JACKSONVILLE CENTER AND SAVANNAH TRACON. LETTER OF AGREEMENT EFFECTIVE: December 22, 2006
|
|
- Dayna Leonard
- 5 years ago
- Views:
Transcription
1 SUBJECT: APPROACH CONTROL SERVICE EFFECTIVE: December 22, PURPOSE. This agreement between Jacksonville Center and SAV TRACON covers approach control service for airports within TRACON delegated airspace and Tower en route control service. This agreement is supplemental to Air Traffic Control Handbook CANCELLATION. The Jacksonville Center and Savannah Tower Letter of Agreement, dated July 10, 2003 is canceled. 3. RESPONSIBILITIES. Center delegates to TRACON authority and responsibility for control of IFR aircraft operations within the Terminal Area described in Appendix PROCEDURES - RADAR. The Center and TRACON shall transition arrivals, departures, and overflights via filed routes or an ATA/DTA as appropriate. a. Arrivals. (1) Center shall clear aircraft landing Savannah/Hunter AAF operating at or above 11,000 feet and inbound between Savannah 270-degree radial clockwise to the 090-degree radial, to cross 35 miles from Savannah at 11,000 feet. All other aircraft landing Savannah/Hunter AAF shall be delivered on course descending to 11,000 feet. (2) Center shall deliver aircraft landing Hilton Head operating at or above 11,000 feet to cross 35 miles from Hilton Head at 11,000 feet. (3) Aircraft landing in TRACON airspace from within the Allendale, Brunswick and Jekyll sectors, as depicted on Appendix 1, that are at or descending to 11,000 feet are released to the TRACON for descent to 9,000 feet, for speed restrictions, and turns not to exceed 30 degrees within 10 miles of the ZJX/SAV common boundary. Center shall advise TRACON when Brunswick/Jekyl sectors are split, TRACON shall coordinate with the Brunswick sector for aircraft descending to 9000 feet. (4) Unless prior coordination is effected, arrivals released to the TRACON for a published JAL penetration shall maintain Center assigned altitude until over the Initial Approach Fix (IAF) commencing penetration. The Center is responsible for coordination with all affected Center sectors. (5) Center shall clear aircraft operating at 10,000 feet or below to the destination airport to cross the Center/TRACON boundary LEVEL at an altitude appropriate for direction of flight. Rev. 3: January 7, 2015
2 b. Departures. (1) Automatic departures are authorized. (2) TRACON shall clear aircraft requesting 11,000 feet or above to maintain 10,000 feet and expect requested altitude 10 minutes after departure. Savannah Airport departures that are climbing to 10,000 feet and requesting at or above 11,000 feet are released to the Center for turns, not to exceed 30 degrees from the route. c. Overflights. Overflights shall be cleared via the Route/altitude printed on the strip. Center shall ensure overflight aircraft are on routings clear of special use airspace. 5. PROCEDURES - NONRADAR a. When Center and TRACON radar is not operational, and CENRAP is not available, nonradar arrival and departure routes, clearance limites and transfer control points shall be used as depicted in Appendix 1. Automatic departures shall be discontinued. b. In the event of a TRACON radar outage ZJX shall implement the support procedures contained in the Automated Contingency Tool 2 (ACT2) in support of TRACON. (as on midnight shift) c. When TRACON radar is not operational, the TRACON shall verify with the Allendale/Brunswick Sectors receipt of flight plans on all traffic affected by the redelegation of airspace. The TRACON shall forward to the Allendale/Brunswick Sectors any amendments concerning these flights. 6. PROCEDURES - ARTS a. In the event of an ARTS failure at TRACON, aircraft shall be coordinated on an individual basis. The following NON-DISCRETE beacon code assignments shall be assigned as follows: 1. ZJX shall assign the following non-discrete codes: (a) Overflights code 0400 (b) Arrivals code TRACON shall assign the following non-discrete codes and shall DM all IFR departures: (a) Departures 0300 b. ZJX may change the beacon codes of departure/overflight aircraft to NAS assigned codes on contact. c. ZJX shall advise SAV when aircraft are clear of SAV APCH delegated airspace. 2 Rev 3: January 7, 2013
