Chapter 4 Development Alternatives

Size: px
Start display at page:

Download "Chapter 4 Development Alternatives"

Transcription

1 LAKE COUNTY AIRPORT MASTER PLAN UPDATE The preceding chapter identified deficiencies of the Lake County Airport (Airport) with respect to existing and anticipated aeronautical demand, which are consistent with current Federal Aviation Administration (FAA) design standards and State of Oregon development guidelines. This chapter presents several development alternatives that focus on meeting the Airport s facility needs for the long term future (2032 and beyond). While the development alternatives focus on meeting aeronautical demand projected for 2032, it is prudent to consider the ultimate potential of airport property. By doing so, the planning documents remain flexible and functional, considering the possibility that unforeseen events or increases in user demand occur. Consequently, the alternatives highlight possible airfield and landside uses that could meet facility needs projected to occur after SUMMARY OF FACILITY REQUIREMENTS The preceding chapter, Facility Requirements, identified development needs to accommodate forecasted aeronautical activity. These are summarized below. Lake County Airport 4 1

2 Airfield Requirements If the Airport were upgraded to an approach with lower minimums, improvements would be required for several design standards, including runway safety area (), object free area (), obstacle free zone (), runway protection zone (RPZ), and possibly others depending on the approach. o It is suggested the Airport be upgraded to a precision approach. Final determination of feasibility of implementing a precision instrument approach procedure would need an expensive survey meeting rigorous FAA standards and then an evaluation by the FAA Flight Procedures Office A runway extension may be justified if larger aircraft begin operating at the Airport or if an operator documents constrained operations. A runway length of at least 6,500 feet would be preferred to accommodate all small airplanes and some of the larger aircraft fleet. The current pavement strength rating of Runway 16/34 is 74,000 pounds for Single Wheel Gear (SWG) aircraft and 86,000 pounds for Dual Wheel Gear (DWG). The Runway will need to be reconstructed in the near future and any strength changes can be made at that time, if needed. Develop a parallel taxiway for Runway 16/34. The parallel taxiway could be constructed in phases to lessen the project s overall financial cost. Construct a run up area near each runway end. Markings on Runway 16/34 should be upgraded to nonprecision with threshold markings. If a precision approach were to be implemented, the runway markings would need to be upgraded to precision markings. It is recommended that the Visual Approach Slope Indicators (VASIs) should be replaced with Precision Approach Path Indicators (PAPIs), when practical. Runway End Identifier Lights (REILs) should be installed for Runway 16. Depending on the instrument approach implemented, an instrument approach lighting system may be required, to include omnidirectional approach lights (ODALs). Future improvements should include the installation of taxiway and taxilane edge lights. The current off airport location of the Remote Communications Outlet (RCO) blocks line of sight transmissions below 2,000 feet (above ground level). The County should begin coordination with the FAA s Airways and Facilities Division to relocate the facility. Develop a public helipad to accommodate helicopter parking. It should be located away from the fixed wing tiedown area, so as to reduce potential damage from rotorwash. It is recommended to place a lighted windcone midfield, with two supplemental windcones at each runway end. The tetrahedron should be removed. An agricultural containment pad should be constructed for when an operator uses the Airport. Also, the area could be used by airport tenants as an aircraft wash pad. The County should continue to participate in the Oregon Department of Aviation s Pavement Maintenance Program to extend the airfield pavement s useful life. Lake County Airport 4 2

3 Landside Requirements Construct one additional bank of T hangars with a capacity for four airplanes and one additional conventional hangar. Construct an apron that can accommodate at least twelve tiedown positions. It is recommended a cargo apron be developed, which would allow for an ARC B II aircraft taxi, turn and maneuver on the ramp, as well as an area for the delivery truck/van to park. Additional vehicle parking should be developed at the access acres near the Runway 16 end. If demand warrants, a second FBO business may be attracted to the Airport (or the existing FBO may need to expand). It is recommended that at an area be designated for a future FBO facility. As demand at the Airport dictates, it may be advisable to provide a terminal facility separate from the FBO as recommended in the Oregon Aviation Plan. Support Facility Requirements The basic perimeter fencing should be upgraded to chainlink security fence, for safety and wildlife abatement. As facilities are developed, a new septic system should be installed or sewer should be extended to the Airport from the Town of Lakeview. The potable water well and water lines are in need of replacement or upgrade. The overhead electrical lines at the Airport should be replaced and located underground. DEVELOPMENT ALTERNATIVES Four alternatives for the long term future development of the Airport are presented in this chapter: No Build Alternative, which assumes maintenance of existing facilities and no expansion of airfield or landside facilities. Development Alternative 1 includes a western parallel taxiway, with landside development concentrated in the existing operations area. Development Alternative 2 shows a 1,200 feet runway extension to the north, a full parallel taxiway, and a precision instrument approach. All future development is sited east of the Runway, along County Highway 1 10A. Also included is a reserve for airport compatible development at the northwest section of the Airport property. Development Alternative 3 depicts a 1,200 feet runway extension, a full parallel taxiway, and an instrument approach with visibility greater than ¾ mile. All development, with the exception of T hangars, is located along County Highway 1 10A, with area requirements far beyond the anticipated demand to show full development of that area. In addition to the airport compatible development area, Lake County Airport 4 3

4 a portion of the County s southwestern property is shown for re designation from Airport use to General County lands (known as surplus property). In addition to a runway extension, instrument approach improvements, and changes to airport land uses, the three development alternatives depict additional hangar and apron expansion, a new area for helicopter operations, corporate development reserves, reserves for aviation related business development, and an agricultural operations area. The below sections further detail the alternatives, along with an environmental overview. No Build Alternative Exhibit 4A illustrates the No Build alternative. By showing the consequences of not developing the Airport, the Airport Sponsor (Lake County) can assess the advantages and disadvantages of development alternatives. As shown in Chapter 2, Aeronautical Activity Forecast, the Airport is expected to experience increased demand. If no development were to occur, the Airport would not be able to support forecasted aeronautical uses and demands. The No Build alternative would not optimize the Airport s potential. While the No Build alternative is essentially a do nothing option, it does not mean that there would be no financial impact to the Airport. Most prominently, there would still be a cost associated with maintaining the current pavements and facilities. Development Alternative 1 Development Alternative 1 includes a western parallel taxiway and an instrument approach with visibility not lower than 1 statute mile, and is illustrated in Exhibit 4B. Generally speaking, Alternative 1 concentrates development near the existing landside facilities, at the Airport s southern section. Per the ConnectOregon IV application, development of a corporate aviation area is shown near the Runway 16 end. It meets some of the above stated facility requirements, excepting runway extension, precision approach, terminal area, and cargo apron. The alternative assumes redevelopment of the existing FBO to meet future needs. Airfield. Airfield developments for Alternative 1 are outlined below. Development of a western parallel taxiway. Construction of run up areas for Taxiways A and B. Upgrades to PAPIs and REILs for both runway ends. Additional windcones, one to be lighted with a segmented circle. Inclusion of a helicopter parking area. Development of an agricultural containment pad. Participation in the Pavement Maintenance Program. Overall, Alternative 1 includes minimal airfield improvements for the planning period. It would most likely meet the needs of existing users for a majority of the operations, but would not enable the use of larger aircraft requiring a longer runway. Landside. The landside development features proposed in Alternative 1 include: Construction of a T Hangar building, with at least four individual units, and a conventional hangar development reserve. Lake County Airport 4 4

