATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION T-191

196 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION CARTERET NC 101 R-3624 DELETED BEAUFORT-MOREHEAD CITY AIRPORT, RELOCATION TO ACCOMMODATE EXTENSION OF RUNWAY NUMBER 26. TWO LANES ON NEW LOCATION. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. CARTERET NEW ROUTE R-4431 DELETED HAVELOCK BYPASS TO BEAUFORT. CONSTRUCT MULTI- LANES. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. CARTERET NC 24 R-4721 DELETED NC 24 AT NC 58. CONVERT AT-GRADE INTERSECTION TO INTERCHANGE. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. CARTERET US 70-NC 12 R-4746 DELETED NC 101 IN BEAUFORT TO CEDAR ISLAND. UPGRADE EXISTING ROADWAY. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. CARTERET MOREHEAD CITY BEAUFORT U-5188 COMPLETED INSTALL A CLOSED LOOP SIGNAL SYSTEM. CASWELL NC R-2543 DELETED US 70 IN HAW RIVER TO US 158 IN YANCEYVILLE. UPGRADE ROADWAY AND CONSTRUCT MULTI-LANES AT SELECTED LOCATIONS. (30.9 MILES) CASWELL NC 87 R-2560 DELETED SR 1547 IN ALAMANCE COUNTY TO US 29 IN REIDSVILLE. WIDEN TO MULTI-LANES. (19.1 MILES) CASWELL NC 119 R-3105 DELETED SOUTH OF SR 1917 IN ALAMANCE COUNTY TO NC 62 IN CASWELL COUNTY. WIDEN NC 119 IN ALAMANCE COUNTY TO SR 1901 AND CONSTRUCT A CONNECTOR TO NC 62 ON NEW LOCATION. (10 MILES) CASWELL NC 86 R-3418 DELETED US 158 TO VIRGINIA STATE LINE. WIDEN TO MULTI-LANES (9.1 MILES) CASWELL NC 86 R-5176 COMPLETED NC 119 TO US 158. WIDEN, ADD FOUR FOOT PAVED SHOULDERS AND RESURFACE. CATAWBA HICKORY E-4575 COMPLETED CONSTRUCT PAVED SHOULDERS ON 3RD STREET, MAIN AND 1ST AVENUE, NORTH CENTER STREET, 5TH AND 8TH AVENUE, STASAVICH PLACE, 26TH AVENUE, 2ND STREET, 28TH, 17TH AND 10TH AVENUE. CONSTRUCT SIDEWALKS AND CURB AND GUTTER ALONG MAIN AVENUE AND 5TH STREET. CATAWBA CLAREMONT E-4806 DELETED ENHANCE PUBLIC ACCESS TO THE BUNKER HILL COVERED BRIDGE. CATAWBA CONOVER E-4965 COMPLETED NC 16 (THORNBURG DRIVE). LANDSCAPING MEDIAN AT SR 1739 (EMMANUEL CHURCH ROAD). CATAWBA I-40 I-2802 DELETED BURKE COUNTY LINE (MILE MARKER 120) TO SR 1484 (4TH AVENUE). PAVEMENT REHABILITATION, BRIDGE AND SAFETY IMPROVEMENTS. PROJECT NOT FUNDED IN DRAFT STIP. CATAWBA I-40 I-5003 COMPLETED EXIT 119 IN BURKE COUNTY TO SR 1753 (MILE MARKER 146) IN IREDELL COUNTY. PAVEMENT REHABILITATION. T-192

197 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION CATAWBA I-40 I-5401 DELETED I-40, MILE MARKER 131 TO MILE MARKER 146. PAVEMENT REHABILITATION. PROJECT DELETED - PROJECT AREA COVERED BY PROJECTS I-3302 & I-906. CATAWBA NC 127 R-3603 DELETED SR 1400 (CLONINGER MILL ROAD)- SR 1351 (1 ST. STREET NW) IN CATAWBA COUNTY TO US 64-NC 90 IN ALEXANDER COUNTY. UPGRADE TWO LANES AND PROVIDE SOME MULTI-LANE CURB AND GUTTER. PROJECT WAS NOT FUNDED IN DRAFT STIP. CATAWBA SR 1005 (STARTOW ROAD) R-5113 DELETED SR 1005 (STARTOWN ROAD), US 70 TO NC 10. WIDEN TO MULTI- LANES. PROJECT NOT FUNDED IN DRAFT STIP. CATAWBA HICKORY U-2306 COMPLETED LENOIR RHYNE BOULEVARD EXTENSION, TATE BOULEVARD NE TO 8TH, STREET NE. WIDEN TO MULTI-LANES, PART ON NEW LOCATION REALIGN 8TH STREET NE WITH HIGHLAND AVENUE NE. CATAWBA HICKORY U-2307 DELETED EAST SIDE THOROUGHFARE (MCDONALD PARKWAY), US TO NC 127. MULTI-LANES, PART ON NEW LOCATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. CATAWBA HICKORY, LONGVIEW U-2528 DELETED NORTHWEST LOOP, 33RD STREET, I-40 TO AIRPORT ROAD AT US 321. MULTI-LANE IMPROVEMENTS, CONNECTOR ON NEW LOCATION AND NEW INTERCHANGE AT SR 1124 AND I-40. PROJECT WAS NOT FUNDED IN DRAFT STIP. CATAWBA HICKORY, NEWTON, CONOVER U-2529 DELETED SR 1476 (FAIRGROVE CHURCH ROAD), NC 10 SOUTHWEST OF NEWTON TO SR 1491 (SECTION HOUSE ROAD). WIDEN TO MULTI-LANES AND CONSTRUCT MULTI-LANE CONNECTOR ON NEW LOCATION. PROJECT NOT FUNDED IN DRAFT STIP. CATAWBA HICKORY U-2530 DELETED NC 127. WIDEN NC 127 TO MULTI-LANES, SR 1132 TO SR UPGRADE AND EXTEND SR 1213 (CURRENTLY NC 127), PROPOSED US 321-NC 127 INTERCHANGE TO NORTH OF SR PROJECT WAS NOT FUNDED IN DRAFT STIP. CATAWBA HICKORY U-2531 DELETED HICKORY NORTH CROSSTOWN LOOP, NC 127 TO NC 16 IN CONOVER. MULTI-LANES ON NEW LOCATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. CATAWBA HICKORY, BROOKFORD U-2532 DELETED SOUTHERN LOOP, I-40 AT SR 1124 TO US 321 IN NEWTON. MULTI-LANES ON NEW LOCATION. PROJECT NOT FUNDED IN DRAFT STIP. CATAWBA HICKORY, CONOVER U-2535 DELETED 13TH AVENUE DRIVE SE/SR 3003 (15TH AVENUE SE), SR 1007 (LENOIR RHYNE BOULEVARD SE) TO SR 1468 (21ST STREET DRIVE SE). WIDEN ROADWAY AND CONSTRUCT SECTION ON NEW LOCATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. CATAWBA NEWTON, CONOVER U-3450 DELETED NEWTON-CONOVER LOOP, NC 10 WEST TO NC 16. TWO LANE FACILITY WITH PAVED SHOULDERS, PART ON NEW LOCATION. PROJECT NOT FUNDED IN DRAFT STIP. CATAWBA HICKORY U-3614 DELETED NEW ROUTE, US 321 TO NC 127. TWO LANES ON FOUR LANE RIGHT OF WAY SOME NEW LOCATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. T-193

198 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION CHATHAM TRIANGLE J COUNCIL OF GOVERNMENTS C-5102 DELETED TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. CHATHAM COUNTYWIDE C-5218 DELETED CHATHAM TRANSIT ALTERNATE FUEL VEHICLE CONVERSION. CONVERT 12 VEHICLES (VANS AND LIGHT TRANSIT) FROM GASOLINE TO PROPANE. PROJECT DECLINED BY TOWN OF PITTSBORO. CHATHAM DURHAM EB-2921F COMPLETED AMERICAN TOBACCO TRAIL, DURHAM COUNTY LINE TO WAKE COUNTY LINE. CONSTRUCT A MULTI-PURPOSE TRAIL. CHATHAM US R-2628 DELETED PITTSBORO, NC 87 TO US 64. TWO LANES ON MULTI-LANE RIGHT OF WAY, NEW LOCATION. (5.3 MILES) CHATHAM NEW ROUTE R-3325 DELETED SR 1100 (AIRPORT ROAD), SR 1181 (GILLIAND ROAD) TO SR 1107 (WEST THIRD STREET), SR 1362 (PINEY GROVE CHURCH ROAD), SR 1006 (OLD US 421) TO US 421 WIDEN ROADWAY. SR 1107 (WEST THIRD STREET) TO SR 1006 (OLD US 421), TWO LANES ON NEW LOCATION. (5.5 MILES) CHATHAM NEW ROUTE R-3617 DELETED SILER CITY INNER LOOP, SR 2113 (SOUTH CHATHAM AVENUE) AT COLLEGE STREET TO CROSS SCHOOL ROAD (1.1 MILES) AND FROM SUNRISE PLACE TO US 64 (EAST ELEVENTH STREET) (0.4 MILES). TWO LANES ON MULTI-LANE RIGHT OF WAY, NEW LOCATION. (2.3 MILES) CHATHAM NC 87 R-4754 DELETED NC 902 NORTH TO THE ALAMANCE COUNTY LINE. WIDEN AND REPLACE BRIDGE NO. 61. (11 MILES) CHATHAM NC 87 R-5181 COMPLETED PITTSBORO, SR 1516 (OLD NC 87). CONSTRUCT AN ELLIPTICAL ROUNDABOUT AND REALIGNMENT OF CAMP STREET. CHATHAM US R-5301 DELETED PITTSBORO, US INTERSECTION WITH PARK DRIVE. INSTALL TRAFFIC SIGNAL. PROJECT SCOPE TO BE REVIEWED FOR HAZARD ELIMINATION PROGRAM OR RESUBMITTAL FOR PRIORITIZATION. CHATHAM NC 751 SF-4908I COMPLETED INTERSECTION WITH SR 1731 (O'KELLY CHURCH ROAD). INSTALL TRAFFIC SIGNAL AND LEFT TURN LANE. CHEROKEE SR 1505 B-3635 COMPLETED JUNALUSKA CREEK. REPLACED BRIDGE NO. 26 CHEROKEE SR 1393 (ROCKY CREEK- WAKEFIELD ROADS) B-4071 COMPLETED JUNALUSKA CREDDK. REPLACED BRIDGE NO. 32 CHEROKEE SR 1564 B-4072 COMPLETED BRASSTOWN CREEK OVERFLOW. REPLACE BRIDGE NO. 98 CHEROKEE SR 1556 B-5233 COMPLETED MARTIN CREEK. REPLACE BRIDGE NO. 173 CHEROKEE US 64 R-0977 DELETED US IN MURPHY TO EAST OF NC 141. TWO LANES ON FOUR LANE RIGHT OF WAY SOUTH OF HIWASSEE RIVER ON NEW LOCATION, ULTIMATE FOUR LANE FACILITY. PROJECT NOT FUNDED IN DRAFT STIP. CHEROKEE US 23, US 74, IS CONNECTOR R-4412 COMPLETED NATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDING GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. T-194

199 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION CHEROKEE QUALLA BOUNDARY R-5007 DELETED AMMONS SEQUOYAH. INCLUDED IN R CHEROKEE QUALLA BOUNDARY R-5009 DELETED LUCY LONG ROAD. INCLUDED IN R CHEROKEE QUALLA BOUNDARY R-5010 DELETED INDIAN CREEK ROAD. INCLUDED IN R CHEROKEE QUALLA BOUNDARY R-5011 DELETED HORNBUCKLE CREEK ROAD OVERLAY. INCLUDED IN R CHEROKEE QUALLA BOUNDARY R-5012 DELETED BLUE WING CHURCH ROAD. INCLUDED IN R-5500 CHEROKEE NC 141 R-5161 COMPLETED NC 141, US 64 TO US 74. PAVEMENT REHABILITATION. CHEROKEE VARIOUS W-5214 COMPLETED DIVISION 14 RUMBLE STRIPS, GUARDRAIL AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. CHOWAN EDENTON U-3419 DELETED NC 94 (SOUNDSIDE ROAD), NC 32 TO US 17 BYPASS. TWO LANES ON NEW LOCATION. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. CHOWAN EDENTON U-5001 DELETED WESTERN CONNECTOR (LUKE STREET), ALBANIA STREET YO VITGINIA STREET. CONSTRUCT MULTI-LANES, SOME NEW LOCATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION CHOWAN US 17 W-5122 COMPLETED NORTH OF CHOWAN RIVER BRIDGE TO SR 1330 (SHANNONHOUSE ROAD). INSTALL MEDIAN BARRIER. CLAY SR 1104 B-4466 COMPLETED BRASSTOWN CREEK. REPLACED BRIDGE NO. 4 CLAY COUNTYWIDE TOWN SQUARE E-4970 COMPLETED TOWN SQUARE, CONSTRUCT SIDEWALKS ON THE SOUTH SIDE OF HERBERT STREET, NORTH SIDE OF CHURCH STREET, WEST SIDE OF MAIN STREET AND EAST SIDE OF SANDERSON STREET. CLAY VARIOUS W-5214 COMPLETED DIVISION 14 RUMBLE STRIPS, GUARDRAIL AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. CLEVELAND SR 1327 B-4468 COMPLETED SANDY RUN CREEK. REPLACED BRIDGE NO. 144 CLEVELAND SR 1350 B-4469 COMPLETED BRUSHY CREEK. REPLACE BRIDGE NO. 219 CLEVELAND KINGS MOUNTAIN E-4963 COMPLETED CANSLER STREET, ORR TERRACE TO WACO ROAD. CONSTRUCT SIDEWALKS ON EAST SIDE. CLEVELAND US 74 R-2222 DELETED DIXON AVENUE, US 74 BUSINESS WEST OF SHELBY TO US 74 BUSINESS EAST OF SHELBY. WIDEN TO SIX LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. CLEVELAND US 74 R-5144 COMPLETED SOUTHERN RAILROAD CROSSING NEAR SR 1170 TO END OF NEW PAVEMENT NEAR WEST LEE STREET RESURFACE. CLEVELAND SR 1158 SF-4912G COMPLETED SR 1158 (BEAVER DAM CHURCH ROAD HOMESTEAD AVENUE AT SR 1159 (SKINNER ROAD). CONSTRUCT ROUNDABOUT. CLEVELAND SHELBY U-2221 DELETED NC 180, NC 226 TO NC 150. WIDEN TO MULTI-LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. T-195

200 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION CLEVELAND SHELBY U-2567 DELETED US 74-NC 150 (DEKALB STREET). CONSTRUCT INTERCHANGE. PROJECT WAS NOT FUNDED IN DRAFT STIP. CLEVELAND SR 1001 (STONEY POINT ROAD) W-5013 COMPLETED US 74 BYPASS TO SR PAVE SHOULDERS AND WIDEN LANES. COLUMBUS SR 1947 B-3830 COMPLETED FRIAR SWAMP. REPLACE BRIDGE NO. 363 AND BRIDGE NO. 364 COLUMBUS SR 1173 MOLLIE IRON HILL ROAD BK-5109 COMPLETED GRISSETT CREEK. REPLACE BRIDGE NO. 97 AND BRIDGE NO. 98 COLUMBUS WHITEVILLE E-4121 COMPLETED GREATER WHITEVILLE CHAMBER OF COMMERCE - WACCAMAW CYPRESS TRAIL COMMITTEE. REHABILITATE HISTORIC RAILROAD DEPOT. COLUMBUS CHADBOURN E-4766 COMPLETED CONSTRUCT FIVE-FOOT SIDEWALKS AT VARIOUS LOCATIONS ALONG BROWN STREET, ELM STREET, PINE STREET AND STRAWBERRY BOULEVARD. COLUMBUS NEW ROUTE R-3436 DELETED PROPOSED I-74 CORRIDOR, SOUTH CAROLINA STATE LINE AT US 17 IN BRUNAWICK COUNTY TO US EAST OF WHITEVILLE IN COLUMBUS COUNTY. MULTI-LANES ON NEW LOCATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION COLUMBUS US R-4462 DELETED WHITEVILLE TO THE PROPOSED US 17 WILMINGTON BYPASS (R-2633). UPGRADE TO INTERSTATE STANDARDS. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. COLUMBUS US 701-NC 410 R-5013 DELETED SOUTH CAROLINA STATE LINE TO US 76 IN CHADBOURN. WIDEN TO MULTI-LANES. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. COLUMBUS WHITEVILLE R-5020 DELETED US 701 BYPASS (MADISON STREET-POWELL BOULEVARD), SR 1166 (PLEASANT PLAINS ROAD) TO US BYPASS. WIDEN TO MULTI-LANES. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. CRAVEN US 17 R-2513A DELETED NC 43 TO SR 1438 (SPRUILL TOWN ROAD). WIDEN TO MULTI- LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION CRAVEN NEW ROUTE R-3821 DELETED NEW BERN BYPASS TO US 70 NEAR RIVERDALE. TWO LANES ON NEW LOCATION. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. CRAVEN NEW ROUTE R-4431 DELETED HAVELOCK BYPASS TO BEAUFORT. CONSTRUCT MULTI- LANES. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. CRAVEN NC 43 R-5189 COMPLETED US 17 TO SR 1304 (BOSCH BOULEVARD). WIDEN AND RESURFACE. CRAVEN HAVELOCK U-3431 DELETED SR 1763 (MILLER BOULEVARD-/SR 1756 (LAKE ROAD), US 70-NC 101 TO PROPOSED US 70 HAVELOCK BYPASS (R-1015). WIDEN TO MULTI-LANES. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. T-196

201 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION CRAVEN NEW BERN U-3448 DELETED SR 1278 (TRENT ROAD), US 17 (MLK JR., BOULEVARD) TO SR 1215 (SIMMONS STREET). WIDEN TO MULTI-LANES. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. CUMBERLAND I-95 B-5022 COMPLETED SR 1005 (BRIDGE NO. 153), SR 1815 (BRIDGE NO. 154), SR 1005 (BR.# 153), SR 1815 (BR#154), SR 1813 (BR.# 155) & SR 1709 (BR. NO. 81). ELEVATE STRUCTURES, & INSTALL OVER HEIGHT DETECTION ON SB I-95 BETWEEN EXIT 77 AND 75 AND BETWEEN MILEPOST 63 AND EXIT 65. CUMBERLAND FAYETTEVILLE DUNN E-4534 COMPLETED AVERASBORO BATTLEFIELD COMMISSION, INC. CREATE DRIVING TOUR AND A PORTION OF HISTORIC-SCENIC BYWAY FROM FAYETTEVILLE THROUGH THE BATTLEFIELD, REPAIR AND REINSTALL HISTORIC HIGHWAY MARKERS AND LANDSCAPING. CUMBERLAND STEDMAN E-4931 COMPLETED NC 24, WEST OF WADE-STEDMAN ROAD EAST TO BAINBRIDGE ROAD. STREET-SCAPING NORTH SIDE OF NC 24. CUMBERLAND FAYETTEVILLE U-2710 DELETED SR 1403 (REILLY ROAD), SR 3569 TO SR 1400 (CLIFFDALE ROAD). WIDEN TO MULTI-LANES. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. CUMBERLAND FAYETTEVILLE U-2811 DELETED SR 1219 (IRELAND DRIVE), SR 1141 (CUMBERLAND ROAD) TO US 401 BUSINESS (RAEFORD ROAD). WIDEN TO MULTI-LANES. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. CUMBERLAND FAYETTEVILLE U-3422 DELETED SR 1003 (CAMDEN ROAD), FAYETTEVILLE OUTER LOOP (U-2519) TO NC 59 (HOPE MILLS ROAD). WIDEN TO MULTI-LANES. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. CUMBERLAND FAYETTEVILLE U-4403 DELETED US 401 (RAMSEY STREET), NC (GROVE STREET) TO SR 1710 (SLOCUMB ROAD). WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION CUMBERLAND FAYETTEVILLE U-4404 DELETED SR 1400 (CLIFFDALE ROAD), MCPHERSON CHURCH ROAD TO SR 1404 (MORGANTON ROAD). WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION CUMBERLAND FAYETTEVILLE U-4415 DELETED NC (CEDAR CREEK ROAD), I-95 EAST TO NC JUNCTION. WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION CUMBERLAND NEW ROUTE U-4425 DELETED BLANTON ROAD EXTENSION, SYCAMORE DAIRY ROAD TO NC (BRAGG BOULEVARD). MULTI-LANES ON NEW LOCATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION CUMBERLAND HOPE MILLS U-4709 DELETED SR 1112 (ROCKFISH ROAD), SR 1115 (GOLFVIEW ROAD) TO NC 59 (MAIN STREET). WIDEN TO FOUR LANES DIVIDED. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. T-197

202 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION CUMBERLAND FAYETTEVILLE U-4710 DELETED SR 1115 (GOLFVIEW ROAD), SR 1112 (ROCKFISH ROAD) TO NC 59 (MAIN STREET). WIDEN TO FOUR LANES DIVIDED. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION CUMBERLAND FAYETTEVILLE U-4761 DELETED SR 1149 (BOONE TRAIL), SR 1007 (OWEN DRIVE) TO SR 1141 (CUMBERLAND ROAD). WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION CUMBERLAND NC 210 MURCHISON ROAD U-5015 DELETED ROWAN STREET TO US 401 BYPASS (RAMSEY STREET). WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION CUMBERLAND FAYETTEVILLE U-5101 DELETED SR 1437 (SHAW ROAD)-SR 1614 (SHAW MILL ROAD)-SR 1615 (ROSEHILL ROAD-STACEY WEAVER DRIVE). INTERCONNECT AND WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION CUMBERLAND FAYETTEVILLE Z-3144B COMPLETED HILLSBORO STREET, CSX TRANSPORTATION CROSSING K. REVISE AUTOMATIC WARNING DEVICES. CUMBERLAND FAYETTEVILLE Z-3144H COMPLETED MCPHERSON CHURCH ROAD AT ABERDEEN AND ROCKFISH RAILROAD CROSSING B. REVISE AUTOMATIC WARNING DEVICES. CUMBERLAND FAYETTEVILLE Z-3344M COMPLETED US 401 (RAEFORD ROAD) AT ABERDEEN AND ROCKFISH RAILROAD CROSSING H. REVISE AUTOMATIC WARNING DEVICES. CURRITUCK NC 615 F-5007 DELETED DOUBLE ENDED FERRY. CURRITUCK-KNOTTS ISLAND.- DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION DARE NC 12 B-5014 COMPLETED OREGON INLET. REPAIR BRIDGE NO DO NOT REMOVE FROM FILE DUE TO GARVEE PAYOUT. DARE US 64 B-5181 COMPLETED BRIDGE NO. 9. PAINT BRIDGE. DARE NAGS HEAD E-4900 COMPLETED BARNES STREET SOUTH TO THE TOWN-COUNTY RECREATIONAL COMPLEX. CONSTRUCT A MULTI-USE FACILITY. DARE F-2412 DELETED BUILD A REPLACEMENT DREDGE PROJECT - DELETED FY11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION DARE F-3313 DELETED TANK BARGE (NC 2), REPLACEMENT.- DELETED FY11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION DARE F-3314 DELETED DREDGE SUPPORT VESSELS REPLACEMENT.- DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION DARE NC 12, NPS ROUTE 10 R-5105 COMPLETED CAHA 10(2). NC 12 (NPS ROUTE 10) NEAR CAPE HATTERAS NATHIONAL SEASHORE ENTRANCE. OVERLAY ROADWAY AND REPLACE 4 CULVERTS AND HEADWALLS. DARE NC 12 R-5310 COMPLETED SR 1257 (OLD NC 12) SOUTH FOR TWO MILES. RAISE GRADE APPROXIMATELY ONE FOOT TO MINIMIZE ROADWAY FLOODING. T-198

203 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION DARE NC 12 U-2917 DELETED KITTY HAWK, IN THE VICINITY OF SR ROADWAY IMPROVEMENTS. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. DARE MANTEO U-3815 DELETED US 64-US 64 BYPASS-NC 345. IMPROVE INTERSECTION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION DAVIDSON DAVIDSON COUNTY C-5140 DELETED INSTALL A 10,000-GALLON E-85 TANK AND CREDIT CARD READER FOR CNG STATION WITH 24-HOUR PUBLIC ACCESS. PROJECT DELETED AT REQUEST OF DAVIDSON COUNTY. DAVIDSON I-85 K-4905 COMPLETED RENOVATION OF REST AREA PAIR-BUILDINGS, GROUNDS AND PARKING FACILITIES. BUILDINGS TO INCLUDE DUAL RESTROOMS AND ADA COMPLIANT FAMILY RESTROOM. DAVIDSON US AND I-85 BUSINESS R-2808B DELETED I-85 IN DAVIDSON COUNTY TO I-85 IN GUILFORD COUNTY. UPGRADE, SAFETY IMPROVEMENTS AND REPLACE BRIDGE NO. 74 AT SR 1627 (B- 2163). (31.1 MILES) DAVIDSON US 64 R-3602 DELETED US 601 SOUTH OF MOCKSVILLE TO US 52 IN LEXINGTON. WIDEN TO MULTI-LANES AND UPGRADE INTERCHANGE AT US 52. (14 MILES) DAVIDSON NC 109 R-4734 DELETED I-85 IN THOMASVILLE TO NC 47 IN DENTON. WIDEN TO MULTI- LANES. (16.9 MILES) DAVIDSON US 64 SF-5108A COMPLETED I-85 IN DAVIDSON COUNTY TO SR 1424 (OTIS ROAD) IN RANDOLPH COUNTY. INSTALL RUMBLE STRIPS ON CENTERLINE AND SHOULDERS. DAVIDSON HIGH POINT U-2537 DELETED NORTH-SOUTH CONNECTOR, I-85 TO US 311 / FUTURE I-74. MULTI-LANES ON NEW LOCATION. (10.5 MILES) DAVIDSON THOMASVILLE U-4411 DELETED NC 109 (RANDOLPH STREET), ROYAL OAKS STREET TO WEST COLONIAL DRIVE. WIDEN TO MULTI- LANES. (0.5 MILE) DAVIDSON THOMASVILLE U-4420 DELETED SR 2165 (TURNER STREET)/SR 2055 (LIBERTY STREET), NC 62 (CLONIGER STREET) TO SR 2123 (NATIONAL HIGHWAY). WIDEN TO MULTI-LANES. (2.4 MILES) DAVIE MOCKSVILLE EB-5112 DELETED RICH PARK GREENWAY. PROJECT DELETED AT REQUEST OF DIVISION OF BICYCLE AND PEDESTRIAN TRANSPORTATION. DAVIE NEW ROUTE R-3111 DELETED US 64 EAST OF MOCKSVILLE TO US 601 WEST OF MOCKSVILLE. TWO LANE BYPASS OF MOCKSVILLE ON FOUR LANE RIGHT OF WAY, NEW LOCATION. (INCLUDES R-3326) (6.1 MILES) DAVIE US 64 R-3602 DELETED US 601 SOUTH OF MOCKSVILLE TO US 52 IN LEXINGTON. WIDEN TO MULTI-LANES AND UPGRADE INTERCHANGE AT US 52. (14 MILES) DAVIE NC 801 R-3610 DELETED SR 1650 AT ADVANCE TO US 158 SOUTH OF I-40. UPGRADE ROADWAY, SR 1650 TO SR 1624 AND MULTI-LANE ROADWAY, SR 1624 TO US 158. (4.6 MILES) DAVIE I-40 W-4824 COMPLETED INSTALL SHOULDER RUMBLE STRIPS. T-199

