CHAPTER 3 AIRPORT FACILITY REQUIREMENTS

Size: px
Start display at page:

Download "CHAPTER 3 AIRPORT FACILITY REQUIREMENTS"

Transcription

1 CHAPTER 3 AIRPORT FACILITY REQUIREMENTS 3.1 Introduction The existing runway and taxiway system at Skyhaven Airport provides more than adequate operational capacity to accommodate future peak hour and annual aircraft operations described in all three of the forecast scenarios presented in Chapter 2. According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the hourly capacity of the airfield in visual conditions is 98 operations, and the hourly capacity in instrument weather conditions is 58 operations. The annual service volume is 230,000 operations. The FAA s Terminal Area Forecast projects that aircraft operations will remain at 17,000 annually. As a result, no additional runways or taxiways are needed to enhance operational capacity. However, certain airport facilities are needed to accommodate both existing and future activity. The facilities identified in this chapter would accommodate unconstrained needs. Other factors such as cost, funding availability, and environmental issues, may affect the ultimate facility requirements, and are considered in Chapter 4. Input about airport facilities was also obtained from the SAAC and airport tenants, who identified a number of possible improvements and facilities they felt were needed at Skyhaven Airport (see Appendix 3-A). The following recommendations were based, in part, on this input, as well as projected aviation activity and operational needs. 3.2 Skyhaven Airport Facility Improvements and Needs Runway 15-33: The 2001 AMPU recommended extending Runway by 1,000 feet (to a total length of 5,000 ), but only if aircraft operations increased at the High Growth rate presented in that plan. Although actual operations did not grow at that forecasted rate, it is possible that corporate activity could increase in the future if certain improvements are made. Under certain scenarios described in Chapter 2, turbine powered aircraft activity could increase to the level of 500 operations per year by 2028 at Skyhaven Airport. The runway length requirements to accommodate such aircraft are examined in detail later in this chapter. Runway is 24 years old and is in fair to poor condition with numerous cracks. As a result, the runway should be reconstructed by The existing runway is 100 wide, but FAA criteria notes the runway width should be 75 to accommodate ARC B-II aircraft such as the Beech King Air 200. T-Hangars: All of the existing T-hangars are full. The PDA has a list of 31 aircraft owners waiting for hangar space at Skyhaven Airport. Some aircraft owners on the list presently occupy a tiedown on the airport, so if they move their airplane to a hangar the total number of based aircraft would not change. Because aircraft owners are price sensitive, the cost of hangar construction and the subsequent purchase price or lease rate will affect actual demand. It s also possible some owners have sold their airplanes or moved to another airport. As a result, one option would be to construct one row of 10 T- 3-1

2 hangars, then rent (or sell) every unit, and then reconfirm demand for the next set of T- hangars before beginning construction. Such a process would minimize the risk of overbuilding, particularly since there are T-hangars currently available for both lease and sale at other area airports. If existing T-hangars at other airports are available at a lower price than new ones at Skyhaven Airport, demand for the new hangars at Skyhaven may be less than anticipated. Transient Aircraft Parking: Due to the configuration of the existing terminal based aircraft apron and self-serve fuel pumps, transient aircraft 1 wishing to park at Skyhaven Airport have a limited amount of space available. Transient aircraft typically park for short periods of time (often less than a day), although some aircraft park for 2 or more days. There is a need for additional transient parking space for both turbine-powered and piston-engine aircraft. Turbine aircraft require paved parking vs. turf parking. Transient aircraft pilots and passengers generally want convenient access to the terminal building, particularly if a restaurant or other businesses are located in the building, as well as to ground transportation. A paved parking apron for transient aircraft should be sized to accommodate 2 to 3 aircraft as large as the Beech King Air 200, in addition to six single or multi-engine piston aircraft. The parking positions should also allow for power-in, power-out parking where feasible, particularly for turbine aircraft. Based Aircraft Tiedown Apron: Providing additional transient aircraft parking close to the terminal building would require moving some or all of the existing paved based aircraft tiedowns to another location. A new paved tiedown apron could be constructed south of the terminal building and former FBO maintenance hangar, adjacent to Taxiway A. That would allow the based aircraft on tiedowns to move, and the tiedown apron could be converted to transient aircraft parking. Airport users also recommended that electrical power be provided to the paved aircraft tiedowns in order to heat aircraft engines in the winter, which would also be an additional revenue source for the airport. Self-Serve Aviation Fuel Pumps: There are two existing self-serve fuel pumps (one for 100LL avgas and one for Jet A) located in the middle of the terminal parking apron. Jet A fuel is not currently stored or sold at Skyhaven, so that pump is not being used. Moving the self-serve fuel pumps to another location could provide better access for aircraft wishing to refuel, particularly if Jet A fuel is offered for sale again, the move would also provide more space for transient and based aircraft. In addition, new state-of-the-art fuel pumps could be installed. Improved Instrument Approach to Runway 33: Based on data compiled by a FlightAware, there were 306 instrument aircraft arrivals and departures at Skyhaven Airport between July 1, 2007 and June 30, In addition, there were also practice (training) instrument approaches conducted during visual weather conditions that were not counted by FAA or tracked by FlightAware. There is a need for lower instrument approach minimums to serve those aircraft, as well as by other aircraft that would prefer 1 Transient aircraft are those that are not based at Skyhaven Airport. FAA also uses the term itinerant to refer to visiting (or non-based) aircraft. 3-2

