Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)
|
|
- Marian Andrews
- 5 years ago
- Views:
Transcription
1 Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number I (5.5/20, 0.5 each) What is each contracting state of ICAO required to provide? [ ] Modern radio navigation facilities for aeroplanes transiting its airspace [ ] Oceanic control facilities in oceanic areas adjacent to territorial airspace [ ] Details of Aerodrome Operating Minima to each operator using its airspace [x] Facilities for SAR (Search and Rescue) operations to be undertaken in its airspace As per ICAO Convention on International Aviation (Doc 7300) in the case of amendments to International Standards, any State which does not make the appropriate amendments to its own regulations or practices shall give notice to [ ] the ICAO Council within 30 days of the adoption of the amendment [ ] the ICAO Assembly within 30 days of the adoption of the amendment [x] the ICAO Council within 60 days of the adoption of the amendment [ ] the ICAO Assembly within 60 days of the adoption of the amendment Who is responsible for the development and modifications of the SARPS? [ ] the Contracting States [ ] the ICAO Assembly [x] the ICAO Air Navigation Commission [ ] the ICAO Council Which of the following ICAO documents contain International Standards and Recommended Practices (SARPS)? [x] Annexes to the Convention on international civil aviation [ ] Procedures for Air Navigation Services (PANS) [ ] ICAO Technical Manuals [ ] Regional Supplementary Procedures (SUPPS) What is a danger area? [ ] A NOTAM activated airspace where the general flight rules are disregarded [ ] An airspace of defined dimensions within which air traffic control service is provided to IFR flights and to VFR flights in accordance with the airspace classification [ ] An airspace of defined dimensions above the land areas or territorial waters of a State within which flight of aircraft is prohibited [x] An airspace of defined dimensions within which activities dangerous to the flight of aircraft may exist at specified times Except when necessary for take-off or landing, a VFR flight over congested areas of cities, towns or settlements or over an open-air assembly of persons shall not be flown at a height less than [ ] 600 m above the highest obstacle within a radius of 300 m from the aircraft [ ] 300 m above the highest obstacle [x] 300 m above the highest obstacle within a radius of 600 m from the aircraft [ ] 300 m above the highest obstacle within a radius of 600 ft from the aircraft
2 In class D airspace the minimum flight visibility for VFR flight above FL 100 is: [ ] 1500 m [ ] 5 km [x] 8 km [ ] 1500 ft The Transition Level: [ ] is calculated and declared for an approach by the Pilot-in command [ ] shall be the highest available flight level below the transition altitude that has been established [x shall be the lowest flight level available for use above the transition altitude [ ] is published for the aerodrome in the Section ENR of the AIP A portion of airspace above FL290 where suitably equipped aircraft are allowed to maintain 1000 ft vertical separation is called [ ] High-level flight zone [ ] Upper Control airspace [x] RVSM airspace [ ] Upper control area Which of the following statements are false? [ ] A IFR flight can also be done in VMC [x] A VFR flight can be done in IMC and VMC [ ] A IFR flight can be done in uncontrolled airspace [x] A VFR flight can not be done in controlled airspace What is the meaning of a readback in voice radio communications? [ ] the phrase readback is correct [ ] a confirmation word, such as Roger or Copy [ ] the instruction is repeated by the sender [ ] the instruction received is repeated word by word [x] the instruction received is repeated in the receiver s own words
3
4
5 II (5/ each) Answer, or fill as necessary, the following questions related to the annexed chart EFHK AD 2.12 for Helsinki aerodrome * Identify the type of this chart: 1. Enroute 2. SID 3. STAR 4. Approach 5. Obstacle * which navigation equipment is required for this procedure? 1. RNAV VOR/DME. 2. RNAV GNSS only 3. VOR/DME 4. RNAV GNSS or DME/DME * operational approval is required according to which PBN navigation specification? 1. RNAV 1 2. RNP 1 3. RNP APCH AR 4. RNP APCH * Which codes should be filed in the flight plan item 10 and item 18 to identify the PBN NAV spec approval for this procedure? item 10a D (DME), G (GNSS), R (PBN requires item 18) item 18 -PBN/D1 (RNAV1) * What are the navigation specification accuracy requirements? the lateral total system error must be within ± 1 NM for at least 95 % per cent of the total flight time. * When needed to generate a DME/DME position, as a minimum, DME signal can only be used if the aircraft is between 3 NM and 160 NM from the facility, below _40_ degrees above the horizon (as viewed from the facility) and if the DME/DME include angle is between _30_ degrees and _150_degrees. Reference ICAO PBN Manual Doc 9613 Volume 2 Chapter 3 Implementing RNAV Criteria for distance measuring equipment (DME/DME RNAV system)