204 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION DUPLIN SR 1141 BK-5104 COMPLETED STOCKINGHEAD CREEK. REPLACE BRIDGE NO. 196 DUPLIN TRIANGLE J COUNCIL OF GOVERNMENTS C-5102 DELETED TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. DUPLIN WALLACE E-4744 COMPLETED RESTORATION OF WALLACE DEPOT ON RAILROAD STREET IN THE HISTORIC DISTRICT. DUPLIN WARSAW E-4917 COMPLETED PHASE 1: RAILROAD STREET, HILL STREET TO COLLEGE STREET. STREETSCAPING. DUPLIN NC 24 E-4918 COMPLETED I-40 (NC 903 EXIT) TO OUTSIDE OF KENANSVILLE. LANDSCAPE MEDIANS. DUPLIN NC R-2204 DELETED NC 24 AT KENANSVILLE TO SR 1194 (ROSEWOOD DRIVE) NORTH OF PINK HILL. WIDEN TO FOUR LANES DIVIDED WITH A BYPASS OF PINK HILL ON NEW LOCATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION DUPLIN NC 403 R-2815 DELETED US 117 TO FAISON CITY LIMITS. WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION DUPLIN NC 41 R-3409 DELETED EAST OF I-40 TO NC 24 IN BEULAVILLE. WIDEN TO TWENTY- FOUR FEET, CONSTRUCT PAVED SHOULDERS, PROVIDE TURN LANES AT VARIOUS LOCATIONS AND REALIGN, WHERE APPROPRIATE. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION DUPLIN WALLACE R-4435 DELETED RAILROAD STREET AT MURPHY STREET. REALIGN INTERSECTION. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. DUPLIN NEW ROUTE R-4443 DELETED SR 1825 (CHARLES WOOD ROAD)- SR 1715 IN DUPLIN COUNTY TO SR 1245 (BRYAN ROAD)-SR 1209 IN ONSLOW COUNTY. TWO LANES ON NEW LOCATION. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. DURHAM NC 54 C-4402 DELETED I-40 WEST OF NC 751 TO TRIANGLE DRIVE IN RESEARCH TRIANGLE PARK. CONSTRUCT ON-ROAD BICYCLE FACILITY. PROJECT DELETED. SCOPE TO BE INCORPORATED INTO FS- 1005C. DURHAM DURHAM P-3802 COMPLETED STATION CONSTRUCTION. DURHAM NC 54 R-2904 COMPLETED SR 1999 (DAVIS DRIVE) TO SR 1959 (MIAMI BOULEVARD) AND SR 1973 (PAGE ROAD), NC 54 TO I-40. WIDEN TO MULTILANES AND REPLACE RAILROAD STRUCTURE. DURHAM DURHAM R-5164C COMPLETED US BUSINESS SOUTH, NC 98 TO US BUSINESS; US BUSINESS NORTH, US TO NC 98, US BUSINESS, US TO SR 1361 (VICKERS AVENUE) AND SR 1127 (CHAPEL HILL STREET), GREAT JONES TO MOREHEAD AVENUE. RESURFACING. DURHAM DURHAM U-2405 DELETED M. L. KING, JR. PARKWAY AND NC 55. CONSTRUCT INTERCHANGE T-200

205 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION DURHAM DURHAM/CHAPEL HILL U-2807 DELETED US , SR 1010 (FRANKLIN STREET) IN CHAPEL HILL TO US BYPASS IN DURHAM. MAJOR CORRIDOR UPGRADE. (3.8 MILES) DURHAM DURHAM U-2831B DELETED BRIGGS AVENUE EXTENSION, RIDDLE ROAD TO SR 1951 (SO-HI DRIVE). TWO LANES ON MULTI-LANE RIGHT OF WAY. (1.0 MILE) DURHAM RESEARCH TRIANGLE PARK U-4026 COMPLETED SR 1613-SR 1999 (DAVIS DRIVE), SR 3014 (MORRISVILLE- CARPENTER ROAD) IN WAKE COUNTY TO NC 54 IN DURHAM COUNTY. WIDEN TO MULTI-LANES. DURHAM DURHAM U-4445 COMPLETED NC 147 (DURHAM FREEWAY), NEAR ALSTON AVENUE. CONSTRUCT PEDESTRIAN BRIDGE OVER NC 147 AND REMOVE EXISTING SUBSTANDARD PEDESTRIAN BRIDGE. DURHAM DURHAM U-5142 COMPLETED INSTALL LED TRAFFIC SIGNALS ON CITY MAINTAINED SYSTEM. DURHAM DURHAM U-5146 COMPLETED DURHAM, SIGNAL UPGRADE AT VARIOUS LOCATIONS ON CITY MAINTAINED SYSTEM. DURHAM DURHAM U-5148 COMPLETED DURHAM, NORTHPOINTE DRIVE, HOME DEPOT TO KROGER. INSTALL TRAFFIC SIGNAL. DURHAM DURHAM U-5149 COMPLETED DURHAM, RENAISSANCE PARKWAY AT SOUTHPOINT MALL ENTRANCE NEAR SOUTHPOINT CINEMA AND AT AMERICAN TOBACCO TRAIL. INSTALL TRAFFIC SIGNALS. DURHAM DURHAM U-5150 COMPLETED DURHAM, WILLIAM PENN STREET AT BEN FRANKLIN STREET. INSTALL TRAFFIC SIGNAL. DURHAM DURHAM U-5151 COMPLETED DURHAM, SR 1670 (GEER STREET) AT MIAMI BOULEVARD. INTERSECTION REDESIGN. EDGECOMBE US 64/NC 33 STREET MAIN B-2965 COMPLETED TAR RIVER, REPLACE BRIDGE NO. 24 EDGECOMBE SR 1003 DAVISTOWN/ MERCER RD. B-4743 DELETED TRIBUTSRY OF TOWN CREEK. REPLACE BRIDGE NO. 63. DELETED, BECAME PART OF BD-5104A. EDGECOMBE SR 1141 BK-5105 COMPLETED CORKEY CREEK. REPLACE BRIDGE NO. 56 EDGECOMBE PRINCEVILLE E-4522 COMPLETED REHABILITATE HISTORIC PRINCEVILLE TOWN HALL INTO A VISITOR CENTER AND CULTURAL TRANSPORTATION MUSEUM. EDGECOMBE NC 11 R-2700 DELETED US 64 RELOCATION NORTH OF BETHEL TO NC 903. WIDEN TO FOUR LANES WITH A BYPASS OF OAK CITY AN NEW LOCATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION EDGECOMBE US 258 R-3308 DELETED CRESCENT ROAD IN KINSTON IN LENOIR COUNTY TO US 64 AT TARBORO IN EDGECOMBE COUNTY. MULTI-LANES ON NEW LOCTION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION EDGECOMBE US 64 R-5148 COMPLETED SR 1613 (WINSTEAD AVENUE) IN NASH COUNTY TO TAR RIVER BRIDGE IB EDGECOMBE COUNTY. PAVEMENT REHABILITATION. T-201

206 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION EDGECOMBE ROCKY MOUNT U-4762 DELETED SR 1250 (SPRINGFIELD ROAD), US 64 ALTERNATE TO SR 1243 (LEGGETT ROAD). WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION EDGECOMBE ROCKY MOUNT U-5002 DELETED SR (AIRPORT ROAD), US 301 BYPASS (WESELYAN BOULEVARD) TO SR 1401 (TANNER ROAD). WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION FORSYTH SOUTH GREEN STREET B-4512 DELETED I-40 BUSINESS. REPLACE BRIDGE NO. 286 FORSYTH US 52, FUTURE I-74 I-4404 DELETED NC 65 IN WINSTON-SALEM TO I-74 IN SURRY COUNTY. UPGRADE TO INTERSTATE STANDARDS. PROJECT WAS NOT FUNDED IN DRAFT STIP. FORSYTH I-73/74 CONNECTOR I-4924 DELETED WINSTON-SALEM BELTWAY NORTH OF KERNERSVILLE TO NC 68 WEST OF GREENSBORO. MULTI-LANE FREEWAY ON NEW LOCATION. FORSYTH I-40 I-5200 DELETED NC 109 IN FORSYTH COUNTY TO NC 68 IN GUILFORD COUNTY. WIDEN TO SIXLANES. (14.8 MILES) FORSYTH I-40 BUSINESS/ US 421 R-0952 DELETED WEST OF US 158 IN FORSYTH COUNTY TO WEST OF SR 1850 IN GUILFORD COUNTY. PAVEMENT AND BRIDGE REHABILITATION. (8.5 MILES) FORSYTH WINSTON-SALEM U-2729 DELETED SR 1672 (HANES MILL ROAD), MUSEUM DRIVE TO SR 4000 (UNIVERSITY PARKWAY). WIDEN TO MULTI-LANES WITH CURB AND GUTTER. (0.4 MILE) FORSYTH WINSTON-SALEM U-2730B DELETED NC 65 (BETHANIA-RURAL HALL ROAD). US 52 TO NC 66 IN RURAL HALL. WIDEN TO MULTILANES. (2.1 MILES) FORSYTH COLFAX KERNERSVILLE U-3617 DELETED SR 1005 / SR 1008 / SR 2045 (EAST MOUNTAIN STREET-OLD US 421), NC IN KERNERSVILLE (FORSYTH COUNTY) TO SR 2007 (BUNKER HILL ROAD) IN COLFAX (GUILFORD COUNTY). WIDEN TO MULTI-LANES. (3 MILES) FORSYTH CLEMMONS U-5121 DELETED SR 1103 (LEVISVILLE-CLEMMONS ROAD), I-40 TO US 158. CONVERT TO A MULTILANE MEDIAN SECTION. (1 MILE) FORSYTH WINSTON-SALEM U-5144A COMPLETED REYNOLDA ROAD TO FIRST STREET. RESURFACING. FORSYTH VARIOUS U-5195 COMPLETED INSTALL DYNAMIC MESSAGE SIGNS. FORSYTH US 421 W-4823 COMPLETED INSTALL SHOULDER RUMBLE STRIPS. FORSYTH I-40 W-4824 COMPLETED INSTALL SHOULDER RUMBLE STRIPS. FRANKLIN SR 1239 (ROCKY FORD ROAD) B-5211 COMPLETED LYNCH CREEK. REPLACE BRIDGE NO. 38 FRANKLIN SR 1109 (TIMBERLAKE ROAD) B-5212 COMPLETED CEDAR CREEK. REPLACE BRIDGE NO. 17 T-202

207 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION FRANKLIN TRIANGLE J COUNCIL OF GOVERNMENTS C-5102 DELETED TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. FRANKLIN US 401-NC 39 R-3608 DELETED LOUISBURG, US 401-NC 39 (BICKETT BOULEVARD), NC (NASH STREET) TO NORTH OF SR 1229 (MAIN STREET). WIDEN TO MULTI- LANES. (1.6 MILES) FRANKLIN VARIOUS R-5165 COMPLETED RESURFACING ON FEDERAL-AID ROUTES. GASTON SR 1820 B-4117 COMPLETED CREEK. REPLACE BRIDGE NO. 173 GASTON SR 1620 B-4518 COMPLETED CREEK. REPLACE BRIDGE NO. 110 GASTON SR 1800 B-4519 COMPLETED LITTLE LONG CREEK. REPLACE BRIDGE NO. 155 GASTON BELMONT E-4572 COMPLETED STREETSCAPE IMPROVEMENT ALONG US 29-74, CATAWBA RIVER TO THE INTERSECTION OF WILKINSON BOULEVARD, CATAWBA STREET, AND HAZELINE AVENUE. GASTON DALLAS E-4959 COMPLETED PHASE II: TRADE, COLLEGE, HOFFMAN AND WILKINS STREET. STREETSCAPING GASTON CRAMERTON EB-5016 DELETED DOWNTOWN CREAMERTON-SOUTH FORK RIVER GREENWAY EXTENSION. PEDESTRIAN BRIDGES AND TRAIL. PROJECT DELETED AT REQUEST OF THE TOWN OF CRAMERTON. GASTON GASONIA EB-5017 COMPLETED AVON-CATAWBA CREEK GREENWAY TRAIL EXTENSION. GASTON GASTONIA EB-5131 DELETED HIGHLAND RAIL TRAIL - LONG CREEK GREENWAY. DELETED AT REQUEST OF NCDOT'S BIKE/PED DIVISION. GASTON MOUNT HOLLY EB-5132 DELETED MOUNT HOLLY RIVERFRONT GREENWAY. DELETED AT REQUEST OF NCDOT'S BIKE/PED DIVISION. GASTON I-85 I-5121 COMPLETED I-85, MILE MARKER 21.8 TO MILE MARKER MILL AND RESURFACE. GASTON NC 150 R-0617 DELETED NC 279 AT CHERRYVILLE TO RELOCATED US 321. WIDEN TO MULTI-LANES, PART ON NEW LOCATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. GASTON NEW ROUTE R-2720 DELETED NC 273 TO NC 16. TWO LANE CONNECTOR WITH TWO FOOT PAVED SHOULDERS ON NEW LOCATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. GASTON NC 279 R-3107 DELETED CHERRYVILLE TO US 321. WIDEN TO MULTI-LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. GASTON GASTONIA U-2523 DELETED NC 279, NC 7 TO WEST OF NC 275 IN DALLAS. WIDEN TO MULTI- LANES. PROJECT DELETED FY-11-WAS NOT FUNDED IN DRAFT STIP GASTON GASTONIA U-2713 DELETED SR 1131 (LINWOOD ROAD) CROWDER'S CREEK TO US NC 274 (FRANKLIN BOULEVARD). WIDEN TO MULTI-LANES, SOME RELOCATION.PROJECT DELETED FY WAS NOT FUNDED IN DRAFT STIP T-203

208 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION GASTON GASTONIA U-3425 DELETED SR 1136 (MYRTLE SCHOOL ROAD), US TO SR 1255 (HUDSON BOULEVARD). WIDEN TO MULTI- LANES. PROJECT DELETED FY11-WAS NOT FUNDED IN DRAFT STIP GASTON BELMONT U-3608 DELETED NC 7, I-85 TO US WIDEN TO FIVE LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. GASTON NEW ROUTE U-4705 DELETED BELMONT- MOUNT HOLLY NORTHERN LOOP, NC 27 WEST OF MOUNT HOLLY TO NC 27 EAST OF MOUNT HOLLY. MULTI- LANES ON NEW LOCATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. GASTON US U-5316 DELETED US 29-74, NC 7-SR 2083 (HAZELEEN AVENUE) TO SR 1191 (OLD DOWD ROAD). WIDEN ROADWAY AND REPLACE BRIDGE NO. 91 OVER THE CATAWBA RIVER. PROJECT WAS NOT FUNDED IN DRAFT STIP. GRAHAM SR 1123 B-4123 COMPLETED WEST BUFFALO CREEK. REPLACE BRIDGE NO. 117 GRAHAM US 129 B-5209 COMPLETED BRIDGE NO. 10 OVER EAST BUFFALO CREEK. REHABILITATE DECK USING HYDRO-DEMOLITION AND EARLY STRENGTH LATEX MODIFIED CONCRETE. GRAHAM ROBBINSVILLE E-4821 COMPLETED PHASE A: MAIN STREET STREETSCAPING AROUND COURTHOUSE SQUARE. GRAHAM ROBBINSVILLE E-4974 COMPLETED COURT STREET, SR 1106 (NORTH MAIN STREET) TO SR 1106 (EAST MAIN STREET). STREETSCAPING. GRAHAM QUALLA BOUNDARY R-5003 COMPLETED S HUNTING BOY BRANCH. RECONSTRUCTION. GRAHAM BURLINGTON U-2410 DELETED SR 1716 (GRAHAM-HOPEDALE ROAD), PROVIDENCE ROAD TO US 70. WIDEN TO MULTI-LANES WITH A RAILROAD GRADE SEPARATION. (1.2 MILES) GRAHAM VARIOUS W-5214 COMPLETED DIVISION 14 RUMBLE STRIPS, GUARDRAIL AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. GRANVILLE SR 1307 (DANIEL ROAD) B-4523 COMPLETED FOX CREEK. REPLACE BRIDGE NO. 164 GRANVILLE CREEDMOOR C-4941 COMPLETED CONSTRUCT SIDEWALKS AT VARIOUS LOCATIONS. GRANVILLE TRIANGLE J COUNCIL OF GOVERNMENTS C-5102 DELETED TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. GRANVILLE I-85 I-5141 COMPLETED NORTH OF NC 56 (MILE POST 191) TO VANCE COUNTY LINE. DIAMOND GRINDING, RESEALING JOINTS AND INSTALL PAVEMENT MARKERS. GRANVILLE NC 56 R-2542 DELETED WEST OF I-85 TO NC 50. CORRIDOR UPGRADE AND SAFETY IMPROVEMENTS. PROJECT DELETED. SCOPE REPLACED WITH CREEDMOOR CONNECTOR IN CITY OF CREEDMOOR COMPREHENSIVE TRANSPORTATION PLAN. GRANVILLE VARIOUS R-5166 COMPLETED RESURFACING ON FEDERAL-AID ROUTES. T-204

209 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION GRANVILLE OXFORD U-3322 DELETED SR 1195 AND SR 1646 (INDUSTRY DRIVE), SR 1166 (HILLSBORO STREET) TO NC 96 (LINDEN AVENUE). WIDEN TO MULTILANES, SOME NEW LOCATION. (2.3 MILES) GRANVILLE OXFORD U-4717 DELETED NC 96, SR 1607 (KNOTT'S GROVE ROAD SR 1609 (FAIRPORT ROAD) TO SR 1606 (ANTIOCH ROAD-SR 1649 NEW COMMERCE ROAD). WIDEN TO MULTI-LANES. (1.1 MILES) GREENE NC 58 R-3102 DELETED KINSTON TO WILSON. CONSTRUCT A FREEWAY ON NEW LOCATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION GREENE US 258 R-3308 DELETED CRESCENT ROAD IN KINSTON IN LENOIR COUNTY TO US 64 AT TARBORO IN EDGECOMBE COUNTY. MULTI-LANES ON NEW LOCTION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION GREENE US 259-NC 91 R-4423 DELETED SR 1573 (DOBBS FARM ROAD) IN KINSTON TO US 264 ALTERNATE. WIDEN TO MULTI-LANES WITH A BYPASS OF SNOW HILL. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. GUILFORD SR 3000 (MCCONNELL ROAD) B-4129 COMPLETED LITTLE ALAMANCE CREEK. REPLACE BRIDGE NO GUILFORD I-40 / US 220 B-4534 COMPLETED I-85. REPLACE BRIDGE NO GUILFORD VARIOUS B-5190 COMPLETED BRIDGE EXPANSION JOINT REPAIRS AT SELECTED LOCATIONS. GUILFORD NEW ROUTE FS-0707A COMPLETED NEW ROUTE, SR 1850 (SANDY RIDGE ROAD) AT SR 1008 (WEST MARKET STREET) TO NC 68 NEAR PIEDMONT TRIAD INTERNATIONAL AIRPORT. GUILFORD US 220 FUTURE I-73 I-4921 DELETED SR 1462 (WEST PRESNELL STREET EXTENSION) IN ASHEBORO TO I-85 IN GREENSBORO. UPGRADE TO INTERSTATE STANDARDS. (23 MILES) GUILFORD I-73/74 CONNECTOR I-4924 DELETED WINSTON-SALEM BELTWAY NORTH OF KERNERSVILLE TO NC 68 WEST OF GREENSBORO. MULTI-LANE FREEWAY ON NEW LOCATION. GUILFORD I-40/85 I-5134 COMPLETED I-85 BYPASS SPLIT TO NORTH OF SR 3045 (MT. HOPE CHURCH ROAD). RELENSING OF SNOWPLOWABLE PAVEMENT GUILFORD I-85 BYPASS I-5135 COMPLETED I-85 BUSINESS MERGE (MILEPOST 120) TO I-40/85 BUSINESS (MILEPOST 131). INSTALL POLYUREA PAVEMENT MARKINGS AND RELENSE SNOWPLOWABLE PAVEMENT MARKERS. GUILFORD I-85 I-5136 COMPLETED DEEP RIVER BRIDGE (NORTH OF US 311 PROJECT) TO I-85 BUSINESS SPLIT (EXIT 118). RELENSING OF SNOWPLOWABLE PAVEMENT MARKERS. GUILFORD I-40 I-5200 DELETED NC 109 IN FORSYTH COUNTY TO NC 68 IN GUILFORD COUNTY. WIDEN TO SIXLANES. (14.8 MILES) GUILFORD I-40 BUSINESS/ US 421 R-0952 DELETED WEST OF US 158 IN FORSYTH COUNTY TO WEST OF SR 1850 IN GUILFORD COUNTY. PAVEMENT AND BRIDGE REHABILITATION. (8.5 MILES) T-205

210 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION GUILFORD US AND I-85 BUSINESS R-2808B DELETED I-85 IN DAVIDSON COUNTY TO I-85 IN GUILFORD COUNTY. UPGRADE, SAFETY IMPROVEMENTS AND REPLACE BRIDGE NO. 74 AT SR 1627 (B- 2163). (31.1 MILES) GUILFORD HIGH POINT U-2537 DELETED NORTH-SOUTH CONNECTOR, I-85 TO US 311 / FUTURE I-74. MULTI-LANES ON NEW LOCATION. (10.5 MILES) GUILFORD HIGH POINT U-3432 DELETED SR 1595-SR 1216 (SURRETT DRIVE), EDEN TERRACE TO MARKET CENTER DRIVE. WIDEN TO MULTI-LANES. (1.5 MILES) GUILFORD HIGH POINT U-3433 DELETED NC 610 (EAST FAIRFIELD ROAD), US 311 (SOUTH MAIN STREET) TO NC 62 (LIBERTY STREET). WIDEN TO MULTI-LANES. (2.1 MILES) GUILFORD COLFAX KERNERSVILLE U-3617 DELETED SR 1005 / SR 1008 / SR 2045 (EAST MOUNTAIN STREET-OLD US 421), NC IN KERNERSVILLE (FORSYTH COUNTY) TO SR 2007 (BUNKER HILL ROAD) IN COLFAX (GUILFORD COUNTY). WIDEN TO MULTI-LANES. (3 MILES) GUILFORD GREENSBORO U-4757 DELETED INTERSECTIONS OF MARKET STREET AND GALLIMORE DAIRY ROAD AND MARKET STREET AND FRIENDLY AVENUE. CONSTRUCT IMPROVEMENTS. GUILFORD GREENSBORO U-5003 DELETED SR 1840 (PEGG ROAD) AND SR 1842 (THATCHER ROAD), SR 1556 (GALLIMORE DARY ROAD) TO SR 1008 (WEST MARKET STREET). WIDEN TO MULTI-LANES WITH GRADE SEPARATION OVER I-40. (2.1 MILES) GUILFORD HIGH POINT U-5156A COMPLETED INTERSECTION IMPROVEMENTS - NC 68 (EASTCHESTER DRIVE) AND BURTON ROAD. GUILFORD HIGH POINT U-5156B COMPLETED INTERSECTION IMPROVEMENTS - NC 68 (EASTCHESTER DRIVE) AND CLINARD FARMS ROAD. GUILFORD GREENSBORO U-5157C COMPLETED RESURFACING - CONE BOULEVARD, ELM STREET TO SUMMIT AVENUE (1.5 MILES), FRIENDLY AVENUE, RADIANCE DRIVE TO ELAM AVENUE (O.7 MILES) GUILFORD HIGH POINT U-5185 COMPLETED SR 1538 (DEEP RIVER ROAD), SUNSET HOLLOW DRIVE TO NC 68 (EASTCHESTER DRIVE) AT LAKE FOREST DRIVE. CORRIDOR REALIGNMENT, INCLUDING CURB AND GUTTER, SIDEWALKS AND DRAINAGE. GUILFORD US 421 W-4823 COMPLETED INSTALL SHOULDER RUMBLE STRIPS. GUILFORD I-40 W-4824 COMPLETED INSTALL SHOULDER RUMBLE STRIPS. GUILFORD I-40 W-5131 COMPLETED WEST OF MCCONNELL ROAD TO EAST OF MCCONNELL ROAD. INSTALL MEDIAN BARRIER. HALIFAX ROANOKE RAPIDS E-4523 COMPLETED ROANOKE CANAL COMMISSION, INC. AND CITY OF ROANOKE RAPIDS. PHASE A: REHABILITATE CANAL ARTS CENTER TO CONVERT TO THE ROANOKE CANAL MUSEUM. PHASE B: IMPROVE THE ROANOKE CANAL TRAIL. HALIFAX ROANOKE RAPIDS E-4920 COMPLETED ROANOKE CANAL COMMISSION, INC. AND ROANOKE RAPIDS. CONSTRUCT THE ROANOKE CANAL MUSEUM AT JACKSON STREET AND ROANOKE AVENUE. T-206