5 X X X X STOCK DRIVE RUNWAY PROTECTION ZONE =500' X 700' X 1,000' (VISUAL & NOT LOWER THAN 1 MI) X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 300' X X X X X 1 6 AIRPORT FENCE X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X ACCESS ROAD 150' 100' X 5,318' 125' 125' 250' 250' 495' 495' TETRAHEDRON WIND INDICATOR USFS / BLM STAGING AREA 15 ASOS FUEL ISLAND USFS / BLM TANKER BASE X X X X X X X X X X X X RPZ=500' X 700' X 1,000' (VISUAL & NOT LOWER THAN 1 MI) X X X X X X X X X X X X X X X X X X X X 300' 27 AIRPORT ROAD X X X X X X X X X X DRAG RACING STRIP EXISTING AIR EASEMENT Property Line Existing Air Easement Primary Surface Runway Protection Zone (RPZ) Object Free Zone () Runway Safety Area () Object Free Area () Building Restriction Line (35') Graphic Legend X X X X SCALE ( FEET ) 1 INCH = 400 FT. 1 Aircraft Storage County 2-4 Aircraft Storage Private 5 Well House County 6 Electrical County 7 Storage County 8 Security Private 9 FBO / Maintenance County Aircraft Storage Private Storage County 18 Storage County Unused Bunker County Lake County Airport Master Plan Lake County, OR. Exhibit 4A No-Build Alternative June 8, SW Barnes Rd, Suite 300 Portland, OR Fax AIRP-EX4A_MC.DWG 06/08/12

6 X X X X RUNWAY PROTECTION ZONE =500' X 700' X 1,000' (VISUAL & NOT LOWER THAN 1 MI) ACCESS ROAD 300' ASOS RPZ=500' X 700' X 1,000' (VISUAL & NOT LOWER THAN 1 MI) 300' EXISTING AIR EASEMENT STOCK DRIVE X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X AIRPORT FENCE X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 23 35' 240' 150' 100' X 5,318' 125' 125' 250' 250' 495' 495' TETRAHEDRON WIND INDICATOR USFS / BLM STAGING AREA 15 FUEL ISLAND USFS / BLM TANKER BASE H 8 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X AIRPORT ROAD X X X X X X X X X X DRAG RACING STRIP SCALE ( FEET ) 1 INCH = 400 FT. Property Line Graphic Legend Existing Air Easement Primary Surface Runway Protection Zone (RPZ) Object Free Zone () Runway Safety Area () Object Free Area () Building Restriction Line (35') Aquisition and / or Avigation Easement Airport-Compatible Development Area PAPI Lighted Windcone with Segmented Circle Supplemental Windcone Helipad REIL Vehicle Parking Corporate Development Area Conventional Hangar Development Area T-Hangar Development Area Tiedown Apron Agricultural containment area / wash rack Lake County Airport Master Plan Lake County, OR. H 1 Aircraft Storage County 2-4 Aircraft Storage Private 5 Well House County 6 Electrical County 7 Storage County 8 Security Private 9 FBO / Maintenance * County Aircraft Storage Private Storage County 18 Storage County Unused Bunker County * 20 Tiedown Apron 21 T-Hangar Development Agricultural Containment Area 22 Wash Rack 23 Run-Up Areas 24 Conventional Hangar Development Area 25 Corporate Development Area 26 Vehicle Parking Redevelopment / Upgrade of Existing FBO Exhibit 4B Development Alternative 1 X X X X June 11, SW Barnes Rd, Suite 300 Portland, OR Fax AIRP-EX4B_MC.DWG 06/11/12

7 Additional tiedown apron near the new hangars. Redevelopment of existing FBO building to meet future needs. Vehicle parking near the Runway 16 access area. Alternative 1 does not provide specific reserves to accommodate a future cargo apron or terminal facility. The reason for this is to allow flexibility to potential developers to site the facility where it is most needed (north vs. south end). There is adequate room remaining on Airport for such development. A benefit to keeping the development at the south end of the Airport is the proximity to the new fueling station. If development were to occur at the north end, there would likely be a need for a fuel truck to service those aircraft. However, any future development will still require significant upgrades to the existing utilities. Development Alternative 2 Development Alternative 2 includes a 1,200 feet runway extension to the north and instrument approaches with visibility minimums lower than ¾ statute mile. All future facilities would be located east of Runway 16/34 along County Highway 1 10A. Exhibit 4C illustrates this alternative. Alternative 2 encompasses the facility requirements previously outlined, with areas identified to meet demand beyond the 20 year planning period. Airfield. Airfield developments for Alternative 2 are outlined below. Runway extension of 1,200 feet to the north. Full parallel taxiway. Precision instrument approach. Run up areas identified for the future parallel taxiway and Taxiways A and B. Upgrades to PAPIs Installation of REILs at the extended Runway 16 end. Helicopter parking area located adjacent to the future terminal/cargo apron. Upgraded wind indicators; a lighted segmented circle at mid field, with two supplemental windcones at each runway end. An agricultural containment pad located on the south end of the future building development, which can also be used as an aircraft wash pad. A significant feature of Alternative 2 is the installation of a precision type approach. In order to meet specific standards outlined in FAA Advisory Circular 150/ , Airport Design, the RPZ area would be increased to 1,000 feet by 2,500 feet by 1,750 feet, which would require additional property acquisition or avigation easements acres for the Runway 34 approach and acres for the Runway 16 approach. Landside. The landside development features proposed in Alternative 2 include: Reserve areas identified for T hangar and conventional hangar construction, beyond the land area needs identified in the previous chapter. A tiedown apron located between the hangar development areas for GA tiedown. Location for a future FBO facility sited north of the current access road, with a tiedown and cargo apron located north and west of the facility. Additional vehicular parking along the Runway 16 access road. Development Alternative 2 includes a reserve area in the Airport s northwest section that would allow for airportcompatible development, which would not necessarily be aviation related. The County owns a significant amount of land and, as shown, future facility requirements do not fully develop the property. Any future airport Lake County Airport 4 5