6 * Which ARINC 424 Path Terminators were used to codify this procedure? IF, TF * Which of these points is an entry point of the procedure? 1. LAKUT 2. BALTI 3. PODOM 4. HK HK801 * Which of these points is an exit point of the procedure? 1. LAKUT 2. BALTI 3. PODOM 4. HK HK801 * When a pilot, within the geographical area enclosed by this chart, tunes the radio for the frequency MHz, what can (s)he do? 1. voice communication with the tower position 2. voice communication with the approach position 3. listen to ATIS recording 4. distance measurement to a beacon 5. bearing measurement to a beacon 6. both distance and bearing measurements to a beacon
7 III (7/20) The following information is given about air traffic at a particular runway of an airport. Aircraft type Approach speed (knots) Mix (%) Runway occupancy time on landing (s) Heavy (1) Medium (2) Light (3) The length of the final approach to the runway is 9 nmi. Aircraft can be classified in three types: Heavy (H), Medium (M) and Light (L) The minimum separation requirements (in nautical miles) between successive landing aircraft on final approach are given by the matrix below (rows indicate leading aircraft and columns the following aircraft) 1(H) 2(M) 3(L) I(H) (M) (L) a) Suppose the runway is used for arrivals only. Find its (maximum throughput) capacity. b) Mixed mode operations with free departures : for which of the arrival pairs Leader-Follower H-L, H-M, H-H, M-M can a departure be inserted between the two arrivals without increasing the separations between sucessive two arrivals? The following asumptions apply A landing aircraft will not be permitted to cross the runway threshold on its final approach until the preceding departing aircraft has crossed the end of the runway-in-use, Takeoff cannot begin until the preceding landing aircraft has cleared the runway. Runway occupancy time on departure = 90 s a) Time Separation Matrix 1(H) 2(L) 3(S) 1(H) (L) (S)
8 Probability of Leading/Trailing Pairs 1(H) 2(L) 3(S) I(H) (L) (S) Expected time separation 92.7 sec Average runway capacity 38.8 arrivals/hr b) 55 s + 90 s A departure can be inserted between H-S pair H-S interarrival time 177s > 145 s =55+90
9 IV (2.5/20) = REGULATION YES / NO? YES / NO? YES / NO? YES / NO? a) How are the 4 flights in the chart affected by the different Network Manager areas of operation?. Select YES if the flight is submited to ATFCM measures. Select NO if the flight is not submited to ATFCM measures. A flight departing from within ATFCM area -> YES A flight departing from a FIR immediately adjacent to the ATFCM area and entering the ATFCM area -> YES A flight departing from a FIR immediately adjacent to the ATFCM area and not entering the ATFCM area ->NO A flight departing from outside the ATFCM area and ouside FIRs immediately adjacent to the ATFCM area b) The EUROCONTROL Network operations Pre-Tactical Flow Management phase occurs [ ] in the day of operation (D-day) [ ] seven days or more before the day of operation [x] in the six days before the day of operation [ ] in the two days before the day of operation (D-1,D-2)
10 c) Consider the Single Airport Ground Holding Problem studied in the practical classes. Mark each sentence T(rue)/F(alse): [F] this problem applies only to a single departure airport [T] this problem applies only to a single arrival airport [F] this problem applies only to a single departure and a single arrival airport [T] this is a discrete optimization problem [T] this is a linear optimization problem [F] this is an unconstrained optimization problem
Learning Objectives. By the end of this presentation you should understand:
Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The
More informationAIR LAW AND ATC PROCEDURES
1 The International Civil Aviation Organisation (ICAO) establishes: A standards and recommended international practices for contracting member states. B aeronautical standards adopted by all states. C
More informationRegulations & Obligations
Regulations & Obligations Thursday, March 24, 2015 9:00 a.m. 10:00 a.m.) PRESENTED BY: John Harpool Richard White Adam Hartley International Operators Conference San Diego, CA March 21 24, 2016 Sources:
More informationIFR SEPARATION WITHOUT RADAR
1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s
More informationNav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation
Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different
More informationAERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen
Page 1 of 6 1 INTRODUCTION Each route shall be assigned a designator that is unique for that aerodrome. The designator shall be defined in accordance with Annex 11, Appendix 3. In addition, the first 4
More informationPBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationPBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationTítulo ponencia: Introduction to the PBN concept
Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based
More informationLecture Minimum safe flight altitude
Lecture Minimum safe flight altitude Calculate of minimum safe flight altitude, safe flight altitude in approach zone, in circle zone (circle altitude), minimum safe flight altitude in aerodrome area,
More informationPBN Airspace Concept. ATS requirements
INTERNATIONAL CIVIL AVIATION ORGANIZATION PBN Airspace Concept ATS requirements Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office 1 Gate to Gate concept Phases
More informationPBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN
PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components
More informationContents. Subpart A General 91.1 Purpose... 7
Contents Rule objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 6 Insertion of Amendments... 6 Effective date of rule... 6 Availability of rules... 6 Part 91
More informationInternational Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez
International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate
More informationICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES
AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based
More informationRNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.
RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks
More informationPBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING
PBN Airspace Design Workshop Area Navigation Asia and Pacific Regional Sub-Office Beijing, China 5 May 2016 Page 1 APAC RSO BEIJING Learning Objectives By the end of this presentation, you will be: Aware
More informationCHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT
CHAP 7-1 CHAPTER 7 COMMUNICATION AND NAVIGATION EQUIPMENT 7.1 COMMUNICATION EQUIPMENT 7.1.1 An aeroplane shall be provided with radio communication equipment capable of: a) conducting two-way communication
More informationGBAS ICAO Provisions. Presented by Sylvie GRAND-PERRET EUROCONTROL Navigation Unit
GBAS ICAO Provisions Presented by Sylvie GRAND-PERRET EUROCONTROL Navigation Unit ICAO EUR GBAS Implementation Workshop Paris 18th March 2010 Applicable ICAO provisions ICAO Global provisions ANNEX 10
More informationAIC 01/ Aug 2012
Turks & Caicos Islands. B.W.I. P.O. Box 1058 FAX: (649) 941-5996 PHONE: (649) 946-4420 Email: ais@tciairports.com Web: www.tciairports.com TURKS & CAICOS ISLANDS AIRPORTS AUTHORITY Aeronautical Information
More informationDesign Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation
Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which
More informationAERODROME OPERATING MINIMA
Title: Determination of Aerodrome Operating Minima Page 1 of 8 AERODROME OPERATING MINIMA 1. PURPOSE 1.1 The purpose of this Advisory Circular is to provide methods to be adopted by operators in determining
More informationStatus of PBN implementation in France
Status of PBN implementation in France PBN TF/4 Dec 2010 Benoit ROTURIER (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions
More informationTANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES
Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.
More informationIVAO Flight Operations Department Indonesia (ID) Division Procedures
IVAO Flight Operations Department Indonesia (ID) Division Procedures Revised April 12 rd, 2010 Please consult also the local application of common procedures on http://www.ivao.web.id 1. General 1.1 In
More information1- Wher can you find the difference between ICAO standards and Iran regulation and procedure? a) GEN 2.5 b) ENR 3 c) GEN 1.
1- Wher can you find the difference between ICAO standards and Iran regulation and procedure? a) GEN 2.5 b) ENR 3 c) GEN 1.7 d) ENR l 2- Which part of AIP contain conversion table? a) GEN 1 b) GEN 2 c)
More informationAIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory.
