1 Slow Down! Reducing Downtown Bloomington s Progression Speed Neil Kopper, PE, City of Bloomington Patrick O Connor, PE, PTOE, American Structurepoint March 7, 2018
2 Background and Project Overview Bloomington, IN Population 85, Full Signals and 2 PHBs Mode Split 5% Bicycle 15% Walk 5% Transit 5% Work at Home 70% Drive Last Signal Retiming HSIP Funding
3 Project Goals Compliance with standards Safety Walkability Minimize Stops and Delay
4 Project Goals Consultant View Increased Clearance Times Maintain Similar Cycle Lengths Address Multi-Modal Needs Lack of Detection Communication Deficiencies Central Business District On-Street Parking Commercial Deliveries
5 Project Specifics Existing Corridors Overview College & Walnut Cross Coordination 3 rd Street (Campus) Minor Streets
6 Why Speed Reduction? Existing Posted Speed Limit College Avenue 30 mph (Southbound) Walnut Street 25 mph (Northbound) Observed Speeds Well in excess of posted Existing Coordination Issues Timings Clock Synch
7 Project Specifics Data Collection Tube Counts TMCs Field Reviews Timing Uploads
8 Timing Development Before Travel Time Runs Walnut Street Walnut Street PM Before College Avenue PM Before AM Before AM Before PM Before
9 Timing Development Clearance Compliance Corridor Node Node Yellow Recall Clearance Mode Walk Time All-Red Flashing Clearance Don't Walk Flashing Don't Walk Total Clearance Change 102 N 101 College N Ave College & W 10th Ave & StW 11th St x x -4.7 x x 2.7x N 102 College N Ave College & W 7th Ave St & W 10th St x x -3.7 x x 3.2x College Avenue 104 N 103 College N Ave College & W 6th Ave St & W 7th St x x -4.1 x x 5.0 x S 104 College N Ave/N College College Ave & Ave W 6th & W St Kirkwood Ave x x -1.6 x 3.8 x S College Ave/N College Ave & W Kirkwood Ave S College Ave & W 4th St x x x -1.6 x 3.6 x S College Ave & W 4th St S College Ave & W 3rd St x x x x x 107 S College Ave & W 3rd St S College Ave & W 2nd St x x x x x 108 S College Ave & W 2nd St S College Ave & W 1st St x x x x 109 S College Ave & W 1st St N 201 Walnut St N & Walnut W 10th St St/E & W 10th 10th St St/E 10th St x x -3.7 x x 3.2 x N 202 Walnut St N & Walnut W 7th St/E & 7th W 7th St St/E 7th St x x -4.1 x x 4.2 x N 203 Walnut St N & Walnut W 6th St/E & 6th W 6th St St/E 6th St x x -1.0 x x 1.5 x S 204 Walnut St/N S Walnut St/N & Walnut W Kirkwood St & Ave/E Kirkwood Kirkwood Ave Ave x x -1.6 x x 2.5 x S 205 Walnut St S Walnut & W 4th St/E & 4th W 4th St St/E 4th St x x x -4.1 x 3.7 x Walnut Street Intersection Intersection 101 N College Ave & W 11th St x x x x x Change by Intersection 206 S 206 Walnut St S Walnut & W 3rd St/E & W 3rd 3rd St St/E 3rd St x x x -4.1 x x 3.7 x S 207 Walnut St S Walnut & W 2nd St St/E & W 2nd 2nd St St/E 2nd St x x x -3.7 x x 1.9 x S Walnut St & W 1st St/E 1st St S Walnut St & W 1st St/E 1st St x x x 0.8 x x 1.9 x Minimum Initial Yellow Change All-Red Clearance Average Clearance Change by Corridor (per Intersection) 92% of Controller Timings Changed Pedestrian Recall & Rest-In-Walk
10 Timing Development Schedule Development Before After
11 Timing Development Timing Optimization Cycle/Split/Offset
12 Timing Implementation Download New Timings In-Field Fine Tuning Travel Time Runs Observe All Patterns
13 After Travel Time Runs College AM After College AM After Walnut AM After College PM After Walnut PM After
14 Average Travel Time & Delay College Avenue Before & After Comparison MD AM PM MD PO
15 Average Travel Time & Delay Walnut Street Before & After Comparison AM PM MD PO
16 Project Results Standard Compliance Yellow, All-Red, Walk, Don t Walk Develop Citywide Standard Controller Timings Progression Speed Reduced (Noted by Citizens and Staff) Multi-Modal (bicycle and pedestrians) Minimize Stops and Delay Delay 52,000 hours (9%) Stops 8.6 million stops (14%)
