Port McNeill - Alert Bay Alternate Service Tug & Barge Service Proposed Port McNeill Ramp
|
|
- Peregrine Page
- 5 years ago
- Views:
Transcription
1 Port McNeill - Alert Bay Alternate Tug & Barge Proposed Port McNeill Ramp Ba Dates: April 8th to April 26th Fer c ei ry S Sointula e rry Fe Tu g& Ba rg es er vic e & Tug rge Proposed Alert Bay Ramp Tug & B arge Proposed Schedule Loading Procedures Commercial vehicles will be directed to the staging area at the terminal by BC Ferries personnel prior to the scheduled sailing. Tug & Barge personnel will load and unload the commercial vehicles on and off the barge. Sailing Procedures Commercial vehicle operators may not travel on the barge with their vehicles. Commercial vehicles may be left running during the trip if required to keep refrigeration units operating. The duration of the trip will be approx 1hr15min. Commercial vehicle operators are to confirm with the BC Ferries attendant at their departing location for the Ferry, Shuttle, and Water Taxi connection schedule. Sailing Schedule Sailing times will vary depending on the tides and weather. *Commercial Vehicles by Reseation Only Proposed Schedule
2 Port McNeill - Alert Bay Alternate Water Taxi Dates: April 7th to April 28th Port McNeill Tax Sointula e Fe rry ter Wa ic i Alert Bay y rr Fe Water T axi T ter i ax Wa Proposed Parking Notes Passengers to report to the BC Ferries Attendent when arriving at your departing location as the water taxi se will be provided on a first-come first-see basis. Water taxis running between Alert Bay and Port McNeill will shuttle back and forth when heavy traffic conditions exist and therefore sailing times may be altered. Water taxi size may be adjusted to accomodate traffic volumes. A limited amount of bicycles will be allowed on the water taxi each sailing. A shuttle se is planned to be provided in Alert Bay. Space will be limited and the shuttle will be operated on a first-come first-see basis. Proposed Parking Proposed Schedule Port McNeill Parking: Persons leaving their vehicles in Port McNeill during the shutdown will have the ability to begin parking in the temporary parking lots during the last two sailings on April 7th. A night watchman will be hired for vehicle security in Port McNeill during the closure in Alert Bay. Alert Bay Parking: Limited parking will be available at the Alert Bay terminal.
3 Existing Alert Bay Terminal Proposed Alert Bay Terminal
4 Alert Bay Alternate Shuttle Dates: April 7th to April 28th Proposed Pick-up Schedule Proposed Drop-off Schedule Alert Bay
5 Proposed Alert Bay Terminal 3D Renderings
6 Route 25 Terminal Upgrades, Closures and Open Houses Over the upcoming years, BC Ferries will be upgrading the berthing structures at Alert Bay, Port McNeill and Sointula. Construction will occur around operations but at some point, each terminal will require a temporary closure period, currently planned as follows: Alert Bay: Construction Dec 2012 to June 2013 Berth Closure April 2013 Port McNeill: Construction pt 2013 to June 2014 Berth Closure April 2014 Sointula: Construction October 2014 to June 2015 Berth Closure April 2015 Closure lengths may vary, however BC Ferries will provide alternative se to the affected communities. In general, this includes: Water-taxi se for all foot passengers Tug and barge se for commercial customers. BC Ferries will host open house sessions in the affected community in the months leading up to each closure to outline specific se plans and seek feedback. The Alert Bay closure is planned for April 8-28, During that period, regular ferry se will continue between Sointula and Port McNeill. Parking will be available in Port McNeill for Alert Bay residents to leave their cars during the closure and a shuttle bus is planned to provide continuous free ground se on Cormorant Island. Your feedback is appreciated in helping us improve plans for the alternate se during the closure period. Please contact: Darin Guenette, Manager, Public Affairs, BC Ferries at (toll free) or darin.guenette@bcferries.com Thank-you!