AIRSPACE STRUCTURE 1. Introduction In aeronautics, s are the portion of the atmosphere controlled by a country above its territory. There are two kinds of : Controlled is of defined dimensions within which
More informationPBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies
PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance
More informationAERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)
AIS-AIMSG/5-IP/3 02/11/11 AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG) FIFTH MEETING Montréal, 7 to 11 November 2011 Agenda Item 9: Other Business Report
More informationRegulation. 1. While flying you observe a green light ahead of you:
Regulation 1. While flying you observe a green light ahead of you: a) Port light of another aircraft crossing your path b) Another aircraft overtaking you c) Starboard light of another aircraft crossing
More informationSafety and Airspace Regulation Group
Safety and Airspace Regulation Group 24 August 2015 Policy Statement POLICY FOR POINT MERGE AND TROMBONE TRANSITION PROCEDURES 1 Introduction 1.1 The Point Merge transition procedure is an Area Navigation
More informationAD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:
AIP CANADA (ICAO) PART 3 AERODROMES (AD) AD 2. AERODROMES AD 2.1 Aerodrome Location Indicator and Name For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:
More informationTHIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.
IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS
More informationAIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES
AIP ENR 1.6-1 JORDAN 12 DEC 2013 ENR 1.6 RADAR SERVICES AND PROCEDURES 1. GENERAL 1.1 SERVICES a) Radar units in the Amman FIR operate as integral parts of the ATS system and provide Radar Control Service
More informationIFR SEPARATION USING RADAR
IFR SEPARATION USING RADAR 1. Introduction When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s traffic,
More informationChapter 6. Nonradar. Section 1. General DISTANCE
12/10/15 JO 7110.65W Chapter 6. Nonradar Section 1. General 6 1 1. DISTANCE Use mileage based (DME and/or ATD) procedures and minima only when direct pilot/controller communications are maintained. FIG
More informationEASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments
EASA NPA on SERA Part ENAV Response sheet GENERAL COMMENTS ON NPA PACKAGE te: Specific comments are provided after the General Comments 1 SERA Parts C and D ENAV still misses clarity on the whole scope
More informationLegal regulations in transport policy
Air Legal regulations in transport policy Lecture 2 Anna Kwasiborska, PhD Air Flying is becoming easier and cheaper, with new airlines, more routes and hundreds of services connecting large numbers of
More informationSULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11
KURDISTAN REGIONAL GOVERNMENT SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11 SEPARATION STANDARDS & APPLICATIONS International and Local Procedures ( First Edition ) April 2012 Ff Prepared By Fakhir.F.
More informationCHAPTER 5 SEPARATION METHODS AND MINIMA
CHAPTER 5 SEPARATION METHODS AND MINIMA 5.1 Provision for the separation of controlled traffic 5.1.1 Vertical or horizontal separation shall be provided: a) between IFR flights in Class D and E airspaces
More information34 th Airline/ATS Safety Forum
34 th Airline/ATS Safety Forum Colleen Kitson, Senior ATS Specialist Outline RNP1 - including Albury Future applications Workshop Background ICAO Global Air Navigation Plan specifies PBN as the highest
More informationFIT FOR PURPOSE: A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR PURPOSE INFORMATION
FIT FOR : A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR INFORMATION I TABLE OF CONTENTS SECTION A: GENERAL MATERIAL 2 SECTION B: PUBLICATION SPECIFIC FIT
More informationDRAFT. AND/OR one or more of the following to indicate the serviceable COM/NAV/approach aid equipment and capabilities:
AIP ENR 1.10 Amendment ITEM 10: EQUIPMENT AND CAPABILITIES Radio Communication, Navigation and Approach Aid Equipment and Capabilities INSERT one letter as follows: N if no COM/NAV/approach aid equipment
More informationRegulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.
