Bridge Collapse. Minneapolis Public Works Department. Presented by Steven Kotke, P.E. - Director of Public Works

Size: px
Start display at page:

Download "Bridge Collapse. Minneapolis Public Works Department. Presented by Steven Kotke, P.E. - Director of Public Works"

Transcription

1 Bridge Collapse Minneapolis Public Works Department Presented by Steven Kotke, P.E. - Director of Public Works 1

2 St. Anthony Falls I-35W Bridge History Construction started in 1964 Opened to traffic in feet high, 1,907 feet long, 14 spans Four lanes of traffic in each direction Carried 140,000 vehicles daily (Year 2007) Source: MnDOT I-35W Bridge - Looking North July,

3 Before I-35W Bridge Downtown Minneapolis University of Minnesota 3

4 Before

5 Before

6 August 1,

7 The Collapse I-35W Bridge collapses into the Mississippi and onto its banks during rush hour More than 100 injuries 13 deaths Approximately 180 people and 120 vehicles on the bridge at the time of collapse 7

8 ...and After 8

9 9

10 10

11 11

12 Multiple Jurisdictions FHWA Mn/DOT Hennepin County City of Minneapolis MPRB Corp of Engineers Coast Guard U of M 12

13 August 1 August 1 st Timeline 6:05 p.m. first 911 call received 6:11 p.m. first emergency units on scene 6:20 p.m. Emergency Operations Center (EOC) activated Unified incident command established at the scene 7:55 p.m. All survivors rescued from the scene 13

14 City of Minneapolis Emergency Operations Center (EOC) Located in the basement of City Hall Activated when a largescale disturbance or event involves multiple City departments or agencies 14

15 Emergency Response Medical Care Fire & Rescue Law Enforcement 15

16 Minneapolis Fire/Rescue Operations Established Incident Command once first fire vehicle arrived at the scene at 6:11 Unified command established on 10 th Ave. Bridge (ran parallel to I-35W bridge) 16

17 Minneapolis Fire/Rescue Operations Collapsed Structure 17

18 Minneapolis Fire/Rescue Operations Vehicle fires 18

19 Minneapolis Fire/Rescue Operations Hazardous Materials 19

20 Minneapolis Fire/Rescue Operations EMS 20

21 Hennepin County Sheriff Dive Team - Water Rescue - - Victim Recovery Navy Divers 21

22 Recovery Efforts August 2nd MPD takes Incident Command at 4 p.m. (end of rescue, start of recovery) Maintains perimeter security Divers from Hennepin County perform recovery August 10th Mn/DOT Takes Incident command from 4:00 p.m. 22

23 Public Works Overview Initial Response First 24 Hours Ongoing Collapse Issues Rebuilding The Bridge 23

24 Public Works Initial Response Assisting Rescue Efforts Inspection Boats Barricades Road Closures Lights Generators Heavy Construction Machinery Other Equipment Traffic Issues 24

25 Public Works Initial Response Traffic Issues Area wide detours I-35W TH

26 Public Works Initial Traffic Issues Local Streets University Ave/4 th Street 2 nd Street West River Road Washington Ave Bridges Stone Arch Bridge 9 10 th Avenue Bridge 26

27 Public Works Organizational Assignments Fleet Services Property Services Transportation Planning & Engineering Surface Water & Sewers On-going Collapse Issues Traffic & Parking Public Works Solid Waste & Recycling 35W Rebuilding Management Transportation Maintenance & Repair Water Treatment & Distribution Administratio n & Management 27

28 On-going Collapse Issues Communication Efforts Daily meetings with agency partners City elected official briefings Centralized info by Communications Dept (web was key communication tool, City s 311, media requests, etc.) Citizen Involvement and Input Meetings with various neighborhood groups, legislators and with city council members Old traffic issues take on new life Speed and cut through traffic 28

29 On-going Collapse Issues Assist with debris issues Vehicles removed and handled at City impound lot 29

30 On-going Collapse Issues Traffic Management Street closures (adjusted hard and soft closures) Continued use of Traffic Control Agents Defined secondary detour routes (20 to 120% Higher Volume More traffic data early September after school started Retimed signals in NE quadrant of the City (over 300 signals retimed) Lane additions, restrictions and prohibitions 30

