1 RUNWAY EXTENSION INITIATIVE AT FT. LAUDERDALE HOLLYWOOD INTERNATIONAL AIRPORT ISMAEL IZZY BONILLA DEPUTY DIRECTOR BROWARD COUNTY AVIATION AUTHORITY AIRPORT WITH NO RUNWAYS IS A MALL
2
3 Runway Business Case Insufficient airfield capacity* to accommodate demand Demand dictated a new runway in 2004 FLL is essentially a one commercial runway airport 30 large hub airports in US FLL is one of only 2 large hub airports that have 1 runway The Runway Extension will increase capacity from 310,000 to 445,000 operations per year * Capacity is measured as the point at which the average departure is delayed by 6 minutes. Estimated $50.00 per minute costs to airlines 5 Runway Business Case The key driver of the Runway 9R/27L expansion project is that FLL does not currently have adequate runway capacity to meet the number and mix of aircraft operations forecast for the Airport without delays reaching unacceptable levels. Runway 9L/27R (North Runway) is the only runway that can handle large air carrier aircraft such as the A320 and Boeing 767 without weight and size restrictions. The existing parallel runway, Runway 9R/27L, can accommodate only limited types of commuter jet and general aviation aircraft due to insufficient runway length, width, and inadequate separation from its taxiway.
4 While Runway 13/31 provides sufficient length and width to accommodate a portion of the aviation fleet, its use is limited because of its length, crosswind orientation and intersection with the parallel runways. The operational delay caused by this deficiency will increase because the number of large air carrier aircraft operating at FLL is forecast to increase through the forecast period (FY2030). The primary runway, Runway 9L/27R, at its existing length and width, can accommodate all aircraft types currently operating, and forecast to operate, at FLL. Enplanements & Operations Source: 2008 Terminal Area Forecast ,000 operations Enplanements Operations Enplanements Operations 8
5 Traffic Update: Jan Oct 2010 Total traffic 17,411,841 up 5.6% Domestic traffic 15,581,885 up 4.5% International traffic 2,810,235 up 12.7% FLL ranked 1st among large US Airports for total traffic growth for September 2010 vs. 2009, up 10.3%. September and October both set all time FLL traffic records for those months. Seats per departure have increased from 114 in 2005 to 134 in Typical Cruise Season Scenes 10
6 Typical Cruise Season Scenes 11 THE PROCESS Airports that plan to build runways must comply with what can become a complex process involving three general phases that often overlap: 1. Planning 2. Environmental Review 3. Design and Construction
7 1. PLANNING THE PROCESS Airports and local officials determine the type of development and estimated costs in both political and economic terms. Establishing the purpose and need for the runway Coordinating land use issues with Planning Boards Preparing or updating Master Plans, Airspace Reviews, Costs Benefit Analyses How will the Airport Sponsor fund the project? THE PROCESS 2. ENVIRONMENTAL REVIEW Most Challenging Phase of the Process FAA determination of the extent to which the proposed project will affect the environment. The FAA will make one of three determinations: a) The project will not directly affect the environment. b) Project has measurable impacts, but impacts will not exceed guidelines. (FONSI) c) Project has significant environmental impacts.