8 X X X X STOCK DRIVE RUNWAY PROTECTION ZONE 1,000' X 1,750' X 2,500' (APPROACH MINIMUMS LOWER THAN 3/4 SM) ACQUISITION OR EASEMENT AREA = AC. 600' 35' H EXTENSION (6,518' TOTAL) X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 25 35' 35' 35' 35' 35' 100' X 5,318' 1 6 AIRPORT FENCE 20 ACCESS ROAD X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 300' RUN-UP AREA 35' 150' 150' ' 400' 745' 745' TETRAHEDRON WIND INDICATOR USFS / BLM STAGING AREA 15 ASOS FUEL ISLAND USFS / BLM TANKER BASE 12 35' X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 600' 27 AIRPORT ROAD X X X X X X X X X X DRAG RACING STRIP RUNWAY PROTECTION ZONE 1,000' X 1,750' X 2,500' (APPROACH MINIMUMS LOWER THAN 3/4 SM) EXISTING AIR EASEMENT ACQUISITION OR EASEMENT AREA = AC. X X X X SCALE ( FEET ) 1 INCH = 400 FT. Property Line Graphic Legend Existing Air Easement Runway Protection Zone (RPZ) Object Free Zone () Runway Safety Area () Object Free Area () Building Restriction Line (35') Aquisition and / or Avigation Easement Airport-Compatible Development Area PAPI Lighted Windcone with Segmented Circle Supplemental Windcone Helipad REIL Vehicle Parking Corporate / Conventional Hangar Development Area T-Hangar Development Area Tiedown Apron Agricultural containment area / wash rack Terminal Tiedown Apron & Tiedown Apron Terminal Building Development Area Lake County Airport Master Plan Lake County, OR. H 1 Aircraft Storage County 2-4 Aircraft Storage Private 5 Well House County 6 Electrical County 7 Storage County 8 Security Private 9 FBO / Maintenance County Aircraft Storage Private Storage County 18 Storage County Unused Bunker County 20 Vehicle Parking 21 Corporate / Conventional Hangar Development 22 Tiedown Apron 23 T-Hangar Development 24 Agricultural Containment Area 25 Terminal Bldg. Development Area 26 Terminal Tiedown Apron & Cargo Apron 27 Run-Up Areas Exhibit 4C Development Alternative 2 June 11, SW Barnes Rd, Suite 300 Portland, OR Fax AIRP-EX4C_MC.DWG 06/11/12

9 compatible development should be approved with FAA coordination to ensure the development is in compliance with FAA grant assurances. Development Alternative 3 Development Alternative 3 includes a 1,200 feet runway extension to the north and an instrument approach with visibility minimums greater than ¾ statute mile. It also shows a portion of Airport land to be re designated away from airport use. Exhibit 4D illustrates this alternative. Alternative 3 encompasses the facility requirements previously outlined, with areas identified to exceed demand beyond the 20 year planning period. Airfield. Airfield developments for Alternative 3 are outlined below. Runway extension of 1,200 feet to the north. Full parallel taxiway. Non precision instrument approach, with minimums greater than ¾ statute mile. Run up areas identified for the future parallel taxiway and Taxiways A and B. Upgrades to PAPIs Installation of REILs at the extended Runway 16 end. Helicopter parking area located approximately mid field. Upgraded wind indicators; a lighted segmented circle at mid field, with two supplemental windcones at each runway end. An agricultural containment pad located at mid field. The installation of a non precision approach would require additional land acquisition or avigation easements to secure the runway protection zones. In order to meet specific standards outlined in FAA Advisory Circular 150/ , Airport Design, the RPZ area would be increased to 500 feet by 1,010 feet by 1,700 feet, which would require additional property acquisition or avigation easements of 0.48 acres to Runway 34 and acres to Runway 16. Landside. The landside development features proposed in Alternative 3 include: T hangar development located near the existing T hangars, at the Airport s southern end. An area for airport compatible development in the Airport s northwestern section. Conventional hangar development north of the Runway 16 access road, with expanded vehicle parking. A corporate development area located south of the Runway 16 access road. A tiedown apron and terminal building development area near mid field. Reserve areas for future aviation related development at the runway s southern section. The land area needs identified for both landside and airfield facilities over the 20 year planning period are far less than the available Airport property, as shown in all of the development alternatives. Currently, a portion of Airport property is leased for use as a drag racing strip. As the next chapter will outline, this lease may not be in compliance with FAA grant assurances. Since the land, approximately 109 acres, is not needed for Airport use, it is recommended the land be surplussed and designated as general County property. Additionally, the land is already outside of the airport fence and is not in aeronautical use. The process for disposing of airport property is outlined in FAA Advisory Circular 50.6B, Airport Compliance Manual. The Circular requires the land use must continue to be restricted, so that aeronautical operations are not jeopardized. Additionally, the surplussing of land must be justified and the land shown to not be needed for future aviation related activities, to which this Master Plan can exhibit. Lake County Airport 4 6