31 Significant Changes in Traffic Volumes Over 200 traffic counts conducted (20 to 120% higher) 31

32 On-going Collapse Issues Pedestrian View Areas First reopened Stone Arch Bridge in a week Second reopened Bridge 9 after recovery completed in mid August The view desired by the public from the 10 th Avenue bridge 32

33 On-going Collapse Issues Reimbursement Mind your paper work FEMA FHWA & DDIR s 33

34 35W Rebuilding (City efforts) City Concerns, Needs and Issues North Bank South Bank City utility impacts Storm water implications ROW impacts 34

35 35W Rebuilding (City efforts) Statement of Principles Rebuilding the 35W Bridge adopted by City Council Meet present and future transportation needs Improve vehicle and transit capacity LRT/BRT-ready Support and identify funding to address other transportation needs Meet all current environmental standards New fifth lanes dedicated for transit/hov Equal Employment Opportunity goals are equal to the City s Memorial should be created Provide and seek community input on design and construction process 35

36 River dredging operations Main Street portal (80 ) 2 nd Street Safety at NB ramp to Univ. Ave Bridge profile vs. future freeway under Univ/4 th St Utilities crossing and parallel 35W -- North Bank City Concerns, Needs and Issues 36

37 West River Parkway Bridge 9 Trail Extension 14 th Avenue impacts Future South Bank freeway access Utilities crossing and parallel 35W - South Bank City Concerns, Needs and Issues 37

38 New 35W Bridge Layout Existing = 8 lanes & narrow shoulders Future = 10 lanes & wide shoulders Municipal Consent Capacity Access ROW 38

39 What worked well at this incident? EOC using NIMS, Emergency Operations Plan, and Mutual Aid Partners Traffic Management coordination with all agencies Involvement in Design-Build Selection Process Response successful due to good Relationships (past and new) Communications Planning 39

40 Federal, State, County and City: Cooperation at all Levels Made It Work Thank you to everyone for their condolences and offers of support. 40

Standard Operating Procedures Debris Management. Concept of Operations

Standard Operating Procedures Debris Management. Concept of Operations Concept of Operations Lead Agency Support Agencies Standard Operating Procedures Debris Management Franklin County Road Department (FCRD) Apalachicola Streets Department (ASD) Carrabelle Streets and Roads

More information

STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007

STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007 STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS 202.15b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007 AIRCRAFT INCIDENTS AND ACCIDENTS Goals 1. To familiarize with Airport Index 2. To familiarize

More information

KLHQ Fairfield County Emergency Response Plan (August 13, 2012)

KLHQ Fairfield County Emergency Response Plan (August 13, 2012) (August 13, 2012) Purpose The purpose of this plan is to ensure the safe and efficient handling of emergency situations that may arise at the Fairfield County (KLHQ) Lancaster, Ohio Airport. It is intended

More information

Management of Disaster Debris

Management of Disaster Debris Management of Disaster Debris Jeff Hepler Portland District, USACE Sarah Eckman & Shannon Martin Clackamas County, Oregon October 6, 2014 OEMA Conference Sunriver, Oregon US Army Corps of Engineers Introductions

More information

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation LESLIE BARNS & CONNECTION TRACK Project Update Construction and Traffic Management Consultation PRESENTATION SUMMARY Part 1 Brief Project Update (New Streetcars & Streetscape Improvements) Part 2 Construction

More information

City of Doral Flood Warning and Response Plan

City of Doral Flood Warning and Response Plan City of Doral Flood Warning and Response Plan Prepared by: City of Doral Public Works Department Stormwater Division City of Doral Flood Warning and Response Plan Flood events tend to pose a variety of

More information

Constructor: Joseph B. Fay

Constructor: Joseph B. Fay 1 1 2 OWNER: PENNDOT Engineering District 11-0 City of Pittsburgh Design Consultant: SAI Consulting Engineers KTA-Tator Constructor: Joseph B. Fay Construction Manager: Michael Baker Construction Inspection:

More information

2009 Regional Solicitation Selected Projects*

2009 Regional Solicitation Selected Projects* 2009 Regional Solicitation Selected Projects* Special Federal Allocation from the MPO Mn/DOT I-494/TH169 Interchange Reconstruction $34,000,000 Surface Transportation Program - Urban Guarantee AR-09-10