3 to land at Skyhaven Airport in poor weather conditions but had to use another airport with lower approach minimums. In February 2010, FAA published an LPV approach to Runway 33 with minimums of 305 height above runway touchdown zone elevation (HAT), and 1 mile visibility. Prior to that, the lowest existing instrument approach minimum to Runway 33 at Skyhaven Airport had been 438 feet above the runway touchdown zone (HAT) and 1 mile visibility (see Appendix 1-B). When weather conditions at Skyhaven Airport are lower than those minimums aircraft must land at another airport. According to FAA, an LPV approach to Runway 33 at Skyhaven Airport could potentially have minimums as low as ¾ mile visibility, which would provide operational benefits compared to the existing approach minimums. The actual approach minimums will be determined by FAA, and published in aeronautical charts. In order to achieve visibility minimums as low as ¾ mile, approach lights to Runway 33 will need to be installed, which is discussed in more detail later in this chapter, as well as in Chapter 4. An LPV is considered by FAA to be a non-precision instrument approach, although it could potentially provide approach minimums as low as 200 feet above the runway touchdown zone and ½ mile visibility, similar to current precision instrument landing system (ILS) minimums. However, FAA design criteria changes as instrument approach minimums are lowered (Table3-1 and Table 3-2). Table 3-1 New Instrument Approaches FAA Criteria Visibility Minimums Facilities 1 mile (existing) ¾ Mile ½ Mile Height Above 400 ft. 340 ft. 300 ft. Touchdown Zone(HAT) Minimum Runway 3,200 ft. 3,200 ft. 4,200 ft. Length Airport Layout Plan Recommend Required Required Runway Markings Non-precision Non-precision Precision Parallel Taxiway Recommend Required Required Runway Edge Lights Medium or Low Medium or High Medium or High Approach Lights Recommend Required Required Source: FAA AC 150/ , Airport Design, Appendix 16, Table A16-1C, Nonprecision Approach Requirements Notes: HAT elevations for planning purposes only actual HAT determined by TERPS. Approach lights for 1 mile or ¾ mile: ODALS, MALS, SSALS, or SALS acceptable. For ½ mile MALSR required. 3-3

4 Table 3-2 FAA Airport Design Criteria Visibility Minimums Imaginary Surfaces 1 mile (existing) ¾ Mile ½ Mile Primary Surface Width 500 ft. 500 ft. 1,000 ft. Runway Protection Zone (area acres) Part 77 Approach Surface & Slope 500 x 5,000 x 20:1 500 x 5,000 x 20:1 1,000 x 50,000 x 50:1 Runway Safety Areas 120 ft. x 240 ft. 120 ft. x 240 ft. 300 ft. x 600 ft. TERPS para :1 clear 20:1 clear 34:1 clear Sources: FAR Part 77, Objects Affecting Navigable Airspace and FAA AC 150/ , Airport Design The size of some imaginary surfaces increase as visibility minimums are lowered. For example, if the visibility minimums were reduced to ¾ mile (from the current 1 mile) on the instrument approach to Runway 33 after an approach light system such as an ODALS were installed, the runway protection zone (RPZ) to Runway 33 would increase in size from its current 8.04 acres to acres, a large portion of which would be located off airport property (Figure 3-1). Based on the current location of the Runway 33 threshold, a large RPZ would require acquiring at least two parcels of property with houses, and possibly realigning Airport Road south of the airport. Given its topography, Skyhaven Airport cannot meet FAA s current criteria to achieve ½ mile visibility because of potential penetrations to the larger imaginary surfaces (such as the 1,000 wide primary surface). In addition, FAA requires a minimum runway length of 4,200 (vs. the existing 4,001 ) in order to publish visibility minimums as low as ½ mile. One of the criteria considered by the FAA in terms of publishing a new instrument approach is the number and location of the penetrations to the imaginary surfaces described in the Terminal Instrument Procedures (TERPS) Handbook, FAA Order B, as well as the extent of the penetrations (distance by which they penetrate each surface). An analysis prepared as part of this AMPU indicates that the glidepath qualification surface (GQS) to the existing Runway 33 end is clear, and therefore an LPV approach can be published (which in fact FAA did in early 2010). However, there are penetrations to other imaginary surfaces that could impact the potential approach minimums (Table 3-3). If the Runway 33 threshold were extended 500 feet to the south, as shown in the 2001 Master Plan, trees would penetrate the GQS surface. The trees are located off-airport property, and FAA will not publish a new LPV instrument approach procedure if there are penetrations to the GQS surface. In order to remove the trees, easements would need to be acquired from the property owners, and the approach re-surveyed after the trees were removed in order for the FAA to publish an LPV approach. 3-4