10 X X X X STOCK DRIVE RUNWAY PROTECTION ZONE 500' X 1,700' X 1,010' (APPROACH MINIMUMS GREATER THAN 3/4 SM) ACQUISITION OR EASEMENT AREA = AC. 400' 35' X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 35' 35' 35' 35' 35' 600' 1, EXTENSION (6,518' TOTAL) AIRPORT FENCE ACCESS ROAD X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 240' ' 20 H 100' X 5,318' ' 125' 250' 250' 495' 495' 29 TETRAHEDRON WIND INDICATOR USFS / BLM STAGING AREA 15 ASOS FUEL ISLAND USFS / BLM TANKER BASE X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 5 400' 600' 1 27 AIRPORT ROAD X X X X X X X X X X DRAG RACING STRIP SURPLUS PROPERTY RUNWAY PROTECTION ZONE 500' X 1,700' X 1,010' (APPROACH MINIMUMS GREATER THAN 3/4 SM) ACQUISITION OR EASEMENT AREA = 0.48 AC. EXISTING AIR EASEMENT SCALE ( FEET ) 1 INCH = 400 FT. Property Line Existing Air Easement Graphic Legend Primary Surface Runway Protection Zone (RPZ) Object Free Zone () Runway Safety Area () Object Free Area () Building Restriction Line (35') Aquisition and / or Avigation Easement Airport-Compatible Development Area Redesignate from Airport to General County Property (Surplus) Helipad PAPI Lighted Windcone with Segmented Circle Supplemental Windcone REIL Vehicle Parking Corporate Development Area Conventional Hangar Development Area T-Hangar Development Area Tiedown Apron Agricultural containment area / wash rack Septic Drain Field Lake County Airport Master Plan Lake County, OR. 1 Aircraft Storage County 2-4 Aircraft Storage Private 5 Well House County 6 Electrical County 7 Storage County 8 Security Private 9 FBO / Maintenance County Aircraft Storage Private Storage County 18 Storage County Unused Bunker County 20 Vehicle Parking 21 Conventional Hangar Development Area 22 Corporate Development Area 23 Tiedown Apron 24 T-Hangar Development Area 25 Agricultural Containment Area 26 Terminal Bldg. Development Area 27 Helipad 29 Future Aviation-Related Development Reserve 30 Septic Drain Field Exhibit 4D Development Alternative 3 X X X X June 11, SW Barnes Rd, Suite 300 Portland, OR Fax AIRP-EX4D_MC.DWG 06/11/12

11 COMPARISON OF ALTERNATIVES Detailed costs estimates were not prepared for each alternative; however, the alternatives are compared in order of magnitude costs. Alternative 2 would have the highest capital cost, since it includes both the longer runway extension and the more expensive instrument approach improvement requiring additional property acquisition. Alternative 3 would cost less than Alternative 2, since it requires significantly less property acquisition/easement. Alternative 1, has no change in runway length and the areas identified for development are less than in the other two development alternatives. The No Build Alternative has the lowest capital cost, as it would only maintain the existing pavements and facilities. However, the three development alternatives would provide for more economic benefit and revenue growth than the No Build Alternative. Runway length would be nominally 5,318 feet for the No Build Alternative and Alternative 1, and 6,518 feet for Alternatives 2 and 3. The No Build and Alternative 1 would limit aircraft to those currently operating at the Airport. The instrument approach minimums shown for each development alternative vary greatly. The existing, No Build Alternative, has minimums of not lower than 1 statute mile, which is also retained in the Alternative 1 scenario. Alternative 3 depicts the design standards necessary for an instrument approach with minimums greater than ¾ statute mile. The primary surface, which dictates placement of the 35 foot building restriction line (), does not change as a result of the lower approach minimums. Alternative 2 shows the requirements for a precision instrument approach with minimums lower than ¾ statute mile. As a result of the lowered minimums, the is extended outward by 250 feet on each side of the runway; thereby greatly reducing the buildable land. Additionally, to ensure protection of the RPZs, the amount of land acquisition and/or avigation easement is greatly increased. The Airport would remain open more often in times of low visibility, as the approach minimums decrease. However, according to NOAA data, the Airport only experiences precision approach level weather approximately 2.0% of the time. Therefore, the reduction of buildable land and the increased cost may not justify the need for a precision approach. The three development alternatives include a parallel taxiway to enhance safety. Alternative 1 shows the taxiway west of the runway, while the other two place the taxiway to the east. If the western parallel taxiway were developed, followed by construction of facilities east of the runway, aircraft based on the east side would be required to cross the runway to use the parallel taxiway on the west side a potential safety hazard. Helicopter operations, which currently do not have a designated area (except for those associated with the USFS/BLM tanker base), would be accommodated at various locations per each alternative. In each alternative the helicopter parking is separate from the fixed wing tiedown area to reduce rotorwash impacts to fixed wing aircraft. The FBO will likely need to expand or relocate over the planning period. The current facilities would remain unimproved in the No Build Alternative. Alternative 1 allows the FBO to expand and/or redevelop at its current location. Alternatives 2 and 3 show areas for future terminal and/or FBO development east of the runway, which is desirable from the standpoint of taxiing efficiency, customer visibility, and road access. Currently the FBO offers limited services; an expanded FBO could offer services such as flight instruction, maintenance, aircraft charter, and aircraft fueling. Lake County Airport 4 7

12 None of the alternatives show a relocation of the existing fueling facility, as it is expected to have a usable life throughout the planning period. However, if facilities are developed east of the runway, it would be inefficient and potentially unsafe due to increased runway crossings to require aircraft to taxi to the existing fuel facility. If development under Alternatives 2 and 3 were to occur, the existing above ground fueling facility could be relocated or a fuel could truck be available to service aircraft on the east side. If needed a second fueling facility could be developed on the east side. The No Build Alternative would have no additional T hangars, conventional hangars, aviation related businesses, or aviation compatible development than now exist. Alternative 3 reserves the most land for future landside development, Alternative 2 has slightly less land available as a result of the larger. Alternative 1 identifies the least area for landside development. In all alternatives the Airport property is under utilized; even when showing development far beyond the anticipated demand. Resultantly, Alternative 3 shows re designation of a portion of property to general County use, rather than dedicating it to Airport only use. ENVIRONMENTAL SCREENING OF ALTERNATIVES Each alternative was reviewed to assess its relative environmental impact, as well as identify any environmental constraints that may prohibit development. The results of this analysis are presented in Table 4A. Each alternative presents an array of environmental opportunities and constraints. The following discussion summarizes the potential environmental concerns associated with each alternative. Because the airport is so remote, and there is little development around the airport, there are very few environmental impacts associated with any of the alternatives. The issues surrounding the alternatives are likely more associated with cost and needs of the airport. Lake County Airport 4 8