Denman Island - Hornby Island (September 4th, March 31st, 2013)
- Hornby Island (September 4th, 2012 - March 31st, 2013) From Vancouver Island (Buckley Bay) To ( West) 3 From ( West) To Vancouver Island (Buckley Bay) 3 From (Gravelly Bay) To Hornby Island (Shingle
More informationAppendix 1: Operations Summary Report for the Quarter Ended December 31, 2017
Appendix 1: Operations Summary Report for the A B C D E F G H I J Routes Actual Round Trips Capacity Provided (AEQ's) AEQ's Carried QTR 3 F2018 Capacity Utilization QTR 3 F2018 (C / B) Capacity Utilization
More informationChemainus-Thetis-Penelakut Ferry Advisory Committee Meeting
Chemainus-Thetis-Penelakut Ferry Advisory Committee Meeting Overview: BC Ferries Head Office Victoria, November 7, 2016 In Attendance: Committee: Annie Cossey, Art Hunter, Ken Hunter, Keith Rush BC Ferries:
More informationSINGAPORE AIRSHOW 2018 TRAFFIC ARRANGEMENTS AND TRANSPORTATION ADVISORY
FOR IMMEDIATE RELEASE 26 JANUARY 2018 SINGAPORE AIRSHOW 2018 TRAFFIC ARRANGEMENTS AND TRANSPORTATION ADVISORY The Singapore Airshow will take place at Changi Exhibition Centre from Tuesday, 6 February
More informationThe next meeting will be planned as a WebEx meeting during the fall of Issues Summary and Resolution Plan
North and Central Coast Ferry Advisory Committee Meeting Overview: meeting held at the Fairmont YVR May 15, 2015 In Attendance: Committee: Bill Beldessi, Hank Bood, Sharron Cartier, Ellen Cranston (via
More informationBritish Columbia Ferry Services Inc. Annual Report to the British Columbia Ferries Commissioner. Year Ended March 31, 2012
British Columbia Ferry Services Inc. Annual Report to the British Columbia Ferries Commissioner Year Ended March, 2012 Table of Contents Introduction... 2 Part 1: Services on Designated Routes Overview...7
More informationFerry Advisory Committee Meeting Minutes
Tri-Island Ferry Advisory Committee Ferry Advisory Committee Meeting Minutes Date: Time: 5:30 p.m. Location: Wild Island Foods Sointula, Malcolm Island Attendees: Committee Josephine Mrozewski, Chair John
More informationDublin Airport Update Presented by Pat Molloy
Dublin Airport Update Presented by Pat Molloy daa Actions from Previous Meetings Action Item Summary 1. PM to confirm the type of fencing that will be erected around the Toberburr road site 2. daa and
More informationDenman Island - Hornby Island (September 3rd, March 31st, 2014)
- Hornby Island (September 3rd, 2013 - March 31st, 2014) From Vancouver Island (Buckley Bay) To ( West) 3 From ( West) To Vancouver Island (Buckley Bay) 3 From (Gravelly Bay) To Hornby Island (Shingle
More informationPre-Construction Public Meeting July 2017
Pre-Construction Public Meeting July 2017 Agenda Introduction to Project Team Project Description Schedule Impacts Communication/Public Outreach 2 Contractor Walsh Construction Design Team HDR Lead City
More informationIRREGULAR OPERATIONS AIRPORT CONTINGENCY PLAN
IRREGULAR OPERATIONS AIRPORT CONTINGENCY PLAN.doc TABLE OF CONTENTS SAN Appendix 1 - DOT Required Contingency Plan Appendix 2 CBP Sterile Area Procedures.doc 1.0 Purpose 1.1. The purpose of the is to provide
More informationBritish Columbia Ferry Services Inc. Annual Report to the British Columbia Ferries Commissioner. Year Ended March 31, 2015
British Columbia Ferry Services Inc. Annual Report to the British Columbia Ferries Commissioner Year Ended March, 2015 Table of Contents Introduction... 2 Part 1: Services on Designated Routes Overview...