17 Benefit-Cost Analysis (5-year Project Life) Benefits Network Performance Measures ~$600,000 Costs ~$50,000* (*portion from Citywide retiming) B:C Ratio 12:1College Avenue/Walnut Street 17:1Citywide Retiming
18 Lessons Learned Continually Adaptable Signal Timing Construction Educate Traveling Public I stopped at every signal! It s not working right! Maintenance Keep staff involved/informed
19 Perceived vs. Actual Issues Perceived Issues No Complaints Debated/discussed strategy prior to implementation Removed overnight flash Citywide Actual Issues Complaints Removing protected phasing (5-section heads) Reducing progression speed
20 City Feedback Expect updates Expect to find unrelated issues Keep local staff involved Change is hard sometimes Goals met
Strategic Signal Timing Changes = BIG Results. Barbara Jones, PE, PTOE DGL Consulting Engineers, LLC Senior Traffic Engineer
Strategic Signal Timing Changes = BIG Results Barbara Jones, PE, PTOE DGL Consulting Engineers, LLC Senior Traffic Engineer Pre Signal Timing Updates Signal Timing Updates Average Retiming Interval Percent
More informationMercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017
Mercer SCOOT Adaptive Signal Control Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017 Our mission, vision, and core values Mission: deliver a high-quality transportation system for Seattle Vision: connected
More informationKING STREET TRANSIT PILOT
KING STREET TRANSIT PILOT Update toronto.ca/kingstreetpilot #kingstreetpilot HIGHLIGHTS TRANSIT RIDERSHIP TRANSIT CAPACITY To respond to this growth in ridership, the TTC has increased the capacity of
More informationPedestrian Safety Review Spadina Avenue
STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District
More information5.1 Traffic and Transportation
5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the
More informationSouthern Oregon Transportation Engineering, LLC
Southern Oregon Transportation Engineering, LLC 112 Monterey Drive - Medford, Or. 97504 Office 541.608.9923 Cell 541.941.4148 Email: Kwkp1@Q.com August 12, 2013 Mike Faught, Public Works Department City
More informationLongmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT
Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use
More informationEast Farmingdale Fire Department 930 Conklin Street. Source: Parsons Brinckerhoff
Route 110 Alternatives Analysis Public Meeting #2 April 27, 2015 East Farmingdale Fire Department 930 Conklin Street Source: Parsons Brinckerhoff Agenda Welcome/Project Background Jonathan Keyes Director,
More informationMemorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:
Memorandum Date: March 23, 2018 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 4/10/18 Board Meeting: San Francisco Freeway Corridor Management Study Update
More informationReport on Installation of Wayside Horns at Railroad Crossings and Railroad Trench System
City Council Agenda November 4, 2014 Mayor and Council Agenda Item No. B.01 Reviewed by City Mgr s office: /KLM Memo to: From: Manteca City Council Karen L. McLaughlin, City Manager Date: October 28, 2014
More informationPublic Open House. Chief Peguis Trail Project
Public Open House Chief Peguis Trail Project CHIEF PEGUIS TRAIL OPEN HOUSE Welcome! Please browse the display boards Project Engineers and City of Winnipeg representatives are available to address your
More informationWelcome to the Cross County Trail Public Input Session!
Welcome to the Cross County Trail Public Input Session! Please sign in on the table below! What are we doing here? Camden County has proposed a bicycle and pedestrian trail spanning across the entire county.