13 TABLE 4A. DEVELOPMENT ALTERNATIVES - ENVIRONMENTAL CONSTRAINTS AND IMPACTS Impact Categories No Build Alternative Development Alternative 1 Development Alternative 2 Development Alternative 3 Air Quality No apparent issues. No apparent issues. No apparent issues. No apparent issues. Biotic Resources No apparent issues. No apparent issues. No apparent issues. No apparent issues. Land Use Impacts No apparent issues. No apparent issues. Slight perception of community character change. Slight perception of community character change. Construction Impacts No apparent issues. No apparent issues. No apparent issues. No apparent issues. Section 4(f) Resources No apparent issues. No apparent issues. No apparent issues. No apparent issues. Threatened and Endangered Species No apparent issues. No apparent issues. No apparent issues. No apparent issues. Energy Supplies, Natural Resources and Sustainability No apparent issues. No apparent issues. No apparent issues. No apparent issues. Environmental Justice No apparent issues. No apparent issues. No apparent issues. No apparent issues. Farmlands No apparent issues. No apparent issues. No apparent issues. No apparent issues. Hazardous Materials Potential for contamination from agricultural chemicals. Wash and containment area reduces agricultural chemical risk. Risk for spills with landside development Wash and containment area reduces agricultural chemical risk. Risk for spills with landside development Wash and containment area reduces agricultural chemical risk. Risk for spills with landside development Historical, Archaeological and Cultural Resources No apparent issues. No apparent issues. No apparent issues. No apparent issues. Lake County Airport 4 9 (draft)

14 Impact Categories No Build Alternative Development Alternative 1 Development Alternative 2 Development Alternative 3 Induced Socioeconomic Impacts No apparent issues. Development of landside improvements would create jobs and rent revenue. Development of landside improvements would create jobs and rent revenue. Development of landside improvements would create jobs and rent revenue. Light Emissions and Visual Effects No apparent issues. No apparent issues. No apparent issues. No apparent issues. Energy Supply & Natural Resources No apparent issues. No apparent issues. No apparent issues. No apparent issues. Noise No apparent issues. Taxiway relocation changes shape of noise footprint. Runway extension and potential new aircraft types expand airport noise footprint. Runway extension and potential new aircraft types expand airport noise footprint. Social Impacts No apparent issues. No apparent issues. Slight potential for perception of change in community structure. Slight potential for perception of change in community structure. Solid Waste No apparent issues. No apparent issues. No apparent issues. No apparent issues. Water Quality No apparent issues. No apparent issues. No apparent issues. No apparent issues. Wetlands No apparent issues. No apparent issues. No apparent issues. No apparent issues. Cumulative Impact No apparent issues. No apparent issues. No apparent issues. No apparent issues. Controversy No apparent issues. No apparent issues. No apparent issues. No apparent issues. Lake County Airport 4 10 (draft)

15 No Build Alternative The No Build Alternative does not propose any new use designations on the airport. It includes only maintenance for the next 20 years. The No Build Alternative does not present land use compatibility concerns, noise concerns, changes to the social environment, or direct threats to plant and animal communities. In terms of overall impact, this alternative has the least impact to the existing natural and built environments. Development Alternative 1 This alternative has minimal landside development, most of which is in the currently developed area of the airport. A small development area is set aside at the northeast corner of the airport for industrial use and associated parking. The runway will be modified to include a parallel taxiway, but will not be extended. The greatest impact of this alternative is associated with the increase in impervious surfaces. New drainage would need to be installed to convey storm water to the existing airport storm water system. The current system, with minor modifications, should be able to accommodate increased storm water from new impervious surface. Because of the airport s remote location from the town of Lakeview and any neighbors, local residents will not likely perceive the small increase in hangar development, as well as new on airport employment uses as a change in character. Development of the landside areas, may also slightly increase surface transportation demand, however local roadways have adequate capacity to accommodate these minor increases. The taxiway area has been previously disturbed and does not constitute prime habitat. The development area in the northeast area is vegetated and known to be home for deer, small mammals, and hunting area for raptors. Many of these species are not desirable on an airport, and loss of habitat (along with improved fencing) will discourage their presence. There is adequate similar habitat off airport. No noise impacts are anticipated from this alternative, other than the forecast increases in aviation use. Aircraft noise will move closer to the runway, due to the inclusion of a parallel taxiway, compared to the present taxiway configuration. This alternative has the least environmental impact of the three build alternatives. Development Alternative 2 This alternative includes a runway extension of 1,200 feet to the north, a parallel taxiway, and development of hangars, tiedowns and other airport facilities along the eastern edge of the runway. Minimal change is planned for the existing landside operation area at the south end. This alternative has a runway extension and full length taxiway; the impervious surface increase would be greater than in Alternative 1. The impervious surface created by the new development would also be significantly greater than Alternative 1. A new storm water collection system would be needed for the eastern development area and taxiway. Storm water would be conveyed to the existing drainage ditches, which appear to have adequate capacity to accommodate additional development. The increase in hangar development, as well as new on airport commercial and employment uses will be more visible from local roads and may be perceived as a change in character by local residents. Development of the Lake County Airport 4 11

16 landside areas, may also slightly increase surface transportation demand, however local roads have adequate capacity. The runway and taxiway area has been previously disturbed and does not constitute prime habitat. Compared to Alternative 1, more of the vegetated area in the northeast corner will be placed in developed uses. Loss of onairport habitat may be considered a benefit due to the potential for wildlife hazards. There is adequate off airport habitat. This alternative accommodates larger aircraft than Build Alternative 1. There may be a slight noise increase due to the potential use by larger aircraft. Sound generation will also move based on the change in taxiway operation. This alternative is has the mid level of environmental impact of the Build Alternatives. Development Alternative 3 This alternative includes the same features as Build Alternative 2, but with larger space allocations to conventional hangars, tiedowns, and corporate hangar space. This alternative includes additional T hangar development in the existing airport area. The land around the drag strip would be transferred from airport ownership to general County ownership. A septic drainfield would be located in the northeast area to serve the new development area. Because this alternative has the largest amount of potential land development, the impervious surface increase would be larger than in the other alternatives. A new storm water collection system would be needed for the eastern development area and taxiway. Storm water would be conveyed to the existing drainage ditches, which appear to have adequate capacity to accommodate additional development. Transfer of ownership of the area around the drag strip from Airport to general County ownership could open this land for additional development. This alternative is has the greatest environmental impact of the Build Alternatives. As shown in Table 4A, the No Build Alternative has the least impact, as it does not change the airport from its current configuration. Build Alternative 1 has the least impact of the build alternatives because it has no runway extension and the least amount of potential new development. Alternative 2 is shown with the mid level of impact, while Alternative 3 is shown as having the greatest. None of the alternatives appears to have any significant negative environmental impacts. MASTER PLAN CONCEPT The four alternatives were presented to the County, Planning Advisory Committee (PAC), FAA, and members of the public on July 10, Based on comments given, the County selected a Preferred Alternative (see Exhibit 4E). The Preferred Alternative, or Master Plan Concept, is based on various components of each of the alternatives presented in this chapter. The Preferred Alternative is the basis for the Airport Layout Plan in Chapter 6. The proposed Preferred Alternative is summarized below. Note that the runway was restriped in June of 2012 to reflect the new alignment caused by the shifting magnetic north pole. The runway is now designated /35, and this change will be reflected in the document from this point on. Lake County Airport 4 12