211 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION HALIFAX I-95 I-3102 DELETED NORTH OF SR 1524 IN NASH COUNTY TO SOUTH OF NC 561 (EXIT 160) IN HALIFAX COUNTY. PAVEMENT AND BRIDGE REHABILITATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION HALIFAX NEW ROUTE R-3822 DELETED NC 125 TO SOUTH OF US 158. CONSTRUCT A TWO LANE FACILITY PARALLEL TO I PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. HALIFAX NC 125 R-5308 DELETED SR 1600 (AURELIAN SPRINGS ROAD) TO SR 1686 (SMITH CHURCH ROAD). WIDEN TO MULTI-LANES WITH CURB AND GUTTER. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. HALIFAX ROANOKE RAPIDS U-2419 DELETED NC 48 (ROANOKE AVENUE), NORTH OF JACKSON STREET IN HALIFAX COUNTY TO NC 46 IN GASTON IN NORTHAMPTON COUNTY. WIDEN TO MULTI-LANES. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. HARNETT SR 1120 B-3655 COMPLETED JUMPING RUN CREEK. REPLACE BRIDGE NO. 59 HARNETT NC 42 B-4137 COMPLETED NORFOLK AND SOUTHERN RAILWAY. REPLACE BRIDGE NO. 35 HARNETT I-95 B-5022 COMPLETED SR 1005 (BRIDGE NO. 153), SR 1815 (BRIDGE NO. 154), SR 1005 (BR.# 153), SR 1815 (BR#154), SR 1813 (BR.# 155) & SR 1709 (BR. NO. 81). ELEVATE STRUCTURES, & INSTALL OVER HEIGHT DETECTION ON SB I-95 BETWEEN EXIT 77 AND 75 AND BETWEEN MILEPOST 63 AND EXIT 65. HARNETT TRIANGLE J COUNCIL OF GOVERNMENTS C-5102 DELETED TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. HARNETT FAYETTEVILLE DUNN E-4534 COMPLETED AVERASBORO BATTLEFIELD COMMISSION, INC. CREATE DRIVING TOUR AND A PORTION OF HISTORIC-SCENIC BYWAY FROM FAYETTEVILLE THROUGH THE BATTLEFIELD, REPAIR AND REINSTALL HISTORIC HIGHWAY MARKERS AND LANDSCAPING. HARNETT ANGIER E-4937 COMPLETED NC 210 AT NC 55. LANDSCAPING AND PEDESTRIAN IMPROVEMENTS. HARNETT I-95 I-5010 COMPLETED NC 55/US 421, RECONFIGURE INTERCHANGE RAMP. HARNETT NC 55 R-2540 DELETED US 421 TO US 401. UPGRADE EXISTING ROADWAY. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION HARNETT NC 55 R-5163 COMPLETED NC 55, NC 210 TO SR 1415 (RAWLS CHURCH ROAD). MILL AND RESURFACE. HAYWOOD SR 1643 B-3189 COMPLETED SOUTHERN RAILROAD. REPLACED BRIDGE NO. 272 HAYWOOD SR 1318 B-3343 COMPLETED HEMPHILL CREEK. REPLACED BRIDGE NO. 48 HAYWOOD SR 1503 B-3661 COMPLETED CRABTREE CREEK. REPLACED BRIDGE NO. 36 HAYWOOD SR 1519 B-4144 COMPLETED RICHLAND CREEK. REPLACED BRIDGE NO. 211 T-207

212 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION HAYWOOD I-40 B-5206 DELETED BRIDGE NO. 142 OVER PIEGON RIVER. REHABILITATE DECK USING HYDRO-DEMOLITION AND EARLY STRENGTH LATEX MODIFIED CONCRETE. PROJECT DELETED AND TO BE COMPLETED UNDER BD HAYWOOD I-40 B-5207 COMPLETED BRIDGE NO. 124 OVER SR 1338 REHABILITATE DECK USING HYDRO-DEMOLITION AND EARLY STRENGTH LATEX MODIFIED CONCRETE. HAYWOOD I-40 B-5208 COMPLETED BRIDGE NO. 205 OVER SR REHABILITATE DECK USING HYDRO-DEMOLITION AND EARLY STRENGTH LATEX MODIFIED CONCRETE. HAYWOOD WAYNESVILLE E-4589 COMPLETED CONSTRUCT GREENWAY, INDUSTRIAL PARK NEAR LAKE JUNALUSKA TO THE DOWNTOWN MAIN STREET DISTRICT. HAYWOOD I-40 I-2701 DELETED SR 1338 TO WEST OF NC 209. SAFETY IMPROVEMENTS, PAVEMENT AND BRIDGE REHABILITATION. PROJECT NOT FUNDED IN DRAFT STIP. HAYWOOD I-40 I-5140 COMPLETED MILE MARKER 33.4 (EAST AND WESTBOUND), MILE MARKER 28.7 (EAST AND WESTBOUND), MILE MARKER 21 (WESTBOUND) AND MILE MARKER 0.7 (EASTBOUND). REPLACE SIX DIGITAL MESSAGE SIGNS (DMS). HAYWOOD I-40 I-5300 COMPLETED TENNESSEE STATE LINE TO MILE POST 4. ROCK SLOPE STABLIZATION AND ROCK FALL MITIGATION. HAYWOOD US 23, US 74, IS CONNECTOR R-4412 COMPLETED NATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDING GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. HAYWOOD BLUE RIDGE PARKWAY R-5111 COMPLETED PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. HAYWOOD GREAT SMOKY MOUNTAINS NATIONAL PARK R-5213 DELETED GREAT SMOKY MOUNTAINS NATIONAL PARK. RESURFACE HEINTOOGA RIDGE ROAD AND BALSAM MOUNTAIN CAMPGROUND. HAYWOOD NC 110 SR-5114A COMPLETED NC 110 AT SR 1876 (SONOMA ROAD) NEAR CANTON. INSTALL LEFT TURN LANE ON NORTHBOUND NC 110. HAYWOOD VARIOUS W-5214 COMPLETED DIVISION 14 RUMBLE STRIPS, GUARDRAIL AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. HENDERSON SR 1799 B-3666 COMPLETED NORTH BRANCH HUNGRY RIVER. REPLACED BRIDGE NO. 53 HENDERSON SR 1764 B-5180 COMPLETED MUD CREEK. REPLACED BRIDGE NO. 205 HENDERSON I-26 I-2800 DELETED SR 1722 (EXIT 22) IN HENDERSON COUNTY TO SR 1142 (EXIT 28) IN POLK COUNTY. PAVEMENT REHABILITATION. PROJECT NOT FUNDED IN DRAFT STIP. HENDERSON NC 191 R-2588 DELETED US 25 IN HENDERSONVILLE TO NC 280 SOUTH OF MILLS RIVER. WIDEN TO MULTI-LANES. PROJECT NOT FUNDED IN DRAFT STIP. HENDERSON US 23, US 74, IS CONNECTOR R-4412 COMPLETED NATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDING GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. T-208

213 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION HENDERSON BLUE RIDGE PARKWAY R-5111 COMPLETED PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. HENDERSON ASHEVILLE U-3403 DELETED NC 191 (BREVARD ROAD-OLD HAYWOOD ROAD), NC 280 TO NC 112 (SARDIS ROAD). WIDEN TO MULTI-LANES. PROJECT DELETED FY 11-WAS NOT FUNDED IN DRAFT STIP HENDERSON HENDERSONVILLE U-5123 COMPLETED US 176, NC 225 TO US 25. PAVEMENT REHABILITATION. HENDERSON US 176 W-5005 COMPLETED SR 1831 IN HENDERSON COUNTY TO THE SOUTHERN INTERSECTION OF SR 1102 IN POLK COUNTY. INSTALL SHOULDER GUARDRAIL. HENDERSON VARIOUS W-5214 COMPLETED DIVISION 14 RUMBLE STRIPS, GUARDRAIL AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. HERTFORD SR 1441 SWAINS MILL ROAD B-4549 COMPLETED TAYLOR ROAD. REPLACE BRIDGE NO. 42 HERTFORD NC 11/SR 1212 R-2900 DELETED NC 903 IN MARTIN COUNTY TO US 13 NORTH OF AHOSKIE IN HERTFORD COUNTY. WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION HERTFORD NC 11 R-5197 COMPLETED NC 11, AHOSKIE CREEK BRIDGE TO SR STRENGTHEN PAVEMENT, RESURFACE AND INSTALL LONG LIFE PAVEMENT MARKINGS. HOKE NC 211 R-2592 DELETED US IN ABERDEEN TO SR 1244 IN RAEFORD. WIDEN TO MULTI-LANES. (15.8 MILES) HOKE US 401 R-3333 DELETED US 401 BUSINESS NORTH OF LAURINBURG TO US 401 BUSINESS EAST OF RAEFORD. WIDEN TO MULTI-LANES. (20.7 MILES) HYDE NC 12 F-4703B COMPLETED OCRACOKE VISITORS CENTER. REFURBISH. HYDE MATTAMUSKEET WILDLIFE REFUGE R-5106 COMPLETED MTK-10(1). REHABILITATE EAST CANAL BRIDGE ON ROUTE 20 AND ENTRANCE ROAD BRIDGE ON ROUTE 10. REPAIR LAKE LANDING ROAD, ROUTE 15. REPAIR CENTRAL CANAL BRIDGE. IREDELL SR 1537 B-4156 COMPLETED THIRD CREEK. REPLACE BRIDGE NO. 95 IREDELL I-77 I-2514 DELETED SR 2117 (JANE SOWERS ROAD). CONVERT GRADE SEPARATION TO AN INTERCHANGE. PROJECT DELETED FY 11-WAS NOT FUNDED IN DRAFT STIP IREDELL I-77 I-3309 DELETED SR 2117 (SOUTH OF EXIT 54) TO NORTH OF SR PAVEMENT AND BRIDGE REHABILITATION. PROJECT DELETED FY 11-WAS NOT FUNDED IN DRAFT STIP IREDELL I-40 I-5003 COMPLETED EXIT 119 IN BURKE COUNTY TO SR 1753 (MILE MARKER 146) IN IREDELL COUNTY. PAVEMENT REHABILITATION. IREDELL I-77 I-5107 COMPLETED I-77, MILE MARKER 56 TO MILE MARKER AND MILE MARKER TO MILE MARKER PAVEMENT REHABILITATION. T-209

214 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION IREDELL I-40 I-5401 DELETED I-40, MILE MARKER 131 TO MILE MARKER 146. PAVEMENT REHABILITATION. PROJECT DELETED - PROJECT AREA COVERED BY PROJECTS I-3302 & I-906. IREDELL US 21-NC 115 R-2522 DELETED TROUTMAN, CEDAR LANE AVENUE TO SR 1336 IN BARIUM SPRINGS. WIDEN TO A MULTI-LANE URBAN FACILITY. PROJECT DELETED FY 11-WAS NOT FUNDED IN DRAFT STIP IREDELL SR 1109 WILLIAMSON ROAD R-5100 DELETED SR 1109 (WILLIAMSON ROAD), 1-77 TO SR 1100 (BRAWLEY SCHOOL ROAD). WIDEN TO MULTI-LANES. PROJECT DELETED FY 11-WAS NOT FUNDED IN DRAFT STIP IREDELL US 64 R-5143 COMPLETED NC 90 IN IREDELL COUNTY TO NC 90 IN ALEXANDER COUNTY. MICROSURFACE OVERLAY. IREDELL SR 1109 AND SR 1190 SF-4912E COMPLETED SR 1109 (WILLIAMSON ROAD) AT SR 1190 (SUNDOWN ROAD) NEAR MOORESVILLE CONSTRUCT LEFT TURN LANE. IREDELL STATESVILLE U-2568 DELETED SR 2333 (EAST SIDE DRIVE), SR 2352 (BARKLEY ROAD) TO SR 2321 (EAST BROAD STREET). WIDEN TO MULTI- LANES, PART ON NEW LOCATION. PROJECT DELETED FY 11-WAS NOT FUNDED IN DRAFT STIP IREDELL STATESVILLE U-2731 DELETED US 21, SR 1933 TO I-77. WIDEN TO MULTI-LANES AND REALIGN OFFSET INTERSECTIONS OF SR 1922 AND SR PROJECT DELETED FY 11-WAS NOT FUNDED IN DRAFT STIP IREDELL STATESVILLE U-2930 DELETED US 21, US 64 TO SR WIDEN TO MULTI-LANES. PROJECT DELETED FY 11-WAS NOT FUNDED IN DRAFT STIP IREDELL STATESVILLE U-3625 DELETED US 70, SR 2352 TO I-77. CONSTRUCT ADDITIONAL TURN LANES. PROJECT DELETED FY 11-WAS NOT FUNDED IN DRAFT IREDELL STATESVILLE U-4749 DELEDTED US (GARNER BAGNEL ROAD), I-40 TO I-77. WIDEN TO FOUR LANE DIVIDED FACILITY. PROJECT DELETED FY 11-WAS NOT FUNDED IN DRAFT STIP IREDELL MOORESVILLE U-4914 DELETED NC 150, NC 115 TO NC 150/NC 152 SPLIT. WIDEN TO FOUR LANE DIVIDED FACILITY. PROJECT DELETED FY 11-WAS NOT FUNDED IN DRAFT STIP IREDELL MOORESVILLE Z-3482A DELETED CATAWBA AVENUE AT NORFOLK SOUTHERN RAILWAY CROSSING V. SAFETY IMPROVEMENTS. JACKSON SR 1132 B-4161 COMPLETED TUCKASEGEE RIVER. REPLACED BRIDGE NO. 211 JACKSON CULLOWHEE E-4823 DELETED COLLOWHEE GREENWAY CONNECTOR, CULLOWHEE VALLEY ELEMENTARY SCHOOL AND SR 1329 (LYLE WILSON ROAD) TO SR 1330 (COUNTRY CLUB DRIVE) PROVIDING ACCESS TO WESTERN CAROLINA UNIVERSITY. JACKSON US 23, US 74, IS CONNECTOR R-4412 COMPLETED NATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDING GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. JACKSON US 19 R-4751 DELETED SR 1152 (HUGHES BRANCH ROAD) IN BRYSON CITY TO US 441 NORTH IN CHEROKEE. UPGRADE ROADWAY. PROJECT NOT FUNDED IN DRAFT STIP. JACKSON US 19 R-4758 COMPLETED CHEROKEE RESERVATION. SLOPE STABILIZATION. T-210

215 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION JACKSON BLUE RIDGE PARKWAY R-5111 COMPLETED PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. JACKSON US W-4713 COMPLETED EAST OF SR 1391 TO SR 1514-SR REMOVE AND REPLACE CONCRETE ISLAND. JACKSON VARIOUS W-5214 COMPLETED DIVISION 14 RUMBLE STRIPS, GUARDRAIL AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. JOHNSTON TRIANGLE J COUNCIL OF GOVERNMENTS C-5102 DELETED TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. JOHNSTON SMITHFIELD EB-4706 COMPLETED GREENWAY ALONG BUFFALOE CREEK AND THE NEUSE RIVER. CONNECTS DOWNTOWN WITH NEIGHBORHOODS, PARKS AND SCHOOLS. JOHNSTON I-95 I-5016 COMPLETED I-95, NORTH OF US 70 (MILE POST 99.8) TO NORTH OF SR 2130 (MILE POST 107.1). RESURFACE. JOHNSTON NC 42 R-3410 DELETED NC 50 TO US 70. WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION JOHNSTON NEW ROUTE R-3618 DELETED SR 1553 (SHOTWELL ROAD) WEST OF US 70 TO NC 42 EAST OF CLAYTON. TWO LANES ON MULTI-LANE RIGHT OF WAY, NEW LOCATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION JOHNSTON US 70 BUSINESS R-5162 COMPLETED US 70 BUSINESS AT SR 1553 (SHOTWELL ROAD). INTERSECTION IMPROVEMENTS. JOHNSTON SMITHFIELD U-3464 DELETED US 301-NC 96, NC 96 TO SR 1007 (BROGDEN ROAD). WIDEN TO MULTI-LANES. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. JOHNSTON SMITHFIELD U-4419 DELETED SR 2398 (INDUSTRIAL PARK DRIVE) TO US 301 (BRIGHT LEAF BOULEVARD). CONSTRUCT TWO LANES ON MULTILANE RIGHT OF WAY, NEW LOCATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION JONES US 258 R-2235 DELETED NC 24 WEST OF RICHLANDS TO US 70 AT KINSTON. WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION LEE SANFORD EB-4981 COMPLETED ENDOR IRON FURNACE GREENWAY, KIWANIS FAMILY PARK ON CARBONTON ROAD TO BOONE DRIVE IN SANFORD. CONSTRUCT MULTI-USE TRAIL. LEE NC 78 R-3831 DELETED WEST OF SR 1157 (HICKORY HOUSE ROAD) TO WEST OF SR WIDEN TO THREE LANES. (1.8 MILES) LEE US R-4742 DELETED US , SOUTH OF SR 1157 (HICKORY HOUSE (ROAD) TO SR 1333; SR 1303 (CENTER CHURCH ROAD), SR 1305 (HENLEY ROAD) TO US ; NC 78, US TO EAST OF SR T-211

216 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION LEE SANFORD U-2565 DELETED SR 1515 (THIRD STREET EXTENSION), SR 1560 (WEATHERSPOON STREET) TO US 1 BUSINESS (HAWKINS AVENUE). MULTI-LANES ON NEW LOCATION. (0.5 MILE) LEE SANFORD U-2566 DELETED SANFORD SOUTHERN LOOP, NC 42 TO SR TWO LANES ON MULTI-LANE RIGHT OF WAY, NEW LOCATION. (4.3 MILES) LEE SANFORD U-3461 DELETED SR 1107 (FIELDS DRIVE), SR 1237 (CARTHAGE STREET) TO WOODLAND AVENUE; SR 1237 (CARTHAGE STREET), SOUTH OF SR 1107 TO NC 42. WIDEN TO MULTI-LANES, SOME REALIGNMENT. (1.6 MILES) LEE BROADWAY U-3602 DELETED SR 1579 NORTH MAIN STREET, HARRINGTON AVENUE TO HUNTER STREET. WIDEN TO THREE LANES WITH CURB AND GUTTER AND SIDEWALKS. (0.6 MILE) LEE SANFORD U-5004 DELETED US 1 BUSINESS-US (HAWKINS AVENUE), WINFIELD STREET TO SR 1462 (BROWN ROAD). WIDEN TO MULTI-LANES. (2.6 MILES) LENOIR SR 1544 B-4570 COMPLETED GUM SWAMP CREEK. REPLACE BRIDGE NO. 79 LENOIR KINSTON E-4739 COMPLETED IMPROVEMENTS TO STABILIZE AND PRESERVE THE CSS NEUSE STATE HISTORIC SITE ON THE NEUSE RIVER. LENOIR KINSTON FS-0802A COMPLETED NEW ROUTE, PROPOSED US 70 BYPASS TO NC CONSTRUCT MULTI-LANE FACILITY ON NEW LOCATION. FEASIBILITY STUDY COMPLETE. LENOIR NC R-2204 DELETED NC 24 AT KENANSVILLE TO SR 1194 (ROSEWOOD DRIVE) NORTH OF PINK HILL. WIDEN TO FOUR LANES DIVIDED WITH A BYPASS OF PINK HILL ON NEW LOCATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION LENOIR US 258 R-2235 DELETED NC 24 WEST OF RICHLANDS TO US 70 AT KINSTON. WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION LENOIR NC 58 R-3102 DELETED KINSTON TO WILSON. CONSTRUCT A FREEWAY ON NEW LOCATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION LENOIR US 258 R-3308 DELETED CRESCENT ROAD IN KINSTON IN LENOIR COUNTY TO US 64 AT TARBORO IN EDGECOMBE COUNTY. MULTI-LANES ON NEW LOCTION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION LENOIR US 259-NC 91 R-4423 DELETED SR 1573 (DOBBS FARM ROAD) IN KINSTON TO US 264 ALTERNATE. WIDEN TO MULTI-LANES WITH A BYPASS OF SNOW HILL. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. LENOIR NC 241 R-5221 COMPLETED PINK HILL, NC 11 TO END OF CURB AND GUTTER, MILL AND RESURFACE AND WIDEN 2 FOOT FROM END OF CURB AND GUTTER TO RHE DUOLIN COUNTY LINE. T-212

217 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION LENOIR KINSTON U-3341 DELETED GLOBAL TRANSPARK "SPINE ROAD" FACILITY. MULTI-LANES ON NEW LOCATION. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. LENOIR KINSTON U-4018 DELETED PLAZA BOULEVARD EXTENSION, NC 58 (NORTH QUEEN STREET) TO NC 11 NORTH (GREENVILLE HIGHWAY). MULTI- LANES ON NEW LOCATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION LINCOLN LINCOLNTON C-4946 COMPLETED RAIL TO TRAIL EXPANSION ALONG ABANDONED CAROLINA NORTHWESTERN RAIL CORRIDOR BETWEEN CONGRESS STREET AND MOTZ AVENUE. LINCOLN NC 150 R-0617 DELETED NC 279 AT CHERRYVILLE TO RELOCATED US 321. WIDEN TO MULTI-LANES, PART ON NEW LOCATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. LINCOLN NC 73 R-2705 DELETED US 321 TO NC 73 AT SR EXTEND TWO LANES ON NEW LOCATION. PROJECT DELETED FY11-WAS NOT FUNDED IN DRAFT STIP LINCOLN NC 73 R-2706 DELETED SR 1356 IN LINCOLN COUNTY TO SR 554 (WEST CATAWBA AVENUE) IN MECKLENBURG COUNTY. WIDEN TO MULTI-LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. MACON SR 1513 B-4179 COMPLETED RABBIT CREEK. REPLACED BRIDGE NO. 65 MACON SR 1122 B-5023 COMPLETED SHEEHAN CREEK. REPLACED BRIDGE NO. 313 MACON US 23, US 74, IS CONNECTOR R-4412 COMPLETED NATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDING GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. MACON US 64 R-4415 DELETED WINDING STAIR GAP EASTWARD FOR TWO MILES. CONTRUCT TRUCK CLIMBING LANE. PROJECT NOT FUNDED IN DRAFT STIP. MACON VARIOUS W-5214 COMPLETED DIVISION 14 RUMBLE STRIPS, GUARDRAIL AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. MADISON VARIOUS B-5179 COMPLETED I-26, I-40, I-240, US 19, US 25, AND SR BRIDGE DECKS PRESERVATION. ONLY PART "A" COMPLETE. MADISON MARSHALL E-4584 COMPLETED STREETSCAPE ON THE PROPOSED BRIDGE ON BAILEY BRANCE ROAD ACROSS THE FRENCEH BROAD RIVER. MADISON NC 208 R-2426 DELETED US TO TENNESSEE STATE LINE. UPGRADE TWO LANE ROADWAY. PROJECT NOT FUNDED IN DRAFT STIP. MADISON NC 209 R-2589 DELETED NC 63 AT TRUST TO US IN HOT SPRINGS. UPGRADE TWO LANE ROADWAY. PROJECT NOT FUNDED IN DRAFT STIP. MADISON NEW ROUTE r-5117 DELETED MARSHALL TO SPRING CREEK COMMUNITY. CONSTRUCT NEW ROUTE. PROJECT NOT FUNDED IN DRAFT STIP. MARTIN NC 11 B-5199 COMPLETED ROANOKE RIVER. REPLACE BRIDGE NO. 39 T-213

218 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION MARTIN WILLIAMSTON E-4731 COMPLETED PHASE A: CONSTRUCT AN ELEVATED BICYCLE-PEDESTRIAN CORRIDOR ALONG R0ANOKE RIVER TO CONNECT THE SKEWARKEE TRAIL WITH MORATOC PARK AND ROANOKE RIVER TRAIL. MARTIN NC 11 R-2700 DELETED US 64 RELOCATION NORTH OF BETHEL TO NC 903. WIDEN TO FOUR LANES WITH A BYPASS OF OAK CITY AN NEW LOCATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION MARTIN NC 11/SR 1212 R-2900 DELETED NC 903 IN MARTIN COUNTY TO US 13 NORTH OF AHOSKIE IN HERTFORD COUNTY. WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION MARTIN US 64 R-5124 COMPLETED EDGECOMBE COUNTY LINE TO US 64 ALTERNATE. RESURFACE. MCDOWELL SR 1747 B-3874 COMPLETED CREEK. REPLACED BRIDGE NO. 68 MCDOWELL NC 226 B-4189 COMPLETED SOUTH MUDDY CREEK. REPLACED BRIDGE NO. 49 MCDOWELL SR 1129 B-4194 COMPLETED REPLACED BRIDGE NO. 103 OVER CROOKED CREEK. McDOWELL SR 1771 B-4198 COMPLETED SOUTH MUDDY CREEK. REPLACE BRIDGE NO. 223 McDOWELL MARION EL-5106 COMPLETED SR 1001 (SUGAR HILL ROAD), SR 1168 (REID STREET) TO WILHEMENIA STREET. CONSTRUCT A FIVE FOOT SIDEWALK. McDOWELL NC 226 R-2642 DELETED I-40 TO US 221. WIDEN TO MULTI-LANES. PROJECT NOT FUNDED IN DRAFT STIP. McDOWELL BLUE RIDGE PARKWAY R-5111 COMPLETED PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. McDOWELL US 221-NC 226 R-5112 DELETED US 221-NC 226, WOODLAWN TO SPRUCE PINE. CONSTRUCT TWO LANE IMPROVEMENTS AND WIDEN TO MULTI-LANES. PROJECT NOT FUNDED IN DRAFT STIP. MECKLENBURG CHARLOTTE C-5205 DELETED SUGAR CREEK ROAD-RUMPLE ROAD. CONSTRUCT A SOUTHBOUND TURN LANE ON SUGAR CREEK ROAD ONTO RUMPLE ROAD. DELETED PER REQUEST OF CHARLOTTE MPO. MECKLENBURG CORNELIUS C-5206 DELETED GEM STREET EXTENSION EASTWARD TO OAK STREET. CONSTRUCT A NEW CONNECTOR. MECKLENBURG CORNELIUS C-5207 DELETED LIVERPOOL PARKWAY ROUNDABOUT. CONSTRUCT A ROUNDABOUT AT INTERSECTION WITH CHARTWELL CENTER DRIVE. MECKLENBURG CORNELIUS EB-5010 DELETED CORNELIUS GREENWAY TRAIL. CORNELIUS OPEN SPACE TO BAILEY ROAD PARK. MECKLENBURG I-77 FS-0510A COMPLETED 5TH STREET IN CHARLOTTE TO I-85, ADDITIONAL LANES AND EXTENSION OF HOV FACILITY. FEASIBILITY STUDY COMPLETE - RESULTS REFLECTED IN I-3311C. MECKLENBURG I-277, BROOKSHIRE FREEWAY I-5014 COMPLETED CHARLOTTE, US 74 (INDEPENDENCE BOULEVARD TO I-77. REPLACED INTERSTATE LIGHTING SYSTEM. T-214