More information2019 Travel Tips for Martha s Vineyard Residents
2019 Travel Tips for Martha s Vineyard Residents As a full-time or seasonal resident of Martha s Vineyard, you know that the Steamship Authority serves as the Lifeline to the Islands, providing reliable
More informationBUILDING THE CAPACITY FOR GREATNESS 2019 STATE OF THE PORT
BUILDING THE CAPACITY FOR GREATNESS 2019 STATE OF THE PORT 1 WE ARE A CATALYST FOR COMMERCE WE ARE CREATING THE CAPACITY FOR GREATNESS WE ARE DRIVING PRODUCTIVITY Q & A Attracting growth, fostering development,
More informationMINISTRY OF INFRASTRUCTURES AND TRANSPORT HARBOUR MASTER S OFFICE OF RAVENNA ORDER NO. 97/2017
MINISTRY OF INFRASTRUCTURES AND TRANSPORT HARBOUR MASTER S OFFICE OF RAVENNA ORDER NO. 97/2017 The Head of the Maritime Compartment and Harbour Master of the Port of Ravenna: the Regulation for the towing
More informationOrganization Date. Sound Regional Council Regional Project Evaluation Committee. Brian Nielsen, Program Administrator
Organization Puget Date Sound Regional Council Regional Project Evaluation Committee Brian Nielsen, Program Administrator October 26, 2018 TODAY S FOCUS The big picture #Realign99 closure/opening the tunnel
More informationThe Saskatchewan Gazette PUBLISHED WEEKLY BY AUTHORITY OF THE QUEEN S PRINTER/PUBLIÉE CHAQUE SEMAINE SOUS L AUTORITÉ DE L IMPRIMEUR DE LA REINE
THE SASKATCHEWAN GAZETTE, FEBRUARY 11, 2011 9 The Saskatchewan Gazette PUBLISHED WEEKLY BY AUTHORITY OF THE QUEEN S PRINTER/PUBLIÉE CHAQUE SEMAINE SOUS L AUTORITÉ DE L IMPRIMEUR DE LA REINE PART II/PARTIE
More informationFerry Advisory Committee Meeting Minutes
Ferry Advisory Committee Meeting Minutes Meeting Details: FAC: Salt Spring Island Ferry Advisory Committee Date: June 14, 2006 Location: Harbour House Hotel, Ganges Time: 6:00 p.m. Attendees: Committee
More informationH O M E C O M I N G. NOTAM Aircraft Owners and Pilots Association (AOPA) Fly-In Frederick Municipal Airport (FDK) Frederick, MD
F L Y - I N AOPA H O M E C O M I N G FREDERICK, MD NOTAM Aircraft Owners and Pilots Association (AOPA) Fly-In Frederick Municipal Airport (FDK) Frederick, MD SPECIAL FLIGHT PROCEDURES EFFECTIVE 1200 NOON
More informationTHE PLUS INDUSTRIAL MANUFACTURING EMPLOYER OF THE YEAR USACE BUFFALO DISTRICT BARGES MILLER BOAT LINE FERRY WILLIAM MARKET RYBA MARINE BARGES & TUG
THE DECEMBER 2015 VOLUME 1 ISSUE 11 A LEGACY OF GREATNESS, INNOVATING FOR THE FUTURE CUYAHOGA COMMUNITY COLLEGE INDUSTRIAL MANUFACTURING EMPLOYER OF THE YEAR USACE BUFFALO DISTRICT BARGES DRYDOCKING CONTRACT
More informationThree Sisters Campground Redevelopment
Three Sisters Campground Redevelopment In 2013 heavy rains in southern Alberta caused flooding along the Bow River that resulted in damage to facilities in the Kananaskis Region including the Three Sisters
More informationAlexandria Port, Egypt
Alexandria Port, Egypt Source: This information has been extracted from the WFP Logistics Capacity Assessment for Egypt. This LCA is a work in progress and not all sections are complete. This material
More informationDesign and Construction of the Lake St. Martin Emergency Outlet
Design and Construction of the Lake St. Martin Emergency Outlet Background 2011 was the largest flood event experienced in the last 200 years Flood Fighting required some difficult decisions by the Manitoba
More informationSPRINGFIELD-BRANSON NATIONAL AIRPORT. Irregular Operations (IROPS) Contingency Plan STANDARD OPERATING PROCEDURES
SPRINGFIELD-BRANSON NATIONAL AIRPORT Irregular Operations (IROPS) Contingency Plan STANDARD OPERATING PROCEDURES ASSISTANCE TO AIRCRAFT OPERATORS DURING IRREGULAR OPERATIONS 1 Irregular Operations (IROPS)
More informationTexas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge
Texas Department of Transportation Corpus Christi District Corpus Christi Harbor Bridge Presented by Russel W. Lenz, P.E. Corpus Christi District Engineer For 2009 Texas Ports and Waterways Conference
More informationMorgan Stanley 2011 Emerging Companies Conference 9 June 2011
Morgan Stanley 2011 Emerging Companies Conference 9 June 2011 Company Overview Mermaid Marine Australia Limited (MMA) is Australia s largest integrated marine services provider to the offshore oil and
More informationCarnival Spirit (SP)
Carnival Spirit (SP) Carnival Spirit sails from Sydney, Australia and Singapore. Cruise departures through December 2020 are open for sale and are booked through Carnival Australia. Itineraries listed
More informationEnding September 30, 2007