3 7. DTA/ATA OPERATIONS. Arrivals at or descending to 11,000 feet and departures requesting above 11,000 feet operating between the SAV270 radial and the SAV330 radial shall utilize the appropriate Arrival Transition Area (LOTTS ATA) and Departure Transition Area (STATESBORO DTA) as depicted on Appendix 1. These aircraft shall be on routings or headings to ensure transition within the confines of the appropriate ATA/DTA. 8. MISCELLANEOUS. a. The TRACON hours of operation are as published in the SE United States airport/facility directory. At other times, the Center shall assume approach control service and airspace delegated to the TRACON. When commencing or ceasing operations, the Center and TRACON shall coordinate the following: (1) Equipment Status, NOTAMS. (2) Traffic Information. (3) NAS Interface. (4) Other pertinent information. b. The TRACON will remain open for up to 2 hours past normal operational hours when requested by the Center Watch Manager-in-Charge. c. The TRACON shall coordinate for release on departures from Statesboro Airport that will enter Center airspace prior to issuance of clearance. Departures shall be assigned 3,000 feet unless otherwise specified by Center. The Center shall advise TRACON when departures from Statesboro Airport are clear of TRACON airspace. The TRACON shall advise Center when arrivals to Statesboro Airport are clear of Center airspace. The TRACON shall coordinate with the Center prior to clearing aircraft for the RNAV (GPS) RWY 32 approach at Statesboro Airport. d. Aircraft operating from the ZJX Brunswick sector to SAV, must be cleared northbound at odd altitudes. e. Aircraft operating from SAV, south to the ZJX Brunswick sector must be cleared southbound at even altitudes. Aircraft operating north of SAV to the ZJX Allendale sector, east of V185, must be cleared at odd altitudes. Aircraft on or west of V185 to the ZJX Allendale sector must be cleared at even altitudes. f. Automatic departures are not authorized during Center RDP/FDIO outages. 3 Rev. 3: January 7, 2013
4 g. Deviations from procedures established by this agreement may be made only after coordination which completely defines responsibility in each case. Original Signed By Miles R. Miller Manager Jacksonville Center Original Signed By Pamela D. Adams Manager Savannah TRACON 4
5 APPENDIX 1 EFFECTIVE: December 22, 2006 REV 4: January 8, 2015
6 APPENDIX 2 EFFECTIVE: Janaury 8, 2015 PAGE 1 APPROACH CONTROL COORDINATES NBC4 REV 4: January 8, 2015
7 APPENDIX 2 EFFECTIVE: January 8, 2015 PAGE 2 APPROACH CONTROL COORDINATES (cont d) G410 G44B H3A4 J501 J503 J504 NBC1 NBC3 NBC4 SA07 SA08 SA09 SA11 SA15 SA16 SA17 SA18 SA19 SA20 SA21 SA22 SA23 SA24 SA25 SA26 SA27 SA28 SA6A SA7A N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W N/ W REV 4: January 8, 2015
8 APPENDIX 3 EFFECTIVE: January 8, 2015 SAV STEREOTYPE ROUTES FORMAT CODE ACFT ALTITUDE ROUTE SP ESAV C172/A VFR/030 SAV NOMAS SAV SP NSAV C172/A VFR/030 SAV SPONG SAV SP SSAV C172/A VFR/030 SAV TYBEE SAV SP WSAV C172/A VFR/030 SAV MAYAR SAV REV 4: January 8, 2015
ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE
ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT EFFECTIVE: July 10, 2010. SUBJECT: APPROACH CONTROL SERVICE 1. PURPOSE: To delegate authority and responsibility for approach control services in the airspace described
More informationATLANTA ARTC CENTER AND CHARLOTTE TOWER LETTER OF AGREEMENT
ATLANTA ARTC CENTER AND CHARLOTTE TOWER LETTER OF AGREEMENT EFFECTIVE: March 1, 2011 SUBJECT: APPROACH CONTROL SERVICE 1. PURPOSE: To delegate authority and responsibility for approach control services
More informationVATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures
VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT EFFECTIVE: 01/08/08 SUBJECT: Interfacility Coordination Procedures 1. PURPOSE. This Letter of Agreement establishes procedures for coordinating
More informationERIE ATCT STANDARD OPERATING PROCEDURES
ORDER ERI ATCT 7110.10I ERIE ATCT STANDARD OPERATING PROCEDURES August 1, 2014 VATUSA CLEVELAND ARTCC VIRTUAL AIR TRAFFIC SIMULATION NETWORK VIRTUAL AIR TRAFFIC SIMULATE NETWORK UNITED STATES DIVISION
More informationSouthern California TRACON and Lindbergh Tower LETTER OF AGREEMENT SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES
Southern California TRACON and Lindbergh Tower LETTER OF AGREEMENT EFFECTIVE: September 13, 2012 SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES 1. PURPOSE. This agreement establishes procedures
More informationJacksonville ARTCC. F11 TRACON Standard Operating Procedures
Document Number ZJX-10 Version A Effective Date 9/19/2018 Purpose Document Information ZJX 10A establishes procedures for staffing of the Central Florida TRACON radar positions (herein referred to as F11
More informationRALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES
RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES January 3, 2017 BULLETIN NUMBER RECORD OF CHANGES SUBJECT AUTHORIZED BY DATE ENTERED DATE REMOVED 7110.100 Initial RR 1/3/17 3/25/17 7110.101 Added
More information- Updated formatting - Re-drawn airspace delegation diagram
Z D C A R T C C - Updated formatting - Re-drawn airspace delegation diagram Change Log... 2 Table of Contents... 3 Chapter 1. Positions... 4 Chapter 2. Clearance Delivery... 5 Chapter 3. Ground Control...