219 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION MECKLENBURG I-77, WESTMORELAND R I-5127 DELETED 1-77/WESTMORELAND ROAD. CONVERT EXISTING GRADE SEPARATION TO A SINGLE POINT URBAN INTERCHANGE (SPUI). PROJECT DELETED AT THE REQUEST OF MPO. MECKLENBURG I-77 I-5405 DELETED I-85 TO NORTH OF US 21 (CATAWBA AVENUE - EXIT 28) AT DAVIDSON. EXTEND EXISTING HOV LANES AND CONVERT HOV LANES TO HOT LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. MECKLENBURG I-77 K-4701 COMPLETED RENOVATE AND ENLARGE WELCOME CENTER TO INCLUDE DUAL RESTROOMS AND ADA COMPLIANT SINGLE RESTROOMS. RENOVATE COURTYARD AND LANDSCAPE. MECKLENBURG NC 73 R-2706 DELETED SR 1356 IN LINCOLN COUNTY TO SR 554 (WEST CATAWBA AVENUE) IN MECKLENBURG COUNTY. WIDEN TO MULTI-LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. MECKLENBURG US 21 R-4059 DELETED CORNELIUS, CATAWBA AVENUE. INTERSECTION IMPROVEMENTS. PROJECT WAS NOT FUNDED IN DRAFT STIP. MECKLENBURG I-485, SR 3174 SF-5110A COMPLETED I-485 INNER LOOP RAMP AND SR 3174 (IDLEWILD RD). INSTALL TRAFFIC SIGNAL WITH PROTECTED PERMITTED LEFT TURNS AND INSTALL RADIO COMMUNICATIONS FOR NEW AND EXISTING SIGNALS ON IDLEWILD RD AT I-485 OUTER LOOP RAMP, LOWES FOOD SHOPPING CENTER AT TEVENS MILL RD MECKLENBURG CHARLOTTE U-0203 DELETED LITTLE ROCK ROAD, I-85 TO CHARLOTTE-DOUGLAS INTERNATIONAL AIRPORT. REVISE ACCESS. PROJECT WAS NOT FUNDED IN DRAFT STIP. MECKLENBURG CHARLOTTE U-2510A COMPLETED NC 16 (PROVIDENCE ROAD), REA ROAD EXTENSION IN UNION COUNTY TO SOUTH OF THE CHARLOTTE OUTER LOOP IN MECKLENBURG COUNTY. WIDEN TO MULTI-LANES. MECKLENBURG CHARLOTTE U-2704 DELETED US (WILKINSON BOULEVARD) AND SR 5901 (BILLY GRAHAM PARKWAY). AREA IMPROVEMENTS. PROJECT WAS NOT FUNDED IN DRAFT STIP. MECKLENBURG PINEVILLE U-3447 COMPLETED NC 51, SOUTH CAROLINA STATE LINE TO SR 3645 (DOWNS CIRCLE). WIDEN TO MULTI-LANES. MECKLENBURG NEW ROUTE U-4705 DELETED BELMONT- MOUNT HOLLY NORTHERN LOOP, NC 27 WEST OF MOUNT HOLLY TO NC 27 EAST OF MOUNT HOLLY. MULTI- LANES ON NEW LOCATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. MECKLENBURG CHARLOTTE U-4752 COMPLETED DIXIE RIVER ROAD EXTENSION. INTERSECTION OF NC 160 (STEELE CREEK ROAD) AND SR 1116 (SHOPTON ROAD). DESIGN INTERSECTION. MECKLENBURG MATTHEWS MINT HILL U-5007 DELETED NC 51, US 74 (INDEPENDENCE BOULEVARD) TO SR 3128 (LAWYERS ROAD). WIDEN TO MULTI-LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. MECKLENBURG SOUTH BOULEVARD U-5014 COMPLETED SOUTH BOULEVARD SIGNAL SYSTEM. MECKLENBURG CHARLOTTE U-5116 DELETED CONSTRUCT LITTLE ROCK ROAD RE-LOCATION. PROJECT DELETED - WAS NOT SELECTED AS A STIMULUS PROJECT. MECKLENBURG CHARLOTTE U-5198 COMPLETED SR 4497 (INDEPENDENCE POINT PARKWAY), NC 51 TO MATTHEWS-MINT HILL ROAD). MILL AND RESURFACE. T-215

220 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION MECKLENBURG MATTHEWS U-5199 COMPLETED NC 51 AT FULLWOOD LANE AND MONROE ROAD. LENGTHEN LEFT TURN LANES. MECKLENBURG US U-5316 DELETED US 29-74, NC 7-SR 2083 (HAZELEEN AVENUE) TO SR 1191 (OLD DOWD ROAD). WIDEN ROADWAY AND REPLACE BRIDGE NO. 91 OVER THE CATAWBA RIVER. PROJECT WAS NOT FUNDED IN DRAFT STIP. MECKLENBURG CHARLOTTE Z-3810C COMPLETED GRANITE STREET AT SOUTHERN RAILWAY STYSTEM CROSSING G. SAFETY IMPROVEMENTS. MITCHELL SR 1002 B-4202 COMPLETED CRABTREE CREEK. REPLACED BRIDGE NO. 109 AND BRIDGE NO. 110 MITCHELL BAKERSVILLE EL-5107 COMPLETED SR 1260 (SOUTH MITCHELL AVENUE) NC 226 (CRIMSON LAUREL WAY), ALONG SR 1260 FROM BOWMAN MIDDLE SCHOOL TO NC 226 AND ALONG NC 226 FROM SR 1260 TO SR 1211 (CANE CREEK ROAD). CONSTRUCT A FIVE FOOT SIDEWALK. MITCHELL NC 226 R-2599 DELETED NC 197 TO NC 261. UPGRADE TWO LANES. PROJECT NOT FUNDED IN DRAFT STIP. MITCHELL BLUE RIDGE PARKWAY R-5111 COMPLETED PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. MITCHELL US 221-NC 226 R-5112 DELETED US 221-NC 226, WOODLAWN TO SPRUCE PINE. CONSTRUCT TWO LANE IMPROVEMENTS AND WIDEN TO MULTI-LANES. PROJECT NOT FUNDED IN DRAFT STIP. MONTGOMERY SR 1005 R-2314 DELETED NC IN TROY TO US 74 AT ROCKINGHAM. UPGRADE ROADWAY (TWO LANES ONLY) WITH MINOR RELOCATIONS. (32.5 MILES) MONTGOMERY NC 211 R-2591 DELETED US 220 EAST OF CANDOR TO US IN ABERDEEN. WIDEN TO MULTI-LANES WITH BYPASS OF PINEHURST ON NEW LOCATION. (25.1 MILES) MONTGOMERY FH 49 R-4069 DELETED UWHARRIE NATIONAL FOREST, PFH 554(1), HUNT'S CAMP TO EXISTING PAVEMENT. RECONSTRUCT ROADWAY. PROJECT NOT FUNDED MONTGOMERY STAR Z-3808C COMPLETED WEST COLLEGE STREET AT ABERDEEN CAROLINA AND WESTERN RAILWAY CROSSING V. SAFETY IMPROVEMENTS. MOORE NC B-4207 COMPLETED MCLENDONS CREEK. REPLACE BRIDGE NO. 43 MOORE SR 1864 (LONG POINT ROAD) B-4584 COMPLETED LITTLE RIVER. REPLACE BRIDGE NO. 11 MOORE NC 211 R-2591 DELETED US 220 EAST OF CANDOR TO US IN ABERDEEN. WIDEN TO MULTI-LANES WITH BYPASS OF PINEHURST ON NEW LOCATION. (25.1 MILES) MOORE NC 211 R-2592 DELETED US IN ABERDEEN TO SR 1244 IN RAEFORD. WIDEN TO MULTI-LANES. (15.8 MILES) MOORE NC 5 R-4743 DELETED US 1 IN ABERDEEN TO SOUTH CITY LIMITS OF PINEHURST. WIDEN TO MULTI-LANES. (4 MILES) T-216

221 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION MOORE US 1 R-5140 COMPLETED SR 1309 (MORGANTON ROAD) TO SR 2175 (AIDEN ROAD). CONSTRUCT PAVED SHOULDERS. MOORE NC R-5142 COMPLETED NC 705 TO THE MONTGOMERY COUNTY LINE. STRENGTHEN, WIDEN AND ADD TURN LANES. MOORE CARTHAGE U-3628 DELETED NC 24-27, COURTHOUSE WEST OF NC 22 (MCNEILL STREET) TO US WIDEN TO THREE LANES WITH CURB AND GUTTER. (1.2 MILES) NASH I-95 I-3102 DELETED NORTH OF SR 1524 IN NASH COUNTY TO SOUTH OF NC 561 (EXIT 160) IN HALIFAX COUNTY. PAVEMENT AND BRIDGE REHABILITATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION NASH US 64 R-5147 COMPLETED US 64, FRANKLIN COUNTY LINE TO SR 1613 (WINSTEAD AVENUE). PAVEMENT REHABILITATION. NASH US 64 R-5148 COMPLETED SR 1613 (WINSTEAD AVENUE) IN NASH COUNTY TO TAR RIVER BRIDGE IB EDGECOMBE COUNTY. PAVEMENT REHABILITATION. NASH US 264 R-5199 COMPLETED US 264, WAKE COUNTY LINE TO US 264 ALTERNATE. RESURFACE. NASH ROCKY MOUNT U-2561 DELETED NC 43, SR 1616 (COUNTRY CLUB ROAD) TO I-95. WIDEN TO MULTI-LANES WITH CURB AND GUTTER. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. NASH ROCKY MOUNT U-5002 DELETED SR (AIRPORT ROAD), US 301 BYPASS (WESELYAN BOULEVARD) TO SR 1401 (TANNER ROAD). WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION NEW HANOVER WILMINGTON E-4516 COMPLETED US 74 (EASTWOOD ROAD), SR 1409 (MILITARY CUTOFF ROAD) TO CARDINAL LANE. CONSTRUCT MULTI-USE TRAIL. NEW HANOVER CAROLINA BEACH E-4914 COMPLETED CAROLINA BEACH AVENUE, HARPER AVENUE TO SANDPIPER LANE AND CANAL DRIVE, SEAGULL LANE TO VIRGINIA AVENUE. CONSTRUCT MULTI-USE FACILITY. NEW HANOVER WILMINGTON SF-4903D COMPLETED NC 132 (COLLEGE ROAD) AND SR1272 (NEW CENTER DRIVE). INTERSECTION IMPROVEMENTS. NEW HANOVER WILMINGTON U-2724 DELETED NC 133, US 74 (MLK, JR. PARKWAY) TO SR 1002 (HOLLY SHELTER ROAD) AT CASTLE HAYNE AND ALONG SR 1002 TO I- 40. WIDEN TO MULTI-LANES. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. NEW HANOVER SR 1411 WRIGHTSVILLE AVENUE U-4733 COMPLETED SR 2313 (WILSHIRE BOULEVARD) TO FOREST HILLS DRIVE. INTERSECTION IMPROVEMENTS. NEW HANOVER US 76 OLEANDER DRIVE U-4903 COMPLETED SR 1209 (INDEPENDENCE BOULEVARD) TO SR 2817 (17TH STREET). MILL AND RESURFACE. NORTHAMPTON ROANOKE RAPIDS U-2419 DELETED NC 48 (ROANOKE AVENUE), NORTH OF JACKSON STREET IN HALIFAX COUNTY TO NC 46 IN GASTON IN NORTHAMPTON COUNTY. WIDEN TO MULTI-LANES. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. T-217

222 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION ONSLOW SWANSBORO E-4911 COMPLETED NC 24, MAIN STREET TO WHITE OAK MANOR APPARTMENTS. CONSTRUCT SIDEWALK ALONG SOUTHERN SIDE. ONSLOW JACKSONVILLE E-4916 COMPLETED INSTALLATION OF A CONCRETE MONOLITHIC ISLAND AND LIGHTGUARD (IN PAVEMENT LIGHTING SYSTEM) ON SR 1403 (HARGETT STREET). ONSLOW US 258 R-2235 DELETED NC 24 WEST OF RICHLANDS TO US 70 AT KINSTON. WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION ONSLOW NEW ROUTE R-4443 DELETED SR 1825 (CHARLES WOOD ROAD)- SR 1715 IN DUPLIN COUNTY TO SR 1245 (BRYAN ROAD)-SR 1209 IN ONSLOW COUNTY. TWO LANES ON NEW LOCATION. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. ONSLOW NC 53 BURGAW HIGHWAY R-5023A COMPLETED SR 1135 (MORNINGSIDE ROAD) TO SR 1116 (ONSLOW PINES ROAD). WIDEN TO THREE LANES AND ADD TWO FOOT PAVED SHOULDERS. ONSLOW SR1213 BLUE CREEK ROAD SF-4903A COMPLETED SOUTH OF SR 1241 (BLSKR ROAD). INSTALL GUARDRAIL. ONSLOW JACKSONVILLE U-4409 DELETED SR 1876 (HEMLOCK DRIVE) EXTENSION, SR 1406 (PINEY GREEN ROAD) TO CORBIN STREET. CONSTRUCT MULTI-LANE CONNECTOR AND UPGRADE EXISTING FACILITY. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION ONSLOW JACKSONVILLE U-4707 DELETED SR 1403 (COUNTRY CLUB ROAD), SR 1308 (BELL FORK ROAD) TO SR 1406 (PINEY GREEN ROAD). WIDEN TO MULTI-LANES WITH BICYCLE AND PEDESTRIAN ACCOMMODATIONS. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. ONSLOW JACKSONVILLE U-5106 DELETED NEW ROUTE, NORTHWEST LOOP, US 258-NC 24 TO US 17. FOUR- LANE DIVIDED FACILITY, PART ON NEW LOCATION AND ALONG EXISTING ROADWAY. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION ORANGE SR 1002 (SAINT MARY'S ROAD) B-4216 COMPLETED STROUDS CREEK. REPLACE BRIDGE NO. 66. ORANGE VARIOUS B-5191 COMPLETED BRIDGE EXPANSION JOINT REPAIRS AT SELECTED LOCATIONS. ORANGE TRIANGLE J COUNCIL OF GOVERNMENTS C-5102 DELETED TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. ORANGE CHAPEL HILL EB-4710 DELETED SEAWELL SCHOOL ROAD BICYCLE IMPROVEMENTS, HOMESTEAD ROAD TO ESTES DRIVE. PROJECT DELETED. FUNDS REALLOCATED TO EB ORANGE CHAPEL HILL EB-5110 DELETED BOLIN CREEK GREENWAY, NC 86 (MARTIN LUTHER KING, JR. BOULEVARD TO UMSTEAD PARK. PROJECT DELETED. TO BE ACCOMPLISHED UNDER U ORANGE CARRBORO EL-4994 DELETED BOLIN CREEK GREENWAY. PROJECT DELETED. TO BE ACCOMPLISHED UNDER U T-218

223 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION ORANGE CARRBORO CHAPEL HILL EL-4995 DELETED DRY CREEK GREENWAY. PROJECT DELETED AT REQUEST OF DURHAM / CHAPEL HILL / CARRBORO MPO. ORANGE CHAPEL HILL EL-5022 DELETED UPPER BOOKER CREEK GREENWAY. PROJECT DELETED. SCOPE TO BE REPRIORITIZED BY DURHAM / CHAPEL HILL / CARRBORO MPO. ORANGE I-40 I-4716 COMPLETED I-85 TO DURHAM COUNTY LINE. DIAMOND GRINDING, JOINT SEALING, SLAB REPAIR AND MARKING. ORANGE I-85 I-5138 COMPLETED I-40/85 SPLIT NEAR HILLSBOROUGH TO SR 1006 (ORANGE GROVE ROAD). MILL, RESURFACE AND OVERLAY. ORANGE SR 1146 MATTRESS FACTORY ROAD-WEST TEN ROAD R-2716 DELETED CONVERT GRADE SEPARATION TO AN INTERCHANGE WITH I- 40/85. ORANGE SR 1009 (SOUTH CHURTON STREET) R-2825 DELETED I-40 TO ENO RIVER. WIDEN TO MULTILANES AND WIDEN BRIDGE NO. 240 OVER SOUTHERN RAILROAD. (1.8 MILES) ORANGE NEW ROUTE R-3438 DELETED HILLSBOROUGH WESTERN BYPASS, US 70 TO NC 57. TWO LANES ON NEW LOCATION. (2.9 MILES) ORANGE VARIOUS R-5178 COMPLETED RESURFACING ON FEDERAL-AID ROUTES. ORANGE DURHAM/CHAPEL HILL R-5178A COMPLETED RESURFACING - NC 57, NC 86 TO (PEARSON ROAD). ORANGE US 70 / NC 751 SF-4907B COMPLETED INSTALL RIGHT TURN LANE ORANGE CARRBORO CHAPEL HILL U-2805 DELETED SR 1777 (HOMESTEAD ROAD), SR 1834 (HIGH SCHOOL ROAD) TO NC 86. WIDEN TO MULTI-LANES. (1.4 MILES) ORANGE DURHAM/CHAPEL HILL U-2807 DELETED US , SR 1010 (FRANKLIN STREET) IN CHAPEL HILL TO US BYPASS IN DURHAM. MAJOR CORRIDOR UPGRADE. (3.8 MILES) ORANGE CHAPEL HILL CARRBORO U-2909 DELETED SR 1780 (ESTES DRIVE), SR 1772 (GREENSBORO STREET) TO NC 86. WIDEN TO MULTI-LANES. (1.7 MILES) ORANGE CARRBORO U-3100B COMPLETED SR 1107 (OLD FAYETTEVILLE ROAD), NC 54 TO SR 1106 (STROUD LANE). PROVIDE BICYCLE AND PEDESTRIAN FACILITIES AND TRANSIT ACCOMMODATIONS. ORANGE HILLSBOROUGH U-3436 DELETED SR 1148 (ENO MOUNTAIN ROAD) AND SR 1192 (MAYO STREET) AT SR 1006 (ORANGE GROVE ROAD). REALIGN INTERSECTION AND MAKE SAFETY IMPROVEMENTS. ORANGE CARRBORO Z-4007B DELETED SR 1927 (BREWER ROAD) IN CARRBORO AT NORFOLK SOUTHERN RAILWAY CROSSING M. SAFETY IMPROVEMENTS. PROJECT CANCELED. PAMLICO NC 304 B-4594 COMPLETED CANAL. REPLACE BRIDGE NO. 44 PAMLICO NC 304 B-5129B COMPLETED VANDERMERE CREEK.. REPLACE BRIDGE NO. 31. T-219

224 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION PAMLICO NC 304 B-5129C COMPLETED LITTLE VANDERMERE CREEK. REPLACE BRIDGE NO. 35. PAMLICO NC 304 B-5129D COMPLETED BEAR CREEK. REPLACE BRIDGE NO. 40 PAMLICO NC 304 B-5129E COMPLETED GALE CREEK. REPLACE BRIDGE NO. 42 PASQUOTANK ELIZABETH CITY U-3420 DELETED SR 1309 (MAIN STREET) EXTENSION, PROPOSED US 17 BYPASS TO US 17 BYPASS (HUGHS BOULEVARD). UPGRADE ROADWAY, SOME NOW LOCATION WITH INTERCHANGE AT THE PROPOSED US 17 BYPASS. -PROJECT DELETED FY 11. SCHEDULED FOR PRIORITIZATION. PENDER NC 210 FS-0703A COMPLETED US 17 TO INTERCOASTAL WATERWAY AT SURF CITY. WIDEN TO MULTI-LANES. PENDER NC 53 R-3302 DELETED BURGAW BYPASS, NC 53 EAST OF SR 1120 (MALPASS CORNER) TO NC 53 WEST OF I-40. TWO LANES WITH PAVED SHOULDERS, SOME NEW LOCATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION PENDER SR 1644 EXTENSION R-3824 DELETED NC 210 TO SR 1569 (HOOVER ROAD). UPGRADE ROADWAY TO SECONDARY STANDARDS, SOME NEW LOCATION. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. PENDER NC 210 SF-4903E COMPLETED I-40 RAMP. INSTALL TRAFFIC SIGNAL. PERQUIMANS NC 37 B-5182 COMPLETED CULVERT NO. 6 OVER BURNT MILL CREEK. REPLACE CULVERT. PERQUIMANS US 17 R-4458 DELETED CONVERT AT-GRADE INTERSECTION AT SR 1300 (NEW HOPE ROAD) TO AN INTERCHANGE. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. PERQUIMANS US 17 R-4459 DELETED CONVERT AT-GRADE INTERSECTION AT SR 1336 (HARVEY POINT ROAD) AND SR 1338 (WAYNE FORK ROAD) TO AN INTERCHANGE. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. PERSON SR 1112 (LONG ROAD) B-4600 COMPLETED SOUTH FLAT RIVER. REPLACE BRIDGE NO. 43 PERSON US 501 R-3609 DELETED EAST ROXBORO BYPASS, US 501-NC 57 SOUTH OF US 158 TO NC 49. MULTI-LANES ON NEW LOCATION. PROJECT REMOVED FROM PERSON COUNTY COMPREHENSIVE TRANSPORTATION PLAN. PERSON VARIOUS R-5167 COMPLETED RESURFACING ON FEDERAL-AID ROUTES. PITT SR 1200 STANTONSBURG ROAD B-4233 COMPLETED PINELOG BRANCH. REPLACE BRIDGE NO. 65 PITT SR 1541 MASON SCHOOL ROAD B-4236 COMPLETED GRINDLE CREEK. REPLACE BRIDGE NO. 121 PITT SR 1723 AYDEN GOLF CLUB ROAD B-4237 COMPLETED FORK SWAMP. REPLACE BRIDGE NO. 25 PITT SR 1726 B-4238 COMPLETED HARDEE CREEK. REPLACE BRIDGE NO. 219 T-220

225 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION PITT SR 1711 WORTHINGTON ROAD B-4602 DELETED FORK SWAMP. REPLACE BRIDGE NO. 28. DELETE - TO BE ACCOMPLISHED UNDER W PITT US 258 R-3308 DELETED CRESCENT ROAD IN KINSTON IN LENOIR COUNTY TO US 64 AT TARBORO IN EDGECOMBE COUNTY. MULTI-LANES ON NEW LOCTION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION PITT GREENVILLE U-3430 DELETED US 264-NC 33 CONNECTOR. FOUR LANE DIVIDED FREEWAY ON NEW LOCATION WITH BRIDGE OVER TAR RIVER. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. PITT VARIOUS U-5161AA COMPLETED VARIOUS LOCATIONS IN PITT COUNTY. CONSTRUCT SIDEWALKS IN AYDEN. PITT VARIOUS U-5161AB COMPLETED VARIOUS LOCATIONS IN PITT COUNTY. CONSTRUCT SIDEWALKS IN ADEN. PITT VARIOUS U-5161BA COMPLETED VARIOUS LOCATIONS IN PITT COUNTY. CONSTRUCT SIDEWALKS IN GREENVILLE. PITT VARIOUS U-5161BB COMPLETED VARIOUS LOCATIONS IN PITT COUNTY. CONSTRUCT SIDEWALKS IN GREENVILLE. PITT VARIOUS U-5161CA COMPLETED VARIOUS LOCATIONS IN PITT COUNTY. CONSTRUCT SIDEWALKS IN WINTERVILLE.. PITT VARIOUS U-5161CB COMPLETED VARIOUS LOCATONS IN PITT COUNTY. CONSTRUCT SIDEWALKS IN WINTERVILLE. POLK SR 1102 B-4239 COMPLETED PACOLET RIVER. REPLACED BRIDGE NO. 2 POLK I-26 I-2800 DELETED SR 1722 (EXIT 22) IN HENDERSON COUNTY TO SR 1142 (EXIT 28) IN POLK COUNTY. PAVEMENT REHABILITATION. PROJECT NOT FUNDED IN DRAFT STIP. POLK COLUMBUS I-4729 DELETED I-26, US 74, NC 108 INTERCHANGE (EXIT 36) REVISIONS AND IMPROVEMENTS TO NC 108. PROJECT NOT FUNDED IN DRAFT STIP. POLK US 176 W-5005 COMPLETED SR 1831 IN HENDERSON COUNTY TO THE SOUTHERN INTERSECTION OF SR 1102 IN POLK COUNTY. INSTALL SHOULDER GUARDRAIL. POLK VARIOUS W-5214 COMPLETED DIVISION 14 RUMBLE STRIPS, GUARDRAIL AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. RANDOLPH US 220 FUTURE I-73 I-4921 DELETED SR 1462 (WEST PRESNELL STREET EXTENSION) IN ASHEBORO TO I-85 IN GREENSBORO. UPGRADE TO INTERSTATE STANDARDS. (23 MILES) RANDOLPH US 220 FUTURE I-73/74 I-5105 DELETED SOUTH OF SR 1138 (DAWSON-MILLER ROAD-US 220 BUSINESS) TO NORTH OF SR 2269 (VISION DRIVE). GEOMETRIC, OPERATIONAL, AND SAFETY IMPROVEMENTS. (10.1 MILES) RANDOLPH I-37/34 (US 220) K-3807 COMPLETED NEW PAIR OF REST AREAS ON I-73/74 CORRIDOR SOUTH OF ASHEBORO. T-221