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page

TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page 1.0 Disabled Aircraft Recovery Plan Overview 4 1.1 Overview 4 2.0 Aircraft Incident/Accidents 6 3.0 TAA

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.4 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various parking and traffic modifications associated

More information

N. Central St. & W. Jackson Ave. Streetscape Projects

N. Central St. & W. Jackson Ave. Streetscape Projects N. Central St. & W. Jackson Ave. Streetscape Projects October 13, 2016 Meeting Overview North Central Street City of Knoxville KUB History & Vision Plan Timing Project Area Overview Schedule Communications

More information

Flying Cloud Airport Joint Airport Zoning Board. 27 February 2018 Public Hearing #1 Overview of Proposed Airport Zoning Ordinance

Flying Cloud Airport Joint Airport Zoning Board. 27 February 2018 Public Hearing #1 Overview of Proposed Airport Zoning Ordinance Flying Cloud Airport Joint Airport Zoning Board 27 February 2018 Public Hearing #1 Overview of Proposed Airport Zoning Ordinance Presentation Agenda Purpose & Goals Review of FCM Zoning Historical Timeline

More information

Bonita to Bridgeport January 24, 2019

Bonita to Bridgeport January 24, 2019 Thank you for participating 6:00-6:05 Welcome 6:05-6:55 Presentation; clarifying questions 7:00-7:30 Talk with staff; write comments Concerns with Locally Preferred Alternative (LPA) route between Bonita

More information

Carlisle Connectivity Projects Communication Plan and Project Status

Carlisle Connectivity Projects Communication Plan and Project Status Carlisle Connectivity Projects Communication Plan and Project Status Overview Communication Plan Communication Plan Communication Plan Objective The Borough staff will develop and execute timely and effective

More information

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1 ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City

More information

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2)

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2) Atlantic Street Bridge Project CTDOT Project Nos. 135-301 & 301-163 (Phase 2) Reconstruction of Atlantic Street & Metro North RR Bridge Replacement Track & Station Infrastructure Improvements City of Stamford

More information

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT 8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated May 27, 2010, from the Commissioner

More information

APPENDIX F List of Commitments

APPENDIX F List of Commitments APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators

More information

Understanding Temporary Shelters for the Homeless

Understanding Temporary Shelters for the Homeless Understanding Temporary Shelters for the Homeless Thank you for your interest in learning about temporary shelters for the homeless. This handout is intended to provide updated information regarding the

More information

Head to University Avenue and save!

Head to University Avenue and save! April 2011 Head to University Avenue and save! Liberty Tax Service at 1731 University Ave. W. in is offering a special for first-time customers who drive through the construction zone to get their taxes

More information

AGENDA ITEM I-6 Public Works

AGENDA ITEM I-6 Public Works AGENDA ITEM I-6 Public Works STAFF REPORT City Council Meeting Date: 8/6/2018 Staff Report Number: 18-150-CC Informational Item: Update on the Willow Road and highway 101 interchange construction, upcoming

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE July 27, 2018 CONTACT: Tina Bundy 540 899 4560 (office) 540 907 8325 (cell) Tina.Bundy@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT July 29 August 4, 2018 All work

More information

AIRLINE FAMILY ASSISTANCE PLAN

AIRLINE FAMILY ASSISTANCE PLAN AIRLINE FAMILY ASSISTANCE PLAN 29 September 2000 TABLE OF CONTENTS Page List of Corresponding Items i 1. Overview 2. 2.1. 2.2. 2.3. 2.4. 3. 3.1. 3.2. 3.3. Pre-Response Planning Committing Sufficient Resources

More information

OSO LANDSLIDE REMBEMBRANCE DAY

OSO LANDSLIDE REMBEMBRANCE DAY OSO LANDSLIDE REMBEMBRANCE DAY Jim Bloodgood, PE Snohomish County Traffic Engineer Oso, Washington is a small, rural community located in unincorporated Snohomish County on State Route 530 between the