Appendix 4: Service Delivery and ROUTE GROUP: Major s Reasons for Major s 108.0% 100% = Sailings BCF 01 02 30 MJR Rt Grp Major Description () Actual Actual 01 Swartz Bay-Tsawwassen 1,293.0 1,337.0 44.0
More informationDates 8/15/2015 & 8/22/2015. Island Status Weekender. Comments: Wider lanes on the Ferry. Retiree
Dates 8/15/2015 & 8/22/2015 Comments: Wider lanes on the Ferry Island Status Weekender Comments: A ferry that loads straight in; no angles to drive around Comments: Keep the pilot house centered, not off
More informationJACK EDWARDS NATIONAL AIRPORT (JKA) GULF SHORES, AL
OCTOBER 26-27, 2018 JACK EDWARDS NATIONAL AIRPORT (JKA) GULF SHORES, AL SPECIAL FLIGHT PROCEDURES EFFECTIVE: Thursday Oct 25, 2018 12:00 NOON CDT until 6:00 PM CDT Friday Oct 26, 2018 7:00 AM CDT until
More informationTraditional and Alternative Financing of Cruise Terminals
Traditional and Alternative Financing of Cruise Terminals Steven Cernak, Port Director Port of Galveston AAPA Cruise Seminar Grand Cayman, Cayman Islands January 11, 2007 How
More informationBILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE
BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE City of Toronto Local Issues & Initiatives Bryan Bowen City Planning Waterfront Secretariat June 25, 2018 PRESENTATION OUTLINE BACKGROUND: ISSUES
More informationRenewable Energy for Sustainable Development and Decarbonisation
World Renewable Energy Congress Australia 2013 International Conference on Renewable Energy for Sustainable Development and Decarbonisation Transport Information Transport Information 1 Table of Contents
More informationEFFECTIVE NOTAM KOUN SPECIAL FLIGHT PROCEDURES 09/08 NORMAN, OK
KOUN WESTHEIMER AIRPORT NORMAN, OK 17 09/08 09/09 NOTAM SPECIAL FLIGHT PROCEDURES EFFECTIVE 12:00 Noon CDT until 7:30 PM CDT Thursday, September 7, 2017 7:00 AM CDT until 7:30 PM CDT Friday, September
More informationMINUTES OF MEETING SOUTHERN GULF ISLANDS FERRY ADVISORY COMMITTEE MEETING. November 21, :00 a.m. 2:00 p.m. Swartz Bay Retail Room
MINUTES OF MEETING SOUTHERN GULF ISLANDS FERRY ADVISORY COMMITTEE MEETING November 21, 2001 9:00 a.m. 2:00 p.m. Swartz Bay Retail Room Attendees: Committee Members: BC Ferries: Richard Dalon, Co/Chair,
More informationSUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012
SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012 TO BE READ IN CONJUNCTION WITH THE CPA MODEL CONDITIONS FOR THE HIRING OF PLANT (2011) EXPLANATORY NOTE: The purpose of these Supplementary Conditions
More informationWelcome. B.C. Coastal Ferries Consultation and Engagement, Fall 2012
Welcome THE DEADLINE TO SUBMIT FEEDBACK IS DECEMBER 21, 2012. B.C. Coastal Ferries Consultation and Engagement, Fall 2012 British Columbia British Columbia We invite you to provide feedback and learn more
More informationExperiencing London Theatre January 4-14, 2018
Center for International Education Nexus Center, Suite 145 (516) 877 3487 cie@adelphi.edu EMERGENCY CONTACT INFORMATION Experiencing London Theatre January 4-14, 2018 U.S. Embassy in England 24 Grosvenor
More informationRECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1
PHASING PLAN - PHASE 1 2 Weeks PHASE 1 SCOPE OF WORK Phase 1 consists of the reconstruction of a portion of Taxiway 'A' and the crack seal and seal coat of the North Apron. The portion of Taxiway 'A' to
More information2018 GENERAL PUBLIC VEHICLE RESERVATION PROGRAM
2018 GENERAL PUBLIC VEHICLE RESERVATION PROGRAM Dear Valued Customers: We are pleased to provide you with this important vehicle reservation information. We ask that you provide the Steamship Authority
More informationRickenbacker International Airport Irregular Operations (Tarmac Delay) Emergency Contingency Plan May 2017
Rickenbacker International Airport Irregular Operations (Tarmac Delay) Emergency Contingency Plan May 2017 The Rickenbacker International Airport (LCK) has prepared this Emergency Contingency Plan pursuant
More informationPort Handbook SANSOUCI PUERTO SANTO DOMINGO
TITLE: Port Handbook ENGLISH VERSION Page 1 of 14 Port Handbook SANSOUCI PUERTO SANTO DOMINGO Latitude: 18 28.000 N LONG 069 53.000 W World Port Index No: 11040. D.R Chart: 25449 B.A Chart: 467 D.M.A Chart:
More informationThe Operating Authority Regulations, 2011
OPERATING AUTHORITY, 2011 T-18.1 REG 8 1 The Operating Authority Regulations, 2011 being Chapter T-18.1 Reg 8 (effective January 31, 2011). NOTE: This consolidation is not official. Amendments have been
More informationQuestion 1: Why are passengers required to show ID on the northern routes?
