Revised Routes Between Miami ARTC Center and Havana Area Control Center
|
|
- Joel Spencer
- 6 years ago
- Views:
Transcription
1 Revised Routes Between Miami ARTC Center and Havana Area Control Center Federal Aviation Administration Presented by Miami ARTC Center
2 Content Implementation date - Oct 12, 2017 at 0400Z. Changes to G448 corridor New Y Routes South Florida to Havana Routes Overflight Routes Arrival Routes Departure Routes Changes to arrival/departures from MUHA and other Cuban airports
3 Background G448 between W174C and W465A, often referred to as the GIRON corridor, has been a primary air traffic route between Miami ARTCC and Havana ACC. Miami and Havana Centers jointly developed new airways through this corridor designed to increase safety, capacity and to reduce delays.
4 Changes Beginning with the October 12 chart change, G448 between TADPO and MTH will no longer be an available route option regardless of aircraft equipment or destination. The previous single airway, G448, has been replaced by two laterally separated RNAV airways, Y442 and Y183. The design is intended to reduce delays for aircraft climbing out of and descending into the Miami Terminal area.
5 New Routes: Y442 southbound only Y183 northbound only Changes These new Yankee routes are RNAV airways -- The Y routes are designated RNAV 2 with GNSS required. Aircraft must be properly equipped to fly them Aircraft without the minimum equipment will be routed via the MAXIM/CANOA or URSUS/TANIA Intersections No exceptions will be made
6 Y route requirements United States AIP, ENR RNAV 2 with GNSS
7 New Y Routes
8 New Y183 Route Northbound only Procedurally separated from W174C and Y442 From IKBIX at 24 North to PEAKY
9 New Y442 Route Southbound only Procedurally separated from W465A and Y183 From MNATE to TAZER to MCLAW to FUNDI
10 Old vs New
11
12 OLD Southbound from MIA/FLL Terminal MIA*MNATE MTH G448 TADPO NEW MIA*MNATE Y442 FUNDI *denotes MIA or any MIA/FLL terminal departure points
13 Southbound flights from points other than Miami Terminal OLD MTH G448 TADPO NEW MCLAW Y442 FUNDI
14 Northbound to MIA/FLL Terminal: OLD TADPO G448 MTH (DVALL/CURSO STAR)KMIA NEW IKBIX Y183 PEAKY DVALL (DVALL/CURSO STAR*) KMIA * After DVALL aircraft should file either the DVALL2 or CURSO4 STAR: DVALL2 (Conventional STAR) CURSO4 (Advanced RNAV STAR)
15 Northbound to points other than Miami Terminal OLD TADPO G448 MTH NEW IKBIX Y183 PEAKY
16 Overflying Havana FIR and Miami Center FIR IKBIX Y183 PEAKY ORL IKBIX Y183 PEAKY LAL IKBIX Y183 PEAKY PHK IKBIX Y183 PEAKY LBV Entering Miami Center FIR over IKBIX
17 Overflying Havana FIR Landing Palm Beach Entering Miami Center over IKBIX IKBIX Y183 PEAKY SWAGS BOBIO WLACE (RNAV) STAR IKBIX Y183 PEAKY SWAGS PHK
18 Overflying Havana FIR Landing Orlando Entering Miami Center over IKBIX IKBIX Y183 PEAKY PHK BAIRN (RNAV) STAR IKBIX Y183 PEAKY PHK GOOFY STAR
19 CUBA SIDS/STARS All Cuba SIDS and STARS that pertain to aircraft transitioning from Miami Center airspace have been changed from 7 characters to 6 characters.