More information

LESLIE BARNS & CONNECTION TRACK. Leslieville BIA Meeting May 2, 2014

LESLIE BARNS & CONNECTION TRACK. Leslieville BIA Meeting May 2, 2014 LESLIE BARNS & CONNECTION TRACK Leslieville BIA Meeting May 2, 2014 1 OVERVIEW Communications Queen/Leslie Intersection Closure Overview Next Steps - Coordination of TTC Track Upgrades (Queen streetcar

More information

Incident Management using the TOC Control Room

Incident Management using the TOC Control Room Incident Management using the TOC Control Room John Abraham, Director of Traffic & Operations Joshua Fink, Traffic Operations Engineer, AECOM Macomb County Department of Roads 117 South Groesbeck Highway

More information

2 Construction Program

2 Construction Program 2018 C P 2018 Districtonstruction 2 Construction Program rogram district 2 Governor John Kasich ODOT Director Jerry Wray District Deputy Director Pat McColley, PE, SI 2018 Construction Program Thank you

More information

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010 MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010 This is a compilation of issues and outcomes identified by the CAC. It is a work in progress,

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

First Coast TIM Meeting Tuesday, July 19, 2016 Meeting Minutes

First Coast TIM Meeting Tuesday, July 19, 2016 Meeting Minutes First Coast TIM Meeting Tuesday, July 19, 2016 Meeting Minutes The list of attendees, agenda, and meeting handouts are attached to these meeting minutes. Introductions Josh Reichert opened and welcomed

More information

Managed Lanes, Transit Access, and Economic Development: Implementing the Region s First Highway BRT Corridor

Managed Lanes, Transit Access, and Economic Development: Implementing the Region s First Highway BRT Corridor Managed Lanes, Transit Access, and Economic Development: Implementing the Region s First Highway BRT Corridor Tim Burkhardt, AICP William Reynolds, AICP, PTP Matt Horton Who we are/astrological signs Tim

More information

9/10/2012. Chapter 54. Learning Objectives. Learning Objectives (Cont d) Wilderness EMS

9/10/2012. Chapter 54. Learning Objectives. Learning Objectives (Cont d) Wilderness EMS Chapter 54 Wilderness EMS 1 Learning Objectives Define and describe wilderness medicine and wilderness EMS Define and describe the wilderness EMS system Describe the differences in practice environments

More information

I-405 Express Toll Lanes Coming in 2015

I-405 Express Toll Lanes Coming in 2015 I-405 Express Toll Lanes Coming in 2015 Jennifer Charlebois Roadway Toll Systems PE, Toll Division Anne Broache Public Information, I-405/SR 167 Lynn Peterson Secretary of Transportation Market Neighborhood

More information

Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information

Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your

More information

SHELTER FIELD GUIDE OPERATIONS TRAINING

SHELTER FIELD GUIDE OPERATIONS TRAINING SHELTER FIELD GUIDE OPERATIONS TRAINING 2 Welcome to Shelter Field Guide Training Housekeeping 3 Emergency Exits Breaks Lunch Restrooms Smoking Purpose of the Course 4 Course is designed to train faith-based

More information

Atlantic Street Bridge Project Update CTDOT Project Nos & (Phase 2)

Atlantic Street Bridge Project Update CTDOT Project Nos & (Phase 2) Atlantic Street Bridge Project Update CTDOT Project Nos. 135-301 & 301-163 (Phase 2) Reconstruction of Atlantic Street & Metro-North RR Bridge Replacement Track & Station Infrastructure Improvements City

More information

Glasgow Street Traffic Review

Glasgow Street Traffic Review Glasgow Street Traffic Review Recommendation That the Standing Policy Committee on Transportation recommend to City Council: 1. That the Administration proceed with removing the pinch points installed

More information

AIR EUROPA LINEAS AEREAS, S.A.U. Plan for addressing the needs of the families of passengers involved in an aircraft accident.