17 X X X X STOCK DRIVE RUNWAY PROTECTION ZONE 500' X 1,700' X 1,010' (APPROACH MINIMUMS GREATER THAN 3/4 SM) ACQUISITION OR EASEMENT AREA = AC. 400' 35' X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 35' 35' 35' 35' 35' 600' 1, EXTENSION (6,518' TOTAL) AIRPORT FENCE FUTURE TAXILANE X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 240' ACCESS ROAD 35' 20 H 100' X 5,318' ' 125' 250' 250' 495' 495' 29 TETRAHEDRON WIND INDICATOR USFS / BLM STAGING AREA 15 ASOS FUEL ISLAND USFS / BLM TANKER BASE X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 5 400' 600' 1 27 AIRPORT ROAD X X X X X X X X X X DRAG RACING STRIP SURPLUS PROPERTY RUNWAY PROTECTION ZONE 500' X 1,700' X 1,010' (APPROACH MINIMUMS GREATER THAN 3/4 SM) ACQUISITION OR EASEMENT AREA = 0.48 AC. EXISTING AVIGATION EASEMENT Property Line Graphic Legend X X X X Existing Avigation Easement Primary Surface Runway Protection Zone (RPZ) Object Free Zone () Runway Safety Area () Object Free Area () Building Restriction Line (35') Aquisition and / or Avigation Easement Airport-Compatible Development Area Redesignate from Airport to General County Property (Surplus) Helipad SCALE ( FEET ) 1 INCH = 400 FT. PAPI Lighted Windcone with Segmented Circle Supplemental Windcone REIL Vehicle Parking Corporate Development Area Conventional Hangar Development Area T-Hangar Development Area Tiedown Apron Agricultural containment area / wash rack Septic Drain Field 1 Aircraft Storage County 2-4 Aircraft Storage Private 5 Well House County 6 Electrical County 7 Storage County 8 Security Private 9 FBO / Maintenance County Aircraft Storage Private Storage County 18 Storage County Unused Bunker County 20 Vehicle Parking 21 Conventional Hangar Development Area 22 Corporate Development Area 23 Tiedown Apron 24 T-Hangar Development Area 25 Agricultural Containment Area 26 Terminal Bldg. Development Area 27 Helipad 29 Future Aviation-Related Development Reserve 30 Septic Drain Field Lake County Airport Master Plan Lake County, OR. Exhibit 4E Master Plan Concept July 20, SW Barnes Rd, Suite 300 Portland, OR Fax AIRP-EX4E_MC.DWG 07/20/12

18 Airfield. Airfield developments for the Master Plan Concept are outlined below. Runway extension of 1,200 feet to the north. * Full eastside parallel taxiway. Non precision instrument approach, with minimums greater than ¾ statute mile. Run up areas identified for the future parallel taxiway and Taxiways A and B. Upgrades to PAPIs Installation of REILs at the extended Runway end. Helicopter parking area located approximately mid field. Upgraded wind indicators; a lighted segmented circle at mid field, with two supplemental windcones at each runway end. An agricultural containment pad located at mid field. Landside. The landside development features proposed for the Master Plan Concept include: An area for airport compatible development in the Airport s northwestern section. Conventional hangar development north of the Runway access road, with expanded vehicle parking. T hangar development located adjacent to the conventional hangar development area. A corporate development area located south of the Runway access road. A tiedown apron and terminal building development area near mid field. Reserve areas for future aviation related development at the runway s southern section. Redesignation of property from airport use to general County property (currently in use as a drag racing area). The above described Preferred Alternative mirrors the PAC s recommendations, which was a slight modification to Development Alternative 3. *The Runway extension of 1,200 feet to the north is neither justified nor necessary in the foreseeable future based on the current critical aircraft and type of operations. Several years ago the County developed a long term vision to move the flight line to the eastside of Runway /35. As previously stated, the infrastructure at the present location is WWII era and in very poor condition. The water supply well is undersized and can t support future development. The water supply piping system is dated from the 40 60s and is corroded and failing. The sanitary drain field is failing and has no expansion capabilities to accommodate future development; the soils in this area don t support current DEQ requirements. Power to the area is via overhead lines that are also undersized with limited expansion capabilities. The various County structures are requiring major maintenance just to meet the current building codes. All of these issues led the County to make the decision to start the development along Runway /35 and in 2009 they invested in building a new access road/taxiway from the County road to the holding apron to Runway. In 2011 the County applied for and will be receiving a $526,000 ConnectOregon IV grant for a new business, Withrotor Aviation Inc., to relocate to the Airport. Withrotor will invest approximately $250,000 to construct a new building that will house 2 3 airplanes and several helicopters, as well as up to 5 full time employees. The County will invest up to $200,000 in the project to bring in new power, a potable water well that will meet long term fire fight needs, and a sanitary sewer system that is expandable to meet future growth. In addition, the access road and connector taxiway to Runway will be paved and security fencing and gates installed. The PAC agreed with this vision when they selected the Master Concept described above. Lake County Airport 4 13

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

MASTER PLAN CONCEPT 1 DRAFT

MASTER PLAN CONCEPT 1 DRAFT The Airport Master Plan Update for Dallas Executive Airport has included the development of aviation demand forecasts, an assessment of future facility needs, and the evaluation of airport development

More information

Grants Pass Airport Master Plan & Airport Layout Plan Update

Grants Pass Airport Master Plan & Airport Layout Plan Update Attendees: Grants Pass Airport Master Plan & Airport Layout Plan Update Meeting #3 January 26, 2010 Merlin Community Center 100 Acorn Street, Merlin 5:45 7:15 p.m. Josephine County Department of Airports:

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014 DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

Chapter 4 Airport Facility Requirements

Chapter 4 Airport Facility Requirements Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT

More information

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES 5.1 INTRODUCTION This section investigates Airfield Development Alternatives, generalized Land Use Alternatives, and more detailed General Aviation Alternatives.