5 SKYHAVEN AIRPORT MASTER PLAN UPDATE 3-5

6 Table 3-3 FAA Imaginary Surfaces FAA Imaginary Surface Number of Penetrations Number of Parcels TERPS Glidepath Qualification Surface 0 0 TERPS Precision Final Approach Segment AC Appendix 2 Row 4 Criteria Approach 0 0 end of runways expected to support instrument night circling AC Appendix 2 Row 8 Criteria Approach 45 6 end of runways expected to accommodate instrument approaches having visibility minimums ¾ but < 1 statute mile, day or night. AC Appendix 2 Row 11 Criteria Departure 1, Surface TERPS Visual Portion of the Final Approach Segment 0 0 Standard TERPS Visual Portion of the Final Approach Segment 0 0 Straight-in 20:1 TERPS Visual Portion of the Final Approach Segment 17 1 Straight-in 34:1 TERPS Missed Approach 0 0 FAR Part Runway Approach Lights: There are currently no runway approach lights at Skyhaven Airport. In order for FAA to publish visibility minimums as low as ¾ mile, approach lights to Runway 33 will need to be installed. The shortest approach lighting configuration, and the one with the fewest number of lights, is the Omni-Directional Approach Light System (ODALS). It consists of 5 light poles with a white strobe light on top of each pole. The approach lights flash sequentially, however, they are not on continuously they are turned by pilots using their aircraft radio when needed, and the lights automatically shut off after 15 minutes. The existing runway lights at Skyhaven are operated in that manner. A more detailed description of the ODALS system is provided in Chapter 4. If the visual portion of the straight-in approach surface (as defined in TERPS) is clear, after the ODALS are installed FAA can publish visibility minimums as low as ¾ mile. Paved Aircraft Run-Up Areas: Airport users expressed a need for paved aircraft run-up areas near the threshold of Runway 33 and 15. Run-up pads allow aircraft to perform pretakeoff checks and wait for ATC clearances while allowing other airplanes access to the runway, thereby preventing traffic bottlenecks. FAA Advisory Circular 150/ , Airport Design, notes that a holding bay (i.e., aircraft run-up area) should be provided when runway operations reach 30 operations per hour. 2 Although Skyhaven Airport is not projected to have this level of activity by 2028, the holding bays would offer 2 Source: FAA AC 150/ , Airport Design, Chapter 4, Taxiway & Taxilane Design, para. 409, Holding Bays 3-6

7 operational benefits, particularly if additional turbine-powered aircraft use the airport. Runway 33 is the primary use runway, and therefore has the greatest need for a run-up pad. Airport Perimeter Fencing: Additional perimeter fencing is needed, particularly along the north and east side of the airport, to prevent intrusions by people and wildlife into the active airport operation area. Auto Parking Lot: The terminal building s automobile parking lot has numerous pavement cracks and loose pavement material that has become hazardous to both automobiles and pedestrians using the parking lot. This pavement should be reconstructed and remarked which would result in greater parking capacity. Aircraft Wash Rack: Airport users noted that an aircraft wash rack would be useful. This is a paved area with proper drainage and water hookup where an aircraft can be washed. The area should be large enough to accommodate a twin-engine piston airplane such as a Piper Aztec or Seneca. A wash rack could be a source of revenue generation for Skyhaven Airport as well. Current environmental regulations require the runoff to be collected and properly disposed of and not allowed into the airports stormwater drainage system. 3.3 Runway Length Requirements One recommendation made in the 2001 AMPU was to extend Runway by 1,000 feet to a total length of 5,000 feet. That recommendation was based on the anticipated need to accommodate corporate aircraft on a regular basis at Skyhaven Airport, although as of late 2009 that type of traffic had not increased to the level needed to trigger the runway extension (see Chart 3-1). However, as described in Chapter 2, it is possible that under certain circumstances corporate aircraft activity at Skyhaven could increase in the future. An analysis of runway length requirements was prepared based on accommodating a variety of corporate aircraft. Extensive corporate aircraft performance data has been compiled by Business & Commercial Aviation Magazine (BCA), a publication of McGraw Hill 3 (see Appendix 3-B for an excerpt of the aircraft data table). This analysis identified numerous turboprops and corporate jets that can takeoff and land on a runway 4,001 long, at maximum gross weight, sea level, in standard atmospheric conditions (Appendix 3-A). Skyhaven Airport is 322 feet above sea level, and the mean maximum temperature in the summer is 83 0 F, which impacts aircraft takeoff performance compared to operating at sea level under standard conditions. 3 BCA Magazine publishes the Purchase Planning Handbook in May of each year. The Handbook provides detailed data on aircraft size and performance characteristics. See Appendix G for a sample of the data. 3-7

8 Chart 3-1 Skyhaven Airport - Aircraft Operations 2001 AMPU Scenarios vs. Actual High Growth Low Growth Actual 80,000 70,000 60,000 Operations 50,000 40,000 30,000 20,000 10, Year The analysis concluded that numerous models of corporate jets, and nine models of turboprops currently in production, can takeoff and land on a 4,001 foot runway at maximum gross weight. The aircraft include the Raytheon King Air 90 and 200, Pilatus PC-12, Cessna Citation CJ1, CJ2, CJ3, Hawker 400XP, Embraer Phenom 100 and 300, Beech Premier 1A, and Cessna Mustang, among others. The BCA analysis used balanced field length in its runway length calculations, which is consistent with federal aviation regulations and standard operating procedures for those types of aircraft. Ten different models of corporate jets were identified that can takeoff at maximum gross weight on runways between 4,001 ft. to 5,000 ft. long, including the Lear 40XR and 45XR; Hawker 750, 850XP, and 900XP; Gulfstream G-350; Falcon 900DX; and the Challenger 300, among others. It is important to note that corporate (and airline) jets frequently do not takeoff at maximum gross weight. Surveys prepared for the National Business Aircraft Association (NBAA) indicate that the typical passenger load for corporate jets and turboprops is three to four passengers, and their typical non-stop stage length is approximately 600 miles, significantly less than most turbine aircraft maximum range or payload. As a result, corporate jets and turboprops typically carry less than their maximum capacity in terms of passengers, baggage, and fuel, and as a result, frequently need less than maximum runway distance for takeoff. That means that a number of corporate aircraft, including the Lear 40XR, Falcon 900DX, Challenger 300, etc., can takeoff and land on a 4,001 foot runway because they typically operate at less than maximum gross weight. 3-8