20 CUBA SIDS/STARS STARS MUHA - ENTRY1, AFFIL2, JUGAR1 MUVR GOLFO2, BANAO2 MUSC KIPUS3, SILGO3, IMASA2, NUBOR2 MUCF URKON3, SEGOL3 MUCC RESIT2, SIKNI2 MUCM SATOG3, SATOG4, DASUG2, PERMU2 MUHG BEMUV2, SAXIM2, KEKSA2, XOSOT2 MUCU MUNKO1, SENSO1 SIDS MUHA - AFFIL1, FARAC3 MUVR - NOXIL1, PESBI2 MUSC DEMSA3, NUBOR1, SELOG2, ETLAS3 MUCF DUPEB3, VITAK3, BOSON3 MUCC PIDNA2, BIMBI2, BONIB2, RESIT3 MUCM BOKTO1, PETMU1, KANID2, SATOG2 MUHG XOSOT1, PEMDA1, KEKSA1, BEMUV1 MUCU KINIS1, KINIS2
21 MUHA Arrivals Havana ACC will no longer be accepting MUHA arrivals via G448 The new STARS will have transition fixes of MAXIM or CANOA and will change based on the current runway configuration. Old MAXIM FARAC1 MUHA TADPO MUMBU1 MUHA New FIS G765 MAXIM JUGAR1 MUHA (RWY 24) FIS B646 CANOA ENTRY1 MUHA (RWY 6) Note: MUHA primarily operates on RWY 6
22 South Florida to Havana (MUHA) Routes MUHA Landing RWY06 MNATE FIS B646 CANOA ENTRY-STAR
23 South Florida to Havana (MUHA) Routes MUHA Landing RWY24 MNATE FIS G765 MAXIM JUGAR-STAR
24 Overflying Miami Center FIR Landing MUHA Entering Havana FIR West of TANIA MUHA Landing RWY 06 FIS B646 CANOA ENTRY STAR MUHA Landing RWY 24 FIS G765 MAXIM JUGAR STAR Entering Havana FIR Over TANIA MUHA Landing RWY 06 TANIA ENTRY STAR MUHA Landing RWY 24 TANIA AFFIL STAR
25 Overflying Miami Center FIR Landing MUHA over TANIA
26 Havana (MUHA) to South Florida Routes MUHA Departing RWY06 MAXIM G765 FIS DVALL CURSO (RNAV) STAR MAXIM G765 FIS DVALL DVALL STAR
27 Havana (MUHA) to South Florida Routes MUHA Departing RWY24 CANOA B646 FIS DVALL CURSO (RNAV) STAR CANOA B646 FIS DVALL DVALL STAR
28 Overflying Havana FIR Landing South Florida Entering Miami Center Between TANIA and BORDO New route structure being implemented in order to streamline the MIA and FLL metro area arrivals entering Miami Center between TANIA and BORDO. The new routes segregate the arrivals by designating URSUS for the MIA terminal arrivals and BORDO for the FLL terminal arrivals.
29 Overflying Havana FIR Landing South Florida Entering Miami Center Between TANIA and BORDO Landing Fort Lauderdale Metro Area BORDO B760 ZBV WAVUN (RNAV) STAR BORDO B760 ZBV DEKAL STAR Landing Miami Metro Area URSUS FOWEE STAR URSUS FLIPR (RNAV) STAR
30 Overflying Havana FIR Landing South Florida
31 MUVR Departures entering Miami Center FIR Filed AR Routes Northbound AR16 TANIA ZOLLA PERMT AR16 ILM AR18 TANIA ZOLLA WOLFO AR18 DIW
32 MMUN ROUTE OLD CANOA B646 VINKA MMUN NEW CANOA B/UB879 NOSAT MMUN
VERO BEACH VRB Chan 120 N W L-23-24, H-8 PHORD N W
(48) 163 (28) 165 (27) R-345 (24) 163 (40) 174 (13) 174 N (ANNEY.ANNEY1) 08157 ANNEY ONE ARRIVAL N28 32.88 W80 48.63 PCMAN ORMOND BEACH 112.6 OMN N29 18.20 - W81 06.76 L-21-23-24, H-8 Chan 73 OMN 110.0
More informationMIAMI ARTC CENTER AND JACKSONVILLE ARTC CENTER LETTER OF AGREEMENT
MIAMI ARTC CENTER AND JACKSONVILLE ARTC CENTER LETTER OF AGREEMENT SUBJECT: INTER-CENTER PROCEDURES EFFECTIVE: 07/24/2014 1 PURPOSE. This agreement establishes Inter-facility procedures between Miami ARTC
More informationNATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION
National Business Aviation Association (NBAA) Convention Notices to Airmen NATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION ORLANDO, October 16 18, 2018 SPECIAL AIR TRAFFIC PROCEDURES Special air
More informationMARCH Resources ZMA ATC Terminal Layout Passenger Feedback
CROSS THE POND WESTBOUND MIAMI INTERNATIONAL AIRPORT (KMIA) PILOT INFORMATION BRIEFING MARCH 23, 2013 Miami vartcc wishes to welcome and thank you for choosing Miami as your arrival airport for the 2013