8 THE PROCESS 3. DESIGN AND CONSTRUCTION Project Engineering Financing Contracting Land Acquisition Site Preparation Project Construction Project Certification
9 Noise Mitigation Program Noise mitigation program is estimated at $175 million in the EIS/ROD. Congress directs that approximately $1 billion be set aside annually for noise mitigation programs throughout the US. Funds are distributed on an 80% federal/20% local formula. FLL has reserved $35 million to date in local PFC funds dedicated to a noise mitigation program. This will fund a total program of $175 million. 18
10 Airfield Refinement Plan 19 Possible Design for Tunnel 20
11 Airfield Plan Runway Extension
Existing Conditions AIRPORT PROFILE Passenger Terminal Complex 57 air carrier gates 11,500 structured parking stalls Airfield Operations Area 9,000 North Runway 9L-27R 6,905 Crosswind Runway 13-31 5,276
More informationFort Lauderdale Hollywood International Airport
ATLANTA, GEORGIA 1 2 ATLANTA, GEORGIA Fort Lauderdale Hollywood International Airport Master Plan to Master Plan Implementation Jamie McCluskie Director of Aviation Planning & Environmental Broward County
More informationYakima Air Terminal/McAllister Field Airport Master Plan Update
Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used
More informationEXECUTIVE SUMMARY FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT (FLL) MASTER PLAN UPDATE PHASE 1
Workshop Briefing Package Airport Master Plan Update, Phase I Fort Lauderdale-Hollywood International Airport October 18, 2005 Leigh Fisher Associates A Division of Jacobs Consultancy Inc. EXECUTIVE SUMMARY
More informationFORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT
D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix
More informationAPPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS
APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS Pocatello Regional Airport Airport Master Plan APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS The Airport and Airway Improvement Act of 1982
More informationPartnership for Quieter Skies Report
Ft. Lauderdale-Hollywood International Airport Prepared by: March 2008 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview of progress of efforts to reduce
More informationPartnership for Quieter Skies Report
Ft. Lauderdale-Hollywood International Airport Prepared by: Broward County Aviation Department March 2008 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview
More informationAccording to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:
4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity
More informationPartnership for Quieter Skies Report
Ft. Lauderdale-Hollywood International Airport Prepared by: Broward County Aviation Department July 2008 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined
More informationMilton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.
Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet
More informationNotice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport
Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport Pursuant to 14 CFR Part 158.24(a) (1) (III), the Broward County
More informationFinance and Implementation
5 Finance and Implementation IMPLEMENTATION The previous chapters have presented discussions and plans for development of the airfield, terminal, and building areas at Sonoma County Airport. This chapter
More informationFLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016
FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1 September 28, 2016 TAC Committee Role: Internal Stakeholders To provide input on the master planning analysis from the technical and
More informationQuieter Skies Report. Partnership for. Fort Lauderdale-Hollywood International Airport. Prepared by: Broward County Aviation Department
Fort Lauderdale-Hollywood International Airport Prepared by: February 2016 Partnership for Quieter Skies Report The Report provides an overview of progress of efforts to reduce the noise impacts of Fort
More informationCommunity Noise Consortium Meeting (CNC)
Community Noise Consortium Meeting (CNC) March 8, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Water: In the back of the room. Emergency Exit:
More informationMaster Plan Update Technical Advisory Committee Meeting
Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate
More informationSession Six: State Aviation System Plan Overview GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau
Session Six: State Aviation System Plan Overview 2018 GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau STUDY GOALS AND OBJECTIVES The purpose of the Georgia Statewide
More informationCommunity Noise Consortium Meeting (CNC)
Community Noise Consortium Meeting (CNC) September 13, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Emergency Exit: Door through which you entered
More informationSouthwestFloridaInternational Airport
SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom
More informationWill it Fit? Preliminary Findings
Will it Fit? Preliminary Findings Presented by John Dickson Airport System Development Committee, Chair Transportation Committee October 24, 2018 Agenda Introduction & overview Airport site planning considerations
More informationFLL s international traffic has tripled in the last 10 years and it is now 16% of total traffic
FLL in Perspective FLL in Perspective 2013- FLL ranked as the 21 st busiest airport in the U.S. with 23,559,779 total passengers, 15 th in international passengers and 13 th in domestic Origin and Destination
More informationEXECUTIVE SUMMARY. Master Plan Update Phase 2/3 FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 1. INTRODUCTION 2.