226 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION RANDOLPH NC 49 R-2535 DELETED SR 1174 WEST OF FARMER TO PROPOSED ASHEBORO SOUTHERN BYPASS (R-2536) WEST OF SR WIDEN TO A FOUR LANE DIVIDED FACILITY. (9.7 MILES) RANDOLPH US AND I-85 BUSINESS R-2808B DELETED I-85 IN DAVIDSON COUNTY TO I-85 IN GUILFORD COUNTY. UPGRADE, SAFETY IMPROVEMENTS AND REPLACE BRIDGE NO. 74 AT SR 1627 (B- 2163). (31.1 MILES) RANDOLPH NC 49 R-3803 DELETED EAST LIBERTY BYPASS, NC 49 (FAYETTEVILLE STREET) AT SR 2427 (KINRO ROAD) TO NC 49 (SWANNANOA STREET). TWO LANES ON FOUR LANE RIGHT OF WAY, PART NEW LOCATION. (2 MILES) RANDOLPH NEW ROUTE R-4065 DELETED RANDLEMAN, SR 1950 (WEST ACADEMY STREET) TO US 311 NEAR SOPHIA. MULTILANE CONNECTOR ON NEW LOCATION. (1.3 MILES) RANDOLPH NC 22 R-5182 DELETED SR 2138 (MAC LINEBERRY ROAD)-SR 2445 (BENNY LINEBERRY ROAD). INTERSECTION IMPROVEMENT. PROJECT DELETED. UNFUNDED ARRA CANDIDATE. RANDOLPH US 64 SF-5108A COMPLETED I-85 IN DAVIDSON COUNTY TO SR 1424 (OTIS ROAD) IN RANDOLPH COUNTY. INSTALL RUMBLE STRIPS ON CENTERLINE AND SHOULDERS. RANDOLPH HIGH POINT U-2537 DELETED NORTH-SOUTH CONNECTOR, I-85 TO US 311 / FUTURE I-74. MULTI-LANES ON NEW LOCATION. (10.5 MILES) RANDOLPH HIGH POINT U-3432 DELETED SR 1595-SR 1216 (SURRETT DRIVE), EDEN TERRACE TO MARKET CENTER DRIVE. WIDEN TO MULTI-LANES. (1.5 MILES) RANDOLPH HIGH POINT U-3434 DELETED SR 1619 (PROSPECT STREET) AT I-85 BUSINESS-US REPLACE BRIDGE NO. 136 AND BRIDGE NO. R118, FORMERLY B RANDOLPH ASHEBORO U-5005 DELETED US 220 BUSINESS, PROPOSED US 64 SOUTHERN BYPASS TO NORTH TO US 64-NC 49. UPGRADE ROADWAY, ADDRESS INTERSECTIONS AND OTHER SAFETY ISSUES. (5 MILES) RICHMOND NC 73 B-4614 COMPLETED NAKED CREEK. REPLACE BRIDGE NO. 41 RICHMOND US 74 I-3801 DELETED US 74, ROCKINGHAM-HAMLET BYPASS TO LAURINBURG BYPASS. UPGRADE TO INTERSTATE STANDARDS. (9 MILES) RICHMOND I-73 I-4923 DELETED US 74/I-74 (FUTURE) TO SOUTH CAROLINA STATE LINE. FREEWAY ON NEW LOCATION. (5.1 MILES) RICHMOND SR 1005 R-2314 DELETED NC IN TROY TO US 74 AT ROCKINGHAM. UPGRADE ROADWAY (TWO LANES ONLY) WITH MINOR RELOCATIONS. (32.5 MILES) RICHMOND US 74 R-4441 DELETED MONROE BYPASS (R-2559) TO ROCKINGHAM BYPASS (R-0512). UPGRADE TO FREEWAY STANDARDS WITH BYPASS OF WADESBORO. PROJECT WAS NOT FUNDED IN DRAFT STIP. T-222

227 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION RICHMOND PEE DEE WILDLIFE REFUGE R-5107 COMPLETED PED-10(1). REHABILITATE REFUGE ROAD AND PARKING AREA. RICHMOND HAMLET U-3807 DELETED NEW ROUTE, SR 1909 (HYLAN AVENUE) TO US 74. TWO LANES ON NEW LOCATION. (0.5 MILE) RICHMOND ROCKINGHAM U-3818 DELETED NEW CONNECTOR, SR 1903 (MILL ROAD) TO SR 1426 (ABERDEEN ROAD). CONSTRUCT TWO LANES UTILIZING SECTIONS OF SR 1923 (BROAD STREET), SR 1641 (CLEMMER ROAD) AND SR 1645 (MT. OLIVE CHURCH ROAD), REMAINDER ON NEW LOCATION. (4.1 MILES) RICHMOND ROCKINGHAM U-5010 DELETED US 1, SOUTH OF SR 1108 TO US 74 (FUTURE I-74). WIDEN TO MULTILANES. (0.7 MILE) ROBESON I-95 B-5021 COMPLETED SR 1726 (BR#162), SR 1723 (BR#167), SR 1718 (BR#169), US 301 (BR#100&54) AND SR 1529 (BR#151). ELEVATE STRUCTURES TO PROVIDE 16 FEET MINIMUM ROADWAY CLEARANCE. ROBESON LUMBERTON E-4120 COMPLETED PHASE A: MULTI-USE TRAIL ALONG JACOB SWAMP DIKE. PHASE B: EXTENSION OF MULTI-USE TRAIL ALONG JACOBS SWAMP DIKE, EAST SECOND STREET TO CHESTNUT STREET. ROBESON MAXTON E-4533 DELETED NC 71 (NORTH PATTERSON STREET), US 74 BUSINESS (DR. MARTIN LUTHER KING JR. DRIVE) AND CENTRAL STREET. STREETSCAPING. FUNDING REMOVED FROM PROJECT. ROBESON PARKTON E-4932 COMPLETED PHASE I: RESTORATION OF THE HISTORIC ATLANTIC COAST LINE RAILWAY DEPOT. ROBESON LUMBERTON FS-0806A COMPLETED SR 1997 (FAYETTEVILLE ROAD), 23RD STREET TO FARRINGDON STREET. ROBESON I-95 i-3806 DELETED US 74 (EXIT 14) TO US 301-SR 1997 (EXIT 22). WIDEN TO SIX LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION ROBESON NC 211 R-2593 DELETED RED SPRINGS BYPASS, NC71 AT SR 1321 (MCGINNIS ROAD) TO NC TWO LANES ON MULTI-LANE RIGHT OF WAY, PART ON NEW LOCATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION ROBESON NC 711 R-4428 DELETED PEMBROKE, SR 1340 (ODOM STREET-PHILADELPHUS ROAD) TO SR 1557 (REDMOND ROAD). WIDEN TO MULTI-LANES. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. ROBESON SR 1556 NORMAL STREET R-4907 DELETED PEMBROKE, NC 711 TO SR 1339 (DEEP BRANCH ROAD). WIDEN TO INCLUCE CURB AND GUTTER AND SIDEWALK. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. ROBESON US 301 R-5019 COMPLETED US 301, ROBESON COMMUNITY COLEGE TO NORTH OF SR 1752 (RENNERT ROAD) AND SR 1765 (ROZIER ROAD). WIDEN TO THREE LANES. ROBESON LUMBERTON U-3814 DELETED SOUTHERN LOOP, SR 2501 (STARLITE DRIVE EXTENSION), NC 41 (M. L. KING DRIVE) TO SR 2202 (HESTERTOWN ROAD). TWO LANES ON MULTI-LANE RIGHT OF WAY, NEW LOCATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION T-223

228 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION ROCKINGHAM SR 2192 B-4625 COMPLETED MASSY CREEK - REPLACE BRIDGE NO ROCKINGHAM VARIOUS B-5192 COMPLETED BRIDGE EXPANSION JOINT REPAIRS AT SELECTED LOCATIONS. ROCKINGHAM US 220 K-4404 DELETED NEW REST AREA/WELCOME CENTER ON FUTURE I-73 CORRIDOR NEAR VIRGINIA STATE LINE. ROCKINGHAM NC 87 R-2560 DELETED SR 1547 IN ALAMANCE COUNTY TO US 29 IN REIDSVILLE. WIDEN TO MULTI-LANES. (19.1 MILES) ROCKINGHAM NC R-3414 DELETED WEST OF SR 2371 (OLD COUNTY HOME ROAD) AT WENTWORTH TO US BUSINESS (FREEWAY DRIVE) IN REIDSVILLE. UPGRADE EXISTING ROADWAY. (5.5 MILES) ROCKINGHAM NC R-4402 DELETED NC (MEADOW ROAD) IN EDEN TO THE VIRGINIA STATE LINE. WIDEN TO MULTI-LANES. (5.5 MILES) ROCKINGHAM MAYODAN R-5015 DELETED US / NC 135 INTERCHANGE. WIDEN BRIDGE ON US 311/NC 135 OVER US 220 AND UPGRADE INTERCHANGE. ROCKINGHAM US 29 R-5138 COMPLETED GUILFORD COUNTY LINE TO TROUBLESOME CREEK. CONCRETE REHABILITATION AND SHOULDER RECONSTRUCTION. ROWAN SR 1003 (COOL SPRINGS ROAD) B-4627 COMPLETED THIRD CREEK. REPLACE BRIDGE NO. 26 ROWAN SALISBURY B-5193 DELETED EAST BANK STREET. REPAIRS TO BRIDGE NO. 394 OVER NORFOLK SOUTHERN RAILWAY. UNFUNDED ARRA CANDIDATE. ROWAN SR 2114 (CORRELL STREET) B-5221 COMPLETED TOWN CREEK. REPLACE BRIDGE NO. 95. ROWAN SR 1506 (SHUE ROAD) B-5222 COMPLETED GRANT'S CREEK. REPLACE BRIDGE NO ROWAN SALISBURY C-4907 DELETED TRAFFIC SIGNAL SYSTEM. IMPROVE OPERATION AND UPGRADE EQUIPMENT. PROJECT DELETED. TO BE ACCOMPLISHED UNDER C ROWAN SALISBURY EB-4713 DELETED KELSEY-SCOTT PARK, CATAWBA COLLEGE GREENWAY CONNECTOR. PROJECT DELETED AT REQUEST OF DIVISION OF BICYCLE AND PEDESTRIAN TRANSPORTATION. ROWAN SALISBURY EB-5122 DELETED RAIL WALK STREETSCAPE IMPROVEMENTS. PROJECT DELETED. UNFUNDED ARRA CANDIDATE. ROWAN I-85 I-3804 DELETED SR 1221 (OLD BEATTY FORD ROAD). CONSTRUCT AN INTERCHANGE. ROWAN US 52 R-2903 DELETED MULTI-LANES SOUTH OF NC 49 AT RICHFIELD TO I-85 NORTH OF SALISBURY. FOUR LANES DIVIDED ON NEW LOCATION. (COORDINATE WITH I-2511). PROJECT WAS NOT FUNDED IN DRAFT STIP. ROWAN NC 152 R-4062 DELETED I-85/US 601 INTERCHANGE TO RELOCATED US 52 (R-2903) NEAR ROCKWELL. UPGRADE FACILITY. (9.2 MILES) T-224

229 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION ROWAN US 29 SF-4909A COMPLETED INTERSECTION WITH SR 2539 (PEACH ORCHARD ROAD). CONSTRUCT RIGHT TURN LANE. ROWAN SR 1221 (OLD BEATTY FORD ROAD) SF-4909D COMPLETED INTERSECTION WITH SR 1002 (OLD CONCORD ROAD). IMPROVE SIGHT DISTANCE. ROWAN SALISBURY U-3460 DELETED SR 1002 (BRINGLE FERRY ROAD)-US (MAIN STREET). WIDEN TO MULTI-LANES, GRADE SEPARATION OVER NORTH CAROLINA AND NORFOLK SOUTHERN RAILROADS AND AN ACCESS ROAD TO LONG STREET. (0.8 MILE) ROWAN SALISBURY U-3623 DELETED NC 150, SR 1516 TO WEST OF GRANTS CREEK. WIDEN TO MULTI-LANES. (3 MILES) ROWAN SALISBURY U-3821 DELETED JAKE ALEXANDER BOULEVARD AT HARRISON ROAD TO PEACH ORCHARD ROAD AT I-85. TWO LANES ON MULTILANE RIGHT OF WAY, NEW LOCATION. (7.7 MILES) ROWAN SPENCER U-3822 DELETED SR 2120 (LONG FERRY ROAD), GRADE SEPARATION AT SOUTHERN RAILWAY. ROWAN LANDIS U-4416 DELETED CONSTRUCT GRADE SEPARATION AT RICE STREET OVER PIEDMONT HIGH SPEED RAIL CORRIDOR. ROWAN LANDIS U-5120 DELETED EXTENSION OF SR 1211 (KIMBALL ROAD), SOUTH OF US ON SR 1221 (BOSTIAN ROAD) TO NORTH OF SR 2739 (NORTH MAIN STREET). CONSTRUCT CONNECTOR ON NEW LOCATION. (0.8 MILE) RUTHERFORD SR 2215 B-4634 DELETED FLOYDS CREEK. REPLACE BRIDGE NO RUTHERFORD LAKE LURE E-4819 COMPLETED PHASE A: CONSTRUCT A PEDESTRIAN SYSTEM UTILIZING ASPHALT PATHS AND CONCRETE SIDEWALKS PARALLEL TO US 64-74A (MEMORIAL HIGHWAY). RUTHERFORD SR 1006 R-2618 DELETED BOSTIC, SR 1006 (MAIN STREET). RAILROAD GRADE SEPARATION AT CSX TRANSPORTATION CROSSING R. PROJECT NOT FUNDED IN DRAFT STIP. RUTHERFORD RUTHERFORDTON U-3458 DELETED US INTERCHANGE RECONSTRUCTION. REPLACE BRIDGE NO (FORMERLY B-3040). PROJECT NOT FUNDED IN DRAFT STIP. RUTHERFORD FOREST CITY U-5159 COMPLETED SR 2169 AT SR REALIGH INTERSECTION. SAMPSON NC 403 R-2815 DELETED US 117 TO FAISON CITY LIMITS. WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION SAMPSON US 701 R-2819 DELETED SOUTH OF US 701 BUSINESS TO I-40. WIDEN TO MULTI- LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION SAMPSON US 701 R-2820 DELETED I-40 TO NEWTON GROVE. WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION SAMPSON US 701 BUSINESS R-2821 DELETED NC 24 RELOCATION TO SR WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION T-225

230 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION SAMPSON NEW ROUTE R-4456 COMPLETED NC TO THE PROPOSED NC 24 (R-2303) IN ROSEBORO. TWO LANES ON NEW LOCATION. SCOTLAND US 74 I-3801 DELETED US 74, ROCKINGHAM-HAMLET BYPASS TO LAURINBURG BYPASS. UPGRADE TO INTERSTATE STANDARDS. (9 MILES) SCOTLAND I-73 I-4923 DELETED US 74/I-74 (FUTURE) TO SOUTH CAROLINA STATE LINE. FREEWAY ON NEW LOCATION. (5.1 MILES) SCOTLAND I-73 K-3808 DELETED NEW REST AREA-WELCOME CENTER BETWEEN SOUTH CAROLINA STATE LINE AND ROCKINGHAM. SCOTLAND US R-2508 DELETED SOUTH CAROLINA STATE LINE TO SOUTH OF SR 1105 (TURNPIKE ROAD). WIDEN TO MULTI- LANES. (3.5 MILES) SCOTLAND US 401 R-3333 DELETED US 401 BUSINESS NORTH OF LAURINBURG TO US 401 BUSINESS EAST OF RAEFORD. WIDEN TO MULTI-LANES. (20.7 MILES) SCOTLAND SR 1435 R-3334 DELETED US 74, CONSTRUCT GRADE SEPARATION. STANLY SR 1968 B-3909 COMPLETED LONG CREEK. REPLACED BRIDGE NO. 99 STANLY NC 73 B-4276 COMPLETED LONG CREEK. REPLACED BRIDGE NO. 33 STANLY ALBEMARLE E-4129 DELETED SNYDER GREENWAY. DON MONTGOMERY MEMORIAL PARK TO NORTH SIDE OF WEST MAIN STREET WEST OF MARKET STATION. CONSTRUCT GREENWAY. PROJECT NOT FUNDED IN DRAFT STIP. STANLY OAKBORO E-4561 COMPLETED DEVELOPMENT OF THE OAKBORO RAILROAD MUSEUM AND ITS SETTINGS. STANLY NC R-0967 COMPLETED WEST CITY LIMITS OF LOCUST TO SR 1963 (ST. MARTIN ROAD) IN ALBEMARLE. WIDEN TO FOUR LANES. FINAL SEGMENT R- 967CC COMPLETE. STANLY NC 73 R-2410 DELETED WEST OF SR 2408 IN CONCORD TO ALBEMARLE. UPGRADE TWO LANE ROADWAY. PROJECT WAS NOT FUNDED IN DRAFT STIP. STANLY US 52 R-2903 DELETED MULTI-LANES SOUTH OF NC 49 AT RICHFIELD TO I-85 NORTH OF SALISBURY. FOUR LANES DIVIDED ON NEW LOCATION. (COORDINATE WITH I-2511). PROJECT WAS NOT FUNDED IN DRAFT STIP. STANLY NC 24-27, NC 200, NC 205 AND NC 704 R-5194 COMPLETED NC 24-27, BIRD ST TO NC 740 IN ALBEMARLE; NC 200, UNION CO TO SR 1121; NC 205, UNION CO TO SR 1102; NC 704, SR 1730 TO ISLAND AND US 52, N. CITY LIMITS OF ALBEMARLE TO SR 1214 AND S. OF SR 494 (W. MAIN ST) TO N. MONOLITHIC ISLAND. PAVEMENT REHABILITATION. STATEWIDE VARIOUS EB-4012 DELETED NORTH CAROLINA BICYCLING HIGHWAYS NO. 10 (SANDHILLS SECTOR): MAPPING AND SIGNING. TO BE ACCOMPLISHED BY DIFFERENT STIP PROJECT. T-226

231 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION STATEWIDE VARIOUS P-4701 COMPLETED CAPACITY AND TRAVEL TIME IMPROVEMENTS TO FREIGHT AND PASSENGER RAIL CORRIDORS, NEW EQUIPMENT AND MATCH FOR FEDERAL FUNDS. RESTORED DOUBLE TRACK FROM COX TO HOSKINS. STOKES US 52, FUTURE I-74 I-4404 DELETED NC 65 IN WINSTON-SALEM TO I-74 IN SURRY COUNTY. UPGRADE TO INTERSTATE STANDARDS. PROJECT WAS NOT FUNDED IN DRAFT STIP. STOKES NEW ROUTE R-3823 DELETED US 52 TO US 311. TWO LANES UTILIZING EXISTING SECONDARY ROADS WHERE POSSIBLE, SOME NEW LOCATION. (15 MILES) STOKES KING U-5313 DELETED US 52 AND SR 1106 (TRINITY CHURCH ROAD). CONSTRUCT INTERCHANGE. SURRY SR 1602, SR 1649 B-5185 COMPLETED PAINT BRIDGE GIRDERS ON BRIDGE NO. 210 ON SR 1396, BRIDGE NO. 211 ON SR 1602 AND BRIDGE NO. 214 ON SR ALL STRUCTURES ARE OVER I-77. SURRY I-77 B-5186 COMPLETED BRIDGE NO. 87, 120, 147, 167, 168, 187, 198, 204, 208, 210, 211, AND 214 ON I-77 FROM NC 268 TO VIRGINA STATE LINE. SURRY I-77 B-5187 COMPLETED BRIDGE NO. 87, 120, 147, 167, 168, 187, 198, 204, 208, 210, 211, AND 214 ON I-77 FROM NC 268 TO VIRGINA STATE LINE. SURRY ELKIN E-4804 DELETED IMPROVEMENTS TO ELKIN GREENWAY INCLUDING THREE BRIDGES AND PAVING OF GREENWAY. SURRY ELKIN E-4956 COMPLETED WORLD WAR II VETERANS MEMORIAL FOOT BRIDGE OVER BIG ELKIN CREEK BETWEEN FRONT STREET AND MEMORIAL PARK DRIVE. REHABILITATE BRIDGE. SURRY I-77 I-2807 DELETED US 21 BYPASS (EXIT 83) TO VIRGINIA STATE LINE. PAVEMENT AND BRIDGE REHABILITATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. SURRY US 52, FUTURE I-74 I-4404 DELETED NC 65 IN WINSTON-SALEM TO I-74 IN SURRY COUNTY. UPGRADE TO INTERSTATE STANDARDS. PROJECT WAS NOT FUNDED IN DRAFT STIP. SURRY I-77 I-5101 DELETED I-74 (EXIT 101) TO VIRGINIA STATE LINE (MILE MARKER 106). PAVEMENT REHABILITATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. SURRY I-77 I-5102 DELETED MILE MARKER 91 TO MILE POSE 95. PAVEMENT REHABILITATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. SURRY I-77 I-5103 COMPLETED I-77, US 21 (EXIT 79) TO MILE MARKER 84. PAVEMENT REHABILITATION. SURRY I-77 I-5130 COMPLETED I-77, MILE MARKER 88.4 TO MILE MARKER 90. PAVEMENT REHABILITATION. SURRY I-77 K-4702 DELETED MT. AIRY MUNICIPAL SYSTEM, PROVIDE WATER AND SEWER SERVICE TO THE WELCOME CENTER. PROJECT DELETED FROM STIP - SEGMENT A COMPLETE AND SEGMENT B WAS NOT FUNDED. T-227

232 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION SURRY NC 268 BYPASS R-2640 DELETED PILOT MOUNTAIN, SOUTH KEY STREET TO OLD US 52. TWO LANES ON MULTI-LANE RIGHT OF WAY, NEW LOCATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. SURRY NC 268 R-3423 DELETED EAST OF VENEER STREET IN ELKIN TO SR 2048 (SHOALS ROAD)/SR 2099 (BARNEY VENABLE ROAD) IN PILOT MOUNTAIN. UPGRADE ROADWAY AND PROVIDE TURN LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. SURRY NC 268 R-3605 DELETED PILOT MOUNTAIN, KEY STREET TO SR 2048 (SHOALS ROAD). WIDEN TO MULTI-LANES WITH CURB AND GUTTER. PROJECT WAS NOT FUNDED IN DRAFT STIP. SURRY ELKIN, JONESVILLE R-5101 DELETED CONSTRUCT NEW CROSSING OF YADKIN RIVER. PROJECT WAS NOT FUNDED IN DRAFT STIP. SURRY US 52 R-5155 COMPLETED US 52, STOKES COUNTY LINE TO SR 1815 (COOKE SCHOOL ROAD). PAVEMENT REHABILITATION. SURRY NC 268 SF-4911B COMPLETED NC 268, SR 2048 (SHOAL ROAD) TO US 52 RAMPS. CONSTRUCT CENTER TURN LANE, INSTALL TRAFFIC SIGNAL AND REVISE TRAFFIC SIGNAL. SURRY US 52 BYPASS SF-4911F COMPLETED US 52 BYPASS AT SR 1722 (OLD BUCK SHOALS ROAD). CONSTRUCT LIMITED MOVEMENT CROSS-OVER. SURRY MOUNT AIRY U-2553 DELETED SOUTH STREET, US 601 (ROCKFORD STREET) TO US 52 BUSINESS (WEST LEBANON STREET). WIDEN TO MULTI-LANES AND IMPROVE INTERSECTIONS AT WORTH AND GRACE STREETS. PROJECT WAS NOT FUNDED IN DRAFT STIP. SWAIN US BUS. B-4696 COMPLETED OCONALUFTEE RIVER. REPLACE BRIDGE NO. 24 SWAIN US 19 E-4825 COMPLETED NANTAHALA NATIONAL FOREST. UPGRADE PULL-OFF AT TEN SITES (SITES 2, 3, 4, 6, 7, 8, 9, 11,13 AND 14) IN THE NANTAHALA GORGE. SWAIN BRYSON CITY E-4972 COMPLETED DEPOT STREET, EVERTT STREET TO COLLINS STREET. STREETSCAPING. SWAIN US 23, US 74, IS CONNECTOR R-4412 COMPLETED NATIONAL HIGHWAY SYSTEM GUARDRAIL REHABILITATION. UPGRADE SUB-STANDING GUARDRAIL, END TREATMENTS AND BRIDGE ANCHOR UNITS. SWAIN QUALLA BOUNDARY R-4715 COMPLETED OLLIE JUMPER ROAD. RECONSTRUCTION. SWAIN GREAT SMOKY MOUNTAINS NATIONAL PARK R-4730 COMPLETED PHASE A - PRA-GRSM 1B17, REHABILITATE NEWFOUND GAP ROAD. PHASE B - PRA-GRSM 1B19, REHABILITATE NEWFOUND GAP ROAD. SWAIN US 19 R-4751 DELETED SR 1152 (HUGHES BRANCH ROAD) IN BRYSON CITY TO US 441 NORTH IN CHEROKEE. UPGRADE ROADWAY. PROJECT NOT FUNDED IN DRAFT STIP. SWAIN QUALLA BOUNDARY R-5006 DELETED RAMSSEY WALKINGSTICK OVERLAY. INCLUDED IN R SWAIN QUALLA BOUNDARY R-5008 DELETED S ELSIE RATTLER ROAD. RECONSTRUCTION. PROJECT DROPPED. T-228