More informationPiedmont Triad International Airport
ZTL ARTCC Piedmont Triad International Airport Airport Traffic Control Tower Standard Operating Procedures GSO 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1-1-1. Callsign
More informationZTL ARTCC. Augusta Regional
ZTL ARTCC Augusta Regional Air Traffic Control Tower Standard Operating Procedures AGS 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1-1-1. Callsign Usage and Frequency
More informationVATUSA C90 TRACON AND O HARE ATCT LETTER OF AGREEMENT
VATUSA C90 TRACON AND O HARE ATCT LETTER OF AGREEMENT EFFECTIVE: 02/01/2019 SUBJECT: INTERFACILITY COORDINATION 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of
More informationDenver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES
Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES OCTOBER 7, 2018 Definition of Airspace Colorado Springs Class C airspace is defined as show in Appendix 1. Definition of Positions
More informationVirtual Jacksonville Air Route Traffic Control Center Tallahassee ATCT Standard Operating Procedures
Virtual Jacksonville Air Route Traffic Control Center Tallahassee ATCT Standard Operating Procedures TLH 7110.65 Effective Date: May 11, 2015 Chapter 1. General 1 1. General Information obtained in this
More informationBOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE KALB) ALBANY APPROACH (ALB
BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE ALBANY ATCT (KALB( KALB) ALBANY APPROACH (ALB APP) RELEASE RECORD Version Date Author Notes 1.0 24 April 2009 Initial Release 1.1 30 Jan 2015 BN Match ALB5
More informationVATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT
VATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT SUBJECT: TERMINAL AREA CONTROL SERVICE EFFECTIVE: September 1, 2016 1. PURPOSE. This agreement delegates authority and establishes procedures
More informationFEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC
FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC LETTER OF AGREEMENT Effective: April 10,2012 SUBJECT:
More informationGreenville Spartanburg International
ZTL ARTCC Greenville Spartanburg International Airport Traffic Control Tower Standard Operating Procedures GSP 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 2-1-1. Callsign
More informationFLIGHT ADVISORY WASHINGTON D.C. SPECIAL FLIGHT RULES AREA LEESBURG MANUVERING AREA
FLIGHT ADVISORY WASHINGTON D.C. SPECIAL FLIGHT RULES AREA LEESBURG MANUVERING AREA EFFECTIVE October 11, 201609 0400 This Notice does not supersede restrictions pertaining to the use of airspace contained
More informationAlbany ATCT Standard Operating Procedures
Albany ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world
More informationZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011
ZTL ARTCC Asheville Regional Air Traffic Control Tower Standard Operating Procedures AVL 7110.65B Effective: May 1, 2011 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1 1-1-1. Callsign Usage and Frequency
More informationSouthern California Terminal Radar Approach Control and Ontario Airport Traffic Control Tower
Southern California Terminal Radar Approach Control and Ontario Airport Traffic LETTER OF AGREEMENT SUBJECT: Interfacility Coordination and Control Procedures Effective: August 16, 2013 1. PURPOSE: This
More informationCharlotte - Douglas International Airport Traffic Control Tower
Charlotte - Douglas International Airport Traffic Control Tower Standard Operating Procedures CLT ATCT 7110.65D Effective: May 1, 2011. 1 1-1-1. Callsign Usage and Frequency Delegation: CHAPTER 1. GENERAL
More informationVATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012
VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP EFFECTIVE OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012 I. PURPOSE With the establishment of the VATNZ division of the Oceania Region on 1 January 2007, the Oakland