More informationREVIEW OF THE IMPLEMENTATION REQUIREMENTS IN AIR NAVIGATION SERVICES. (Presented by the Secretariat)
International Civil Aviation Organization 18/06/12 North American, Central American and Caribbean Office (NACC) Twelfth Meeting of Directors of Civil Aviation of the Central Caribbean (C/CAR/DCA/12) Punta
More informationSE-3, 01 FEB 2018 to 01 MAR SE-3, 01 FEB 2018 to 01 MAR 2018
EADEN TRANSITION (EADEN.CURSO5) then on track 072 to MNNDY. (DVALL.CURSO5) CURSO FIVE ARRIVAL 124.85 322.3 MIAMI INTLD-ATIS 119.15 MIAMI-OPA LOCKA ATIS CURSO MIAMI ATIS 124.0 072 249 069 18032 HOMESTEAD
More informationSE-3, 11 OCT 2018 to 08 NOV SE-3, 11 OCT 2018 to 08 NOV 2018
EADEN TRANSITION (EADEN.CURSO5) then on track 072 to MNNDY. (DVALL.CURSO5) CURSO FIVE ARRIVAL 124.85 322.3 INTLD-ATIS 119.15 -OPA LOCKA ATIS CURSO ATIS 124.0 072 249 069 18032 HOMESTEAD ARB ATIS 132.275
More informationNATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION
2016 NBAA Convention Notices to Airmen NATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION ORLANDO, November 1 4, 2016 SPECIAL AIR TRAFFIC PROCEDURES In anticipation of a large number of aircraft
More informationZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE
ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT EFFECTIVE: July 10, 2010. SUBJECT: APPROACH CONTROL SERVICE 1. PURPOSE: To delegate authority and responsibility for approach control services in the airspace described
More informationATLANTA ARTC CENTER AND CHARLOTTE TOWER LETTER OF AGREEMENT
ATLANTA ARTC CENTER AND CHARLOTTE TOWER LETTER OF AGREEMENT EFFECTIVE: March 1, 2011 SUBJECT: APPROACH CONTROL SERVICE 1. PURPOSE: To delegate authority and responsibility for approach control services
More informationLetter of Agreement by and between Jacksonville ARTCC and Miami ARTCC
Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC Effective Date: 1 November 2007 0400Z I. Scope: This agreement is made by and between Miami ARTCC (herein ZMA) and Jacksonville ARTCC
More informationHoneywell.com PBN Concepts Krakow, Poland
PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure
More informationJacksonville ARTCC. F11 TRACON Standard Operating Procedures
Document Number ZJX-10 Version A Effective Date 9/19/2018 Purpose Document Information ZJX 10A establishes procedures for staffing of the Central Florida TRACON radar positions (herein referred to as F11
More informationAERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen
Page 1 of 6 1 INTRODUCTION Each route shall be assigned a designator that is unique for that aerodrome. The designator shall be defined in accordance with Annex 11, Appendix 3. In addition, the first 4
More information1. SUBJECT: PROCEDURES RELATING TO THE COORDINATION OF AIR TRAFFIC BETWEEN KINGSTON FIR AND HAVANA FIR
1. SUBJECT: PROCEDURES RELATING TO THE COORDINATION OF AIR TRAFFIC BETWEEN KINGSTON FIR AND HAVANA FIR 2. PURPOSE: This document establishes the coordination and operational procedures to be applied by
More informationFeasibility Study into increasing the altitude of the Noise Preferential Routes (NPRs) from 3000 to 4000 feet
Feasibility Study into increasing the altitude of the Noise Preferential Routes (NPRs) from 3000 to 4000 feet Presented by: Tom Redfern Environmental Specialist 20 th January 2016 Agenda What is a Noise
More informationNextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures
NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures DFW International Airport Sandy Lancaster, Manager Noise Compatibility October 13, 2008 OUTLINE About DFW Airport
More informationUNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C.
UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. Order 2018-7-3 Issued by the Department of Transportation on the 6 th day of July, 2018 Served: July 6, 2018
More informationDesign Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation
Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which
More informationPBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931
International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic
More informationInternational Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez
International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate
More informationAIP MACAO GUANG ZHOU FIR HONG KONG FIR AD2-VMMC-65 A STAR MACAO RWY SEP 2013 (BIGRO 6 A, NLG 5 A, CON 6 A, POU 6 A) CAT A, B, C, D
AIP MACAO GUANG ZHOU FIR HONG KONG FIR AD2-VMMC-65 A STAR MACAO RWY 34 19 SEP 2013 (BIGRO 6 A, NLG 5 A, CON 6 A, POU 6 A) CAT A, B, C, D BIGRO 6 A Proceed from BIGRO to UJ. Cross GURIN at 2700 m and cross
More informationMiami Orlando Passenger Rail Project Overview
Miami Orlando Passenger Rail Project Overview 1 The Historical Significance of Florida East Coast Industries Henry Flagler transformed Florida when he built his railroad FEC Railway connected cities along
More informationAIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory.
AIRSPACE STRUCTURE 1. Introduction In aeronautics, s are the portion of the atmosphere controlled by a country above its territory. There are two kinds of : Controlled is of defined dimensions within which
More informationRNP AR Experience. Phil Rakena PBN Project Manager February 2015
RNP AR Experience Phil Rakena PBN Project Manager February 2015 1 What is PBN? Area navigation, using on-board systems to provide position and confirm navigation performance. PBN represents a shift from
More informationVATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT
VATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT SUBJECT: TERMINAL AREA CONTROL SERVICE EFFECTIVE: September 1, 2016 1. PURPOSE. This agreement delegates authority and establishes procedures
More informationEastern Caribbean PIARCO Virtual FIR. PIARCO Control Zone (CTR)
PIARCO Control Zone (CTR) Eastern Caribbean PIARCO Virtual FIR NOT TO BE USED FOR REAL WORLD AVIATION, STRICTLY FOR USE ON THE VATSIM VIRTUAL ATC NETWORK. 1. Introduction 1.1 Objective of this SOP is to
More informationOverview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1
Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1 1 Learning Objectives RNAV applications in a continental en-route context Characteristics of available navigation specifications
More information2 Purpose and Need. 2.1 The Need for the CLT OAPM Project Description of the Problem
2 Purpose and Need Under NEPA, an Environmental Assessment (EA) must describe the purpose and need for the Proposed Action. The following sections discuss the need for the Proposed Action and provide specific
More informationTERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW
TERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW NAV CANADA Level of Service & Aeronautical Studies 77 Metcalfe Street, 5th Floor Ottawa, Ontario K1P 5L6 April, 2013 The information and diagrams contained
More informationSOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC
SOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC 1 Table of Contents SECTION 1. GENERAL 3 1-1. PURPOSE 3 1-2. SCOPE OF RESPONSIBILITIES
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based
More informationController Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA
Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole
More informationGestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)
Gestão de Tráfego Aéreo 2015/2016 Exam 2016.01.04 Name Student ID Number I (5.5/20, 0.5 each) What is each contracting state of ICAO required to provide? [ ] Modern radio navigation facilities for aeroplanes
More informationUPDATE ON THE 6 IDEAS (1-4) NAV CANADA
UPDATE ON THE 6 IDEAS (1-4) THE 6 INITIATIVES 1. New approaches for night-time operations - Implemented 2. New departure procedures for night-time operations - Implemented 3. Increased downwind arrival
More informationFramework Brief. Edinburgh SIDs
Framework Brief 11-Nov-2015 CAA House Edinburgh SIDs 2 Security Statement Unclassified This presentation has been approved for public distribution and publication on the CAA website. Copyright 2015 NATS/
More informationStatus of PBN implementation in France
Status of PBN implementation in France PBN TF/4 Dec 2010 Benoit ROTURIER (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions
More informationMiami Orlando Passenger Rail Project Overview
Miami Orlando Passenger Rail Project Overview 1 The Historical Significance of Florida East Coast Industries Henry Flagler transformed Florida when he built his railroad FEC Railway connected cities along
More informationPOST-IMPLEMENTATION COMMUNITY IMPACT REVIEW
POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Halifax Stanfield International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 November 2017 The information
More informationGENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons.
GENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons. The two parallel runways are about 3000 metres long while the intersecting runway (12-30) is about
More informationFollowing supplement is issued for information, guidance and necessary action. [EFFECTIVE DATE: 1 JULY 2010] RGI AIRPORT, SHAMSHABAD
TEL: 91 11 24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: 91 11 24615508 E_mail: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICES AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG AIRPORT NEW
More information9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures
Raleigh-Durham Air Traffic Control Tower Standard Operating Procedures 1) Purpose This order defines duties and responsibilities, depicts areas of airspace, runways, and taxiways allocated to each position
More informationAD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:
AIP CANADA (ICAO) PART 3 AERODROMES (AD) AD 2. AERODROMES AD 2.1 Aerodrome Location Indicator and Name For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:
More informationTRAFFIC MANAGEMENT PLAN FINAL STAGE. Implementation of Standard Instrument Departure and Standard Instrument Arrival Flight Paths.
TOWNSVILLE AIRPORT TRAFFIC MANAGEMENT PLAN FINAL STAGE Implementation of Standard Instrument Departure and Standard Instrument Arrival Flight Paths. Airservices and the Department of Defence are implementing
More informationFlying an Approach with the Garmin GTN 750
Flying an Approach with the Garmin GTN 750 www.bruceair.com BruceAir at Wordpress YouTube: BruceAirFlying Using the Flight Plan Page Use the Flight Plan page to activate the approach Direct-To a fix or
More informationPBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN
PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components
More informationStandard Operational Procedures
Standard Operational Procedures Aerodrome Ostrava Mošnov VERSION 1.2 CHANGES AND UPDATES Effective Version Change 24 JUN 09 1.1 LVP added. 12 FEB 11 1.2 General text revision. NOTES Official scenery and
More informationIRELAND AERONAUTICAL INFORMATION SERVICES IRISH AVIATION AUTHORITY CONTROL TOWER SHANNON AIRPORT
IRELAND AIC AERONAUTICAL INFORMATION SERVICES IRISH AVIATION AUTHORITY Nr 10/02 CONTROL TOWER SHANNON AIRPORT 31 OCT CO. CLARE Tel +353 61 471954 Fax +353 61 471965 AFTN EINNYNYX OPERATIONS AT WESTON 1.
More informationFederal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017
Presented to: UC Davis Aviation Symposium By: Michael Valencia & Dianna Johnston Date: Overview Part 1 Air Traffic Controllers History Safety and Navigation Terminology Air Traffic Facility Types Equipment
More informationRegulations & Obligations
Regulations & Obligations Thursday, March 24, 2015 9:00 a.m. 10:00 a.m.) PRESENTED BY: John Harpool Richard White Adam Hartley International Operators Conference San Diego, CA March 21 24, 2016 Sources:
More informationTHE BAHAMAS FLIGHT INFORMATION REGION (FIR) (Presented by Bahamas) SUMMARY
C/CAR DCA/7-WP/16 International Civil Aviation Organization 14/06/04 North American, Central American and Caribbean Office Seventh Meeting of Directors of Civil Aviation of the Central Caribbean (C/CAR/DCA/7)
More informationFLIGHT PROCEDURE AT SUVARNABHUMI INTERNATIONAL AIRPORT
Phone: 66 02 568 8831 Fax: 66 02 576 1903 AFTN: VTBAYOYX E-mail: aisthai@caat.or.th ais@caat.or.th THE CIVIL AVIATION AUTHORITY OF THAILAND Aeronautical Information Service Department 333/105 Lak Si Plaza,
More informationAERONAUTICAL INFORMATION CIRCULAR
REPUBLICA BOLIVARIANA DE VENEZUELA INSTITUTO NACIONAL DE AERONAUTICA CIVIL SERVICIO DE INFORMACION AERONAUTICA TEL: (58)212 3551920. FAX: (58) 3551518. AFTN: SVMIYOYX. E-mail: ais@inac.gov.ve AIC A10/04
More informationRedesign Traffic Routes Review the Present Route Structure and Procedures for Inefficiencies
AIRSPACE DESIGN 7 AIRSPACE DESIGN 7 7 AIRSPACE DESIGN This chapter describes the FAA s initiatives to increase airspace capacity by restructuring airspace. Airspace issues may be identified from within