233 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION SWAIN BLUE RIDGE PARKWAY R-5111 COMPLETED PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. SWAIN US 74 R-5145 COMPLETED US 74, SR 1159 TO JACKSON COUNTY LINE. PAVEMENT REHABILITATION. SWAIN GREAT SMOKY MOUNTAINS NATIONAL PARK R-5212 DELETED GREAT SMOKY MOUNTAINS NATIONAL PARK, RESURFACE SMOKEMENT DEVELOPED AREA. PROJECT DROPPED. SWAIN GREAT SMOKY MOUNTAINS NATIONAL PARK R-5213 DELETED GREAT SMOKY MOUNTAINS NATIONAL PARK. RESURFACE HEINTOOGA RIDGE ROAD AND BALSAM MOUNTAIN CAMPGROUND. SWAIN GREAT SMOKY MOUNTAINS NATIONAL PARK R-5214 DELETED GREAT SMOKY MOUNTAINS NATIONAL PARK. RESURFACE CLINGMANS DOME ROAD IN SWAIN COUNTY AND SEVIER TENNESSEE. PROJECT DROPPED. SWAIN VARIOUS W-5214 COMPLETED DIVISION 14 RUMBLE STRIPS, GUARDRAIL AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. TRANSYLVANIA BREVARD E-4143 COMPLETED PHASE B- TRAIL TO PISGAH NATIONAL FOREST, INTERSECTION OF STRAUS PARKWAY-US 64 TO INTERSECTION OF MORRIS ROAD-ECUSTA ROAD AND INTERSECTION OF ATRAUS PARKWAY-US 64 TO INTERSECTION OF CALDWELL AND BROAD STREET. TRANSYLVANIA BLUE RIDGE PARKWAY R-5111 COMPLETED PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. TRANSYLVANIA NC 215 W-5120 COMPLETED US 64 TO HAYWOOD COUNTY LINE. INSTALL AND REVISE GUARDRAIL. TRANSYLVANIA VARIOUS W-5214 COMPLETED DIVISION 14 RUMBLE STRIPS, GUARDRAIL AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. TYRRELL US 64 K-4902 COMPLETED REST AREA RENOVATION AND REPAIR. UNION SR 2102 B-5120 DELETED LITTLE RICHARDSON CREEK. REPLACE BRIDGE NO DELETED PER DIVISION. UNION WINGATE E-4798 COMPLETED US 74 STREETSCAPING, BEGINS DRIVE TO CAMDEN STREET. PROVIDES ACCESS BETWEEN WINGATE UNIVERSITY AND DOWNTOWN. UNION MONROE FS-0210A COMPLETED SR 1349 (AIRPORT ROAD), NC 84 (WEDDINGTON ROAD) TO SR 1162 (GOLDMINE ROAD). UPGRADE ROADWAY, SOME NEW LOCATION. FS-0210A - FEASIBILITY STUDY COMPLETE - PROJECT NOT FUNDED AND REMOVED FROM STIP. UNION NC 16 R-3802 DELETED REA ROAD EXTENSION IN WEDDINGTON TO NC 75 IN WAXHAW. WIDEN TO MULTI-LANES ALONG EXISTING ALIGNMENT. PROJECT WAS NOT FUNDED IN DRAFT STIP. UNION US 74 R-4441 DELETED MONROE BYPASS (R-2559) TO ROCKINGHAM BYPASS (R-0512). UPGRADE TO FREEWAY STANDARDS WITH BYPASS OF WADESBORO. PROJECT WAS NOT FUNDED IN DRAFT STIP. T-229

234 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION UNION MONROE U-0213 DELETED CHARLOTTE AVENUE, RAILROAD TO CONCORD AVENUE. WIDEN TO MULTI-LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. UNION CHARLOTTE U-2510A COMPLETED NC 16 (PROVIDENCE ROAD), REA ROAD EXTENSION IN UNION COUNTY TO SOUTH OF THE CHARLOTTE OUTER LOOP IN MECKLENBURG COUNTY. WIDEN TO MULTI-LANES. UNION MONROE U-2547 DELETED SR 2188 (CHARLES STREET), SR 2181 (SUNSET DRIVE) TO SR 2100 (FRANKLIN STREET). WIDEN TO MULTI-LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. UNION MONROE U-2549 DELETED MONROE NORTHERN LOOP, US 74 TO SR 1751 (WALKUP AVENUE) AT SR 1763 (BIVENS ROAD). TWO LANES ON FOUR LANE RIGHT OF WAY. PROJECT WAS NOT FUNDED IN DRAFT STIP. UNION MONROE U-3412 COMPLETED SR 1223 (MARTIN LUTHER KING JR. BOULEVARD), NC 200 (LANCASTER AVENUE) TO SR 1009 (CHARLOTTE AVENUE). TWO LANES ON MULTI-LANE RIGHT OF WAY, NEW LOCATION. UNION MONROE U-3619 DELETED SECREST AVENUE EXTENSION, SR 1751(WALKUP AVENUE) TO SR 1006 (OLIVE BRANCH ROAD). MULTI-LANES ON NEW LOCATION WITH INTERCHANGE AT PROPOSED MONROE BYPASS (R.-2559). PROJECT WAS NOT FUNDED IN DRAFT STIP. UNION INDIAN TRAIL U-3809 DELETED SR 1008 (INDIAN TRAIL ROAD), SR 1009 (OLD CHARLOTTE HIGHWAY) TO US 74. WIDEN TO MULIT-LANES. (INCLUDES B- 3520). DELETED FROM STIP - PROJECT NOT SUPPORTED BY LOCAL GOVERNMENTS. UNION STALLINGS U-3825 DELETED SR 1365 (STALLINGS ROAD), SR 1009 (OLD CHARLOTTE HIGHWAY) TO US 74. WIDEN TO MULTI-LANES. (COORDINATE WITH R-3329). PROJECT DELETED FROM STIP - PROJECT NOT SUPPORTED BY LOCAL GOVERNMENTS. UNION MONROE U-4024 DELETED US 601, US 74 TO THE PROPOSED MONROE BYPASS (R-2559). WIDEN TO MULTI-LANES AND CONSTRUCT IMPROVEMENTS TO THE EXITING US 74/US 601 INTERCHANGE. PROJECT WAS NOT FUNDED IN DRAFT STIP. UNION WAXHAW U-5135 COMPLETED NC 16 AND NC 75. INTERSECTION IMPROVEMENTS. UNION NC 84 U-5310 DELETED NC 16 (PROVIDENCE ROAD) TO SR 1349 (AIRPORT ROAD). WIDEN TO MULTI-LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. UNION NC 218 AND NC 200 W-5012 COMPLETED CONSTRUCT INTERSECTION IMPROVEMENTS. VANCE SR 1110 (WATKINS ROAD) B-5213 COMPLETED TABBS CREEK. REPLACE BRIDGE NO. 5 VANCE I-85 I-3812 DELETED US 1 INTERCHANGE. PROVIDE ADDITIONAL TRAFFIC MOVEMENTS. VANCE I-85 I-5141 COMPLETED NORTH OF NC 56 (MILE POST 191) TO VANCE COUNTY LINE. DIAMOND GRINDING, RESEALING JOINTS AND INSTALL PAVEMENT MARKERS. VANCE US 1 BUSINESS R-2503 DELETED SR 1548 (PETER GILL ROAD) TO SR 1267 (DABNEY DRIVE). WIDEN TO MULTI-LANES WITH CURB AND GUTTER. (4.2 MILES) T-230

235 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION VANCE VARIOUS R-5168 COMPLETED RESURFACING ON FEDERAL-AID ROUTES VANCE HENDERSON U-3836 DELETED NEW ROUTE, SR 1126 (POPLAR CREEK ROAD) TO SR 1128 (RUIN CREEK ROAD). TWO LANE SERVICE ROAD ON NEW LOCATION. (2.5 MILES) VANCE SR 1437 (I-85 CONNECTOR) W-5126 COMPLETED US 158 NORTHWARD TO I-85. INSTALL MEDIAN BARRIER. WAKE SR 1300 (KILDAIRE FARM ROAD) B-3523 COMPLETED SWIFT CREEK. REPLACE BRIDGE NO. 525 WAKE SR 1301 (SUNSET LAKE ROAD) B-4302 COMPLETED TERRIBLE CREEK. REPLACE BRIDGE NO WAKE TRIANGLE J COUNCIL OF GOVERNMENTS C-5102 DELETED TRIANGLE TRANSPORTATION DEMAND MANAGEMENT PROGRAM SERVICES FOR EMPLOYERS AND ORGANIZATIONS IN THE TRIANGLE OZONE NON-ATTAINMENT REGION. MARKETING AND OUTREACH. WAKE APEX C-5162 DELETED SR 1435 (OLD RALEIGH ROAD). CONSTRUCT SIDEWALKS ON NORTH SIDE, APEAX PEAKWAY TO US 64 AND ALONG WEST SIDE OF SHEPHERDS VINEYARD DRIVE, OLD RALEIGH ROAD TO US 64. TO BE COMPLETED UNDER EL-5100DA. WAKE RALEIGH E-4927 COMPLETED NORTH CAROLINA STATE CAPITOL FOUNDATION. PHASE I: PROVIDE HANDICAP ACCESSIBILITY ALONG THE SOUTHEAST GROUNDS OF THE STATE CAPITOL BUILDING (FAYETTEVILLE STREET AT MORGAN STREET TO THE CAPITOL). WAKE KNIGHTDALE EB-5003 DELETED BEAVERDAM CREEK GREENWAY. PROJECT DECLINED BY TOWN. WAKE NC 55 R-2540 DELETED US 421 TO US 401. UPGRADE EXISTING ROADWAY. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION WAKE NC 98 R-2809 COMPLETED WAKE FOREST BYPASS, WEST OF SR 1923 (THOMSON MILL ROAD) TO EAST OF SR 2053 (JONES DAIRY ROAD). MULTI- LANES ON NEW LOCATION. WAKE US 1A R-3600 DELETED WAKE FOREST, US 1 (CAPITAL BOULEVARD) TO NC 98 BYPASS. WIDEN TO MULTI-LANES. PROJECT DELETED. PART COMPLETED BY DIVISION AND TOWN OF WAKE FOREST. REMAINDER SCHEDULED FOR REPRIORITIZATION. WAKE US 264 R-5123 COMPLETED US 64 TO NASH COUNTY LINE. RESURFACING. WAKE RALEIGH U-0515E DELETED US 70, SR 2026 (HAMMOND ROAD)-SR 2812 (TIMBER DRIVE). CONSTRUCT AN INTERCHANGE. WAKE RALEIGH U-2918 DELETED SR 1837 (WESTGATE ROAD), EAST OF US 70 TO SR 1822 (LEESVILLE ROAD). WIDEN TO MULTI-LANES. (2.8 MILES) WAKE RALEIGH U-3111 DELETED TRYON ROAD EXTENSION, SR 1004 (OLD GARNER ROAD) TO SR 2542 (ROCK QUARRY ROAD). MULTILANES ON NEW LOCATION. (2.9 MILES) T-231

236 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION WAKE MORRISVILLE U-3343 DELETED SR 1002 (AVIATION PARKWAY), NC 54 TO I-40. WIDEN TO MULTI- LANES. (2.6 MILES) WAKE KNIGHTDALE U-3441 DELETED SR 2233 (NORTH SMITHFIELD ROAD), CARRINGTON DRIVE TO SR 2049 (FORESTVILLE ROAD). WIDEN TO MULTI-LANES. (1 MILE) WAKE GARNER U-3607 DELETED NEW RAND ROAD, TIMBER DRIVE TO US 70. WIDEN TO THREE LANES. (1.1 MILES) WAKE MORRISVILLE U-3620 DELETED MCCRIMMON PARKWAY, NC 54 TO AIRPORT BOULEVARD. EXTEND ROADWAY AS A MULTI-LANE CURB AND GUTTER FACILITY. (0.4 MILE) WAKE RALEIGH U-3817 DELETED EDWARDS MILL ROAD EXTENSION, NC 54 TO WESTERN BOULEVARD. MULTI-LANE ON NEW LOCATION. (0.7 MILE) WAKE RESEARCH TRIANGLE PARK U-4026 COMPLETED SR 1613-SR 1999 (DAVIS DRIVE), SR 3014 (MORRISVILLE- CARPENTER ROAD) IN WAKE COUNTY TO NC 54 IN DURHAM COUNTY. WIDEN TO MULTI-LANES. WAKE RALEIGH U-4417 DELETED SR 1321 (AVENT FERRY ROAD)-SR 1012 (WESTERN BOULEVARD), MONORAIL ACCOMMODATIONS. EVALUATE INTERCHANGE AND GRADE SEPARATION. (0.1 MILE) WAKE RESEARCH TRIANGLE PARK U-4763A DELETED WAKE HOLLY SPRINGS U-5024 COMPLETED NEW ROUTE - GREEN OAKS PARKWAY, SR 1152 (HOLLY SPRINGS-NEW HILL ROAD) TO NC 55 (HOLLY SPRINGS BYPASS). MULTI-LANES ON NEW LOCATION. WAKE SR 3097 (AVIATION PARKWAY) W-5127 COMPLETED SOUTH OF SR 1644 (GLOBE ROAD). INSTALL MEDIAN BARRIER. WAKE I-40 W-5128 COMPLETED I-440 TO SR 2547 (JONES SAUSAGE ROAD). INSTALL MEDIAN BARRIER. WAKE APEX Y-2940A COMPLETED EAST THOMPSON STREET AT CSX TRANSPORTATION CROSSING Y. INSTALL PEDESTRIAN DEVICES. RAIL PASSENGER CROSSING. WARREN VARIOUS R-5170 COMPLETED RESURFACING ON FEDERAL-AID ROUTES WASHINGTON SR 1163 ROAD SPRUILL B-4314 COMPLETED MAUL CREEK. REPLACE BRIDGE NO. 29 WASHINGTON NC B-5183 COMPLETED BRIDGE NO. 1. REPLACE BRIDGE. WASHINGTON NEW ROUTE R-4909 DELETED SR 1126 (NEWLAND ROAD) TO SR 1125 (MILLPOND ROAD). CONSTRUCT TWO LANE FACILITY ON NEW LOCATION. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. WATAUGA SR 1153 B-4316 COMPLETED CREEK. REPLACE BRIDGE NO. 320 WATAUGA US 421 R-2615A DELETED TENNESSEE LINE TO US 321-US421 JUNCTION NEAR VILAS. WIDEN TO MULTI-LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. T-232

237 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION WATAUGA BLUE RIDGE PARKWAY R-5108 COMPLETED BLUE RIDGE PARKWAY. PRA-BLRI 2H13, J16. RESURFACE SECTIONS 2H AND 2J, MILE MARKER TO MILE MARKER 317.5, INCLUDING OVERLOOKS, PARKING AREAS, SPURS, AND ACCESS ROADS. WATAUGA BLUE RIDGE PARKWAY R-5111 COMPLETED PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. WATAUGA US 421 R-5306 DELETED US 421 IN WATAUGA COUNTY TO SR 1301 IN WILKES COUNTY. TRUCK ESCAPE RAMPS AND IMPROVEMENT. PROJECT WAS NOT FUNDED IN DRAFT STIP. WAYNE MOUNT OLIVE E-4755 COMPLETED RELOCATION AND RENOVATION OF THE MOUNT OLIVE RAILROAD DEPOT. WAYNE I-795 R-1030G COMPLETED NORTH OF SR 1300 (SALEM CHURCH ROAD) TO NC 222. RESURFACE. WAYNE I-795 R-1030H COMPLETED NC 222 IN WAYNE COUNTY TO THE BRIDGE OVER CSX RAILROAD SOUTH OF US 301 IN WILSON COUNTY. RESURFACE. WAYNE GOLDSBORO U-2714 DELETED US 117, US 70 BYPASS TO SR 1537 (OLD SEVEN BRIDGE ROAD). WIDEN ROADWAY AND/OR MAKE SAFETY IMPROVEMENTS. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. WAYNE GOLDSBORO U-3125 DELETED US 117, NC 55 TO NC 581 SOUTH OF US 70. UPGRADE ROADWAY TO FREEWAY STANDARDS, PART ON NEW LOCATION. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. WAYNE GOLDSBORO U-3611 DELETED SR 1003 (NEW HOPE ROAD), SR 1556 (WAYNE MEMORIAL DRIVE) TO SR 1713 (MILLER'S CHAPEL ROAD). WIDEN TO MULTI- LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION WAYNE GOLDSBORO U-4407 DELETED US 70 BUSINESS (ASH STREET), SR 1579 (BERKELEY BOULEVARD) TO US 70 BYPASS. WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION WILKES SR 2428 B-5227 COMPLETED HUNTING CREEK. REPLACE BRIDGE NO. 24 WILKES NC R-0616 DELETED WILKESBORO-NORTH WILKESBORO BYPASS, NC 18 TO US 421. MULTI-LANES, PART ON NEW LOCATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. WILKES NC 16 R-2207 DELETED US 421 ASHE COUNTY LINE. UPGRADE TWO LANES AND ADD CLIMBING LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. WILKES NC 268 R-2602 DELETED US 321 TO SR 1162 IN WILKES COUNTY. UPGRADE ROADWAY. PROJECT WAS NOT FUNDED IN DRAFT STIP. WILKES NC 268 R-3309 DELETED SR 1966 IN WILKES COUNTY (R-2603) TO ELKIN BYPASS (R- 2604). UPGRADE TWO LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. WILKES BLUE RIDGE PARKWAY R-4724 COMPLETED PRA-BLRI 2D16. REHABILITATE PARKWAY MILE MARKER TO MILE MARKER T-233

238 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION WILKES BLUE RIDGE PARKWAY R-4724 COMPLETED PRA-BLRI 2D16. REHABILITATE PARKWAY MILE MARKER TO MILE MARKER WILKES WILKESBORO, NORTH WILKESBORO R-4744 DELETED US 421 TO NC 268. CONSTRUCT CONNECTOR, PART ON NEW LOCATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. WILKES BLUE RIDGE PARKWAY R-5104 COMPLETED PRA-BLRI 2E15. SLIDE REPAIR AT MILE MARKER 270. WILKES BLUE RIDGE PARKWAY R-5111 COMPLETED PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. WILKES US 21 R-5119 DELETED SR 1900 (OLD RAILROAD GRADE ROAD) IN WILKES COUNTY TO SR 1100 (OKLAHOMA ROAD) IN ALLEGHANY COUNTY. UPGRADE EXISTING ROADWAY. PROJECT WAS NOT FUNDED IN DRAFT STIP. WILKES NC 16 NORTH R-5153 COMPLETED NC 16 NORTH, SR 1559 (OLD NC 16) TO ASHE COUNTY LINE. PAVEMENT REHABILITATION AND INSTALL GUARDRAIL. WILKES NC 115 R-5159 COMPLETED NC 115, US 421 TO IREDELL COUNTY LINE. WIDENING AND PAVEMENT REHABILITATION. WILKES US 421 R-5306 DELETED US 421 IN WATAUGA COUNTY TO SR 1301 IN WILKES COUNTY. TRUCK ESCAPE RAMPS AND IMPROVEMENT. PROJECT WAS NOT FUNDED IN DRAFT STIP. WILKES SR 1143 (NEW BROWN'S FORD ROAD) SF-4911A COMPLETED NORTH OF SR SAFETY IMPROVEMENTS AT CURVE. WILKES WILKESBORO U-3468 DELETED US 421 BYPASS (NORTHERN OPTION). NC 16 TO YADKIN RIVER. FOUR LANE DIVIDED FACILITY ON NEW LOCATION. PROJECT WAS NOT FUNDED IN DRAFT STIP. WILKES NORTH WILKESBORO U-5000 DELETED US 421 BUSINESS, US 421 BYPASS TO SR WIDEN TO MULTI-LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. WILKES WILKESBORO U-5322 DELETED SR 1001 (OAKWOOD ROAD), US 421 BYPASS TO NC 18/268-SR 2510 (EAST MAIN STREET). WIDEN TO MULTI-LANES. PROJECT WAS NOT FUNDED IN DRAFT STIP. WILSON ELM CITY E-4922 COMPLETED RELOCATION AND RENOVATION OF THE CSX TRANSPORTATION TRAIN DEPOT ON BROAD STREET. WILSON I-795 R-1030H COMPLETED NC 222 IN WAYNE COUNTY TO THE BRIDGE OVER CSX RAILROAD SOUTH OF US 301 IN WILSON COUNTY. RESURFACE. WILSON NC 58 R-3102 DELETED KINSTON TO WILSON. CONSTRUCT A FREEWAY ON NEW LOCATION. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION WILSON US 264 R-4737 COMPLETED US 264, US 264 BYPASS AT SR 1602 (OLD STANTONSBURG ROAD). CONVERT GRADE SEPARATION TO A MODIFIED DIAMOND INTERCHANGE WITH LOOPS AND RAMPS ON WEST SIDE. WILSON US 264 R-5191 COMPLETED NC 58 TO THE GREENE COUNTY LINE. PAVEMENT REHABILITATION. T-234

239 COMPLETED / DELETED PROJECTS FEDERAL FISCAL YEAR 2011 COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION WILSON US 264 R-5199 COMPLETED US 264, WAKE COUNTY LINE TO US 264 ALTERNATE. RESURFACE. WILSON WILSON U-3471 DELETED SR 1606 (BLACK CREEK ROAD), US 264 BYPASS TO US ALTERNATE (WARD BOULEVARD). WIDEN TO MULTI-LANES. - PROJECT DELETED FY 11 - WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION. WILSON WILSON U-5314 DELETED SR 1001 (LAMM ROAD), US 264 ALTERNATE TO INTERNATIONAL BOULEVARD. WIDEN TO MULTI-LANES. - DELETED FY 11- WAS NOT FUNDED IN DRAFT STIP - SCHEDULED FOR PRIORITIZATION WINSTON-SALEM WINSTON-SALEM C-5219 DELETED PHASE 3: INTERIM TRANSIT SIGNAL SYSTEM. INSTALL FIBER OPTIC AND INTEGRATED TRAFFIC SIGNALS FROM CITY HALL TO THE SOUTH AND SOUTHWEST PORTIONS OF THE TRAFFIC SIGNAL SYSTEM. TO BE ACCOMPLISHED UNDER C YADKIN SR 1538 B-5228 COMPLETED CREEK. REPLACE BRIDGE NO. 99 YADKIN I-77 I-5103 COMPLETED I-77, US 21 (EXIT 79) TO MILE MARKER 84. PAVEMENT REHABILITATION. YADKIN I-77 I-5129 COMPLETED IREDELL COUNTY LINE TO SOUTH OF SR 1125 (ASBURY CHURCH ROAD). PAVEMENT REHABILITATION. YADKIN ELKIN, JONESVILLE R-5101 DELETED CONSTRUCT NEW CROSSING OF YADKIN RIVER. PROJECT WAS NOT FUNDED IN DRAFT STIP. YANCEY SR 1141 B-4687 DELETED REPLACE BRIDGE NO. 105 OVER LITTLE CREEK ROAD. PROJECT TO BE REHABED BY DIVISION FORCES. YANCEY SR 1121 B-5231 COMPLETED CREEK. REPLACED BRIDGE NO. 162 YANCEY BLUE RIDGE PARKWAY R-3816 COMPLETED PRA-BLRI 2P14. REHABILITATE PARKWAY MILE MARKER TO MILE MARKER SLIDE REPAIR AT MILE MARKER YANCEY BLUE RIDGE PARKWAY R-5111 COMPLETED PRA-BLRI IDIQC. BRIDGE REPAIRS ALONG THE BLUE RIDGE PARKWAY. T-235