AIR EUROPA LINEAS AEREAS, S.A.U. Plan for addressing the needs of the families of passengers involved in an aircraft accident. AIR EUROPA LINEAS AEREAS, S.A.U. Plan for addressing the needs of the families of passengers involved in an aircraft accident Submitted to The U.S. Department of Transportation (DOT) and The National Transportation

More information

DEMOGRAPHICS AND EXISTING SERVICE

DEMOGRAPHICS AND EXISTING SERVICE EXECUTIVE SUMMARY The Central Corridor light-rail transit (LRT) project will open in 2014 and operate between downtown Minneapolis and downtown St. Paul, serving the University of Minnesota and University

More information

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need Highway 22 Segment 1 - US 169 to CSAH 2 Vehicle Mobility Congestion Intersection Congestion Existing Conditions - Based on Highway Capacity Manual methodology, corridor level of service is currently LOS

More information

Date: March 8, From: Chief Michael F. Masterson

Date: March 8, From: Chief Michael F. Masterson Date: March 8, 2007 To: Mayor David H. Bieter and Boise City Council From: Chief Michael F. Masterson MEMORANDUM Re: Proposal to integrate Boise Airport Police into the Boise Police Department On February

More information

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015 May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

Arlington County Board Meeting Project Briefing. October 20, 2015

Arlington County Board Meeting Project Briefing. October 20, 2015 Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66

More information

Long water shutdown scheduled for Tuesday, September 18

Long water shutdown scheduled for Tuesday, September 18 Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility

More information

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps Section 106 Update Memo #1 Attachment D Traffic Diversion & APE Expansion Methodology & Maps I-65/I-70 North Split Interchange Reconstruction Project (Des. Nos. 1592385 & 1600808) Traffic Diversion and

More information

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA December 1, 2008 Public Hearing TOWN CENTER PARKING TIME LIMITS (FIRST READING) Proposed Council Action: Conduct public hearing and first reading

More information

IRONCLAD. MINNEAPOLIS 811 Washington Ave 1. live.work.explore. MINNEAPOLIS 811 Washington Ave

IRONCLAD. MINNEAPOLIS 811 Washington Ave 1. live.work.explore. MINNEAPOLIS 811 Washington Ave IRONCLAD live.work.explore. 1 WELCOME TO IRONCLAD neighborhood overview One of the hottest development areas of Downtown, Ironclad offers a high-end, mixed-use development consisting of highrise apartments,

More information

Fort Wayne-Allen County Airport Authority

Fort Wayne-Allen County Airport Authority Fort Wayne-Allen County Airport Authority Media Guide INTRODUCTION The Fort Wayne-Allen County Airport Authority s (FWACAA) Marketing and Administration office is committed to serving the needs of the

More information

Texas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge

Texas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge Texas Department of Transportation Corpus Christi District Corpus Christi Harbor Bridge Presented by Russel W. Lenz, P.E. Corpus Christi District Engineer For 2009 Texas Ports and Waterways Conference

More information

Classification: Public AIRSPACE AND FUTURE OPERATIONS CONSULTATION (JANUARY-MARCH 2019)

Classification: Public AIRSPACE AND FUTURE OPERATIONS CONSULTATION (JANUARY-MARCH 2019) AIRSPACE AND FUTURE OPERATIONS CONSULTATION (JANUARY-MARCH 2019) LOCAL AUTHORITY BRIEFING 8 FEBRUARY 2019 Westerly operations Easterly operations PRESENTATION OVERVIEW Intro Airspace and Future Operations

More information

Engineering Ethics: The Minnesota I-35W Bridge Collapse

Engineering Ethics: The Minnesota I-35W Bridge Collapse Engineering Ethics: The Minnesota I-35W Bridge Collapse Course No. ET-2011 Credit: 2 PDH Engineering Ethics: The Minnesota I-35W Bridge Collapse Edward P. Brunet, Jr., P.E. Prologue: Recollections of survivors

More information

Arvidson, Adam R. Adam,

Arvidson, Adam R. Adam, Arvidson, Adam R. From: Andrew Hestness Sent: Wednesday, May 18, 2016 5:39 PM To: Arvidson, Adam R. Cc: Renee Spillum; Schroeder, Michael Subject: RE: Park Dedication Attachments: FranklinPlan - Bystrom

More information

San Martin Drive. January 2016 Pre-Project Update

San Martin Drive. January 2016 Pre-Project Update San Martin Drive January 2016 Pre-Project Update Overview The San Martin Drive Pedestrian Improvements project has the goal of providing a continuous pedestrian pathway on San Martin Drive from University