More informationHOBART AIRSPACE DESIGN
HOBART AIRSPACE DESIGN SORELL COMMUNITY Airservices has undertaken a review of the Hobart Airport Standard Instrument Departures (SIDs) and Standard Instrument Arrivals (STARs) for Runway 12 and Runway
More informationBAGHDAD FIR AERONAUTICAL INFORMATION SERVICE BAGHDAD INTERNATIONAL AIRPORT P.O.BOX 55103
BAGHDAD FIR AERONAUTICAL INFORMATION SERVICE BAGHDAD INTERNATIONAL AIRPORT P.O.BOX 55103 Iraq AIP SUPPLEMENT No: A 05/2013 Date: 19 Sep 2013 Effective: 17 Oct 2013 AFTN: ORBIYNYX PHONE: +9641 813-2122
More informationRNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.
RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks
More informationProject Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures
VIA E-MAIL Date: To: From: Subject: Boston Technical Advisory Committee (BOS/TAC) Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures At the February 17, 2006 BOS/TAC meeting several issues
More informationATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR
ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR OBJECTIVE: This ATS Contingency plan s objective is to ensure the continued safety and supplies of air navigation services in the event of partially or total
More informationNOTAM AIRCRAFT OWNERS AND PILOTS ASSOCIATION (AOPA) FLY-IN CHINO AIRPORT (CNO) CHINO, CALIFORNIA
NOTAM AIRCRAFT OWNERS AND PILOTS ASSOCIATION (AOPA) FLY-IN CHINO AIRPORT (CNO) CHINO, CALIFORNIA EFFECTIVE 12:00 NOON LOCAL FRIDAY, SEPTEMBER 19, 2014 UNTIL 6:00 PM LOCAL SATURDAY, SEPTEMBER 20, 2014 TEMPORARY
More informationAir Navigation Bureau ICAO Headquarters, Montreal
Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation
More informationFEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC
FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC LETTER OF AGREEMENT Effective: April 10,2012 SUBJECT:
More informationSID/STAR phraseology FAQ Canadian implementation April 27, 2017
SID/STAR phraseology FAQ Canadian implementation April 27, 2017 The International Civil Aviation Organization (ICAO) has developed harmonized phraseology for Standard Instrument Departures (SIDs) and Standard
More informationREVIEW OF THE IMPLEMENTATION REQUIREMENTS OF PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)
C/CAR/DCA/13 WP/09 International Civil Aviation Organization 12/03/13 North American, Central American and Caribbean Office (NACC) Thirteenth Meeting of Directors of Civil Aviation of the Central Caribbean
More informationAREA NAVIGATION RNAV- MANAGEMENT
1. Introduction AREA NAVIGATION RNAV- MANAGEMENT RNAV is an instrument-based navigation method that leads to fly from a fix (geographic point inside an airspace) to another fix directly. Contrary to conventional
More informationRestricted Hours Operating Policy
Restricted Hours Operating Policy Airside Systems & Programs Creation Date: [February 19, 2018] Version: [4.0] Table of Contents 1 Introduction... 1 1.1 General Information... 1 1.2 Noise Operating Restrictions
More informationMID Region Air Navigation Strategy
MID Region Air Navigation Strategy Mohamed Smaoui ICAO Deputy Regional Director Middle East Office, Cairo Cairo/23 26 November 2015 Outline Background Strategy Main Objectives MID ASBU Block 0 Modules
More informationJACKSONVILLE CENTER AND SAVANNAH TRACON. LETTER OF AGREEMENT EFFECTIVE: December 22, 2006
SUBJECT: APPROACH CONTROL SERVICE EFFECTIVE: December 22, 2006 1. PURPOSE. This agreement between Jacksonville Center and SAV TRACON covers approach control service for airports within TRACON delegated
More informationPART 71. Designation Of Class A And C Airspace; Air Traffic Service Routes; Designation Of Airways; And Reporting Points
PART 71 Designation Of Class A And C Airspace; Air Traffic Service Routes; Designation Of Airways; And Reporting Points This new part of Jordanian Civil Aviation Regulations is hereby adopted under the
More informationNATS. SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting. Friday 2 nd February x NATS presenters.