9 According to BCA, 44 different models of corporate jets can takeoff on a 4,001 foot runway and fly a 1,000-nm mission non-stop with four passengers and crew. 1,000 nm was the longest non-stop mission analyzed by BCA, and it corresponds with the longest non-stop flight into Skyhaven Airport tracked by FlightAware. These corporate jets ranged in size from Cessna Citation to the Challenger 605, Challenger 850, and Global Express XRS, the Gulfstream G-450 and G-500, the Falcon 7X and 2000, etc. The landing distance for each jet was 3,000 feet or less. Discussions were also held with three insurance companies that write policies for corporate aircraft operators. They were asked if insurance policies limit corporate aircraft from taking off or landing on runways less than 5,000 long, and all three responded that insurance policies do not set such limits. They said that turbine aircraft pilots are allowed to use any runway that meets the standards set in the current aircraft flight manual and federal aviation regulations. The insurance companies indicated that they look more closely at the airport where the turbine airplane is based to ensure that the aircraft can operate from that particular airport with few, if any constraints, and that there are adequate hangar facilities, etc. But when flying into an airport as a transient operation, the airport only needs to meet the aircraft operating specification (for runway length) for that particular flight, and the pilot-incommand of that flight makes that determination. As a result, insurance policies would not restrict corporate aircraft from using Skyhaven Airport if the pilot-in-command determines that the runway is long enough for that particular operation. Conclusion: Runway does not need to be extended by 1,000 feet for the following reasons: The existing length of Runway (4,001 feet) does not constrain most corporate jets from taking off and landing at Skyhaven Airport. The number of operations by corporate jets large enough to require 5,000 feet for takeoff will not increase sufficiently to meet FAA s threshold of 500 takeoffs and landings per year to be classified as critical design aircraft. Portsmouth International Airport at Pease is 18 road miles, or 32-minute drive time, from Skyhaven Airport. Its Runway is 11,321 feet long, has multiple precision instrument approaches, and can accommodate all sizes of corporate jets, up to the Airbus A-380. However, there is room on Skyhaven Airport property to extend Runway to the north by 500 feet. Any extension of the runway would enhance its utility, not only for turbine aircraft, but also for larger piston twin-engine airplanes such as the Piper Navajo, Cessna 421, Beech Duke, etc., as well. A 4,500 foot runway would allow some aircraft to takeoff with more fuel and passengers. As a result, a 500 foot extension to the north should be considered, for an ultimate runway length of 4,500 feet, particularly if corporate traffic increases at Skyhaven Airport in the future. Current FAA criteria notes that the minimum runway length in order to achieve instrument minimums as low as

10 feet and ½ mile visibility is 4,200 feet. Extending Runway 15 by 500 feet will keep that option open for future consideration at Skyhaven Airport. The facilities identified in this chapter are based on unconstrained needs. The lack of transient aircraft parking space, Jet-A fuel, FBO services, and the relatively high instrument approach minimums, are significant constraints to existing corporate aircraft wishing to use Skyhaven Airport. There are number of options that were considered in terms of improving airport facilities, and the alternatives analysis is presented in Chapter 4. That analysis considered other factors such as cost and environmental issues, all of which can affect the ultimate facility layout and configuration. 3.4 Summary of Facility Improvement Recommendations Reconstruct the existing based aircraft tiedown and parking apron and convert it to paved transient aircraft parking apron. It should accommodate at least 2 to 3 Beech King Air 200 sized aircraft (ARC B-II), as well as five to six single and multi-engine piston sized aircraft (ARC B-I), and also allow for power-in and power-out parking for turbine aircraft. Construct 31 additional T-hangars to accommodate existing demand, assuming that demand for that many hangars is confirmed with aircraft owners on the waiting list. In the short term (by 2015) reconstruct Runway ,001 x 75, and replace the lighting and electrical system to the runway. Remove, light, or mark the penetrations to the imaginary surfaces in the vicinity of the airport, and associated land and easement acquisition.. Construct a new paved based aircraft tiedown apron. Ultimately extend Runway 15 by 500 feet (x 75 wide) to the north on airport property, to a total length of 4,500 feet, if demand warrants in the future. Install an omni-directional approach light system (ODALS) to Runway 33. Clear the 20:1 visual portion of the TERPS straight-in approach surface to allow visibility minimums as low as ¾ mile. Construct aircraft run-up pads (holding areas) on either end of Taxiway A near the Runway 33 and 15 thresholds. Reconstruct and mark the auto parking lot by the terminal building. Install security fencing around the remainder of airport property. In terms of additional services, continue the process of looking for a full-service FBO to locate at Skyhaven Airport, and also offer Jet-A fuel for sale. Explore the possibility of attracting additional businesses such as avionics repair, aircraft interior installation, on-field restaurant, etc. Modifications or enhancements to some facilities may be required to accommodate the additional businesses. Upgrade the existing 100LL and Jet-A self-fuel pumps. Upgrade the terminal building to ensure that it meets all current building codes as well as the Americans with Disability Act (ADA) requirements.. Construct an aircraft wash rack. 3-10