More information

First rail. August 2011

First rail. August 2011 August 2011 First rail A downtown resident showed his son in early August the first completed section of embedded track on Fourth Street in front of the Farmer s Market. During July, the Central Corridor

More information

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg) RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information

More information

Classrooms & Resources Available. Regional Public Safety Training Center

Classrooms & Resources Available. Regional Public Safety Training Center Classrooms & Resources Available Regional Public Safety Training Center Note: If you are viewing this PDF online, the Room numbers are clickable links to pages specific to those rooms. Standard Classrooms

More information

I-35 Reconstruction Project

I-35 Reconstruction Project I-35 Reconstruction Project Business Community Meeting McLennan County Projects Jodi Wheatley, I 35 Information Specialist, TxDOT John Jasek, PE, Waco Area Engineer, TxDOT Jacob Bell, PE, Project Manager,

More information

County of San Bernardino Film Permit Information

County of San Bernardino Film Permit Information County of San Bernardino Film Permit Information Dear Permit Applicant: The following is information about the County of San Bernardino Filming Permit Application. Enclosed you will also find a Filmmakers

More information

UAB Avion Express FAMILY ASSISTANCE PLAN

UAB Avion Express FAMILY ASSISTANCE PLAN UAB Avion Express FAMILY ASSISTANCE PLAN 1. Overview 1.1. The purpose of the UAB Avion Express Family Assistance Plan is to provide company personnel with the guidelines, procedures and training that will

More information

Restoration and Challenge of Sendai Towards a Disaster-Resilient and Environmentally-Friendly City

Restoration and Challenge of Sendai Towards a Disaster-Resilient and Environmentally-Friendly City City of Sendai Restoration and Challenge of Sendai Towards a Disaster-Resilient and Environmentally-Friendly City Akira TAKAHASHI akira_takahashi_a@city.sendai.jp Director, Disaster-Resilient and Environmentally-Friendly

More information

Public Information Center August 12, 2010

Public Information Center August 12, 2010 Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

Redelivery Management and Technical Aspects of Leases

Redelivery Management and Technical Aspects of Leases currently be displayed. Redelivery Management and Technical Aspects of Leases Oisín Murray - Head of Technical and Asset Management Agenda Lease Agreement Technical Considerations Maintenance Overview

More information

CURRENT SHORT-RANGE TRANSIT PLANNING PRACTICE. 1. SRTP -- Definition & Introduction 2. Measures and Standards

CURRENT SHORT-RANGE TRANSIT PLANNING PRACTICE. 1. SRTP -- Definition & Introduction 2. Measures and Standards CURRENT SHORT-RANGE TRANSIT PLANNING PRACTICE Outline 1. SRTP -- Definition & Introduction 2. Measures and Standards 3. Current Practice in SRTP & Critique 1 Public Transport Planning A. Long Range (>

More information

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016 Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty

More information

O Hare Noise Compatibility Commission Technical Committee April 19, Proposed Interim Fly Quiet Runway Rotation Plan

O Hare Noise Compatibility Commission Technical Committee April 19, Proposed Interim Fly Quiet Runway Rotation Plan O Hare Noise Compatibility Commission Technical Committee April 19, 2016 Proposed Interim Fly Quiet Runway Rotation Plan O HARE MODERNIZATION ROD - FLY QUIET Record of Decision (ROD) was issued on September

More information

The Lake Charles Regional Airport is owned by the Parish of Calcasieu and operated by the Airport Authority of Airport District No. One.

The Lake Charles Regional Airport is owned by the Parish of Calcasieu and operated by the Airport Authority of Airport District No. One. Preface The purpose of the Lake Charles Regional Airport Media Guide is to provide the local and national news media organizations and their crews and reporters with information to work most effectively

More information

McLean Citizens Association Transportation Committee Project Briefing

McLean Citizens Association Transportation Committee Project Briefing McLean Citizens Association Transportation Committee Project Briefing November 10, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight

More information

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative. Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection

More information

Just to keep you informed, as of May 12, 2017, here is a brief synopsis of things being worked on/or accomplished in your City.