240

241 ALPHABETICAL LISTING OF COUNTIES COUNTY DIV COUNTY DIV COUNTY DIV COUNTY DIV COUNTY DIV ALAMANCE 7 CHOWAN 1 GUILFORD 7 MITCHELL 13 RUTHERFORD 13 ALEXANDER 12 CLAY 14 HALIFAX 4 MONTGOMERY 8 SAMPSON 3 ALLEGHANY 11 CLEVELAND 12 HARNETT 6 MOORE 8 SCOTLAND 8 ANSON 10 COLUMBUS 6 HAYWOOD 14 NASH 4 STANLY 10 ASHE 11 CRAVEN 2 HENDERSON 14 NEW HANOVER 3 STOKES 9 AVERY 11 CUMBERLAND 6 HERTFORD 1 NORTHAMPTON 1 SURRY 11 BEAUFORT 2 CURRITUCK 1 HOKE 8 ONSLOW 3 SWAIN 14 BERTIE 1 DARE 1 HYDE 1 ORANGE 7 TRANSYLVANIA 14 BLADEN 6 DAVIDSON 9 IREDELL 12 PAMLICO 2 TYRRELL 1 BRUNSWICK 3 DAVIE 9 JACKSON 14 PASQUOTANK 1 UNION 10 BUNCOMBE 13 DUPLIN 3 JOHNSTON 4 PENDER 3 VANCE 5 BURKE 13 DURHAM 5 JONES 2 PERQUIMANS 1 WAKE 5 CABARRUS 10 EDGECOMBE 4 LEE 8 PERSON 5 WARREN 5 CALDWELL 11 FORSYTH 9 LENOIR 2 PITT 2 WASHINGTON 1 CAMDEN 1 FRANKLIN 5 LINCOLN 12 POLK 14 WATAUGA 11 CARTERET 2 GASTON 12 MACON 14 RANDOLPH 8 WAYNE 4 CASWELL 7 GATES 1 MADISON 13 RICHMOND 8 WILKES 11 CATAWBA 12 GRAHAM 14 MARTIN 1 ROBESON 6 WILSON 4 CHATHAM 8 GRANVILLE 5 McDOWELL 13 ROCKINGHAM 7 YADKIN 11 CHEROKEE 14 GREENE 2 MECKLENBURG 10 ROWAN 9 YANCEY 13 NORTH CAROLINA COUNTIES BY DIVISION DIVISION 1 DIVISION 6 DIVISION 12 BERTIE DIVISION 3 BLADEN DIVISION 9 ALEXANDER CAMDEN BRUNSWICK COLUMBUS DAVIDSON CATAWBA CHOWAN DUPLIN CUMBERLAND DAVIE CLEVELAND CURRITUCK NEW HANOVER HARNETT FORSYTH GASTON DARE ONSLOW ROBESON ROWAN IREDELL GATES HERTFORD PENDER SAMPSON STOKES LINCOLN HYDE MARTIN NORTHAMPTON DIVISION 7 ALAMANCE CASWELL DIVISION 10 ANSON DIVISION 13 BUNCOMBE BURKE PASQUOTANK DIVISION 4 GUILFORD CABARRUS MADISON PERQUIMANS EDGECOMBE ORANGE MECKLENBURG McDOWELL TYRRELL HALIFAX ROCKINGHAM STANLY MITCHELL WASHINGTON JOHNSTON NASH UNION RUTHERFORD YANCEY WAYNE DIVISION 2 WILSON DIVISION 8 DIVISION 14 BEAUFORT CARTERET CRAVEN GREENE JONES DIVISION 5 DURHAM FRANKLIN CHATHAM HOKE LEE MONTGOMERY MOORE DIVISION 11 ALLEGHANY ASHE AVERY CALDWELL CHEROKEE CLAY GRAHAM HAYWOOD HENDERSON LENOIR PAMLICO PITT GRANVILLE RANDOLPH RICHMOND SCOTLAND SURRY WATAUGA WILKES YADKIN JACKSON PERSON VANCE WAKE WARREN MACON POLK SWAIN TRANSYLVANIA T-237

242

243

244 URBANIZED AREAS (UAB) CITY COUNTY DIV CITY COUNTY DIV CITY COUNTY DIV BUNCOMBE 13 JACKSONVILLE ONSLOW 3 ASHEVILLE HAYWOOD 13 GASTONIA GASTON 12 HENDERSON 14 KANNAPOLIS CABARRUS 10 GOLDSBORO WAYNE 4 DAVIDSON 9 ALAMANCE 7 ROWAN 9 BURLINGTON GUILFORD 7 GREENSBORO GUILFORD 7 ORANGE 7 RALEIGH FRANKLIN 5 GREENVILLE PITT 2 WAKE 5 CABARRUS 10 CHARLOTTE MECKLENBURG 10 ALEXANDER 12 ROCKY MOUNT EDGECOMBE 4 UNION 10 HICKORY BURKE 13 NASH 4 CALDWELL 11 CHATHAM 8 CATAWBA 12 WILMINGTON NEW HANOVER 3 DURHAM DURHAM 5 BRUNSWICK 3 ORANGE 7 DAVIDSON 9 WAKE 5 HIGH POINT FORSYTH 9 DAVIDSON 9 GUILFORD 7 WINSTON-SALEM DAVIE 9 CUMBERLAND 6 RANDOLPH 8 FORSYTH 9 FAYETTEVILLE HARNETT 6 STOKES 9 HOKE 8 SMALL URBANIZED AREAS (UCB) CITY COUNTY DIV CITY COUNTY DIV CITY COUNTY DIV ALBEMARLE STANLY 10 HAVELOCK CRAVEN 2 RAEFORD HOKE 8 ASHEBORO RANDOLPH 8 HENDERSON VANCE 5 REIDSVILLE ROCKINGHAM 7 BOONE WATAUGA 11 HUBERT ONSLOW 3 ROANOKE RAPIDS HALIFAX 4 BREVARD TRANSYLVANIA 14 KILL DEVIL HILLS DARE 1 ROCKINGHAM RICHMOND 8 BUTNER GRANVILLE 5 KINGS MOUNTAIN CLEV-GASTON 12 ROXBORO PERSON 5 CAROLINA SHORES BRUNSWICK 3 KINSTON LENOIR 2 SANFORD LEE 8 CHERRYVILLE GASTON 12 LAURINBURG SCOTLAND 8 SHELBY CLEVELAND 12 CLAYTON JOHNSTON 4 LEXINGTON DAVIDSON 9 SILER CITY CHATHAM 8 CLINTON SAMPSON 3 LINCOLNTON LINCOLN 12 SMITHFIELD JOHNSTON 4 CULLOWEE JACKSON 14 LUMBERTON ROBESON 6 SOUTHERN PINES MOORE 8 DUNN HARNETT 6 MANTEO DARE 1 STATESVILLE IREDELL 12 EDEN ROCKINGHAM 7 MARION MCDOWELL 13 TARBORO EDGECOMBE 4 EDENTON CHOWAN 1 MOORESVILLE IREDELL 12 WADESBORO ANSON 10 ELIZABETH CITY PASQ-CAMDEN 1 MOREHEAD CITY CARTERET 2 WASHINGTON BEAUFORT 2 ELKIN SURRY-WILKES 11 MOUNT AIRY SURRY 11 WESTPORT LINCOLN 12 EMERALD ISLE CARTERET 2 NEW BERN CRAVEN 2 WHITEVILLE COLUMBUS 6 FOREST CITY RUTHERFORD 13 NORTH WILKESBORO WILKES 11 WILLIAMSTON MARTIN 1 FRANKLIN MACON 14 OAK ISLAND BRUNSWICK 3 WILSON WILSON 4 OXFORD GRANVILLE 5 T-240

245 MPO BURLINGTON-GRAHAM CABARRUS-ROWAN CAPITAL AREA (CAMPO) DURHAM-CHAPEL HILL- CARRBORO (DCHC) FAYETTEVILLE (FAMPO) FRENCH BROAD RIVER GASTON URBAN AREA GOLDSBORO URBAN AREA GREATER HICKORY GREENSBORO URBAN AREA GREENVILLE URBAN AREA HIGH POINT URBAN AREA JACKSONVILLE URBAN AREA MECKLENBURG-UNION (MUMPO) ROCKY MOUNT URBAN AREA WILMINGTON WINSTON-SALEM-FORSYTH METROPOLITAN PLANNING ORGANIZATIONS (MPO) CITY-TOWN-COUNTY BURLINGTON, GRAHAM, ELON COLLEGE, GIBSONVILLE, MEBANE, HAW RIVER, WHITSETT, GREEN LEVEL, VILLAGE OF ALAMANCE AND ALAMANCE COUNTY CONCORD, KANNAPOLIS, CHINA GROVE, CLEVELAND, GRANITE QUARRY, HARRISBURG, LANDIS, MOUNT PLEASANT, ROCKWELL, SALISBURY, SPENCER AND ALSO ROWAN AND CABARRUS COUNTIES ANGIER, APEX, BUNN, CARY, CLAYTON, CREEDMOOR, FRANKLINTON, FUQUAY- VARINA, HOLLY SPRINGS, KNIGHTDALE, MORRISVILLE, RALEIGH, ROLESVILLE, WAKE FOREST, YOUNGSVILLE, ZEBULON, WAKE COUNTY AND PARTS OF FRANKLIN, GRANVILLE, HARNETT AND JOHNSTON COUNTIES CARRBORO, CHAPEL HILL, DURHAM, HILLSBOROUGH, DURHAM COUNTY AND PARTS OF CHATHAM AND ORANGE COUNTIES FAYETTEVILLE, FORT BRAGG MILITARY RESERVATION, HOPE MILLS, POPE AIR FORCE BASE, SPRING LAKE, THE URBAN PORTION OF CUMBERLAND COUNTY AND PARTS OF HARNETT AND HOKE COUNTIES ASHEVILLE, BLACK MOUNTAIN, BILTMORE FOREST, CANTON, CLYDE, FLAT ROCK, FLETCHER, HENDERSONVILLE, LAUREL PARK, MAGGIE VALLEY, MILLS RIVER, MONTREAT, WAYNESVILLE, WOODFIN, BUNCOMBE, HAYWOOD AND HENDERSON COUNTIES BELMONT, BESSEMER CITY, CRAMERTON, DALLAS, GASTONIA, LOWELL, MCADENVILLE, MOUNT HOLLY, RANLO, SPENCER MOUNTAIN, STANLEY AND GASTON COUNTY GOLDSBORO, MOUNT OLIVE, SEYMOUR JOHNSON AIR FORCE BASE, WALNUT CREEK AND WAYNE COUNTY BROOKFORD, CAJAH'S MOUNTAIN, CATAWBA, CEDAR ROCK, CLAREMONT, CONOVER, CONNELLY SPRINGS, DREXEL, GAMEWELL, GLEN ALPINE, GRANITE FALLS, HICKORY, HILDEBRAN, HUDSON, LENOIR, LONG VIEW, MAIDEN, MAIDEN, MORGANTON, NEWTON, RHODHISS, RUTHERFORD COLLEGE, SAWMILLS, VALDESE AND URBAN AREAS OF ALEXANDER, BURKE, CALDWELL AND CATAWBA COUNTIES GREENSBORO, SUMMERVILLE, STOKESDALE, OAK RIDGE, PLEASANT GARDEN AND SEDALIA AYDEN, GREENVILLE, WINTERVILLE AND THE VILLAGE OF SIMPSON ARCHDALE, HIGH POINT, JAMESTOWN (PART), THOMASVILLE, TRINITY, PARTS OF DAVIDSON AND RANDOLPH COUNTIES JACKSONVILLE AND PARTS OF ONSLOW COUNTY CHARLOTTE, CORNELIUS, DAVIDSON, HUNTERSVILLE, MATHEWS, MINT HILL, PINEVILLE IN MECKLENBURG COUNTY AND INDIAN TRAIL, MONROE, STALLINGS, WAXHAW, WEDDINGTON, WESLEY CHAPEL AND WINGATE IN UNION COUNTY NASHVILLE, ROCKY MOUNT AND PARTS OF EDGECOMBE AND NASH COUNTIES CAROLINA BEACH, KURE BEACH, WILMINGTON AND WRIGHTSVILLE BEACH IN NEW HANOVER COUNTY AND BELVILLE, LELAND NAVASSA IN BRUNSWICK COUNTY AND PART OF PENDER COUNTY BERMUDA RUN, BETHANIA, CLEMMONS, KERNERSVILLE, KING, LEWISVILLE, RURAL HALL, TOBACCOVILLE, WALKERTOWN, WINSTON-SALEM AND PARTS OF DAVIDSON, DAVIE AND STOKES COUNTIES T-241

246 RURAL PLANNING ORGANIZATIONS (RPO) RPO ALBEMARLE CAPE FEAR DOWN EAST EASTERN CAROLINA HIGH COUNTRY ISOTHERMAL KERR TAR LAKE NORMAN LAND OF SKY LUMBER RIVER MID-CAROLINA MID-EAST NORTHWEST PIEDMONT PEANUT BELT PIEDMONT TRIAD ROCKY RIVER SOUTHWESTERN TRIANGLE AREA UNIFOUR UPPER COASTAL PLAIN BERTIE, HALIFAX, HERTFORD AND NORTHAMPTON CASWELL, DAVIDSON, MONTGOMERY, RANDOLPH AND ROCKINGHAM ANSON, STANLY AND UNION CHEROKEE, CLAY, GRAHAM, JACKSON, MACON AND SWAIN CHATHAM, LEE, MOORE AND ORANGE COUNTY CAMDEN, CHOWAN, CURRITUCK, DARE, GATES, HYDE, PASQUOTANK, PERQUIMANS, TYRRELL AND WASHINGTON BRUNSWICK, COLUMBUS AND PENDER CARTERET, CRAVEN, JONES, ONSLOW AND PAMLICO DUPLIN, GREENE, LENOIR AND WAYNE ALLEGHANY, ASHE, AVERY, MITCHELL, WATAUGA, WILKES AND YANCEY MCDOWELL, POLK AND RUTHERFORD FRANKLIN, GRANVILLE, PERSON, VANCE AND WARREN CLEVELAND, GASTON, IREDELL AND LINCOLN BUNCOMBE, HAYWOOD, MADISON AND TRANSYLVANIA HOKE, RICHMOND, ROBESON AND SCOTLAND BLADEN, CUMBERLAND, HARNETT AND SAMPSON BEAUFORT, PITT AND MARTIN DAVIE, STOKES, SURRY AND YADKIN ALEXANDER, BURKE, CALDWELL AND CATAWBA EDGECOMBE, JOHNSTON, NASH AND WILSON T-242

247 Morehead City NC Department of Transportation Rail Division May 2010 Current and Future Passenger Rail Services to Washington, DC and New York, NY to Washington, DC and New York, NY NS: Western NC Service, Salisbury to Asheville Asheville Black Mountain Marion Old Fort Morganton Valdese Conover Statesville Winston- Salem Salisbury Kannapolis Gastonia Charlotte to Atlanta, GA and Meridian, MS Burlington Durham Greensboro High Point Raleigh Hamlet Southern Pines Cary Fayetteville Rocky Mount Wilson Selma Goldsboro Greenville Existing passenger train routes NC Amtrak Connector (van service) to Florida Proposed Service Extension Future Southeast High-Speed Rail Service 2050 SEHSR 2050 Intrastate to Savannah and Florida Wilmington NCRR/CSXT: Southeastern NC Service, Raleigh to Wilmington via Fayetteville and Goldsboro

248

249 STATE TRANSPORTATION IMPROVEMENT PROGRAM G GHSP

250

251 The Governor's Highway Safety Program The Governor s Highway Safety Program (GHSP) was created in 1967 by legislation which empowered the Governor to contract with the U.S. Department of Transportation for the purpose of securing funding through the Highway Safety Act of 1966, Section 402. This funding provides for the administration of a highway safety program designed to reduce traffic crashes and the resulting deaths, injuries and property damage. Today, the GHSP is under the supervision, guidance and support of the Secretary of Transportation. Funding for the GHSP projects and activities is provided through federal traffic safety grants. The nine major areas of funding are occupant protection, police traffic services, speed control, traffic records, emergency medical services, motorcycles, pedestrians/bicycles, roadside safety and prevention of alcohol/drug-related crashes. The GHSP consists of 11 staff positions representing planning, programming, evaluation, fiscal management, public information and education. The GHSP s mission is to plan and execute a comprehensive highway traffic safety program for North Carolina to reduce the number of fatalities and injuries on the state s roadways. The GHSP developed a statewide safety belt campaign that utilizes enhanced law enforcement and public education to increase statewide safety belt usage rates. This campaign, Click It or Ticket, has become a national model and is now utilized in over 40 states. North Carolina now boast an 88.5 percent safety belt usage rate and Click It or Ticket has been responsible for a 14 percent decline in fatalities and serious injuries and a savings of more than $150 million in health care costs, not including costs associated with loss of productivity. A companion campaign to address impaired driving, Booze It & Lose It was developed shortly after Click It or Ticket was launched in The Booze It & Lose It campaign, through the implementation of high profile checkpoints utilizing the state s six mobile breath alcohol testing units, or BAT Mobiles, has been responsible for reducing late-night impaired driving to less than 1 in 100--the lowest rate ever measured in the U.S. All 100 counties have joined the GHSP s Click It or Ticket and Booze It & Lose It campaigns by establishing county law enforcement coordinators that organize local agencies that participate in the efforts. The U.S. Department of Transportation has praised the initiative as an outstanding example for the U.S. DOT s campaign to reduce alcohol-related fatalities and increase safety belt use. The GHSP has also been to focusing additional attention on motorcycle safety since Motorcycles are overrepresented in the number of fatal crashes and serious injuries. Motorcycling has become more popular in recent years increasing the exposure of those riding to crashes. GHSP has working to address safety issues from a legislative standpoint, education perspective, and law enforcement perspective. A high school component of the Click It or Ticket campaign has been implemented. This program is named Click It or Ticket, Securing Your Future ties safety belt usage to parking privileges at individual high schools. The program has been implemented in over 300 high schools statewide. The following represents the GHSP plan: G-3

252 The Governor's Highway Safety Program Project Federal Share State/Local Share (in thousands) (in thousands) GHSP Administration: Planning and Administration Alcohol Involvement: GHSP Paid Media GHSP Booze It & Lose It Public Information & Education Conference of District Attorneys Prosecutor Training SADD Conference ALE MADD Public Information & Education El Pueblo HSRC DWI Crash Web Site DHHS Impaired Driving Science DHHS BAT Mobiles DHHS Drug Recognition Expert Program DHHS Standardized Field Sobriety Testing Pitt County DA Wayne County DA Buncombe County DA New Hanover County DA Johnston County DA Wake County DA Columbus County DA Smithfield PD Robeson County SO Columbus County SO Creedmoor PD Dobson PD Enfield PD Granite Falls PD Norlina PD Wilson PD Taylorsville PD China Grove PD Salisbury PD Brevard PD Haywood County SO Durham County SO Holly Springs PD G-4

253 The Governor's Highway Safety Program Project Federal Share State/Local Share (in thousands) (in thousands) Alcohol Involvement (continued): Tyrell County SO Fayetteville PD Justice In Motion Brunswick County SO New Hanover County SO SHP In-Car Video Cary PD Montgomery County SO Vehicle Injury Prevention for a Very Important Person (VIP for VIP) Forsyth County DA Monroe PD Emerald Isle PD Princeton PD Winston-Salem/Forsyth County/Kernersville DWI Enforcement Cornelius PD NC DMV Ignition Interlock Training Dare County SO Fayetteville PD Harnett/Lee County DA Micro PD Spring Lake PD Police Traffic Services:) Sheriff s Association NCJA Traffic Training East Regional Law Enforcement Liaison (RLEL) Triangle RLEL Triad RLEL Sky RLEL Great Smokies RLEL Northeast RLEL High Country RLEL Southern Piedmont RLEL Southeast RLEL Sandhills RLEL Roanoke RLEL Enfield PD G-5

254 The Governor s Highway Safety Program Project Federal Share State/Local Share (in thousands) (in thousands) Police Traffic Services (continued): Cabarrus County SO Marshville PD Troutman PD Waxhaw PD China Grove PD Guilford County SO Coats PD Garner PD Aberdeen PD Alexander County SO Anson County SO Conover PD Landis PD Laurinburg PD Lexington PD Locust PD Mint Hill PD Scotland County SO Statesville PD Wadesboro PD Wilkesboro PD Wingate PD Bridgeton PD Burgaw PD Jones County SO Henderson County SO Morehead City PD Nashville PD Pittsboro PD Sharpsburg PD Wendell PD Avery County SO Cornelius PD Hoke County SO Iredell County SO Reidsville PD G-6

255 The Governor s Highway Safety Program Project Federal Share State/Local Share (in thousands) (in thousands) Police Traffic Services (continued): Haywood County SO Holly Springs PD Harnett County SO Knightdale PD Franklinton PD Thomasville PD Wilson PD Lumberton PD Pembroke PD Robeson County SO Newton PD Spring Lake PD Youngsville PD Kill Devil Hills PD Garner PD Data Driven Approach to Crime & Traffic Safety Columbus PD Troutman PD Rolesville PD Mount Gilead PD Montgomery County SO Apex PD Polk County SO Camden County SO King PD Morganton PD Reidsville PD Wilson PD Raleigh PD Duck PD Shelby PD Weaverville PD Charlotte-Mecklenburg PD Cumberland County SO Person County SO SHP Radars G-7

256 The Governor s Highway Safety Program Project Federal Share State/Local Share (in thousands) (in thousands) Police Traffic Services (continued): NCSU PD Hickory PD Dare County SO Winston-Salem PD Kernersville PD Driver Education: NC Department of Public Instruction Driver Education Consultant Street Safe HSRC Street Safe Evaluation Occupant Protection: Department of Insurance (DOI) Safe Kids Buckle Up HSRC Child Passenger Safety Resource Center GHSP Click It or Ticket RTI Observational Surveys El Pueblo Hispanic OP Education WNC SAFE KIDS Regional Training Haywood County SO NCSU PD Robeson County SO Columbus County SO Brunswick County SO New Hanover County SO Winston-Salem/Forsyth County/Kernersville Enforcement Team Rail/Highway Crossing: Operation Lifesaver G-8

257 The Governor's Highway Safety Program Project Federal Share State/Local Share (in thousands) (in thousands) Motorcycle Safety: NC Motorcycle Safety Education Program (NCMSEP) Expansion NCMSEP Rider Coach Training SHP Bike Safe NC Hendersonville PD Bike Safe NC Durham PD Bike Safe NC Columbus PD Bike Safe NC GHSP Paid Media GHSP Public Information and Education HSRC Graham County Crash Evaluation Traffic Records: HSRC Quick Response HSRC Crash Web Site Traffic Records Coordinator Traffic Records Assessment NC SHP e-citation NC DOT Traffic Engineering Branch ITRE GIS Support HSRC Geocode Pedestrian Crashes AOC NC Aware NC DMV Crash Reporting Enfield PD Roxboro PD School Bus Safety: NC DPI School Bus Safety PI&E Safe Communities: GHSP Grants Management HSRC HSP Development HSRC Senior Driver HSRC Hispanic G-9

258

259 STATE TRANSPORTATION IMPROVEMENT PROGRAM Eastern Federal Lands FL

260

261 STATE PROJECT AWARD FY COUNTY NC BLRI TRANSYLVANIA NC BLRI ALLEGHANY/ WILKES NC BLRI 2B ALLEGHANY NC BLRI 2F WATAUGA NC BLRI 2N YANCY/ MCDOWELL NC BLRI 2N BUNCOMBE NC BLRI 2S HENDERSON FHWA - Eastern Federal Lands Highway Division FY2012-FY2015 Transportation Improvement Program - NORTH CAROLINA Digitally signed by KAREN A SCHMIDT KAREN A DN: c=us, o=u.s. Government, ou=dot Headquarters, ou=fhwahq, cn=karen A SCHMIDT Approved by: SCHMIDT Date: :28:20-04'00' PARK, REFUGE, FOREST OR OTHER AGENCY DESCRIPTION CATEGORY PRIMARY FUND SOURCE TOTAL PROGRAM AMOUNT FUNDS FROM TITLE ADMIN BY/ DELIVER BY PHASE STATUS CONSIST WITH LRTP REGION SIGNIF PROJECT CHANGE FROM LAST UPDATED TIP (January 6, 2011) CONGR DISTRICT NUMBER National Park Service, Blue Ridge Parkway Critical Repair of Devil's Courthouse Tunnel Repair/ Reconstruction/ Resurface Park Roads and Parkways $1,225,000 Title 23 EFLHD Planned No LRTP N/A No change 11 National Park Service, Blue Ridge Parkway Repair Retaining Walls at Ice Rock and Alligator Back Repair/ Reconstruction/ Resurface Park Roads and Parkways $6,034,000 Title 23 EFLHD Planned No LRTP N/A No change 05 National Park Service, Blue Ridge Parkway Resurfacing MP 230 to MP 237 Repair/ Reconstruction/ Resurface Park Roads and Parkways $4,435,000 Title 23 Planned No LRTP New project, added in Summer National Park Service, Blue Ridge Parkway Goshen Creek Bridge Repair Repair/ Reconstruction/ Resurface Park Roads and Parkways $540,000 Title 23 EFLHD In Design No LRTP N/A New project, added on 05/09/ National Park Service, Blue Ridge Parkway Resurface Blue Ridge Parkway from MP to Repair/ Reconstruction/ Resurface Data not available $9,260,000 Planned No LRTP New project, added on 8/8/ National Park Service, Blue Ridge Parkway BLRI Slide Repair MP Repair/ Reconstruction/ Resurface Park Roads and Parkways $4,500,000 Title 23 EFLHD In Design No LRTP N/A New project, added on 5/09/ National Park Service, Blue Ridge Parkway Ferrin Knob Tunnel #1, Repair slope erosion. Construct new retaining walls and patch and repair pavement. New Construction Park Roads and Parkways $145,000 Title 23 EFLHD In Design No LRTP N/A Award year changed from 2011 to FL-3 Last Updated: September 28, 2011

262 STATE PROJECT AWARD FY COUNTY NC BLRI 2Y JACKSON NC BLRI 2Y JACKSON NC EDENTON 2013 CHOWAN NC MATTAMUSK EET 2015 HYDE FHWA - Eastern Federal Lands Highway Division FY2012-FY2015 Transportation Improvement Program - NORTH CAROLINA Digitally signed by KAREN A SCHMIDT KAREN A DN: c=us, o=u.s. Government, ou=dot Headquarters, ou=fhwahq, cn=karen A SCHMIDT Approved by: SCHMIDT Date: :29:33-04'00' PARK, REFUGE, FOREST OR OTHER AGENCY DESCRIPTION CATEGORY PRIMARY FUND SOURCE TOTAL PROGRAM AMOUNT FUNDS FROM TITLE ADMIN BY/ DELIVER BY PHASE STATUS CONSIST WITH LRTP REGION SIGNIF PROJECT CHANGE FROM LAST UPDATED TIP (January 6, 2011) CONGR DISTRICT NUMBER National Park Service, Blue Ridge Parkway Drainage and pavement repair at Big Witch Tunnel near milepost Repair/ Reconstruction/ Resurface Park Roads and Parkways $425,000 Title 23 EFLHD In Acquisition No LRTP N/A Award year changed from 2011 to Total Program Amount. Phase Status 11 National Park Service, Blue Ridge Parkway Big Witch Overlook Drainage Repair Repair/ Reconstruction/ Resurface NPS Repair/Rehab $210,000 Title 16 EFLHD In Design No LRTP N/A Award year changed from 2011 to Total Program Amount. Phase Status 11 U.S. Fish and Wildlife Service, Edenton National Fish Hatchery Rehad entrance road and various parking lots (SAMMS WO# , , , , , , , ) Repair/ Reconstruction/ Resurface Refuge Roads Program $126,000 Title 23 USFWS Planned No LRTP N/A No change 01 U.S. Fish and Wildlife Service, Mattamuskeet National Wildlife Refuge Rehabilitate Farm Area Road (SAMMS WO# ) Repair/ Reconstruction/ Resurface Refuge Roads Program $200,000 Title 23 USFWS Planned No LRTP N/A New project, added in Summer FL-4 Last Updated: September 28, 2011