More informationBRIEFING Subject: 2017 Visitation Initiatives
BRIEFING Subject: 2017 Visitation Initiatives Presented to: Council Submitted by: Adrian Field Date: June 12, 2017 Agenda #: 7.6 This report is submitted for council s information. BACKGROUND Reason for
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No
SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS RESOLUTION No. 16-145 WHEREAS, The San Francisco Municipal Transportation Agency has proposed parking and traffic on San Bruno Avenue included
More informationWelcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,
Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how
More informationTABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2
Job No. 15-019 Page 2 TABLE OF CONTENTS 1.0 INTRODUCTION... 4 2.0 EXISTING CONDITIONS... 5 3.0 TRAFFIC GENERATION... 7 4.0 TRIP DISTRIBUTION... 8 5.0 FUTURE CONDITIONS... 8 6.0 SITE ACCESS...13 7.0 CONCLUSION...13
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More informationAppendix H1 Traffic Study Hill St Obispo Ave Obispo Ave Student Drop-off & Pick-up Area Parking Lot Plaza Level Hill St Fire Lane Access Service Lane Access Redondo Ave Redondo Ave Parking Lot N No
More informationGeneral Issues Committee Item Transit Operating Budget Ten Year Local Transit Strategy
General Issues Committee Item 4.1 2017 Transit Operating Budget Ten Year Local Transit Strategy January 27, 2017 Presentation Outline 2017 Operating Budget Overview Ten Year Local Transit Strategy 2 2017
More information2017 Proposed Service Changes. For Public Meetings January 2017
2017 Proposed Service Changes For Public Meetings January 2017 Peninsula Corridor Electrification Project (PCEP) Schedule First Train Set Env. Clearance (Jan.) Delivered LNTP Award (Sept.) NTP (March)
More informationFHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need
Highway 22 Segment 1 - US 169 to CSAH 2 Vehicle Mobility Congestion Intersection Congestion Existing Conditions - Based on Highway Capacity Manual methodology, corridor level of service is currently LOS
More informationMinistry of Transportation
This report is prepared for the sole use of Ministry of Transportation. No representations of any kind are made by Urban Systems Ltd. or its employees to any party with whom Urban Systems Ltd. does not
More informationRequest to Improve Transit along the Dufferin Street Corridor
For Action Request to Improve Transit along the Dufferin Street Corridor Date: July 10, 2018 To: TTC Board From: Chief Customer Officer Summary The 29 Dufferin bus route is one of the top five busiest
More informationLUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS
LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS Prepared for Skip Coddington GSC Development, Inc PO Box 1623 Woodinville WA 9872 Prepared by 1141 NE 124 th St., #59 Kirkland, WA 9834 425.522.4118
More informationMemorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility
Memorandum To: From: The Honorable Dow Constantine, King County Executive; The Honorable Ed Murray, City of Seattle Mayor; The Honorable Bruce Bassett, City of Mercer Island Mayor; The Honorable John Stokes,
More informationDowntown to Defiance Trolley Key Messages Jan. 2017
Downtown to Defiance Trolley Key Messages Jan. 2017 Overarching Messages This is a demonstration (pilot) project for one summer. We will evaluate how it went to see if we can offer it again in the future.
More informationSTAR Bond Development
STR ond Development Traffic Impact Study Goddard, Kansas Prepared for: Kansas Department of Transportation City of Goddard, Kansas Prepared by TranSystems November 218 November 3, 218 Kansas Department
More informationStage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge
Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium
More informationCurrent Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications
Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway
More information7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW
7272 LOCAL AREA TRANSPORTATION REVIEW AND TRANSPORTATION POLICY AREA REVIEW MONTGOMERY COUNTY, MARYLAND Submitted on behalf of Carr Properties Prepared by: Wells + Associates, Inc. Submission: July 1,
More informationKING STREET PILOT STUDY PUBLIC MEETING
KING STREET PILOT STUDY PUBLIC MEETING 2017.02.13 PUBLIC WORK with GEHL STUDIO / NEW YORK SWERHUN ASSOCIATES SAM SCHWARTZ CONSULTING LLC STARTING POINTS 17 1 - TRANSIT FIRST! Transit service is beyond
More informationUS 19 Sunset Point Rd to Countryside Blvd.
Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way Status Update Construction started
More informationBaltimore Ravens Egress Study
Baltimore Ravens Egress Study Presented by: Matt Snare, P.E., PTOE Amy Jackson, P.E. April 19, 2016 Agenda History of Ravens in Baltimore Traditional Traffic Studies vs. Stadium Work Ravens Egress Study
More informationAuthors. Courtney Slavin Graduate Research Assistant Civil and Environmental Engineering Portland State University
An Evaluation of the Impacts of an Adaptive Coordinated Traffic Signal System on Transit Performance: a case study on Powell Boulevard (Portland, Oregon) Authors Courtney Slavin Graduate Research Assistant
More informationMEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018
MEMORANDUM TO: Bob Zagozda, Chief Financial Officer Westside Community Schools FROM: Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig DATE: June 11, 218 6-11-18 SUBJECT: Sunset Hills Elementary School
More informationApril 21, 2016 Next Stop Urban Burbs
ULI Spring Meeting 2016 Next Stop the suburbs what is a suburb? April 21, 2016 Next Stop Urban Burbs Suburban Washington, DC Justin B. Schor, Principal SUBURBAN DC EXAMPLES TYSONS 12 miles to Downtown
More informationSan Martin Drive. January 2016 Pre-Project Update
San Martin Drive January 2016 Pre-Project Update Overview The San Martin Drive Pedestrian Improvements project has the goal of providing a continuous pedestrian pathway on San Martin Drive from University
More informationFINAL TERMINAL TRAFFIC MONITORING STUDY
FINAL TERMINAL 91 216 TRAFFIC MONITORING STUDY Prepared for: Port of Seattle February 15, 217 Prepared by: 12131 113 th Avenue NE, Suite 23 Kirkland, WA 9834-712 Phone: 425-821-3665 www.transpogroup.com
More informationMetrolinx Projects: Temporary Delegation for Long- Term Road Closures
PW29.1 REPORT FOR ACTION Metrolinx Projects: Temporary Delegation for Long- Term Road Closures Date: April 24th, 2018 To: Public Works and Infrastructure Committee From: General Manager, Transportation
More informationEstablishes a fare structure for Tacoma Link light rail, to be implemented in September 2014.
RESOLUTION NO. R2013-24 Establish a Fare Structure and Fare Level for Tacoma Link MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: PHONE: Board 09/26/2013 Final Action Ric Ilgenfritz, Executive Director,
More information1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET
Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt
More informationFLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016
FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1 September 28, 2016 TAC Committee Role: Internal Stakeholders To provide input on the master planning analysis from the technical and
More informationProposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street
STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure
More informationInfrastructure development: Vienna Vienna Int. Airport Bruck/Leitha state border near Nickelsdorf ( airport link )
1 Infrastructure development: Vienna Vienna Int. Airport Bruck/Leitha state border near Nickelsdorf ( airport link ) Vienna Airport Josef Zitzler bmvit unit II/Infra2 Infrastructure planning Bled, 15/05/2018
More informationChicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014
Chicago St. Louis High-Speed Rail Enos Park Neighborhood Association May 13, 2014 1 Illinois High-Speed Rail Program 2 Chicago-St. Louis Corridor» IDOT has actively developed the corridor since the mid1980
More informationSan Pedro Waterfront Development Efforts Presentation for Trade, Commerce & Technology Committee
San Pedro Waterfront Development Efforts Presentation for Trade, Commerce & Technology Committee November 17, 2015 Ports O Call Area Redevelopment Ports O Call Area Redevelopment Implementation Schedule
More informationA. CONCLUSIONS OF THE FGEIS
Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300
More informationMetro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements
Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements Jan Perry Councilwoman, District 9 Welcome Remarks Arthur T. Leahy Chief Executive Officer, Metro Metro ExpressLanes Overview
More informationAppendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group
Appendix 4.1 J May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM
More informationSTAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk
STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route
More informationFrequently Asked Questions on the Route 29 Solutions Improvements Projects
Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy
More informationPennDOT Interstate Work next week March 30-April 3:
PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)
More informationONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1
ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City
More informationWelcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010
Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting First meeting june 17, 2010 State of the Project Draft Environmental Impact Statement Study Phase This study is NOT the final
More informationMETROPOLITAN EVANSVILLE TRANSIT SYSTEM Part I: Comprehensive Operations Analysis Overview July 9 th, 2015 Public Information Meeting
METROPOLITAN EVANSVILLE TRANSIT SYSTEM Part I: Comprehensive Operations Analysis Overview July 9 th, 2015 Public Information Meeting AGENDA 5:30 5:40 Open House 5:40 6:30 Presentation Comprehensive Operations
More informationDowntown Skokie & Oakton Street Corridor Study (Draft)
Downtown Skokie & Oakton Street Corridor Study (Draft) Skokie, Illinois Project Manager: William C. Grieve, P.E., PTOE GHA Project #3261.805 Downtown Skokie & Oakton Street Corridor Study Skokie, Illinois
More informationTransportation Improvement District (TID) Exercise New Castle County Unified Development Code
Transportation Improvement District (TID) Exercise New Castle County Unified Development Code Churchmans Crossing TID How should New Castle County deploy Transportation Improvement Districts (TIDs)? Site
More informationConstruction Staging Adelaide Street West
REPORT FOR ACTION Construction Staging Adelaide Street West Date: October 6, 2016 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More informationOcean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.