Just to keep you informed, as of May 12, 2017, here is a brief synopsis of things being worked on/or accomplished in your City. Just to keep you informed, as of May 12, 2017, here is a brief synopsis of things being worked on/or accomplished in your City. City Manager s Office: Worked with the Lee County School District regarding

More information

City of Penticton: Financial Plan Reporting Structure

City of Penticton: Financial Plan Reporting Structure City of Penticton: Financial Plan Reporting Structure General Utilities Transportation Services Recreation and Culture Environmental Health Services Public Health and Safety Protective Services Environmental

More information

1. That Council approve the pilot project for the City designated toboggan hill at Uplands Golf and Ski Club;

1. That Council approve the pilot project for the City designated toboggan hill at Uplands Golf and Ski Club; COMMITTEE OF THE WHOLE OCTOBER 19, 2009 PILOT PROJECT FOR CITY DESIGNATED TOBOGGAN HILLS Recommendation Regional Councillor Mario Ferri and Councillor Sandra Yeung Racco, Co-Chairs of the Recreational

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 1, 2011 SUBJECT: PROCUREMENT AUTHORIZATION AMENDMENT CONTRACT AMENDMENT NO. 8 ACTION ITEM RECOMMENDATION It is recommended

More information

METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017

METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017 METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017 Orange Line BRT Project What is the Orange Line project? 17-mile

More information

US AIRWAYS. November 11, 2013 VIA ELECTRONIC

US AIRWAYS. November 11, 2013 VIA ELECTRONIC US AIRWAYS November 11, 2013 VIA ELECTRONIC SUBMISSION VIA ELECTRONIC MAIL Docket OST -1996-1960 U.S. Department of Transportation Docket Management Facility 1200 New Jersey Avenue, SE Washington, DC 20590

More information

Slow Down! Reducing Downtown Bloomington s Progression Speed

Slow Down! Reducing Downtown Bloomington s Progression Speed Slow Down! Reducing Downtown Bloomington s Progression Speed Neil Kopper, PE, City of Bloomington Patrick O Connor, PE, PTOE, American Structurepoint March 7, 2018 Background and Project Overview Bloomington,

More information

4.0 Context for the Crossing Project

4.0 Context for the Crossing Project 4.0 Context for the Crossing Project This section provides background information about key features of the North Douglas Crossing project area, and opportunities and constraints. This information is important

More information

METROBUS SERVICE GUIDELINES

METROBUS SERVICE GUIDELINES METROBUS SERVICE GUIDELINES In the late 1990's when stabilization of bus service was accomplished between WMATA and the local jurisdictional bus systems, the need for service planning processes and procedures

More information

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding I. Welcome / Introductions Bethany Creek Trail #2 Segment 3 Neighborhood Meeting #1 Bethany Presbyterian Church 15505 NW Springville Road, Portland, OR 97229 Tuesday, June 26, 2018 @ 6:00PM Meeting Minutes

More information

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance City of Fort Lauderdale Frequently Asked Questions Proposed Sea Wall Ordinance The City of Fort Lauderdale is considering amending the Unified Land Development Regulations of the City of Fort Lauderdale

More information

The Falls: A Visitor & Interpretive Center for the Upper Lock

The Falls: A Visitor & Interpretive Center for the Upper Lock The Falls: A Visitor & Interpretive Center for the Upper Lock Image courtesy of Northern Spark Surface by Aaron Dysart Illuminate the Lock is a program of Mississippi Park Connection The Falls Initiative

More information

Spadina Avenue Built Form Study Preliminary Report

Spadina Avenue Built Form Study Preliminary Report STAFF REPORT ACTION REQUIRED Spadina Avenue Built Form Study Preliminary Report Date: July 9, 2014 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Community Planning,

More information

Barron County Sheriff s Dept 2016 Annual Report

Barron County Sheriff s Dept 2016 Annual Report Barron County Sheriff s Dept 2016 Annual Report 2016 was a safe year in Barron County but brought tragedy to our adjoining county with the Line of Duty Death of Deputy Glaze. An opportunity arose to upgrade

More information

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety Vancouver Airport Authority Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety - 2017 CSMP Contractor Expectations - 2017 i Contents Contents Contents Introduction ii

More information

County of Santa Clara Emergency Medical Services System

County of Santa Clara Emergency Medical Services System County of Santa Clara Emergency Medical Services System Policy #611: EMS Air Resource Utilization EMS AIR RESOURCE UTILIZATION Effective: Feburary 12, 2015 Replaces: May 5, 2008 Review: November 12, 2018