263 STATE PROJECT NC NC PFH 049 1(004) NC NC PFH 102-1(1) NC NC PFH 102-1(2) NC NC PFH 49-1(3) NC PEE DEE NWR AWARD FY COUNTY 2013 MONTGOMERY 2013 JACKSON 2013 JACKSON 2012 MONTGOMERY 2012 ANSON/ RICHMOND FHWA - Eastern Federal Lands Highway Division FY2012-FY2015 Transportation Improvement Program - NORTH CAROLINA Digitally signed by KAREN A SCHMIDT KAREN A DN: c=us, o=u.s. Government, ou=dot Headquarters, ou=fhwahq, cn=karen A SCHMIDT Approved by: SCHMIDT Date: :30:36-04'00' PARK, REFUGE, FOREST OR OTHER AGENCY DESCRIPTION CATEGORY PRIMARY FUND SOURCE TOTAL PROGRAM AMOUNT FUNDS FROM TITLE ADMIN BY/ DELIVER BY PHASE STATUS CONSIST WITH LRTP REGION SIGNIF PROJECT CHANGE FROM LAST UPDATED TIP (January 6, 2011) CONGR DISTRICT NUMBER U.S. Forest Service, Uwharrie National Forest Roadway reconstruction Replacement /Realignment Public Lands Highway - Forest Highway $5,000,000 EFLHD In Design No LRTP N/A Award year changed from 2012 to U.S. Forest Service, Nantahala National Forest Reconstruct bridge #79 and approaches on NC State Route 1737 over Caney Creek Replacement /Realignment Public Lands Highway - Forest Highway $2,700,000 EFLHD In Design No LRTP N/A Award year changed from 2011 to Total Program Amount 11 U.S. Forest Service, Nantahala National Forest Reconstruction of Bridge #80 (TIP No. B-4472) on NC SR 1737 over Caney Fork Creek, reconstruct approaches, and reconstruct 325 ft of NC SR 1743) Replacement /Realignment Forest Highway $2,300,000 EFLHD In Design No LRTP N/A Project name changed from NC PFH 102-1(2) to NC PFH 102-1(002) 11 U.S. Forest Service, Uwharrie National Forest Replace Reeves Creek Vented Ford and Roadway. Replacement /Realignment Public Lands Highway - Forest Highway $900,000 EFLHD In Design No LRTP N/A Total Program Amount 08 U.S. Fish and Wildlife Service, Pee Dee Wildlife Refuge Rehabilitate Silo Road and river extension (SAMMS WO# ) Repair/Reconstructio n/ Resurface Refuge Roads Program $16,000 Title 23 EFLHD Planned No LRTP N/A Project name changed from Pee Dee to Pee Dee NWR 08 FL-5 Last Updated: September 28, 2011

for The Nation, North Carolina & its Neighbors NC's Regions & Counties Posted October 2, 2013

for The Nation, North Carolina & its Neighbors NC's Regions & Counties Posted October 2, 2013 s 1 Table 1 s The Nation, North Carolina & its Neighbors NC's Regions & Counties North Carolina United States South Carolina Georgia Tennessee Virginia AdvantageWest Economic Development Group Alleghany

More information

Current Price. Alamance Suburban Propane Alamance AmeriGas Propane, LP

Current Price. Alamance Suburban Propane Alamance AmeriGas Propane, LP Alamance Suburban 0.9631 Alamance AmeriGas, LP 1.0531 Alexander Suburban 0.9631 Alexander AmeriGas, LP 1.1021 Alleghany Suburban 0.9631 Alleghany AmeriGas, LP 1.1021 Anson Ferrellgas 0.8091 Anson AmeriGas,

More information

Current Price. Alamance Suburban Propane Alamance AmeriGas Propane, LP

Current Price. Alamance Suburban Propane Alamance AmeriGas Propane, LP Alamance Suburban 0.8955 Alamance AmeriGas, LP 0.9855 Alexander Suburban 0.8955 Alexander AmeriGas, LP 1.0345 Alleghany Suburban 0.8955 Alleghany AmeriGas, LP 1.0345 Anson Ferrellgas 0.7415 Anson AmeriGas,

More information

H.B. 35 Feb 6, 2019 HOUSE PRINCIPAL CLERK

H.B. 35 Feb 6, 2019 HOUSE PRINCIPAL CLERK H GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 0 HOUSE BILL DRH000-MMa- H.B. Feb, 0 HOUSE PRINCIPAL CLERK D Short Title: Add'l Judges/Onslow, Jones, Duplin, Sampson. (Public) Sponsors: Referred to: Representatives

More information

North Carolina County Weatherization Agencies by County Note: Some agencies serve more than one county.

North Carolina County Weatherization Agencies by County Note: Some agencies serve more than one county. Where to Apply for Weatherization Assistance Applications must be placed with the designated local service provider for the county in which you live. Start the application process by contacting the appropriate

More information

May Following is a guide to charts and graphs for this report:

May Following is a guide to charts and graphs for this report: May 212 Strategic tourism marketing and policy decisions depend on accurate, consistent tracking of business indicators such as lodging statistics, attraction and welcome center visitation, transportation

More information

2012 Year End Report

2012 Year End Report 212 Year End Report Strategic tourism marketing and policy decisions depend on accurate, consistent tracking of business indicators such as lodging statistics, attraction and welcome center visitation,

More information

H.B. 259 Mar 4, 2019 HOUSE PRINCIPAL CLERK

H.B. 259 Mar 4, 2019 HOUSE PRINCIPAL CLERK H GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 0 HOUSE BILL DRH0-NDa-A H.B. Mar, 0 HOUSE PRINCIPAL CLERK D Short Title: Add'l Judge and Magistrates in Union County. (Public) Sponsors: Referred to: Representatives

More information

Occupancy tax collections fiscal year County collections Municipal collections

Occupancy tax collections fiscal year County collections Municipal collections Occupancy tax collections fiscal year 2013-2014 County collections Municipal collections Counties Rate Total net Amount to Amount to Amount to Municipalities Rate Total net Amount to Amount to Amount to

More information

OCCUPANCY TAX COLLECTIONS FISCAL YEAR

OCCUPANCY TAX COLLECTIONS FISCAL YEAR OCCUPANCY TAX COLLECTIONS FISCAL YEAR 2014-2015 County collections Municipal collections Counties Rate Total net Amount to Amount to Amount to Municipalities Rate Total net Amount to Amount to Amount to

More information

Update of MDX Open Road Tolling

Update of MDX Open Road Tolling Update of MDX Open Road Tolling Citizens Transportation Advisory Committee September 11, 2013 About MDX MDX is an agency of the state created by the State Legislature and the County Commission to assure

More information

Aviation Tax Report. June 30, 2016

Aviation Tax Report. June 30, 2016 Aviation Tax Report June 30, 2016 Prepared by The Minnesota Department of Transportation 395 John Ireland Boulevard Saint Paul, Minnesota 55155-1899 Phone: 651-296-3000 Toll-Free: 1-800-657-3774 TTY, Voice

More information

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii

More information

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins January

More information

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The

More information

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP) 6.0 The addresses the phased scheduling of projects identified in this Master Plan and their financial implications on the resources of the Airport and the City of Prescott. The phased Capital Improvement

More information

NCDOT, DIVISION SIX HIGHWAY INCIDENT MANAGEMENT PROGRAM

NCDOT, DIVISION SIX HIGHWAY INCIDENT MANAGEMENT PROGRAM NCDOT, DIVISION SIX HIGHWAY INCIDENT MANAGEMENT PROGRAM CONSTRUCTION/BRIDGE/MAINTENANCE PROJECT STATUS REPORT DATE: 9-7-17 COUNTY: Cumberland TIP # ROUTE LOCATION WORK DESCRIPTION START DATE END DATE CONTACT

More information

Date Day # of Mtgs Meeting Time County City Venue

Date Day # of Mtgs Meeting Time County City Venue 9/25/2018 Tues. 1 4PM-6PM Nash Rocky Mount DoubleTree by Hilton Hotel Rocky Mount at the Texas Steakhouse & Saloon 651 N Winstead Ave Rocky Mount, NC 27804 9/26/2018 Wed. 1 4PM-6PM Wilson Wilson Wilson

More information

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014.

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014. RESOLUTION NO. R2013-24 Establish a Fare Structure and Fare Level for Tacoma Link MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: PHONE: Board 09/26/2013 Final Action Ric Ilgenfritz, Executive Director,

More information

North Carolina Counties Servicing Social Security Field Office. County Servicing Office District Manager Phone Number

North Carolina Counties Servicing Social Security Field Office. County Servicing Office District Manager Phone Number North Carolina Counties Servicing Social Security Field Office County Servicing Office District Manager Phone Number Alamance Burlington Sandra Muller 336-221-8179 Alexander Hickory Debbie Dedmon 828-328-2484

More information

BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING

BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING Date of Hearing: September 14, 2016 #1 SUBJECT: ELECTION DISTRICT: Proposed FY2017-FY2022 Secondary Road Six-Year Plan

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

Chapel Hill Transit: Short Range Transit Plan. Preferred Alternative DRAFT

Chapel Hill Transit: Short Range Transit Plan. Preferred Alternative DRAFT : Short Range Transit Plan Preferred Alternative August 2018 Table of Contents Executive Summary... 1 Preferred Alternative... 3 Best Practices for Route Design... 3 Project Goals... 4 Preferred Alternative...

More information

Item #7. 10 members of the public stopped by to ask questions, review the maps and make comments. The comments received were:

Item #7. 10 members of the public stopped by to ask questions, review the maps and make comments. The comments received were: Item #7 Winston Salem Urban Area Metropolitan Planning Organization (MPO) February 2015 Public Involvement Drop In Meeting Bryce A. Stuart Municipal Building Lobby 9:00 a.m. to 1:00 p.m., Thursday, February

More information

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway

More information

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013 FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144

More information

RACINE COUNTY PUBLIC TRANSIT PLAN:

RACINE COUNTY PUBLIC TRANSIT PLAN: RACINE COUNTY PUBLIC TRANSIT PLAN: 2013-2017 Recommended Transit Service Improvement Plan NEWSLETTER 3 SEPTEMBER 2013 This newsletter describes the final recommended public transit plan for the City of

More information

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv)

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv) Current Status (Tier 1, Tier 2 or New) Proposed Status (Tier 1 or Tier 2) Project Application General Information ODOT PID ODOT District Primary County (3 char abrv) Facility Name (i.e. route, rail, terminal,

More information

Charlotte Regional Express Lane Facilities: I-485 and US 74. North Carolina Turnpike Authority March 21, 2018

Charlotte Regional Express Lane Facilities: I-485 and US 74. North Carolina Turnpike Authority March 21, 2018 Charlotte Regional Express Lane Facilities: I-485 and US 74 North Carolina Turnpike Authority March 21, 2018 NC Turnpike Authority Overview Created in 2002 by the General Assembly Authorized to design,

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

LENOIR COUNTY COMPREHENSIVE TRANSPORTATION PLAN: APRIL 2018 MUNICIPAL AND COUNTY PRESENTATIONS. 2. Recommendations

LENOIR COUNTY COMPREHENSIVE TRANSPORTATION PLAN: APRIL 2018 MUNICIPAL AND COUNTY PRESENTATIONS. 2. Recommendations 2. Recommendations This chapter presents recommendations for each mode of transportation in the 2018 Lenoir County CTP as shown in Figure 1. More detailed information on each recommendation is tabulated

More information

AGENCY NAME TRANSPORTATION

AGENCY NAME TRANSPORTATION TRANSPORTATION TRANSPORTATION AGENCY NAME Prince William County FY 2015 BUDGET CIP-TRANSPORTATION 561 Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4 M This project will widen Fuller

More information

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 Mon-Fayette Transportation Project A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 The Mon/Fayette Transportation Project (MFTP) from I-68 in West Virginia

More information

Next Generation Air Transportation System Financing Reform Act of 2007

Next Generation Air Transportation System Financing Reform Act of 2007 Next Generation Air Transportation System Financing Reform Act of 2007 Funding Proposal An ACC Summary of Key Provisions in the USDOT s FAA Reauthorization Proposal Overall, the change in the aviation

More information

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE) 2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE) TABLE OF CONTENTS Introduction 1 Transportation Planning Activities 2 Identification of Problem Areas and Recommended Solutions 7 DeKalb County Projects

More information

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv)

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv) Current Status (Tier 1, Tier 2 or New) Proposed Status (Tier 1 or Tier 2) Project Application General Information ODOT PID ODOT District Primary County (3 char abrv) Facility Name (i.e. route, rail, terminal,

More information

Tolling in Washington State. Craig J. Stone, P.E. Assistant Secretary, Toll Division

Tolling in Washington State. Craig J. Stone, P.E. Assistant Secretary, Toll Division Tolling in Washington State Craig J. Stone, P.E. Assistant Secretary, Toll Division Connecticut Department of Transportation Bridgeport, CT June 4, 2014 Tolling in Washington State Tolling is part of Washington

More information

NC Dredge Studies NCBIWA Spring Conference April 23, 2018

NC Dredge Studies NCBIWA Spring Conference April 23, 2018 NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis 2018 NCBIWA Spring Conference

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

TRANSPORTATION ELEMENT

TRANSPORTATION ELEMENT Transportation TRANSPORTATION ELEMENT Data, Inventory, and Analysis Prepared by Contents 1.0 INTRODUCTION... 1 2.0 EXISTING CONDITIONS... 1 2.1 Roadways... 1 2.1.1 Jurisdiction... 1 2.1.2 Functional Classification...

More information

Clackamas County Development Agency

Clackamas County Development Agency Clackamas County Development Agency Development Services Building, 150 Beavercreek Rd., Oregon City, OR 97045 www.clackamas.us/transportation/renewal 503-742-4323 The Clackamas County Board of Commissioners

More information

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time.

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time. PREFACE The Florida Department of Transportation (FDOT) has embarked upon a statewide evaluation of transit system performance. The outcome of this evaluation is a benchmark of transit performance that

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

BOARD OF AIRPORT COMMISSIONERS

BOARD OF AIRPORT COMMISSIONERS 1 8/17/2018 8/21/2018 8/16/2018 i ElY MY Y I : JH MT BY...01,, III1*.ji,"1.111Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS Meeting Date: la Approved by: e1. "ampbell, Chief Airports

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

Future Economic Benefits to North Carolina from Session Law (34.19a-34.19c) Investments. Bobby Walston, Director of Aviation April 2, 2018

Future Economic Benefits to North Carolina from Session Law (34.19a-34.19c) Investments. Bobby Walston, Director of Aviation April 2, 2018 Future Economic Benefits to North Carolina from Session Law 2017-57 (34.19a-34.19c) Investments Bobby Walston, Director of Aviation April 2, 2018 2016 Study Results (Summary) Jobs Economic Contribution

More information

2012 North Carolina Governor s Conference on Tourism March 2012

2012 North Carolina Governor s Conference on Tourism March 2012 Marlise Taylor, Research Manager, NC Division of Tourism Mike Applegate, Director of Research, Charlotte Regional Visitors Authority Nancy Nicholls, Tourism Director, Chowan County 2012 North Carolina

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

Fuller Road/Fuller Heights Road Improvements

Fuller Road/Fuller Heights Road Improvements Transportation Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4M This project will widen Fuller Road, which is the entrance road serving the Quantico Marine Corps Base, the Town of

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017 Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society

More information

CITY OF BROOKFIELD Capital Improvement Fund Budget

CITY OF BROOKFIELD Capital Improvement Fund Budget CITY OF BROOKFIELD Capital Improvement Fund Budget The City adopts an annual capital improvement budget, based on a five-year capital improvement program (CIP). The annual budget and CIP are prepared by

More information

Base Governor (Updated 4/20/17) First Special Session HF 3 Transportation - Ch. 3. Conference Position 5/1/2017. Conf Position Changes FY 18-19

Base Governor (Updated 4/20/17) First Special Session HF 3 Transportation - Ch. 3. Conference Position 5/1/2017. Conf Position Changes FY 18-19 TRANSPORTATION - FY 2018-19 BUDGET, First Special Session HF 3 Appropriations/(Reductions) Tracking (all dollars in thousands, direct appropriations shown unless otherwise indicated) Agency/Program/Budget

More information

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

TransAction Overview. Introduction. Vision. NVTA Jurisdictions Introduction Vision NVTA Jurisdictions In the 21 st century, Northern Virginia will develop and sustain a multimodal transportation system that enhances quality of life and supports economic growth. Investments

More information

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps Section 106 Update Memo #1 Attachment D Traffic Diversion & APE Expansion Methodology & Maps I-65/I-70 North Split Interchange Reconstruction Project (Des. Nos. 1592385 & 1600808) Traffic Diversion and

More information

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem

More information

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

Passenger Facility Charge Application #1

Passenger Facility Charge Application #1 Passenger Facility Charge Application #1 February 2017 APPLICATION PUNTA GORDA AIRPORT PFC ASSURANCES CERTIFICATION STATEMENT The undersigned Chair of the Charlotte County Airport Authority assures

More information

NC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018

NC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018 NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis Sterling Baker, P.E. NCDOT James

More information

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

Special Committee on U. S. Route Numbering

Special Committee on U. S. Route Numbering 1 OF 8 Members: Special Committee on U. S. Route Numbering 2018 Spring Meeting Report to the Council on Highways and Streets Region 1 William Cass, New Hampshire DOT Region 2 Emanuel Banks, Arkansas DOT

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY EXECUTIVE SUMMARY The 2030 Northwest Arkansas Regional Transportation Plan developed by the Northwest Arkansas Regional Planning Commission (NWARPC)

More information

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv)

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv) Current Status (Tier 1, Tier 2 or New) Proposed Status (Tier 1 or Tier 2) Project Application General Information ODOT PID ODOT District County (3 char abrv) Facility Name (i.e. route, rail, terminal,

More information

Northeast Corridor Transportation Update

Northeast Corridor Transportation Update Northeast Corridor Transportation Update Presented by: Stuart Basham Division 10 Planning Engineer North Carolina Department of Transportation October 2, 2014 Today s presentation includes: I-485 Outer

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the

More information

Federal Subsidies to Passenger Transportation December 2004

Federal Subsidies to Passenger Transportation December 2004 U.S. Department of Transportation Bureau of Transportation Statistics Federal Subsidies to Passenger Transportation December 2004 Federal Subsidies to Passenger Transportation Executive Summary Recent

More information

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

2016 Regional Transportation Alternatives Program (TAP) Grant Application

2016 Regional Transportation Alternatives Program (TAP) Grant Application 2016 Regional Transportation Alternatives Program (TAP) Grant Application PROJECT TITLE: Yelm-Tenino Trail Extension Feasibility Study TRPC use only GENERAL PROJECT INFORMATION Agency or Organization City

More information

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3 This is the presentation for the third Master Plan Update Working Group Meeting being conducted for the Ted Stevens Anchorage International Airport Master Plan Update. It was given on Thursday March 7

More information

January 25, House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions

January 25, House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions House Select Committee on Strategic Planning and Long Term Funding Solutions January 25, 2016 Sterling Baker, P.E. Multimodal Special Projects Engineer Key Items Ferry System Overview System wide Summary

More information

Changes in TIP projects Draft vs. Final Draft

Changes in TIP projects Draft vs. Final Draft Attachment 2 Dollars in $1,000 Key 08698 Franklin Road and Cloverdale Road Intersection Changes in TIP projects Draft vs. Final Draft RW - $1,314 UT - $1,000 CE - $341 CN - $3,675 CN - $499 09438 Caldwell

More information

PIEDMONT TRIAD INTERNATIONAL AIRPORT (GSO) INTERNATIONAL AIRPORT (GSO)

PIEDMONT TRIAD INTERNATIONAL AIRPORT (GSO) INTERNATIONAL AIRPORT (GSO) Division 07 DRAFT STIP 2015-2025 PROJECTS PROGRAMMED TO BEGIN CONSTRUCTION OR REMAINING FUNDING FOR PROJECTS ALREADY Transition State Transportation Improvement Program (Construction Schedules) Developmental

More information

DEMOGRAPHICS AND EXISTING SERVICE

DEMOGRAPHICS AND EXISTING SERVICE EXECUTIVE SUMMARY The Central Corridor light-rail transit (LRT) project will open in 2014 and operate between downtown Minneapolis and downtown St. Paul, serving the University of Minnesota and University

More information

District 3 ITS Project Update

District 3 ITS Project Update District 3 ITS Project Update Chad Williams, P.E. District 3 ITS Engineer Key ITS Projects in District 3 Bay County Advanced Traffic Management System (ATMS) Okaloosa County Computerized Traffic Control

More information

Mainline Description

Mainline Description Mainline Description The Mainline component of Florida s Turnpike extends for 320 miles and consists of five distinct sections as shown in the figure above. These sections are the SR 821 (HEFT), Southern

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

Highway & Bridge Construction Market Update Southern Region

Highway & Bridge Construction Market Update Southern Region Highway & Bridge Construction Market Update Southern Region Alison Premo Black, PhD ARTBA Senior VP & Chief Economist November 26, 2016 2016 ARTBA. All rights reserved. No part of this document may be

More information

BULK DISTRIBUTION CENTER

BULK DISTRIBUTION CENTER PRE-LEASING 00 Garner, North Carolina FEATURES & SITE PLAN BUILDING BUILDING SIZE AVAILABLE SF CLEAR HEIGHT 32' COLUMN SPACING Designed to specifications LOADING 55 dock-high doors LIGHTING High bay fluorescent

More information

SAMTRANS TITLE VI STANDARDS AND POLICIES

SAMTRANS TITLE VI STANDARDS AND POLICIES SAMTRANS TITLE VI STANDARDS AND POLICIES Adopted March 13, 2013 Federal Title VI requirements of the Civil Rights Act of 1964 were recently updated by the Federal Transit Administration (FTA) and now require

More information

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services Lafourche Parish Government REQUEST FOR QUALIFICATIONS Landscape Architectural Services Bayou Lafourche Parish Multi-Use Path Feasibility Study Phase 1 And Bayou Lafourche Parish Multi-Use Path Feasibility

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

Passenger Facility Charge (PFC) Program: Eligibility of Ground Access Projects Meeting

Passenger Facility Charge (PFC) Program: Eligibility of Ground Access Projects Meeting This document is scheduled to be published in the Federal Register on 05/03/2016 and available online at http://federalregister.gov/a/2016-10334, and on FDsys.gov [ 4910-13] DEPARTMENT OF TRANSPORTATION

More information

PRELEASING GREENFIELD PARKWAY Garner, North Carolina 1001 GREENFIELD NORTH PRELEASING 151,642 SF CONTACT:

PRELEASING GREENFIELD PARKWAY Garner, North Carolina 1001 GREENFIELD NORTH PRELEASING 151,642 SF CONTACT: PRELEASING 1001 GREENFIELD PARKWAY Garner, North Carolina OPTIONAL DOOR PAIR 200'-0" FIRE PUMP ELEC ROOF ACCESS LADDER SITE PLAN OPTIONAL DOOR PAIR 7 A B 200'-0" C 50' 50' D FIRE PUMP ELEC E ROOF ACCESS

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

REVIEW OF THE STATE EXECUTIVE AIRCRAFT POOL

REVIEW OF THE STATE EXECUTIVE AIRCRAFT POOL STATE OF FLORIDA Report No. 95-05 James L. Carpenter Interim Director Office of Program Policy Analysis And Government Accountability September 14, 1995 REVIEW OF THE STATE EXECUTIVE AIRCRAFT POOL PURPOSE

More information

DELIVERED GREENFIELD PARKWAY Garner, North Carolina 1001 GREENFIELD NORTH CONTACT:

DELIVERED GREENFIELD PARKWAY Garner, North Carolina 1001 GREENFIELD NORTH CONTACT: DELIVERED 1001 GREENFIELD PARKWAY Garner, North Carolina OPTIONAL DOOR PAIR 50'-0" 750-0 200'-0" 50 50 FIRE PUMP ELEC SLOPE DN ROOF ACCESS LADDER SLOPE DN SITE PLAN 151,642 SF OPTIONAL DOOR PAIR 750'-0"

More information

Special Committee on U. S. Route Numbering

Special Committee on U. S. Route Numbering Special Committee on U. S. Route Numbering Franklin, Tennessee- Franklin Marriott Cool Springs Monday May 21, 2018 5:30 PM (Central Daylight Time) Conference Call- Tel 1-888-585-9008, Conf. Room No. 191-374-518

More information

University Region Non-Motorized Plan 2015

University Region Non-Motorized Plan 2015 Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

SR 2308 (FOWLER ROAD) SR 1433 (PERSON ROAD) NC 50 SR 1343 (JOHN BREWER ROAD)

SR 2308 (FOWLER ROAD) SR 1433 (PERSON ROAD) NC 50 SR 1343 (JOHN BREWER ROAD) Division 05 DRAFT STIP 2015-2025 PROJECTS PROGRAMMED TO BEGIN CONSTRUCTION OR REMAINING FUNDING FOR PROJECTS ALREADY UNDER CONSTRUCTION Transition State Transportation Improvement Program (Construction

More information

Airport Master Plan Open House Front Range Airport February 23, 2017

Airport Master Plan Open House Front Range Airport February 23, 2017 Airport Master Plan Open House Front Range Airport February 23, 2017 MASTER PLAN PROCESS AND OVERVIEW MASTER PLAN ELEMENTS The Master Plan is a 20-year plan to understand the needs of current and future

More information