More informationBurlington ATCT Standard Operating Procedures
This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for
More informationRELEASE RECORD. Version Date Author Notes Dec 2006 SK Initial Release
BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE BOSTON ARTCC (ZBW) RELEASE RECORD Version Date Author Notes 1.0 10 Dec 2006 SK Initial Release 2.0 01 Oct 2011 DO Major update, transformed from more of
More informationVATUSA CHICAGO ARTCC AND VATUSA MINNEAPOLIS ARTCC LETTER OF AGREEMENT
SUBJECT: INTERFACILITY COORDINATION EFFECTIVE: 04/15/2015 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of airspace between VATUSA Chicago ARTCC (ZAU) and VATUSA
More informationVATUSA CHICAGO ARTCC AND C90 TRACON LETTER OF AGREEMENT
VATUSA CHICAGO ARTCC AND C90 TRACON LETTER OF AGREEMENT EFFECTIVE: 01/16/2019 SUBJECT: INTERFACILITY COORDINATION 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of
More informationSID/STAR phraseology FAQ Canadian implementation April 27, 2017
SID/STAR phraseology FAQ Canadian implementation April 27, 2017 The International Civil Aviation Organization (ICAO) has developed harmonized phraseology for Standard Instrument Departures (SIDs) and Standard
More informationVATUSA CHICAGO ARTCC AND VATUSA INDIANAPOLIS ARTCC LETTER OF AGREEMENT EFFECTIVE: 01/01/2017 SUBJECT: INTERFACILITY COORDINATION
EFFECTIVE: 01/01/2017 SUBJECT: INTERFACILITY COORDINATION 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of airspace between VATUSA Chicago ARTCC (ZAU) and VATUSA
More information9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures
Raleigh-Durham Air Traffic Control Tower Standard Operating Procedures 1) Purpose This order defines duties and responsibilities, depicts areas of airspace, runways, and taxiways allocated to each position
More informationAERONAUTICAL INFORMATION CIRCULAR 18/18
NAV CANADA 19 JUL 18 AERONAUTICAL INFORMATION CIRCULAR 18/18 GUIDANCE FOR STANDARD TERMINAL ARRIVAL (STAR) PROCEDURES The guidance currently published in the Transport Canada Aeronautical Information Manual
More informationSEATTLE AIR ROUTE TRAFFIC CONTROL CENTER SEATTLE GLIDER COUNCIL LETTER OF AGREEMENT. EFFECTIVE: June 1, 2015
SEATTLE AIR ROUTE TRAFFIC CONTROL CENTER SEATTLE GLIDER COUNCIL LETTER OF AGREEMENT EFFECTIVE: June 1, 2015 SUBJECT: GLIDER OPERATIONS WITHIN CLASS A AIRSPACE 1. PURPOSE. This Letter of Agreement establishes
More information1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;
Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS
More informationChapter 6. Nonradar. Section 1. General DISTANCE
12/10/15 JO 7110.65W Chapter 6. Nonradar Section 1. General 6 1 1. DISTANCE Use mileage based (DME and/or ATD) procedures and minima only when direct pilot/controller communications are maintained. FIG
More informationVATUSA CHICAGO ARTCC AND VATUSA INDIANAPOLIS ARTCC LETTER OF AGREEMENT EFFECTIVE: 10/15/2018 SUBJECT: INTERFACILITY COORDINATION
EFFECTIVE: 10/15/2018 SUBJECT: INTERFACILITY COORDINATION 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of airspace between VATUSA Chicago ARTCC (ZAU) and VATUSA
More informationFLIGHT STRIP MANAGEMENT - APPROACH LEVEL
FLIGHT STRIP MANAGEMENT - APPROACH LEVEL 1. Introduction The flight strip management for ATC is an important point in order to ensure aircraft management and improve safety when controlling. In real aviation,
More informationCLEARANCE INSTRUCTION READ BACK
CLEARANCE INSTRUCTION READ BACK 1. Introduction An ATC clearance or an instruction constitutes authority for an aircraft to proceed only in so far as known air traffic is concerned and is based solely
More informationVirtual Jacksonville Air Route Traffic Control Center Daytona Beach ATCT Standard Operating Procedures
Virtual Jacksonville Air Route Traffic Control Center Daytona Beach ATCT Standard Operating Procedures DAB 7210.3E Effective Date: May 11, 2015 Chapter 1. General 1 1. General Information obtained in this