Change History Version Status Date Affected Pages Author Cause and Summary of the Change 00.01 draft 2017-01-22 all M. Mlynarik New document 00.02 draft 2017-01-29 all M. Mlynarik Internal reviews 00.03
More informationINTERNATIONAL FEDERATION OF AIR TRAFFIC CONTROLLERS ASSOCIATIONS. Agenda Item: B.5.12 IFATCA 09 WP No. 94
INTERNATIONAL FEDERATION OF AIR TRAFFIC CONTROLLERS ASSOCIATIONS 48 th ANNUAL CONFERENCE - Dubrovnik, 20 th to 24 th April 2009 Agenda Item: B.5.12 IFATCA 09 WP No. 94 Study Go Around Procedures When on
More informationPBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)
International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for
More informationInsert new Standards, including Appendix 6, applicable from 20 November 2008, and Attachment F as follows:
Insert new Standards, including Appendix 6, applicable from 20 November 2008, and Attachment F as follows: 4.2.1.6 The air operator certificate shall contain at least the following information and, from
More informationAIP KUWAIT FIR AMENDMENT 28 IMPLEMENTATION AIRAC DATE 25 NOVEMBER 2004
Phone: +965 476 25 31 FAX: +965 476 55 12 AFTN: OKNOYNYX Email :ais1@kuwait-airport.com.kw www.kuwait-airport.com.kw STATE OF DIRECTORATE GENERAL OF CIVIL AVIATION AERONAUTICAL INFORMATION SERVICE (AIS)
More informationENR 1.7 ALTIMETER SETTING PROCEDURES
AIP LEBANON ENR 1.7-1 11 APR 2008 ENR 1.7 ALTIMETER SETTING PROCEDURES 1. Introduction: 1.1 The procedures herein describe the method used in providing adequate vertical separation between aircraft and
More informationOPERATIONS MANUAL PART A
PAGE: 1 Table of Content A.GENERAL /CHAPTER 7 -....3 7.... 3 7.1 Minimum Flight Altitudes /Flight Levels VFR Flight... 3 7.2 Minimum Flight Altitudes /Flight Levels IFR Flight... 4 7.2.1 IFR flights non
More informationEFFECTIVE 0901Z 29 MARCH 2018 TO 0901Z 24 MAY 2018 AIP CANADA (ICAO) Part 3 Aerodromes (AD)
EFFECTIVE 0901Z 29 MARCH 2018 TO 0901Z 24 MAY 2018 AIP CANADA (ICAO) Part 3 Aerodromes (AD) Published by in accordance with ICAO Annexes 4 and 15 of the Convention on International Civil Aviation 2018
More informationAir Navigation Bureau ICAO Headquarters, Montreal
Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation
More informationTABLE OF CONTENTS 1.0 INTRODUCTION...
Advisory Circular Subject: Changes to Air Operator Certificates and Private Operator Registration Documents Issuing Office: Civil Aviation, Standards Document No.: AC 700-043 File Classification No.: Z
More informationOpen Questions & Collecting Lessons Learned
Open Questions & Collecting Lessons Learned 2nd joint ICAO EUR PBN TF EUROCONTROL RAiSG meeting Rick Farnworth EUROCONTROL 12-14 March 2014 Summary Objective List of Open Questions Options for making Information
More informationAIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original
AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2016-06-0532 V2 15 June 2016 15 June 2016 BRITISH GLIDING ASSOCIATION : COMPETITIONS 2016
More informationEuropean Aviation Safety Agency
Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation
More informationOverview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation
Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation
More informationCONTROLLED AIRSPACE CONTAINMENT POLICY
Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon
More informationGOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION
GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case
More informationCouncil of the European Union Brussels, 14 October 2016 (OR. en)
Council of the European Union Brussels, 14 October 2016 (OR. en) 13305/16 ADD 1 AVIATION 209 COVER NOTE From: European Commission date of receipt: 10 October 2016 To: General Secretariat of the Council
More informationUnderstanding the Jeppesen. Updates: Changes, Errata and What s New
Understanding the Jeppesen Updates: Changes, Errata and What s New www.understandingaviation.com info@understandingaviation.com Table of Contents Changes... 1 Errata... 5 What s New... 5 Changes Law Amendment
More informationSID/STAR phraseology FAQ Canadian implementation April 27, 2017
SID/STAR phraseology FAQ Canadian implementation April 27, 2017 The International Civil Aviation Organization (ICAO) has developed harmonized phraseology for Standard Instrument Departures (SIDs) and Standard
More informationSAFETYSENSE LEAFLET AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE
SAFETYSENSE LEAFLET 8e AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE 1 INTRODUCTION 2 NON-RADAR SERVICES 3 RADAR SERVICES 4 HOW TO OBTAIN A SERVICE 5 RADAR SERVICE LIMITATIONS 1 INTRODUCTION a) In this
More informationImplementation challenges for Flight Procedures
Implementation challenges for Flight Procedures A Data-house perspective for comprehensive Procedure Design solution: A need today Sorin Onitiu Manager Business Affairs, Government & Military Aviation,
More informationPBN Operational Approval Continental En Route Navigation Specifications
PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation
More informationEXPLANATION OF TPP TERMS AND SYMBOLS
U.S. TERMINAL PROCEDURES PUBLICATION 52 EXPLANATION OF TPP TERMS AND SYMBOLS The discussions and examples in this section will be based primarily on the IFR (Instrument Flight Rule) Terminal Procedures
More informationAnchorage ARTCC Phraseology Guide. Clearance Delivery Operations
Anchorage ARTCC Phraseology Guide Clearance Delivery Operations Initial Contact: The first time an aircraft calls you, you MUST identify your position, i.e. AWE123 Anchorage Delivery. Clearance Delivery:
More informationAPAC PBN UPDATE Slide 1 of xx
APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide
More informationFLIGHT OPERATIONS PANEL (FLTOPSP)
International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items
More informationTHE TOWER CONTROL POSITION (TWR)
1. Introduction THE TOWER CONTROL POSITION (TWR) The Aerodrome Local Control, or Tower (called TWR) controller has the responsibility of ensuring Air Traffic Control (ATC) Services within a restricted
More informationFinal Approach Operations Symposium
Final Approach perations Symposium Transition to Final Approach ATC/ATM Aspects Charlie Eliot NMD/TRG/TDD 2 February 2017 Agenda PBN to support the Approach RNP to xls What is it? Parallel Approach perations
More informationSECTION 4 - APPROACH CONTROL PROCEDURES
SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES
More informationInternational Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN
International Civil Aviation Organization AIRARDTF/2 IP03 Second Meeting of the Advanced Inter-Regional ATS Route Development Task Force (AIRARDTF/02) Astana, Kazakhstan, 26-27 October 2017 Agenda Item
More informationAERONAUTICAL INFORMATION CIRCULAR 18/18
NAV CANADA 19 JUL 18 AERONAUTICAL INFORMATION CIRCULAR 18/18 GUIDANCE FOR STANDARD TERMINAL ARRIVAL (STAR) PROCEDURES The guidance currently published in the Transport Canada Aeronautical Information Manual
More informationREGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application
Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation
More informationFlight inspection service of LGS Radionavigation Aids in 2017
Annex 5 1. Subject TECHNICAL SPECIFICATION Flight inspection service of LGS Radionavigation Aids in 2017 (identification Nr. LGS 2016/107) 1.1. Flight inspection of LGS radio navigation aids for one year.
More informationImplementation of PBN in Armenian airspace
Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved
More informationPART 71. Designation Of Class A And C Airspace; Air Traffic Service Routes; Designation Of Airways; And Reporting Points
PART 71 Designation Of Class A And C Airspace; Air Traffic Service Routes; Designation Of Airways; And Reporting Points This new part of Jordanian Civil Aviation Regulations is hereby adopted under the
More informationController Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA
Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole
More informationNATA 2018 AGM & CONFERENCE
NATA 2018 AGM & CONFERENCE Tracy Beeman A / VP, Stakeholder and Commercial Relations Jeff Cochrane Director, Navigation and Airspace TOPICS NAV CANADA Corporate Update Navigation and Airspace NAVAID Modernization
More informationApproach Specifications
Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the
More informationRULES OF THE AIR 2007 NOT SUPERSEDED BY SERA (correct at 4 December 2014)
RULES OF THE AIR 2007 NOT SUPERSEDED BY SERA (correct at 4 December 2014) This document is for guidance only. It subject to change and is not to be treated as authoritative. Implementing Regulation (EU)
More informationPBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931
International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic
More informationICAO flight plan form completion guide
ICAO flight plan form completion guide The information is provided here as a handy reference. For the full instructions you should obtain a copy of the latest AIC on the subject from your local authority.