Question 1: Why are passengers required to show ID on the northern routes? Answer 1: BC Ferries supports the Transportation Canada Fire and Boat Drill Regulation Measures Respecting Vessels that Carry
More informationReduced Surface Emissions through Airport Surface Movement Optimization. Prof. Hamsa Balakrishnan. Prof. R. John Hansman
Reduced Surface Emissions through Airport Surface Movement Optimization Prof. Hamsa Balakrishnan Prof. R. John Hansman Aeronautics & Astronautics and Engineering Systems Motivation Opportunities to improve
More informationDecision (Applicant claims urgent public need )
Decision (Applicant claims urgent public need ) Application: 253 10 Applicant: 457562 BC Ltd. Trade Names: Osoyoos Taxi Address: PO Box 762, Osoyoos BC V0H 1V0 Principals: SINGH, Subag Special Authorization:
More informationHMS Unicorn. Unique Ship / Remarkable History. Access Guide for HMS Unicorn HMS Unicorn Victoria Dock Dundee DD1 3BP
HMS Unicorn Unique Ship / Remarkable History Access Guide for HMS Unicorn 2018 HMS Unicorn Victoria Dock Dundee DD1 3BP www.frigateunicorn.org For SAT NAV directions please use our postcode 01382 200900
More information2019 Travel Tips for Nantucket Residents
2019 Travel Tips for Nantucket Residents As a full-time or seasonal resident of Nantucket, you know that the Steamship Authority serves as the Lifeline to the Islands, providing reliable and safe transportation
More information2019 GENERAL PUBLIC VEHICLE RESERVATION PROGRAM
Dear Valued Customers: 2019 GENERAL PUBLIC VEHICLE RESERVATION PROGRAM We are pleased to provide you with this important vehicle reservation information. If you haven t already done so, please provide
More informationCLIPPER COVE PROMENADE & MARINA DEVELOPMENT
CLIPPER COVE PROMENADE & MARINA DEVELOPMENT Treasure Island / Yerba Buena Island Citizen Advisory Board Review May 05 2015 CLIPPER COVE PROMENADE & MARINA DEVELOPMENT TREASURE ISLAND TI YBI CAB Review
More informationOPERATIONAL SAFETY POLICY GROUND RUNNING OF AIRCRAFT MARCH This document is uncontrolled when printed
OPERATIONAL SAFETY POLICY GROUND RUNNING OF AIRCRAFT MARCH 2015 Produced by Melbourne Airport in the interest of Airport Safety and Security Printed on Maine Recycled Digital Paper Table of Contents SECTION
More informationPORT OF CORPUS CHRISTI BUILDING FOR THE FUTURE
Frank C. Brogan P.E., R.P.L.S. Director of Engineering Services PORT OF CORPUS CHRISTI BUILDING FOR THE FUTURE TRANSPORTATION RESEARCH BOARD Galveston, Texas June 25, 2001 PORT OF CORPUS CHRISTI AUTHORITY
More information25 th Avenue Grade Separation. December 13, 2017
25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationSalem Airport Solar Eclipse Event (SASEE) Notice to Pilots McNary Field Salem, OR August 21, 2017
Salem Airport Solar Eclipse Event (SASEE) Notice to Pilots McNary Field Salem, OR August 21, 2017 PURPOSE This Notice is to inform pilots and other airport users of the airport management plan and aircraft
More informationStaff Report. Re: National Park Service Ferry Landing Facilities at Piers 31, 31½ and 33 Joint Meeting with BCDC Design Review Board
Port of San Francisco Waterfront Design Advisory Committee Agenda Item No. 1 Meeting Date: Staff Report To: From: Waterfront Design Advisory Committee: Laura Crescimano Jeff Joslin Marsha Maytum Kathrin
More information25 th Avenue Grade Separation. September 13, 2017
25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationUNIVERSITY OF ALABAMA FOOTBALL
UNIVERSITY OF FOOTBALL SPECIAL AIR TRAFFIC PROCEDURES TUSCALOOSA, AL September 16, 2017 November 18, 2017 The following procedures will be implemented to enhance safety and minimize delays during the following
More informationRESPONSE TO INQUIRIES. Operator: TORNGAT MOUNTIANS BASE CAMP AND RESEARCH STATION (Base Camp)
RESPONSE TO INQUIRIES Operator: TORNGAT MOUNTIANS BASE CAMP AND RESEARCH STATION (Base Camp) Issue Date: February 5, 2018 Inquiries & Responses: 1) Will the fuel tanks be filled by Nunatsiavut Government
More informationOpportunities in Non-Container Trade and the Expanding Cruise Industry