MASTER PLAN UPDATE Phase 2/3 Draft Final Summary Report Report Issued 2010 in association with Prepared for Broward County Aviation Department Main Office 555 Airport Blvd., Suite 300 Burlingame, CA 94010
More informationDEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER
PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,
More informationPFC Application #2 Niagara Falls International Airport
Public Notice Application #2 Falls International April 12, 2018 Agenda Program at the Falls International Notice to air carriers and consultation meeting Class of air carriers not required to collect Air
More informationPartnership for Quieter Skies Report
Ft. Lauderdale-Hollywood International Airport Prepared by: Broward County Aviation Department August 2007 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview
More informationBNA Master Plan Update Community Advisory Committee Meeting No. 5
A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,
More informationState of the Airport Robert S. Bowen, Executive Director October 18, 2018
Robert S. Bowen, Executive Director October 18, 2018 A Year of Change The last year will be remembered as a period when the airlines, bolstered by a growing national economy, moderate fuel prices and changing
More informationCHAPTER 1 EXECUTIVE SUMMARY
CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport
More informationFLL. Fort Lauderdale-Hollywood International Airport Yesterday, Today and Tomorrow. The Brazilian Business Group
FLL Fort Lauderdale-Hollywood International Airport Yesterday, Today and Tomorrow The Center of Business in South Florida Presented to: The Brazilian Business Group Presented by: Mark Presented Gale, by:
More informationFAA Reauthorization Issues & Impacts on Airports
Issues & Impacts on Airports Presentation to Mid America Association of State Transportation Officials July 21, 2011 Presented by Greta J. Hawvermale Sr. Director of Engineering & Environmental Matters
More informationAVIATION. MichiganReportCard.com 5
MichiganReportCard.com 5 GRADE C AVIATION OVERVIEW Michigan s 200+ airports bring $4.3 billion into the economy each year. The state s Tier 1 and Tier 2 airports were evaluated based on six key infrastructure
More informationPublic Information Meeting. September 2015
W ki P O & T / Working Papers One & Two/ Public Information Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Papers
More informationCHAPTER TWO THE PROPOSAL
CHAPTER TWO THE PROPOSAL 2.0 AIRPORT SPONSOR S PROPOSED PROJECT The Airport Sponsor s Proposed Project includes the following elements, which are depicted in Exhibit 2-1, Sponsor s Proposed Project: Expand
More informationSTAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D
STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings
More informationExecutive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport
Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche
More informationThe purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration
Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this
More informationNextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures
NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures DFW International Airport Sandy Lancaster, Manager Noise Compatibility October 13, 2008 OUTLINE About DFW Airport
More informationAviation Department Board Workshop. December 7, 2010
Aviation Department Board Workshop December 7, 2010 1 Agenda North Perry Airport (HWO) FLL Economic Impact & Traffic Update Terminal Area Forecast FLL Airport Layout Plan & Master Plan Update Runway 9R/27L
More informationPULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project
PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February
More informationQuieter Skies Report. Partnership for. Fort Lauderdale-Hollywood International Airport. Prepared by: Broward County Aviation Department
Fort Lauderdale-Hollywood International Airport Prepared by: Broward County Aviation Department February 2014 Partnership for Quieter Skies Report The Report provides an overview of progress of efforts
More informationOctober 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION
October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.
More informationTable of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update
Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East
More informationCasper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM
Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, 2014 1:30 PM Casper/Natrona County International Airport Master Plan Update Policy
More informationPUBLIC SCOPING MEETING APRIL 2018
Photo credit: Patrick Schneider PUBLIC SCOPING MEETING APRIL 2018 Welcome to the meeting! The Federal Aviation Administration (FAA) is preparing an Environmental Impact Statement (EIS) to evaluate the
More informationAirport. Improvement Program (AIP) Overview. Federal Aviation Administration. Texas Aviation Conference Ben Guttery, Texas ADO April 2017
Airport Improvement Program (AIP) Overview Texas Aviation Conference Ben Guttery, Texas ADO April 2017 Objectives Status of AIP Legislative Authority History and Summary of AIP AIP funding formulas 2 AIP
More informationAirport Master Plan. Brookings Regional Airport. Runway Runway 17-35
Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements
More informationAirportInfo. Airport Improvement Program
AirportInfo Airport Improvement Program April 2014 Airport Improvement Program (AIP) AIP provides grants to airport sponsors for the planning and development of public-use airports. To be eligible for
More informationAviation Gridlock: Airport Capacity Infrastructure How Do We Expand Airfields?
Aviation Gridlock: Airport Capacity Infrastructure How Do We Expand Airfields? By John Boatright Vice President - Delta Air Lines Properties and Facilities Issue What can be done to expand airfield capacity?