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES Chapter Four Airport Development Alternatives Prior to formulating a development program for Ryan Airfield, it is important to consider development potential

More information

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906 Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement

More information

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3 Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus

More information

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report April 2016 Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report Prepared for the County of Yolo Mindi Nunes,

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

Airport Master Plan Update

Airport Master Plan Update Duttchessss Countty Airrporrtt Masstterr Plan Updatte Airport Master Plan Update Final Report Dutchess County Airport Town of Wappingers, New York C&S Engineers, Inc. 499 Col. Eileen Collins Blvd. Syracuse,

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS

6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS 6.1 INTRODUCTION In the previous chapter, facility needs for the 20-year planning horizon were identified. The next step in the planning process is to identify and evaluate the various ways certain facilities

More information

Update on the Aspen/Pitkin County Airport Improvements

Update on the Aspen/Pitkin County Airport Improvements Update on the Aspen/Pitkin County Airport Improvements and EA Process Public Information Meeting September 10, 2015 Meeting Objectives Explain what has changed since we had our last meeting and how it

More information

INDEPENDENCE STATE AIRPORT (7S5)

INDEPENDENCE STATE AIRPORT (7S5) INDEPENDENCE STATE AIRPORT (7S5) Airport Master Plan Update 2018 Planning Advisory Committee PAC Meeting #3 April 11, 2018 1994-2016 AGENDA The second PAC workshop will cover the following topics: Recap

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

CHAPTER 3 AIRPORT FACILITY REQUIREMENTS

CHAPTER 3 AIRPORT FACILITY REQUIREMENTS CHAPTER 3 AIRPORT FACILITY REQUIREMENTS 3.1 Introduction The existing runway and taxiway system at Skyhaven Airport provides more than adequate operational capacity to accommodate future peak hour and

More information

DRAFT MASTER PLAN UPDATE

DRAFT MASTER PLAN UPDATE DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS

More information

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS EXECUTIVE SUMMARY ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS PAGE NO. CHAPTER 1-INTRODUCTION... 1-1 1.01 General...1-1 1.02 Purpose and Scope of Study...1-1 1.03 The Planning Process...1-2

More information

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item. Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings

More information

ACTION TRANSMITTAL

ACTION TRANSMITTAL Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2018-16 DATE: February 9, 2018 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED

More information

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline

More information

Buchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan

Buchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business Plan Steering Committee December 14, 2006 Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business

More information

Chapter 5 Airport Development Alternatives

Chapter 5 Airport Development Alternatives Chapter 5 Airport Development Alternatives Introduction CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-1 Evaluation Process No-Action Alternative CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-2

More information

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017 Lopez Island Airport Master Plan Update Public Meeting June 15, 2017 Master Plan Update Team Reid Middleton/Everett, WA Shannon Kinsella, Project Manager Melania Haagsma, Project Engineer Mead & Hunt/Tulsa,

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet

More information

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.

More information

CHAPTER FOUR AIRPORT ALTERNATIVES

CHAPTER FOUR AIRPORT ALTERNATIVES 4.0 INTRODUCTION CHAPTER FOUR The goal of the master planning process is to provide the City of New Smyrna Beach with an assessment of the adequacy and capabilities of the Airport as well as to identify

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington

More information

Merritt Island Airport

Merritt Island Airport TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

Chapter 9 - AIRPORT SYSTEM DESIGN

Chapter 9 - AIRPORT SYSTEM DESIGN Chapter 9 - AIRPORT SYSTEM DESIGN 9.01 GENERAL This chapter discusses the development program for Dutchess County Airport to the year 2020. This airport system design is based upon the airport's existing

More information

Draft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005

Draft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005 Draft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005 County of Santa Clara Board of Supervisors Donald F. Gage Blanca Alvarado Peter A. McHugh James T. Beall, Jr. Liz

More information

Chapter 2 FINDINGS & CONCLUSIONS

Chapter 2 FINDINGS & CONCLUSIONS Chapter 2 FINDINGS & CONCLUSIONS 2.01 GENERAL Dutchess County acquired the airport facility in 1947 by deed from the War Assets Administration. Following the acquisition, several individuals who pursued

More information

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together Bringing g the PUBLIC WORKSHOP Venice Municipal Airport New Opportunities Presented for Venice City Council & Citizens of Venice September 25, 2009 Slide 1 Bringing g the Welcome & Introductions May 12th

More information

Public Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California

Public Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California Public Review Draft South County Airport Master Plan Report County of Santa Clara San Martin, California July 2005 County of Santa Clara Board of Supervisors Donald F. Gage Blanca Alvarado Peter A. McHugh

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

CHAPTER 5: Landside Facility Requirements and Development Concepts

CHAPTER 5: Landside Facility Requirements and Development Concepts CHAPTER 5: Landside Facility Requirements and Development Concepts Overview Implementation of the preferred intermediate-term (10-year) and long-term (20-year) airside alternatives will have a significant

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East

More information

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by: Draft AIRPORT MASTER PLAN Newport State Airport () Prepared for: 2000 Post Road Warwick, Rhode Island 02886-1533 THE Louis Berger Group, INC. 20 Corporate Woods Boulevard Albany, New York 12211-2370 Prepared

More information

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update Appendix D Project Newsletters Tacoma Narrows Airport Master Plan Update This appendix contains the newsletters distributed throughout the project. These newsletters provided updates and information on

More information

AIRPORT MASTER PLAN UPDATE

AIRPORT MASTER PLAN UPDATE AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo

More information

chapter 5 Recommended Master Plan Concept airport master plan MASTER PLAN CONCEPT

chapter 5 Recommended Master Plan Concept airport master plan MASTER PLAN CONCEPT chapter 5 Recommended Master Plan Concept airport master plan The planning process for Coolidge Municipal Airport has included several analytical efforts in the previous chapters intended to project potential

More information

CHAPTER 3 FACILITY REQUIREMENTS

CHAPTER 3 FACILITY REQUIREMENTS CHAPTER 3 FACILITY REQUIREMENTS 3.1 INTRODUCTION To properly plan for the future requirements of Newport News/Williamsburg International Airport, it is necessary to translate the forecasts of aviation

More information

Source: Chippewa Valley Regional Airport ASOS, Period of Record

Source: Chippewa Valley Regional Airport ASOS, Period of Record Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size