11 Acquire property and easements as they become available in order to clear imaginary surfaces and also comply with FAA policies regarding through-the-fence access. 3.5 Skyhaven Airport Advisory Council (SAAC) Airport Planning Survey The SAAC conducted an online survey of airport users to identify what facilities they felt were needed at the airport. The survey also asked respondents to rank airport improvements based on their ability to serve existing users, attract new users, provide benefits to the community, as well as socio-economic and safety benefits. The results of the survey, including comments submitted, are presented in Appendix 3-C. Facility improvements identified by survey respondents included repaving the existing runway, extending the runway by 500 to the north, installing ODALS to Runway 33, creating transient parking, providing additional based aircraft tiedown space and an aircraft wash rack, providing 24-hr. restroom and flight planning facility, renovating the terminal building, adding a restaurant, constructing additional hangars, and attracting an FBO. 3-11

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS AIRSIDE CAPACITY AND FACILITY REQUIREMENTS This Section investigates the capacity of the airport, its ability to meet current demand, and the facilities required to meet forecasted needs as established

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.

More information

Airport Master Plan Open House Front Range Airport February 23, 2017

Airport Master Plan Open House Front Range Airport February 23, 2017 Airport Master Plan Open House Front Range Airport February 23, 2017 MASTER PLAN PROCESS AND OVERVIEW MASTER PLAN ELEMENTS The Master Plan is a 20-year plan to understand the needs of current and future

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

Chapter 4 Airport Facility Requirements

Chapter 4 Airport Facility Requirements Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT

More information

Agenda: SASP SAC Meeting 3

Agenda: SASP SAC Meeting 3 Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification

More information

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017 Lopez Island Airport Master Plan Update Public Meeting June 15, 2017 Master Plan Update Team Reid Middleton/Everett, WA Shannon Kinsella, Project Manager Melania Haagsma, Project Engineer Mead & Hunt/Tulsa,

More information

CHAPTER 5 - FACILITY REQUIREMENTS

CHAPTER 5 - FACILITY REQUIREMENTS CHAPTER 5 - FACILITY REQUIREMENTS This chapter identifies the requirements for airfield and landside facilities to accommodate the forecast demand level. Facility requirements have been developed for the

More information

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #4 March 19, 2018

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #4 March 19, 2018 PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #4 March 19, 2018 Meeting Agenda 1. Master Plan Status [5 Minutes] 2. Preferred Forecasts [15 Minutes] 3. Runway Length Options [45

More information

5. Facility Requirements

5. Facility Requirements 5. Facility Requirements The purpose of this chapter is to compare existing airfield and adjacent landside facilities with the Airport operations and aircraft forecasts developed in the previous chapter

More information

Chapter 4.0 Facility Requirements

Chapter 4.0 Facility Requirements Chapter 4.0 Facility Requirements Having inventoried the existing infrastructure and forecasted demand, determining airport facility requirements is the next essential step in the airport master planning

More information

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline

More information

Dallas Executive Airport Town Hall Meeting April 3, 2014

Dallas Executive Airport Town Hall Meeting April 3, 2014 Dallas Executive Airport Town Hall Meeting April 3, 2014 Background 1,040 acre general aviation facility owned and operated by the City of Dallas 150 based aircraft including business jets and helicopters,

More information

3.1 CRITICAL AIRCRAFT

3.1 CRITICAL AIRCRAFT The purpose of the demand capacity analysis is to determine an airport s capacity and its ability to support the forecasted aviation demand. Facility requirements identify development, replacement, and/or

More information

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long The first (AMP) was completed in 1984 and updated in 2000. The current FAA approved Airport Layout Plan (ALP) is dated November 9, 2001. The FAA suggests updating the AMP every five year in accordance

More information

Merritt Island Airport

Merritt Island Airport TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory

More information

Appendix C. User Survey Data

Appendix C. User Survey Data Appendix C User Survey Data Charlevoix Municipal Airport Master Plan APPENDIX C: 2010 USER SURVEY SUMMARY In support of the 2010 Master Planning effort for Charlevoix Municipal Airport (CVX), an aviation

More information

DRAFT MASTER PLAN UPDATE

DRAFT MASTER PLAN UPDATE DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS

More information

Airfield Design. Public Review Draft OVERVIEW BASIC DESIGN FACTORS. Airport Role

Airfield Design. Public Review Draft OVERVIEW BASIC DESIGN FACTORS. Airport Role Public Review Draft 3 Airfield Design OVERVIEW The Facilities Plan, Figure 3D, presents the recommended airfield improvements. The principal airfield design issues examined in this chapter are the optimal

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

Technical Memorandum. Synopsis. Steve Carrillo, PE. Bryan Oscarson/Carmen Au Lindgren, PE. April 3, 2018 (Revised)

Technical Memorandum. Synopsis. Steve Carrillo, PE. Bryan Oscarson/Carmen Au Lindgren, PE. April 3, 2018 (Revised) Appendix D Orange County/John Wayne Airport (JWA) General Aviation Improvement Program (GAIP) Based Aircraft Parking Capacity Analysis and General Aviation Constrained Forecasts Technical Memorandum To:

More information

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together Bringing g the PUBLIC WORKSHOP Venice Municipal Airport New Opportunities Presented for Venice City Council & Citizens of Venice September 25, 2009 Slide 1 Bringing g the Welcome & Introductions May 12th

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3 Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus

More information

6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS

6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS 6.1 INTRODUCTION In the previous chapter, facility needs for the 20-year planning horizon were identified. The next step in the planning process is to identify and evaluate the various ways certain facilities

More information

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN LAST UPDATE JULY 2013 Acknowledgements The preparation of this document was financed in part by a grant from the Federal Aviation Administration (Project No: 3-27-0000-07-10), with the financial support

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

chapter 5 Recommended Master Plan Concept airport master plan MASTER PLAN CONCEPT

chapter 5 Recommended Master Plan Concept airport master plan MASTER PLAN CONCEPT chapter 5 Recommended Master Plan Concept airport master plan The planning process for Coolidge Municipal Airport has included several analytical efforts in the previous chapters intended to project potential

More information

Facility Requirements

Facility Requirements C H A P T E R T H R E E Facility Requirements 3.0 OVERVIEW Airport planning for facility requirements is based upon addressing any existing issues and accommodating the probable demand that may occur over

More information

BELFAST MUNICIPAL AIRPORT OVERVIEW

BELFAST MUNICIPAL AIRPORT OVERVIEW BELFAST MUNICIPAL AIRPORT OVERVIEW LOCATION AND HISTORY Belfast Municipal Airport (Federal Aviation Administration (FAA) airport code BST, International Civil Aviation Organization airport code KBST, FAA

More information

Airfield Design OVERVIEW BASIC DESIGN FACTORS. Airport Role

Airfield Design OVERVIEW BASIC DESIGN FACTORS. Airport Role 3 Airfield Design OVERVIEW Due to the presence of significant physical constraints, little change to the existing airfield is anticipated. The emphasis in this plan is on identifying airfield improvements

More information

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017 Pierre Regional Airport Airport Master Plan Kickoff Meeting April 7, 2017 Agenda Introductions Airport Master Planning Planning Considerations Master Plan Elements Schedule Public Involvement Basics about

More information

Chapter 5. Facility Requirements

Chapter 5. Facility Requirements Chapter 5 Facility Requirements Chapter 5 Facility Requirements INTRODUCTION The Baseline Forecast was used to determine facility requirements. Chapter 4 produced a forecast of traffic volumes expected

More information

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, 2018 Airport Master Plan WELCOME & INTRODUCTIONS Kimberly Moss, Doug Hammon (The Ohio State University) 2 Member Introduction Name Organization 3 MEETING

More information

APPENDIX X: RUNWAY LENGTH ANALYSIS

APPENDIX X: RUNWAY LENGTH ANALYSIS APPENDIX X: RUNWAY LENGTH ANALYSIS Purpose For this Airport Master Plan study, the FAA has requested a runway length analysis to be completed to current FAA AC 150/5325-4B, Runway Length Requirements for

More information

Airport Obstruction Standards

Airport Obstruction Standards Airport Obstruction Standards Dr. Antonio Trani Department of Civil and Environmental Engineering Virginia Tech Outline of this Presentation Obstructions to navigation around airports Discussion of Federal

More information

FACILITY REQUIREMENTS 5.1 Introduction

FACILITY REQUIREMENTS 5.1 Introduction Chapter 5 FACILITY REQUIREMENTS 5.1 Introduction The facility requirements section of this study defines the physical facilities needed to safely and efficiently accommodate the current and future aviation

More information

OVERVIEW BASIC DESIGN FACTORS. Demand Determinants

OVERVIEW BASIC DESIGN FACTORS. Demand Determinants 3 Airfield Airfield Design Design OVERVIEW The basic configuration of the runway and taxiway system at Hanford Municipal Airport has changed moderately since the airport was constructed in 1950. These

More information

SECTION 4 DEMAND/CAPACITY ANALYSIS AND FACILITY REQUIREMENTS

SECTION 4 DEMAND/CAPACITY ANALYSIS AND FACILITY REQUIREMENTS SECTION 4 DEMAND/CAPACITY ANALYSIS AND FACILITY REQUIREMENTS 4.1 INTRODUCTION This section provides a technical presentation of demand/capacity and facility requirements analysis for Nampa Municipal Airport.

More information

CHAPTER 1 BACKGROUND AND PROPOSED ACTION

CHAPTER 1 BACKGROUND AND PROPOSED ACTION CHAPTER 1 BACKGROUND AND PROPOSED ACTION 1.0 INTRODUCTION An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance

More information

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside

More information

Preliminary Findings of Proposed Alternative

Preliminary Findings of Proposed Alternative Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Runway Length Analysis Prescott Municipal Airport

Runway Length Analysis Prescott Municipal Airport APPENDIX 2 Runway Length Analysis Prescott Municipal Airport May 11, 2009 Version 2 (draft) Table of Contents Introduction... 1-1 Section 1 Purpose & Need... 1-2 Section 2 Design Standards...1-3 Section

More information

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION 1.1.3 Taxiways EWN has an extensive network of taxiways and taxilanes connecting the terminal, air cargo, and general aviation areas with the runways as listed in Figure 1-15. A 50-foot wide parallel taxiway