More informationLetter of Agreement by and between Jacksonville ARTCC and Miami ARTCC
Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC Effective Date: 1 November 2007 0400Z I. Scope: This agreement is made by and between Miami ARTCC (herein ZMA) and Jacksonville ARTCC
More informationSection 5. Radar Separation
7/24/14 JO 7110.65V CHG 1 4/3/14 JO 7110.65V Section 5. 5 5 1. APPLICATION a. Radar separation must be applied to all RNAV aircraft operating at and below FL450 on Q routes or random RNAV routes, excluding
More informationLETTER OF AGREEMENT. Between
LETTER OF AGREEMENT Between Romania vacc and Moldova vacc Bucharest FIR Chisinau FIR Effective: 01/12/2015 Version: 1.0 Purpose: The purpose of this Letter of Agreement is to define the coordination procedures
More informationSOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC
SOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC 1 Table of Contents SECTION 1. GENERAL 3 1-1. PURPOSE 3 1-2. SCOPE OF RESPONSIBILITIES
More informationTHE AREA CONTROL CENTRE (CTR) POSITION
THE AREA CONTROL CENTRE (CTR) POSITION 1. Introduction The Area Control Centre (ACC) also known as en-route controller and called CTR on IVAO, has the responsibility of ensuring Air Traffic Control (ATC)
More informationD01 TERMINAL RADAR APPROACH CONTROL
Order D01 7110.65A D01 TERMINAL RADAR APPROACH CONTROL December 5, 2016 VATSIM D01 7110.65A Effective Date: Denver TRACON December 5, 2016 Northwest Mountain District VATUSA Subject: D01 Air Traffic Control
More informationEFFECTIVE NOTAM KOUN SPECIAL FLIGHT PROCEDURES 09/08 NORMAN, OK
KOUN WESTHEIMER AIRPORT NORMAN, OK 17 09/08 09/09 NOTAM SPECIAL FLIGHT PROCEDURES EFFECTIVE 12:00 Noon CDT until 7:30 PM CDT Thursday, September 7, 2017 7:00 AM CDT until 7:30 PM CDT Friday, September
More informationThe NOTAM described will replace previously issued FDC NOTAMs 6/2550 and 7/7778 for the DC ADIZ/FRZ.
This advisory covers published NOTAMs 7/0206 for the DC ADIZ, 7/0211 for the DC FRZ and FDC 7/0204 for the outer speed restriction. WARNING This document only contains an overview of the new rules for
More informationNATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION
NATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION LAS VEGAS, October 10 12, 2017 In anticipation of a large number of aircraft operating to and from the Las Vegas area in conjunction with the 2017
More informationLetter of Agreement. Between Jacksonville ARTCC and Virtual United States Navy Effective Date: Sept 1, 2008
Letter of Agreement Between Jacksonville ARTCC and Virtual United States Navy Effective Date: Sept 1, 2008 Purpose: This Letter of Agreement (LOA) outlines standard operating policies and procedures to
More informationVIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures
VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION ALBUQUERQUE ARTCC ORDER PHX ATCT v7110.1a Effective Date: Sept. 18, 2014 SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating
More informationOakland Air Route Traffic Control Center, Northern California Terminal Radar Approach Control, and Pacific Soaring Council LETTER OF AGREEMENT
Oakland Air Route Traffic Control Center, Northern California Terminal Radar Approach Control, and Pacific Soaring Council LETTER OF AGREEMENT SUBJECT: Pyramid and Minden Glider Area Operations EFFECTIVE:
More informationH O M E C O M I N G. NOTAM Aircraft Owners and Pilots Association (AOPA) Fly-In Frederick Municipal Airport (FDK) Frederick, MD
F L Y - I N AOPA H O M E C O M I N G FREDERICK, MD NOTAM Aircraft Owners and Pilots Association (AOPA) Fly-In Frederick Municipal Airport (FDK) Frederick, MD SPECIAL FLIGHT PROCEDURES EFFECTIVE 1200 NOON
More informationLETTER OF AGREEMENT 1. PURPOSE: 2. Cancellation: 3. vzdc Responsibilities, Arrivals: CAE MYR: FLO: CLT: 4. vzjx Responsibilities, Arrivals: RDU: FAY