PALM BEACH COUNTY TRAFFIC DIVISION UPDATE OF ROAD AND BRIDGE CONSTRUCTION LIST DATE OF ISSUE: FEBRUARY 13, 2013 STATUS FOR FEBRUARY 18, 2013 THROUGH FEBRUARY 24, 2013 *** CONSTRUCTION WORK ZONES ADDED
More informationMDOT MTA: Project Updates and Looking Forward. Kevin Quinn, Administrator 12/12/18
MDOT MTA: Project Updates and Looking Forward Kevin Quinn, Administrator 12/12/18 1 What We ve Been Doing 2 Real-Time Bus Information External Partnership with Transit App Provides real-time transit information,
More informationI-405 Express Toll Lanes Coming in 2015
I-405 Express Toll Lanes Coming in 2015 Jennifer Charlebois Roadway Toll Systems PE, Toll Division Anne Broache Public Information, I-405/SR 167 Lynn Peterson Secretary of Transportation Market Neighborhood
More informationScore. Category. Access Aesthetics Community Resources
NO BUILD ALTERNATIVE The No Build Alternative is the do nothing option that is used for comparison to the build alternatives. The screening assumes no new facilities are constructed as part of the I-93
More information95 Express Managed Lanes Consolidated Analysis Technical Report
95 Express Managed Lanes Consolidated Analysis Technical Report November 2011 FDOT District 4 Prepared by Cambridge Systematics, Inc Acronyms AVO Average Vehicle Occupancy CCTV Closed Circuit Television
More informationMount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus
Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! Study Overview and Timeline Phase 1: Collect and Analyze Data Project Kickoff, September 2017
More informationEVALUATION OF TRANSIT SIGNAL PRIORITY EFFECTIVENESS USING AUTOMATIC VEHICLE LOCATION DATA
EVALUATION OF TRANSIT SIGNAL PRIORITY EFFECTIVENESS USING AUTOMATIC VEHICLE LOCATION DATA A Thesis Presented to The Academic Faculty by Carl Andrew Sundstrom In Partial Fulfillment of the Requirements
More informationCommunity Advisory Panel Meeting #
Community Advisory Panel Meeting # 6 02.13.19.. Agenda Welcome and Introductions Community Conversations City Council Meeting Debrief Review Citywide Tunnel Video (North Portal Only) Churchill Pedestrian
More informationEast Link Project Update. Maintenance of Traffic During Construction. April 21, 2015
East Link Project Update Maintenance of Traffic During Construction April 21, 2015 1 Agenda TFP project 242 Bellevue Way HOV Bellevue Way - Maintenance of Traffic During Construction Early Work Utilities
More informationProject Deliverable 4.1.3d Individual City Report - City of La Verne
Pomona Valley ITS Project Project Deliverable 4.1.3d Individual City Report - City of La Verne Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS
More informationAbbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd
Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:
More informationCHAPTER FOUR: TRANSPORTATION
CHAPTER FOUR: TRANSPORTATION Barron County Comprehensive Plan: Transportation Page 61 Background Transportation facilities have a significant influence on land use, development and quality of life for
More informationWorkshop on Advances in Public Transport Control and Operations, Stockholm, June 2017
ADAPT-IT Analysis and Development of Attractive Public Transport through Information Technology Real-time Holding Control Strategies for Single and Multiple Public Transport Lines G. Laskaris, PhD Candidate,
More informationRegulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road. Toronto and East York Community Council
TORONTO STAFF REPORT ACTION REQUIRED Regulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road Dnte: February 16,2009 To: From: Toronto and East York Community
More informationBoston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA
Boston Redevelopment Authority 2/26/2014 Cassidy Playground Waterworks Design revisions made since the DPIR submission March 2013 Massing - Reduced project 16,030 SF, for a total project area of 218,520
More informationClaremont Project Background and Update Community Meeting September 11, 2017
Claremont Project Background and Update Community Meeting September 11, 2017 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions
More informationKingston Transportation Master Plan Draft Report Transit Forecasting 1
TRANSIT FORECASTING Transit Forecasting 1 INTRODUCTION A spreadsheet model was developed to identify existing transit deficiencies and additional transit service requirements. The model comprised transit
More informationProject Deliverable 4.1.3f Individual City Report - City of San Dimas
Pomona Valley ITS Project Project Deliverable 4.1.3f Individual City Report - City of San Dimas Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS
More informationUS Route 3 Corridor Study: Phase I. Town of Boscawen & City of Franklin, New Hampshire
US Route 3 Corridor Study: Phase I Town of Boscawen & City of Franklin, New Hampshire January 27, 2004 US Route 3 Corridor Study: Phase I, NH City of Franklin Franklin Plantation For the Town of Boscawen