NATS SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting Friday 2 nd February 2018 3x NATS presenters Agenda Revised Statement of need Background Issues and benefits arising from proposed change
More informationMinneapolis-St. Paul International Airport Monthly Runway Use System Report. June 2015
Minneapolis-St. Paul International Airport Monthly Runway Use System Report June 2015 Environment Department, Noise Program Office Metropolitan Airports Commission 6040 28th Avenue South, Minneapolis,
More informationMinneapolis-St. Paul International Airport Monthly Runway Use System Report. June 2016
Minneapolis-St. Paul International Airport Monthly Runway Use System Report June 2016 Environment Department, Noise Program Office Metropolitan Airports Commission 6040 28th Avenue South, Minneapolis,
More information1. RESPONSIBLE SERVICES 2. MAINTENANCE OF CHARTS 3. PURCHASE ARRANGEMENTS 4. AERONAUTICAL CHART SERIES AVAILABLE GEN APR 2015 AIP HUNGARY
GEN 3.2-1 GEN 3.2 AERONAUTICAL CHARTS 1. RESPONSIBLE SERVICES 1.1. The aeronautical charts for the territory of are published by Pte. Ltd. Co. The charts are provided by the Publications and Static Data
More informationFLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016
FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1 September 28, 2016 TAC Committee Role: Internal Stakeholders To provide input on the master planning analysis from the technical and
More informationInauguration 2017 Dulles Tower
Inauguration 2017 Dulles Tower Presented to: IAD Users By: IAD Staff, Management and NATCA Date:1/3/2017 General Information Inauguration takes place Friday, January 20, 2017 at 1200 (noon) local. The
More informationREPUBLIC OF KAZAKHSTAN
POST: Bldg 15, E522 str., 010014 Astana, Republic of Kazakhstan REPUBLIC OF KAZAKHSTAN The Republican State Enterprise Kazaeronavigatsia AIRAC AIP SUP: 001 TEL: +7 (7172) 704268 Effective Date: 30 Mar
More informationAIRPORT WITH NO RUNWAYS IS A MALL
RUNWAY EXTENSION INITIATIVE AT FT. LAUDERDALE HOLLYWOOD INTERNATIONAL AIRPORT ISMAEL IZZY BONILLA DEPUTY DIRECTOR BROWARD COUNTY AVIATION AUTHORITY AIRPORT WITH NO RUNWAYS IS A MALL Runway Business Case
More informationPOST-IMPLEMENTATION COMMUNITY IMPACT REVIEW
POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Winnipeg James Armstrong Richardson International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 November
More informationDATABASE UPDATES SCNs and
The database update subscription service is offered to provide current, accurate navigation information for your UNS System. Navigation databases are compiled from official State sources and supplied to
More informationDSNA NAVIGATION STRATEGY
DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,
More informationCLEARANCE INSTRUCTION READ BACK
CLEARANCE INSTRUCTION READ BACK 1. Introduction An ATC clearance or an instruction constitutes authority for an aircraft to proceed only in so far as known air traffic is concerned and is based solely
More informationOperating Procedures. For the Provision of Air Traffic Control Services. RAF Mount Pleasant EGYP. Falklands Islands. RAF Monte Agradable EGYP
Version 2.0 10.05.2008 Operating Procedures For the Provision of Air Traffic Control Services at RAF Mount Pleasant EGYP Falklands Islands RAF Monte Agradable EGYP Islas Malvinas 1 General All IFR traffic
More informationTítulo ponencia: Introduction to the PBN concept
Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based
More informationVATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012
VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP EFFECTIVE OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012 I. PURPOSE With the establishment of the VATNZ division of the Oceania Region on 1 January 2007, the Oakland
More informationHOBART AIRSPACE DESIGN