LETTER OF AGREEMENT BETWEEN: JACKSONVILLE AIR ROUTE TRAFFIC CONTROL CENTER AND WASHINGTON AIR ROUTE TRAFFIC CONTROL CENTER EFFECTIVE: 15 JULY 2011 19 NOVEMBER 2011 1. PURPOSE: This agreement between Washington
More informationStandard Operating Procedures
Allentown TRACON Standard Operating Procedures General This document describes the standard operating procedures for controlling at any of the positions within the Allentown TRACON and the airports it
More informationSOUTHERN CALIFORNIA TRACON LOS ANGELES AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC
SOUTHERN CALIFORNIA TRACON LOS ANGELES AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC 1 Table of Contents SECTION 1. GENERAL 4 1-1. PURPOSE 4 1-2. SCOPE OF
More informationEastern Caribbean PIARCO Virtual FIR. PIARCO Control Zone (CTR)
PIARCO Control Zone (CTR) Eastern Caribbean PIARCO Virtual FIR NOT TO BE USED FOR REAL WORLD AVIATION, STRICTLY FOR USE ON THE VATSIM VIRTUAL ATC NETWORK. 1. Introduction 1.1 Objective of this SOP is to
More informationVersion O January 21, 2019
Bradley ATCT and Y90 TRACON Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not
More informationIFR 91.157 Must be instrument rated to fly special VFR at Night (civil twilight to civil twilight, sun 6 degrees below horizon) 91.159 Unless in a holding pattern of 2 minutes or less, VFR cruising altitude
More informationCharlotte - Douglas International
Charlotte - Douglas International Standard Operating Procedures CLT TRACON 7110.65D Effective: May 1, 2011. 1 CHAPTER 1. Departure/Satellite Radar SECTION 1. EQUIPMENT 1-1-1. Callsign Usage and Frequency
More informationVIRTUAL AIR TRAFFIC SIMULATION NETWORK NORTH AMERICA REGION - USA DIVISION vzkc KANSAS CITY ARTCC
VIRTUAL AIR TRAFFIC SIMULATION NETWORK NORTH AMERICA REGION - USA DIVISION vzkc KANSAS CITY ARTCC ZKC ORDER 01.110A Effective Date: March 18, 2017 SUBJECT: ZKC Center Standard Operating Procedures This
More informationFrom: Commanding Officer, Naval Air Station Pensacola. Subj: NAVAL AIR STATION PENSACOLA CLOSED CONTROL TOWER AIRFIELD OPERATIONS
DEPARTMENT OF THE NAVY COMMANDING OFFICER NAS PENSACOLA 150 HASE ROAD STE-A PENSACOLA, FLORIDA 32508-1051 NAVAL AIR STATION PENSACOLA INSTRUCTION 3710.1 NASPCOLAINST 3710.1 N32 From: Commanding Officer,
More informationUnderstanding Role of Flight Data Processing Across NAS Operational Domains
Understanding Role of Data Processing Across NAS Operational Domains Elvan McMillen August 24, 1999 Organization: F062 Project: 02991204-O5 2 Context Presentations such as this can be used: - For developing
More informationGOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION
GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case
More informationProvidence ATCT Standard Operating Procedures
This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for
More informationFLIGHT ADVISORY NATIONAL SPECIAL SECURITY EVENT UNITED NATIONS GENERAL ASSEMBLY UNGA-67 SEPTEMBER 18, 2012 September 28, 2012
FEDERAL AVIATION ADMINISTRATION FLIGHT ADVISORY NATIONAL SPECIAL SECURITY EVENT UNITED NATIONS GENERAL ASSEMBLY UNGA-67 SEPTEMBER 18, 2012 September 28, 2012 This advisory will serve as notice of flight
More informationRegulations & Obligations
Regulations & Obligations Thursday, March 24, 2015 9:00 a.m. 10:00 a.m.) PRESENTED BY: John Harpool Richard White Adam Hartley International Operators Conference San Diego, CA March 21 24, 2016 Sources:
More informationEFFECTIVE NOTAM KGON 10/06 SPECIAL FLIGHT PROCEDURES GROTON, CT
KGON GROTON-NEW LONDON AIRPORT GROTON, CT 17 10/06 10/07 NOTAM SPECIAL FLIGHT PROCEDURES EFFECTIVE 12:00 Noon EDT until 6:00 PM EDT Thursday, October 5, 2017 7:00 AM EDT until 6:00 PM EDT Friday, October
More information40 BEALEAFBI OCTOBER Chapter 8 RQ-4 OPERATIONS
40 BEALEAFBI11-250 1 OCTOBER 2012 Chapter 8 RQ-4 OPERATIONS 8.1. CERTIFICATE OF AUTHORIZATION. Pilots will comply with each COA and LOA in effect between Beale and other Air Traffic Control (ATC) facilities.
More informationVirtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW)
Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW) KDAL Dallas Love International Airport ATCT Standard Operating Procedures Rev. December 17, 2014 Approved:
More informationJax Navy Flying Club Course Rules
Jax Navy Flying Club Course Rules Responsibilities. The Jax Navy Flying Club maintains responsibility for ensuring that all pilots operating out of Naval Air Station Jacksonville are familiar with local
More informationCHICAGOLAND SPEEDWAY NASCAR RACES
CHICAGOLAND SPEEDWAY NASCAR RACES JUNE 28 THROUGH JULY 2, 2018 In anticipation of a significant number of aircraft traveling to the Chicago, Illinois, area during the Chicagoland Speedway NASCAR races,
More informationUSE OF RADAR IN THE APPROACH CONTROL SERVICE
USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:
More informationNorthern Regional Training Scheme. EGBB Birmingham Airport Pilot s Guide. REVISION 1 (Monday, 30 January 2012)
Northern Regional Training Scheme EGBB Birmingham Airport Pilot s Guide REVISION 1 (Monday, 30 January 2012) PUBLISHED Monday, 30 January 2012 Contents Contents... 2 Section - 1 Departures... 3 1.1 Stand
More informationBFR WRITTEN TEST B - For IFR Pilots
(61 Questions) (Review and study of the FARs noted in parentheses right after the question number is encouraged. This is an open book test!) 1. (91.3) Who is responsible for determining that the altimeter
More informationCHICAGOLAND SPEEDWAY NASCAR RACES
CHICAGOLAND SPEEDWAY NASCAR RACES SEPTEMBER 15 THROUGH SEPTEMBER 19, 2016 In anticipation of a significant number of aircraft traveling to the Chicago, Illinois, area during the Chicagoland Speedway NASCAR
More informationLETTER OF AGREEMENT. Between. and RELATING TO
LETTER OF AGREEMENT Between NATS (En Route) plc, Scottish Area Control (Prestwick) NATS (Services) Ltd, Edinburgh ATC NATS (Services) Ltd, Glasgow ATC and BRITISH GLIDING ASSOCIATION (BGA) RELATING TO
More informationNOTAM. Aircraft Owners and Pilots Association (AOPA) Fly-In Colorado Springs Airport (COS) Colorado Springs, CO SPECIAL FLIGHT PROCEDURES
NOTAM Aircraft Owners and Pilots Association (AOPA) Fly-In Colorado Springs Airport (COS) Colorado Springs, CO SPECIAL FLIGHT PROCEDURES EFFECTIVE 12:00 Noon Local Friday, September 25, 2015 Until 6:00
More informationIFR SEPARATION WITHOUT RADAR
1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s
More informationCape Area Airports Standard Operating Procedures
Cape Area Airports Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world
More informationSOUTHERN CALIFORNIA TRACON STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC
SOUTHERN CALIFORNIA TRACON STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC 1 SUBJ: Standard Operating Procedures VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES
More informationPilot RVSM Training Guidance Material
Pilot RVSM Training Guidance Material Captain Souhaiel DALLEL IFALPA RVP AFI WEST RVSM Pilot Procedures ICAO requires states to establish for flight crews specific: Initial training programs and Recurrent
More informationINTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME
INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016!1 GENERAL Proper use of phraseology is one of the most important thing in aviation and
More informationNATS Edinburgh / BGA LOA effective 24 November 2005
Letter of Agreement NATS Edinburgh Air Traffic Control and British Gliding Association 1. General This Letter Of Agreement (LOA) is effective from the day that Edinburgh's revised Class 'D' Airspace is
More informationSECTION 4 - APPROACH CONTROL PROCEDURES
SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES
More informationContinuous Descent? And RNAV Arrivals
Continuous Descent? And RNAV Arrivals From an ATC Perspective Presentation to: CDA Workshop GA Tech Name: Don Porter RNP Project Lead FAA, RNAV RNP Group Date: 18 April 2006 My Background 22 years Terminal
More informationORDER MSY V. New Orleans. Standard Local Operating Procedures. Rev 3 December 7, 2011
ORDER MSY 7110.1V New Orleans Standard Local Operating Procedures Rev 3 December 7, 2011 Foreword This order defines the duties and responsibilities for personnel providing air traffic control services
More informationAIR LAW AND ATC PROCEDURES
1 The International Civil Aviation Organisation (ICAO) establishes: A standards and recommended international practices for contracting member states. B aeronautical standards adopted by all states. C
More informationDO NOT BEGIN THIS WORK UNTIL YOU HAVE COMPLETED ALL REQUIRED ASSIGNED READING AND EXERCISES.