More information

FATALITY INVESTIGATION ACTIVITY #2

FATALITY INVESTIGATION ACTIVITY #2 FATALITY INVESTIGATION ACTIVITY #2 UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION Surface Nonmetal Mine (Limestone)

More information

AAPA 2017 COMMUNICATION AWARDS CATEGORY: OVERALL CAMPAIGN

AAPA 2017 COMMUNICATION AWARDS CATEGORY: OVERALL CAMPAIGN AAPA 2017 COMMUNICATION AWARDS CATEGORY: OVERALL CAMPAIGN INTRODUCTION In 2016, the Port of Longview assumed ownership of a local park and boat launch from the county, which was financially unable to maintain

More information

Ed Hamaker 3rd Ward. Darryl Thurber 2nd Ward. Mardie Milligan 1st Ward Vice Mayor. Mike Barhorst. Janet Born. Joe Ratermann At Large

Ed Hamaker 3rd Ward. Darryl Thurber 2nd Ward. Mardie Milligan 1st Ward Vice Mayor. Mike Barhorst. Janet Born. Joe Ratermann At Large Mardie Milligan st Ward Vice Mayor Darryl Thurber 2nd Ward Ed Hamaker 3rd Ward Mike Barhorst At Large Mayor Steve Wagner 4th Ward Janet Born At Large Joe Ratermann At Large Fielding Road Reconstruction

More information

Freeway Volume-Crash Summary

Freeway Volume-Crash Summary Freeway Volume-Crash Summary Twin Cities Metropolitan Area Continuation Report 22 Data Minnesota Department of Transportation Office of Traffic, Security and Operations Freeway Operations Section Regional

More information

Project Deliverable 4.1.3d Individual City Report - City of La Verne

Project Deliverable 4.1.3d Individual City Report - City of La Verne Pomona Valley ITS Project Project Deliverable 4.1.3d Individual City Report - City of La Verne Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS

More information

Pardon Our Dust Public Information Meeting

Pardon Our Dust Public Information Meeting Pardon Our Dust Public Information Meeting Robert G. Ridgell, P.E. Virginia Department of Transportation, Fredericksburg District Area Construction Engineer July 12, 2018 Project Team and Leadership Virginia

More information

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014.

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014. RESOLUTION NO. R2013-24 Establish a Fare Structure and Fare Level for Tacoma Link MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: PHONE: Board 09/26/2013 Final Action Ric Ilgenfritz, Executive Director,

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 10/11/2018 5:24:09 PM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 10/11/2018 5:24:09 PM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 10/11/2018 5:24:09 PM ROUTE Hwy100 15 22 7 Mi W of Ainsworth St Park Closure Information Westbound (Right

More information

The following criteria shall be applied within the boundaries of the AO District:

The following criteria shall be applied within the boundaries of the AO District: Sec. 419 (a) Purpose AIRPORT OVERLAY DISTRICT (AO) The purpose of the Airport Overlay District is to regulate and restrict the height of structures, objects, or natural growth, regulate the locations of

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE

BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE City of Toronto Local Issues & Initiatives Bryan Bowen City Planning Waterfront Secretariat June 25, 2018 PRESENTATION OUTLINE BACKGROUND: ISSUES

More information

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

THREE MILE PLAN TOWN OF SUPERIOR COLORADO THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate

More information

Foreign Air Carrier Family Support Act. August, 2011

Foreign Air Carrier Family Support Act. August, 2011 Foreign Air Carrier Family Support Act August, 2011 Principles of Family Assistance Deutsche Lufthansa AG d/b/a Lufthansa German Airlines and Lufthansa Cargo AG (hereinafter referred to collectively as

More information

MONTHLY OPERATIONS REPORT DECEMBER 2015

MONTHLY OPERATIONS REPORT DECEMBER 2015 MONTHLY OPERATIONS REPORT DECEMBER 215 Table of Contents DECEMBER 215 Section Page December Highlights... 3 Strategic Goals Progress Update... 4 Ridership... 6 Revenue... 9 Expenses... 1 System Summary...

More information