HOBART AIRSPACE DESIGN CARLTON COMMUNITY Airservices has undertaken a review of the Hobart Airport Standard Instrument Departures (SIDs) and Standard Instrument Arrivals (STARs) for Runway 12 and Runway
More informationHOBART AIRSPACE DESIGN
HOBART AIRSPACE DESIGN CARLTON COMMUNITY Airservices has undertaken a review of the Hobart Airport Standard Instrument Departures (SIDs) and Standard Instrument Arrivals (STARs) for Runway 12 and Runway
More informationNaples Noise and FAA Updates
Naples Noise and FAA Updates Presentation to NCC January 31, 2019 Mary Ellen Eagan, HMMH Agenda FAA Reauthorization Update FAA South Central Florida Metroplex Update Analysis of Departure Altitudes 2 3
More informationINTERNATIONAL CIVIL AVIATION ORGANIZATION FOURTH MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CENTRAL CARIBBEAN
05/04/00 INTERNATIONAL CIVIL AVIATION ORGANIZATION FOURTH MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CENTRAL CARIBBEAN (Grand Cayman, Cayman Islands, 17-20 May 2000) Agenda Item 3: Air Traffic Management
More informationPOST-IMPLEMENTATION COMMUNITY IMPACT REVIEW
POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Edmonton International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 January 2018 The information
More informationAIP ENR JORDAN 01 MAY 2014
AIP ENR 1.5-1 JORDAN 01 MAY 2014 ENR 1.5 HOLDING, APPROACH AND DEPARTURE PROCEDURES 1. GENERAL 1.1 The procedures used in Jordan are generally in accordance with ICAO DOC 8168. Holding patterns in Jordan
More informationRNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement
RNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement Dr. Philipp Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) ICANA, Frankfurt, November 2016 DIESER TEXT DIENT DER NAVIGATION
More informationSeychelles Civil Aviation Authority. Telecomm & Information Services Unit
Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA
More informationPBN Implementation. Phil Rakena. PBN Implementation Programme Manager
Implementation Phil Rakena Implementation Programme Manager CANSO APAC Conference - 06 th May 2017 Implementation Scope: What, Why, When? How to? o Needs / Plan o Collaborate o Educate o Regulate o Resource
More informationTHIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.
IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS
More information3.3 Specific Developments in Air Navigation CNS AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) (Presented by the United States of America) SUMMARY
International Civil Aviation Organization 23/02/12 North American, Central American and Caribbean Office (NACC) Seventh Central American Air Navigation Experts Working Group Meeting (CA/ANE/WG/7) Ninth
More informationHOBART AIRSPACE DESIGN
HOBART AIRSPACE DESIGN DODGES FERRY COMMUNITY Airservices has undertaken a review of the Hobart Airport Standard Instrument Departures (SIDs) and Standard Instrument Arrivals (STARs) for Runway 12 and
More informationREPORTS FROM REGIONS
REPORTS FROM REGIONS CIVIL/MILITARY COORDINATION IN THE MIDDLE EAST (MID) REGION Presented by Mohamed R.M. Khonji Regional Director ICAO Middle East (MID) Office Body of Presentation: The FIRS. Military
More informationDenver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES
Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES OCTOBER 7, 2018 Definition of Airspace Colorado Springs Class C airspace is defined as show in Appendix 1. Definition of Positions
More informationFederal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration
DCA Presented to: Arlington County By: Terry Biggio, Vice President Air Traffic Services Date: June 18, 2015 Air Traffic Roles and Responsibilities As aviation technology advances, the FAA is putting in
More informationIVAO Switzerland Division
IVAO ATC Operations Zurich Tower Date Updated by Update description 08.01.2016 CH-TC Document Creation 30.10.2017 CH-AOC Document Revision 1 Contents 1-Objective... 3 2-Zurich Tower LSZH_TWR... 4 3-Operating
More information