More informationMemphis International Airport Enplanements by Fiscal Year (000 s)
Enplanements (000's) Memphis International Airport Enplanements by Fiscal Year (000 s) 6000 5000 4000 3000 International Domestic 2000 1000 0 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Enplanements
More informationAppendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis
Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway
More informationChapter 3. Demand/Capacity & Facility Requirements
Chapter 3. Demand/Capacity & Facility Requirements Chapter 3. DEMAND/CAPACITY & FACILITY REQUIREMENTS This chapter provides an assessment of future airport development requirements based upon the forecasts
More informationTABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i
TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term
More informationThe presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3
This is the presentation for the third Master Plan Update Working Group Meeting being conducted for the Ted Stevens Anchorage International Airport Master Plan Update. It was given on Thursday March 7
More informationBNA Master Plan Update Public Meeting No. 2
A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation
More informationChapter 4. Development Alternatives
Chapter 4. Development Alternatives Chapter 4. DEVELOPMENT ALTERNATIVES This chapter identifies and evaluates airport development alternatives to fulfill the facility requirements for the airport as defined
More informationFORECASTING FUTURE ACTIVITY
EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver
More informationCommunity Noise Consortium Meeting (CNC)
Community Noise Consortium Meeting (CNC) May 10, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Water: In the back of the room. Emergency Exit:
More informationKey Purpose & Need Issues
Key Purpose & Need Issues Efficiently meet demand through the 2025 planning horizon 864,000+ annual operations 180-200 operations during peak daytime hours Balance peak hour arrival/departure capability
More informationCHAPTER 3 ALTERNATIVES CONSIDERED
CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from
More informationQuarterly Performance Measurement Report
Quarterly Performance Measurement Report Department: Aviation Section: Administration/Executive To provide the executive and administrative support necessary to the Divisions within the Aviation Department
More informationERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS
EXECUTIVE SUMMARY ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS PAGE NO. CHAPTER 1-INTRODUCTION... 1-1 1.01 General...1-1 1.02 Purpose and Scope of Study...1-1 1.03 The Planning Process...1-2
More informationNotice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application
July 3, 2018 Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application The City of Kansas City (City), Missouri through its Aviation Department ( the Department
More informationINTRODUCTION TO THE ADAPTING TO RISING TIDES EXISTING CONDITIONS AND STRESSORS REPORT
INTRODUCTION TO THE ADAPTING TO RISING TIDES EXISTING CONDITIONS AND STRESSORS REPORT The Adapting to Rising Tides (ART) project evaluated the current condition of shoreline and community assets, and the
More informationPublic Notice July 14, 2017
Public Notice July 14, 2017 PROPOSED IMPLEMENTATION OF PFC 13 NOTICE TO AIR CARRIERS AND CONSULTATION MEETING Implementation of PFC On June 14, 2017 the Omaha Airport Authority provided written notice
More informationAirportInfo. Passenger Facility Charge
AirportInfo Passenger Facility Charge May 2014 PFC A Cornerstone of Airport Capital Programs PFC user fees were first authorized by Congress in 1990 and are tied directly to local airport projects that:
More informationQuieter Skies Report. Partnership for. Broward County Aviation Department Partnership for Quieter Skies Quarterly Report
Ft. Lauderdale-Hollywood International Prepared by: Broward County Aviation June 2011 Partnership for Quieter Skies Report This report was prepared by the (954-359-6181). The Report provides an overview
More informationNext Generation Air Transportation System Financing Reform Act of 2007
Next Generation Air Transportation System Financing Reform Act of 2007 Funding Proposal An ACC Summary of Key Provisions in the USDOT s FAA Reauthorization Proposal Overall, the change in the aviation
More informationUpdate on the Aspen/Pitkin County Airport Improvements
Update on the Aspen/Pitkin County Airport Improvements and EA Process Public Information Meeting September 10, 2015 Meeting Objectives Explain what has changed since we had our last meeting and how it
More informationAviation Operating Administration/Executive
Administration/Executive To provide the executive and administrative support necessary to the Divisions within the Aviation Department to ensure continued efficiencies, effectiveness, and compliance with
More informationStudy Committee Meeting. September 2015
W ki P T / Working Paper Two/ Study Committee Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments,
More informationWestover Metropolitan Airport Master Plan Update
Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The
More informationNoise Abatement 101. July 13, Regular Board Meeting / August 7, 2014 Hillsborough County Aviation Authority
Noise Abatement 101 July 13, 2017 1 Objectives Provide context and a better understanding for how and why flights may operate at Tampa International Airport the way they do. Provide an overview of laws,