More information

Chapter Three AIRPORT FACILITY REQUIREMENTS

Chapter Three AIRPORT FACILITY REQUIREMENTS Chapter Three AIRPORT FACILITY REQUIREMENTS Airport Master Plan Update In this chapter, existing airport facilities are evaluated to identify their functionality, condition, compliance with design standards,

More information

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES Chapter Four Airport Development Alternatives Prior to formulating a development program for Ryan Airfield, it is important to consider development potential

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

CATCODE ] CATCODE

CATCODE ] CATCODE Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class

More information

Source: Chippewa Valley Regional Airport ASOS, Period of Record

Source: Chippewa Valley Regional Airport ASOS, Period of Record Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

AIRPORT MASTER PLAN UPDATE

AIRPORT MASTER PLAN UPDATE AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo

More information

Chapter 9 - AIRPORT SYSTEM DESIGN

Chapter 9 - AIRPORT SYSTEM DESIGN Chapter 9 - AIRPORT SYSTEM DESIGN 9.01 GENERAL This chapter discusses the development program for Dutchess County Airport to the year 2020. This airport system design is based upon the airport's existing

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this

More information

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016 Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand

More information

Airport Master Plan 1

Airport Master Plan 1 1 Aviation Demand AIRPORT PLANNING PROCESS FAA Design Standards Financial Resources Community Goals Environmental Requirements Serve Business Community This Advisory Circular (AC) provides guidance for

More information

CHAPTER 1 INTRODUCTION AND BACKGROUND

CHAPTER 1 INTRODUCTION AND BACKGROUND CHAPTER 1 INTRODUCTION AND BACKGROUND An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance with the National

More information

Master Plan Update Technical Advisory Committee Meeting

Master Plan Update Technical Advisory Committee Meeting Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives

More information

CHAPTER 3 FACILITY REQUIREMENTS

CHAPTER 3 FACILITY REQUIREMENTS CHAPTER 3 FACILITY REQUIREMENTS 3.1 INTRODUCTION To properly plan for the future requirements of Newport News/Williamsburg International Airport, it is necessary to translate the forecasts of aviation

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

PORT OF PORTLAND. Chapter Four AVIATION FACILITY REQUIREMENTS

PORT OF PORTLAND. Chapter Four AVIATION FACILITY REQUIREMENTS PORT OF PORTLAND Chapter Four AVIATION FACILITY REQUIREMENTS CHAPTER FOUR PORT OF PORTLAND AVIATION FACILITY REQUIREMENTS In this chapter, existing components of the airport are evaluated to identify the

More information

3 INTRODUCTION. Chapter Three Facility Requirements. Facility Requirements PEAKING CHARACTERISTICS

3 INTRODUCTION. Chapter Three Facility Requirements. Facility Requirements PEAKING CHARACTERISTICS Chapter Three Facility Requirements 3 INTRODUCTION This chapter identifies the long-range airfield and terminal area facilities needed to satisfy the 20-year forecast of aviation demand at Monett Municipal

More information

1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions.

1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions. ALBUQUERQUE INTERNATIONAL SUNPORT AIRCRAFT HOLD LINE LOCATION ANALYSIS WHITE PAPER JUNE 24, 2016 HOLD LINE LOCATION ISSUE The location of many of the taxiway hold lines at the Sunport do not meet current

More information

ArcadiaMunicipalAirportislocatedonthesoutheast sideofarcadia,southofstateroute70,westofstate Route31,andisaccessiblefrom AirportRoad.

ArcadiaMunicipalAirportislocatedonthesoutheast sideofarcadia,southofstateroute70,westofstate Route31,andisaccessiblefrom AirportRoad. Arcadia GeneralAviationAirport ArcadiaMunicipalAirportislocatedonthesoutheast sideofarcadia,southofstateroute70,westofstate Route31,andisaccessiblefrom AirportRoad.Arcadia islocatedapproximately30milesnortheastoftheport

More information

Punta Gorda Airport Master Plan Update

Punta Gorda Airport Master Plan Update Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

Basic Design Factors. Airfield Design. Airport Role

Basic Design Factors. Airfield Design. Airport Role Chapter 3 Airfield Design Basic Design Factors The Federal Aviation Administration (FAA) provides guidance and standards for airport design through a series of Advisory Circulars (ACs). These guidelines

More information

CHAPTER D Capacity Analysis and Facility Requirements INTRODUCTION

CHAPTER D Capacity Analysis and Facility Requirements INTRODUCTION CHAPTER D Capacity Analysis and Facility Requirements INTRODUCTION The capacity of an airfield is primarily a function of the major aircraft operating surfaces that compose the facility and the configuration

More information

MASTER PLAN CONCEPT 1 DRAFT

MASTER PLAN CONCEPT 1 DRAFT The Airport Master Plan Update for Dallas Executive Airport has included the development of aviation demand forecasts, an assessment of future facility needs, and the evaluation of airport development

More information

Airport Master Plan Update

Airport Master Plan Update Duttchessss Countty Airrporrtt Masstterr Plan Updatte Airport Master Plan Update Final Report Dutchess County Airport Town of Wappingers, New York C&S Engineers, Inc. 499 Col. Eileen Collins Blvd. Syracuse,