More information

2015 PURDUE ROAD SCHOOL March 11, 2015

2015 PURDUE ROAD SCHOOL March 11, 2015 2015 PURDUE ROAD SCHOOL March 11, 2015 Runway Protection Zone (RPZ) Definition It is a trapezoidal shape formed off the end of a runway and its geometry it a function of the airport s aircraft approach

More information

TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017

TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017 TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017 Please find attached for your review prior to the PAC Meeting #4,

More information

CHAPTER 1 BACKGROUND AND PROPOSED ACTION

CHAPTER 1 BACKGROUND AND PROPOSED ACTION CHAPTER 1 BACKGROUND AND PROPOSED ACTION 1.0 INTRODUCTION An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

Punta Gorda Airport Master Plan Update

Punta Gorda Airport Master Plan Update Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,

More information

Austin-Bergstrom International Airport Master Plan Update

Austin-Bergstrom International Airport Master Plan Update FINAL REPORT Prepared for: City of Austin Department of Aviation 3600 Presidential Boulevard Austin, Texas 78719 Prepared by: P&D Aviation A Division of P&D Consultants, Inc. 999 Town & County Road, 4

More information

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, 2018 Airport Master Plan WELCOME & INTRODUCTIONS Kimberly Moss, Doug Hammon (The Ohio State University) 2 Member Introduction Name Organization 3 MEETING

More information

Financial Plan/Capital Improvements - DRAFT 6-1

Financial Plan/Capital Improvements - DRAFT 6-1 The analyses completed in previous chapters evaluated development needs at McKinney National Airport (TKI or Airport) over the next 20 years, based on forecast activity, facility requirements, safety standards,

More information

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February

More information

3.9 AIRPORT SUPPORT FACILITIES

3.9 AIRPORT SUPPORT FACILITIES 3.9 AIRPORT SUPPORT FACILITIES This section details additional airfield facilities that may be required over the next 20 years. 3.9.1 Airport Rescue and Fire Fighting (ARFF) Station GEG is certified under

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN LAST UPDATE JULY 2013 Acknowledgements The preparation of this document was financed in part by a grant from the Federal Aviation Administration (Project No: 3-27-0000-07-10), with the financial support

More information

Study Committee Meeting. September 2015

Study Committee Meeting. September 2015 W ki P T / Working Paper Two/ Study Committee Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments,

More information

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016 Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

5.0 ALTERNATIVES ANALYSIS

5.0 ALTERNATIVES ANALYSIS 5.0 ALTERNATIVES ANALYSIS The Alternative Analysis chapter describes and evaluates the various development alternatives considered for. In addition, it presents a preferred development plan that accommodates

More information

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM PORT OF PORTLAND Chapter Seven CAPITAL IMPROVEMENT PROGRAM CHAPTER SEVEN PORT OF PORTLAND CAPITAL IMPROVEMENT PROGRAM The analyses conducted in the previous chapters evaluated airport development needs

More information

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 Meeting Agenda 1. Introductions and Contacts [10 Minutes] 2. Plan Overview and MPAC Role [20 Minutes] 3. MPAC Visioning

More information

Airfield Design OVERVIEW BASIC DESIGN FACTORS. Airport Role

Airfield Design OVERVIEW BASIC DESIGN FACTORS. Airport Role 3 Airfield Design OVERVIEW Due to the presence of significant physical constraints, little change to the existing airfield is anticipated. The emphasis in this plan is on identifying airfield improvements

More information

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application PUBLIC NOTICE ***************************** New Castle Airport Intention to File a Passenger Facility Charge (PFC) Application The Delaware River & Bay Authority (DRBA), the sponsor of the New Castle Airport

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

BELFAST MUNICIPAL AIRPORT OVERVIEW

BELFAST MUNICIPAL AIRPORT OVERVIEW BELFAST MUNICIPAL AIRPORT OVERVIEW LOCATION AND HISTORY Belfast Municipal Airport (Federal Aviation Administration (FAA) airport code BST, International Civil Aviation Organization airport code KBST, FAA

More information

MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management

MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management 200 S. Spruce St. P.O. Box 20,000 Grand Junction, Colorado 81502-5022

More information

Dallas Executive Airport Town Hall Meeting April 3, 2014

Dallas Executive Airport Town Hall Meeting April 3, 2014 Dallas Executive Airport Town Hall Meeting April 3, 2014 Background 1,040 acre general aviation facility owned and operated by the City of Dallas 150 based aircraft including business jets and helicopters,

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10 The 747 8 offers operators increased capacity while taking advantage of existing airport infrastructure. 14 aero quarterly qtr_03 10 Operating the 747 8 at Existing Airports Today s major airports are

More information

EXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project #

EXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project # EXHIBIT A LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project # 3-06-0125-11 INTRODUCTION The following proposed work program for the Lompoc Airport Master Plan describes in detail the work which is to

More information

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

ArcadiaMunicipalAirportislocatedonthesoutheast sideofarcadia,southofstateroute70,westofstate Route31,andisaccessiblefrom AirportRoad.

ArcadiaMunicipalAirportislocatedonthesoutheast sideofarcadia,southofstateroute70,westofstate Route31,andisaccessiblefrom AirportRoad. Arcadia GeneralAviationAirport ArcadiaMunicipalAirportislocatedonthesoutheast sideofarcadia,southofstateroute70,westofstate Route31,andisaccessiblefrom AirportRoad.Arcadia islocatedapproximately30milesnortheastoftheport

More information

Introduction DRAFT March 9, 2017

Introduction DRAFT March 9, 2017 Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout

More information

Demand. Typical Building Area Functions and Facilities Commonly Found at General Aviation Airports:

Demand. Typical Building Area Functions and Facilities Commonly Found at General Aviation Airports: OVERVIEW The building area of an airport encompasses all of the airport property not devoted to runways, major taxiways, required clear areas, and other airfieldrelated functions. Typical facilities found

More information

Chapter Four ALTERNATIVES

Chapter Four ALTERNATIVES Chapter Four ALTERNATIVES Master Plan Update This chapter walks through the process of identifying and evaluating development alternatives to serve the (Airport) in the near-term to the distant future.

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long The first (AMP) was completed in 1984 and updated in 2000. The current FAA approved Airport Layout Plan (ALP) is dated November 9, 2001. The FAA suggests updating the AMP every five year in accordance

More information

Preliminary Findings of Proposed Alternative

Preliminary Findings of Proposed Alternative Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be

More information