More informationLake Erie Commerce Center Traffic Analysis
LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table
More informationPattullo Bridge Replacement Project
Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor
More informationUPDATE ON THE 6 IDEAS (1-4) NAV CANADA
UPDATE ON THE 6 IDEAS (1-4) THE 6 INITIATIVES 1. New approaches for night-time operations - Implemented 2. New departure procedures for night-time operations - Implemented 3. Increased downwind arrival
More informationConstruction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013
FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationDevelopment of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives
Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives June 1, 2018 Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level
More informationMichigan s Engineering Safety Program for Local Roadways
Michigan s Engineering Safety Program for Local Roadways Local Road Safety Peer Exchange October 2018 Timothy J. Gates, Ph.D., P.E., P.T.O.E. Michigan State University Andrew Ceifetz, P.E. WSP For More
More information3rd Quarter 2015 Minneapolis-St. Paul International Airport (MSP) Public Input Meeting
3rd Quarter 2015 Minneapolis-St. Paul International Airport (MSP) Public Input Meeting Metropolitan Airports Commission Noise Program Office July 28, 2015 Meeting Goals To hear the views and concerns of
More information10.0 Recommendations Methodology Assumptions
10.0 Recommendations To accommodate the projected growth of the I-526 corridor, this report has summarized potential improvement strategies that were separated into four categories, TDM, Modal, Traffic
More information8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT
8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated May 27, 2010, from the Commissioner
More informationBridge Collapse. Minneapolis Public Works Department. Presented by Steven Kotke, P.E. - Director of Public Works
Bridge Collapse Minneapolis Public Works Department Presented by Steven Kotke, P.E. - Director of Public Works 1 St. Anthony Falls I-35W Bridge History Construction started in 1964 Opened to traffic in
More informationRW Bruhn Bridge and Approaches Project
RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the
More informationSCOPING INFORMATION PACKET
SCOPING INFORMATION PACKET Project Description The proposed project would provide a direct link connecting several light rail lines in operation or in construction, including the Metro Gold Line to Pasadena,
More informationSAMTRANS TITLE VI STANDARDS AND POLICIES
SAMTRANS TITLE VI STANDARDS AND POLICIES Adopted March 13, 2013 Federal Title VI requirements of the Civil Rights Act of 1964 were recently updated by the Federal Transit Administration (FTA) and now require
More informationTreasure Island Supplemental Information Report Addendum
1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land
More informationAPPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS
Draft Environmental Impact Statement/Environment Impact Report Appendix H Milestone 2 Traffic Operations Analysis of the At-Grade Crossings APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE
More informationSOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER
SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER Proposal to Eliminate Traffic Gridlock in South North York Centre Area With Southbound Yonge Street to Eastbound Highway 401 Fly-UNDER A much
More informationService Summary. Winter Service Change Highlights WINTER 2019 CHANGES TRIP LEVEL DETAIL. Victoria Regional Transit Commission
Service Summary WINTER 2019 CHANGES TRIP LEVEL DETAIL Effective January 2, 2019 This document outlines Winter 2019 seasonal schedule changes for the Victoria Regional Transit System for implementation
More informationHuman Factors of Remotely Piloted Aircraft. Alan Hobbs San Jose State University/NASA Ames Research Center
Human Factors of Remotely Piloted Aircraft Alan Hobbs San Jose State University/NASA Ames Research Center Transfer of Risk UA collides with people or property on ground Other airspace user collides with
More informationIntegration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems
Traffic Advisory Leaflet 2/09 April 2009 Integration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems Introduction SCOOT 1,2,3 (Split Cycle and Offset Optimisation Technique) is an adaptive
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 1, 2011 SUBJECT: PROCUREMENT AUTHORIZATION AMENDMENT CONTRACT AMENDMENT NO. 8 ACTION ITEM RECOMMENDATION It is recommended
More informationPalm Beach County Traffic Report August 24 through August 31, 2012
For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will
More informationAttachment 1 PARK & RIDE GUIDELINES
Attachment 1 PARK & RIDE GUIDELINES The City of Edmonton August 2018 Executive Summary Edmonton will soon be a city of a million people - not within 25 years but within the next five years. This growth