Opportunities in Non-Container Trade and the Expanding Cruise Industry AAPA Commissioners Seminar Steven Cernak, Port Director Port of Galveston San Francisco, CA May 18, 2005 The Port Industry Is a highly
More informationAmendments to subsidised local bus services
Amendments to subsidised local bus services Committee Operations Date of meeting 24 June 2016 Date of report 21 June 2016 Report by Assistant Chief Executive (Operations) 1. Object of report To advise
More informationNoise Mitigation Program
Noise Mitigation Program Quick Facts 78% decrease year over year in complaints related to scheduled engine-run ups which is attributable to the new Ground Run-Up Enclosure (GRE) that went into operation
More informationMcCormick Theological Seminary. GUEST HOUSING POLICY AND PROCEDURES (Policy adopted by Administrative Cabinet, October 13, 1998)
I. POLICY McCormick Theological Seminary GUEST HOUSING POLICY AND PROCEDURES (Policy adopted by Administrative Cabinet, October 13, 1998) Guest Housing Policy and Procedures: Page 1 A. OVERVIEW McCormick
More informationSection 1 approximately 90 metre section of road on the R610 from Toureen House to Passage West Library Road Closure of 4 weeks.
Cork Lower Harbour Main Drainage Project Information on Road Closures Applications for works from Toureen Terrace to Comminutor Station (west of Oysterhaven Boats) 1. What are the works on Cork Street?
More informationAGENDA ITEM I-6 Public Works
AGENDA ITEM I-6 Public Works STAFF REPORT City Council Meeting Date: 8/6/2018 Staff Report Number: 18-150-CC Informational Item: Update on the Willow Road and highway 101 interchange construction, upcoming
More informationVirgin Islands Port Authority Marine Tariff Rate Amendments August 30, 2017 Public Hearing
Virgin Islands Port Authority Marine Tariff Rate Amendments August 30, 2017 Public Hearing V I R G I N I S L A N D S P O R T A U T H O R I T Y S T. C R O I X S T. T H O M A S S T. J O H N U N I T E D S
More informationTreasure Island Supplemental Information Report Addendum
1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land
More information2. STAKEHOLDER FEEDBACK // What We Heard
1. QUARRY ROAD TRAIL // Welcome to the Information Session PROJECT DESCRIPTION WHY WE ARE HERE Quarry Road Trail is a popular commuter trail and recreational area for Calgarians. 1. To report citizen feedback
More information2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)
2018 Airport Master Plan Overview of Development Concepts Greg Ballentine (WSP) Thank You Stakeholder and community consultation has included discussions with over 40 stakeholder groups including airport
More information2016 Travel Tips for Nantucket Residents
2016 Travel Tips for Nantucket Residents This is a quick reference guide to the Steamship s programs designed for Nantucket residents. For further assistance consult the Customer Handbook available online
More informationFull I-35E Mainlane Closure at Beckley Avenue - July 27-30
July 20, 2018 Media Contact: Keith Bilbrey Public Involvement Manager The Southern Gateway Project kbilbrey@kstrategies.com 972-989-9995 Full I-35E Mainlane Closure at Beckley Avenue - July 27-30 DALLAS
More informationKTPF PETER O. KNIGHT AIRPORT TAMPA, FL 10/27 NOTAM SPECIAL FLIGHT PROCEDURES EFFECTIVE
KTPF PETER O. KNIGHT AIRPORT TAMPA, FL 10/27 17 10/28 NOTAM SPECIAL FLIGHT PROCEDURES EFFECTIVE 12:00 Noon EDT until 7:00 PM EDT Thursday, October 26, 2017 7:00 AM EDT until 7:00 PM EDT Friday, October
More informationCommunity Noise Consortium Meeting (CNC)
Community Noise Consortium Meeting (CNC) September 13, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Emergency Exit: Door through which you entered
More informationSection 4 / Rev Page 1 of 5
Section 4 / Rev.6.0 2011-12-31 Page 1 of 5 Section 4 / Rev.6.0 2011-12-31 Page 2 of 5 AES Andres Latitude: 18º 24,4 N Longitude: 069º 37,6 W D.R: Chart 008 B.A. Chart 467 D.M.A. Chart 25849 Plan A Admiralty
More informationDay and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April
New M5 Work notification 4 April 2018 Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April A significant amount
More informationPort Feeder Barge: Floating Infrastructure for African Ports. 2 nd German-African Infrastructure Forum. Prof. Dr.-Ing.