DO NOT BEGIN THIS WORK UNTIL YOU HAVE COMPLETED ALL REQUIRED ASSIGNED READING AND EXERCISES. Gardner Textbook Review Questions to prepare for Class #12 Answer these on notebook paper (or a text file) then
More informationInstrument Proficiency Check Flight Record
Instrument Proficiency Check Flight Record Date: Flight Time: Sim. Inst. Time: Pilot Name: Aircraft Type: Aircraft Tail Number: Act. Inst. Time: Instructor Name: Holding Procedures Task Notes N/A Satisfactory
More informationAOPA FLY-IN PACKET EFFECTIVE PILOT INFORMATION SPECIAL FLIGHT PROCEDURES SEPT 30-OCT 1 PRESCOTT, AZ ERNEST A LOVE FIELD AIRPORT (PRC)
AOPA FLY-IN ERNEST A LOVE FIELD AIRPORT (PRC) PILOT INFORMATION PACKET SEPT 30-OCT 1 PRESCOTT, AZ SPECIAL FLIGHT PROCEDURES EFFECTIVE 12:00 Noon MST until 6:00 PM MST Friday, September 30, 2016 7:00 AM
More informationAIR TRAFFIC ROUTE CONTROL CENTER
JACKSONVILLE AIR TRAFFIC ROUTE CONTROL CENTER KCHS CHARLESTON AFB/INT L AIRPORT STANDARD OPERATING PROCEDURES CHS 7110.65 TABLE OF CONTENTS CHAPTER 1 General... 4 1.1 Purpose... 4 1.2 Positions... 4 1.3
More informationENR 1.1 GEN. RULES (Insert para 13 in ENR 1.1 of AIP India as follows)
TEL: +91-11-24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: +91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG AIRPORT NEW
More informationInternational Civil Aviation Organization COMMON FORMAT LOA BETWEEN ATS UNITS. (Presented by United Arab Emirates) SUMMARY
International Civil Aviation Organization ATM SG/1-WP/27 28/05/2014 MIDANPIRG ATM Sub-Group First Meeting (ATM SG/1) (Cairo, Egypt, 9 12 June 2014) Agenda Item 5: Airspace Management Issues COMMON FORMAT
More informationPHILIPPINES ATC EXPERIENCE ON PBN 6/15/ CIVIL AVIATION AUTHORITY OF THE PHILIPPINES
PHILIPPINES ATC EXPERIENCE ON PBN a Brief History Dependency to Ground Navigational Aids In June 2010, the outage of the Manila DVOR/DME and ILS system brought air traffic to a halt. The very low visibility
More informationSFAR 93 and Minimum Altitudes
SFAR 93 and Minimum Altitudes Stuart W. Goering FAA Aviation Safety Counselor 1/14/2003 22:12 Copyright 2003 Stuart W. Goering 1 You Make the Call Too Low or Just Fine? 1/14/2003 22:12 Copyright 2003 Stuart
More informationPITTSBURGH ATCT STANDARD OPERATING PROCEDURES
ORDER PIT ATCT 7110.1I PITTSBURGH ATCT STANDARD OPERATING PROCEDURES August 1, 2014 VATUSA CLEVELAND ARTCC VIRTUAL AIR TRAFFIC SIMULATION NETWORK VIRTUAL AIR TRAFFIC SIMULATE NETWORK UNITED STATES DIVISION
More informationLuxembourg TMA Contingency measures. Clear the sky procedure & Agreement on service continuity
Luxembourg TMA Contingency measures Clear the sky procedure & Agreement on service continuity Environment Luxembourg approach control (APP) covers a single sector (TMA Luxembourg with all subdivisions
More informationCleveland ARTCC and Boston Virtual ARTCC Letter of Agreement
Cleveland ARTCC and Boston Virtual ARTCC Letter of Agreement Effective: 1 Oct 2017 1. PURPOSE: This agreement defines the necessary pre-defined air traffic control procedures and coordination responsibilities
More informationVATUSA Approval 3/21/18
PANC SOP beta 1.0 2/30/2018 Ted Stevens Anchorage International Airport - PANC Air Traffic Control Tower STANDARD OPERATING PROCEDURES SUBJ: PANC SOP This order provides direction and guidance for the
More informationSingle Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports.
Single Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports. surface analysis charts. radar summary charts. significant weather
More informationLETTER OF AGREEMENT BETWEEN DENMARK FIR AND SWEDEN FIR. VATSIM Scandinavia 4 April 2013
2013 LETTER OF AGREEMENT BETWEEN DENMARK FIR AND SWEDEN FIR VATSIM Scandinavia 4 April 2013 1 General 1.1 Purpose The purpose of this Letter of Agreement (LoA) is to define the coordination procedures
More information