More information

Hartford-Brainard Airport Potential Runway Closure White Paper

Hartford-Brainard Airport Potential Runway Closure White Paper Hartford-Brainard Airport Potential Runway 11-29 Closure White Paper June 2012 In recent years there has been discussion regarding the necessity of Runway 11-29 to the Hartford- Brainard Airport (HFD)

More information

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update Appendix D Project Newsletters Tacoma Narrows Airport Master Plan Update This appendix contains the newsletters distributed throughout the project. These newsletters provided updates and information on

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

C > Capacity Analysis and Facility Requirements

C > Capacity Analysis and Facility Requirements Buchanan Field Buchanan Field Airport Master Planning Program C. CAPACITY ANALYSIS & FACILITY REQUIREMENTS C > Capacity Analysis and Facility Requirements INTRODUCTION. The capacity of an airfield is primarily

More information

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report April 2016 Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report Prepared for the County of Yolo Mindi Nunes,

More information

Chapter 5 Facility Requirements

Chapter 5 Facility Requirements Chapter 5 Facility Requirements 5.0 INTRODUCTION The Facility Requirements chapter of this Sustainable Master Plan Update describes airside and landside facilities, which are needed to accommodate existing

More information

Appendix 6.1: Hazard Worksheet

Appendix 6.1: Hazard Worksheet Appendix 6.1: Appendix 6.1: Ref. Condition, real or potential; that can cause injury, illness, etc. This is a prerequisite for an Airfield Hazards 1. Taxiway Geometry Direct access to runway from ramp

More information

Thursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES

Thursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES SOUTH ST. PAUL MUNICIPAL AIRPORT FLEMING FIELD MASTER PLAN ADVISORY GROUP MEETING #2 Thursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES The purpose

More information

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906 Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement

More information

FINAL SUMMARY REPORT

FINAL SUMMARY REPORT FINAL SUMMARY REPORT RUNWAY 1-19 EXTENSION ANALYSIS at MIDDLEBURY STATE AIRPORT PREPARED BY ROXBURY, VERMONT APRIL 2008 FINAL SUMMARY REPORT TABLE OF CONTENTS SECTION PAGE 1.1 INTRODUCTION...1 2.1 OBSTRUCTION

More information

Section 3: Demand/Capacity Analysis and Facility Requirements

Section 3: Demand/Capacity Analysis and Facility Requirements 3.0 INTRODUCTION In the previous section, aviation demand forecasts were presented for FDK through the year 2025. These forecasts included projections of aircraft operations, based aircraft, aircraft fleet

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS

PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS INTRODUCTION The Zelienople Airport Authority (ZAA) has commenced engineering activities for the rehabilitation of Runway 17-35 to a

More information

Freedom S.40 COMPETITIVE ADVANTAGES

Freedom S.40 COMPETITIVE ADVANTAGES Freedom COMPETITIVE ADVANTAGES 6 ft. 0 in. (1.8m) 6 ft. (1.8m) 21 ft. 1 in. (6.5m) Citation CJ3+ Phenom 300 Citation XLS+ Learjet 60XR Gulfstream G - 150 Freedom BEST IN CLASS CABIN HEIGHT AND WIDTH Freedom

More information

50 Ways to Improve Your Airport: Engaging Airport Management on Key Issues

50 Ways to Improve Your Airport: Engaging Airport Management on Key Issues 50 Ways to Improve Your Airport: Engaging Airport Management on Key Issues Tuesday, November 17, 2015 1:00 p.m. 2:00 p.m. PRESENTED BY: Charles D. Lamb, P.E. Airfield Lighting Image Source: Delta Airport

More information

AVIATION. MichiganReportCard.com 5

AVIATION. MichiganReportCard.com 5 MichiganReportCard.com 5 GRADE C AVIATION OVERVIEW Michigan s 200+ airports bring $4.3 billion into the economy each year. The state s Tier 1 and Tier 2 airports were evaluated based on six key infrastructure

More information

AIRFIELD CAPACITY AND FACILITY REQUIREMENTS

AIRFIELD CAPACITY AND FACILITY REQUIREMENTS CHAPTER FOUR: AIRFIELD CAPACITY AND FACILITY REQUIREMENTS 4.1 INTRODUCTION A key step in the Airport Master Plan Update (AMPU) process is determining future requirements for airport facilities that will

More information

CHAPTER 5: Landside Facility Requirements and Development Concepts

CHAPTER 5: Landside Facility Requirements and Development Concepts CHAPTER 5: Landside Facility Requirements and Development Concepts Overview Implementation of the preferred intermediate-term (10-year) and long-term (20-year) airside alternatives will have a significant

More information

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet

More information

Assignment 2: Runway Length Analysis

Assignment 2: Runway Length Analysis CEE 4674: Airport Planning and Design Spring 2018 Date Due: February 2, 2018 (Ground Hog Day) Assignment 2: Runway Length Analysis Instructor: Trani Reading Assignment: Review Chapters 1 through 3 of the

More information

AIRPORT FACILITY REQUIREMENTS

AIRPORT FACILITY REQUIREMENTS 4.1 INTRODUCTION Chapter 4 AIRPORT FACILITY REQUIREMENTS The major elements of the Airport, which were described in Chapter 3, Existing Airport Facilities must be analyzed individually and balanced in

More information

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES 5.1 INTRODUCTION This section investigates Airfield Development Alternatives, generalized Land Use Alternatives, and more detailed General Aviation Alternatives.

More information

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014 DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation

More information