2 nd German-African Infrastructure Forum December 3 4, 2014 Munich Port Feeder Barge: Floating Infrastructure for African Ports Prof. Dr.-Ing. Ulrich Malchow Hamburg African port congestion African port
More informationPort Dues and Charges of the Freeport of Riga
Approved by Decree No 38, 16.06.2000 of Board of the Freeport With amendments of: 22.09.2000 22.12.2000 27.04.2001 08.06.2001 19.10.2001 17.12.2001 18.12.2002 Port Dues and Charges of the Freeport of Riga
More information11 December Inverness Airport Outline Business Case
11 December 2015 Outline of Presentation Overview of the Demand Forecasting Timetabling Assumptions Calibration of the Demand Profiles Demand Forecasts Summary of the Benefits Page 2 Overview of the Demand
More informationTANJONG PAGAR/KEPPEL/BRANI TERMINALS. DEPTH A/S (m)
TANJONG PAGAR/KEPPEL/BRANI TERMINALS BERTH DEPTH A/S (m) APPROACH DEPTH (m) T01 13.6 14.0 T02 13.6 14.5 T03 13.6 13.8 T04 11.0 9.7 T05 14.8 15.0 T06 13.6 14.2 REMARKS T07 12.4 12.6 Shallower depths exist
More informationProject Update 3. Carpentaria Rail. Port Carpentaria Railway Project. Carpentaria Rail. 21 Second Ave, Mount Isa, Queensland, Australia, 4825
Project Update 3 Carpentaria Rail Port Carpentaria Railway Project Carpentaria Rail 21 Second Ave, Mount Isa, Queensland, Australia, 4825 Tel 0413178182 Port Carpentaria community consultation commenced
More information! "# $ %&''( %.& $& $-)77$ $& 7$&7 $ $. / $ / 6 )+ *$ /
! "# %&''( & ) * +, -. / 01 12,.3))))+ && && 4 5/ 6 )+ * / %.& & &)-)77 -)77 & 7&7 *&) - &- 89& ' 4 & :.;:. -)77 7 " Please register early. Accommodation has been booked at this popular resort but we will
More informationStrategies to keep people and goods moving in and through Seattle. SR 99 Closure and the Seattle Squeeze
Strategies to keep people and goods moving in and through Seattle SR 99 Closure and the Seattle Squeeze 2018-2024 Puget Sound Regional Council Transportation Policy Board January 10, 2019 How we get around
More informationBC Ferries Customer Satisfaction Tracking Survey SAILING HEADER
Wave 3 NOVEMBER 2012 BC Ferries Customer Satisfaction Tracking Survey SAILING HEADER SECTION A: CLASSIFICATION DATA (to be completed prior to interview) A1. DATE: / / DAY MONTH YEAR A3. SCHEDULED SAILING
More information2012 Fireball World Championships Mandurah - Western Australia 27 th Dec th Jan 2012
2012 Fireball World Championships Mandurah - Western Australia 27 th Dec 2011-7 th Jan 2012 When? December 2011 January 2012 Pre-Worlds & Australian Championships 27 th 31 st December 2011 World Championships
More informationReport of the Executive
Mersey Ferries Timetable Review 2014/15 (PTE/40/13) Report of the Executive 1. Introduction The purpose of the report is to review the Mersey Ferries timetable arrangements and available ticket types with
More informationPolicy Number. Page Number: Interstate Commission for Adult Offender Supervision ICAOS Administrative Policy.