More informationIVAO Switzerland Division
IVAO ATC Operations Zurich Tower Date Updated by Update description 08.01.2016 CH-TC Document Creation 30.10.2017 CH-AOC Document Revision 1 Contents 1-Objective... 3 2-Zurich Tower LSZH_TWR... 4 3-Operating
More informationCAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs.
CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs. The text of the amendment is arranged to show deleted text, new or amended
More informationLATVIJAS CIVILĀS AVIĀCIJAS AĂENTŪRA EKSAMINĒŠANA AIR LAW PPL(A) Variants: 107 WEB. Jautājumu skaits - 20 Eksāmena ilgums 60 minūtes
LATVIJAS CIVILĀS AVIĀCIJAS AĂENTŪRA EKSAMINĒŠANA AIR LAW PPL(A) Variants: 107 WEB Jautājumu skaits - 20 Eksāmena ilgums 60 minūtes 1 Interception Procedure by DAY or NIGHT: If the pilot of an intercepted
More informationAir Law. Iain Darby NAPC/PH-NSIL IAEA. International Atomic Energy Agency
Air Law Iain Darby NAPC/PH-NSIL International Atomic Energy Agency Aviation Regulations International Civil Aviation Organisation (ICAO) Convention on International Civil Aviation also known as the Chicago
More informationOverview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1
Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1 1 Learning Objectives RNAV applications in a continental en-route context Characteristics of available navigation specifications
More informationMetroAir Virtual Airlines
MetroAir Virtual Airlines NAVIGATION BASICS V 1.0 NOT FOR REAL WORLD AVIATION GETTING STARTED 2 P a g e Having a good understanding of navigation is critical when you fly online the VATSIM network. ATC
More informationClass B Airspace. Description
Class B Airspace Ref. AIM 3-2-3 and FAR 91.131 Surrounds certain large airports Within each Class B airspace area, there are multiple segments with different ceiling/floor altitudes. Example: 70/30 = ceiling
More informationUSE OF RADAR IN THE APPROACH CONTROL SERVICE
USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:
More informationAUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.
TELEPHONE: 1300-306-630 (local call - Aust wide, except from mobile phone) FAX: 02 6268 5111 1. INTRODUCTION 1.1 This AIP SUP amends AIP to remove navigation approvals that are no longer able to be used
More informationENR 1.1 GEN. RULES (Insert para 13 in ENR 1.1 of AIP India as follows)
TEL: +91-11-24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: +91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG AIRPORT NEW
More informationCivil Aviation Authority INFORMATION NOTICE. Number: IN 2017/034. Implementation of Performance Based Navigation Guidance for Pilots
Civil Aviation Authority INFORMATION NOTICE Number: IN 2017/034 Issued: 18 August 2017 Implementation of Performance Based Navigation Guidance for Pilots This Information Notice contains information that
More informationAIRAC AIP SUPPLEMENT A 16/17 08 June 2017
Phone: 66 02 568 8831 Fax: 66 02 576 1903 AFTN: VTBAYOYX E-mail: aisthai@caat.or.th ais@caat.or.th THE CIVIL AVIATION AUTHORITY OF THAILAND Aeronautical Information Service Department 333/105 Lak Si Plaza,
More informationICAO Changes to the Present Flight Plan Form. Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ
ICAO Changes to the Present Flight Plan Form Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ Introduction to FPL 2012 Background ICAO 2012 Timeline ICAO 2012 Impacts
More informationAIP PORTUGAL ENR NOV-2007
AIP PORTUGAL ENR 1.6-1 ENR 1.6 RADAR SERVICES AND PROCEDURES PROVISION OF RADAR SERVICES WITHIN LISBOA AND SANTA MARIA FIR / UIR Introduction Air Traffic Control Services within Lisboa and Santa Maria
More informationThe aim of any instrument approach is to allow the aircraft to safely descend to a low altitude in order to become visual.
INSTRUMENT APPROACH CHARTS "An instrument approach is just a series of straight lines joined by rate one turns" Ron Magrath The aim of any instrument approach is to allow the aircraft to safely descend
More informationNextGen Priorities: Multiple Runway Operations & RECAT
NextGen Priorities: Multiple Runway Operations & RECAT May 2018 Presented by Paul Strande & Jeffrey Tittsworth Federal Aviation Administration National Airspace System Today Air traffic services for the
More information