More information6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)
6.0 The addresses the phased scheduling of projects identified in this Master Plan and their financial implications on the resources of the Airport and the City of Prescott. The phased Capital Improvement
More informationChapter Seven COST ESTIMATES AND FUNDING A. GENERAL
Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction
More informationECONOMIC DEVELOPMENT INCENTIVES AND PROGRAMS. Provide Airport Encroachment Protection. Standardize Ad Valorem Tax Exemptions
ECONOMIC MASTER PLAN Florida s airport industry indicates the following programs are needed to maximize its impact on the State s economy: AIRPORT SECURITY Develop Model Security Plan for General Aviation
More informationTABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved
TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING
More informationAirport Funding FAA Airport Improvement Program (AIP)
Airport Funding FAA Airport Improvement Program (AIP) Presented to: Texas Aviation Conference By: Mike Nicely, Manager Texas ADO Date: May 15, 2013 Discussion Topics Enabling Legislation Authorization
More informationQuieter Skies Report. Partnership for. Broward County Aviation Department Partnership for Quieter Skies Quarterly Report
Ft. Lauderdale-Hollywood International Prepared by: Broward County Aviation November 2011 Partnership for Quieter Skies Report This report was prepared by the (954-359-6181). The Report provides an overview
More informationA Love Note from Me to You
Community Weekly Update for September 8- September 14, 2012 A Love Note from Me to You Dear Neighbors, Please be advised that we have a scheduled closure of our Preferential Runway 13R/31L (Denton) Friday
More informationTable of Contents. Master Plan March 2014 TOC i Spokane International Airport
Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land
More informationMeeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies
Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, 2017 Prepared by: File: Attendees: Shannon Eibert, C&S Companies N93.012.001 See Sign-In List A third meeting was held
More informationTable of Contents. Overview Objectives Key Issues Process...1-3
Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5
More informationLas Vegas McCarran International Airport. Capacity Enhancement Plan
Las Vegas McCarran International Airport Capacity Enhancement Plan Las Vegas McCarran International Airport Capacity Enhancement Plan September 1994 Prepared jointly by the U.S. Department of Transportation,
More informationSunshine Coast Airport Master Plan September 2007
Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT
More informationP U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS
P U B L I C N O T I C E MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application 10-07-C-00-MBS INTRODUCTION: This Public Notice is issued as part of a Federal Aviation
More informationChapter 4 Noise. 1. Airport noise
Chapter 4 Noise 1. Airport noise Airport noise includes the following: 1) Flight noise (engine noise during takeoff and landing) 2) Ground noise (i) Aircraft engine operation noise on the ground (ii) APU
More informationApril 4, McKinney Airport Advisory Committee Airport Master Plan Update.
McKinney Airport Advisory Committee Airport Master Plan Update http://mckinney.airportstudy.com/project-documents April 4, 2017 Paul Hendricks phendricks@fairviewtexas.org McKinney National Airport (TKI)
More informationSession 6 Airport Finance 101 Funding Sources for Airports
Session 6 Airport Finance 101 Funding Sources for Airports 31 st Annual AAAE Basics of Airport Law Workshop and 2015 Legal Update November 1-3, 2015 Desk Reference Chapters 2, 19, 22 Frank J. San Martin
More informationIDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT
IDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT 7 7.1 GENERAL The primary objective of this chapter is to evaluate potential development alternatives and identify
More informationCHAPTER 4 DEMAND/CAPACITY ANALYSIS
CHAPTER DEMAND/CAPACITY ANALYSIS INTRODUCTION The demand/capacity analysis examines the capability of the airfield system at Blue Grass Airport (LEX) to address existing levels of activity as well as determine
More informationSTUDY WORK GROUP MEETING No. 3. November 29, 2016
STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity
More informationJUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017
JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017 1 Agenda Program Description Runway Incursions Design and Geometry Deficiencies Runway 8/26 Operations Potential Mitigation Next Steps
More informationPrepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906
Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement
More informationDr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University. Spring 2015 Blacksburg, Virginia
CEE 4674 Airport Planning and Design Runway Length Calculations Addendum 1 Dr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University Spring 2015 Blacksburg,
More informationPUBLIC NOTICE. Table 1 Projects Proposed by Amendment
PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the
More informationSummary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.
Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed
More informationPunta Gorda Airport Master Plan Update
Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,