1 I. Authority The Executive Committee is vested with the power to adopt a policy on behalf of the Interstate Commission during periods when the Interstate Commission is not in session. The Executive Committee
More informationFLORIDA ASSOCIATION OF PUBLIC PROCUREMENT OFFICIALS TRAVEL POLICY
FLORIDA ASSOCIATION OF PUBLIC PROCUREMENT OFFICIALS TRAVEL POLICY I. POLICY STATEMENT All tentative travel must be approved by the Board of Directors (hereinafter referred to as BOD ) of the Florida Association
More information2015 Travel Tips for Nantucket Residents
2015 Travel Tips for Nantucket Residents This is a quick reference guide to the Steamship Authority s programs designed for Nantucket residents. For further assistance, please call toll-free from Nantucket
More informationAnnex 2. S c h e d u l e o f C h a r g e s f o r S t a n d a r d S e r v i c e s
Annex 2 to the General Terms and Conditions for Ground Handling Services - Handling Company - S c h e d u l e o f C h a r g e s f o r S t a n d a r d S e r v i c e s 1 Basic Charges by s - all amounts
More informationGold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content
Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239
More informationHARTSFIELD-JACKSON ATLANTA INTERNATIONAL AIRPORT EMERGENCY CONTINGENCY PLAN
HARTSFIELD-JACKSON ATLANTA INTERNATIONAL AIRPORT EMERGENCY CONTINGENCY PLAN Hartsfield-Jackson Atlanta International Airport (ATL) has prepared this Emergency Contingency Plan pursuant to 42301 of the
More informationLeveraging on ATFM and A-CDM to optimise Changi Airport operations. Gan Heng General Manager, Airport Operations Changi Airport Group
Leveraging on ATFM and A-CDM to optimise Changi Airport operations Gan Heng General Manager, Airport Operations Changi Airport Group Singapore Changi Airport Quick fact sheet 4 Terminals 2 Runways 113
More information2016 Travel Tips for Nantucket Residents
2016 Travel Tips for Nantucket Residents This is a quick reference guide to the Steamship s programs designed for Nantucket residents. For further assistance consult the Customer Handbook available online
More informationAccess Statement for The Royal Yacht Britannia July 2014
Access Statement for The Royal Yacht Britannia July 2014 The Royal Yacht Britannia, Ocean Terminal, Leith, Edinburgh EH6 6JJ Tel: 0131 555 8800 Email: enquiries@tryb.co.uk Website: www.royalyachtbritannia.co.uk
More informationEgnatia Odos, a tollway from the past to the future
Egnatia Odos, a tollway from the past to the future, Director of Exploitation and Growth, EGNATIA ODOS SA 1 Contents Historical reference of Egnatia Implementation and impact of Egnatia Odos Traffic figures
More informationFor Immediate Release September 3, CONSTRUCTION BEGINS ON NEW CABLE FERRY Special steel cutting ceremony held at shipyard
For Immediate Release 14-033 September 3, 2014 CONSTRUCTION BEGINS ON NEW CABLE FERRY Special steel cutting ceremony held at shipyard VICTORIA BC Ferries and Seaspan s Vancouver Shipyards announced that
More informationBusiness Aviation: Operations and Service Quality by Provider Organisations. Macao, September Captain Scott Macpherson
Business Aviation: Operations and Service Quality by Provider Organisations Macao, September 2013 Captain Scott Macpherson Business Aviation: Operations and Service Quality by Provider Organizations Today
More informationFigure 1: Little Dry Creek Trail Crossing
Figure 1: Little Dry Creek Trail Crossing Figure 2: Little Dry Creek Trail Crossing Northwest Rail Environmental Evaluation Temporary Trail Detour Concurrence Form Adams County, Little Dry Creek Trail
More informationRW Bruhn Bridge and Approaches Project
RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the
More informationMain Street Station Upgrades
Main Street Station Upgrades Public Meeting Hope United Church 1 Main Street Station Upgrades Bus diversions Planned improvements Construction staging Pedestrian flows 2 Main Street Station Aerial Bar
More informationALBERT LOH consultants. m a r i n e s p e c i a l i s t
ALBERT LOH consultants m a r i n e s p e c i a l i s t ALBERT LOH consultants m a r i n e s p e c i a l i s t Albert Loh Consultants has a long history as engineers and consultants on all aspects of works
More information